Skip to main content

A prototype public docket site for the Connecticut Public Utilities Regulatory Authority

Utility Dockets and Filings

Interrogatories

To CL&P, questions 481 thru 500

Files1

Search terms highlighted
Eversource rate increase is on 2 pages of the text below, highlighted. Go to the first matchClear highlighting
2 pages match
  1. Page 1 of 40

    STATE OF CONNECTICUT PUBLIC UTILITIES REGULATORY AUTHORITY OFFICE OF EDUCATION, OUTREACH, & ENFORCEMENT November 13, 2026 Docket No. 26-05-10 Re: Docket No. 26-05-10 - Application of CL&P dba Eversource Energy to Amend its Rate Schedules Enclosed are interrogatories EOE-481 through EOE-580 directed to The Connecticut Light and Power Company d/b/a Eversource Energy (“Eversource,” or “Company”). The responses to these questions have been deemed necessary by the Public Utilities Regulatory Authority (Authority) Office of Education, Outreach, and Enforcement (EOE) in connection with the above referenced docket, and will become a part of the record in this proceeding. Please note that persons responsible for responses must be available for cross-examination during a hearing, if held, and must attest to the truth and accuracy of their responses. Please submit the responses to the Authority’s Executive Secretary no later than 4pm on November 30, 2026. If a response to any of the requested information has already been filed in response to another interrogatory response in this proceeding, please reference the interrogatory which provides the information. It is the respondent’s responsibility to ensure that any such information is on file with the Executive Secretary of the Authority. EOE requests that all interrogatory responses be included in the same document, rather than responses to each interrogatory being filed as individual documents. Anyone filing material with the Authority should file only an electronic copy through the PURA Web Filing System. Please refer to Electronic Filing on the Authority’s website for more information. Paper filings will be accepted only if a person is unable to file electronically. The Authority reserves the right to request paper copies of certain filings at a later date. No confidential material may be filed publicly through the web filing system. Confidential material can be filed electronically by email using the following directions: confidential material must be emailed directly to [email removed] in an email with a subject line labeled in all capital letters “CONFIDENTIAL MATERIAL - NOT FOR PUBLIC DISCLOSURE.” Each page of any electronic confidential information shall also contain a header “CONFIDENTIAL – NOT FOR PUBLIC DISCLOSURE.” The motion for a protective order shall be filed publicly. 10 Franklin Square, New Britain, CT 06051 An Equal Opportunity Employer www.ct.gov/pura
  2. Page 2 of 40

    The Authority operates with the strong presumption that all documents filed with it are public records subject to the right of public inspection and copying in accordance with the Connecticut Freedom of Information Act, Conn. Gen. Stat. § 1-200 et. seq. In those exceptional circumstances where a participant believes that information it intends to file is confidential under law, it may file a Motion for a Protective Order requesting an exemption from public disclosure. The Motion must provide specific legal arguments with reference to state or federal law describing with supporting facts why the information should be kept confidential. A certified affidavit supplied by a competent witness in support of the Motion, a proposed protective order and nondisclosure agreement must be appended to the Motion. The Authority will rule on the Motion forthwith, and give further direction as necessary. Contact the Authority’s Executive Secretary at [phone removed] with questions regarding making a confidential filing. The current service list for this docket is available on the Authority's website located at www.dpuc.state.ct.us/DPUCservlist.html. Sincerely, By: /s/Brittany Wyman Brittany Wyman Attorney PUBLIC UTILITIES REGULATORY AUTHORITY Office of Education, Outreach and Enforcement Enclosure cc: Service List
  3. Page 3 of 40

    CERTIFICATE OF SERVICE I hereby certify that on this day the foregoing document was filed with the Public Utilities Regulatory Authority, and copies thereof were served upon each person designated on the official service list in this proceeding in accordance with R.C.S.A. § 16-1-15. Sincerely, Jamie Spannhake By: /s/ Jamie Spannhake Attorney PUBLIC UTILITIES REGULATORY AUTHORITY Office of Education, Outreach and Enforcement
  4. Page 4 of 40

    The following Interrogatories, designated as EOE-481 through EOE-580, are directed to The Connecticut Light and Power Company d/b/a Eversource Energy (“Eversource” or “Company”). EOE-481. (EVERSOURCE WINDSOR OPERATIONS CENTER) Regarding the Company’s property located at 1985 Blue Hills Avenue Extension, Windsor, Connecticut, provide the following information: a. Describe the Company’s acquisition of the property, including the acquisition date, purchase price, and original intended use. Additionally, discuss the historical and current uses of the property, including any expansion or changes in operations conducted at the location, as well as the timing. b. Identify, by year, all capital investments associated with the property, including acquisition costs, improvements, expansions, and other capital expenditures. For each year, identify the amount of capital investment included in the Company's rate case filing and provide the corresponding references (e.g., schedules, exhibits, testimony, or supplemental filings). c. Identify the annual O&M expenses associated with the property that are included in the Company's Rate Year request, broken down by major expense category. As part of the response, provide the corresponding references to where these expenses are reflected within the rate case filing (i.e., SFR schedules). d. Indicate whether the Company's use of the property has resulted in any cost allocations or chargebacks from its Connecticut operations to Eversource affiliates. If applicable, identify the allocation amounts by affiliate and year from 2020 through the Rate Year and discuss the nature of the allocations. EOE-482. (STORM REMEDIATION – BLOCKED ROADS) Refer to Responses to EOE-383 and OCC-906. The Company’s response to EOE-383 appears to focus on the removal of damaged vegetation that could still result in damage to the electrical grid versus the removal of downed vegetation that would not impair electrical service. Provide copies of all policies, procedures, guidance, statutes, or regulations, that detail the Company’s obligations for the removal of vegetation that is blocking a road or right of way, which is unrelated to an issue with electrical service or exists after the vegetation has been cut free from the electrical apparatus (i.e., wires, poles, transformers, etc). To clarify, this inquiry attempts to understand if the Company is required to incur costs to remove the downed vegetation in lieu of deferring the remediation to the property owner or municipality. EOE-483. (MS24A-VENDOR-FOOD/LODGING) Refer to Responses to EOE-219 and EOE-386, and Exhibit ACCT-2 CLP-1 and Confidential Exhibit ACCT-2 CLP-1A-10, pp. 158-162. The Company’s response to EOE-219 identified
  5. Page 5 of 40

    that “[t]he cancellation notification was sent via email on Wednesday, January 10, 2024, at 2:19pm.” Additionally, the response stated that “[d]ue to a guarantee on the rooms and the ordered food, the Company incurred charges for the cancelled rooms and the cost of the ordered food.” The Company’s response to EOE-386 identified that “[t]he notice required that would have prevented a cancellation charge would have been any time prior to 6pm on the same day” and “there is no notice requirement for meals.” Respond to the following: a. Reconcile these two conflicting responses within EOE-219 and EOE386. Specifically, explain why the Company was unable to cancel all unused rooms and meals given that the cancellation was provided prior to the notice requirement. b. Identify the specific meals and rooms by day that were paid and not used, along with the total cost of the unused services (i.e., rooms and meals). Specifically, EOE requests confirmation that none of the January 10-12 charges were applicable to services actually utilized. If not confirmed, explain. EOE-484. (MS24A-VENDOR-LINE) Refer to Responses to EOE-417, EOE-243, Exhibit ACCT-2 CLP-1, and Confidential Exhibit ACCT-2 CLP-1A-17, pp. 238-301. The Company’s response to EOE-243 (subsection ‘d’) deduced that there was a clerical error with the hours reported on pp. 274-275 but asserted that there was no duplicate billing. The Company’s response to EOE-417 confirmed that the response to EOE-243 cited a document in error and referenced reliance on the Arcos system to support the vendor crews’ arrival time of 6:00 p.m. Respond to the following: a. Provide a copy of the Arcos records that were referenced in EOE-417, as used to confirm the crew’s arrival time of 6:00 p.m. b. Provide the “incremental impact of two hours billed” as was originally requested in EOE-417. c. Clarify the Company’s final sentence within its response to EOE-417 where the response states “… notwithstanding the absence of a signed Eversource Contractor Storm Mobilization & Demobilization Time Report.” Specifically, please confirm that there was a signed Eversource Contractor Storm Mobilization & Demobilization Time Report provided at pp. 274-275 and explain what the Company meant in its response. EOE-485. (EMERGENCY RESPONSE SPECIALIST) Refer to Response to EOE-418. Identify if the Company performed any type of analysis to determine the largest number of Emergency Response Specialists that could be employed while maintaining the same, or less, annual fully loaded costs. If an analysis has occurred, please provide. If an analysis has not occurred, explain why.
  6. Page 6 of 40

    EOE-486. (FUEL REIMBURSEMENT) Refer to Responses to EOE-401 and EOE-290, Att. 2. The Company’s response to EOE-401 identified that “the Company has not separated and removed these [fuel] costs to obtain contractor reimbursements because it is not cost-efficient to do so.” Respond to the following: a. Explain how the Company determined that it is not cost-effective to obtain reimbursement for vendor fuel costs during storm events. Additionally, provide an estimate for the unreimbursed fuel costs included in the storm recovery request, along with corresponding calculations, or explain why an estimate cannot be provided. b. Referring to EOE-290, Att. 2 CONFIDENTIAL, identify both the number of external vendor crews and number of Eversource crews located at each location (i.e., hotel) that would have received Fuel. Additionally, using the respective crew counts, provide a percentage of costs that would be applicable to external vendors versus Company employees. c. Referring to response to subsection ‘b’, discuss if the percentage derived would be representative of other major storm events. EOE-487. (CAR VS. POLE) Refer to Response to EOE-406. Respond to the following: a. Discuss any review procedures performed by the Company to ensure that all Car vs. Pole activity identified within OMS has been eliminated from the storm recovery balance. If a dedicated review of OMS vehicle accidents has not occurred, explain why. b. Referring to EOE-406, Att. 1, identify if the report can be expanded to include additional details (i.e., fields) to include work order number and assigned crews (i.e., vendors). If the additional fields can be provided, please provide along with a data dictionary. If the fields cannot be provided, please provide a detailed listing of all fields that could be extracted for analysis purposes, along with a data dictionary. EOE-488. (3RD PARTY CLAIMS/CAR VS. POLE) Refer to Responses to EOE-406 and RRU-087. Respond to the following: a. Discuss how 3rd party claims are identified, who handles the processing, where the activity is logged, how the activity is monitored, and how the activity is reported (i.e., internally within the Company). b. Identify how the accounting of 3rd party claims is administered to include both the recording of the recoverable balance and the reserve (i.e., referenced in RRU-087). c. Identify if the Company performs or is capable of performing a reconciliation between the Car vs. Pole activity reported in OMS to the activity discussed in subsections ‘a’ and ‘b’. If a reconciliation is possible, please provide a representative sample for 2024. If a reconciliation is not possible, explain why.
  7. Page 7 of 40Match

    d. Identify all 3rd party claim scenarios that are logged in OMS (i.e., other than car vs. pole) and provide a comprehensive OMS extract detailing each scenario’s activity for the period 2024 through 2025. EOE-489. (MS24H-CAR VS. POLE) Refer to Response to EOE-406. Comparing EOE-406, Att. 1, Excel Row 490 to Exhibit ACCT-2 (CLP-9A-1) CONFIDENTIAL, p. 497, confirm that the OMS Event No. 5440073 was repaired by the Conexus Energy Group vendor and the costs were incorrectly charged to the MS24H event. If confirmed, provide an unlocked Excel spreadsheet calculating the amount applicable to the “car vs pole” repair and confirm that it will be eliminated from the recovery request. Additionally, identify any other vendor charges that would be applicable to the OMS Event. If not confirmed, explain how the Company determined that the OMS information was inaccurate. EOE-490. (MS24A-VENDOR-LINE-TRAVEL) Refer to Responses to EOE-408, EOE246, Exhibit ACCT-2 CLP 1, and Confidential Exhibit ACCT-2 CLP-1A-17, pp. 329-333. Respond to the following: a. Referring to EOE-408 subsection ‘b’, please clarify the Company’s response where it responded that the Correct number of hours attributed to Travel was 16 and the Correct number of hours attributed to Standby was 3. Specifically, is it the Company’s position that time spent to “Shape up at shop, onboard/safety train new hires, prepare fleet, tooling fleet, tailboard, travel, safety training of Eversource videos” (i.e., EOE246, subsection ‘a’) are all attributed to Travel or are several of these activities attributed to Standby? Provide details. b. If response to subsection ‘a’ is that all onboarding hours are attributed to Travel (i.e., billed at the corresponding rates), identify where this treatment is defined within the vendor contract or Company procedures. Additionally, explain why it took 6 hours (i.e., 11 hours on ACCT-2 CLP1A-17, pp. 331-332 less the 5 hours of travel estimated in EOE-246, subsections ‘a’ and ‘b’) to perform the onboarding tasks. c. If response to subsection ‘a’ is that onboarding hours are attributed to Standby, provide an unlocked Excel spreadsheet detailing the equipment billed during standby and calculate the total amount of equipment billed during the revised (increased) number of standby hours. EOE-491. (STORM EVENT DOCUMENTATION) Refer to Response to EOE-030SP01, Att. 1. Provide a reconciliation between the line crew costs reported within EOE-030-SP01, Att. 1 to the respective line crew costs reported within each storm’s Excel spreadsheet. To the extent that the amounts differ, please supplement EOE-030-SP01, Att. 1. As an example, EOE observed that Exhibit ACCT-2 CLP-01 (MS24A Excel spreadsheet) identified $14,059,070 of line crew costs compared to $8,355,703 within
  8. Page 8 of 40

    EOE-030-SP01, Att. 1. Similarly, EOE observed that Exhibit ACCT-2 CLP02 (MS24B Excel spreadsheet) identified $3,490,465 of line crew costs compared to $2,036,801 within EOE-030-SP01, Att. 1. EOE’s observations were not limited to these two examples. EOE-492. (STORM FLEET) Refer to Response to EOE-393. EOE-393 attempted to obtain a breakdown of the Storm Fleet costs split between Connecticut, Massachusetts, and New Hampshire. Instead, the Company provided an allocation of the total Annual Storm Fleet costs allocated to each state based on usage. Identify if the Company is capable of providing the underlying costs for each state to include costs relevant to the individual vehicles (i.e., maintenance, depreciation, etc) and the individual locations (i.e., storage costs, plowing, etc). If the Company is capable of providing costs applicable to each state’s fleet, please provide. If the Company is incapable of providing the costs applicable to each state’s fleet, explain why. EOE-493. (STORM FLEET-EXPENSES) Refer to Responses to EOE-396 and EOE178, Att.1. The Company was requested to provide documentation supporting various sampled Fleet expenses and provide explanations detailing the nature of the expenses. Respond to the following: a. Referring to sample selection ‘b’, the Company referenced that the monthly charge for storage of storm vehicles was approved without an invoice. Provide additional details regarding the nature of this monthly charge (i.e., why do the vehicles require storage in lieu of using Company owned property, where is the storage located, etc.) and provide the omitted documentation. If documentation cannot be provided, explain how this cost can be assessed for prudence. b. Referring to sample selection ‘c’, explain how an upgrade to an MRC command vehicle is treated as an expense versus a capitalized asset in accordance with Capital Versus Expense Criteria (i.e., EOE-060, Att.3). c. Referring to sample selection ‘c’, explain how the supporting invoice aligns to the selection. Specifically, the invoice references an International HV607 (i.e., a dump truck) supporting a different amount than included in EOE-178, Att. 1. Also, explain how a dump truck is included in the storm fleet. d. Referring to sample selection ‘c’, explain how the plowing of the Shrewsbury Massachusetts lot is relevant to the Connecticut storm fleet. As part of the response, identify if any of the Connecticut storm fleet vehicles are located in the lot. e. Referring to sample selection ‘d’, explain why a third-party vendor is necessary to drive the trucks “to keep them from forming issues from sitting for long periods” in lieu of Company employees. Additionally, identify the preceding date in which the storm fleet vehicles were used to have warranted the need for the vendor to drive the fleet vehicles.
  9. Page 9 of 40

    f. Referring to sample selection ‘g’, the Company explained that the sampled expense “are journal entries and UVL transactions to account for charges in the proper account” but failed to provide any supporting documentation for the $232,106.98 expense. Provide additional details and supporting documentation for the underlying amount. If supporting documentation cannot be provided, explain why. g. Referring to sample selection ‘h’, explain how the rental of a specialty "cutter truck" is relevant to the storm fleet. As part of the response, identify if the equipment is mounted on a Connecticut fleet vehicle. EOE-494. (STORM FLEET-INVENTORY) Refer to Responses to EOE-031, Att.1 and EOE-395. Provide an unlocked Excel spreadsheet detailing each fleet vehicle included within the Company’s inventory by year (2024-present). As part of the response, please identify the type of vehicle, the vehicle ID number, the assigned state, the cost basis, the net carrying value, and other pertinent details that reconcile with EOE-395. EOE-495. (STORM FLEET-DEPRECIATION/RATE OF RETURN) Refer to Responses to EOE-395 and EOE-178, Att. 1. The Company’s response to EOE-395 identified several “revisions” to the storm fleet costs and referenced EOE-178RV01 (which has yet to be provided). Provide an unlocked Excel spreadsheet detailing the impact (i.e., allocation reduction) to each Major and Minor storm event to account for the revisions. EOE-496. (NON-STORM FLEET ADDITIONS– CONNECTICUT) Provide an unlocked Excel spreadsheet detailing the Company’s non-storm fleet additions and disposals by year (i.e., 2021-present) and provide details regarding the types of vehicles. Additionally, identify the projected number of non-storm fleet additions by type through the rate year. EOE-497. (MS24A-VENDOR-LINE/FLEET) Refer to Responses to EOE-407 and EOE-251. The Company’s responses to the two interrogatories provided conflicting information. Specifically, EOE-251 confirmed billing errors of $24,653 and discussed that “[c]ertain Eversource Storm Fleet assets, including bucket trucks utilized by line crews, were staged in Massachusetts.” The Company’s response to EOE-407 asserts that “[t]he SOS contractor mobilized directly to Connecticut. The reference to Shrewsbury, Massachusetts, as the ending location on the timesheet was most likely an inadvertent documentation error.” Respond to the following: a. Identify whether the vendor was staged in Massachusetts, as asserted within EOE-251, or if they were mobilized directly to Connecticut, as asserted within EOE-407. If mobilized (i.e., staged) to Massachusetts, provide responses to subsections ‘b’ and ‘c’ as requested within EOE407. If mobilized directly to Connecticut, explain how the response aligns to the description of work included on pp. 822-824 (i.e., “crew was
  10. Page 10 of 40

    ordered to leave hotel in Marlborough, MA where self-lodging was established and sent to Norwalk Inn in Norwalk, CT where customer supplied hotel and dinner.”) b. Referring to EOE-251 subsection ‘e’, provide the Excel spreadsheet that was originally requested, along with the corresponding cites. c. Provide a redacted version of the various invoices provided at CLP-1A19, pp. 790-915, along with notations identifying any errors confirmed within EOE-251 or the Company’s analysis to be provided in response to subsection ‘b’. d. Provide all emails or other correspondence detailing the mobilization instructions for the SOS vendor for the MS24A event. e. Referring to EOE-407, subsection ‘a’, please clarify the specific location or locations of where the Connecticut storm fleet (i.e., 68 vehicles) was located when not in use. If the vehicles were located in different locations, identify the locations, and counts of vehicles. EOE-498. (STORM COST OF REMOVAL-PBR) Identify if the Company has allocated any storm costs to capital to account for the cost of removal that occurs during storm events. To the extent that removal costs are eliminated from the storm balance, please explain how the accounting is administered, identify how the costs were derived, and provide a detailed listing of removal costs that were eliminated per storm event. If removal costs are not eliminated, explain why. EOE-499. (MS24H-VENDOR-TREE) Refer to Exhibit ACCT-2 CLP-9, Confidential Exhibit ACCT-2 CLP-9A-1, pp. 1-184. The Company reported 60 invoices in the combined incremental charge of $164,956 for the Asplundh Tree Expert vendor. Respond to the following: a. Referring to Rows 37, 53-59, 68, 83-84, and 88, explain why the vendor was permitted to bill until 10PM on July 1, 2024 when EOE-019, Att.1 identified that crews were released at 6:00PM (i.e., 1800). b. Referring to Rows 39, 61, 66, 74, 77, 81, 86, and 89, the Company included various charges for Disc Chippers and a Power Blower. Explain why the equipment was necessary for storm remediation purposes and identify if the equipment was actually used. Furthermore, provide documentation to support the Company’s pre-authorization of the additional charges and identify the total amount charged for this equipment. c. Referring to Rows 77, 80-82, and 89-90, the Company allocated incremental charges for each crew for nine hours on July 3, 2024 (i.e., several days after the storm event). Explain if all of the activity included within these July 3, 2024 invoices were applicable to the MS24H storm and, if applicable, provide supporting documentation. To the extent that

As listed on the current system

Interrogs from PURA/EOE to CL&P 481 thru 500-Issued 11/13/2026 [26-05-10]

This filing on the current system (opens in a new tab)