Interrogatory responses

Answers to questions 159

ResponseFiled by Connecticut Light and Power Company dba Eversource Energy51 files
Part of docket 26-05-10Open
  • Electric
Application of The Connecticut Light and Power Company d/b/a Eversource Energy to Amend its Rate Schedules

Files51

Search terms highlighted
Eversource rate increase is on 36 pages across 17 files of the text below, highlighted. Go to the first matchClear highlighting
Words on different pages
Words on different pages
Words on different pages

Text of RRU-159 Attachment 23.xlsx

Sheet names, column headings and text cells; numbers left out · first 300,000 characters

Text of RRU-159 Attachment 23.pdf

Extracted from the file · 1,160 pages · 16,330,154 characters

Text of RRU-159 Attachment 22.xlsx

Sheet names, column headings and text cells; numbers left out · first 300,000 characters

Text of RRU-159 Attachment 22.pdf

Extracted from the file · 1,203 pages · 14,349,246 characters

Words on different pages

This spreadsheet is large. Its searchable text keeps the sheet names, column headings and text cells and stops at 300,000 characters, so search may miss words further in. Download the file for every cell and figure.

  1. Part 13 of 76

    AP1-YWO Total Cost Less Than 7K | Taxes-T00 1S721343 | DM/DAVIS & LE GRANDE AVE GRN: P.679 | DM/DAVIS & LE GRANDE AVE GRN: P.67972 REPLACE XARMS_x000D_ AP1-YWO Total Cost Less Than 7K | Taxes-T00 1S721357 | RL:Byram Shore Rdf:9A DIGUP- 245 BY | RL:Byram Shore Rdf:9A DIGUP- 245 BYRAM SHORE RD GREENWICH Riser Pole 81785_x000D_ AP1-YWO Total Cost Less Than 7K | Taxes-T00 1S721416 | DM/STRICKLAND RD COS COB: 11R56 CAB | DM/STRICKLAND RD COS COB: 11R56 CABLE FAILURE/REPLACE CABLE AT MH117 TO MH127_x000D_ AP2-YWO Total Cost Variance Met - Variance :8.429 MIN.:-20 MAX.:20 | Taxes-T00 1S721431 | RL:1 Lillian Ter: Replace OH Servic | RL:1 Lillian Ter: Replace OH Service 110' #2 Tpx_x000D_ AP1-YWO Total Cost Less Than 7K | Taxes-T00 1S721479 | RL: N Maple Ave: Electric Service U | RL: N Maple Ave: Electric Service Un-Metered pole 67238_x000D_ AP1-YWO Total Cost Less Than 7K | Taxes-T00 1S721482 | PH; 55 WOODLEDGE RD; Replace OH Ser | PH; 55 WOODLEDGE RD; Replace OH Service & LOOSE HOUSE KNOB_x000D_ AP1-YWO Total Cost Less Than 7K | Taxes-T00 1S721517 | DL; GREYROCK PLElectric Service Un- | DL; GREYROCK PLElectric Service Un-Metered - POLE#1460 - CONVERSATION #408277_x000D_ AP1-YWO Total Cost Less Than 7K | Taxes-T00 1S721520 | RL:12 Harbor Rd; Electric Service N | RL:12 Harbor Rd; Electric Service New Residential SC OH/DB 350 Riser Line Set_x000D_ AP1-YWO Total Cost Less Than 7K | Taxes-T00 1S721524 | DL; RIVERBANK RD; REPLACE/RELOCATE | DL; RIVERBANK RD; REPLACE/RELOCATE 2 POLES FOR STAMFORD BRIDGE_x000D_ CL-YWO Variance - Contractor Labor | Taxes-T00 1S721577 | 21 LEEDS ST STAMFORD/ REPLACED SERV | 21 LEEDS ST STAMFORD/ REPLACED SERVICE WITH 40' #2 - ALL WORK COMPLETE_x000D_ AP1-YWO Total Cost Less Than 7K | Taxes-T00 1S721581 | RL:59 View St West Electric Service | RL:59 View St West Electric Service Existing Residl OH Install 3 meters remove 2_x000D_ AP1-YWO Total Cost Less Than 7K | Taxes-T00 1S721624 | DL; 33 ELM TREE PL, STAMFORD: REPLA | DL; 33 ELM TREE PL, STAMFORD: REPLACE #2 100FT SERVICE- ALL WORK COMPLET_x000D_ AP1-YWO Total Cost Less Than 7K | Taxes-T00 1S721655 | DM/7 INDIAN HEAD RD RIVERSIDE: INST | DM/7 INDIAN HEAD RD RIVERSIDE: INST 3" SVC RISER, 350MCM DB SVC, 400AMP_x000D_ AP1-YWO Total Cost Less Than 7K | Taxes-T00 1S721672 | DL; 179 FOX RIDGE RD; P#9982 REPLAC | DL; 179 FOX RIDGE RD; P#9982 REPLACE 25KVA WITH NEW 50KVA XFMR_x000D_ AP1-YWO Total Cost Less Than 7K | Taxes-T00 1S721960 | PH; 71 KENSETT LN; INSTALL 4/0, 200 | PH; 71 KENSETT LN; INSTALL 4/0, 200AMP UG SERVICE_x000D_ AP1-YWO Total Cost Less Than 7K | Taxes-T00 1S722078 | DM/600 NORTH ST GRN: RELOCATE (2) P | DM/600 NORTH ST GRN: RELOCATE (2) POLES FOR 3-LOT SUBDIVISION_x000D_ AP2-YWO Total Cost Variance Met - Variance :-37.3145 MIN.:-50 MAX.:50 | Taxes-T00 1S722546 | RL: 20 Edgar Rd:Replace #1 AL prim | RL: 20 Edgar Rd:Replace #1 AL primary, cutout & arrester already replaced_x000D_ AP2-YWO Total Cost Variance Met - Variance :-34.5233 MIN.:-50 MAX.:50 | Taxes-T00 1S811292 | RL;159 Breezy Hill Rd; Elec Svc Exi | RL;159 Breezy Hill Rd; Elec Svc Existing Residential DESG (DN)_x000D_ AP1-YWO Total Cost Less Than 7K | Taxes-T00 1S820537 | COMP. 05/06/2019 STM Muni FLR ir@ | COMP. 05/06/2019 STM Muni FLR ir@ POLE 2143 NO PWR UG- NEEDS FIXTURE_x000D_ AP1-YWO Total Cost Less Than 7K | Taxes-T00 1S821141 | DM/36 HEUSTED DR OLD GRN: INST 3" S | DM/36 HEUSTED DR OLD GRN: INST 3" SEC RISER, 4/0 QPX, 200AMP 4W 120/208_x000D_ AP1-YWO Total Cost Less Than 7K | Taxes-T00 1S821166 | Elec Maint Replace/Renewal/Obsol OH | Elec Maint Replace/Renewal/Obsol OH DESG (AROH)_x000D_ AP1-YWO Total Cost Less Than 7K | Taxes-T00 1S821300 | RL:150 Old Kings Hwy; Electric Serv | RL:150 Old Kings Hwy; Electric Service Existing Residential Overhead 110' #2 tpx_x000D_ AP1-YWO Total Cost Less Than 7K | Taxes-T00 1S821317 | SH-Convo#671325-MakeReadyReimb - Ci | SH-Convo#671325-MakeReadyReimb - Cingular WL Parent Convo#655137_x000D_ AP1-YWO Total Cost Less Than 7K | Taxes-T00
  2. Part 14 of 76

    1S821631 | (50,0): DL; 50 SEASIDE AVE; Electri | DL; 50 SEASIDE AVE; Electric Service Existing Residential Overhead_x000D_ | Taxes-T00 1S821939 | CM-Conv#673174-MakeReadyNonReimb-MC | CM-Conv#673174-MakeReadyNonReimb-MCI Parent Conv#657452_x000D_ NO AWOCS-AWOCS REASON CODE AND DESCRIPTION NOT FOUND. | Taxes-T00 1S822292 | DL; 102 W Broad St;, BURNT POLE TOP | DL; 102 W Broad Street Stamford, Frontier P 793 needs new pole had 3 phs bank_x000D_ | Taxes-T00 1S920928 | RF:57 HUNTING RIDGE RD STAMFORD TT: | RF:57 HUNTING RIDGE RD:POLE #11788 INSTALL HH, REPLC & SHIFT POLE WITH RISER_x000D_ | Taxes-T00 1S921110 | TC : 3143 HIGH RIDGE RD STM: REPLA | CTF: 3143 HIGH RIDGE RD STM: REPLACE 85' #2TPX OH SVC 200 AMP UPGRADE_x000D_ | Taxes-T00 1S921247 | TC 44 MARVA LN, STM replace OH svc | TMC 44 MARVA LN: SERVICE UPGRADE, MOVING POA FROM FRONT TO SIDE OF HOUSE_x000D_ | Taxes-T00 GUILFORD 29F-REPLACE RECLOSER CONTR | PROPOSED REPLACEMENT OF 4 COOPER RECLOSERS WITH SIEMENS FOR GUILFORD 29F1-2, GUILFORD 29F2-2, MEADOW 28J1-2 AND MEADOW 28J2-2 ______________________________________JEL | Taxes-T00 SOUTH END 1G - REFURBISH SWITCHGEAR | SOUTH END 1G - REFURBISH SWITCHGEAR PHASE 4 | Taxes-T00 NORWALK 9S - ADD THREE 13.8 KV FEED | POSITIONS BY EXTENDING THE EXISTING SWITCHGEAR A6/B6 BUS | Taxes-T00 WEST SIDE 7A - OLD SWITCHGEAR REMOV | REPLACE THE WESTSIDE 7A SWITCHGEAR __________________________________________RJC | Taxes-T00 CANAL 15Q - ADD BULK TRANSFORMER & | ADD A SECOND BULK POWER TRANSFORMER & A SIX- BAY PCE TO PROVIDE FOUR NEW 23 KV FEEDER POSITIONS. A 60 MVA TRANSFORMER IS PROPOSED SINCE LOAD IN THIS AREA IS EXPECTED TO GROW. | Taxes-T00 UNCASVILLE 1Q - BUS REHAB | REPLACEMENT OF THE 1Q-2X1-4 HIGHSIDE TRANS- FORMER MOD ___________________________________________KA | Taxes-T00 Transformer Metering | Bokum 15L - Install multifunction metering on bulk transformer positions in conjunction with Circuit Breaker Automation. | Taxes-T00 SOUTH MEADOW 1A - BUS REHAB | REMOVE AND REPLACE (95) 34.5 KV, 1200A GROUP OPERATED DISCONNECT SWITCHES | Taxes-T00 2025TRGP | T-Group Study CT 2025 | Taxes-T00 20CGBI11 | CT Equipment for CG | CT Equipment for CG | Taxes-T00 20CTTRN2 | Berlin Elect Train Yard Tent Purcha | This work order is to purchase CT Technical Training Tent for the electric training yard._x000D__x000D_ _x000D__x000D_ Per (Chris Richard's email 10/2/20)- requesting the purchase of a tent from Extreme Canopy for $93510.00 for Matt Greges. | Taxes-T00 21CGMR11 | 2021 CG Equipment CLP Equipment | 2021 CG Equipment CLP Equipment | Taxes-T00 21CTTR12 | Smartboard for UG/DB Lab Training | This work order is to purchase a smart board TV for UG/DB Lab training under 2T3 (Technical Training) in Berlin Training Yard. This request was approved by Dan chambrello during our 7/21/21 meeting._x000D__x000D_ _x000D__x000D_ Per Matt Greges's email dated 8/13/2, requesting the purchase of a smart board in Berling for UG/DB Lab Training. Thes estimated cost is $17,000.00. | Taxes-T00 DPM & Optimal Crew Allocation | RELEASE 1 OF PO - UCONN Damage Prediction Model and weather forecasting research. Development of optimized crew allocation and dispatch tools. This is for UCONN weather research to improve forecasting and predict grid system vulnerability analysis. | Taxes-T00 UCONN VEG MGMT RSRCH REL2 | RELEASE 3 OF PO - UCONN selective hardening | Taxes-T00 UNINTENTIONAL ISLAND & FREQ | RELEASE 4 OF PO - UCONN Unintentional islanding & frequency response analysis Eversource Distribution Systems under various weather conditions | Taxes-T00 EE Ground Lidar Project | RELEASE 5 OF PO - UCONN EE Ground Lidar Project (technology) Eversource Distribution Systems under various weather conditions | Taxes-T00 22CGMR11 | 2022 CG Equipment CLP Equipment | 2022 CG Equipment CLP Equipment | Taxes-T00
  3. Part 15 of 76

    22CTFTCG | CT Apprentice Climbing Gear Toolkit | This work order is to purchase CT Craft School Apprentices Climbing Gear / Toolkits budgeted in Field Training (1CS)._x000D__x000D_ _x000D__x000D_ Per Dan Chambrello's e-mail dated 4/12/2022, there was a need for 60 kits in total for 2022. Hydron was able to deliver 37 kits for 2022 in 2021, therefore, the charges appeared in 2021. This work order is for the remaining 23 kits that are needed to make up the 60 in total. _x000D__x000D_ Unit price = $3,546.22_x000D__x000D_ Quantity = 23_x000D__x000D_ Estimated total = $81,563.06 | Taxes-T00 22CTTRN1 | Berlin Training Yard Tools & Equip | This work order is to purchase CT Technical (Eletric) Training tools and equipment for the Berlin Training Yard and classroom facilities._x000D__x000D_ _x000D__x000D_ Per Bridget Bentley's email dated 2/4/2022 - requesting the purchase of a pole holder base for the Berlin Training Yard approx $1,993.00._x000D__x000D_ _x000D__x000D_ Per Bridget Bentley's e-mail dated 3/2/2022 - requesting to purchase 3 tower lanyards to be used in the Berlin Training Yard and they cost $604.44 each. _x000D__x000D_ _x000D__x000D_ Per Bridget Bentley's e-mail dated 4-4-2022 - requesting $47,754.58 for the purchase of upgrades to the AV equipment in one of the Berlin classrooms. _x000D__x000D_ _x000D__x000D_ Per Matthew Greges e-mails dated 4/5/2022 and 4/6/2022, requesting steel pole part # 593301 for $2,468.32 and steps part # 529994 @ $41.22 for each unit and 25 units are needed._x000D__x000D_ _x000D__x000D_ Per e-mail from Matthew Greges dated 4/29/2022, 25 poles will be ordered. (5) 40/2 PENTA poles at $670.73 each and (20) 45/2 PENTA poles at $742.63 each._x000D__x000D_ _x000D__x000D_ Per e-mail from Matt Greges on 5/17/2022, a ladder and v-rung will be purchased for the Berlin Training Yard. The cost per unit is approximately $550._x000D__x000D_ _x000D__x000D_ Per 4 invoices being received for tools for TMP Hot Stick Training course for Technical (Electric) Training, $9,495.77 was spent. PO 11132408 (911115355619, 911115355615, 911115355623, 911115355621)._x000D__x000D_ _x000D__x000D_ Per Dan Chambrello's e-mail dated 7/26/2022, 3 crimper/cutter tools will be purchased costing $1,171.35 each for a total of $3,514.05. These will be used for UG apprentice and refresher training._x000D__x000D_ _x000D__x000D_ Per Dan Chambrello's e-mail dated 11-1-2022, a new switch will be added to the Berlin Training Yard for a total estimated cost of $34,000._x000D__x000D_ 580199 = G&W Trident Switch for $20,000_x000D__x000D_ 588540 = Trident Switch Bracket for $1,000_x000D__x000D_ 579688 = QEI Control (Complete) for $13,000_x000D__x000D_ _x000D__x000D_ Per Dan Chambrello's e-mail dated 11/8/2022, there was a request for tools for the Berlin training yard for $10,000. | Taxes-T00 22CTTRSS | CT Substation | This work order is to purchase CT Substation related tools and equipment for the Berlin Training Yard and classroom. _x000D__x000D_ _x000D__x000D_ Per Ken Lomax's e-mail dated 8-12-2022, a manhole cage will be issued from inventory for about $2,500.00._x000D__x000D_ _x000D__x000D_ Per Dean Arbogash's e-mail dated 11-17-2022, a rescue stick (500740) will be ordered which costs between $900 and $1,063 | Taxes-T00 23CF0UVL | CT ETT 2023 UVLs | CT ETT Work Order for monthly capital UVL. Need to book UVLs to "town code unspecified" work orders for Property Tax billing procedures. | Taxes-T00 23CTCSCG | CT Apprentice Climbing Gear 2023 | This work order is to purchase CT craft school apprentice climbing gear / tool kits budgeted in 1CS (CT craft school)._x000D__x000D_ _x000D__x000D_ Per Joe Chiappetta and Todd Lynch on 5-3-2023, 15 tool kits will be purchased for UG apprentice lineworkers._x000D__x000D_ _x000D__x000D_
  4. Part 16 of 76

    Per Dan Chambrello's e-mail dated 4/12/2022, there was a need for 60 kits in total for 2022. Hydron was able to deliver 37 kits for 2022 in 2021, therefore, the charges appeared in 2021. This work order is for the remaining 23 kits that are needed to make up the 60 in total. _x000D__x000D_ Unit price = $3,546.22_x000D__x000D_ Quantity = 23_x000D__x000D_ Estimated total = $81,563.06 | Taxes-T00 23CTEHFT | East Hampton Tools and Equipment | This work order is to purchase CT craft school (AWC) tools and equipment for East Hampton._x000D__x000D_ _x000D__x000D_ Per M. Greges' e-mail dated 10-24-2023, the following items will be purchased: Item # 521659 ($590.80) and item # 568629 ($2,475.00)._x000D__x000D_ _x000D__x000D_ Per M. Greges' e-mail dated 11-7-2023, a Milwaukee Transfer Pump Utility Kit will be purchased for $631.60. | Taxes-T00 23CTHTFD | Hartford Tools and Equipment | This work order is to purchase CT craft school (AWC) tools and equipment for Hartford._x000D__x000D_ _x000D__x000D_ Per M. Greges' e-mail dated 10-24-2023, the following items will be purchased: Item # 521659 ($590.80) and item # 568629 ($2,475.00)._x000D__x000D_ _x000D__x000D_ Per M. Greges' e-mail dated 11-7-2023, a Milwaukee Transfer Pump Utility Kit will be purchased for $631.60. | Taxes-T00 23CTNWTN | Newtown Tools and Equipment | This work order is to purchase CT craft school (AWC) tools and equipment for Newtown._x000D__x000D_ _x000D__x000D_ Per meeting with D. Chambrello and J. Bradley on 6/7/2023, it was determined a hoist should be capital for Newtown. The amount is $3,280.38 for item number 569917 at a cost of $564.73 per unit._x000D__x000D_ _x000D__x000D_ Per M. Greges' e-mail dated 10-24-2023, the following items will be purchased: Item # 521659 ($590.80) and item # 568629 ($2,475.00)._x000D__x000D_ _x000D__x000D_ Per M. Greges' e-mail dated 11-7-2023, a Milwaukee Transfer Pump Utility Kit will be purchased for $631.60. | Taxes-T00 23CTTENT | 2 Tents for Berlin Training Yard | This work order is for CT Technical (Electric) Training to purchase 2 tents for the Berlin training yard._x000D__x000D_ _x000D__x000D_ Per M. Greges' e-mail dated 1/20/2023, Hubbell C4030296A Hinged Shotgun/Gripall is being purchased for $537.84._x000D__x000D_ _x000D__x000D_ Per D. Chambrello's and M. Greges' e-mails dated 1/26/2023 - requesting the purchase of a control for the new UG switch in the Berlin UG lab. The cost is $4,441.00. DR 634100_x000D__x000D_ _x000D__x000D_ Per D. Arbogash's e-mail dated 1/27/2023, DR 634390 was created for $9,493.30 for capital items._x000D__x000D_ _x000D__x000D_ Per M. Greges' e-mail dated 1/31/2023, purchasing 6 potential testers @ $616.29 each for a total of $3,700.00._x000D__x000D_ _x000D__x000D_ Per e-mail from M. Greges dated 2/13/2023, item number 534621 is being purchased for the training yard for $1,946.00._x000D__x000D_ _x000D__x000D_ Per D. Chambrello's e-mail dated 4/5/2023, equipment (item # 620277) will be purchased for the Berlin training yard and the cost is $6,098.00._x000D__x000D_ _x000D__x000D_ Beckwith Capacitor Control (equipment) for the Berlin training yard. About $10,000 per D. Chambrello on 5-3-2023 through Teams call._x000D__x000D_ _x000D__x000D_ Per e-mail from M. Greges dated 5-5-2023, item 600895 (recloser) for $4,023.06 will be purchased for the Berlin training yard._x000D__x000D_ _x000D__x000D_ Per D. Chambrello's e-mail dated 6/28/2023, testers are being purchased. | Taxes-T00 23CTTRN1 | Berlin Training Yard Tools & Equip | This work order is to purchase CT Technical (Eletric) Training tools and equipment for the Berlin Training Yard and classroom facilities._x000D__x000D_ _x000D__x000D_ Per M. Greges' e-mail dated 1/20/2023, Hubbell C4030296A Hinged Shotgun/Gripall is being purchased for $537.84._x000D__x000D_ _x000D__x000D_
  5. Part 17 of 76

    Per D. Chambrello's and M. Greges' e-mails dated 1/26/2023 - requesting the purchase of a control for the new UG switch in the Berlin UG lab. The cost is $4,441.00. DR 634100_x000D__x000D_ _x000D__x000D_ Per D. Arbogash's e-mail dated 1/27/2023, DR 634390 was created for $9,493.30 for capital items._x000D__x000D_ _x000D__x000D_ Per M. Greges' e-mail dated 1/31/2023, purchasing 6 potential testers @ $616.29 each for a total of $3,700.00._x000D__x000D_ _x000D__x000D_ Per e-mail from M. Greges dated 2/13/2023, item number 534621 is being purchased for the training yard for $1,946.00._x000D__x000D_ _x000D__x000D_ Per D. Chambrello's e-mail dated 4/5/2023, equipment (item # 620277) will be purchased for the Berlin training yard and the cost is $6,098.00._x000D__x000D_ _x000D__x000D_ Beckwith Capacitor Control (equipment) for the Berlin training yard. About $10,000 per D. Chambrello on 5-3-2023 through Teams call._x000D__x000D_ _x000D__x000D_ Per e-mail from M. Greges dated 5-5-2023, item 600895 (recloser) for $4,023.06 will be purchased for the Berlin training yard._x000D__x000D_ _x000D__x000D_ Per D. Chambrello's e-mail dated 6/28/2023, testers are being purchased._x000D__x000D_ _x000D__x000D_ Per J. Chiappetta's e-mail dated 9/19/2023, a rescue randy doll is being purchased for the Berlin training yard for an estimated cost of $4,219.80._x000D__x000D_ _x000D__x000D_ Per M. Greges' e-mail dated 10-27-2023, 5 Milwaukee packout kits will be purchased for the Berlin training yard for a total estimated cost of $10,773.27._x000D__x000D_ _x000D__x000D_ Per M. Greges' e-mail dated 11-7-2023, caissons will be installed in the climbing section of the Berlin training yard to set the poles into. The material cost is estimated to be $15,000.00._x000D__x000D_ _x000D__x000D_ Per M. Greges' e-mail dated 12/5/2023, 2 rescue mannequins will be purchased for $2,192.36 each. | Taxes-T00 23CTVMES | CT VM 2023 internal capital labor c | CT VM 2023 internal capital labor charges previously charged to E&S | Taxes-T00 23ETRUVL | 2023 ETR UVLs | CT ETR Work Order for monthly capital UVL. Need to book UVLs to "town code unspecified" work orders for Property Tax billing procedures. | Taxes-T00 23REL006 | REL -BETHANY, CT | REL -BETHANY, CT | Taxes-T00 23REL100 | REL -WATERFORD, CT | REL -WATERFORD, CT | Taxes-T00 23REL910 | REL -DURHAM, CT | REL -DURHAM, CT | Taxes-T00 24AEP011 | Mutual Aid - Appalachian 9/29/24 | For mutual aid to Appalachian Energy (AEP): to capture costs associated with the deployment of Co. 011 CT Eversource crews to assist with storm restoration beginning on Sept 29, 20245 (Hurricane Helene) | Taxes-T00 24CETTES | CF ETT 2024 ES intl capital labor | CF ETT 2024 ES internal capital labor | Taxes-T00 24CF0UVL | CT ETT UVL WO | CT ETT Work Order for monthly capital UVL. Need to book UVLs to "town code unspecified" work orders for Property Tax billing procedures. | Taxes-T00 24CTCSCG | CT Apprentice Climbing Gear 2024 | This work order is to purchase CT craft school apprentice climbing gear / tool kits budgeted in 1CS (CT craft school)._x000D__x000D_ _x000D__x000D_ Per Dan Chambrello's e-mail dated 6/28/2024, 20 basic school climbing kits will be purchased for apprentice lineworkers._x000D__x000D_ _x000D__x000D_ Unit price = $5,500.00_x000D__x000D_ Quantity = 20_x000D__x000D_ Estimated total = $110,000.00 | Taxes-T00 24CTEHFT | East Hampton Tools and Equipment | This work order is to purchase CT craft school (AWC) tools and equipment for East Hampton._x000D__x000D_ _x000D__x000D_ Per D. Chambrello's e-mail dated 3/26/2024, an Ox block will be purchased for about $700._x000D__x000D_ _x000D__x000D_ Per D. Chambrello's e-mail dated 9/5/2024, there will be tools purchased for East Hampton for $5,000. | Taxes-T00 24CTHTFD | Hartford Tools & Equipment | This work order is to purchase CT craft school (AWC) tools and equipment for Hartford._x000D__x000D_ _x000D__x000D_
  6. Part 18 of 76

    Per D. Chambrello's e-mail dated 3-1-2024, the following items will be purchased: (2) Secondary fault finders $760 each_x000D__x000D_ (1) Conduit snake $620 each_x000D__x000D_ _x000D__x000D_ Per D. Chambrello's e-mail dated 9/5/2024, there will be tools purchased for Hartford for $2,500. | Taxes-T00 24CTMDSN | Madison Tools and Equipment | This work order is to purchase CT craft school (AWC) tools and equipment for Madison._x000D__x000D_ _x000D__x000D_ Per D. Chambrello's e-mail dated 3/26/2024, an Ox block will be purchased for about $700_x000D__x000D_ _x000D__x000D_ Per D. Chambrello's e-mail dated 9/5/2024, there will be tools purchased for $10,000 for Madison. | Taxes-T00 24CTNWTN | Newtown Tools and Equipment | This work order is to purchase CT craft school (AWC) tools and equipment for Newtown._x000D__x000D_ _x000D__x000D_ Per D. Chambrello's e-mail dated 3/26/2024, items to be purchased are:_x000D__x000D_ - Ox block (cost is about $700)_x000D__x000D_ - Milwaukee rotary hammer (cost is about $1,000)_x000D__x000D_ _x000D__x000D_ Per D. Chambrello's e-mail dated 9/5/2024, there will be tools purchased for Newtown for $4,500. | Taxes-T00 24CTTRN1 | Berlin Training Yard Tools & Equip | This work order is to purchase CT Technical (Eletric) Training tools and equipment for the Berlin Training Yard and classroom facilities._x000D__x000D_ _x000D__x000D_ Per J. Chiapetta's e-mail dated 1/22/2024, 2 dry type transformers are being purchased for $6,000.00 each and Gen 2 Lindsey Sensors._x000D__x000D_ _x000D__x000D_ Per D. Chambrello's e-mail dated 1/25/2024, 36 poles will be purchased for the training yard. The cost is estimated to be $1,100 per pole which is $39,600. | Taxes-T00 24CTTRN2 | Berlin Training Yard Equipment | This work order is to purchase CT Technical (Eletric) Training equipment for the Berlin Training Yard and classroom facilities._x000D__x000D_ _x000D__x000D_ Per D. Chambrello's e-mail dated 3/26/2024:_x000D__x000D_ - Regulator and regulator control costs about $17,500_x000D__x000D_ - Vacufuse costs about $1,500_x000D__x000D_ - Explosion proof manhole cover and associated installation costs about $6,000_x000D__x000D_ - Ox blocks costs about $2,800 ($700 @ 4)_x000D__x000D_ _x000D__x000D_ Per Dean Arbogash's e-mail dated 7-25-2024, the stock code item is 518938 and the estimated price is $13,882.00. There will be 2 purchased and then a 3rd control for a Viper control unit will be purchased of similar cost. The total estimate is $41,646.00. | Taxes-T00 24CTVMES | CT VM 2024 ETTCF | CT VM 2023 internal capital labor charges previously charged to E&S | Taxes-T00 24DOT085 | VM DOT -WOODSTOCK, CT | VM DOT -WOODSTOCK, CT | Taxes-T00 24DOT119 | VM DOT -UNION, CT | VM DOT -UNION, CT | Taxes-T00 24DOT157 | VM DOT -EAST HAMPTON, CT | VM DOT -EAST HAMPTON, CT | Taxes-T00 24DOT166 | VM DOT -MANSFIELD, CT | VM DOT -MANSFIELD, CT | Taxes-T00 24DOTUVL | CT DOT UVL 24 | CT DOT Work Order for monthly capital UVL. Need to book UVLs to "town code unspecified" work orders for Property Tax billing procedures. | Taxes-T00 24ETR002 | ETR -WATERBURY, CT | ETR -WATERBURY, CT | Taxes-T00 24ETR003 | ETR -NAUGATUCK, CT | ETR -NAUGATUCK, CT | Taxes-T00 24ETR004 | ETR -WATERTOWN, CT | ETR -WATERTOWN, CT | Taxes-T00 24ETR006 | ETR -BETHANY, CT | ETR -BETHANY, CT | Taxes-T00 24ETR007 | ETR -BETHEL, CT | ETR -BETHEL, CT | Taxes-T00 24ETR008 | ETR -DANBURY, CT | ETR -DANBURY, CT | Taxes-T00 24ETR010 | ETR -MIDDLEBURY, CT | ETR -MIDDLEBURY, CT | Taxes-T00 24ETR012 | ETR -MONROE, CT | ETR -MONROE, CT | Taxes-T00 24ETR013 | ETR -NEWTOWN, CT | ETR -NEWTOWN, CT | Taxes-T00 24ETR015 | ETR -PROSPECT, CT | ETR -PROSPECT, CT | Taxes-T00 24ETR016 | ETR -SEYMOUR, CT | ETR -SEYMOUR, CT | Taxes-T00 24ETR018 | ETR -SOUTHBURY, CT | ETR -SOUTHBURY, CT | Taxes-T00 24ETR019 | ETR -THOMASTON, CT | ETR -THOMASTON, CT | Taxes-T00 24ETR020 | ETR -WOLCOTT, CT | ETR -WOLCOTT, CT | Taxes-T00 24ETR022 | ETR -WOODBURY, CT | ETR -WOODBURY, CT | Taxes-T00
  7. Part 19 of 76

    24ETR030 | ETR -CHESHIRE, CT | ETR -CHESHIRE, CT | Taxes-T00 24ETR032 | ETR -MERIDEN, CT | ETR -MERIDEN, CT | Taxes-T00 24ETR033 | ETR -MIDDLETOWN, CT | ETR -MIDDLETOWN, CT | Taxes-T00 24ETR034 | ETR -SOUTHINGTON, CT | ETR -SOUTHINGTON, CT | Taxes-T00 24ETR037 | ETR -MIDDLEFIELD, CT | ETR -MIDDLEFIELD, CT | Taxes-T00 24ETR040 | ETR -BERLIN, CT | ETR -BERLIN, CT | Taxes-T00 24ETR041 | ETR -FARMINGTON, CT | ETR -FARMINGTON, CT | Taxes-T00 24ETR042 | ETR -NEW BRITAIN, CT | ETR -NEW BRITAIN, CT | Taxes-T00 24ETR043 | ETR -NEWINGTON, CT | ETR -NEWINGTON, CT | Taxes-T00 24ETR044 | ETR -PLAINVILLE, CT | ETR -PLAINVILLE, CT | Taxes-T00 24ETR045 | ETR -WETHERSFIELD, CT | ETR -WETHERSFIELD, CT | Taxes-T00 24ETR051 | ETR -NEW CANAAN, CT | ETR -NEW CANAAN, CT | Taxes-T00 24ETR052 | ETR -NORWALK, CT | ETR -NORWALK, CT | Taxes-T00 24ETR053 | ETR -REDDING , CT | ETR -REDDING , CT | Taxes-T00 24ETR054 | ETR -RIDGEFIELD, CT | ETR -RIDGEFIELD, CT | Taxes-T00 24ETR055 | ETR -WESTON, CT | ETR -WESTON, CT | Taxes-T00 24ETR056 | ETR -WESTPORT, CT | ETR -WESTPORT, CT | Taxes-T00 24ETR057 | ETR -WILTON, CT | ETR -WILTON, CT | Taxes-T00 24ETR065 | ETR -GREENWICH, CT | ETR -GREENWICH, CT | Taxes-T00 24ETR066 | ETR -STAMFORD, CT | ETR -STAMFORD, CT | Taxes-T00 24ETR070 | ETR -BRISTOL, CT | ETR -BRISTOL, CT | Taxes-T00 24ETR071 | ETR -PLYMOUTH, CT | ETR -PLYMOUTH, CT | Taxes-T00 24ETR075 | ETR -BROOKLYN, CT | ETR -BROOKLYN, CT | Taxes-T00 24ETR076 | ETR -CANTERBURY, CT | ETR -CANTERBURY, CT | Taxes-T00 24ETR077 | ETR -EASTFORD, CT | ETR -EASTFORD, CT | Taxes-T00 24ETR078 | ETR -HAMPTON, CT | ETR -HAMPTON, CT | Taxes-T00 24ETR079 | ETR -KILLINGLY, CT | ETR -KILLINGLY, CT | Taxes-T00 24ETR080 | ETR -PLAINFIELD, CT | ETR -PLAINFIELD, CT | Taxes-T00 24ETR081 | ETR -POMFRET, CT | ETR -POMFRET, CT | Taxes-T00 24ETR082 | ETR -PUTNAM, CT | ETR -PUTNAM, CT | Taxes-T00 24ETR083 | ETR -STERLING, CT | ETR -STERLING, CT | Taxes-T00 24ETR084 | ETR -THOMPSON, CT | ETR -THOMPSON, CT | Taxes-T00 24ETR085 | ETR -WOODSTOCK, CT | ETR -WOODSTOCK, CT | Taxes-T00 24ETR089 | ETR -MADISON, CT | ETR -MADISON, CT | Taxes-T00 24ETR090 | ETR -CHESTER, CT | ETR -CHESTER, CT | Taxes-T00 24ETR091 | ETR -CLINTON, CT | ETR -CLINTON, CT | Taxes-T00 24ETR092 | ETR -EAST LYME, CT | ETR -EAST LYME, CT | Taxes-T00 24ETR093 | ETR -ESSEX, CT | ETR -ESSEX, CT | Taxes-T00 24ETR094 | ETR -HADDAM, CT | ETR -HADDAM, CT | Taxes-T00 24ETR095 | ETR -KILLINGWORTH, CT | ETR -KILLINGWORTH, CT | Taxes-T00 24ETR096 | ETR -LYME, CT | ETR -LYME, CT | Taxes-T00 24ETR097 | ETR -OLD LYME, CT | ETR -OLD LYME, CT | Taxes-T00 24ETR098 | ETR -OLD SAYBROOK, CT | ETR -OLD SAYBROOK, CT | Taxes-T00 24ETR099 | ETR -DEEP RIVER, CT | ETR -DEEP RIVER, CT | Taxes-T00 24ETR100 | ETR -WATERFORD, CT | ETR -WATERFORD, CT | Taxes-T00 24ETR101 | ETR -WESTBROOK, CT | ETR -WESTBROOK, CT | Taxes-T00 24ETR102 | ETR -BRANFORD, CT | ETR -BRANFORD, CT | Taxes-T00 24ETR103 | ETR -GUILFORD, CT | ETR -GUILFORD, CT | Taxes-T00 24ETR110 | ETR -EAST WINDSOR, CT | ETR -EAST WINDSOR, CT | Taxes-T00 24ETR111 | ETR -ELLINGTON, CT | ETR -ELLINGTON, CT | Taxes-T00 24ETR112 | ETR -ENFIELD, CT | ETR -ENFIELD, CT | Taxes-T00 24ETR113 | ETR -HARTFORD, CT | ETR -HARTFORD, CT | Taxes-T00 24ETR114 | ETR -SOMERS, CT | ETR -SOMERS, CT | Taxes-T00 24ETR115 | ETR -SOUTH WINDSOR, CT | ETR -SOUTH WINDSOR, CT | Taxes-T00 24ETR116 | ETR -STAFFORD, CT | ETR -STAFFORD, CT | Taxes-T00 24ETR117 | ETR -SUFFIELD, CT | ETR -SUFFIELD, CT | Taxes-T00 24ETR118 | ETR -TOLLAND, CT | ETR -TOLLAND, CT | Taxes-T00 24ETR120 | ETR -VERNON, CT | ETR -VERNON, CT | Taxes-T00 24ETR121 | ETR -WINDSOR , CT | ETR -WINDSOR , CT | Taxes-T00 24ETR122 | ETR -WINDSOR LOCKS, CT | ETR -WINDSOR LOCKS, CT | Taxes-T00 24ETR123 | ETR -EAST GRANBY, CT | ETR -EAST GRANBY, CT | Taxes-T00 24ETR130 | ETR -BRIDGEWATER, CT | ETR -BRIDGEWATER, CT | Taxes-T00 24ETR131 | ETR -BROOKFIELD, CT | ETR -BROOKFIELD, CT | Taxes-T00 24ETR132 | ETR -CORNWALL, CT | ETR -CORNWALL, CT | Taxes-T00
  8. Part 20 of 76

    24ETR133 | ETR -KENT, CT | ETR -KENT, CT | Taxes-T00 24ETR134 | ETR -NEW FAIRFIELD, CT | ETR -NEW FAIRFIELD, CT | Taxes-T00 24ETR135 | ETR -NEW MILFORD, CT | ETR -NEW MILFORD, CT | Taxes-T00 24ETR136 | ETR -ROXBURY, CT | ETR -ROXBURY, CT | Taxes-T00 24ETR137 | ETR -SHARON, CT | ETR -SHARON, CT | Taxes-T00 24ETR138 | ETR -SHERMAN, CT | ETR -SHERMAN, CT | Taxes-T00 24ETR139 | ETR -WARREN, CT | ETR -WARREN, CT | Taxes-T00 24ETR140 | ETR -WASHINGTON, CT | ETR -WASHINGTON, CT | Taxes-T00 24ETR141 | ETR -GOSHEN, CT | ETR -GOSHEN, CT | Taxes-T00 24ETR150 | ETR -ANDOVER, CT | ETR -ANDOVER, CT | Taxes-T00 24ETR151 | ETR -ASHFORD, CT | ETR -ASHFORD, CT | Taxes-T00 24ETR152 | ETR -CHAPLIN, CT | ETR -CHAPLIN, CT | Taxes-T00 24ETR153 | ETR -COLCHESTER, CT | ETR -COLCHESTER, CT | Taxes-T00 24ETR154 | ETR -COLUMBIA, CT | ETR -COLUMBIA, CT | Taxes-T00 24ETR155 | ETR -COVENTRY , CT | ETR -COVENTRY , CT | Taxes-T00 24ETR156 | ETR -EAST HADDAM, CT | ETR -EAST HADDAM, CT | Taxes-T00 24ETR157 | ETR -EAST HAMPTON, CT | ETR -EAST HAMPTON, CT | Taxes-T00 24ETR158 | ETR -FRANKLIN, CT | ETR -FRANKLIN, CT | Taxes-T00 24ETR159 | ETR -GLASTONBURY, CT | ETR -GLASTONBURY, CT | Taxes-T00 24ETR160 | ETR -GRISWOLD, CT | ETR -GRISWOLD, CT | Taxes-T00 24ETR161 | ETR -GROTON, CT | ETR -GROTON, CT | Taxes-T00 24ETR162 | ETR -HEBRON, CT | ETR -HEBRON, CT | Taxes-T00 24ETR163 | ETR -LEBANON, CT | ETR -LEBANON, CT | Taxes-T00 24ETR164 | ETR -LEDYARD, CT | ETR -LEDYARD, CT | Taxes-T00 24ETR165 | ETR -LISBON, CT | ETR -LISBON, CT | Taxes-T00 24ETR166 | ETR -MANSFIELD, CT | ETR -MANSFIELD, CT | Taxes-T00 24ETR167 | ETR -MARLBOROUGH, CT | ETR -MARLBOROUGH, CT | Taxes-T00 24ETR168 | ETR -MONTVILLE, CT | ETR -MONTVILLE, CT | Taxes-T00 24ETR169 | ETR -NEW LONDON, CT | ETR -NEW LONDON, CT | Taxes-T00 24ETR170 | ETR -NORTH STONINGTON, CT | ETR -NORTH STONINGTON, CT | Taxes-T00 24ETR172 | ETR -PORTLAND, CT | ETR -PORTLAND, CT | Taxes-T00 24ETR173 | ETR -PRESTON, CT | ETR -PRESTON, CT | Taxes-T00 24ETR174 | ETR -SALEM, CT | ETR -SALEM, CT | Taxes-T00 24ETR175 | ETR -SCOTLAND, CT | ETR -SCOTLAND, CT | Taxes-T00 24ETR176 | ETR -SPRAGUE, CT | ETR -SPRAGUE, CT | Taxes-T00 24ETR177 | ETR -STONINGTON, CT | ETR -STONINGTON, CT | Taxes-T00 24ETR178 | ETR -VOLUNTOWN, CT | ETR -VOLUNTOWN, CT | Taxes-T00 24ETR179 | ETR -WILLINGTON, CT | ETR -WILLINGTON, CT | Taxes-T00 24ETR180 | ETR -WINDHAM, CT | ETR -WINDHAM, CT | Taxes-T00 24ETR190 | ETR -BARKHAMSTED, CT | ETR -BARKHAMSTED, CT | Taxes-T00 24ETR191 | ETR -BURLINGTON, CT | ETR -BURLINGTON, CT | Taxes-T00 24ETR192 | ETR -COLEBROOK, CT | ETR -COLEBROOK, CT | Taxes-T00 24ETR193 | ETR -HARTLAND, CT | ETR -HARTLAND, CT | Taxes-T00 24ETR194 | ETR -TORRINGTON, CT | ETR -TORRINGTON, CT | Taxes-T00 24ETR195 | ETR -WINCHESTER, CT | ETR -WINCHESTER, CT | Taxes-T00 24ETR196 | ETR -NORFOLK, CT | ETR -NORFOLK, CT | Taxes-T00 24ETR405 | ETR -HARWINTON, CT | ETR -HARWINTON, CT | Taxes-T00 24ETR406 | ETR -LITCHFIELD, CT | ETR -LITCHFIELD, CT | Taxes-T00 24ETR407 | ETR -MORRIS, CT | ETR -MORRIS, CT | Taxes-T00 24ETR903 | ETR -BOLTON, CT | ETR -BOLTON, CT | Taxes-T00 24ETR908 | ETR -DARIEN, CT | ETR -DARIEN, CT | Taxes-T00 24ETR910 | ETR -DURHAM, CT | ETR -DURHAM, CT | Taxes-T00 24ETR928 | ETR -SALISBURY, CT | ETR -SALISBURY, CT | Taxes-T00 24ETR929 | ETR -CANAAN, CT | ETR -CANAAN, CT | Taxes-T00 24ETR931 | ETR -AVON, CT | ETR -AVON, CT | Taxes-T00 24ETR932 | ETR -BLOOMFIELD, CT | ETR -BLOOMFIELD, CT | Taxes-T00 24ETR933 | ETR -CANTON, CT | ETR -CANTON, CT | Taxes-T00 24ETR934 | ETR -EAST HARTFORD, CT | ETR -EAST HARTFORD, CT | Taxes-T00 24ETR936 | ETR -GRANBY, CT | ETR -GRANBY, CT | Taxes-T00 24ETR937 | ETR -MANCHESTER, CT | ETR -MANCHESTER, CT | Taxes-T00 24ETR938 | ETR -NEW HARTFORD, CT | ETR -NEW HARTFORD, CT | Taxes-T00 24ETR941 | ETR -ROCKY HILL, CT | ETR -ROCKY HILL, CT | Taxes-T00 24ETR942 | ETR -SIMSBURY, CT | ETR -SIMSBURY, CT | Taxes-T00 24ETR943 | ETR -WEST HARTFORD, CT | ETR -WEST HARTFORD, CT | Taxes-T00
  9. Part 21 of 76

    24ETRECI | CT ECI ETR 2024 | 2024 CT ECI charges for ETR tree profiling will be charged to work order 24ETRECI. These charges will be transferred to "by town" ETR work orders at year-end. ECI = Environmental Consultants Inc. | Taxes-T00 24ETRLES | 2024 CT ETR ES intl capital labor | 2024 CT ETR ES internal capital labor | Taxes-T00 24ETRUVL | CT ETR UVL WO | CT ETR Work Order for monthly capital UVL. Need to book UVLs to "town code unspecified" work orders for Property Tax billing procedures. | Taxes-T00 24ETW135 | ETW -NEW MILFORD, CT | ETW -NEW MILFORD, CT | Taxes-T00 24PAR016 | CF ETT -SEYMOUR, CT | CF ETT -SEYMOUR, CT | Taxes-T00 24PAR018 | CF ETT -SOUTHBURY, CT | CF ETT -SOUTHBURY, CT | Taxes-T00 24PAR030 | CF ETT -CHESHIRE, CT | CF ETT -CHESHIRE, CT | Taxes-T00 24PAR040 | CF ETT -BERLIN, CT | CF ETT -BERLIN, CT | Taxes-T00 24PAR053 | CF ETT -REDDING , CT | CF ETT -REDDING , CT | Taxes-T00 24PAR054 | CF ETT -RIDGEFIELD, CT | CF ETT -RIDGEFIELD, CT | Taxes-T00 24PAR065 | CF ETT -GREENWICH, CT | CF ETT -GREENWICH, CT | Taxes-T00 24PAR070 | CF ETT -BRISTOL, CT | CF ETT -BRISTOL, CT | Taxes-T00 24PAR075 | CF ETT -BROOKLYN, CT | CF ETT -BROOKLYN, CT | Taxes-T00 24PAR080 | CF ETT -PLAINFIELD, CT | CF ETT -PLAINFIELD, CT | Taxes-T00 24PAR082 | CF ETT -PUTNAM, CT | CF ETT -PUTNAM, CT | Taxes-T00 24PAR089 | CF ETT -MADISON, CT | CF ETT -MADISON, CT | Taxes-T00 24PAR091 | CF ETT -CLINTON, CT | CF ETT -CLINTON, CT | Taxes-T00 24PAR092 | CF ETT -EAST LYME, CT | CF ETT -EAST LYME, CT | Taxes-T00 24PAR093 | CF ETT -ESSEX, CT | CF ETT -ESSEX, CT | Taxes-T00 24PAR094 | CF ETT -HADDAM, CT | CF ETT -HADDAM, CT | Taxes-T00 24PAR097 | CF ETT -OLD LYME, CT | CF ETT -OLD LYME, CT | Taxes-T00 24PAR098 | CF ETT -OLD SAYBROOK, CT | CF ETT -OLD SAYBROOK, CT | Taxes-T00 24PAR099 | CF ETT -DEEP RIVER, CT | CF ETT -DEEP RIVER, CT | Taxes-T00 24PAR101 | CF ETT -WESTBROOK, CT | CF ETT -WESTBROOK, CT | Taxes-T00 24PAR112 | CF ETT -ENFIELD, CT | CF ETT -ENFIELD, CT | Taxes-T00 24PAR115 | CF ETT -SOUTH WINDSOR, CT | CF ETT -SOUTH WINDSOR, CT | Taxes-T00 24PAR116 | CF ETT -STAFFORD, CT | CF ETT -STAFFORD, CT | Taxes-T00 24PAR117 | CF ETT -SUFFIELD, CT | CF ETT -SUFFIELD, CT | Taxes-T00 24PAR122 | CF ETT -WINDSOR LOCKS, CT | CF ETT -WINDSOR LOCKS, CT | Taxes-T00 24PAR133 | CF ETT -KENT, CT | CF ETT -KENT, CT | Taxes-T00 24PAR135 | CF ETT -NEW MILFORD, CT | CF ETT -NEW MILFORD, CT | Taxes-T00 24PAR138 | CF ETT -SHERMAN, CT | CF ETT -SHERMAN, CT | Taxes-T00 24PAR150 | CF ETT -ANDOVER, CT | CF ETT -ANDOVER, CT | Taxes-T00 24PAR151 | CF ETT -ASHFORD, CT | CF ETT -ASHFORD, CT | Taxes-T00 24PAR153 | CF ETT -COLCHESTER, CT | CF ETT -COLCHESTER, CT | Taxes-T00 24PAR155 | CF ETT -COVENTRY , CT | CF ETT -COVENTRY , CT | Taxes-T00 24PAR156 | CF ETT -EAST HADDAM, CT | CF ETT -EAST HADDAM, CT | Taxes-T00 24PAR157 | CF ETT -EAST HAMPTON, CT | CF ETT -EAST HAMPTON, CT | Taxes-T00 24PAR163 | CF ETT -LEBANON, CT | CF ETT -LEBANON, CT | Taxes-T00 24PAR166 | CF ETT -MANSFIELD, CT | CF ETT -MANSFIELD, CT | Taxes-T00 24PAR168 | CF ETT -MONTVILLE, CT | CF ETT -MONTVILLE, CT | Taxes-T00 24PAR173 | CF ETT -PRESTON, CT | CF ETT -PRESTON, CT | Taxes-T00 24PAR180 | CF ETT -WINDHAM, CT | CF ETT -WINDHAM, CT | Taxes-T00 24PAR405 | CF ETT -HARWINTON, CT | CF ETT -HARWINTON, CT | Taxes-T00 24PAR406 | CF ETT -LITCHFIELD, CT | CF ETT -LITCHFIELD, CT | Taxes-T00 24PAR931 | CF ETT -AVON, CT | CF ETT -AVON, CT | Taxes-T00 24PAR932 | CF ETT -BLOOMFIELD, CT | CF ETT -BLOOMFIELD, CT | Taxes-T00 24PAR933 | CF ETT -CANTON, CT | CF ETT -CANTON, CT | Taxes-T00 24PAR942 | CF ETT -SIMSBURY, CT | CF ETT -SIMSBURY, CT | Taxes-T00 24REL002 | REL -WATERBURY, CT | REL -WATERBURY, CT | Taxes-T00 24REL004 | REL -WATERTOWN, CT | REL -WATERTOWN, CT | Taxes-T00 24REL006 | REL -BETHANY, CT | REL -BETHANY, CT | Taxes-T00 24REL007 | REL -BETHEL, CT | REL -BETHEL, CT | Taxes-T00 24REL008 | REL -DANBURY, CT | REL -DANBURY, CT | Taxes-T00 24REL012 | REL -MONROE, CT | REL -MONROE, CT | Taxes-T00
  10. Part 22 of 76

    24REL013 | REL -NEWTOWN, CT | REL -NEWTOWN, CT | Taxes-T00 24REL014 | REL -OXFORD, CT | REL -OXFORD, CT | Taxes-T00 24REL018 | REL -SOUTHBURY, CT | REL -SOUTHBURY, CT | Taxes-T00 24REL019 | REL -THOMASTON, CT | REL -THOMASTON, CT | Taxes-T00 24REL020 | REL -WOLCOTT, CT | REL -WOLCOTT, CT | Taxes-T00 24REL022 | REL -WOODBURY, CT | REL -WOODBURY, CT | Taxes-T00 24REL030 | REL -CHESHIRE, CT | REL -CHESHIRE, CT | Taxes-T00 24REL031 | REL -CROMWELL, CT | REL -CROMWELL, CT | Taxes-T00 24REL043 | REL -NEWINGTON, CT | REL -NEWINGTON, CT | Taxes-T00 24REL044 | REL -PLAINVILLE, CT | REL -PLAINVILLE, CT | Taxes-T00 24REL051 | REL -NEW CANAAN, CT | REL -NEW CANAAN, CT | Taxes-T00 24REL052 | REL -NORWALK, CT | REL -NORWALK, CT | Taxes-T00 24REL053 | REL -REDDING , CT | REL -REDDING , CT | Taxes-T00 24REL054 | REL -RIDGEFIELD, CT | REL -RIDGEFIELD, CT | Taxes-T00 24REL055 | REL -WESTON, CT | REL -WESTON, CT | Taxes-T00 24REL056 | REL -WESTPORT, CT | REL -WESTPORT, CT | Taxes-T00 24REL057 | REL -WILTON, CT | REL -WILTON, CT | Taxes-T00 24REL065 | REL -GREENWICH, CT | REL -GREENWICH, CT | Taxes-T00 24REL066 | REL -STAMFORD, CT | REL -STAMFORD, CT | Taxes-T00 24REL070 | REL -BRISTOL, CT | REL -BRISTOL, CT | Taxes-T00 24REL071 | REL -PLYMOUTH, CT | REL -PLYMOUTH, CT | Taxes-T00 24REL075 | REL -BROOKLYN, CT | REL -BROOKLYN, CT | Taxes-T00 24REL076 | REL -CANTERBURY, CT | REL -CANTERBURY, CT | Taxes-T00 24REL077 | REL -EASTFORD, CT | REL -EASTFORD, CT | Taxes-T00 24REL078 | REL -HAMPTON, CT | REL -HAMPTON, CT | Taxes-T00 24REL079 | REL -KILLINGLY, CT | REL -KILLINGLY, CT | Taxes-T00 24REL080 | REL -PLAINFIELD, CT | REL -PLAINFIELD, CT | Taxes-T00 24REL081 | REL -POMFRET, CT | REL -POMFRET, CT | Taxes-T00 24REL082 | REL -PUTNAM, CT | REL -PUTNAM, CT | Taxes-T00 24REL084 | REL -THOMPSON, CT | REL -THOMPSON, CT | Taxes-T00 24REL085 | REL -WOODSTOCK, CT | REL -WOODSTOCK, CT | Taxes-T00 24REL089 | REL -MADISON, CT | REL -MADISON, CT | Taxes-T00 24REL090 | REL -CHESTER, CT | REL -CHESTER, CT | Taxes-T00 24REL091 | REL -CLINTON, CT | REL -CLINTON, CT | Taxes-T00 24REL092 | REL -EAST LYME, CT | REL -EAST LYME, CT | Taxes-T00 24REL093 | REL -ESSEX, CT | REL -ESSEX, CT | Taxes-T00 24REL094 | REL -HADDAM, CT | REL -HADDAM, CT | Taxes-T00 24REL095 | REL -KILLINGWORTH, CT | REL -KILLINGWORTH, CT | Taxes-T00 24REL096 | REL -LYME, CT | REL -LYME, CT | Taxes-T00 24REL097 | REL -OLD LYME, CT | REL -OLD LYME, CT | Taxes-T00 24REL098 | REL -OLD SAYBROOK, CT | REL -OLD SAYBROOK, CT | Taxes-T00 24REL099 | REL -DEEP RIVER, CT | REL -DEEP RIVER, CT | Taxes-T00 24REL100 | REL -WATERFORD, CT | REL -WATERFORD, CT | Taxes-T00 24REL101 | REL -WESTBROOK, CT | REL -WESTBROOK, CT | Taxes-T00 24REL102 | REL -BRANFORD, CT | REL -BRANFORD, CT | Taxes-T00 24REL103 | REL -GUILFORD, CT | REL -GUILFORD, CT | Taxes-T00 24REL111 | REL -ELLINGTON, CT | REL -ELLINGTON, CT | Taxes-T00 24REL112 | REL -ENFIELD, CT | REL -ENFIELD, CT | Taxes-T00 24REL113 | REL -HARTFORD, CT | REL -HARTFORD, CT | Taxes-T00 24REL114 | REL -SOMERS, CT | REL -SOMERS, CT | Taxes-T00 24REL115 | REL -SOUTH WINDSOR, CT | REL -SOUTH WINDSOR, CT | Taxes-T00 24REL116 | REL -STAFFORD, CT | REL -STAFFORD, CT | Taxes-T00 24REL117 | REL -SUFFIELD, CT | REL -SUFFIELD, CT | Taxes-T00 24REL118 | REL -TOLLAND, CT | REL -TOLLAND, CT | Taxes-T00 24REL120 | REL -VERNON, CT | REL -VERNON, CT | Taxes-T00 24REL121 | REL -WINDSOR , CT | REL -WINDSOR , CT | Taxes-T00 24REL122 | REL -WINDSOR LOCKS, CT | REL -WINDSOR LOCKS, CT | Taxes-T00 24REL131 | REL -BROOKFIELD, CT | REL -BROOKFIELD, CT | Taxes-T00 24REL132 | REL -CORNWALL, CT | REL -CORNWALL, CT | Taxes-T00 24REL133 | REL -KENT, CT | REL -KENT, CT | Taxes-T00 24REL134 | REL -NEW FAIRFIELD, CT | REL -NEW FAIRFIELD, CT | Taxes-T00 24REL135 | REL -NEW MILFORD, CT | REL -NEW MILFORD, CT | Taxes-T00 24REL137 | REL -SHARON, CT | REL -SHARON, CT | Taxes-T00 24REL138 | REL -SHERMAN, CT | REL -SHERMAN, CT | Taxes-T00 24REL139 | REL -WARREN, CT | REL -WARREN, CT | Taxes-T00

Text of RRU-159 Attachment 21.pdf

Extracted from the file · 1,203 pages · 13,880,364 characters

Text of RRU-159 Attachment 20.xlsx

Sheet names, column headings and text cells; numbers left out

Text of RRU-159 Attachment 20.pdf

Extracted from the file · 16 pages · 151,762 characters

Text of RRU-159 Attachment 19.xlsx

Sheet names, column headings and text cells; numbers left out

Text of RRU-159 Attachment 19.pdf

Extracted from the file · 1 page · 5,328 characters

Text of RRU-159 Attachment 18.xlsx

Sheet names, column headings and text cells; numbers left out · first 300,000 characters

Text of RRU-159 Attachment 18.pdf

Extracted from the file · 640 pages · 7,983,236 characters

Text of RRU-159 Attachment 17.xlsx

Sheet names, column headings and text cells; numbers left out · first 300,000 characters

Text of RRU-159 Attachment 17.pdf

Extracted from the file · 855 pages · 14,651,941 characters

Text of RRU-159 Attachment 16.xlsx

Sheet names, column headings and text cells; numbers left out · first 300,000 characters

Text of RRU-159 Attachment 16.pdf

Extracted from the file · 489 pages · 7,076,557 characters

Text of RRU-159 Attachment 15.xlsx

Sheet names, column headings and text cells; numbers left out · first 300,000 characters

Text of RRU-159 Attachment 15.pdf

Extracted from the file · 897 pages · 15,723,777 characters

Text of RRU-159 Attachment 14 .pdf

Extracted from the file · 1 page · 2,589 characters

Text of RRU-159 Attachment 14.xlsx

Sheet names, column headings and text cells; numbers left out

Text of RRU-159 Attachment 13.xlsx

Sheet names, column headings and text cells; numbers left out

Text of RRU-159 Attachment 13.pdf

Extracted from the file · 1 page · 427 characters

Text of RRU-159 Attachment 12.xlsx

Sheet names, column headings and text cells; numbers left out · first 300,000 characters

Text of RRU-159 Attachment 12.pdf

Extracted from the file · 802 pages · 14,341,138 characters

Text of RRU-159 Attachment 11.xlsx

Sheet names, column headings and text cells; numbers left out · first 300,000 characters

Text of RRU-159 Attachment 11.pdf

Extracted from the file · 858 pages · 15,906,152 characters

Text of RRU-159 Attachment 10.xlsx

Sheet names, column headings and text cells; numbers left out

Text of RRU-159 Attachment 10.pdf

Extracted from the file · 1 page · 822 characters

Text of RRU-159 Attachment 09.xlsx

Sheet names, column headings and text cells; numbers left out · first 300,000 characters

Text of RRU-159 Attachment 09.pdf

Extracted from the file · 449 pages · 7,355,312 characters

Text of RRU-159 Attachment 08.xlsx

Sheet names, column headings and text cells; numbers left out · first 300,000 characters

Text of RRU-159 Attachment 08.pdf

Extracted from the file · 867 pages · 13,878,236 characters

Text of RRU-159 Attachment 07.xlsx

Sheet names, column headings and text cells; numbers left out · first 300,000 characters

Text of RRU-159 Attachment 07.pdf

Extracted from the file · 869 pages · 15,728,932 characters

Text of RRU-159 Attachment 06.xlsx

Sheet names, column headings and text cells; numbers left out · first 300,000 characters

Text of RRU-159 Attachment 06.pdf

Extracted from the file · 459 pages · 8,128,897 characters

Text of RRU-159 Attachment 05.xlsx

Sheet names, column headings and text cells; numbers left out · first 300,000 characters

Text of RRU-159 Attachment 05.pdf

Extracted from the file · 879 pages · 16,073,548 characters

Text of RRU-159 Attachment 04.xlsx

Sheet names, column headings and text cells; numbers left out

Text of RRU-159 Attachment 04.pdf

Extracted from the file · 5 pages · 20,994 characters

Text of RRU-159 Attachment 03.xlsx

Sheet names, column headings and text cells; numbers left out · first 300,000 characters

Text of RRU-159 Attachment 03.pdf

Extracted from the file · 840 pages · 14,413,580 characters

Text of RRU-159 Attachment 02.xlsx

Sheet names, column headings and text cells; numbers left out · first 300,000 characters

Text of RRU-159 Attachment 02.pdf

Extracted from the file · 1,137 pages · 16,605,462 characters

Text of RRU-159 Attachment 01.xlsx

Sheet names, column headings and text cells; numbers left out

Text of RRU-159 Attachment 01.pdf

Extracted from the file · 1 page · 1,403 characters

As listed on the current system

Question(s) Answered 159 (Connecticut Light and Power Company dba Eversource Energy) Date Filed: 11/06/2026