Interrogatory responses

Answers to questions 30, 33, 36, 37, 40

ResponseFiled by Connecticut Light and Power Company dba Eversource Energy13 files
Part of docket 26-05-10Open
  • Electric
Application of The Connecticut Light and Power Company d/b/a Eversource Energy to Amend its Rate Schedules

Files13

Text of EOE-033_final.pdf

Extracted from the file · 2 pages · 2,411 characters

Text of EOE-036 Attachment 1.pdf

Extracted from the file · 5 pages · 10,251 characters

Text of EOE-036_final.pdf

Extracted from the file · 1 page · 605 characters

  1. Page 1

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set EOE-01 Date Issued July 31, 2026 EOE-037 Page 1 of 1 Date Filed: August 14, 2026 Witness: Donald J. Scacco Jr., Christopher E. Colorio, Mark P. Baldwin, John G. Griffin and Leanne M. Landry Request from: Office of Education, Outreach, and Enforcement Question: (STORM – WIRE DOWN GUARDS) Provide an unlocked Excel spreadsheet listing of all wire down guard crews that were engaged from out-of-state for any of the catastrophic storms included in the application. As part of the information provided, please identify the following information: a. Storm b. Vendor c. Mobilization Location d. Number of resources e. Total Cost f. Actions taken to engage local crews g. Citations for supporting documents (i.e., invoices, timesheets, etc.) Response: Please refer to the following chart for the information requested in subparts (a) through (d). Storm Vendor Mobilization Location 1/10/2024 1/10/2024 1/10/2024 6/27/2024 6/27/2024 Maverick Construction Storm Services Engineering Vision Utilities Maverick Construction Storm Services Engineering Massachusetts New York New Jersey Massachusetts New York 20 67 15 60 40 Number of Resources Resource counts do not include supervisor / support personnel that were not performing Wire Guard functions (e). Please refer to EOE-037, Attachment 1, for the requested total cost of Wire Guards. (f). Local crews are procured by contacting vendors on the Company’s contract resource list. If local companies cannot provide the resources needed, the call radius is expanded until the resources are filled. (g). Please refer to EOE-037, Attachment 1.

Text of EOE-037 Attachment 1.pdf

Extracted from the file · 1 page · 1,360 characters

Text of EOE-037 Attachment 1.xlsx

Extracted from the file

Text of EOE-040_final.pdf

Extracted from the file · 1 page · 1,218 characters

Text of EOE-040 Attachment 1.pdf

Extracted from the file · 108 pages · 301,257 characters

Text of EOE-040 Attachment 2.pdf

Extracted from the file · 108 pages · 299,821 characters

Text of EOE-040 Attachment 3.pdf

Extracted from the file · 328 pages · 663,868 characters

As listed on the current system

Question(s) Answered 30, 33, 36, 37, 40 (Connecticut Light and Power Company dba Eversource Energy) Date Filed: 08/14/2026