Skip to main content

A prototype public docket site for the Connecticut Public Utilities Regulatory Authority

Utility Dockets and Filings

Interrogatory responses

Answers to questions 159

ResponseFiled by Connecticut Light and Power Company dba Eversource Energy51 files
Part of docket 26-05-10Open
  • Electric
Application of The Connecticut Light and Power Company d/b/a Eversource Energy to Amend its Rate Schedules

Files51

Search terms highlighted
Eversource rate increase is on 36 pages across 17 files of the text below, highlighted. Go to the first matchClear highlighting
Words on different pages
Words on different pages
Words on different pages
Words on different pages

This spreadsheet is large. Its searchable text keeps the sheet names, column headings and text cells and stops at 300,000 characters, so search may miss words further in. Download the file for every cell and figure.

  1. Part 1 of 77

    [Sheet: Sheet1] work_order_number | description | long_description | cost_element_group | ferc_account | percent DVR Replacement Project | The DVR that is being replaced is a computer that is beyond its expected life cycle and requires frequent maintenance. | Wholesale Expenses-W00 Non - Productive Labor | 00000011EMPBENPAY11 | Wholesale Expenses-W00 | 9200NP 02EAST48 | 4.8KV Grounding EASTERN | 4.8KV DELTA GROUNDING Eastern Division | Wholesale Expenses-W00 03CENT48 | 4.8KV GROUNDING CENTRAL | 4.8KV GROUNDING CENTRAL Division | Wholesale Expenses-W00 03EAST48 | 4.8KV GROUNDING EASTERN | 4.8KV DELTA GROUNDING Eastern Division | Wholesale Expenses-W00 2016 sale- st lts town of cheshire | record the sale of street lights to the town of Cheshire value of approx -$464,633.15 Closing date 01/13/16 | Wholesale Expenses-W00 sale of vernon st lts 319.3K | record the sale of street lights to the town of vernon value of approx 319.3K Closing date 05/13/16 | Wholesale Expenses-W00 sale of Meriden st lts -1,072.7M | record the sale of street lights to the town of meriden value of approx 1,1072.7M Closing date 05/13/16 | Wholesale Expenses-W00 Wolcott street light sale | record the sale of street lights to the town of Wolcott | Wholesale Expenses-W00 Street Lights for the town Cromwell | Record the sale of street lights to the town of Cromwell | Wholesale Expenses-W00 Street Light Sale Berlin | Record the sale of street lights to the town of Berlin | Wholesale Expenses-W00 Street Light Sale in Clinton | Record the sale of street lights to the town of Clinton | Wholesale Expenses-W00 Sale of Street Lights in East Lyme | Record the sale of street lights to the town of East Lyme | Wholesale Expenses-W00 Sale of Street Lights in Darien | Record the sale of street lights to the town of Darien | Wholesale Expenses-W00 Sale of Streetlights Simsbury | Record the sale of street lights to the town of Simsbury | Wholesale Expenses-W00 Sale of Street Lights West Hartford | Record the sale of street lights to the town of West Hartford | Wholesale Expenses-W00 2017 Sale of Streetlights Simsbury | Record the sale of street lights to the town of Simsbury | Wholesale Expenses-W00 2017 Sale of Streetlights Berlin | Record the sale of street lights to the town of Berlin | Wholesale Expenses-W00 Sale of Streetlights Mansfield | Record the sale of street lights to the town of Mansfield | Wholesale Expenses-W00 Sale of Streetlights Chester | Record the sale of street lights to the town of Chester | Wholesale Expenses-W00 Sale of Street Lights East Lyme | Record the sale of street lights to the town of East Lyme | Wholesale Expenses-W00 Sale of Streetlights Madison | Record the sale of street lights to the town of Madison | Wholesale Expenses-W00 Sale of Street Lights Wolcott | record the sale of street lights to the town of Wolcott | Wholesale Expenses-W00 Sale of Street Lights Old Saybrook | record the sale of street lights to the town of Old Saybrook | Wholesale Expenses-W00 Sale of Street Lights Granby | record the sale of street lights to the town of Granby | Wholesale Expenses-W00 Sale of Street Lights Ledyard | record the sale of street lights to the town of Ledyard | Wholesale Expenses-W00 Sale of Street Lights Seymour | record the sale of street lights to the town of Seymour | Wholesale Expenses-W00 Sale of Street Lights Thomaston | record the sale of street lights to the town of Thomaston 2018 | Wholesale Expenses-W00 Sale of Streetlights Berlin 2018 | Record the sale of street lights to the town of Berlin | Wholesale Expenses-W00 Sale of Streetlights Old Saybrook | Record the sale of street lights to the town of Old Saybrook 2018 | Wholesale Expenses-W00 Sale of Streetlights Farmington | Record the sale of street lights to the town of Farmington 2018 | Wholesale Expenses-W00 Sale of Streetlights Westbrook | Record the sale of street lights to the town of Westbrook 2018 | Wholesale Expenses-W00
  2. Part 2 of 77

    Sale of Streetlights Sprague | Record the sale of street lights Sprague | Wholesale Expenses-W00 Sale of Streetlights Sterling | Record the sale of street lights Sterling | Wholesale Expenses-W00 Sale of Streetlights Mansfield 2018 | Record the sale of street lights for Mansfield 2018 | Wholesale Expenses-W00 Sale of Street Lights Wethersfield | Record the sale of street lights for Wethersfield 2018 | Wholesale Expenses-W00 Sale of Street Lights Canton | Record the sale of street lights for Canton 2018 | Wholesale Expenses-W00 Sale of Streetlights Waterbury | Record the sale of street lights for Waterbury 2018 | Wholesale Expenses-W00 Sale of StreetLights East Lyme 2018 | Record the sale of street lights for East Lyme 2018 | Wholesale Expenses-W00 Sale of Street lights Plymouth | Record the sale of street lights for Plymouth 2018 | Wholesale Expenses-W00 SALE OF STREET LIGHTS WATERFORD | Record the sale of street lights for Waterford 2019_x000D__x000D_ | Wholesale Expenses-W00 SALE OF STREET LIGHTS GUILFORD | Record the sale of street lights for Guilford 2019_x000D__x000D_ | Wholesale Expenses-W00 Sale of Streetlights to Middlefield | Record the sale of street lights for Middlefield 2019_x000D__x000D_ | Wholesale Expenses-W00 Sale of Streetlights WESTON | Record the sale of street lights for WESTON 2019_x000D__x000D_ | Wholesale Expenses-W00 CL&P Transformer Charge | CL&P Transformer Charge-Vu | Wholesale Expenses-W00 11ADMINI | CL&P EE Expense | 11ADMINI11OTHER | Wholesale Expenses-W00 11ADMNBD | Aministration-Bid | Aministration-Bid-Quaresma | Wholesale Expenses-W00 | 186EEB 11AHESLM | CLP - HEAR | CLP - HEAR - Tran, Thuy T | Wholesale Expenses-W00 11AHISLI | CLP - HEAR | CLP - HEAR - Tran, Thuy T | Wholesale Expenses-W00 11AHVALM | CLP - HEAR | CLP - HEAR - Tran, Thuy T | Wholesale Expenses-W00 11AINFOT | CLP - HEAR | CLP - HEAR - Tran, Thuy T | Wholesale Expenses-W00 11ANCSLM | CLP - HEAR | CLP - HEAR - Tran, Thuy T | Wholesale Expenses-W00 11APPREC | CL&P-EE Appliance Recycling | CL&P-EE Appliance Recycling-Lempa | Wholesale Expenses-W00 11ARPALM | CLP - HEAR | CLP - HEAR - Tran, Thuy T | Wholesale Expenses-W00 11AUFIOP | Audits-Financial and Operational | Audits-Financial and Operational-Krawczyk | Wholesale Expenses-W00 11BUMANA | CL&P EE Expense | 11BUMANA11OTHER | Wholesale Expenses-W00 11BUSINT | CL&P-Business Intelligence | CL&P-Business Intelligence-Lempa | Wholesale Expenses-W00 11BUSUCH | CL&P EE Expense | 11BUSUCH11CI | Wholesale Expenses-W00 11CIDERE | C & I Demand Response | C & I Demand Response-Krawczyk | Wholesale Expenses-W00 11CILNPR | CL&P EE Expense | 11CILNPR11CI | Wholesale Expenses-W00 11CISEFU | CL&P EE Expense | 11CISEFU11CI | Wholesale Expenses-W00 11CLENCO | CL&P EE Expense | 11CLENCO11OTHER | Wholesale Expenses-W00 11CUENGA | CL&P EE Expense | 11CUENGA11OTHER | Wholesale Expenses-W00 11CUSENG | Customer Engagement | Customer Engagement-Quaresma | Wholesale Expenses-W00 11EDPUBL | Educate the Public | Educate the Public-Krawczyk | Wholesale Expenses-W00 11EDSTUD | Educate the Students | Educate the Students-Krawczyk | Wholesale Expenses-W00 11EDWORK | Educate the Workforce | Educate the Workforce-Krawczyk | Wholesale Expenses-W00 11EEBORE | EE Boiler Replacement | EE Boiler Replacement in CT_x000D__x000D_ | Wholesale Expenses-W00 11EEK12E | CL&P EE Expense | 11EEK12E11OTHER | Wholesale Expenses-W00 11ENCOBL | CL&P EE Expense | 11ENCOBL11CI | Wholesale Expenses-W00 11ENEFBO | CL&P EE Expense | 11ENEFBO11OTHER | Wholesale Expenses-W00 11ENOPPO | CL&P EE Expense | 11ENOPPO11CI | Wholesale Expenses-W00 11ENSTAP | CL&P EE Expense | 11ENSTAP11RES | Wholesale Expenses-W00 11EVALUA | CL&P EE Expense | 11EVALUA11OTHER | Wholesale Expenses-W00 11EVCONS | CL&P EE Expense | 11EVCONS11OTHER | Wholesale Expenses-W00 11FLML24 | CT Elec D Fleet Blanket WO-Mat Log | CT Electric Distribution 2024 Blanket Work Order for Fleet Vehicles-Material Logistics | Wholesale Expenses-W00
  3. Part 3 of 77

    11FLTUVL | CT Electric Fleet Capital UVL | CT Electric work order for Fleet UVL. | Wholesale Expenses-W00 11FLUV21 | CT Elec D Fleet Capital Veh Purch | CT Electric blanket work order for Fleet vehicle UVL's. | Wholesale Expenses-W00 11FLUV22 | CT Elec D Fleet Capital Veh Purchas | CT Electric Distribution 2022 Blanket Work Order for Fleet Vehicle UVL's. | Wholesale Expenses-W00 11FLUV23 | CT Elec D Fleet Capital Veh Blnk WO | CT Electric Distribution 2023 Blanket Work Order for Fleet Vehicle UVL's. | Wholesale Expenses-W00 11FLUV24 | CT Elec D Fleet Capital Blanket WO | CT Electric Distribution 2024 Blanket Work Order for Fleet Vehicle UVL's. | Wholesale Expenses-W00 11FLUV25 | CT Elec D Fleet 2025 Blanket WO | CT Electric Distribution 2025 Blanket Work Order for Fleet | Wholesale Expenses-W00 11HEDUSE | CL&P EE Expense | 11HEDUSE11RES | Wholesale Expenses-W00 11HEHVAC | CL&P EE Expense | 11HEHVAC11RES | Wholesale Expenses-W00 11HEIEMU | HES-Income Eligible-Multi Family | HES-Income Eligible-Multi Family-Lempa | Wholesale Expenses-W00 11HEINEL | CL&P EE Expense | 11HEINEL11LI | Wholesale Expenses-W00 11HEMUFA | HES-Multi Family | HES-Multi Family-Lempa | Wholesale Expenses-W00 11INTECH | CL&P EE Expense | 11INTECH11OTHER | Wholesale Expenses-W00 11MAPLAN | CL&P EE Expense | 11MAPLAN11OTHER | Wholesale Expenses-W00 11MEYE21 | CT Elec Fleet Cap Purch - Mobileye | CT Elec Fleet Capital Purchase - Mobileye $208,078.47_x000D__x000D_ Mobileye Safety Mechanism hardware & installation 153 Units | Wholesale Expenses-W00 11NECONS | CL&P EE Expense | 11NECONS11RES | Wholesale Expenses-W00 11OPMAIN | CL&P EE Expense | 11OPMAIN11CI | Wholesale Expenses-W00 11PLANNI | CL&P EE Expense | 11PLANNI11OTHER | Wholesale Expenses-W00 11PRIME0 | CL&P EE Expense | 11PRIME011CI | Wholesale Expenses-W00 11RECOMM | CL&P EE Expense | 11RECOMM11CI | Wholesale Expenses-W00 11REDEDE | CL&P EE Expense | 11REDEDE11OTHER | Wholesale Expenses-W00 11REDMRE | Residential Demand Response | Residential Demand Response-Krawczyk | Wholesale Expenses-W00 11REGULA | CL&P EE Expense | 11REGULA11OTHER | Wholesale Expenses-W00 11RELIGH | CL&P EE Expense | 11RELIGH11RES | Wholesale Expenses-W00 11RELOBI | CL&P EE Expense | 11RELOBI11OTHER | Wholesale Expenses-W00 | 242RE0 11RELOPR | CL&P EE Expense | 11RELOPR11RES | Wholesale Expenses-W00 11RESERV | CL&P EE Expense | 11RESERV11OTHER | Wholesale Expenses-W00 | 254PJ0 11SBLODE | CL&P EE Expense | 11SBLODE11OTHER | Wholesale Expenses-W00 11SBMPAY | CL&P EE Expense | 11SBMPAY11OTHER | Wholesale Expenses-W00 | 186S10 11SBREPY | Customer Loan Repayment | Customer Loan Repayment-Darragjati | Wholesale Expenses-W00 | 253EE0 11SMBUSI | CL&P EE Expense | 11SMBUSI11CI | Wholesale Expenses-W00 11SMRELN | Residential Loan payable-SMART E | Residential Loan payable-SMART E-Desrosieurs | Wholesale Expenses-W00 | 242SE0 11TRASYS | CL&P Tracking Sys EE Expense | CL&P Tracking Sys EE Expense-Desrosiers | Wholesale Expenses-W00 16CCFS11 | 2016 CG CT Electric FCS | FCS Rollout Project (already approved) that will implement Itron’s Field Collection System (FCS) for CT in addition to providing interfaces to Meter Data Management for C2 Billing. | Wholesale Expenses-W00 16CCMR11 | Handhelds for CT Electric (11) | Handhelds for CT Electric in 2016 | Wholesale Expenses-W00 17CCAR11 | CT AMR Solutions | Wholesale Expenses-W00 17CCDH11 | CT Disconnects Handhelds | Wholesale Expenses-W00 1864N011 | Tax Liability for Non-Cash Cont N-R | Tax Liability for Non-Cash Cont N-R | Wholesale Expenses-W00 | 1864N0 1864W011 | CIAC Goss-Up of Taxes Refundable | CIAC Goss-Up of Taxes Refundable | Wholesale Expenses-W00 | 1864W0 19CGMR11 | CT AMR Solutions | Wholesale Expenses-W00 19CTETRN | CT Electric tools &equipment | This work order is to pay 37.5% of the Field Training Royal flush invoice, a total cost of $27,000. Per Randy 12/2/19 | Wholesale Expenses-W00
  4. Part 4 of 77

    1B030056 | HEL 15 DD BY 10/24/22 (50,513857580 | JS - 97 South St, Danb, Inst\Rem OH Svc (11A77)_x000D_ | Wholesale Expenses-W00 1B030148 | COMPLETED KD-EVENT #4074131 REPLC C | Elec Maint Trouble Call - Repairs/Obsolescence OH (AROH) | Wholesale Expenses-W00 1B031024 | COMPLETED WM - 22 South St, Rdgfld, | 22 SOUTH ST Elec Svc New Com/Ind DESG_x000D_ | Wholesale Expenses-W00 1B031933 | COMPLETED 261 Wilton Rd E, Ridgefie | JS - 261 Wilton Rd E, Rdgfld, Rem OH Sec & Svc, Inst OH/DB Sec & DB Svc (22N3)_x000D_ | Wholesale Expenses-W00 1B032048 | BR Bethany Rd Beacon Falls Pole 263 | BR Bethany Rd Beacon Falls Pole 26351 Load Balancing 11N81_x000D_ | Wholesale Expenses-W00 1B032446 | JS - 9 Long Ridge Rd, Danb, Inst 1p | JS - 9 Long Ridge Rd, Danb, Inst 1ph Pri Riser, DB Pri, Pri HH & DB XFMR (11A77)_x000D_ | Wholesale Expenses-W00 1B032471 | CD01357 - Reconductor Wagon Wheel R | CD01357 - Reconductor Wagon Wheel Rd Pole 1170 - 1325 w/ 1/0 TW_x000D_ | Wholesale Expenses-W00 1B032554 | APPRENTICES (50): FRISBIE RD Elec P | FRISBIE RD Elec Proj Reconductor/Relocate/Conversion Annual DESG_x000D_ | Wholesale Expenses-W00 1B032555 | MATERIAL (50,0): 129 MAIN ST N Ligh | 129 MAIN ST N Lighting - Area - Non-roadway / Private Roadway (DA)_x000D_ | Wholesale Expenses-W00 1B032601 | JS - Country Club Rd, Ridgefield, R | CP-64 Country Club rd, replace pole_x000D_ | Wholesale Expenses-W00 1B032667 | JS - 1 Two Pence Rd, Rdgfld, Rem OH | JS - 1 Two Pence Rd, Rdgfld, Rem OH Svc & Inst OH/DB Svc (22N5)_x000D_ | Wholesale Expenses-W00 1B032685 | COMPLETED (50) TURNOVER 10 ROWLEDGE | Elec Maint Trouble Call - Repairs/Obsolescence OH (AROH)_x000D_ | Wholesale Expenses-W00 1B032703 | COMPLETED 25 Gilbert St, Rem DB Svc | JS - 25 Gilbert St, Danb, Rem DB Svc, Repl DB XFMR & Conn Cust DB Svc (22N4)_x000D_ | Wholesale Expenses-W00 1B032789 | (50,0): BR 736 - 740 Championship D | BR 736 - 740 Championship Dr Oxford New UG Residential Meter Dept Set_x000D_ | Wholesale Expenses-W00 1B032859 | COMPLETE-(20): KD-EVENT #4384967 RE | Elec Maint Trouble Call - Repairs/Obsolescence OH (AROH) | Wholesale Expenses-W00 1B032871 | MPB; 4 OAK RIDGE RD BETHEL- P#1295 | MPB; 4 OAK RIDGE RD BETHEL- P#1295 RMV OH TEMP, INST #2 TPX OH SVC_x000D_ | Wholesale Expenses-W00 1B032980 | (50,0): 61-67 BRENTWOOD CIR Electri | 63-66 BRENTWOOD CIR Electric Service New UG Residential Meter Dept Set_x000D_ | Wholesale Expenses-W00 1B033211 | COMPLETED 29 Comstock St, Danb, Ins | JS - 29 Comstock St, Danb, Inst\Rem OH Svc (11A73)_x000D_ | Wholesale Expenses-W00 1B0E0011 | Purchase of Energy | Purchase of Energy | Wholesale Expenses-W00 1B0R0011 | Purchase of Recs | Purchase of Recs-Rose | Wholesale Expenses-W00 1B0R0111 | PURCHASE of RECs | PURCHASE of RECs - Ed Morawsky | Wholesale Expenses-W00 1B130070 | (30): KD-EVENT # 4389912 REPL P 365 | KD-EVENT # 4389912 REPL P 3650 | Wholesale Expenses-W00 1B320712 | AF - ELEC MAINT REPL/RENEWAL/OBSOL | AF - ELEC MAINT REPL/REN/OBSOL OH DESG(AROH)POLE RECORDS/ JO INT BILLING POLE 263 AP1 -WO TOTAL COST LESS THAN 7K | Wholesale Expenses-W00 1B321594 | TB- 772 MONROE TPKE POLE 268 INSTAL | TB- 772 MONROE TPKE POLE 268 INSTALL CV SERVICE_x000D_ | Wholesale Expenses-W00 1B420020 | WM, SHELTER ROCK RD, DANBURY, PHASE | BR, SHELTER ROCK RD, DANBURY, PHASE OFF GLASSS COMPLETED AP1 -WO TOTAL COST LESS THAN 7K | Wholesale Expenses-W00 1B420651 | BR Pad 13 Hickory Ln Roxbury Repair | BR Pad 13 Hickory Ln Roxbury Repair Primary Fault DB (ARDB) Completed_x000D_ AP1-YWO Total Cost Less Than 7K | Wholesale Expenses-W00 1B420672 | BR, Big Buck Ln, Brookfield, cable | BR, Big Buck Ln, Brookfield, cable fault bet sw 45 & pad 46 Completed_x000D_ AP1-YWO Total Cost Less Than 7K | Wholesale Expenses-W00 1B420682 | MT- Completed in Field on 5/08/14 b | MT- Completed in Field on 5/08/14 by ESO_x000D_ AP1-YWO Total Cost Less Than 7K | Wholesale Expenses-W00
  5. Part 5 of 77

    1B421221 | WM, Shelter Rock Rd, Danbury, welde | WM, Shelter Rock Rd, Danbury, welded manhole cover_x000D_ AP1-YWO Total Cost Less Than 7K | Wholesale Expenses-W00 1B422408 | ESO hattertown rd monroe tree broke | ESO hattertown rd monroe tree broke x arm_x000D_ | Wholesale Expenses-W00 1B520312 | BR Hut Hill Rd, Bridgewater ESO Wor | BR Hut Hill Rd, Bridgewater ESO Work #3217 Completed in Field_x000D_ | Wholesale Expenses-W00 1B520862 | BR Rt 39 New Fairfield Replaced Xfr | BR Rt 39 New Fairfield Replaced Xfrm Completed in Field_x000D_ | Wholesale Expenses-W00 1B520865 | APPLE BLOSSOM LN New UG Residenti | APPLE BLOSSOM LN New UG Residential Meter Dept Set pr 3/31_x000D_ | Wholesale Expenses-W00 1B520888 | 1-4-179A-179B PRINCESS PINE LN | 1-4-179A-179B PRINCESS PINE LN New UG Residential Meter Dept Set_x000D_ AP1-YWO Total Cost Less Than 7K | Wholesale Expenses-W00 1B521850 | Meadows End Rd, Monroe, p.#206 poor | Meadows End Rd, Monroe, p.#206 poor condition should be replaced_x000D_ AP1-YWO Total Cost Less Than 7K | Wholesale Expenses-W00 1B521883 | BR 153 Wilton Rd Ridgefield Tree vs | BR 153 Wilton Rd Ridgefield Tree vs Line Completed in Field_x000D_ | Wholesale Expenses-W00 1B521909 | ESO Mill Plain Rd DNBY- CarVsPole55 | ESO Mill Plain Rd DNBY- CarVsPole55 Braced-Frontier to Set New 8/21/15_x000D_ AP3-YWO Resource Variance Met- Labor 13 <= 32 OR 112.2 <= 30 And Contractor $1546.34 <= 2000 | Wholesale Expenses-W00 1B522090 | NF, 6A ROCK RIDGE CT, RUN DB SEC N | NF, 6A ROCK RIDGE CT, RUN DB SEC NEW HH THEN DB SVC, TOTAL 475' 350MCM RUN_x000D_ | Wholesale Expenses-W00 1B522254 | Key Rock Rd, Newtown, pole top fire | Key Rock Rd, Newtown, pole top fire need to repl p#2477 40/2 NOTIFY# 496101_x000D_ AP2-YWO Total Cost Variance Met - Variance :100.357 MIN.:-50 MAX.:150 | Wholesale Expenses-W00 1B522296 | AF - 3PA-CONV#310934 - Replace pole | AF - 3PA-CONV#310934 - Replace pole 2007 pr TS 1/28_x000D_ AP1-YWO Total Cost Less Than 7K | Wholesale Expenses-W00 1B522443 | RM-101395, REPLACE CABLE, Scenic Hi | RM-101395, REPLACE CABLE, Scenic Hill LN pad 46 & 47- Monroe_x000D_ CL-YWO Variance - Contractor Labor | Wholesale Expenses-W00 1B620051 | CB - CDOT 34-305 & 345 Move 1 | CB - CDOT 34-305 & 345 Move 1_x000D_ JE-YWO Variance Job Type Exclusion | Wholesale Expenses-W00 1B620115 | RR- 104 Forty Acre Mtn Rd Danbury, | RR- 104 Forty Acre Mtn Rd Danbury, ATT p #4268 needs to be replaced PR01/20/16_x000D_ AP1-YWO Total Cost Less Than 7K | Wholesale Expenses-W00 1B620199 | 15 BATES PL Elec Svc New Residenti | 15 BATES PL Elec Svc New Residential PR2/4/16_x000D_ | Wholesale Expenses-W00 1B620226 | DP, WASH 165 SHEARER RD, PRIORITY | DP, WASH 165 SHEARER RD, PRIORITY REJECT POLE#3474, 1PH , ANCHOR_x000D_ CL-YWO Variance - Contractor Labor | Wholesale Expenses-W00 1B620261 | 44 KENOSIA AVE Elec Maint Trouble C | 44 KENOSIA AVE Elec Maint Trouble Call - Repairs/Obsolescence OH PR2/17/16_x000D_ AP1-YWO Total Cost Less Than 7K | Wholesale Expenses-W00 1B620362 | NORTH ST replace recloser 22N5-71 | NORTH ST replace recloser 22N5-71s Y-17131-2016 pole 5024 PR3/2/16_x000D_ | Wholesale Expenses-W00 1B620819 | JDB WEBATUCK RD SHERMAN COMPLETED, | JDB WEBATUCK RD SHERMAN COMPLETED, ESO 5/7 9A pole 929_x000D_ AP2-YWO Total Cost Variance Met - Variance :63.2336 MIN.:-50 MAX.:150 | Wholesale Expenses-W00 1B621325 | SH-Convo#342618-(MakeReadyNonReimb) | SH-Convo#342618-(MakeReadyNonReimb) - Fibertech Parent Convo#338911_x000D_ AP2-YWO Total Cost Variance Met - Variance :-30.9342 MIN.:-40 MAX.:40 | Wholesale Expenses-W00 1B621534 | ROX, 142 EAST FLAG SWAMP, TEL REPL | ROX, 142 EAST FLAG SWAMP, TEL REPL POLE. HANG POT AND OH/DB SVC FOR GATE_x000D_ AP1-YWO Total Cost Less Than 7K | Wholesale Expenses-W00 1B621706 | BM/ INS 3P PRI RISER, RUN 390' 1AL | BM/ INS 3P PRI RISER, RUN 390' 1AL 4CT TO NEW 500KVA PAD_x000D_ AP2-YWO Total Cost Variance Met - Variance :24.7788 MIN.:-50 MAX.:50 | Wholesale Expenses-W00
  6. Part 6 of 77

    1B622090 | WOOD, 120 WEST LAKE RD, OH SVC CHEC | WOOD, 120 WEST LAKE RD, OH SVC CHECK EXISTING DROP TO 2 , SET METER_x000D_ AP1-YWO Total Cost Less Than 7K | Wholesale Expenses-W00 1B622120 | 8-13 PRINCESS PINE LN Electric Ser | 8-13 PRINCESS PINE LN Electric Service New UG Residential Meter Dept Set_x000D_ AP1-YWO Total Cost Less Than 7K | Wholesale Expenses-W00 1B622145 | RM 39 Putnam Park Rd Bethel PER SH | RM 39 Putnam Park Rd Bethel PER SHOOTER NEED CUT AND KICK ALSO TREE TRIMMING_x000D_ AP1-YWO Total Cost Less Than 7K | Wholesale Expenses-W00 1B622282 | RL Black Rock Tpke, Redding replace | RL Black Rock Tpke, Redding replace DB primary cable from Riser P#969 to PAD200_x000D_ AP2-YWO Total Cost Variance Met - Variance :1.7385 MIN.:-40 MAX.:40 | Wholesale Expenses-W00 1B622283 | PH; 661 Redding Rd, Redding, replac | PH; 661 Redding Rd, Redding, replace DB primary from Riser P#1181 to PAD3_x000D_ AP2-YWO Total Cost Variance Met - Variance :3.1947 MIN.:-40 MAX.:40 | Wholesale Expenses-W00 1B720029 | Electric Service Existing Residenti | Electric Service Existing Residential Overhead (PHD)_x000D_ | Wholesale Expenses-W00 1B720072 | 9A COMPLETED, 124 Calhoun, Washingt | 9A COMPLETED, 124 Calhoun, Washington, car vs. pole 1773, TEL REPLACED,SHIFTED_x000D_ AP1-YWO Total Cost Less Than 7K | Wholesale Expenses-W00 1B720073 | 9A COMPLETED23 Hooppole Hill, Woodb | 9A COMPLETED23 Hooppole Hill, Woodbury, car vs. pole FRONTIER REPLACED POLE W5_x000D_ AP1-YWO Total Cost Less Than 7K | Wholesale Expenses-W00 1B720145 | CDOT 34-313 Danbury - CIS#2 - relo | CDOT 34-313 Danbury - CIS#2 - reloc service to Wells Fargo_x000D_ JE-YWO Variance Job Type Exclusion | Wholesale Expenses-W00 1B720242 | ESO, White Deer Rocks Rd, Woodbury | ESO, White Deer Rocks Rd, Woodbury - Car vs Pole 1215_x000D_ AP2-YWO Total Cost Variance Met - Variance :116.5616 MIN.:-50 MAX.:150 | Wholesale Expenses-W00 1B720378 | BRANCHVILLE replace cap bank pole 5 | BRANCHVILLE replace cap bank pole 559 pr3/1/17_x000D_ NL-YWO Variance - NU Construction Labor | Wholesale Expenses-W00 1B720417 | OLD BROOKFIELD RD Elec Maint Troub | OLD BROOKFIELD RD Elec Maint Trouble Call - Repairs/Obsolescence DB pr3/9/17_x000D_ CL-YWO Variance - Contractor Labor | Wholesale Expenses-W00 1B720430 | BLITZ, NM, OLD PARK LN, POLE #10, E | BLITZ, NM, OLD PARK LN, POLE #10, ES SHIFT TEL HAS SET, DBL POLE_x000D_ AP1-YWO Total Cost Less Than 7K | Wholesale Expenses-W00 1B720453 | Brookfield, Meadow Brook Rd - Front | Brookfield, Meadow Brook Rd - Frontier pole shift 1384 pr3/11/17_x000D_ AP1-YWO Total Cost Less Than 7K | Wholesale Expenses-W00 1B720502 | COMPL IN FIELD; REPL 100AMP C/O @ P | COMPL IN FIELD; REPL 100AMP C/O @ PL 2622_x000D_ | Wholesale Expenses-W00 1B720688 | WM - 22N3 Rehab, Ridgefield | WM - 22N3 Rehab, Ridgefield_x000D_ | Wholesale Expenses-W00 1B720873 | TB- ELGIN AVE BETHEL SHIFT FRONTIER | TB- ELGIN AVE BETHEL SHIFT FRONTIER P 30_x000D_ AP1-YWO Total Cost Less Than 7K | Wholesale Expenses-W00 1B720883 | 23 SIMPAUG TPKE Elec Svc Existing | 23 SIMPAUG TPKE Elec Svc Existing Residential pr4/27/17_x000D_ AP2-YWO Total Cost Variance Met - Variance :66.3019 MIN.:-50 MAX.:150 | Wholesale Expenses-W00 1B720920 | JS - 50 Sawmill Rd, Danb, Inst\Rem | JS - 50 Sawmill Rd, Danb, Inst\Rem OH/DB Svc (28M3)_x000D_ AP1-YWO Total Cost Less Than 7K | Wholesale Expenses-W00 1B720940 | 1+3 ENCLAVE DR Electric Service N | 1+3 ENCLAVE DR Electric Service New UG Residential Meter Dept Set_x000D_ AP1-YWO Total Cost Less Than 7K | Wholesale Expenses-W00 1B720942 | 11-17 MOORLAND DR Electric Service | 11-17 MOORLAND DR Electric Service New UG Residential Meter Dept Set_x000D_ AP1-YWO Total Cost Less Than 7K | Wholesale Expenses-W00 1B720968 | CB - CDOT - 34-305 & 345 Move 2 | CB - CDOT - 34-305 & 345 Move 2_x000D_ JE-YWO Variance Job Type Exclusion | Wholesale Expenses-W00 1B720975 | 116 N LAKE SHORE DR Elec Svc New R | 116 N LAKE SHORE DR Elec Svc New Residential_x000D_
  7. Part 7 of 77

    AP1-YWO Total Cost Less Than 7K | Wholesale Expenses-W00 1B721039 | 15 DD BY 6/27/22 (50): 4 FINANCE DR | 4 FINANCE DR Elec Svc New Com/Ind_x000D_ | Wholesale Expenses-W00 1B721060 | 104 MAIN ST Elec Svc Existing Resi | 104 MAIN ST Elec Svc Existing Residential pr6/2/17_x000D_ AP2-YWO Total Cost Variance Met - Variance :97.5358 MIN.:-50 MAX.:150 | Wholesale Expenses-W00 1B721402 | TB- 29 WEST ST INSTALL NEW X OVER P | TB- 29 WEST ST INSTALL NEW X OVER POLE AND DB SERVICE_x000D_ AP1-YWO Total Cost Less Than 7K | Wholesale Expenses-W00 1B721538 | 2 ROCKWELL RD extend primary pole l | 2 ROCKWELL RD extend primary pole line install prim. riser to pad + svc_x000D_ CL-YWO Variance - Contractor Labor | Wholesale Expenses-W00 1B721557 | BR 121 Lantern Park Ln N Southbury | BR 121 Lantern Park Ln N Southbury Yellow Tag_x000D_ CL-YWO Variance - Contractor Labor | Wholesale Expenses-W00 1B721722 | NEW MILFORD 20 EVERWOOD DR NEW MIL | NEW MILFORD 20 EVERWOOD DR NEW MILFORD , RUN NEW 4/0 DB SVC PAD 1343_x000D_ AP1-YWO Total Cost Less Than 7K | Wholesale Expenses-W00 1B721855 | 36 HAYES LN relocate to mid-span E | 36 HAYES LN relocate to mid-span Existing Residential Overhead_x000D_ AP1-YWO Total Cost Less Than 7K | Wholesale Expenses-W00 1B721941 | JS - 3 East St, Danb, Inst\Rem OH S | JS - 3 East St, Danb, Inst\Rem OH Svc (11A76)_x000D_ AP1-YWO Total Cost Less Than 7K | Wholesale Expenses-W00 1B721946 | JS - 17 Beckett St, Danb, Inst\Rem | JS - 17 Beckett St, Danb, Inst\Rem OH Svc (28M1)_x000D_ AP1-YWO Total Cost Less Than 7K | Wholesale Expenses-W00 1B721957 | JS - 4 Woodview Dr, Brkfld, Inst\Re | JS - 4 Woodview Dr, Brkfld, Inst\Rem OH Svc (14H3)_x000D_ AP1-YWO Total Cost Less Than 7K | Wholesale Expenses-W00 1B721958 | JS - 25 Woodview Dr, Brkfld, Inst\R | JS - 25 Woodview Dr, Brkfld, Inst\Rem OH Svc (14H3)_x000D_ AP1-YWO Total Cost Less Than 7K | Wholesale Expenses-W00 1B722028 | JS - 6 Hewlett Rd, Nw Frfld, Inst\R | JS - 6 Hewlett Rd, Nw Frfld, Inst\Rem OH Svc (28M2)_x000D_ AP1-YWO Total Cost Less Than 7K | Wholesale Expenses-W00 1B722315 | RSO OXFORD, Oakwood Dr - Digu up - | RSO OXFORD, Oakwood Dr - Digu up - damage done by S+S paving (see T/T)_x000D_ AP1-YWO Total Cost Less Than 7K | Wholesale Expenses-W00 1B722524 | TB 154 ENTERPRISE DR INSTALL NEW PR | TB 154 ENTERPRISE DR INSTALL NEW PRIMARY SVC AND 300 KVA XFMR_x000D_ AP2-YWO Total Cost Variance Met - Variance :49.4991 MIN.:-50 MAX.:50 | Wholesale Expenses-W00 1B722785 | BR 38 Twin Oaks Beacon Falls New Re | BR 38 Twin Oaks Beacon Falls New Residential Underground_x000D_ AP1-YWO Total Cost Less Than 7K | Wholesale Expenses-W00 1B722786 | BR 76 Fieldstone Ln Beacon Falls Ne | BR 76 Fieldstone Ln Beacon Falls New Residential Underground_x000D_ AP1-YWO Total Cost Less Than 7K | Wholesale Expenses-W00 1B722807 | JS - 26 Linda La, Nw Frfld, Inst OH | JS - 26 Linda La, Nw Frfld, Inst OH/DB Svc (14H4)_x000D_ AP1-YWO Total Cost Less Than 7K | Wholesale Expenses-W00 1B722973 | JS - Larson Dr, Danb, Rem OH Neut, | JS - Larson Dr, Danb, Rem OH Neut, Inst OH Sec (28M13)_x000D_ AP1-YWO Total Cost Less Than 7K | Wholesale Expenses-W00 1B820016 | 25 CREST RD Electric Service Existi | 25 CREST RD Electric Service Existing Residential Overhead_x000D_ AP1-YWO Total Cost Less Than 7K | Wholesale Expenses-W00 1B820583 | 2-4-6 PUTNAM LN Electric Service Ne | 2-4-6 PUTNAM LN Electric Service New UG Residential Meter Dept Set_x000D_ | Wholesale Expenses-W00 1B821681 | SH-Convo#672962-MakeReadyNonReimib | SH-Convo#672962-MakeReadyNonReimib Parent Convo#657857_x000D_ NO AWOCS-AWOCS REASON CODE AND DESCRIPTION NOT FOUND. | Wholesale Expenses-W00 1B821744 | JS - 47 West Wooster St, Danb, Inst | JS - 47 West Wooster St, Danb, Inst\Rem OH Svc (11A74)_x000D_ AP1-YWO Total Cost Less Than 7K | Wholesale Expenses-W00 1B822339 | APPRENTICES 15 DD BY 11/17/22 (50,0 | 25 BRIDGE Elec Svc New Com/Ind DESG pr9/14/18_x000D_ | Wholesale Expenses-W00
  8. Part 8 of 77

    1B822375 | CDOT 18-136 - Brookfield Streetscap | CDOT 18-136 - Brookfield Streetscape - Relocate 205, 206_x000D_ JE-YWO Variance Job Type Exclusion | Wholesale Expenses-W00 1B920812 | (50): 261 WOODBURY RD Elec Maint Tr | 261 WOODBURY RD Elec Maint Trouble Call - Repairs/Obsolescence OH_x000D_ | Wholesale Expenses-W00 1B921722 | BM/ REPL PAD 872 WITH SAME | BM/ REPL PAD 872 WITH SAME_x000D_ NL-YWO Variance - NU Construction Labor | Wholesale Expenses-W00 1B922289 | 101395 1552 Replace cable from P | 101395 1552 Replace cable from POLE 1296 to PAD 316 Old Field Ln, Redding_x000D_ CL-YWO Variance - Contractor Labor | Wholesale Expenses-W00 1B922605 | Electric Service New Residential Un | Electric Service New Residential Underground_x000D_ AP1-YWO Total Cost Less Than 7K | Wholesale Expenses-W00 1B923067 | 15 DD BY 1/5/23 (40,0): CP- 15 Wild | CP- 15 Wildwood Ln, Install new UG SVC_x000D_ | Wholesale Expenses-W00 1B923313 | 5 HIGH ST Electric Service Existing | 5 HIGH ST Electric Service Existing Residential Overhead pr10/24/19_x000D_ AP1-YWO Total Cost Less Than 7K | Wholesale Expenses-W00 1BOE0011 | Purchase of Energy | Purchase of Energy-Rose | Wholesale Expenses-W00 1G520647 | RL:48 Clapboard Ridge Rd; Elec Svc | RL:48 Clapboard Ridge Rd; Elec Svc Existing Residential IT Meter 600 Amps (DN)_x000D_ AP2-YWO Total Cost Variance Met - Variance :109.6871 MIN.:-50 MAX.:150 | Wholesale Expenses-W00 1G520706 | DM/6 Grove ST COS COB: PRIORITY DE | DM/6 Grove ST COS COB: PRIORITY DESG (IFOH) - POLE#119_x000D_ CL-YWO Variance - Contractor Labor | Wholesale Expenses-W00 1G520761 | DM/107 DOUBLING RD GREENWICH: RELOC | DM/107 DOUBLING RD GREENWICH: RELOCATE OH LINES TO UNDERGROUND_x000D_ AP2-YWO Total Cost Variance Met - Variance :-23.6492 MIN.:-50 MAX.:50 | Wholesale Expenses-W00 1G620304 | RL 30 Butternut Hollow/P#70537/Tree | RL 30 Butternut Hollow/P#70537/Tree broke pole,see ticket/Alex M._x000D_ | Wholesale Expenses-W00 1G620491 | RL:35 Mooreland Rd; Elec Svc New Re | RL:35 Mooreland Rd; Elec Svc New Residential IT 600 amp Meter DESG_x000D_ NO AWOCS-AWOCS REASON CODE AND DESCRIPTION NOT FOUND. | Wholesale Expenses-W00 1G620693 | Elec Svc New Com/Ind IT Meter DESG | Elec Svc New Com/Ind IT Meter DESG (DN)_x000D_ AP2-YWO Total Cost Variance Met - Variance :-18.0765 MIN.:-40 MAX.:40 | Wholesale Expenses-W00 1G621024 | RL:10 Broad St: Elec Svc New Reside | RL:10 Broad St: Elec Svc New Residential IT 800 Amps Meter DESG_x000D_ AP1-YWO Total Cost Less Than 7K | Wholesale Expenses-W00 1G621097 | RL:900 Lake Ave: Greenwich pole Ve | RL:900 Lake Ave: Greenwich pole Verizon Pole VZ 225 75656_x000D_ AP1-YWO Total Cost Less Than 7K | Wholesale Expenses-W00 1G621155 | RL:120 Valley Dr::Elec Svc New Resi | RL:120 Valley Dr::Elec Svc New Residential DESG 40/2 Pole 36" Silo (DN)_x000D_ AP3-YWO Resource Variance Met- Labor 14 <= 32 OR 62.62 <= 30 And Contractor $1228.29 <= 2000 | Wholesale Expenses-W00 1G621163 | DM/32 MEETING HOUSE RD GRN: REPL P. | DM/32 MEETING HOUSE RD GRN: REPL P.80483 & 73715 - CUSTOMER COMPLAINT_x000D_ AP2-YWO Total Cost Variance Met - Variance :-35.0579 MIN.:-40 MAX.:40 | Wholesale Expenses-W00 1G621184 | RL:ZACCHEUS MEAD GREENWICH 9A POLE | RL:ZACCHEUS MEAD GREENWICH 9A POLE 73577 ESO_x000D_ AP2-YWO Total Cost Variance Met - Variance :40.0956 MIN.:-50 MAX.:50 | Wholesale Expenses-W00 1G621238 | RL:North Maple Ave: Electric Servic | RL:North Maple Ave: Electric Service Un-Metered for school zone lights_x000D_ AP1-YWO Total Cost Less Than 7K | Wholesale Expenses-W00 1G621249 | RL:Patterson Ave: Electric Service | RL:Patterson Ave: Electric Service Un-Metered pole 70468_x000D_ AP1-YWO Total Cost Less Than 7K | Wholesale Expenses-W00 1G621258 | RL: Paterson Ave: Electric Service | RL: Paterson Ave: Electric Service Un-Metered Pole 73219_x000D_ AP1-YWO Total Cost Less Than 7K | Wholesale Expenses-W00
  9. Part 9 of 77

    1G621297 | RL:10 Glenville Rd: Verizon replace | RL:10 Glenville Rd: Verizon replaced pole 68060 VZ 5 50/2 Car vs pole 9A_x000D_ CL-YWO Variance - Contractor Labor | Wholesale Expenses-W00 1M320139 | 588, NF, DP, Bear Mt Rd, AT&T to R | 588, NF, DP, Bear Mt Rd, AT&T to Repl Detriorated pole 1315_x000D_ AP1-YWO Total Cost Less Than 7K | Wholesale Expenses-W00 1M420090 | KENT, CAMEL HILL RD,CAMP FRANCIS , | KENT, CAMEL HILL RD,CAMP FRANCIS , DEMO 2 OF 4 REM OH SECSVC METER RANGER CABIN AP1 -WO TOTAL COST LESS THAN 7K | Wholesale Expenses-W00 1N030200 | LD WALL ST NOR CD01024-06 Remv Xfm | LD WALL ST NOR CD01024-06 Remv Xfmr from Vlt 866_x000D_ CL-YWO Variance - Contractor Labor | Wholesale Expenses-W00 1N030547 | MATERIAL (FOLLOW UP) JDB - CDOT158- | Elec Proj Highway Relocation Non-Reimbursable DESG (DH) | Wholesale Expenses-W00 1N030555 | JDB 6/7: LINDEN HTS NORWALK:POLE#94 | JDB 6/7: LINDEN HTS NORWALK:POLE#945 REPLACED 50 KVA AND ELBOW ARRESTOR_x000D_ | Wholesale Expenses-W00 1N120458 | JDB 6 CAPTAINS WALK NWLK INSTALL250 | JDB 6 CAPTAINS WALK NWLK INSTALL250W HPS COBRA Canceled_x000D_ | Wholesale Expenses-W00 1N130045 | JES; 30 EVERGREEN AVE. WILTON. REPL | 9/1: P# 3487/EVERGREEN AVE WILTON 4330130 / NEEDS GUY WIRE | Wholesale Expenses-W00 1N221114 | JDB 10 ARCH ST,NWLK TRUCK HIT POLE | JDB 10 ARCH ST,NWLK TRUCK HIT POLE #9577 SEE TT INFO 06/01/12_x000D_ AP1-YWO Total Cost Less Than 7K | Wholesale Expenses-W00 1N321978 | JDB 165 GRUMMAN AVE NWLK P32758 Ele | JDB 165 GRUMMAN AVE NWLK P32758 Elec Proj Maintain Voltage Annual DESG (DK)_x000D_ CL-YWO Variance - Contractor Labor | Wholesale Expenses-W00 1N322459 | JES: 3 DUKE PL. NORWALK, CAR VS POL | JES: 3 DUKE PL. NORWALK, CAR VS POLE MADE TEMP REPAIRS, P# 9012 SEE TT 11-15-13_x000D_ AP1-YWO Total Cost Less Than 7K | Wholesale Expenses-W00 1N420695 | am/PN 103612, Seg 1 - Civil Work Re | am/PN 103612, Seg 1 - Civil Work Relocate Vlt 39_x000D_ CI-YWO Variance - Contractor Invoice | Wholesale Expenses-W00 1N421438 | RM 50 POWDER HORN HILL WESTON REPLA | RM 50 POWDER HORN HILL WESTON REPLACE OPEN SEC POLE#13557 PER LINE DEPT_x000D_ AP1-YWO Total Cost Less Than 7K | Wholesale Expenses-W00 1N422555 | AF-Elec Proj Cable Repl Spec - Butl | AF-Elec Proj Cable Repl Spec - Butler Ln - New Canaan, CT_x000D_ CI-YWO Variance - Contractor Invoice | Wholesale Expenses-W00 1N520002 | RM- 101395, Cable Replacement - Mes | RM- 101395, Cable Replacement - Messex Ln - Weston_x000D_ | Wholesale Expenses-W00 1N522133 | AJC 128 MATHER ST WLTN INSTALL RISE | AJC 128 MATHER ST WLTN INSTALL RISER FOR 480V 3PH DELTA SERVICE P24555_x000D_ AP1-YWO Total Cost Less Than 7K | Wholesale Expenses-W00 1N522299 | KS 645 POST RD E, WSPT P# 18505 INS | KS 645 POST RD E, WSPT P# 18505 INS PRI RISER, DB PRI, PRI VLT, & 300KVA PAD_x000D_ AP2-YWO Total Cost Variance Met - Variance :19.9624 MIN.:-50 MAX.:50 | Wholesale Expenses-W00 1N522364 | AJC 183 HEMLOCK HILL RD NC UPGRD TR | AJC 183 HEMLOCK HILL RD NC UPGRD TRANS & INST RISER FOR 320A SC SERV POLE 5713_x000D_ | Wholesale Expenses-W00 1N620110 | LD WEST CEDAR ST NORWALK RECONDUCTO | LD WEST CEDAR ST NORWALK RECONDUCTOR PRI 24A10-73S-24A10-92T TD 941 POLE#23020_x000D_ CI-YWO Variance - Contractor Invoice | Wholesale Expenses-W00 1N620657 | CONV 484563 - RM-CDOT 158-0211, PHA | CONV 484563 - RM-CDOT 158-0211, PHASE I, NEWTOWN TRPK / RT 15 - WESTPORT_x000D_ JE-YWO Variance Job Type Exclusion | Wholesale Expenses-W00 1N620810 | RM 159 Godfrey Rd East Weston Repl | RM 159 Godfrey Rd East Weston Replace pole 31846 per tele request !!!_x000D_ AP2-YWO Total Cost Variance Met - Variance :24.4577 MIN.:-50 MAX.:150 | Wholesale Expenses-W00 1N620926 | LD 14 MAIN STREET NOR PARKING LOT R | LD 14 MAIN STREET NOR PARKING LOT RPL POLE#27127 RPL TO LED'S FROM HPS LIGHTS_x000D_ AP2-YWO Total Cost Variance Met - Variance :42.7862 MIN.:-50 MAX.:50 | Wholesale Expenses-W00
  10. Part 10 of 77

    1N620945 | LD WESTPORT NETWORK RPL SEC MAIN'S | LD WESTPORT NETWORK RPL SEC MAIN'S & RECRAB 3 MH#'S TO TYPE B PROJ #103358-13_x000D_ AP2-YWO Total Cost Variance Met - Variance :2.4156 MIN.:-10 MAX.:10 | Wholesale Expenses-W00 1N621035 | KS 9 COLONIAL RD, WSPT P# 781 INS C | KS 9 COLONIAL RD, WSPT P# 781 INS CROSSOVER POLE & 200A OH/DB SVC_x000D_ AP1-YWO Total Cost Less Than 7K | Wholesale Expenses-W00 1N621145 | JDB EAST AVE NWLK P2890 RMV ARMLESS | JDB EAST AVE NWLK P2890 RMV ARMLESS INSTALL 6' XARM OH DESG (AROH)_x000D_ AP1-YWO Total Cost Less Than 7K | Wholesale Expenses-W00 1N621166 | JES; 345 NEWTOWN TPKE, WESTON-BROKE | JES; 345 NEWTOWN TPKE, WESTON-BROKEN P#31868 & 31870 08/09/16_x000D_ | Wholesale Expenses-W00 1N621292 | JES; WILLARD RD. NWLK.; IR INSP. - | JES; WILLARD RD. NWLK.; IR INSP. - Minor DESG (IFOH) - POLE 13273_x000D_ AP1-YWO Total Cost Less Than 7K | Wholesale Expenses-W00 1N621466 | AJC BEACHSIDE AVE WSPT RPL DB PRI | AJC BEACHSIDE AVE WSPT RPL DB PRI FROM POLE#25131 TO PAD#127 PROJ#101395-09_x000D_ CL-YWO Variance - Contractor Labor | Wholesale Expenses-W00 1N621473 | ESO 8/13 Grays Farm Rd Westport pol | ESO 8/13 Grays Farm Rd Westport pole 17813_x000D_ AP1-YWO Total Cost Less Than 7K | Wholesale Expenses-W00 1N621475 | AJC BUTLER LN NC INS PIPE& RPL DB | AJC BUTLER LN NC INS PIPE& RPL DB PRI FROM POLE#24732 TO PAD#221 PROJ#101395-09_x000D_ AP2-YWO Total Cost Variance Met - Variance :29.9076 MIN.:-40 MAX.:40 | Wholesale Expenses-W00 1N621658 | AJC 7 FAIRFIELD AVE WSPT Electric S | AJC 7 FAIRFIELD AVE WSPT Electric Service New Residential Overhead P 25864_x000D_ | Wholesale Expenses-W00 1N621689 | JDB 18 OX YOKE LN NWLK P9366 EXTEND | JDB 18 OX YOKE LN NWLK P9366 EXTEND PRI INS 50KVA & OH/DB SVC DESG (DN)_x000D_ AP2-YWO Total Cost Variance Met - Variance :-19.5236 MIN.:-40 MAX.:40 | Wholesale Expenses-W00 1N621793 | AJC 2 BRIGHTFIELD LN WSPT Electric | AJC 2 BRIGHTFIELD LN WSPT Electric Service New Residential Underground HH30203A_x000D_ | Wholesale Expenses-W00 1N621850 | RM -CD00667, Recloser @ P-4977 Knap | RM -CD00667, Recloser @ P-4977 Knapp St - Norwalk_x000D_ AP2-YWO Total Cost Variance Met - Variance :23.7919 MIN.:-30 MAX.:30 | Wholesale Expenses-W00 1N621866 | AJC 6 KELLER LN WSPT MIDTAP Electri | AJC 6 KELLER LN WSPT MIDTAP Electric Service Existing Residential Overhead P9106_x000D_ | Wholesale Expenses-W00 1N621985 | RM 10 Ridge Ln Weston Replace Exis | RM 10 Ridge Ln Weston Replace Existing Residential Overhead svc_x000D_ | Wholesale Expenses-W00 1N720013 | JDB FILLOW ST NWLK P1746 FUSE COORD | JDB FILLOW ST NWLK P1746 FUSE COORDINATION Annual DESG (DR)_x000D_ AP1-YWO Total Cost Less Than 7K | Wholesale Expenses-W00 1N720608 | JDB 18 FLICKER LN NWLK SHIFT POLE 6 | JDB 18 FLICKER LN NWLK SHIFT POLE 6545 INSTALL New OH/DB Residential DESG (DN)_x000D_ AP1-YWO Total Cost Less Than 7K | Wholesale Expenses-W00 1N720793 | RM 139 Lords Hwy Weston Install pr | RM 139 Lords Hwy Weston Install primary riser to new pad and db svc_x000D_ AP1-YWO Total Cost Less Than 7K | Wholesale Expenses-W00 1N720842 | JDB ESO 4/26/17 WESTPORT - 9 CRAWF | JDB ESO 4/26/17 WESTPORT - 9 CRAWFORD RD P6838 REPLACE XTRANS_x000D_ AP1-YWO Total Cost Less Than 7K | Wholesale Expenses-W00 1N720847 | ESO 9A 4/29/17-WESTPORT = 22 MAPLE | ESO 9A 4/29/17-WESTPORT = 22 MAPLE AVE, P#26017 !!!!!_x000D_ AP1-YWO Total Cost Less Than 7K | Wholesale Expenses-W00 1N720848 | JDB/P# 33766/REPLACED 50KVA XFRMR/I | JDB/P# 33766/REPLACED 50KVA XFRMR/INSTALLED 100 AMP CUTOUT & BRACKET/5-31_x000D_ AP1-YWO Total Cost Less Than 7K | Wholesale Expenses-W00 1N720860 | JES; 31A8 Capacitor Solution - New | JES; 31A8 Capacitor Solution - New Canaan Silvermine Rd PL 27..._x000D_ AP2-YWO Total Cost Variance Met - Variance :4.9118 MIN.:-40 MAX.:40 | Wholesale Expenses-W00 1N720916 | JDB 10 STURGESS COMMONS WSPT POLE 5 | JDB 10 STURGESS COMMONS WSPT POLE 5337 INSTALLED 50KVA/CUTOUT/6-13-2017_x000D_

Text of RRU-159 Attachment 23.pdf

Extracted from the file · 1,160 pages · 16,330,154 characters

Text of RRU-159 Attachment 22.xlsx

Sheet names, column headings and text cells; numbers left out · first 300,000 characters

Text of RRU-159 Attachment 22.pdf

Extracted from the file · 1,203 pages · 14,349,246 characters

Text of RRU-159 Attachment 21.xlsx

Sheet names, column headings and text cells; numbers left out · first 300,000 characters

Text of RRU-159 Attachment 21.pdf

Extracted from the file · 1,203 pages · 13,880,364 characters

Text of RRU-159 Attachment 20.xlsx

Sheet names, column headings and text cells; numbers left out

Text of RRU-159 Attachment 20.pdf

Extracted from the file · 16 pages · 151,762 characters

Text of RRU-159 Attachment 19.xlsx

Sheet names, column headings and text cells; numbers left out

Text of RRU-159 Attachment 19.pdf

Extracted from the file · 1 page · 5,328 characters

Text of RRU-159 Attachment 18.xlsx

Sheet names, column headings and text cells; numbers left out · first 300,000 characters

Text of RRU-159 Attachment 18.pdf

Extracted from the file · 640 pages · 7,983,236 characters

Text of RRU-159 Attachment 17.xlsx

Sheet names, column headings and text cells; numbers left out · first 300,000 characters

Text of RRU-159 Attachment 17.pdf

Extracted from the file · 855 pages · 14,651,941 characters

Text of RRU-159 Attachment 16.xlsx

Sheet names, column headings and text cells; numbers left out · first 300,000 characters

Text of RRU-159 Attachment 16.pdf

Extracted from the file · 489 pages · 7,076,557 characters

Text of RRU-159 Attachment 15.xlsx

Sheet names, column headings and text cells; numbers left out · first 300,000 characters

Text of RRU-159 Attachment 15.pdf

Extracted from the file · 897 pages · 15,723,777 characters

Text of RRU-159 Attachment 14 .pdf

Extracted from the file · 1 page · 2,589 characters

Text of RRU-159 Attachment 14.xlsx

Sheet names, column headings and text cells; numbers left out

Text of RRU-159 Attachment 13.xlsx

Sheet names, column headings and text cells; numbers left out

Text of RRU-159 Attachment 13.pdf

Extracted from the file · 1 page · 427 characters

Text of RRU-159 Attachment 12.xlsx

Sheet names, column headings and text cells; numbers left out · first 300,000 characters

Text of RRU-159 Attachment 12.pdf

Extracted from the file · 802 pages · 14,341,138 characters

Text of RRU-159 Attachment 11.xlsx

Sheet names, column headings and text cells; numbers left out · first 300,000 characters

Text of RRU-159 Attachment 11.pdf

Extracted from the file · 858 pages · 15,906,152 characters

Text of RRU-159 Attachment 10.xlsx

Sheet names, column headings and text cells; numbers left out

Text of RRU-159 Attachment 10.pdf

Extracted from the file · 1 page · 822 characters

Text of RRU-159 Attachment 09.xlsx

Sheet names, column headings and text cells; numbers left out · first 300,000 characters

Text of RRU-159 Attachment 09.pdf

Extracted from the file · 449 pages · 7,355,312 characters

Text of RRU-159 Attachment 08.xlsx

Sheet names, column headings and text cells; numbers left out · first 300,000 characters

Text of RRU-159 Attachment 08.pdf

Extracted from the file · 867 pages · 13,878,236 characters

Text of RRU-159 Attachment 07.xlsx

Sheet names, column headings and text cells; numbers left out · first 300,000 characters

Text of RRU-159 Attachment 07.pdf

Extracted from the file · 869 pages · 15,728,932 characters

Text of RRU-159 Attachment 06.xlsx

Sheet names, column headings and text cells; numbers left out · first 300,000 characters

Text of RRU-159 Attachment 06.pdf

Extracted from the file · 459 pages · 8,128,897 characters

Text of RRU-159 Attachment 05.xlsx

Sheet names, column headings and text cells; numbers left out · first 300,000 characters

Text of RRU-159 Attachment 05.pdf

Extracted from the file · 879 pages · 16,073,548 characters

Text of RRU-159 Attachment 04.xlsx

Sheet names, column headings and text cells; numbers left out

Text of RRU-159 Attachment 04.pdf

Extracted from the file · 5 pages · 20,994 characters

Text of RRU-159 Attachment 03.xlsx

Sheet names, column headings and text cells; numbers left out · first 300,000 characters

Text of RRU-159 Attachment 03.pdf

Extracted from the file · 840 pages · 14,413,580 characters

Text of RRU-159 Attachment 02.xlsx

Sheet names, column headings and text cells; numbers left out · first 300,000 characters

Text of RRU-159 Attachment 02.pdf

Extracted from the file · 1,137 pages · 16,605,462 characters

Text of RRU-159 Attachment 01.xlsx

Sheet names, column headings and text cells; numbers left out

Text of RRU-159 Attachment 01.pdf

Extracted from the file · 1 page · 1,403 characters

As listed on the current system

Question(s) Answered 159 (Connecticut Light and Power Company dba Eversource Energy) Date Filed: 11/06/2026

This filing on the current system (opens in a new tab)