Skip to main content

A prototype public docket site for the Connecticut Public Utilities Regulatory Authority

Utility Dockets and Filings

Interrogatory responses

Answers to questions 304, 313, 314

Files9

Search terms highlighted
Eversource rate increase is on 1 page of the text below, highlighted. Go to the first matchClear highlighting
1 page match

Scanned pages and machine-read text of EOE-304 Attachment 1 REDACTED.pdf

Read by machine
This document is a scan with no text in it. The text shown with each page was read from the image by machine (an AI model), not typed or checked by a person. It may contain errors, especially in numbers, dates and names, and a hard-to-read spot can come out as plausible but wrong text. Check the page image before relying on any figure. Open the original PDF (opens in a new tab)
  1. Scan of page 1 of 1 of EOE-304 Attachment 1 REDACTED.pdf. The machine-read text is below it.
    The scanned page

    Machine-read text

    REDACTED The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 22,2026 EOE-304 Attachment 1 REDACTED Page 1 of 1
    DateEmployee NameJob ClassificationWorking hoursWorking RateTotal AmountVehicle IDEquipmentEquipment HoursEquipment RateTotal Amount
    04/04/24STEVE FOSTERForeman5.0[redacted][redacted]531107Pick-Up5[redacted][redacted]
    STEVE BARCANSKILead Lineman5.0[redacted][redacted]975001Bucket Truck 40'-60'5[redacted][redacted]
    MIKE VALOVICHLead Lineman5.0[redacted][redacted]974001Bucket Truck 40'-60'5[redacted][redacted]
    CONOR SMITHLineman5.0[redacted][redacted]97502Bucket Truck 40'-60'5[redacted][redacted]
    JARRETT DZIERKOWSKI5th Step Apprentice5.0[redacted][redacted]975410Bucket Truck 40'-60'5[redacted][redacted]
    JOSH BELLAIGER4th Step Apprentice5.0[redacted][redacted]961003Digger Derrick 48'5[redacted][redacted]
    MIKE MARTINEq Oper/Field Mech A5.0[redacted][redacted]944203Mechanic Truck5[redacted][redacted]
    Total Amount$10,149.10Total Amount$2,778.40
    Total amount$12,927.50

Scanned pages and machine-read text of EOE-304 Attachment 2 REDACTED.pdf

Read by machine
This document is a scan with no text in it. The text shown with each page was read from the image by machine (an AI model), not typed or checked by a person. It may contain errors, especially in numbers, dates and names, and a hard-to-read spot can come out as plausible but wrong text. Check the page image before relying on any figure. Open the original PDF (opens in a new tab)
  1. Scan of page 1 of 1 of EOE-304 Attachment 2 REDACTED.pdf. The machine-read text is below it.
    The scanned page

    Machine-read text

    REDACTED The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 22, 2026 EOE-304 Attachment 2 REDACTED Page 1 of 1
    PAGE / DATEBILLABLE TYPEDESCRIPTIONVEHICLE IDBILLABLE HOURSBILLABLE RATEBILLABLE TOTAL
    PAGE 2494/3/24STANDBYPICKUP53110716[redacted]
    PAGE 2494/3/24STANDBYBUCKET97500116[redacted]
    PAGE 2494/3/24STANDBYBUCKET97400116[redacted]
    PAGE 2494/3/24STANDBYBUCKET97500216[redacted]
    PAGE 2494/3/24STANDBYBUCKET97541016[redacted]
    PAGE 2494/3/24STANDBYDIGGER96100316[redacted]
    PAGE 2494/3/24STANDBYMECHANIC TRUCK94420316[redacted]
    PAGE 2494/3/24STANDBYPICKUP5250134[redacted]
    PAGE 2514/3/24STANDBYPICKUP5313115[redacted]
    PAGE 2514/3/24STANDBYBUCKET9740075[redacted]
    PAGE 2514/3/24STANDBYBUCKET8188105[redacted]
    PAGE 2514/3/24STANDBYDIGGER9622075[redacted]
    PAGE 2514/3/24STANDBYBUCKET9743065[redacted]
    PAGE 2514/3/24STANDBYPICKUP5250135[redacted]
    PAGE 2514/3/24STANDBYPICKUP5252125[redacted]
    Total Amount$11,293.42

Scanned pages of EOE-304 Attachment 3 REDACTED.pdf

Read by machine from a scan · 1 page · may contain errors, especially in numbers

Text of EOE-304 Attachment 4 REDACTED.pdf

Extracted from the file · 1 page · 806 characters

Text of EOE-313_Final.pdf

Extracted from the file · 2 pages · 4,002 characters

Words on different pagesRead the text of EOE-313_Final.pdf

Text of EOE-313 Attachment 1 REDACTED.pdf

Extracted from the file · 7 pages, 1 without text · 5,714 characters

Text of EOE-314_Final.pdf

Extracted from the file · 1 page · 2,180 characters

Words on different pagesRead the text of EOE-314_Final.pdf
Words on different pages
  1. Page 1

    The Connecticut Light and Power Company d/b/a Eversource Energy REDACTED Docket No. 26-05-10 Date Issued September 22, 2026 EOE-314 Attachment 1 REDACTED Page 1 of 3 SCHEDULE A =- Contractor Billing Rates - Labor Rates are all inclusive of insurance, taxes, overhead, profit, maintenance and fuel and shall be in effect for the term of this Agreement. EFFECTIVE DATE RANGE START: 3/23/24 Title General Foreman Foreman Lead Lineman/working foreman Lineman 7th Step Apprentice 6th Step Apprentice 5th Step Apprentice 4th Step Apprentice 3rd Step Apprentice 2nd Step Apprentice 1st Step Apprentice Heavy Equipment Operator/line equipment operator Material Man Eq Oper/Field Mech A/vehicle mechanic Driver Groundman/line groundman Field Mechanic B Field Mechanic C Groundman - experienced Groundman - 1st Step Flagman Safety Administration Service Crew Electrician END: 5/31/24 Straight Time Rate Travel/Standby Response Rate Emergency Response Working Rate (includes Holidays & Sundays) Travel per diem Lodging Travel per diem Meals
  2. Page 2

    The Connecticut Light and Power Company d/b/a Eversource Energy REDACTED Docket No. 26-05-10 Date Issued September 22, 2026 EOE-314 Attachment 1 REDACTED Page 2 of 3 TRANSMISSION LINE RATES EQUIPMENT RATES SCHEDULE A - Contractor Billing Rates - Equipment Rates are all inclusive of insurance, taxes, overhead, profit, maintenance and fuel and shall be in effect for the term of this Agreement. START: EFFECTIVE DATE RANGE END: Equipment 1/2 ton pick-up truck 2 x 4 1/2 ton pick-up truck 4 x 4 10 Ton Trailer 3/4 Ton Pick-up Truck - 4 wheel drive 9 Ton 3x1 Trailer Air Compressor Air Compressor with Tools ATV with pull behind trailer Boom Truck Bucket - Squirt Boom Bucket Truck - 55 ML Bucket Truck - 55MH Bucket Truck - 65 ft Bulldozer - Small Compressor 850 CFM Digger (Corner Mounted) Digger Derrick Dump Truck Flatbed Truck Lift Gate Material Truck Material Trailer Pole Trailer Rack Truck - Large Rock Drill with truck Single Arbor Trailer Utility Truck - 1 Ton Wire Puller Tensioner Wire Trailer Command Center Snowmobile Mechanic truck/Service truck Rate
  3. Page 3

    The Connecticut Light and Power Company d/b/a Eversource Energy REDACTED Docket No. 26-05-10 Date Issued September 22, 2026 EOE-314 Attachment 1 REDACTED Page 3 of 3

As listed on the current system

Question(s) Answered 304, 313, 314 (The Connecticut Light and Power Company) Date Filed: 10/06/2026

This filing on the current system (opens in a new tab)