Interrogatory responses
Answers to questions 31, 32
Files7
EOE-031_final.pdf
PDF · 84 KB · 1 pageText searchable
Download EOE-031_final.pdfRead the text of EOE-031_final.pdf
EOE-031 Attachment 1.pdf
PDF · 745 KB · 1 pageText searchable
Download EOE-031 Attachment 1.pdfRead the text of EOE-031 Attachment 1.pdf
EOE-031 Attachment 1.xlsx
Excel · 26 KBText searchable
Download EOE-031 Attachment 1.xlsxRead the text of EOE-031 Attachment 1.xlsx
EOE-032_final.pdf
PDF · 90 KB · 1 pageText searchable
Download EOE-032_final.pdfRead the text of EOE-032_final.pdf
EOE-032 Attachment 1.pdf
PDF · 864 KB · 4 pagesText searchable
Download EOE-032 Attachment 1.pdfRead the text of EOE-032 Attachment 1.pdf
EOE-032 Attachment 2.pdf
PDF · 1.3 MB · 1 pageText searchable
Download EOE-032 Attachment 2.pdfRead the text of EOE-032 Attachment 2.pdf
EOE-032 Attachment 3.pdf
PDF · 770 KB · 1 pageText searchable
Download EOE-032 Attachment 3.pdfRead the text of EOE-032 Attachment 3.pdf
Text of EOE-032_final.pdf
Extracted from the file · 1 page · 2,189 characters
Page 1
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set EOE-01 Date Issued July 31, 2026 EOE-032 Attachment 1 Page 1 of 4 Operations Services 2021 Budget Presentation October 30, 2020 CONFIDENTIAL 1Page 2
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set EOE-01 Date Issued July 31, 2026 EOE-032 Attachment 1 Page 2 of 4 2021 BUSINESS PLAN & BUDGET FLEET OPERATIONS October 30, 2020 CONFIDENTIAL 2 2Page 3
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set EOE-01 Date Issued July 31, 2026 EOE-032 Attachment 1 Page 3 of 4 ERP Improvement Opportunities- Domiciled Fleet- The First 50 Vehicles • • • • • • • • • • • • We will have a fleet of vehicles available during storms to fly external crews in to support the storm and to support training (surges in class size) All vehicles would be tooled for storms (training has completed the tool list) Currently have the first buy completed- 9 vehicles and the second buy completed 21 vehiclesthird buy is in process for 20 vehicles the total will be 50 vehicles Vehicles would be assigned to MAW and parked at Shrewsbury, MA Long term storage protocols would be in place- Rear of vehicle tarped, exhaust covered, rodent controls in place, all vehicles parked on pavement, plus other protections Vehicles would be vendor maintained- Altec, Pete’s Tire Barn, chassis manufacturers Tools would be inspected quarterly- By training Vehicles will also supplement training as needed when classes exceed current vehicles assigned Other vehicles maintained by the shops will be stored at Eversource sites These vehicles will be vehicles held from auction These vehicles will be used for both internal and external crews The tooling has also been ordered CONFIDENTIAL 3Page 4
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set EOE-01 Date Issued July 31, 2026 EOE-032 Attachment 1 Page 4 of 4 ERP Improvement Opportunities- Domiciled Fleet- The Second 50 Vehicles • • • • • • • • • The second 50 vehicles will come from Eversource replacement vehicles The vehicles will be from retained vehicles from this year's buy, 1 to 1 vehicles returned to Fleet and vehicles retained from the 2021 vehicle buy The total of 50 vehicles will be achieved by December 2021 The vehicles will be a mixture of TA40, TA41, AN50 and AN55 vehicles with and without material handling The vehicles will be stored on company property The vehicles will be tooled The vehicles will be used for internal and external crews We will use all material handling trucks that are worth retaining first Retained levels by state: o MAE- 15 o MAW- 10 o CT-15 o NH- 10 CONFIDENTIAL 4
Text of EOE-032 Attachment 2.pdf
Extracted from the file · 1 page · 264 characters
Text of EOE-032 Attachment 3.pdf
Extracted from the file · 1 page · 3,256 characters
As listed on the current system
Question(s) Answered 31, 32 (The Connecticut Light and Power Company dba Eversource Energy) Date Filed: 08/14/2026