Skip to main content

A prototype public docket site for the Connecticut Public Utilities Regulatory Authority

Utility Dockets and Filings

Interrogatory responses

Answers to questions 159

ResponseFiled by Connecticut Light and Power Company dba Eversource Energy51 files
Part of docket 26-05-10Open
  • Electric
Application of The Connecticut Light and Power Company d/b/a Eversource Energy to Amend its Rate Schedules

Files51

Search terms highlighted
Eversource rate increase is on 36 pages across 17 files of the text below, highlighted. Go to the first matchClear highlighting
Words on different pages
Words on different pages
Words on different pages

Text of RRU-159 Attachment 23.xlsx

Sheet names, column headings and text cells; numbers left out · first 300,000 characters

Text of RRU-159 Attachment 23.pdf

Extracted from the file · 1,160 pages · 16,330,154 characters

Text of RRU-159 Attachment 22.xlsx

Sheet names, column headings and text cells; numbers left out · first 300,000 characters

Text of RRU-159 Attachment 22.pdf

Extracted from the file · 1,203 pages · 14,349,246 characters

Text of RRU-159 Attachment 21.xlsx

Sheet names, column headings and text cells; numbers left out · first 300,000 characters

Text of RRU-159 Attachment 21.pdf

Extracted from the file · 1,203 pages · 13,880,364 characters

Words on different pages

The searchable text of a spreadsheet keeps the sheet names, column headings and text cells. Download the file for the figures.

  1. Part 21 of 38

    AP1-YWO Total Cost Less Than 7K | Salvage -M02 3H721681 | South Main St.Manchester Pole 3881 | South Main St.Manchester Pole 3881 hit/ Replace with 40/2_x000D_ AP1-YWO Total Cost Less Than 7K | Salvage -M02 3H721721 | Htfd TRINITY ST - C6843 replace 250 | Htfd TRINITY ST - C6843 replace 250w head to new pole_x000D_ AP1-YWO Total Cost Less Than 7K | Salvage -M02 3H721728 | RSO/AWC, 7/3, WEST HARTFORD, CONCOR | RSO/AWC, 7/3, WEST HARTFORD, CONCORD STREET REPLACED 150' SEC WITH 4/0_x000D_ AP1-YWO Total Cost Less Than 7K | Salvage -M02 3H721751 | 7/5 - AWC - WETHERSFIELD, OLD PEPPE | 7/5 - AWC - WETHERSFIELD, OLD PEPPERIDGE LA - REPLACED CUTOUT/TERM/RISER_x000D_ AP1-YWO Total Cost Less Than 7K | Salvage -M02 3H721767 | 7/8 RSO, WINDSOR COLONIAL DR - 9A T | 7/8 RSO, WINDSOR COLONIAL DR - 9A TRUCK TOOK DOWN WIRES - RAN 125' SERVICE_x000D_ AP1-YWO Total Cost Less Than 7K | Salvage -M02 3H721776 | 7/9 - HARAWC - WINDSOR, PARK RD - E | 7/9 - HARAWC - WINDSOR, PARK RD - EVERSOURCE POLE 156_x000D_ AP2-YWO Total Cost Variance Met - Variance :69.5323 MIN.:-50 MAX.:150 | Salvage -M02 3H721840 | RSO, 7/13, E HARTFORD, ROBERTS ST, | RSO, 7/13, E HARTFORD, ROBERTS ST, RPLC 8' ARM pole 4138/shift 1/0 ACSR_x000D_ AP1-YWO Total Cost Less Than 7K | Salvage -M02 3H721865 | RSO,7/16, WEST HARTFORD, KANE STREE | RSO,7/16, WEST HARTFORD, KANE STREET - INS 3 ELBOW ARR P-3173/REBUILT RISER_x000D_ AP2-YWO Total Cost Variance Met - Variance :-6.6382 MIN.:-50 MAX.:50 | Salvage -M02 3H721933 | Replace OH svc / new attachment poi | Replace OH svc / new attachment point_x000D_ AP1-YWO Total Cost Less Than 7K | Salvage -M02 3H721937 | AWC 7/24 MANCHESTER HARTFORD RD 9A | AWC 7/24 MANCHESTER HARTFORD RD 9A - REPLACED QUAD SERVICE FROM P-4700_x000D_ AP1-YWO Total Cost Less Than 7K | Salvage -M02 3H721946 | JWL... 119-121 BLUE HILLS AVE. run | JWL... 119-121 BLUE HILLS AVE. run new svc from P5709_x000D_ AP1-YWO Total Cost Less Than 7K | Salvage -M02 3H721986 | HARTFORD, ANN ST-C6661 - INSTALL 25 | HARTFORD, ANN ST-C6661 - INSTALL 250W HPS AND RECONNECT UG FEED_x000D_ AP1-YWO Total Cost Less Than 7K | Salvage -M02 3H721987 | HARTFORD, WALNUT ST - P-CH9493 - IN | HARTFORD, WALNUT ST - P-CH9493 - INSTALL 250W HPS COBRA AND RECONNECT UG FEED_x000D_ AP1-YWO Total Cost Less Than 7K | Salvage -M02 3H721993 | 7/26 - BLOOMFIELD, CHATEAU MARGAUX | 7/26 - BLOOMFIELD, CHATEAU MARGAUX - REPLACED PAD 1719_x000D_ AP2-YWO Total Cost Variance Met - Variance :51.2571 MIN.:-50 MAX.:150 | Salvage -M02 3H722032 | 8/4 - RSO - ROCKY HILL, WEST ST - R | 8/4 - RSO - ROCKY HILL, WEST ST - RPL 3-50KVA 120/208 BANK POLE 1406_x000D_ AP2-YWO Total Cost Variance Met - Variance :-42.569 MIN.:-50 MAX.:50 | Salvage -M02 3H722035 | RSO, 8/5, WINDSOR, KENDRICK LANE - | RSO, 8/5, WINDSOR, KENDRICK LANE - REPLACED HH 1596B_x000D_ AP1-YWO Total Cost Less Than 7K | Salvage -M02 3H722049 | DKH - Kennedy Rd, Wsr - Replace rec | DKH - Kennedy Rd, Wsr - Replace recloser upper unit P2982._x000D_ AP2-YWO Total Cost Variance Met - Variance :.4686 MIN.:-40 MAX.:40 | Salvage -M02 3H722079 | RSO/AWC, 8/9, AVON, LOVELY STREET, | RSO/AWC, 8/9, AVON, LOVELY STREET, P421 9A_x000D_ AP2-YWO Total Cost Variance Met - Variance :-4.5576 MIN.:-50 MAX.:50 | Salvage -M02 3H722149 | 453 Wash St Htfd replace 250w Head | 453 Wash St Htfd replace 250w Head CH8192_x000D_ AP1-YWO Total Cost Less Than 7K | Salvage -M02 3H722155 | JWL @ 877-879 CAPITOL AVE replace | JWL @ 877-879 CAPITOL AVE replace svc from sb3177._x000D_ AP1-YWO Total Cost Less Than 7K | Salvage -M02 3H722156 | 8/18 - RSO/HAROH - EAST HARTFORD, | 8/18 - RSO/HAROH - EAST HARTFORD, SEDGEWICK RD, P2646, 9A_x000D_ AP2-YWO Total Cost Variance Met - Variance :73.2456 MIN.:-50 MAX.:150 | Salvage -M02 3H722164 | 8/17 RSO-AWC, WHARTFORD, SEQUIN RD | 8/17 RSO-AWC, WHARTFORD, SEQUIN RD 9A - REPLACED POLE_x000D_ AP1-YWO Total Cost Less Than 7K | Salvage -M02
  2. Part 22 of 38

    3H722171 | XL-CDOT 63-633, electrical work to | XL-CDOT 63-633, electrical work to relocate service along Woodland St, Hartford_x000D_ JE-YWO Variance Job Type Exclusion | Salvage -M02 3H722173 | XL-CDOT 63-633, electrical work to | XL-CDOT 63-633, electrical work to relocate service along Kent St, Hartford_x000D_ JE-YWO Variance Job Type Exclusion | Salvage -M02 3H722174 | 8/19 RSO HARTFORD, SWHITNEY ST P#68 | 8/19 RSO HARTFORD, SWHITNEY ST P#6850 REPLACED 90' SVC WIRE_x000D_ AP1-YWO Total Cost Less Than 7K | Salvage -M02 3H722415 | 175 N. Main St., W. Htfd - REPL OH | 175 N. Main St., W. Htfd - REPL OH svc / New attachment point-WORK BY HTFD OH_x000D_ AP1-YWO Total Cost Less Than 7K | Salvage -M02 3H722493 | COMP 1/27/18 CCC - WETHERSFIELD, RE | COMP 1/27/18 CCC - WETHERSFIELD, REPLACE ST LT POLE 3230 18' BROWN 70W PTT_x000D_ AP1-YWO Total Cost Less Than 7K | Salvage -M02 3H722608 | 13 Pinecrest Dr.E.Hartf. Replace op | 13 Pinecrest Dr.E.Hartf. Replace open wire service P- 3341_x000D_ AP1-YWO Total Cost Less Than 7K | Salvage -M02 3H723020 | 4-118 - Relocate facilities for int | 4-118 - Relocate facilities for intersection relocation RT 10 - 50% Re-Im_x000D_ JE-YWO Variance Job Type Exclusion | Salvage -M02 3H723179 | 12/2 - RSO - HARTFORD, ELLIOT ST - | 12/2 - RSO - HARTFORD, ELLIOT ST - NEED TO REPLACE 150W C9116_x000D_ AP1-YWO Total Cost Less Than 7K | Salvage -M02 3H723287 | HARTFORD, MAIN ST CH7097 replace 25 | HARTFORD, MAIN ST CH7097 replace 250 w head when pole is replaced_x000D_ AP1-YWO Total Cost Less Than 7K | Salvage -M02 3H820160 | WINDSOR RAINBOW RD P#256 FUSE BLEW | WINDSOR RAINBOW RD P#256 FUSE BLEW ON RISER POLE# 256_x000D_ AP3-YWO Resource Variance Met- Labor 3 <= 32 OR -3.18 <= 30 And Contractor $1551.87 <= 2000 | Salvage -M02 3H820327 | AWC UG 2/9 HARTFORD, PARK ST SB 938 | AWC UG 2/9 HARTFORD, PARK ST SB 938 BURNING SEC INST NE 4/0 3PHSE SRV TO 701_x000D_ NL-YWO Variance - NU Construction Labor | Salvage -M02 3H820563 | 3150 Main St Htfd C8671 Replace 250 | 3150 Main St Htfd C8671 Replace 250w head to new city pole_x000D_ AP1-YWO Total Cost Less Than 7K | Salvage -M02 3H820695 | 4-118 - Relocate facilities to the | 4-118 - Relocate facilities to the NEW Town Farms Rd 50% Re-Im_x000D_ JE-YWO Variance Job Type Exclusion | Salvage -M02 3H822312 | RF-3 N Fairfield St,Manchester,Relo | RF-3 N Fairfield St,Manchester,Relocate OH SVC_x000D_ | Salvage -M02 3H920073 | HARTFORD, 877 TOWER AVE @ P5382 ru | HARTFORD, 877 TOWER AVE @ P5382 run new 90ft OH svc, CHANGE METER_x000D_ AP1-YWO Total Cost Less Than 7K | Salvage -M02 3H922469 | RF-597 Burnside Ave, East Hartford, | RF-597 Burnside Ave, East Hartford, Replace SVC with #2 TPX_x000D_ AP1-YWO Total Cost Less Than 7K | Salvage -M02 3H923040 | RF-21 Bancroft Rd,East Hartford,Rep | RF-21 Bancroft Rd,East Hartford,Replace Damaged OH SVC_x000D_ AP1-YWO Total Cost Less Than 7K | Salvage -M02 3H923346 | 10/25---HTFD-34 Shultas Pl-----new | 10/25---HTFD-34 Shultas Pl-----new OH 200A service_x000D_ AP1-YWO Total Cost Less Than 7K | Salvage -M02 3H923407 | 10/25---BLOOM-11 Mayfair Ct----LINE | 10/25---BLOOM-11 Mayfair Ct----LINEWORK REQUIRE TRIPLEX NEEDS TO BE CHANGE_x000D_ AP1-YWO Total Cost Less Than 7K | Salvage -M02 3H923415 | CR- 60-62 ENFIELD ST HARTFORD, REPL | CR- 60-62 ENFIELD ST HARTFORD, REPLACE OH SVC OFF POLE 4956_x000D_ AP1-YWO Total Cost Less Than 7K | Salvage -M02 3H923418 | 11/5---W HTFD-94 Flagg Rd-----OH 20 | 11/5---W HTFD-94 Flagg Rd-----OH 200A service upgrade-power off at pole_x000D_ AP1-YWO Total Cost Less Than 7K | Salvage -M02 3H923519 | CR-5 BUCKBOARD LN AVON, REPLACE OH | CR-5 BUCKBOARD LN AVON, REPLACE OH SVC OFF POLE 3518_x000D_ AP1-YWO Total Cost Less Than 7K | Salvage -M02 3H923696 | RF-185 Main St,Manchester,Pole#5223 | RF-185 Main St,Manchester,Pole#5223, Replace SVC_x000D_ AP1-YWO Total Cost Less Than 7K | Salvage -M02 3L520898 | HPS 100W PTT @ PID 79 - COMPLETED 1 | HPS 100W PTT @ PID 79 - COMPLETED 11/6/15 HARES1_x000D_
  3. Part 23 of 38

    AP1-YWO Total Cost Less Than 7K | Salvage -M02 3L620438 | WESTPORT POLE 29551 100 MH PDL - CO | WESTPORT POLE 29551 100 MH PDL - COMPLETED 3/18/16 NTW_x000D_ | Salvage -M02 3L620719 | SOUTH WINDSOR POLE 2977 400 HPS COB | SOUTH WINDSOR POLE 2977 400 HPS COBRA - COMPLETED 3/18/16 TOL_x000D_ | Salvage -M02 3L620841 | PROSPECT POLE 1597 70 HPS COBRA (SE | PROSPECT POLE 1597 70 HPS COBRA (SEMI TO FULL) - COMPLETED 3/18/16 WTB_x000D_ | Salvage -M02 3L620897 | BETHEL POLE 29 70 HPS COBRA - COMPL | BETHEL POLE 29 70 HPS COBRA - COMPLETED 3/9/16 NTW_x000D_ | Salvage -M02 3L620934 | WATERBURY POLE G7635 400 HPS FLOOD | WATERBURY POLE G7635 400 HPS FLOOD - COMPLETED 3/11/16 WTB_x000D_ AP1-YWO Total Cost Less Than 7K | Salvage -M02 3L620966 | STAMFORD POLE 17 70 HPS PTT - COMP | STAMFORD POLE 17 70 HPS PTT - COMPLETED 3/18/16 NTW_x000D_ | Salvage -M02 3L620985 | WINDSOR POLE 2987 70 HPS COBRA - CO | WINDSOR POLE 2987 70 HPS COBRA - COMPLETED 3/18/16 TOL_x000D_ | Salvage -M02 3L620990 | BEACON FALLS POLE 22721 250 HPS COB | BEACON FALLS POLE 22721 250 HPS COBRA - COMPLETED 3/18/16 WTB_x000D_ | Salvage -M02 3L620993 | WATERBURY POLE 63621 400 HPS COBRA | WATERBURY POLE 63621 400 HPS COBRA - COMPLETED 3/18/16 WTB_x000D_ | Salvage -M02 3L620994 | WATERTOWN POLE 6112 70 HPS COBRA - | WATERTOWN POLE 6112 70 HPS COBRA - COMPLETED 3/18/16 WTB_x000D_ | Salvage -M02 3L620995 | WINDSOR POLE 2652 70 HPS COBRA - CO | WINDSOR POLE 2652 70 HPS COBRA - COMPLETED 3/18/16 TOL_x000D_ | Salvage -M02 3L620996 | MANCHESTER POLE 7984 250 HPS COBRA | MANCHESTER POLE 7984 250 HPS COBRA - COMPLETED 3/18/16 TOL_x000D_ | Salvage -M02 3L620999 | WATERBURY POLE 5141 100 HPS COBRA - | WATERBURY POLE 5141 100 HPS COBRA - COMPLETED 3/18/16 HAR_x000D_ | Salvage -M02 3L621000 | MERIDEN POLE 5569 70 HPS COBRA - CO | MERIDEN POLE 5569 70 HPS COBRA - COMPLETED 3/18/16 SIM_x000D_ | Salvage -M02 3L621875 | STONINGTON POLE 7264 100 HPS PTT 43 | STONINGTON POLE 7264 100 HPS PTT 430740 & BROWN SQUARE 175189_x000D_ AP1-YWO Total Cost Less Than 7K | Salvage -M02 3L623404 | Municipal Light Fault Locate and Re | Municipal Light Fault Locate and Repair@ POLE C6404 NO POWER_x000D_ AP1-YWO Total Cost Less Than 7K | Salvage -M02 3L721076 | HARTFORD POLE 6156 150 HPS COBRA CO | HARTFORD POLE 6156 150 HPS COBRA COMP 4/13 TOL_x000D_ AP1-YWO Total Cost Less Than 7K | Salvage -M02 3L721151 | BLOOMFIELD, CHESTNUT HILL RD, P-54 | BLOOMFIELD, CHESTNUT HILL RD, P-5481 REMOVED 100W HPS PTT/NEED TO REPLACE_x000D_ AP1-YWO Total Cost Less Than 7K | Salvage -M02 3L721835 | WATERFORD POLE 3764 50 HPS COBRA CO | WATERFORD POLE 3764 50 HPS COBRA COMPLETED 7/24 CHE_x000D_ AP1-YWO Total Cost Less Than 7K | Salvage -M02 3L721945 | TORRINGTON POLE 3560 150 HPS COBRA | TORRINGTON POLE 3560 150 HPS COBRA COMPLETED 8/3 CHE_x000D_ AP1-YWO Total Cost Less Than 7K | Salvage -M02 3L722556 | BLOOMFIELD POLE 5616 100 HPS PTT & | BLOOMFIELD POLE 5616 100 HPS PTT & BROWN SQUARE POLE_x000D_ AP1-YWO Total Cost Less Than 7K | Salvage -M02 3L722822 | LEDYARD POLE 6045 250 HPS COBRA COM | LEDYARD POLE 6045 250 HPS COBRA COMPLETED 10/24 EHA_x000D_ AP1-YWO Total Cost Less Than 7K | Salvage -M02 3L722823 | LEDYARD POLE 96 50 HPS COBRA COMPLE | LEDYARD POLE 96 50 HPS COBRA COMPLETED 10/24 EHA_x000D_ AP1-YWO Total Cost Less Than 7K | Salvage -M02 3L722875 | PLYMOUTH POLE 1711 150 HPS PTT FIXT | PLYMOUTH POLE 1711 150 HPS PTT FIXTURE IS WORKING 03/01 NTW_x000D_ AP1-YWO Total Cost Less Than 7K | Salvage -M02 3L820579 | STAMFORD POLE 16917 250 HPS COBRA C | STAMFORD POLE 16917 250 HPS COBRA COMPLETED 12/20 NTW_x000D_ AP1-YWO Total Cost Less Than 7K | Salvage -M02 3L820837 | FARMINGTON POLE 1076 70 HPS COBRA - | FARMINGTON POLE 1076 70 HPS COBRA - COMP 2/3/18 TOL_x000D_ AP1-YWO Total Cost Less Than 7K | Salvage -M02 3L821505 | WATERBURY POLE 7175 150 HPS COBRA C | WATERBURY POLE 7175 150 HPS COBRA COMPLETED 04/09 CHE_x000D_ AP1-YWO Total Cost Less Than 7K | Salvage -M02
  4. Part 24 of 38

    3L821619 | COMP 5/23/18 CCC-LEDYARD POLE 2807 | COMP 5/23/18 CCC-LEDYARD POLE 2807 BROWN SQ POLE & 51W PTT 601648_x000D_ AP1-YWO Total Cost Less Than 7K | Salvage -M02 3L821890 | RTM-COMP 9/28/18 CCC MERIDEN POLE 4 | RTM-COMP 9/28/18 CCC MERIDEN POLE 42 BR SQ & RMV 150 HPS PTT, INST 51W LED PTT_x000D_ AP1-YWO Total Cost Less Than 7K | Salvage -M02 3L821930 | COMP 10/03/18 CCC POLE 4032 NEEDS T | COMP 10/03/18 CCC POLE 4032 NEEDS TO BE STRAIGHTENED & NEEDS 28W LED PTT_x000D_ AP1-YWO Total Cost Less Than 7K | Salvage -M02 3L822274 | HARTFORD POLE 9052 RMV 92W, INST 92 | HARTFORD POLE 9052 RMV 92W, INST 92W COMPLETED 07/20 TOL_x000D_ AP1-YWO Total Cost Less Than 7K | Salvage -M02 3L823415 | BRANFORD POLE 5918 RMV 36W, INST 30 | BRANFORD POLE 5918 RMV 36W, INST 30W_x000D_ AP1-YWO Total Cost Less Than 7K | Salvage -M02 3L920794 | Pole ID: 4167 RMV 70 HPS PTT INSTAL | Pole ID: 4167 RMV 70 HPS PTT INSTALL 28W LED PTT COMP 2/11/19 CHE1_x000D_ AP1-YWO Total Cost Less Than 7K | Salvage -M02 3R420243 | CD00316-02; 11C14 Resiliency; Recon | CD00316-02; 11C14 Resiliency; Recon. RT 81 w 336 TW pole 602 to 637; WO 3 of 3_x000D_ AP2-YWO Total Cost Variance Met - Variance :-6.1021 MIN.:-20 MAX.:20 | Salvage -M02 3R420245 | bwg/CD000320 pole replacements&reco | bwg/CD000320 pole replacements&reconductor Rte 80 30R8 BB to 336TW,Killingworth_x000D_ CI-YWO Variance - Contractor Invoice | Salvage -M02 3R420248 | MP - CD00320-02 - 30R8 - Reconducto | MP - CD00320-02 - 30R8 - Reconductor RTE 80-BB to 336TW - 2 of 2, Madison_x000D_ MS-YWO Variance - Multiple Setups | Salvage -M02 3R420330 | CD00283-02 Ashford, RT 44, Knowlto | CD00283-02 Ashford, RT 44, Knowlton Hill Rd (pole 1089) to (pole 1120)_x000D_ CL-YWO Variance - Contractor Labor | Salvage -M02 3R520161 | CD00389-01 Remove Autos & Convert | CD00389-01 Remove Autos & Convert Boston Post Rd, Guilford_x000D_ CI-YWO Variance - Contractor Invoice | Salvage -M02 3R520162 | CD00389-03 Convert Tanner Marsh & | CD00389-03 Convert Tanner Marsh & Clapboard Hill & Hang Steps_x000D_ CI-YWO Variance - Contractor Invoice | Salvage -M02 3R520167 | CD00387-04 Replace Pad 312 Rt 1 | CD00387-04 Replace Pad 312 Rt 1 Guilford_x000D_ CI-YWO Variance - Contractor Invoice | Salvage -M02 3R520199 | CD00390-02 - System Resiliency - St | CD00390-02 - System Resiliency - Step Down XFMRs - Wildrose & Sam Hill_x000D_ CI-YWO Variance - Contractor Invoice | Salvage -M02 3R620039 | JL 2015 SR highway crossing Locatio | JL 2015 SR highway crossing Location ID 139937542 Pole 946 & 947_x000D_ CL-YWO Variance - Contractor Labor | Salvage -M02 3R620095 | CD00103-13 11M3 seg 13 resiliency p | CD00103-13 11M3 seg 13 resiliency part 1_x000D_ AP2-YWO Total Cost Variance Met - Variance :8.3386 MIN.:-30 MAX.:30 | Salvage -M02 3R620120 | BW 2015 SR Highway Crossing, Locati | BW 2015 SR Highway Crossing, LocationID46668676, Pole 3472 & 3473_x000D_ CI-YWO Variance - Contractor Invoice | Salvage -M02 3R620320 | BC-CD00630-02 SR Hwy Xng Upg;Obj ID | BC-CD00630-02 SR Hwy Xng Upg;Obj ID(135331980&139930744), I-691@Lewis Ave 417412_x000D_ AP2-YWO Total Cost Variance Met - Variance :-4.2222 MIN.:-30 MAX.:30 | Salvage -M02 3R620361 | SR Highway Crossing Upgrades CD0063 | SR Highway Crossing Upgrades CD00631-02 Object ID (46795754) E. River Rd_x000D_ | Salvage -M02 3R620362 | CD00631 SR HIGWY XING UPGRADES OBJE | CD00631 SR HIGWY XING UPGRADES OBJECT ID (46818750) HARTFORD RD_x000D_ | Salvage -M02 3R620616 | RA CD00571-08 Install 3-167KVA S/D | RA CD00571-08 Install 3-167KVA S/D's Sunset Ave Putnam_x000D_ CI-YWO Variance - Contractor Invoice | Salvage -M02 3R620628 | CD00392 - Transfer 35L7-90T from P. | CD00392 - Transfer 35L7-90T from P.7242 to P.6475 - Segment 1_x000D_ AP2-YWO Total Cost Variance Met - Variance :-45.4462 MIN.:-50 MAX.:50 | Salvage -M02 3R620629 | CD00392 - Reconductor 35L7 Boston P | CD00392 - Reconductor 35L7 Boston Post Rd - Segment 2 WR 1 of 2_x000D_ CI-YWO Variance - Contractor Invoice | Salvage -M02
  5. Part 25 of 38

    3R620630 | CD00392 - Reconductor 35L7 Boston P | CD00392 - Reconductor 35L7 Boston Post Rd - Segment 2 WR 2 of 2_x000D_ CI-YWO Variance - Contractor Invoice | Salvage -M02 3R620743 | CD00647-02, 28J1 convert OH, Branfo | CD00647-02, 28J1 convert OH, Branford, 1 of 3_x000D_ CL-YWO Variance - Contractor Labor | Salvage -M02 3R621016 | CD00471-01Elim. 23U Voluntown S/S C | CD00471-01Elim. 23U Voluntown S/S Conversion Work #1_x000D_ AP2-YWO Total Cost Variance Met - Variance :6.287 MIN.:-30 MAX.:30 | Salvage -M02 3R621017 | CD00471-01Elim. 23U Voluntown S/S C | CD00471-01Elim. 23U Voluntown S/S Conversion Work #2_x000D_ AP2-YWO Total Cost Variance Met - Variance :-28.5624 MIN.:-30 MAX.:30 | Salvage -M02 3R621018 | CD00471-01Elim. 23U Voluntown S/S C | CD00471-01Elim. 23U Voluntown S/S Conversion Work #3_x000D_ CI-YWO Variance - Contractor Invoice | Salvage -M02 3R621019 | CD00471-01Elim. 23U Voluntown S/S C | CD00471-01Elim. 23U Voluntown S/S Conversion Work #4_x000D_ AP2-YWO Total Cost Variance Met - Variance :-32.8857 MIN.:-40 MAX.:40 | Salvage -M02 3R621020 | CD00471-01Elim. 23U Voluntown S/S C | CD00471-01Elim. 23U Voluntown S/S Conversion Work #5_x000D_ AP2-YWO Total Cost Variance Met - Variance :-18.003 MIN.:-20 MAX.:20 | Salvage -M02 3R621025 | CD00471-01 Elim. 23U Voluntown S/S | CD00471-01 Elim. 23U Voluntown S/S - Convert Machine Shop w/XFbank_x000D_ AP3-YWO Resource Variance Met- Labor 4 <= 32 OR 300 <= 30 And Contractor $351.6 <= 2000 | Salvage -M02 3R621026 | CD00471-01 Recond. & Convert Gate S | CD00471-01 Recond. & Convert Gate St - Place 1Ph. on Phase B_x000D_ AP2-YWO Total Cost Variance Met - Variance :-26.0201 MIN.:-30 MAX.:30 | Salvage -M02 3R621028 | CD00471-01 Elim. 23U Voluntown S/S | CD00471-01 Elim. 23U Voluntown S/S Convert School & Housing Authority Phase A_x000D_ AP2-YWO Total Cost Variance Met - Variance :-25.243 MIN.:-30 MAX.:30 | Salvage -M02 3R621031 | CD00471-02 Conversion Work Install | CD00471-02 Conversion Work Install Step Down XF Rte.165 - Place on Phase C_x000D_ AP2-YWO Total Cost Variance Met - Variance :-28.6336 MIN.:-40 MAX.:40 | Salvage -M02 3R621032 | CD00471-03 Conversion Work Rte.49 S | CD00471-03 Conversion Work Rte.49 South_x000D_ AP2-YWO Total Cost Variance Met - Variance :-25.124 MIN.:-30 MAX.:30 | Salvage -M02 3R621034 | CD00471-04 Conversion Work Install | CD00471-04 Conversion Work Install Step Down XF Rte.49 North_x000D_ AP2-YWO Total Cost Variance Met - Variance :32.2343 MIN.:-40 MAX.:40 | Salvage -M02 3R621035 | CD00471-04 Conversion Work Install | CD00471-04 Conversion Work Install Open Point P#41 Rte.49 North_x000D_ AP1-YWO Total Cost Less Than 7K | Salvage -M02 3R621036 | CD00471-04 Conversion Work Install | CD00471-04 Conversion Work Install Step Down XF Rte.49 North_x000D_ AP2-YWO Total Cost Variance Met - Variance :2.0975 MIN.:-40 MAX.:40 | Salvage -M02 3R621037 | CD00471-05 Conversion Work Install | CD00471-05 Conversion Work Install Step Down XF Shetucket Tpke P#449_x000D_ AP2-YWO Total Cost Variance Met - Variance :-30.923 MIN.:-40 MAX.:40 | Salvage -M02 3R621038 | CD00471-05 Conversion Work Install | CD00471-05 Conversion Work Install Open Point Btwn. Stepdowns P#2046_x000D_ AP2-YWO Total Cost Variance Met - Variance :-30.5759 MIN.:-50 MAX.:50 | Salvage -M02 3R621047 | CD00471-09 Conversion Work Forge Hi | CD00471-09 Conversion Work Forge Hill Rd Job 2_x000D_ AP2-YWO Total Cost Variance Met - Variance :-4.4317 MIN.:-20 MAX.:20 | Salvage -M02 3R621049 | CD00471-09 Conversion Work Inst.Ste | CD00471-09 Conversion Work Inst.Step Down XF's No.Shore & Wylie School Job 4_x000D_ AP2-YWO Total Cost Variance Met - Variance :-12.178 MIN.:-30 MAX.:30 | Salvage -M02 3R621050 | CD00471-10 Conversion Work Install | CD00471-10 Conversion Work Install Step Down XF Bennett Rd_x000D_ AP2-YWO Total Cost Variance Met - Variance :-26.4673 MIN.:-40 MAX.:40 | Salvage -M02
  6. Part 26 of 38

    3R621058 | CD00471-01 Elim. 23U S/S Install 13 | CD00471-01 Elim. 23U S/S Install 13B25-160R P#4 w/pole replacements_x000D_ CL-YWO Variance - Contractor Labor | Salvage -M02 3R720020 | CAL - CD00849-01 - Ckt 21M1 MBI Ini | CAL - CD00849-01 - Ckt 21M1 MBI Initiative Design Work, Westport_x000D_ CL-YWO Variance - Contractor Labor | Salvage -M02 3R720043 | CAL - CD00849-01 - Ckt 21M15 MBI In | CAL - CD00849-01 - Ckt 21M15 MBI Initiative Design Work, Weston_x000D_ AP1-YWO Total Cost Less Than 7K | Salvage -M02 3R720059 | CAL - CD00849-01 - Ckt 23K12 MBI In | CAL - CD00849-01 - Ckt 23K12 MBI Initiative Design Work, Westport_x000D_ AP1-YWO Total Cost Less Than 7K | Salvage -M02 3R720097 | CAL - CD00849-01 - Ckt 28A1 MBI Ini | CAL - CD00849-01 - Ckt 28A1 MBI Initiative Design Work, Norwalk_x000D_ AP1-YWO Total Cost Less Than 7K | Salvage -M02 3R720326 | CD00471-01 Reconfig. Ovhd Lines in | CD00471-01 Reconfig. Ovhd Lines in Front of 23U S/S_x000D_ AP2-YWO Total Cost Variance Met - Variance :-17.2137 MIN.:-40 MAX.:40 | Salvage -M02 3S321466 | CDOT 17-186 - RTE 6 Farmington Road | CDOT 17-186 - RTE 6 Farmington Road Widening - OH 6 of 6 - Scott Swamp Rd_x000D_ JE-YWO Variance Job Type Exclusion | Salvage -M02 3S521081 | DB LOOP URD AT DUNCASTER WOOD, GRAN | DB LOOP URD AT DUNCASTER WOOD, GRANBY_x000D_ JE-YWO Variance Job Type Exclusion | Salvage -M02 3S521505 | 16 BARNARD DR, SIMSBURY / REPLACE O | 16 BARNARD DR, SIMSBURY / REPLACE OH SVC W/ #2 TPX_x000D_ | Salvage -M02 3S620038 | W HTFD, South Main St., Replaced Ne | W HTFD, South Main St., Replaced Network Protector and transformer U-259_x000D_ | Salvage -M02 3S620064 | SIMSBURY 995 HOPMEADOW WESTMINSTER | SIMSBURY 995 HOPMEADOW WESTMINSTER SCHOOL LINE RELO (PHASE 1)_x000D_ AP1-YWO Total Cost Less Than 7K | Salvage -M02 4D321128 | cb//high st @ ridge rd, chester//sh | cb//high st @ ridge rd, chester//shift to ATT pole 749 & 750_x000D_ AP2-YWO Total Cost Variance Met - Variance :28.1567 MIN.:-50 MAX.:150 | Salvage -M02 4D421399 | 9/6,ESO,9A,car vp3036 trouble ticke | 9/6,ESO,9A,car vp3036 trouble ticket & timesheet in documents_x000D_ AP2-YWO Total Cost Variance Met - Variance :39.5828 MIN.:-50 MAX.:50 | Salvage -M02 4D520695 | NS- P 272 Cow Hill Rd, CL- Shift to | NS- P 272 Cow Hill Rd, CL- Shift to Frontier Pole 272_x000D_ | Salvage -M02 4D521360 | Notify 299187 (child 311443), Billa | Notify 299187 (child 311443), Billable, DAS pole 1870, Old Saybrook_x000D_ | Salvage -M02 4D521524 | CDOT 59-161/CD00610, UG civil work | CDOT 59-161/CD00610, UG civil work 35L9/35L7, long hill rd, Guilford, stage1_x000D_ AP2-YWO Total Cost Variance Met - Variance :-35.8544 MIN.:-40 MAX.:40 | Salvage -M02 4D620423 | MV-MADISON CREWS REPLACED REJECT PO | MV-MADISON CREWS REPLACED REJECT POLE 1170_x000D_ AP1-YWO Total Cost Less Than 7K | Salvage -M02 4D620654 | NS- P 692 Cow Hill Rd, KW- Shift to | NS- P 692 Cow Hill Rd, KW- Shift to New Pole, Rmv 600A Disconnects_x000D_ CL-YWO Variance - Contractor Labor | Salvage -M02 4D620709 | CB//GUILFORD, 95 HART RD//RELOCATE | CB//GUILFORD, 95 HART RD//RELOCATE OH SVC_x000D_ | Salvage -M02 4D620878 | ESO - 6/4 Stevenstown Rd. Westbrook | ESO - 6/4 Stevenstown Rd. Westbrook CAR V POLE 651- FOLLOW UP WORK REQUIRED_x000D_ AP2-YWO Total Cost Variance Met - Variance :99.9865 MIN.:-50 MAX.:150 | Salvage -M02 4D621010 | SH-Convo#399782-(MakeReadyREIMB) - | SH-Convo#399782-(MakeReadyREIMB) - VZ Parent Convo#378446_x000D_ AP1-YWO Total Cost Less Than 7K | Salvage -M02 4D621162 | PATROL REPAIRS 30R10 - GUILFORD | PATROL REPAIRS 30R10 - GUILFORD_x000D_ CL-YWO Variance - Contractor Labor | Salvage -M02 4D621215 | (DF) Ple 957 -(R/I) Pole & 1 Ph tpo | (DF) Ple 957 -(R/I) Pole & 1 Ph tpo & 1 Ph tap ESO 9A_x000D_ AP2-YWO Total Cost Variance Met - Variance :94.7836 MIN.:-50 MAX.:150 | Salvage -M02 4D621244 | PATROL REPAIRS, 30R8, MADISON | PATROL REPAIRS, 30R8, MADISON_x000D_ CL-YWO Variance - Contractor Labor | Salvage -M02
  7. Part 27 of 38

    4D621412 | ESO- 9A Pole - P 2473- Hemlock Dr, | ESO- 9A Pole - P 2473- Hemlock Dr, KW- FOLLOW UP WORK- Rplc Pole & Shift_x000D_ AP2-YWO Total Cost Variance Met - Variance :50.483 MIN.:-50 MAX.:150 | Salvage -M02 4D621442 | PATROL REPAIRS, 11J45 - BRANFORD | PATROL REPAIRS, 11J45 - BRANFORD_x000D_ AP2-YWO Total Cost Variance Met - Variance :11.1984 MIN.:-20 MAX.:20 | Salvage -M02 4D621494 | S Main St, Deep River/TL-ESO - 9A - | S Main St, Deep River/TL-ESO - 9A - 10/12 Car vs Pole 337_x000D_ AP1-YWO Total Cost Less Than 7K | Salvage -M02 4D621517 | Bokum Rd, Essex/TL-11/20/16 9A car | Bokum Rd, Essex/TL-11/20/16 9A car vs pole 156 see attached TT_x000D_ AP2-YWO Total Cost Variance Met - Variance :37.7622 MIN.:-50 MAX.:50 | Salvage -M02 4D621682 | Attanwanhood Trl, #1 Old Saybrook/T | Attanwanhood Trl, #1 Old Saybrook/TL--REPL #4 AL SVC W/#2 70'_x000D_ AP1-YWO Total Cost Less Than 7K | Salvage -M02 4D720127 | CB//Guilford, Boston Post Rd @ Notc | CB//Guilford, Boston Post Rd @ Notch Hill Rd//9A follow up,Install lights,ins_x000D_ NL-YWO Variance - NU Construction Labor | Salvage -M02 4D720134 | Hartlands Dr, #35 Old Saybrook/TL-P | Hartlands Dr, #35 Old Saybrook/TL-POLE 496 - NEED NEW 60' SVC TO HOUSE_x000D_ AP1-YWO Total Cost Less Than 7K | Salvage -M02 4D720149 | CB//GUILFORD, MOOSE HILL RD//UPGRAD | CB//GUILFORD, MOOSE HILL RD//UPGRADE FUSES/CUTOUTS TO 140K POLE 2_x000D_ AP1-YWO Total Cost Less Than 7K | Salvage -M02 4D720194 | CB//MADISON, 57 MIDDLE BEACH RD W// | CB//MADISON, 57 MIDDLE BEACH RD W//NEW SVC, SHIFT POLE/WORKS W TEMP RMVL_x000D_ AP1-YWO Total Cost Less Than 7K | Salvage -M02 4D720220 | CB//MADISON, 75 NEW RD//SVC UPGRADE | CB//MADISON, 75 NEW RD//SVC UPGRADE 200A/RPL SVC W #2TPX IF ITS #4TPX_x000D_ AP1-YWO Total Cost Less Than 7K | Salvage -M02 4D720245 | Stanford Hill Rd, #32 Essex/TL-REPL | Stanford Hill Rd, #32 Essex/TL-REPL EX OH SVC FROM P#432 ***BACKYARD FEED***_x000D_ | Salvage -M02 4D720251 | CB//MADISON, HULL RD//RELOCATE SECO | CB//MADISON, HULL RD//RELOCATE SECONDARY,XF (EXISTING CROSS FUSE)_x000D_ AP1-YWO Total Cost Less Than 7K | Salvage -M02 4D720272 | RSO 2/22 -- WESTBROOK, 798 HORSE HI | RSO 2/22 -- WESTBROOK, 798 HORSE HILL RD- POLE # 2211 - NEEDS 60' OF #2 SERVICE_x000D_ AP1-YWO Total Cost Less Than 7K | Salvage -M02 4D720286 | 48 LINDEN AVE (IN OWENEGO BEACH CLU | 48 LINDEN AVE (IN OWENEGO BEACH CLUB) P37670 RPL SVC //PRE CHECK OVER ROOF_x000D_ AP1-YWO Total Cost Less Than 7K | Salvage -M02 4D720484 | NS- 1 Sag Ter, WB- Ins 4/0 AL from | NS- 1 Sag Ter, WB- Ins 4/0 AL from New HH 831A, Rmv Oh Svc- P 831_x000D_ AP1-YWO Total Cost Less Than 7K | Salvage -M02 4D720605 | TS 7 FERRY LA 40778 EC RMV OH SVC I | TS 7 FERRY LA 40778 EC RMV OH SVC INSTALL OH/DB SVC NOT SURE IF APPOINT REQUIRED_x000D_ AP1-YWO Total Cost Less Than 7K | Salvage -M02 4D720858 | RSO GUILFORD, Cornwall Ln -Need to | RSO GUILFORD, Cornwall Ln -Need to Replace 153' #2 OH Service @ P8792_x000D_ AP1-YWO Total Cost Less Than 7K | Salvage -M02 4D720970 | (DF) Ple 1229 - (R/I) CV svc & cond | (DF) Ple 1229 - (R/I) CV svc & conduit - EMROD DB DESG (ARDB)_x000D_ AP2-YWO Total Cost Variance Met - Variance :-44.9095 MIN.:-50 MAX.:50 | Salvage -M02 4D721115 | (DF) Midspn Ples 1533-3826- Make OH | (DF) Midspn Ples 1533-3826- Make OH svc Connec - 100A upgd- Residential Overhead_x000D_ AP1-YWO Total Cost Less Than 7K | Salvage -M02 4D721118 | NS- 25 Aspen Dr, Mad- FOLLOW UP WOR | NS- 25 Aspen Dr, Mad- FOLLOW UP WORK- RPLC BROKEN DB STREETLIGHT_x000D_ AP1-YWO Total Cost Less Than 7K | Salvage -M02 4D721175 | RSO 7/23 - MADISON, 393 COPSE RD- P | RSO 7/23 - MADISON, 393 COPSE RD- POLE # 847-_x000D_ AP1-YWO Total Cost Less Than 7K | Salvage -M02 4D721191 | Boston Post Rd, Old Saybrook/TL-7/2 | Boston Post Rd, Old Saybrook/TL-7/25-P#1712,P#1714,P#2949,P#2949-1/2. Buchetto_x000D_ CL-YWO Variance - Contractor Labor | Salvage -M02
  8. Part 28 of 38

    4D721230 | cb//branford, farm river rd//rpl li | cb//branford, farm river rd//rpl light head p 38780R w full cutoff, shield_x000D_ AP1-YWO Total Cost Less Than 7K | Salvage -M02 4D721307 | cb//branford, 15 pawson rd//oh svc | cb//branford, 15 pawson rd//oh svc upgrade_x000D_ AP1-YWO Total Cost Less Than 7K | Salvage -M02 4D721781 | PT-2017 Double Poles-Pole# 4149-Old | PT-2017 Double Poles-Pole# 4149-Old Quarry Rd, Guilford CT-Conv# 362600_x000D_ AP1-YWO Total Cost Less Than 7K | Salvage -M02 4D721830 | COMP 12/30 CCC-Municipal Light Faul | COMP 12/30 CCC-Municipal Light Fault Locate and Repair@ POLE 93 NO VOLTAGE_x000D_ AP1-YWO Total Cost Less Than 7K | Salvage -M02 4D820623 | Roamtree Dr, Old Saybrook/TL-5/4/18 | Roamtree Dr, Old Saybrook/TL-5/4/18 replace xfmrs, 3 c/o's @ pole2834_x000D_ | Salvage -M02 4E030999 | MV-NEW DG PROJECT CD01409-01 FOR CP | MV-NEW DG PROJECT CD01409-01 FOR CP EAST HAMPTON SOLAR 1 LLC_x000D_ CL-YWO Variance - Contractor Labor | Salvage -M02 4E031581 | CDOT 82-320 Refeed lights at St Joh | CDOT 82-320 Refeed lights at St John's Square_x000D_ JE-YWO Variance Job Type Exclusion | Salvage -M02 4E420727 | car vs pole 1561 6/30/14 | car vs pole 1561 6/30/14_x000D_ AP1-YWO Total Cost Less Than 7K | Salvage -M02 4E420733 | 74 MIDDLE HADDAM RD E HMPTN AT NEW | 74 MIDDLE HADDAM RD E HMPTN AT NEW P-40 INST PRI RISER, PAD XF, SVC_x000D_ AP3-YWO Resource Variance Met- Labor 12 <= 32 OR 29.54 <= 30 And Contractor $1020.59 <= 2000 | Salvage -M02 4E520935 | RA CDOT 163-203 RT 66, Bridge#0049 | RA CDOT 163-203 RT 66, Bridge#00490 over Natchaug River, Windham - stage 1_x000D_ JE-YWO Variance Job Type Exclusion | Salvage -M02 4E520936 | RA CDOT 163-203 RT 66, Bridge#0049 | RA CDOT 163-203 RT 66, Bridge#00490 over Natchaug River, Windham - stage 2_x000D_ JE-YWO Variance Job Type Exclusion | Salvage -M02 4E521680 | TW Verizon antenna billable make re | TW Verizon antenna billable make ready Conv 320155_x000D_ AP1-YWO Total Cost Less Than 7K | Salvage -M02 4E620127 | COLCHESTER AVE E HMPTN 9A AT FRO | COLCHESTER AVE E HMPTN 9A AT FRONTIER POLE 64, REPL XF, SHIFT FACILITIES_x000D_ AP1-YWO Total Cost Less Than 7K | Salvage -M02 4E620254 | JK>POLE 651--REPLACE POLE W/35', AN | JK>POLE 651--REPLACE POLE W/35', ANCHOR, SECONDARY & SERVICE_x000D_ | Salvage -M02 4E620324 | 491 COOK HILL RD LEB REPL 4 POLES, | 491 COOK HILL RD LEB REPL 4 POLES, 3 SPANS OF, INS STUB POLE & ANC, SHIFT FAC's_x000D_ CL-YWO Variance - Contractor Labor | Salvage -M02 4E620345 | Elec Maint Trouble Call - Repairs/O | Elec Maint Trouble Call - Repairs/Obsolescence OH (AROH)_x000D_ | Salvage -M02 4E621047 | (CH) EAST HADDAM_TO WRITE_ESO 7/10 | (CH) EAST HADDAM_TO WRITE_ESO 7/10 Mill rd East Haddam pole 2311_x000D_ AP2-YWO Total Cost Variance Met - Variance :148.1196 MIN.:-50 MAX.:150 | Salvage -M02 4E621233 | JK>PAD 533--EXTEND DB SEC TO (3) NE | JK>PAD 533--EXTEND DB SEC TO (3) NEW HH'S FOR CONDO UNITS_x000D_ NL-YWO Variance - NU Construction Labor | Salvage -M02 4E621328 | BC - CDOT 41-118 - Relocate facilit | BC - CDOT 41-118 - Relocate facilities on RT 66 for bridge replacement STAGE 1_x000D_ JE-YWO Variance Job Type Exclusion | Salvage -M02 4E621348 | (CH) P#3720: WORK COMP'D_ESO 9/3_CA | (CH) P#3720: WORK COMP'D_ESO 9/3_CAR V POLE_SET & SHFT'D NEW_x000D_ AP2-YWO Total Cost Variance Met - Variance :70.5819 MIN.:-50 MAX.:150 | Salvage -M02 4E621449 | (CH) HH#385A: CHG LAWNBOX & TAG_HH# | (CH) HH#385A: CHG LAWNBOX & TAG_HH#385B: CHG POLYCRETE & TAG._x000D_ AP2-YWO Total Cost Variance Met - Variance :-20.3294 MIN.:-50 MAX.:50 | Salvage -M02 4E720228 | (CH) HH#313A: NEED TO CHG COVER_HH# | (CH) HH#313A: NEED TO CHG COVER_HH#311G: COMP'D_FAULT LOCATED/RPR'D/CHG'D_x000D_ AP1-YWO Total Cost Less Than 7K | Salvage -M02 4E720235 | (CH) P#437: WORK COMP'D_RSO/AWC 2/ | (CH) P#437: WORK COMP'D_RSO/AWC 2/21_REPLACED ROTTED POLE & SHFT'D_x000D_ AP1-YWO Total Cost Less Than 7K | Salvage -M02
  9. Part 29 of 38

    4E720266 | (CH) HH#204A: CHG HDP TO POLYCRETE_ | (CH) HH#204A: CHG HDP TO POLYCRETE_DISC/RE-CONN SVC FOR SOCKET CHANGE-OUT._x000D_ AP1-YWO Total Cost Less Than 7K | Salvage -M02 4E720331 | 32 FERNWOOD DR COLCH AT P- 2298 FTR | 32 FERNWOOD DR COLCH AT P- 2298 FTR POLE IS SET, SHIFT FACILITIES. DBL POLES_x000D_ AP1-YWO Total Cost Less Than 7K | Salvage -M02 4E720341 | 3/2 MIDDLETOWN, WESTLAKE RD, YELLOW | 3/2 MIDDLETOWN, WESTLAKE RD, YELLOW TAG Y-18557-2017 ** 17B-2340 ***_x000D_ AP1-YWO Total Cost Less Than 7K | Salvage -M02 4E720362 | (CH) P#5438 - P#5439: SPLICE OUT WH | (CH) P#5438 - P#5439: SPLICE OUT WHAT LOOKS LIKE TREE GROWTH AROUND CONDUCTOR._x000D_ AP1-YWO Total Cost Less Than 7K | Salvage -M02 4E720394 | RSO/AWC 3/15 PORTLAND, HIGH ST POLE | RSO/AWC 3/15 PORTLAND, HIGH ST POLE 1082 SVC REPLACED_x000D_ AP1-YWO Total Cost Less Than 7K | Salvage -M02 4E720401 | MN LAKE DR E HMPTN AT P-244 REPLACE | MN LAKE DR E HMPTN AT P-244 REPLACE POLE, SHIFT FACILITIES. THIS IS A 9A._x000D_ AP2-YWO Total Cost Variance Met - Variance :-10.9133 MIN.:-50 MAX.:50 | Salvage -M02 4E720451 | (CH) P#97: WORK COMP'D_RSO 3/30-3/3 | (CH) P#97: WORK COMP'D_RSO 3/30-3/31_9A_FRNTR SET_WE SHFT'D_x000D_ AP1-YWO Total Cost Less Than 7K | Salvage -M02 4E720454 | (CH) P#207: CHG DROP_MTR DEPT TO CH | (CH) P#207: CHG DROP_MTR DEPT TO CHG MTR #97987663._x000D_ AP1-YWO Total Cost Less Than 7K | Salvage -M02 4E720474 | (CH) P#2427: RPL EXIST'G OH/DB SVC | (CH) P#2427: RPL EXIST'G OH/DB SVC WITH NEW 4/0 OH/DB SVC_85'_x000D_ AP1-YWO Total Cost Less Than 7K | Salvage -M02 4E720481 | (CH) P#474: WRK COMP'D_RSO 4/3_ RPL | (CH) P#474: WRK COMP'D_RSO 4/3_ RPL'D X-ARM__P#5311: NEED TO RPL X-ARM_x000D_ AP1-YWO Total Cost Less Than 7K | Salvage -M02 4E720504 | JV RSO 4/7 WINDHAM, BEACON RD - REP | JV RSO 4/7 WINDHAM, BEACON RD - REPOLACED 200'AL SVC_x000D_ AP1-YWO Total Cost Less Than 7K | Salvage -M02 4E720505 | (CH) P#3444: WRK COMP'D_RSO/AWC/RSO | (CH) P#3444: WRK COMP'D_RSO/AWC/RSO 4/8_9A_x000D_ AP3-YWO Resource Variance Met- Labor 19 <= 32 OR 35.64 <= 30 And Contractor $1435.56 <= 2000 | Salvage -M02 4E720513 | RSO 4/9/17 Jurczyk, Franklin - rep | RSO 4/9/17 Jurczyk, Franklin - replaced arrestors @ 383 & 385, replace OH xfrm_x000D_ AP1-YWO Total Cost Less Than 7K | Salvage -M02 4E720539 | JK>HH6833 (LAWN BOX)--REPLACE 17 X | JK>HH6833 (LAWN BOX)--REPLACE 17 X 30 LAWN BOX_x000D_ AP1-YWO Total Cost Less Than 7K | Salvage -M02 4E720569 | JV 66 Back Rd Windham Ct replace se | JV 66 Back Rd Windham Ct replace secondary pole with svc riser_x000D_ AP1-YWO Total Cost Less Than 7K | Salvage -M02 4E720622 | JV 60 LOVERS LN WINDHAM INST OH XFM | JV 60 LOVERS LN WINDHAM INST OH XFMR RPLC PL TOP SPCR INST OH SVC_x000D_ AP1-YWO Total Cost Less Than 7K | Salvage -M02 4E720707 | JK>POLE 102--REPLACE POLE & SPAN OF | JK>POLE 102--REPLACE POLE & SPAN OF SEC/SVC FOR OH TRESPASS_x000D_ AP1-YWO Total Cost Less Than 7K | Salvage -M02 4E720807 | JV Spring View Windham- between pad | JV Spring View Windham- between pad#92 & #93 requires replmt ** 17B-5319 ***_x000D_ CL-YWO Variance - Contractor Labor | Salvage -M02 4E720811 | RSO/AWC 5/24 COLCHESTER, LEBANON AV | RSO/AWC 5/24 COLCHESTER, LEBANON AVE (RT 16) 9A POLE 3 1/4_x000D_ AP1-YWO Total Cost Less Than 7K | Salvage -M02 4E720849 | RSO/EH - 5/26 MIDDLETOWN, WASHINGTO | RSO/EH - 5/26 MIDDLETOWN, WASHINGTON ST - 9A P3088 STROM / HOAR_x000D_ AP2-YWO Total Cost Variance Met - Variance :80.0182 MIN.:-50 MAX.:150 | Salvage -M02 4E721001 | JK>POLE 867--REPLACE TERMINATOR AT | JK>POLE 867--REPLACE TERMINATOR AT RISER POLE, RESORE POWER TO NORMAL_x000D_ AP1-YWO Total Cost Less Than 7K | Salvage -M02 4E721058 | JK>POLE 242--RMV 3PH PRI RISER, DB | JK>POLE 242--RMV 3PH PRI RISER, DB CABLE, 3PH SVC TO BLDG FOR DEMO (7 MTRS)_x000D_ AP1-YWO Total Cost Less Than 7K | Salvage -M02 4E721241 | (CH) P#4204: CHG OH DROP_#2 TPX_45' | (CH) P#4204: CHG OH DROP_#2 TPX_45'_MTR DEPT TO CHG MTR #98849099._x000D_
  10. Part 30 of 38

    AP1-YWO Total Cost Less Than 7K | Salvage -M02 4E721256 | RSO 8/6 MIDDLETOWN, CRYSTAL LAKE RD | RSO 8/6 MIDDLETOWN, CRYSTAL LAKE RD PASCARELLI_x000D_ AP2-YWO Total Cost Variance Met - Variance :32.0064 MIN.:-50 MAX.:150 | Salvage -M02 4E721257 | (CH) PAD#4263: EXTEND PRIM'Y TO PAD | (CH) PAD#4263: EXTEND PRIM'Y TO PAD#4264_UNITS 5-8, 18-21_PHASE 2_x000D_ AP2-YWO Total Cost Variance Met - Variance :-28.7598 MIN.:-50 MAX.:50 | Salvage -M02 4E721709 | Elec Maint Trouble Call - Repairs/O | Elec Maint Trouble Call - Repairs/Obsolescence OH (AROH)_x000D_ AP2-YWO Total Cost Variance Met - Variance :-1.0265 MIN.:-50 MAX.:50 | Salvage -M02 4E721884 | MN 426 CABIN RD COLCH AT P-2297 RE | MN 426 CABIN RD COLCH AT P-2297 REPLACE OH SVC, MIDSPAN,10 FT OFF OF POLE._x000D_ AP1-YWO Total Cost Less Than 7K | Salvage -M02 4E820604 | RA CDOT 163-203 RT 66 - outage sou | RA CDOT 163-203 RT 66 - outage south side of bridge -_x000D_ JE-YWO Variance Job Type Exclusion | Salvage -M02 4E820807 | (CH) P#1868: CHG OH DROP_DAMANGED D | (CH) P#1868: CHG OH DROP_DAMANGED DURING MARCH STORMS_x000D_ AP1-YWO Total Cost Less Than 7K | Salvage -M02 4E821066 | BC - CDOT 41-118 - Relocate facilit | BC - CDOT 41-118 - Relocate facilities on RT 66 for bridge replacement STAGE 2_x000D_ JE-YWO Variance Job Type Exclusion | Salvage -M02 4E920002 | RA Project CDOT 052-091 RT 207 Fran | RA Project CDOT 052-091 RT 207 Franklin_x000D_ JE-YWO Variance Job Type Exclusion | Salvage -M02 4E921852 | MJG - CD01111-01 - Install TR 22R1- | MJG - CD01111-01 - Install TR 22R1-91T on Pole 550 Founders Road_x000D_ AP2-YWO Total Cost Variance Met - Variance :26.2659 MIN.:-30 MAX.:30 | Salvage -M02 4M221036 | pole 2067 prim de/3ph. riser pole s | pole 2067 prim de/3ph. riser pole splitting. NEED to repl & shift now E. Cook_x000D_ | Salvage -M02 4M320057 | Pole 1253 -40/3 pole has been set, | Pole 1253 -40/3 pole has been set, (R/I) anc- Guy & Pole top, Shift wires &Light_x000D_ AP1-YWO Total Cost Less Than 7K | Salvage -M02 4M910087 | Replace 300A Solids with 600A Disco | Replace 300A Solids with 600A Disconnects_x000D_ | Salvage -M02 4N030544 | PD-14 Boulevard Court N. London/Rep | PD-14 Boulevard Court N. London/Repl OH svc drop wit 65ft #2TPX from P# 6357_x000D_ | Salvage -M02 4N031326 | AWC-MV- I/R 250 MID-SPAN OH SVC | AWC-MV- I/R 250 MID-SPAN OH SVC_x000D_ | Salvage -M02 4N320643 | O Colony Rd,P1840,OL(P4031 Swan Av) | O Colony Rd,P1840,OL(P4031 Swan Av)/Elec Maint T Call - Repairs/Obsol OH (AROH)_x000D_ AP2-YWO Total Cost Variance Met - Variance :11.5968 MIN.:-50 MAX.:50 | Salvage -M02 4N421261 | 07/03/14 Pole 5013 replace mh 100 w | 07/03/14 Pole 5013 replace mh 100 w head ESO_x000D_ AP1-YWO Total Cost Less Than 7K | Salvage -M02 4N520050 | RA Project CDOT 113-107 - relocate | RA Project CDOT 113-107 - relocate facilities for bridge construction Stage 1_x000D_ JE-YWO Variance Job Type Exclusion | Salvage -M02 4N520390 | STONINGTON COTTRELL ST - HPS 150W C | STONINGTON COTTRELL ST - HPS 150W COBRA @ PID 2401_x000D_ AP1-YWO Total Cost Less Than 7K | Salvage -M02 4N521143 | 08/15 ESO LAWRENCE CT PRESTON BROK | 08/15 ESO LAWRENCE CT PRESTON BROKEN POLE 2469_x000D_ AP1-YWO Total Cost Less Than 7K | Salvage -M02 4N521323 | PD-247 Shore Rd/Old Lyme REPLACE PC | PD-247 Shore Rd/Old Lyme REPLACE PCB XFMR P#1911_x000D_ CL-YWO Variance - Contractor Labor | Salvage -M02 4N620016 | PD-849 Pequot Ave NLD/Replace exist | PD-849 Pequot Ave NLD/Replace existing P# 10836/Replace ASAP pole is leaning._x000D_ | Salvage -M02 4N620201 | MM JOSHUATOWN FUSESAVER RECLOSER PO | MM JOSHUATOWN FUSESAVER RECLOSER POLE 481_x000D_ NL-YWO Variance - NU Construction Labor | Salvage -M02 4N620204 | SM-WHITEHALL AVE, STONINGTON - CarV | SM-WHITEHALL AVE, STONINGTON - CarVsP2370- Replaced 45' CLASS 2_x000D_ AP3-YWO Resource Variance Met- Labor 19 <= 32 OR 67.31 <= 30 And Contractor $916.52 <= 2000 | Salvage -M02

Text of RRU-159 Attachment 20.pdf

Extracted from the file · 16 pages · 151,762 characters

Text of RRU-159 Attachment 19.xlsx

Sheet names, column headings and text cells; numbers left out

Text of RRU-159 Attachment 19.pdf

Extracted from the file · 1 page · 5,328 characters

Text of RRU-159 Attachment 18.xlsx

Sheet names, column headings and text cells; numbers left out · first 300,000 characters

Text of RRU-159 Attachment 18.pdf

Extracted from the file · 640 pages · 7,983,236 characters

Text of RRU-159 Attachment 17.xlsx

Sheet names, column headings and text cells; numbers left out · first 300,000 characters

Text of RRU-159 Attachment 17.pdf

Extracted from the file · 855 pages · 14,651,941 characters

Text of RRU-159 Attachment 16.xlsx

Sheet names, column headings and text cells; numbers left out · first 300,000 characters

Text of RRU-159 Attachment 16.pdf

Extracted from the file · 489 pages · 7,076,557 characters

Text of RRU-159 Attachment 15.xlsx

Sheet names, column headings and text cells; numbers left out · first 300,000 characters

Text of RRU-159 Attachment 15.pdf

Extracted from the file · 897 pages · 15,723,777 characters

Text of RRU-159 Attachment 14 .pdf

Extracted from the file · 1 page · 2,589 characters

Text of RRU-159 Attachment 14.xlsx

Sheet names, column headings and text cells; numbers left out

Text of RRU-159 Attachment 13.xlsx

Sheet names, column headings and text cells; numbers left out

Text of RRU-159 Attachment 13.pdf

Extracted from the file · 1 page · 427 characters

Text of RRU-159 Attachment 12.xlsx

Sheet names, column headings and text cells; numbers left out · first 300,000 characters

Text of RRU-159 Attachment 12.pdf

Extracted from the file · 802 pages · 14,341,138 characters

Text of RRU-159 Attachment 11.xlsx

Sheet names, column headings and text cells; numbers left out · first 300,000 characters

Text of RRU-159 Attachment 11.pdf

Extracted from the file · 858 pages · 15,906,152 characters

Text of RRU-159 Attachment 10.xlsx

Sheet names, column headings and text cells; numbers left out

Text of RRU-159 Attachment 10.pdf

Extracted from the file · 1 page · 822 characters

Text of RRU-159 Attachment 09.xlsx

Sheet names, column headings and text cells; numbers left out · first 300,000 characters

Text of RRU-159 Attachment 09.pdf

Extracted from the file · 449 pages · 7,355,312 characters

Text of RRU-159 Attachment 08.xlsx

Sheet names, column headings and text cells; numbers left out · first 300,000 characters

Text of RRU-159 Attachment 08.pdf

Extracted from the file · 867 pages · 13,878,236 characters

Text of RRU-159 Attachment 07.xlsx

Sheet names, column headings and text cells; numbers left out · first 300,000 characters

Text of RRU-159 Attachment 07.pdf

Extracted from the file · 869 pages · 15,728,932 characters

Text of RRU-159 Attachment 06.xlsx

Sheet names, column headings and text cells; numbers left out · first 300,000 characters

Text of RRU-159 Attachment 06.pdf

Extracted from the file · 459 pages · 8,128,897 characters

Text of RRU-159 Attachment 05.xlsx

Sheet names, column headings and text cells; numbers left out · first 300,000 characters

Text of RRU-159 Attachment 05.pdf

Extracted from the file · 879 pages · 16,073,548 characters

Text of RRU-159 Attachment 04.xlsx

Sheet names, column headings and text cells; numbers left out

Text of RRU-159 Attachment 04.pdf

Extracted from the file · 5 pages · 20,994 characters

Text of RRU-159 Attachment 03.xlsx

Sheet names, column headings and text cells; numbers left out · first 300,000 characters

Text of RRU-159 Attachment 03.pdf

Extracted from the file · 840 pages · 14,413,580 characters

Text of RRU-159 Attachment 02.xlsx

Sheet names, column headings and text cells; numbers left out · first 300,000 characters

Text of RRU-159 Attachment 02.pdf

Extracted from the file · 1,137 pages · 16,605,462 characters

Text of RRU-159 Attachment 01.xlsx

Sheet names, column headings and text cells; numbers left out

Text of RRU-159 Attachment 01.pdf

Extracted from the file · 1 page · 1,403 characters

As listed on the current system

Question(s) Answered 159 (Connecticut Light and Power Company dba Eversource Energy) Date Filed: 11/06/2026

This filing on the current system (opens in a new tab)