    b. Referring to Rows 168, 187, 197, 227, 233-234, and 236, the Company was billed by multiple different crews for remediation on July 5, 2024, with many of the invoices billing at OT rates for apparent after-hours activity. Identify how this remediation was both necessary and directly applicable to the MS24H event and unrelated to the MN24S minor storm event. To the extent that errors are identified, please identify each instance and the impact. c. Referring to pp. 93, 103, 107, and 114 (supporting Rows 173, 176-177, and 179), explain why each invoice was supported by a “2024 Vine Survey” document that detailed activity, unrelated to MS24H, performed on July 1, 2024. As part of the response, explain why these costs were included in the MS24H storm recovery request and separately identify the specific hours and costs attributed to the survey activity. EOE-516. (MS24H-VENDOR-LINE-TRAVEL) Refer to Exhibit ACCT-2 CLP-9, Confidential Exhibit ACCT-2 CLP-9A-5, pp. 31-44. The Company reported an incremental charge of $184,438 for the MTV Solutions vendor. Respond to the following: a. Referring to pp. 32-34 and 42-44, explain why four employees were billed for eight hours of travel (mobilization and demobilization) in lieu of the 12.5 hours billed by the majority of the crew members. b. Referring to pp. 32-34 and 42-44, explain why most of the vendor crew members were permitted to bill for 12.5 hours for both mobilization and demobilization when the distance between the two locations was less than 400 miles, which using the criteria outlined in response to EOE-130 would result in billable travel of less than nine hours. As part of the response, provide emails or other correspondence obtained during the initial review to support the hours billed. Additionally, provide an unlocked Excel spreadsheet demonstrating the calculation of the total incremental costs for the hours billed in excess of the estimated travel. EOE-517. (MS24H-VENDOR-LINE) Refer to Exhibit ACCT-2 CLP-9, Confidential Exhibit ACCT-2 CLP-9A-5, pp. 118-140. The Company reported an incremental charge of $213,481 for the MTV Solutions vendor. Respond to the following: a. Referring to pp. 119-121, confirm that the mobilization references to Manchester, New Hampshire was a typo. If not confirmed, explain why the charges apply to Connecticut. b. Referring to pp. 119-121 and 132-134, explain why the vendor crew members were permitted to bill for four hours of travel for both mobilization and demobilization when the distance between the two
  2. Page 18 of 40Match

    locations was approximately 100 miles, which using the criteria outlined in response to EOE-130 would result in billable travel of less than 2.5 hours. As part of the response, provide emails or other correspondence obtained during the initial review to support the hours billed. Additionally, identify the total incremental costs for the hours billed in excess of the estimated travel. c. Comparing p. 140 with OCC-044, Att.2, p. 4622, explain why the Company permitted the vendor to bill for the Digger at a higher rate than reflected within the contractual rate included with the contract. As part of the response, please identify the total incremental impact of allowing the use of the higher rate for all of the MTV invoices provided for MS24H. EOE-518. (MS24H-VENDOR-LINE) Refer to Exhibit ACCT-2 CLP-9, Confidential Exhibit ACCT-2 CLP-9A-5, pp. 153-167. The Company reported an incremental charge of $158,024 for the MTV Solutions vendor. Respond to the following: a. Referring to pp. 155-158, explain why the vendor was permitted to bill for two hours of mobilization from Windsor Locks CT to East Hampton CT when that commute would typically take minutes, or less than 1 hour after applying a 1.3 factor increase. As part of the response, provide any communication between the Company and the vendor that occurred prior to the approval of the invoice substantiating the travel hours billed and separately identify the incremental impact of the 1 hour of excess travel billed. b. Referring to pp. 160-166, explain why the vendor was permitted to bill for Work Time, including the billing of equipment, when the Eversource Contractor Storm Daily Time & Work Reports failed to identify any assignments. As part of the response, identify the incremental impact of allowing the vendor to bill for the equipment that would otherwise not be billed during standby (i.e., see p. 167). c. Referring to pp. 167 and OCC-044, Att.2 (Confidential), p. 4621, explain why the Company permitted the vendor to establish and bill a higher “Standby Rate” versus a lower “Work Rate” for labor. As part of the response, identify if the higher Standby rate was established to account for the equipment that was not billable during standby. d. Cite the location of the vendor’s contractual Pricing Schedule Exhibit that supports the Travel rates charged. The pricing schedule provided at OCC-044, Att.2 (Confidential), p. 4621 does not identify a rate for travel. If not specifically included within a pricing schedule, explain why the higher rate was charged along with the corresponding billing for the
  3. Page 19 of 40

    equipment. As part of the response, identify the incremental impact of billing at the higher standby rate versus the lower work rate. EOE-519. (MS24H-VENDOR-LINE) Refer to Exhibit ACCT-2 CLP-9, Confidential Exhibit ACCT-2 CLP-9A-5, pp. 168-171. The Company reported an incremental charge of $14,771 for the Nooter Construction LLC vendor. Respond to the following: a. Referring to OCC-044, Att. 2 (Confidential), p. 4624-4638, confirm that the vendor’s Exhibit A Pricing Schedule contains the Company’s standard provisions, including “Standby Rates apply to labor resources only” (i.e., p. 4630). If not confirmed, cite the revised Exhibit A Pricing Schedule that was executed (signed) for 2024 and 2025 that revised the standard provisions. b. Referring to pp. 170-171, explain why the vendor was permitted to submit Eversource Contractor Storm Daily Time & Work Reports that lacked any details regarding actual work performed (i.e., boxes 20-25). As part of the response, identify if the vendor was assigned any actual remediation and, if applicable, provide documentation to support the assignments and corresponding timing. c. Identify the incremental billing of both labor and equipment for allowing the vendor to bill at DT rates and bill for equipment prior to the first assignment referenced in subsection ‘b’ above. EOE-520. (MS24H-VENDOR-LINE) Refer to Exhibit ACCT-2 CLP-9, Confidential Exhibit ACCT-2 CLP-9A-6, pp. 1-24. The Company reported two incremental charges in the combined amount of $275,721 for the One Source Power LLC vendor. Respond to the following: a. Referring to pp. 7-10, explain why the vendor was permitted to submit Eversource Contractor Storm Daily Time & Work Reports that lacked any details regarding actual work performed (i.e., boxes 20-25). b. Referring to pp. 7-10, provide documentation demonstrating when the vendor received its first assignment. If the first assignment did not occur at 6:00AM, identify the incremental impact of allowing the vendor to bill for equipment at the higher rates until the first assignment. c. Comparing pp. 21-22 with p. 16, explain why the vendor billed equipment at the full rates during standby when the Company’s response to EOE-399, Att. 1 identified the vendor as being subject to Exhibit B (i.e., equipment should only be billed at 50% during standby). As part of the response, identify the incorrect amount billed.
  4. Page 20 of 40

    EOE-521. (MS24H-VENDOR-LINE) Refer to Exhibit ACCT-2 CLP-9, Confidential Exhibit ACCT-2 CLP-9A-6, pp. 44-61. The Company reported two incremental charges in the total amount of $33,548 for the Riggs Distler & Company Inc vendor. Respond to the following: a. Explain why the vendor was permitted to submit Eversource Contractor Storm Daily Time & Work Reports that lacked details regarding hours worked for each assignment (i.e., boxes 24-26 within pp. 46-47, 50-51, and 54-57). EOE acknowledges that several of the referenced pages were for charges that were allocated to the MS24G event. b. For the two MS24H charges, identify when the vendor crews were provided their first assignments in relation to its commencement of billing and identify the incremental billing of both labor and equipment for allowing the vendor to bill at DT rates and to bill for equipment prior to the first assignments. EOE-522. (MS24H-VENDOR-TREE) Refer to Exhibit ACCT-2 CLP-9, Confidential Exhibit ACCT-2 CLP-9A-6, pp. 65-67, 74-76. The Company reported two incremental charges in the total amount of $6,555 for the Stanley Tree Service Inc vendor which included charges for chip trucks and chippers. Provide documentation demonstrating the arborist’s pre-approval of these charges. Additionally, identify the incremental amounts charged for the chip truck and chipper. EOE-523. (MS24H-VENDOR-TREE) Refer to Exhibit ACCT-2 CLP-9, Confidential Exhibit ACCT-2 CLP-9A-6, pp. 68-70. The Company reported an incremental charge of $959 for the Stanley Tree Service Inc vendor. The charges related to “wood pick up” (i.e., p. 70), which billed for a log truck and labor (i.e., p. 69) several days after the storm event. Explain why it was the Company’s responsibility to remove the wood from the broken maple (i.e., p. 67) in lieu of allowing the property owner or town to perform these services. Additionally, explain why it was necessary for this charge to be allocated to the MS24H event. EOE-524. (MS24H-VENDOR-TREE) Refer to Exhibit ACCT-2 CLP-9, Confidential Exhibit ACCT-2 CLP-9A-6, pp. 80-84. The Company reported two incremental charges in the combined amount of $4,544 for the Stanley Tree Service Inc vendor. The two charges related to the same location on July 8, 2024 and included individual charges for a crane and a log truck. Additionally, the supporting documentation included references to “PURA” (i.e., pp. 81 and 84). Respond to the following: a. Provide all correspondence between the Company and either PURA or the property owner that is associated with the remediation included
  5. Page 21 of 40

    within the two referenced invoices. Additionally, cite where the correspondence demonstrates the applicability of the remediation to the MS24H storm event or any associated storm event. b. If the Company’s review of subsection ‘a’ identifies an error, identify how the arborist had initially determined that the charges would be applicable to the storm event. c. If the Company’s review of subsection ‘a’ identifies an error, explain why the Company was responsible for removing the tree in lieu of the property owner. EOE-525. (MS24H-VENDOR-EQUIPMENT) Refer to Exhibit ACCT-2 CLP-9, Confidential Exhibit ACCT-2 CLP-9A-6, pp. 90-108. The Company reported ten incremental charges in the combined amount of $88,648 for the Sunbelt Rentals vendor. (Note: The page numbers per the Excel file appear to be misaligned for 9 of the 10 selections but are all included at pp. 90-108.) Respond to the following: a. Provide redacted copies of the referenced documents to include copies of all Oracle Analytics Interactive Dashboards-Events where this document was omitted. Specifically, it appears this document was omitted for Event No. 13273242 (p. 99); and 5439369 (p. 100). b. Referring to pp. 91 and 93 (i.e., supporting charges for $13,246 and $24,416), explain how these charges apply to the MS24H event when both Oracle Analytics Interactive Dashboards–Events reports detail outages that occurred prior to the onset of the MS24H event and specify Weather of “Norm-Normal Weather”. If determined to be a valid MS24H expense, provide documentation supporting the Company’s response. c. Referring to pp. 106 and 108 (i.e., supporting charges for $8,170 and $6,252), explain how both of these charges apply to the MS24H event when both outages commenced on July 2, 2024 (several days after the event) and neither outage was included within the Company’s outage data reported within EOE-020, Att.1. If determined to be a valid MS24H expense, provide documentation supporting the Company’s response. EOE-526. (MS24H-VENDOR-TREE) Refer to Exhibit ACCT-2 CLP-9, Confidential Exhibit ACCT-2 CLP-9A-6, pp. 109-117. The Company reported three incremental charges in the total amount of $8,421 for the Tennett Tree Service Inc vendor which included charges for chip trucks, chippers, and extra saws. Provide documentation demonstrating the arborist’s preapproval of these charges. Additionally, identify the incremental amounts charged for the chip trucks, chippers, and extra saws.
  6. Page 22 of 40

    EOE-527. (MS24H-VENDOR-TRAFFIC) Refer to Exhibit ACCT-2 CLP-9, Confidential Exhibit ACCT-2 CLP-9A-6, pp. 183-280. The Company reported an incremental charge in the amount of $2,109 for the Town of Greenwich which was supported by an invoice detailing dozens of jobs between July 26, 2024 and July 31, 2024 (i.e., approximately a month after the MS24H event). Please identify which jobs applied to the MS24H event and provide supporting documentation. EOE-528. (MS24H-VENDOR-TRAFFIC) Refer to Exhibit ACCT-2 CLP-9, Confidential Exhibit ACCT-2 CLP-9A-6, pp. 281-365. The Company reported an incremental charge in the amount of $2,811 for the Town of Greenwich which was supported by an invoice detailing dozens of jobs between August 1, 2024 and August 18, 2024 (i.e., over a month after the MS24H event). Please identify which jobs applied to the MS24H event and provide supporting documentation. EOE-529. (MS24H-VENDOR-ACCRUAL) Refer to Exhibit ACCT-2 CLP-9. The Company reported an incremental charge of $32,077 for a Tree Accrual (Row 321). Explain why the Company is reporting an accrual for Tree costs that occurred over two years ago and provide documentation supporting the amount. EOE-530. (MS24H-VENDOR-FOOD) Refer to Exhibit ACCT-2 CLP-9, Confidential Exhibit ACCT-2 CLP-9A-2, pp. 148-149. The Company reported an incremental charge of $7,701 for the Heritage Hotel for a buffet dinner. Provide an unlocked Excel spreadsheet detailing the total all-in costs for the associated meal and provide a comparison of the cost to the maximum meal cap outlined within Eversource’s restaurant meal policy. As part of the response, identify the aggregate amount that exceeds the policy. EOE-531. (MS24H-VENDOR-FOOD) Refer to Exhibit ACCT-2 CLP-9, Confidential Exhibit ACCT-2 CLP-9A-2, pp. 154-155. The Company reported an incremental charge of $6,537 for the HT-Exit 88 Hotel TRS LLC (i.e., Mystic Marriott) for a buffet dinner. Provide an unlocked Excel spreadsheet detailing the total all-in costs for the associated meal and provide a comparison of the cost to the maximum meal cap outlined within Eversource’s restaurant meal policy. As part of the response, identify the aggregate amount that exceeds the policy. EOE-532. (MS24H-VENDOR-FOOD) Refer to Exhibit ACCT-2 CLP-9, Confidential Exhibit ACCT-2 CLP-9A-6, pp. 35-36. The Company reported an incremental charge of $10,862 for the Paul Gregorys vendor. Respond to the following:
  7. Page 23 of 40

    a. Specific to the MS24H charges, provide an unlocked Excel spreadsheet detailing the total all-in costs for the associated meal (i.e., lunch on 7/1/24) and provide a comparison of the cost to the maximum meal cap outlined within Eversource’s restaurant meal policy. As part of the response, identify the aggregate amount that exceeds the policy. b. Specific to the additional invoice charges not allocated to the MS24H event, provide an unlocked Excel spreadsheet detailing the total all-in costs for each meal (i.e., breakfast, lunch, and dinner) and provide a comparison of the cost to the maximum meal caps outlined within Eversource’s restaurant meal policy. As part of the response, identify the aggregate amount that exceeds the policy. EOE-533. (MS24H-LABOR OVERTIME) Refer to Exhibit ACCT-2 CLP-9, Labor by Empl. Title tab. Provide documentation to support the validity of the following Overtime hours specific to the MS24H event. As part of the response, please provide relevant timesheets, calculations, or other supporting documents. a. Row 110, Response Specialist-Line, 31.5 hours b. Row 471, Response Specialist-Line, 36 hours c. Row 694, Lead Line Mechanic , 43.5 hours d. Row 743, Chief/Top Line Mechanic, 44.5 hours e. Row 851, Lead Line Mechanic , 38.5 hours f. Row 927, Lead Line Mechanic , 41.5 hours g. Row 1707, Response Specialist- Line, 31.5 hours h. Row 2094, Principal Counsel, 10 hours EOE-534. (MS24H- MEALS) Refer to Exhibit ACCT-2 CLP-9, Labor by Empl. Title tab. Provide documentation to support the validity of the following Meal reimbursements (stipends). As part of the response, please provide relevant calculations, union agreement citations, invoices, or other supporting documents and identify whether the employee received any Company provided meals or not. a. Row 693, Lead Line Mechanic, $110 b. Row 742, Chief/Top Line Mechanic, $130 c. Row 819, Response Specialist- Line, $200 d. Row 1148, Line Helper, $120 EOE-535. (MS24H-P-CARDS-MEALS) Refer to Exhibit ACCT-2 CLP-9, P-Card tab. The Company included five references to supporting documents provided within Confidential Exhibit ACCT-2 CLP-9A-6 and cited various pages (see rows 19, 56, 58, 62, and 81). Explain how each of the five charges (totaling
  8. Page 24 of 40

    $89,406) are applicable to the MS24H event when every invoice pre-dates the event (pp. 398-412). EOE-536. (MS24H-P-CARDS-MEALS) Refer to Exhibit ACCT-2 CLP-9, P-Card tab. Provide documentation to support the validity of the following sampled PCard Meal expenses. As part of the response, please provide the relevant invoices and other supporting documents demonstrating the necessity and applicability of each charge to the MS24H event. Additionally, provide documentation to support the charges complying with Eversource’s restaurant meal policy and if the charges exceed the policy, identify the amounts in excess of the policy. a. Row 39, HARTFORD RESTAURANT, $402 b. Row 46, MAGGIE MCFLYS, $168 c. Row 59, PARKWAY DINER, $8,309 d. Row 64, SPARTAN II RESTAURANT, $505 e. Row 69, NEWTOWN DELI LLC, $43,263 EOE-537. (MS24H-EMPLOYEE EXPENSE REIMB) Refer to Exhibit ACCT-2 CLP-9, Empl. Expense&Other tab. Provide documentation to support the validity of the following sampled employee expenses. As part of the response, please provide a description of the purchase, relevant invoices, applicable calculations, and other supporting documents demonstrating the necessity and applicability of each cost to the MS24H event. a. Row 24, Employee Reimbursements, $360 b. Row 64, Employee Reimbursements, $598 c. Row 182, Employee Reimbursements, $936 d. Row 204, Employee Reimbursements, $932 e. Row 232, Employee Reimbursements, $678 EOE-538. (MS24H-EMPLOYEE EXPENSE MILEAGE) Refer to Exhibit ACCT-2 CLP9, Empl. Expense&Other tab. Provide documentation to support the validity of the following sampled mileage expenses. As part of the response, please provide the mileage logs and other supporting documents that were available to the Eversource reviewer at the time of approval demonstrating the applicability of each cost to the MS24H event, as well as the netting of the employee’s normal commute. a. Row 31, $161 b. Row 51, $110 c. Row 63, $352 d. Row 143, $166 e. Row 171, $110
  9. Page 25 of 40

    EOE-539. (MS24K-NONSTORM DAMAGE) Refer to Exhibit CLP-STORM-IMT-3 (Event 12-MS24K), p. 85. The Emergency Briefing document referenced a Hartford Electric Outage that related to “customer-owned underground electric equipment on Elm Street in Hartford that damaged our equipment and caused an underground fire”. Respond to the following: a. Identify if the Company has included any costs associated with the nonstorm Elm Street fire within the storm recovery request. If included, identify all amounts. b. Provide a complete extract of OMS activity associated with the nonstorm Elm Street fire, inclusive of details on assigned crews. c. Identify the total costs associated with the underground fire, including both O&M and Capital costs, and identify if the Company has obtained reimbursement for those costs. d. Identify if the Company included the outages from the Elm Street fire within its storm outage activity reported within Exh. CLP-STORM-IMT-3 or EOE-020, Att. 1. If included, explain why. EOE-540. (MS24K-VENDOR-TREE) Refer to Exhibit ACCT-2 CLP-12, Confidential Exhibit ACCT-2 CLP-12A-1, pp. 144-146. The Company reported an incremental charge of $2,787 for the Asplundh Tree Expert Co vendor. The Eversource Connecticut Weekly Operations Report (p. 145) billed for hours from 12/9/24 (two days prior to the event) through 12/13/24 (two days after the event) and included an Emergency Restoration Tree Contractor Work Location report that solely referenced “Misc” (p. 146). The Company appears to have allocated approximately four of the five days of the invoiced amount to the MS24K event. a. Identify which days were allocated to the MS24K event and provide documentation to support the applicability of the charges. To the extent that the Company cannot provide documentation, explain why documentation could not be provided and explain what specific services were performed. b. Explain how the invoice reviewer was able to verify the accuracy of the billed hours when the Eversource Connecticut Weekly Operations Report (p. 145) failed to identify any start or end times for the entire week. EOE-541. (MS24K-VENDOR-TREE) Refer to Exhibit ACCT-2 CLP-12, Confidential Exhibit ACCT-2 CLP-12A-1, pp. 42-44, 81-83, 87-89, 209-214, and 229231. The Company reported six incremental charges in the total amount of $10,758 for the Asplundh Tree Expert Co vendor that included activity from December 13, 2024 (after the storm event). Respond to the following:
  10. Page 26 of 40

    a. Referring to pp. 42-44, provide documentation to demonstrate that the remediation was caused by the MS24K event and that the remediation required the use of a Disc Chipper. b. Referring to pp. 81-83, provide documentation to demonstrate that the remediation was caused by the MS24K event and that the remediation required the use of a Disc Chipper. c. Referring to pp. 87-89, provide documentation to demonstrate that the remediation was caused by the MS24K event and that the remediation required the use of a Disc Chipper. Additionally, explain how the invoice reviewer was able to validate the accuracy of the hours billed given the lack of start and end times on the Eversource Connecticut Weekly Operations Report (p. 88). d. Referring to pp. 209-211, explain why the Company permitted the vendor to bill for standby on December 13, 2024. e. Referring to pp. 212-214, provide documentation to demonstrate that the remediation was caused by the MS24K event and explain how the invoice reviewer was able to validate the accuracy of the hours billed given the lack of start and end times on the Eversource Connecticut Weekly Operations Report (p. 213). f. Referring to pp. 229-231, provide the omitted Emergency Restoration Tree Contractor Work Location Report, along with documentation to demonstrate that the remediation was caused by the MS24K event. Additionally, explain how the invoice reviewer was able to validate the accuracy of the hours billed given the lack of start and end times on the Eversource Connecticut Weekly Operations Report (p. 230). EOE-542. (MS24K-VENDOR-SERVICE) Refer to Exhibit ACCT-2 CLP-12, Confidential Exhibit ACCT-2 CLP-12A-2, pp. 25-48. The Company reported an incremental charge in the total amount of $18,069 for the Central Connecticut Cable vendor. The charge solely related to the billing of four hours on December 12, 2024 and included an email from the Company stating “Crews released this morning as of 0600 will be able to bill 4 hours of demob” (p. 36). Explain why vendor crews that were released immediately upon the commencement of their shift were permitted to bill for four hours. As part of the response, identify where this billing treatment is defined within the vendor contract. If not included within the vendor contract, explain why this additional billing was authorized by the Company. EOE-543. (MS24K-VENDOR-TRAFFIC) Refer to Exhibit ACCT-2 CLP-12, Confidential Exhibit ACCT-2 CLP-12A-2, pp. 68-93. The Company reported an incremental charge of $5,756 for the Certified Utility Services Inc vendor.