    The Connecticut Light and Power Company d/b/a Eversource Energy REDACTED Docket No. 26-05-10 Date Issued September 11, 2026 EOE-262 Attachment 3 REDACTED Page 65 of 214 Section 8. Company/Union Understanding Through a memorandum and meetings, supervision will be advised of the Company's intent and understandings with the Union with regard to the following: A. Reasonable assignments during inclement weather, making particular mention of extremes of heat and cold. The Company agrees to instruct its supervisors to make reasonable assignments in all Departments during extreme cold. Except in the case of emergency or to restore service, employees will not be required to do overhead line work or steel substation structure work when the temperature is 10° or lower at the job site. B. Inexperienced probationary Line Mechanics limited to simpler work in which they are fully qualified when assigned to two-person line crew and truck. C. Importance of staying within the limitation provided in the Agreement on work done by supervisors. D. Assistance will be provided, when requested by employees assigned to service customers, under conditions which present special problems or hazards. E. Line Mechanics will get help, if requested, when performing switching duties aloft on primary voltage on a planned switching job on a scheduled day off when such switching presents an unsafe working condition. F. Replacement of clothing unavoidably destroyed due to abnormal working conditions. 28 29 Section 9. Inclement Weather 9.(a) Except in emergency, no employee shall be required to do outdoor work when weather conditions might make such work unsafe. 9.(b) It will be the policy of the Company to give reasonable consideration to limiting the outside work of Meter Readers-AMR Drivers, when extreme weather conditions exist, providing the nature of the work will permit postponement. 9.(c) Meters installed on the outside of buildings or structures will not be tested in place during rainy or snowy weather unless the meterman is sheltered from rain or snow during the testing operation. Section 10. Hazardous Tasks No employee shall be required to perform any hazardous task, with which the employee is not familiar, without proper instruction and close supervision. When working on emergency service restoration, employees shall call the appropriate Company office or person designated by the Company to receive such calls for any assistance that may be required for compliance with safe work practices. 28 29 July 1, 1966 B.5. July 15, 1971 #3 59
  2. Page 66 of 214

    The Connecticut Light and Power Company d/b/a Eversource Energy REDACTED Docket No. 26-05-10 Date Issued September 11, 2026 EOE-262 Attachment 3 REDACTED Page 66 of 214 Section 11. Regular On Call Requirements A Line Mechanic shall not be placed on the regular "on-call" schedule unless the employee shall have had at least six months of service in such classification. Section 12. Work Assignment Disputes Where a disputed work assignment clearly involves a violation of the safety rules and such abnormal hazard as to affect a person's life, such work shall not be completed until the dispute is resolved or a temporary solution is reached by the Company and the local Union concerned. This shall not apply to any established practices. This paragraph shall not be so construed as to excuse an employee from performing any established duties of the employee’s job classification unless the employee is not familiar with them. Section 13. Practices and Procedures for Rubber Gloving Energized Conductors above 600v up to three-phase 23kv MGY 1. All standard safety rules in effect shall be followed. 2. Practices and procedures set forth below shall be strictly adhered to. 3. Rubber Gloving energized conductors more than 600 volts up to 23kv MGY will be done by minimum two qualified person crew. 4. No work will be permitted on energized conductors from a pole position (line mechanic spurred into pole or standing on pole steps or other permanent pole attachments). 5. Class 2 (20 kV) gloves and properly tested sleeves shall be used for all pole work while rubber gloving high-voltage energized conductors up to and including the three-phase 23 kV MGY class. A ground-to-ground rubber glove rule shall be enforced for all voltages. Gloves shall be air inflated for testing in the morning and after lunch and at any other time deemed necessary. 6. Employees using bucket trucks shall follow all rules and procedures governing the use of bucket trucks. The insulation portion of the bucket truck shall be inspected and cleaned as necessary before work. 7. a. All energized or grounded parts such as secondaries, neutral conductors, guy wires, telephone wires, cables or CATV cables within reaching distance of the employee shall be covered with approved protective equipment. Company-owned wires and equipment may be floated clear of the pole when practical if work is being done on or near energized conductors. If the neutral conductor is moved, the continuity of all earth grounds including guy grounds shall be maintained. b. All energized conductors or equipment within reaching distance shall be covered with approved protective equipment, except that portion which is actually being worked on. No handline shall be permitted near an unprotected area. c. When work is performed on an energized primary conductor, all other conductors, neutrals, grounds, and potential grounds, including crossarms and any 60
  3. Page 67 of 214

    The Connecticut Light and Power Company d/b/a Eversource Energy REDACTED Docket No. 26-05-10 Date Issued September 11, 2026 EOE-262 Attachment 3 REDACTED Page 67 of 214 portion of the pole within reaching distance, shall be covered with approved protective equipment. 8. When an energized primary conductor is placed on the crossarm, bracket or against the pole, it shall first be covered with a line hose, and in addition, the crossarm, bracket or pole shall be covered with a rubber blanket or other approved insulation. 9. Work being performed on energized conductors by workers in buckets, and/or by workers working at the same pole or structure, shall be confined to only one phase of any circuit at a time. 10. Work not directly related to rubber glove procedures shall not be performed on the same pole or structure. Tools and materials shall not be handed to or from the pole to a person in a bucket while a Line Mechanic is spurred to the pole or not otherwise isolated from the ground. 11. All jumpers and rubber protective equipment, including gloves, sleeves, blankets, hoods, and line hose shall be inspected before each use and shall be turned in for testing and/or washing in accordance with a Company schedule, or sooner if there is any indication that the equipment may be defective. 12. Bucket trucks shall be tested two times per year and at any other time there are indications of damage or electrical leakage. 13. When wet conditions exist, hot sticks will be used or the lines will be deenergized. Section 14. Safety Shoes Effective January 1, 2023, the Company will provide up to annual allowance to Operating Department employees towards the purchase of one or more pair(s) of safety footwear that meets the requirements for impact/compression resistance and protection from electrical hazards (EH rated) as described in ASTM F2413-05 (M 1175/C75/Mt75) EH Rated Safety (steel toe or composite) footwear. The employee must furnish a receipt of purchase for reimbursement documenting the purchase of safety shoes which meet the above safety standard and the allowance will be limited to per year. Ordering safety shoes through the Company stock rooms has been discontinued. 30 31 32 Section 15. Safety Eyeglasses The Company will pay the full cost of lenses, frame and carrying case of clear and/or tinted prescription safety eyeglasses, for operating department personnel who are required to wear them for their job. Employees will be limited to two (2) pairs of safety glasses (clear and/or tinted) every two years for the term of the agreement. Employees who opt for safety glasses with Photochromatic (photogray) or progressive lenses will not receive a second pair of clear or tinted safety glasses. The Company will pay for the cost of Photochromatic (photogray) or progressive lenses. The Company will provide for the replacement of safety eyeglasses when 30 July 1, 1969 #3 July 18, 1975 #3 & #4 32 August 21, 1995 31 61
  4. Page 68 of 214

    The Connecticut Light and Power Company d/b/a Eversource Energy REDACTED Docket No. 26-05-10 Date Issued September 11, 2026 EOE-262 Attachment 3 REDACTED Page 68 of 214 damaged on the job. Replacement will be limited to lenses only if the lenses are damaged or obscured. The employee will provide the Company with a current (not over two years old) prescription. The Company will also provide replacement lenses if the employee’s prescription changes. When obtaining prescription safety glasses under the Company’s current plan with the American Optical Company (or other company approved vendor) employees will pay any costs for eye examinations which are not covered by their chosen medical or vision plan. The Company will reimburse the employee for all fitting fees. Section 16. Emergency Equipment on Vehicles Gas masks, fire extinguishers and first-aid kits will be standard equipment on all trucks where conditions require. Section 17. Rubber Protective Equipment Protective rubber gloves and similar equipment are to be maintained in a safe working condition or replaced as frequently as required or when so-requested by employees. Section 18. Bucket Trucks for Call Person It is not intended to be normal practice to assign articulating boom bucket trucks for use by employees on-call when working alone at night. Extendible (telescopic or similar equipment) boom bucket trucks may be assigned to employees on-call when working alone at night. Section 19. Testing Articulating Boom Bucket Trucks Two bargaining unit employees will be utilized when testing articulating boom bucket trucks. Section 20. Assignment for Patrolling Rights of Way When necessary to patrol lines on foot through rights-of-way at night or during severe weather conditions, employees will be assigned in pairs. Section 21. Personnel Assignment for Pole-Mounted Transformers It shall be standard practice to assign suitably qualified bargaining-unit line personnel as follows to install or remove a pole-mounted distribution transformer. 21.(a) During the hours of darkness, three qualified bargaining unit Line personnel may be utilized when high intensity lighting and when material handling bucket trucks of the type that enables the operator to be in the work area or line derrick trucks suitably rated for the load being handled are provided. Additional Line personnel will be made available when the type of 62
  5. Page 69 of 214

    The Connecticut Light and Power Company d/b/a Eversource Energy REDACTED Docket No. 26-05-10 Date Issued September 11, 2026 EOE-262 Attachment 3 REDACTED Page 69 of 214 equipment indicated in this Section is not available or when required or requested by the person in charge in order to perform the work safely. 21.(b) Employees assigned shall be suitably qualified bargaining unit Line department personnel. However, under emergency conditions, when the required number of Line department personnel cannot be located or are otherwise unavailable to perform the work, other employees, including wage hour or supervisory, may be assigned to assist available Line department personnel. Section 22. Personal Security To enhance personal safety, employees will avoid entering a high-risk area to perform their assigned duties if it appears that their personal safety, or the safety of their personal or company property, may be endangered. Personnel should report such conditions immediately to their supervisor. District management will request local law enforcement agencies to accompany employees performing an assignment in a high-risk area when the employee has identified the area as imminently dangerous. Section 23. Fire Retardant Clothing (Effective January 1, 2023) Increase F.R. allowance to $1,450.00 for a new hire in the first year and $800.00 per year thereafter and for all other incumbents. ARTICLE IX General Provisions Section 1. Bulletin Board for Union Use 1.(a) The Company will furnish suitably identified bulletin boards for use by the Union in such numbers and locations as mutually agreed upon. The purpose of these bulletin boards will be for the posting of notices pertaining to the Union and its members. All Union notices must be signed by an official of the Union and such notices shall contain nothing political, controversial or reflecting upon the Company, Union or any employees. Either the Union or the Company may remove from these bulletin boards any notices posted thereon which do not comply with this Section 1.(a). 1.(b) If a general notice to employees or the public is issued pertaining to a change made in this Agreement it shall be signed jointly by representatives of the Company and the Union. 1.(c) When information pertaining to Company-Union business is to be disseminated to the employees, announcement shall be posted on the official bulletin boards in the department or departments affected, and duplicates submitted to the Business Manager and Assistant Business Manager. 63
  6. Page 70 of 214

    The Connecticut Light and Power Company d/b/a Eversource Energy REDACTED Docket No. 26-05-10 Date Issued September 11, 2026 EOE-262 Attachment 3 REDACTED Page 70 of 214 33 34 Section 2. Supervisors Performing Work (a) Supervisors shall not act in other than a supervisory capacity while they are actively supervising three or more men working on the same shift with them. They shall in no case act in other than a supervisory capacity for more than twenty percent of the time. (b) A supervisor is not relieved from the employee’s responsibility to protect life and property, nor from giving occasional or emergency assistance. (c) A supervisor called out in an emergency shall not perform regular work other than shall be immediately required to protect life and property. If any additional regular work is required, the foreman or supervisor shall call out bargaining unit personnel to perform the required work. Section 3. Contract Work (a) The Company agrees that it will not have work done by contract which is usually done by employees where such contracts will be accompanied by a layoff or reduction of hours in the working schedule or where men capable of doing the work are on layoff, have recall rights, and are readily available. Where contractors employing I.B.E.W. members are readily available and qualified to perform such work, they will be given any contract involving live wire work, to the extent permitted by law, and, all things being equal, will be given preference for other work usually done by employees, to the extent permitted by law. (b) When Contracting Out is Not Allowed Work regularly performed by employees covered by this Agreement will not be contracted out if it would result in loss of continuity of employment or opportunities for permanent promotions to job classifications covered by this Agreement. (c) Use of Contractors – District and Division Managers will advise Union of use of Contractors upon request 35 Upon requests made at reasonable intervals by Local Union Business Managers to the Company's Division or District Managers, the Company will advise the Union of tree trimming, major plant maintenance, substation construction and electric line construction contractors working on the Company's facilities and the estimated duration of such work. Section 4. Definition Of Emergency An emergency, as referred to in this Agreement, is any unforeseen circumstance which involves the safety of any person, loss of or damage to any property, or interruption of or interference with service or operation. Section 5. Wages While Negotiating During negotiations for the amendment or replacement of this Agreement, the Company will pay basic straight-time wages to not more than twenty-four employee representatives of the 33 July 3, 1963 #4(C) July 24, 1970 #3 35 July 1, 1960 #2 34 64
  7. Page 71 of 214

    The Connecticut Light and Power Company d/b/a Eversource Energy REDACTED Docket No. 26-05-10 Date Issued September 11, 2026 EOE-262 Attachment 3 REDACTED Page 71 of 214 Union for time lost from their normal work schedules while attending meetings with Company representatives. If any of these Union representatives is a shift or scheduled worker and the employee’s schedule of normal work coverage includes shifts directly preceding and directly following the time during which a negotiation meeting with the Company takes place, the employee will be allowed time off with basic straight-time wages from either the shift directly preceding or the shift directly following, but not both, provided that the period of time elapsing between the end of the shift directly preceding and the beginning of the shift directly following does not exceed sixteen hours. 36 Section 6. Work Outside of Company Area It is recognized that the Company may occasionally assign employees covered by this Agreement to work in locations and upon facilities other than those owned or operated by the Company. On such occasions the employees involved, the Union and the Company shall be bound by the provisions of this Agreement except that when emergency assistance to other utility companies is involved, Section 2 of Article XII shall not be applicable. All hours for travel time or work time paid at a straight- time rate under the terms of this Agreement will be paid at double straight-time rates, when employees are assigned to work in locations or upon facilities other than those owned or operated by Eversource Energy. Section 7. Relative Policy It is understood and agreed that notwithstanding the provisions of the collective bargaining agreement between the parties, relatives of employees will not be hired, transferred or promoted into situations where the possibility of favoritism or conflicts of interest might exist. These restrictions also apply to a relative who is working on Company property through a contractor or vendor agency. A relative of an employee will not be hired, transferred or promoted into the same department unless the employee reports to a different supervisor. Additionally, a relative of an employee will not be hired, transferred or promoted into a position in which the relative would be in the employee’s direct chain of command (no matter how far removed geographically). Relatives (including Step-relatives) are defined as: Father Mother Son Daughter Brother Sister Husband Wife Father-in-Law Mother-in-Law Son-in-Law Daughter-in-Law Brother-in-Law Sister-in-Law Uncle Aunt Nephew Niece Grandfather Grandmother Grandchild If any liability is incurred as a result of discrimination charges that directly result from this Relative Policy, the Company will assume said liability. 36 Topic: Storm Assignment 65
  8. Page 72 of 214

    The Connecticut Light and Power Company d/b/a Eversource Energy REDACTED Docket No. 26-05-10 Date Issued September 11, 2026 EOE-262 Attachment 3 REDACTED Page 72 of 214 ARTICLE X Strikes and Lockouts Section 1. The Company agrees that there shall be no lockout and the Union agrees that there shall be no strike or stoppage of work during the period of this Contract. The Company agrees that no action will be taken against the Union as an organization, or its officers while acting as such, for any damage which may be sustained as a result of any strike or stoppage of work not countenanced or authorized by the Union. ARTICLE XI Employee Benefits Section 1. 1.(a) The Company agrees to continue in effect for the period of this Agreement the benefits and eligibility requirements which apply to employees and their dependents where applicable under its current Group Life Insurance Plan, and Health Insurance Plan and the current Northeast Utilities Retirement Plan as amended. January 1, 2008, for employees hired prior to January 1, 2010, and to offer the K-Vantage Benefit to employees hired after December 31, 2009. K-Vantage will also be available to employees hired prior to January 1, 2010, who choose K-Vantage before January 1, 2010 in lieu of additional service and earnings credits under the Northeast Utilities Service Company Retirement Plan. Employees originally hired into NU System Companies other than NStar who transfer into the union after January 1, 2010 will retain the same retirement benefit plan elections (under the NUSCO Retirement Plan or KVantage) they have immediately prior to the transfer, and will not be given an opportunity to make a new election for either plan. Employees transferred into the union from NStar will be treated as new hires as of their transfer date and will participate in K-Vantage. Previous vesting service from NStar will be recognized for vesting of K-Vantage benefits. 1.(b) Should the Company make any major changes which affect privileges or benefits to employees under any major policy, plan, or program not specifically covered by this Agreement but affecting employees hereunder, the Company shall, if it recognizes such change as significant, notify the Union in writing of such proposed change and the effective date thereof and the Union may, if it so desires, request in writing at any time within thirty days after notice of such change, that a meeting be arranged to discuss the effect of such change on employees and the Company will promptly arrange such a meeting. If notice of such change has not been given, the Company will arrange a meeting for discussing it promptly on request of the Union. 1.(c) It is understood and agreed by the Union and the Company that continuation of benefits provided under the Plans shall, of necessity, be contingent upon the rules and regulations applicable thereto and that the Company and its Plan Carriers will have authority to administer the Plans in accordance with such rules and regulations. Any change in a policy or practice covered by this Section which is not specifically mentioned in this Agreement or any question concerning the Company's application of such policies and practices of the Pension Plan, Group Life Insurance Plan or Health Insurance Plan shall not be subject to grievance procedure or arbitration. Section 2. Company-Sustained Injury; Total Incapacity If during the term of this Agreement a regular employee sustains an injury on a Company job which results in total incapacity and which prevents the employee from doing any work and which is compensable under the Worker’s Compensation laws of the State of 66
  9. Page 73 of 214

    The Connecticut Light and Power Company d/b/a Eversource Energy REDACTED Docket No. 26-05-10 Date Issued September 11, 2026 EOE-262 Attachment 3 REDACTED Page 73 of 214 Connecticut, the employee shall be paid the differential between the employee's normal basic after-tax wages and Worker's Compensation benefits for the period of total incapacity not in excess of one year from the date of the injury. If it is established that the injury is caused by the negligence of a third party and that third party makes settlement with the injured employee, the Company shall be reimbursed for all wage payments made to the injured employee to the extent that such settlement covers the Company's payments made under the terms of this provision. Section 3. Employee Benefits – Increase Accidental Death Benefits 3.(a) Notification to Union - It is the Company's intention to continue its past practices with respect to employee benefits. Should the Company contemplate any diminution of employee benefits affecting bargaining-unit employees, the matter will be discussed with the Union in advance of the change. 3.(b) Accidental Death Provision - In the event any bargaining-unit employee dies as a result of a job-connected injury and benefit is payable under the accidental death provisions of Group Policy No. GC-323337, the Company will provide an additional benefit equal to the amount payable under such accidental death provisions. These benefits are in addition to life insurance coverage provided under Group Policy No. GL-323337. Section 4. Dutch Point Credit Union The Company will provide payroll deduction for employees desiring membership in the Dutch Point Credit Union. ARTICLE XII Expense Allowance Section 1. Travel Time and Transportation When required to work distant from their base area, employees will be paid expense and travel allowances as follows: 1.(a) When the Company supplies transportation between the base and work, employees will be allowed travel time at the rate applicable and equal to the time spent en route. 1.(b) When requested to travel by means of specific public transportation, employees will receive the actual fare paid and will be allowed travel time at the rate applicable and equal to the time spent en route. Section 2. Expense Plans Outside Base Area Except when Section 1. or Section 3. of this Article is applicable, an employee required to make the employee’s own arrangements to report at a job location including all training assignments outside the employee’s base area (except satellite/line shops or when the job location distance one way is ten (10) miles or less) will be paid a daily expense allowance as provided under one of the following Plans: 67
  10. Page 74 of 214

    The Connecticut Light and Power Company d/b/a Eversource Energy REDACTED Docket No. 26-05-10 Date Issued September 11, 2026 EOE-262 Attachment 3 REDACTED Page 74 of 214 Plan A - If the distance one way is twenty-five miles or less; Plan B - If the distance one way is over twenty-five miles but not over forty miles; $55.20 per day. If the distance one way is over forty miles but not over sixty miles; per day. If the distance one way is over sixty miles but not over ninety miles; per day. When the distance is beyond ninety miles, the employee will be paid mileage at the current NU mileage rate per mile for each mile beyond ninety miles. Plan C Plan D - per day. 2.(a) If on any day an employee travels one way to or returns one way from a job location under the provisions of Section 1. of this Article, the employee will be paid an expense allowance on that day under one of the following Plans: Plan E Plan F - If the distance one way is thirty miles or less, If the distance one way is over thirty miles; per day. per day. 2.(b) For the purposes of the above Plans, distances shall be measured over highways which are reasonably passable and which provide the shortest routes between the employee's base area headquarters and the job locations involved. 2.(c) If an employee is required to report at two or more job locations outside of the employee’s base area on one day the employee will be paid the daily expense allowance provided under the Plan applicable to the job location which is the greatest distance from the employee’s base area headquarters. In addition, the employee will be paid mileage at the current Eversource mileage rate per mile one way for the actual distance traveled between the job locations involved on that day. This Section 2.(c) will not be applied to require an employee to report at two or more job locations on one day involving Plans B, C, D, or F except when it is necessary to do so to provide a full day's work or when emergency work is required. Whenever possible, employees will be advised not later than the day preceding requirement to report at a different job location. 2.(d) As part of the 2009 contract negotiations, the company and union agreed that the mileage reimbursement rate for the CL&P Blue Book and Green Book union agreements will be paid at the current Company mileage rate (i.e., the same rate as non-union employees). This rate will be paid to employees who are authorized to use their personal vehicles while on company time, unless the mileage is otherwise addressed as part of the established contractual expense plans. It is understood by all parties that the company may change the mileage rate at its sole discretion without notice to, or negotiation with, the union. Changes or modifications to the rate will also not be subject to the grievance and arbitration procedure. 2.(e) If an employee is required to make his or her own arrangements to report to a job location, including all training assignments, outside of the employee’s base area on any day and the employee is subject to any tolls using section 2.(b), the Company will reimburse the cost of such tolls to the employee. 2.(f) Employees shall not be eligible to receive any of the above expense plans during the time that they are in the 18-month Field Training program. 68

Text of EOE-267_Final.pdf

Extracted from the file · 2 pages · 6,089 characters

As listed on the current system

Question(s) Answered 262, 267 (Connecticut Light and Power Company dba Eversource Energy) Date Filed: 09/29/2026

This filing on the current system (opens in a new tab)