Skip to main content

A prototype public docket site for the Connecticut Public Utilities Regulatory Authority

Utility Dockets and Filings

Interrogatory responses

Answers to questions 159

ResponseFiled by Connecticut Light and Power Company dba Eversource Energy51 files
Part of docket 26-05-10Open
  • Electric
Application of The Connecticut Light and Power Company d/b/a Eversource Energy to Amend its Rate Schedules

Files51

Search terms highlighted
Eversource rate increase is on 36 pages across 17 files of the text below, highlighted. Go to the first matchClear highlighting
Words on different pages
Words on different pages
Words on different pages

Text of RRU-159 Attachment 23.xlsx

Sheet names, column headings and text cells; numbers left out · first 300,000 characters

3 pages match
  1. Page 1,125 of 1,160Match

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued October 23, 2026 RRU-159 Attachment 23 Page 1125 of 1160 work_order_number description long_description cost_element_group ferc_account percent Furnish necessary engineering and design to create a 23kV source at Mansfield 12J substation to replace the existing 27.6kV transformer and associated feeders. Work includes the following installation: •One 69-115/23kV 62.5MVA (12J-4X) transformer •One new lineup of 23kV Double Bus Metaclad Switchgear •Three 115kV circuit switchers •One 115kV Motor Operated Disconnect Switch •Replacement of existing electromechanical relays for the 12J-1X, 12J-2X transformers with new microprocessor based SEL relays •Installation of l 12J-3S, 12J-4S, 12J-3H, 12J-4H transformers •Installation of six 115kV cable potheads [(2) cable pothead structures] and arresters •Approximately 1500 ft. total 115kV XLPE cable 500 ft. per phase •Install new ground grid to cover the expended fenced area •25kV power cables between switchgear and riser poles (located outside of the substation fence)t •Required conduits and foundations for new equipment CS001661 Mansfield 12J Install 12J-4X transf Wholesale Expenses-W00 107010 1 107010 1 107010 1 108030 107010 1 1 108030 1 107010 1 108030 0.04911358 Furnish necessary engineering and design to create a 23kV source at Mansfield 12J substation to replace the existing 27.6kV transformer and associated feeders. Work includes the following installation •Remove the 12J-3X transformer and replace with One (1) 69-115/23kV, 62.5 MVA Transformer •One 115kV circuit switcher (Candlestick) (12J-3X1-2) •Install 23kV steel structure and bus to make connection between new transformer and switchgear •Remove all 27.6kV equipment including low side transformer breaker, feeder breakers, and bus structures •Required conduits and foundations for new equipment CS001662 Mansfield 12J Replace 12J-3X transf CS001751 Install New Feeder (DG) CS001881 CS001891 Eggleston 42-Remove Substation TRIANGLE 11A REPL BUS W SWITCHGEAR CS001941 Jewett City 21D-Remove Substation CS001951 South MeaSpare Transformer Assembly CS002151 Recloser Automation CS002151 Recloser Automation Wholesale Expenses-W00 Tracy 14M - Establish a new feeder position 14M13 for a DG project associated with the RES Americas' 20MW PV DG project. The new 14M13 overhead feeder position will be between 14M-14T-6 and 14M-15T-6 bus switches. A new vacuum 23kV circuit breaker 14M13-2 will be installed using steel spans on the existing foundation, a new group operated disconnec tswitch14M13-5, a new set of PTs and arresters will also be installed. Wholesale Expenses-W00 Eggleston 42 - Remove the entire substation. All of the equipment will be removed, all foundations need to be cut below grade, trap rocks and fence need to be removed as well. The property will be turned over to Real Estate for sale. Wholesale Expenses-W00 PHASE 1. REPLACE EXISTING A1, A2, A3 OPEN BUS CONFIGURATION W A POWER CON STYLE ENCLOSED, DBLE BUS, METAL CLAD SWITCHGEAR. Wholesale Expenses-W00 Jewett City 21D - Remove the substation. All of the equipment will be removed, including the foundations, fence and trap rock. The transformer will be sold for scrap and the site will be turned over to Real Estate for sale. An easement must be maintained becuase overhead lines will continue to cross the site. Wholesale Expenses-W00 Spare Transformer Assembly - Purchase, assemble, fill and test a system spare transformer for storage at the South Meadow Storage Facility in Hartford, CT. The new system spare will be 60 MVA, 115-23kV, 14.2% impedance. Catalog ID 465287. This new spare will take the place of the existing spare (Catalog 443766) which will be moved from the SOuth Meadow Storage Facility to Tracy 14M substation in September. Wholesale Expenses-W00 Jefferson Hill 26F - Install new station FORM 6 Reclosers on the 26F1 feeder to address Recloser Automation (RA). This project also includes installation of a DSCADA communications system that will allow the SOC to remotely apply the control fast-trip feature prior to commencing any live-line feeder work. The overall project includes complete installation of all necessary protection settings, control and communications devices. Wholesale Expenses-W00 Jefferson Hill 26F - Install new station FORM 6 Reclosers on the 26F1 feeder to address Recloser Automation (RA). This project also includes installation of a DSCADA communications system that will allow the SOC to remotely apply the control fast-trip feature prior to commencing any live-line feeder work. The overall project includes complete installation of all necessary protection settings, control and communications devices. Wholesale Expenses-W00 107010 0.95088642 Sandbank 30F S/S – Remove Substatio Furnish necessary engineering and design to retire the Sandbank 30F substation. Remove all equipment including transformer, recloser, switches, etc. Also remove the fence and trap rock. Remove all foundations to below grade or remove completely, if practical. Perform environmental remediation as required. Loam and seed the site for grass growth to minimize erosion. Turn the site over to the Real Estate Department for sale with the provision that an easement is obtained for an overhead line. The 30F-1X transformer will be put in inventory and then relocated to Judd Brook 32R for installation there (reference Project #201338). All other equipment will be scrapped. Wholesale Expenses-W00 108030 1 Williams 9L – Network Monitoring Sy This project is the substation component of installing the Digital Grid network remote monitoring system. This project in conjunction with CD00828 and CD00948 will prolong the useful life of the network protector and transformer by allowing the system to notify System Operators when conditions such as network protectors pumping or cycling, loss of protector pressure and the presence of water occurs. Overall, these projects are focused on enabling Eversource to increase network protector’s reliability and defer network protector’s major maintenance from a 2-year cycle to a 4-year cycle, thus reducing resource impact on Operations. This project involves the following work within the Williams 9L fence: installation of 4 coil sensors (one on the getaway cable of every network feeder), installing a receiver cabinet in the control house, installing a DNP interface, commissioning the system, 2 years of web portal access, and 2 years of engineering support. This project was approved on 11/17/2016 for $31,000 with an with an overall estimate of $306,255. Following detailed design, the total project request is $297,203. Wholesale Expenses-W00 107010 1 Network monitoring system STEPSTONE 35L XFMR & PCE INSTALL Furnish necessary engineering and design to install new PLC sensors on the B-Phase of the following three (3) underground feeder getaway cables: 1C04, 1C05, and 1C07. The sensors’ wires will be routed from each of the three feeder cubicles on the existing control wire-tray to the network monitoring cabinet which will be installed inside the control house and it will be connected to the Ethernet switch inside the CIP cabinet. INSTALL A NEW 60 MVA 115/23 KV XFORMER W 4 FEEDER SWITCHGEAR. Wholesale Expenses-W00 Wholesale Expenses-W00 107010 107010 1 1 SW Hartford 47N Replace 9 OCBs Southwest Hartford 47N substation in Hartford, CT is a 115-23kV substation built in 1973. While a few pieces of equipment have been replaced over the last 45 years, most equipment is original. There are nine (9) 23kV oil circuit breakers that need to be replaced, in addition to the circuit breaker isolation switches and electro-mechanical relays used for transformer, bus and feeder protection. Besides the need to replace aging equipment, multiple animal outages have highlighted the need to improve animal/bird protection for reliability purposes. In addition to these equipment replacements, 115kV Circuit Switchers need to be added for the two transformers to address a transformer switching restriction that prohibits energizing or de-energizing the two 48/64/80 MVA transformers with the 115kV disconnect switches. Wholesale Expenses-W00 107010 1 Wholesale Expenses-W00 107010 1 Wholesale Expenses-W00 Wholesale Expenses-W00 108030 107010 1 1 Wholesale Expenses-W00 Furnish necessary engineering and design to install a new 43F-2X transformer, a 43F-2X1-2 high-side circuit switcher, 43F-2S pad-mounted station service and new double-bus 23kV switchgear. The new switchgear will contain PTs and pads to connect cable which will supply the new pad-mounted station service transformer. The pad-mounted station service transformer and PTs in the switchgear are proposed to fit the new switchgear within the existing yard. Wholesale Expenses-W00 West Goshen 20U Distribution Substation is to complete the decommission and retirement work for the West Goshen 20U substation. The substation is located at 23 Beach Street, Goshen, CT. Eversource is required to complete the removal of substation equipment, fencing, foundations, and any future environmental liability when decommissioning and retiring substation properties. The substation was de-energized in Q4 2018 under Distribution line project number CD00911 Wholesale Expenses-W00 Refurbish switchgear body, excludes roof. Refurbish roof after moratorium Wholesale Expenses-W00 Refurbish switchgear body, excludes roof. Refurbish roof after moratorium Wholesale Expenses-W00 Refurbish switchgear body, excludes roof. Refurbish roof after moratorium Wholesale Expenses-W00 Refurbish switchgear body, excludes roof. Refurbish roof after moratorium Wholesale Expenses-W00 Refurbish switchgear body, excludes roof. Refurbish roof after moratorium Wholesale Expenses-W00 Refurbish switchgear body, excludes roof. Refurbish roof after moratorium Wholesale Expenses-W00 Refurbish switchgear body, excludes roof. Refurbish roof after moratorium Wholesale Expenses-W00 Refurbish switchgear body, excludes roof. Refurbish roof after moratorium Wholesale Expenses-W00 Refurbish switchgear body, excludes roof. Refurbish roof after moratorium Wholesale Expenses-W00 Refurbish switchgear body, excludes roof. Refurbish roof after moratorium Wholesale Expenses-W00 Refurbish switchgear body, excludes roof. Refurbish roof after moratorium Wholesale Expenses-W00 Refurbish switchgear body, excludes roof. Refurbish roof after moratorium Wholesale Expenses-W00 Refurbish switchgear body, excludes roof. Refurbish roof after moratorium Wholesale Expenses-W00 Refurbish switchgear body, excludes roof. Refurbish roof after moratorium Wholesale Expenses-W00 Refurbish switchgear body, excludes roof. Refurbish roof after moratorium Wholesale Expenses-W00 Refurbish switchgear body, excludes roof. Refurbish roof after moratorium Wholesale Expenses-W00 Refurbish switchgear body, excludes roof. Refurbish roof after moratorium Wholesale Expenses-W00 Refurbish switchgear body, excludes roof. Refurbish roof after moratorium Wholesale Expenses-W00 Refurbish switchgear body, excludes roof. Refurbish roof after moratorium Wholesale Expenses-W00 Refurbish switchgear body, excludes roof. Refurbish roof after moratorium Wholesale Expenses-W00 Refurbish switchgear body, excludes roof. Refurbish roof after moratorium Wholesale Expenses-W00 Refurbish switchgear body, excludes roof. Refurbish roof after moratorium Wholesale Expenses-W00 Refurbish switchgear body, excludes roof. Refurbish roof after moratorium Wholesale Expenses-W00 Refurbish switchgear body, excludes roof. Refurbish roof after moratorium Wholesale Expenses-W00 Refurbish switchgear body, excludes roof. Refurbish roof after moratorium Wholesale Expenses-W00 Refurbish switchgear body, excludes roof. Refurbish roof after moratorium Wholesale Expenses-W00 Refurbish switchgear body, excludes roof. Refurbish roof after moratorium Wholesale Expenses-W00 Refurbish switchgear body, excludes roof. Refurbish roof after moratorium Wholesale Expenses-W00 Refurbish switchgear body, excludes roof. Refurbish roof after moratorium Wholesale Expenses-W00 Refurbish switchgear body, excludes roof. Refurbish roof after moratorium Wholesale Expenses-W00 Implement Station DC Battery Voltage Monitoring as a Backup System to the AT10 Charger Internal Alarm System Wholesale Expenses-W00 Implement Station DC Battery Voltage Monitoring as a Backup System to the AT10 Charger Internal Alarm System Wholesale Expenses-W00 Implement Station DC Battery Voltage Monitoring as a Backup System to the AT10 Charger Internal Alarm System Wholesale Expenses-W00 Bloomfield 3B - Implement station DC Battery Voltage Monitoring as a backup system to the AT10 charger internal alarm system. Wholesale Expenses-W00 108030 1 107010 1 108030 107010 108030 107010 107010 108030 107010 108030 108030 107010 107010 108030 107010 108030 107010 108030 108030 107010 107010 108030 108030 107010 107010 108030 108030 107010 107010 108030 107010 107010 108030 107010 107010 107010 107010 1 1 0.01999986 0.98000014 0.79999991 0.20000009 0.8 0.2 0.02 0.98 0.93733945 0.06266055 0.98000012 0.01999988 0.95319113 0.04680887 0.17622628 0.82377372 0.82521561 0.17478439 0.2 0.8 0.8 0.2 0.17004157 0.82995843 0.87166702 0.12833298 1 0.8 0.2 1 1 1 1 107010 1 108030 108030 107010 107010 107010 108030 107010 108030 107010 1 0.1164018 0.8835982 1 0.79999991 0.20000009 1 0.2 0.8 107010 107010 1 1 108030 0.0099937 107010 0.9900063 107010 1 107010 1 108030 1 107010 1 107010 107010 108030 107010 1 1 0.2 0.8 107010 1 CS002241 CS002391 CS002411 CS002471 CS002581 To purchase an add-on software package to PQView called FaultPoint Set up a database link to our exiting saved relay events thru IT that would enable the use of Synergy models to populate algorithms to calculate fault locations based on system parameters and protection relay event logs This proposal includes the cost to fund the purchase and set up the required support from IT and database storage space in order to store system data for software analysis. Project Objectives To identify, locate and repair underground faults within minimal time, limiting customer outage times. This will improve overall system response times and minimize repair times having a direct effect on SAIDI and CAIDI CS002631 PILOT PROG FEEDER FAILURE DETECTION CS002641 CS002671 Putnam 25C – Remove deenergized sub HOPEWELL 22R INSTALL GREENJACKET CS002691 Race Hill 15D - Remove S/S CS002731 Add 2nd Transformer & Switchgear CS002771 CS002781 CS002782 CS002782 CS002785 CS002785 CS002787 CS002787 CS002788 CS002788 CS00278A CS00278A CS00278B CS00278B CS00278C CS00278C CS00278D CS00278D CS00278E CS00278E CS00278G CS00278G CS00278M CS00278M CS00278N CS00278N CS00278Q CS00278Q CS00278R CS00278T CS00278T CS002810 CS002814 CS002815 CS002816 West Goshen 20U - Remove Deenergize Bates Rock Switchgear MIDDLE RIVER 28M SWITCHGEAR MIDDLE RIVER 28M SWITCHGEAR STONY HILL 48C SWITCHGEAR STONY HILL 48C SWITCHGEAR TORRINGTON TERM 8A SWITCHGEAR TORRINGTON TERM 8A SWITCHGEAR THOMASTON 2B SWITCHGEAR THOMASTON 2B SWITCHGEAR PEPPERIDGE 28A SWITCHGEAR PEPPERIDGE 28A SWITCHGEAR LAKEVIEW 31A SWITCHGEAR LAKEVIEW 31A SWITCHGEAR WESTON 21M SWITCHGEAR WESTON 21M SWITCHGEAR FLAX HILL 24A SWITCHGEAR FLAX HILL 24A SWITCHGEAR NORWALK 9S-27.6kV SWITCHGEAR NORWALK 9S-27.6kV SWITCHGEAR BYRAM 13C SWITCHGEAR BYRAM 13C SWITCHGEAR HANOVER 12F SWITCHGEAR HANOVER 12F SWITCHGEAR SO NAUGATUCK 21L SWITCHGEAR SO NAUGATUCK 21L SWITCHGEAR TODD 30L SWITCHGEAR TODD 30L SWITCHGEAR WESTBROOK 20S SWITCHGEAR FOXWOODS CASINO 43P SWITCHGEAR FOXWOODS CASINO 43P SWITCHGEAR DC Battery Voltage Monitoring DC Battery Voltage Monitoring DC Battery Voltage Monitoring DC Battery Voltage Monitoring This project will decommission and retire Putnam 25C substation located in Putnam, CT. This project provides for the removal of the de-energized equipment, fence, and trap rock, and restoration of the site with loam and seeding. This process ensures all environmental impacts are addressed that are subject to the CT DEEP remediation standards TO INSTALL GREENJACKET ANIMAL PROTECTION TO MITIGATE THE RISK OF ANIMAL CAUSED INTERRUPTIONS Race Hill 15D - remove deenergize substation PER HOANG HUYNH - DO NOT CLOSE WO - REMOVAL WORK NOT COMPLETE - ENVIRONMENTAL CHARGES STILL PENDING AND FOUNDATION WORK NEEDED. it CS002841 Carmel Hill Add 2nd Xfmr + SWGR CS003001 CS003081 CS003081 CS003161 CS003241 CS003241 CS003331 CS003411 CS003411 Retire Substation Replace Failing 1X LTC Control Replace Failing 1X LTC Control Install Backup Relays Replace Failed 27K-11R53-2 Circuit Replace Failed 27K-11R53-2 Circuit Manchester 3A Avigilom IDS CT Replacement of 16M-1X Load Tap Chan Replacement of 16M-1X Load Tap Chan CS003571 CS003651 Shunock 32P – Add Switchgear Bokum 15L - Install 3X Transformer CS003721 Tunnel 12S/S- LTC controllers upgr CS003721 Tunnel 12S/S- LTC controllers upgr CS003821 Southington 4C Add 8X Transformer CS003831 Hopewell 22R Replace 2X Xmers CS003881 Voluntown 23U – Retire Substation CS003921 Beacon Falls 11N Replace 1X & 2X Tr CS003931 CS004112 CS005641 CS005641 Shunock 32P Add New Feeder (32P6) Newtown 12M OCB Eng WO Sasco Creek 51R Replace 51R-91T-2 Sasco Creek 51R Replace 51R-91T-2 This project proposes the addition of the second 115/23kV 62.5 MVA transformer (11S-2X), with associated switchgear. Carmel Hill 11S in Woodbury, CT is a 115/23kV Substation with one (1) distribution transformer and one (1) switchgear that has three (3) feeders. A second distribution transformer and switchgear are required to improve reliability by increasing the contingency load carrying capability of the substation and feeders. Eversource’s “SYS PLAN-010 Bulk Distribution Substation Assessment Procedure” specifies the need for a second transformer to keep the substation loading below 75% of the existing transformer’s nameplate rating. Wholesale Expenses-W00 Furnish necessary engineering and design using a 2011 annual work order to retire the Oak St. 43 substation; scrap the transformer, remove the fence, traprock and sell the site. Wholesale Expenses-W00 Furnish necessary engineering and design using a 2012 annual work order to replace the failing 1X LTC control, control relays at South End 1G substation Wholesale Expenses-W00 Furnish necessary engineering and design using a 2012 annual work order to replace the failing 1X LTC control, control relays at South End 1G substation Wholesale Expenses-W00 Beacon Falls 11N - Install back-up transformer protection relays for the 11N-1X and 11N-2X transformers. Wholesale Expenses-W00 Replace Failed 27K-11R53-2 Circuit Breaker Wholesale Expenses-W00 Replace Failed 27K-11R53-2 Circuit Breaker Wholesale Expenses-W00 Avigilon Intrusion Detection System Security Upgrades Wholesale Expenses-W00 Essex 16M - Rebuild the failed 16M-1X LTC and replace the failed low side arresters Wholesale Expenses-W00 Essex 16M - Rebuild the failed 16M-1X LTC and replace the failed low side arresters Wholesale Expenses-W00 Add a 2nd switchgear PCE to the 32P-1X position. 100% reimbursable Wholesale Expenses-W00 Bokum 15L - Add third transformer and 23kV switchgear, replace the 1X and 2X transformers, replace the 27.6kV ring bus with 23kV switchgear Wholesale Expenses-W00 The scope and magnitude of this project is to replace the 12S-3X and 12S-4X LTC Controllers and associated paralleling equipment at Tunnel 12S substation to improve voltage control and system reliability by eliminating the risk of mis-operations due to hardware. The existing 45+ year old controls will be replaced with Beckwith M-2001D LTC controls. Wholesale Expenses-W00 The scope and magnitude of this project is to replace the 12S-3X and 12S-4X LTC Controllers and associated paralleling equipment at Tunnel 12S substation to improve voltage control and system reliability by eliminating the risk of mis-operations due to hardware. The existing 45+ year old controls will be replaced with Beckwith M-2001D LTC controls. Wholesale Expenses-W00 The Southington 4C-5X transformer is 47 years old and 4C-6X is 17 years and both have no known issues at this time. Due to the age and condition of the transformers it is preferred to defer the capital expenditure of replacing both transformers for 10 years (2022-2032). This initial funding request is to evaluate the potential options for resolving this need Wholesale Expenses-W00 The project is for the replacement of the current substation 2X transformer with the Eversource 62.5MVA standard Wholesale Expenses-W00 This project is to decommission and retire the Voluntown 23U substation. The substation is located at Main Street in Voluntown, CT. Eversource is required to remove the de-energized substation equipment and any future environmental liability when decommissioning and retiring substation properties. The substation was de-energized in 2018 under Distribution Feeder reconfiguration project number CD00471. Wholesale Expenses-W00 The 2032 Beacon Falls load forecasted peak is 60MVA. The existing load and future load growth would require replacement of both 46.7MVA transformers. Installation of a BESS to shave the peak load 2.5MW will defer the cost of these capital expenditures for a minimum of ten (10) years. Wholesale Expenses-W00 To furnish necessary engineering and design to establish a new 13.8kV feeder (32P6) position which will serve as an express feed to the 15MW North Stonington Solar Center located on Ella Wheeler Rd in North Stonington, Connecticut. The project plant has a proposed aggregated generation output capability of 15 MW and will be connected to the 15kV A2 Bus. Wholesale Expenses-W00 Newtown 12M OCB Eng WO - work order to capture preliminary engineering charges, will be transferred to WO# CS004121 when the specific program release is approved. Wholesale Expenses-W00 Replace the 51R-91T-2. Projects is 100% reimbursable by MNR/CDOT. Sasco Creek 51R Wholesale Expenses-W00 Replace the 51R-91T-2. Projects is 100% reimbursable by MNR/CDOT. Sasco Creek 51R Wholesale Expenses-W00 PI Vision Transformer Monitor Repl This project will replace transformer monitoring displays used by the substation technical engineering group to monitor asset health real-time by visualizing data collected using online equipment monitors. An external vendor will be funded to create these displays in PI Vision, an existing visualization tool on the Eversource network. A new PI Asset Framework database will be developed. The structure of the dashboard includes an Overview page and nine sub-pages. The objective of the Overview page is to provide users a quick look at the health of each transformer and to highlight via color coding the potential issues to be investigated further. Wholesale Expenses-W00 CS005951
  2. Page 1,126 of 1,160

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued October 23, 2026 RRU-159 Attachment 23 Page 1126 of 1160 work_order_number CS009048 long_description description DSCADA LTC Controls Upgrade cost_element_group Furnish necessary engineering and design to replace existing radio-controlled Transformer Load Tap Changer (LTC) Voltage Reduction System with a DSCADA controlled LTC Voltage Reduction System at various Eversource Connecticut substations. This system is used to lower the Distribution voltage (2% or 5%) during certain Transmission contingencies to help stabilize the system. The DSCADA signal will be transmitted via radio from the control house to the LTC receiver, to avoid the expense of adding additional conduit, if no conduit is available. If conduit is available, the devices will be connected via fiber cable. Wholesale Expenses-W00 ferc_account percent 107010 1 Wholesale Expenses-W00 FEEDER FAULT LOCATER LOCATED AT VARIOUS SITES IN CONNECTICUT. INSTALLED BY EVERSOURCE IT AND ELECTROTEK Wholesale Expenses-W00 CTE Supplier Billing DCKT Wholesale Expenses-W00 Common Stock DividendNT011 Wholesale Expenses-W00 PURCHASE AND INSTALL STEEL CONDUIT FOR 10 MB ETHERNET CIRCUIT REQUESTOR-ED ARIOLA - MANAGER GERRY BLANCHARD Wholesale Expenses-W00 Customer Care EPO Credit Wholesale Expenses-W00 Clean / stock truck Wholesale Expenses-W00 C2 Customer Service-Ouimette Wholesale Expenses-W00 C2 Customer Service-Ouimette Wholesale Expenses-W00 C2 Customer Service-Ouimette Wholesale Expenses-W00 Customer Service Week-Quarsema Wholesale Expenses-W00 ADD AN ADDITIONA OC-3 MICROWAVE HOP BETWEEN SOUTH MOUNTAIN TO NEW MILFORD AND NEW MILFORD TO NEWTOWN. REQUESTER: M. CARBARY______MGR. G. BLANCHARD Wholesale Expenses-W00 ADD AN ADDITIONA OC-3 MICROWAVE HOP BETWEEN TALCOTT MOUNTAIN TO SOUTH MOUNTAI TO NEW MILFORD RADIO SITES. REQUESTER: M. CARBARY______MGR. G. BLANCHARD Wholesale Expenses-W00 ADDTION DMXTEND MULTIPLEXER IN BERLIN TO SUPPORT THE TALCOTT-SOUTH MOUNTAIN- NEW MILFORD-NEWTOWN OC-3 MICROWAVE EXPANSION REQUESTER: M. CARBARY______MGR. G. BLANCHARD Wholesale Expenses-W00 ADD AN ADDITIONAL OC-3 MICROWAVE HOP BETWEEND TALCOTT MOUNTAIN AND SOUTH MOUNTAIN RADIO SITES. REQUESTER: M. CARBARY______MGR. G. BLANCHARD Wholesale Expenses-W00 ADD AN ADDITIONAL OC-3 MICROWAVE HOP BETWEEND NEW MILFORD AND NEWTOWN RADIO SITES. REQUESTER: M. CARBARY______MGR. G. BLANCHARD Wholesale Expenses-W00 REPLACE BASE STATIONS FOR THE HARTFORD TRUCK RADION SYSTEM. THIS WILL REPLACE AGING BASE STATIONS AS WELL AS INCREASE FUNCTIONALITY. PROJECT IT1DWANA Wholesale Expenses-W00 REPLACE BASE STATIONS FOR THE MAN. 3A TRUCK RADIO SYSTEM. THIS WILL REPLACE AGING BASE STATIONS AS WELL AS INCREASE FUNCTIONALITY. PROJECT IT1DWANA Wholesale Expenses-W00 REPLACE BASE STATIONS FOR THE ROCKY HILL 3R RADIO SYSTEM. THIS WILL REPLACE AGING BASE STATIONS AS WELL AS INCREASE FUNCTIONALITY. PROJECT IT1DWANA Wholesale Expenses-W00 REPLACE BASE STATIONS FOR THE TALCOLT MT RS RADIO SYSTEM. THIS WILL REPLACE AGING BASE STATIONS AS WELL AS INCREASE FUNCTIONALITY. PROJECT IT1DWANA Wholesale Expenses-W00 REPLACE BASE STATIONS FOR THE MIDDLETOWN AWC RADIO SYSTEM. THIS WILL REPLACE AGING BASE STATIONS AS WELL AS INCREASE FUNCTIONALITY. PROJECT IT1DWANA Wholesale Expenses-W00 107010 107010 107010 238010 107010 908004 588132 143S30 184800 184820 903003 1 1 1 1 1 1 1 1 1 1 1 107010 1 107010 1 107010 1 107010 107010 1 1 107010 1 107010 1 107010 1 107010 1 107010 1 BRING EXPANDED CONNECTIVITY TO THE GREENWICH AWC. THIS WORK ORDER WILL COVER ALL ASSOCIATED EQUIP, CONTRACTOR & LABOR. PROJECT IT1DWANA REPLACEMENT TOWER LIGHTS FOR UNION TOWER . REQUESTER: M. CARBARY PROJECT: IT1DWANA REPLACEMENT TOWER LIGHTS FOR NEW MILFORD TOWER . REQUESTER: M. CARBARY PROJECT: IT1DWANA REPLACEMENT TOWER LIGHTS FOR GOOSE HILL TOWER . REQUESTER: M. CARBARY PROJECT: IT1DWANA REPLACEMENT TOWER LIGHTS FOR MANCHESTER TOWER . REQUESTER: M. CARBARY PROJECT: IT1DWANA REPLACEMENT TOWER LIGHTS FOR TALCOTT MTN TOWER . REQUESTER: M. CARBARY PROJECT: IT1DWANA REPLACE BASE STATIONS FOR THE MADISON TRUCK RADIO SYSTEM. THIS WILL REPLACE AGING BASE STATIONS AS WELL AS INCREASE FUNCTIONALITY. PROJECT IT1DWANA REPLACE BASE STATIONS FOR THE MADISON TRUCK TO TRUCK RADIO SYSTEM. THIS WILL REPLACE AGAING BASE STATIONS AS WELL AS INCREASE THE FUNCTIONALITY. PROJECT IT1DWANA THE LARSE ALARM RTU IS OBSOLETE AND NEEDS TO BE REPLACED PROJECT IT1DWANA REQUESTER:TOM MULINSKI/WRONA MGR: AHRENS THE LARSE ALARM RTU IS OBSOLETE AND NEEDS TO BE REPLACED_@ 626 GLENBROOK ROAD, STAMFORD PROJECT IT1DWANA REQUESTER:TOM MULINSKI/WRONA MGR: AHRENS TELECOM ROOM, THE LARSE ALARM RTU IS OBSOLETE AND NEEDS TO BE REPLACED @ 107 SELDEN ST PENTHOUSE LOCATION PROJECT IT1DWANA THE LARSE ALARM RTU IS OBSOLETE AND NEEDS TO BE REPLACED_@ 705 WEST JOHNSON AVE, CHESHIRE (AWC) PROJECT IT1DWANA REPLACE EXISTING DVM6-45 EQUIPMENT WHICH IS AT THE END OF ITS USEFUL SERVICE LIFE. REQUESTOR:DOLLY WRONA, MGR: JIM AHRENS Added install / remove waveguid - removal estimated at $7800, new install $5350 REPLACE EXISTING DVM6-45 EQUIPMENT WHICH IS AT THE END OF ITS USEFUL SERVICE LIFE AT 107 SELDEN STREET, BERLIN, CT CUPOLA AND MUX ROOM Wholesale Expenses-W00 Wholesale Expenses-W00 Wholesale Expenses-W00 Wholesale Expenses-W00 Wholesale Expenses-W00 Wholesale Expenses-W00 107010 107010 107010 107010 107010 107010 1 1 1 1 1 1 Wholesale Expenses-W00 107010 1 Wholesale Expenses-W00 Wholesale Expenses-W00 107010 107010 1 1 Wholesale Expenses-W00 Wholesale Expenses-W00 Wholesale Expenses-W00 107010 107010 107010 1 1 1 Wholesale Expenses-W00 Wholesale Expenses-W00 107010 107010 1 1 Wholesale Expenses-W00 Wholesale Expenses-W00 Wholesale Expenses-W00 Wholesale Expenses-W00 Wholesale Expenses-W00 Wholesale Expenses-W00 Wholesale Expenses-W00 Wholesale Expenses-W00 Wholesale Expenses-W00 107010 107010 107010 107010 107010 107010 107010 107010 107010 1 1 1 1 1 1 1 1 1 Wholesale Expenses-W00 Wholesale Expenses-W00 Wholesale Expenses-W00 Wholesale Expenses-W00 Wholesale Expenses-W00 Wholesale Expenses-W00 Wholesale Expenses-W00 107010 107010 107010 107010 107010 107010 107010 1 1 1 1 1 1 1 Wholesale Expenses-W00 107010 0.90909091 Wholesale Expenses-W00 108030 0.09090909 Wholesale Expenses-W00 107010 1 Wholesale Expenses-W00 Wholesale Expenses-W00 Wholesale Expenses-W00 Wholesale Expenses-W00 Wholesale Expenses-W00 107010 107010 108030 107010 107010 1 0.90909031 0.09090969 1 1 Wholesale Expenses-W00 107010 1 Wholesale Expenses-W00 Wholesale Expenses-W00 Wholesale Expenses-W00 Wholesale Expenses-W00 Wholesale Expenses-W00 Wholesale Expenses-W00 Wholesale Expenses-W00 Wholesale Expenses-W00 Wholesale Expenses-W00 Wholesale Expenses-W00 Wholesale Expenses-W00 Wholesale Expenses-W00 Wholesale Expenses-W00 Wholesale Expenses-W00 Wholesale Expenses-W00 Wholesale Expenses-W00 Wholesale Expenses-W00 Wholesale Expenses-W00 Wholesale Expenses-W00 Wholesale Expenses-W00 Wholesale Expenses-W00 Wholesale Expenses-W00 Wholesale Expenses-W00 Wholesale Expenses-W00 Wholesale Expenses-W00 Wholesale Expenses-W00 Wholesale Expenses-W00 Wholesale Expenses-W00 Wholesale Expenses-W00 Wholesale Expenses-W00 Wholesale Expenses-W00 Wholesale Expenses-W00 Wholesale Expenses-W00 Wholesale Expenses-W00 Wholesale Expenses-W00 Wholesale Expenses-W00 Wholesale Expenses-W00 Wholesale Expenses-W00 Wholesale Expenses-W00 Wholesale Expenses-W00 Wholesale Expenses-W00 107010 107010 107010 107010 107010 107010 107010 108030 107010 107010 108030 108030 107010 108030 107010 108030 107010 107010 107010 107010 108030 107010 108030 107010 107010 107010 107010 107010 107010 107010 107010 107010 107010 107010 107010 107010 108030 107010 107010 107010 107010 1 1 1 1 1 1 1 0.06542056 0.93457944 0.93457944 0.06542056 0.06542056 0.93457944 0.09090909 0.90909091 0.09090909 0.90909091 1 1 0.90909091 0.09090909 0.90909091 0.09090909 1 1 1 1 1 1 1 1 1 1 1 1 0.95833333 0.04166667 1 1 1 1 Project Scope: Oxford 26N Furnish necessary engineering and design to replace existing radio-controlled Transformer Load Tap Changer (LTC) Voltage Reduction System with a DSCADA controlled LTC Voltage Reduction System. This system is used to lower the Distribution voltage (2% or 5%) during certain Transmission contingencies to help stabilize the system. Provide additional LTC control capability for the new DSCADA system so the voltage of individual LTCs can be raised/lowered by the SOC to satisfy field conditions. Ability to provide the tap position of the LTC and to remotely turn off regulation so the LTC does not react during switching. CS009085 CS318001 CSBD11C1 CSKD0011 CSMS1DC2 CSTC0011 CSTR0011 CSTS0011 CSTS1011 CSTS2011 CSWK0011 Oxford 26N DSCADA LTC Contrs Up FEEDER FAULT LOCATER VARIOUS CTE Supplier Billing DCKT Common Stock Dividend EQUIPMENT TO PROVIDE 10 MB ETHERNET Customer Care Clean / stock truck C2 Customer Service C2 Customer Service C2 Customer Service Customer Service Week CT13D001 NEW MILFORD OC-3 MICROWAVE EXPANSIO CT13D002 SOUTH MOUNTAIN OC-3 MICROWAVE EXPAN CT13D003 BERLIN MULTIPLEXER FOR OC-2 MICRO. CT13D004 CT13D005 TALCOTT MOUNTAIN OC-3 MICROWAVE EXP NEWTOWN OC-3 MICROWAVE EXPANSION CT13D006 HARTFORD AWC LOWBAND REPEATER SYSTE CT13D007 MANCHESTER 3A LOWBAND REPEATER SYST CT13D008 ROCKY HILL 3R LOWBAND REPEATER SYST CT13D009 TALCOTT MT TS LOWBAND REPEATER SYST CT13D010 MIDDLETOWN AWC LOWBAND REPEATER SYS CT13D012 CT13D015 CT13D016 CT13D017 CT13D018 CT13D019 GREENWICH AWC 10 M ETHERNET UNIION REPLACEMENT TOWER LIGHTS NEW MILFORD REPLACEMENT TOWER LIGHT GOOSE HILL REPLACEMENT TOWER LIGHTS MANCHESTER REPLACEMENT TOWER LIGHTS TALCOTT MT REPLACEMENT TOWER LIGHTS CT14D001 MADISON AWC - MADISON LOWBAND REPEA CT14D003 CT14D008 GOOSE HILL RADIO SITE-MADISON LOWBA ASENTRIA ALARM REMOTE 4 GOOSE HILL CT14D009 CT14D010 CT14D011 ASENTRIA ALARM REMOTE FOR STAMFORD ASENTRIA ALARM REMOTE FOR BERLIN PE ASENTRIA ALARM REMOTE 4 CHESHIRE TE CT14D030 CT14D031 BOLTON-E SPRINGFIELD MICROWAVE UPGR BERLIN TOWARD TALCOTT MICROWAVE UPG CT14D032 CT14D033 CT14D034 CT15D001 CT15D002 CT15D004 CT15D006 CT15D007 CT15D008 MANCHESTER MICROWAVE UPGRADE TALCOTT MICROWARE UPGRADE UNION OC-3 MICROWAVE Waterbury Portable Radios DSCADA DR Telecom - CL&P New Milford Radio Site Battery Repl Cheshire AWC Charger Replace N LNDN BATTERY & CHRGER BACKUP Grounding Upgrade Tower Sites CT16D001 CT16D002 CT16D003 CT16D004 CT16D005 CT16D006 CT16D007 KILLINGLY 2G-DWDM FIBER AMPLIFIER SOUTH MTN DNX-11 Protection Shelf BERLIN SOUTH SITEBOSS INSTALL GOOSE HILL DNX-11 PROTECTION SHELF Soapstone to So Mtn Microwave Upgr SO MTN TO SOAPSTONE MICROWAVE UPGR 2016 LOWBAND MOBILE RADIOS CT16D019 BERLIN TO W PEAK MICROW UPGRADE CT16D019 BERLIN TO W PEAK MICROW UPGRADE CT16D020 W Peak to Berlin Microwave Upgrade CT16D021 CT16D022 CT16D022 CT16D023 CT16D027 NORWALK PAGING BASE HADDAM NECK 14B SITEBOSS ALARM HADDAM NECK 14B SITEBOSS ALARM MILLSTONE 15G SITEBOSS INSTALL ALAR BERLIN SOUTH CAMPUS FIBER RUNS CT16D028 TOLLAND AWC MW UPGRADE W/USED EQUIP CT16D029 CT16D032 CT16D033 CT16D034 CT17D001 CT17D003 CT17D004 CT17D006 CT17D006 CT17D007 CT17D007 CT17D008 CT17D008 CT17D011 CT17D011 CT17D012 CT17D012 CT17D013 CT17D014 CT17D015 CT17D015 CT17D016 CT17D016 CT17D017 CT17D018 CT17D019 CT17D020 CT17D021 CT17D022 CT17D023 CT17D024 CT17D025 CT17D026 CT17D027 CT17D028 CT17D029 CT17D029 CT17D030 CT17D031 CT17D032 CT17D033 BOLTON MW UPGR W/REUSED MA EQUIP PURCH TK6110 MOBILE RADIOS MANCHESTER SS SHELTER BATTERY REPL TK3180 Portable Radios 56P BATTERY REPLACEMENT Southbury CSP Battery Replacement STAMFORD SHELTER BATTERY REPLACE W HARTLAND BATTERY REPLACEMENT W HARTLAND BATTERY REPLACEMENT W PEAK BATTERY REPLACEMENT W PEAK BATTERY REPLACEMENT WILLIMANTIC SBA BATTERY REPLACEMENT WILLIMANTIC SBA BATTERY REPLACEMENT Stamford AWC DMX Install Stamford AWC DMX Install 56 Prospect St SiteBoss Install 56 Prospect St SiteBoss Install Berlin South Penthouse SiteBoss Ins GREENWICH CSP RS SITEBOSS INSTALL PROSPECT RS SITEBOSS INSTALL PROSPECT RS SITEBOSS INSTALL SOUTHINGTON SITEBOSS INSTALL SOUTHINGTON SITEBOSS INSTALL W HARTLAND SITEBOSS INSTALL WINDSOR DATA CTR SITEBOSS INSTALL CHESHIRE TO W PEAK MICROWAVE UPGRAD W PEAK TO CHESHIRE MICROWAVE UPGRAD LONG HILL TO SOAPSTONE MICROW UPGRA SOAPSTONE TO LONG HILL MICROW UPGRA GOOSE HILL TO TALCOTT MICROW INSTAL TALCOTT TO GOOSE HILL MICROW INSTAL MADISON PAGING BASE New Milford Paging Base Newtown Paging Base North Stonington Paging Base Soapstone Paging Base Soapstone Paging Base Union Paging Base Chapel Hill Paging Base Berlin paging network materials Windsor Paging Network Materials REPLACE EXISTING DVM6-45 EQUIPMENT WHICH IS AT THE END OF ITS USEFUL SERVICE LIFE AT OLCOTT STREET, MANCHESTER, CT ( MANCHESTER SS LOCATION) REPLACE EXISTING DVM6-45 EQUIPMENT WHICH IS AT THE END OF ITS USEFUL SERVICE LIFE AT HOSKINS ROAD, BLOOMFIELD, CT PART OF LARGER PROJECT TO REROUTE MICROWAVE NETWORK SERVING HADLEY TO AVOID MT TOM GEN STATION WHICH IS BEING DECOMMISSIONED This WO will be used to order (10) TK-3180 portable radios that are needed for Waterbury districts operations. This WO will be order various telecom equpiment that is required to have DSCADA DR talk to the various SCADA systems. - CL&P New Milford radio site remove and repl batteries Cheshire area work center charger replacement New London AWC Battery & Charger install to provide 48v backup for communications equipment Site grounding upgrade plus additional ground bars to support microwave equipment and mobile radio for Tower sites KILLINGLY 2G - DWDM Fiber Amplifier - Install fiber optic amplifier for high capacity DWDM system between Windsor, CT and Southborough, MA. The DWDM system will be used to support the eECS Energy Management and IT Systems. Install a protection shelf and card in the South Mountain DNX-11. Improves redundancy of system. South Mountain Radio Site, Bristol Install a SiteBoss alarm panel and remove the old Larse alarm panel in Berlin (NU South) Install a protection shelf and card in the Goose Hill DNX-11. Improves reduncancy of system Soapstone to South Mtn microwave upgrad from DS3 to OC3 capacity to provide sufficient backhaul to enable microwave to be an alternate path from fiber to increase capacity Upgrade the microwave equipment from DS3 to OC3 capacity to provide sufficient backhaul to enable microwave to be an alternate patch from fiber and increase capacity. Connecticut Mobile Radios - Statewide initiative - 2016 BERLIN TO WEST PEAK MICROWAVE UPGRADE - Upgrade microwave equipment from DS3 to OC3 capacity to provide sufficient backhaul to Berlin to enable microwave to be an alternate path from fiber and increase capacity. BERLIN TO WEST PEAK MICROWAVE UPGRADE - Upgrade microwave equipment from DS3 to OC3 capacity to provide sufficient backhaul to Berlin to enable microwave to be an alternate path from fiber and increase capacity. WEST PEAK TO BERLIN MICROWAVE UPGRADE - Upgrade the microwave equipment from DS3 to OC3 capacity to provide sufficient backhaul to Berlin to enable microwave to be an alternate path from fiber and increase capacity. NORWALK PAGING BASE: Replace the paging base that was installed in the Norwalk Harbor plant with a new base located at the Tindall Ave AWC. Does not include antenna work covered under the tower project. Install a SiteBoss alarm panel and remove the old Larse alarm panel @ Haddam Neck 14B Haddam CT Install a SiteBoss alarm panel and remove the old Larse alarm panel @ Haddam Neck 14B Haddam CT Install a SiteBoss alarm panel and remove the old Larse alarm panel @ Millstone 15G Waterford CT Pull fiber from Berlin OBA communications room to Berlin South Main communications room. Fiber to be pulled from East Building communications room to Berlin South Bldg. The OC3 microwave equipment that was removed from service between Mt Tom GS and Hadley area work center will be moved from the books to the new locations Tolland and Bolton. This work order is for equipment to be located at Tolland AWC. The OC3 microwave equipment that was removed from service between Mt Tom GS and Hadley area work center will be moved from the books to the new locations Tolland and Bolton. This work order is for equipment to be located at Bolton AWC. TK6110 LOWBAND MOBILE RADIOS WILL BE ORDERED IN 2016 TO COVER UPCOMING PURCHASES OF COMPANY VEHICLES BY TRANSPORTATION REPLACE BATTERIES AT MANCHESTER SUBSTATION SHELTER WHICH HAVE REACHED THEIR END OF LIFE TK3180 45MHz portable radios will be ordered in 2016 for use in emergency/evacuation scenarios at Cheshire AWC. Replace existing batteries at 56 Prospect Street which have reached end of life. Replace existing batteries at Southbury CSP which have reached end of life. Replace existing batteries at Stamford Shelter which have reached end of life. Replace existing batteries at West Hartland which have reached end of life. Replace existing batteries at West Hartland which have reached end of life. Replace existing batteries at West Peak which have reached end of life. Replace existing batteries at West Peak which have reached end of life. Replace existing batteries at Willimantic SBA which have reached end of life. Replace existing batteries at Willimantic SBA which have reached end of life. Install a DMX fiber mux at the Stamford AWC. Roll services to the new DMX and remove the old comm equipment. Install a DMX fiber mux at the Stamford AWC. Roll services to the new DMX and remove the old comm equipment. Install a SiteBoss alarm panel and remove the old Badger E500 alarm panel. Install a SiteBoss alarm panel and remove the old Badger E500 alarm panel. Install a SiteBoss alarm panel and remove the old Badger E500 alarm panel. Install a SiteBoss alarm panel and remove the old Badger E500 alarm panel. Install a SiteBoss alarm panel and remove the old Badger E500 alarm panel. Install a SiteBoss alarm panel and remove the old Badger E500 alarm panel. Install a SiteBoss alarm panel and remove the old Badger E500 alarm panel. Install a SiteBoss alarm panel and remove the old Badger E500 alarm panel. Install a SiteBoss alarm panel and remove the old Badger E500 alarm panel. Install a SiteBoss alarm panel and remove the old Badger E500 alarm panel. Upgrade the microwave equipment from DS3 to OC3 capacity to provide sufficient backhaul to enable microwave to be an alternate path from fiber and increase capacity. Upgrade the microwave equipment from DS3 to OC3 capacity to provide sufficient backhaul to enable microwave to be an alternate path from fiber and increase capacity. Upgrade the microwave equipment from DS3 to OC3 capacity to provide sufficient backhaul to enable microwave to be an alternate path from fiber and increase capacity. Upgrade the microwave equipment from DS3 to OC3 capacity to provide sufficient backhaul to enable microwave to be an alternate path from fiber and increase capacity. Install a dual-polarized feed horn on the existing dishes at Goose Hill. Install a new microwave radio to Talcott. Install a new feed line to the existing dishes at Talcott. Install a new microwave radio to Goose Hill. The existing equipment is at the end of its useful life. New equipment including a superior timing mechanism are proposed. The existing equipment is at the end of its useful life. New equipment including a superior timing mechanism are proposed. The existing equipment is at the end of its useful life. New equipment including a superior timing mechanism are proposed. The existing equipment is at the end of its useful life. New equipment including a superior timing mechanism are proposed. No Stonington Radio Tower Site The existing equipment is at the end of its useful life. New equipment including a superior timing mechanism are proposed. Soapstone Hill Rd, Torrington The existing equipment is at the end of its useful life. New equipment including a superior timing mechanism are proposed. Soapstone Hill Rd, Torrington The existing equipment is at the end of its useful life. New equipment including a superior timing mechanism are proposed. Bald Hill Road, Union The existing equipment is at the end of its useful life. New equipment including a superior timing mechanism are proposed. Chapel Hill Rd, Montville This work order covers equipment needed in Berlin to improve the contention mechanism for holding off paging and RCLMS transmitter controllers. This work order covers equipment needed in Windsor to improve the contention mechanism for holding off paging and RCLMS transmitter controllers. CT17D034 CT17D035 Construction Reps Lowband Radios SIMSBURY TOWER LIGHT MONITORING A request has come in to order radios for mobile/portable radios to be ordered for certain construction reps who do not currently have radios. These radios are needed for switching per TD800 MCPHEE ELECTRIC WILL PURCHASE THE EQUIPMENT AND PERFORM THE WORK FOR SIMSBURY TOWER LIGHT MONITORING Wholesale Expenses-W00 Wholesale Expenses-W00 107010 107010 1 1 CT17D036 CONVEX - Lake Road ARDs CONVEX has requested a new ARD from the Lake Rd generator to CONVEX. ISO would also like to upgrade their existing ARD to the Generator to make use of the fiber at Lake Rd. At the same time, we will upgrade the existing substation ARD to CONVEX over the new AVA-E IP backhaul equipment. This work order will be for CL&P equipment needed at Berlin to provide 4 new terminations that can make use of the corporate network and fiber to TOCA and TOCB from Lake Rd. SS and Gen. Wholesale Expenses-W00 107010 1 Lake Rd ARDs CONVEX has requested a new ARD from the Lake Rd generator to CONVEX. ISO would also like to upgrade their existing ARD to the Generator to make use of the fiber at Lake Rd. At the same time, we will upgrade the existing substation ARD to CONVEX over the new AVA-E IP backhaul equipment. This work order will be for CL&P equipment needed at Lake Rd. to provide 3 new terminations that can make use of the corporate network and fiber. Wholesale Expenses-W00 107010 1 Windsor ISO BCC and CONVEX DR - Lak Colorado Trucks Lowband Radios AVA-E, Frost Bridge ARD CONVEX has requested a new ARD from the Lake Rd generator to CONVEX. ISO would also like to upgrade their existing ARD to the Generator to make use of the fiber at Lake Rd. At the same time, we will upgrade the existing substation ARD to CONVEX over the new AVA-E IP backhaul equipment. This work order will be for CL&P equipment needed at Windsor to provide 3 new terminations that can make use of the corporate network and fiber. A request has come in to order 25 mobile radios for a new wave of Colorado Pickup trucks transportation ordered. This WO is to deploy an AVA-E at Frost Bridge 8R substation. The AVA-E will be used to backhaul an ARD phone circuit using the existing network at Frost Bridge. Wholesale Expenses-W00 Wholesale Expenses-W00 Wholesale Expenses-W00 107010 107010 107010 1 1 1 CT OpenSky Router Replacement This WO is to replace the EOL cisco 2800 series router used by OpenSky on site. This WO is to upgrade the OpenSky system from SR10A.0 to SR10A.4. Included in this WO are 10 EOL Router replacements for the sites listed below. Eversource facilities where the assets will be located: 107 Selden St, Berlin, CT 06037 414 Chapel Hill Rd, Oakdale, CT 06370 207 Garden Circle, Waterbury CT 06704 135 New Rd, Madison, CT 06443 20 Barnabas Rd, Newtown, CT 06470 Butternut Hollow Rd, Greenwich, CT 18 Kluge Rd, Prospect, CT 06712 626 Glenbrook Rd, Stamford, CT 06906 Taugwonk Rd, Stonington, CT 06378 349 Mountain St, Willimantic, CT 06226 Wholesale Expenses-W00 107010 0.92687989 CT17D037 CT17D038 CT17D040 CT17D042 CT17D047
  3. Page 1,127 of 1,160

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued October 23, 2026 RRU-159 Attachment 23 Page 1127 of 1160 work_order_number long_description description cost_element_group ferc_account percent Wholesale Expenses-W00 Wholesale Expenses-W00 Wholesale Expenses-W00 Wholesale Expenses-W00 Wholesale Expenses-W00 Wholesale Expenses-W00 108030 108030 107010 107010 107010 107010 0.07312011 0.04458599 0.95541401 1 1 1 Wholesale Expenses-W00 108030 0.04761905 Wholesale Expenses-W00 107010 0.95238095 CT17D047 CT17D048 CT17D048 CT17D058 CT18D001 CT18D002 CT OpenSky Router Replacement Berlin OpenSky Router Replacement Berlin OpenSky Router Replacement NO BLOOMFIELD 2A DMXTEND 2018 CT BATTERY REPLACEMENTS SO WINDSOR 14L JMUX CIRCUITS CT18D003 SONET Upgrades CT18D003 SONET Upgrades This WO is to replace the EOL cisco 2800 series router used by OpenSky on site. This WO is to upgrade the OpenSky system from SR10A.0 to SR10A.4. Included in this WO are 10 EOL Router replacements for the sites listed below. Eversource facilities where the assets will be located: 107 Selden St, Berlin, CT 06037 414 Chapel Hill Rd, Oakdale, CT 06370 207 Garden Circle, Waterbury CT 06704 135 New Rd, Madison, CT 06443 20 Barnabas Rd, Newtown, CT 06470 Butternut Hollow Rd, Greenwich, CT 18 Kluge Rd, Prospect, CT 06712 626 Glenbrook Rd, Stamford, CT 06906 Taugwonk Rd, Stonington, CT 06378 349 Mountain St, Willimantic, CT 06226 This WO is to replace the EOL cisco 2800 series router used by OpenSky on site. This WO is to replace the EOL cisco 2800 series router used by OpenSky on site. Install a DMXtend at North Bloomfield 2A. Cutover all the required circuits to the DMXtend. THIS IS FOR THE 2018 BATTERY REPLACEMENTS TO BE DONE BY OUTSIDE CONTRACTOR CONNECTICUT HAS 24 SITES TO MOVE THE EXISTING CIRCUITS AT SO WINDSOR 14L TO THE RECENTLY INSTALLED JMUX. THEN CANCEL THE FRONTIER CIRCUITS Install a JMUX at Windsor and cutover circuits to this new JMUX. Remove the East Springfield AWC DMX. Upgrade any out of date firmware on the JMUX networks. Order spares for the DMX network. Install a JMUX at Windsor and cutover circuits to this new JMUX. Remove the East Springfield AWC DMX. Upgrade any out of date firmware on the JMUX networks. Order spares for the DMX network. CT18D004 CT18D005 CT18D006 GPS Windsor GPS Norwalk AWC GPS BERLIN CAMPUS Document the GPS node and install antenna hardware at the Windsor Data Center. Connect any applicable devices to this GPS node. Facility located at 1985 Blue Hills Ave Extension, Windsor Install a GPS node and antenna hardware at Norwalk AWC. Connect any applicable devices to this GPS node.Facility located at 9 Tindall Ave Document the GPS node and install antenna hardware at the Berlin Campus. Connect any applicable devices to this GPS node. Wholesale Expenses-W00 Wholesale Expenses-W00 Wholesale Expenses-W00 107010 107010 107010 1 1 1 CT18D008 CT19D001 CT19D003 Towantic 3P Voice Gateway Installat CT Alarm Panel 2019 SURGE SUPPRESSOR REPL MONROE Wholesale Expenses-W00 Wholesale Expenses-W00 Wholesale Expenses-W00 107010 107010 107010 1 1 1 CT19D004 CT19D005 CT19D006 CT19D007 CT19D008 CT19D009 CT19D010 CT19D011 CT19D012 CT19D013 CT19D014 CT19D015 CT19D017 CT19D018 CT19D019 CT19D020 CT19D021 CT19D022 CT19D023 CT19D024 CT19D025 CT19D027 CT19D028 Berlin Paging Base Replacement 2019 BATTERY REPLACE BERLIN SO MUX 2019 BATTERY REPLACE BETHANY CSP 2019 BATTERY REPLACE EKONK 2019 BATTERY REPLACE GOOSE HILL 2019 BATTERY REPLACE MADISON MUX 2019 BATTERY REPLACE MONROE 2019 BATTERY REPLACE MYSTIC 13K 2019 BATTERY REPLACE REDDING CSP 2019 BATTERY REPLACE SO MTN A & B 2019 BATTERY REPLACE UNION R/S 2019 Circuit Breaker Add Glenbrook OC-12 DIVERSITY UPGRADE BESECK 9F OC-12 DIVERSITY UPGRADE CANAL 15Q OC-12 DIVERSITY UPGRADE DEVON 7R OC-12 DIVERSITY UPGRADE E DEVON 8G OC-12 DIVERSITY UPGRADE FROST BR 8R OC-12 DIVERSITY UPGRADE SOUTHING 4C OC-12 DIVERSITY UPGRADE STEVENS 14A OC-12 DIVERSITY UPGRADE TODD 30L OC-12 DIVERSITY UPGRADE TOWANTIC 3P 2019 TALCOTT MTN SURGE PROTECTION Berlin SEL ICON Installs This work order will be used to order and install a four port voice gateway at Towantic 3P substation. Use of this VG will allow for POTS lines serviced via a SIP trunk at the site to be cancelled. Purchase and install an alarm panel for Williams 9L. REPLACE SURGE SUPPRESSION AT MONROE RADIO SITE. REPLACEMENT MODULES ARE NO LONGER AVAILABLE FOR THE EXISTING SYSTEM. This work order will be used to replace the Berlin, CT Paging base. The current base station is being replaced due to complaints from the Newington FD that the base station is causing harmful interference with their paging operations in the area. MCPHEE TO PURCHASE AND INSTALL BATTERIES IN BERLIN SOUTH MUX MCPHEE TO PURCHASE AND INSTALL BATTERIES IN BETHANY CSP MCPHEE TO PURCHASE AND INSTALL BATTERIES IN BETHANY CSP MCPHEE TO PURCHASE AND INSTALL BATTERIES IN BETHANY CSP MCPHEE TO PURCHASE AND INSTALL BATTERIES IN BETHANY CSP MCPHEE TO PURCHASE AND INSTALL BATTERIES IN MONROE MCPHEE TO PURCHASE AND INSTALL BATTERIES IN MYSTIC 13K MCPHEE TO PURCHASE AND INSTALL BATTERIES IN REDDING CSP MCPHEE TO PURCHASE AND INSTALL BATTERIES IN SOUTH MOUNTAIN A & B MCPHEE TO PURCHASE AND INSTALL BATTERIES IN UNION R/S Add circuit breakers to battery strings at Glenbrook S/C to isolate individual battery strings in the event of battery failure Diversify the DMX OC-12 ring from Frost Bridge 8R to Stevenson 14A. Diversify the DMX OC-12 ring from Frost Bridge 8R to Stevenson 14A. Diversify the DMX OC-12 ring from Frost Bridge 8R to Stevenson 14A. Diversify the DMX OC-12 ring from Frost Bridge 8R to Stevenson 14A. Diversify the DMX OC-12 ring from Frost Bridge 8R to Stevenson 14A. Diversify the DMX OC-12 ring from Frost Bridge 8R to Stevenson 14A. Diversify the DMX OC-12 ring from Frost Bridge 8R to Stevenson 14A. Diversify the DMX OC-12 ring from Frost Bridge 8R to Stevenson 14A. Diversify the DMX OC-12 ring from Frost Bridge 8R to Stevenson 14A. SURGE PROTECTION INSTALL AT TALCOTT MOUNTAIN AND HEATER UPGRADE Install SEL ICONs in Berlin to support the last mile projects. Wholesale Expenses-W00 Wholesale Expenses-W00 Wholesale Expenses-W00 Wholesale Expenses-W00 Wholesale Expenses-W00 Wholesale Expenses-W00 Wholesale Expenses-W00 Wholesale Expenses-W00 Wholesale Expenses-W00 Wholesale Expenses-W00 Wholesale Expenses-W00 Wholesale Expenses-W00 Wholesale Expenses-W00 Wholesale Expenses-W00 Wholesale Expenses-W00 Wholesale Expenses-W00 Wholesale Expenses-W00 Wholesale Expenses-W00 Wholesale Expenses-W00 Wholesale Expenses-W00 Wholesale Expenses-W00 Wholesale Expenses-W00 Wholesale Expenses-W00 107010 107010 107010 107010 107010 107010 107010 107010 107010 107010 107010 107010 107010 107010 107010 107010 107010 107010 107010 107010 107010 107010 107010 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 CT19D029 CT19D030 CT19D033 CT19D035 CT19D036 Berlin Paging Base Replacement ICCP Core Router Installation BERLIN TOCA TOCB ISO OP-18 WINDSOR DATA CENTER ISO OP-18 BERLIN BATTERY REPL BERLIN SO MUX Wholesale Expenses-W00 Wholesale Expenses-W00 Wholesale Expenses-W00 Wholesale Expenses-W00 Wholesale Expenses-W00 107010 107010 107010 107010 107010 1 1 1 1 1 CT19D038 CT20D001 Kenwood NX-5400 Lowband Mobile Repl ISO ICCP Upgrade Wholesale Expenses-W00 Wholesale Expenses-W00 107010 107010 1 1 Wholesale Expenses-W00 Wholesale Expenses-W00 Wholesale Expenses-W00 107010 107010 107010 1 1 1 Wholesale Expenses-W00 107010 1 Wholesale Expenses-W00 107010 1 This work order will be used to replace the Berlin, CT Paging base. The current base station is being replaced due to complaints from the Newington FD that the base station is causing harmful interference with their paging operations in the area. This work order will be used to order a fuse panel for the Winsor Data Center rack 826 in support of the ISO-NE STN ICCP network TEMPORARY HOLDING WORK ORDER AWAITING THE OP-18 PROJECT APPROVAL AND SUBSEQUENT WORK ORDERS TEMPORARY HOLDING WORK ORDER AWAITING THE OP-18 PROJECT APPROVAL AND SUBSEQUENT WORK ORDERS Replace batteries at Berlin South MUX which have reached end of life and require replacement. Batteries will be replaced with four EnerSys C11F batteries. This work order willl be used to pilot the kenwood NX-5400 radio This will be evaluated as a potential replacement for the TK-6110 which is now discontinued Order and install new card for Devon Light Tower JMUX for T1 handoff for ISO's ICCP upgrade This work order will be used to have AZ construction services procure, install, and test a new fiber installation between the Berlin South building Main communications room to the TOC Data Center. CT20D002 CT20D003 CT20D005 Berlin South MDF to TOC Fiber Berlin South SEL ICON for CL&P Zetron Acom Windows 10 Upgrade CT20D006 OpenSky - Bases - Lab CT20D007 Windsor SEL ICON Install 24SM/24MM Berlin South to TOC A 24SM/24MM Berlin South to TOC B This Icon is needed to provide connectivity between the Berlin South penthouse and the Berlin OBA where central electronic equipment is located. Zetron Acom Windows 10 Upgrade This equipment is to be used as part of the CT Berlin Telecom Lab for OpenSky testing and replacement of equipment failures We will be installing a new SEL ICON SONET MUX at Windsor. This will support the interconnection of substation SCADA and other substation communication services with the Eversource Core Network This work order willl be used to purchase (5) Kenwood TK-6110-K2 Lowband Mobile Radios. The TK-6110 radios are manufacturer discontinued as of 2019. This purchase is for used radios which have been pre-tested and certified to meeting manufacturer specification. This will be used to provide radios to new vehicles recently purchased by CT Transportation CT20D008 CT20D011 CT20D011 CT20D012 Kenwood TK-6110 Q3 2020 Order Union Shelter Roof + Door Replaceme Union Shelter Roof + Door Replaceme This work order will be utilized to replace the roof and door on the Eversource owned shelter at Union Radio site This work order will be utilized to replace the roof and door on the Eversource owned shelter at Union Radio site Wholesale Expenses-W00 Wholesale Expenses-W00 Wholesale Expenses-W00 107010 108030 107010 1 0.04761905 0.95238095 Telecom 10XTS Purchase - Last Time These 10XTS units will be used to support the upcoming distribution SCADA upgrade planned for CT and the expansion of serial traffic from EMA to CT for DR purposes.Eversource received notice from the manufacturer that the equipment is being discontinued at the end of 2020. This represents the last oppurtunity Eversource will have to purhcase 10XTS units for units being deployed in the forseeable future as well as emergency spares. Wholesale Expenses-W00 107010 1 Wholesale Expenses-W00 Wholesale Expenses-W00 107010 107010 1 1 The Belden 10XTS platform is currently utilized by Eversource Transmission Automation in support of Supervisory Control and Data Acquisition (SCADA) and remote access of serial devices in substations. CT20D013 CT20D015 TSCADA 10XTS Purchase - Last Time B Soapstone Cathotic Protection Eversource received notice from the manufacturer that the equipment is being discontinued at the end of 2020. This represents the last oppurtunity Eversource will have to purhcase 10XTS units for units being deployed in the forseeable future as well as emergency spares. This work order will be for the installation of Cathodic Protection at Soapstone radio site for the UG piping associated with the generator installation. This work order will be used to repair the roof of Eversource's radio communications shelter at Soapstone Radio site in CT. CT20D016 CT21D001 Soapstone Roof Repair 2020 A proposal for the repair has been received for $4960 Wholesale Expenses-W00 107010 1 Eltek Controllers Purchase Fifteen Eltek Controllers have reached end of life and can not support firmware upgrades Eversource facility where asset is located: Danielson AWC, New Milford R/S, Norwalk AWC, Prospect R/S, Soapstone R/S, Southbury CSP, Southington 4C, Thompson CSP, Torrington AWC, Union R/S, West Hartland R/S, West Peak R/S, Willimantic R/S, Windsor CT1, Windsor CT2 Note: This information is not necessary for radios, GPS Systems and PC's Wholesale Expenses-W00 107010 1 Wholesale Expenses-W00 Wholesale Expenses-W00 Wholesale Expenses-W00 Wholesale Expenses-W00 Wholesale Expenses-W00 Wholesale Expenses-W00 Wholesale Expenses-W00 Wholesale Expenses-W00 Wholesale Expenses-W00 107010 107010 107010 107010 108030 107010 107010 107010 107010 1 1 1 0.95238081 0.04761919 1 1 1 1 Wholesale Expenses-W00 Wholesale Expenses-W00 107010 107010 1 1 Wholesale Expenses-W00 107010 1 Wholesale Expenses-W00 107010 0.95238095 Wholesale Expenses-W00 108030 0.04761905 Wholesale Expenses-W00 107010 0.95238095 Wholesale Expenses-W00 108030 0.04761905 Wholesale Expenses-W00 108030 0.04761905 Wholesale Expenses-W00 107010 0.95238095 Wholesale Expenses-W00 107010 0.95238095 Wholesale Expenses-W00 108030 0.04761905 Wholesale Expenses-W00 107010 0.95238095 Wholesale Expenses-W00 108030 0.04761905 Wholesale Expenses-W00 107010 1 Wholesale Expenses-W00 108030 0.04761905 Wholesale Expenses-W00 107010 0.95238095 This work order willl be used to purchase (14) Kenwood TK-6110-K2 Lowband Mobile Radios. The TK-6110 radios are manufacturer discontinued as of 2019. This purchase is for used radios which have been pre-tested and certified to meeting manufacturer specification. This will be used to provide radios to new vehicles recently purchased by CT Transportation CT21D002 CT21D004 CT21D005 CT21D006 CT21D006 CT21D007 CT21D008 CT21D009 CT21D011 Kenwood TK-6110 Q1 2021 Order Aviat Eclipse - MW Radio SFP Aviat Eclipse-MW Radio SFP Talcott 2021 Danielson AWC Battery Replacem 2021 Danielson AWC Battery Replacem 2021 Higganum Radio Site Battery Re 2021 Wilton CSP Battery Replacement 2021 Southington 4C Charger Replace Berlin South Comm Rm Batt Repl CT22D001 CT22D002 Tait Core Server Repl Windsor Tait Core Server Repl Berlin CT22D003 Berlin Microwave Replacement This WO will be used to purchase a SFP for a Gb Ethernet connection at Goose Hill radio site. The SFP will be utilized for the Aviat Eclipse radio at Goose HIll. This WO will be used to purchase a SFP for a Gb Ethernet connection at Goose Hill radio site. The SFP will be utilized for the Aviat Eclipse radio at Talcott Mtn Batteries at Danielson AWC have reached end of life and must be replaced. Batteries at Danielson AWC have reached end of life and must be replaced. Batteries at Higganum AWC have reached end of life and must be replaced. Batteries at Wilton CSP have reached end of life and must be replaced. Chargers at Southington 4C must be upgraded to support additional loading. Batteries & Chargers in the BerlinSouth Comm Room have reached end of life and must be replaced. Tait Core Server Repl Windsor Tait Core Server Repl Berlin Berlin Microwave Replacement Belrin Garage Battery Replacement Woodbury Great Hollow Rd. Woodbury, CT CT22D004 Battery Replacement Woodbury Battery Replacement Woodbury Great Hollow Rd. Woodbury, CT CT22D004 Battery Replacement Woodbury Battery Replacement Brooklyn 116 Grant Hill Rd. Brooklyn, CT CT22D005 Battery Replacement Brooklyn Battery Replacement Brooklyn 116 Grant Hill Rd. Brooklyn, CT CT22D005 Battery Replacement Brooklyn Battery Replacement Greenwich Hospital 5 Perryridge Rd. Greenwich, CT CT22D006 Battery Replacement Greenwich Hosp Battery Replacement Greenwich Hospital 5 Perryridge Rd. Greenwich, CT CT22D006 Battery Replacement Greenwich Hosp Battery Replacement Tolland AWC 48 Tolland Stage Rd, Tolland, CT CT22D007 Battery Replacement Tolland AWC Battery Replacement Tolland AWC 48 Tolland Stage Rd, Tolland, CT CT22D007 Battery Replacement Tolland AWC Battery Replacement Williams 9L 469 Williams St. New London, CT CT22D008 Battery Replacement Williams 9L Battery Replacement Williams 9L 469 Williams St. New London, CT CT22D008 CT22D010 Battery Replacement Williams 9L New London AWC SEL ICON New London AWC SEL ICON 63R Myrock Avenue, Waterford, CT Asset location: telecom room Battery Replacement Cheshire Shelter 705 W. Johnson Ave, Cheshire, CT CT22D012 Battery replacement Cheshire Shelte Battery Replacement Cheshire Shelter 705 W. Johnson Ave, Cheshire, CT CT22D012 Battery replacement Cheshire Shelte
  4. Page 1,128 of 1,160

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued October 23, 2026 RRU-159 Attachment 23 Page 1128 of 1160 work_order_number long_description description cost_element_group ferc_account percent Wholesale Expenses-W00 107010 0.95238095 Wholesale Expenses-W00 108030 0.04761905 Wholesale Expenses-W00 108030 0.04761905 Wholesale Expenses-W00 107010 0.95238095 Wholesale Expenses-W00 107010 0.95238095 Wholesale Expenses-W00 108030 0.04761905 Wholesale Expenses-W00 107010 0.95238095 Wholesale Expenses-W00 108030 0.04761905 Wholesale Expenses-W00 107010 0.95238095 Wholesale Expenses-W00 108030 0.04761905 Wholesale Expenses-W00 107010 0.95238095 Wholesale Expenses-W00 Wholesale Expenses-W00 Wholesale Expenses-W00 108030 107010 108030 0.04761905 0.95238095 0.04761905 Wholesale Expenses-W00 108030 0.04761905 Wholesale Expenses-W00 Wholesale Expenses-W00 Wholesale Expenses-W00 107010 107010 108030 0.95238095 0.95238095 0.04761905 Wholesale Expenses-W00 107010 1 Wholesale Expenses-W00 107010 1 Wholesale Expenses-W00 107010 0.84473684 Wholesale Expenses-W00 108030 0.15526316 Wholesale Expenses-W00 107010 1 Wholesale Expenses-W00 107010 0.95238095 Wholesale Expenses-W00 108030 0.04761905 Wholesale Expenses-W00 107010 1 Wholesale Expenses-W00 107010 1 Wholesale Expenses-W00 107010 1 Wholesale Expenses-W00 108030 0.04817179 Wholesale Expenses-W00 107010 0.95182821 Wholesale Expenses-W00 107010 1 Wholesale Expenses-W00 Wholesale Expenses-W00 Wholesale Expenses-W00 107010 108030 107010 1 0.04761905 0.95238095 Wholesale Expenses-W00 108030 0.04761905 Wholesale Expenses-W00 107010 0.95238095 Wholesale Expenses-W00 107010 1 Wholesale Expenses-W00 108030 0.04761905 Wholesale Expenses-W00 107010 0.95238095 Wholesale Expenses-W00 108030 0.04761905 Wholesale Expenses-W00 107010 0.95238095 Wholesale Expenses-W00 107010 0.8974359 Wholesale Expenses-W00 Wholesale Expenses-W00 Wholesale Expenses-W00 Wholesale Expenses-W00 Wholesale Expenses-W00 Wholesale Expenses-W00 108030 107010 108030 107010 108030 107010 0.1025641 1 0.10313901 0.89686099 0.08196721 0.91803279 Wholesale Expenses-W00 107010 1 Wholesale Expenses-W00 Wholesale Expenses-W00 Wholesale Expenses-W00 107010 903000 902003 1 1 1 Battery Replacement East Hampton Line 22 East High St. East Hampton, CT CT22D013 Battery Replacement East Hampton Battery Replacement East Hampton Line 22 East High St. East Hampton, CT CT22D013 Battery Replacement East Hampton Battery Replacement Norwalk Hbr Shelter Tindall Ave, Norwalk, CT CT22D014 Battery Replacement Norwalk Hbr Battery Replacement Norwalk Hbr Shelter Tindall Ave, Norwalk, CT CT22D014 Battery Replacement Norwalk Hbr CT22D015 Battery Replacement Torrington Battery Replacement Torrington S/C Battery Replacement Torrington S/C CT22D015 Battery Replacement Torrington Battery Replacement Westport 180A Bayberry Lane, Westport, CT CT22D016 Battery Replacement Westport Battery Replacement Westport 180A Bayberry Lane, Westport, CT CT22D016 Battery Replacement Westport Battery Replacement Montville Fire Dept 911 Route 32 Uncasville, CT CT22D017 Battery Replacement Montville Battery Replacement Montville Fire Dept 911 Route 32 Uncasville, CT CT22D017 Battery Replacement Montville CT23D001 Battery Replacement Cedar Heights CT23D001 CT23D002 CT23D002 Battery Replacement Cedar Heights Battery Replacement Danbury Crows N Battery Replacement Danbury Crows N CT23D003 Battery Replacement Lakeview 31A CT23D003 CT23D004 CT23D004 Battery Replacement Lakeview 31A Battery Replacement Berlin East Lab Battery Replacement Berlin East Lab CT23D006 HVAC Replacement Willimantic CT23D007 HVAC Replacement Cheshire Battery Replacement Cedar Heights 64 Rapids Road, Stamford, CT Battery Replacement Cedar Heights 64 Rapids Road, Stamford, CT Battery Replacement Danbury Crows Nest Battery Replacement Danbury Crows Nest Battery Replacement Lakeview 31A Lakeview Ave, New Canaan Battery Replacement Lakeview 31A Lakeview Ave, New Canaan Battery Replacement Berlin East Lab Battery Replacement Berlin East Lab HVAC Replacement Willimantic 349 Mountain St Windham HVAC Replacement Cheshire 705 W Johnson Ave HVAC Replacement Ridgefield 22N Off Prospect Street, Ridgefield, CT CT23D009 HVAC Replacement Ridgefield HVAC Replacement Ridgefield 22N Off Prospect Street, Ridgefield, CT CT23D009 HVAC Replacement Ridgefield HVAC Replacement Prospect RS 18 Kluge Rd, Prospect, CT CT23D010 HVAC Replacement Prospect HVAC Replacement Greenwich Hospital 5 Perryridge Rd. Greenwich, CT CT23D011 HVAC Replacement Greenwich Hosp HVAC Replacement Greenwich Hospital 5 Perryridge Rd. Greenwich, CT CT23D011 HVAC Replacement Greenwich Hosp Site 47 SEL ICON 107 Selden St, Berlin, CT Telecom Room CT23D012 Site 47 SEL ICON CT Delta Controllers Delta Controllers Various Stations CT23D013 CT Delta Controllers Sasco Creek ADSS 30 Maple Lane, Westport, CT Control house CT23D014 Sasco Creek ADSS HVAC Replacement So. Mtn 790 Willis Street, Bristol, CT Radio Shelter CT23D017 So Mtn Bristol HVAC Replacement HVAC Replacement So. Mtn 790 Willis Street, Bristol, CT Radio Shelter CT23D017 So Mtn Bristol HVAC Replacement CT24CAPEQUIP - 2024 Capital Equipment Dist Comm Lab Equipment Test equipment for lab environment 107 Selden St, Berlin CT Distribution Communication Office CT240001 Lab Equipment Berlin Plumtree FXS FXO Cards Plumtree FXS FXO Cards 16 Walnut Hill Rd, Bethel, CT Control house CT24D001 CT24D002 CT24D002 Plumtree FXS FXO Cards 56 Prospect St Batteries 56 Prospect St Batteries CT24D003 New London Batteries CT24D003 New London Batteries CT24D004 Stamford AWC Batteries CT24D005 So. Mtn HVAC Replacement CT24D005 So. Mtn HVAC Replacement CT24D006 Willimantic HVAC Replacement CT24D006 Willimantic HVAC Replacement CT24D007 West Hartland HVAC Replacement CT24D007 CT24D008 CT24D009 CT24D009 CT24D010 CT24D010 West Hartland HVAC Replacement Sopastone site boss HVAC Replacement Coventry HVAC Replacement Coventry HVAC Replacement Wilton St Police HVAC Replacement Wilton St Police 56 Prospect St Hartford, CT Batteries 56 Prospect St Hartford, CT Batteries 63R Myrock Ave, Waterford, CT New London Batteries 63R Myrock Ave, Waterford, CT New London Batteries 626 Glenbrook Rd. Stamford, CT Stamford AWC Batteries So. Mtn HVAC Replacement 790 Willis Street, Bristol, CT So. Mtn HVAC Replacement 790 Willis Street, Bristol, CT Willimantic HVAC Replacement 349 Mountain St, Windham, CT Willimantic HVAC Replacement 349 Mountain St, Windham, CT West Hartland HVAC Replacement 2 Center Hill Rd, West Hartland, CT West Hartland HVAC Replacement 2 Center Hill Rd, West Hartland, CT 1554 Highland Avenue, Torrington, CT Radio Shelter 400 Riley Rd Coventry CT 400 Riley Rd Coventry CT 46 Fernwood Lane Wilton CT 46 Fernwood Lane Wilton CT Greenwich Hospital Cell Modems Installation Install cell modems to keep the connectivity of the field devices with the SCADA network after the master radio backbone is disconnected by Verizon. Procure and deploy ~ 50 cell modems 5 Perryridge Rd, Greenwich, CT 06830 Telecom Shelter CT24D012 Greenwich Hospital Cell Modems SEL ICON for SCADA Access TOC-B 107 Selden Street, Berlin, MA Comm Room CT24SC01 CTAFP011 CTBGD011 SEL ICON SCADA Access Solution CT AFP Docket 20-07-04 CT Payments Docket 21-07-01 CTCART25 Blanket Cart for CT Dielectric Lab Per Teams call with Matthew Chamberlain 10-10-2025, the estimated cost is $3,705.00. This is from EverGreen Sheet Metal, Inc. The vendor is fabricating a blanket cart from stainless steel. Wholesale Expenses-W00 107010 1 CTCOM011 CTE DK24|05|01 New Comp Stakhers CTE New Comp for Stakeholders - Balmer, Melanie DK 24-05-01 - The electric distribution companies (EDCs) may recover through the Non-Bypassable Federally Mandated Congestion Charge (NBFMCC) any costs that were incurred in the relevant calendar year. Wholesale Expenses-W00 903000 1 CTCRBER1 CTCRC011 Install Card Reader for Berlin Lab Customer Research - Online Communit 107010 903003 1 1 CTDBCONV CTDDP011 DB CONVERSION CT CT Elec Data Dashboard Docket 21-07 Install card reader for meter shop in Torrington AWC to restrict access per e-mails from Karen Palmieri, David Glanovsky, Christopher Kellogg on December 8 & 9 2020. The cost is about $4,000.00. Wholesale Expenses-W00 Customer Research - Online Communities - Balmer, Melanie Wholesale Expenses-W00 THIS IS A MAP CONSOLIDATION PORTION OF THE GIS MAPPING PROJECT. CONTRACTORS WILL REVIEW AND CONSOLIDATE PAPER/CAD/GIS AND UPDATE THE GIS MAPPING SYSTEM. END RESULT IS ONE LOCATION FOR ALL MAPS USING NEW SOURCE SOFTWARE Wholesale Expenses-W00 CT Elec Data Dashboard Docket 21-07-01 Order #15-Balmer Wholesale Expenses-W00 107010 903000 1 1 Wholesale Expenses-W00 108030 0.15084973 Wholesale Expenses-W00 Wholesale Expenses-W00 107010 107010 0.84915027 1 CT AFP Docket 20-07-04-Quarsema CT Payments Docket 21-07-01-Balmer This rubber blanket cart will be in the Berlin dielectric lab to maneuver rubber blankets around the lab. CT Voice Radio 2024 Project Close out Materials & Labor [8:50 AM] Preci, Nikoll S Close-Out [8:49 AM] Preci, Nikoll S CT Voice Radio 2024 Project Close out Materials & Labor CTDM241D CT Voice Radio 2024 closeout CT Voice Radio 2024 Project Close out Materials & Labor [8:50 AM] Preci, Nikoll S Close-Out [8:49 AM] Preci, Nikoll S CT Voice Radio 2024 Project Close out Materials & Labor CTDM241D CTDMR11D CT Voice Radio 2024 closeout DMR Project Close Out CT Dist CT VOICE RADIO SYSTEM PROJECT - DMR Project Close out
  5. Page 1,129 of 1,160

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued October 23, 2026 RRU-159 Attachment 23 Page 1129 of 1160 work_order_number CTDOBLE1 CTDRA011 long_description description Doble Test Equipment CTE LIDR Call Handling Dkt 17-12-03 This work order was created to accept the charges for the doble test equipment from Doble Engineering. The total estimated cost is $756,000.00 which will be split between CT (85%) and WMA (15%). CT = $642,600 WMA = $113,400 CTE LIDR Call Handling Dkt 17-12-03 - Balmer, Melanie cost_element_group ferc_account percent Wholesale Expenses-W00 Wholesale Expenses-W00 107010 908000 1 1 Wholesale Expenses-W00 Wholesale Expenses-W00 107010 908000 1 1 Wholesale Expenses-W00 107010 1 Wholesale Expenses-W00 107010 1 Wholesale Expenses-W00 Wholesale Expenses-W00 107010 107010 1 1 Wholesale Expenses-W00 Wholesale Expenses-W00 Wholesale Expenses-W00 Wholesale Expenses-W00 107010 908EV0 408620 107010 1 1 1 1 Wholesale Expenses-W00 107010 1 Wholesale Expenses-W00 Wholesale Expenses-W00 Wholesale Expenses-W00 Wholesale Expenses-W00 Wholesale Expenses-W00 Wholesale Expenses-W00 Wholesale Expenses-W00 107010 107010 908000 908000 107010 565000 107010 1 1 1 1 1 1 1 Wholesale Expenses-W00 107010 0.95822622 Wholesale Expenses-W00 Wholesale Expenses-W00 Wholesale Expenses-W00 108030 555000 555000 0.04177378 1 1 Wholesale Expenses-W00 Wholesale Expenses-W00 Wholesale Expenses-W00 Wholesale Expenses-W00 Wholesale Expenses-W00 Wholesale Expenses-W00 Wholesale Expenses-W00 Wholesale Expenses-W00 Wholesale Expenses-W00 Wholesale Expenses-W00 107010 920000 555000 555000 555000 555000 555000 908000 107010 107010 1 1 1 1 1 1 1 1 1 1 Wholesale Expenses-W00 107010 1 Wholesale Expenses-W00 107010 1 Wholesale Expenses-W00 107010 1 Wholesale Expenses-W00 107010 1 Wholesale Expenses-W00 107010 1 107010 1 107010 1 107010 1 Wholesale Expenses-W00 107010 1 Wholesale Expenses-W00 107010 1 Wholesale Expenses-W00 107010 0.95238095 Wholesale Expenses-W00 108030 0.04761905 Wholesale Expenses-W00 107010 1 Wholesale Expenses-W00 107010 1 Wholesale Expenses-W00 A project authorization for $19,994,000 is being requested to fund the IT Scope of Work to support the construction of a new CT Distribution System Operation Center (SOC) at the existing Windsor Facility. The new Windsor SOC will be designed like the Mass Ave Control Room to support a physical layout and system visualization tools that encourage communication and visibility between desks. This model has been identified as an industry best practice. Once constructed, the new Windsor SOC will improve our operational efficiency, meeting NERC-CIP best practices. The audio and video display systems will increase operational awareness and efficiencies to include a Human Performance centric design needed to operate the modern distribution system and the distribution grid of the future. Additionally, the video wall display boards will enhance overall awareness by leveraging current and new graphical user interfaces as they become available; this will enhance operations ability to assess and analyze system events. This PAF scope of work includes the purchase, installation, and configuration of Computer, Audio-Visual, and KVM (Keyboard, Video, and Mouse) equipment which must be purchased to outfit the SOC with technology needed for system operations. CTDSOC11 CTEHI011 New Windsor SOC ITand AV Equipment CTE Hardship Inbox 21-07-01; 26 CTE Hardship Inbox 21-07-01; 26-Balmer CT DSCADA OpenSky Replacement Investigate options for Open Sky replacement and DSCADA support in CT including private radio and cellular. Statewide CT CTFAN001 CT DSCADA Open Sky Replaement CTFARM20 CT Meter Farm Project CTFT20E2 CTGISGPS Newtown Smart Board/TV purchase CT DIRECT BURIED GPS CTGISGRD CTGRID11 CTGRT411 CTIPAD20 GIS GRID SCALING Other-Electric Vehicles CT Gross Earnings Tax CT New Apprentices Tablets This work order will capture charges related to the Connecticut Meter Farm being built by Tesco. The purchase order number is 10996182. Itron Riva AMI meters will be installed to test the communication attributes. This test will help decide which type of AMI system should be pursued. The 3 farms cost $94,290.00. All above information provided by George Townsend's e-mail dated 4/10/2020. This work order is to purchase a smart board TV for Newtown, CT Field Training Organization (1FT). Per Dan Chambrello's email dated 7/20/20, requesting the purchase of a smart board in Newtown. The estimated cost is $13,000. The project scope is for DAVEY RESOURCE The project scope is for RAMTeCH to provide (2) onsite personnel and that will work alongside Eversource GIS technicians and (8) offsite RAMTeCH personnel to complete scaling of the CT Grids. Grid scaling is prerequisite for several pending GIS data quality improvement projects. Other-Electric Vehicles-Quaresma CT Gross Earnings Tax-Rose This work order is to purchase 30 new ipads for CT new apprentices for an estimated amount of $36,682.5. This work order is to purchase 56 new ipads for the 2021 CT new apprentices. Per Jonathan Bradley's email dated 3/17/2021 requesting the purchase of 56 ipad at $1,250.00 per tablet for a total amount of $70,000.00. CTIPAD21 CT New Apprentices Tablets Per LIsa's email dated 4/2/2021, requesting to increase the number of iPad for CT to 60 at $1,250/iPad. This work order is to purchase 20 iPads, the accessories, and a charging station for the Berlin training classroom. CTIPAD25 CTLD1DC2 CTLDA011 CTLID011 CTLIFT23 CTME0111 CTMONITR iPads for Berlin Training Classroom EQUIPMENT TO PROVIDE 10 MB ETHERNET CTE LIDR Administrative Costs CTE Low Inc Disc Dkt 17-12-03RELL New Forklift for CT Dielectrics Lab CTMEEC CT BATTERY MONITORING Per Alex Chasson-Colebourn's e-mail dated 2/19/2025, the purchase includes: (20) iPads (inlcuding cases and accessories) @ $1,321.01 each = $26,420.20 (1) LocknCharge charging station = $668.35 Total estimated cost = $27,088.55 PURCHASE AND INSTALL STEEL CONDUIT FOR 10 MB ETHERNET CIRCUIT REQUESTOR-ED ARIOLA - MANAGER GERRY BLANCHARD CTE Low Inc Disc Dkt 17-12-03RELL Motion 51-Balmer This work order will be used to purchase a new electric lift truck. The equipment will be used in the CT Dielectric Lab. The price is estimated at $40,000.00. CTMEEC Add battery monitoring to key facilities in Connecticut to enhance the reliability of the DC power System and minimize the possibility of DC power loss and catastrophic failure. This work order is to purchase CT Technical Training Timpson Training Unit (Timpson Meter Panel) for the Berlin Training Yard. Per Dan Chambrello's e-mail dated 1/13/2022, the unit cost approximately $350,000. CTMTRPNL Timpson Training Unit Per (Chris Richard's email 10/2/20)- requesting the purchase of a tent from Extreme Canopy for $93510.00 for Matt Greges. This work order is to purchase CT Technical Training Timpson Training Unit (Timpson Meter Panel) for the Berlin Training Yard. Per Dan Chambrello's e-mail dated 1/13/2022, the unit cost approximately $350,000. CTMTRPNL CTNRS011 CTNRS311 Timpson Training Unit CT Non Res-Program Administration CT Non Res-Customer Application Fee Per (Chris Richard's email 10/2/20)- requesting the purchase of a tent from Extreme Canopy for $93510.00 for Matt Greges. CT Non Res-Program Administration-Augelli CT Non Res-Customer Application Fees-Augelli This work order was created to accept the charges for the Overhead curriculum development project which is a piece of the overall electric curriculum development project (CTMTRTRN) for Field Training. Per Alex Chasson-Colebourn , the vendor (Index AR) quote is $1,400,000 and the vendor (Mosaic) quote is $1,566,000. The internal labor cost is estimated to be $33,333 each month for 18 months. The costs (direct and indirect) will be distributed according to the PAF $4,200,195. CTOHTRNG CTPBRO11 CTREG011 CTRES011 CTRES211 CTRES311 CTRES511 CTREW011 CTRSHTFD CTRSNWTN Overhead Curriculum Development CT PBR Regulatory Reporting Process CT Regulatory Costs CT Residential Tariff O&M CT Res O&M-Admin Contractors CT Res O&M- Admin Other CT Res O&M-Customer App Fees CTE RRES & ESS DK 23-05-01; 7 HTFD REG EOC SS SECURITY NEWTOWN REG EOC SECURITY CTRTHTFD HARTFORD REG EOC TELCOM CTRTNLND NEW LONDON REG EOC TELECOM CTRTNWTN NEWTOWN REG EOC TELECOM CT = 35% = $1,470,068 EMA = 35% = $1,470,068 NH = 20% = $840,039 WMA = 10% = $420,019 CT PBR Regulatory Reporting Process - Savage, Jessica CT Regulatory Costs-Amnott CT Residential Tariff O&M-Quarsema CT Res O&M-Admin Contractors-Quaresma CT Res O&M- Admin Other-Quaresma CT Res O&M-Customer App Fees-Quaresma CTE RRES & ESS DK 23-05-01; 7 - Balmer, Melanie Cyber and physical security for regional EOC's. Security hardware for DSCADA system, installation of security cameras and card readers. Cyber and physical security for regional EOC's. Security hardware for DSCADA system, installation of security cameras and card readers. NEWTOWN TELECOMMUNICATION FOR HARTFORD REGIONAL EOC. LOCAL AND WAN EQUIPMENT TO SUPPORT DSCADA, AVTEK RADIO FIBER OPITC INSTALLATION TO HARTFORD AND ANCILLARY EQUIPMENT TELECOMMUNICATION FOR NEW LONDON REGIONAL EOC. LOCAL AND WAN EQUIPMENT TO SUPPORT DSCADA, AVTEK RADIO FIBER OPTIC INSTALLATION TO HARTFORD AND ANCILLARY EQUIPMENT TELECOMMUNICATION FOR NEWTOWN REGIONAL EOC. LOCAL AND WAN EQUIPMENT TO SUPPORT DSCADA, AVTEK RADIO FIBER OPITC INSTALLATION TO HARTFORD AND ANCILLARY EQUIPMENT Norwalk ACW SEL ICON 2 Tindall Ave, Norwalk, CT radio room CTSEL001 Norwalk AWC SEL ICON Newtown ACW SEL ICON 20 Barnabas Rd, Newtown CT radio room CTSEL002 Newtown SEL ICON CT Electric Distribution Fleet Capital Tool Purchase Vehicle Diagnostic Equipment - 4 - Berlin 3 Danielson 1 The current diagnostic equipment is outdated and can no longer be updated to our current model year. The diagnostic equipment will allow us to perform diagnostic repairs to our vehicles and reduce vehicle repair time. CTTL2301 CT Elec D Fleet Capital Tool Purcha CTTL2304 CT Elec Fleet Capital Tool Purchase CTTL2307 CT Elec Fleet Capital Tool Purchase Wholesale Expenses-W00 CT Electric Distribution Fleet Capital Tool Purchase CT Fleet Operations is requestig funds to purchase 6 additional HYTORQ tools for the garages that don't have them. The tool is needed to properly torque the turret bolts at the annual inspection. The CT garages are HFD,STM,WTBY,MDS,TOR,EHP. Wholesale Expenses-W00 CT Electric Distribution Fleet Capital Tool Purchase Newtown Fleet Repair Garage is requesting capital funds for the purchase of a new tire machine to replace the existing unrepairable tire machine. Wholesale Expenses-W00 CT Elec Fleet Capital Tool Purchase CT Electric Distribution Fleet Capital Tool Purchase Hytorq Torque Tool CT Fleet Operations is requesting funds to purchase 1 additional HYTORQ tool for the HFD garage. The tool is needed to properly torque the turret bolts at the equipments annual inspection. CTTL2309 CTTL2313 CT Elec D Fleet Capital Tool Purcha CTTL2314 CT Elec D Fleet Capital Tools CTTL2314 CT Elec D Fleet Capital Tools CT Electric Distribution Fleet Capital Tool Purchase 5 Jump packs for CT Garages, TLN, DNL, BER, TORR, WBY Jump pack used to jump start units 5 for 5 garages life exp of tool is 6 years They replace obsolete units we now have No need to call vendor for jump starts average savings per year is $600 per pack. CT Electric Distribution Fleet Capital Tool Purchase CT Operations is requesting Fleet Capital funds to mount new tire equipment and shop work bench in Newtown garage. CT Electric Distribution Fleet Capital Tool Purchase CT Operations is requesting Fleet Capital funds to mount new tire equipment and shop work bench in Newtown garage. CT Elec D Fleet Capital Tools CT Electric Distribution Fleet Capital Tool Purchase Calipers for accurate inspections of leveling chains Estimate service life 8-10 years There is no replacement cost This is for 6 units @ $809.95 each CTTL2316 CT Electric Distribution Fleet Capital Tool Purchase The current diagnostic equipment is outdated and can no longer be updated to our current model year. The diagnostic equipment will allow us to perform diagnostic repairs to our vehicles and reduce vehicle repair time. E.Hampton, Newtown, New London, Norwalk. CTTL2402 CT Elec D Fleet Capital Tools CTTL2406 CT Elec D Fleet Capital Tools 107010 1 CTTL2408 CT Fleet Capital Tool Purchases CT Electric Distribution Fleet Capital Tool Purchase Cordless battery powered tools for service trucks, to provide safer more ergonomic repairs. 16 sets for all 16 Service Trucks CT Electric Distribution Fleet Capital Tool Purchase 14 sets Altec specific tools for maintenance of DM47-B Digger Derricks, to provide safer and more ergonomic repairs. 1 set of tools per each CT garage. Wholesale Expenses-W00 107010 1 CT Fleet Capital Tool Purchases CT Electric Distribution Fleet Capital Tool Purchase Digital fluid pressure gauges to measure hydraulic pressures on bucket trucks. Required for proper preventative maintenance procedures, testing and repair. Cost includes quantity of 13 gauges, one for each CT garage. Wholesale Expenses-W00 107010 1 CT Elec D Fleet Capital Tools CT Electric Distribution Fleet Capital Tool Purchase 4 Vehicle Lifts. The vehicle lifts are used to perform repairs on the bucket trucks. The tool will allow technicians to perform proper repairs. 15T 12872 - 2 are for the Berlin garage, 1 for Norwalk garage and one for the Madison garage. $50,185ea - $200,740 + $6,694.68tx = $207,434.68 Wholesale Expenses-W00 107010 1 CT Elec D Fleet Capital Tools-2025 2025-CT Electric Distribution Fleet Capital Tool Purchase 5 Vehicle Portable Lifts - $50,185ea = $250,925. + $8,368.35 Tax = $259,293.35 The vehicle lift is used to perform repairs on the bucket trucks. The tool will allow technicians to perform proper repairs. Two are for the Berlin Garage, 1 Stamford and 1 Tolland. Wholesale Expenses-W00 107010 1 Wholesale Expenses-W00 107010 1 Wholesale Expenses-W00 2025-CT Electric Distribution Fleet Capital Tool Purchase Computer and batter cabinet needed to charge our diagnostic computers and batteries. Cabinet should have a life expectancy of 20+ years and will help to maintain sensitive equipment consolidated and dust free in a garage environment. Wholesale Expenses-W00 2025-CT Electric Distribution Fleet Capital Tool Purchase Replace aged and defective metal cutting saw. New saw capable of cutting all materials used by Fleet. Wholesale Expenses-W00 2025-CT Electric Distribution Fleet Capital Tool Purchase Parts washer needed to replace older parts washer that is needed to clean parts to be reused. Parts washer should have a life expectancy of around 10 years. Wholesale Expenses-W00 2025-CT Electric Distribution Fleet Capital Tool Purchase Allow Mobile weight on vehicles to determine safe loading of unit. This way we do not have to bring units to public scales. Life expectancy is 20 years. Wholesale Expenses-W00 2025-CT Electric Distribution Fleet Capital Tool Purchase Horizontal & Vertical Band Saw for use in light fabrication work, cutting flat stock and pipe. Wholesale Expenses-W00 107010 1 107010 1 107010 1 107010 1 107010 1 107010 1 CTTL2409 CTTL2412 CTTL2501 CTTL2502 CT Elec D Fleet Capital Tools-2025 CTTL2503 CT Elec D Fleet Capital Tools-2025 CTTL2504 CT Elec D Fleet Capital Tools-2025 CTTL2505 CT Elec D Fleet Capital Tools-2025 CTTL2506 CT Elec D Fleet Capital Tool-2025 CTTL2507 CT Elec D Fleet Capital Tools-2025 CTTL2508 CT Elec D Fleet Capital Tool Purcha 2025-CT Electric Distribution Fleet Capital Tool Purchase Vehicle Diagnostic Equipment 4 units $9,683.16ea = $38,732.67 The current diagnostic equipment is outdated and can no longer be updated to our current model year. The diagnostic equipment will allow us to perform diagnostic repairs to our vehicles and reduce vehicle repair time. Tolland, Torrington, Hartford and Stamford garages. 2025-CT Electric Distribution Fleet Capital Tool Purchase The hose cutter is used to repair and fabricate hydraulic hoses. The tool will allow technicians to perform for Norwalk garage.
  6. Page 1,130 of 1,160

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued October 23, 2026 RRU-159 Attachment 23 Page 1130 of 1160 work_order_number description CTTL2509 CT Elec D Fleet Capital Vehicles CTTL2510 CT Elec D Fleet Capital Tools CTTL2511 CT Elec D Fleet Capital Tools CTTL2512 CT Elec D Fleet Capital Tools CTTL2513 CTTRAIN1 CT Elec D Fleet Capital Tools SMART BOARDS FOR TRAINING long_description 2025-CT Electric Distribution Fleet Capital Tool Purchase 2 Jack stands are used to safely support vehicle while on the post lifts. The tool allow technicians to safely perform repairs while on the lifts. Stamford Garage 2025-CT Electric Distribution Fleet Capital Tool Purchase CT Fleet Operatioins is requesting Fleet Capital funds to upgrade existing wheel balancer machine that is at the end of its useful life. 2025-CT Electric Distribution Fleet Capital Tool Purchase CT Fleet Operations is requesting Fleet capital funds to replace an inoperable transmission jack for the Hartford garage. 2025-CT Electric Distribution Fleet Capital Tool Purchase CT Electric is requesting the purchase of a fire rated cabinet for chemical storage. 2025-CT Electric Distribution Fleet Capital Tool Purchase Pressure washer will help the technicians to diagnose oil leaks, Chesire garage. PURCHASE AND INSTALL 2 SMART BOARDS FOR TRAINING cost_element_group ferc_account percent Wholesale Expenses-W00 107010 1 Wholesale Expenses-W00 107010 1 Wholesale Expenses-W00 107010 1 Wholesale Expenses-W00 107010 1 Wholesale Expenses-W00 Wholesale Expenses-W00 107010 107010 1 1 Wholesale Expenses-W00 Wholesale Expenses-W00 107010 593000 1 1 DEEP Grid Side Enhancements project - this work order is for contractor labor costs associated with the on-line portal software that will enable customers to facilitate interconnections of DER requests. Wholesale Expenses-W00 URD/Direct Bury Inspection-UG-Annual-Tmpl Wholesale Expenses-W00 Wholesale Expenses-W00 DCDW0011OPSNTRELEXPENSES11 work order to be used by Distribution Clearance Administrator and Distribution Clearance Writer under CT Grid management Wholesale Expenses-W00 DC FAST-Electric Vehicles-Quaresma Wholesale Expenses-W00 System upgrade to existing and in queue DER projects to develop online mapping and other analytical tools to better understand the localized impact of DER penetration for select locations Wholesale Expenses-W00 107010 594030 108030 1 1 1 581440 908EV0 107010 1 1 1 Wholesale Expenses-W00 252500 1 This work order was created to accept the charges for the applications developed for new electric equipment training. CTTRNEQP CTVTN16C New Electric Equipment Applications CTVT Wiring 2016 CUSWEB17 DBINSU11 DBLPOL11 CUSTOMER ON-LINE PORTAL URD/Direct Bury Inspection-UG Double Pole Removal Blanket AWO DCDW0011 DCFAST11 DERHOST1 DISTRIBUTION CLEARANCE ADMIN/WRITER DC FAST-Electric Vehicles DER HOST CAP DATA + MAP The costs will be distributed according to the PAF. CT = 35% = $771,750: $154,350 each year from 2026 - 2030 EMA = 35% = $771,750: $154,350 each year from 2026 -2030 NH = 20% = $441,000: $88,200 each year from 2026 - 2030 WMA = 10% = $220,500: $44,100 each year from 2026 -2030 CTVT Wiring-name change G Flannery DG20LSSR LODESTAR SAND RD CANAAN P#CD01400 DG221398 Reimb CD01398 Lodestar Norfolk LODESTAR SAND ROAD CANAAN P# CD01400 INT - 33391 Advance payments DGPRJECT work order for CD01398 - INT-35916, Town of Norfolk / Lodestar generation facility at 599 Greenwoods Road East, Norfolk, CT 06058. 4MW AC PV Installation Matt Riiska Wholesale Expenses-W00 252500 1 DG221594 DG231823 DG252722 DG252734 Reimb CD01594 Louth Cal Haddam Quar Reimb CD01823 Verogy E Windsor II Reimbursables for CD02722 Reimbursables for CD02734 CD01594 DGPRJECT work order for reimbursables paid for the construction project at Haddam Quarter Rd. Durham, CT. INT-40603 Louth Callan Renewables LLC Advance Payments for CD01823 - INT49986, Verogy East Windsor Solar II LLC Reimbursables for CD02722 Reimbursables for CD02734 Wholesale Expenses-W00 Wholesale Expenses-W00 Wholesale Expenses-W00 Wholesale Expenses-W00 252500 186010 252500 252500 1 1 1 1 DGDFLT11 ENFIELD, NEVINS, 2, RONALD L MORGAN This AWO is created to support Maximo functionality which requires an FWO but DG program/project does not. All DG "no fwo needed" will be directed to this AWO as a Maximo "defaultAWO" Wholesale Expenses-W00 186010 1 INTEGRATE DG ENERGY RESOURCES UCONN 2ND AMENDED AND RESTATED RESEARCH PROJECT(S) PREDICT SOLAR POWER AT SPECIFIC LOCATIONS ON THE GRID. ASSET - MODEL FOR ESTIMATION OF PHOTOVOLTAIC (pv) OUTPUT VARIABILITY AND ACTUAL SYSTEM PERFORMANCE W/HIGH PV LEVELS Wholesale Expenses-W00 107010 1 Wholesale Expenses-W00 186010 1 Wholesale Expenses-W00 186010 1 Wholesale Expenses-W00 Wholesale Expenses-W00 186010 186010 1 1 Wholesale Expenses-W00 Wholesale Expenses-W00 Wholesale Expenses-W00 Wholesale Expenses-W00 Wholesale Expenses-W00 Wholesale Expenses-W00 186010 186010 186010 186010 186010 186010 1 1 1 1 1 1 Wholesale Expenses-W00 Wholesale Expenses-W00 Wholesale Expenses-W00 Wholesale Expenses-W00 Wholesale Expenses-W00 Wholesale Expenses-W00 Wholesale Expenses-W00 Wholesale Expenses-W00 Wholesale Expenses-W00 Wholesale Expenses-W00 Wholesale Expenses-W00 Wholesale Expenses-W00 Wholesale Expenses-W00 Wholesale Expenses-W00 186010 186010 186010 186010 186010 186010 186010 588133 43001X 107010 107010 108030 107010 108030 1 1 1 1 1 1 1 1 1 1 1 1 1 1 Wholesale Expenses-W00 107010 1 Wholesale Expenses-W00 107010 1 Wholesale Expenses-W00 107010 1 Wholesale Expenses-W00 107010 1 Wholesale Expenses-W00 107010 1 Wholesale Expenses-W00 107010 1 Wholesale Expenses-W00 107010 1 Wholesale Expenses-W00 Wholesale Expenses-W00 Wholesale Expenses-W00 Wholesale Expenses-W00 Wholesale Expenses-W00 Wholesale Expenses-W00 Wholesale Expenses-W00 Wholesale Expenses-W00 Wholesale Expenses-W00 Wholesale Expenses-W00 Wholesale Expenses-W00 Wholesale Expenses-W00 Wholesale Expenses-W00 Wholesale Expenses-W00 Wholesale Expenses-W00 Wholesale Expenses-W00 Wholesale Expenses-W00 Wholesale Expenses-W00 Wholesale Expenses-W00 Wholesale Expenses-W00 Wholesale Expenses-W00 Wholesale Expenses-W00 Wholesale Expenses-W00 Wholesale Expenses-W00 Wholesale Expenses-W00 Wholesale Expenses-W00 Wholesale Expenses-W00 Wholesale Expenses-W00 Wholesale Expenses-W00 Wholesale Expenses-W00 Wholesale Expenses-W00 Wholesale Expenses-W00 Wholesale Expenses-W00 Wholesale Expenses-W00 Wholesale Expenses-W00 Wholesale Expenses-W00 Wholesale Expenses-W00 Wholesale Expenses-W00 Wholesale Expenses-W00 Wholesale Expenses-W00 Wholesale Expenses-W00 Wholesale Expenses-W00 Wholesale Expenses-W00 Wholesale Expenses-W00 Wholesale Expenses-W00 Wholesale Expenses-W00 Wholesale Expenses-W00 Wholesale Expenses-W00 Wholesale Expenses-W00 Wholesale Expenses-W00 Wholesale Expenses-W00 Wholesale Expenses-W00 Wholesale Expenses-W00 Wholesale Expenses-W00 107010 923000 186ITL 108030 107010 4261T0 236140 408210 582000 592130 594000 107010 107010 107010 108030 107010 107010 107010 107010 108030 107010 107010 107010 108030 582090 582240 107010 108030 108030 107010 108030 107010 108030 107010 107010 107010 107010 108030 108030 107010 107010 108030 108030 107010 108030 107010 107010 107010 108030 108030 107010 107010 108030 107010 1 1 1 0.09090909 0.90909091 1 1 1 1 1 1 1 1 0.6355 0.3645 1 1 1 1 0.05350515 0.94649485 1 0.8 0.2 1 1 0.80814917 0.19185083 0.2 0.8 0.2 0.8 0.2 0.8 1 1 0.8 0.2 0.2 0.8 0.8 0.2 0.2 0.8 0.2 0.8 1 0.8 0.2 0.2 0.8 0.8 0.2 0.8 DGERGRID DGPM1459 DG PM Cost for CD01459 DGPM1594 DG PM Cost for CD01594 Hadm Qtr DGPM1682 DGPM1705 DG PM Cost for CD01682 GRE DGPM COST FOR CD01705 DGPM1776 DGPM1812 DGPM1836 DGPM1957 DGPM1961 DGPM2080 DG PM Cost for CD01776 IND solar DGPM1812 DGPM Cost for CD01836 DG PM COST FOR CD01957 DGPM COST FOR CD01961 DG PM COST FOR CD02080 DGPM2136 DGPM2247 DGPM2353 DGPM2406 DGPM2408 DGPM2433 DGPM2525 DHRD0011 DISE0011 DMCN22PR DMCN24PR DMCN24RT DMCN25PR DMCN25RT DGPM COST FOR CD02136 DGPM COST FOR CD02247 DGPM COST FOR CD02353 DG PM COST FOR CD02406 DG PM COST FOR CD02408 DG PM COST FOR CD02433 DG PM COST FOR CD02525 Desktop PC Hardware Discount Expense 2022 Intercompany Purchases 2024 Intercompany Purchases 2024 Intercompany Transfers 2025 Intercompany Purchases 2025 Intercompany Transfers DG PM Cost for CD01459 CTEC thompson family land trust project. INT 33894 & 33895 3 meters $97,138 inital payment Project Management work order for CD01594 - INT-40603 LCR (Louth Callan Renewables) generation project at Haddam Quarter DG Project COst for GRE Mulnite #2 project. Greenskis INT-41866 / CD01682 DGPM COST FOR CD01705 DG PM Cost for Independence soalr cobb rd project / 524 New London Rd colchester CT INT-51890 / CD01776 DG PM Cost FOR CD01812 DG PM Cost FOR CD01836 | INT-51492 | The Nevar Company, Oakdale DG PM COST FOR CD01957 DGPM COST FOR CD01961 DG PM COST FOR CD02080 DG PM Cost FOR CD02136 | INT-67007 | VCP Realty, Warrenville Road, Mansfield | DGPM COST FOR CD02247 DGPM COST FOR CD02353 DG PM COST FOR CD02406 DG PM COST FOR CD02408 DG PM COST FOR CD02433 DG PM COST FOR CD02525 DHRD0011OPSNTRELEXPENSES21 Discount Expense 2022 Intercompany Purchases 2024 Intercompany Purchases 2024 Intercompany Transfers 2025 Intercompany Purchases 2025 Intercompany Transfers CT DMX Replacements 107 Selden Street, Berlin, CT East Comm Room DMX23001 CT DMX Replacements New Britain CT DMX Replacements Berlin OBA 107 Selden Street, Berlin, CT East Comm Room DMX23002 Berlin OBA DMX Replacements CT DMX Replacements Stepstone 50 Stepstone Hill Rd, Guilford, CT control house DMX23003 Stepstone DMX Replacements CT DMX Replacements Green Hill 775 Green Hill Rd, Madison, CT control house DMX23004 Green Hill DMX Replacement CT DMX Replacements Bokum 49 Bokum Rd. Old Saybrook, CT control house DMX23005 Bokum DMX replacements CT DMX Replacements Branford 11J 272 E. Main St. Branford, CT control house DMX23006 Branford DMX Replacements CT DMX Replacements Goose Hill 330 Pokornoy Road, Haddam, CT radio shelter DMX23008 Goose Hill DMX replacements CT DMX Replacements Chapel Hill 414 Chapel Hill Road, Montville, CT Radio shelter DMX23009 DN093411 DN110411 DNLTW1DC DNLTW1DC DONAT111 DONAT211 DONAT311 DOST0011 DRCM0011 DSCADA14 DSCADA2W DSCCNTRL DSCN0145 DSCN0145 DSCN0147 DSCN8136 DSCN9124 DSCN9166 DSEQ2003 DSEQ2003 DSEQ8026 DSEQ8029 DSEQ8029 DSHK0011 DSIP0011 DSN03003 DSN03003 DSN03005 DSN03005 DSN03006 DSN03006 DSN03008 DSN03008 DSN03009 DSN03010 DSN03011 DSN03011 DSN03013 DSN03013 DSN03014 DSN03014 DSN03015 DSN03015 DSN03016 DSN03016 DSN03017 DSN03018 DSN03018 DSN03019 DSN03019 DSN03020 DSN03020 DSN03021 CTDMX Replacements Chapel HIll DN 23-09-34-SB7 CL&P DN 23-11-04-SB7 CL&P DANIELSON TOWER REPLACEMENT DANIELSON TOWER REPLACEMENT Get Tax Credit-Donation Get Tax Credit-Donation Get Tax Credit-Donation District Operations (Stations) Dist Sta Recloser CM ELEC PROJ DSCADA RETROFITS DSCADA PROGRAM - WATERBURY DISTRICT DSCADA CONTROL PROGRAMMING NORTHEAST SIMSBURY 43F - REPL FAILE NORTHEAST SIMSBURY 43F - REPL FAILE BRANFORD 11J - RPL POSITRON TELECOM NORTH BLOOMFIELD 2A - INSTALL DISCO TRIANGLE 11A - RPL STATION SVC XFMR SHUNOCK 32P - INSTALL TRANSDUCERS Westbrook 20S-1X Low Side Arresters Westbrook 20S-1X Low Side Arresters CHIPPEN HILL 15U - REBUILD FAILED B CEDAR HEIGHTS 4R-RPL FAILING ANNUNC CEDAR HEIGHTS 4R-RPL FAILING ANNUNC Dist Sta Housekeeping Dist Sta Inspect (50): Replace Failing Battery & Cha (50): Replace Failing Battery & Cha Torrington 8A Install Batt Monitor Torrington 8A Install Batt Monitor (30): Replace Failed 12F42 Arrester (30): Replace Failed 12F42 Arrester (30): Replace Failing A/C Unit DSN0 (30): Replace Failing A/C Unit DSN0 Dooley 30K - Upgrade A/C Unit, Inst (30): Install A/C Unit, Hydrogen Mianus 16Q Install AC Unit,Hydro Mo Mianus 16Q Install AC Unit,Hydro Mo Tomac 12H Install A/C Unit,Hydro Mo Tomac 12H Install A/C Unit,Hydro Mo CosCob 11R Install A/C Unit,Hydr Mo CosCob 11R Install A/C Unit,Hydr Mo N Greenwich 27K Inst A/C Unit, Hydr N Greenwich 27K Inst A/C Unit, Hydr Newtown 12M Install A/C Unit,Hydro Newtown 12M Install A/C Unit,Hydro Rocky River 12Y Inst A/C Unit,Hydro Shepaug 13A Install A/C Unit, Hydro Shepaug 13A Install A/C Unit, Hydro Mid River 28M Instal A/C Unit,Hydro Mid River 28M Instal A/C Unit,Hydro Ridgefield 22N Instal A/C Unit,Hydr Ridgefield 22N Instal A/C Unit,Hydr Christian 31C Instal A/C Unit,Hydro DN 23-09-34-SB7 CL&P - Savage, Jessica DN 23-11-04-SB7 CL&P - Savage, Jessica DANIELSON TOWER REPLACEMENT - CL&P DANIELSON TOWER REPLACEMENT - CL&P Get Tax Credit-Donation-Chandler Get Tax Credit-Donation-Chandler Get Tax Credit-Donation-Chandler DOST0011OPSNTRELEXPENSES11 DRCM0011OPSNTRELEXPENSES11 PRE- CHECKS TO THE CONTROLS AS WELL AS OTHER CHECKLIST ITEMS THAT MAY NEED TO BE PERFORMED BY THE ELECTRIC MAINTENANCE DEPARTMENT BASE RADIO INSTALLATION DSCADA PROGRAM Set up the controls in DSCADA enabling the SOC operators to communicate and perform switching, etc. ASSUME CHARGES FOR THE REPLACEMENT OF THE FAILED ARI CONDITIONING UNIT. ASSUME CHARGES FOR THE REPLACEMENT OF THE FAILED ARI CONDITIONING UNIT. REPLACE AND RELOCATE POSITRON TELECOM EQUIP . BRANFORD 11J -__________________________________DWS The disconnects will be installed on the 23-kV #1 bus and 23-kV #3 bus. NORTH BLOOMFIELD 2A SAFETY SWITCHES RPL EXISTING (1) 15KA XFMR NEW FUSED SAFETY SWITCH WILL NEED TO BE INSTALLED AS PART OF THIS EFFORT. TRIANGLE 11A SHUNOCK 32P - INSTALL TRANSDUCERS _________________________________EG Westbrook 20S - Replace Failed 20S-1X Low Side Arresters Westbrook 20S - Replace Failed 20S-1X Low Side Arresters ASSUME CHARGES FOR THE REBUILD OF THE FAILED SPARE BREAKER. _________________________EG REPLACE FAILING ANNUNCIATOR ___________________________CIR REPLACE FAILING ANNUNCIATOR ___________________________CIR DSHK0011OPSNTRELEXPENSES11 DSIP0011OPSNTRELEXPENSES11 Replace Failing Battery & Charger Replace Failing Battery & Charger Install Battery Monitor - Torrington Terminal 8A Install Battery Monitor - Torrington Terminal 8A Replace Failed 12F42 Arresters Replace Failed 12F42 Arresters Replace Failing A/C Unit DSN03008 Replace Failing A/C Unit DSN03008 Upgrade A/C Unit, Install Hydrogen Monitor & Fire Alarm Install A/C Unit, Hydrogen Monitor & Fire Alarm Install A/C Unit, Hydrogen Monitor & Fire Alarm DSN03011. Mianus 16Q Install A/C Unit, Hydrogen Monitor & Fire Alarm DSN03011. Mianus 16Q Install A/C Unit, Hydrogen Monitor & Fire Alarm DSN03013 Tomac 12H Install A/C Unit, Hydrogen Monitor & Fire Alarm DSN03013 Tomac 12H Install A/C Unit, Hydrogen Monitor & Fire Alarm DSN03014 Cos Cob 11R Install A/C Unit, Hydrogen Monitor & Fire Alarm DSN03014 Cos Cob 11R Install A/C Unit, Hydrogen Monitor & Fire Alarm DSN03015 North Greenwich 27K Install A/C Unit, Hydrogen Monitor & Fire Alarm DSN03015 North Greenwich 27K Install A/C Unit, Hydrogen Monitor & Fire Alarm DSN03016 Newtown 12M Install A/C Unit, Hydrogen Monitor & Fire Alarm DSN03016 Newtown 12M Install A/C Unit, Hydrogen Monitor & Fire Alarm DSN03017 Rocky River 12Y Install A/C Unit, Hydrogen Monitor & Fire Alarm DSN03018 Shepaug 13A Install A/C Unit, Hydrogen Monitor & Fire Alarm DSN03018 Shepaug 13A Install A/C Unit, Hydrogen Monitor & Fire Alarm DSN03019. Middle River 28M Install A/C Unit, Hydrogen Monitor & Fire Alarm DSN03019. Middle River 28M Install A/C Unit, Hydrogen Monitor & Fire Alarm DSN03020. Ridgefield 22N Install A/C Unit, Hydrogen Monitor & Fire Alarm DSN03020. Ridgefield 22N Install A/C Unit, Hydrogen Monitor & Fire Alarm DSN03021. Christian 31C
  7. Page 1,131 of 1,160

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued October 23, 2026 RRU-159 Attachment 23 Page 1131 of 1160 work_order_number description DSN03021 Christian 31C Instal A/C Unit,Hydro DSN03022 Beac Falls 11N Insl A/C Unit,Hydro DSN03023 Triangle 11A Install A/C Unit,Hydr DSN03023 Triangle 11A Install A/C Unit,Hydr DSN03028 Bristol 11K Inst Grd Studs on 4.8kV DSN03028 Bristol 11K Inst Grd Studs on 4.8kV DSN03029 (30): Replace Failing 14R66-19U-1RDSN03029 (30): Replace Failing 14R66-19U-1RDSN03031 (30): Install Battery Monitor DSN03 DSN03032 (30): Install Primary Battery Monit DSN12002 WESTON 21M-REPLACE 115 KV INSULATOR DSN12002 DSN12029 WESTON 21M-REPLACE 115 KV INSULATOR (50): Installation of oil containme DSN12044 DSN22023 DSN22023 (60): Install new breaker. DSN1204 SOUTH END 1G-REPLC FAILING 1X 2X LT SOUTH END 1G-REPLC FAILING 1X 2X LT DSN22043 DSN32010 DSN32014 DSN32049 DSN32053 DSN32053 DSN42001 (60): Retire Substation, remove all (50): Miscellaneous: Remote racking MOBILE BATT TRLR #16902 - BUILD BAT WINSTED 22F - REMOVE FOUNDATION VAN DYKE 12 - REPLACE FAILING CUTOU VAN DYKE 12 - REPLACE FAILING CUTOU MOBILE BATTERY TRAILER 1146364-BUIL DSN42003 DSN42020 DSN42020 DSN42025 DSN42025 DSN42027 DSN42027 DSN42029 DSN42029 DSN42041 DSN42046 DSN42046 DSN52002 DSN52019 DSN52019 DSN52038 DSN52039 DSN52043 DSN62001 DSN62001 DSN62035 DSN62035 DSN62046 DSN62047 DSN62047 SOUTH COVENTRY 17Y-REMOVE FENCE & F SOUTH NAUGATUCK 21L-RPLC FAILING AN SOUTH NAUGATUCK 21L-RPLC FAILING AN TORRRINGTON TERMINAL 8A-RPLC LIGHTN TORRRINGTON TERMINAL 8A-RPLC LIGHTN MANCHESTER 3A - REPLACE LIGHTING FI MANCHESTER 3A - REPLACE LIGHTING FI (30): Install new relay Relay DSN42 (30): Install new relay Relay DSN42 (50): Install equipment for network Replace Deteriorating Fence Replace Deteriorating Fence Beacon Falls 11N - Replace ATS swit (30): Rebuild two OCB's. 32G-19T-2 (30): Rebuild two OCB's. 32G-19T-2 Noera 13H - Replace the phone circu (50): Install an air conditioning s (50): Install new vacuum breakers i Chippen Hill 15U LTC control Relay Chippen Hill 15U LTC control Relay (40): Refurbishment of the switchge (40): Refurbishment of the switchge (40): Installation of a hand rail (40): Replacement of the control ho (40): Replacement of the control ho DSN72001 (50): Miscellaneous- Rebuild of dis DSN72001 DSN72010 DSN72012 DSN72013 DSN72014 DSN72014 DSN72016 DSN72017 DSN72018 DSN72018 DSN72020 DSN72020 DSN72030 DSN72033 DSN72034 DSN72044 DSN72044 DSN72045 DSN72045 DSN72048 DSN72048 DSN72049 DSN72049 DSN72050 DSN72050 DSN72051 DSN72051 DSN72052 DSN72052 DSN72055 DSN82001 DSN82001 DSN82002 DSN82008 DSN82008 DSN82009 DSN82009 DSN82011 DSN82011 DSN82016 DSN82016 DSN82019 DSN82019 DSN82020 DSN82020 DSN82026 DSN82026 DSN82031 DSN82046 DSN82046 DSN82048 DSN82048 DSN82057 DSN82057 DSN82059 DSN82059 DSN82063 DSN82063 DSN92009 DSN92009 DSN92010 DSN92010 DSN92012 DSN92012 DSN92013 DSN92013 DSN92021 DSN92021 DSN92022 DSN92022 DSN92030 DSN92044 DSN92044 DSN92048 DSN92048 DSN92049 DSN92049 DSN92053 DSN92057 DSN92058 DSN92061 DSN92061 DSN92067 DSQ03011 DSQ03011 DSQ03015 DSQ03015 DSQ03016 DSQ03016 DSQ03022 DSQ03022 DSQ03026 DSQ03026 DSQ03030 DSQ03030 DSQ22029 DSQ22029 DSQ32018 DSQ32018 (50): Miscellaneous- Rebuild of dis (30): Install new Driveways. DSN720 (50): HVAC system, DSN72012 (50): A/C Unit with Hydrogen sensin Arrester replacement on the 11R-1X Arrester replacement on the 11R-1X (50): Miscellaneous; Refurbishment (50): Miscellaneous, Refurbishment (50): Miscellaneous, Refurbishment (50): Miscellaneous, Refurbishment replacement of 48V DC Battery bank replacement of 48V DC Battery bank (50): Refurbish the switchgear roof (50): Miscellaneous (50): Refurbish the switchgear roof W Brookfield 14H Inst A/C, H2 and F W Brookfield 14H Inst A/C, H2 and F Fencing Fencing Scitico 27H-Replace A/C Unit Scitico 27H-Replace A/C Unit Enfield 12C - Replace A/C Unit DSN7 Enfield 12C - Replace A/C Unit DSN7 W9indsor Locks 14K - Replace A/C Un W9indsor Locks 14K - Replace A/C Un Replace A/C Unit Replace A/C Unit Rockville 14W - Replace A/C Unit Rockville 14W - Replace A/C Unit (30): Add Landscaping DSN72055 (50): A/C Unit DSN82001 (50): A/C Unit DSN82001 (50): Activate 24A19 Feeder Positio (50): Replace Deteriorated Driveway (50): Replace Deteriorated Driveway (50): Replace Failing Battery DSN82 (50): Replace Failing Battery DSN82 (50): Upgrade Substation Lighting D (50): Upgrade Substation Lighting D (50): LED Lighting Upgrades DSN8201 (50): LED Lighting Upgrades DSN8201 (40): LED Lighting Upgrades DSN8201 (40): LED Lighting Upgrades DSN8201 (50): LED Lighting Upgrades DSN8202 (50): LED Lighting Upgrades DSN8202 (50): LED Lighting Upgrades DSN8202 (50): LED Lighting Upgrades DSN8202 (50): Install A/C Unit & Hydrogen D Refurbish Switchgear Roof Refurbish Switchgear Roof (30): LED Lighting Upgrades DSN8204 (30): LED Lighting Upgrades DSN8204 Replace Failed 3A12-1W Reactors & Replace Failed 3A12-1W Reactors & (30): Replace Deteriorated Driveway (30): Replace Deteriorated Driveway Replacement of low side mobile conn Replacement of low side mobile conn (30): Rebuild Failing 23-1X Load Ta (30): Rebuild Failing 23-1X Load Ta (30): Rebuild Failing 23-2X Load Ta (30): Rebuild Failing 23-2X Load Ta (30): Rebuild Failing 44-1X Load Ta (30): Rebuild Failing 44-1X Load Ta (30): Rebuild Failing 44-2X Load Ta (30): Rebuild Failing 44-2X Load Ta (30): Upgrade Lighting DSN92021 (30): Upgrade Lighting DSN92021 Prospect St 22E Upgrade Lighting Prospect St 22E Upgrade Lighting (30): Install Battery Monitoring Sy Todd 30L Install A/C and Hydrogen Todd 30L Install A/C and Hydrogen (30): Replace Deteriorated Fence DS (30): Replace Deteriorated Fence DS Plumtree 30G LED Lighting Upgra Plumtree 30G LED Lighting Upgra (30): Install Battery Monitor DSN92 (30): Install Shed DSN92057 (30): Install Shed DSN92058 (30): LED Lighting Upgrades DSN9206 (30): LED Lighting Upgrades DSN9206 (30): Replace Failing 14S-1H,14S-2H Lakeview 31A Replace 31A-1X and 31A Lakeview 31A Replace 31A-1X and 31A (50): Replace 12F-6X Low Side Arres (50): Replace 12F-6X Low Side Arres (30): Rebuild Failed 12F-6X Load Ta (30): Rebuild Failed 12F-6X Load Ta VanDyke12 Rplc Faild 1215-2k-2 Vacu VanDyke12 Rplc Faild 1215-2k-2 Vacu (40): Replace Failed 27H-1X3-4 Swit (40): Replace Failed 27H-1X3-4 Swit (30): Replace Failed 14A-1H Potenti (30): Replace Failed 14A-1H Potenti NORWALK 9S - REPLACE FAILED ARRESTE NORWALK 9S - REPLACE FAILED ARRESTE MYSTIC 13K - REPLACE FAILED A/C UNI MYSTIC 13K - REPLACE FAILED A/C UNI DSQ42012 EAST BANTAM 19U-RPLC FAILED SWGR W/ DSQ42012 DSQ62013 DSQ62013 EAST BANTAM 19U-RPLC FAILED SWGR W/ (50): Flax Hill 24A-3X low side Arr (50): Flax Hill 24A-3X low side Arr long_description Install A/C Unit, Hydrogen Monitor & Fire Alarm DSN03021. Christian 31C Install A/C Unit, Hydrogen Monitor & Fire Alarm DSN03022. Beacon Falls 11N Install A/C Unit, Hydrogen Monitor & Fire Alarm DSN03023. Triangle 11A Install A/C Unit, Hydrogen Monitor & Fire Alarm DSN03023. Triangle 11A Install Ground Studs on the 4.8kV Switchgear. Bristol 11K Install Ground Studs on the 4.8kV Switchgear. Bristol 11K Replace Failing 14R66-19U-1R-3 Switch Replace Failing 14R66-19U-1R-3 Switch Install Battery Monitor see also DSQ62006 Install Primary Battery Monitor REPLACEMENT OF THE 115 KV HOLLOW CORE INSULATORS ON SWITCHES 21M-1X1-4, 21M-2X1-4, AND 21M-3X1-4 (MOBILE POSITION) ___________________________________________EG REPLACEMENT OF THE 115 KV HOLLOW CORE INSULATORS ON SWITCHES 21M-1X1-4, 21M-2X1-4, AND 21M-3X1-4 (MOBILE POSITION) ___________________________________________EG INSTALLATION OF AN OIL CONTAINMENT BERM PER SPCC REGULATIONS ___________________________________________EG INSTALL A 25 KV SINGLE-PHASE CABLE AND FUSED CUTOUT TO STATION SERVICE TRANSFORMER INSTALL A 3 INCH STEEL CONDUIT AND 25 KV CABLE FROM THE YARD PAD-MOUNTED 15 MVA STEP-DOWN XFMR REPLACE THE FAILING 1X AND 2X LTC CONTROL RELAYS ___________________________________________EZ REPLACE THE FAILING 1X AND 2X LTC CONTROL RELAYS ___________________________________________EZ RETIRE SUBSTATION -ALL OF THE EQUIPMENT INCL- UDING FENCE AND TRAPROCK SHOULD BE REMOVED AND SCRAPPED - UPON COMPLETION THE SITE WILL BE TURNED OVER TO REAL ESTATE TO SELL INSTALLATION OF A REMOTE RACKING UNIT FOR SWITCHGEAR BREAKERS __________________________________________CMK BUILD A NEW MOBILE BATTERY TRAILER #16901 __________________________________________JJD REMOVE ALL UNUSED FOUNDATIONS SIX INCHES BELOW GRADE ___________________________________________EG REPLACEMENT OF THE FAILING SMD-20 CUTOUTS ON THE 12-3S1-1 AND 12-4S1-1 __________________________________________CMK REPLACEMENT OF THE FAILING SMD-20 CUTOUTS ON THE 12-3S1-1 AND 12-4S1-1 __________________________________________CMK BUILD A NEW MOBILE BATTER TRAILER #1146364 __________________________________________JJD REMOVE THE FENCE, FOUNDATIONS & TRAP-ROCK, THE AREA WILL BE LOAMED AND SEEDED TO RETURN IT TO ITS ORIGINAL STATE. THE EQUIPMENT HAS BEEN REMOVED AND THE SITE WILL BE SOLD REPLACE THE FAILING 21L-1X ANNUNCIATOR __________________________________________CMK REPLACE THE FAILING 21L-1X ANNUNCIATOR __________________________________________CMK REPLACEMENT OF THE INADEQUATE LIGHTING FIXTURES ___________________________________________EZ REPLACEMENT OF THE INADEQUATE LIGHTING FIXTURES ___________________________________________EZ REPLACEMENT OF THE INADEQUATE LIGHTING FIXTURES ___________________________________________EZ REPLACEMENT OF THE INADEQUATE LIGHTING FIXTURES ___________________________________________EZ INSTALL NEW RELAY RELAY INSTALL NEW RELAY RELAY Install equipment for network communications pilot. Replacement of the deteriorated fence (appr 100 ft) and gate Replacement of the deteriorated fence (appr 100 ft) and gate Beacon Falls 11N - Replace the failing auto-throwover switch. Rebuild two OCB's. 32G-19T-2 and 32G-30T-2. Rebuild two OCB's. 32G-19T-2 and 32G-30T-2. Noera 13H - Upgrade the DSCADA equipment to transition the DSCADA system over to the fiber SONET ring. Carmel Hill 11S - Install an air conditioning unit. Middle River 28M - Install new vacuum breakers in the 28M11 & 28M12 feeder positions. Chippen Hill 15U - Replace the failing 15U-2X Load Tap Changer control relay. Chippen Hill 15U - Replace the failing 15U-2X Load Tap Changer control relay. Refurbishment of the switchgear enclosure. Refurbishment of the switchgear enclosure. Installation of a hand rail and yard lights Replacement of the control house asbestos tiled flooring Replacement of the control house asbestos tiled flooring Card 11F - Rebuild the distribution control house. Replace entire roof and rebuild structure to support new roof, Install new roof and replace rafters, Install new plywood sheathed 2 1/2 R12 foam insulation to all exterior walls or building, replace and rebuild fascia and soffit, Install Certainteed Iron Max Vertical siding. Card 11F - Rebuild the distribution control house. Replace entire roof and rebuild structure to support new roof, Install new roof and replace rafters, Install new plywood sheathed 2 1/2 R12 foam insulation to all exterior walls or building, replace and rebuild fascia and soffit, Install Certainteed Iron Max Vertical siding. Install new Driveways Fry Brook 13B - Install an air conditioning unit Tunnel 12S - Install an air condiitoning unit Cos Cob 11R - Replace the failing 11R-1X high and low side arresters Cos Cob 11R - Replace the failing 11R-1X high and low side arresters Prospect Street 22E - REfurbish the switchgear enclosure - ROOF REPLACEMENT Byram 13C - Refurbish the switchgear enclosure Cedar Heights 4R - Refurbish the switchgear enclosure Cedar Heights 4R - Refurbish the switchgear enclosure Boulevard 45 - Replace the failing battery and charger Boulevard 45 - Replace the failing battery and charger Peaceable 12N - Refurbish the switchgear enclosure Southington 4C - Refurbish the switchgear enclosure Bates Rock 21K - Refurbish the switchgear enclosure Install A/C Unit and Hydrogen detection. West Brookfield 14H Install A/C Unit and Hydrogen detection. West Brookfield 14H Enfield 12C - REplace the deteriorated fence Enfield 12C - REplace the deteriorated fence Scitico 27H Replace A/C Unit Scitico 27H Replace A/C Unit A/C Unit A/C Unit Windsor Locks 14K Replace A/C Unit Windsor Locks 14K Replace A/C Unit Replace A/C Unit Replace A/C Unit Replace A/C Unit Replace A/C Unit Add Landscaping Rocky Hill 3R - Replace failing A/C Unit and Install Hydrogen Detection System Rocky Hill 3R - Replace failing A/C Unit and Install Hydrogen Detection System Flax Hill 24A - Activate 24A19 Feeder Position Replace Deteriorated Driveway Replace Deteriorated Driveway Replace Failing Battery Replace Failing Battery Glenbrook 1K - Replace existing lightig with LED lights. Glenbrook 1K - Replace existing lightig with LED lights. Bulls Bridge 11M - Replace lighting with LED lights Bulls Bridge 11M - Replace lighting with LED lights Cedar Heights 4R - Replace existing lightig with LED lights. Cedar Heights 4R - Replace existing lightig with LED lights. Waterside 22M - Replace existing lightig with LED lights. Waterside 22M - Replace existing lightig with LED lights. Peaceable 12N - Replace existing lightig with LED lights. Peaceable 12N - Replace existing lightig with LED lights. Install A/C Unit & Hydrogen Detection Refurbish Switchgear Roof Refurbish Switchgear Roof LED Lighting Upgrades LED Lighting Upgrades Replace Failed 3A12-1W Reactors & Arresters Replace Failed 3A12-1W Reactors & Arresters Replace Deteriorated Driveway Replace Deteriorated Driveway Replacement of low side mobile connection pole and cable Replacement of low side mobile connection pole and cable Rebuild Failing 23-1X Load Tap Changer (LTC) Rebuild Failing 23-1X Load Tap Changer (LTC) Rebuild Failing 23-2X Load Tap Changer (LTC) DSN92010 Rebuild Failing 23-2X Load Tap Changer (LTC) DSN92010 Rebuild Failing 44-1X Load Tap Changer (LTC) DSN92012 Rebuild Failing 44-1X Load Tap Changer (LTC) DSN92012 Rebuild Failing 44-2X Load Tap Changer (LTC) DSN92013 Rebuild Failing 44-2X Load Tap Changer (LTC) DSN92013 Upgrade Lighting Upgrade Lighting Upgrade Lighting DSN92022. Upgrade Lighting DSN92022. Install Battery Monitoring System Install A/C Unit and Hydrogen/Fire Monitor. Todd 30L Install A/C Unit and Hydrogen/Fire Monitor. Todd 30L Replace Deteriorated Fence Replace Deteriorated Fence LED Lighting Upgrades. Plumtree 30G LED Lighting Upgrades. Plumtree 30G Install Battery Monitor Install Shed Install Shed DSN92058 - updated location to E.Hartford 12-2019 LED Lighting Upgrades DSN92061 LED Lighting Upgrades DSN92061 Replace Failing 14S-1H,14S-2H &14S-3H Potential Transformers DSN92067 Replace Failed 31A-1X and 31A-2X Ion Meters Replace Failed 31A-1X and 31A-2X Ion Meters Replace 12F-6X Low Side Arresters Replace 12F-6X Low Side Arresters Rebuild Failed 12F-6X Load Tap Changer (LTC) Rebuild Failed 12F-6X Load Tap Changer (LTC) Replace Failed 1215-2k-2 Vacuum Switch and Control. Van Dyke 12 Replace Failed 1215-2k-2 Vacuum Switch and Control. Van Dyke 12 Replace Failed 27H-1X3-4 Switch Replace Failed 27H-1X3-4 Switch Replace Failed 14A-1H Potential Transformers (PTs) DSQ03030 Replace Failed 14A-1H Potential Transformers (PTs) DSQ03030 REPLACEMENT OF THE FAILED 9S43 FEEDER ARRESTER. NORWALK 9S - ___________________________________________EG REPLACEMENT OF THE FAILED 9S43 FEEDER ARRESTER. NORWALK 9S - ___________________________________________EG REPLACEMENT OF THE FAILED A/C UNIT IN THE CONTROL HOUSE ___________________________________________EG REPLACEMENT OF THE FAILED A/C UNIT IN THE CONTROL HOUSE ___________________________________________EG INSTALL A NEW POLE TOP RECLOSER AND CONTROL TO REPLACE/BYPASS THE 19U1 SWITCHGEAR FEEDER POSITION_- ONLY INSTALLING THE RECLOSER WORK ORDER_________________________________EZ INSTALL A NEW POLE TOP RECLOSER AND CONTROL TO REPLACE/BYPASS THE 19U1 SWITCHGEAR FEEDER POSITION_- ONLY INSTALLING THE RECLOSER WORK ORDER_________________________________EZ Flax Hill 24A - REplace the failed 24A-3X low side arresters. Flax Hill 24A - REplace the failed 24A-3X low side arresters. cost_element_group Wholesale Expenses-W00 Wholesale Expenses-W00 Wholesale Expenses-W00 Wholesale Expenses-W00 Wholesale Expenses-W00 Wholesale Expenses-W00 Wholesale Expenses-W00 Wholesale Expenses-W00 Wholesale Expenses-W00 Wholesale Expenses-W00 ferc_account 108030 108030 107010 108030 107010 108030 107010 108030 107010 107010 percent 0.2 1 0.8 0.2 0.8 0.2 0.8 0.2 1 1 Wholesale Expenses-W00 107010 0.8 Wholesale Expenses-W00 Wholesale Expenses-W00 108030 107010 0.2 1 Wholesale Expenses-W00 Wholesale Expenses-W00 Wholesale Expenses-W00 107010 107010 108030 1 0.8 0.2 Wholesale Expenses-W00 Wholesale Expenses-W00 Wholesale Expenses-W00 Wholesale Expenses-W00 Wholesale Expenses-W00 Wholesale Expenses-W00 Wholesale Expenses-W00 108030 107010 107010 108030 107010 108030 107010 1 1 1 1 0.8 0.2 1 Wholesale Expenses-W00 Wholesale Expenses-W00 Wholesale Expenses-W00 Wholesale Expenses-W00 Wholesale Expenses-W00 Wholesale Expenses-W00 Wholesale Expenses-W00 Wholesale Expenses-W00 Wholesale Expenses-W00 Wholesale Expenses-W00 Wholesale Expenses-W00 Wholesale Expenses-W00 Wholesale Expenses-W00 Wholesale Expenses-W00 Wholesale Expenses-W00 Wholesale Expenses-W00 Wholesale Expenses-W00 Wholesale Expenses-W00 Wholesale Expenses-W00 Wholesale Expenses-W00 Wholesale Expenses-W00 Wholesale Expenses-W00 Wholesale Expenses-W00 Wholesale Expenses-W00 Wholesale Expenses-W00 108030 107010 108030 107010 108030 107010 108030 108030 107010 107010 107010 108030 107010 108030 107010 107010 107010 107010 107010 108030 107010 108030 107010 108030 107010 1 0.8 0.2 0.8 0.2 0.8 0.2 0.2 0.8 1 0.80002493 0.19997507 1 0.19999942 0.80000058 1 1 1 0.90969804 0.09030196 0.8 0.2 1 0.2 0.8 Wholesale Expenses-W00 107010 0.80049278 Wholesale Expenses-W00 Wholesale Expenses-W00 Wholesale Expenses-W00 Wholesale Expenses-W00 Wholesale Expenses-W00 Wholesale Expenses-W00 Wholesale Expenses-W00 Wholesale Expenses-W00 Wholesale Expenses-W00 Wholesale Expenses-W00 Wholesale Expenses-W00 Wholesale Expenses-W00 Wholesale Expenses-W00 Wholesale Expenses-W00 Wholesale Expenses-W00 Wholesale Expenses-W00 Wholesale Expenses-W00 Wholesale Expenses-W00 Wholesale Expenses-W00 Wholesale Expenses-W00 Wholesale Expenses-W00 Wholesale Expenses-W00 Wholesale Expenses-W00 Wholesale Expenses-W00 Wholesale Expenses-W00 Wholesale Expenses-W00 Wholesale Expenses-W00 Wholesale Expenses-W00 Wholesale Expenses-W00 Wholesale Expenses-W00 Wholesale Expenses-W00 Wholesale Expenses-W00 Wholesale Expenses-W00 Wholesale Expenses-W00 Wholesale Expenses-W00 Wholesale Expenses-W00 Wholesale Expenses-W00 Wholesale Expenses-W00 Wholesale Expenses-W00 Wholesale Expenses-W00 Wholesale Expenses-W00 Wholesale Expenses-W00 Wholesale Expenses-W00 Wholesale Expenses-W00 Wholesale Expenses-W00 Wholesale Expenses-W00 Wholesale Expenses-W00 Wholesale Expenses-W00 Wholesale Expenses-W00 Wholesale Expenses-W00 Wholesale Expenses-W00 Wholesale Expenses-W00 Wholesale Expenses-W00 Wholesale Expenses-W00 Wholesale Expenses-W00 Wholesale Expenses-W00 Wholesale Expenses-W00 Wholesale Expenses-W00 Wholesale Expenses-W00 Wholesale Expenses-W00 Wholesale Expenses-W00 Wholesale Expenses-W00 Wholesale Expenses-W00 Wholesale Expenses-W00 Wholesale Expenses-W00 Wholesale Expenses-W00 Wholesale Expenses-W00 Wholesale Expenses-W00 Wholesale Expenses-W00 Wholesale Expenses-W00 Wholesale Expenses-W00 Wholesale Expenses-W00 Wholesale Expenses-W00 Wholesale Expenses-W00 Wholesale Expenses-W00 Wholesale Expenses-W00 Wholesale Expenses-W00 Wholesale Expenses-W00 Wholesale Expenses-W00 Wholesale Expenses-W00 Wholesale Expenses-W00 Wholesale Expenses-W00 Wholesale Expenses-W00 Wholesale Expenses-W00 Wholesale Expenses-W00 Wholesale Expenses-W00 Wholesale Expenses-W00 Wholesale Expenses-W00 Wholesale Expenses-W00 Wholesale Expenses-W00 Wholesale Expenses-W00 Wholesale Expenses-W00 Wholesale Expenses-W00 Wholesale Expenses-W00 Wholesale Expenses-W00 Wholesale Expenses-W00 Wholesale Expenses-W00 Wholesale Expenses-W00 Wholesale Expenses-W00 108030 107010 107010 107010 107010 108030 107010 107010 107010 108030 108030 107010 107010 107010 107010 107010 108030 108030 107010 107010 108030 108030 107010 107010 108030 107010 108030 108030 107010 107010 108030 107010 107010 107010 108030 107010 108030 107010 108030 108030 107010 108030 107010 108030 107010 107010 108030 107010 108030 107010 108030 107010 107010 108030 108030 107010 108030 107010 108030 107010 108030 107010 107010 108030 108030 107010 107010 108030 108030 107010 107010 107010 108030 108030 107010 108030 107010 107010 107010 107010 108030 107010 107010 108030 107010 108030 107010 107010 108030 108030 107010 108030 107010 108030 107010 107010 108030 108030 107010 0.19950722 1 1 1 0.8651289 0.1348711 1 1 0.8 0.2 0.14971838 0.85028162 1 1 1 0.8 0.2 0.20485599 0.79514401 0.88156845 0.11843155 0.14341085 0.85658915 0.85658915 0.14341085 0.875 0.125 0.14341085 0.85658915 1 0.20000027 0.79999973 1 0.75 0.25 0.95471954 0.04528046 0.82293176 0.17706824 0.21466772 0.78533228 0.22807018 0.77192982 0.22807018 0.77192982 0.83252776 0.16747224 1 0.2 0.8 0.2 0.8 0.8 0.2 0.13962104 0.86037896 0.2 0.8 0.2 0.8 0.2 0.8 0.8 0.2 0.2 0.8 0.8 0.2 0.2 0.8 1 0.8 0.2 0.19999998 0.80000002 0.2 0.8 1 1 1 0.2 0.8 1 0.2 0.8 0.2 0.8 0.8 0.2 0.2 0.8 0.2 0.8 0.2 0.8 0.8 0.2 0.2 0.8 Wholesale Expenses-W00 107010 0.8 Wholesale Expenses-W00 Wholesale Expenses-W00 Wholesale Expenses-W00 108030 108030 107010 0.2 0.19661017 0.80338983
  8. Page 1,132 of 1,160

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued October 23, 2026 RRU-159 Attachment 23 Page 1132 of 1160 work_order_number description DSQ62024 Replace Failed Relay DSQ62024 Replace Failed Relay DSQ62025 (50): Battery Charger DSQ62025 DSQ62025 (50): Battery Charger DSQ62025 DSQ62030 Replace Failed A/C Unit DSQ62030 Replace Failed A/C Unit DSQ62043 (40): Refinish the 4.8 kV switchgea DSQ62043 (40): Refinish the 4.8 kV switchgea DSQ62048 (40): Replace failed 11B61 3ph regu DSQ62048 (40): Replace failed 11B61 3ph regu DSQ72015 (50): Miscellaneous replacement of DSQ72015 (50): Miscellaneous replacement of DSQ72033 (50): Replace the failed 9A-3X1-4 m DSQ72033 (50): Replace the failed 9A-3X1-4 m DSQ72046 (50): Replace failed 4A-10T-6Switch DSQ72046 (50): Replace failed 4A-10T-6Switch DSQ72048 (50): Replace 14H-4x1-4 motor opera DSQ72050 (50): Replace Failed 67 Relays on t DSQ72050 (50): Replace Failed 67 Relays on t DSQ72052 (30): Replace Failed Load Tap Chang DSQ72052 (30): Replace Failed Load Tap Chang DSQ72053 (50): Replace Failed 30R-4X1-4 Swit DSQ72053 (50): Replace Failed 30R-4X1-4 Swit DSQ82004 (50): Replace Failed 1G01 DPAC Rela DSQ82004 (50): Replace Failed 1G01 DPAC Rela DSQ82005 Replace Failed Heater DSQ82005 Replace Failed Heater DSQ82006 (50): Replace Failed 13C-2X High an DSQ82006 (50): Replace Failed 13C-2X High an DSQ82008 Replacement of failed Newington 4ADSQ82008 Replacement of failed Newington 4ADSQ82009 Weston 21M - Replace 4 Failed GE IA DSQ82009 Weston 21M - Replace 4 Failed GE IA DSQ82011 (50): Replace Failed Battery DSQ820 DSQ82011 (50): Replace Failed Battery DSQ820 DSQ82025 (40): Replace Failed A/C Unit DSQ82 DSQ82025 (40): Replace Failed A/C Unit DSQ82 DSQ82028 (50): Replace Failed SWGR A/C Unit DSQ82028 (50): Replace Failed SWGR A/C Unit DSQ82029 Rebuild Failed 1A-5X Load Tap Chang DSQ82029 Rebuild Failed 1A-5X Load Tap Chang DSQ82030 (50): Replace Failed A/C Unit DSQ82 DSQ82030 (50): Replace Failed A/C Unit DSQ82 DSQ82031 (50): Replace Failing A/C Unit and DSQ82031 (50): Replace Failing A/C Unit and DSQ82035 (60): Replace Failed 23Q-1T-6 Motor DSQ82035 (60): Replace Failed 23Q-1T-6 Motor DSQ82045 (50): Replace Failed High & Low Sid DSQ82045 (50): Replace Failed High & Low Sid DSQ82047 (60): Replace Failed 21J-10T-6 Swit DSQ82047 (60): Replace Failed 21J-10T-6 Swit DSQ92004 (30): Replace Failed 29J-1X3-4 Swi DSQ92004 (30): Replace Failed 29J-1X3-4 Swi DSQ92007 Lake View 31A Rplc fail 31A-3X ION DSQ92007 Lake View 31A Rplc fail 31A-3X ION DSQ92009 Van Dyke 12 - Replace Failed Auto-T DSQ92009 Van Dyke 12 - Replace Failed Auto-T DSQ92011 (30): Replace Failed Battery DSQ920 DSQ92011 (30): Replace Failed Battery DSQ920 DSQ92014 (30): Replace Failed Auto Throwover DSQ92014 (30): Replace Failed Auto Throwover DSQ92017 Replace failed water heater DSQ92017 Replace failed water heater DSQ92023 (30): Replace Failed 2B-2X Load Tap DSQ92023 (30): Replace Failed 2B-2X Load Tap DSQ92040 (30): Replace Failed 1C-2H Potentia DSQ92040 (30): Replace Failed 1C-2H Potentia long_description Norwalk 9S - Replace the failed 9S-45 SEL-351S relay. Norwalk 9S - Replace the failed 9S-45 SEL-351S relay. Carmel Hill 11S - Replace the failed battery charger. Carmel Hill 11S - Replace the failed battery charger. Card 11F - Replace the failed air conditioning unit. Card 11F - Replace the failed air conditioning unit. Refinish the 4.8 kV switchgear enclosure Refinish the 4.8 kV switchgear enclosure Replace failed 11B61 3ph regulator Replace failed 11B61 3ph regulator Cos Cob 11R - Replace the failed HMI system Cos Cob 11R - Replace the failed HMI system Falls Village 9A - Replace the failed 9A-3X1-4 mobile disconnect switch Falls Village 9A - Replace the failed 9A-3X1-4 mobile disconnect switch Newington 4A - Replace the failed 4A-10T-6 disconnect switch. Newington 4A - Replace the failed 4A-10T-6 disconnect switch. West Brookfield 14H - Replace the 14H-4X1-4 motor operated disconnect switch Prospect 22E - Replace the failed 11R51 feeder relays Prospect 22E - Replace the failed 11R51 feeder relays Load Tap Changer (LTC) Load Tap Changer (LTC) Green Hill 30R - Replace the failed 30R-4X1-4 MOD switch for mobile transformer position Green Hill 30R - Replace the failed 30R-4X1-4 MOD switch for mobile transformer position Replace Failed 1G01 DPAC Relay Replace Failed 1G01 DPAC Relay Replace Failed Heater Replace Failed Heater Replace Failed 13C-2X High and Low Side Arresters Replace Failed 13C-2X High and Low Side Arresters Newington 4A - Replace the failed 4A-3H potential Transformers Newington 4A - Replace the failed 4A-3H potential Transformers Weston 21M - Replace the failed GE IAC relays Weston 21M - Replace the failed GE IAC relays Sandy Hook 37F - Replace the failed battery Sandy Hook 37F - Replace the failed battery Replace Failed A/C Unit Replace Failed A/C Unit Replace Failed SWGR A/C Unit Replace Failed SWGR A/C Unit Rebuild Failed 1A-5X Load Tap Changer (LTC) Rebuild Failed 1A-5X Load Tap Changer (LTC) Replace Failed A/C Unit Replace Failed A/C Unit Replace Failing A/C Unit and Install Hydrogen Detection Replace Failing A/C Unit and Install Hydrogen Detection Thompson 23Q - Replace the failed 23Q-1T-6 motor operated disconnect switch Thompson 23Q - Replace the failed 23Q-1T-6 motor operated disconnect switch Replace Failed High & Low Side 14R-1X Arresters Replace Failed High & Low Side 14R-1X Arresters Replace Failed 21J-10T-6 Switch Replace Failed 21J-10T-6 Switch Replace Failed 29J-1X3-4 Switches Replace Failed 29J-1X3-4 Switches Lake View 31A - Replace Failed 31A-3X ION meter Lake View 31A - Replace Failed 31A-3X ION meter Replace Failed Auto-Throwover Switch Replace Failed Auto-Throwover Switch Replace Failed Battery Replace Failed Battery Replace Failed Auto Throwover Replace Failed Auto Throwover Replace failed water heater Replace failed water heater Replace Failed 2B-2X Load Tap Changer Control Replace Failed 2B-2X Load Tap Changer Control Replace Failed 1C-2H Potential Transformers (PTs) Replace Failed 1C-2H Potential Transformers (PTs) cost_element_group Wholesale Expenses-W00 Wholesale Expenses-W00 Wholesale Expenses-W00 Wholesale Expenses-W00 Wholesale Expenses-W00 Wholesale Expenses-W00 Wholesale Expenses-W00 Wholesale Expenses-W00 Wholesale Expenses-W00 Wholesale Expenses-W00 Wholesale Expenses-W00 Wholesale Expenses-W00 Wholesale Expenses-W00 Wholesale Expenses-W00 Wholesale Expenses-W00 Wholesale Expenses-W00 Wholesale Expenses-W00 Wholesale Expenses-W00 Wholesale Expenses-W00 Wholesale Expenses-W00 Wholesale Expenses-W00 Wholesale Expenses-W00 Wholesale Expenses-W00 Wholesale Expenses-W00 Wholesale Expenses-W00 Wholesale Expenses-W00 Wholesale Expenses-W00 Wholesale Expenses-W00 Wholesale Expenses-W00 Wholesale Expenses-W00 Wholesale Expenses-W00 Wholesale Expenses-W00 Wholesale Expenses-W00 Wholesale Expenses-W00 Wholesale Expenses-W00 Wholesale Expenses-W00 Wholesale Expenses-W00 Wholesale Expenses-W00 Wholesale Expenses-W00 Wholesale Expenses-W00 Wholesale Expenses-W00 Wholesale Expenses-W00 Wholesale Expenses-W00 Wholesale Expenses-W00 Wholesale Expenses-W00 Wholesale Expenses-W00 Wholesale Expenses-W00 Wholesale Expenses-W00 Wholesale Expenses-W00 Wholesale Expenses-W00 Wholesale Expenses-W00 Wholesale Expenses-W00 Wholesale Expenses-W00 Wholesale Expenses-W00 Wholesale Expenses-W00 Wholesale Expenses-W00 Wholesale Expenses-W00 Wholesale Expenses-W00 Wholesale Expenses-W00 Wholesale Expenses-W00 Wholesale Expenses-W00 Wholesale Expenses-W00 Wholesale Expenses-W00 Wholesale Expenses-W00 Wholesale Expenses-W00 Wholesale Expenses-W00 Wholesale Expenses-W00 ferc_account 107010 108030 108030 107010 107010 108030 108030 107010 108030 107010 107010 108030 108030 107010 108030 107010 107010 108030 107010 108030 107010 108030 107010 107010 108030 108030 107010 107010 108030 107010 108030 108030 107010 108030 107010 108030 107010 107010 108030 108030 107010 107010 108030 108030 107010 108030 107010 108030 107010 108030 107010 108030 107010 107010 108030 107010 108030 107010 108030 107010 108030 107010 108030 108030 107010 107010 108030 DSRTACLS DSSP0011 DSTR0011 DSYM0011 DV190E11 DV200E11 DV204E11 DV206E11 DV209E11 DV220E11 DV324E11 DV390E11 DV450E11 DV451E11 DV496E11 DV528E11 DV656E11 DVINC011 EAST4801 ECBL2025 EDREM011 EEC23001 EEC24001 EEC25001 EEIBE011 EEIBR011 EHAMP001 planning to have 600 sensors on the system we will need to plan to have 12 RTACS. 6 RTACS for the Production DSCADA System and 6 RTACS for the Disaster Recovery System. We have 4 right now. Will need to order 8 more. The stock code is 458864, $2,850 per RTAC. Total for 8 RTACS: $22,800. DSSP0011OPSNTRELEXPENSES11 DSTR0011OPSNTRELEXPENSES11 DSYM0011OPSNTRELEXPENSES11 CA AWO CLP-1.90S STOCK CA AWO CLP$2.00S STOCK CA AWO CLP$2.04S STOCK CA AWO CLP$2.06S STOCK CA AWO CLP$2.09S STOCK CA AWO CLP$2.20S STOCK CA AWO CLP$3.24S STOCK CA AWO CLP3.90%S STOCK CA AWO CLP4.50%S STOCK 1951 CA AWO CLP4.50%S STOCK 1963 CA AWO CLP4.96%S STOCK CA AWO CLP5.28%S STOCK CA AWO CLP6.56%S STOCK DVINC011NT011 4.8KV DELTA GROUNDING Eastern Division 2025 CABLE FOR EASTERN CT EDREM011EMPBENPAY11 This AWO is being set up to pay the May 2023 Payment for the Eversource Energy center agreement with UCONN. This AWO is being set up to pay the May 2024 Payment for the Eversource Energy center agreement with UCONN. This AWO is being set up to pay the 2025 Payments for the Eversource Energy center agreement with UCONN. EE Incr Bid Recover Exp Amortization-Rose EE Incr Bid Recover Rev Amortization-Rose E Hampton AWC #66-Rose Wholesale Expenses-W00 Wholesale Expenses-W00 Wholesale Expenses-W00 Wholesale Expenses-W00 Wholesale Expenses-W00 Wholesale Expenses-W00 Wholesale Expenses-W00 Wholesale Expenses-W00 Wholesale Expenses-W00 Wholesale Expenses-W00 Wholesale Expenses-W00 Wholesale Expenses-W00 Wholesale Expenses-W00 Wholesale Expenses-W00 Wholesale Expenses-W00 Wholesale Expenses-W00 Wholesale Expenses-W00 Wholesale Expenses-W00 Wholesale Expenses-W00 Wholesale Expenses-W00 Wholesale Expenses-W00 Wholesale Expenses-W00 Wholesale Expenses-W00 Wholesale Expenses-W00 Wholesale Expenses-W00 Wholesale Expenses-W00 Wholesale Expenses-W00 107010 582280 582250 581440 437010 437025 437030 437050 437060 437040 437070 437410 437420 437430 437440 437450 437460 419000 107010 107010 555000 107010 107010 107010 555000 555000 228450 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 Wholesale Expenses-W00 Wholesale Expenses-W00 Wholesale Expenses-W00 Wholesale Expenses-W00 Wholesale Expenses-W00 Wholesale Expenses-W00 Wholesale Expenses-W00 Wholesale Expenses-W00 Wholesale Expenses-W00 Wholesale Expenses-W00 Wholesale Expenses-W00 Wholesale Expenses-W00 107010 107010 908000 908000 908000 107010 107010 2421H0 920000 580000 228450 228450 1 1 1 1 1 1 1 1 1 1 1 1 Wholesale Expenses-W00 Wholesale Expenses-W00 Wholesale Expenses-W00 Wholesale Expenses-W00 107010 580000 594240 593150 1 1 1 1 Wholesale Expenses-W00 Wholesale Expenses-W00 Wholesale Expenses-W00 Wholesale Expenses-W00 Wholesale Expenses-W00 107010 154000 107ES0 107ES0 594260 1 1 1 1 1 Wholesale Expenses-W00 107010 1 Wholesale Expenses-W00 107010 1 Wholesale Expenses-W00 Wholesale Expenses-W00 Wholesale Expenses-W00 Wholesale Expenses-W00 Wholesale Expenses-W00 Wholesale Expenses-W00 Wholesale Expenses-W00 Wholesale Expenses-W00 Wholesale Expenses-W00 Wholesale Expenses-W00 Wholesale Expenses-W00 Wholesale Expenses-W00 107010 107010 107010 107010 107010 107010 107010 107010 107010 107010 107010 107010 1 1 1 1 1 1 1 1 1 1 1 1 Wholesale Expenses-W00 107010 1 Wholesale Expenses-W00 107010 1 Wholesale Expenses-W00 Wholesale Expenses-W00 Wholesale Expenses-W00 Wholesale Expenses-W00 Wholesale Expenses-W00 Wholesale Expenses-W00 107010 107010 107010 107010 107010 107010 1 1 1 1 1 1 Wholesale Expenses-W00 Wholesale Expenses-W00 Wholesale Expenses-W00 Wholesale Expenses-W00 Wholesale Expenses-W00 Wholesale Expenses-W00 107010 107010 107010 107010 107010 107010 1 1 1 1 1 1 RTAC LINE SENSORS DSCADA Dist Sta Care and Support Dist Sta Trouble Response Dispatch - System CA AWO CLP-1.90S STOCK CA AWO CLP$2.00S STOCK CA AWO CLP$2.04S STOCK CA AWO CLP$2.06S STOCK CA AWO CLP$2.09S STOCK CA AWO CLP$2.20S STOCK CA AWO CLP$3.24S STOCK CA AWO CLP3.90%S STOCK CA AWO CLP4.50%S STOCK CA AWO CLP4.50%S STOCK CA AWO CLP4.96%S STOCK CA AWO CLP5.28%S STOCK CA AWO CLP6.56%S STOCK Dividend Interest Income 4.8kV Grounding Eastern 2025 Eastern CT Cable Educational Reimbursements Eversource Energy Ctr May 2023 Eversource Energy Center 2024 2025 Energy Center EE Incr Bid Recover Exp Amortizatio EE Incr Bid Recover Rev Amortizatio E Hampton AWC #66 percent 0.73764259 0.26235741 0.23428571 0.76571429 0.80081517 0.19918483 0.00246914 0.99753086 0.2 0.8 0.80936455 0.19063545 0.16239678 0.83760322 0.2 0.8 1 0.16883117 0.83116883 0.2 0.8 0.12094441 0.87905559 0.81118881 0.18881119 0.2 0.8 0.78059097 0.21940903 0.86550727 0.13449273 0.07284768 0.92715232 0.15506683 0.84493317 0.18367045 0.81632955 0.78947368 0.21052632 0.23395089 0.76604911 0.78632479 0.21367521 0.15121951 0.84878049 0.12229724 0.87770276 0.09024764 0.90975236 0.14846773 0.85153227 0.16266356 0.83733644 0.85406699 0.14593301 0.78055556 0.21944444 0.85365641 0.14634359 0.8 0.2 0.8 0.2 0.2 0.8 0.8 0.2 This work order is to purchase a power reel for the apprentices in East Hampton. The estimated cost is $1,538 per Bridget Bentley's e-mail dated 1/25/2022. EHFTTE22 EHTWR1DC EIAR0011 EIDR0011 EIIN0011 EKCG2411 EKONKSR1 ELSP0211 EMMR0011 EMPP0011 ENFLDAW1 ENFLDMS2 East Hampton Tools & Equipment E HAMPTON TOWER REPLACEMENT EIA GAS Delivery Rebate EIA INT RATE BUY-DN LOANS-REGLTORY EIA DG INCENTIVE income 2024 CG EK Disconnects CT MTR DSCADA Sys Res Ekonk Electric Supply Employment Claims Emergency Preparedness SITE #58 ENFIELD AREA WORK CENTER Enfield 2 Main Street Per Dan Chambrello's e-mail dated 10-5-2022, there will be $85K split evenly between East Hampton, Newtown, Madison, and Hartford for craft school tools and equipment. EAST HAMPTON TOWER REPLACEMENT - CL&P EIAR0011ETT2013 EIDR0011ETT2013 This work order captures the ISO revenues to be sent to customers. Forward Capacity (Wholesale Marketing) - sell capacity on the market for customers. 2024 CG EK Disconnects CT MTR DSCADA System Resiliency EKONK Electric Supply Employment Claims EMPP0011OPSNTRELEXPENSES11 REMEDIATION SITE #58 ENFIELD AREA WORK CENTER Enfield 2 Main Street - Atashian, Austin This work order was created to accept the charges for the Field Engineering / Field Communication curriculum development project for Field Training. ENGCOMCT EPLD0011 ERRU0011 ERRX0011 Field Engineering / Communication Engineering/Planning/Design Envir Resp/Remediation - Undergrnd Envir Resp/Remediation - Overhead ES0046GR ESPCTE11 ESSB0011 ESSL0011 ESVINX11 Voice Radio Site 46 Greenwich CT ELECTRIC EMERGENCY SPARES 11 SS Clearing Blanket CT 11 OH Clearing Blanket CT Positive Detect-Stray-Volt-ESE-Repa ES_001CS CHESHIRE AWC ES 140 FT SST ES_003LH LONG HILL SBA 280 FT ES_004SM ES_005PR ES_008MA ES_009WB ES_010GH ES_012BS ES_018CO ES_022CP ES_025NS ES_026SG ES_028CL ES_033WH ES_004 SOUTH MOUNTAIN VOICE RADIO ES-005 PROSPECT RS ES 150 FT ES_008 MADISON AWC VOICE RADIO ES_009 WESTBROOK STATE POLICE TRP F GooseHillRS_ES_280ft_SST ES_012 BERLIN SOUTH VOICE RADIO ES-018 COLCHESTER CSP 320FT Chapel Hill RS North Stonington III SBA Stonington SBA ES-028 COLEBROOK LCD ES-033 WEST HARTLAND NESM ES_038TC TALCOTTRS ES 185FT SST ES_043TL TOLLAND AWC ES 95 FT SST ES_045UN ES_047CV ES_051TH ES_055WL ES_056EK ES_058GR UNIONRS ES 180 FT SST Coventry CCI ES-051 THOMPSON CSP 180 FT Willimantic_SBA_SST ES_056 EKONK ES_058 GREENWICH VOICE RADIO ES_060NO ES_062WI ES_066NW ES_067OX ES_068SO ES_074NM ES_060 NORWALK AWC VOICE RADIO ES_062 WILTON VOICE RADIO ES-066 NEWTOWN AWC ES 180 FT ES-O67 OXFORD CSP ES-068 SOUTHBURY CASSIDY CSP 180FT ES_074 NEW MILFORD RS The costs will be distributed according to the PAF. CT = 35% = $1,434,017 EMA = 35% = $1,403,598 NH = 20% = $807,924 WMA = 10% = $401,029 EPLD0011OPSNTRELEXPENSES11 ERRU0011OPSNTRELEXPENSES11 ERRX0011OPSNTRELEXPENSES11 In support of CT Voice Radio Project, WO to track all Engineering, Procurement & Construction for "Site 46" . CT ELECTRIC EMERGENCY SPARES - Savage, Jessica ESSB0011ALLOCCLEARING11 ESSL0011ALLOCCLEARING11 Positive Detect-Stray-Volt-ESE-Repair-Annual-Desg CHESHIRE AWC LOC ES-001 VOICE RADIO SET UP LONG HILL SBA LOC ES-001 VOICE RADIO SET UP VOICE RADIO SET UP VOICE RADIO SET UP VOICE RADIO SET UP VOICE RADIO SET UP VOICE RADIO SET UP - GOOSE HILL VOICE RADIO SET UP VOICE RADIO SET UP - COLCHESTER VOICE RADIO SET UP - CHAPEL HILL VOICE RADIO SET UP - NO STONINGTON VOICE RADIO SET UP - STONINGTON VOICE RADIO SET UP VOICE RADIO SET UP TALCOTT RS LOC ES-001 VOICE RADIO SET UP TOLLAND AWC LOC ES-043 VOICE RADIO SET UP UNION LOC ES-045 VOICE RADIO SET UP VOICE RADIO SET UP - COVENTRY VOICE RADIO SET UP VOICE RADIO SET UP - WILLIMANTIC VOICE RADIO SET UP VOICE RADIO SET UP VOICE RADIO SET UP VOICE RADIO SET UP VOICE RADIO SET UP VOICE RADIO SET UP VOICE RADIO SET UP VOICE RADIO SET UP
  9. Page 1,133 of 1,160

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued October 23, 2026 RRU-159 Attachment 23 Page 1133 of 1160 work_order_number description ES_077LI ES-077 LITCHFIELD TRPL CSP 180FT ES_081SH SHARON LCD SST ES_082CH CHURCH HILL LCD SST long_description VOICE RADIO SET UP SHARON LOC ES-081 VOICE RADIO SET UP cost_element_group Wholesale Expenses-W00 ferc_account 107010 percent Wholesale Expenses-W00 107010 1 Wholesale Expenses-W00 107010 1 Wholesale Expenses-W00 Wholesale Expenses-W00 107010 107010 1 1 Wholesale Expenses-W00 Wholesale Expenses-W00 Wholesale Expenses-W00 107010 107010 107010 1 1 1 Wholesale Expenses-W00 Wholesale Expenses-W00 Wholesale Expenses-W00 107010 107010 107010 1 1 1 Wholesale Expenses-W00 Wholesale Expenses-W00 Wholesale Expenses-W00 107010 107010 107010 1 1 1 Wholesale Expenses-W00 Wholesale Expenses-W00 Wholesale Expenses-W00 Wholesale Expenses-W00 Wholesale Expenses-W00 Wholesale Expenses-W00 Wholesale Expenses-W00 Wholesale Expenses-W00 Wholesale Expenses-W00 Wholesale Expenses-W00 Wholesale Expenses-W00 Wholesale Expenses-W00 107010 107010 107010 107010 593100 555000 555000 555000 593100 555000 555000 555000 1 1 1 1 1 1 1 1 1 1 1 1 Wholesale Expenses-W00 107010 0.7999 Wholesale Expenses-W00 584000 0.1 Wholesale Expenses-W00 Wholesale Expenses-W00 593000 593000 0.1001 1 Wholesale Expenses-W00 Wholesale Expenses-W00 Wholesale Expenses-W00 Wholesale Expenses-W00 Wholesale Expenses-W00 Wholesale Expenses-W00 Wholesale Expenses-W00 Wholesale Expenses-W00 Wholesale Expenses-W00 Wholesale Expenses-W00 Wholesale Expenses-W00 Wholesale Expenses-W00 Wholesale Expenses-W00 Wholesale Expenses-W00 Wholesale Expenses-W00 Wholesale Expenses-W00 Wholesale Expenses-W00 Wholesale Expenses-W00 107010 107010 107010 107010 107010 107010 107010 107010 107010 108030 108030 107010 108030 107010 107010 108030 108030 107010 1 1 1 1 1 1 1 1 0.95237558 0.04762442 0.09092332 0.90907668 0.07894737 0.92105263 0.86 0.14 0.06367041 0.93632959 Wholesale Expenses-W00 108030 0.08826588 Wholesale Expenses-W00 Wholesale Expenses-W00 Wholesale Expenses-W00 Wholesale Expenses-W00 Wholesale Expenses-W00 Wholesale Expenses-W00 Wholesale Expenses-W00 Wholesale Expenses-W00 Wholesale Expenses-W00 Wholesale Expenses-W00 Wholesale Expenses-W00 Wholesale Expenses-W00 Wholesale Expenses-W00 Wholesale Expenses-W00 Wholesale Expenses-W00 Wholesale Expenses-W00 Wholesale Expenses-W00 Wholesale Expenses-W00 Wholesale Expenses-W00 Wholesale Expenses-W00 Wholesale Expenses-W00 Wholesale Expenses-W00 Wholesale Expenses-W00 Wholesale Expenses-W00 Wholesale Expenses-W00 Wholesale Expenses-W00 Wholesale Expenses-W00 Wholesale Expenses-W00 Wholesale Expenses-W00 Wholesale Expenses-W00 Wholesale Expenses-W00 Wholesale Expenses-W00 Wholesale Expenses-W00 Wholesale Expenses-W00 Wholesale Expenses-W00 Wholesale Expenses-W00 Wholesale Expenses-W00 Wholesale Expenses-W00 Wholesale Expenses-W00 Wholesale Expenses-W00 Wholesale Expenses-W00 Wholesale Expenses-W00 Wholesale Expenses-W00 Wholesale Expenses-W00 Wholesale Expenses-W00 Wholesale Expenses-W00 Wholesale Expenses-W00 Wholesale Expenses-W00 Wholesale Expenses-W00 Wholesale Expenses-W00 Wholesale Expenses-W00 Wholesale Expenses-W00 Wholesale Expenses-W00 Wholesale Expenses-W00 Wholesale Expenses-W00 Wholesale Expenses-W00 Wholesale Expenses-W00 Wholesale Expenses-W00 Wholesale Expenses-W00 Wholesale Expenses-W00 Wholesale Expenses-W00 Wholesale Expenses-W00 Wholesale Expenses-W00 Wholesale Expenses-W00 Wholesale Expenses-W00 Wholesale Expenses-W00 Wholesale Expenses-W00 Wholesale Expenses-W00 Wholesale Expenses-W00 Wholesale Expenses-W00 Wholesale Expenses-W00 Wholesale Expenses-W00 Wholesale Expenses-W00 Wholesale Expenses-W00 Wholesale Expenses-W00 Wholesale Expenses-W00 Wholesale Expenses-W00 Wholesale Expenses-W00 Wholesale Expenses-W00 Wholesale Expenses-W00 Wholesale Expenses-W00 Wholesale Expenses-W00 Wholesale Expenses-W00 Wholesale Expenses-W00 Wholesale Expenses-W00 Wholesale Expenses-W00 Wholesale Expenses-W00 Wholesale Expenses-W00 Wholesale Expenses-W00 Wholesale Expenses-W00 Wholesale Expenses-W00 Wholesale Expenses-W00 Wholesale Expenses-W00 Wholesale Expenses-W00 Wholesale Expenses-W00 Wholesale Expenses-W00 Wholesale Expenses-W00 Wholesale Expenses-W00 Wholesale Expenses-W00 107010 107010 107010 108030 107010 108030 107010 108030 108030 107010 107010 107010 107010 108030 107010 108030 107010 108030 108030 107010 107010 107010 108030 107010 108030 107010 108030 107010 107010 107010 108030 107010 107010 108030 108030 107010 107010 107010 108030 107010 108030 107010 108030 108030 107010 107010 107010 108030 107010 107010 108030 108030 107010 108030 107010 107010 108030 108030 107010 108030 107010 107010 108030 107010 107010 108030 107010 108030 107010 108030 107010 108030 108030 107010 108030 107010 107010 108030 107010 107010 108030 107010 108030 107010 107010 108030 107010 107010 108030 107010 108030 107010 108030 108030 107010 107010 107010 107010 108030 0.91173412 1 0.9530432 0.0469568 0.92716684 0.07283316 0.94117647 0.05882353 0.04719183 0.95280817 1 1 0.95171423 0.04828577 0.95238095 0.04761905 0.95 0.05 0.0599419 0.9400581 1 0.91666667 0.08333333 0.95238095 0.04761905 1 0.19811321 0.80188679 1 1 0.04761905 0.95238095 0.95238095 0.04761905 0.04761905 0.95238095 1 0.95238095 0.04761905 0.94440532 0.05559468 0.95238095 0.04761905 0.0977387 0.9022613 1 1 0.04761905 0.95238095 0.95238095 0.04761905 0.04761905 0.95238095 0.0703125 0.9296875 0.95238095 0.04761905 0.13534226 0.86465774 0.0862069 0.9137931 1 0.02473195 0.97526805 0.96062992 0.03937008 0.95238104 0.04761896 0.79952006 0.20047994 0.95238095 0.04761905 0.04761905 0.95238095 0.04999854 0.95000146 0.4 0.6 1 1 0.04761905 0.95238095 0.04761905 0.95238095 1 0.04761905 0.95238095 0.90113782 0.09886218 0.9523806 0.0476194 0.95779451 0.04220549 0.07105805 0.92894195 1 1 0.9009009 0.0990991 1 CHURCH HILL LOC ES-082 VOICE RADIO SET UP SALISBURY 21J LOC ES-084 VOICE RADIO SET UP ES_084SL ES_086SS SALISBURY 21J ES NEW ES_086 SOAPSTONE VOICE RADIO ES_090HF ES_106BR ES_127NL HARTFORD AWC ES RT ES_106 BRANFORD VOICE RADIO NEW LONDON AREA WORK CENTER ES_136CA ES_153DL ES_154EH ES_136 CANTON 5R VOICE RADIO ES_153 DANIELSON AWC East HamptonAWC_ES_120ft_SST ES_234FA ES_259ST ES_271EW ES_234 FARMINGTON1C VOICE RADIO ES_295 STAMFORD AWC VOICE RADIO ES_271 EAST WINDSOR AWC VOICE RADIO ES_278KT ES_281ME ES_286RI ES_WFSWH ETRE0011 ETRE2311 ETRE2411 ETRE2511 EVGM0011 EVGM2411 EVGM2511 EVTC0011 KENT ATC 150FT MP ES-281 MERIDEN COOPER ST ES 60 FT ES-286 RIDGEFIELD 22N ES 85 FT Freight Street Waterbury Warehouse Tree Trimming 2023 CT Distribution Tree Trimming 2024 CT Distribution Tree Trimming 2025 CT Distribution Tree Trimming Vegetation Management 2024 CT Veg OM Labor 2025 CT Veg OM Labor Event Sponsorship - Company Funded EXCVT101 2001 CL&P EXCAVATING CONTRACTOR ARE EXCVT101 2001 CL&P EXCAVATING CONTRACTOR ARE EXCVT101 EXP01141 2001 CL&P EXCAVATING CONTRACTOR ARE Expense portion of CD01141 F11WRELY F1411025 F1511011 F1511070 F1511090 F1611010 F1611014 F1611048 F1711013 F1711013 F1711016 F1711016 F1811042 F1811042 F1811065 F1811065 F1811101 F1811101 FREIGHT 11W DIGITAL GRID RELAYS CL&P Backup SOC Newtown Glygol System East Hampton Gate Door Closer Hartford Gate Intercom New London Gate Intercom Cheshire Security Cameras (4) Tolland High Garage Bay Light Myrock Substation Office Fitout Myrock Substation Office Fitout Field Eng Office Fitout (Bldgs) Field Eng Office Fitout (Bldgs) Replace dock leveler pump Replace dock leveler pump Install fluid handling system Install fluid handling system AV Equipment for conf room AV Equipment for conf room F1811102 Newtown EOC Expansion F1811102 F1811144 F1911083 F1911083 F1911107 F1911107 F1911130 F1911130 F1911139 F1911139 F1911140 F1911152 F2111036 F2111036 F2111038 F2111038 F2111050 F2111050 F2111084 F2111084 F2111086 F2111111 F2111111 F2111113 F2111113 F2111152 F2111153 F2111153 F2111154 F2111160 F2111166 F2111166 F2111170 F2111170 F2111179 F2111179 F2111184 F2111188 F2111188 F2111193 F2111193 F2211001 F2211001 F2211004 F2211004 F2211005 F2211007 F2211011 F2211011 F2211012 F2211012 F2211013 F2211013 F2211014 F2211014 F2211016 F2211016 F2211018 F2211018 F2211019 F2211019 F2211024 F2211026 F2211026 F2211028 F2211028 F2211031 F2211031 F2211034 F2211034 F2211041 F2211041 F2211043 F2211043 F2211044 F2211044 F2211047 F2211047 F2211049 F2211050 F2211052 F2211052 F2211054 F2211054 F2211056 F2211057 F2211057 F2211059 F2211059 F2211060 F2211060 F2211062 F2211062 F2211063 F2211063 F2211067 F2211069 F2211075 F2211075 Newtown EOC Expansion Madison Ext Carpet Stair Treads EH Lower Level Breakroom Renovation EH Lower Level Breakroom Renovation Stamford Main Corridor Upgrades Stamford Main Corridor Upgrades New Britain Fan Motor Replacement New Britain Fan Motor Replacement LED Replacement LED Replacement Install new workstations Install card reader 1250 Hooksett Rd - Site Improvement 1250 Hooksett Rd - Site Improvement Stamford Generator Damper Motor Stamford Generator Damper Motor Windsor SOC Renovation Windsor SOC Renovation Norwalk-Tindall Window Replacements Norwalk-Tindall Window Replacements Cheshire Break Room Refrigerator Burner Replacements Burner Replacements Lockset Replacement Lockset Replacement NEW Gen Office Work Stations Bldgs. Replace catch basin Replace catch basin ATC Garage Building Envelope Assess Install Fleet Garage HVAC BMS Tolland Watersource HP Replacement Tolland Watersource HP Replacement New London Door Hardware & Lock New London Door Hardware & Lock BCW Generator Replacement BCW Generator Replacement Waterford Mailsorter Station Entry Gate Intercom Entry Gate Intercom NOR-Tindal 2ndFl RR Sanitary Piping NOR-Tindal 2ndFl RR Sanitary Piping Tolland Garage Entry Doors Tolland Garage Entry Doors Hart-Sheldon St Victaulic Piping Hart-Sheldon St Victaulic Piping Exit Gate Motorized Operator Replac Norwalk-Tindall Electric Strike Bushing Pit Decking Replacement Bushing Pit Decking Replacement Actuator and Valve Replacement Actuator and Valve Replacement Dry-Type Transformer Replacement Dry-Type Transformer Replacement HAR-Sheldon Xenta Controller HAR-Sheldon Xenta Controller HAR-Sheldon Back Flow Preventer HAR-Sheldon Back Flow Preventer Entry Gate Card Reader Post Replac Entry Gate Card Reader Post Replac Stamford Mens RR Automation Stamford Mens RR Automation East Hampton Elec Outlets NOR-Tindall Main Switchgear Replace NOR-Tindall Main Switchgear Replace New Britain Roof Drain/Rain Leader New Britain Roof Drain/Rain Leader electrical panel replacement electrical panel replacement Dock Leveler Replacement Dock Leveler Replacement Replace lift cover Replace lift cover Cheshire Drag Chain Assembly Cheshire Drag Chain Assembly Replace hydraulic valve & pump Replace hydraulic valve & pump Danielson Sewer Line/Flush Valve Danielson Sewer Line/Flush Valve Madison Elec Ops Supervisor Outlets Danielson Card Reader-Elect Door TOR Fleet Gar Veh Lift Replacement TOR Fleet Gar Veh Lift Replacement Cheshire Garage PRV Replacement Cheshire Garage PRV Replacement East Hampton Yard Paving Madison Elec Heater Assembly Madison Elec Heater Assembly BCW Annex-Warehouse Storeroom BCW Annex-Warehouse Storeroom Madison Electric Ceiling Replacemen Madison Electric Ceiling Replacemen NOR-Tindall Store Front Door/Frame NOR-Tindall Store Front Door/Frame Cheshire AV Equipment/Installation Cheshire AV Equipment/Installation EH Card Reader Control Module EH Electric for Pressure Washer Replace elevator lighting Replace elevator lighting FARMINGTON 1C LOC ES-234 VOICE RADIO SET UP HARTFORD AWC LOC ES-090 VOICE RADIO SET UP VOICE RADIO SET UP VOICE RADIO SET UP - NEW LONDON VOICE RADIO SET UP VOICE RADIO SET UP VOICE RADIO SET UP - EAST HAMPTON AWC FARMINGTON 1C LOC ES-234 VOICE RADIO SET UP VOICE RADIO SET UP VOICE RADIO SET UP KENT ATC LOC ES-278 VOICE RADIO SET UP VOICE RADIO SET UP VOICE RADIO SET UP VOICE RADIO SET UP ETRE0011NT011 2023 CT Distribution Tree Trimming-Slossberg 2024 CT Distribution Tree Trimming - Tracey, Emily 2025 CT Distribution Tree Trimming - Tracey, Emily EVGM0011NT011 2024 CT Veg OM Labor - Tracey, Emily 2025 CT Veg OM Labor - Tracey, Emily EVTC0011NT011 WORK ORDER TO COLLECT FOR DISTRIBUTION, CHARGES FROM EXCAVATION CONTRACTS FOR THE 9 CL&P DESIGNATED AREAS - MATERIAL REQUEST # 86884800 AND 15984800 BY D SODERSTROM WORK ORDER TO COLLECT FOR DISTRIBUTION, CHARGES FROM EXCAVATION CONTRACTS FOR THE 9 CL&P DESIGNATED AREAS - MATERIAL REQUEST # 86884800 AND 15984800 BY D SODERSTROM WORK ORDER TO COLLECT FOR DISTRIBUTION, CHARGES FROM EXCAVATION CONTRACTS FOR THE 9 CL&P DESIGNATED AREAS - MATERIAL REQUEST # 86884800 AND 15984800 BY D SODERSTROM Expense portion of CD01141 Digital Grid Relays - FREIGHT STREET 11W Work order is to be used to capture costs for retrofitting relays for network protectors Establishment of CL&P Backup SOC in Windsor Newtown Glygol System Replacement Install Hydraulic Door Closer on Gate Door in East Hampton Hartford Gate Intercom New London Gate Intercom Replacement Cheshire Security Cameras (4) Replace High Garage Bay Light in Tolland Myrock Substation Office Fitout - Structures Myrock Substation Office Fitout - Structures Tolland - Field Engineering Office Fitout - Bldgs Tolland - Field Engineering Office Fitout - Bldgs Norwalk - Replace dock leveler hydraulic pump and motor Norwalk - Replace dock leveler hydraulic pump and motor Stamford Garage - Install new fluid handling system. Stamford Garage - Install new fluid handling system. Newtown - AV Project Newtown Conference Room Newtown - AV Project Newtown Conference Room Newtown - Expansion of space is required to support additional staffing for Storm Response. Newtown - Expansion of space is required to support additional staffing for Storm Response. Madison Ext Carpet Stair Treads EH Lower Level Breakroom Renovation EH Lower Level Breakroom Renovation Stamford Main Corridor Upgrades Stamford Main Corridor Upgrades New Britain Fan Motor Replacement New Britain Fan Motor Replacement Hartford Sheldon St - LED Replacement in Garage & Paddle Fan Installation in Stores' Room Hartford Sheldon St - LED Replacement in Garage & Paddle Fan Installation in Stores' Room Newtown - Install new workstations for Engineering Planning Sections Norwalk - Install card reader Meter Service Torrington - 1250 Hooksett Rd - Site Improvements Torrington - 1250 Hooksett Rd - Site Improvements Stamford Generator Damper Motor Replacement Stamford Generator Damper Motor Replacement Windsor SOC Renovation - Design Windsor SOC Renovation - Design Norwalk-Tindall Window Replacements Norwalk-Tindall Window Replacements Cheshire Break Room Refrigerator Berlin ATC - Burner Replacements Berlin ATC - Burner Replacements Norwalk Tindall Ave - Lockset Replacement Norwalk Tindall Ave - Lockset Replacement NEW Gen Office Work Stations Bldgs. - Includes Demo, Walls, Ceiling, HVAC, Lighting, Electrical, and Data Drops. Torrington - Replace catch basin Torrington - Replace catch basin Berlin - ATC Garage Building Envelope Assessment Project Norwalk Tindall - Fleet Garage ALC HVAC BMS Installation Tolland Watersource HP Replacement Tolland Watersource HP Replacement New London Door Hardware & Lock Replacement - Throughout Building New London Door Hardware & Lock Replacement - Throughout Building BCW Generator Replacement BCW Generator Replacement Waterford Mailsorter Station Replacement - Building Lobby Norwalk Tindall Ave - Install new entry gate intercom Norwalk Tindall Ave - Install new entry gate intercom NOR-Tindall Ave. 2nd Fl RR Sanitary Piping Replacement NOR-Tindall Ave. 2nd Fl RR Sanitary Piping Replacement Tolland Garage Entry Doors Tolland Garage Entry Doors Hart-Sheldon St Victaulic Piping Replacement - 3rd Floor Hart-Sheldon St Victaulic Piping Replacement - 3rd Floor Norwalk Tindall Ave - Exit Gate Motorized Operator Replacement Norwalk-Tindall Electric Strike Replacement - Loading Dock Man Door Electric Meter Dept.BCW - Bushing Pit Decking Replacement BCW - Bushing Pit Decking Replacement Newtown - Actuator and Valve Replacement Newtown - Actuator and Valve Replacement BCW - Dry-Type Transformer Replacement BCW - Dry-Type Transformer Replacement HAR-Sheldon Xenta Controller Replacement - 3rd Floor HAR-Sheldon Xenta Controller Replacement - 3rd Floor HAR-Sheldon Back Flow Preventer Replacement - Basement HAR-Sheldon Back Flow Preventer Replacement - Basement Torrington - Entry Gate Card Reader Post Replacement Torrington - Entry Gate Card Reader Post Replacement Stamford Basement Mens RR Hands Free Automation Stamford Basement Mens RR Hands Free Automation East Hampton Elec Outlets - Trailer Shed - Yard NOR-Tindall Main Switchgear Replacement - Basement Level NOR-Tindall Main Switchgear Replacement - Basement Level New Britain Roof Drain/Rain Leader Replacement - Shop Area New Britain Roof Drain/Rain Leader Replacement - Shop Area Hartford Sheldon St - electrical panel replacement Hartford Sheldon St - electrical panel replacement BCW - Dock Leveler Replacement BCW - Dock Leveler Replacement Berlin ATC Garage - Replace covers over the vehicle lifts are damaged and need replacement Berlin ATC Garage - Replace covers over the vehicle lifts are damaged and need replacement Cheshire Drag Chain Assembly Replacement - Repair Garage Cheshire Drag Chain Assembly Replacement - Repair Garage Hartford - Replace hydraulic valve & pump Hartford - Replace hydraulic valve & pump Danielson Sewer Line/Flush Valve Replacement Danielson Sewer Line/Flush Valve Replacement Madison Elec Ops Supervisor Outlets Danielson Card Reader-Electrician's Door TOR Fleet Gar Veh Lift Replacement TOR Fleet Gar Veh Lift Replacement Cheshire Garage PRV Replacement - Repair Garage Cheshire Garage PRV Replacement - Repair Garage East Hampton Yard Paving Madison Elec Heater Assembly Replacement - Throughout 1st Floor Madison Elec Heater Assembly Replacement - Throughout 1st Floor BCW Annex-Warehouse Storeroom - 225 Episcopal Road BCW Annex-Warehouse Storeroom - 225 Episcopal Road Madison Electric Ceiling Replacement - 1st Floor Hallway between Eversource & Tenant Space Madison Electric Ceiling Replacement - 1st Floor Hallway between Eversource & Tenant Space NOR-Tindall Ave. Store Front Door/Frame Replacement - Main Entrance NOR-Tindall Ave. Store Front Door/Frame Replacement - Main Entrance Cheshire AV Equipment/Installation - 1st Floor Office Cheshire AV Equipment/Installation - 1st Floor Office EH Card Reader Control Module Replacement - Rear Gate EH Electric for Pressure Washer - Garage Waterford - Replace elevator lighting & batteries Waterford - Replace elevator lighting & batteries
  10. Page 1,134 of 1,160

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued October 23, 2026 RRU-159 Attachment 23 Page 1134 of 1160 work_order_number description F2211076 Purchase 3 1-Ton HVAC Units F2211077 TOR Schedule/Planner Work Station F2211077 TOR Schedule/Planner Work Station F2211084 power/data/cooling upgrades F2211084 power/data/cooling upgrades F2211088 Replace Store Room OH Doors F2211088 Replace Store Room OH Doors F2211090 New London Line Rm Furniture F2211094 Replace ice machine F2211094 Replace ice machine F2211097 BMS Control Panels F2211097 BMS Control Panels F2211101 New London-Replace Fire Supp Pipe F2211101 New London-Replace Fire Supp Pipe F2211102 EH Auditorium Acoustical Wall Panel F2211102 EH Auditorium Acoustical Wall Panel F2211104 Tolland Garage Lift Replacement F2211104 Tolland Garage Lift Replacement F2211105 Tolland Mail Sorter F2211107 Overhead Door Operator Replacement F2211107 Overhead Door Operator Replacement F2211108 East Hampton Electrical _ Light Pol F2211108 East Hampton Electrical _ Light Pol F2211110 Replace OH Door Operator F2211110 Replace OH Door Operator F2211111 Stamford HVAC Split Systm Replc F2211111 Stamford HVAC Split Systm Replc F2211115 Wtby-Freight St. - Fence Enclosure F2211117 VP card reader & camera replc F2211121 Cheshire - VP Office Furniture F2211124 Material Lift Replacement F2211124 Material Lift Replacement F2211126 Rplc. Mini Splits & Exhaust Fan F2211126 Rplc. Mini Splits & Exhaust Fan F2211127 Stamford-Compressor Replacement F2211127 Stamford-Compressor Replacement F2211132 Replace curbing F2211132 Replace curbing F2211135 Falls Village - Fence Replacement F2211135 Falls Village - Fence Replacement F2211141 ATC Garage Transaction Window F2211141 ATC Garage Transaction Window F2211148 Waterbury-Freight Fuel Tank Removal F2211148 Waterbury-Freight Fuel Tank Removal F2211152 Exterior Hand Rail Replacement F2211152 Exterior Hand Rail Replacement F2211155 Heat Pump Installation F2211155 Heat Pump Installation F2211157 Paving & Gate Operator Replacement F2211157 Paving & Gate Operator Replacement F2211161 Replace air reals F2211161 Replace air reals F2211162 Replace Gas Monitoring System F2211162 Replace Gas Monitoring System F2211163 Newtown - Replace HVAC ducts F2211163 Newtown - Replace HVAC ducts F2211165 Waterbury - Replace Gate Intercom F2211165 Waterbury - Replace Gate Intercom F2211167 Supervisor/Lineman Area Rennovation F2211167 Supervisor/Lineman Area Rennovation F2211170 Main Breaker Replacement F2211170 Main Breaker Replacement F2211171 Electrical Panel Removal F2211171 Electrical Panel Removal F2211173 Add lighting along fence line F2211177 Loading Dock Leveler Replacement F2211177 Loading Dock Leveler Replacement F2211179 Parking Lot Cameras F2211180 New London - Window Replacement F2211180 New London - Window Replacement F2311001 Overhead Door Barrel Replacement F2311001 Overhead Door Barrel Replacement F2311002 Replace jack pump F2311002 Replace jack pump F2311003 Replace oil pump F2311003 Replace oil pump F2311004 Air Compressor replacement F2311004 Air Compressor replacement F2311005 Install Signage F2311007 Install fiber line F2311007 Install fiber line F2311008 Crane Tagline Replacement F2311008 Crane Tagline Replacement F2311009 Office Renovation F2311009 Office Renovation F2311011 Stamford - Mother's Room F2311011 Stamford - Mother's Room F2311012 Cheshire - UG Furniture F2311012 Cheshire - UG Furniture F2311013 Replace Garage OH Doors F2311013 Replace Garage OH Doors F2311014 Mothers Room F2311014 Mothers Room F2311015 Mothers Room F2311016 Stamford - Mother's Room F2311017 RTU Replacement F2311017 RTU Replacement F2311018 Replace dock leveler F2311018 Replace dock leveler F2311019 Fan Coil Replacement F2311019 Fan Coil Replacement F2311020 Hartford - Pressure Washer F2311020 Hartford - Pressure Washer F2311021 Replace Garage exhaust fan F2311021 Replace Garage exhaust fan F2311022 Replace Destratification Fan F2311022 Replace Destratification Fan F2311023 Fall Protection Ladder Improvements F2311023 Fall Protection Ladder Improvements F2311026 Line Room Electrical Outlets F2311026 Line Room Electrical Outlets F2311027 Water Infiltration Prevention F2311027 Water Infiltration Prevention F2311028 ATC - Air Compressor Replacements F2311028 ATC - Air Compressor Replacements F2311032 Madison Garage Electrical long_description Hartford-Sheldon St. - Purchase 3 1-Ton Portable HVAC Units TOR Schedule/Planner Work Station - Main Bldg. Supervisor Office TOR Schedule/Planner Work Station - Main Bldg. Supervisor Office Cheshire - power/data/cooling upgrades Cheshire - power/data/cooling upgrades Danielson - Replace Store Room OH Doors Danielson - Replace Store Room OH Doors New London Line Rm Furniture - 1st Floor Lineroom Hartford - Replace ice machine Hartford - Replace ice machine Hartford - BMS Control Panels Hartford - BMS Control Panels New London-Replace Fire Suppression Pipe - Covered Truck Parking Area New London-Replace Fire Suppression Pipe - Covered Truck Parking Area EH Auditorium Acoustical Wall Panel EH Auditorium Acoustical Wall Panel Tolland Garage Lift Replacement Tolland Garage Lift Replacement Tolland Mail Sorter Newtown - Overhead Door Operator Replacement Newtown - Overhead Door Operator Replacement East Hampton Electrical _ Light Pole Replacement East Hampton Electrical _ Light Pole Replacement Berlin ATC - Replace OH Door Operator Berlin ATC - Replace OH Door Operator Stamford HVAC Split Systm Replacement Stamford HVAC Split Systm Replacement Wtby-Freight St. - Store Room Fence Enclosure Cheshire - VP card reader & camera replacement Cheshire - VP Office Furniture Waterbury - Freight Street - Material Lift Replacement in Yard Waterbury - Freight Street - Material Lift Replacement in Yard New London - Data Closets Replace Mini Split System & Exhaust Fan New London - Data Closets Replace Mini Split System & Exhaust Fan Stamford-Compressor Replacement (Fleet Garage) Stamford-Compressor Replacement (Fleet Garage) Danielson Curb and Driveway Apron Replacement Danielson Curb and Driveway Apron Replacement Falls Village - Fence Replacement Falls Village - Fence Replacement Berlin - ATC Garage Transaction Window (1st Floor) Berlin - ATC Garage Transaction Window (1st Floor) Waterbury-Freight Fuel Tank Removal Waterbury-Freight Fuel Tank Removal New London - Exterior Hand Rail Replacement New London - Exterior Hand Rail Replacement Waterbury - Freight St - Heat Pump Installation Waterbury - Freight St - Heat Pump Installation Waterbury-Freight - Main Entrance Paving & Gate Operator Replacement Waterbury-Freight - Main Entrance Paving & Gate Operator Replacement Stamford - Due to safety concerns replacement of two low pressure dual arms along with two air reels, existing units are leaking due to age of equipment. Stamford - Due to safety concerns replacement of two low pressure dual arms along with two air reels, existing units are leaking due to age of equipment. Berlin ATC Vehicle Gas Monitoring System Berlin ATC Vehicle Gas Monitoring System Newtown - Replace HVAC ducts Newtown - Replace HVAC ducts Waterbury - Replace Gate Intercom Waterbury - Replace Gate Intercom Falls Village - Supervisor/Lineman Area Rennovation Falls Village - Supervisor/Lineman Area Rennovation Falls Village - Main Breaker Replacement Falls Village - Main Breaker Replacement Torrington - Electrical Panel Removal Torrington - Electrical Panel Removal New London Additional Security Lighting and Electric along fence line Berlin - BCW East Loading Dock Leveler Replacement Berlin - BCW East Loading Dock Leveler Replacement Hartford Sheldon St - Parking Lot Cameras New London - Window Replacement New London - Window Replacement Newtown - Fleet Garage Overhead Door Barrel Replacement Newtown - Fleet Garage Overhead Door Barrel Replacement Cheshire - Replace jack pump Cheshire - Replace jack pump Waterbury Freight - Replace oil pump Waterbury Freight - Replace oil pump Hartford Sheldon St - Air Compressor replacement Hartford Sheldon St - Air Compressor replacement Waterbury Freight - Install new signage Berlin BCW Annex-225 Episcopal Rd. Berlin Ct -Fiber Line Berlin BCW Annex-225 Episcopal Rd. Berlin Ct -Fiber Line Torrington - Electric Maintenance Crane Tagline Replacement Torrington - Electric Maintenance Crane Tagline Replacement Freight Street office renovation Freight Street office renovation Stamford - Mother's Room (Structures) Stamford - Mother's Room (Structures) Cheshire - UG Furniture Cheshire - UG Furniture Hartford - Sheldon St - Replace Garage OH Doors Hartford - Sheldon St - Replace Garage OH Doors Nowarlk - Tindall - Mothers Room(Structures) Nowarlk - Tindall - Mothers Room(Structures) Nowarlk - Tindall - Mothers Room (GP) Stamford - Mother's Room (GP) Newtown - Substation Space RTU Replacement Newtown - Substation Space RTU Replacement Berlin BCW - Replace dock leveler Berlin BCW - Replace dock leveler Norwalk - Tindall Ave - Fan Coil Replacement Norwalk - Tindall Ave - Fan Coil Replacement Hartford - Pressure Washer Hartford - Pressure Washer East Hampton - Replace Garage exhaust fan East Hampton - Replace Garage exhaust fan Berlin ATC - Replace Destratification Fan Berlin ATC - Replace Destratification Fan Berlin Central Warehouse - Fall Protection Ladder Improvements Berlin Central Warehouse - Fall Protection Ladder Improvements East Hampton - Line Room Electrical Outlets East Hampton - Line Room Electrical Outlets New London - Water Infiltration Prevetion (Phase 2) New London - Water Infiltration Prevetion (Phase 2) Berlin - ATC - Air Compressor Replacements Berlin - ATC - Air Compressor Replacements Madison Garage Electrical cost_element_group Wholesale Expenses-W00 Wholesale Expenses-W00 Wholesale Expenses-W00 Wholesale Expenses-W00 Wholesale Expenses-W00 Wholesale Expenses-W00 Wholesale Expenses-W00 Wholesale Expenses-W00 Wholesale Expenses-W00 Wholesale Expenses-W00 Wholesale Expenses-W00 Wholesale Expenses-W00 Wholesale Expenses-W00 Wholesale Expenses-W00 Wholesale Expenses-W00 Wholesale Expenses-W00 Wholesale Expenses-W00 Wholesale Expenses-W00 Wholesale Expenses-W00 Wholesale Expenses-W00 Wholesale Expenses-W00 Wholesale Expenses-W00 Wholesale Expenses-W00 Wholesale Expenses-W00 Wholesale Expenses-W00 Wholesale Expenses-W00 Wholesale Expenses-W00 Wholesale Expenses-W00 Wholesale Expenses-W00 Wholesale Expenses-W00 Wholesale Expenses-W00 Wholesale Expenses-W00 Wholesale Expenses-W00 Wholesale Expenses-W00 Wholesale Expenses-W00 Wholesale Expenses-W00 Wholesale Expenses-W00 Wholesale Expenses-W00 Wholesale Expenses-W00 Wholesale Expenses-W00 Wholesale Expenses-W00 Wholesale Expenses-W00 Wholesale Expenses-W00 Wholesale Expenses-W00 Wholesale Expenses-W00 Wholesale Expenses-W00 Wholesale Expenses-W00 Wholesale Expenses-W00 Wholesale Expenses-W00 Wholesale Expenses-W00 Wholesale Expenses-W00 Wholesale Expenses-W00 Wholesale Expenses-W00 Wholesale Expenses-W00 Wholesale Expenses-W00 Wholesale Expenses-W00 Wholesale Expenses-W00 Wholesale Expenses-W00 Wholesale Expenses-W00 Wholesale Expenses-W00 Wholesale Expenses-W00 Wholesale Expenses-W00 Wholesale Expenses-W00 Wholesale Expenses-W00 Wholesale Expenses-W00 Wholesale Expenses-W00 Wholesale Expenses-W00 Wholesale Expenses-W00 Wholesale Expenses-W00 Wholesale Expenses-W00 Wholesale Expenses-W00 Wholesale Expenses-W00 Wholesale Expenses-W00 Wholesale Expenses-W00 Wholesale Expenses-W00 Wholesale Expenses-W00 Wholesale Expenses-W00 Wholesale Expenses-W00 Wholesale Expenses-W00 Wholesale Expenses-W00 Wholesale Expenses-W00 Wholesale Expenses-W00 Wholesale Expenses-W00 Wholesale Expenses-W00 Wholesale Expenses-W00 Wholesale Expenses-W00 Wholesale Expenses-W00 Wholesale Expenses-W00 Wholesale Expenses-W00 Wholesale Expenses-W00 Wholesale Expenses-W00 Wholesale Expenses-W00 Wholesale Expenses-W00 Wholesale Expenses-W00 Wholesale Expenses-W00 Wholesale Expenses-W00 Wholesale Expenses-W00 Wholesale Expenses-W00 Wholesale Expenses-W00 Wholesale Expenses-W00 Wholesale Expenses-W00 Wholesale Expenses-W00 Wholesale Expenses-W00 Wholesale Expenses-W00 Wholesale Expenses-W00 Wholesale Expenses-W00 Wholesale Expenses-W00 Wholesale Expenses-W00 Wholesale Expenses-W00 Wholesale Expenses-W00 Wholesale Expenses-W00 Wholesale Expenses-W00 Wholesale Expenses-W00 Wholesale Expenses-W00 Wholesale Expenses-W00 Wholesale Expenses-W00 ferc_account 107010 108030 107010 108030 107010 108030 107010 107010 108030 107010 108030 107010 108030 107010 108030 107010 108030 107010 107010 108030 107010 108030 107010 107010 108030 108030 107010 107010 107010 107010 107010 108030 108030 107010 108030 107010 107010 108030 108030 107010 108030 107010 107010 108030 108030 107010 107010 108030 107010 108030 107010 108030 108030 107010 107010 108030 107010 108030 107010 108030 108030 107010 107010 108030 107010 108030 107010 107010 107010 108030 108030 107010 107010 108030 107010 108030 108030 107010 107010 107010 108030 108030 107010 108030 107010 108030 107010 107010 108030 107010 108030 107010 108030 107010 107010 107010 108030 108030 107010 108030 107010 107010 108030 108030 107010 108030 107010 107010 108030 107010 108030 108030 107010 107010 108030 107010 percent 1 0.04761905 0.95238095 0.04454169 0.95545831 0.04761905 0.95238095 1 0.22857143 0.77142857 0.29776233 0.70223767 0.16216216 0.83783784 0.04761905 0.95238095 0.04772911 0.95227089 1 0.04761905 0.95238095 0.04761905 0.95238095 0.95238095 0.04761905 0.05010686 0.94989314 1 1 1 0.95238095 0.04761905 0.04784131 0.95215869 0.70094843 0.29905157 0.94979803 0.05020197 0.04761905 0.95238095 0.04761905 0.95238095 0.32885906 0.67114094 0.04761914 0.95238086 0.95238095 0.04761905 0.95238095 0.04761905 0.95238095 0.04761905 0.04761905 0.95238095 0.95238095 0.04761905 0.95238095 0.04761905 0.93100527 0.06899473 0.05000938 0.94999062 0.61111111 0.38888889 1 0.0496706 0.9503294 1 0.95238095 0.04761905 0.04992729 0.95007271 0.95238095 0.04761905 0.95238095 0.04761905 0.04761905 0.95238095 1 0.90110197 0.09889803 0.25207756 0.74792244 0.03584203 0.96415797 0.08798077 0.91201923 0.77591036 0.22408964 0.76429637 0.23570363 0.91448598 0.08551402 1 1 0.93240557 0.06759443 0.02885937 0.97114063 0.03132803 0.96867197 0.95238095 0.04761905 0.09090909 0.90909091 0.05 0.95 0.95238095 0.04761905 0.95238095 0.04761905 0.4047496 0.5952504 0.81452286 0.18547714 1 F2311033 BCW - Repace Catch Basin Wholesale Expenses-W00 107010 0.77434679 F2311033 F2311034 F2311036 F2311037 F2311037 F2311038 F2311038 F2311039 F2311039 F2311040 F2311041 F2311041 F2311042 F2311043 F2311045 F2311045 F2311046 F2311046 F2311047 F2311048 F2311049 F2311049 F2311050 F2311050 F2311051 F2311051 F2311052 F2311052 F2311053 F2311053 F2311054 F2311054 F2311055 F2311056 F2311056 F2311057 F2311057 F2311058 F2311058 F2311059 F2311060 F2311060 F2311061 BCW - Repace Catch Basin Tolland - Conference Room Chairs and Panel Tolland - Field Engineering Chair Replacements Stamford - Replace water cooler Stamford - Replace water cooler Waterbury Freight - Replace lighting with LEDs Waterbury Freight - Replace lighting with LEDs New Britain - Security Fence Replacement New Britain - Security Fence Replacement New London - Addition of 4 Security Cameras Madison Replace Concrete Pad in Yard Madison Replace Concrete Pad in Yard Southington - Install water bottle filling station Berlin - Training Yard Electrical Improvement New Britain - Replace emergency lighting New Britain - Replace emergency lighting New London - Replace Garage Welder Outlets New London - Replace Garage Welder Outlets New London - Purchase furniture to redesign layout to accommodate additional cubes. Norwalk - Tindall Ave -Fleet Garage Pressure Washer Replacement Falls Village - Exterior Door Replacement Falls Village - Exterior Door Replacement New Britain - Data Closet HVAC Split System Replacement New Britain - Data Closet HVAC Split System Replacement Torrington - Substation Group Interior Door Replacement Torrington - Substation Group Interior Door Replacement Berlin ATC - Replace Heating System Piping and Coils Berlin ATC - Replace Heating System Piping and Coils Hartford Sheldon St - Door Replacement Hartford Sheldon St - Door Replacement Hartford Sheldon St - Fixed ladder replacement Hartford Sheldon St - Fixed ladder replacement Tolland - Line Supervisor Furniture Replacement New London - Electric Operations Truck Canopy Design New London - Electric Operations Truck Canopy Design Newtown - Fleet Inground Lift Valve Replacement Newtown - Fleet Inground Lift Valve Replacement Cheshire - Repair Garage Office Renovation Cheshire - Repair Garage Office Renovation Cheshire - Repair Garage Office Furniture BCW - Replace overhead door BCW - Replace overhead door Berlin - Fleet Garage - Fencing Replacement Wholesale Expenses-W00 Wholesale Expenses-W00 Wholesale Expenses-W00 Wholesale Expenses-W00 Wholesale Expenses-W00 Wholesale Expenses-W00 Wholesale Expenses-W00 Wholesale Expenses-W00 Wholesale Expenses-W00 Wholesale Expenses-W00 Wholesale Expenses-W00 Wholesale Expenses-W00 Wholesale Expenses-W00 Wholesale Expenses-W00 Wholesale Expenses-W00 Wholesale Expenses-W00 Wholesale Expenses-W00 Wholesale Expenses-W00 Wholesale Expenses-W00 Wholesale Expenses-W00 Wholesale Expenses-W00 Wholesale Expenses-W00 Wholesale Expenses-W00 Wholesale Expenses-W00 Wholesale Expenses-W00 Wholesale Expenses-W00 Wholesale Expenses-W00 Wholesale Expenses-W00 Wholesale Expenses-W00 Wholesale Expenses-W00 Wholesale Expenses-W00 Wholesale Expenses-W00 Wholesale Expenses-W00 Wholesale Expenses-W00 Wholesale Expenses-W00 Wholesale Expenses-W00 Wholesale Expenses-W00 Wholesale Expenses-W00 Wholesale Expenses-W00 Wholesale Expenses-W00 Wholesale Expenses-W00 Wholesale Expenses-W00 Wholesale Expenses-W00 108030 107010 107010 107010 108030 108030 107010 107010 108030 107010 108030 107010 107010 107010 107010 108030 108030 107010 107010 107010 108030 107010 108030 107010 107010 108030 108030 107010 107010 108030 108030 107010 107010 107010 108030 107010 108030 108030 107010 107010 108030 107010 108030 0.22565321 1 1 0.95238095 0.04761905 0.25051455 0.74948545 0.95238095 0.04761905 1 0.10845395 0.89154605 1 1 0.95238095 0.04761905 0.04999765 0.95000235 1 1 0.04761905 0.95238095 0.04761905 0.95238095 0.95238095 0.04761905 0.15701861 0.84298139 0.95009266 0.04990734 0.04761905 0.95238095 1 0.93865031 0.06134969 0.95 0.05 0.10224439 0.89775561 1 0.04761905 0.95238095 0.04761905 Conference Room Chairs and Panel Field Engineering Chair Replacement Replace water cooler Replace water cooler Install LEDs Install LEDs Security Fence Replacement Security Fence Replacement Addition of 4 Security Cameras Replace Concrete Pad in Yard Replace Concrete Pad in Yard Install bottle filling station Training Yard Electrical Improvemen Replace emergency lighting Replace emergency lighting Replace Garage Welder Outlets Replace Garage Welder Outlets Furniture Pressure Washer Replacement Exterior Door Replacement Exterior Door Replacement Replace split system Replace split system Interior Door Replacement Interior Door Replacement Replace piping & coils Replace piping & coils Door Replacement Door Replacement Fixed ladder replacement Fixed ladder replacement Line Supervisor Furniture Replc. Truck Canopy Design Truck Canopy Design Fleet Inground Lift Valve Replc. Fleet Inground Lift Valve Replc. Repair Garage Office Renovation Repair Garage Office Renovation Repair Garage Office Furniture Replace OH Door Replace OH Door Fleet Garage - Fencing Replc.

Text of RRU-159 Attachment 22.xlsx

Sheet names, column headings and text cells; numbers left out · first 300,000 characters

Text of RRU-159 Attachment 22.pdf

Extracted from the file · 1,203 pages · 14,349,246 characters

Text of RRU-159 Attachment 21.xlsx

Sheet names, column headings and text cells; numbers left out · first 300,000 characters

Text of RRU-159 Attachment 21.pdf

Extracted from the file · 1,203 pages · 13,880,364 characters

Text of RRU-159 Attachment 20.xlsx

Sheet names, column headings and text cells; numbers left out

Text of RRU-159 Attachment 20.pdf

Extracted from the file · 16 pages · 151,762 characters

Text of RRU-159 Attachment 19.xlsx

Sheet names, column headings and text cells; numbers left out

Text of RRU-159 Attachment 19.pdf

Extracted from the file · 1 page · 5,328 characters

Text of RRU-159 Attachment 18.xlsx

Sheet names, column headings and text cells; numbers left out · first 300,000 characters

Text of RRU-159 Attachment 18.pdf

Extracted from the file · 640 pages · 7,983,236 characters

Text of RRU-159 Attachment 17.xlsx

Sheet names, column headings and text cells; numbers left out · first 300,000 characters

Text of RRU-159 Attachment 17.pdf

Extracted from the file · 855 pages · 14,651,941 characters

Text of RRU-159 Attachment 16.xlsx

Sheet names, column headings and text cells; numbers left out · first 300,000 characters

Text of RRU-159 Attachment 16.pdf

Extracted from the file · 489 pages · 7,076,557 characters

Text of RRU-159 Attachment 15.xlsx

Sheet names, column headings and text cells; numbers left out · first 300,000 characters

Text of RRU-159 Attachment 15.pdf

Extracted from the file · 897 pages · 15,723,777 characters

Text of RRU-159 Attachment 14 .pdf

Extracted from the file · 1 page · 2,589 characters

Text of RRU-159 Attachment 14.xlsx

Sheet names, column headings and text cells; numbers left out

Text of RRU-159 Attachment 13.xlsx

Sheet names, column headings and text cells; numbers left out

Text of RRU-159 Attachment 13.pdf

Extracted from the file · 1 page · 427 characters

Text of RRU-159 Attachment 12.xlsx

Sheet names, column headings and text cells; numbers left out · first 300,000 characters

Text of RRU-159 Attachment 12.pdf

Extracted from the file · 802 pages · 14,341,138 characters

Text of RRU-159 Attachment 11.xlsx

Sheet names, column headings and text cells; numbers left out · first 300,000 characters

Text of RRU-159 Attachment 11.pdf

Extracted from the file · 858 pages · 15,906,152 characters

Text of RRU-159 Attachment 10.xlsx

Sheet names, column headings and text cells; numbers left out

Text of RRU-159 Attachment 10.pdf

Extracted from the file · 1 page · 822 characters

Text of RRU-159 Attachment 09.xlsx

Sheet names, column headings and text cells; numbers left out · first 300,000 characters

Text of RRU-159 Attachment 09.pdf

Extracted from the file · 449 pages · 7,355,312 characters

Text of RRU-159 Attachment 08.xlsx

Sheet names, column headings and text cells; numbers left out · first 300,000 characters

Text of RRU-159 Attachment 08.pdf

Extracted from the file · 867 pages · 13,878,236 characters

Text of RRU-159 Attachment 07.xlsx

Sheet names, column headings and text cells; numbers left out · first 300,000 characters

Text of RRU-159 Attachment 07.pdf

Extracted from the file · 869 pages · 15,728,932 characters

Text of RRU-159 Attachment 06.xlsx

Sheet names, column headings and text cells; numbers left out · first 300,000 characters

Text of RRU-159 Attachment 06.pdf

Extracted from the file · 459 pages · 8,128,897 characters

Text of RRU-159 Attachment 05.xlsx

Sheet names, column headings and text cells; numbers left out · first 300,000 characters

Text of RRU-159 Attachment 05.pdf

Extracted from the file · 879 pages · 16,073,548 characters

Text of RRU-159 Attachment 04.xlsx

Sheet names, column headings and text cells; numbers left out

Text of RRU-159 Attachment 04.pdf

Extracted from the file · 5 pages · 20,994 characters

Text of RRU-159 Attachment 03.xlsx

Sheet names, column headings and text cells; numbers left out · first 300,000 characters

Text of RRU-159 Attachment 03.pdf

Extracted from the file · 840 pages · 14,413,580 characters

Text of RRU-159 Attachment 02.xlsx

Sheet names, column headings and text cells; numbers left out · first 300,000 characters

Text of RRU-159 Attachment 02.pdf

Extracted from the file · 1,137 pages · 16,605,462 characters

Text of RRU-159 Attachment 01.xlsx

Sheet names, column headings and text cells; numbers left out

Text of RRU-159 Attachment 01.pdf

Extracted from the file · 1 page · 1,403 characters

As listed on the current system

Question(s) Answered 159 (Connecticut Light and Power Company dba Eversource Energy) Date Filed: 11/06/2026

This filing on the current system (opens in a new tab)