Interrogatory responses

Answers to questions 46, 48, 50

ResponseFiled by The Connecticut Light and Power Company dba Eversource Energy11 files
Part of docket 26-05-10Open
  • Electric
Application of The Connecticut Light and Power Company d/b/a Eversource Energy to Amend its Rate Schedules

Files11

Text of EOE-046 Attachment 18.pdf

Extracted from the file · 13 pages · 46,634 characters

Text of EOE-046 Attachment 19.pdf

Extracted from the file · 23 pages · 67,960 characters

  1. Page 11 of 24

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued July 31, 2026 EOE-046 Attachment 20 Page 11 of 24 Title: Eversource Procurement Manual the best evaluated proposal (s), they will need a sole source justification to support that purchase if the value is greater than the competitive bidding threshold. 8.9 Competitive bids resulting from formal RFPs with a bid closing date are to be submitted and received as specifically required by the RFP. Any failure to comply with bid submission requirements may result in disqualification of the bid. All Bids submitted shall be held unopened, by or under the direction of the Procurement Agent responsible, until after the closing date. 8.10 All bidders shall be notified if a bid date is to be extended. 8.11 Bidders shall not submit revised or improved bids after the closing date unless authorized to do so by the responsible Procurement Agent or Procurement Management. 8.12 After the closing date, the Supplier proposals or quotations shall be opened and evaluated by or under the direction of the responsible Procurement Agent. 8.13 Procurement reserves the right to request additional bidder information at any time during the bid evaluation process. 8.14 Additional suppliers may be added to the bidders list prior to the bid due date or a mandatory pre-bid meeting. After either has passed, additional suppliers may only be added if: – – A second round of bidding is initiated, or The existing RFP is cancelled and reissued. 8.15 Except for energy efficiency programs funded by Eversource customers, as applicable, Eversource does not make any public announcement or public advertisement of its procurements nor are public sealed bid openings held. All such information is considered commercially confidential. 8.16 The evaluation of a Competitive Bid will be based solely on objective commercial and technical criteria applied consistently to all suppliers. 8.17 Non-competitive bid procurements may include the following: 8.17.1 Strategic Professional Services, including but not limited to Legal, Government Relations, Human Resources and Benefits, Advertising, and Crisis Communication. 8.17.2 Purchase Orders or Contracts issued pursuant to federal, state or municipal regulation (e.g., payments into a state fund required by the NERC, PURA, DPU or PUC). 8.17.3 Purchase Orders or Contracts issued for the primary purpose of making payments to parties other than Suppliers (e.g., Energy Efficiency rebate programs). 8.17.4 Purchases of software applications, hardware, annual maintenance contracts, and other information technology already licensed or owned by Eversource and approved by Information Technology for use. 8.17.5 Purchases of items valued at $50,000 or less, or otherwise so low in value, that the cost of obtaining competitive bids would be disproportionate to any savings that a competitive bid process might produce. 8.17.6 Purchases valued over $50,000 for which a review of the marketplace demonstrates that only one viable Supplier is technically and commercially capable of providing the required goods or service. In such cases, a Sole Source Justification Form must be Revision Number: 31 Previous Revision: 30 Page 11 Issue Date: 01/21/2026 Previous Issue Date: 08/15/2025
  2. Page 12 of 24

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued July 31, 2026 EOE-046 Attachment 20 Page 12 of 24 Title: Eversource Procurement Manual completed and approved in accordance with the Sole Source Process as defined in section 10. 8.17.7 Purchases for which the Chairman, President & Chief Executive Officer, EVP and Chief Operating Officer, EVP and General Counsel, EVP and Chief Financial Officer, EVP Human Resources, EVP Customer and Corporate Relations or a member of the Board of Trustees has determined that the use of a particular Supplier is necessary for strategic, confidential or essential projects. 8.17.8 The purchase of hotel and catering services. 8.17.9 Material represented by an Item Number in Eversource’s electronic ordering system which needs to be purchased from a particular supplier or manufacturer due to mandates by Standards Engineering, Safety Department, or Tool Committee. 8.17.10 Materials and/or Services necessary as part of the maintenance or repair of company assets and provided by the Original Equipment Manufacturer (OEM) where the use of alternate providers would void the warranty or where the supplier or manufacturer is either mandated by Standards Engineering or has specific knowledge, expertise or resource capabilities. 8.17.11 Purchases necessary to meet the needs of an Emergency or Time Critical Need as defined above. 8.18 Suppliers that have materially participated in the development, drafting, or refinement of a Scope of Work, technical specifications, evaluation criteria, or solicitation strategy for a procurement event shall be deemed to have a potential conflict of interest and shall not participate in the resulting competitive solicitation. Participation by such a Supplier may only occur if the Director of Procurement provides written consent. 9 NEGOTIATION & BID EVALUATION 9.1 It is the policy of Eversource to award Agreements based on the best evaluated bid. The best evaluated bid is the proposal that offers the most favorable balance of overall value and pricing, while meeting Eversource’s requirements for quality, reliability, safety, service, availability, and other relevant criteria. The best evaluated bid may or may not be the lowest-priced offer. The criteria and weighting used to determine the best evaluated bid should be collaboratively defined by the responsible Procurement Agent and the Business Unit Leads prior to the release of the competitive solicitation and must be defined prior any proposals being provided. 9.1.1 9.2 Any modification to the bid evaluation criteria and weighting after bids are received must be approved by the Vice President of Supply Chain in writing. Procurement reserves the right, in its sole discretion, to rebid any RFP, to decline to award a contract under any RFP or to award a contract to any Supplier, as deemed to be in the best interests of any Eversource company. In the event of a rebid, Procurement shall document this decision and retain it in the General File. Revision Number: 31 Previous Revision: 30 Page 12 Issue Date: 01/21/2026 Previous Issue Date: 08/15/2025
  3. Page 13 of 24

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued July 31, 2026 EOE-046 Attachment 20 Page 13 of 24 Title: Eversource Procurement Manual 9.3 If a Supplier is expected to have an earned value gap of greater than $5M, is seeking self-insured retention or is supporting a key category where their financial stability has come into question, the procurement team will work with the Supplier and treasury to evaluate the supplier’s financial stability. 9.4 A bid may be disqualified for failure to comply with bid submission requirements. A bid may be disqualified for any reason deemed appropriate by the Procurement Agent responsible, including but not limited to those reasons set forth at Section 7.4. 9.5 Procurement will notify the other bidders of their unsuccessful bid. 10 SOLE SOURCE TRANSACTIONS 10.1 Purchases valued at over $50,000 must be processed as Sole Sources when they are not competitively bid as a review of the marketplace reveals that there is only one viable Supplier who is technically and commercially capable of providing the good or service that is being procured with limited exceptions. Those exceptions include situations where the purchase is identified as an exception to our competitive bidding requirements, which are identified in Section 3.2 and Section 8.17. 10.1.1 Purchases made under and in alignment with Agreements that have been authorized by procurement supported program (e.g., Of Choice Agreement) do not require Sole Source Justification. 10.1.2 Purchases that have already been approved as Sole Source Justifications but required revision within the original scope do not require additional Sole Source Approvals. 10.2 It is the responsibility of the Requester to provide Procurement with either a Sole Source Desktop Requisition in Eversource’s electronic ordering system or a paper form in certain instances. The Sole Source Justification must be approved by the Vice President of Supply Chain. 10.3 In addition, they must be approved by the Requester and their functional Vice President. If they do not have a Vice President in their management chain then a role of greater responsibility should provide their approval in its place (e.g., Sr. Vice President, Executive Vice President, President). 10.4 In addition to these approvals some organizations may elect to require additional approvals, which will be available on Sole Source Specific documentation available on the Eversource Hub page. Note: All Approvers will need to provide their authorization and acceptance of the justification provided and acknowledge that they don’t have any conflicts of interest related to the supplier selection. 10.5 The Sole Source Justification, whether in the form of a Desktop Requisition in Eversource’s electronic ordering system (e.g., Maximo) or an equivalent paper-based form, where applicable, must include the following minimum elements: 10.5.1 A clear and detailed commercial justification describing the rationale for selecting a sole source supplier. This should include an explanation of why no other viable or available sources can meet the technical, commercial, or operational requirements of the requested good or service. 10.5.2 A clear and compelling narrative justification, including a detailed description of the project involved, the reason competitive bidding cannot be conducted, and the efforts Revision Number: 31 Previous Revision: 30 Page 13 Issue Date: 01/21/2026 Previous Issue Date: 08/15/2025
  4. Page 14 of 24

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued July 31, 2026 EOE-046 Attachment 20 Page 14 of 24 Title: Eversource Procurement Manual made to examine the qualifications of the requested sole source vendor to ensure that Eversource’s business interests are adequately protected. 10.6 Procurement may reject any Sole Source transaction that does not meet the criteria set forth herein. 10.7 The Sole Source justification will be retained in the electronic ordering system as part of the Desktop Requisition as part of the General File in Ariba. 11 TRANSACTION APPROVALS 11.1 All approval thresholds for Purchase Orders and Contract approvals are governed by the Eversource Delegation of Authority Policy. 11.2 Signature authority for Contracts is aligned with the Delegation of Authority. 11.2.1 The Vice President, Supply Chain & Property Management is authorized to sign agreements on behalf of the Chief Financial Officer (CFO), Chief Executive Officer (CEO) and the Subsidiary Board, provided that formal approval has been obtained from the CFO, CEO and/or the Board, respectively. 12 PURCHASE ORDER REVISIONS & CONTRACT AMENDMENTS Requests for Contract revisions or amendments shall be reviewed on a case-by-case basis and are subject to the same approval requirements as the original Contract. Typical criteria for Contract amendments may include, but are not limited to: – Market-driven adjustments – Changes in project scope – Unavailability of resources to support a re-bid Procurement Agents are responsible for documenting the basis and approval of all Purchase Order revisions and Contract amendments in the General File, in accordance with Section 14. 12.1 Contingency Management Contingency is defined as an authorized allocation of funds within a Purchase Order to address unforeseen work or conditions that fall within the original scope of the Contract but could not be fully defined or quantified at the time of award. Contingency shall not be added to or released from a Desktop Requisition (DR) to expand the scope of any governing Contract unless the Contract has been formally amended to allow such a change. Contingency functionality exists to maintain accurate records and to provide flexibility for scope refinements due to conditions including, but not limited to: – – – 12.1.1 Revision Number: 31 Previous Revision: 30 Subsurface issues Permitting delays Utility conflicts Contingency may be added to a new Desktop Requisition line or modified on an existing DR that has already generated a Purchase Order. In either case, the DR must route through approvals based on the total value, inclusive of any released or Page 14 Issue Date: 01/21/2026 Previous Issue Date: 08/15/2025
  5. Page 15 of 24

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued July 31, 2026 EOE-046 Attachment 20 Page 15 of 24 Title: Eversource Procurement Manual unreleased contingency. 12.1.2 When contingency is available for release, the Business Partner must notify the assigned Procurement Agent and describe the justification for release. – If the change necessitating contingency release would result in a scope expansion or requires a change to the governing Agreement, the Business Partner must wait for the Contract Amendment to be executed by Procurement before proceeding. 12.2 Change Orders Requiring Contract Amendments Change Orders are formal written amendments to an existing Agreement. Revised Contract documents must be issued to the Supplier by Procurement prior to any performance or billing under the revised terms. A Contract Amendment must be processed through Procurement when any of the following apply: – – – – – – Change in Scope of Work or Deliverables Change to Contract Language or Legal Terms Modification of Unit Rates or Fee Schedules Expenditure of Contingency Funds Impact on Contract Value Requiring Negotiation Order Revisions Exceeding Contract Value These types of Change Orders must be initiated by the Business and provided to Procurement with supporting documentation and justification. Procurement will review, draft, and execute the contract amendment, and update all system records, including the Contract’s General File in Ariba. Revised documents must be provided to the Supplier prior to any implementation. 12.3 Order Revisions for Additional Funding Within Scope If additional funding is required for a Purchase Order, but no changes are needed to the scope of work, commercial terms, or governing contract, the Business Partner may increase the Order value by modifying the DR to add additional contingency or releasing available contingency on the DR. Procurement must be notified of the funding increase, but direct involvement is not required unless: – – The revision causes the Order to exceed the authorized contract value; or The request suggests possible scope expansion or commercial inconsistency. 12.4 Procurement Oversight of Revisions - If Procurement identifies a potential risk or conflict, they may require a contract amendment and apply the Change Order process as defined in Section 12.2. If no issues are identified, the Business Partner may proceed once all financial authorizations are in place. 13 CONTRACT CLOSEOUT Contract closeout is a best practice process led by Procurement and supported by the Business Unit to ensure fulfillment of all contractual obligations, documentation of performance, and transition of responsibilities or data. 13.1 Closeout Activities The following actions are required to formally close a contract: Revision Number: 31 Previous Revision: 30 Page 15 Issue Date: 01/21/2026 Previous Issue Date: 08/15/2025
  6. Page 16 of 24

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued July 31, 2026 EOE-046 Attachment 20 Page 16 of 24 Title: Eversource Procurement Manual 13.1.1 Confirm that all goods and services have been delivered and accepted. 13.1.2 Ensure all invoices have been received and paid. 13.1.3 If the Contract contains a renewal clause, Procurement will work with the Business Unit to determine continuation or re-bid. 13.1.4 Ensure that any supplier access (e.g., system credentials, facility access) has been deactivated where applicable. Revision Number: 31 Previous Revision: 30 Page 16 Issue Date: 01/21/2026 Previous Issue Date: 08/15/2025
  7. Page 17 of 24

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued July 31, 2026 EOE-046 Attachment 20 Page 17 of 24 Title: Eversource Procurement Manual CONTRACT DOCUMENTS & STANDARDS 14 DOCUMENTATION & RECORDS MANAGEMENT All contractual commitments made under the provisions of this Manual must be supported by one of the following: – – – A standalone Agreement represented by a Contract maintained in Ariba; A Purchase Order incorporating General Terms and Conditions and any applicable Special Conditions; or An integrated Purchase Order that references a Contract maintained in Ariba. 14.1 All transactions for services or custom equipment and materials must be supported by either: – – An integrated Purchase Order that references a Contract in Ariba, or A Purchase Order that is dually executed by authorized representatives of both Eversource and the Supplier. 14.2 The Contract General File, maintained in Ariba, shall be created for all executed Contracts and populated with the required documentation within ten (10) calendar days of the Agreement’s effective date. The Contract Workspace General File must include, as applicable: 14.2.1 Exception documentation, a Sole Source Justification, or a systematic linkage to the Sourcing Project that contains the competitive bid documentation for Contracts valued at over $50,000. 14.2.2 The link to the Sourcing Project, when supported by a competitive bid, must contain: – – – The RFP and all Supplier proposals A record of formal and material Supplier correspondence that occurred during the sourcing process The Bid Evaluation and award recommendation documentation, if applicable 14.2.3 A dually executed Agreement and all associated exhibits, attachments, and referenced documents. 14.2.4 Any Agreement Amendments or Contract revisions executed after the original Agreement. 14.2.5 The Certificate of Insurance, where required. All documentation must be systematically organized and remain readily accessible through Ariba to ensure audit readiness and compliance with Eversource’s Records and Information Management Policy. 14.3 For Agreements unique to federal government contracts and valued at over $750,000 (or $1,500,000 for construction-related work), the Contract’s General File must also include a Subcontracting Plan in compliance with applicable Federal Acquisition Regulations (FAR). 15 TERMS AND CONDITIONS Revision Number: 31 Previous Revision: 30 Page 17 Issue Date: 01/21/2026 Previous Issue Date: 08/15/2025
  8. Page 18 of 24

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued July 31, 2026 EOE-046 Attachment 20 Page 18 of 24 Title: Eversource Procurement Manual 15.1 Unless otherwise approved by Procurement Management, the Eversource General Terms and Conditions (GTCs) shall be included in all Requests for Proposal (RFPs) and shall be fully integrated into all resulting Agreements. General Terms and Conditions refers to the standard contract templates maintained by Procurement, which may be issued as standalone GTCs or embedded within an integrated contract format. 16 CERTIFICATES OF INSURANCE 16.1 Contractors providing services on site at Eversource facilities, properties, or work sites owned or managed or legally accessible by Eversource (“Work on Site”) are required to provide current Certificates of Insurance (COI) with proper coverage and naming Eversource Energy and its affiliates as an additional insured prior to the commencement of work. 16.2 Eversource Procurement has contracted with a 3rd party Supplier to manage COIs obtained from contractors as applicable. Agents shall obtain a COI which meets the criteria set forth below prior to the approval of an Order for a new vendor or for work that requires insurance coverage that deviates from the standard coverage required for the work (negotiated insurance coverage). Otherwise, the Procurement Agent shall ensure a valid COI is on file and available with Eversource’s 3rd party COI Administrator provided by the earlier of: (i) seven (7) business days after the issuance of the Order; or (ii) prior to the commencement of work. In the case of emergency work, the COI shall be obtained as soon as reasonably practicable. 16.3 The type of insurance coverages and coverage limits required for an Order may be modified from the standard terms and conditions form requirements upon the approval of Director of Claims and Insurance or his/her designee, and by a Vice President of the business group for whom the services are being performed, in his/her sole discretion. 16.4 Procurement Agents are responsible to ensure that contractors have the appropriate insurance coverages at the initiation of a Contract. Eversource’s 3rd party COI administrator is responsible for ensuring renewal COIs are maintained in their portal for Procurement Agents review and accessibility. In the event the COI Administrator is unable to obtain renewal COI from a Supplier, the Procurement Agent is responsible for obtaining the renewal. Upon receipt of a COI, the Procurement Agent responsible shall confirm that the COI: – – – Reflects the required coverage types and minimum coverage limits; Includes the required additional insured endorsement language; Is uploaded promptly to the third-party COI administrator’s portal for tracking and audit purposes. 17 GOVERNMENT CONTRACTING Government Contracting Compliance: In connection with Work to be performed by Suppliers that Procurement has been advised is specifically for a state or federal government contract or state or federally funded contract, in addition to all other legal compliance obligations, Eversource requires such Suppliers and subcontractors to comply with all applicable laws and regulations specific to and applicable to such contracts. In these situations, Eversource Procurement must engage legal to review the situation and to ensure that that appropriate language and requirements are communicated to both business partners and Revision Number: 31 Previous Revision: 30 Page 18 Issue Date: 01/21/2026 Previous Issue Date: 08/15/2025
  9. Page 19 of 24

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued July 31, 2026 EOE-046 Attachment 20 Page 19 of 24 Title: Eversource Procurement Manual suppliers. Such contracts shall include, without limitation, and as applicable, required provisions regarding employment and non-discrimination, Connecticut Department of Transportation (CDOT) terms, applicable Federal Acquisition Regulations (FAR), and Buy America and Buy American requirements. SUPPLIER MANAGEMENT 18 PERFORMANCE MANAGEMENT Performance Management is a continuous and structured process designed to ensure that suppliers consistently meet Eversource’s expectations related to cost, safety, quality, service, and enterprise risk alignment. It is a shared responsibility across Procurement, Business Units, and the Supplier, and is managed through the Supplier Relationship Management (SRM) best practices and the Vendor Risk Management Program. 18.1 Supplier Relationship Management (SRM) Program The SRM Program is Eversource’s best practice framework for evaluating, engaging, and improving supplier performance through a tiered governance model, supported by structured data, dashboards, and business feedback. Suppliers are identified and placed into tiers based on the associated suppliers existing and expected relationship including but not limited to opportunity, strategic relevance and risk. 18.1.1 Supplier Scorecards Category-specific scorecards are maintained and updated at least annually for Tier I and Tier II suppliers and may include Key Performance Indicators (KPIs) such as: – – – – – 18.1.2 On-time delivery Actual invoice terms and billing accuracy Safety performance (e.g., ISNetworld grades) Sustainability & ESG performance Cybersecurity compliance (where applicable) Formal SRM Meetings Eversource holds structured meetings to review performance and identify opportunities for continuous improvement: – – – 18.1.3 Tier I Suppliers: Executive-level SRM meetings held annually, with mid-year touchpoints. Tier II Suppliers: At least one formal performance review meeting per year, with additional check-ins as needed. Tier III Suppliers: Semi-annual informal check-ins with formal meetings being held based on risk, performance, and spend. Continuous Improvement Supplier feedback, performance insights, and improvement action plans are developed collaboratively with Business Units and are reviewed as part of the SRM process. Revision Number: 31 Previous Revision: 30 Page 19 Issue Date: 01/21/2026 Previous Issue Date: 08/15/2025
  10. Page 20 of 24

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued July 31, 2026 EOE-046 Attachment 20 Page 20 of 24 Title: Eversource Procurement Manual This ensures accountability and enables a closed-loop feedback system focused on driving improvements in quality, safety, and value delivery. 18.1.4 Supplier Tiering Framework Procurement owns and manages supplier tier designations in coordination with Business Units. Tier assignments are reviewed annually or as needed based on supplier performance, risk incidents, or evolving business requirements. Suppliers are categorized as follows: – – – Tier I: Strategic or high-risk suppliers (typically among the top 50–100 by annual spend or business criticality) Tier II: Operationally important suppliers with moderate spend or complexity Tier III: Transactional or low-complexity suppliers with limited strategic impact 18.2 Performance Monitoring Tools Procurement and Business Units leverage several internal and external systems to monitor and evaluate supplier performance: – – – – PowerBI SRM Dashboard (Spend, Scorecards, Compliance) ISNetworld (Safety compliance) RiskRecon (Cyber & compliance risk) Scorecard templates and dashboards available on SharePoint 19 SUPPLIER ENGAGEMENT 19.1 All Procurement Agents are expected to proactively: – – – Identify and pre-qualify prospective suppliers Collaborate with the Senior Specialist, Supplier Engagement Program to maintain an inclusive and competitive supplier base Provide opportunities for prospective suppliers to meet with Procurement and participate in sourcing activities Suppliers shall be evaluated using standardized criteria that apply to all sourcing events, ensuring fairness and consistency across all supplier types and regions. 19.2 Supplier Qualification and Tracking Qualified supplier data shall be: – – – Categorized and tracked in accordance with applicable laws, regulations, and internal policies Maintained to comply with standards such as the Federal Acquisition Regulation (FAR) and other relevant legal or regulatory requirements Used to support Eversource’s commitment to sourcing from a broad and comprehensive pool of qualified suppliers 19.3 Equal Opportunity and Access Eversource is committed to maintaining a procurement environment that promotes equal access to Revision Number: 31 Previous Revision: 30 Page 20 Issue Date: 01/21/2026 Previous Issue Date: 08/15/2025

Text of EOE-046 Attachment 21.pdf

Extracted from the file · 24 pages · 69,773 characters

Text of EOE-048_final.pdf

Extracted from the file · 1 page · 1,490 characters

Text of EOE-048 Attachment 1 REDACTED.pdf

Extracted from the file · 2 pages · 19,737 characters

Text of EOE-050_final.pdf

Extracted from the file · 2 pages · 1,854 characters

As listed on the current system

Question(s) Answered 46, 48, 50 (The Connecticut Light and Power Company dba Eversource Energy) Date Filed: 08/17/2026

This filing on the current system (opens in a new tab)