Skip to main content

A prototype public docket site for the Connecticut Public Utilities Regulatory Authority

Utility Dockets and Filings

Interrogatory responses

Answers to questions 304, 313, 314

Files9

Search terms highlighted
Eversource rate increase is on 1 page of the text below, highlighted. Go to the first matchClear highlighting
1 page match

Scanned pages and machine-read text of EOE-304 Attachment 1 REDACTED.pdf

Read by machine
This document is a scan with no text in it. The text shown with each page was read from the image by machine (an AI model), not typed or checked by a person. It may contain errors, especially in numbers, dates and names, and a hard-to-read spot can come out as plausible but wrong text. Check the page image before relying on any figure. Open the original PDF (opens in a new tab)
  1. Scan of page 1 of 1 of EOE-304 Attachment 1 REDACTED.pdf. The machine-read text is below it.
    The scanned page

    Machine-read text

    REDACTED The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 22,2026 EOE-304 Attachment 1 REDACTED Page 1 of 1
    DateEmployee NameJob ClassificationWorking hoursWorking RateTotal AmountVehicle IDEquipmentEquipment HoursEquipment RateTotal Amount
    04/04/24STEVE FOSTERForeman5.0[redacted][redacted]531107Pick-Up5[redacted][redacted]
    STEVE BARCANSKILead Lineman5.0[redacted][redacted]975001Bucket Truck 40'-60'5[redacted][redacted]
    MIKE VALOVICHLead Lineman5.0[redacted][redacted]974001Bucket Truck 40'-60'5[redacted][redacted]
    CONOR SMITHLineman5.0[redacted][redacted]97502Bucket Truck 40'-60'5[redacted][redacted]
    JARRETT DZIERKOWSKI5th Step Apprentice5.0[redacted][redacted]975410Bucket Truck 40'-60'5[redacted][redacted]
    JOSH BELLAIGER4th Step Apprentice5.0[redacted][redacted]961003Digger Derrick 48'5[redacted][redacted]
    MIKE MARTINEq Oper/Field Mech A5.0[redacted][redacted]944203Mechanic Truck5[redacted][redacted]
    Total Amount$10,149.10Total Amount$2,778.40
    Total amount$12,927.50

Scanned pages and machine-read text of EOE-304 Attachment 2 REDACTED.pdf

Read by machine
This document is a scan with no text in it. The text shown with each page was read from the image by machine (an AI model), not typed or checked by a person. It may contain errors, especially in numbers, dates and names, and a hard-to-read spot can come out as plausible but wrong text. Check the page image before relying on any figure. Open the original PDF (opens in a new tab)
  1. Scan of page 1 of 1 of EOE-304 Attachment 2 REDACTED.pdf. The machine-read text is below it.
    The scanned page

    Machine-read text

    REDACTED The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 22, 2026 EOE-304 Attachment 2 REDACTED Page 1 of 1
    PAGE / DATEBILLABLE TYPEDESCRIPTIONVEHICLE IDBILLABLE HOURSBILLABLE RATEBILLABLE TOTAL
    PAGE 2494/3/24STANDBYPICKUP53110716[redacted]
    PAGE 2494/3/24STANDBYBUCKET97500116[redacted]
    PAGE 2494/3/24STANDBYBUCKET97400116[redacted]
    PAGE 2494/3/24STANDBYBUCKET97500216[redacted]
    PAGE 2494/3/24STANDBYBUCKET97541016[redacted]
    PAGE 2494/3/24STANDBYDIGGER96100316[redacted]
    PAGE 2494/3/24STANDBYMECHANIC TRUCK94420316[redacted]
    PAGE 2494/3/24STANDBYPICKUP5250134[redacted]
    PAGE 2514/3/24STANDBYPICKUP5313115[redacted]
    PAGE 2514/3/24STANDBYBUCKET9740075[redacted]
    PAGE 2514/3/24STANDBYBUCKET8188105[redacted]
    PAGE 2514/3/24STANDBYDIGGER9622075[redacted]
    PAGE 2514/3/24STANDBYBUCKET9743065[redacted]
    PAGE 2514/3/24STANDBYPICKUP5250135[redacted]
    PAGE 2514/3/24STANDBYPICKUP5252125[redacted]
    Total Amount$11,293.42

Scanned pages of EOE-304 Attachment 3 REDACTED.pdf

Read by machine from a scan · 1 page · may contain errors, especially in numbers

Words on different pages
  1. Page 1

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 22,2026 EOE-304 Attachment 4 REDACTED Page 1 of 1 REDACTED PAGE / DATE PAGE 254 | 4/4/24 PAGE 254 | 4/4/24 PAGE 254 | 4/4/24 PAGE 254 | 4/4/24 PAGE 254 | 4/4/24 PAGE 254 | 4/4/24 PAGE 254 | 4/4/24 PAGE 254 | 4/4/24 NAME MICHAEL MORRISSEY HUNTER BLIAS CHAVES MARTINEZ RICO JOVONNI JOE MURDOCCA JUSTIN BOUCHER JOE ALFIERO ANTHONY KUMIEGA CLASIFICATION FOREMAN LEAD LINEMAN LINEMAN APPRENTICE 6 LEAD LINEMAN LINEMAN APPRENTICE 6 SAFETY WORK TIME WORK TIME RATE 2 2 2 2 2 2 2 2 LABOR TOTAL $4,821.74 DESCRIPTION PICKUP BUCKET BUCKET VEHICLE ID 531309 975409 975408 BILLABLE HOURS 2 2 2 BUCKET BUCKET DIGGER PICKUP 974002 975321 961006 937301 2 2 2 2 BILLABLE RATE EQUIPMENT TOTAL $1,037.76

Text of EOE-313_Final.pdf

Extracted from the file · 2 pages · 4,002 characters

Words on different pagesRead the text of EOE-313_Final.pdf

Text of EOE-313 Attachment 1 REDACTED.pdf

Extracted from the file · 7 pages, 1 without text · 5,714 characters

Text of EOE-314_Final.pdf

Extracted from the file · 1 page · 2,180 characters

Words on different pagesRead the text of EOE-314_Final.pdf

Text of EOE-314 Attachment 1 REDACTED.pdf

Extracted from the file · 3 pages · 2,271 characters

As listed on the current system

Question(s) Answered 304, 313, 314 (The Connecticut Light and Power Company) Date Filed: 10/06/2026

This filing on the current system (opens in a new tab)