Skip to main content

A prototype public docket site for the Connecticut Public Utilities Regulatory Authority

Utility Dockets and Filings

Interrogatory responses

Answers to questions 304, 313, 314

Files9

Search terms highlighted
Eversource rate increase is on 1 page of the text below, highlighted. Go to the first matchClear highlighting
1 page match

Scanned pages and machine-read text of EOE-304 Attachment 1 REDACTED.pdf

Read by machine
This document is a scan with no text in it. The text shown with each page was read from the image by machine (an AI model), not typed or checked by a person. It may contain errors, especially in numbers, dates and names, and a hard-to-read spot can come out as plausible but wrong text. Check the page image before relying on any figure. Open the original PDF (opens in a new tab)
  1. Scan of page 1 of 1 of EOE-304 Attachment 1 REDACTED.pdf. The machine-read text is below it.
    The scanned page

    Machine-read text

    REDACTED The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 22,2026 EOE-304 Attachment 1 REDACTED Page 1 of 1
    DateEmployee NameJob ClassificationWorking hoursWorking RateTotal AmountVehicle IDEquipmentEquipment HoursEquipment RateTotal Amount
    04/04/24STEVE FOSTERForeman5.0[redacted][redacted]531107Pick-Up5[redacted][redacted]
    STEVE BARCANSKILead Lineman5.0[redacted][redacted]975001Bucket Truck 40'-60'5[redacted][redacted]
    MIKE VALOVICHLead Lineman5.0[redacted][redacted]974001Bucket Truck 40'-60'5[redacted][redacted]
    CONOR SMITHLineman5.0[redacted][redacted]97502Bucket Truck 40'-60'5[redacted][redacted]
    JARRETT DZIERKOWSKI5th Step Apprentice5.0[redacted][redacted]975410Bucket Truck 40'-60'5[redacted][redacted]
    JOSH BELLAIGER4th Step Apprentice5.0[redacted][redacted]961003Digger Derrick 48'5[redacted][redacted]
    MIKE MARTINEq Oper/Field Mech A5.0[redacted][redacted]944203Mechanic Truck5[redacted][redacted]
    Total Amount$10,149.10Total Amount$2,778.40
    Total amount$12,927.50

Scanned pages and machine-read text of EOE-304 Attachment 2 REDACTED.pdf

Read by machine
This document is a scan with no text in it. The text shown with each page was read from the image by machine (an AI model), not typed or checked by a person. It may contain errors, especially in numbers, dates and names, and a hard-to-read spot can come out as plausible but wrong text. Check the page image before relying on any figure. Open the original PDF (opens in a new tab)
  1. Scan of page 1 of 1 of EOE-304 Attachment 2 REDACTED.pdf. The machine-read text is below it.
    The scanned page

    Machine-read text

    REDACTED The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 22, 2026 EOE-304 Attachment 2 REDACTED Page 1 of 1
    PAGE / DATEBILLABLE TYPEDESCRIPTIONVEHICLE IDBILLABLE HOURSBILLABLE RATEBILLABLE TOTAL
    PAGE 2494/3/24STANDBYPICKUP53110716[redacted]
    PAGE 2494/3/24STANDBYBUCKET97500116[redacted]
    PAGE 2494/3/24STANDBYBUCKET97400116[redacted]
    PAGE 2494/3/24STANDBYBUCKET97500216[redacted]
    PAGE 2494/3/24STANDBYBUCKET97541016[redacted]
    PAGE 2494/3/24STANDBYDIGGER96100316[redacted]
    PAGE 2494/3/24STANDBYMECHANIC TRUCK94420316[redacted]
    PAGE 2494/3/24STANDBYPICKUP5250134[redacted]
    PAGE 2514/3/24STANDBYPICKUP5313115[redacted]
    PAGE 2514/3/24STANDBYBUCKET9740075[redacted]
    PAGE 2514/3/24STANDBYBUCKET8188105[redacted]
    PAGE 2514/3/24STANDBYDIGGER9622075[redacted]
    PAGE 2514/3/24STANDBYBUCKET9743065[redacted]
    PAGE 2514/3/24STANDBYPICKUP5250135[redacted]
    PAGE 2514/3/24STANDBYPICKUP5252125[redacted]
    Total Amount$11,293.42

Scanned pages of EOE-304 Attachment 3 REDACTED.pdf

Read by machine from a scan · 1 page · may contain errors, especially in numbers

Text of EOE-304 Attachment 4 REDACTED.pdf

Extracted from the file · 1 page · 806 characters

Text of EOE-313_Final.pdf

Extracted from the file · 2 pages · 4,002 characters

Words on different pagesRead the text of EOE-313_Final.pdf

Text of EOE-313 Attachment 1 REDACTED.pdf

Extracted from the file · 7 pages, 1 without text · 5,714 characters

Words on different pages
  1. Page 1

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set EOE-06 Date Issued September 22, 2026 EOE-314 Page 1 of 1 Date Filed: October 06, 2026 Witness: Mark P. Baldwin, Clifford G. Williams, Leanne M. Landry and John G. Griffin Request from: Office of Education, Outreach, and Enforcement Question: (MS24F-VENDOR-LINE) Refer to Exhibit ACCT-2 CLP-6 and Confidential Exhibit ACCT-2 CLP-6A-9, pp. 24-38. The Company reported two incremental charges in the combined amount of $142,456 for the MTV Solutions Inc. vendor. Respond to the following: a. Referring to pp. 25-26, 29, 32, and 35, explain why the vendor was permitted a higher rate for the Digger Derrick than permitted within the pricing schedule provided at OCC044, Att.2 (Confidential). As part of the response, identify the incremental impact of the higher rate. b. Referring to pp. 24-38, confirm that the vendor was used in a Dock crew capacity and explain why the vendor was utilized to perform services on April 8, 2024 (several days after demobilization) in lieu of Company personnel. Response: a. Upon further review of the contract attachments, the Company identified a revised pricing schedule submitted by MTV to correct what the vendor identified as a clerical error in its original pricing sheet. The Digger Derrick rate reflected on pp. 25–26, 29, 32, and 35 is consistent with the corrected rate included in that revised pricing schedule. The revised pricing schedule was inadvertently omitted from the Company’s response to OCC-044, Attachment 2 CONFIDENTIAL. The applicable revised pricing schedule has now been provided as EOE-314, Attachment 1 CONFIDENTIAL. b. The MTV crew referenced was a Dock crew at that time. The Stamford work center that the contractor was working for covers the towns of Greenwich, Stamford, and Darien. These towns are very busy with customer work, which often exceeds that which the Company’s internal resources have the capacity to complete on their own without incurring significant drive time to arrive in the area from other work centers. As such, the Company supplements their workforce as needed with contractors to handle additional work.

Text of EOE-314 Attachment 1 REDACTED.pdf

Extracted from the file · 3 pages · 2,271 characters

As listed on the current system

Question(s) Answered 304, 313, 314 (The Connecticut Light and Power Company) Date Filed: 10/06/2026

This filing on the current system (opens in a new tab)