Interrogatory responses
Answers to questions 46, 48, 50
Files11
EOE-046 Attachment 15.pdf
PDF · 1.3 MB · 13 pagesText searchable
Download EOE-046 Attachment 15.pdfRead the text of EOE-046 Attachment 15.pdf
EOE-046 Attachment 16.pdf
PDF · 1.6 MB · 13 pagesText searchable
Download EOE-046 Attachment 16.pdfRead the text of EOE-046 Attachment 16.pdf
EOE-046 Attachment 17.pdf
PDF · 1.4 MB · 13 pagesText searchable
Download EOE-046 Attachment 17.pdfRead the text of EOE-046 Attachment 17.pdf
EOE-046 Attachment 18.pdf
PDF · 1.3 MB · 13 pagesText searchable
Download EOE-046 Attachment 18.pdfRead the text of EOE-046 Attachment 18.pdf
EOE-046 Attachment 19.pdf
PDF · 1.9 MB · 23 pagesText searchable
Download EOE-046 Attachment 19.pdfRead the text of EOE-046 Attachment 19.pdf
EOE-046 Attachment 20.pdf
PDF · 1.6 MB · 24 pagesText searchable
Download EOE-046 Attachment 20.pdfRead the text of EOE-046 Attachment 20.pdf
EOE-046 Attachment 21.pdf
PDF · 2.4 MB · 24 pagesText searchable
Download EOE-046 Attachment 21.pdfRead the text of EOE-046 Attachment 21.pdf
EOE-048_final.pdf
PDF · 90 KB · 1 pageText searchable
Download EOE-048_final.pdfRead the text of EOE-048_final.pdf
EOE-048 Attachment 1 REDACTED.pdf
PDF · 636 KB · 2 pagesText searchable
Download EOE-048 Attachment 1 REDACTED.pdfRead the text of EOE-048 Attachment 1 REDACTED.pdf
EOE-048 Attachment 2 REDACTED.pdf
PDF · 883 KB · 8 pagesNo text in this file
EOE-050_final.pdf
PDF · 105 KB · 2 pagesText searchable
Download EOE-050_final.pdfRead the text of EOE-050_final.pdf
Text of EOE-046 Attachment 18.pdf
Extracted from the file · 13 pages · 46,634 characters
Page 4 of 23
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued July 31, 2026 EOE-046 Attachment 19 Page 4 of 23 Title: Eversource Procurement Manual This repository is typically represented by the Maximo ERP system, where documentation is stored under Purchase Order attachments, or by the Ariba Sourcing and Contracting platforms, where documentation resides within the respective Contract Workspace or Sourcing Project. The General File must include all applicable documentation as outlined in Section 14 to ensure compliance with recordkeeping requirements and audit readiness. 2.17 General Terms and Conditions (“GTCs”) – The standard contractual terms developed and maintained by Eversource Procurement that apply to Agreements issued by the company. These terms serve as the baseline legal and commercial framework for most contracts and may be modified or negotiated, as appropriate, based on the nature of the engagement and subject to Procurement and Legal review. 2.18 Order – A form generally employed to initiate a purchase which may include a description of the materials, equipment or services to be procured, the quantities, prices, discounts, delivery point, delivery dates, billing address, Procurement Agent’s name, and other pertinent information. An Order takes the form of a purchase order release or a standard purchase order. 2.19 Master Service Agreement (MSA) - A comprehensive contract that defines the overarching legal and commercial terms between Eversource and a supplier for a defined category of services or scope of work. Individual project-specific agreement or Blanket Agreements may be executed under the MSA through Sub Agreements or Purchase Orders. 2.20 NSE31 – Statement of Procurement objectives, policies and procedures, filed annually with PURA. This statement is a public document and is available to suppliers upon request. 2.21 Normal Goods & Services – Refers to goods and services routinely acquired to support Eversource’s core utility operations, maintenance, capital programs, and service delivery to customers. This includes but is not limited to products, materials, equipment, tools, supplies and other operational or technical goods, and services related to construction, consulting, engineering and other professional or technical services, field services, information technology, and system operations. It excludes the categories identified in Section 3.2. 2.22 Procurement Agent – An individual within the Procurement function responsible for executing or supporting sourcing, contracting, and supplier management activities. Job titles may vary, but functional responsibilities align with procurement operations. 2.23 Procurement Director – The Director of Procurement, or an authorized delegate acting within the scope of delegated authority, responsible for overseeing procurement operations, policy implementation, and governance across Eversource and its subsidiaries. 2.24 Procurement Management – The leadership team within the Eversource Procurement organization, including Managers, Directors, and the Vice President of Supply Chain & Property Management. This group governs strategic sourcing, compliance, and procurement alignment with corporate goals. 2.25 Request for Proposal (“RFP”, “RFI” or “Auction”) – Formal solicitation methods issued by Procurement to gather Supplier proposals, information, or pricing for goods or services. Includes Requests for Proposals (RFP), Requests for Information (RFI), and online Auctions. 2.26 Requester – An Eversource employee or business unit representative who initiates a procurement request to fulfill an operational, maintenance, or project-related need. 2.27 Supplier – An entity that provides goods, materials, equipment, or services to Eversource. The terms Revision Number: 30 Previous Revision: 29 Page 4 Issue Date: 08/15/2025 Previous Issue Date: 12/11/2024Page 5 of 23
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued July 31, 2026 EOE-046 Attachment 19 Page 5 of 23 Title: Eversource Procurement Manual “Consultant,” “Contractor,” and “Vendor” are used interchangeably with Supplier throughout this Manual. 2.28 Supplier Issue Form – A standardized form accessible via the Eversource Hub for employees to report concerns regarding Supplier performance, safety, ethics, or compliance. Forms are routed to Procurement and escalated to Legal, Compliance, or other stakeholders as appropriate. 2.29 Technical Expert – An individual within a business unit who possesses subject matter expertise relevant to a specific procurement. This individual is responsible for evaluating the technical qualifications of Suppliers and the suitability of proposed goods, equipment, or services. 2.30 Time Critical Need – An emergent procurement requirement that, while not classified as an Emergency, must be fulfilled within an immediate timeframe to avoid significant cost, schedule delays, regulatory non-compliance, or operational disruption. 3 4 POLICY AND APPLICABILITY 3.1 It is Eversource’s policy to encourage and maintain competition for its business. Except as otherwise provided in this Manual, bids shall be solicited from as many qualified sources as are considered necessary to realize the objectives of (a) procuring required materials and services at the best evaluated cost to individual Eversource companies and the Eversource system as a whole, consistent with reliability, quality, service and availability; and (b) having such required materials and services available at the required place, in the required quantity and at the required time. 3.2 All procurement transactions by Eversource and its companies for Normal Goods and Services are subject to the requirements of this Manual, with the following exceptions: 3.2.1 Wholesale gas or energy supplies 3.2.2 Purchases for certain unregulated affiliates 3.2.3 Real Estate Acquisitions 3.2.4 Purchases issued to or pursuant to federal, state or municipal government entities or other regulated utilities ROLES & RESPONSIBILITIES 4.1 Procurement Director 4.1.1 4.1.2 4.1.3 4.2 Oversees implementation and enforcement of the Procurement Manual and Policy Governs procurement strategy, risk management alignment, and supplier governance programs (SRM, Vendor Risk) Approves policy exceptions, major escalations, and tier designations Procurement Team 4.2.1 4.2.2 4.2.3 Revision Number: 30 Previous Revision: 29 Manages all sourcing, negotiation, and contracting activities Maintains procurement systems (Ariba, Maximo ERP, etc.) Facilitates SRM Program, including tier assignments and scorecard development Page 5 Issue Date: 08/15/2025 Previous Issue Date: 12/11/2024Page 6 of 23
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued July 31, 2026 EOE-046 Attachment 19 Page 6 of 23 Title: Eversource Procurement Manual 4.2.4 4.2.5 4.3 Ensures compliance with applicable policies, internal controls, safety and IT security requirements Supports supplier audits and claim resolution Business Unit Leads 4.3.1 Define the scope of work, technical specifications and other business requirements in sufficient detail to minimize the need for unnecessary contract revisions and amendments. 4.3.2 Participate in supplier evaluations and performance reviews, including input into selection decisions and ongoing monitoring. 4.3.3 Manage day-to-day supplier performance, ensuring compliance with contract terms, project schedules, and deliverables. 4.3.4 Track and escalate any commercial, quality, safety, or risk-related issues to Procurement in a timely manner. 4.3.5 Ensure timely approval of invoices and maintain complete and accurate contract documentation for audit readiness. 4.3.6 Lead operational elements of the Supplier Relationship Management (SRM) Program, including performance input, continuous improvement feedback, and resolution of supplier-related issues. Note: Business Units are not authorized to negotiate, commit, bind, and sign Contracts, Purchase Orders or other agreements for Normal Goods and Services, or changes, change orders, revisions, or amendments thereto, on behalf of Eversource Energy and its subsidiaries. 4.4 4.5 Legal/Compliance 4.4.1 4.4.2 4.4.3 4.4.4 Reviews and advise on contract terms, risks, and regulatory requirements Support development of legally compliant agreements Assist and advises on supplier disputes, terminations, or claims Monitor adherence to legal and regulatory obligations (e.g., NERC, CIP, FAR, Buy America) 4.5.1 4.5.2 4.5.3 Periodically reviews procurement transactions, systems, and compliance Validates adherence to competitive bidding, documentation, and exception processes Provides recommendations to strengthen internal controls and reduce risk Audit Revision Number: 30 Previous Revision: 29 Page 6 Issue Date: 08/15/2025 Previous Issue Date: 12/11/2024Page 7 of 23
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued July 31, 2026 EOE-046 Attachment 19 Page 7 of 23 Title: Eversource Procurement Manual PROCUREMENT PROCESS 5 6 REQUIREMENT IDENTIFICATION 5.1 The Requester shall contact Procurement to initiate the procurement process well in advances of a solicitation, if necessary, to allow for proper planning and execution. Requesters shall not negotiate or discuss pricing or other Agreement terms and conditions with Suppliers without the direct involvement of Procurement, regardless of the dollar value of their transaction. 5.2 Except when required to meet an Emergency, the Requester shall not authorize a Supplier to commence work until an Order has been issued. In the case of an Emergency, the Requester shall contact Procurement immediately to request an Order. 5.3 Procurement may refuse to issue Orders based on bids that have been developed, solicited, submitted or negotiated in a manner which is inconsistent with the requirements of this Manual. Procurement may require that any such requests be properly re-bid in accordance with all applicable Policies and Procedures prior to any award. 5.4 Once the procurement process has been initiated by Procurement, Requesters should coordinate all communications with Suppliers through Procurement until after the execution of an Agreement. 5.5 Once a contract is awarded, Requesters should notify Procurement of any circumstances which may require an amendment. BUYING CHANNELS Eversource uses a variety of buying channels to procure goods and services efficiently, in alignment with internal policies and external regulatory expectations. The appropriate channel is determined by the nature of the request, total value, contract coverage, and urgency. 6.1 Eversource Approved Procurement Buying Channels The following chart outlines the approved procurement buying channels, their purpose, and the types of transactions each is intended to support Channel Type Catalog Purchase (Maximo PO) Blanket Purchase Order (Maximo PO) Standalone Contract (Maximo PO) Authorization for Payment (AFP) Purchasing Card (PCard) Employee Expense (Workday or Workforce) Revision Number: 30 Previous Revision: 29 Description Pre-negotiated items available from approved suppliers through Eversource’s electronic catalog system in Maximo. An agreement with a capped total value allowing multiple releases over time for recurring services or goods from a single supplier. A fully executed contract in Ariba tied to a Maximo PO for a specific scope of work or project. Used for non-purchase order payments processed through Maximo where traditional PO issuance is not required. Corporate-issued credit card governed by the P-Card Guidelines. Used for low-dollar, low-risk purchases that fall outside of standard channels. Employee-submitted reimbursement for business-related out-of-pocket expenses processed through Workday or Workforce. Page 7 Typical Use Cases Standard materials, office supplies, and tools with fixed contract pricing. Repetitive services (e.g., snow removal) or materials used throughout the year. Complex services, capital work, construction projects, or custom equipment. Government fees, utility bills, permits, fines, or other approved payables. Non-stock tools, ERP meals, ERP hotel stays, job-related books or subscriptions. Travel meals, mileage, business entertainment, community event fees. Issue Date: 08/15/2025 Previous Issue Date: 12/11/2024Page 8 of 23
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued July 31, 2026 EOE-046 Attachment 19 Page 8 of 23 Title: Eversource Procurement Manual 6.2 Emergency Procurement Eversource recognizes that emergencies may arise where standard procurement processes cannot be followed due to an immediate and unforeseen risk to public safety, operations, system reliability, or critical infrastructure. If a need meets the definition of an Emergency (see Section 2), and an Order is not already in place, the purchase may be supported by a Confirming Order. 6.2.1 Authorization and Initiation – – – 6.2.2 Procurement Review and Confirming Orders – – 7 An Emergency Procurement may be initiated by the Requester when there is insufficient time to process a standard Desktop Requisition. The Requester must notify Procurement immediately and request that a Confirming Order be issued as soon as practical. If a supplier is engaged before formal Procurement involvement, the Requester remains responsible for submitting a Desktop Requisition and supporting documentation as soon as possible. Procurement may issue a Confirming Order to formally authorize the purchase after goods or services have already been delivered or initiated. The Procurement Agent is responsible for ensuring: ▪ The purchase is properly documented and clearly linked to the Emergency in the PO record. If the value exceeds $50,000, appropriate justification and exception documentation must be added to the General File associated with Contract or Purchase Order. ▪ The pricing is reasonable relative to market conditions. ▪ The purchase is aligned with the project scope, where applicable. SUPPLIER QUALIFICATION The supplier qualification process is intended to evaluate the risk associated with a supplier, to collect key information and to determine the capabilities of a supplier. 7.1 A prospective Supplier may receive an invitation to bid upon demonstrating its capability of supplying a product or service that will meet Eversource's standards and requirements, as determined by Eversource in its sole discretion. 7.2 Bulk Electric Systems (BES) and Cyber Systems Procurements: For all equipment and services that may be supplied by a prospective supplier to be used for Eversource’s high and medium impact Bulk Electric Systems (BES) and Cyber Systems as described in North American Electric Reliability Corporation (NERC) CIP Reliability Standards, including, without limitation CIP-013, such suppliers shall be required to be qualified as CIP Contractors in accordance with Eversource Energy requirements (see Contractor Compliance Agreement). 7.3 For matters that require a specialized level of knowledge (e.g., environmental, safety or engineering Revision Number: 30 Previous Revision: 29 Page 8 Issue Date: 08/15/2025 Previous Issue Date: 12/11/2024Page 9 of 23
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued July 31, 2026 EOE-046 Attachment 19 Page 9 of 23 Title: Eversource Procurement Manual consultants, capital construction projects, etc.,) technical qualification shall be the responsibility of the Requester. 7.4 8 Suppliers may be disqualified from a particular procurement event or from doing business with Eversource for reasons deemed appropriate by Eversource in its sole discretion, including but not limited to: 7.4.1 Failure to comply with Eversource’s Supplier Code of Business Conduct 7.4.2 Failure to meet technical or commercial qualifications 7.4.3 Unsatisfactory safety record 7.4.4 Unsatisfactory environmental record 7.4.5 Failure to perform services and/or product failure 7.4.6 Failure to participate in or meet bid requirements, including providing required Information documentation, and/or attending pre-bid meetings, and/or responding to invitation to bid 7.4.7 Unprofessional conduct or unsatisfactory business relations 7.4.8 Supplier’s own request to be removed. 7.4.9 Failure to satisfy Eversource’s IT requirements as outlined in the Records and Information Management Policy. 7.5 In the event a Supplier is disqualified, the Procurement Agent shall document the reason for such disqualification. All Supplier disqualification documentation shall be deemed confidential company information and will be retained in the Procurement General Files. 7.6 Suppliers making initial contact with Eversource shall be directed to Procurement. This policy provides a single point of contact for suppliers and preserves the integrity and continuity of the bidders' list. COMPETITIVE BID 8.1 Except as otherwise provided in this Manual, all purchases—whether through Contracts or Purchase Orders—valued over $50,000 must be supported by one of the following: – – – Revision Number: 30 Previous Revision: 29 Competitive Bid: The procurement must be competitively bid, and the related bid evaluation criteria and supporting documentation must be recorded within the designated Eversource sourcing platform. Sole Source Justification: The procurement must be supported by a valid sole source rationale, evidenced by either: o a fully executed Sole Source Justification form (paper), or o a related or referenced approved Sole Source Desktop Requisition (DR) in Maximo. Documented Exception: A completed exception justification based on the criteria outlined in the current version of the Procurement Manual, including: o For Contracts: Use of the Procurement Exception Template to document the applicable exception. Page 9 Issue Date: 08/15/2025 Previous Issue Date: 12/11/2024Page 10 of 23
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued July 31, 2026 EOE-046 Attachment 19 Page 10 of 23 Title: Eversource Procurement Manual o For Purchase Orders: Entry of exception details using the designated log comment structure in the exception log. 8.2 All competitive bidding events must be conducted using Ariba, unless an exception is approved by Procurement Management. The Procurement Agent is responsible for maintaining all documentation in the Contract’s General File. 8.2.1 In instances where a competitive bidding event is not conducted in Ariba, the Procurement Agent must document the rationale, including a description of the obstacles or constraints, within a formal Sourcing Project. The Sourcing Project must also include comprehensive supporting materials equivalent to those required for an Ariba event, such as: – – – – Supplier outreach and communication emails Supplier responses and proposals Bid evaluation criteria and scoring documentation Decision rationale and final selection summary 8.3 All communication between Eversource personnel and suppliers during a competitive bidding event should be conducted through Ariba, except in cases approved under the exception process described in Section 8.2.1. This requirement ensures transparency, traceability, and auditability of the sourcing process. Activities such as pre-bid meetings, bidder interview and negotiations may be conducted outside of Ariba at the discretion of the procurement agent. 8.4 Competitive bids must include multiple suppliers and, where feasible, at least three (3) bidders. If any of the following conditions occur, award recommendation documentation explaining the rationale for the award decision(s) must be present in the General File of the Sourcing Event linked to the awarded contract workspaces: – – – – All, or multiple solicited suppliers were awarded contracts A supplier is awarded a contract without submitting a proposal A supplier was disqualified from the event The Contract(s) awarded has a cumulative value of greater than $5M In all cases, the Procurement Agent can and should negotiate as appropriate to protect Eversource’s commercial interests. 8.5 In unique situations where a competitive bid was released and reveals that procurement has exhausted the ability to secure market competitive suppliers, the priority of award will be to the suppliers with the most competitive offering that are available and able to support the Eversource requirements. 8.6 A competitive bid may be used to support a Contract or an Of Choice Agreement Program, which may consist of numerous Master Agreements and/or Sub Agreement. 8.7 Procurement, after consultation with Requester(s), makes the final determination whether a prospective Supplier will be invited to bid on any specific procurement. 8.8 If the business elects to utilize an alternative Supplier(s) to the Supplier(s) that were determined to be Revision Number: 30 Previous Revision: 29 Page 10 Issue Date: 08/15/2025 Previous Issue Date: 12/11/2024Page 11 of 23
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued July 31, 2026 EOE-046 Attachment 19 Page 11 of 23 Title: Eversource Procurement Manual the best evaluated proposal (s), they will need a sole source justification to support that purchase if the value is greater than the competitive bidding threshold. 8.9 Competitive bids resulting from formal RFPs with a bid closing date are to be submitted and received as specifically required by the RFP. Any failure to comply with bid submission requirements may result in disqualification of the bid. All Bids submitted shall be held unopened, by or under the direction of the Procurement Agent responsible, until after the closing date. 8.10 All bidders shall be notified if a bid date is to be extended. 8.11 Bidders shall not submit revised or improved bids after the closing date unless authorized to do so by the responsible Procurement Agent or Procurement Management. 8.12 After the closing date, the Supplier proposals or quotations shall be opened and evaluated by or under the direction of the responsible Procurement Agent. 8.13 Procurement reserves the right to request additional bidder information at any time during the bid evaluation process. 8.14 Additional suppliers may be added to the bidders list prior to the bid due date or a mandatory pre-bid meeting. After either has passed, additional suppliers may only be added if: – – A second round of bidding is initiated, or The existing RFP is cancelled and reissued. 8.15 Except for energy efficiency programs funded by Eversource customers, as applicable, Eversource does not make any public announcement or public advertisement of its procurements nor are public sealed bid openings held. All such information is considered commercially confidential. 8.16 The evaluation of a Competitive Bid will be based solely on objective commercial and technical criteria applied consistently to all suppliers. 8.17 Non-competitive bid procurements may include the following: 8.17.1 Strategic Professional Services, including but not limited to Legal, Government Relations, Human Resources and Benefits, Advertising, and Crisis Communication. 8.17.2 Purchase Orders or Contracts issued pursuant to federal, state or municipal regulation (e.g., payments into a state fund required by the NERC, PURA, DPU or PUC). 8.17.3 Purchase Orders or Contracts issued for the primary purpose of making payments to parties other than Suppliers (e.g., Energy Efficiency rebate programs). 8.17.4 Purchases of software applications, hardware, annual maintenance contracts, and other information technology already licensed or owned by Eversource and approved by Information Technology for use. 8.17.5 Purchases of items valued at $50,000 or less, or otherwise so low in value, that the cost of obtaining competitive bids would be disproportionate to any savings that a competitive bid process might produce. 8.17.6 Purchases valued over $50,000 for which a review of the marketplace demonstrates that only one viable Supplier is technically and commercially capable of providing the required goods or service. In such cases, a Sole Source Justification Form must be Revision Number: 30 Previous Revision: 29 Page 11 Issue Date: 08/15/2025 Previous Issue Date: 12/11/2024Page 12 of 23
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued July 31, 2026 EOE-046 Attachment 19 Page 12 of 23 Title: Eversource Procurement Manual completed and approved in accordance with the Sole Source Process as defined in section 10. 8.17.7 Purchases for which the Chairman, President & Chief Executive Officer, EVP and Chief Operating Officer, EVP and General Counsel, EVP and Chief Financial Officer, EVP Human Resources, EVP Customer and Corporate Relations or a member of the Board of Trustees has determined that the use of a particular Supplier is necessary for strategic, confidential or essential projects. 8.17.8 The purchase of hotel and catering services. 8.17.9 Material represented by an Item Number in Eversource’s electronic ordering system which needs to be purchased from a particular supplier or manufacturer due to mandates by Standards Engineering, Safety Department, or Tool Committee. 8.17.10 Materials and/or Services necessary as part of the maintenance or repair of company assets and provided by the Original Equipment Manufacturer (OEM) where the use of alternate providers would void the warranty or where the supplier or manufacturer is either mandated by Standards Engineering or has specific knowledge, expertise or resource capabilities. 8.17.11 Purchases necessary to meet the needs of an Emergency or Time Critical Need as defined above. 9 NEGOTIATION & BID EVALUATION 9.1 It is the policy of Eversource to award Agreements based on the best evaluated bid. The best evaluated bid is the proposal that offers the most favorable balance of overall value and pricing, while meeting Eversource’s requirements for quality, reliability, safety, service, availability, and other relevant criteria. The best evaluated bid may or may not be the lowest-priced offer. The criteria and weighting used to determine the best evaluated bid should be collaboratively defined by the responsible Procurement Agent and the Business Unit Leads prior to the release of the competitive solicitation and must be defined prior any proposals being provided. 9.1.1 Any modification to the bid evaluation criteria and weighting after bids are received must be approved by the Vice President of Supply Chain in writing. 9.2 Procurement reserves the right, in its sole discretion, to rebid any RFP, to decline to award a contract under any RFP or to award a contract to any Supplier, as deemed to be in the best interests of any Eversource company. In the event of a rebid, Procurement shall document this decision and retain it in the General File. 9.3 If a Supplier is expected to have an earned value gap of greater than $5M, is seeking self-insured retention or is supporting a key category where their financial stability has come into question, the procurement team will work with the Supplier and treasury to evaluate the supplier’s financial stability. 9.4 A bid may be disqualified for failure to comply with bid submission requirements. A bid may be disqualified for any reason deemed appropriate by the Procurement Agent responsible, including but not limited to those reasons set forth at Section 7.4. Revision Number: 30 Previous Revision: 29 Page 12 Issue Date: 08/15/2025 Previous Issue Date: 12/11/2024Page 13 of 23
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued July 31, 2026 EOE-046 Attachment 19 Page 13 of 23 Title: Eversource Procurement Manual 9.5 Procurement will notify the other bidders of their unsuccessful bid. 10 SOLE SOURCE TRANSACTIONS 10.1 Purchases valued at over $50,000 must be processed as Sole Sources when they are not competitively bid as a review of the marketplace reveals that there is only one viable Supplier who is technically and commercially capable of providing the good or service that is being procured with limited exceptions. Those exceptions include situations where the purchase is identified as an exception to our competitive bidding requirements, which are identified in Section 3.2 and Section 8.17. 10.1.1 Purchases made under and in alignment with Agreements that have been authorized by procurement supported program (e.g., Of Choice Agreement) do not require Sole Source Justification. 10.1.2 Purchases that have already been approved as Sole Source Justifications but required revision within the original scope do not require additional Sole Source Approvals. 10.2 It is the responsibility of the Requester to provide Procurement with either a Sole Source Desktop Requisition in Eversource’s electronic ordering system or a paper form in certain instances. The Sole Source Justification must be approved by the Vice President of Supply Chain. 10.3 In addition, they must be approved by the Requester and their functional Vice President. If they do not have a Vice President in their management chain then a role of greater responsibility should provide their approval in its place (e.g., Sr. Vice President, Executive Vice President, President). 10.4 In addition to these approvals some organizations may elect to require additional approvals, which will be available on Sole Source Specific documentation available on the Eversource Hub page. Note: All Approvers will need to provide their authorization and acceptance of the justification provided and acknowledge that they don’t have any conflicts of interest related to the supplier selection. 10.5 The Sole Source Justification, whether in the form of a Desktop Requisition in Eversource’s electronic ordering system (e.g., Maximo) or an equivalent paper-based form, where applicable, must include the following minimum elements: 10.5.1 A clear and detailed commercial justification describing the rationale for selecting a sole source supplier. This should include an explanation of why no other viable or available sources can meet the technical, commercial, or operational requirements of the requested good or service. 10.5.2 A clear and compelling narrative justification, including a detailed description of the project involved, the reason competitive bidding cannot be conducted, and the efforts made to examine the qualifications of the requested sole source vendor to ensure that Eversource’s business interests are adequately protected. 10.6 Procurement may reject any Sole Source transaction that does not meet the criteria set forth herein. 10.7 The Sole Source justification will be retained in the electronic ordering system as part of the Desktop Requisition as part of the General File in Ariba. 11 TRANSACTION APPROVALS Revision Number: 30 Previous Revision: 29 Page 13 Issue Date: 08/15/2025 Previous Issue Date: 12/11/2024
Text of EOE-046 Attachment 20.pdf
Extracted from the file · 24 pages · 68,685 characters
Text of EOE-046 Attachment 21.pdf
Extracted from the file · 24 pages · 69,773 characters
Text of EOE-048_final.pdf
Extracted from the file · 1 page · 1,490 characters
Text of EOE-048 Attachment 1 REDACTED.pdf
Extracted from the file · 2 pages · 19,737 characters
Text of EOE-050_final.pdf
Extracted from the file · 2 pages · 1,854 characters
As listed on the current system
Question(s) Answered 46, 48, 50 (The Connecticut Light and Power Company dba Eversource Energy) Date Filed: 08/17/2026