Interrogatory responses

Answers to questions 216, 223, 225, 227, 228, 230

Files12

Search terms highlighted
Eversource rate increase is on 3 pages across 3 files of the text below, highlighted. Go to the first matchClear highlighting
1 page match
  1. Page 1

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set EOE-05 Date Issued September 11, 2026 EOE-216 Page 1 of 3 Date Filed: October 01, 2026 Witness: Christopher E. Colorio, Mark P. Baldwin, John G. Griffin, Leanne M. Landry, Craig Dikeman and Matthew J. Correia Request from: Office of Education, Outreach, and Enforcement Question: (MS24A-VENDOR-LINE) Refer to Exhibit ACCT-2 CLP-1 and Confidential Exhibit ACCT-2 CLP-1A-10, pp. 102-116. The Company reported an incremental charge of $110,362 for the Harlan Electric Construction vendor. Respond to the following: a. Explain why the Company allowed the vendor to commence billing on January 8, 2024 (6 hours), bill for 16 hours on January 9, 2024, and then bill for another 6 hours prior to being released on January 10, 2024, when there were no assignments provided for the entire duration. As part of the response, explain why the Company did not defer the start of services by a day given that the ERP was not declared until 6PM on January 9, 2024 (Ex. CLP-STORM-IMT-3, p. 29). As relevant, provide documentation (i.e., emails, etc.) supporting the Company’s response, to include Company emails identifying when the vendor was expected to be available for storm recovery purposes. b. Cite the location of the vendor’s contractual Pricing Schedule Exhibit (i.e., typically referred to as Exhibit A). EOE observed that the contract provided at OCC-044, Att.2 (Confidential), starting at p. 2286 includes a List of Exhibits at p. 2292 which references the Pricing Schedule as Exhibit B but was unable to locate the document. EOE observed a similar omission in EOE-024, Att.4 (Confidential). To be clear, EOE is looking for the template language, not the individual rates. c. Referring to pp. 107-114, explain why the equipment was charged during standby when the Company’s Master Service Agreement omits billing of equipment during standby. Additionally, identify the amount ($) of equipment that was charged for standby. Response: Referring to Exhibit ACCT-2 CLP-1 (MS24A), Outside Contractor-Vendor, line 272, vendor Harlan Electric Construction, total invoice amount of $110,362. a. Harlan was already working on property for Transmission. They were held onsite and transitioned to storm duty from their normal scheduled work. The crews were instructed to pick up Eversource trucks staged at another location and outfit them with appropriate materials for storm restoration on the 8th and to standby on the 9th. Since they were normally on property, all communications were verbal and they were not released to ensure that the resources were available when needed.
  2. Page 2

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set EOE-05 Date Issued September 11, 2026 EOE-216 Page 2 of 3 b. The Company confirms that, due to a clerical error during the submission process, the vendor’s contractual Exhibit B Pricing Schedule was inadvertently omitted from the materials provided at OCC-044, Attachment 2 CONFIDENTIAL. The Exhibit B Pricing Schedule is now provided as EOE-216, Attachment 1 CONFIDENTIAL. c. Under the applicable Master Service Agreement, the contractor is entitled to receive payment for equipment at 50% of the applicable equipment rate while the contractor is on standby, as expressly provided in OCC-044, Attachment 2 CONFIDENTIAL, Section 3.6, page 5 of EOE-216, Attachment 1, (Exhibit B Pricing Schedule). Accordingly, the equipment charges during standby were billed pursuant to the specific standby provisions contained in the vendor’s contractual Pricing Schedule. In accordance with contract provisions, the total amount of equipment charged for standby is $5,714.28. Please refer to the Company response to EOE-267 i for additional context and detail regarding the billing of equipment. Prior Referenced Response: i EOE-267 Question: (LINE CREWS) For each storm in the Company’s recovery request, identify the total amount of equipment that was billed by line crew vendors during standby activities. Please provide the information in an unlocked excel spreadsheet allocating each cost to a specific vendor by storm event. EOE-267 Response: There is no contractual, operational or other prohibition that bars the payment of equipment rates during standby time and these costs are not tracked separately from a vendor’s crew time for invoicing purposes. Information regarding equipment charges is contained within the underlying vendor invoices and supporting documentation submitted as part of the Company’s filing. The Company has consistently explained that, in the years 2018 through 2023, the Company’s contractual terms provided that standby rates were charged only to labor rates, not to equipment. This policy followed from the fact that, when vendor crews commit to perform work for the Company, their equipment is dedicated for the duration of the engagement, preventing the use of that equipment somewhere else. This commitment of vendor equipment extends beyond working hours, as vendors must remain ready and available so long as they are committed to the Company’s restoration effort. This policy also reflects the fact that labor rates vary depending on the demands and associated risk placed on the field crews for their performance (i.e., standby rates are lower than work rates), where vendor equipment is tied up regardless of the work status of the vendor’s crews. Specifically, the contract language “Standby Rates apply to labor resources only” was applied so that there was no separate standby rate for equipment and equipment was, instead, billed at the same rate regardless of the crew’s work status (e.g. travel, standby, or work time). The Company’s policy acknowledged that it was paying for exclusive access to the vendor’s equipment throughout the event, compensating vendors for their lost opportunity cost. Not paying for
  3. Page 3Match

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set EOE-05 Date Issued September 11, 2026 EOE-216 Page 3 of 3 equipment during standby would discourage vendors from committing their resources to the Company in storms with competitive procurement of crews among regional utilities. In January 2022, Eversource Energy received the final report of an independent assessment of the “Eversource ERP Capability,” prepared by Accenture LLC. This assessment was undertaken by Eversource Energy as part of a regulatory compliance initiative beginning in September 2021. In this assessment, Accenture made several recommendations regarding the Eversource Energy ERP organization, including a recommendation to expand the emergency-management organization and capabilities by creating an executive role to oversee the enterprise emergency-management program with greater visibility and decision-making authority within the overall organization. Specifically, Accenture recommended establishing regionally based directors to oversee the implementation of program initiatives and manage state-specific relationships; expanded oversight and governance coordination of risk mitigation and resiliency initiatives; and additional training and exercise design personnel. Over the next two years, Eversource Energy implemented the Accenture recommendations, expanding and formalizing the emergency-management organization with a new vice president role and several new director roles to improve overall emergency-response preparedness and associated business processes. As part of this organizational initiative, Eversource Energy formalized the role of Director of Emergency Preparedness Logistics and Resource Acquisition in late 2023, vesting this role with responsibility for contract services relating to emergency management. This change placed control of vendor contracts in the hands of the team directly responsible for resource acquisition in emergency events. Following this organizational change, the emergency-management team launched a supplier cost-optimization review to identify opportunities for greater cost control in the tough environment of competitive procurement of contract resources. Working together, the Company’s contracts and procurement teams identified the discounting or elimination of equipment charges during standby time as one of several strategies that could help to contain storm restoration costs. The Company began to shift its policy on standby rates for equipment starting in late 2023, working with vendors throughout 2024 to negotiate changes to the former payment policy. This shift in policy applied in various forms to invoices for work performed during 2023, that were reviewed, approved and paid during 2024, as the Company worked to get vendors to accept a change in the policy. The roll-out of the new policy resulted in significant vendor push-back. Through these interactions, it became clear that it was not possible to eliminate payments for equipment without hindering the Company’s ability to secure necessary crews -- with several vendors simply increasing the equipment charge applicable during crew work time to cover the gap. In 2025, following months of negotiations with vendors and a review of industry practices, the Company adopted a standard policy of paying vendors 50 percent of the standard Base Rate for equipment during standby. The full Base Rate for equipment still applies during travel and work time. This policy strikes a reasonable balance between fairly compensating vendors for lost opportunity costs—ensuring access to skilled, experienced vendors—and containing costs. The Company’s current Master Services Agreement reflects this updated policy.
1 page match
Words on different pages
Words on different pages

Text of EOE-225_Final.pdf

Extracted from the file · 4 pages · 10,336 characters

Scanned pages of EOE-225 Attachment 1 REDACTED.pdf

Read by machine from a scan · 1 page · may contain errors, especially in numbers

Scanned pages of EOE-225 Attachment 2 REDACTED.pdf

Read by machine from a scan · 1 page · may contain errors, especially in numbers

Text of EOE-227_Final.pdf

Extracted from the file · 2 pages · 4,377 characters

Words on different pagesRead the text of EOE-227_Final.pdf

Text of EOE-227 Attachment 1 REDACTED.pdf

Extracted from the file · 1 page · 421 characters

Text of EOE-228_Final.pdf

Extracted from the file · 2 pages · 4,586 characters

Words on different pagesRead the text of EOE-228_Final.pdf

Scanned pages of EOE-228 Attachment 1 REDACTED.pdf

Read by machine from a scan · 1 page · may contain errors, especially in numbers

Text of EOE-230_Final.pdf

Extracted from the file · 1 page · 1,266 characters

Words on different pagesRead the text of EOE-230_Final.pdf

As listed on the current system

Question(s) Answered 216, 223, 225, 227, 228, 230 (The Connecticut Light and Power Company) Date Filed: 10/02/2026

This filing on the current system (opens in a new tab)