Interrogatories
To CL&P, questions 481 thru 500
Files1
26-05-10 - EOE Interrogatories Set 11.pdf
PDF · 630 KB · 40 pagesText searchable
Download 26-05-10 - EOE Interrogatories Set 11.pdfRead the text of 26-05-10 - EOE Interrogatories Set 11.pdf
Search terms highlighted
Eversource rate increase is on 2 pages of the text below, highlighted. Go to the first matchClear highlighting
Page 7 of 40
d. Identify all 3rd party claim scenarios that are logged in OMS (i.e., other than car vs. pole) and provide a comprehensive OMS extract detailing each scenario’s activity for the period 2024 through 2025. EOE-489. (MS24H-CAR VS. POLE) Refer to Response to EOE-406. Comparing EOE-406, Att. 1, Excel Row 490 to Exhibit ACCT-2 (CLP-9A-1) CONFIDENTIAL, p. 497, confirm that the OMS Event No. 5440073 was repaired by the Conexus Energy Group vendor and the costs were incorrectly charged to the MS24H event. If confirmed, provide an unlocked Excel spreadsheet calculating the amount applicable to the “car vs pole” repair and confirm that it will be eliminated from the recovery request. Additionally, identify any other vendor charges that would be applicable to the OMS Event. If not confirmed, explain how the Company determined that the OMS information was inaccurate. EOE-490. (MS24A-VENDOR-LINE-TRAVEL) Refer to Responses to EOE-408, EOE246, Exhibit ACCT-2 CLP 1, and Confidential Exhibit ACCT-2 CLP-1A-17, pp. 329-333. Respond to the following: a. Referring to EOE-408 subsection ‘b’, please clarify the Company’s response where it responded that the Correct number of hours attributed to Travel was 16 and the Correct number of hours attributed to Standby was 3. Specifically, is it the Company’s position that time spent to “Shape up at shop, onboard/safety train new hires, prepare fleet, tooling fleet, tailboard, travel, safety training of Eversource videos” (i.e., EOE246, subsection ‘a’) are all attributed to Travel or are several of these activities attributed to Standby? Provide details. b. If response to subsection ‘a’ is that all onboarding hours are attributed to Travel (i.e., billed at the corresponding rates), identify where this treatment is defined within the vendor contract or Company procedures. Additionally, explain why it took 6 hours (i.e., 11 hours on ACCT-2 CLP1A-17, pp. 331-332 less the 5 hours of travel estimated in EOE-246, subsections ‘a’ and ‘b’) to perform the onboarding tasks. c. If response to subsection ‘a’ is that onboarding hours are attributed to Standby, provide an unlocked Excel spreadsheet detailing the equipment billed during standby and calculate the total amount of equipment billed during the revised (increased) number of standby hours. EOE-491. (STORM EVENT DOCUMENTATION) Refer to Response to EOE-030SP01, Att. 1. Provide a reconciliation between the line crew costs reported within EOE-030-SP01, Att. 1 to the respective line crew costs reported within each storm’s Excel spreadsheet. To the extent that the amounts differ, please supplement EOE-030-SP01, Att. 1. As an example, EOE observed that Exhibit ACCT-2 CLP-01 (MS24A Excel spreadsheet) identified $14,059,070 of line crew costs compared to $8,355,703 withinPage 8 of 40
EOE-030-SP01, Att. 1. Similarly, EOE observed that Exhibit ACCT-2 CLP02 (MS24B Excel spreadsheet) identified $3,490,465 of line crew costs compared to $2,036,801 within EOE-030-SP01, Att. 1. EOE’s observations were not limited to these two examples. EOE-492. (STORM FLEET) Refer to Response to EOE-393. EOE-393 attempted to obtain a breakdown of the Storm Fleet costs split between Connecticut, Massachusetts, and New Hampshire. Instead, the Company provided an allocation of the total Annual Storm Fleet costs allocated to each state based on usage. Identify if the Company is capable of providing the underlying costs for each state to include costs relevant to the individual vehicles (i.e., maintenance, depreciation, etc) and the individual locations (i.e., storage costs, plowing, etc). If the Company is capable of providing costs applicable to each state’s fleet, please provide. If the Company is incapable of providing the costs applicable to each state’s fleet, explain why. EOE-493. (STORM FLEET-EXPENSES) Refer to Responses to EOE-396 and EOE178, Att.1. The Company was requested to provide documentation supporting various sampled Fleet expenses and provide explanations detailing the nature of the expenses. Respond to the following: a. Referring to sample selection ‘b’, the Company referenced that the monthly charge for storage of storm vehicles was approved without an invoice. Provide additional details regarding the nature of this monthly charge (i.e., why do the vehicles require storage in lieu of using Company owned property, where is the storage located, etc.) and provide the omitted documentation. If documentation cannot be provided, explain how this cost can be assessed for prudence. b. Referring to sample selection ‘c’, explain how an upgrade to an MRC command vehicle is treated as an expense versus a capitalized asset in accordance with Capital Versus Expense Criteria (i.e., EOE-060, Att.3). c. Referring to sample selection ‘c’, explain how the supporting invoice aligns to the selection. Specifically, the invoice references an International HV607 (i.e., a dump truck) supporting a different amount than included in EOE-178, Att. 1. Also, explain how a dump truck is included in the storm fleet. d. Referring to sample selection ‘c’, explain how the plowing of the Shrewsbury Massachusetts lot is relevant to the Connecticut storm fleet. As part of the response, identify if any of the Connecticut storm fleet vehicles are located in the lot. e. Referring to sample selection ‘d’, explain why a third-party vendor is necessary to drive the trucks “to keep them from forming issues from sitting for long periods” in lieu of Company employees. Additionally, identify the preceding date in which the storm fleet vehicles were used to have warranted the need for the vendor to drive the fleet vehicles.Page 9 of 40
f. Referring to sample selection ‘g’, the Company explained that the sampled expense “are journal entries and UVL transactions to account for charges in the proper account” but failed to provide any supporting documentation for the $232,106.98 expense. Provide additional details and supporting documentation for the underlying amount. If supporting documentation cannot be provided, explain why. g. Referring to sample selection ‘h’, explain how the rental of a specialty "cutter truck" is relevant to the storm fleet. As part of the response, identify if the equipment is mounted on a Connecticut fleet vehicle. EOE-494. (STORM FLEET-INVENTORY) Refer to Responses to EOE-031, Att.1 and EOE-395. Provide an unlocked Excel spreadsheet detailing each fleet vehicle included within the Company’s inventory by year (2024-present). As part of the response, please identify the type of vehicle, the vehicle ID number, the assigned state, the cost basis, the net carrying value, and other pertinent details that reconcile with EOE-395. EOE-495. (STORM FLEET-DEPRECIATION/RATE OF RETURN) Refer to Responses to EOE-395 and EOE-178, Att. 1. The Company’s response to EOE-395 identified several “revisions” to the storm fleet costs and referenced EOE-178RV01 (which has yet to be provided). Provide an unlocked Excel spreadsheet detailing the impact (i.e., allocation reduction) to each Major and Minor storm event to account for the revisions. EOE-496. (NON-STORM FLEET ADDITIONS– CONNECTICUT) Provide an unlocked Excel spreadsheet detailing the Company’s non-storm fleet additions and disposals by year (i.e., 2021-present) and provide details regarding the types of vehicles. Additionally, identify the projected number of non-storm fleet additions by type through the rate year. EOE-497. (MS24A-VENDOR-LINE/FLEET) Refer to Responses to EOE-407 and EOE-251. The Company’s responses to the two interrogatories provided conflicting information. Specifically, EOE-251 confirmed billing errors of $24,653 and discussed that “[c]ertain Eversource Storm Fleet assets, including bucket trucks utilized by line crews, were staged in Massachusetts.” The Company’s response to EOE-407 asserts that “[t]he SOS contractor mobilized directly to Connecticut. The reference to Shrewsbury, Massachusetts, as the ending location on the timesheet was most likely an inadvertent documentation error.” Respond to the following: a. Identify whether the vendor was staged in Massachusetts, as asserted within EOE-251, or if they were mobilized directly to Connecticut, as asserted within EOE-407. If mobilized (i.e., staged) to Massachusetts, provide responses to subsections ‘b’ and ‘c’ as requested within EOE407. If mobilized directly to Connecticut, explain how the response aligns to the description of work included on pp. 822-824 (i.e., “crew wasPage 10 of 40
ordered to leave hotel in Marlborough, MA where self-lodging was established and sent to Norwalk Inn in Norwalk, CT where customer supplied hotel and dinner.”) b. Referring to EOE-251 subsection ‘e’, provide the Excel spreadsheet that was originally requested, along with the corresponding cites. c. Provide a redacted version of the various invoices provided at CLP-1A19, pp. 790-915, along with notations identifying any errors confirmed within EOE-251 or the Company’s analysis to be provided in response to subsection ‘b’. d. Provide all emails or other correspondence detailing the mobilization instructions for the SOS vendor for the MS24A event. e. Referring to EOE-407, subsection ‘a’, please clarify the specific location or locations of where the Connecticut storm fleet (i.e., 68 vehicles) was located when not in use. If the vehicles were located in different locations, identify the locations, and counts of vehicles. EOE-498. (STORM COST OF REMOVAL-PBR) Identify if the Company has allocated any storm costs to capital to account for the cost of removal that occurs during storm events. To the extent that removal costs are eliminated from the storm balance, please explain how the accounting is administered, identify how the costs were derived, and provide a detailed listing of removal costs that were eliminated per storm event. If removal costs are not eliminated, explain why. EOE-499. (MS24H-VENDOR-TREE) Refer to Exhibit ACCT-2 CLP-9, Confidential Exhibit ACCT-2 CLP-9A-1, pp. 1-184. The Company reported 60 invoices in the combined incremental charge of $164,956 for the Asplundh Tree Expert vendor. Respond to the following: a. Referring to Rows 37, 53-59, 68, 83-84, and 88, explain why the vendor was permitted to bill until 10PM on July 1, 2024 when EOE-019, Att.1 identified that crews were released at 6:00PM (i.e., 1800). b. Referring to Rows 39, 61, 66, 74, 77, 81, 86, and 89, the Company included various charges for Disc Chippers and a Power Blower. Explain why the equipment was necessary for storm remediation purposes and identify if the equipment was actually used. Furthermore, provide documentation to support the Company’s pre-authorization of the additional charges and identify the total amount charged for this equipment. c. Referring to Rows 77, 80-82, and 89-90, the Company allocated incremental charges for each crew for nine hours on July 3, 2024 (i.e., several days after the storm event). Explain if all of the activity included within these July 3, 2024 invoices were applicable to the MS24H storm and, if applicable, provide supporting documentation. To the extent thatPage 11 of 40
any hours were not associated with the MS24H event, identify the amounts. EOE-500. (MS24H-VENDOR-TREE) Refer to Exhibit ACCT-2 CLP-9, Confidential Exhibit ACCT-2 CLP-9A-1, pp. 98-101. The Company reported an incremental charge of $6,979 for the Asplundh Tree Expert vendor. Respond to the following: a. Comparing the storm details referenced within Ex. CLP-STORM-IMT-3 (Event 9) and EOE-019, Att.1, to the vendor’s timesheet (i.e., p. 99), explain how the 1:30AM service call could be attributed to the MS24H event. Specifically, the MS24H documentation characterizes the initial impact of the thunderstorms as occurring at 11:40AM (see Ex. CLPSTORM-IMT-3, p. 8), approximately ten hours after the referenced vegetation charge. b. Provide documentation supporting both the necessity and pre-approval of the referenced crane in support of the MS24H remediation. Additionally, please explain who owned the property where it was necessary for the Company to “hoist and remove trees” (i.e., p. 101) and explain why this activity was necessary for storm remediation purposes. c. Identify the total incremental charges associated with the 1:30am service call. d. Provide a redacted version of the referenced invoice documentation. EOE-501. (MS24H-VENDOR-TREE) Refer to Exhibit ACCT-2 CLP-9, Confidential Exhibit ACCT-2 CLP-9A-1, pp. 129-131. The Company reported an incremental charge of $4,491 for the Asplundh Tree Expert vendor and appears to have omitted an Eversource Connecticut Emergency Restoration Tree Contractor Work Location report for activity billed on July 3, 2024 (i.e., several days after the storm event). Provide documentation demonstrating that the (9) hours billed on July 3, 2024 was applicable to the MS24H event and explain why it was necessary for the vendor to bill for a chipper. Additionally, identify the location of the remediation activity. EOE-502. (MS24H-VENDOR-TREE) Refer to Exhibit ACCT-2 CLP-9, Confidential Exhibit ACCT-2 CLP-9A-1, pp. 132-135. The Company reported an incremental charge of $4,647 for the Asplundh Tree Expert vendor which includes billing for hours (9) on July 3, 2024 (i.e., several days after the storm event). Provide documentation demonstrating that the (9) hours billed on July 3, 2024 was applicable to the MS24H event and explain why it was necessary for the vendor to bill for both a crane service and a chipper. Furthermore, please explain who owned the property where it was necessary for the Company to “hoist and remove trees” (i.e., p. 134).Page 12 of 40
EOE-503. (MS24H-VENDOR-TRAFFIC) Refer to Exhibit ACCT-2 CLP-9, Confidential Exhibit ACCT-2 CLP-9A-1, pp. 204-362. The Company reported 17 invoices in the combined incremental charge of $44,454 for the Certified Utility Services Inc vendor. Respond to the following: a. Cite the contract or corresponding pricing schedule that defines the Hourly Work Zone Setup rate charged. EOE reviewed the contract at EOE-014, Att.2 (CONFIDENTIAL), starting at p. 164 and was unable to locate the specific rate. b. Explain how the Company derived the correct amounts to allocate to the MS24H event when the various invoices and job assignment documents failed to include the MS24H011 work order number. As an example, the Company allocated the entire amount invoiced on p. 266 but the job assignment document on p. 269 referenced MS24G and the job assignment document on p. 270 referenced MS24R. c. Referring to pp. 293-296, explain why the job assignment forms identified multiple different work order numbers (i.e., none of which were MS24H) for July 5, 2024 (several days after the MS24H event), yet all of the activity was charged to the MS24H event. Provide documentation supporting the Company’s position. d. Referring to pp. 320-339, explain why the job assignment forms identified multiple different work order numbers (i.e., none of which were MS24H), including activity through July 5, 2024 (several days after the MS24H event), yet all of the activity was charged to the MS24H event. Provide documentation supporting the Company’s position. e. Referring to p. 362, provide documentation supporting the applicability of the services performed on August 13, 2024 to the MS24H event. EOE-504. (MS24H-VENDOR-ENVIRONMENTAL) Refer to Exhibit ACCT-2 CLP-9, Confidential Exhibit ACCT-2 CLP-9A-1, pp. 404-414. The Company reported two invoices in the combined incremental charge of $2,123 for the Clean Harbors Env Services Inc vendor. Explain how the two invoices which supported “emergency response” activity on August 8, 2024 and August 6, 2024, respectively, applied to the MS24H event (i.e., which occurred over a month prior). Furthermore, provide documentation supporting the applicability of the charges and explain why the remediation did not occur for over a month. EOE-505. (MS24H-VENDOR-LINE) Refer to Exhibit ACCT-2 CLP-9, Confidential Exhibit ACCT-2 CLP-9A-1, pp. 419-421, 426-428. The Company reported an incremental charge of $107,707 for the Conexus Energy Group Inc vendor. Explain if the Eversource Contractor Storm Daily Time & Work Reports were fully completed as required by the Eversource ContractorPage 13 of 40
Storm Daily Time & Work Report Procedure provided at EOE-022, Att.5. If not fully completed, explain why the Eversource reviewer did not require the information (i.e., notably boxes 24 and 25) to be completed prior to approval. EOE-506. (MS24H-VENDOR-LINE) Refer to Exhibit ACCT-2 CLP-9, Confidential Exhibit ACCT-2 CLP-9A-1, pp. 436-499. The Company reported five incremental charges in the combined amount of $876,040 for the Conexus Energy Group Inc vendor. Respond to the following: a. Referring to OCC-044, Att.2 (CONFIDENTIAL), p. 874-892, confirm that the vendor’s Exhibit A Pricing Schedule contains the Company’s standard provisions, including “Standby Rates apply to labor resources only” (i.e., p. 880). If not confirmed, cite the revised Exhibit A Pricing Schedule that was executed (signed) for 2024 and 2025 that revised the standard provisions. b. Refer to pp. 442-444, identify the total amount of incremental billing of equipment during the hours reported when the crews were not provided with assignments (i.e., in accordance with the ERSG-Contractor Obligations-Instructions provided at EOE-173, Att.1, p. 27). c. Referring to pp. 454-456, identify the total amount of incremental billing of equipment during the hours reported when the crews were not provided with assignments. d. Referring to pp. 461-462, identify the total amount of incremental billing of equipment during the hours reported when the crews were not provided with assignments. e. Referring to pp. 469-473, identify the total amount of incremental billing of equipment during the hours between the start time (i.e., 7:00AM) and the first assignment (i.e., 10:00AM). f. Referring to pp. 497-499, identify the total amount of incremental billing of equipment during the hours between the start time (i.e., 6:00AM) and the first assignment (i.e., 7:59AM). g. Referring to pp. 497-499, the Eversource Contractor Storm Daily Time & Work Report identified “Crews Released at 7:00PM – Dinner and acquire lodging” (i.e., p. 497) and then permitted each crew member to bill for an additional three hours to 10:00PM. Explain how the Company determined it was appropriate for the vendor to bill for three hours for dinner/lodging. Furthermore, please identify the total incremental billing for the three hours referenced (i.e., including labor and equipment). EOE-507. (MS24H-VENDOR-LINE) Refer to Exhibit ACCT-2 CLP-9, Confidential Exhibit ACCT-2 CLP-9A-2, pp. 1-10. The Company reported anPage 14 of 40
incremental charge of $96,562 for the Conexus Energy Group Inc vendor. Respond to the following: a. Referring to pp. 4-10, it appears that the Eversource Contractor Storm Daily Time & Work Reports were corrupt, please provide legible documents. b. If the documents provided in response to subsection ‘a’ identifies a delay between the Start Time (Box 6) and the first assignment commencement (i.e., Box 24. Event Start Time), please identify the total amount of incremental billing of equipment during the hours reported when the crews were not provided with assignments. EOE-508. (MS24H-VENDOR-LINE) Refer to Exhibit ACCT-2 CLP-9, Confidential Exhibit ACCT-2 CLP-9A-2, pp. 11-32. The Company reported an incremental charge of $106,794 for the E-J Electric T&D LLC vendor. Respond to the following: a. Referring to pp. 17-21, explain what the “Damaged house service” related to and identify how the charges were applicable to the MS24H event. Furthermore, identify if the homeowner is responsible for the incurred charges. If the charges should not have been applied to the MS24H event, provide an unlocked Excel spreadsheet calculating the impact of the remediation. b. Referring to p. 25, explain why the vendor billed for hotel charges for the evening of June 30, 2024, when the vendor had not been mobilized until the morning of July 1, 2024 (see pp. 14-16). c. Referring to p. 25, explain why the vendor billed for hotel charges for the evening of July 1, 2024, when the vendor had completed its demobilization by 7PM on July 1, 2024 (see pp. 22-24). d. If the Company’s response to subsection ‘b’ and ‘c’ is due to the vendor’s contract, please cite the contract provisions that would permit the billing of lodging for two nights when only supporting the Company for a single day. EOE-509. (MS24H-VENDOR-LINE) Refer to Exhibit ACCT-2 CLP-9, Confidential Exhibit ACCT-2 CLP-9A-2, pp. 43-55. The Company reported an incremental charge of $106,679 for the Elecnor Energy Services LLC vendor. Referring to pp. 48-52, the Eversource Contractor Storm Daily Time & Work Reports identify 30 individuals who supported the MS24H event and each billed for Work Time on July 1, 2024. The vendor identified a total of two assignments for the duration of the billing. Please identify the number of vendor employees who supported each assignment and confirmPage 15 of 40
that both assignments took ten hours to complete. If the hours are not confirmed, identify the number of hours for each assignment. EOE-510. (MS24H-VENDOR-LINE) Refer to Exhibit ACCT-2 CLP-9, Confidential Exhibit ACCT-2 CLP-9A-2, pp. 124-141. The Company reported an incremental charge of $106,081 for the Haugland Energy Group LLC vendor. a. Provide a discussion explaining the timing and nature of services performed by the vendor. As part of the discussion, explain how each crew was able to bill for four hours of travel time (i.e., Box 10 within pp. 127-141) without an Eversource Contractor Storm Mobilization & Demobilization Time Report or details regarding actual travel. Additionally, identify the actual travel including the starting and ending locations. b. Comparing p. 125 with pp. 134-141, confirm that the vendor did not bill for equipment during standby for applicable crews. c. Referring to pp. 127-133, explain why the vendor did not bill for standby when the various timesheets supported work assignments started between 8AM and 10AM. Specifically, comparing the billable hours from pp. 134-141 (see response to subsection ‘b’) with pp. 127-133 would suggest that the vendor should have billed for standby between 1 and 3 hours per crew (assuming a 2-hour travel from 5AM to 7AM). Furthermore, provide an unlocked Excel spreadsheet deriving the incremental billing of equipment for any hours that should have been recorded as standby. EOE-511. (MS24H-VENDOR-LINE) Refer to Exhibit ACCT-2 CLP-9, Confidential Exhibit ACCT-2 CLP-9A-2, pp. 156-162. The Company reported an incremental charge of $190,954 for the I B Abel Inc vendor. Referring to p. 161, the Eversource Contractor Storm Daily Time & Work Reports identify 26 individuals who supported the MS24H event and each billed for Work Time on July 1, 2024. The vendor identified a total of two assignments for the duration of the billing. Please identify the number of vendor employees who supported each assignment and confirm that both assignments took ten hours to complete. If the hours are not confirmed, identify the number of hours for each assignment. EOE-512. (MS24H-VENDOR-CIVIL) Refer to Exhibit ACCT-2 CLP-9, Confidential Exhibit ACCT-2 CLP-9A-3, pp. 31-33. The Company reported an incremental charge of $24,932 for the KTI Utility Construction & Maintenance LLC vendor. Explain why the Company allocated the entire invoice to the MS24H event when several individual charges werePage 16 of 40
referenced to the MS24G011 work order number. As part of the response, identify the total amount attributed to the MS24G011 work order. EOE-513. (MS24H-VENDOR-TREE) Refer to Exhibit ACCT-2 CLP-9 (Outside Contractors tab), Confidential Exhibit ACCT-2 CLP-9A-3 through CLP-9A4. The Company reported 97 incremental charges (Excel Rows 155-251) for the combined amount of $322,466 for the Lewis Tree Service Inc. vendor. Explain why almost every Weekly Operations Summary report (e.g., pp. 35, 38, 41, etc.) included a ‘Time Start’ and a ‘Time Finish’ of 7:00AM and 4:00PM, respectively, which does not agree with the hours billed. As part of the response, explain how the Company was able to validate the accuracy of the hours billed and provide supporting documentation available to the reviewer at the time verifying that the hours were correctly billed for each invoice (i.e., crew). Additionally, provide an unlocked Excel spreadsheet listing each invoice, detailing the crew’s actual start and end times, identifying the billable amounts, and identifying if supporting documentation (i.e., available to the arborist at the time of the review) is being provided. EOE-514. (MS24H-VENDOR-TREE-EQUIPMENT) Refer to Exhibit ACCT-2 CLP-9 (Outside Contractors tab), Confidential Exhibit ACCT-2 CLP-9A-3 through CLP-9A-4. The Company reported 97 incremental charges (Excel Rows 155-251) for the combined amount of $322,466 for the Lewis Tree Service Inc. vendor. The Company was billed for atypical equipment including extra chainsaws, chipper disks, chip trucks, and log trucks. Provide an unlocked Excel spreadsheet listing each applicable invoice, the referenced equipment, the amounts billed for the applicable equipment, and the justification for why the equipment was necessary for storm remediation purposes. Additionally, please provide documentation of prior authorization for each charge. EOE-515. (MS24H-VENDOR-TREE) Refer to Exhibit ACCT-2 CLP-9 (Outside Contractors tab), Confidential Exhibit ACCT-2 CLP-9A-3 through CLP-9A4. The Company reported 97 incremental charges (Excel Rows 155-251) for the combined amount of $322,466 for the Lewis Tree Service Inc. vendor. Respond to the following: a. Referring to Rows 218-225 and 247-251, the Company was billed for remediation and/or police activity passthroughs between the dates of July 8, 2024 and August 22, 2024, when the storm event was demobilized on July 1, 2024. Provide an unlocked Excel spreadsheet listing each applicable invoice, the referenced dates, the amounts billed for each date, and, as applicable, provide documentation demonstrating that the remediation was both necessary and directly applicable to the MS24H event. To the extent that errors are identified, please reference each error in the Excel spreadsheet.
As listed on the current system
Interrogs from PURA/EOE to CL&P 481 thru 500-Issued 11/13/2026 [26-05-10]