Interrogatories
To CL&P, questions 481 thru 500
Files1
26-05-10 - EOE Interrogatories Set 11.pdf
PDF · 630 KB · 40 pagesText searchable
Download 26-05-10 - EOE Interrogatories Set 11.pdfRead the text of 26-05-10 - EOE Interrogatories Set 11.pdf
Search terms highlighted
Eversource rate increase is on 2 pages of the text below, highlighted. Go to the first matchClear highlighting
Page 31 of 40
EOE-556. (MS24K-VENDOR-TREE) Refer to Exhibit ACCT-2 CLP-12, Confidential Exhibit ACCT-2 CLP-12A-4, pp. 112-115, 237-238. The Company reported three incremental charges (Excel Rows 275-276, 314) for the combined amount of $38,365 for the Lewis Tree Service Inc. vendor. Respond to the following: a. The invoices reference different job descriptions (see e.g., “Operator of 70’ Bucket”), types of equipment, and rates. Please cite the executed contract and pricing schedule that supports each of the billed employees and types of equipment. b. The Company failed to provide Eversource Connecticut Emergency Restoration Tree Contractor Work Location reports for each of the referenced invoices, please provide. c. Referring to pp. 237-238, explain why the Company utilized the reference crews on December 13, 2024, when the Company resumed normal operations as of 8AM on December 12, 2024. Additionally, explain why the Company required the use of the various atypical equipment (i.e., Albach Felling Crane, Bobcat, Log Truck, and Whole Tree Chipper) and provide documentation to support both the applicability and necessity of these charges to the MS24K event. EOE-557. (MS24K-VENDOR-TREE) Refer to Exhibit ACCT-2 CLP-12, Confidential Exhibit ACCT-2 CLP-12A-4, pp. 10-33, 122-157. The Company reported 17 incremental charges (Excel Rows 241-248, 279-287) for the combined amount of $38,365 for the Lewis Tree Service Inc. vendor. Each of the charges were for remediation between December 16, 2024 and December 20, 2024, when the Company resumed normal operations as of 8AM on December 12, 2024. Respond to the following: a. Provide an unlocked Excel spreadsheet listing each applicable invoice, the referenced dates, the amounts billed for each date, and, as applicable, provide documentation demonstrating that the remediation was both necessary and directly applicable to the MS24K event. To the extent that errors are identified, please reference each error in the Excel spreadsheet. b. Comparing pp. 124-129 with p. 132-137, explain why duplicate Eversource Connecticut Emergency Restoration Tree Contractor Work Location reports (encompassing a week’s activity) were provided in support of two different invoices. c. Explain why the remediation of “dead” trees (see e.g., pp. 124, 125, 128, etc) was directly attributed to the MS24K event. As part of the response,Page 32 of 40
identify if the Company’s existing vegetation management program includes revenue to remediate dead vegetation. EOE-558. (MS24K-VENDOR-LINE) Refer to Exhibit ACCT-2 CLP-12, Confidential Exhibit ACCT-2 CLP-12A-4, pp. 304-307. The Company reported an incremental charge in the amount of $11,726 for the M J Electric vendor. Respond to the following: a. The vendor appears to have provided a non-standard version of the Eversource Contractor Daily Work Report (pp. 305-306) that fails to identify billing for ‘travel’, ‘standby’, and ‘work’. Explain why the Company permitted the use of the form and identify what specific billing activity was performed. If billing for travel or work, provide details on the actual travel and work assignments. b. Comparing p. 307 with OCC-044, Att. 2, p. 3662, confirm that the vendor billed for its equipment at 100% for each hour worked. If confirmed, explain why this was permitted when the Company’s response to EOE399, Att.1 would require billing of equipment at 50% (i.e., during standby) and identify the total incorrect amount billed. EOE-559. (MS24K-VENDOR-LINE) Refer to Exhibit ACCT-2 CLP-12, Confidential Exhibit ACCT-2 CLP-12A-5, pp. 12-42. The Company reported an incremental charge in the amount of $138,549 for the McPhee Electric LTD LLC vendor. Respond to the following: a. Explain why the Company identified an incremental recoverable amount of $138,549 when the invoice was for $134,077. b. Referring to p. 13, confirm that the vendor did not bill for equipment during standby (i.e., for the OT Hours). If confirmed, explain why. c. Referring the vendor’s Exhibit B provided at EOE-237, Att. 2 (Confidential) and the vendor’s Pricing Schedule provided at OCC-044, Att. 2, p. 4246, explain why the Company allowed for conflicting provisions and identify which provision applies. Specifically, Exhibit B at Section 4.4 [Emergency Response Work], subsection e (p. 10) defines that fuel is included in Equipment rates; however, the Pricing Schedule provides a notation that “Fuel will be billed at cost – No Markup.” EOE-560. (MS24K-VENDOR-LINE) Refer to Exhibit ACCT-2 CLP-12, Confidential Exhibit ACCT-2 CLP-12A-5, pp. 44-67. The Company reported an incremental charge in the amount of $100,821 for the Michels Power Inc vendor. The charge solely related to the billing of four hours on DecemberPage 33 of 40
12, 2024, and included an email from the Company stating, “Crews released this morning as of 0600 will be able to bill 4 hours of demob to the storm” (p. 52). Respond to the following: a. Explain why vendor crews that were released immediately upon the commencement of their shift were permitted to bill for four hours. As part of the response, identify where this billing treatment is defined within the vendor contract. If not included within the vendor contract, explain why this additional billing was authorized by the Company. b. Explain why the billed rates included on pp. 56-63 are different (higher) than the rates included within the vendor’s pricing schedule provided within OCC-044, Att. 2 (Confidential), pp. 4420-4427 for the same period. As part of the response, please provide an unlocked Excel spreadsheet that compares the billing at the two different rate schedules. c. Explain why the Company permitted the vendor to bill the entire four hours as Travel in lieu of Standby, which would be subject to a lower billing rate for equipment (see EOE-399, Att.1). As part of the response, please identify the incremental impact on the equipment charge for permitting the vendor to bill travel in lieu of standby. EOE-561. (MS24K-VENDOR-LINE) Refer to Exhibit ACCT-2 CLP-12, Confidential Exhibit ACCT-2 CLP-12A-5, pp. 68-75. The Company reported an incremental charge in the amount of $138,549 for the Michels Power Inc vendor. Confirm that the vendor solely performed standby and did not bill for any equipment for the duration of its assignment. If confirmed, explain why. EOE-562. (MS24K-VENDOR-LINE) Refer to Exhibit ACCT-2 CLP-12, Confidential Exhibit ACCT-2 CLP-12A-5, pp. 76-109. The Company reported three incremental charges in the combined amount of $296,439 for the MTV Solutions Inc vendor. Respond to the following: a. Referring to pp. 77-83 and 86-90, each of the Eversource Contractor Storm Daily Time & Work Reports include a discussion within Section 23 [Description of Work] that references coordination for December 11, 2024, but the billing applied to December 12, 2024. Confirm that this was a typo. If not confirmed, explain. b. Referring to pp. 77-83 and 86-90, explain how the Company validated the accuracy of the vendor’s billing of six hours of travel. As part of the explanation, identify if any portion of the billing should have been attributed to standby and, if applicable, how much of the equipment costs were attributed to standby in error.Page 34 of 40
c. Referring to pp. 77-83 and 86-90, explain how a vendor can arrive at a location “ready to work” and then incur billable time to eat breakfast 30 minutes later. Additionally, identify if breakfast was provided by the Company and, if so, explain why the vendor was also permitted to separately bill the Company for the meal (see pp. 84, 91). d. Referring to the 3rd Invoice, specifically pp. 93-100, confirm that the portion of billing associated with standby did not include any billing for equipment. If confirmed explain why. e. Referring to the 3rd Invoice, specifically pp. 101-107, explain how the Company validated the accuracy of the four hours of billing for travel when the Eversource Contractor Storm Daily Time & Work Reports failed to provide any details. As part of the response, provide details on the travel. EOE-563. (MS24K-VENDOR-LINE) Refer to Exhibit ACCT-2 CLP-12, Confidential Exhibit ACCT-2 CLP-12A-5, pp. 130-153. The Company reported three incremental charges in the combined amount of $81,440 for the One Source Power LLC vendor. Respond to the following: a. Explain why each of the invoices billed for four hours of demobilization on December 12, 2024, with the starting and ending locations being the same location (see e.g., p. 136). To the extent that the billing of four hours was permitted by contract, identify where this billing treatment is defined within the vendor contract. If not included within the vendor contract, explain why this billing was permitted. b. Explain why the Company permitted the vendor to bill the entire four hours as Travel in lieu of Standby, which would be subject to a lower billing rate for equipment (see EOE-399, Att.1). As part of the response, please identify the incremental impact on the equipment charge for permitting the vendor to bill travel in lieu of standby. EOE-564. (MS24K-VENDOR-LINE) Refer to Exhibit ACCT-2 CLP-12, Confidential Exhibit ACCT-2 CLP-12A-5, pp. 154-160. The Company reported an incremental charge of $87,834 for the OneSource Restoration LLC vendor. Respond to the following: a. Referring to OCC-044, Att. 2 (Confidential), p. 5048-5064, confirm that the vendor’s Exhibit A Pricing Schedule contains the Company’s standard provisions, including “Standby Rates apply to labor resources only” (i.e., p. 5054). If not confirmed, cite the revised Exhibit A Pricing Schedule that was executed (signed) for 2024 and 2025 that revised the standard provisions.Page 35 of 40
b. Referring to OCC-044, Att. 2 (Confidential), p. 5048-5064, the vendor’s Exhibit A Pricing Schedule appears to include outdated rates. Provide or cite the signed 2024 Pricing Schedule that aligns to the rates charged. c. Explain why the vendor was permitted to bill for four hours of demobilization on December 12, 2024, with the starting and ending locations being the same location. To the extent that the billing of four hours was permitted by contract, identify where this billing treatment is defined within the vendor contract. If not included within the vendor contract, explain why this billing was permitted. d. Explain why the Company permitted the vendor to bill the entire four hours as Travel in lieu of Standby, which would be subject to the provisions of Exhibit A (see EOE-389, Att.2). As part of the response, please identify the incremental impact of the equipment charge. EOE-565. (MS24K-VENDOR-LINE) Refer to Exhibit ACCT-2 CLP-12, Confidential Exhibit ACCT-2 CLP-12A-5, pp. 161-167. The Company reported an incremental charge of $94,616 for the Orion Utility Contractors LLC vendor. Respond to the following: a. Confirm that the portion of billing associated with standby did not include any billing for equipment. If confirmed explain why. b. Comparing pp. 164-165 with EOE-406, Att. 1, Excel Row 907, confirm that the OMS Event No. 5554682 (i.e., car vs pole) was repaired by the Orion Utility Contractors LLC vendor and the costs were incorrectly charged to the MS24K event. If confirmed, provide an unlocked Excel spreadsheet calculating the amount applicable to the “car vs pole” repair and confirm that it will be eliminated from the recovery request. Additionally, identify any other vendor charges that would be applicable to the OMS Event (i.e., flagging, environmental, etc). If not confirmed, explain how the Company determined that the OMS information was inaccurate. EOE-566. (MS24K-VENDOR-SERVICE) Refer to Exhibit ACCT-2 CLP-12, Confidential Exhibit ACCT-2 CLP-12A-5, pp. 168-189. The Company reported an incremental charge of $22,240 for the Pasquariello Electric Corp vendor. Most of the supporting exhibits (i.e., Eversource Contractor Storm Daily Time & Work Reports at pp. 170-179 and Eversource Contractor Storm Mobilization & Demobilization Time Reports at pp. 180189) are either illegible or inconsistent. For example, it appears that Crew #1 reported 8 hours of standby on December 12, 2024 from 6AM to 2PM (p. 170) and then reported 4 hours of demobilization on December 12, 2024 from 7AM to 11AM (p.180). Please provide a narrative detailing the specific support efforts performed by the vendor, including timing, and explain why the vendor wasn’t released as of the Company’s 8AM return to normalPage 36 of 40
operations. If the vendor did not support a full 8 hours as billed on p. 168, identify the incremental impact of the overbilling. EOE-567. (MS24K-VENDOR-SERVICE) Refer to Exhibit ACCT-2 CLP-12, Confidential Exhibit ACCT-2 CLP-12A-5, pp. 190-193. The Company reported three incremental charges in the combined amount of $44,703 for the Paul Gregorys LLC and Perk on Main LLC vendors. Provide an unlocked Excel spreadsheet detailing the total all-in costs for each meal (i.e., breakfast, lunch, and dinner) and provide a comparison of the cost to the maximum meal caps outlined within Eversource’s restaurant meal policy. Additionally, explain why each of the requested recovery amounts exceed the amounts reported on the invoices. EOE-568. (MS24K-VENDOR-LINE) Refer to Exhibit ACCT-2 CLP-12, Confidential Exhibit ACCT-2 CLP-12A-5, pp. 130-153. The Company reported two incremental charges in the combined rounded amount of $53,439 for the Premium Utility Contractor Inc vendor. Respond to the following: a. Explain how the two invoices, both in the amount of $26,719 for the same crew members on the same December 12, 2024, date, are not duplicated charges. If duplicates, explain this was not identified during management’s review and confirm the amount that will be removed from the recovery request. b. Identify if the vendor was mobilized or if they were immediately released and permitted to bill for four hours of demobilization on December 12, 2024. c. If response to subsection ‘b’ is that the crews were actually mobilized, explain why they were permitted to bill for four hours to travel between East Hampton and Monroe CT. d. If response to subsection ‘b’ is that they were not mobilized but were permitted to bill for a minimum of four hours, identify where this billing treatment is defined within the vendor contract. If not included within the vendor contract, explain why this billing was permitted. e. Explain why the Company permitted the vendor to bill the entire four hours as Travel in lieu of Standby, which would be subject to the provisions of Exhibit A (see EOE-389, Att.2). As part of the response, please identify the incremental impact of the equipment charge. EOE-569. (MS24K-VENDOR-LINE) Refer to Exhibit ACCT-2 CLP-12, Confidential Exhibit ACCT-2 CLP-12A-5, pp. 212-219. The Company reported an incremental charge of $55,133 for the Riggs Distler & Company Inc vendor. Respond to the following:Page 37 of 40
a. Referring to p. 213, explain why the vendor billed for 13 hours of equipment on December 11, 2024 when they billed for 10 hours of standby and 8 hours of work. b. Explain why the vendor was permitted to submit Eversource Contractor Storm Daily Time & Work Reports that lacked details regarding hours worked for each assignment (i.e., boxes 24-26 within pp. 214-215). c. Referring to p. 215, please provide a complete copy of the OMS report for event number 5556582. If not included in OMS, identify when the event was completed. EOE-570. (MS24K-VENDOR-LINE) Refer to Exhibit ACCT-2 CLP-12, Confidential Exhibit ACCT-2 CLP-12A-6, pp. 1-9. The Company reported an incremental charge of $30,769 for the Siebert and Sons Enterprises LLC vendor. Respond to the following: a. Identify if the vendor was mobilized or if they were immediately released and permitted to bill for the four hours of demobilization on December 12, 2024. b. If response to subsection ‘a’ is that the crews were actually mobilized, provide details on the mobilization/demobilization to include the missing “End Location” on pp. 6-9. c. If response to subsection ‘a’ is that they were not mobilized but were permitted to bill for a minimum of four hours, identify where this billing treatment is defined within the vendor contract. If not included within the vendor contract, explain why this billing was permitted. d. Explain why the Company permitted the vendor to bill the entire four hours as Travel in lieu of Standby, which would be subject to the provisions of Exhibit A (see EOE-389, Att.2). As part of the response, please identify the incremental impact of the equipment charge. EOE-571. (MS24K-VENDOR-EQUIPMENT) Refer to Exhibit ACCT-2 CLP-12, Confidential Exhibit ACCT-2 CLP-12A-6, pp. 24-36. The Company reported 12 incremental charges in the combined amount of $143,353 for the Sunbelt Rentals Inc. vendor. Respond to the following: a. Referring to p. 24 (supporting charge of $10,001), explain how the charge could be applicable to the MS24K event when the outage was reported as December 9-10, 2024, commencing several days prior to the MS24K event, associated with an unrelated workorder number, and was not included within the Company’s outage data reported within EOE-020, Att. 1. b. Referring to pp. 30-34 (supporting charges of $51,033), explain how each of the charges could be applicable to the MS24K event when the outages all commenced on December 12, 2024, after the MS24K eventPage 38 of 40
and none of the outages were included within the Company’s outage data reported within EOE-020, Att. 1. If determined applicable to the MS24K event, please provide both copies of the applicable OMS reports and copies of the Oracle Analytics Interactive Dashboards-Events reports. c. Referring to pp. 35-36 (supporting charges of $54,714), identify if any of the charges were applicable to generators that were actually used or if the generators were solely staged. If the generators were not used, provide all documentation that was contemporaneously available to support the necessity of the generators for the MS24K event. EOE-572. (MS24K-VENDOR-POLICE) Refer to Exhibit ACCT-2 CLP-12, Confidential Exhibit ACCT-2 CLP-12A-6, pp. 100-131. The Company reported an incremental charge of $2,430 for the Town of Stonington. The invoice included multiple individual charges, including charges that occurred both prior to and after the MS24K event. Please identify how the Company derived the amount applicable to the MS24K event. Additionally, provide additional documentation to include OMS reports substantiating the billing for any allocated charges that did not occur on either December 11 or 12, 2024. EOE-573. (MS24K-VENDOR-REPS) Refer to Exhibit ACCT-2 CLP-12, Confidential Exhibit ACCT-2 CLP-12A-6, pp. 137-146. The Company reported an incremental charge of $4,484 for the United Utility Services Holdings LP vendor. Explain the specific services performed by the vendor employee, explain why these services were necessary, and explain why the individual was necessary to commence billing at 6AM on December 11, 2024. As part of the response, identify if this vendor employee was engaged for non-storm activities where those services would be funded by existing base rates. EOE-574. (MS24K-VENDOR-FOOD) Refer to Exhibit ACCT-2 CLP-12 (P-Card tab), Confidential Exhibit ACCT-2 CLP-12A-6, pp. 158-177. The Company reported seven incremental charges in the combined amount of $95,635 for various restaurants and provided supporting documents (i.e., P-Card tab, rows 20, 33, 56, 58, 61, 62, and 77). EOE was unable to reconcile each of the recovery amounts to the corresponding invoices provided. Respond to the following: a. Provide a reconciliation between each of the charges and the corresponding invoices provided and identify any adjustments required to the recovery amounts. As an initial example, row 33 identified a recovery amount of $15,121 and supported the charge by two invoices in the amounts of $5,872.80 each (i.e., $11,745.60), leaving a difference of approximately $3,375.Page 39 of 40
b. Provide an unlocked Excel spreadsheet detailing the total all-in costs for each associated meal/vendor and provide a comparison of the cost to the maximum meal cap outlined within Eversource’s restaurant meal policy. As part of the response, identify the aggregate amount that exceeds the policy. c. Referring to p. 177 (i.e., row 77), the Company provided a receipt for December 10, 2024, prior to the MS24K event and prior to any apparent vendor mobilization. Explain how the charges apply to the MS24K event and identify both where the food was delivered and who the food was for. EOE-575. (MS24K-LABOR OVERTIME) Refer to Exhibit ACCT-2 CLP-12, Labor by Empl. Title tab. Explain why most of the overtime billing was identified as being applicable to the week ending December 21, 2024 when the MS24K storm event occurred on December 11, 2024. Specifically, it appears that the Company’s submission details approximately $3,500 of incremental costs for the week ending December 14, 2024 (column G) and approximately $2 million for the week ending December 21, 2024 (i.e., overlapping with minor storm MN24AP). EOE-576. (MS24K-LABOR OVERTIME) Refer to Exhibit ACCT-2 CLP-12, Labor by Empl. Title tab. Provide documentation to support the validity of the following Overtime hours specific to the MS24K event. As part of the response, please provide relevant timesheets, calculations, or other supporting documents. a. Row 442, Distribution System Operator, 28.25 hours b. Row 1893, Line Helper, 32 hours c. Row 2658, Response Specialist-Line, 42 hours d. Row 2758, Line Mechanic, 30 hours e. Row 3357, Response Specialist-Line, 44 hours f. Row 3404, Distribution System Operator, 28.25 hours EOE-577. (MS24K- MEALS) Refer to Exhibit ACCT-2 CLP-12, Labor by Empl. Title tab. Provide documentation to support the validity of the following Meal reimbursements (stipends). As part of the response, please provide relevant calculations, union agreement citations, invoices, or other supporting documents and identify whether the employee received any Company provided meals or not. a. Row 553, Response Specialist- Line, $220 b. Row 1127, Senior Supervisor, Electric Field Operations, $736 c. Row 1467, Supervisor, Electric Field Operations, $843 d. Row 1892, Line Helper, $130 e. Row 2717, Response Specialist- Line, $220Page 40 of 40
f. Row 3323, Senior Supervisor, Electric Field Operations, $880 EOE-578. (MS24K-P-CARDS-MEALS) Refer to Exhibit ACCT-2 CLP-12, P-Card tab. Provide documentation to support the validity of the following sampled PCard Meal expenses. As part of the response, please provide the relevant invoices and other supporting documents demonstrating the necessity and applicability of each charge to the MS24K event. Additionally, provide documentation to support the charges complying with Eversource’s restaurant meal policy and if the charges exceed the policy, identify the amounts in excess of the policy. a. Row 19, ANGELO S MARKET, $3,485 b. Row 30, CASA MIA AT THE HAWTHO, $2,763 c. Row 40, GRAND APIZZA MADISON, $7,735 d. Row 47, HILLTOP RESTAURANT & B, $3,911 e. Row 60, PARKWAY DINER, $9,698 f. Row 76, SQ *NEWTOWN DELI LLC, $8,234 EOE-579. (MS24K-EMPLOYEE EXPENSE REIMB) Refer to Exhibit ACCT-2 CLP-12, Empl. Expense&Other tab. Provide documentation to support the validity of the following sampled employee expenses. As part of the response, please provide a description of the purchase, relevant invoices, applicable calculations, and other supporting documents demonstrating the necessity and applicability of each cost to the MS24K event. a. Row 25, Employee Reimbursements, $714.00 b. Row 184, Employee Reimbursements, $465.00 c. Row 185, Employee Reimbursements, $344.00 EOE-580. (MS24K-EMPLOYEE EXPENSE MILEAGE) Refer to Exhibit ACCT-2 CLP12, Empl. Expense&Other tab. Provide documentation to support the validity of the following sampled mileage expenses. As part of the response, please provide the mileage logs and other supporting documents that were available to the Eversource reviewer at the time of approval demonstrating the applicability of each cost to the MS24K event, as well as the netting of the employee’s normal commute. a. Row 81, $178 b. Row 88, $126 c. Row 90, $126 d. Row 116, $110 e. Row 136, $126 f. Row 176, $126
As listed on the current system
Interrogs from PURA/EOE to CL&P 481 thru 500-Issued 11/13/2026 [26-05-10]