  1. Page 1 of 22

    STATE OF CONNECTICUT PUBLIC UTILITIES REGULATORY AUTHORITY October 23, 2026 In reply, please refer to: Docket No. 26-05-10 Vincent Pace, Esq. Assistant General Counsel Eversource Energy Service Company P.O. Box 270 Hartford, CT 06141 Re: Docket No. 26-05-10 – Application of The Connecticut Light and Power Company d/b/a Eversource Energy to Amend its Rate Schedules Dear Attorney Pace: Enclosed are interrogatories numbered RRU-140 through RRU-198 and UPA83 through UPA-99, directed to The Connecticut Light and Power Company d/b/a Eversource Energy (Company) and refer to the Company’s request to amend its rate schedules. The responses to these questions have been deemed necessary by the Public Utilities Regulatory Authority (Authority) in connection with the above-referenced docket and will become a part of the record in this proceeding. Please note that persons responsible for responses must be available for cross-examination during a hearing, if held, and must attest to the truth and accuracy of their responses. Please submit the responses to the Authority’s Executive Secretary no later than November 6, 2026, at 4:00 p.m. The Authority encourages the submission of responses as soon as they are available rather than delaying until all answers are completed. Please list each question and answer on the same sheet of paper using a separate sheet for each interrogatory number, and sequentially number the pages of each response (e.g., p. 1 of 5, etc.). At the top of each page, clearly identify the Docket Number, the interrogatory number (including the prefix), the name of the company and the person responsible for the response, and the date of submission. Similarly, each Late Filed Exhibit that may be submitted after hearing in this docket shall be sequentially numbered and identified with the Docket Number, Late Filed Exhibit Number, page number, the name of the company and the person responsible for the exhibit, and the date of submission. If a response to any of the requested information has already been filed in response to another Parties’ interrogatory(ies) in this proceeding, please reference the interrogatory which provides the information. It is the respondent’s responsibility to ensure that any such information is on file with the Executive Secretary of the Authority.
  2. Page 2 of 22

    ELECTRONIC SUBMISSION OF FILINGS IMPORTANT NOTE: The Authority has indefinitely suspended the paper copy filing requirement. Anyone filing material with the Authority should file only an electronic copy through the PURA Web Filing System. Please refer to the Electronic Filing webpage for more information, including on confidential materials: Make An Electronic Filing CONFIDENTIAL DOCUMENTS No confidential material may be filed publicly through the web filing system. Confidential material can be filed electronically by emailing the material to [email removed] with a subject line labeled in all capital letters “CONFIDENTIAL MATERIAL - NOT FOR PUBLIC DISCLOSURE.” Each page of any electronic confidential information shall also contain a header “CONFIDENTIAL – NOT FOR PUBLIC DISCLOSURE.” The motion for a protective order shall be filed electronically. The Authority operates with the strong presumption that all documents filed with it are public records subject to the right of public inspection and copying in accordance with the Connecticut Freedom of Information Act, Conn. Gen. Stat. §1-200 et. seq. In those exceptional circumstances where a participant believes that information it intends to file is confidential under law, it may file a Motion for a Protective Order requesting an exemption from public disclosure. The Motion must provide specific legal arguments with reference to state or federal law describing with supporting facts why the information should be kept confidential. A certified affidavit supplied by a competent witness in support of the Motion must be appended to the Motion. The Authority will rule on the Motion forthwith, and it will give further direction as necessary. The current service list for this docket is available on the Authority's website located at http://www.dpuc.state.ct.us/DPUCPublicList.NSF. By the Direction of the Authority, PUBLIC UTILITIES REGULATORY AUTHORITY Enclosure cc: Service List Jeffrey R. Gaudiosi, Esq. Executive Secretary
  3. Page 3 of 22

    DOCKET NO. 26-05-10 APPLICATION OF THE CONNECTICUT LIGHT AND POWER COMPANY D/B/A EVERSOURCE ENERGY TO AMEND ITS RATE SCHEDULES Interrogatories RRU-140 through RRU-198 are directed to The Connecticut Light and Power Company (CL&P or Company) and refer to the Company’s request to amend its rate schedules (Application). RRU-140 (TRIAL BALANCES) Audit Plan No. 1. Provide the monthly trial balances for all FERC accounts for calendar years 2020 through 2025 and 2026 to date, with a column for the yearly total of each account, in unlocked Excel worksheet(s) with formulas intact, including the monthly NU Rolling Trial Balance for 2025 provided as Attachment 6 to the Company’s response to Audit Plan No. 1. RRU-141 (MANAGEMENT REPORTS) Audit Plan No. 2. Provide each monthly and each quarterly managerial report of actual results compared to budget that the Company prepares for CL&P and for EESCO, for the Test Year and for the pro forma period through the most recent quarter completed, including the quarterly budget and management reports at the operating company level that the Company began in 2025. RRU-142 (BOARD MINUTES) Audit Plan No. 3. Provide the minutes of the Board of Trustees of Eversource Energy and of the Board of Directors of EESCO for each meeting held in 2025 and 2026 to date. RRU-143 (REGULATORY AGENCY AUDITS) Audit Plan No. 7. Provide the copy of the FERC audit produced in response to Audit Plan No. 7 and the results of all other audits of CL&P, Eversource Energy or EESCO conducted by a tax authority or regulatory agency since 2019. RRU-144 (EXECUTIVE COMPENSATION APPROVAL) Audit Plan No. 8. Provide the materials presented to or relied on by the Compensation Committee and the Board of Trustees of Eversource Energy and by the Board of Directors of CL&P in setting or approving executive compensation levels and types for the Test Year and the pro forma period, and describe the review process each board or committee undertook. RRU-145 (OFFICER EXPENSE REPORTS) Audit Plan No. 10. Provide each expense report or similar document exceeding $1,000 submitted by an officer of CL&P, Eversource Energy, or EESCO for reimbursement of business or personal expenses in the Test Year and in 2026 to date. Include an exhibit that summarizes and identifies each CL&P officer’s or the parent company officer’s expense and quantifies the portion of the parent company’s expenses included in the CL&P Test Year schedules. RRU-146 (CONTRACTS OVER $100,000) agreements over $100,000: Audit Plan No. 11. Regarding service contracts and a. Provide a copy of each contract or agreement held by Eversource Energy or EESCO under which more than $100,000 was charged or allocated to CL&P in the Test Year. b. Provide a copy of each service contract or agreement held by Eversource Energy or EESCO that is effective after December 31, 2025, will be in effect in the Rate Year, and for which more than $100,000 is charged or allocated to CL&P. RRU-147 (O&M) Audit Plan No. 13. Provide, in an unlocked Excel worksheet with formulas intact, the Test Year operating and maintenance expense reconciled to Schedule C-2.0, row 22, with one row for each FERC account within each SFR schedule and separate columns for CL&P direct
  4. Page 4 of 22

    charges, direct charges from EESCO, allocated charges from EESCO by rate code, other categories and the total, with row and column totals that tie to Schedule C-2.0, row 22. RRU-148 (AFFILIATE AGREEMENTS) Audit Plan No. 14. Regarding agreements with affiliates, provide: a. Provide copies of agreements between CL&P and each affiliate other than EESCO that provides services to or receives services from CL&P. b. Provide the procedures governing intercompany billing and payment terms between CL&P and each affiliate, including EESCO, and the timing of settlement. RRU-149 (RECEIVABLES AGING) Audit Plan No. 15. Provide, in an unlocked Excel worksheet, the monthly accounts receivable aging reports from December 31, 2024, through December 31, 2025, and 2026 to date, showing for each month the dollar balance in each aging category (current, 31-60, 61-90, 91-120 and over 120 days) by customer class, with hardship and nonhardship residential accounts stated separately, and monthly totals that tie to the accounts receivable balance on the Company’s books. RRU-150 (VENDOR INVOICES) Audit Plan No. 16. Provide, in an unlocked Excel worksheet,copies of the 10 largest vendor invoices recorded in July 2025 and the ten largest recorded in December 2025 in the non-compensation operating and maintenance accounts within each SFR schedule for which the Company derived the Rate Year amount by applying an inflation factor, with a schedule identifying for each invoice the vendor, the amount, the FERC account, and the SFR schedule. RRU-151 (PROPERTY TAXES) Audit Plan No. 18. Provide copies of the assessments, tax bills, and grand list reports of each town or municipality in CL&P’s service area supporting the property taxes assessed and paid for calendar years 2024 through 2026 to date, with evidence of payment. RRU-152 (PROPERTY TAX DECLARATIONS) Audit Plan No. 4 (Onsite follow up). Provide the calendaryear summary of property declarations for 2024 through 2026, the supporting calculations for the EESCO property taxes allocated to CL&P, and the Excel worksheet containing the breakdown of the fire districts and other line items, as provided in folder PURA Audit-in-Person4 folder. Also provide the Company’s statement that internal labor charged to capital projects is included in the declared value of personal property under General Statutes § 12-63(b)(2). RRU-153 (EESCO PAYROLL) Audit Plan No. 19. Provide an exhibit that (1) summarizes EESCO’s total quarterly payroll expenses for calendar years 2024, 2025, and 2026 to date and the portion charged or allocated to CL&P, and (2) breaks down the allocated amounts between expense and capital. RRU-154 (WAGE REPORTS) Audit Plan No. 20. Provide copies of the state and federal quarterly wage reports and withholding tax returns filed by CL&P and EESCO in 2024, 2025, and 2026 to date, with an exhibit reconciling the quarterly wages reported to the quarterly payroll expense of CL&P and EESCO and explanations of each reconciling adjustment. RRU-155 (PAYROLL TAXES) Audit Plan No. 21. Provide an exhibit that summarizes the quarterly payroll tax expense of CL&P and EESCO for calendar years 2024, 2025, and 2026 to date and the portion of EESCO’s quarterly payroll tax expense allocated to CL&P, with a reconciliation of the quarterly payroll tax expense to the taxes reported on the returns requested in Interrogatory RRU-123 and explanations of each reconciling adjustment. RRU-156 (FEDERAL INCOME TAX RETURNS) Audit Plan No. 22. Provide copies of the unredacted federal income tax returns (Form 1120) and all supporting schedules for 2023 through 2025, including each schedule and form supporting a net operating loss or investment tax credit claimed or carried forward.
  5. Page 5 of 22

    RRU-157 (STATE INCOME TAX RETURNS) Audit Plan No. 23. Provide copies of the unredacted Connecticut corporation business tax returns (Form CT-1120, CT-1120CU or CT-1120CR) and all supporting schedules for 2023 through 2025, including Forms CT-1120K, CT-1120 FCIC, and CT-1120 EDPC, and each other form or schedule supporting a tax credit claimed. RRU-158 (POSITION APPROVALS) Audit Plan No. 24. Provide a written description of the process and the levels of approval required to refill a vacant position and to establish a new position at CL&P and at EESCO, and the documentation evidencing the authorization of each vacancy refilled and each position established in the Test Year and the pro forma period. RRU-159 (WORK ORDER MASTER LIST) Audit Plan No. 25. Provide the work order master list showing, for each CL&P work order active during the Test Year, its description, its default capital or expense designation, its FERC account mapping, and the organization responsible for it. RRU-160 (EESCO WORK ORDERS) Audit Plan No. 21 (Onsite follow up). Provide the listing of EESCO work orders with the description of each and the rate code used to allocate its cost, as provided in folder for PURA Audit-in-Person-21. RRU-161 (BUDGETED LABOR ALLOCATORS) Audit Plan No. 12 (Onsite follow up). Regarding rate codes M03 and M04 and each other rate code allocated on Service Company Budgeted Distributed Labor plus Operating Company Budgeted Labor: a. Provide each rate code recalculated using actual 2025 payroll by company, and the resulting CL&P percentage against the percentage applied in the Test Year. b. State, by company, the budgeted labor and the actual labor for each of calendar years 2021 through 2025 and the variance between them. c. State the effect on each SFR schedule of applying the recalculated percentages to the Test Year EESCO charges. d. Explain the basis for the statement in PURA Audit-in-Person-22 that budgeted labor is a better indicator than historical actuals, given the variances in subpart b. RRU-162 (POSITION LISTING) Audit Plan No. 27. Provide a listing from the human resources system for each active position at CL&P and EESCO as of December 31, 2024, and December 31, 2025, with the position’s department, title, company code and reporting line, and the departmental organizational charts of EESCO. RRU-163 (MANAGEMENT AUDIT) Audit Plan No. 28. Regarding the 2022-2025 Management Audit: a. Provide each recommendation directed to CL&P or EESCO, the Company’s response to each, the implementation status of each as of October 13, 2026, and the internal documents by which the Company tracks that status. b. Provide the Company’s responses to the management auditor’s information requests regarding compensation, staffing, shared services, and cost allocation. RRU-164 (COST ALLOCATION) Audit Plan No. 12. Provide the spreadsheet containing the inter-affiliate costs allocations for services provided on audit. RRU-165 (COST ALLOCATION) Audit in-Person 21. Provide the worksheet contained in this response that that the Company provided during the audit that lists the Accounting Work Orders and Rate Codes of EESCO. RRU-166 (CHART OF ACCOUNTS) Audit in-Person 12. Provide the worksheet containing the Chart of Accounts provided during the audit.
  6. Page 6 of 22

    RRU-167 (COST ALLOCATION) Audit in-Person 4. Provide both files contained in the response provided during the audit, i.e., CL&P PT Exp and ESC Allocations to CL&P. RRU-168 (COST ALLOCATION) Audit in-Person 12. Provide, in an unlocked Excel worksheet, the worksheet prepared in response to Audit in-Person 12 for the sample of September 2025 EESCO invoices selected from the Audit Plan No. 26 documents, showing for each invoice: the vendor and a description of the service performed; the invoice amount; the rate code applied, its allocation percentage, and the calculation of that percentage; the amount allocated to CL&P; and the SFR schedule and line in which the CL&P amount is included in the Test Year. RRU-169 (COST ALLOCATION) Provide page 3 of the Accounting Overview and ESC Allocations presentation provided during the audit in response to Audit Plan No. 17. The referenced page is titled “Eversource Energy Corporate Chart.” RRU-170 (DIRECT PAYMENT SALES TAX) PURA Audit-in-Person-6 (Onsite follow up). Provide the reconciliation of the invoice amounts to the general ledger amounts inclusive of only the 3.335% sales tax paid under the Company’s Direct Payment Permit for Schedules C-3.16 and C-3.17 selections identified and as provided in the PURA-Audit-in-Person-6 folder. RRU-171 (UNIT PRICE BILLING) PURA Audit-in-Person-7 (Onsite follow up). Provide the Company’s explanation of the contractor unit-price billing and the reconciliation of the spreadsheet amounts to the invoice amounts for the Schedules C-3.16 and C-3.17 selections, identified and as provided in the PURA Audit-in-Person-7 folder. RRU-172 (FIELD OPERATIONS DETAIL) Audit Plan No. 8 (Onsite follow up). Regarding the Schedule C-3.16 and C-3.17 selections identified in the PURA Audit-in-Person-8: a. Provide the Field Ops Overhead Selection Detail and Field Ops Underground Selection Detail files provided in the PURA Audit-in-Person-8 folder, the Company’s explanation of the transactions recorded without a supporting invoice or journal entry, and the basis for reporting a transaction in PURA-SUPP-001 rather than in the files referenced. b. Provide the documentation for items 1744369602 and 1744369604 in the Field Ops Overhead Selection Detail file. RRU-173 (FRONTIER WRITE-OFF) Audit Plan No. 9 (Onsite follow up). Provide the Company’s response in the PURA Audit-in-Person-9 folder for the journal entry 589916 and the $598,010 of accounts receivable write-offs recorded in the Test Year Field Operations Overhead expense on Schedule C-3.16 after the December 2025 settlement with Frontier Communications, and identify the cost-of-service update where the amount is removed and the schedule and line affected. RRU-174 (INVOICE RECONCILIATION) Audit Plan No. 11 (Onsite follow up). Provide the reconciliation of each invoice to the spreadsheet amount for the Schedule C-3.16 and C-3.17 selections as identified and provided in the PURA-Audit in-Person-11 folder. RRU-175 (FIELD WORK ORDERS) Audit Plan No. 13 (Onsite follow up). Provide PURA-SUPP-001 with the field work order column added to each schedule, as identified and provided in folder PURA Audit-in-Person-13. RRU-176 (OFFICER COMPENSATION REMOVAL) O’Brien and Murray Pre-Filed Test., pp. 74 and 78; Lazor, Eichler and O’Connor Pre-Filed Test., p. 45; Application, Schs. WP C-3.5 and WP C-3.7; Interrog. Resp. CIEC-015, Att. 1; Interrog. Resp. UPA-003, Interrog. Resp. UPA-014, Att. 1, and Interrog. Resp. UPA-016. Regarding the removal of the compensation of the Eversource Energy Chief Executive Officer, Chief Financial Officer and CL&P President from the cost of service:
  7. Page 7 of 22

    a. Identify, for each of the Chief Executive Officer, Chief Financial Officer and CL&P President, the schedule, line and amount of the pro forma reduction of base compensation described at page 74 of the Revenue Requirements Panel testimony, including any part within the lines captioned “Less: Administered Salaries & Expense” of $237,000 and $2,796,000 on Schedule WP C-3.5 or within the base salaries of $176,313,000 for CL&P and $84,078,000 for the Eversource Energy Service Company (EESCO) portion. If no reduction was applied, state the base salary for each of the three officers charged to CL&P in the Test Year and included in the Rate Year, identify the schedule and line on which each appears, and provide a corrected Schedule WP C-3.5 as necessary. b. Reconcile testimony that the adjustment removes the long-term incentive expense of all executives and officers of EESCO supporting CL&P, with the Compensation and Benefits Panel testimony that CL&P did not include the named executive long-term incentives to the long-term incentive expense of $1,364,250 retained in the Test Year pro forma, of which $1,270,537 is EESCO, and $1,469,043 in the Rate Year. State the Rate Year revenue requirement effect of removing all of the retained long-term incentive expense. c. For each of the Chief Executive Officer, the Chief Financial Officer and the CL&P President, state the amount charged or allocated to CL&P in each of calendar years 2021 through 2025, and the amount included in the Rate Year, for: (i) employee benefits, including pension, supplemental executive retirement, non-qualified pension, and deferred compensation; (ii) payroll taxes; (iii) Payroll Benefits Loader and General Service Company Overhead loadings; and (iv) the items reported in the “All Other Compensation” column in the table on page 68 of Attachment 1 of the response to Interrogatory CIEC-015. Identify the schedule and line on which each Rate Year amount appears. d. Identify which of the benefits, payroll taxes, and loadings in subpart c the Company treats as within the “base and variable pay compensation of the new CL&P President” for which Section 1.4.12 of the amended settlement agreement approved by the Authority in the October 27, 2021 Interim Decision in Docket Nos. 17-10-46RE03, Application of The Connecticut Light and Power Company d/b/a Eversource Energy to Amend its Rate Schedules – Interim Rate Decrease, Low-Income Rates, and Economic Development Rates, and 17-12-03RE11, PURA Investigation into Distribution System Planning of the Electric Distribution Companies – New Rate Designs and Rates Review, provides that CL&P will not seek recovery in the next general distribution rate proceeding, and, for each it treats as outside of this assertion. State the basis and the amount for the CL&P President that the Company included in the Rate Year. RRU-177 (LONG-TERM INCENTIVE ESCALATION) Application, Sch. C-3.7; Interrog. Resp. UPA-003; and Interrog. Resp. UPA-016 Regarding the Rate Year long-term incentive expense: a. State the basis for applying the 3% merit escalation to the expense of long-term incentive awards granted in 2023, 2024 and 2025, which represent the three-year vesting period under Accounting Standards Codification 718. b. State the Rate Year long-term incentive expense portions separately attributable to awards granted in 2023, 2024, and2025 and to awards not yet granted. RRU-178 (EXECUTIVE PAY ALLOCATION) Application, Sch. C-3.7; Interrog. Resp. CIEC-015, Att. 1, and Interrog. Resp. UPA-003. Regarding the allocation of the compensation of the Eversource Energy named executive officers among the Eversource companies: a. For the CL&P President and each named executive officer identified in the response to Interrogatory UPA-003, identify for each of calendar years 2021 through 2025 the rate code or direct-charge basis used to charge or allocate each component of compensation to CL&P, and state the resulting percentage of each component charged to CL&P distribution. b. For the Chief Operating Officer, the General Counsel, and the Executive Vice President for Corporate Relations and Sustainability, state the annual amounts charged or allocated to CL&P in each of calendar years 2021 through 2025, and the amount charged to operating expense. Identify the schedule and line where the Rate Year amounts appear for those
  8. Page 8 of 22Match

    amounts reported as Change in Pension Value and Non-Qualified Deferred Earnings, and All Other Compensation in Attachment 1 of the response to Interrogatory CIEC-015. c. For each named executive officer, quantify the annual changes for each identified component of total compensation from 2021 through 2025, and state the annual amounts for salary, stock awards, and non-equity incentive plan compensation charged to CL&P in each year and included in the Rate Year. d. State the amounts charged to CL&P and included in the Rate Year out of the 2025 annual incentive awards approved above the funded pool for the Chief Financial Officer ($1,016,000 at the 145% performance factor and $1,300,000 paid) and the Executive Vice President for Corporate Relations and Sustainability ($577,000 and $750,000), as shown in Interrog. Resp. CIEC-015, Att. 1, pp. 53-54. Also, state the total reduction in the awards of other executives needed to keep the total within the approved 145% pool and its effect on Schedule C-3.7. RRU-179 (POLITICAL AND LEGISLATIVE GOALS) Application, Schs. C-3.5, C-3.6 and C-3.7; Interrog. Resp. CIEC-015, Att. 1, Interrog. Resp. OCC-310, Interrog. Resp. OCC-611, Att. 1, and Interrog. Resp. UPA-003; Conn. Gen. Stat. § 1-91; Public Act 23-102, Sec. 3(b). Regarding the corporate performance goal of “Advance strategies to improve the Connecticut political and regulatory environment:” a. Identify activities underlying the outcome reported for that goal and the 175% performance result for the goal category, including the activities that “contributed to the development of Connecticut Senate Bill 4,” the nomination or appointment of commissioners of the Authority, and the increase to five commissioners, as shown in Interrog. Resp. CIEC-015, Att. 1, pp. 49-50. State how the Company classified each activity under the definitions of lobbying and legislative action in General Statutes § 1-91, and the basis for any activity it did not treat as lobbying. b. For calendar years 2021 through 2025 and the nine months ended September 30, 2026, state the annual labor (including benefit and service company loadings), outside lobbyist and consultant fees, travel and other costs of the activities identified in subpart a, the Federal Energy Regulatory Commission (FERC) account in which each was recorded, and amounts charged or allocated to CL&P including separating such amounts for those recorded above and below the line. c. Explain for officers whose labor costs are allocated rather than direct charged, how payments for lobbying and legislative activities are excluded from the amounts allocated to CL&P in Schedules C-3.5, C-3.6 and C-3.7 based on testimonies that all lobbying and government relations costs, including amounts allocated from EESCO, are recorded below the line and that officer variable compensation is charged to CL&P only when an officer is providing services to CL&P. Quantify the compensation for those officers attributable to lobbying and legislative activities included in the Test Year and the Rate Year. d. Reconcile the annual compensation and expenditures reported to the Office of State Ethics for 2021 through 2025 by or on behalf of Eversource Energy, CL&P and EESCO to the amounts recorded in Account 426.4 and charged or allocated to CL&P. Provide an explanation for any material variances. e. Identify each goal or initiative relating to the Connecticut political, legislative or regulatory environment in the corporate scorecard for each plan year from 2021 through 2025, including the 2024 initiative to continue to implement plans and strategies to “improve” the Connecticut political and regulatory environment. Explain the basis for recovering any variable compensation funded by those goals and initiatives given Section 3(b) of Public Act 23-102. RRU-180 (NON-CL&P SCORECARD METRICS) Lazor, Eichler and O’Connor Pre-Filed Test., p. 32; Interrog. Resp. OCC-198, Att. 1 and Interrog. Resp. OCC-297, Att. 1. Regarding corporate scorecard metrics that measure the performance of operations other than CL&P:
  9. Page 9 of 22

    a. Identify each gas distribution company with performance of the Gas Emergency Response metric weighted at 8.33% of the operational component reflecting Eversource Gas Company of Massachusetts (EGMA) integration and Massachusetts response times measured in each plan year from 2021 through 2025. For each plan year from 2018 through 2020, state the weighting of the metric shown as 8% in 2018, and the payout percentage on it, and explain the basis of using the metric to fund variable compensation charged to CL&P, an electric distribution company. b. State amounts of variable compensation charged to CL&P in each plan year from 2021 through 2025, and amounts included in the Rate Year that are attributable to performance on the Gas Emergency Response metric. c. For each plan year from 2021 through 2025, identify each initiative under the Enhance the Customer Experience and Clean Energy Execution metrics, which for 2025 included the Advanced Metering Infrastructure (AMI) rollout and the Massachusetts Grid Modernization, geothermal and decarbonization projects, and the operating company whose performance it measures. State the payout percentage, and the variable compensation charged to CL&P, and included in the Rate Year that are attributable to such initiatives given that CL&P has not deployed AMI. d. Identify other scorecard metric, initiative or credited achievement from 2018 through 2025 that measures the performance of an operation other than that of CL&P, including the 2018 achievements for the offshore wind partnership with Ørsted, the Northern Pass appeal and 62 MW of Massachusetts solar, the 2021 achievements for the Columbia Gas integration, NSTAR Gas capital recovery and the Aquarion acquisition of NESC, and the 2023 initiative to execute the three contracted offshore wind projects until divestiture. For each, state the weighting, the payout percentage and the variable compensation charged to CL&P attributable to the achievement of each metric or initiative. RRU-181 (VARIABLE PAY CAPITALIZATION) O’Brien and Murray Pre-Filed Test., pp. 76-78; Lazor, Eichler and O’Connor Pre-Filed Test., p. 45; Application, Schs. C-3.6, C-3.7, WP C-3.6 and WP C-3.7; Interrog. Resp. RRU-023, Att. 1, Interrog. Resp. OCC-317, Interrog. Resp. UPA-003, Interrog. Resp. UPA-004, Att. 1, and Interrog. Resp. UPA-045. Regarding the administrative and general expense transferred out of the compensation schedules, the capitalization and escalation of variable compensation: a. Identify the transaction that produces the credit of $6,627,251 to Account 922000, Administrative Expense Transferred, of which $2,903,105 is applied to Schedule C-3.5, $912,378 to Schedule C-3.6, $634,585 to Schedule C-3.7, and $2,177,183 remains in Sch C-3.33 O&M Residual (O&M Residual) before the adjustment of $1,741,091 for the General Service Company Overhead and Payroll Benefits Loader. Provide the derivation of each rate applied, including the 8.9475% ratio of the Schedule C-3.6 and C-3.7 credits to the Account 920000 amounts. Also, identify the accounts and work orders receiving the offsetting charge and the amount recorded to capital. b. Reconcile the $634,585 credit applied to Schedule C-3.7 to the testimonies that there is no capitalization adjustment for officer variable pay; that no executive cash incentives are capitalized; and that none of the $6,458,000 of Test Year officer variable expense in Schedule C-3.7 is capitalized. State the annual amounts of officer variable compensation transferred out of operating expense through Account 922000 or through the incentive labor loader in 2021 through 2025. c. Explain the credit of $1,701,229 to Account 9200NP, Adm + Gen Salaries Non Productive, on line 237 of Attachment 1 of the response to Interrogatory RRU-023, applied entirely to Schedule C-3.5. Identify the offsetting charge, and state the amount for the related nonproductive time also recovered through the Non-Productive Time Loader. d. State which employee population underlies Schedules WP C-3.6 and WP C-3.7, given the testimonies that the Rate Year includes variable pay at actual for all employees as of December 31, 2025, and that the Test Year reflects only employees employed at the time of the March 2026 payment. Furthermore, state the number of employees and the amount included for employees who separated between December 31, 2025, and the payment date.
  10. Page 10 of 22

    Reconcile each population to the eligible and recipient counts in Attachment 1 of the response to Interrogatory UPA-004, including the 2,956 eligible EESCO non-union employees in the attachment against the 2,954 stated in the response, and state if the 2,229 eligible count or the 1,904 recipient count underlies the Rate Year amounts. RRU-182 (RAM POSITIONS) O’Brien and Murray Pre-Filed Test., pp. 71 and 143-147; Application, Sch. WP C-3.5. Regarding the incremental positions currently recovered through the Rate Adjustment Mechanism (RAM) that the Company proposes to roll into base distribution rates: a. Identify each position by title, employer (CL&P or EESCO), RAM component and program supported, and provide, in an unlocked Excel worksheet with formulas intact, for each position the Test Year payroll, benefits and payroll taxes, the total annual amounts recovered through the RAM in 2021 through 2025, and the amount included in the RAM rates effective May 1, 2026. b. Identify which of the positions are included in the 1,417 CL&P and 4,493 EESCO active and filled positions and which are not, and for each position identify the schedule and line on which the Rate Year cost appears and the amount. c. Provide Attachment 1 of the Company’s response to Interrogatory CAE-036 in Docket No. 26-01-03, Annual Review of the Rate Adjustment Mechanisms of The Connecticut Light and Power Company, referenced in footnote 11 of the testimony and reconcile positions therein to those identified in the response to subpart a. above. d. Explain how the Company will prevent recovery of the same positions through both RAM and base distribution rates for any period after June 30, 2027, given that RAM rates effective May 1, 2027, will include an estimate of these costs for January 1 through June 30, 2027, to be trued up in rates effective May 1, 2028. State the RAM revenue requirement for these positions for each RAM rate period from January 1, 2027, through the final true-up. e. For each position described in footnote 11 of the testimony that recorded a portion rather than all of its time to the identified programs, state the portion of payroll recovered in base distribution rates and the portion recovered through RAM in each of calendar years 2021 through 2025, and explain how the Company prevented recovery of the same time through both. RRU-183 (VOLUNTEER PAYROLL) Application, Sch. G-2.9; Interrog. Resp. EOE-006, Att. 1, Interrog. Resp. RRU-021, Att. 1, and Interrog. Resp. OCC-364. Regarding the employee volunteer payroll included in the cost of service: a. Reconcile the Test Year volunteer payroll of $220,384 to the $236,143 of volunteer labor included in the Rate Year in the response to Interrogatory OCC-364, including the escalation applied. b. Explain the increase in volunteer hours from 538.95 in 2021 to 4,030.51 in 2025 and in volunteer payroll from $27,633 to $220,384 in Attachment 1 of the response to Interrogatory EOE-006. For each of calendar years 2021 through 2025, state the hours and payroll attributable to CL&P employees and to EESCO employees charged to CL&P, the number of employees, and identify each event and organization benefited, including events held outside of Connecticut. c. State the basis for recording paid volunteer time in payroll expense rather than in Account 426.1, Donations, of the FERC Uniform System of Accounts. d. State the volunteer hours and payroll included in the non-productive time used to derive the Non-Productive Time Loader in each of calendar years 2021 through 2025, in an unlocked Excel worksheet with formulas intact. RRU-184 (PENSION PARTICIPANT MATCH) Lazor, Eichler and O’Connor Pre-Filed Test., pp. 82-85; Interrog. Resp. OCC-302, Att. 1. Regarding the matching of 401(k) contributions for employees who also participate in a defined benefit pension plan:

As listed on the current system

Interrogs from RRU to CL&P 140 thru 159-Issued 10/23/2026 [26-05-10]