    any hours were not associated with the MS24H event, identify the amounts. EOE-500. (MS24H-VENDOR-TREE) Refer to Exhibit ACCT-2 CLP-9, Confidential Exhibit ACCT-2 CLP-9A-1, pp. 98-101. The Company reported an incremental charge of $6,979 for the Asplundh Tree Expert vendor. Respond to the following: a. Comparing the storm details referenced within Ex. CLP-STORM-IMT-3 (Event 9) and EOE-019, Att.1, to the vendor’s timesheet (i.e., p. 99), explain how the 1:30AM service call could be attributed to the MS24H event. Specifically, the MS24H documentation characterizes the initial impact of the thunderstorms as occurring at 11:40AM (see Ex. CLPSTORM-IMT-3, p. 8), approximately ten hours after the referenced vegetation charge. b. Provide documentation supporting both the necessity and pre-approval of the referenced crane in support of the MS24H remediation. Additionally, please explain who owned the property where it was necessary for the Company to “hoist and remove trees” (i.e., p. 101) and explain why this activity was necessary for storm remediation purposes. c. Identify the total incremental charges associated with the 1:30am service call. d. Provide a redacted version of the referenced invoice documentation. EOE-501. (MS24H-VENDOR-TREE) Refer to Exhibit ACCT-2 CLP-9, Confidential Exhibit ACCT-2 CLP-9A-1, pp. 129-131. The Company reported an incremental charge of $4,491 for the Asplundh Tree Expert vendor and appears to have omitted an Eversource Connecticut Emergency Restoration Tree Contractor Work Location report for activity billed on July 3, 2024 (i.e., several days after the storm event). Provide documentation demonstrating that the (9) hours billed on July 3, 2024 was applicable to the MS24H event and explain why it was necessary for the vendor to bill for a chipper. Additionally, identify the location of the remediation activity. EOE-502. (MS24H-VENDOR-TREE) Refer to Exhibit ACCT-2 CLP-9, Confidential Exhibit ACCT-2 CLP-9A-1, pp. 132-135. The Company reported an incremental charge of $4,647 for the Asplundh Tree Expert vendor which includes billing for hours (9) on July 3, 2024 (i.e., several days after the storm event). Provide documentation demonstrating that the (9) hours billed on July 3, 2024 was applicable to the MS24H event and explain why it was necessary for the vendor to bill for both a crane service and a chipper. Furthermore, please explain who owned the property where it was necessary for the Company to “hoist and remove trees” (i.e., p. 134).
  2. Page 12 of 40

    EOE-503. (MS24H-VENDOR-TRAFFIC) Refer to Exhibit ACCT-2 CLP-9, Confidential Exhibit ACCT-2 CLP-9A-1, pp. 204-362. The Company reported 17 invoices in the combined incremental charge of $44,454 for the Certified Utility Services Inc vendor. Respond to the following: a. Cite the contract or corresponding pricing schedule that defines the Hourly Work Zone Setup rate charged. EOE reviewed the contract at EOE-014, Att.2 (CONFIDENTIAL), starting at p. 164 and was unable to locate the specific rate. b. Explain how the Company derived the correct amounts to allocate to the MS24H event when the various invoices and job assignment documents failed to include the MS24H011 work order number. As an example, the Company allocated the entire amount invoiced on p. 266 but the job assignment document on p. 269 referenced MS24G and the job assignment document on p. 270 referenced MS24R. c. Referring to pp. 293-296, explain why the job assignment forms identified multiple different work order numbers (i.e., none of which were MS24H) for July 5, 2024 (several days after the MS24H event), yet all of the activity was charged to the MS24H event. Provide documentation supporting the Company’s position. d. Referring to pp. 320-339, explain why the job assignment forms identified multiple different work order numbers (i.e., none of which were MS24H), including activity through July 5, 2024 (several days after the MS24H event), yet all of the activity was charged to the MS24H event. Provide documentation supporting the Company’s position. e. Referring to p. 362, provide documentation supporting the applicability of the services performed on August 13, 2024 to the MS24H event. EOE-504. (MS24H-VENDOR-ENVIRONMENTAL) Refer to Exhibit ACCT-2 CLP-9, Confidential Exhibit ACCT-2 CLP-9A-1, pp. 404-414. The Company reported two invoices in the combined incremental charge of $2,123 for the Clean Harbors Env Services Inc vendor. Explain how the two invoices which supported “emergency response” activity on August 8, 2024 and August 6, 2024, respectively, applied to the MS24H event (i.e., which occurred over a month prior). Furthermore, provide documentation supporting the applicability of the charges and explain why the remediation did not occur for over a month. EOE-505. (MS24H-VENDOR-LINE) Refer to Exhibit ACCT-2 CLP-9, Confidential Exhibit ACCT-2 CLP-9A-1, pp. 419-421, 426-428. The Company reported an incremental charge of $107,707 for the Conexus Energy Group Inc vendor. Explain if the Eversource Contractor Storm Daily Time & Work Reports were fully completed as required by the Eversource Contractor
  3. Page 13 of 40

    Storm Daily Time & Work Report Procedure provided at EOE-022, Att.5. If not fully completed, explain why the Eversource reviewer did not require the information (i.e., notably boxes 24 and 25) to be completed prior to approval. EOE-506. (MS24H-VENDOR-LINE) Refer to Exhibit ACCT-2 CLP-9, Confidential Exhibit ACCT-2 CLP-9A-1, pp. 436-499. The Company reported five incremental charges in the combined amount of $876,040 for the Conexus Energy Group Inc vendor. Respond to the following: a. Referring to OCC-044, Att.2 (CONFIDENTIAL), p. 874-892, confirm that the vendor’s Exhibit A Pricing Schedule contains the Company’s standard provisions, including “Standby Rates apply to labor resources only” (i.e., p. 880). If not confirmed, cite the revised Exhibit A Pricing Schedule that was executed (signed) for 2024 and 2025 that revised the standard provisions. b. Refer to pp. 442-444, identify the total amount of incremental billing of equipment during the hours reported when the crews were not provided with assignments (i.e., in accordance with the ERSG-Contractor Obligations-Instructions provided at EOE-173, Att.1, p. 27). c. Referring to pp. 454-456, identify the total amount of incremental billing of equipment during the hours reported when the crews were not provided with assignments. d. Referring to pp. 461-462, identify the total amount of incremental billing of equipment during the hours reported when the crews were not provided with assignments. e. Referring to pp. 469-473, identify the total amount of incremental billing of equipment during the hours between the start time (i.e., 7:00AM) and the first assignment (i.e., 10:00AM). f. Referring to pp. 497-499, identify the total amount of incremental billing of equipment during the hours between the start time (i.e., 6:00AM) and the first assignment (i.e., 7:59AM). g. Referring to pp. 497-499, the Eversource Contractor Storm Daily Time & Work Report identified “Crews Released at 7:00PM – Dinner and acquire lodging” (i.e., p. 497) and then permitted each crew member to bill for an additional three hours to 10:00PM. Explain how the Company determined it was appropriate for the vendor to bill for three hours for dinner/lodging. Furthermore, please identify the total incremental billing for the three hours referenced (i.e., including labor and equipment). EOE-507. (MS24H-VENDOR-LINE) Refer to Exhibit ACCT-2 CLP-9, Confidential Exhibit ACCT-2 CLP-9A-2, pp. 1-10. The Company reported an
  4. Page 14 of 40

    incremental charge of $96,562 for the Conexus Energy Group Inc vendor. Respond to the following: a. Referring to pp. 4-10, it appears that the Eversource Contractor Storm Daily Time & Work Reports were corrupt, please provide legible documents. b. If the documents provided in response to subsection ‘a’ identifies a delay between the Start Time (Box 6) and the first assignment commencement (i.e., Box 24. Event Start Time), please identify the total amount of incremental billing of equipment during the hours reported when the crews were not provided with assignments. EOE-508. (MS24H-VENDOR-LINE) Refer to Exhibit ACCT-2 CLP-9, Confidential Exhibit ACCT-2 CLP-9A-2, pp. 11-32. The Company reported an incremental charge of $106,794 for the E-J Electric T&D LLC vendor. Respond to the following: a. Referring to pp. 17-21, explain what the “Damaged house service” related to and identify how the charges were applicable to the MS24H event. Furthermore, identify if the homeowner is responsible for the incurred charges. If the charges should not have been applied to the MS24H event, provide an unlocked Excel spreadsheet calculating the impact of the remediation. b. Referring to p. 25, explain why the vendor billed for hotel charges for the evening of June 30, 2024, when the vendor had not been mobilized until the morning of July 1, 2024 (see pp. 14-16). c. Referring to p. 25, explain why the vendor billed for hotel charges for the evening of July 1, 2024, when the vendor had completed its demobilization by 7PM on July 1, 2024 (see pp. 22-24). d. If the Company’s response to subsection ‘b’ and ‘c’ is due to the vendor’s contract, please cite the contract provisions that would permit the billing of lodging for two nights when only supporting the Company for a single day. EOE-509. (MS24H-VENDOR-LINE) Refer to Exhibit ACCT-2 CLP-9, Confidential Exhibit ACCT-2 CLP-9A-2, pp. 43-55. The Company reported an incremental charge of $106,679 for the Elecnor Energy Services LLC vendor. Referring to pp. 48-52, the Eversource Contractor Storm Daily Time & Work Reports identify 30 individuals who supported the MS24H event and each billed for Work Time on July 1, 2024. The vendor identified a total of two assignments for the duration of the billing. Please identify the number of vendor employees who supported each assignment and confirm
  5. Page 15 of 40

    that both assignments took ten hours to complete. If the hours are not confirmed, identify the number of hours for each assignment. EOE-510. (MS24H-VENDOR-LINE) Refer to Exhibit ACCT-2 CLP-9, Confidential Exhibit ACCT-2 CLP-9A-2, pp. 124-141. The Company reported an incremental charge of $106,081 for the Haugland Energy Group LLC vendor. a. Provide a discussion explaining the timing and nature of services performed by the vendor. As part of the discussion, explain how each crew was able to bill for four hours of travel time (i.e., Box 10 within pp. 127-141) without an Eversource Contractor Storm Mobilization & Demobilization Time Report or details regarding actual travel. Additionally, identify the actual travel including the starting and ending locations. b. Comparing p. 125 with pp. 134-141, confirm that the vendor did not bill for equipment during standby for applicable crews. c. Referring to pp. 127-133, explain why the vendor did not bill for standby when the various timesheets supported work assignments started between 8AM and 10AM. Specifically, comparing the billable hours from pp. 134-141 (see response to subsection ‘b’) with pp. 127-133 would suggest that the vendor should have billed for standby between 1 and 3 hours per crew (assuming a 2-hour travel from 5AM to 7AM). Furthermore, provide an unlocked Excel spreadsheet deriving the incremental billing of equipment for any hours that should have been recorded as standby. EOE-511. (MS24H-VENDOR-LINE) Refer to Exhibit ACCT-2 CLP-9, Confidential Exhibit ACCT-2 CLP-9A-2, pp. 156-162. The Company reported an incremental charge of $190,954 for the I B Abel Inc vendor. Referring to p. 161, the Eversource Contractor Storm Daily Time & Work Reports identify 26 individuals who supported the MS24H event and each billed for Work Time on July 1, 2024. The vendor identified a total of two assignments for the duration of the billing. Please identify the number of vendor employees who supported each assignment and confirm that both assignments took ten hours to complete. If the hours are not confirmed, identify the number of hours for each assignment. EOE-512. (MS24H-VENDOR-CIVIL) Refer to Exhibit ACCT-2 CLP-9, Confidential Exhibit ACCT-2 CLP-9A-3, pp. 31-33. The Company reported an incremental charge of $24,932 for the KTI Utility Construction & Maintenance LLC vendor. Explain why the Company allocated the entire invoice to the MS24H event when several individual charges were
  6. Page 16 of 40

    referenced to the MS24G011 work order number. As part of the response, identify the total amount attributed to the MS24G011 work order. EOE-513. (MS24H-VENDOR-TREE) Refer to Exhibit ACCT-2 CLP-9 (Outside Contractors tab), Confidential Exhibit ACCT-2 CLP-9A-3 through CLP-9A4. The Company reported 97 incremental charges (Excel Rows 155-251) for the combined amount of $322,466 for the Lewis Tree Service Inc. vendor. Explain why almost every Weekly Operations Summary report (e.g., pp. 35, 38, 41, etc.) included a ‘Time Start’ and a ‘Time Finish’ of 7:00AM and 4:00PM, respectively, which does not agree with the hours billed. As part of the response, explain how the Company was able to validate the accuracy of the hours billed and provide supporting documentation available to the reviewer at the time verifying that the hours were correctly billed for each invoice (i.e., crew). Additionally, provide an unlocked Excel spreadsheet listing each invoice, detailing the crew’s actual start and end times, identifying the billable amounts, and identifying if supporting documentation (i.e., available to the arborist at the time of the review) is being provided. EOE-514. (MS24H-VENDOR-TREE-EQUIPMENT) Refer to Exhibit ACCT-2 CLP-9 (Outside Contractors tab), Confidential Exhibit ACCT-2 CLP-9A-3 through CLP-9A-4. The Company reported 97 incremental charges (Excel Rows 155-251) for the combined amount of $322,466 for the Lewis Tree Service Inc. vendor. The Company was billed for atypical equipment including extra chainsaws, chipper disks, chip trucks, and log trucks. Provide an unlocked Excel spreadsheet listing each applicable invoice, the referenced equipment, the amounts billed for the applicable equipment, and the justification for why the equipment was necessary for storm remediation purposes. Additionally, please provide documentation of prior authorization for each charge. EOE-515. (MS24H-VENDOR-TREE) Refer to Exhibit ACCT-2 CLP-9 (Outside Contractors tab), Confidential Exhibit ACCT-2 CLP-9A-3 through CLP-9A4. The Company reported 97 incremental charges (Excel Rows 155-251) for the combined amount of $322,466 for the Lewis Tree Service Inc. vendor. Respond to the following: a. Referring to Rows 218-225 and 247-251, the Company was billed for remediation and/or police activity passthroughs between the dates of July 8, 2024 and August 22, 2024, when the storm event was demobilized on July 1, 2024. Provide an unlocked Excel spreadsheet listing each applicable invoice, the referenced dates, the amounts billed for each date, and, as applicable, provide documentation demonstrating that the remediation was both necessary and directly applicable to the MS24H event. To the extent that errors are identified, please reference each error in the Excel spreadsheet.
  7. Page 17 of 40

    b. Referring to Rows 168, 187, 197, 227, 233-234, and 236, the Company was billed by multiple different crews for remediation on July 5, 2024, with many of the invoices billing at OT rates for apparent after-hours activity. Identify how this remediation was both necessary and directly applicable to the MS24H event and unrelated to the MN24S minor storm event. To the extent that errors are identified, please identify each instance and the impact. c. Referring to pp. 93, 103, 107, and 114 (supporting Rows 173, 176-177, and 179), explain why each invoice was supported by a “2024 Vine Survey” document that detailed activity, unrelated to MS24H, performed on July 1, 2024. As part of the response, explain why these costs were included in the MS24H storm recovery request and separately identify the specific hours and costs attributed to the survey activity. EOE-516. (MS24H-VENDOR-LINE-TRAVEL) Refer to Exhibit ACCT-2 CLP-9, Confidential Exhibit ACCT-2 CLP-9A-5, pp. 31-44. The Company reported an incremental charge of $184,438 for the MTV Solutions vendor. Respond to the following: a. Referring to pp. 32-34 and 42-44, explain why four employees were billed for eight hours of travel (mobilization and demobilization) in lieu of the 12.5 hours billed by the majority of the crew members. b. Referring to pp. 32-34 and 42-44, explain why most of the vendor crew members were permitted to bill for 12.5 hours for both mobilization and demobilization when the distance between the two locations was less than 400 miles, which using the criteria outlined in response to EOE-130 would result in billable travel of less than nine hours. As part of the response, provide emails or other correspondence obtained during the initial review to support the hours billed. Additionally, provide an unlocked Excel spreadsheet demonstrating the calculation of the total incremental costs for the hours billed in excess of the estimated travel. EOE-517. (MS24H-VENDOR-LINE) Refer to Exhibit ACCT-2 CLP-9, Confidential Exhibit ACCT-2 CLP-9A-5, pp. 118-140. The Company reported an incremental charge of $213,481 for the MTV Solutions vendor. Respond to the following: a. Referring to pp. 119-121, confirm that the mobilization references to Manchester, New Hampshire was a typo. If not confirmed, explain why the charges apply to Connecticut. b. Referring to pp. 119-121 and 132-134, explain why the vendor crew members were permitted to bill for four hours of travel for both mobilization and demobilization when the distance between the two
  8. Page 18 of 40Match

    locations was approximately 100 miles, which using the criteria outlined in response to EOE-130 would result in billable travel of less than 2.5 hours. As part of the response, provide emails or other correspondence obtained during the initial review to support the hours billed. Additionally, identify the total incremental costs for the hours billed in excess of the estimated travel. c. Comparing p. 140 with OCC-044, Att.2, p. 4622, explain why the Company permitted the vendor to bill for the Digger at a higher rate than reflected within the contractual rate included with the contract. As part of the response, please identify the total incremental impact of allowing the use of the higher rate for all of the MTV invoices provided for MS24H. EOE-518. (MS24H-VENDOR-LINE) Refer to Exhibit ACCT-2 CLP-9, Confidential Exhibit ACCT-2 CLP-9A-5, pp. 153-167. The Company reported an incremental charge of $158,024 for the MTV Solutions vendor. Respond to the following: a. Referring to pp. 155-158, explain why the vendor was permitted to bill for two hours of mobilization from Windsor Locks CT to East Hampton CT when that commute would typically take minutes, or less than 1 hour after applying a 1.3 factor increase. As part of the response, provide any communication between the Company and the vendor that occurred prior to the approval of the invoice substantiating the travel hours billed and separately identify the incremental impact of the 1 hour of excess travel billed. b. Referring to pp. 160-166, explain why the vendor was permitted to bill for Work Time, including the billing of equipment, when the Eversource Contractor Storm Daily Time & Work Reports failed to identify any assignments. As part of the response, identify the incremental impact of allowing the vendor to bill for the equipment that would otherwise not be billed during standby (i.e., see p. 167). c. Referring to pp. 167 and OCC-044, Att.2 (Confidential), p. 4621, explain why the Company permitted the vendor to establish and bill a higher “Standby Rate” versus a lower “Work Rate” for labor. As part of the response, identify if the higher Standby rate was established to account for the equipment that was not billable during standby. d. Cite the location of the vendor’s contractual Pricing Schedule Exhibit that supports the Travel rates charged. The pricing schedule provided at OCC-044, Att.2 (Confidential), p. 4621 does not identify a rate for travel. If not specifically included within a pricing schedule, explain why the higher rate was charged along with the corresponding billing for the
  9. Page 19 of 40

    equipment. As part of the response, identify the incremental impact of billing at the higher standby rate versus the lower work rate. EOE-519. (MS24H-VENDOR-LINE) Refer to Exhibit ACCT-2 CLP-9, Confidential Exhibit ACCT-2 CLP-9A-5, pp. 168-171. The Company reported an incremental charge of $14,771 for the Nooter Construction LLC vendor. Respond to the following: a. Referring to OCC-044, Att. 2 (Confidential), p. 4624-4638, confirm that the vendor’s Exhibit A Pricing Schedule contains the Company’s standard provisions, including “Standby Rates apply to labor resources only” (i.e., p. 4630). If not confirmed, cite the revised Exhibit A Pricing Schedule that was executed (signed) for 2024 and 2025 that revised the standard provisions. b. Referring to pp. 170-171, explain why the vendor was permitted to submit Eversource Contractor Storm Daily Time & Work Reports that lacked any details regarding actual work performed (i.e., boxes 20-25). As part of the response, identify if the vendor was assigned any actual remediation and, if applicable, provide documentation to support the assignments and corresponding timing. c. Identify the incremental billing of both labor and equipment for allowing the vendor to bill at DT rates and bill for equipment prior to the first assignment referenced in subsection ‘b’ above. EOE-520. (MS24H-VENDOR-LINE) Refer to Exhibit ACCT-2 CLP-9, Confidential Exhibit ACCT-2 CLP-9A-6, pp. 1-24. The Company reported two incremental charges in the combined amount of $275,721 for the One Source Power LLC vendor. Respond to the following: a. Referring to pp. 7-10, explain why the vendor was permitted to submit Eversource Contractor Storm Daily Time & Work Reports that lacked any details regarding actual work performed (i.e., boxes 20-25). b. Referring to pp. 7-10, provide documentation demonstrating when the vendor received its first assignment. If the first assignment did not occur at 6:00AM, identify the incremental impact of allowing the vendor to bill for equipment at the higher rates until the first assignment. c. Comparing pp. 21-22 with p. 16, explain why the vendor billed equipment at the full rates during standby when the Company’s response to EOE-399, Att. 1 identified the vendor as being subject to Exhibit B (i.e., equipment should only be billed at 50% during standby). As part of the response, identify the incorrect amount billed.
  10. Page 20 of 40

    EOE-521. (MS24H-VENDOR-LINE) Refer to Exhibit ACCT-2 CLP-9, Confidential Exhibit ACCT-2 CLP-9A-6, pp. 44-61. The Company reported two incremental charges in the total amount of $33,548 for the Riggs Distler & Company Inc vendor. Respond to the following: a. Explain why the vendor was permitted to submit Eversource Contractor Storm Daily Time & Work Reports that lacked details regarding hours worked for each assignment (i.e., boxes 24-26 within pp. 46-47, 50-51, and 54-57). EOE acknowledges that several of the referenced pages were for charges that were allocated to the MS24G event. b. For the two MS24H charges, identify when the vendor crews were provided their first assignments in relation to its commencement of billing and identify the incremental billing of both labor and equipment for allowing the vendor to bill at DT rates and to bill for equipment prior to the first assignments. EOE-522. (MS24H-VENDOR-TREE) Refer to Exhibit ACCT-2 CLP-9, Confidential Exhibit ACCT-2 CLP-9A-6, pp. 65-67, 74-76. The Company reported two incremental charges in the total amount of $6,555 for the Stanley Tree Service Inc vendor which included charges for chip trucks and chippers. Provide documentation demonstrating the arborist’s pre-approval of these charges. Additionally, identify the incremental amounts charged for the chip truck and chipper. EOE-523. (MS24H-VENDOR-TREE) Refer to Exhibit ACCT-2 CLP-9, Confidential Exhibit ACCT-2 CLP-9A-6, pp. 68-70. The Company reported an incremental charge of $959 for the Stanley Tree Service Inc vendor. The charges related to “wood pick up” (i.e., p. 70), which billed for a log truck and labor (i.e., p. 69) several days after the storm event. Explain why it was the Company’s responsibility to remove the wood from the broken maple (i.e., p. 67) in lieu of allowing the property owner or town to perform these services. Additionally, explain why it was necessary for this charge to be allocated to the MS24H event. EOE-524. (MS24H-VENDOR-TREE) Refer to Exhibit ACCT-2 CLP-9, Confidential Exhibit ACCT-2 CLP-9A-6, pp. 80-84. The Company reported two incremental charges in the combined amount of $4,544 for the Stanley Tree Service Inc vendor. The two charges related to the same location on July 8, 2024 and included individual charges for a crane and a log truck. Additionally, the supporting documentation included references to “PURA” (i.e., pp. 81 and 84). Respond to the following: a. Provide all correspondence between the Company and either PURA or the property owner that is associated with the remediation included