Interrogatory responses

Answers to questions 159

ResponseFiled by Connecticut Light and Power Company dba Eversource Energy51 files
Part of docket 26-05-10Open
  • Electric
Application of The Connecticut Light and Power Company d/b/a Eversource Energy to Amend its Rate Schedules

Files51

Search terms highlighted
Eversource rate increase is on 36 pages across 17 files of the text below, highlighted. Go to the first matchClear highlighting
Words on different pages
Words on different pages
Words on different pages
Words on different pages

This spreadsheet is large. Its searchable text keeps the sheet names, column headings and text cells and stops at 300,000 characters, so search may miss words further in. Download the file for every cell and figure.

  1. Part 49 of 77

    2W421609 | JAM CHANGE OUT SW GEAR AND CABLE FA | JAM CHANGE OUT SW GEAR AND CABLE FAULT_x000D_ | Wholesale Expenses-W00 2W421636 | JD 492601 13F64 RELOCATE OH LINE CD | JD 492601 13F64 RELOCATE OH LINE CDOT 151-273- SEG 2_x000D_ JE-YWO Variance Job Type Exclusion | Wholesale Expenses-W00 2W421645 | JD 492601 13F64 REMOVE/RELOCATE OH | JD 492601 13F64 REMOVE/RELOCATE OH LINE-CDOT 151-273 - SEG 2_x000D_ JE-YWO Variance Job Type Exclusion | Wholesale Expenses-W00 2W520098 | ROTTED FRNTR POLE #8951 INSTALLED R | ROTTED FRNTR POLE #8951 INSTALLED RIDGE PIN NEUTRAL CLAMP & SHIFTED_x000D_ | Wholesale Expenses-W00 2W521082 | VT/RUN NEW OH SVC - TAKEN OUT BY S | VT/RUN NEW OH SVC - TAKEN OUT BY STORM - NEW MAST INSTALLED_x000D_ AP1-YWO Total Cost Less Than 7K | Wholesale Expenses-W00 2W521224 | ESO 7/12 COOKE ST, WATERBURY - CAR | ESO 7/12 COOKE ST, WATERBURY - CAR VS P# 14126_x000D_ | Wholesale Expenses-W00 2W521519 | VT/INSTALL 120' 4/0 TPX FROM HANDHO | VT/INSTALL 120' 4/0 TPX FROM HANDHOLE TO NEW HOUSE_x000D_ | Wholesale Expenses-W00 2W521547 | Lantern Park Dr., Naugatuck - Cable | Lantern Park Dr., Naugatuck - Cable Replacement_x000D_ | Wholesale Expenses-W00 2W521628 | P.1114 CAR FIRE VS POLE RISER PIPE | P.1114 CAR FIRE VS POLE RISER PIPE MELTED NEEDS TO BE REPLACED_x000D_ AP1-YWO Total Cost Less Than 7K | Wholesale Expenses-W00 2W522049 | PHD Elec Maint Replace/Renewal/Obs | PHD Elec Maint Replace/Renewal/Obsol OH DESG (AROH)_x000D_ AP2-YWO Total Cost Variance Met - Variance :112.0869 MIN.:-50 MAX.:150 | Wholesale Expenses-W00 2W522136 | PHD VT *REJECT POLES* - SHIFT AF | PHD VT *REJECT POLES* - SHIFT AFTER FRONTIER SETS POLES_x000D_ AP1-YWO Total Cost Less Than 7K | Wholesale Expenses-W00 2W522187 | PHD Elec Maint Replace/Renewal/Ob | PHD Elec Maint Replace/Renewal/Obsol OH DESG (AROH)_x000D_ AP1-YWO Total Cost Less Than 7K | Wholesale Expenses-W00 2W522237 | PHD JAM Frontier reject poles nee | PHD JAM Frontier reject poles need to be changed over_x000D_ AP1-YWO Total Cost Less Than 7K | Wholesale Expenses-W00 2W620005 | PHD Elec Maint Replace/Renewal/Ob | PHD Elec Maint Replace/Renewal/Obsol OH DESG (AROH)_x000D_ AP1-YWO Total Cost Less Than 7K | Wholesale Expenses-W00 2W620038 | PHD Elec Maint Replace/Renewal/Obs | PHD Elec Maint Replace/Renewal/Obsol OH DESG (AROH)_x000D_ CI-YWO Variance - Contractor Invoice | Wholesale Expenses-W00 2W620080 | PHD Elec Maint Replace/Renewal/Ob | PHD Elec Maint Replace/Renewal/Obsol OH DESG (AROH)_x000D_ AP1-YWO Total Cost Less Than 7K | Wholesale Expenses-W00 2W620099 | PHD Elec Maint Replace/Renewal/Obs | PHD Elec Maint Replace/Renewal/Obsol OH DESG (AROH)_x000D_ AP1-YWO Total Cost Less Than 7K | Wholesale Expenses-W00 2W620198 | PHD Elec Maint Replace/Renewal/Ob | PHD Elec Maint Replace/Renewal/Obsol OH DESG (AROH)_x000D_ AP1-YWO Total Cost Less Than 7K | Wholesale Expenses-W00 2W620247 | PHD JC/ POLE 9436 FRONTIER SHIFT | PHD JC/ POLE 9436 FRONTIER SHIFT_x000D_ AP1-YWO Total Cost Less Than 7K | Wholesale Expenses-W00 2W620270 | PHD JC/ POLE 8971 FRONTIER SHIFT | PHD JC/ POLE 8971 FRONTIER SHIFT_x000D_ AP1-YWO Total Cost Less Than 7K | Wholesale Expenses-W00 2W620297 | PHD Elec Maint Replace/Renewal/Ob | PHD Elec Maint Replace/Renewal/Obsol OH DESG (AROH) P# 6615_x000D_ AP2-YWO Total Cost Variance Met - Variance :47.7694 MIN.:-50 MAX.:50 | Wholesale Expenses-W00 2W620324 | VT/REMOVE EXISTING LIGHT...INSTALL | VT/REMOVE EXISTING LIGHT...INSTALL 100W LED COBRA HEAD ON 12' BRACKET_x000D_ | Wholesale Expenses-W00 2W620538 | Proj#CD00699-13B33 Relocate for Tra | Proj#CD00699-13B33 Relocate for Trans, Part 3 of 6: Chase Pkwy w/ 556_x000D_ CL-YWO Variance - Contractor Labor | Wholesale Expenses-W00 2W620715 | CAR VS FRONTIER POLE #35 POLE IS CR | CAR VS FRONTIER POLE #35 POLE IS CRACKED & ROTTED SHOULD BE REPLACED_x000D_ AP2-YWO Total Cost Variance Met - Variance :66.1647 MIN.:-50 MAX.:150 | Wholesale Expenses-W00
  2. Part 50 of 77

    2W620798 | DM 5/3 ESO CAR VS POLE WATERBURY RD | DM 5/3 ESO CAR VS POLE WATERBURY RD PRSPCT P#1366 CONV#393701_x000D_ AP1-YWO Total Cost Less Than 7K | Wholesale Expenses-W00 2W620826 | JDB 54 PORTER HILL RD MIDDLEBURY R | JDB 54 PORTER HILL RD MIDDLEBURY REPLACE POLE 61480 & SHIFT CONV#449244_x000D_ AP1-YWO Total Cost Less Than 7K | Wholesale Expenses-W00 2W620862 | VT/WC-27 Williams Dr, Prospect. SHI | VT/WC-27 Williams Dr, Prospect. SHIFT TO NEW FRONTIER POLE 1775_x000D_ AP1-YWO Total Cost Less Than 7K | Wholesale Expenses-W00 2W620907 | JS - 64 Garrigus Ct, Wlctt, Repl PA | JS - 64 Garrigus Ct, Wlctt, Repl PAD XFMR (30L26)_x000D_ AP1-YWO Total Cost Less Than 7K | Wholesale Expenses-W00 2W620982 | RL:1255 E Main St Wtby CAR V POLE | RL:1255 E Main St Wtby CAR V POLE Replaced 8602 45/2 transfer 50kva_x000D_ | Wholesale Expenses-W00 2W720002 | AMM WAKELEE RD,WTBY. Municipal Lig | AMM WAKELEE RD,WTBY. Municipal Light Fault Locate and Repair@ POLE L2A7._x000D_ AP1-YWO Total Cost Less Than 7K | Wholesale Expenses-W00 3H030708 | Electric Service Un-Metered--2/12-- | Electric Service Un-Metered--2/12---HTFD-60 Curtiss St-------pole# 4119_x000D_ | Wholesale Expenses-W00 3H031622 | (50): EAST HARTFORD, MAPLEWOOD AVE, | EAST HARTFORD, MAPLEWOOD AVE, REPL ROTTEN POLE #1886S_x000D_ | Wholesale Expenses-W00 3H031702 | (30): BLOOMFIELD, TERRY PLAINS, REP | BLOOMFIELD, TERRY PLAINS, REP P2598 3/200AMP CUTOUTS,3/18KV /10 DEAD END ARM | Wholesale Expenses-W00 3H031780 | CDOT 42-317 Ensign St. Civil Work | CDOT 42-317 Ensign St. Civil Work Rt. 2 Safety Improvements_x000D_ JE-YWO Variance Job Type Exclusion | Wholesale Expenses-W00 3H031783 | Rplc. 3 poles to accomodate new tra | Rplc. 3 poles to accomodate new traffic signals Main, Broad, Maple, Rt 2_x000D_ JE-YWO Variance Job Type Exclusion | Wholesale Expenses-W00 3H031811 | COMP (*)(50): Low Voltage Issue 1C2 | Low Voltage Issue 1C20 - Hunter Drive, West Hartford, 4.8 kV Stepdown Area_x000D_ | Wholesale Expenses-W00 3H032171 | NJB 115/117 BEDFORD ST RMV EXIST SV | NJB115/117 BEDFORD ST HTFD RMV EXIST SVC&INSTL 000' 4/0-3CT FROM MH#5617 TO G | Wholesale Expenses-W00 3H032301 | Waterville Rd Avon - Install new 12 | Install new 1200KVAR unit on pole 280 located Waterville Rd Avon_x000D_ | Wholesale Expenses-W00 3H032318 | NJB 280 SAYBROOKE ST HTFD RMV EXIST | Wholesale Expenses-W00 3H032645 | WAITING MUNI 12-16-21 - CR-12 LOSTB | CR-12 LOSTBROOK RD. SIMSBURY, REM OH SVC, INS OH-UG SVC OFF POLE 2480_x000D_ | Wholesale Expenses-W00 3H032682 | (60,0): RF-520 Bush Hill Rd,Manches | RF-520 Bush Hill Rd,Manchester,Elec Svc New Residential DESG (DN)_x000D_ | Wholesale Expenses-W00 3H032770 | Work here FCOMp: JTR, 141 Preston S | JTR, 141 Preston St, HTFD, Replace Priority Reject P-230,Repl 1 sec of OWS w/TPX_x000D_ | Wholesale Expenses-W00 3H032920 | JTR, Seabury Dr, Bloomfield, Replac | JTR, Seabury Dr, Bloomfield, Replace DB Cable (ID: 2218)_x000D_ | Wholesale Expenses-W00 3H033013 | HTFD, NAUGATUCK ST - REPL 35/2 & MI | replace 35-2 pole and missing muni street light_x000D_ | Wholesale Expenses-W00 3H033436 | FCOMP ALDEN ONE PENDING FARMINGTON, | 11/11- RSO - P4250 NEEDS TO BE STRAIGHTENED. NO OUTAGE. | Wholesale Expenses-W00 3H033620 | (30): WEST HARTFORD, WOODLAWN ST - | Wholesale Expenses-W00 3H420289 | JWL. RUN NEW OH SVC . RUN MID SPAN | JWL. RUN NEW OH SVC . RUN MID SPAN TO AVOID 2ND FLOOR. TOO CLOSE!!! AP1 -WO TOTAL COST LESS THAN 7K | Wholesale Expenses-W00 3H421552 | MANCHESTER, HARTFORD RD - Dressing | MANCHESTER, HARTFORD RD - Dressing Mill 8H - Relay & Sensor_x000D_ NL-YWO Variance - NU Construction Labor | Wholesale Expenses-W00 3H422062 | Prospect St EH / 10.2.14 / P527 / 9 | Prospect St EH / 10.2.14 / P527 / 9A_x000D_ AP2-YWO Total Cost Variance Met - Variance :-28.0599 MIN.:-40 MAX.:40 | Wholesale Expenses-W00 3H520140 | 12/16 ESO FOREST ST MANCHESTER CAR | 12/16 ESO FOREST ST MANCHESTER CAR VS POLE #2262 / NOT DONE_x000D_
  3. Part 51 of 77

    CI-YWO Variance - Contractor Invoice | Wholesale Expenses-W00 3H521526 | RF-758 Rainbow Rd,Windsor,Remove Pr | RF-758 Rainbow Rd,Windsor,Remove Primary SVC and Pad 3215_x000D_ AP3-YWO Resource Variance Met- Labor 114 <= 32 OR -70.38 <= 30 And Contractor $0 <= 2000 | Wholesale Expenses-W00 3H522527 | TPA/Rplc P1561 & provide DE guy.Con | TPA/Rplc P1561 & provide DE guy.Conv#281746 billable 5' for com top mount Ant_x000D_ AP1-YWO Total Cost Less Than 7K | Wholesale Expenses-W00 3H522597 | NJB AWC 12/04 HTFD BUCKINGHAM ST HT | NJB AWC 12/04 HTFD BUCKINGHAM ST HTFD. REPLCAE P#2374 35/2 (Stlght UG Feed)_x000D_ | Wholesale Expenses-W00 3H620015 | WF-41 Zion St-Htfd-@ mh# 4908, rpl | WF-41 Zion St-Htfd-@ mh# 4908, rpl ug svc._x000D_ | Wholesale Expenses-W00 3H620101 | 394 Tolland Tpk.Manch. Disconn.3PH | 394 Tolland Tpk.Manch. Disconn.3PH service from P-3954_x000D_ AP1-YWO Total Cost Less Than 7K | Wholesale Expenses-W00 3H620115 | HARTFORD, FRANKLIN AVE @ STANDISH S | HARTFORD, FRANKLIN AVE @ STANDISH ST REBUILD HEX VLT 606_x000D_ AP3-YWO Resource Variance Met- Labor 62 <= 32 OR -95.41 <= 30 And Contractor $0 <= 2000 | Wholesale Expenses-W00 3H620395 | Hartford, Broad St - car vs pole 5 | Hartford, Broad St - car vs pole 5138- need to replace 150 cobra head_x000D_ AP1-YWO Total Cost Less Than 7K | Wholesale Expenses-W00 3H620866 | HARTFORD, SCARBOROUGH ST city to re | HARTFORD, SCARBOROUGH ST city to replace pole C9051_x000D_ AP1-YWO Total Cost Less Than 7K | Wholesale Expenses-W00 3H620959 | Elliot St Htfd C9103 City Pole 9a | Elliot St Htfd C9103 City Pole 9a Replace 250W head_x000D_ AP1-YWO Total Cost Less Than 7K | Wholesale Expenses-W00 3H621240 | DKH - Tower Ave, Htfd - P# 8053 - P | DKH - Tower Ave, Htfd - P# 8053 - Problem with 2N10-53z recloser_x000D_ AP1-YWO Total Cost Less Than 7K | Wholesale Expenses-W00 3H621384 | HOMESTEAD AVE, HARTFORD Replace CH8 | HOMESTEAD AVE, HARTFORD Replace CH8470 and 250w head_x000D_ AP1-YWO Total Cost Less Than 7K | Wholesale Expenses-W00 3H621467 | MAIN ST, HARTFORD - REPLACE VACUUM | MAIN ST, HARTFORD - REPLACE VACUUM SWITCH MH 731_x000D_ AP3-YWO Resource Variance Met- Labor 126 <= 32 OR -72.58 <= 30 And Contractor $1577.83 <= 2000 | Wholesale Expenses-W00 3H621509 | Bidwell St, Manchester - Need to re | Bidwell St, Manchester - Need to replace bad arrester 02 - P-9099 8/11 - HAROH -_x000D_ AP1-YWO Total Cost Less Than 7K | Wholesale Expenses-W00 3H621565 | WF-51+53+55- Maple Ave-Windsor-@ po | WF-51+53+55- Maple Ave-Windsor-@ pole-864, rpl oh svc to building._x000D_ | Wholesale Expenses-W00 3H621641 | Hartford, Asylum Ave 300B-2 repl 4 | Hartford, Asylum Ave 300B-2 repl 4ways in Hex5856 all 3 phases_x000D_ AP1-YWO Total Cost Less Than 7K | Wholesale Expenses-W00 3H621725 | RF-1150 Elm St Ext.,RHl,Install 3PH | RF-1150 Elm St Ext.,RHl,Install 3PH XFMR Bank on pole4966 & install OH/UG SVC_x000D_ AP1-YWO Total Cost Less Than 7K | Wholesale Expenses-W00 3H621940 | 85 WOODLAND- HTFD C6266 Replace 250 | 85 WOODLAND- HTFD C6266 Replace 250w head_x000D_ AP1-YWO Total Cost Less Than 7K | Wholesale Expenses-W00 3H622038 | 9/19 - ESO - MANCHESTER, LOVE LN, 9 | 9/19 - ESO - MANCHESTER, LOVE LN, 9A CAR V POLE 2828 - Replace with 40/2_x000D_ AP1-YWO Total Cost Less Than 7K | Wholesale Expenses-W00 3H622080 | HTFD 3080 MAIN STREET City to repla | HTFD 3080 MAIN STREET City to replace pole CH8668_x000D_ AP1-YWO Total Cost Less Than 7K | Wholesale Expenses-W00 3H622085 | HTFD, Wyllys St, CH9366 replaced 1 | HTFD, Wyllys St, CH9366 replaced 143w led head_x000D_ AP1-YWO Total Cost Less Than 7K | Wholesale Expenses-W00 3H622137 | 99 HENDERSON RD, MANCH - PT Conv# 4 | 99 HENDERSON RD, MANCH - PT Conv# 448570-TPA-Fibertech-ParentConv# 447025_x000D_ | Wholesale Expenses-W00 3H622162 | HARTFORD, LYME/ BURNHAM STREET 6373 | HARTFORD, LYME/ BURNHAM STREET 6373_x000D_ AP1-YWO Total Cost Less Than 7K | Wholesale Expenses-W00
  4. Part 52 of 77

    3H622496 | WF-40-44 Lawrence St-Htfd-@pole-300 | WF-40-44 Lawrence St-Htfd-@pole-3002, rpl oh svc to building._x000D_ | Wholesale Expenses-W00 3H622553 | 12/7 - RSO - HARTFORD, SEQUIN ST - | 12/7 - RSO - HARTFORD, SEQUIN ST - 18' DB POLE 10816 BROKEN, MADE SAFE_x000D_ AP1-YWO Total Cost Less Than 7K | Wholesale Expenses-W00 3H622565 | NEW BRITAIN AV, W HTFD - Conv#45560 | NEW BRITAIN AV, W HTFD - Conv#455605 - TPA DUE BY 3/19_x000D_ AP2-YWO Total Cost Variance Met - Variance :17.9129 MIN.:-50 MAX.:50 | Wholesale Expenses-W00 3H622617 | WF-424-426 New Britain Ave-Htfd-@ m | WF-424-426 New Britain Ave-Htfd-@ mh-2828, rpl ug svc to building._x000D_ AP2-YWO Total Cost Variance Met - Variance :36.9082 MIN.:-50 MAX.:150 | Wholesale Expenses-W00 3H622751 | WETHERSFIELD, WELLS RD, RPL POLE#1 | WETHERSFIELD, WELLS RD, RPL POLE#1496 40/2_x000D_ AP1-YWO Total Cost Less Than 7K | Wholesale Expenses-W00 3H720005 | 12/31 - HAROH - MANCHESTER, CENTE | 12/31 - HAROH - MANCHESTER, CENTER ST, EVERSOURCE P-1500 set 35/2_x000D_ AP1-YWO Total Cost Less Than 7K | Wholesale Expenses-W00 3H720215 | WEST HARTFORD S MAIN - 9A - EVERSOU | WEST HARTFORD S MAIN - 9A - EVERSOURCE P-3059_x000D_ AP1-YWO Total Cost Less Than 7K | Wholesale Expenses-W00 3H720291 | HARTFORD, HOMESTEAD AVE C8448 city | HARTFORD, HOMESTEAD AVE C8448 city pole replace 250w head_x000D_ AP1-YWO Total Cost Less Than 7K | Wholesale Expenses-W00 3H720325 | HARTFORD,ANN ST REPLACE A MAINS BET | HARTFORD,ANN ST REPLACE A MAINS BETWEEN SB1607 & SB1831_x000D_ AP2-YWO Total Cost Variance Met - Variance :-27.189 MIN.:-30 MAX.:30 | Wholesale Expenses-W00 3H720396 | WF 2/10 - HAROH - BLOOMFIELD, TIMOT | WF 2/10 - HAROH - BLOOMFIELD, TIMOTHY LANE ST LT POLE 6049 - COMP 2/21/17 CCC_x000D_ AP1-YWO Total Cost Less Than 7K | Wholesale Expenses-W00 3H720397 | HARTFORD, JEFFERSON ST - ST LT POLE | HARTFORD, JEFFERSON ST - ST LT POLE 2444 TROUBLE CALL_x000D_ AP1-YWO Total Cost Less Than 7K | Wholesale Expenses-W00 3H720409 | Htfd, Gillet St Replace A mains 2 | Htfd, Gillet St Replace A mains 2 sections_x000D_ AP2-YWO Total Cost Variance Met - Variance :-33.7248 MIN.:-50 MAX.:50 | Wholesale Expenses-W00 3H720573 | RSO 2/27 WINDSOR, HANSOM HILL RD - | RSO 2/27 WINDSOR, HANSOM HILL RD - DB FAULT REPLACED HANDHOLE 1232C_x000D_ AP1-YWO Total Cost Less Than 7K | Wholesale Expenses-W00 3H720590 | RSO& AWC, 3/4, HARTFORD, VINE STREE | RSO& AWC, 3/4, HARTFORD, VINE STREET, 9A REPLACED 4/0 TPX 3743 TO 3742_x000D_ AP1-YWO Total Cost Less Than 7K | Wholesale Expenses-W00 3H720698 | WETHERSFIELD, BERLIN TPKE, 9A REPLA | WETHERSFIELD, BERLIN TPKE, 9A REPLACE P1738 45/2_x000D_ AP2-YWO Total Cost Variance Met - Variance :-47.6215 MIN.:-50 MAX.:50 | Wholesale Expenses-W00 3H720736 | RSO 3/23 -- WEST HARTFORD, 134 OAKW | RSO 3/23 -- WEST HARTFORD, 134 OAKWOOD AVE- POLE # 1082 - 9A_x000D_ AP2-YWO Total Cost Variance Met - Variance :-11.2451 MIN.:-50 MAX.:50 | Wholesale Expenses-W00 3H720840 | 603 Broad St-Htfd metered St light | 603 Broad St-Htfd metered St light service_x000D_ AP1-YWO Total Cost Less Than 7K | Wholesale Expenses-W00 3H720896 | NJB WEST ST R.H. RPL CUTOUT & RISER | NJB WEST ST R.H. RPL CUTOUT & RISER ON P#1481 CUST OUTAGE ON 6/2/17? @ 5PM_x000D_ AP2-YWO Total Cost Variance Met - Variance :4.7256 MIN.:-50 MAX.:50 | Wholesale Expenses-W00 3H720933 | AWC/RSO, 4/14, MANCHESTER, E MIDDLE | AWC/RSO, 4/14, MANCHESTER, E MIDDLE TPKE No double pole_x000D_ AP1-YWO Total Cost Less Than 7K | Wholesale Expenses-W00 3H720935 | RF-970 Marshall Phelps Rd,Windsor, | RF-970 Marshall Phelps Rd,Windsor, Install new OH/UG Sec SVC_x000D_ AP2-YWO Total Cost Variance Met - Variance :-5.3741 MIN.:-50 MAX.:50 | Wholesale Expenses-W00 3H720981 | WF-1221-1223-Broad St-Htfd-@ sb-336 | WF-1221-1223-Broad St-Htfd-@ sb-3368, rpl ug svc._x000D_ AP2-YWO Total Cost Variance Met - Variance :33.2649 MIN.:-50 MAX.:50 | Wholesale Expenses-W00
  5. Part 53 of 77

    3H721029 | EJL - 270 Wetherell St.Manch.Reloca | EJL - 270 Wetherell St.Manch.Relocate 25KVA/Pri./Remove tree guy/P-5188_x000D_ AP2-YWO Total Cost Variance Met - Variance :113.508 MIN.:-50 MAX.:150 | Wholesale Expenses-W00 3H721131 | 8/22 - HAROH - WINDSOR POQUONOCK AV | 8/22 - HAROH - WINDSOR POQUONOCK AVE - REPLACED 2 OH/DB SERVICES P-5248_x000D_ AP2-YWO Total Cost Variance Met - Variance :3.3243 MIN.:-50 MAX.:50 | Wholesale Expenses-W00 3H721195 | BLOOMFIELD BLUE HILLS AVE POLE 18 - | BLOOMFIELD BLUE HILLS AVE POLE 18 - 9A_x000D_ AP2-YWO Total Cost Variance Met - Variance :139.4207 MIN.:-50 MAX.:150 | Wholesale Expenses-W00 3H721259 | Mountain St Htffd POLE 3435 Install | Mountain St Htffd POLE 3435 Installed 90' duplex_x000D_ AP1-YWO Total Cost Less Than 7K | Wholesale Expenses-W00 3H721262 | HARTFORD, NEW BRITAIN AVE REPLACED | HARTFORD, NEW BRITAIN AVE REPLACED 250W HPS P-5038 - COMP 6/8/17 CCC_x000D_ AP1-YWO Total Cost Less Than 7K | Wholesale Expenses-W00 3H721263 | HARTFORD, NEW BRITAIN AVE REPLACE 2 | HARTFORD, NEW BRITAIN AVE REPLACE 250W HPS P-4962 - COMP 6-8-17 CCC_x000D_ AP1-YWO Total Cost Less Than 7K | Wholesale Expenses-W00 3H721333 | 5/24 RSO WIndsor Ravine Rd P 3195 | 5/24 RSO WIndsor Ravine Rd P 3195 Replace pole/crossarm_x000D_ AP2-YWO Total Cost Variance Met - Variance :22.2081 MIN.:-50 MAX.:50 | Wholesale Expenses-W00 3H721365 | NJB 60P HICKSVILLE RD CROM INSTL 60 | NJB 60P HICKSVILLE RD CROM INSTL 60' #2 TPX FROM POLE#2024 TO CUST POLE SVC_x000D_ AP1-YWO Total Cost Less Than 7K | Wholesale Expenses-W00 3H721395 | Capitol Ave Htfd Traffic control UG | Capitol Ave Htfd Traffic control UG #8 Electric Service Un-Metered_x000D_ AP1-YWO Total Cost Less Than 7K | Wholesale Expenses-W00 3H721456 | RSO, 6/10, WINDSOR, BROOKVIEW RD, 9 | RSO, 6/10, WINDSOR, BROOKVIEW RD, 9A, POLE 4230 REPLACE LED LIGHT_x000D_ AP1-YWO Total Cost Less Than 7K | Wholesale Expenses-W00 3H721681 | South Main St.Manchester Pole 3881 | South Main St.Manchester Pole 3881 hit/ Replace with 40/2_x000D_ AP1-YWO Total Cost Less Than 7K | Wholesale Expenses-W00 3H721721 | Htfd TRINITY ST - C6843 replace 250 | Htfd TRINITY ST - C6843 replace 250w head to new pole_x000D_ AP1-YWO Total Cost Less Than 7K | Wholesale Expenses-W00 3H721728 | RSO/AWC, 7/3, WEST HARTFORD, CONCOR | RSO/AWC, 7/3, WEST HARTFORD, CONCORD STREET REPLACED 150' SEC WITH 4/0_x000D_ AP1-YWO Total Cost Less Than 7K | Wholesale Expenses-W00 3H721751 | 7/5 - AWC - WETHERSFIELD, OLD PEPPE | 7/5 - AWC - WETHERSFIELD, OLD PEPPERIDGE LA - REPLACED CUTOUT/TERM/RISER_x000D_ AP1-YWO Total Cost Less Than 7K | Wholesale Expenses-W00 3H721758 | WF-109 Pond Rd-Windsor-@ pole-1853, | WF-109 Pond Rd-Windsor-@ pole-1853,inst new oh/db svc to hse_x000D_ AP1-YWO Total Cost Less Than 7K | Wholesale Expenses-W00 3H721767 | 7/8 RSO, WINDSOR COLONIAL DR - 9A T | 7/8 RSO, WINDSOR COLONIAL DR - 9A TRUCK TOOK DOWN WIRES - RAN 125' SERVICE_x000D_ AP1-YWO Total Cost Less Than 7K | Wholesale Expenses-W00 3H721776 | 7/9 - HARAWC - WINDSOR, PARK RD - E | 7/9 - HARAWC - WINDSOR, PARK RD - EVERSOURCE POLE 156_x000D_ AP2-YWO Total Cost Variance Met - Variance :69.5323 MIN.:-50 MAX.:150 | Wholesale Expenses-W00 3H721840 | RSO, 7/13, E HARTFORD, ROBERTS ST, | RSO, 7/13, E HARTFORD, ROBERTS ST, RPLC 8' ARM pole 4138/shift 1/0 ACSR_x000D_ AP1-YWO Total Cost Less Than 7K | Wholesale Expenses-W00 3H721859 | 42 Grassmere Ave., W. Htfd - Instal | 42 Grassmere Ave., W. Htfd - Install new OH/DB svc (single-phase, 120/208)_x000D_ AP1-YWO Total Cost Less Than 7K | Wholesale Expenses-W00 3H721865 | RSO,7/16, WEST HARTFORD, KANE STREE | RSO,7/16, WEST HARTFORD, KANE STREET - INS 3 ELBOW ARR P-3173/REBUILT RISER_x000D_ AP2-YWO Total Cost Variance Met - Variance :-6.6382 MIN.:-50 MAX.:50 | Wholesale Expenses-W00 3H721884 | EAST HARTFORD, MULCAHY DRIVE - XFMR | EAST HARTFORD, MULCAHY DRIVE - XFMR RMVED/TIED SEC CRIB_x000D_ AP1-YWO Total Cost Less Than 7K | Wholesale Expenses-W00
  6. Part 54 of 77

    3H721933 | Replace OH svc / new attachment poi | Replace OH svc / new attachment point_x000D_ AP1-YWO Total Cost Less Than 7K | Wholesale Expenses-W00 3H721937 | AWC 7/24 MANCHESTER HARTFORD RD 9A | AWC 7/24 MANCHESTER HARTFORD RD 9A - REPLACED QUAD SERVICE FROM P-4700_x000D_ AP1-YWO Total Cost Less Than 7K | Wholesale Expenses-W00 3H721946 | JWL... 119-121 BLUE HILLS AVE. run | JWL... 119-121 BLUE HILLS AVE. run new svc from P5709_x000D_ AP1-YWO Total Cost Less Than 7K | Wholesale Expenses-W00 3H721986 | HARTFORD, ANN ST-C6661 - INSTALL 25 | HARTFORD, ANN ST-C6661 - INSTALL 250W HPS AND RECONNECT UG FEED_x000D_ AP1-YWO Total Cost Less Than 7K | Wholesale Expenses-W00 3H721987 | HARTFORD, WALNUT ST - P-CH9493 - IN | HARTFORD, WALNUT ST - P-CH9493 - INSTALL 250W HPS COBRA AND RECONNECT UG FEED_x000D_ AP1-YWO Total Cost Less Than 7K | Wholesale Expenses-W00 3H721988 | HARTFORD, SIGOURNEY ST- C7394 - INS | HARTFORD, SIGOURNEY ST- C7394 - INSTALL 400W HPS COBRA CONNECT UG FEED_x000D_ AP1-YWO Total Cost Less Than 7K | Wholesale Expenses-W00 3H721993 | 7/26 - BLOOMFIELD, CHATEAU MARGAUX | 7/26 - BLOOMFIELD, CHATEAU MARGAUX - REPLACED PAD 1719_x000D_ AP2-YWO Total Cost Variance Met - Variance :51.2571 MIN.:-50 MAX.:150 | Wholesale Expenses-W00 3H722019 | RSO, 8/3, MANCHESTER, DARTMOUTH, P5 | RSO, 8/3, MANCHESTER, DARTMOUTH, P5501 REPLACED XFMR_x000D_ AP1-YWO Total Cost Less Than 7K | Wholesale Expenses-W00 3H722032 | 8/4 - RSO - ROCKY HILL, WEST ST - R | 8/4 - RSO - ROCKY HILL, WEST ST - RPL 3-50KVA 120/208 BANK POLE 1406_x000D_ AP2-YWO Total Cost Variance Met - Variance :-42.569 MIN.:-50 MAX.:50 | Wholesale Expenses-W00 3H722035 | RSO, 8/5, WINDSOR, KENDRICK LANE - | RSO, 8/5, WINDSOR, KENDRICK LANE - REPLACED HH 1596B_x000D_ AP1-YWO Total Cost Less Than 7K | Wholesale Expenses-W00 3H722049 | DKH - Kennedy Rd, Wsr - Replace rec | DKH - Kennedy Rd, Wsr - Replace recloser upper unit P2982._x000D_ AP2-YWO Total Cost Variance Met - Variance :.4686 MIN.:-40 MAX.:40 | Wholesale Expenses-W00 3H722079 | RSO/AWC, 8/9, AVON, LOVELY STREET, | RSO/AWC, 8/9, AVON, LOVELY STREET, P421 9A_x000D_ AP2-YWO Total Cost Variance Met - Variance :-4.5576 MIN.:-50 MAX.:50 | Wholesale Expenses-W00 3H722126 | 8/15 - HAROH - AVON, FAR HILLS DR - | 8/15 - HAROH - AVON, FAR HILLS DR - SECONDARY FAULT UNDER DRIVEWAY_x000D_ AP2-YWO Total Cost Variance Met - Variance :70.5939 MIN.:-50 MAX.:150 | Wholesale Expenses-W00 3H722149 | 453 Wash St Htfd replace 250w Head | 453 Wash St Htfd replace 250w Head CH8192_x000D_ AP1-YWO Total Cost Less Than 7K | Wholesale Expenses-W00 3H722155 | JWL @ 877-879 CAPITOL AVE replace | JWL @ 877-879 CAPITOL AVE replace svc from sb3177._x000D_ AP1-YWO Total Cost Less Than 7K | Wholesale Expenses-W00 3H722156 | 8/18 - RSO/HAROH - EAST HARTFORD, | 8/18 - RSO/HAROH - EAST HARTFORD, SEDGEWICK RD, P2646, 9A_x000D_ AP2-YWO Total Cost Variance Met - Variance :73.2456 MIN.:-50 MAX.:150 | Wholesale Expenses-W00 3H722164 | 8/17 RSO-AWC, WHARTFORD, SEQUIN RD | 8/17 RSO-AWC, WHARTFORD, SEQUIN RD 9A - REPLACED POLE_x000D_ AP1-YWO Total Cost Less Than 7K | Wholesale Expenses-W00 3H722171 | XL-CDOT 63-633, electrical work to | XL-CDOT 63-633, electrical work to relocate service along Woodland St, Hartford_x000D_ JE-YWO Variance Job Type Exclusion | Wholesale Expenses-W00 3H722173 | XL-CDOT 63-633, electrical work to | XL-CDOT 63-633, electrical work to relocate service along Kent St, Hartford_x000D_ JE-YWO Variance Job Type Exclusion | Wholesale Expenses-W00 3H722174 | 8/19 RSO HARTFORD, SWHITNEY ST P#68 | 8/19 RSO HARTFORD, SWHITNEY ST P#6850 REPLACED 90' SVC WIRE_x000D_ AP1-YWO Total Cost Less Than 7K | Wholesale Expenses-W00 3H722415 | 175 N. Main St., W. Htfd - REPL OH | 175 N. Main St., W. Htfd - REPL OH svc / New attachment point-WORK BY HTFD OH_x000D_ AP1-YWO Total Cost Less Than 7K | Wholesale Expenses-W00 3H722493 | COMP 1/27/18 CCC - WETHERSFIELD, RE | COMP 1/27/18 CCC - WETHERSFIELD, REPLACE ST LT POLE 3230 18' BROWN 70W PTT_x000D_
  7. Part 55 of 77

    AP1-YWO Total Cost Less Than 7K | Wholesale Expenses-W00 3H722608 | 13 Pinecrest Dr.E.Hartf. Replace op | 13 Pinecrest Dr.E.Hartf. Replace open wire service P- 3341_x000D_ AP1-YWO Total Cost Less Than 7K | Wholesale Expenses-W00 3H723020 | 4-118 - Relocate facilities for int | 4-118 - Relocate facilities for intersection relocation RT 10 - 50% Re-Im_x000D_ JE-YWO Variance Job Type Exclusion | Wholesale Expenses-W00 3H723179 | 12/2 - RSO - HARTFORD, ELLIOT ST - | 12/2 - RSO - HARTFORD, ELLIOT ST - NEED TO REPLACE 150W C9116_x000D_ AP1-YWO Total Cost Less Than 7K | Wholesale Expenses-W00 3H723287 | HARTFORD, MAIN ST CH7097 replace 25 | HARTFORD, MAIN ST CH7097 replace 250 w head when pole is replaced_x000D_ AP1-YWO Total Cost Less Than 7K | Wholesale Expenses-W00 3H820160 | WINDSOR RAINBOW RD P#256 FUSE BLEW | WINDSOR RAINBOW RD P#256 FUSE BLEW ON RISER POLE# 256_x000D_ AP3-YWO Resource Variance Met- Labor 3 <= 32 OR -3.18 <= 30 And Contractor $1551.87 <= 2000 | Wholesale Expenses-W00 3H820327 | AWC UG 2/9 HARTFORD, PARK ST SB 938 | AWC UG 2/9 HARTFORD, PARK ST SB 938 BURNING SEC INST NE 4/0 3PHSE SRV TO 701_x000D_ NL-YWO Variance - NU Construction Labor | Wholesale Expenses-W00 3H820563 | 3150 Main St Htfd C8671 Replace 250 | 3150 Main St Htfd C8671 Replace 250w head to new city pole_x000D_ AP1-YWO Total Cost Less Than 7K | Wholesale Expenses-W00 3H820695 | 4-118 - Relocate facilities to the | 4-118 - Relocate facilities to the NEW Town Farms Rd 50% Re-Im_x000D_ JE-YWO Variance Job Type Exclusion | Wholesale Expenses-W00 3H822312 | RF-3 N Fairfield St,Manchester,Relo | RF-3 N Fairfield St,Manchester,Relocate OH SVC_x000D_ | Wholesale Expenses-W00 3H920073 | HARTFORD, 877 TOWER AVE @ P5382 ru | HARTFORD, 877 TOWER AVE @ P5382 run new 90ft OH svc, CHANGE METER_x000D_ AP1-YWO Total Cost Less Than 7K | Wholesale Expenses-W00 3H922458 | (50,0): Columbus Cir,East Hartford, | Columbus Cir,East Hartford,Elec Svc Line Extension/Development DESG (DN)_x000D_ | Wholesale Expenses-W00 3H922469 | RF-597 Burnside Ave, East Hartford, | RF-597 Burnside Ave, East Hartford, Replace SVC with #2 TPX_x000D_ AP1-YWO Total Cost Less Than 7K | Wholesale Expenses-W00 3H923040 | RF-21 Bancroft Rd,East Hartford,Rep | RF-21 Bancroft Rd,East Hartford,Replace Damaged OH SVC_x000D_ AP1-YWO Total Cost Less Than 7K | Wholesale Expenses-W00 3H923346 | 10/25---HTFD-34 Shultas Pl-----new | 10/25---HTFD-34 Shultas Pl-----new OH 200A service_x000D_ AP1-YWO Total Cost Less Than 7K | Wholesale Expenses-W00 3H923407 | 10/25---BLOOM-11 Mayfair Ct----LINE | 10/25---BLOOM-11 Mayfair Ct----LINEWORK REQUIRE TRIPLEX NEEDS TO BE CHANGE_x000D_ AP1-YWO Total Cost Less Than 7K | Wholesale Expenses-W00 3H923415 | CR- 60-62 ENFIELD ST HARTFORD, REPL | CR- 60-62 ENFIELD ST HARTFORD, REPLACE OH SVC OFF POLE 4956_x000D_ AP1-YWO Total Cost Less Than 7K | Wholesale Expenses-W00 3H923418 | 11/5---W HTFD-94 Flagg Rd-----OH 20 | 11/5---W HTFD-94 Flagg Rd-----OH 200A service upgrade-power off at pole_x000D_ AP1-YWO Total Cost Less Than 7K | Wholesale Expenses-W00 3H923519 | CR-5 BUCKBOARD LN AVON, REPLACE OH | CR-5 BUCKBOARD LN AVON, REPLACE OH SVC OFF POLE 3518_x000D_ AP1-YWO Total Cost Less Than 7K | Wholesale Expenses-W00 3H923696 | RF-185 Main St,Manchester,Pole#5223 | RF-185 Main St,Manchester,Pole#5223, Replace SVC_x000D_ AP1-YWO Total Cost Less Than 7K | Wholesale Expenses-W00 3L030008 | DARIEN LED POST TOP REPLACEMENTS 30 | DARIEN LED POST TOP REPLACEMENTS 3000K_x000D_ | Wholesale Expenses-W00 3L030009 | STAMFORD LED POST TOP REPLACEMENTS | STAMFORD LED POST TOP REPLACEMENTS 3000K_x000D_ | Wholesale Expenses-W00 3L030030 | PUTNAM LED POST TOP REPLACEMENTS 30 | PUTNAM LED POST TOP REPLACEMENTS 3000K_x000D_ | Wholesale Expenses-W00 3L030035 | THOMPSON LED POST TOP REPLACEMENTS | THOMPSON LED POST TOP REPLACEMENTS 3000K_x000D_ | Wholesale Expenses-W00 3L030053 | PRESTON LED POST TOP REPLACEMENTS 3 | PRESTON LED POST TOP REPLACEMENTS 3000K_x000D_ | Wholesale Expenses-W00
  8. Part 56 of 77

    3L030055 | NEW CANAAN LED POST TOP REPLACEMENT | NEW CANAAN LED POST TOP REPLACEMENTS 3000K_x000D_ | Wholesale Expenses-W00 3L030056 | NORWALK LED POST TOP REPLACEMENTS 3 | NORWALK LED POST TOP REPLACEMENTS 3000K_x000D_ | Wholesale Expenses-W00 3L030057 | WESTPORT LED POST TOP REPLACEMENTS | WESTPORT LED POST TOP REPLACEMENTS 3000K_x000D_ | Wholesale Expenses-W00 3L030058 | WINCHESTER LED POST TOP REPLACEMENT | WINCHESTER LED POST TOP REPLACEMENTS 3000K_x000D_ | Wholesale Expenses-W00 3L030066 | EAST GRANBY LED POST TOP REPLACEMEN | EAST GRANBY LED POST TOP REPLACEMENTS 3000K_x000D_ | Wholesale Expenses-W00 3L030067 | GRANBY LED POST TOP REPLACEMENTS 30 | GRANBY LED POST TOP REPLACEMENTS 3000K_x000D_ | Wholesale Expenses-W00 3L030069 | SUFFIELD LED POST TOP REPLACEMENT 3 | SUFFIELD LED POST TOP REPLACEMENT 3000K_x000D_ | Wholesale Expenses-W00 3L030072 | WINDSOR LOCKS LED POST TOP REPLACEM | WINDSOR LOCKS LED POST TOP REPLACEMENTS 3000K_x000D_ | Wholesale Expenses-W00 3L030087 | EAST LYME LED POST TOP REPLACEMENTS | EAST LYME LED POST TOP REPLACEMENTS 3000K_x000D_ | Wholesale Expenses-W00 3L030089 | MONTVILLE LED POST TOP REPLACEMENTS | MONTVILLE LED POST TOP REPLACEMENTS 3000K_x000D_ | Wholesale Expenses-W00 3L030092 | RIDGEFIELD LED POST TOP REPLACEMENT | RIDGEFIELD LED POST TOP REPLACEMENTS 3000K_x000D_ | Wholesale Expenses-W00 3L030104 | SOMERS LED POST TOP REPLACEMENTS 30 | SOMERS LED POST TOP REPLACEMENTS 3000K_x000D_ | Wholesale Expenses-W00 3L030105 | STAFFORD LED POST TOP REPLACEMENTS | STAFFORD LED POST TOP REPLACEMENTS 3000K_x000D_ | Wholesale Expenses-W00 3L030107 | LISBON LED POST TOP REPLACEMENTS 30 | LISBON LED POST TOP REPLACEMENTS 3000K_x000D_ | Wholesale Expenses-W00 3L030108 | PLAINFIELD LED POST TOP REPLACEMENT | PLAINFIELD LED POST TOP REPLACEMENTS 3000K_x000D_ | Wholesale Expenses-W00 3L030109 | OLD LYME LED POST TOPS REPLACEMENTS | OLD LYME LED POST TOPS REPLACEMENTS 3000K_x000D_ | Wholesale Expenses-W00 3L030118 | NEWTOWN LED POST TOP REPLACEMENTS 3 | NEWTOWN LED POST TOP REPLACEMENTS 3000K_x000D_ | Wholesale Expenses-W00 3L030123 | SEYMOUR LED POST TOP REPLACEMENTS 3 | SEYMOUR LED POST TOP REPLACEMENTS 3000K_x000D_ | Wholesale Expenses-W00 3L030127 | WOODBURY LED POST TOP REPLACEMENTS | WOODBURY LED POST TOP REPLACEMENTS 3000K_x000D_ | Wholesale Expenses-W00 3L030128 | BURLINGTON LED POST TOP REPLACEMENT | BURLINGTON LED POST TOP REPLACEMENTS 3000K_x000D_ | Wholesale Expenses-W00 3L030129 | CANTON LED POST TOP REPLACEMENTS 30 | CANTON LED POST TOP REPLACEMENTS 3000K_x000D_ | Wholesale Expenses-W00 3L030130 | HARWINTON LED POST TOP REPLACEMENTS | HARWINTON LED POST TOP REPLACEMENTS 3000K_x000D_ | Wholesale Expenses-W00 3L030131 | NEW HARTFORD LED POST TOP REPLACEME | NEW HARTFORD LED POST TOP REPLACEMENTS 3000K_x000D_ | Wholesale Expenses-W00 3L030132 | PLYMOUTH LED POST TOP REPLACEMENTS | PLYMOUTH LED POST TOP REPLACEMENTS 3000K_x000D_ | Wholesale Expenses-W00 3L030133 | MORRIS LED POST TOP REPLACEMENTS 30 | MORRIS LED POST TOP REPLACEMENTS 3000K_x000D_ | Wholesale Expenses-W00 3L030134 | THOMASTON LED POST TOP REPLACEMENTS | THOMASTON LED POST TOP REPLACEMENTS 3000K_x000D_ | Wholesale Expenses-W00 3L030135 | TORRINGTON LED POST TOP REPLACEMENT | TORRINGTON LED POST TOP REPLACEMENTS 3000K 1 OF 2_x000D_ | Wholesale Expenses-W00 3L030136 | TORRINGTON LED POST TOP REPLACEMENT | TORRINGTON LED POST TOP REPLACEMENTS 3000K 2 OF 2_x000D_ | Wholesale Expenses-W00 3L030137 | WATERTOWN LED POST TOP REPLACEMENTS | WATERTOWN LED POST TOP REPLACEMENTS 3000K_x000D_ | Wholesale Expenses-W00 3L030146 | MANSFIELD LED POST TOP REPLACEMENTS | MANSFIELD LED POST TOP REPLACEMENTS 3000K_x000D_ | Wholesale Expenses-W00 3L030147 | TOLLAND LED POST TOP REPLACEMENTS 3 | TOLLAND LED POST TOP REPLACEMENTS 3000K_x000D_ | Wholesale Expenses-W00 3L030150 | WILLINGTON LED POST TOP REPLACEMENT | WILLINGTON LED POST TOP REPLACEMENTS 3000K_x000D_ | Wholesale Expenses-W00
  9. Part 57 of 77

    3L030196 | DARIEN LED FLOOD REPLACEMENTS 3000K | DARIEN LED FLOOD REPLACEMENTS 3000K_x000D_ | Wholesale Expenses-W00 3L030197 | GREENWICH LED FLOOD REPLACEMENTS 30 | GREENWICH LED FLOOD REPLACEMENTS 3000K_x000D_ | Wholesale Expenses-W00 3L030198 | STAMFORD LED FLOOD REPLACEMENTS 300 | STAMFORD LED FLOOD REPLACEMENTS 3000K 1 OF 3_x000D_ | Wholesale Expenses-W00 3L030199 | STAMFORD LED FLOOD REPLACEMENTS 300 | STAMFORD LED FLOOD REPLACEMENTS 3000K 2 OF 3_x000D_ | Wholesale Expenses-W00 3L030200 | STAMFORD LED FLOOD REPLACEMENTS 300 | STAMFORD LED FLOOD REPLACEMENTS 3000K 3 OF 3_x000D_ | Wholesale Expenses-W00 3L030454 | DEEP RIVER POST TOP LED REPLACEMENT | DEEP RIVER POST TOP LED REPLACEMENTS 3000K 1 OF 1_x000D_ | Wholesale Expenses-W00 3L030455 | ESSEX POST TOP LED REPLACEMENTS 300 | ESSEX POST TOP LED REPLACEMENTS 3000K 1 OF 1_x000D_ | Wholesale Expenses-W00 3L030456 | GUILFORD POST TOP LED REPLACEMENTS | GUILFORD POST TOP LED REPLACEMENTS 3000K 1 OF 1_x000D_ | Wholesale Expenses-W00 3L030457 | HADDAM POST TOP LED REPLACEMENTS 30 | HADDAM POST TOP LED REPLACEMENTS 3000K 1 OF 1_x000D_ | Wholesale Expenses-W00 3L030459 | MADISON POST TOP LED REPLACEMENTS 3 | MADISON POST TOP LED REPLACEMENTS 3000K 1 OF 1_x000D_ | Wholesale Expenses-W00 3L030460 | NORTH BRANFORD POST TOP LED REPLACE | NORTH BRANFORD POST TOP LED REPLACEMENTS 3000K 1 OF 1_x000D_ | Wholesale Expenses-W00 3L030464 | WESTBROOK POST TOP LED REPLACEMENTS | WESTBROOK POST TOP LED REPLACEMENTS 3000K 1 OF 1_x000D_ | Wholesale Expenses-W00 3L030467 | BRISTOL POST TOP LED REPLACMENTS 30 | BRISTOL POST TOP LED REPLACMENTS 3000L 1 OF 2_x000D_ | Wholesale Expenses-W00 3L030468 | BRISTOL POST TOP LED REPLACMENTS 30 | BRISTOL POST TOP LED REPLACMENTS 3000L 2 OF 2_x000D_ | Wholesale Expenses-W00 3L030474 | (40): CHESHIRE POST TOP LED REPLACE | CHESHIRE POST TOP LED REPLACEMENTS 3000K 1 OF 1_x000D_ | Wholesale Expenses-W00 3L030476 | DURHAM POST TOP LED REPLACEMENTS 30 | DURHAM POST TOP LED REPLACEMENTS 3000K 1 OF 1_x000D_ | Wholesale Expenses-W00 3L030479 | FARMINGTON POST TOP LED REPLACEMENT | FARMINGTON POST TOP LED REPLACEMENTS 3000K 1 OF 2_x000D_ | Wholesale Expenses-W00 3L030480 | FARMINGTON POST TOP LED REPLACEMENT | FARMINGTON POST TOP LED REPLACEMENTS 3000K 2 OF 2_x000D_ | Wholesale Expenses-W00 3L030481 | KENSINGTON (berlin) POST TOP LED RE | KENSINGTON (berlin) POST TOP LED REPLACEMENTS 3000K 1 OF 1_x000D_ | Wholesale Expenses-W00 3L030577 | COLCHESTER POST TOP LED REPLACEMENT | COLCHESTER POST TOP LED REPLACEMENTS 3000K_x000D_ | Wholesale Expenses-W00 3L030580 | EAST HADDAM POST TOP LED REPLACEMEN | EAST HADDAM POST TOP LED REPLACEMENTS 3000K_x000D_ | Wholesale Expenses-W00 3L030582 | EAST HAMPTON POST TOP LED REPLACEME | EAST HAMPTON POST TOP LED REPLACEMENTS 3000K_x000D_ | Wholesale Expenses-W00 3L030590 | HEBRON POST TOP LED REPLACEMENTS 30 | HEBRON POST TOP LED REPLACEMENTS 3000K_x000D_ | Wholesale Expenses-W00 3L030591 | MANCHESTER POST TOP LED REPLACEMENT | MANCHESTER POST TOP LED REPLACEMENTS 3000K_x000D_ | Wholesale Expenses-W00 3L030592 | MARLBOROUGH POST TOP LED REPLACEMEN | MARLBOROUGH POST TOP LED REPLACEMENTS 3000K_x000D_ | Wholesale Expenses-W00 3L030595 | MIDDLEBURY POST TOP LED REPLACEMENT | MIDDLEBURY POST TOP LED REPLACEMENTS 3000K_x000D_ | Wholesale Expenses-W00 3L030596 | MIDDLEFIELD POST TOP LED REPLACEMEN | MIDDLEFIELD POST TOP LED REPLACEMENTS 3000K_x000D_ | Wholesale Expenses-W00 3L030597 | MIDDLETOWN POST TOP LED REPLACEMENT | MIDDLETOWN POST TOP LED REPLACEMENTS 3000K_x000D_ | Wholesale Expenses-W00 3L030598 | NAUGATUCK POST TOP LED REPLACEMENTS | NAUGATUCK POST TOP LED REPLACEMENTS 3000K_x000D_ | Wholesale Expenses-W00 3L030599 | NEW BRITAIN POST TOP LED REPLACEMEN | NEW BRITAIN POST TOP LED REPLACEMENTS 3000K_x000D_ | Wholesale Expenses-W00 3L030600 | PLAINVILLE POST TOP LED REPLACEMENT | PLAINVILLE POST TOP LED REPLACEMENTS 3000_x000D_ | Wholesale Expenses-W00
  10. Part 58 of 77

    3L030601 | PLANTSVILLE POST TOP LED REPLACEMEN | PLANTSVILLE POST TOP LED REPLACEMENTS 3000K_x000D_ | Wholesale Expenses-W00 3L030602 | PORTLAND POST TOP LED REPLACEMENTS | PORTLAND POST TOP LED REPLACEMENTS 3000K_x000D_ | Wholesale Expenses-W00 3L030607 | SOUTHINGTON POST TOP LED REPLACEMEN | SOUTHINGTON POST TOP LED REPLACEMENTS 3000K_x000D_ | Wholesale Expenses-W00 3L030613 | WATERBURY POST TOP LED REPLACEMENTS | WATERBURY POST TOP LED REPLACEMENTS 3000K_x000D_ | Wholesale Expenses-W00 3L030615 | WETHERSFIELD POST TOP LED REPLACEME | WETHERSFIELD POST TOP LED REPLACEMENTS 3000K_x000D_ | Wholesale Expenses-W00 3L030616 | WINDHAM POST TOP LED REPLACEMENTS 3 | WINDHAM POST TOP LED REPLACEMENTS 3000K_x000D_ | Wholesale Expenses-W00 3L030681 | WOODSTOCK PRIVATE COBRA LED REPLACE | WOODSTOCK PRIVATE COBRA LED REPLACEMENT 3000K_x000D_ | Wholesale Expenses-W00 3L520898 | HPS 100W PTT @ PID 79 - COMPLETED 1 | HPS 100W PTT @ PID 79 - COMPLETED 11/6/15 HARES1_x000D_ AP1-YWO Total Cost Less Than 7K | Wholesale Expenses-W00 3L620313 | Municipal Light Fault Locate and Re | Municipal Light Fault Locate and Repair @ PID 4569 NO FEED ON POLES_x000D_ AP1-YWO Total Cost Less Than 7K | Wholesale Expenses-W00 3L620438 | WESTPORT POLE 29551 100 MH PDL - CO | WESTPORT POLE 29551 100 MH PDL - COMPLETED 3/18/16 NTW_x000D_ | Wholesale Expenses-W00 3L620719 | SOUTH WINDSOR POLE 2977 400 HPS COB | SOUTH WINDSOR POLE 2977 400 HPS COBRA - COMPLETED 3/18/16 TOL_x000D_ | Wholesale Expenses-W00 3L620841 | PROSPECT POLE 1597 70 HPS COBRA (SE | PROSPECT POLE 1597 70 HPS COBRA (SEMI TO FULL) - COMPLETED 3/18/16 WTB_x000D_ | Wholesale Expenses-W00 3L620897 | BETHEL POLE 29 70 HPS COBRA - COMPL | BETHEL POLE 29 70 HPS COBRA - COMPLETED 3/9/16 NTW_x000D_ | Wholesale Expenses-W00 3L620934 | WATERBURY POLE G7635 400 HPS FLOOD | WATERBURY POLE G7635 400 HPS FLOOD - COMPLETED 3/11/16 WTB_x000D_ AP1-YWO Total Cost Less Than 7K | Wholesale Expenses-W00 3L620966 | STAMFORD POLE 17 70 HPS PTT - COMP | STAMFORD POLE 17 70 HPS PTT - COMPLETED 3/18/16 NTW_x000D_ | Wholesale Expenses-W00 3L620985 | WINDSOR POLE 2987 70 HPS COBRA - CO | WINDSOR POLE 2987 70 HPS COBRA - COMPLETED 3/18/16 TOL_x000D_ | Wholesale Expenses-W00 3L620990 | BEACON FALLS POLE 22721 250 HPS COB | BEACON FALLS POLE 22721 250 HPS COBRA - COMPLETED 3/18/16 WTB_x000D_ | Wholesale Expenses-W00 3L620993 | WATERBURY POLE 63621 400 HPS COBRA | WATERBURY POLE 63621 400 HPS COBRA - COMPLETED 3/18/16 WTB_x000D_ | Wholesale Expenses-W00 3L620994 | WATERTOWN POLE 6112 70 HPS COBRA - | WATERTOWN POLE 6112 70 HPS COBRA - COMPLETED 3/18/16 WTB_x000D_ | Wholesale Expenses-W00 3L620995 | WINDSOR POLE 2652 70 HPS COBRA - CO | WINDSOR POLE 2652 70 HPS COBRA - COMPLETED 3/18/16 TOL_x000D_ | Wholesale Expenses-W00 3L620996 | MANCHESTER POLE 7984 250 HPS COBRA | MANCHESTER POLE 7984 250 HPS COBRA - COMPLETED 3/18/16 TOL_x000D_ | Wholesale Expenses-W00 3L620999 | WATERBURY POLE 5141 100 HPS COBRA - | WATERBURY POLE 5141 100 HPS COBRA - COMPLETED 3/18/16 HAR_x000D_ | Wholesale Expenses-W00 3L621000 | MERIDEN POLE 5569 70 HPS COBRA - CO | MERIDEN POLE 5569 70 HPS COBRA - COMPLETED 3/18/16 SIM_x000D_ | Wholesale Expenses-W00 3L621875 | STONINGTON POLE 7264 100 HPS PTT 43 | STONINGTON POLE 7264 100 HPS PTT 430740 & BROWN SQUARE 175189_x000D_ AP1-YWO Total Cost Less Than 7K | Wholesale Expenses-W00 3L622637 | Municipal Light Fault Locate and Re | Municipal Light Fault Locate and Repair @ POLE 1210 NO POWER_x000D_ CL-YWO Variance - Contractor Labor | Wholesale Expenses-W00 3L623404 | Municipal Light Fault Locate and Re | Municipal Light Fault Locate and Repair@ POLE C6404 NO POWER_x000D_ AP1-YWO Total Cost Less Than 7K | Wholesale Expenses-W00 3L721076 | HARTFORD POLE 6156 150 HPS COBRA CO | HARTFORD POLE 6156 150 HPS COBRA COMP 4/13 TOL_x000D_ AP1-YWO Total Cost Less Than 7K | Wholesale Expenses-W00

Text of RRU-159 Attachment 23.pdf

Extracted from the file · 1,160 pages · 16,330,154 characters

Text of RRU-159 Attachment 22.xlsx

Sheet names, column headings and text cells; numbers left out · first 300,000 characters

Text of RRU-159 Attachment 22.pdf

Extracted from the file · 1,203 pages · 14,349,246 characters

Text of RRU-159 Attachment 21.xlsx

Sheet names, column headings and text cells; numbers left out · first 300,000 characters

Text of RRU-159 Attachment 21.pdf

Extracted from the file · 1,203 pages · 13,880,364 characters

Text of RRU-159 Attachment 20.xlsx

Sheet names, column headings and text cells; numbers left out

Text of RRU-159 Attachment 20.pdf

Extracted from the file · 16 pages · 151,762 characters

Text of RRU-159 Attachment 19.xlsx

Sheet names, column headings and text cells; numbers left out

Text of RRU-159 Attachment 19.pdf

Extracted from the file · 1 page · 5,328 characters

Text of RRU-159 Attachment 18.xlsx

Sheet names, column headings and text cells; numbers left out · first 300,000 characters

Text of RRU-159 Attachment 18.pdf

Extracted from the file · 640 pages · 7,983,236 characters

Text of RRU-159 Attachment 17.xlsx

Sheet names, column headings and text cells; numbers left out · first 300,000 characters

Text of RRU-159 Attachment 17.pdf

Extracted from the file · 855 pages · 14,651,941 characters

Text of RRU-159 Attachment 16.xlsx

Sheet names, column headings and text cells; numbers left out · first 300,000 characters

Text of RRU-159 Attachment 16.pdf

Extracted from the file · 489 pages · 7,076,557 characters

Text of RRU-159 Attachment 15.xlsx

Sheet names, column headings and text cells; numbers left out · first 300,000 characters

Text of RRU-159 Attachment 15.pdf

Extracted from the file · 897 pages · 15,723,777 characters

Text of RRU-159 Attachment 14 .pdf

Extracted from the file · 1 page · 2,589 characters

Text of RRU-159 Attachment 14.xlsx

Sheet names, column headings and text cells; numbers left out

Text of RRU-159 Attachment 13.xlsx

Sheet names, column headings and text cells; numbers left out

Text of RRU-159 Attachment 13.pdf

Extracted from the file · 1 page · 427 characters

Text of RRU-159 Attachment 12.xlsx

Sheet names, column headings and text cells; numbers left out · first 300,000 characters

Text of RRU-159 Attachment 12.pdf

Extracted from the file · 802 pages · 14,341,138 characters

Text of RRU-159 Attachment 11.xlsx

Sheet names, column headings and text cells; numbers left out · first 300,000 characters

Text of RRU-159 Attachment 11.pdf

Extracted from the file · 858 pages · 15,906,152 characters

Text of RRU-159 Attachment 10.xlsx

Sheet names, column headings and text cells; numbers left out

Text of RRU-159 Attachment 10.pdf

Extracted from the file · 1 page · 822 characters

Text of RRU-159 Attachment 09.xlsx

Sheet names, column headings and text cells; numbers left out · first 300,000 characters

Text of RRU-159 Attachment 09.pdf

Extracted from the file · 449 pages · 7,355,312 characters

Text of RRU-159 Attachment 08.xlsx

Sheet names, column headings and text cells; numbers left out · first 300,000 characters

Text of RRU-159 Attachment 08.pdf

Extracted from the file · 867 pages · 13,878,236 characters

Text of RRU-159 Attachment 07.xlsx

Sheet names, column headings and text cells; numbers left out · first 300,000 characters

Text of RRU-159 Attachment 07.pdf

Extracted from the file · 869 pages · 15,728,932 characters

Text of RRU-159 Attachment 06.xlsx

Sheet names, column headings and text cells; numbers left out · first 300,000 characters

Text of RRU-159 Attachment 06.pdf

Extracted from the file · 459 pages · 8,128,897 characters

Text of RRU-159 Attachment 05.xlsx

Sheet names, column headings and text cells; numbers left out · first 300,000 characters

Text of RRU-159 Attachment 05.pdf

Extracted from the file · 879 pages · 16,073,548 characters

Text of RRU-159 Attachment 04.xlsx

Sheet names, column headings and text cells; numbers left out

Text of RRU-159 Attachment 04.pdf

Extracted from the file · 5 pages · 20,994 characters

Text of RRU-159 Attachment 03.xlsx

Sheet names, column headings and text cells; numbers left out · first 300,000 characters

Text of RRU-159 Attachment 03.pdf

Extracted from the file · 840 pages · 14,413,580 characters

Text of RRU-159 Attachment 02.xlsx

Sheet names, column headings and text cells; numbers left out · first 300,000 characters

Text of RRU-159 Attachment 02.pdf

Extracted from the file · 1,137 pages · 16,605,462 characters

Text of RRU-159 Attachment 01.xlsx

Sheet names, column headings and text cells; numbers left out

Text of RRU-159 Attachment 01.pdf

Extracted from the file · 1 page · 1,403 characters

As listed on the current system

Question(s) Answered 159 (Connecticut Light and Power Company dba Eversource Energy) Date Filed: 11/06/2026