Page 28 of 40
a. Explain how each of the three invoices were dated December 3, 2024, but applicable to Jobs on December 11 or 12, 2024, over a week later. b. Identify if the vendor actually performed remediation or if they billed for standby. c. The Company did not provide timesheets or other documents to support the hours worked. Provide any omitted signed timesheets. If timesheets do not exist, explain how the invoice reviewer was able to validate the accuracy of the hours billed and provide any relevant documentation. EOE-549. (MS24K-VENDOR-LINE) Refer to Exhibit ACCT-2 CLP-12, Confidential Exhibit ACCT-2 CLP-12A-2, pp. 239-282. The Company reported two incremental charges in the total amount of $178,102 for the D&D Power LLC vendor. Respond to the following: a. Referring to OCC-044, Att. 2 (Confidential), p. 908-946, confirm that the vendor’s Exhibit A Pricing Schedule contains the Company’s standard provisions, including “Standby Rates apply to labor resources only” (i.e., p. 914). If not confirmed, cite the revised Exhibit A Pricing Schedule that was executed (signed) for 2024 and 2025 that revised the standard provisions. b. Comparing pp. 241-242 with pp. 244-249, confirm that the vendor did not bill for equipment during standby. If not confirmed, identify where the vendor billed for equipment during standby. c. Referring to pp. 274-275, the charge solely related to the billing of four hours on December 12, 2024 and included an email from the Company stating “Crews released this morning as of 0600 will be able to bill 4 hours of demob to the storm” (p. 277). Explain why vendor crews that were released immediately upon the commencement of their shift were permitted to bill for four hours. As part of the response, identify where this billing treatment is defined within the vendor contract. If not included within the vendor contract, explain why this additional billing was authorized by the Company. EOE-550. (MS24K-VENDOR-LINE) Refer to Exhibit ACCT-2 CLP-12, Confidential Exhibit ACCT-2 CLP-12A-2, pp. 317-326. The Company reported an incremental charge of $88,762 for the E-J Electric T&D LLC vendor. The charges related to activity on December 11 - 12, 2024. Respond to the following: a. Referring to p. 322, the Description of Work for December 12, 2024 characterized the sole OMS assignment as “Replace 3ph primary riser dead end pole due to fire. Rebuild pole, pull in and terminate new 3phPage 29 of 40
urd cable to pad 2811. Complete switching and energize.” Additionally, the OMS Event No. (i.e., 55556308) was not included within EOE-020, Att. 1. Explain how the work assignment (i.e., an event that was “due to fire” and after return to normal operations) was applicable to the MS24K storm event. b. Referring to p. 323, the Eversource Contractor Storm Daily Time & Work Report included a note in the top right-hand corner that provided a different WO# (i.e., 19648810). Additionally, the OMS Event Nos. (i.e., 55556372/5556291) were not included within EOE-020, Att. 1. Explain how the December 12, 2024 work assignment was applicable to the MS24K storm event. c. Referring to p. 324, the OMS Event No. (i.e., 5556190) was not included within EOE-020, Att. 1. Explain how the work assignment was applicable to the MS24K storm event. d. To the extent that subsections ‘a’ – ‘c’ above identify errors with the allocation of costs to MS24K, provide an unlocked Excel spreadsheet demonstrating the calculation of all costs that should be eliminated, including costs associated with flagging or other related activity (i.e., see e.g., CUS charges at pp. 103-107, meal charges, hotel charges, etc.). e. To the extent that subsections ‘a’ – ‘c’ above do not confirm errors with the allocation of costs to MS24K, provide copies of the OMS reports and all correspondence between the Company and the vendor pertaining to the reference Event Nos. EOE-551. (MS24K-VENDOR-LINE) Refer to Exhibit ACCT-2 CLP-12, Confidential Exhibit ACCT-2 CLP-12A-3, pp. 1-15. The Company reported an incremental charge of $25,515 for the E-J Electric T&D LLC vendor. The charges related to activity solely on December 12, 2024. Respond to the following: a. Explain why the vendor was permitted to bill for hotel charges the evening of December 11, 2024 when they were both mobilized and released on December 12, 2024, and each hotel receipt (i.e., pp. 11-15) referenced an unrelated “NY Job”. b. Referring to p. 2, explain why the vendor billed for one hour of standby (labor) and also billed for the equipment at the full equipment rate in lieu of the 50% rate identified by the Company within the Exhibit B referenced in EOE-399, Att.1. EOE-552. (MS24K-VENDOR-TRAFFIC) Refer to Exhibit ACCT-2 CLP-12, Confidential Exhibit ACCT-2 CLP-12A-3, pp. 39-57. The Company reported an incremental charge in the amount of $5,225 for the Elite Flaggers LLCPage 30 of 40
vendor. Identify the specific charges (i.e., flagging services) that were allocated to the MS24K event. Specifically, EOE reviewed each of the timesheet equivalents (i.e., pp. 41-57) and was unable to derive the reported charge based on the reported Job # (i.e., work order numbers). EOE-553. (MS24K-VENDOR-ENVIRONMENTAL) Refer to Exhibit ACCT-2 CLP-12, Confidential Exhibit ACCT-2 CLP-12A-3, pp. 58-249. The Company reported an incremental charge in the amount of $5,350 for the Environmental Consultants Inc vendor and appears to have provided unrelated documents. Please provide an unlocked Excel spreadsheet demonstrating how the Company derived the reported charge based on the documentation provided. Please cite the relevant pages and separately identify the vendor’s billing at Regular Time versus Overtime. EOE-554. (MS24K-VENDOR-CIVIL) Refer to Exhibit ACCT-2 CLP-12, Confidential Exhibit ACCT-2 CLP-12A-3, pp. 273-284. The Company reported two incremental charges in the combined amount of $24,232 for the KTI Utility Construction & Maintenance LLC vendor. Respond to the following: a. Referring to p. 273, the Company did not provide timesheets or other documents to support the hours worked. Provide any omitted signed timesheets. If timesheets do not exist, explain how the invoice reviewer was able to validate the accuracy of the hours billed and provide any relevant documentation. b. Referring to p. 274, explain how the activity performed on December 2324, 2024 were applicable to the MS24K event. Specifically, the dates align with the MN24AN minor storm event as reported within EOE-013RV01, Att. 1. EOE-555. (MS24K-VENDOR-TREE) Refer to Exhibit ACCT-2 CLP-12, Confidential Exhibit ACCT-2 CLP-12A-3 through CLP-12A-4. The Company reported 130 incremental charges (Excel Rows 185-314) for the combined amount of $264,881 for the Lewis Tree Service Inc. vendor. Explain why almost every Weekly Operations Summary report (e.g., pp. 278, 281, 287, etc.) included a ‘Time Start’ and a ‘Time Finish’ of 7:00AM and 4:00PM, respectively, which does not agree with the hours billed. As part of the response, explain how the Company was able to validate the accuracy of the hours billed and provide supporting documentation available to the reviewer at the time verifying that the hours were correctly billed for each invoice (i.e., crew). Additionally, provide an unlocked Excel spreadsheet listing each invoice, detailing the crew’s start and end times, identifying the billable amounts, and identifying if supporting documentation (i.e., available to the arborist at the time of the review) is being provided.Page 31 of 40
EOE-556. (MS24K-VENDOR-TREE) Refer to Exhibit ACCT-2 CLP-12, Confidential Exhibit ACCT-2 CLP-12A-4, pp. 112-115, 237-238. The Company reported three incremental charges (Excel Rows 275-276, 314) for the combined amount of $38,365 for the Lewis Tree Service Inc. vendor. Respond to the following: a. The invoices reference different job descriptions (see e.g., “Operator of 70’ Bucket”), types of equipment, and rates. Please cite the executed contract and pricing schedule that supports each of the billed employees and types of equipment. b. The Company failed to provide Eversource Connecticut Emergency Restoration Tree Contractor Work Location reports for each of the referenced invoices, please provide. c. Referring to pp. 237-238, explain why the Company utilized the reference crews on December 13, 2024, when the Company resumed normal operations as of 8AM on December 12, 2024. Additionally, explain why the Company required the use of the various atypical equipment (i.e., Albach Felling Crane, Bobcat, Log Truck, and Whole Tree Chipper) and provide documentation to support both the applicability and necessity of these charges to the MS24K event. EOE-557. (MS24K-VENDOR-TREE) Refer to Exhibit ACCT-2 CLP-12, Confidential Exhibit ACCT-2 CLP-12A-4, pp. 10-33, 122-157. The Company reported 17 incremental charges (Excel Rows 241-248, 279-287) for the combined amount of $38,365 for the Lewis Tree Service Inc. vendor. Each of the charges were for remediation between December 16, 2024 and December 20, 2024, when the Company resumed normal operations as of 8AM on December 12, 2024. Respond to the following: a. Provide an unlocked Excel spreadsheet listing each applicable invoice, the referenced dates, the amounts billed for each date, and, as applicable, provide documentation demonstrating that the remediation was both necessary and directly applicable to the MS24K event. To the extent that errors are identified, please reference each error in the Excel spreadsheet. b. Comparing pp. 124-129 with p. 132-137, explain why duplicate Eversource Connecticut Emergency Restoration Tree Contractor Work Location reports (encompassing a week’s activity) were provided in support of two different invoices. c. Explain why the remediation of “dead” trees (see e.g., pp. 124, 125, 128, etc) was directly attributed to the MS24K event. As part of the response,Page 32 of 40
identify if the Company’s existing vegetation management program includes revenue to remediate dead vegetation. EOE-558. (MS24K-VENDOR-LINE) Refer to Exhibit ACCT-2 CLP-12, Confidential Exhibit ACCT-2 CLP-12A-4, pp. 304-307. The Company reported an incremental charge in the amount of $11,726 for the M J Electric vendor. Respond to the following: a. The vendor appears to have provided a non-standard version of the Eversource Contractor Daily Work Report (pp. 305-306) that fails to identify billing for ‘travel’, ‘standby’, and ‘work’. Explain why the Company permitted the use of the form and identify what specific billing activity was performed. If billing for travel or work, provide details on the actual travel and work assignments. b. Comparing p. 307 with OCC-044, Att. 2, p. 3662, confirm that the vendor billed for its equipment at 100% for each hour worked. If confirmed, explain why this was permitted when the Company’s response to EOE399, Att.1 would require billing of equipment at 50% (i.e., during standby) and identify the total incorrect amount billed. EOE-559. (MS24K-VENDOR-LINE) Refer to Exhibit ACCT-2 CLP-12, Confidential Exhibit ACCT-2 CLP-12A-5, pp. 12-42. The Company reported an incremental charge in the amount of $138,549 for the McPhee Electric LTD LLC vendor. Respond to the following: a. Explain why the Company identified an incremental recoverable amount of $138,549 when the invoice was for $134,077. b. Referring to p. 13, confirm that the vendor did not bill for equipment during standby (i.e., for the OT Hours). If confirmed, explain why. c. Referring the vendor’s Exhibit B provided at EOE-237, Att. 2 (Confidential) and the vendor’s Pricing Schedule provided at OCC-044, Att. 2, p. 4246, explain why the Company allowed for conflicting provisions and identify which provision applies. Specifically, Exhibit B at Section 4.4 [Emergency Response Work], subsection e (p. 10) defines that fuel is included in Equipment rates; however, the Pricing Schedule provides a notation that “Fuel will be billed at cost – No Markup.” EOE-560. (MS24K-VENDOR-LINE) Refer to Exhibit ACCT-2 CLP-12, Confidential Exhibit ACCT-2 CLP-12A-5, pp. 44-67. The Company reported an incremental charge in the amount of $100,821 for the Michels Power Inc vendor. The charge solely related to the billing of four hours on DecemberPage 33 of 40
12, 2024, and included an email from the Company stating, “Crews released this morning as of 0600 will be able to bill 4 hours of demob to the storm” (p. 52). Respond to the following: a. Explain why vendor crews that were released immediately upon the commencement of their shift were permitted to bill for four hours. As part of the response, identify where this billing treatment is defined within the vendor contract. If not included within the vendor contract, explain why this additional billing was authorized by the Company. b. Explain why the billed rates included on pp. 56-63 are different (higher) than the rates included within the vendor’s pricing schedule provided within OCC-044, Att. 2 (Confidential), pp. 4420-4427 for the same period. As part of the response, please provide an unlocked Excel spreadsheet that compares the billing at the two different rate schedules. c. Explain why the Company permitted the vendor to bill the entire four hours as Travel in lieu of Standby, which would be subject to a lower billing rate for equipment (see EOE-399, Att.1). As part of the response, please identify the incremental impact on the equipment charge for permitting the vendor to bill travel in lieu of standby. EOE-561. (MS24K-VENDOR-LINE) Refer to Exhibit ACCT-2 CLP-12, Confidential Exhibit ACCT-2 CLP-12A-5, pp. 68-75. The Company reported an incremental charge in the amount of $138,549 for the Michels Power Inc vendor. Confirm that the vendor solely performed standby and did not bill for any equipment for the duration of its assignment. If confirmed, explain why. EOE-562. (MS24K-VENDOR-LINE) Refer to Exhibit ACCT-2 CLP-12, Confidential Exhibit ACCT-2 CLP-12A-5, pp. 76-109. The Company reported three incremental charges in the combined amount of $296,439 for the MTV Solutions Inc vendor. Respond to the following: a. Referring to pp. 77-83 and 86-90, each of the Eversource Contractor Storm Daily Time & Work Reports include a discussion within Section 23 [Description of Work] that references coordination for December 11, 2024, but the billing applied to December 12, 2024. Confirm that this was a typo. If not confirmed, explain. b. Referring to pp. 77-83 and 86-90, explain how the Company validated the accuracy of the vendor’s billing of six hours of travel. As part of the explanation, identify if any portion of the billing should have been attributed to standby and, if applicable, how much of the equipment costs were attributed to standby in error.Page 34 of 40
c. Referring to pp. 77-83 and 86-90, explain how a vendor can arrive at a location “ready to work” and then incur billable time to eat breakfast 30 minutes later. Additionally, identify if breakfast was provided by the Company and, if so, explain why the vendor was also permitted to separately bill the Company for the meal (see pp. 84, 91). d. Referring to the 3rd Invoice, specifically pp. 93-100, confirm that the portion of billing associated with standby did not include any billing for equipment. If confirmed explain why. e. Referring to the 3rd Invoice, specifically pp. 101-107, explain how the Company validated the accuracy of the four hours of billing for travel when the Eversource Contractor Storm Daily Time & Work Reports failed to provide any details. As part of the response, provide details on the travel. EOE-563. (MS24K-VENDOR-LINE) Refer to Exhibit ACCT-2 CLP-12, Confidential Exhibit ACCT-2 CLP-12A-5, pp. 130-153. The Company reported three incremental charges in the combined amount of $81,440 for the One Source Power LLC vendor. Respond to the following: a. Explain why each of the invoices billed for four hours of demobilization on December 12, 2024, with the starting and ending locations being the same location (see e.g., p. 136). To the extent that the billing of four hours was permitted by contract, identify where this billing treatment is defined within the vendor contract. If not included within the vendor contract, explain why this billing was permitted. b. Explain why the Company permitted the vendor to bill the entire four hours as Travel in lieu of Standby, which would be subject to a lower billing rate for equipment (see EOE-399, Att.1). As part of the response, please identify the incremental impact on the equipment charge for permitting the vendor to bill travel in lieu of standby. EOE-564. (MS24K-VENDOR-LINE) Refer to Exhibit ACCT-2 CLP-12, Confidential Exhibit ACCT-2 CLP-12A-5, pp. 154-160. The Company reported an incremental charge of $87,834 for the OneSource Restoration LLC vendor. Respond to the following: a. Referring to OCC-044, Att. 2 (Confidential), p. 5048-5064, confirm that the vendor’s Exhibit A Pricing Schedule contains the Company’s standard provisions, including “Standby Rates apply to labor resources only” (i.e., p. 5054). If not confirmed, cite the revised Exhibit A Pricing Schedule that was executed (signed) for 2024 and 2025 that revised the standard provisions.Page 35 of 40
b. Referring to OCC-044, Att. 2 (Confidential), p. 5048-5064, the vendor’s Exhibit A Pricing Schedule appears to include outdated rates. Provide or cite the signed 2024 Pricing Schedule that aligns to the rates charged. c. Explain why the vendor was permitted to bill for four hours of demobilization on December 12, 2024, with the starting and ending locations being the same location. To the extent that the billing of four hours was permitted by contract, identify where this billing treatment is defined within the vendor contract. If not included within the vendor contract, explain why this billing was permitted. d. Explain why the Company permitted the vendor to bill the entire four hours as Travel in lieu of Standby, which would be subject to the provisions of Exhibit A (see EOE-389, Att.2). As part of the response, please identify the incremental impact of the equipment charge. EOE-565. (MS24K-VENDOR-LINE) Refer to Exhibit ACCT-2 CLP-12, Confidential Exhibit ACCT-2 CLP-12A-5, pp. 161-167. The Company reported an incremental charge of $94,616 for the Orion Utility Contractors LLC vendor. Respond to the following: a. Confirm that the portion of billing associated with standby did not include any billing for equipment. If confirmed explain why. b. Comparing pp. 164-165 with EOE-406, Att. 1, Excel Row 907, confirm that the OMS Event No. 5554682 (i.e., car vs pole) was repaired by the Orion Utility Contractors LLC vendor and the costs were incorrectly charged to the MS24K event. If confirmed, provide an unlocked Excel spreadsheet calculating the amount applicable to the “car vs pole” repair and confirm that it will be eliminated from the recovery request. Additionally, identify any other vendor charges that would be applicable to the OMS Event (i.e., flagging, environmental, etc). If not confirmed, explain how the Company determined that the OMS information was inaccurate. EOE-566. (MS24K-VENDOR-SERVICE) Refer to Exhibit ACCT-2 CLP-12, Confidential Exhibit ACCT-2 CLP-12A-5, pp. 168-189. The Company reported an incremental charge of $22,240 for the Pasquariello Electric Corp vendor. Most of the supporting exhibits (i.e., Eversource Contractor Storm Daily Time & Work Reports at pp. 170-179 and Eversource Contractor Storm Mobilization & Demobilization Time Reports at pp. 180189) are either illegible or inconsistent. For example, it appears that Crew #1 reported 8 hours of standby on December 12, 2024 from 6AM to 2PM (p. 170) and then reported 4 hours of demobilization on December 12, 2024 from 7AM to 11AM (p.180). Please provide a narrative detailing the specific support efforts performed by the vendor, including timing, and explain why the vendor wasn’t released as of the Company’s 8AM return to normalPage 36 of 40
operations. If the vendor did not support a full 8 hours as billed on p. 168, identify the incremental impact of the overbilling. EOE-567. (MS24K-VENDOR-SERVICE) Refer to Exhibit ACCT-2 CLP-12, Confidential Exhibit ACCT-2 CLP-12A-5, pp. 190-193. The Company reported three incremental charges in the combined amount of $44,703 for the Paul Gregorys LLC and Perk on Main LLC vendors. Provide an unlocked Excel spreadsheet detailing the total all-in costs for each meal (i.e., breakfast, lunch, and dinner) and provide a comparison of the cost to the maximum meal caps outlined within Eversource’s restaurant meal policy. Additionally, explain why each of the requested recovery amounts exceed the amounts reported on the invoices. EOE-568. (MS24K-VENDOR-LINE) Refer to Exhibit ACCT-2 CLP-12, Confidential Exhibit ACCT-2 CLP-12A-5, pp. 130-153. The Company reported two incremental charges in the combined rounded amount of $53,439 for the Premium Utility Contractor Inc vendor. Respond to the following: a. Explain how the two invoices, both in the amount of $26,719 for the same crew members on the same December 12, 2024, date, are not duplicated charges. If duplicates, explain this was not identified during management’s review and confirm the amount that will be removed from the recovery request. b. Identify if the vendor was mobilized or if they were immediately released and permitted to bill for four hours of demobilization on December 12, 2024. c. If response to subsection ‘b’ is that the crews were actually mobilized, explain why they were permitted to bill for four hours to travel between East Hampton and Monroe CT. d. If response to subsection ‘b’ is that they were not mobilized but were permitted to bill for a minimum of four hours, identify where this billing treatment is defined within the vendor contract. If not included within the vendor contract, explain why this billing was permitted. e. Explain why the Company permitted the vendor to bill the entire four hours as Travel in lieu of Standby, which would be subject to the provisions of Exhibit A (see EOE-389, Att.2). As part of the response, please identify the incremental impact of the equipment charge. EOE-569. (MS24K-VENDOR-LINE) Refer to Exhibit ACCT-2 CLP-12, Confidential Exhibit ACCT-2 CLP-12A-5, pp. 212-219. The Company reported an incremental charge of $55,133 for the Riggs Distler & Company Inc vendor. Respond to the following:Page 37 of 40
a. Referring to p. 213, explain why the vendor billed for 13 hours of equipment on December 11, 2024 when they billed for 10 hours of standby and 8 hours of work. b. Explain why the vendor was permitted to submit Eversource Contractor Storm Daily Time & Work Reports that lacked details regarding hours worked for each assignment (i.e., boxes 24-26 within pp. 214-215). c. Referring to p. 215, please provide a complete copy of the OMS report for event number 5556582. If not included in OMS, identify when the event was completed. EOE-570. (MS24K-VENDOR-LINE) Refer to Exhibit ACCT-2 CLP-12, Confidential Exhibit ACCT-2 CLP-12A-6, pp. 1-9. The Company reported an incremental charge of $30,769 for the Siebert and Sons Enterprises LLC vendor. Respond to the following: a. Identify if the vendor was mobilized or if they were immediately released and permitted to bill for the four hours of demobilization on December 12, 2024. b. If response to subsection ‘a’ is that the crews were actually mobilized, provide details on the mobilization/demobilization to include the missing “End Location” on pp. 6-9. c. If response to subsection ‘a’ is that they were not mobilized but were permitted to bill for a minimum of four hours, identify where this billing treatment is defined within the vendor contract. If not included within the vendor contract, explain why this billing was permitted. d. Explain why the Company permitted the vendor to bill the entire four hours as Travel in lieu of Standby, which would be subject to the provisions of Exhibit A (see EOE-389, Att.2). As part of the response, please identify the incremental impact of the equipment charge. EOE-571. (MS24K-VENDOR-EQUIPMENT) Refer to Exhibit ACCT-2 CLP-12, Confidential Exhibit ACCT-2 CLP-12A-6, pp. 24-36. The Company reported 12 incremental charges in the combined amount of $143,353 for the Sunbelt Rentals Inc. vendor. Respond to the following: a. Referring to p. 24 (supporting charge of $10,001), explain how the charge could be applicable to the MS24K event when the outage was reported as December 9-10, 2024, commencing several days prior to the MS24K event, associated with an unrelated workorder number, and was not included within the Company’s outage data reported within EOE-020, Att. 1. b. Referring to pp. 30-34 (supporting charges of $51,033), explain how each of the charges could be applicable to the MS24K event when the outages all commenced on December 12, 2024, after the MS24K event