Skip to main content

A prototype public docket site for the Connecticut Public Utilities Regulatory Authority

Utility Dockets and Filings

Interrogatory responses

Answers to questions 262, 267

ResponseFiled by Connecticut Light and Power Company dba Eversource Energy5 files
Part of docket 26-05-10Open
  • Electric
Application of The Connecticut Light and Power Company d/b/a Eversource Energy to Amend its Rate Schedules

Files5

  1. Page 195 of 214

    No text on this page. It may be a picture of a page, such as a scan or a chart.
  2. Page 196 of 214

    The Connecticut Light and Power Company d/b/a Eversource Energy REDACTED Docket No. 26-05-10 Date Issued September 11, 2026 EOE-262 Attachment 3 REDACTED Page 196 of 214 November 3, 2010 LR-10-162 Ref: Mr. Frank Cirillo, Assistant Business Manager Local Union 420 – I.B.E.W. 550 Wolcott Street Waterbury, CT 06708 Mr. Richard Sank, Business Manager Local Union 457 – I.B.E.W. 1237 East Main Street, 1st Floor South Meriden, CT 06450 Re: Agreement – Scheduling Vacation and On-call Dear Rich & Frank: This letter documents our August 2, 2010 agreement in principle and my subsequent discussion with Frank Cirillo regarding the company’s development, approval and posting of annual vacation and on-call schedules. This agreement applies to the CL&P Blue Book and Green Book union contracts, the Yankee Gas White Book Contract, and the CL&P Technical Contract and as applicable, modifies the language contained in these contracts on this subject and replaces any side agreements or practices currently in existence regarding this topic. This agreement also applies to the Transmission Group as applicable. It is also agreed that neither the Union or the Company will use this agreement as part of Local 457’s grievance 2010-014 (Company No. 2010-10-457), or the arbitration of that grievance. Purpose: This agreement reflects an effort by the parties to eliminate unnecessary controversy surrounding conflict between the on-call schedule and the employee’s vacation submittal. To date, the company has processed these schedules independently – leaving some employees in a position where their vacation preference has conflicted with their on-call schedule. These employees have often had to swap their on-call schedule with another employee or otherwise modify their vacation plans. This agreement is specific to this conflicting schedule issue. All other vacation requests will continue to be processed in accordance with the applicable union contract (Blue Book and Green Book). This agreement also documents the company’s intent to fill on-call schedule vacancies (e.g., for planned medical absences) as soon as they are made aware of such. To fill short notice vacancies (less than 30 days) the company will seek volunteers, and if none will use the overtime list effective the Monday prior to the vacancy. For longer notice vacancies, the company will use the established on-call schedule rotation and will assign the vacancy to one of the scheduled employees provided the employee does not get back to back on-call schedules. 190
  3. Page 197 of 214

    The Connecticut Light and Power Company d/b/a Eversource Energy REDACTED Docket No. 26-05-10 Date Issued September 11, 2026 EOE-262 Attachment 3 REDACTED Page 197 of 214 It is understood that the company may decide not to fill vacancies (particularly short notice absences) if it determines that the existing on-call response resources are appropriate for the anticipated trouble call volume. Company actions for 2010: Effective November 3, 2010, the company will review the existing on-call schedule to determine if there is a conflict between the approved vacation schedule and the on-call schedule. Identified conflicts will be resolved by filling the vacancy through the overtime list of employees – specifically those employees eligible for scheduled on-call assignment. The company is not obligated to take action on any other vacation request. Concurrent with its actions on resolving the vacation/on-call scheduling conflicts, the company will extend the current on-call schedule rotation until April 24, 2011. Employees requesting vacation during the period of January 1, 2010 through April 24, 2010, will submit their requests in accordance with the applicable contract language. Company Actions for 2011 [and Future Years]: Effective April 24, 2011, and every year thereafter, the company will post the on-call schedule by the last Sunday in April. The on-call schedule will be prepared using approved vacation schedules to ensure there is no conflict with the employees approved vacation. Company management will process the employees’ vacation preference in accordance with Article IX of the Blue book and Article V of the Green book, Article IX White book, and Article 22 of the Technical Contract as applicable. Once the vacation and on-call schedules are finalized by the Companies the employee (not the company) will be responsible for addressing any swapping or other schedule change, outside of those resulting from illness or disability. Both parties understand and agree that this agreement will terminate with the expiration of each cited contract and this agreement will be incorporated into the next version of these contracts or will otherwise be dispositioned through the contract negotiations process. Additionally either party may request a revision to this agreement. Agreed to by the Company: Agreed to by the Union: /s/ R. Sank Agreed to by the Union: /s/ F. Cirillo 191
  4. Page 198 of 214

    The Connecticut Light and Power Company d/b/a Eversource Energy REDACTED Docket No. 26-05-10 Date Issued September 11, 2026 EOE-262 Attachment 3 REDACTED Page 198 of 214 192
  5. Page 199 of 214

    The Connecticut Light and Power Company d/b/a Eversource Energy REDACTED Docket No. 26-05-10 Date Issued September 11, 2026 EOE-262 Attachment 3 REDACTED Page 199 of 214 Memorandum of Understanding Between The Connecticut Light and Power Company dba Eversource Energy and IBEW Locals 420 and 457 Response Specialist - Line The purpose of this document is to outline the scope and parameters of the Response Specialist position in Connecticut as agreed to between Connecticut Light and Power dba Eversource Energy (the “Company”) and IBEW Local 420 and 457 (the “Union”), collectively referred to herein as the “Parties.” In accordance with collective bargaining agreements between the Parties dated June 1, 2022 (the “CBAs”), both Parties agree as follows. Job Duties and Description Attachment “A” Schedule: The hours of coverage will be 24 hours daily and 7 days per week. See attachment D. The Company commits to maintain the schedule for the term of the contract. However, the Company and Union recognize that for the 12 hour shift to work properly, RSO employees must make a good faith effort to be available to work when needs dictate. The Company shall monitor the response for both planned overtime and call outs. If the Company determines that employees are engaging in overtime abuse, the Company may cancel 12 hour shifts. Such cancellation may be limited to specific zone(s) where the overtime abuse occurs. Prior to implementing the schedule change, the Company and Union shall meet and discuss the abuse concerns and make reasonable efforts to address these issues. Holidays: For the determination of Holiday hours, a Holiday will start at 06:00 hours on the actual day of the holiday and end at 06:00 hours the following day. There will continue to be twelve (12) paid, eight (8) hour holidays per year. When an employee works a holiday, they will receive eight (8) hours of holiday pay at basic straight time rate and the hours worked will be paid at the applicable rates. Lieu days will continue to be administered per the contract except that in addition to eight (8) hours of holiday pay, for any shifts greater than eight (8) hours, the employee shall elect to use either vacation pay, lieu time, if available, or up to twenty-four (24) hours of “no pay” per calendar year for the remaining hours of the shift. Number of positions for the staffing of the Response Specialist: Range of 81-100 positions for the initial staffing. See Attachment C. Subsequent to that, the Company can determine the staffing levels with the maximum number of positions for the organization set at 126. The Company can force qualified employees up to a maximum of 126 positions. 193
  6. Page 200 of 214

    The Connecticut Light and Power Company d/b/a Eversource Energy REDACTED Docket No. 26-05-10 Date Issued September 11, 2026 EOE-262 Attachment 3 REDACTED Page 200 of 214 Backfilling shift vacancies within the Response Specialist organization: The Company will determine the need to backfill open shifts and positions based on operational requirements and will be done from within the respective zones. Incremental backfills; will be attempted to be filled from within the zone, if unsuccessful, the company will then utilize the entire Response Specialist roster as appropriate. Scheduled backfills; will be posted and attempted to be filled in the respective zone. All vacancies will be filled in accordance with the overtime list. See Attachment E. If the Company adds additional resources equally in each zone due to weather related events, the Company retains the right to move resources across zones based on operational needs regardless if the Response Specialists are on straight time or overtime. Reporting location(s): Closest district to home within the zone or a mutually agreed upon location. However, the Company reserves the right to change the mutually agreed upon reporting location. Such change shall either be to another mutually agreed upon location or the closest district to home within the zone. See Attachment C*. Coverage area: The area that is covered by The Connecticut Light And Power Company. Supervisory Direction: Response Specialists will be directed through the Systems Operation Center (“SOC”) and RSO Management. The RSO organization will consist of a Director, Managers, and RSO/Field Supervision. The Field Supervisor will provide the day-to-day direction for the Response Specialists. When necessary, the local AWC Supervisor- Electric Field Operations will also provide direction, in coordination with RSO management. Mutual Aid: Response Specialists will not be eligible to perform mutual aid assignments off Company property. Company property is defined as any and all property owned by Eversource. Storm Assignments: Local AWC personnel, System Projects and Transmission Line will be asked and required prior to Response Specialist being offered to perform Storm assignments on Company property outside of the Connecticut Light and Power service territory. Training: The Company will schedule all required ongoing training and updates. Ongoing training and updates will be furnished to the Business Manager on a semi-annual basis. See Attachment F. Response Specialist Initial Staffing: Step One Response Specialist positions will be offered to and filled by the respective districts. The selection of employees will be in accordance with departmental seniority.* Step Two Remainder of the vacancies will be filled in accordance with the contractual provisions. 194
  7. Page 201 of 214

    The Connecticut Light and Power Company d/b/a Eversource Energy REDACTED Docket No. 26-05-10 Date Issued September 11, 2026 EOE-262 Attachment 3 REDACTED Page 201 of 214 *Length of service in the Department since date of last employment by the Company shall constitute Department seniority. Response Specialist Staffing • Internal Candidates – Hiring process in accordance with contractual provisions. • External Candidates – Potential candidates to be given a physical skills assessment. Successful candidates to be offered a position within the Response Specialist organization. Candidates who accept a position will receive training/orientation prior to beginning their new role. External hires will start at the minimum RSO rate and be held at that rate through their probationary period in accordance with the contract. Retention Initial incumbent qualified employees who elect to accept a position within the Response Specialist classification will be retained for a period of two (2) years from date of transfer and will not be entitled to apply for posted job openings during this period. Exceptions to this two year restriction would be promotions attained through the employee’s normal sequence of progression. The initial incumbent employees, who wish to return to their respective districts and classifications, must notify RSO management in writing, at least thirty days prior to their intention to leave the Response Specialist organization. However, an adequate complement of Response Specialists must be maintained to operate the Response Specialist organization. Therefore, an incumbent employee will not be released if the complement would be below a certain threshold, set forth in Attachment D. The Response Specialist reclassified to their previous classification will not be required to accept upgrade to the Response Specialist for a period of two (2) years. All others, subsequent to the initial posting, once qualified as a Response Specialist, will remain in the position for a minimum of three (3) years and will not be entitled to apply for posted job openings outside of the RSO during this period. The junior qualified employee(s) by Teal Book seniority in the affected Local 420 or Local 457 territory will be required to accept any unfilled vacancies in the Response Specialist classification. Incumbent employees forced into the Response Specialist position will be retained for a minimum of eighteen (18) months. An employee who is forced into the Response Specialist classification for a minimum of eighteen (18) months will not be required to accept upgrade to the Response Specialist classification for a period of one (1) year starting from the date of being released from the organization. Exceptions to this eighteen (18) month retention period restriction would be promotions attained through the employee’s normal sequence of progression. Seniority: For the purposes of Article V, Section 2 (a) only, Response Specialist and Line Mechanic will be considered as the same classification. 195
  8. Page 202 of 214

    The Connecticut Light and Power Company d/b/a Eversource Energy REDACTED Docket No. 26-05-10 Date Issued September 11, 2026 EOE-262 Attachment 3 REDACTED Page 202 of 214 In addition, during the initial two (2) year startup period, Response Specialists formerly classified as a Lead or Chief Line Mechanic will be treated as a Lead or Chief Line Mechanic respectively for the purposes of Article V, Section 2 (a) only. All initial incumbent employees who chose to remain in the RSO following the two (2) year startup period will have their classification seniority date adjusted to the implementation date for Zone 1. The Response Specialist position requires a minimum qualification of Line Mechanic for at least one (1) year prior to the date of transfer or forcing. Implementation: Post and fill initial Response Specialist positions upon June 1, 2016 contract ratification. Upgrading: When the Company assigns three (3) or more people to a crew, the Company will designate an employee to direct the workforce and be responsible for the crew for all hours so assigned on that day provided the assignment is for one (1) or more hours. The designated employee in charge will be paid one dollar and seventy-five cents per hour ($1.75) in addition to the employee’s basic straight time hourly rate for all hours so assigned. Upgrading will normally be on a classification seniority basis. Meals: Any earned meals will be paid at the contractually higher rate ($20.00). Meal time not taken shall not count as hours worked for the purposes of determining sixteen hours of work or rest time in accordance with Article VI, Sections 6 and 7. Rest Time: Except in case of emergency or the case of unforeseen absence of other employees, employees shall not be required to work more than sixteen hours in any one twenty-four hour period. The rest time window set forth in Article VI, Section 6 does not apply to Response Specialist employees. A Response Specialist must work beyond 16 hours in any 24 hour period, not including meal time not taken, in order to be allowed 8 hours off, once released, before returning to work. If this period extends into the employee’s regular scheduled working hours, the employee shall lose no pay thereby. Planned Overtime: Planned overtime shall be defined as overtime work for which at least forty-eight hours advance notice has been given and will be assigned among employees as equally as possible. Effective June 1, 2020, the planned overtime notice will be reduced from forty-eight hours to thirty-six hours. Effective June 1, 2021, the planned overtime notice will be reduced from thirty-six hours to twenty-four hours. If a Response Specialist accepts a planned overtime shift, the Response Specialist cannot accept a call out prior to the planned overtime shift that would preclude him or her from filling the initial planned overtime shift. 196
  9. Page 203 of 214

    The Connecticut Light and Power Company d/b/a Eversource Energy REDACTED Docket No. 26-05-10 Date Issued September 11, 2026 EOE-262 Attachment 3 REDACTED Page 203 of 214 A Response Specialist cannot accept a planned overtime shift prior to his or her regular shift if taking such planned overtime will make the employee unavailable to work all of his or her regular shift. Attachment A Eversource Response Specialist Duties The responsibilities will include, but not be limited to, clearing faulty and unsafe conditions, including maintaining or restoring electrical service, by temporary or permanent means to include replacing or bracing/lashing poles, securing pole tops, floating conductors, extending secondary, or as described in the below listed duties. The below illustrative duties will be performed as a single-person crew or as a multiperson crew as dictated by the task and applicable work methods. 1. Clearing faulty and unsafe conditions including maintaining or restoring electrical service by temporary or permanent means; 2. Operate primary* and secondary fault locating equipment on URD systems in order to isolate the faulted equipment and restore the customers. This includes all URD/DB single phase systems and three phase radials; 3. Operate switching and control devices on both the overhead and underground systems (pad mounted equipment). See Attachment B for further information; 4. Connect, disconnect, and operate portable transformers and temporary primary jumpers under emergency or urgent conditions; 5. Replace failed transformers with assistance of other qualified employee(s); 6. Replace damaged or faulty equipment during the initial response; 7. Perform street light repair work including replacing defective bulbs, photocells, and heads along with new installations (up to a 250 watt head and under a 12’ bracket); 8. Install and remove minimal cover up as needed. This may include primary conductors; 9. Perform secondary overhead and URD service connections associated with connecting customers; 10. Perform overhead distribution system line patrols; 11. Perform URD and overhead equipment inspections; 12. Make current and voltage measurements, as required; 13. Determine and record causes of failures and communicate the findings to the SOC; 14. Communicate the status of outages to the SOC – on-site, restoration projections, ETRs, etc.; 15. Investigate customer concerns, communicate with customer when needed to provide information; 16. Investigate and correct complaints of interference to telephone, radio, or television reception; 17. Document and submit required records and reports associated with trouble, line patrols, equipment inspections, and other related work; 18. Utilize mobile data terminals as instructed; 19. Operate GOABs that Line Mechanics operate (excluding GOABs with keyed interlock systems), reclosers and cutouts when needed, as well as other equipment that Line Mechanics currently operate; 20. External substation inspections. 197
  10. Page 204 of 214

    The Connecticut Light and Power Company d/b/a Eversource Energy REDACTED Docket No. 26-05-10 Date Issued September 11, 2026 EOE-262 Attachment 3 REDACTED Page 204 of 214 Attachment B There are two types of pad mounted switchgear in CT. The first is air insulated PMH Gear (Type 3, 5, 8, 9, 11, 12, and 13). The second is SF6 insulated (Vista, Trayer). In addition, there are wall mounted (Elastimold) located in customer vaults (primarily in Stamford and Hartford) that are tied into the UG system. Response Specialists would not normally respond to these outages. However, the Company may train them if they were to be utilized to restore customers while UG personnel are responding to an event. There are many more types of gear in the industry. Therefore, this is for discussion purposes only and not meant to be all-inclusive. Attachment C 198

Text of EOE-267_Final.pdf

Extracted from the file · 2 pages · 6,089 characters

As listed on the current system

Question(s) Answered 262, 267 (Connecticut Light and Power Company dba Eversource Energy) Date Filed: 09/29/2026

This filing on the current system (opens in a new tab)