Interrogatory responses
Answers to questions 304, 313, 314
Files9
EOE-304_Final.pdf
PDF · 181 KB · 4 pagesText searchable
Download EOE-304_Final.pdfRead the text of EOE-304_Final.pdf
EOE-304 Attachment 1 REDACTED.pdf
PDF · 98 KB · 1 pageText read by machine from a scan; may contain errors, especially in numbers
Download EOE-304 Attachment 1 REDACTED.pdfScanned pages and text of EOE-304 Attachment 1 REDACTED.pdf
EOE-304 Attachment 2 REDACTED.pdf
PDF · 129 KB · 1 pageText read by machine from a scan; may contain errors, especially in numbers
Download EOE-304 Attachment 2 REDACTED.pdfScanned pages and text of EOE-304 Attachment 2 REDACTED.pdf
EOE-304 Attachment 3 REDACTED.pdf
PDF · 151 KB · 1 pageText read by machine from a scan; may contain errors, especially in numbers
Download EOE-304 Attachment 3 REDACTED.pdfScanned pages and text of EOE-304 Attachment 3 REDACTED.pdf
EOE-304 Attachment 4 REDACTED.pdf
PDF · 698 KB · 1 pageText searchable
Download EOE-304 Attachment 4 REDACTED.pdfRead the text of EOE-304 Attachment 4 REDACTED.pdf
EOE-313_Final.pdf
PDF · 142 KB · 2 pagesText searchable
Download EOE-313_Final.pdfRead the text of EOE-313_Final.pdf
EOE-313 Attachment 1 REDACTED.pdf
PDF · 1.4 MB · 7 pagesText searchable
Download EOE-313 Attachment 1 REDACTED.pdfRead the text of EOE-313 Attachment 1 REDACTED.pdf
EOE-314_Final.pdf
PDF · 110 KB · 1 pageText searchable
Download EOE-314_Final.pdfRead the text of EOE-314_Final.pdf
EOE-314 Attachment 1 REDACTED.pdf
PDF · 1.2 MB · 3 pagesText searchable
Download EOE-314 Attachment 1 REDACTED.pdfRead the text of EOE-314 Attachment 1 REDACTED.pdf
Scanned pages and machine-read text of EOE-304 Attachment 1 REDACTED.pdf

The scanned page Machine-read text
REDACTED The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 22,2026 EOE-304 Attachment 1 REDACTED Page 1 of 1Date Employee Name Job Classification Working hours Working Rate Total Amount Vehicle ID Equipment Equipment Hours Equipment Rate Total Amount 04/04/24 STEVE FOSTER Foreman 5.0 [redacted] [redacted] 531107 Pick-Up 5 [redacted] [redacted] STEVE BARCANSKI Lead Lineman 5.0 [redacted] [redacted] 975001 Bucket Truck 40'-60' 5 [redacted] [redacted] MIKE VALOVICH Lead Lineman 5.0 [redacted] [redacted] 974001 Bucket Truck 40'-60' 5 [redacted] [redacted] CONOR SMITH Lineman 5.0 [redacted] [redacted] 97502 Bucket Truck 40'-60' 5 [redacted] [redacted] JARRETT DZIERKOWSKI 5th Step Apprentice 5.0 [redacted] [redacted] 975410 Bucket Truck 40'-60' 5 [redacted] [redacted] JOSH BELLAIGER 4th Step Apprentice 5.0 [redacted] [redacted] 961003 Digger Derrick 48' 5 [redacted] [redacted] MIKE MARTIN Eq Oper/Field Mech A 5.0 [redacted] [redacted] 944203 Mechanic Truck 5 [redacted] [redacted] Total Amount $ 10,149.10 Total Amount $ 2,778.40 Total amount $ 12,927.50
Scanned pages and machine-read text of EOE-304 Attachment 2 REDACTED.pdf

The scanned page Machine-read text
REDACTED The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 22, 2026 EOE-304 Attachment 2 REDACTED Page 1 of 1PAGE / DATE BILLABLE TYPE DESCRIPTION VEHICLE ID BILLABLE HOURS BILLABLE RATE BILLABLE TOTAL PAGE 249 4/3/24 STANDBY PICKUP 531107 16 [redacted] PAGE 249 4/3/24 STANDBY BUCKET 975001 16 [redacted] PAGE 249 4/3/24 STANDBY BUCKET 974001 16 [redacted] PAGE 249 4/3/24 STANDBY BUCKET 975002 16 [redacted] PAGE 249 4/3/24 STANDBY BUCKET 975410 16 [redacted] PAGE 249 4/3/24 STANDBY DIGGER 961003 16 [redacted] PAGE 249 4/3/24 STANDBY MECHANIC TRUCK 944203 16 [redacted] PAGE 249 4/3/24 STANDBY PICKUP 525013 4 [redacted] PAGE 251 4/3/24 STANDBY PICKUP 531311 5 [redacted] PAGE 251 4/3/24 STANDBY BUCKET 974007 5 [redacted] PAGE 251 4/3/24 STANDBY BUCKET 818810 5 [redacted] PAGE 251 4/3/24 STANDBY DIGGER 962207 5 [redacted] PAGE 251 4/3/24 STANDBY BUCKET 974306 5 [redacted] PAGE 251 4/3/24 STANDBY PICKUP 525013 5 [redacted] PAGE 251 4/3/24 STANDBY PICKUP 525212 5 [redacted] Total Amount $ 11,293.42
Scanned pages of EOE-304 Attachment 3 REDACTED.pdf
Read by machine from a scan · 1 page · may contain errors, especially in numbers
Text of EOE-304 Attachment 4 REDACTED.pdf
Extracted from the file · 1 page · 806 characters
Text of EOE-313_Final.pdf
Extracted from the file · 2 pages · 4,002 characters
Text of EOE-313 Attachment 1 REDACTED.pdf
Extracted from the file · 7 pages, 1 without text · 5,714 characters
Page 1
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set EOE-06 Date Issued September 22, 2026 EOE-314 Page 1 of 1 Date Filed: October 06, 2026 Witness: Mark P. Baldwin, Clifford G. Williams, Leanne M. Landry and John G. Griffin Request from: Office of Education, Outreach, and Enforcement Question: (MS24F-VENDOR-LINE) Refer to Exhibit ACCT-2 CLP-6 and Confidential Exhibit ACCT-2 CLP-6A-9, pp. 24-38. The Company reported two incremental charges in the combined amount of $142,456 for the MTV Solutions Inc. vendor. Respond to the following: a. Referring to pp. 25-26, 29, 32, and 35, explain why the vendor was permitted a higher rate for the Digger Derrick than permitted within the pricing schedule provided at OCC044, Att.2 (Confidential). As part of the response, identify the incremental impact of the higher rate. b. Referring to pp. 24-38, confirm that the vendor was used in a Dock crew capacity and explain why the vendor was utilized to perform services on April 8, 2024 (several days after demobilization) in lieu of Company personnel. Response: a. Upon further review of the contract attachments, the Company identified a revised pricing schedule submitted by MTV to correct what the vendor identified as a clerical error in its original pricing sheet. The Digger Derrick rate reflected on pp. 25–26, 29, 32, and 35 is consistent with the corrected rate included in that revised pricing schedule. The revised pricing schedule was inadvertently omitted from the Company’s response to OCC-044, Attachment 2 CONFIDENTIAL. The applicable revised pricing schedule has now been provided as EOE-314, Attachment 1 CONFIDENTIAL. b. The MTV crew referenced was a Dock crew at that time. The Stamford work center that the contractor was working for covers the towns of Greenwich, Stamford, and Darien. These towns are very busy with customer work, which often exceeds that which the Company’s internal resources have the capacity to complete on their own without incurring significant drive time to arrive in the area from other work centers. As such, the Company supplements their workforce as needed with contractors to handle additional work.
Text of EOE-314 Attachment 1 REDACTED.pdf
Extracted from the file · 3 pages · 2,271 characters
As listed on the current system
Question(s) Answered 304, 313, 314 (The Connecticut Light and Power Company) Date Filed: 10/06/2026