Scanned pages and machine-read text of EOE-304 Attachment 1 REDACTED.pdf

Read by machine
This document is a scan with no text in it. The text shown with each page was read from the image by machine (an AI model), not typed or checked by a person. It may contain errors, especially in numbers, dates and names, and a hard-to-read spot can come out as plausible but wrong text. Check the page image before relying on any figure. Open the original PDF (opens in a new tab)
  1. Scan of page 1 of 1 of EOE-304 Attachment 1 REDACTED.pdf. The machine-read text is below it.
    The scanned page

    Machine-read text

    REDACTED The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 22,2026 EOE-304 Attachment 1 REDACTED Page 1 of 1
    DateEmployee NameJob ClassificationWorking hoursWorking RateTotal AmountVehicle IDEquipmentEquipment HoursEquipment RateTotal Amount
    04/04/24STEVE FOSTERForeman5.0[redacted][redacted]531107Pick-Up5[redacted][redacted]
    STEVE BARCANSKILead Lineman5.0[redacted][redacted]975001Bucket Truck 40'-60'5[redacted][redacted]
    MIKE VALOVICHLead Lineman5.0[redacted][redacted]974001Bucket Truck 40'-60'5[redacted][redacted]
    CONOR SMITHLineman5.0[redacted][redacted]97502Bucket Truck 40'-60'5[redacted][redacted]
    JARRETT DZIERKOWSKI5th Step Apprentice5.0[redacted][redacted]975410Bucket Truck 40'-60'5[redacted][redacted]
    JOSH BELLAIGER4th Step Apprentice5.0[redacted][redacted]961003Digger Derrick 48'5[redacted][redacted]
    MIKE MARTINEq Oper/Field Mech A5.0[redacted][redacted]944203Mechanic Truck5[redacted][redacted]
    Total Amount$10,149.10Total Amount$2,778.40
    Total amount$12,927.50

Scanned pages and machine-read text of EOE-304 Attachment 2 REDACTED.pdf

Read by machine
This document is a scan with no text in it. The text shown with each page was read from the image by machine (an AI model), not typed or checked by a person. It may contain errors, especially in numbers, dates and names, and a hard-to-read spot can come out as plausible but wrong text. Check the page image before relying on any figure. Open the original PDF (opens in a new tab)
  1. Scan of page 1 of 1 of EOE-304 Attachment 2 REDACTED.pdf. The machine-read text is below it.
    The scanned page

    Machine-read text

    REDACTED The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 22, 2026 EOE-304 Attachment 2 REDACTED Page 1 of 1
    PAGE / DATEBILLABLE TYPEDESCRIPTIONVEHICLE IDBILLABLE HOURSBILLABLE RATEBILLABLE TOTAL
    PAGE 2494/3/24STANDBYPICKUP53110716[redacted]
    PAGE 2494/3/24STANDBYBUCKET97500116[redacted]
    PAGE 2494/3/24STANDBYBUCKET97400116[redacted]
    PAGE 2494/3/24STANDBYBUCKET97500216[redacted]
    PAGE 2494/3/24STANDBYBUCKET97541016[redacted]
    PAGE 2494/3/24STANDBYDIGGER96100316[redacted]
    PAGE 2494/3/24STANDBYMECHANIC TRUCK94420316[redacted]
    PAGE 2494/3/24STANDBYPICKUP5250134[redacted]
    PAGE 2514/3/24STANDBYPICKUP5313115[redacted]
    PAGE 2514/3/24STANDBYBUCKET9740075[redacted]
    PAGE 2514/3/24STANDBYBUCKET8188105[redacted]
    PAGE 2514/3/24STANDBYDIGGER9622075[redacted]
    PAGE 2514/3/24STANDBYBUCKET9743065[redacted]
    PAGE 2514/3/24STANDBYPICKUP5250135[redacted]
    PAGE 2514/3/24STANDBYPICKUP5252125[redacted]
    Total Amount$11,293.42

Scanned pages of EOE-304 Attachment 3 REDACTED.pdf

Read by machine from a scan · 1 page · may contain errors, especially in numbers

Text of EOE-304 Attachment 4 REDACTED.pdf

Extracted from the file · 1 page · 806 characters

Words on different pages
  1. Page 1

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set EOE-06 Date Issued September 22, 2026 EOE-313 Page 1 of 2 Date Filed: October 06, 2026 Witness: Mark P. Baldwin, Clifford G. Williams, Leanne M. Landry and John G. Griffin Request from: Office of Education, Outreach, and Enforcement Question: (MS24F-VENDOR-LINE) Refer to Exhibit ACCT-2 CLP-6 and Confidential Exhibit ACCT-2 CLP-6A-9, pp. 11-23. The Company reported an incremental charge of $756,614 for the Michels Power vendor. Respond to the following: a. Referring to pp. 13-14, explain why the billed equipment rates exceed the contractual rates included within OCC-044, Att.2 (Confidential), pp. 4391-4395. As part of the response, provide an unlocked Excel spreadsheet detailing the equipment billed via the invoice to equipment rates provided within the contract and identify the amount of overbill. b. Referring to pp. 17, 19, 21, and 23, explain if the Eversource Contractor Storm Daily Time & Work Report was completed in accordance with the Eversource Contractor Storm Daily Time & Work Report Procedure provided at EOE-022, Att.5. As part of the response, explain why the vendor was not required to enter information within boxes 24 (Event Start Time) and 25 (Event End Time) prior to the Company’s approval. Response: a. The equipment rates billed on the referenced invoice differ from the rates provided in OCC044, Attachment 2 CONFIDENTIAL, pp. 4391-4395 because the resources associated with this invoice were not provided under the external line crew rate schedule reflected in those pages. To provide Eversource access to a broader pool of Michels resources across Eversource’s service territory, the Company permitted Michels to submit a separate schedule of labor and equipment rates applicable to those resources. This supplemental rate schedule is associated with the same underlying contract provided in the Company’s response to OCC044 i; however, it was inadvertently omitted from the OCC-044 production. The applicable supplemental rate schedule is now provided as EOE-313, Attachment 1 CONFIDENTIAL. b. Although Boxes 24 (Event Start Time) and 25 (Event End Time) were not completed by the vendor, the absence of this information did not prevent the Company from validating
  2. Page 2

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set EOE-06 Date Issued September 22, 2026 EOE-313 Page 2 of 2 and approving the timesheets. Part of the Company's review process is to verify the accuracy and reasonableness of contractor labor charges using the total hours worked, dates of service, event assignments, crew information, and consultation with personnel responsible for overseeing the contractor's work, as necessary. The review confirmed that sufficient information was available to validate the hours billed and their association with the applicable event or activity. In this instance, the Company confirmed the validity of the labor charges through its established review controls and therefore, the omission of the Event Start Time and Event End Time fields did not impact the Company's ability to verify or approve the charges. This review process serves as a key control to ensure that contractor invoices are reasonable, supported, and accurately associated with the applicable event. Prior Referenced Response: i OCC-044 Question: (Contracts) For all external line crews and vegetation contractors whose costs are reflected in the storms in this docket and for all current external line crews, please provide all contracts and addendums thereto in effect from January 1, 2024, to the present. OCC-044 Response: Please refer to OCC-044, Attachment 1, for a listing of external line crew and vegetation contractors whose services were utilized in the storms under review in this docket and all current external line crews. Attachment 1 includes page number references to the associated contracts, which are provided as OCC-044, Attachment 2 CONFIDENTIAL.

Text of EOE-313 Attachment 1 REDACTED.pdf

Extracted from the file · 7 pages, 1 without text · 5,714 characters

Text of EOE-314_Final.pdf

Extracted from the file · 1 page · 2,180 characters

Words on different pagesRead the text of EOE-314_Final.pdf

Text of EOE-314 Attachment 1 REDACTED.pdf

Extracted from the file · 3 pages · 2,271 characters