Skip to main content

A prototype public docket site for the Connecticut Public Utilities Regulatory Authority

Utility Dockets and Filings

Interrogatory responses

Answers to questions 143

Files6

Words on different pages
Every word of Eversource rate increase is in the text below, but not all on one page. Pages with any of them are listed and highlighted. Clear highlighting
Words on different pages

Scanned pages and machine-read text of RRU-143 Attachment 1 REDACTED.pdf

Read by machine
This document is a scan with no text in it. The text shown with each page was read from the image by machine (an AI model), not typed or checked by a person. It may contain errors, especially in numbers, dates and names, and a hard-to-read spot can come out as plausible but wrong text. Check the page image before relying on any figure. Open the original PDF (opens in a new tab)
  1. Scan of page 1 of 6 of RRU-143 Attachment 1 REDACTED.pdf. The machine-read text is beside it.
    The scanned page

    Machine-read text

    The Connecticut Light and Power Company REDACTED d/b/a Eversource Energy Docket No. 26-05-10 Date Issued October 23, 2026 RRU-143 Attachment 1 REDACTED Page 1 of 6 Department of the Treasury Internal Revenue Service Large Business & International Division IRS Washington, DC 20224 Date: 11/18/2025 Taxpayer ID number: 04-2147929 Tax year: 2024 Person to contact: [redacted] Contact ID number: [redacted] Contact telephone number: [redacted] Eversource Energy & Subs PO Box 270 Hartford, CT 06141-0270 Attn: [redacted] Tax - Director Compliance Assurance Process (CAP) Full Acceptance Letter Why you're receiving this letter We have completed the pre-file review of the tax year shown above. The material issues that were resolved by factual clarification, issue resolution agreement, or closing agreement before the tax return was filed are listed in the attached list of resolved issues. What to expect next This letter confirms that, once we complete our post-filing review of the tax return, we will accept it as filed if your return is consistent with the resolved issues and we don't find undisclosed material issues and correlative adjustments during our post-filing review. If you have any questions, you can call the contact person at the number shown above. Sincerely, [signature] Digitally signed by Olga P. Trindade Date: 2025.11.19 09:01:02 -05'00' Olga Trindade Acting Territory Manager Enclosure: List of resolved issues Letter 6351 (1-2021) Catalog Number 74988Z
  2. Scan of page 2 of 6 of RRU-143 Attachment 1 REDACTED.pdf. The machine-read text is beside it.
    The scanned page

    Machine-read text

    REDACTED The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued October 23, 2026 RRU-143 Attachment 1 REDACTED Page 2 of 6 Department of the Treasury Internal Revenue Service LB&I/Northeast Compliance (NC) 135 High Street Hartford, CT 06103-1125 Date: 12/19/2024 Taxpayer ID number (last 4 digits): 7929 Form: 1120 Tax period(s): 202312 Person to contact: [redacted] Contact telephone number: [redacted] Employee ID number: [redacted] Eversource Energy & Subsidiaries c/o [redacted] Tax Director P.O. Box 270 Hartford, CT 06141-0270 Dear Mr. [redacted] We've completed the review of the examination of your tax return for the year(s) shown above. We made no changes to your reported tax. This is the final letter we'll send you regarding your examination unless we make a change to a partnership, S corporation, trust, or estate tax return in which you have an interest. If you have any questions, please call or write us at the telephone number or address shown above. If you write, please include your telephone number, the best time for us to call you in case we need to contact you, and a copy of this letter. You may want to keep a copy of this letter for your records. Thank you for your cooperation. Sincerely [illegible] Digitally signed by Richard T. Kellner Date: 2024.12.19 12:24:53 -05'00' Richard Kellner for Deborah Mullen, DFO Team Manager, Group 1658 Letter 590 (Rev. 1-2017) Catalog Number 40261Z
  3. Scan of page 3 of 6 of RRU-143 Attachment 1 REDACTED.pdf. The machine-read text is beside it.
    The scanned page

    Machine-read text

    The Connecticut Light and Power Company REDACTED d/b/a Eversource Energy Docket No. 26-05-10 Date Issued October 23, 2026 RRU-143 Attachment 1 REDACTED Page 3 of 6 Department of the Treasury Internal Revenue Service LBI/Northeastern Compliance (NC) 135 High Street Hartford, CT 06103-1125 Date: 11/27/2023 Taxpayer ID number (last 4 digits): 7929 Form: 1120 Tax period(s): 202212 Person to contact: [redacted] Contact telephone number: [redacted] Employee ID number: [redacted] Eversource Energy & Subsidiaries c/o Mr. [redacted] Tax Director P.O. Box 270 Hartford, Connecticut 06141-0270 Dear Mr. [redacted] We've completed the review of the examination of your tax return for the year(s) shown above. We made no changes to your reported tax. This is the final letter we'll send you regarding your examination unless we make a change to a partnership, S corporation, trust, or estate tax return in which you have an interest. If you have any questions, please call or write us at the telephone number or address shown above. If you write, please include your telephone number, the best time for us to call you in case we need to contact you, and a copy of this letter. You may want to keep a copy of this letter for your records. Thank you for your cooperation. Sincerely [redacted] Denis Derosier for Deborah Mullen, DFO Team Manager, Group 1658 Letter 590 (Rev. 1-2017) Catalog Number 40261Z
  4. Scan of page 4 of 6 of RRU-143 Attachment 1 REDACTED.pdf. The machine-read text is beside it.
    The scanned page

    Machine-read text

    The Connecticut Light and Power Company REDACTED d/b/a Eversource Energy Docket No. 26-05-10 Date Issued October 23, 2026 RRU-143 Attachment 1 REDACTED Page 4 of 6 Department of the Treasury Internal Revenue Service LBI/Northeastern Compliance (NC) 135 High Street Hartford, CT 06103-1125 Eversource Energy & Subsidiaries c/o Mr. [redacted] Tax Director P.O. Box 270 Hartford, Connecticut 06141-0270 Date: Taxpayer ID number (last 4 digits): XX-XXX7929 Form: 1120 Tax period(s): 202112 Person to contact: [redacted] Contact telephone number: [redacted] Employee ID number: [redacted] Dear Mr. [redacted] We've completed the review of the examination of your tax return for the year(s) shown above. We made no changes to your reported tax. This is the final letter we'll send you regarding your examination unless we make a change to a partnership, S corporation, trust, or estate tax return in which you have an interest. If you have any questions, please call or write us at the telephone number or address shown above. If you write, please include your telephone number, the best time for us to call you in case we need to contact you, and a copy of this letter. You may want to keep a copy of this letter for your records. Thank you for your cooperation. Sincerely Denis Derosier for Deborah Mullen, DFO Team Manager, Group 1658 Letter 590 (Rev. 1-2017) Catalog Number 40261Z
  5. Scan of page 5 of 6 of RRU-143 Attachment 1 REDACTED.pdf. The machine-read text is beside it.
    The scanned page

    Machine-read text

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued October 23, 2026 RRU-143 Attachment 1 REDACTED Page 5 of 6 REDACTED Department of the Treasury Internal Revenue Service LBI/Northeastern Compliance (NC) 135 High Street Hartford, CT 06103-1125 Date: Taxpayer ID number (last 4 digits): XX-XXX7929 Form: 1120 Tax period(s): 202012 Person to contact: [redacted] Contact telephone number: [redacted] Employee ID number: [redacted] Eversource Energy & Subsidiaries c/o Mr. [redacted] Tax Director P.O. Box 270 Hartford, Connecticut 06141-0270 Dear Mr. [redacted] We've completed the review of the examination of your tax return for the year(s) shown above. We made no changes to your reported tax. This is the final letter we'll send you regarding your examination unless we make a change to a partnership, S corporation, trust, or estate tax return in which you have an interest. If you have any questions, please call or write us at the telephone number or address shown above. If you write, please include your telephone number, the best time for us to call you in case we need to contact you, and a copy of this letter. You may want to keep a copy of this letter for your records. Thank you for your cooperation. Sincerely Denis Derosier Digitally signed by Denis Derosier Date: 2021.12.06 08:28:50 -05'00' Denis Derosier for Ms. Darlena Billops-Hill, DFO Team Manager, Group 1658 Letter 590 (Rev. 1-2017) Catalog Number 40261Z
  6. Scan of page 6 of 6 of RRU-143 Attachment 1 REDACTED.pdf. The machine-read text is beside it.
    The scanned page

    Machine-read text

    The Connecticut Light and Power Company d/b/a Eversource Energy REDACTED Docket No. 26-05-10 Date Issued October 23, 2026 RRU-143 Attachment 1 REDACTED Page 6 of 6 Department of the Treasury Internal Revenue Service LBI/Northeastern Compliance (NC) 135 High Street Hartford, CT 06103-1125 Date: 10/29/2020 Taxpayer ID number (last 4 digits): XX-XXX7929 Form: 1120 Tax period(s): 201912 [redacted] Director of Tax EVERSOURCE ENERGY & SUBD, INC PO BOX 270 HARTFORD, Connecticut 061410270 Person to contact: [redacted] Contact telephone number: [redacted] Employee ID number: [redacted] Dear EVERSOURCE ENERGY & SUBD, INC We've completed the review of the examination of your tax return for the year(s) shown above. We made no changes to your reported tax. This is the final letter we'll send you regarding your examination unless we make a change to a partnership, S corporation, trust, or estate tax return in which you have an interest. If you have any questions, please call or write us at the telephone number or address shown above. If you write, please include your telephone number, the best time for us to call you in case we need to contact you, and a copy of this letter. You may want to keep a copy of this letter for your records. Thank you for your cooperation. Sincerely [signature] Audrey H. McCarthy Sr. Revenue Agent Letter 590 (Rev. 1-2017) Catalog Number 40261Z
Words on different pages

Scanned pages of RRU-143 Attachment 3 REDACTED.pdf

Read by machine from a scan · 2 pages · may contain errors, especially in numbers

Words on different pages
  1. Page 30 of 43

    The Connecticut Light and Power Company d/b/a Eversource Energy REDACTED Docket No. 26-05-10 Date Issued October 23, 2026 RRU-143 Attachment 5 REDACTED Page 30 of 43 The Connecticut Light and Power Company Docket No. FA19-8-000 16. Submit a refund analysis, within 60 days of issuance of the audit report, to DAA for review that explains and details the following: (1) the calculation of refunds that results from excluding income tax account receivable balances from transmission rates during the audit period, plus interest; (2) determinative components of the refund; (3) refund method; (4) customers to receive refunds; and (5) period(s) refunds will be made. 17. File a refund report with the Commission after receiving DAA’s assessment of the refund analysis. 18. Refund the amounts disclosed in the refund report to customers, with interest calculated in accordance with section 35.19a of the Commission’s regulations. 26
  2. Page 31 of 43

    The Connecticut Light and Power Company d/b/a Eversource Energy REDACTED Docket No. 26-05-10 Date Issued October 23, 2026 RRU-143 Attachment 5 REDACTED Page 31 of 43 The Connecticut Light and Power Company 4. Docket No. FA19-8-000 Merger Transaction Costs CL&P improperly included merger transaction costs in operating accounts, contrary to the Commission’s long-standing policy that such expenses be recorded in nonoperating accounts. As a result, CL&P overstated its annual transmission revenue requirement and overbilled transmission customers. Pertinent Guidance x The Commission’s long-standing precedent stipulates that transaction costs incurred by public utilities associated with a merger are nonoperating in nature and should be charged to Account 426.5, Other Deductions, to the extent the costs are not retained by the parent holding company. The Commission has stated: It is Commission policy that costs incurred to consummate a merger are non-operational in nature and must be recorded in Account 426.5, Other Deductions. These costs may include, but are not limited to, internal and external third-party labor costs for legal, consulting, and professional services incurred to consummate the merger.16 x 18 C.F.R. Part 101, Account 426.5, Other Deductions, states: This account shall include other miscellaneous expenses which are nonoperating in nature, but which are properly deductible before determining total income before interest charges. 16 ITC Holdings Corp., 143 FERC ¶ 61,256, at P 168 (2013) (footnote omitted), order dismissing as moot requests for reh’g and clarification, 151 FERC ¶ 61,266 (2015); accord Exelon Corp., 138 FERC ¶ 61,167, at P 133 (2012) (“we have required [merging] entities to record the transaction costs in Account 426.5”); BHE Holdings Inc., 133 FERC ¶ 61,231, at P 51 (2010) (“Costs incurred to effectuate a merger are not considered an operating activity under the Commission’s accounting regulations and therefore should not be recorded in Account No. 923 as proposed by the Applicants. The Commission has required companies to record merger-related transaction costs in Account No. 426.5, Other Deductions. Account No. 426.5 includes miscellaneous expense items which are non-operating in nature”) (footnotes omitted); Midwest Power Sys., Inc. and Iowa Illinois Gas and Elec. Co., 71 FERC ¶ 61,386, at 62,509 (1995) (“[w]e will, therefore, direct Applicants to record the transaction costs associated with the merger in Account 426.5”). 27
  3. Page 32 of 43

    The Connecticut Light and Power Company d/b/a Eversource Energy REDACTED Docket No. 26-05-10 Date Issued October 23, 2026 RRU-143 Attachment 5 REDACTED Page 32 of 43 The Connecticut Light and Power Company Docket No. FA19-8-000 Background On December 4, 2017, Eversource consummated a merger transaction involving the acquisition of Aquarion Water Company from Macquarie Infrastructure Partners and British Columbia Investment Management Corporation. The transaction did not require Commission approval prior to consummation. Rather, the transaction was approved by three jurisdictional state regulators – the Connecticut Public Utilities Regulatory Authority, the Massachusetts Department of Public Utilities, and the Maine Public Utilities Commission – and was subject to U.S. Department of Justice review. Eversource’s merger costs were comprised of transaction and transition costs, which included, among other things, internal labor costs and employee expenses. To track the merger costs it incurred, Eversource established special accounting processes and procedures, and distributed time reporting instructions to EESCO employees who were assigned to work on the merger project. Pursuant to the instructions, EESCO employees’ labor costs and external expenses were required to be charged to a special merger project work order. Costs charged to the work order were supposed to be restricted from allocation to the Eversource public utilities. However, during discussions with company personnel, audit staff was informed that several EESCO employees who performed work on the merger did not charge time associated with the merger duties they performed to the special work order. Audit staff analyzed EESCO documentation on employees that improperly charged their time. Audit staff found that the portion of these employees’ time and associated labor cost that involved performance of merger-related activities was excluded from the special merger project work order; and as a result the associated labor cost was allocated to the public utilities. According to Eversource’s time reporting policy, employees were generally not required to directly charge internal labor hours to a specific work order or project, unless they spent at least 4 hours a week on the project. For time spent less than 4 hours a week, when employees did not identify duties performed as being provided for a particular project, predetermined default allocators in the timekeeping system allocated labor cost associated with hours worked to Eversource subsidiaries. Eversource explained that some employees did not work more than 4 hours per week on the merger project, and as such did not directly charge their labor hours to the project. Consequently, the portion of these employees’ labor cost associated with duties performed for the merger were charged to CL&P and other Eversource subsidiaries. EESCO estimated that approximately $209,000 of labor costs were erroneously allocated to Eversource subsidiaries, which included $73,000 charged to CL&P. CL&P recorded the costs in operating expense accounts that included balances used to populate its transmission formula rate. However, the Commission has long held that costs incurred to consummate a merger are non-operational in nature and must be recorded in 28
  4. Page 33 of 43

    The Connecticut Light and Power Company d/b/a Eversource Energy REDACTED Docket No. 26-05-10 Date Issued October 23, 2026 RRU-143 Attachment 5 REDACTED Page 33 of 43 The Connecticut Light and Power Company Docket No. FA19-8-000 Account 426.5, Other Deductions. As a result, CL&P overstated its annual transmission revenue requirement and overbilled its transmission customers. Recommendations DAA recommends that CL&P: 19. Enhance accounting policies and procedures for tracking and accounting for merger-related costs consistent with Commission accounting requirements. 20. Provide training to relevant staff on the revised accounting policies and procedures. Also, develop a training program that supports the provision of periodic training in this area, as needed. 21. Submit a refund analysis, within 60 days of issuance of the audit report, to DAA for review that explains and details the following: (1) calculation of refunds resulting from correcting the improper inclusion of merger transaction costs in transmission formula rates during the audit period, plus interest; (2) determinative components of the refund; (3) refund method; (4) customers to receive refunds; and (5) period(s) refunds will be made. 22. File a refund report with the Commission after receiving DAA’s assessment of the refund analysis. 23. Refund the amounts disclosed in the refund report to customers, with interest calculated in accordance with section 35.19a of the Commission’s regulations. 29
  5. Page 34 of 43

    The Connecticut Light and Power Company d/b/a Eversource Energy REDACTED Docket No. 26-05-10 Date Issued October 23, 2026 RRU-143 Attachment 5 REDACTED Page 34 of 43 The Connecticut Light and Power Company 5. Docket No. FA19-8-000 Application of Nonapproved Depreciation Rates CL&P used a depreciation rate for accounting and transmission ratemaking purposes that was not filed with, and approved by, the Commission. As a result, the Commission was not afforded an opportunity to review or decide on the appropriateness of the inclusion of the depreciation rate in the transmission service rate determination. Pertinent Guidance x 18 C.F.R. § 35.13(a) states in part: General rule. Every public utility shall file the information required by this section, as applicable, at the time it files with the Commission under § 35.1 all or part of a rate schedule, tariff or service agreement to supersede or otherwise change the provisions of a rate schedule, tariff or service agreement filed with the Commission under § 35.1. Any petition filed under § 385.207 of this chapter for waiver of any provision of this section shall specifically identify the requirement that the applicant wishes the Commission to waive. x 18 C.F.R. § 35.13(h)(10) states in part: Statement AJ – Depreciation and amortization expenses. Statement AJ consists of statements of depreciation and amortization expenses for Period I and Period II. ..... (iv) For Period I and Period II, the utility shall show the annual depreciation rate applicable to each function and subfunction for which depreciation expense is reported. The utility shall indicate the bases upon which the depreciation rates were established. If the depreciation rates used for Period I or Period II data differ from those employed to support the utility's prior approved jurisdictional electric rate, the utility shall include in or append to Statement AJ detailed studies in support of such changes. These detailed studies shall include: (A) Copies of any reports or analyses prepared by any independent consultant or utility personnel to support the proposed depreciation rates; and 30
  6. Page 35 of 43

    The Connecticut Light and Power Company d/b/a Eversource Energy REDACTED Docket No. 26-05-10 Date Issued October 23, 2026 RRU-143 Attachment 5 REDACTED Page 35 of 43 The Connecticut Light and Power Company Docket No. FA19-8-000 (B) A detailed capital recovery study showing by primary account the depreciation base, accumulated provision for depreciation, cost of removal, net salvage, estimated service life, attained age of survivors, accrual rate, and annual depreciation expense. x Order No. 618; Depreciation Accounting, at footnote 25, states in relevant part: To change prices charged for power sales or transmission services (whether determined by stated rates or formula rates) to reflect a change in depreciation, a utility would first have to make a filing with us, pursuant to sections 205 or 206, 16 U.S.C. 824d, 824e, as appropriate, to that effect.17 Background Audit staff evaluated CL&P’s depreciation processes and procedures to determine whether they complied with the Commission’s accounting and rate regulations. Audit staff found that CL&P applied a depreciation rate to utility plant that was not the rate on file with, and approved by, the Commission. Specifically, CL&P applied depreciation rates ranging from 3.17% to 3.26% to the cost of its Norwalk Harbor-Northport underground transmission line recorded in Account 358, Underground Conductors and Devices. The approved rate on file with the Commission for the transmission line’s balances recorded in the account was zero (0%). The zero depreciation rate for the Norwalk Harbor-Northport underground transmission line was filed with the Commission in Docket No. ER03-1247-000 and, was part of an uncontested offer of settlement among the stakeholders, which was ultimately approved by the Commission on September 16, 2004.18 During the audit, CL&P acknowledged that the depreciation rate used was not filed with the Commission, as required, and explained that the assets used to develop the zero depreciation rate were fully depreciated by 2004 when the associated depreciation study was filed with the Commission. CL&P stated that, in 2008, new assets were added to the Norwalk Harbor17 Depreciation Accounting, Order No. 618, 92 FERC ¶ 61,078, FERC Stats. & Regs. ¶ 31,104, at 31,695 n. 25 (2000). 18 See Northeast Utilities Service Co., Open Access Transmission Service Filing, Docket No. ER03-1247-000 (Aug. 26, 2003), order on settlement, 108 FERC ¶ 61,240 (2004), clarification granted, 111 FERC ¶ 61,333, at P 6, n.10 (clarifying that issue involving a memorandum of understanding was pending before ALJ). 31
  7. Page 36 of 43

    The Connecticut Light and Power Company d/b/a Eversource Energy REDACTED Docket No. 26-05-10 Date Issued October 23, 2026 RRU-143 Attachment 5 REDACTED Page 36 of 43 The Connecticut Light and Power Company Docket No. FA19-8-000 Northport line that CL&P began to depreciate based on an engineering study that predicted a life expectancy for the installed assets of 40 years. CL&P’s explanation for its use of an engineering study and associated depreciation rates for transmission ratemaking purposes does not justify its departure from Commission precedent as provided in Order No. 618, and 18 C.F.R. §§ 35.1(e) and 35.13(h)(10) of the Commission’s regulations. CL&P should have filed its engineering study and associated depreciation rate with the Commission for review and consideration under section 205 of the Federal Power Act prior to using the rate for ratemaking purposes. Recommendations DAA recommends that CL&P: 24. Revise and implement processes and procedures to ensure that depreciation rates and related studies are filed with the Commission for consideration and decision before being used for transmission ratemaking purposes. 25. Provide training to relevant staff on the revised procedures. Also, develop a training program that supports the provision of periodic training in this area, as needed. 26. File a depreciation study and associated depreciation rate for the Norwalk HarborNorthport underground transmission line in a docket relating to its transmission formula rate within 60 days of issuance of the audit report. 32
  8. Page 37 of 43

    The Connecticut Light and Power Company d/b/a Eversource Energy REDACTED Docket No. 26-05-10 Date Issued October 23, 2026 RRU-143 Attachment 5 REDACTED Page 37 of 43 The Connecticut Light and Power Company Docket No. FA19-8-000 V. Other Matter 1. Transparency of the Derivation of Service Company Capital Costs in Jurisdictional Rates EESCO is a centralized service company within the Eversource holding company system. EESCO provides accounting, administrative, engineering, financial, information technology, legal, operational, planning, purchasing, and other shared services to Eversource and its subsidiaries. EESCO charges the companies for the cost of the services that it provides. The cost that EESCO charges is comprised of its actual incurred operations cost plus an additional amount of compensation. EESCO explained that the additional compensation charge is the cost for use of its capital to provide the services. In accordance with Commission regulations, franchised public utilities that have captive customers, or that own or provide transmission service over jurisdictional transmission facilities, may only purchase or receive nonpower goods and services from centralized service companies, such as EESCO, at cost.19 For accounting purposes, the service cost of a centralized service company that is charged to such public utilities is deemed to be appropriate when based on a fair allocation of the total amount of expenses incurred by the service company plus an amount that provides compensation to the service company for the use of its capital.20 The portion of a service cost that provides compensation for use of a service company’s capital should represent recovery, by the service company, of its cost of interest on borrowed funds and a reasonable return on 19 See 18 C.F.R. § 35.44 (2021), Protections Against Affiliate Cross-Subsidization; id. at § 35.44(b)(3) (“A franchised public utility that has captive customers or that owns or provides transmission service over jurisdictional transmission facilities, may only purchase or receive non-power goods and services from a centralized service company at cost”). 20 See 18 C.F.R. § 367.25 (2021), Determination of Service Cost, stating: A service must be deemed at cost and fair allocation of costs requires an accurate accounting for the elements that makes [sic] up the aggregate expense of conducting the business of the service company. In the accounts prescribed in this part, the total amounts included in the expense accounts during any period plus the amount that appropriately may be added as compensation for the use of capital constitute cost during that period. 33
  9. Page 38 of 43

    The Connecticut Light and Power Company d/b/a Eversource Energy REDACTED Docket No. 26-05-10 Date Issued October 23, 2026 RRU-143 Attachment 5 REDACTED Page 38 of 43 The Connecticut Light and Power Company Docket No. FA19-8-000 capital investments used for the performance of services or construction work for, or the sale of goods to, associate companies.21 Audit staff reviewed EESCO’s method and inputs used to calculate its service cost, focusing on the portion of the cost that represented compensation for use of its capital. EESCO’s capital compensation cost included recovery of its debt interest expenses and a return on equity (ROE). The debt interest expense amounts were derived from actual monthly short-term and long-term debt interest expenses incurred by the company. EESCO calculated the amount of ROE charges monthly by applying an annual ROE rate to total equity reported on its books as of the previous month-end. EESCO’s ROE rate was comprised of state regulator-approved and FERC-approved ROE rates for all the electric and natural gas companies in Eversource’s corporate structure.22 State regulator-approved ROE rates were used for Eversource electric company subsidiaries with distribution segments and its natural gas companies. FERC-approved ROE rates were used for Eversource electric company subsidiaries with transmission segments. EESCO combined the multiple state and FERC ROE rates to calculate a single weighted average ROE rate that was applied to EESCO’s total equity balance. The product of that calculation was then divided by 12 and allocated monthly as a component of service cost charged. In 2019, EESCO’s weighted ROE rate used to determine its capital compensation cost was 9.80%. EESCO charged over $165 million in capital compensation cost to its affiliates, including CL&P, from 2016 to 2019. CL&P was charged $65 million during this period. While reviewing CL&P’s calculation of its annual transmission revenue requirement during the audit period, and certain of its retail rate of return calculations, audit staff noted that the EESCO capital compensation cost were included in CL&P’s retail and Commission-jurisdictional transmission service rate determinations. However, inclusion of the cost in CL&P’s retail rates was more transparent than the inclusion in Commission-jurisdictional transmission rates. For example, CL&P’s retail rate case filed with the Connecticut Public Utilities Regulatory Authority (CT PURA) included standardized schedules and a formula calculation that demonstrated and provided notice to CT PURA of the EESCO capital compensation cost proposed for inclusion in CL&P’s 21 See 18 C.F.R. § 367.29 (2021), Compensation for Use of Capital. 22 During the audit period, the EESCO ROE rate was comprised of the ROE rates of six electric and natural gas companies. 34
  10. Page 39 of 43

    The Connecticut Light and Power Company d/b/a Eversource Energy REDACTED Docket No. 26-05-10 Date Issued October 23, 2026 RRU-143 Attachment 5 REDACTED Page 39 of 43 The Connecticut Light and Power Company Docket No. FA19-8-000 retail service rates.23 Whereas, the transmission formula rate filing to the Commission does not provide this detailed disclosure of information. Pursuant to 18 C.F.R. § 367.29 of the Commission’s regulations, a service company’s return on its capital investment is required to be reasonable. Also pursuant to the same regulation, EESCO is to provide to CL&P “[a]n annual statement to support the amount of compensation for use of capital billed for the previous 12 months and how it was calculated . . . .” The Commission also generally requires that formula rates be stated with sufficient specificity, clarity, and transparency so as to be understandable and reviewable by those affected by them and by the Commission. Moreover, in December 2015, pursuant to section 206 of the FPA, the Commission found that ISO-NE’s Transmission, Markets, and Services Tariff was unjust and unreasonable because it lacked adequate transparency and challenge procedures with regard to the transmission formula rate protocols for ISO-NE Participating Transmission Owners (PTO)s, including CL&P.24 In June 2020, the ISO-NE PTOs jointly filed an offer of settlement to resolve all issues in the section 206 proceeding. To address the transparency concerns, the ISO-NE PTOs proposed replacing the then-existing formula rate narrative method with a new formula rate template and attachments with associated worksheets that provide for disclosure of the components and calculations of cost inputs to the template.25 The settlement participants did not contest the filing. In December 2020, the Commission approved the filing as an uncontested settlement.26 The effective date for the new formula rate template and attachments is January 1, 2022.27 23 See In re: Application of the Connecticut Light and Power Company d/b/a Eversource Energy to Amend its Rate Schedule, State of Connecticut Public Utilities Regulatory Authority, Docket No. 17-10-46 (filed Apr. 18, 2018). 24 ISO New England Inc. Participating Transmission Owners Admin. Comm., 153 FERC ¶ 61,343, at PP 1, 4-9 (2015), reh’g denied, 154 FERC 61,230 (2016). 25 See ISO-New England Inc. Transmission, Markets, and Services Tariff, Section II.H Other Transmission Provisions, Attachment F, Annual Transmission Revenue Requirements 24.0.0, Appendix A 1.0.0., and Appendix C, Formula Rate Protocols 1.0.0. 26 ISO New England Inc. Participating Transmission Owners Admin. Comm., 173 FERC ¶ 61,270, at P 6 (2020). 27 See ISO New England Inc. Participating Transmission Owners Admin. Comm., Open Access Transmission Tariff Filing, Docket No. ER20-2054-001 (filed Jan. 27, 35

Scanned pages of RRU-143 Attachment 4 REDACTED.pdf

Read by machine from a scan · 97 pages · may contain errors, especially in numbers

As listed on the current system

Question(s) Answered 143 (Connecticut Light and Power Company dba Eversource) Date Filed: 11/16/2026

This filing on the current system (opens in a new tab)