Skip to main content

A prototype public docket site for the Connecticut Public Utilities Regulatory Authority

Utility Dockets and Filings

Interrogatory responses

Answers to questions 159

ResponseFiled by Connecticut Light and Power Company dba Eversource Energy51 files
Part of docket 26-05-10Open
  • Electric
Application of The Connecticut Light and Power Company d/b/a Eversource Energy to Amend its Rate Schedules

Files51

Search terms highlighted
Eversource rate increase is on 36 pages across 17 files of the text below, highlighted. Go to the first matchClear highlighting
Words on different pages
Words on different pages
Words on different pages

Text of RRU-159 Attachment 23.xlsx

Sheet names, column headings and text cells; numbers left out · first 300,000 characters

Text of RRU-159 Attachment 23.pdf

Extracted from the file · 1,160 pages · 16,330,154 characters

Text of RRU-159 Attachment 22.xlsx

Sheet names, column headings and text cells; numbers left out · first 300,000 characters

Text of RRU-159 Attachment 22.pdf

Extracted from the file · 1,203 pages · 14,349,246 characters

Text of RRU-159 Attachment 21.xlsx

Sheet names, column headings and text cells; numbers left out · first 300,000 characters

Text of RRU-159 Attachment 21.pdf

Extracted from the file · 1,203 pages · 13,880,364 characters

Text of RRU-159 Attachment 20.xlsx

Sheet names, column headings and text cells; numbers left out

Words on different pages
  1. Page 7 of 16

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set PURA-15 Date Issued October 23, 2026 RRU-159 Attachment 20 Page 7 of 16 work_order_number description 2M722436 RSO/AWC 7/10 CHESHIRE, W JOHNSON AV 2M722455 WC 7/11 SOUTHINGTON, MAIN ST - REPL 2M722543 Jpt-RSO- Middle St BRI P6285 - 9a - 2M722553 Greystone Rd,Wtby. Make upgrades on 2M722576 DM RSO 7/19 CREAMERY RD, DURHAM - B 2M722592 AMM 65 BENEDICT ST,WTBY. REPLACED 2M722602 WC-RSO 7/21 SOUTHINGTON, WEST ST - 2M722664 JC/RSO 7/22 NAUGATUCK, NEW HAVEN RD 2M722719 JC/RSO 7/28 MIDDLEBURY, SOUTH ST - 2M722757 RSO NEW BRITAIN, Biruta St - Replac 2M722797 AMM 455 CHASE PKWY,WTBY. PART POWER 2M722833 Jpt-RSO- Park Hill Rd BRI - Rplc'd 2M722839 RSO SOUTHINGTON, Belleview Ave - I 2M722853 AMM 32 DEPOT PL, FARMINGTON. REPLA 2M722861 WC-8/10 SOUTHINGTON, BRISTOL ST - 9 2M722889 DM/RSO 8/13 WOLCOTT, LONG SWAMP RD- 2M722892 CD00927 - CDOT 151-326 - I84 Mix Ma 2M722893 CD00927 - CDOT 151-326 - I84 Mix Ma 2M722903 ESO 9A 6/8 WATERBURY, 593 SYLVAN AV 2M722919 RTM-1821 N Broad St, Mer. 9A Car vs 2M722933 DM/ESO 9A 6/10/17 - CHESHIRE - P#85 2M723013 Jpt-RSO-518 Jerome Ave BRI P2073 - 2M723018 EJC 66 Clifford St, Newington P#602 2M723162 WC-9/3 RSO P#1468 INSTLLD, CO NEED 2M723627 Jpt-Lexington Ave Wtby P62509 - Rpl 2M724513 Jpt-7 Pickett Ln Farm (Frnt)P6024 - 2M820194 AMM 12 GILLETTE WAY FARM. Municipa 2M820195 AMM 12 GILLETTE WAY,FARM. Municipa 2M820295 Jpt-RSO-320 Farmington Ave Plnv P15 2M821305 CDOT 17-186 - RTE 6 Bristol Road Wi 2M821520 AMM 25 HATTERS LN,FARM. REPLACE & 2M923592 RTM-Yale Acres, Meriden. OH/DB Conv 2M923734 RTM-1 Washington Hts, Mer. Existing 2M924043 EJC 62 New Britain Rd, Berlin Repl 2W421201 PHD BM/ Pole 1342 Install 600 Amp s 2W421609 JAM CHANGE OUT SW GEAR AND CABLE FA 2W421636 JD 492601 13F64 RELOCATE OH LINE CD 2W421645 JD 492601 13F64 REMOVE/RELOCATE OH 2W520098 ROTTED FRNTR POLE #8951 INSTALLED R 2W521082 VT/RUN NEW OH SVC - TAKEN OUT BY S 2W521224 ESO 7/12 COOKE ST, WATERBURY - CAR long_description RSO/AWC 7/10 CHESHIRE, W JOHNSON AVE - RECONDUCTERING 250' CONDUIT/CABLE CI-YWO Variance - Contractor Invoice WC 7/11 SOUTHINGTON, MAIN ST - REPLACED 3 PH BANK & 2 CUTOUTS P86145 AP2-YWO Total Cost Variance Met - Variance :20.4912 MIN.:-50 MAX.:50 Jpt-RSO- Middle St BRI P6285 - 9a - Replaced pole Shifted 3PH Tan & 3PH Tap CI-YWO Variance - Contractor Invoice Greystone Rd,Wtby. Make upgrades on 64496,64497,G413&64500 for animal protection AP1-YWO Total Cost Less Than 7K DM RSO 7/19 CREAMERY RD, DURHAM - BROKEN P 1092 AP1-YWO Total Cost Less Than 7K AMM 65 BENEDICT ST,WTBY. REPLACED XFMR BANK. REPLACED 3 CUTOUTS. CL-YWO Variance - Contractor Labor WC-RSO 7/21 SOUTHINGTON, WEST ST - 9A P92660 PICK UP SNAGGED WIRE - REPLD SVC JC/RSO 7/22 NAUGATUCK, NEW HAVEN RD- 9A P3602 - BROKEN POLE AP1-YWO Total Cost Less Than 7K JC/RSO 7/28 MIDDLEBURY, SOUTH ST - TRUCK TOOK DOWN SVC - RAN 130' #2 SVC AP1-YWO Total Cost Less Than 7K RSO NEW BRITAIN, Biruta St - Replace 50' #2 OH Service @ P53400 AP1-YWO Total Cost Less Than 7K AMM 455 CHASE PKWY,WTBY. PART POWER. REPAIRED PRIMARY CABLE NEAR POLE F8074. AP1-YWO Total Cost Less Than 7K Jpt-RSO- Park Hill Rd BRI - Rplc'd 4 (Frnt) Poles & 1 Xfrm AP2-YWO Total Cost Variance Met - Variance :104.2948 MIN.:-50 MAX.:150 RSO SOUTHINGTON, Belleview Ave - Installed 15 KV arrestor at Pad A CI-YWO Variance - Contractor Invoice AMM 32 DEPOT PL, FARMINGTON. REPLACED 3 PH BANK ON POLE 2350 & ADDED 3 CUTOUTS. AP1-YWO Total Cost Less Than 7K WC-8/10 SOUTHINGTON, BRISTOL ST - 9A P 2647 - CAR V POLE & 3 PH BANK XFRMS AP2-YWO Total Cost Variance Met - Variance :-4.2993 MIN.:-50 MAX.:50 DM/RSO 8/13 WOLCOTT, LONG SWAMP RD- 9A P 5000 - LONGO/KENNEY AP1-YWO Total Cost Less Than 7K CD00927 - CDOT 151-326 - I84 Mix Master Rehab - Remove Streetlights &Secondaries JE-YWO Variance Job Type Exclusion CD00927 - CDOT 151-326 - I84 Mix Master Rehab - Extend MH's to New Street Level JE-YWO Variance Job Type Exclusion ESO 9A 6/8 WATERBURY, 593 SYLVAN AVE - 9A P7260 AP1-YWO Total Cost Less Than 7K RTM-1821 N Broad St, Mer. 9A Car vs P#3141. Frontier Replaced. POST CONSTRUCTION AP2-YWO Total Cost Variance Met - Variance :-29.3137 MIN.:-50 MAX.:50 DM/ESO 9A 6/10/17 - CHESHIRE - P#853 RESAG OH SVC 1308 S MERIDEN RD AP1-YWO Total Cost Less Than 7K Jpt-RSO-518 Jerome Ave BRI P2073 - RAN NEW 100' #2 SVS MIDSPANNED AP1-YWO Total Cost Less Than 7K EJC 66 Clifford St, Newington P#6022 Replaced Pole, Xfrmr, Shift Facilities AP2-YWO Total Cost Variance Met - Variance :134.8751 MIN.:-50 MAX.:150 WC-9/3 RSO P#1468 INSTLLD, CO NEED RHANG TPX TO NEW POLE + HANG SRV TO HOUSE AP1-YWO Total Cost Less Than 7K Jpt-Lexington Ave Wtby P62509 - Rplc'd Pole - PER KEN GROHS - XFMR WAS NOT REPL CI-YWO Variance - Contractor Invoice Jpt-7 Pickett Ln Farm (Frnt)P6024 - Existing Residential Overhead - MLC AP1-YWO Total Cost Less Than 7K AMM 12 GILLETTE WAY FARM. Municipal Light Fault Locate and Repair@ POLE 2926. AP1-YWO Total Cost Less Than 7K AMM 12 GILLETTE WAY,FARM. Municipal Light Fault Locate and Repair@ POLE 2927. AP1-YWO Total Cost Less Than 7K Jpt-RSO-320 Farmington Ave Plnv P1515 - REPL 1000 WATT BULB AND EYE AP1-YWO Total Cost Less Than 7K CDOT 17-186 - RTE 6 Bristol Road Widening - Additional Pole Sets to New Depth JE-YWO Variance Job Type Exclusion AMM 25 HATTERS LN,FARM. REPLACE & RELOCATE OH SERVICE TO NEW ATTACHMENT POINT. AP1-YWO Total Cost Less Than 7K RTM-Yale Acres, Meriden. OH/DB Conversion. Phase 1 of 6 (C-01) CD00551-02 AP2-YWO Total Cost Variance Met - Variance :-3.9788 MIN.:-40 MAX.:40 RTM-1 Washington Hts, Mer. Existing Res Upgrade. Replace OH Svc. M/L-C 200A 1PH AP1-YWO Total Cost Less Than 7K EJC 62 New Britain Rd, Berlin Repl 3ph Bank, Inst OH/DB Svc to Pedestal, M/L/C PHD BM/ Pole 1342 Install 600 Amp switches CL-YWO Variance - Contractor Labor JAM CHANGE OUT SW GEAR AND CABLE FAULT JD 492601 13F64 RELOCATE OH LINE CDOT 151-273- SEG 2 JE-YWO Variance Job Type Exclusion JD 492601 13F64 REMOVE/RELOCATE OH LINE-CDOT 151-273 - SEG 2 JE-YWO Variance Job Type Exclusion ROTTED FRNTR POLE #8951 INSTALLED RIDGE PIN NEUTRAL CLAMP & SHIFTED VT/RUN NEW OH SVC - TAKEN OUT BY STORM - NEW MAST INSTALLED AP1-YWO Total Cost Less Than 7K ESO 7/12 COOKE ST, WATERBURY - CAR VS P# 14126 cost_element_group ferc_account percent Salvage -M02 108040 1 Salvage -M02 108040 1 Salvage -M02 108040 1 Salvage -M02 108040 1 Salvage -M02 108040 1 Salvage -M02 108040 1 Salvage -M02 108040 1 Salvage -M02 108040 1 Salvage -M02 108040 1 Salvage -M02 108040 1 Salvage -M02 108040 1 Salvage -M02 108040 1 Salvage -M02 108040 1 Salvage -M02 108040 1 Salvage -M02 108040 1 Salvage -M02 108040 1 Salvage -M02 108040 1 Salvage -M02 108040 1 Salvage -M02 108040 1 Salvage -M02 108040 1 Salvage -M02 108040 1 Salvage -M02 108040 1 Salvage -M02 108040 1 Salvage -M02 108040 1 Salvage -M02 108040 1 Salvage -M02 108040 1 Salvage -M02 108040 1 Salvage -M02 108040 1 Salvage -M02 108040 1 Salvage -M02 108040 1 Salvage -M02 108040 1 Salvage -M02 108040 1 Salvage -M02 108040 1 Salvage -M02 108040 1 Salvage -M02 108040 1 Salvage -M02 108030 1 Salvage -M02 108040 1 Salvage -M02 108040 1 Salvage -M02 108040 1 Salvage -M02 108040 1 Salvage -M02 108040 1 Salvage -M02 108040 1 Salvage -M02 108040 1 Salvage -M02 108040 1 Salvage -M02 108040 1 Salvage -M02 108040 1 Salvage -M02 108040 1 Salvage -M02 108040 1 Salvage -M02 108040 1 Salvage -M02 108040 1 Salvage -M02 108040 1 Salvage -M02 108040 1 Salvage -M02 108040 1 Salvage -M02 108040 1 Salvage -M02 108040 1 Salvage -M02 108040 1 Lantern Park Dr., Naugatuck - Cable Replacement 2W521547 Lantern Park Dr., Naugatuck - Cable 2W522049 PHD Elec Maint Replace/Renewal/Obs 2W522136 PHD VT *REJECT POLES* - SHIFT AF 2W522187 PHD Elec Maint Replace/Renewal/Ob 2W522237 PHD JAM Frontier reject poles nee 2W620005 PHD Elec Maint Replace/Renewal/Ob 2W620038 PHD Elec Maint Replace/Renewal/Obs 2W620080 PHD Elec Maint Replace/Renewal/Ob 2W620099 PHD Elec Maint Replace/Renewal/Obs 2W620198 PHD Elec Maint Replace/Renewal/Ob 2W620247 PHD JC/ POLE 9436 FRONTIER SHIFT 2W620270 PHD JC/ POLE 8971 FRONTIER SHIFT 2W620297 PHD Elec Maint Replace/Renewal/Ob 2W620324 VT/REMOVE EXISTING LIGHT...INSTALL 2W620538 Proj#CD00699-13B33 Relocate for Tra PHD Elec Maint Replace/Renewal/Obsol OH DESG (AROH) AP2-YWO Total Cost Variance Met - Variance :112.0869 MIN.:-50 MAX.:150 PHD VT *REJECT POLES* - SHIFT AFTER FRONTIER SETS POLES AP1-YWO Total Cost Less Than 7K PHD Elec Maint Replace/Renewal/Obsol OH DESG (AROH) AP1-YWO Total Cost Less Than 7K PHD JAM Frontier reject poles need to be changed over AP1-YWO Total Cost Less Than 7K PHD Elec Maint Replace/Renewal/Obsol OH DESG (AROH) AP1-YWO Total Cost Less Than 7K PHD Elec Maint Replace/Renewal/Obsol OH DESG (AROH) CI-YWO Variance - Contractor Invoice PHD Elec Maint Replace/Renewal/Obsol OH DESG (AROH) AP1-YWO Total Cost Less Than 7K PHD Elec Maint Replace/Renewal/Obsol OH DESG (AROH) AP1-YWO Total Cost Less Than 7K PHD Elec Maint Replace/Renewal/Obsol OH DESG (AROH) AP1-YWO Total Cost Less Than 7K PHD JC/ POLE 9436 FRONTIER SHIFT AP1-YWO Total Cost Less Than 7K PHD JC/ POLE 8971 FRONTIER SHIFT AP1-YWO Total Cost Less Than 7K PHD Elec Maint Replace/Renewal/Obsol OH DESG (AROH) P# 6615 AP2-YWO Total Cost Variance Met - Variance :47.7694 MIN.:-50 MAX.:50 VT/REMOVE EXISTING LIGHT...INSTALL 100W LED COBRA HEAD ON 12' BRACKET Proj#CD00699-13B33 Relocate for Trans, Part 3 of 6: Chase Pkwy w/ 556 CL-YWO Variance - Contractor Labor
  2. Page 8 of 16

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set PURA-15 Date Issued October 23, 2026 RRU-159 Attachment 20 Page 8 of 16 work_order_number description 2W620715 CAR VS FRONTIER POLE #35 POLE IS CR 2W620798 DM 5/3 ESO CAR VS POLE WATERBURY RD 2W620826 JDB 54 PORTER HILL RD MIDDLEBURY R 2W620862 VT/WC-27 Williams Dr, Prospect. SHI 2W620982 RL:1255 E Main St Wtby CAR V POLE 2W720002 AMM WAKELEE RD,WTBY. Municipal Lig 3H031783 Rplc. 3 poles to accomodate new tra 3H032920 JTR, Seabury Dr, Bloomfield, Replac 3H422062 Prospect St EH / 10.2.14 / P527 / 9 3H520140 12/16 ESO FOREST ST MANCHESTER CAR 3H521526 RF-758 Rainbow Rd,Windsor,Remove Pr 3H522527 TPA/Rplc P1561 & provide DE guy.Con 3H522597 NJB AWC 12/04 HTFD BUCKINGHAM ST HT long_description CAR VS FRONTIER POLE #35 POLE IS CRACKED & ROTTED SHOULD BE REPLACED AP2-YWO Total Cost Variance Met - Variance :66.1647 MIN.:-50 MAX.:150 DM 5/3 ESO CAR VS POLE WATERBURY RD PRSPCT P#1366 CONV#393701 AP1-YWO Total Cost Less Than 7K JDB 54 PORTER HILL RD MIDDLEBURY REPLACE POLE 61480 & SHIFT CONV#449244 AP1-YWO Total Cost Less Than 7K VT/WC-27 Williams Dr, Prospect. SHIFT TO NEW FRONTIER POLE 1775 AP1-YWO Total Cost Less Than 7K RL:1255 E Main St Wtby CAR V POLE Replaced 8602 45/2 transfer 50kva AMM WAKELEE RD,WTBY. Municipal Light Fault Locate and Repair@ POLE L2A7. AP1-YWO Total Cost Less Than 7K Rplc. 3 poles to accomodate new traffic signals Main, Broad, Maple, Rt 2 JE-YWO Variance Job Type Exclusion JTR, Seabury Dr, Bloomfield, Replace DB Cable (ID: 2218) Prospect St EH / 10.2.14 / P527 / 9A AP2-YWO Total Cost Variance Met - Variance :-28.0599 MIN.:-40 MAX.:40 12/16 ESO FOREST ST MANCHESTER CAR VS POLE #2262 / NOT DONE CI-YWO Variance - Contractor Invoice RF-758 Rainbow Rd,Windsor,Remove Primary SVC and Pad 3215 AP3-YWO Resource Variance Met- Labor 114 <= 32 OR -70.38 <= 30 And Contractor $0 <= 2000 TPA/Rplc P1561 & provide DE guy.Conv#281746 billable 5' for com top mount Ant AP1-YWO Total Cost Less Than 7K NJB AWC 12/04 HTFD BUCKINGHAM ST HTFD. REPLCAE P#2374 35/2 (Stlght UG Feed) cost_element_group ferc_account percent Salvage -M02 108040 1 Salvage -M02 108040 1 Salvage -M02 108040 1 Salvage -M02 108040 1 Salvage -M02 108040 1 Salvage -M02 108040 1 Salvage -M02 108040 1 Salvage -M02 108040 1 Salvage -M02 108040 1 Salvage -M02 108040 1 Salvage -M02 108040 1 Salvage -M02 108040 1 Salvage -M02 108040 1 Salvage -M02 108040 1 Salvage -M02 108040 1 Salvage -M02 108040 1 Salvage -M02 108040 1 Salvage -M02 108040 1 Salvage -M02 108040 1 Salvage -M02 108040 1 Salvage -M02 108040 1 Salvage -M02 108040 1 Salvage -M02 108040 1 Salvage -M02 108040 1 Salvage -M02 108040 1 Salvage -M02 108040 1 Salvage -M02 108040 1 Salvage -M02 108040 1 Salvage -M02 108040 1 Salvage -M02 108040 1 Salvage -M02 108040 1 Salvage -M02 108040 1 Salvage -M02 108040 1 Salvage -M02 108040 1 Salvage -M02 108040 1 Salvage -M02 108040 1 Salvage -M02 108040 1 Salvage -M02 108040 1 Salvage -M02 108040 1 Salvage -M02 108040 1 Salvage -M02 108040 1 Salvage -M02 108040 1 Salvage -M02 108040 1 Salvage -M02 108040 1 Salvage -M02 108040 1 Salvage -M02 108040 1 Salvage -M02 108040 1 Salvage -M02 108040 1 Salvage -M02 108040 1 Salvage -M02 108040 1 Salvage -M02 108040 1 Salvage -M02 108040 1 Salvage -M02 108040 1 Salvage -M02 108040 1 Salvage -M02 108040 1 Salvage -M02 108040 1 WF-41 Zion St-Htfd-@ mh# 4908, rpl ug svc. 3H620015 WF-41 Zion St-Htfd-@ mh# 4908, rpl 3H620101 394 Tolland Tpk.Manch. Disconn.3PH 3H620115 HARTFORD, FRANKLIN AVE @ STANDISH S 3H620395 Hartford, Broad St - car vs pole 5 3H620866 HARTFORD, SCARBOROUGH ST city to re 3H620959 Elliot St Htfd C9103 City Pole 9a 3H621384 HOMESTEAD AVE, HARTFORD Replace CH8 3H621467 MAIN ST, HARTFORD - REPLACE VACUUM 3H621509 Bidwell St, Manchester - Need to re 3H621565 WF-51+53+55- Maple Ave-Windsor-@ po 3H621940 85 WOODLAND- HTFD C6266 Replace 250 3H622038 9/19 - ESO - MANCHESTER, LOVE LN, 9 3H622080 HTFD 3080 MAIN STREET City to repla 3H622085 HTFD, Wyllys St, CH9366 replaced 1 3H622137 99 HENDERSON RD, MANCH - PT Conv# 4 3H622162 HARTFORD, LYME/ BURNHAM STREET 6373 3H622496 WF-40-44 Lawrence St-Htfd-@pole-300 3H622553 12/7 - RSO - HARTFORD, SEQUIN ST - 3H622565 NEW BRITAIN AV, W HTFD - Conv#45560 3H622617 WF-424-426 New Britain Ave-Htfd-@ m 3H622751 WETHERSFIELD, WELLS RD, RPL POLE#1 3H720005 12/31 - HAROH - MANCHESTER, CENTE 3H720215 WEST HARTFORD S MAIN - 9A - EVERSOU 3H720291 HARTFORD, HOMESTEAD AVE C8448 city 3H720325 HARTFORD,ANN ST REPLACE A MAINS BET 3H720396 WF 2/10 - HAROH - BLOOMFIELD, TIMOT 3H720409 Htfd, Gillet St Replace A mains 2 3H720573 RSO 2/27 WINDSOR, HANSOM HILL RD - 3H720590 RSO& AWC, 3/4, HARTFORD, VINE STREE 3H720698 WETHERSFIELD, BERLIN TPKE, 9A REPLA 3H720736 RSO 3/23 -- WEST HARTFORD, 134 OAKW 3H720896 NJB WEST ST R.H. RPL CUTOUT & RISER 3H720933 AWC/RSO, 4/14, MANCHESTER, E MIDDLE 3H720981 WF-1221-1223-Broad St-Htfd-@ sb-336 3H721029 EJL - 270 Wetherell St.Manch.Reloca 3H721131 8/22 - HAROH - WINDSOR POQUONOCK AV 3H721195 BLOOMFIELD BLUE HILLS AVE POLE 18 - 3H721259 Mountain St Htffd POLE 3435 Install 3H721262 HARTFORD, NEW BRITAIN AVE REPLACED 3H721263 HARTFORD, NEW BRITAIN AVE REPLACE 2 3H721333 5/24 RSO WIndsor Ravine Rd P 3195 3H721456 RSO, 6/10, WINDSOR, BROOKVIEW RD, 9 3H721681 South Main St.Manchester Pole 3881 394 Tolland Tpk.Manch. Disconn.3PH service from P-3954 AP1-YWO Total Cost Less Than 7K HARTFORD, FRANKLIN AVE @ STANDISH ST REBUILD HEX VLT 606 AP3-YWO Resource Variance Met- Labor 62 <= 32 OR -95.41 <= 30 And Contractor $0 <= 2000 Hartford, Broad St - car vs pole 5138- need to replace 150 cobra head AP1-YWO Total Cost Less Than 7K HARTFORD, SCARBOROUGH ST city to replace pole C9051 AP1-YWO Total Cost Less Than 7K Elliot St Htfd C9103 City Pole 9a Replace 250W head AP1-YWO Total Cost Less Than 7K HOMESTEAD AVE, HARTFORD Replace CH8470 and 250w head AP1-YWO Total Cost Less Than 7K MAIN ST, HARTFORD - REPLACE VACUUM SWITCH MH 731 AP3-YWO Resource Variance Met- Labor 126 <= 32 OR -72.58 <= 30 And Contractor $1577.83 <= 2000 Bidwell St, Manchester - Need to replace bad arrester 02 - P-9099 8/11 - HAROH AP1-YWO Total Cost Less Than 7K WF-51+53+55- Maple Ave-Windsor-@ pole-864, rpl oh svc to building. 85 WOODLAND- HTFD C6266 Replace 250w head AP1-YWO Total Cost Less Than 7K 9/19 - ESO - MANCHESTER, LOVE LN, 9A CAR V POLE 2828 - Replace with 40/2 AP1-YWO Total Cost Less Than 7K HTFD 3080 MAIN STREET City to replace pole CH8668 AP1-YWO Total Cost Less Than 7K HTFD, Wyllys St, CH9366 replaced 143w led head AP1-YWO Total Cost Less Than 7K 99 HENDERSON RD, MANCH - PT Conv# 448570-TPA-Fibertech-ParentConv# 447025 HARTFORD, LYME/ BURNHAM STREET 6373 AP1-YWO Total Cost Less Than 7K WF-40-44 Lawrence St-Htfd-@pole-3002, rpl oh svc to building. 12/7 - RSO - HARTFORD, SEQUIN ST - 18' DB POLE 10816 BROKEN, MADE SAFE AP1-YWO Total Cost Less Than 7K NEW BRITAIN AV, W HTFD - Conv#455605 - TPA DUE BY 3/19 AP2-YWO Total Cost Variance Met - Variance :17.9129 MIN.:-50 MAX.:50 WF-424-426 New Britain Ave-Htfd-@ mh-2828, rpl ug svc to building. AP2-YWO Total Cost Variance Met - Variance :36.9082 MIN.:-50 MAX.:150 WETHERSFIELD, WELLS RD, RPL POLE#1496 40/2 AP1-YWO Total Cost Less Than 7K 12/31 - HAROH - MANCHESTER, CENTER ST, EVERSOURCE P-1500 set 35/2 AP1-YWO Total Cost Less Than 7K WEST HARTFORD S MAIN - 9A - EVERSOURCE P-3059 AP1-YWO Total Cost Less Than 7K HARTFORD, HOMESTEAD AVE C8448 city pole replace 250w head AP1-YWO Total Cost Less Than 7K HARTFORD,ANN ST REPLACE A MAINS BETWEEN SB1607 & SB1831 AP2-YWO Total Cost Variance Met - Variance :-27.189 MIN.:-30 MAX.:30 WF 2/10 - HAROH - BLOOMFIELD, TIMOTHY LANE ST LT POLE 6049 - COMP 2/21/17 CCC AP1-YWO Total Cost Less Than 7K Htfd, Gillet St Replace A mains 2 sections AP2-YWO Total Cost Variance Met - Variance :-33.7248 MIN.:-50 MAX.:50 RSO 2/27 WINDSOR, HANSOM HILL RD - DB FAULT REPLACED HANDHOLE 1232C AP1-YWO Total Cost Less Than 7K RSO& AWC, 3/4, HARTFORD, VINE STREET, 9A REPLACED 4/0 TPX 3743 TO 3742 AP1-YWO Total Cost Less Than 7K WETHERSFIELD, BERLIN TPKE, 9A REPLACE P1738 45/2 AP2-YWO Total Cost Variance Met - Variance :-47.6215 MIN.:-50 MAX.:50 RSO 3/23 -- WEST HARTFORD, 134 OAKWOOD AVE- POLE # 1082 - 9A AP2-YWO Total Cost Variance Met - Variance :-11.2451 MIN.:-50 MAX.:50 NJB WEST ST R.H. RPL CUTOUT & RISER ON P#1481 CUST OUTAGE ON 6/2/17? @ 5PM AP2-YWO Total Cost Variance Met - Variance :4.7256 MIN.:-50 MAX.:50 AWC/RSO, 4/14, MANCHESTER, E MIDDLE TPKE No double pole AP1-YWO Total Cost Less Than 7K WF-1221-1223-Broad St-Htfd-@ sb-3368, rpl ug svc. AP2-YWO Total Cost Variance Met - Variance :33.2649 MIN.:-50 MAX.:50 EJL - 270 Wetherell St.Manch.Relocate 25KVA/Pri./Remove tree guy/P-5188 AP2-YWO Total Cost Variance Met - Variance :113.508 MIN.:-50 MAX.:150 8/22 - HAROH - WINDSOR POQUONOCK AVE - REPLACED 2 OH/DB SERVICES P-5248 AP2-YWO Total Cost Variance Met - Variance :3.3243 MIN.:-50 MAX.:50 BLOOMFIELD BLUE HILLS AVE POLE 18 - 9A AP2-YWO Total Cost Variance Met - Variance :139.4207 MIN.:-50 MAX.:150 Mountain St Htffd POLE 3435 Installed 90' duplex AP1-YWO Total Cost Less Than 7K HARTFORD, NEW BRITAIN AVE REPLACED 250W HPS P-5038 - COMP 6/8/17 CCC AP1-YWO Total Cost Less Than 7K HARTFORD, NEW BRITAIN AVE REPLACE 250W HPS P-4962 - COMP 6-8-17 CCC AP1-YWO Total Cost Less Than 7K 5/24 RSO WIndsor Ravine Rd P 3195 Replace pole/crossarm AP2-YWO Total Cost Variance Met - Variance :22.2081 MIN.:-50 MAX.:50 RSO, 6/10, WINDSOR, BROOKVIEW RD, 9A, POLE 4230 REPLACE LED LIGHT AP1-YWO Total Cost Less Than 7K South Main St.Manchester Pole 3881 hit/ Replace with 40/2 AP1-YWO Total Cost Less Than 7K
  3. Page 9 of 16

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set PURA-15 Date Issued October 23, 2026 RRU-159 Attachment 20 Page 9 of 16 work_order_number description 3H721721 Htfd TRINITY ST - C6843 replace 250 3H721728 RSO/AWC, 7/3, WEST HARTFORD, CONCOR 3H721751 7/5 - AWC - WETHERSFIELD, OLD PEPPE 3H721767 7/8 RSO, WINDSOR COLONIAL DR - 9A T 3H721776 7/9 - HARAWC - WINDSOR, PARK RD - E 3H721840 RSO, 7/13, E HARTFORD, ROBERTS ST, 3H721865 RSO,7/16, WEST HARTFORD, KANE STREE 3H721933 Replace OH svc / new attachment poi 3H721937 AWC 7/24 MANCHESTER HARTFORD RD 9A 3H721946 JWL... 119-121 BLUE HILLS AVE. run 3H721986 HARTFORD, ANN ST-C6661 - INSTALL 25 3H721987 HARTFORD, WALNUT ST - P-CH9493 - IN 3H721993 7/26 - BLOOMFIELD, CHATEAU MARGAUX 3H722032 8/4 - RSO - ROCKY HILL, WEST ST - R 3H722035 RSO, 8/5, WINDSOR, KENDRICK LANE - 3H722049 DKH - Kennedy Rd, Wsr - Replace rec 3H722079 RSO/AWC, 8/9, AVON, LOVELY STREET, 3H722149 453 Wash St Htfd replace 250w Head 3H722155 JWL @ 877-879 CAPITOL AVE replace 3H722156 8/18 - RSO/HAROH - EAST HARTFORD, 3H722164 8/17 RSO-AWC, WHARTFORD, SEQUIN RD 3H722171 XL-CDOT 63-633, electrical work to 3H722173 XL-CDOT 63-633, electrical work to 3H722174 8/19 RSO HARTFORD, SWHITNEY ST P#68 3H722415 175 N. Main St., W. Htfd - REPL OH 3H722493 COMP 1/27/18 CCC - WETHERSFIELD, RE 3H722608 13 Pinecrest Dr.E.Hartf. Replace op 3H723020 4-118 - Relocate facilities for int 3H723179 12/2 - RSO - HARTFORD, ELLIOT ST - 3H723287 HARTFORD, MAIN ST CH7097 replace 25 3H820160 WINDSOR RAINBOW RD P#256 FUSE BLEW 3H820327 AWC UG 2/9 HARTFORD, PARK ST SB 938 3H820563 3150 Main St Htfd C8671 Replace 250 3H820695 4-118 - Relocate facilities to the 3H822312 RF-3 N Fairfield St,Manchester,Relo 3H920073 HARTFORD, 877 TOWER AVE @ P5382 ru 3H922469 RF-597 Burnside Ave, East Hartford, 3H923040 RF-21 Bancroft Rd,East Hartford,Rep 3H923346 10/25---HTFD-34 Shultas Pl-----new 3H923407 10/25---BLOOM-11 Mayfair Ct----LINE 3H923415 CR- 60-62 ENFIELD ST HARTFORD, REPL 3H923418 11/5---W HTFD-94 Flagg Rd-----OH 20 3H923519 CR-5 BUCKBOARD LN AVON, REPLACE OH 3H923696 RF-185 Main St,Manchester,Pole#5223 3L520898 HPS 100W PTT @ PID 79 - COMPLETED 1 3L620438 WESTPORT POLE 29551 100 MH PDL - CO long_description Htfd TRINITY ST - C6843 replace 250w head to new pole AP1-YWO Total Cost Less Than 7K RSO/AWC, 7/3, WEST HARTFORD, CONCORD STREET REPLACED 150' SEC WITH 4/0 AP1-YWO Total Cost Less Than 7K 7/5 - AWC - WETHERSFIELD, OLD PEPPERIDGE LA - REPLACED CUTOUT/TERM/RISER AP1-YWO Total Cost Less Than 7K 7/8 RSO, WINDSOR COLONIAL DR - 9A TRUCK TOOK DOWN WIRES - RAN 125' SERVICE AP1-YWO Total Cost Less Than 7K 7/9 - HARAWC - WINDSOR, PARK RD - EVERSOURCE POLE 156 AP2-YWO Total Cost Variance Met - Variance :69.5323 MIN.:-50 MAX.:150 RSO, 7/13, E HARTFORD, ROBERTS ST, RPLC 8' ARM pole 4138/shift 1/0 ACSR AP1-YWO Total Cost Less Than 7K RSO,7/16, WEST HARTFORD, KANE STREET - INS 3 ELBOW ARR P-3173/REBUILT RISER AP2-YWO Total Cost Variance Met - Variance :-6.6382 MIN.:-50 MAX.:50 Replace OH svc / new attachment point AP1-YWO Total Cost Less Than 7K AWC 7/24 MANCHESTER HARTFORD RD 9A - REPLACED QUAD SERVICE FROM P-4700 AP1-YWO Total Cost Less Than 7K JWL... 119-121 BLUE HILLS AVE. run new svc from P5709 AP1-YWO Total Cost Less Than 7K HARTFORD, ANN ST-C6661 - INSTALL 250W HPS AND RECONNECT UG FEED AP1-YWO Total Cost Less Than 7K HARTFORD, WALNUT ST - P-CH9493 - INSTALL 250W HPS COBRA AND RECONNECT UG FEED AP1-YWO Total Cost Less Than 7K 7/26 - BLOOMFIELD, CHATEAU MARGAUX - REPLACED PAD 1719 AP2-YWO Total Cost Variance Met - Variance :51.2571 MIN.:-50 MAX.:150 8/4 - RSO - ROCKY HILL, WEST ST - RPL 3-50KVA 120/208 BANK POLE 1406 AP2-YWO Total Cost Variance Met - Variance :-42.569 MIN.:-50 MAX.:50 RSO, 8/5, WINDSOR, KENDRICK LANE - REPLACED HH 1596B AP1-YWO Total Cost Less Than 7K DKH - Kennedy Rd, Wsr - Replace recloser upper unit P2982. AP2-YWO Total Cost Variance Met - Variance :.4686 MIN.:-40 MAX.:40 RSO/AWC, 8/9, AVON, LOVELY STREET, P421 9A AP2-YWO Total Cost Variance Met - Variance :-4.5576 MIN.:-50 MAX.:50 453 Wash St Htfd replace 250w Head CH8192 AP1-YWO Total Cost Less Than 7K JWL @ 877-879 CAPITOL AVE replace svc from sb3177. AP1-YWO Total Cost Less Than 7K 8/18 - RSO/HAROH - EAST HARTFORD, SEDGEWICK RD, P2646, 9A AP2-YWO Total Cost Variance Met - Variance :73.2456 MIN.:-50 MAX.:150 8/17 RSO-AWC, WHARTFORD, SEQUIN RD 9A - REPLACED POLE AP1-YWO Total Cost Less Than 7K XL-CDOT 63-633, electrical work to relocate service along Woodland St, Hartford JE-YWO Variance Job Type Exclusion XL-CDOT 63-633, electrical work to relocate service along Kent St, Hartford JE-YWO Variance Job Type Exclusion 8/19 RSO HARTFORD, SWHITNEY ST P#6850 REPLACED 90' SVC WIRE AP1-YWO Total Cost Less Than 7K 175 N. Main St., W. Htfd - REPL OH svc / New attachment point-WORK BY HTFD OH AP1-YWO Total Cost Less Than 7K COMP 1/27/18 CCC - WETHERSFIELD, REPLACE ST LT POLE 3230 18' BROWN 70W PTT AP1-YWO Total Cost Less Than 7K 13 Pinecrest Dr.E.Hartf. Replace open wire service P- 3341 AP1-YWO Total Cost Less Than 7K 4-118 - Relocate facilities for intersection relocation RT 10 - 50% Re-Im JE-YWO Variance Job Type Exclusion 12/2 - RSO - HARTFORD, ELLIOT ST - NEED TO REPLACE 150W C9116 AP1-YWO Total Cost Less Than 7K HARTFORD, MAIN ST CH7097 replace 250 w head when pole is replaced AP1-YWO Total Cost Less Than 7K WINDSOR RAINBOW RD P#256 FUSE BLEW ON RISER POLE# 256 AP3-YWO Resource Variance Met- Labor 3 <= 32 OR -3.18 <= 30 And Contractor $1551.87 <= 2000 AWC UG 2/9 HARTFORD, PARK ST SB 938 BURNING SEC INST NE 4/0 3PHSE SRV TO 701 NL-YWO Variance - NU Construction Labor 3150 Main St Htfd C8671 Replace 250w head to new city pole AP1-YWO Total Cost Less Than 7K 4-118 - Relocate facilities to the NEW Town Farms Rd 50% Re-Im JE-YWO Variance Job Type Exclusion RF-3 N Fairfield St,Manchester,Relocate OH SVC HARTFORD, 877 TOWER AVE @ P5382 run new 90ft OH svc, CHANGE METER AP1-YWO Total Cost Less Than 7K RF-597 Burnside Ave, East Hartford, Replace SVC with #2 TPX AP1-YWO Total Cost Less Than 7K RF-21 Bancroft Rd,East Hartford,Replace Damaged OH SVC AP1-YWO Total Cost Less Than 7K 10/25---HTFD-34 Shultas Pl-----new OH 200A service AP1-YWO Total Cost Less Than 7K 10/25---BLOOM-11 Mayfair Ct----LINEWORK REQUIRE TRIPLEX NEEDS TO BE CHANGE AP1-YWO Total Cost Less Than 7K CR- 60-62 ENFIELD ST HARTFORD, REPLACE OH SVC OFF POLE 4956 AP1-YWO Total Cost Less Than 7K 11/5---W HTFD-94 Flagg Rd-----OH 200A service upgrade-power off at pole AP1-YWO Total Cost Less Than 7K CR-5 BUCKBOARD LN AVON, REPLACE OH SVC OFF POLE 3518 AP1-YWO Total Cost Less Than 7K RF-185 Main St,Manchester,Pole#5223, Replace SVC AP1-YWO Total Cost Less Than 7K HPS 100W PTT @ PID 79 - COMPLETED 11/6/15 HARES1 AP1-YWO Total Cost Less Than 7K WESTPORT POLE 29551 100 MH PDL - COMPLETED 3/18/16 NTW cost_element_group ferc_account percent Salvage -M02 108040 1 Salvage -M02 108040 1 Salvage -M02 108040 1 Salvage -M02 108040 1 Salvage -M02 108040 1 Salvage -M02 108040 1 Salvage -M02 108040 1 Salvage -M02 108040 1 Salvage -M02 108040 1 Salvage -M02 108040 1 Salvage -M02 108040 1 Salvage -M02 108040 1 Salvage -M02 108040 1 Salvage -M02 108040 1 Salvage -M02 108040 1 Salvage -M02 108040 1 Salvage -M02 108040 1 Salvage -M02 108040 1 Salvage -M02 108040 1 Salvage -M02 108040 1 Salvage -M02 108040 1 Salvage -M02 108040 1 Salvage -M02 108040 1 Salvage -M02 108040 1 Salvage -M02 108040 1 Salvage -M02 108040 1 Salvage -M02 108040 1 Salvage -M02 108040 1 Salvage -M02 108040 1 Salvage -M02 108040 1 Salvage -M02 108040 1 Salvage -M02 108040 1 Salvage -M02 108040 1 Salvage -M02 108040 1 Salvage -M02 108040 1 Salvage -M02 108040 1 Salvage -M02 108040 1 Salvage -M02 108040 1 Salvage -M02 108040 1 Salvage -M02 108040 1 Salvage -M02 108040 1 Salvage -M02 108040 1 Salvage -M02 108040 1 Salvage -M02 108040 1 Salvage -M02 108040 1 Salvage -M02 108040 1 Salvage -M02 108040 1 Salvage -M02 108040 1 Salvage -M02 108040 1 Salvage -M02 108040 1 Salvage -M02 108040 1 Salvage -M02 108040 1 Salvage -M02 108040 1 Salvage -M02 108040 1 Salvage -M02 108040 1 Salvage -M02 108040 1 SOUTH WINDSOR POLE 2977 400 HPS COBRA - COMPLETED 3/18/16 TOL 3L620719 SOUTH WINDSOR POLE 2977 400 HPS COB PROSPECT POLE 1597 70 HPS COBRA (SEMI TO FULL) - COMPLETED 3/18/16 WTB 3L620841 PROSPECT POLE 1597 70 HPS COBRA (SE BETHEL POLE 29 70 HPS COBRA - COMPLETED 3/9/16 NTW 3L620897 BETHEL POLE 29 70 HPS COBRA - COMPL 3L620934 WATERBURY POLE G7635 400 HPS FLOOD 3L620966 STAMFORD POLE 17 70 HPS PTT - COMP WATERBURY POLE G7635 400 HPS FLOOD - COMPLETED 3/11/16 WTB AP1-YWO Total Cost Less Than 7K STAMFORD POLE 17 70 HPS PTT - COMPLETED 3/18/16 NTW WINDSOR POLE 2987 70 HPS COBRA - COMPLETED 3/18/16 TOL 3L620985 WINDSOR POLE 2987 70 HPS COBRA - CO BEACON FALLS POLE 22721 250 HPS COBRA - COMPLETED 3/18/16 WTB 3L620990 BEACON FALLS POLE 22721 250 HPS COB WATERBURY POLE 63621 400 HPS COBRA - COMPLETED 3/18/16 WTB 3L620993 WATERBURY POLE 63621 400 HPS COBRA WATERTOWN POLE 6112 70 HPS COBRA - COMPLETED 3/18/16 WTB 3L620994 WATERTOWN POLE 6112 70 HPS COBRA WINDSOR POLE 2652 70 HPS COBRA - COMPLETED 3/18/16 TOL 3L620995 WINDSOR POLE 2652 70 HPS COBRA - CO
  4. Page 10 of 16

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set PURA-15 Date Issued October 23, 2026 RRU-159 Attachment 20 Page 10 of 16 work_order_number 3L620996 description long_description MANCHESTER POLE 7984 250 HPS COBRA - COMPLETED 3/18/16 TOL MANCHESTER POLE 7984 250 HPS COBRA cost_element_group ferc_account percent Salvage -M02 108040 1 Salvage -M02 108040 1 Salvage -M02 108040 1 Salvage -M02 108040 1 Salvage -M02 108040 1 Salvage -M02 108040 1 Salvage -M02 108040 1 Salvage -M02 108040 1 Salvage -M02 108040 1 Salvage -M02 108040 1 Salvage -M02 108040 1 Salvage -M02 108040 1 Salvage -M02 108040 1 Salvage -M02 108040 1 Salvage -M02 108040 1 Salvage -M02 108040 1 Salvage -M02 108040 1 Salvage -M02 108040 1 Salvage -M02 108040 1 Salvage -M02 108040 1 Salvage -M02 108040 1 Salvage -M02 108040 1 Salvage -M02 108040 1 Salvage -M02 108040 1 Salvage -M02 108040 1 Salvage -M02 108040 1 Salvage -M02 108040 1 Salvage -M02 108040 1 Salvage -M02 108040 1 Salvage -M02 108040 1 Salvage -M02 108040 1 Salvage -M02 108040 1 Salvage -M02 108040 1 Salvage -M02 108040 1 Salvage -M02 108040 1 Salvage -M02 108040 1 Salvage -M02 108040 1 Salvage -M02 108040 1 Salvage -M02 108040 1 Salvage -M02 108040 1 Salvage -M02 108040 1 Salvage -M02 108040 1 Salvage -M02 108040 1 Salvage -M02 108040 1 Salvage -M02 108040 1 Salvage -M02 108040 1 Salvage -M02 108040 1 Salvage -M02 108040 1 Salvage -M02 108040 1 Salvage -M02 108040 1 Salvage -M02 108040 1 Salvage -M02 108040 1 Salvage -M02 108040 1 Salvage -M02 108040 1 Salvage -M02 108040 1 Salvage -M02 108040 1 WATERBURY POLE 5141 100 HPS COBRA - COMPLETED 3/18/16 HAR 3L620999 WATERBURY POLE 5141 100 HPS COBRA MERIDEN POLE 5569 70 HPS COBRA - COMPLETED 3/18/16 SIM 3L621000 MERIDEN POLE 5569 70 HPS COBRA - CO 3L621875 STONINGTON POLE 7264 100 HPS PTT 43 3L623404 Municipal Light Fault Locate and Re 3L721076 HARTFORD POLE 6156 150 HPS COBRA CO 3L721151 BLOOMFIELD, CHESTNUT HILL RD, P-54 3L721835 WATERFORD POLE 3764 50 HPS COBRA CO 3L721945 TORRINGTON POLE 3560 150 HPS COBRA 3L722556 BLOOMFIELD POLE 5616 100 HPS PTT & 3L722822 LEDYARD POLE 6045 250 HPS COBRA COM 3L722823 LEDYARD POLE 96 50 HPS COBRA COMPLE 3L722875 PLYMOUTH POLE 1711 150 HPS PTT FIXT 3L820579 STAMFORD POLE 16917 250 HPS COBRA C 3L820837 FARMINGTON POLE 1076 70 HPS COBRA - 3L821505 WATERBURY POLE 7175 150 HPS COBRA C 3L821619 COMP 5/23/18 CCC-LEDYARD POLE 2807 3L821890 RTM-COMP 9/28/18 CCC MERIDEN POLE 4 3L821930 COMP 10/03/18 CCC POLE 4032 NEEDS T 3L822274 HARTFORD POLE 9052 RMV 92W, INST 92 3L823415 BRANFORD POLE 5918 RMV 36W, INST 30 3L920794 Pole ID: 4167 RMV 70 HPS PTT INSTAL 3R420243 CD00316-02; 11C14 Resiliency; Recon 3R420245 bwg/CD000320 pole replacements&reco 3R420248 MP - CD00320-02 - 30R8 - Reconducto 3R420330 CD00283-02 Ashford, RT 44, Knowlto 3R520161 CD00389-01 Remove Autos & Convert 3R520162 CD00389-03 Convert Tanner Marsh & 3R520167 CD00387-04 Replace Pad 312 Rt 1 3R520199 CD00390-02 - System Resiliency - St 3R620039 JL 2015 SR highway crossing Locatio 3R620095 CD00103-13 11M3 seg 13 resiliency p 3R620120 BW 2015 SR Highway Crossing, Locati 3R620320 BC-CD00630-02 SR Hwy Xng Upg;Obj ID 3R620361 SR Highway Crossing Upgrades CD0063 STONINGTON POLE 7264 100 HPS PTT 430740 & BROWN SQUARE 175189 AP1-YWO Total Cost Less Than 7K Municipal Light Fault Locate and Repair@ POLE C6404 NO POWER AP1-YWO Total Cost Less Than 7K HARTFORD POLE 6156 150 HPS COBRA COMP 4/13 TOL AP1-YWO Total Cost Less Than 7K BLOOMFIELD, CHESTNUT HILL RD, P-5481 REMOVED 100W HPS PTT/NEED TO REPLACE AP1-YWO Total Cost Less Than 7K WATERFORD POLE 3764 50 HPS COBRA COMPLETED 7/24 CHE AP1-YWO Total Cost Less Than 7K TORRINGTON POLE 3560 150 HPS COBRA COMPLETED 8/3 CHE AP1-YWO Total Cost Less Than 7K BLOOMFIELD POLE 5616 100 HPS PTT & BROWN SQUARE POLE AP1-YWO Total Cost Less Than 7K LEDYARD POLE 6045 250 HPS COBRA COMPLETED 10/24 EHA AP1-YWO Total Cost Less Than 7K LEDYARD POLE 96 50 HPS COBRA COMPLETED 10/24 EHA AP1-YWO Total Cost Less Than 7K PLYMOUTH POLE 1711 150 HPS PTT FIXTURE IS WORKING 03/01 NTW AP1-YWO Total Cost Less Than 7K STAMFORD POLE 16917 250 HPS COBRA COMPLETED 12/20 NTW AP1-YWO Total Cost Less Than 7K FARMINGTON POLE 1076 70 HPS COBRA - COMP 2/3/18 TOL AP1-YWO Total Cost Less Than 7K WATERBURY POLE 7175 150 HPS COBRA COMPLETED 04/09 CHE AP1-YWO Total Cost Less Than 7K COMP 5/23/18 CCC-LEDYARD POLE 2807 BROWN SQ POLE & 51W PTT 601648 AP1-YWO Total Cost Less Than 7K RTM-COMP 9/28/18 CCC MERIDEN POLE 42 BR SQ & RMV 150 HPS PTT, INST 51W LED PTT AP1-YWO Total Cost Less Than 7K COMP 10/03/18 CCC POLE 4032 NEEDS TO BE STRAIGHTENED & NEEDS 28W LED PTT AP1-YWO Total Cost Less Than 7K HARTFORD POLE 9052 RMV 92W, INST 92W COMPLETED 07/20 TOL AP1-YWO Total Cost Less Than 7K BRANFORD POLE 5918 RMV 36W, INST 30W AP1-YWO Total Cost Less Than 7K Pole ID: 4167 RMV 70 HPS PTT INSTALL 28W LED PTT COMP 2/11/19 CHE1 AP1-YWO Total Cost Less Than 7K CD00316-02; 11C14 Resiliency; Recon. RT 81 w 336 TW pole 602 to 637; WO 3 of 3 AP2-YWO Total Cost Variance Met - Variance :-6.1021 MIN.:-20 MAX.:20 bwg/CD000320 pole replacements&reconductor Rte 80 30R8 BB to 336TW,Killingworth CI-YWO Variance - Contractor Invoice MP - CD00320-02 - 30R8 - Reconductor RTE 80-BB to 336TW - 2 of 2, Madison MS-YWO Variance - Multiple Setups CD00283-02 Ashford, RT 44, Knowlton Hill Rd (pole 1089) to (pole 1120) CL-YWO Variance - Contractor Labor CD00389-01 Remove Autos & Convert Boston Post Rd, Guilford CI-YWO Variance - Contractor Invoice CD00389-03 Convert Tanner Marsh & Clapboard Hill & Hang Steps CI-YWO Variance - Contractor Invoice CD00387-04 Replace Pad 312 Rt 1 Guilford CI-YWO Variance - Contractor Invoice CD00390-02 - System Resiliency - Step Down XFMRs - Wildrose & Sam Hill CI-YWO Variance - Contractor Invoice JL 2015 SR highway crossing Location ID 139937542 Pole 946 & 947 CL-YWO Variance - Contractor Labor CD00103-13 11M3 seg 13 resiliency part 1 AP2-YWO Total Cost Variance Met - Variance :8.3386 MIN.:-30 MAX.:30 BW 2015 SR Highway Crossing, LocationID46668676, Pole 3472 & 3473 CI-YWO Variance - Contractor Invoice BC-CD00630-02 SR Hwy Xng Upg;Obj ID(135331980&139930744), I-691@Lewis Ave 417412 AP2-YWO Total Cost Variance Met - Variance :-4.2222 MIN.:-30 MAX.:30 SR Highway Crossing Upgrades CD00631-02 Object ID (46795754) E. River Rd CD00631 SR HIGWY XING UPGRADES OBJECT ID (46818750) HARTFORD RD 3R620362 CD00631 SR HIGWY XING UPGRADES OBJE 3R620616 RA CD00571-08 Install 3-167KVA S/D 3R620628 CD00392 - Transfer 35L7-90T from P. 3R620629 CD00392 - Reconductor 35L7 Boston P 3R620630 CD00392 - Reconductor 35L7 Boston P 3R620743 CD00647-02, 28J1 convert OH, Branfo 3R621016 CD00471-01Elim. 23U Voluntown S/S C 3R621017 CD00471-01Elim. 23U Voluntown S/S C 3R621018 CD00471-01Elim. 23U Voluntown S/S C 3R621019 CD00471-01Elim. 23U Voluntown S/S C 3R621020 CD00471-01Elim. 23U Voluntown S/S C 3R621025 CD00471-01 Elim. 23U Voluntown S/S 3R621026 CD00471-01 Recond. & Convert Gate S 3R621028 CD00471-01 Elim. 23U Voluntown S/S 3R621031 CD00471-02 Conversion Work Install 3R621032 CD00471-03 Conversion Work Rte.49 S 3R621034 CD00471-04 Conversion Work Install 3R621035 CD00471-04 Conversion Work Install 3R621036 CD00471-04 Conversion Work Install 3R621037 CD00471-05 Conversion Work Install 3R621038 CD00471-05 Conversion Work Install RA CD00571-08 Install 3-167KVA S/D's Sunset Ave Putnam CI-YWO Variance - Contractor Invoice CD00392 - Transfer 35L7-90T from P.7242 to P.6475 - Segment 1 AP2-YWO Total Cost Variance Met - Variance :-45.4462 MIN.:-50 MAX.:50 CD00392 - Reconductor 35L7 Boston Post Rd - Segment 2 WR 1 of 2 CI-YWO Variance - Contractor Invoice CD00392 - Reconductor 35L7 Boston Post Rd - Segment 2 WR 2 of 2 CI-YWO Variance - Contractor Invoice CD00647-02, 28J1 convert OH, Branford, 1 of 3 CL-YWO Variance - Contractor Labor CD00471-01Elim. 23U Voluntown S/S Conversion Work #1 AP2-YWO Total Cost Variance Met - Variance :6.287 MIN.:-30 MAX.:30 CD00471-01Elim. 23U Voluntown S/S Conversion Work #2 AP2-YWO Total Cost Variance Met - Variance :-28.5624 MIN.:-30 MAX.:30 CD00471-01Elim. 23U Voluntown S/S Conversion Work #3 CI-YWO Variance - Contractor Invoice CD00471-01Elim. 23U Voluntown S/S Conversion Work #4 AP2-YWO Total Cost Variance Met - Variance :-32.8857 MIN.:-40 MAX.:40 CD00471-01Elim. 23U Voluntown S/S Conversion Work #5 AP2-YWO Total Cost Variance Met - Variance :-18.003 MIN.:-20 MAX.:20 CD00471-01 Elim. 23U Voluntown S/S - Convert Machine Shop w/XFbank AP3-YWO Resource Variance Met- Labor 4 <= 32 OR 300 <= 30 And Contractor $351.6 <= 2000 CD00471-01 Recond. & Convert Gate St - Place 1Ph. on Phase B AP2-YWO Total Cost Variance Met - Variance :-26.0201 MIN.:-30 MAX.:30 CD00471-01 Elim. 23U Voluntown S/S Convert School & Housing Authority Phase A AP2-YWO Total Cost Variance Met - Variance :-25.243 MIN.:-30 MAX.:30 CD00471-02 Conversion Work Install Step Down XF Rte.165 - Place on Phase C AP2-YWO Total Cost Variance Met - Variance :-28.6336 MIN.:-40 MAX.:40 CD00471-03 Conversion Work Rte.49 South AP2-YWO Total Cost Variance Met - Variance :-25.124 MIN.:-30 MAX.:30 CD00471-04 Conversion Work Install Step Down XF Rte.49 North AP2-YWO Total Cost Variance Met - Variance :32.2343 MIN.:-40 MAX.:40 CD00471-04 Conversion Work Install Open Point P#41 Rte.49 North AP1-YWO Total Cost Less Than 7K CD00471-04 Conversion Work Install Step Down XF Rte.49 North AP2-YWO Total Cost Variance Met - Variance :2.0975 MIN.:-40 MAX.:40 CD00471-05 Conversion Work Install Step Down XF Shetucket Tpke P#449 AP2-YWO Total Cost Variance Met - Variance :-30.923 MIN.:-40 MAX.:40 CD00471-05 Conversion Work Install Open Point Btwn. Stepdowns P#2046 AP2-YWO Total Cost Variance Met - Variance :-30.5759 MIN.:-50 MAX.:50
  5. Page 11 of 16

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set PURA-15 Date Issued October 23, 2026 RRU-159 Attachment 20 Page 11 of 16 work_order_number description 3R621047 CD00471-09 Conversion Work Forge Hi 3R621049 CD00471-09 Conversion Work Inst.Ste 3R621050 CD00471-10 Conversion Work Install 3R621058 CD00471-01 Elim. 23U S/S Install 13 3R720020 CAL - CD00849-01 - Ckt 21M1 MBI Ini 3R720043 CAL - CD00849-01 - Ckt 21M15 MBI In 3R720059 CAL - CD00849-01 - Ckt 23K12 MBI In 3R720097 CAL - CD00849-01 - Ckt 28A1 MBI Ini 3R720326 CD00471-01 Reconfig. Ovhd Lines in 3S321466 CDOT 17-186 - RTE 6 Farmington Road 3S521081 DB LOOP URD AT DUNCASTER WOOD, GRAN 3S521505 16 BARNARD DR, SIMSBURY / REPLACE O long_description CD00471-09 Conversion Work Forge Hill Rd Job 2 AP2-YWO Total Cost Variance Met - Variance :-4.4317 MIN.:-20 MAX.:20 CD00471-09 Conversion Work Inst.Step Down XF's No.Shore & Wylie School Job 4 AP2-YWO Total Cost Variance Met - Variance :-12.178 MIN.:-30 MAX.:30 CD00471-10 Conversion Work Install Step Down XF Bennett Rd AP2-YWO Total Cost Variance Met - Variance :-26.4673 MIN.:-40 MAX.:40 CD00471-01 Elim. 23U S/S Install 13B25-160R P#4 w/pole replacements CL-YWO Variance - Contractor Labor CAL - CD00849-01 - Ckt 21M1 MBI Initiative Design Work, Westport CL-YWO Variance - Contractor Labor CAL - CD00849-01 - Ckt 21M15 MBI Initiative Design Work, Weston AP1-YWO Total Cost Less Than 7K CAL - CD00849-01 - Ckt 23K12 MBI Initiative Design Work, Westport AP1-YWO Total Cost Less Than 7K CAL - CD00849-01 - Ckt 28A1 MBI Initiative Design Work, Norwalk AP1-YWO Total Cost Less Than 7K CD00471-01 Reconfig. Ovhd Lines in Front of 23U S/S AP2-YWO Total Cost Variance Met - Variance :-17.2137 MIN.:-40 MAX.:40 CDOT 17-186 - RTE 6 Farmington Road Widening - OH 6 of 6 - Scott Swamp Rd JE-YWO Variance Job Type Exclusion DB LOOP URD AT DUNCASTER WOOD, GRANBY JE-YWO Variance Job Type Exclusion 16 BARNARD DR, SIMSBURY / REPLACE OH SVC W/ #2 TPX cost_element_group ferc_account percent Salvage -M02 108040 1 Salvage -M02 108040 1 Salvage -M02 108040 1 Salvage -M02 108040 1 Salvage -M02 108040 1 Salvage -M02 108040 1 Salvage -M02 108040 1 Salvage -M02 108040 1 Salvage -M02 108040 1 Salvage -M02 108040 1 Salvage -M02 108040 1 Salvage -M02 108040 1 Salvage -M02 108040 1 Salvage -M02 108040 1 Salvage -M02 108040 1 Salvage -M02 108040 1 Salvage -M02 108040 1 Salvage -M02 108040 1 Salvage -M02 108040 1 Salvage -M02 108040 1 Salvage -M02 108040 1 Salvage -M02 108040 1 Salvage -M02 108040 1 Salvage -M02 108040 1 Salvage -M02 108040 1 Salvage -M02 108040 1 Salvage -M02 108040 1 Salvage -M02 108040 1 Salvage -M02 108040 1 Salvage -M02 108040 1 Salvage -M02 108040 1 Salvage -M02 108040 1 Salvage -M02 108040 1 Salvage -M02 108040 1 Salvage -M02 108040 1 Salvage -M02 108040 1 Salvage -M02 108040 1 Salvage -M02 108040 1 Salvage -M02 108040 1 Salvage -M02 108040 1 Salvage -M02 108040 1 Salvage -M02 108040 1 Salvage -M02 108040 1 Salvage -M02 108040 1 Salvage -M02 108040 1 Salvage -M02 108040 1 Salvage -M02 108040 1 Salvage -M02 108040 1 Salvage -M02 108040 1 Salvage -M02 108040 1 Salvage -M02 108040 1 Salvage -M02 108040 1 Salvage -M02 108040 1 Salvage -M02 108040 1 Salvage -M02 108040 1 Salvage -M02 108040 1 W HTFD, South Main St., Replaced Network Protector and transformer U-259 3S620038 W HTFD, South Main St., Replaced Ne 3S620064 SIMSBURY 995 HOPMEADOW WESTMINSTER 4D321128 cb//high st @ ridge rd, chester//sh 4D421399 9/6,ESO,9A,car vp3036 trouble ticke 4D520695 NS- P 272 Cow Hill Rd, CL- Shift to SIMSBURY 995 HOPMEADOW WESTMINSTER SCHOOL LINE RELO (PHASE 1) AP1-YWO Total Cost Less Than 7K cb//high st @ ridge rd, chester//shift to ATT pole 749 & 750 AP2-YWO Total Cost Variance Met - Variance :28.1567 MIN.:-50 MAX.:150 9/6,ESO,9A,car vp3036 trouble ticket & timesheet in documents AP2-YWO Total Cost Variance Met - Variance :39.5828 MIN.:-50 MAX.:50 NS- P 272 Cow Hill Rd, CL- Shift to Frontier Pole 272 Notify 299187 (child 311443), Billable, DAS pole 1870, Old Saybrook 4D521360 Notify 299187 (child 311443), Billa 4D521524 CDOT 59-161/CD00610, UG civil work 4D620423 MV-MADISON CREWS REPLACED REJECT PO 4D620654 NS- P 692 Cow Hill Rd, KW- Shift to 4D620709 CB//GUILFORD, 95 HART RD//RELOCATE 4D620878 ESO - 6/4 Stevenstown Rd. Westbrook 4D621010 SH-Convo#399782-(MakeReadyREIMB) - 4D621162 PATROL REPAIRS 30R10 - GUILFORD 4D621215 (DF) Ple 957 -(R/I) Pole & 1 Ph tpo 4D621244 PATROL REPAIRS, 30R8, MADISON 4D621412 ESO- 9A Pole - P 2473- Hemlock Dr, 4D621442 PATROL REPAIRS, 11J45 - BRANFORD 4D621494 S Main St, Deep River/TL-ESO - 9A - 4D621517 Bokum Rd, Essex/TL-11/20/16 9A car 4D621682 Attanwanhood Trl, #1 Old Saybrook/T 4D720127 CB//Guilford, Boston Post Rd @ Notc 4D720134 Hartlands Dr, #35 Old Saybrook/TL-P 4D720149 CB//GUILFORD, MOOSE HILL RD//UPGRAD 4D720194 CB//MADISON, 57 MIDDLE BEACH RD W// 4D720220 CB//MADISON, 75 NEW RD//SVC UPGRADE 4D720245 Stanford Hill Rd, #32 Essex/TL-REPL 4D720251 CB//MADISON, HULL RD//RELOCATE SECO 4D720272 RSO 2/22 -- WESTBROOK, 798 HORSE HI 4D720286 48 LINDEN AVE (IN OWENEGO BEACH CLU 4D720484 NS- 1 Sag Ter, WB- Ins 4/0 AL from 4D720605 TS 7 FERRY LA 40778 EC RMV OH SVC I 4D720858 RSO GUILFORD, Cornwall Ln -Need to 4D720970 (DF) Ple 1229 - (R/I) CV svc & cond 4D721115 (DF) Midspn Ples 1533-3826- Make OH 4D721118 NS- 25 Aspen Dr, Mad- FOLLOW UP WOR 4D721175 RSO 7/23 - MADISON, 393 COPSE RD- P 4D721191 Boston Post Rd, Old Saybrook/TL-7/2 4D721230 cb//branford, farm river rd//rpl li 4D721307 cb//branford, 15 pawson rd//oh svc 4D721781 PT-2017 Double Poles-Pole# 4149-Old 4D721830 COMP 12/30 CCC-Municipal Light Faul 4D820623 Roamtree Dr, Old Saybrook/TL-5/4/18 4E030999 MV-NEW DG PROJECT CD01409-01 FOR CP 4E031581 CDOT 82-320 Refeed lights at St Joh CDOT 59-161/CD00610, UG civil work 35L9/35L7, long hill rd, Guilford, stage1 AP2-YWO Total Cost Variance Met - Variance :-35.8544 MIN.:-40 MAX.:40 MV-MADISON CREWS REPLACED REJECT POLE 1170 AP1-YWO Total Cost Less Than 7K NS- P 692 Cow Hill Rd, KW- Shift to New Pole, Rmv 600A Disconnects CL-YWO Variance - Contractor Labor CB//GUILFORD, 95 HART RD//RELOCATE OH SVC ESO - 6/4 Stevenstown Rd. Westbrook CAR V POLE 651- FOLLOW UP WORK REQUIRED AP2-YWO Total Cost Variance Met - Variance :99.9865 MIN.:-50 MAX.:150 SH-Convo#399782-(MakeReadyREIMB) - VZ Parent Convo#378446 AP1-YWO Total Cost Less Than 7K PATROL REPAIRS 30R10 - GUILFORD CL-YWO Variance - Contractor Labor (DF) Ple 957 -(R/I) Pole & 1 Ph tpo & 1 Ph tap ESO 9A AP2-YWO Total Cost Variance Met - Variance :94.7836 MIN.:-50 MAX.:150 PATROL REPAIRS, 30R8, MADISON CL-YWO Variance - Contractor Labor ESO- 9A Pole - P 2473- Hemlock Dr, KW- FOLLOW UP WORK- Rplc Pole & Shift AP2-YWO Total Cost Variance Met - Variance :50.483 MIN.:-50 MAX.:150 PATROL REPAIRS, 11J45 - BRANFORD AP2-YWO Total Cost Variance Met - Variance :11.1984 MIN.:-20 MAX.:20 S Main St, Deep River/TL-ESO - 9A - 10/12 Car vs Pole 337 AP1-YWO Total Cost Less Than 7K Bokum Rd, Essex/TL-11/20/16 9A car vs pole 156 see attached TT AP2-YWO Total Cost Variance Met - Variance :37.7622 MIN.:-50 MAX.:50 Attanwanhood Trl, #1 Old Saybrook/TL--REPL #4 AL SVC W/#2 70' AP1-YWO Total Cost Less Than 7K CB//Guilford, Boston Post Rd @ Notch Hill Rd//9A follow up,Install lights,ins NL-YWO Variance - NU Construction Labor Hartlands Dr, #35 Old Saybrook/TL-POLE 496 - NEED NEW 60' SVC TO HOUSE AP1-YWO Total Cost Less Than 7K CB//GUILFORD, MOOSE HILL RD//UPGRADE FUSES/CUTOUTS TO 140K POLE 2 AP1-YWO Total Cost Less Than 7K CB//MADISON, 57 MIDDLE BEACH RD W//NEW SVC, SHIFT POLE/WORKS W TEMP RMVL AP1-YWO Total Cost Less Than 7K CB//MADISON, 75 NEW RD//SVC UPGRADE 200A/RPL SVC W #2TPX IF ITS #4TPX AP1-YWO Total Cost Less Than 7K Stanford Hill Rd, #32 Essex/TL-REPL EX OH SVC FROM P#432 ***BACKYARD FEED*** CB//MADISON, HULL RD//RELOCATE SECONDARY,XF (EXISTING CROSS FUSE) AP1-YWO Total Cost Less Than 7K RSO 2/22 -- WESTBROOK, 798 HORSE HILL RD- POLE # 2211 - NEEDS 60' OF #2 SERVICE AP1-YWO Total Cost Less Than 7K 48 LINDEN AVE (IN OWENEGO BEACH CLUB) P37670 RPL SVC //PRE CHECK OVER ROOF AP1-YWO Total Cost Less Than 7K NS- 1 Sag Ter, WB- Ins 4/0 AL from New HH 831A, Rmv Oh Svc- P 831 AP1-YWO Total Cost Less Than 7K TS 7 FERRY LA 40778 EC RMV OH SVC INSTALL OH/DB SVC NOT SURE IF APPOINT REQUIRED AP1-YWO Total Cost Less Than 7K RSO GUILFORD, Cornwall Ln -Need to Replace 153' #2 OH Service @ P8792 AP1-YWO Total Cost Less Than 7K (DF) Ple 1229 - (R/I) CV svc & conduit - EMROD DB DESG (ARDB) AP2-YWO Total Cost Variance Met - Variance :-44.9095 MIN.:-50 MAX.:50 (DF) Midspn Ples 1533-3826- Make OH svc Connec - 100A upgd- Residential Overhead AP1-YWO Total Cost Less Than 7K NS- 25 Aspen Dr, Mad- FOLLOW UP WORK- RPLC BROKEN DB STREETLIGHT AP1-YWO Total Cost Less Than 7K RSO 7/23 - MADISON, 393 COPSE RD- POLE # 847AP1-YWO Total Cost Less Than 7K Boston Post Rd, Old Saybrook/TL-7/25-P#1712,P#1714,P#2949,P#2949-1/2. Buchetto CL-YWO Variance - Contractor Labor cb//branford, farm river rd//rpl light head p 38780R w full cutoff, shield AP1-YWO Total Cost Less Than 7K cb//branford, 15 pawson rd//oh svc upgrade AP1-YWO Total Cost Less Than 7K PT-2017 Double Poles-Pole# 4149-Old Quarry Rd, Guilford CT-Conv# 362600 AP1-YWO Total Cost Less Than 7K COMP 12/30 CCC-Municipal Light Fault Locate and Repair@ POLE 93 NO VOLTAGE AP1-YWO Total Cost Less Than 7K Roamtree Dr, Old Saybrook/TL-5/4/18 replace xfmrs, 3 c/o's @ pole2834 MV-NEW DG PROJECT CD01409-01 FOR CP EAST HAMPTON SOLAR 1 LLC CL-YWO Variance - Contractor Labor CDOT 82-320 Refeed lights at St John's Square JE-YWO Variance Job Type Exclusion
  6. Page 12 of 16

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set PURA-15 Date Issued October 23, 2026 RRU-159 Attachment 20 Page 12 of 16 work_order_number description 4E420727 car vs pole 1561 6/30/14 4E420733 74 MIDDLE HADDAM RD E HMPTN AT NEW 4E520935 RA CDOT 163-203 RT 66, Bridge#0049 4E520936 RA CDOT 163-203 RT 66, Bridge#0049 4E521680 TW Verizon antenna billable make re 4E620127 COLCHESTER AVE E HMPTN 9A AT FRO 4E620254 JK>POLE 651--REPLACE POLE W/35', AN 4E620324 491 COOK HILL RD LEB REPL 4 POLES, 4E620345 Elec Maint Trouble Call - Repairs/O 4E621047 (CH) EAST HADDAM_TO WRITE_ESO 7/10 4E621233 JK>PAD 533--EXTEND DB SEC TO (3) NE 4E621328 BC - CDOT 41-118 - Relocate facilit 4E621348 (CH) P#3720: WORK COMP'D_ESO 9/3_CA 4E621449 (CH) HH#385A: CHG LAWNBOX & TAG_HH# 4E720228 (CH) HH#313A: NEED TO CHG COVER_HH# 4E720235 (CH) P#437: WORK COMP'D_RSO/AWC 2/ 4E720266 (CH) HH#204A: CHG HDP TO POLYCRETE_ 4E720331 32 FERNWOOD DR COLCH AT P- 2298 FTR 4E720341 3/2 MIDDLETOWN, WESTLAKE RD, YELLOW 4E720362 (CH) P#5438 - P#5439: SPLICE OUT WH 4E720394 RSO/AWC 3/15 PORTLAND, HIGH ST POLE 4E720401 MN LAKE DR E HMPTN AT P-244 REPLACE 4E720451 (CH) P#97: WORK COMP'D_RSO 3/30-3/3 4E720454 (CH) P#207: CHG DROP_MTR DEPT TO CH 4E720474 (CH) P#2427: RPL EXIST'G OH/DB SVC 4E720481 (CH) P#474: WRK COMP'D_RSO 4/3_ RPL 4E720504 JV RSO 4/7 WINDHAM, BEACON RD - REP 4E720505 (CH) P#3444: WRK COMP'D_RSO/AWC/RSO 4E720513 RSO 4/9/17 Jurczyk, Franklin - rep 4E720539 JK>HH6833 (LAWN BOX)--REPLACE 17 X 4E720569 JV 66 Back Rd Windham Ct replace se 4E720622 JV 60 LOVERS LN WINDHAM INST OH XFM 4E720707 JK>POLE 102--REPLACE POLE & SPAN OF 4E720807 JV Spring View Windham- between pad 4E720811 RSO/AWC 5/24 COLCHESTER, LEBANON AV 4E720849 RSO/EH - 5/26 MIDDLETOWN, WASHINGTO 4E721001 JK>POLE 867--REPLACE TERMINATOR AT 4E721058 JK>POLE 242--RMV 3PH PRI RISER, DB 4E721241 (CH) P#4204: CHG OH DROP_#2 TPX_45' 4E721256 RSO 8/6 MIDDLETOWN, CRYSTAL LAKE RD 4E721257 (CH) PAD#4263: EXTEND PRIM'Y TO PAD 4E721709 Elec Maint Trouble Call - Repairs/O 4E721884 MN 426 CABIN RD COLCH AT P-2297 RE 4E820604 RA CDOT 163-203 RT 66 - outage sou 4E820807 (CH) P#1868: CHG OH DROP_DAMANGED D 4E821066 BC - CDOT 41-118 - Relocate facilit 4E920002 RA Project CDOT 052-091 RT 207 Fran 4E921852 MJG - CD01111-01 - Install TR 22R1- 4M221036 pole 2067 prim de/3ph. riser pole s 4M320057 Pole 1253 -40/3 pole has been set, 4M910087 Replace 300A Solids with 600A Disco long_description car vs pole 1561 6/30/14 AP1-YWO Total Cost Less Than 7K 74 MIDDLE HADDAM RD E HMPTN AT NEW P-40 INST PRI RISER, PAD XF, SVC AP3-YWO Resource Variance Met- Labor 12 <= 32 OR 29.54 <= 30 And Contractor $1020.59 <= 2000 RA CDOT 163-203 RT 66, Bridge#00490 over Natchaug River, Windham - stage 1 JE-YWO Variance Job Type Exclusion RA CDOT 163-203 RT 66, Bridge#00490 over Natchaug River, Windham - stage 2 JE-YWO Variance Job Type Exclusion TW Verizon antenna billable make ready Conv 320155 AP1-YWO Total Cost Less Than 7K COLCHESTER AVE E HMPTN 9A AT FRONTIER POLE 64, REPL XF, SHIFT FACILITIES AP1-YWO Total Cost Less Than 7K JK>POLE 651--REPLACE POLE W/35', ANCHOR, SECONDARY & SERVICE 491 COOK HILL RD LEB REPL 4 POLES, 3 SPANS OF, INS STUB POLE & ANC, SHIFT FAC's CL-YWO Variance - Contractor Labor Elec Maint Trouble Call - Repairs/Obsolescence OH (AROH) (CH) EAST HADDAM_TO WRITE_ESO 7/10 Mill rd East Haddam pole 2311 AP2-YWO Total Cost Variance Met - Variance :148.1196 MIN.:-50 MAX.:150 JK>PAD 533--EXTEND DB SEC TO (3) NEW HH'S FOR CONDO UNITS NL-YWO Variance - NU Construction Labor BC - CDOT 41-118 - Relocate facilities on RT 66 for bridge replacement STAGE 1 JE-YWO Variance Job Type Exclusion (CH) P#3720: WORK COMP'D_ESO 9/3_CAR V POLE_SET & SHFT'D NEW AP2-YWO Total Cost Variance Met - Variance :70.5819 MIN.:-50 MAX.:150 (CH) HH#385A: CHG LAWNBOX & TAG_HH#385B: CHG POLYCRETE & TAG. AP2-YWO Total Cost Variance Met - Variance :-20.3294 MIN.:-50 MAX.:50 (CH) HH#313A: NEED TO CHG COVER_HH#311G: COMP'D_FAULT LOCATED/RPR'D/CHG'D AP1-YWO Total Cost Less Than 7K (CH) P#437: WORK COMP'D_RSO/AWC 2/21_REPLACED ROTTED POLE & SHFT'D AP1-YWO Total Cost Less Than 7K (CH) HH#204A: CHG HDP TO POLYCRETE_DISC/RE-CONN SVC FOR SOCKET CHANGE-OUT. AP1-YWO Total Cost Less Than 7K 32 FERNWOOD DR COLCH AT P- 2298 FTR POLE IS SET, SHIFT FACILITIES. DBL POLES AP1-YWO Total Cost Less Than 7K 3/2 MIDDLETOWN, WESTLAKE RD, YELLOW TAG Y-18557-2017 ** 17B-2340 *** AP1-YWO Total Cost Less Than 7K (CH) P#5438 - P#5439: SPLICE OUT WHAT LOOKS LIKE TREE GROWTH AROUND CONDUCTOR. AP1-YWO Total Cost Less Than 7K RSO/AWC 3/15 PORTLAND, HIGH ST POLE 1082 SVC REPLACED AP1-YWO Total Cost Less Than 7K MN LAKE DR E HMPTN AT P-244 REPLACE POLE, SHIFT FACILITIES. THIS IS A 9A. AP2-YWO Total Cost Variance Met - Variance :-10.9133 MIN.:-50 MAX.:50 (CH) P#97: WORK COMP'D_RSO 3/30-3/31_9A_FRNTR SET_WE SHFT'D AP1-YWO Total Cost Less Than 7K (CH) P#207: CHG DROP_MTR DEPT TO CHG MTR #97987663. AP1-YWO Total Cost Less Than 7K (CH) P#2427: RPL EXIST'G OH/DB SVC WITH NEW 4/0 OH/DB SVC_85' AP1-YWO Total Cost Less Than 7K (CH) P#474: WRK COMP'D_RSO 4/3_ RPL'D X-ARM__P#5311: NEED TO RPL X-ARM AP1-YWO Total Cost Less Than 7K JV RSO 4/7 WINDHAM, BEACON RD - REPOLACED 200'AL SVC AP1-YWO Total Cost Less Than 7K (CH) P#3444: WRK COMP'D_RSO/AWC/RSO 4/8_9A AP3-YWO Resource Variance Met- Labor 19 <= 32 OR 35.64 <= 30 And Contractor $1435.56 <= 2000 RSO 4/9/17 Jurczyk, Franklin - replaced arrestors @ 383 & 385, replace OH xfrm AP1-YWO Total Cost Less Than 7K JK>HH6833 (LAWN BOX)--REPLACE 17 X 30 LAWN BOX AP1-YWO Total Cost Less Than 7K JV 66 Back Rd Windham Ct replace secondary pole with svc riser AP1-YWO Total Cost Less Than 7K JV 60 LOVERS LN WINDHAM INST OH XFMR RPLC PL TOP SPCR INST OH SVC AP1-YWO Total Cost Less Than 7K JK>POLE 102--REPLACE POLE & SPAN OF SEC/SVC FOR OH TRESPASS AP1-YWO Total Cost Less Than 7K JV Spring View Windham- between pad#92 & #93 requires replmt ** 17B-5319 *** CL-YWO Variance - Contractor Labor RSO/AWC 5/24 COLCHESTER, LEBANON AVE (RT 16) 9A POLE 3 1/4 AP1-YWO Total Cost Less Than 7K RSO/EH - 5/26 MIDDLETOWN, WASHINGTON ST - 9A P3088 STROM / HOAR AP2-YWO Total Cost Variance Met - Variance :80.0182 MIN.:-50 MAX.:150 JK>POLE 867--REPLACE TERMINATOR AT RISER POLE, RESORE POWER TO NORMAL AP1-YWO Total Cost Less Than 7K JK>POLE 242--RMV 3PH PRI RISER, DB CABLE, 3PH SVC TO BLDG FOR DEMO (7 MTRS) AP1-YWO Total Cost Less Than 7K (CH) P#4204: CHG OH DROP_#2 TPX_45'_MTR DEPT TO CHG MTR #98849099. AP1-YWO Total Cost Less Than 7K RSO 8/6 MIDDLETOWN, CRYSTAL LAKE RD PASCARELLI AP2-YWO Total Cost Variance Met - Variance :32.0064 MIN.:-50 MAX.:150 (CH) PAD#4263: EXTEND PRIM'Y TO PAD#4264_UNITS 5-8, 18-21_PHASE 2 AP2-YWO Total Cost Variance Met - Variance :-28.7598 MIN.:-50 MAX.:50 Elec Maint Trouble Call - Repairs/Obsolescence OH (AROH) AP2-YWO Total Cost Variance Met - Variance :-1.0265 MIN.:-50 MAX.:50 MN 426 CABIN RD COLCH AT P-2297 REPLACE OH SVC, MIDSPAN,10 FT OFF OF POLE. AP1-YWO Total Cost Less Than 7K RA CDOT 163-203 RT 66 - outage south side of bridge JE-YWO Variance Job Type Exclusion (CH) P#1868: CHG OH DROP_DAMANGED DURING MARCH STORMS AP1-YWO Total Cost Less Than 7K BC - CDOT 41-118 - Relocate facilities on RT 66 for bridge replacement STAGE 2 JE-YWO Variance Job Type Exclusion RA Project CDOT 052-091 RT 207 Franklin JE-YWO Variance Job Type Exclusion MJG - CD01111-01 - Install TR 22R1-91T on Pole 550 Founders Road AP2-YWO Total Cost Variance Met - Variance :26.2659 MIN.:-30 MAX.:30 pole 2067 prim de/3ph. riser pole splitting. NEED to repl & shift now E. Cook Pole 1253 -40/3 pole has been set, (R/I) anc- Guy & Pole top, Shift wires &Light AP1-YWO Total Cost Less Than 7K Replace 300A Solids with 600A Disconnects cost_element_group ferc_account percent Salvage -M02 108040 1 Salvage -M02 108040 1 Salvage -M02 108040 1 Salvage -M02 108040 1 Salvage -M02 108040 1 Salvage -M02 108040 1 Salvage -M02 108040 1 Salvage -M02 108040 1 Salvage -M02 108040 1 Salvage -M02 108040 1 Salvage -M02 108040 1 Salvage -M02 108040 1 Salvage -M02 108040 1 Salvage -M02 108040 1 Salvage -M02 108040 1 Salvage -M02 108040 1 Salvage -M02 108040 1 Salvage -M02 108040 1 Salvage -M02 108040 1 Salvage -M02 108040 1 Salvage -M02 108040 1 Salvage -M02 108040 1 Salvage -M02 108040 1 Salvage -M02 108040 1 Salvage -M02 108040 1 Salvage -M02 108040 1 Salvage -M02 108040 1 Salvage -M02 108040 1 Salvage -M02 108040 1 Salvage -M02 108040 1 Salvage -M02 108040 1 Salvage -M02 108040 1 Salvage -M02 108040 1 Salvage -M02 108040 1 Salvage -M02 108040 1 Salvage -M02 108040 1 Salvage -M02 108040 1 Salvage -M02 108040 1 Salvage -M02 108040 1 Salvage -M02 108040 1 Salvage -M02 108040 1 Salvage -M02 108040 1 Salvage -M02 108040 1 Salvage -M02 108040 1 Salvage -M02 108040 1 Salvage -M02 108040 1 Salvage -M02 108040 1 Salvage -M02 108040 1 Salvage -M02 108040 1 Salvage -M02 108040 1 Salvage -M02 108040 1 Salvage -M02 108040 1 Salvage -M02 108040 1 Salvage -M02 108040 1 Salvage -M02 108040 1 Salvage -M02 108040 1 PD-14 Boulevard Court N. London/Repl OH svc drop wit 65ft #2TPX from P# 6357 4N030544 PD-14 Boulevard Court N. London/Rep AWC-MV- I/R 250 MID-SPAN OH SVC 4N031326 AWC-MV- I/R 250 MID-SPAN OH SVC 4N320643 O Colony Rd,P1840,OL(P4031 Swan Av) 4N421261 07/03/14 Pole 5013 replace mh 100 w 4N520050 RA Project CDOT 113-107 - relocate O Colony Rd,P1840,OL(P4031 Swan Av)/Elec Maint T Call - Repairs/Obsol OH (AROH) AP2-YWO Total Cost Variance Met - Variance :11.5968 MIN.:-50 MAX.:50 07/03/14 Pole 5013 replace mh 100 w head ESO AP1-YWO Total Cost Less Than 7K RA Project CDOT 113-107 - relocate facilities for bridge construction Stage 1 JE-YWO Variance Job Type Exclusion
  7. Page 13 of 16

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set PURA-15 Date Issued October 23, 2026 RRU-159 Attachment 20 Page 13 of 16 work_order_number description 4N520390 STONINGTON COTTRELL ST - HPS 150W C 4N521143 08/15 ESO LAWRENCE CT PRESTON BROK 4N521323 PD-247 Shore Rd/Old Lyme REPLACE PC 4N620016 PD-849 Pequot Ave NLD/Replace exist 4N620201 MM JOSHUATOWN FUSESAVER RECLOSER PO 4N620204 SM-WHITEHALL AVE, STONINGTON - CarV 4N620334 GCC / INSTALL A NEW 50KVA XFMR W/CU 4N620359 ESO 1/28 OXOBOXO DAM RD MONTVILLE C 4N620422 3/29/16-Tree down, replaced c/o, po 4N620614 PD-18 Bartlett Place WTFD/Install n 4N620638 PD-Tillley/Green/Pearl NLD/Parking 4N620766 GCC / REMOVE AND RELOCATE FACILITIE 4N620866 SM-1 LAMBERTS LN, STGN- EVRSRC RPLC 4N620924 PD-Bayonet St P# 11494/Replace faul 4N621217 ESO 9A - 08/15/16 GREEN HAVEN STONI 4N621221 ESO 9/1/16-HAWKS NEST RD., OLD LYME 4N621252 MM SMART SWITCH PROGAM TR POLE 7794 4N621263 PD-P# 105S Ocean Ave Car vs Pole 4N621319 Elec Svc New Com/Ind DESG (DN) 4N621398 ESO 9A 9/7/16-Cow Hill Rd., Groton/ 4N621399 ESO 9A 9/5/ Pole 20865 - Fellows 4N621416 PD-187 West Main St East Lyme/Car V 4N621419 MM POLE 2551 S. LEDYARD RD10/14/201 long_description STONINGTON COTTRELL ST - HPS 150W COBRA @ PID 2401 AP1-YWO Total Cost Less Than 7K 08/15 ESO LAWRENCE CT PRESTON BROKEN POLE 2469 AP1-YWO Total Cost Less Than 7K PD-247 Shore Rd/Old Lyme REPLACE PCB XFMR P#1911 CL-YWO Variance - Contractor Labor PD-849 Pequot Ave NLD/Replace existing P# 10836/Replace ASAP pole is leaning. MM JOSHUATOWN FUSESAVER RECLOSER POLE 481 NL-YWO Variance - NU Construction Labor SM-WHITEHALL AVE, STONINGTON - CarVsP2370- Replaced 45' CLASS 2 AP3-YWO Resource Variance Met- Labor 19 <= 32 OR 67.31 <= 30 And Contractor $916.52 <= 2000 GCC / INSTALL A NEW 50KVA XFMR W/CUT-OUT AND NEW 1/0 AL TPX OH SVC TO BUILDING ESO 1/28 OXOBOXO DAM RD MONTVILLE CARVSPOLE AP1-YWO Total Cost Less Than 7K 3/29/16-Tree down, replaced c/o, pole #3755 AP1-YWO Total Cost Less Than 7K PD-18 Bartlett Place WTFD/Install new pole due to woodpecker damage AP1-YWO Total Cost Less Than 7K PD-Tillley/Green/Pearl NLD/Parking lot overhead service refeeds NL-YWO Variance - NU Construction Labor GCC / REMOVE AND RELOCATE FACILITIES / STREET LITES SM-1 LAMBERTS LN, STGN- EVRSRC RPLC 2 POLES INSTALL OH-DB SVC- APPNT REQ AP2-YWO Total Cost Variance Met - Variance :-6.923 MIN.:-50 MAX.:50 PD-Bayonet St P# 11494/Replace fault indicators ESO 9A - 08/15/16 GREEN HAVEN STONINGTON car v pole 6781 AP1-YWO Total Cost Less Than 7K ESO 9/1/16-HAWKS NEST RD., OLD LYME BACKHOE V POLE 761 AP1-YWO Total Cost Less Than 7K MM SMART SWITCH PROGAM TR POLE 7794 PEQUOT RD 1Q01 NL-YWO Variance - NU Construction Labor PD-P# 105S Ocean Ave Car vs Pole AP1-YWO Total Cost Less Than 7K Elec Svc New Com/Ind DESG (DN) ESO 9A 9/7/16-Cow Hill Rd., Groton/Mystic /NEED TO RETURN & FIX PRIMARY RISER AP1-YWO Total Cost Less Than 7K ESO 9A 9/5/ Pole 20865 - Fellows Rd., (Rt 163), Montville AP1-YWO Total Cost Less Than 7K PD-187 West Main St East Lyme/Car VS P# 1224 NL-YWO Variance - NU Construction Labor MM POLE 2551 S. LEDYARD RD10/14/2016 REPLACED INSULTATOR ALL WORK COMPLETE cost_element_group ferc_account percent Salvage -M02 108040 1 Salvage -M02 108040 1 Salvage -M02 108040 1 Salvage -M02 108040 1 Salvage -M02 108040 1 Salvage -M02 108040 1 Salvage -M02 108040 1 Salvage -M02 108040 1 Salvage -M02 108040 1 Salvage -M02 108040 1 Salvage -M02 108040 1 Salvage -M02 108040 1 Salvage -M02 108040 1 Salvage -M02 108040 1 Salvage -M02 108040 1 Salvage -M02 108040 1 Salvage -M02 108040 1 Salvage -M02 108040 1 Salvage -M02 108040 1 Salvage -M02 108040 1 Salvage -M02 108040 1 Salvage -M02 108040 1 Salvage -M02 108040 1 Salvage -M02 108040 1 Salvage -M02 108040 1 Salvage -M02 108040 1 Salvage -M02 108040 1 Salvage -M02 108040 1 Salvage -M02 108040 1 Salvage -M02 108040 1 Salvage -M02 108040 1 Salvage -M02 108040 1 Salvage -M02 108040 1 Salvage -M02 108040 1 Salvage -M02 108040 1 Salvage -M02 108040 1 Salvage -M02 108040 1 Salvage -M02 108040 1 Salvage -M02 108040 1 Salvage -M02 108040 1 Salvage -M02 108040 1 Salvage -M02 108040 1 Salvage -M02 108040 1 Salvage -M02 108040 1 Salvage -M02 108040 1 Salvage -M02 108040 1 Salvage -M02 108040 1 Salvage -M02 108040 1 Salvage -M02 108040 1 Salvage -M02 108040 1 Salvage -M02 108040 1 Salvage -M02 108040 1 Salvage -M02 108040 1 Salvage -M02 108040 1 Salvage -M02 108040 1 Salvage -M02 108040 1 MM STUB POLE 2701S 9A ALL WORK COMPLETE DOT hit pole 2701 notify 491208 4N621464 MM STUB POLE 2701S 9A ALL WORK COM 4N621470 MM STUB POLE, 95s ANCHOR, SPAN GUY, 4N621483 SM-249 PALMER NECK RD, STGN- RPLC P 4N621485 MM SMART SWITCH 11Y6 POLES 405 W MA 4N621600 ESO 10/19 RAYMOND HILL RD, MONTVILL 4N621608 11/23/16 9A CAR V POLE - HARTFORD N 4N621635 GCC / FRONTIER I&R POLE / SHIFT FAC 4N621724 MM REPLACE SERVICE RSO 12/20 NL, BR MM STUB POLE, 95s ANCHOR, SPAN GUY, SDWLK GUY COLMANST NEW LONDON notif #490181 AP1-YWO Total Cost Less Than 7K SM-249 PALMER NECK RD, STGN- RPLC POLE/, INSTL XFMR/INSTL OH-DB SVC AP2-YWO Total Cost Variance Met - Variance :82.3711 MIN.:-50 MAX.:150 MM SMART SWITCH 11Y6 POLES 405 W MAIN ST EAST LYME NL-YWO Variance - NU Construction Labor ESO 10/19 RAYMOND HILL RD, MONTVILLE - CAR VS P#4492 MADE SAFE FOR NOW AP1-YWO Total Cost Less Than 7K 11/23/16 9A CAR V POLE - HARTFORD NEW LOND TPKE MNTVILE AP1-YWO Total Cost Less Than 7K GCC / FRONTIER I&R POLE / SHIFT FACILITES/INSTALL NEW SVC RISER TO DB SVC TO HOM AP1-YWO Total Cost Less Than 7K MM REPLACE SERVICE RSO 12/20 NL, BRAEMER PL P 7607 ALL WORK COMPLETE MM REPLACE SERVICE 48 LONGVIEW ST, NEW LODON ALL WORK COMPLETE 4N621741 MM REPLACE SERVICE 48 LONGVIEW ST, MM ALL WORK COMPLETE GORTON ST,POLE 1740 - REPLACED 70' 2 STRAND SERVICE 4N621769 MM ALL WORK COMPLETE GORTON ST,POLE 4N720015 RSO 1/2/, LIBERTY ST, STONINGTON - 4N720030 RSO/AWC - 1/6 LEDYARD, IRON ST 9A P 4N720046 MM REPLACE SERVICE 9A SPITHEAD RD. 4N720048 GCC / ROTTEN POLE / FRONTIER I&R PO 4N720237 PD-Pequot Ct and West End Ave Niant 4N720247 SM-265 NW CRNR RD, N STGN- FRNT RPL 4N720274 PD-9 Fairhaven Rd East Lyme/Disconn 4N720369 SM-PURA DBL PLE P234- ELM ST, GRTN 4N720562 SM Y-18695-2017 YELLOW TAG REPLACE 4N720646 MM NEW MID SPAN SERVICE POLE 1200 H 4N720868 MM RELOCATE POLE LINE FOR NEW LONDO 4N720921 MM WTFD, E. Wood - Replace 50' #2 O 4N720977 GCC / REMOVE AND INSTALL CUT-OUTS A 4N721015 GCC / RMV XFMR OVERLOADED / INSTALL 4N721068 COMPLETED 6/27 CCC - Fault Locate a 4N721070 COMPLETED 6/29 CCC-Fault Locate and 4N721078 GCC / REMOVE CUT-OUTS AND INSTALL A 4N721153 PD-27 Lincoln Rd WTFD/Disconnect-re 4N721175 MM REPLACE 75' SERVICE AT POLE 25 4N721203 SM-240 BOSTON POST RD, WTRFRD- RMV 4N721319 PD-7/28 INST. NEW XFORMER AND 3/CUT 4N721464 PD-44 Indianola Rd Niantic/Replace 4N721466 RSO 8/17 - SALEM, WEST RD - PAD # 1 RSO 1/2/, LIBERTY ST, STONINGTON - 9A - pole # 7004- needs to be replaced CI-YWO Variance - Contractor Invoice RSO/AWC - 1/6 LEDYARD, IRON ST 9A P1247 LEMIEUX/LEARNED/BONGO/ DOWLING AP1-YWO Total Cost Less Than 7K MM REPLACE SERVICE 9A SPITHEAD RD. WATERFORD @ P1558 GCC / ROTTEN POLE / FRONTIER I&R POLE / EVERSOURCE TO SHIFT ONTO AP1-YWO Total Cost Less Than 7K PD-Pequot Ct and West End Ave Niantic set new 45-2 & shifted facilities AP2-YWO Total Cost Variance Met - Variance :85.6706 MIN.:-50 MAX.:150 SM-265 NW CRNR RD, N STGN- FRNT RPLC PLE, OH XFMR, OH-DB SVC AP3-YWO Resource Variance Met- Labor 26 <= 32 OR 166.67 <= 30 And Contractor $571.4 <= 2000 PD-9 Fairhaven Rd East Lyme/Disconnect-reconnect OH svc for upgrade. AP1-YWO Total Cost Less Than 7K SM-PURA DBL PLE P234- ELM ST, GRTN AP1-YWO Total Cost Less Than 7K SM Y-18695-2017 YELLOW TAG REPLACE CAPACITOR P#3051 AP2-YWO Total Cost Variance Met - Variance :30.1932 MIN.:-50 MAX.:50 MM NEW MID SPAN SERVICE POLE 1200 HOUSE 213 SHORE RD MLC METER SER TO SET METER AP1-YWO Total Cost Less Than 7K MM RELOCATE POLE LINE FOR NEW LONDON ROAD WIDENING notify #529767 AP2-YWO Total Cost Variance Met - Variance :-4.1735 MIN.:-40 MAX.:40 MM WTFD, E. Wood - Replace 50' #2 OH Service ALL WORK COMPLETE AP1-YWO Total Cost Less Than 7K GCC / REMOVE AND INSTALL CUT-OUTS AT TWO LOCATIONS, SAME ROAD AP1-YWO Total Cost Less Than 7K GCC / RMV XFMR OVERLOADED / INSTALL A NEW XFMR AP1-YWO Total Cost Less Than 7K COMPLETED 6/27 CCC - Fault Locate and Repair@ POLE 2986 NO POWER UG AP1-YWO Total Cost Less Than 7K COMPLETED 6/29 CCC-Fault Locate and Repair@POLE 2794 NO POWER UG AP1-YWO Total Cost Less Than 7K GCC / REMOVE CUT-OUTS AND INSTALL A NEW CUT-OUTS AP2-YWO Total Cost Variance Met - Variance :-15.0233 MIN.:-50 MAX.:50 PD-27 Lincoln Rd WTFD/Disconnect-reconnect for svc upgrade/Net meter AP1-YWO Total Cost Less Than 7K MM REPLACE 75' SERVICE AT POLE 2500 ALL WORK COMPLETE AP1-YWO Total Cost Less Than 7K SM-240 BOSTON POST RD, WTRFRD- RMV OH SVC AND INSTL OH-DB AP1-YWO Total Cost Less Than 7K PD-7/28 INST. NEW XFORMER AND 3/CUT OUTS ON 7057 AP1-YWO Total Cost Less Than 7K PD-44 Indianola Rd Niantic/Replace OH svc drop AP1-YWO Total Cost Less Than 7K RSO 8/17 - SALEM, WEST RD - PAD # 142 / NEED TO RETURN FIX PROBLEM AP1-YWO Total Cost Less Than 7K
  8. Page 14 of 16

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set PURA-15 Date Issued October 23, 2026 RRU-159 Attachment 20 Page 14 of 16 work_order_number description 4N721497 GCC / REMOVE AND INSTALL OVERHEAD S 4N721645 MM RPLCE 3 LEAKING XFRMRS ALL WORK 4N721805 GCC / RMV EXISTING OVERHEAD SVC AND 4N820210 MM REPLACE DAMAGED SERVICE WIRE FRO 4N820536 Quanaduck Rd, Stonington/TL-02-26-1 4N820787 GCC / I&R XFMR AND INSTALL A NEW 15 4N821095 MM REPLACE 100' SERVICE WIRE NEW 20 4N821586 GCC / I&R OVERHEAD SERVICE TO HOME 4N921005 PD- South Water Street N. London/Re 4N921785 10/23/19 37 ORCHARD ST - STONINGTON long_description GCC / REMOVE AND INSTALL OVERHEAD SERVICE TO HOME AP1-YWO Total Cost Less Than 7K MM RPLCE 3 LEAKING XFRMRS ALL WORK COMPLETE CL-YWO Variance - Contractor Labor GCC / RMV EXISTING OVERHEAD SVC AND INSTALL A NEW OVERHEAD SVC AP1-YWO Total Cost Less Than 7K MM REPLACE DAMAGED SERVICE WIRE FROM POLE 1517TO HOUSE AP1-YWO Total Cost Less Than 7K Quanaduck Rd, Stonington/TL-02-26-18 REPLACED XFMR WITH ABOVE GROUND XFMR & PAD AP2-YWO Total Cost Variance Met - Variance :27.7279 MIN.:-50 MAX.:50 GCC / I&R XFMR AND INSTALL A NEW 150' OVERHEAD SERVICE TO HOME AP1-YWO Total Cost Less Than 7K MM REPLACE 100' SERVICE WIRE NEW 200A MTR BY MTR SERVC AP1-YWO Total Cost Less Than 7K GCC / I&R OVERHEAD SERVICE TO HOME PD- South Water Street N. London/Replace crushed polycrete handhold AP1-YWO Total Cost Less Than 7K 10/23/19 37 ORCHARD ST - STONINGTON- P2770-6 Replcd 30 FT #2 oh svc cost_element_group ferc_account percent Salvage -M02 108040 1 Salvage -M02 108040 1 Salvage -M02 108040 1 Salvage -M02 108040 1 Salvage -M02 108040 1 Salvage -M02 108040 1 Salvage -M02 108040 1 Salvage -M02 108040 1 Salvage -M02 108040 1 Salvage -M02 108040 1 Salvage -M02 108040 1 Salvage -M02 108040 1 Salvage -M02 108040 1 Salvage -M02 108040 1 Salvage -M02 108040 1 Salvage -M02 108040 1 Salvage -M02 108040 1 Salvage -M02 108040 1 Salvage -M02 108040 1 Salvage -M02 108040 1 Salvage -M02 108040 1 Salvage -M02 108040 1 Salvage -M02 108040 1 Salvage -M02 108040 1 Salvage -M02 108040 1 Salvage -M02 108040 1 Salvage -M02 108040 1 Salvage -M02 108040 1 Salvage -M02 108040 1 Salvage -M02 108040 1 Salvage -M02 108040 1 Salvage -M02 108040 1 Salvage -M02 108040 1 Salvage -M02 108040 1 Salvage -M02 108040 1 Salvage -M02 108040 1 Salvage -M02 108040 1 Salvage -M02 108040 1 Salvage -M02 108040 1 Salvage -M02 108040 1 Salvage -M02 108040 1 Salvage -M02 108040 1 Salvage -M02 108040 1 Salvage -M02 108040 1 Salvage -M02 108040 1 Salvage -M02 108040 1 Salvage -M02 108040 1 Salvage -M02 108040 1 Salvage -M02 108040 1 Salvage -M02 108040 1 Salvage -M02 108040 1 Salvage -M02 108040 1 Salvage -M02 108040 1 Salvage -M02 108040 1 Salvage -M02 108040 1 Salvage -M02 108040 1 DG P#2652, FRNTR POLE RPLC , CLP SHIFTED, 25KVA XFMR & CO JOB COMP 5D030998 DG P#2652, FRNTR POLE RPLC , CLP SH DG P#2411 RPLC 1 SECT NEUTRAL W/TPX, 1 SECT TPX XROAD, OH/DB SVC RSR 5D221491 DG P#2411 RPLC 1 SECT NEUTRAL W/TPX 5D420614 RA CD00086-04 1ph 1/0 to 3ph 336 T 5D520552 CD00450-01 RIGHT OF WAY FROM RIVER 5D520553 BC - CD00450-02 - New 3PH Ovrbld,Re 5D520555 BC - CD00450-02 - 1PH, Re-cond. & C 5D520569 CD00450-01 New 3PH 556 TW Overbuild 5D521065 RA Power Survey 307373, Billable, D 5D620106 RA CD00078-02 JC B/B 12S1/21D3 co 5D620111 RA CD00078-06 JC B/B 12S1/21D3 : 5D620198 DG P#1423 10 BIG HORN LN WOODSTOCK RA CD00086-04 1ph 1/0 to 3ph 336 TW reconductor RT 6 Chaplin AP2-YWO Total Cost Variance Met - Variance :9.3973 MIN.:-10 MAX.:10 CD00450-01 RIGHT OF WAY FROM RIVER CROSSING AT 12STUNNEL TO RT 169 NL-YWO Variance - NU Construction Labor BC - CD00450-02 - New 3PH Ovrbld,Re-cond. & Convert 1PH Undrbld (1 of 5) 472157 CL-YWO Variance - Contractor Labor BC - CD00450-02 - 1PH, Re-cond. & Convert (4.8 to 23)kV, Club House Rd (3 of 5) CL-YWO Variance - Contractor Labor CD00450-01 New 3PH 556 TW Overbuild, Paper Mill Rd, Town of Lisbon (Part 1 of 5) NO AWOCS-AWOCS REASON CODE AND DESCRIPTION NOT FOUND. RA Power Survey 307373, Billable, DAS pole 1754, Sterling RA CD00078-02 JC B/B 12S1/21D3 convert RT 138 p80 (600's) to p50 (600's) AP2-YWO Total Cost Variance Met - Variance :.8963 MIN.:-20 MAX.:20 RA CD00078-06 JC B/B 12S1/21D3 : install 3-333KVA S/D RT 164 Griswold AP2-YWO Total Cost Variance Met - Variance :-11.2133 MIN.:-20 MAX.:20 DG P#1423 10 BIG HORN LN WOODSTOCK RPLC OH SVC MOVE MIDSPAN CLOSER TO POLE RD 2016 Def Pole Replacement - P1790 - Brockway Rd 5D620475 RD 2016 Def Pole Replacement - P179 1148 PLAINFIELD PIKE, STERLNG, POLE#218, INST NEW 1/0 QPX, 3-PH, 120/208 OH/SVC 5D620545 1148 PLAINFIELD PIKE, STERLNG, POL 5D620573 RA CD00078-02 JC B/B 12S1/21D3 : 5D620574 RA CD00078-02 JC B/B 12S1/21D3 : 5D620575 RA CD00078-02 JC B/B 12S1/21D3 : 5D620845 RA CD00078-02 JC B/B 12S1/21D3 co 5D620880 RA CD00078-02 JC B/B 12S1/21D3 pr 5D620884 RA CD00078-02 install 333KVA S/D Ta 5D621134 BC - CD00450-08 - Re-cond, Inst/Rmv 5D621289 DG P#1258 96 RED BRIDGE RD THOMPSON 5D621348 DG P#981 RSO 12/24 CONVERSE RD, WOO 5D720030 DG P#535 KILLINGLY RD POMFRET HBV 1 5D720332 EXLEY RD, POLE # 933, FRONTIER REJE 5D720504 POLE 286, RSO, 4/28, LISBON, NEWEN 5D720552 DG P#2493 DOW RD PLAINFIELD FRNTR P 5D720556 DG P#1348S ACADEMY HILL RD PLAINFIE 5D720575 RSO, 5/5, STARKWEATHER ROAD, 9A GN 5D720640 135 WESTON RD, P#2497 Elec Maint Po 5D720651 39 CANTERBURY RD, POLE#27, SHIFT TO 5D720743 RSO 6/2 GRISWOLD, BITGOOD RD- 9A P1 5D720752 DG P#359 6 WESTFORD RD EASTFORD RPL 5D720755 RA replace Frontier defective po 5D720768 RSO/AWC, 6/10, THOMPSON, RIVERSIDE 5D720811 DG P#2456 1 BEATTIE AVE THOMPSON FR 5D820008 49 N. CHESTNUT ST, POLE#25, INSTALL 5D820187 RSO,2/14, WOODSTOCK, ROCKY HILL ROA 5D920268 RA Project CDOT 123-066 RT 14 Scotl 5D920489 RA Project CDOT 123-066 RT 14 Scotl 5T520257 CDOT32-148 Mansfield/Cov Re-energiz 5T520636 CB PN CD00462 - replace reject pole 5T521327 West Rd, Ellington. BBA P-32007 Ins RA CD00078-02 JC B/B 12S1/21D3 : Pine Rd - Convert/Recon from RT 138 end AP2-YWO Total Cost Variance Met - Variance :-20.7484 MIN.:-30 MAX.:30 RA CD00078-02 JC B/B 12S1/21D3 : Pine Rd - fill gap - create N.O. tie point AP2-YWO Total Cost Variance Met - Variance :-33.7995 MIN.:-40 MAX.:40 RA CD00078-02 JC B/B 12S1/21D3 : Convert Goldstein Rd AP2-YWO Total Cost Variance Met - Variance :-47.7583 MIN.:-50 MAX.:50 RA CD00078-02 JC B/B 12S1/21D3 convert RT 138 p50 (600's) to 12S1 r.o.w. AP2-YWO Total Cost Variance Met - Variance :7.3617 MIN.:-20 MAX.:20 RA CD00078-02 JC B/B 12S1/21D3 pre-build DB Slater Village Shopping Center AP2-YWO Total Cost Variance Met - Variance :-33.6523 MIN.:-50 MAX.:50 RA CD00078-02 install 333KVA S/D Taylor Hilll Rd off RT 138 Griswold AP2-YWO Total Cost Variance Met - Variance :-31.9432 MIN.:-50 MAX.:50 BC - CD00450-08 - Re-cond, Inst/Rmv River/RR Xing Structures, Town of Preston CL-YWO Variance - Contractor Labor DG P#1258 96 RED BRIDGE RD THOMPSON FRNTR POLE RPLC CLP TO SHIFT CO P#1259 AP1-YWO Total Cost Less Than 7K DG P#981 RSO 12/24 CONVERSE RD, WOODSTOCK - HBV - WEBB CLP TO SHIFT NOT COMP AP1-YWO Total Cost Less Than 7K DG P#535 KILLINGLY RD POMFRET HBV 12-12-16 NO 9A TICKET AP1-YWO Total Cost Less Than 7K EXLEY RD, POLE # 933, FRONTIER REJECT, SET NEW 40'/2, POLE SHIFT AP1-YWO Total Cost Less Than 7K POLE 286, RSO, 4/28, LISBON, NEWENT RD, 9A, STILWELL AP2-YWO Total Cost Variance Met - Variance :10.474 MIN.:-50 MAX.:50 DG P#2493 DOW RD PLAINFIELD FRNTR POLE RPLC CLP TO SHIFT AP1-YWO Total Cost Less Than 7K DG P#1348S ACADEMY HILL RD PLAINFIELD FRNTR POLE RPLC CLP TO SHIFT AP1-YWO Total Cost Less Than 7K RSO, 5/5, STARKWEATHER ROAD, 9A GNESDA, POLE 430, HBV, SHIFT TO NEW POLE AP1-YWO Total Cost Less Than 7K 135 WESTON RD, P#2497 Elec Maint Pole Reject - PRIORITY DESG (IFOH) AP1-YWO Total Cost Less Than 7K 39 CANTERBURY RD, POLE#27, SHIFT TO NEW POLE#27, REJECT POLE AP1-YWO Total Cost Less Than 7K RSO 6/2 GRISWOLD, BITGOOD RD- 9A P1789 - WEBB/GEMBEL/CIVARDI , NOT COMP AP2-YWO Total Cost Variance Met - Variance :85.6143 MIN.:-50 MAX.:150 DG P#359 6 WESTFORD RD EASTFORD RPLC BRKN ARM, CO's, NEED TO INST(3) ARRESTERS AP2-YWO Total Cost Variance Met - Variance :15.2523 MIN.:-50 MAX.:50 RA replace Frontier defective pole 564 Bethel Rd AP1-YWO Total Cost Less Than 7K RSO/AWC, 6/10, THOMPSON, RIVERSIDE DRIVE, 9A AP1-YWO Total Cost Less Than 7K DG P#2456 1 BEATTIE AVE THOMPSON FRNTR POLE RPLC, 25 KVA, OH SVC AP1-YWO Total Cost Less Than 7K 49 N. CHESTNUT ST, POLE#25, INSTALL 50KVA , SPLIT CRIB FROM POLE#1570 RSO,2/14, WOODSTOCK, ROCKY HILL ROAD AP1-YWO Total Cost Less Than 7K RA Project CDOT 123-066 RT 14 Scotland Stage 1 JE-YWO Variance Job Type Exclusion RA Project CDOT 123-066 RT 14 Scotland Stage 2 JE-YWO Variance Job Type Exclusion CDOT32-148 Mansfield/Cov Re-energize primary over Rte 275 bridge 1of 2 50% reimb JE-YWO Variance Job Type Exclusion CB PN CD00462 - replace reject pole #7883 Colburn Rd. Stafford 40'/2 CI-YWO Variance - Contractor Invoice West Rd, Ellington. BBA P-32007 Install 45-2 replaced primary riser. 8/12 SPRINGFIELD RD,SOMERS-BBA 5T521425 8/12 SPRINGFIELD RD,SOMERS-BBA 5T522069 AWC 12/1 S. MAIN ST, EW - DIG UP ES 5T522213 ESO 12/9 MAIN ST, SOMERS - MVA CAUS 5T620092 1/15 RIVER RD,WILLINGTON 9A AWC 12/1 S. MAIN ST, EW - DIG UP ESI HIT CABLE AP2-YWO Total Cost Variance Met - Variance :-1.3831 MIN.:-40 MAX.:40 ESO 12/9 MAIN ST, SOMERS - MVA CAUSED P#313 TO BREAK AP2-YWO Total Cost Variance Met - Variance :39.6471 MIN.:-50 MAX.:50 1/15 RIVER RD,WILLINGTON 9A AP2-YWO Total Cost Variance Met - Variance :38.8667 MIN.:-50 MAX.:50
  9. Page 15 of 16

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set PURA-15 Date Issued October 23, 2026 RRU-159 Attachment 20 Page 15 of 16 work_order_number 5T620313 description long_description Highland Ave, Ellington - P#275, replace 2 missing Fault Indicators Highland Ave, Ellington - P#275, re cost_element_group ferc_account percent Salvage -M02 108040 1 Salvage -M02 108040 1 Salvage -M02 108040 1 Salvage -M02 108040 1 Salvage -M02 108040 1 Salvage -M02 108040 1 Salvage -M02 108040 1 Salvage -M02 108040 1 Salvage -M02 108040 1 Salvage -M02 108040 1 Salvage -M02 108040 1 Salvage -M02 108040 1 Salvage -M02 108040 1 Salvage -M02 108040 1 Salvage -M02 108040 1 Salvage -M02 108040 1 Salvage -M02 108040 1 Salvage -M02 108040 1 Salvage -M02 108040 1 Salvage -M02 108040 1 Salvage -M02 108040 1 Salvage -M02 108040 1 Salvage -M02 108040 1 Salvage -M02 108040 1 Salvage -M02 108040 1 Salvage -M02 108040 1 Salvage -M02 108040 1 Salvage -M02 108040 1 Salvage -M02 108040 1 Salvage -M02 108040 1 Salvage -M02 108040 1 Salvage -M02 108040 1 Salvage -M02 108040 1 Salvage -M02 108040 1 Salvage -M02 108040 1 Salvage -M02 108040 1 Salvage -M02 108040 1 Salvage -M02 108040 1 Salvage -M02 108040 1 Salvage -M02 108040 1 Salvage -M02 108040 1 Salvage -M02 108040 1 Salvage -M02 108040 1 Salvage -M02 108040 1 Salvage -M02 108040 1 Salvage -M02 108040 1 Salvage -M02 108040 1 Salvage -M02 108040 1 Salvage -M02 108040 1 Salvage -M02 108040 1 Salvage -M02 108040 1 Salvage -M02 108040 1 Salvage -M02 108040 1 Salvage -M02 108040 1 Salvage -M02 108040 1 Salvage -M02 108040 1 3/17 STOUGHTON RD, EW - TREE TOOK DOWN 2 POLES 1964 & 2310 40/2'S 5T620432 3/17 STOUGHTON RD, EW - TREE TOOK D 5T620824 RA CDOT 32-130 Main St., Coventry 5T620828 RA CDOT 32-130 Main St., Coventry 5T621064 Shenipsit Lake Rd, Tolland. BBA P-3 5T621453 8/7, 9A 196 FrazerFir Rd, SOUTH Win 5T621525 ESO 8/22 Conklin Rd Stafford p 7056 5T621800 RSO 11/14 HAZARD AVE ENFIELD - 2ND 5T720247 SW, RUGBY LN - INSTALLED MED HH @ P 5T720350 Lathrop Rd, Covemtry - Extend prima 5T720375 AWC-OH, 2/25, ENFIELD, TILL STREET, 5T720405 Avery St., South Windsor - Relocate 5T720517 3/8 - AWC - LONG HILL RD,ANDOVER - 5T720571 Fletcher Rd, Enfield - Relocate fac 5T720579 WILLINGTON, RIVER RD 9A POLE 220 po 5T720674 Alice Dr, Coventry. Shift Frontier 5T720693 JV COVENTRY, SOUTH ST - SHIFT FRONT 5T720704 JV COVENTRY, SOUTH ST - SHIFT FRONT 5T720747 West Main St 45, Vernon. Install Ra 5T720857 STAFFORD LAMB RD - PRIORITY REJECT 5T720994 VERNON, E MAIN ST - REPLACED 400W H 5T721048 Mullen Rd, Enfield - Part 3 of 4 - 5T721223 Relocate 39E1 23kV From Hamlton Rd. 5T721250 5/16 RSO & ESO PUCKER ST,COVENTRY 9 5T721381 RSO, 5/31, ENFIELD, MOODY ROAD, POL 5T721465 6/12 - RSO/AWC - WILLINGTON, HANCOC 5T721538 6/20 - RSO - ANDOVER, SKINNER HILL 5T721575 Woods Rd, Somers - Extend 1 ph prim 5T721629 ANDOVER, BEAR SWAMP RD - VOLTAGE CO 5T721647 6/30 - RSO/AWC - ENFIELD, BRAINARD 5T721689 MOUNTAIN VIEW RD, SOMERS - 9A POLE 5T721716 AWC 7/9 EAST WINDSOR OMELIA RD - RE 5T721737 RSO, 7/12, ENFIELD, ELM STREET, CAB 5T721742 7/13 - RSO/TOLOH - VERNON, TAYLOR S 5T721752 RSO, 7/15, ENFIELD, ELM STREET, POL 5T721771 Pleasant View Dr. Vernon P1733 repl 5T721785 RSO, 7/19, ENFIELD, POST OFFICE, PO 5T721787 Hall HillRd.,23,Somers,install 4/0q 5T721877 8/3 - RSO - SULLIVAN AVE, SOUTH WIN 5T721885 Diamond Ledge Rd.,6,Stafford run 12 5T721904 8/7 - RSO/AWC - PLEASANT VALLEY RD, 5T721995 RSO, 8/21, ENFIELD, ENFIELD STREET, 5T820043 COMP 3/2 CCC - ENFIELD THE MEADOWS 5T820195 CLH - 2018 DEF POLE REPLACEMENT - P 5T820821 Vernon Ave, Vernon- pole # 53 - Inf 5T821166 CDOT134-147 W. Stafford Rd. Rte 190 5T821517 Main St, Somers Rejects P-340, 350, 5T821527 2019 POLE INTEGRITY PROGRAM - SOMER 5T822185 8 Belle Ave.Enfield Replace service 5T822402 CDOT 134-147 Orcuttville Rd. Rt 319 5T920058 CDOT 129-115 Turnpike Rd. Somers Br 5T920988 CDOT 129-115 Turnpike Rd. Somers. M 5T922225 294 Hartford Ave E.Granby Remove se 5W220907 RA CDOT 32-130 Main St., Coventry 5W220938 RA CDOT 32-130 Main St., Coventry 5W420455 JV Crystal Ln Mansfield replace 3 w RA CDOT 32-130 Main St., Coventry - STA 23+50 relocate 26S JE-YWO Variance Job Type Exclusion RA CDOT 32-130 Main St., Coventry - STA 21+40 relocate 28s JE-YWO Variance Job Type Exclusion Shenipsit Lake Rd, Tolland. BBA P-35 all work done in field AP1-YWO Total Cost Less Than 7K 8/7, 9A 196 FrazerFir Rd, SOUTH Windsor, pole 305 AP1-YWO Total Cost Less Than 7K ESO 8/22 Conklin Rd Stafford p 7056/ 7060 AP1-YWO Total Cost Less Than 7K RSO 11/14 HAZARD AVE ENFIELD - 2ND TIME DIG UP AP2-YWO Total Cost Variance Met - Variance :25.4823 MIN.:-50 MAX.:50 SW, RUGBY LN - INSTALLED MED HH @ POLE 1 - COMP 6/2/17 CCC AP1-YWO Total Cost Less Than 7K Lathrop Rd, Covemtry - Extend primary two sections, plz see sketch AP2-YWO Total Cost Variance Met - Variance :20.6548 MIN.:-50 MAX.:50 AWC-OH, 2/25, ENFIELD, TILL STREET, CAR VS POLE 15009 9A AP2-YWO Total Cost Variance Met - Variance :32.6392 MIN.:-50 MAX.:150 Avery St., South Windsor - Relocate facilities for The Town Road Work 3/8 - AWC - LONG HILL RD,ANDOVER - 9A - POLE 337 BROKEN - REPLACED XFMR AP2-YWO Total Cost Variance Met - Variance :-18.835 MIN.:-50 MAX.:50 Fletcher Rd, Enfield - Relocate facilities for the Town of Enfield AP2-YWO Total Cost Variance Met - Variance :-10.4774 MIN.:-50 MAX.:50 WILLINGTON, RIVER RD 9A POLE 220 pole replaced by Frontier 3/16 AP2-YWO Total Cost Variance Met - Variance :76.8228 MIN.:-50 MAX.:150 Alice Dr, Coventry. Shift Frontier pole sets, Replace open wire sec and XFR'S AP2-YWO Total Cost Variance Met - Variance :-24.9807 MIN.:-50 MAX.:50 JV COVENTRY, SOUTH ST - SHIFT FRONTIER POLES 391, 392 AND 393 AP1-YWO Total Cost Less Than 7K JV COVENTRY, SOUTH ST - SHIFT FRONTIER POLE 137 AP1-YWO Total Cost Less Than 7K West Main St 45, Vernon. Install Rayflate kits on 8 location. 2 SETS 4 CONDUITS AP1-YWO Total Cost Less Than 7K STAFFORD LAMB RD - PRIORITY REJECT POLE 7651 AP1-YWO Total Cost Less Than 7K VERNON, E MAIN ST - REPLACED 400W HPS FLOOD @ POLE 9s - COMP 5/25/17 CCC AP1-YWO Total Cost Less Than 7K Mullen Rd, Enfield - Part 3 of 4 - Relocate poles per Town of Enfield AP2-YWO Total Cost Variance Met - Variance :4.5336 MIN.:-40 MAX.:40 Relocate 39E1 23kV From Hamlton Rd. to new Schoephoester Rd. Windsor Locks JE-YWO Variance Job Type Exclusion 5/16 RSO & ESO PUCKER ST,COVENTRY 9A EW-YWO Variance - Emergent Work RSO, 5/31, ENFIELD, MOODY ROAD, POLE 21590 AP1-YWO Total Cost Less Than 7K 6/12 - RSO/AWC - WILLINGTON, HANCOCK RD POLE 1044 AP1-YWO Total Cost Less Than 7K 6/20 - RSO - ANDOVER, SKINNER HILL RD - REMOVE IDLE 10KVA XFMR P-446 AP1-YWO Total Cost Less Than 7K Woods Rd, Somers - Extend 1 ph primary AP2-YWO Total Cost Variance Met - Variance :-24.137 MIN.:-50 MAX.:50 ANDOVER, BEAR SWAMP RD - VOLTAGE COMPLAINT - INSTALL 25KVA XFMR P-407 AP1-YWO Total Cost Less Than 7K 6/30 - RSO/AWC - ENFIELD, BRAINARD RD, 9A - EVERSOURCE P-2503 complete in field AP2-YWO Total Cost Variance Met - Variance :29.3618 MIN.:-50 MAX.:50 MOUNTAIN VIEW RD, SOMERS - 9A POLE 11075-COMPLETE AP1-YWO Total Cost Less Than 7K AWC 7/9 EAST WINDSOR OMELIA RD - REPLACED 3 CUTOUTS P-1792 EW-YWO Variance - Emergent Work RSO, 7/12, ENFIELD, ELM STREET, CABLE FAULT, RPLC FAULT INDICATORS MHC AP1-YWO Total Cost Less Than 7K 7/13 - RSO/TOLOH - VERNON, TAYLOR ST - 9A - FRONTIER POLE 1105 AP2-YWO Total Cost Variance Met - Variance :-25.8548 MIN.:-50 MAX.:50 RSO, 7/15, ENFIELD, ELM STREET, POLE 2139, REFER TO AWC TO RPLC 9A AP2-YWO Total Cost Variance Met - Variance :35.4939 MIN.:-50 MAX.:150 Pleasant View Dr. Vernon P1733 replace rotten cross arm AP1-YWO Total Cost Less Than 7K RSO, 7/19, ENFIELD, POST OFFICE, POLE 12666 - REPLACE OH SVC/REPLACE METER AP1-YWO Total Cost Less Than 7K Hall HillRd.,23,Somers,install 4/0qpxsec,(2) risers 200,400amp 3phase 120/208 AP1-YWO Total Cost Less Than 7K 8/3 - RSO - SULLIVAN AVE, SOUTH WINDSOR, P-5026 - UPGRADE QUAD - LOW VOLTAGE AP1-YWO Total Cost Less Than 7K Diamond Ledge Rd.,6,Stafford run 120'2tpx 100amp meter p-3723 AP1-YWO Total Cost Less Than 7K 8/7 - RSO/AWC - PLEASANT VALLEY RD,SW-GENERATOR INSTALLED CI-YWO Variance - Contractor Invoice RSO, 8/21, ENFIELD, ENFIELD STREET, P 2932 - REPLACED 60' OF 1/0 QUAD AP1-YWO Total Cost Less Than 7K COMP 3/2 CCC - ENFIELD THE MEADOWS P#18 - RPL BLK FG POLE & PTT 150HPS AP1-YWO Total Cost Less Than 7K CLH - 2018 DEF POLE REPLACEMENT - P22490 KING SPRING RD, WINDSOR LOCKS AP2-YWO Total Cost Variance Met - Variance :22.1396 MIN.:-50 MAX.:50 Vernon Ave, Vernon- pole # 53 - Infrared Repairs - Minor (IFOH) CL-YWO Variance - Contractor Labor CDOT134-147 W. Stafford Rd. Rte 190 Stafford Reconductor 336 TW Phase 1 JE-YWO Variance Job Type Exclusion Main St, Somers Rejects P-340, 350, 357 & 358 AP2-YWO Total Cost Variance Met - Variance :6.952 MIN.:-50 MAX.:50 2019 POLE INTEGRITY PROGRAM - SOMERS, WATCHAUG RD P-8589S AP1-YWO Total Cost Less Than 7K 8 Belle Ave.Enfield Replace service from P- 14154 AP1-YWO Total Cost Less Than 7K CDOT 134-147 Orcuttville Rd. Rt 319 Stafford Phase 2 pole relocations JE-YWO Variance Job Type Exclusion CDOT 129-115 Turnpike Rd. Somers Bridge replacement project JE-YWO Variance Job Type Exclusion CDOT 129-115 Turnpike Rd. Somers. Move 1PH primary to permanent location JE-YWO Variance Job Type Exclusion 294 Hartford Ave E.Granby Remove service to house/install on new garage P-576 AP1-YWO Total Cost Less Than 7K RA CDOT 32-130 Main St., Coventry - STA 16+00 to 19+00 (pole 32 to pole 30) JE-YWO Variance Job Type Exclusion RA CDOT 32-130 Main St., Coventry - STA 16+00 to 22+50 (pole 32 to pole 27) JE-YWO Variance Job Type Exclusion JV Crystal Ln Mansfield replace 3 wood SL poles rotted. UG complex AP2-YWO Total Cost Variance Met - Variance :17.4631 MIN.:-50 MAX.:50
  10. Page 16 of 16

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set PURA-15 Date Issued October 23, 2026 RRU-159 Attachment 20 Page 16 of 16 work_order_number description 5W613498 RA CDOT 32-130 Main St. Coventry - 5W720003 80072021 80238606 RA CDOT 32-130 Main St. Coventry COMP NTW 11/11/24* ESSEX, 5 LITTLE * MAP COMP ASP JTR, CD01701-02, Blm 80399654 Riverside 2R RBI Rls CS000231 STORE011 VH1DRT24 VH1DRT25 Goodwin Lane 22 - Remove Substation Stores clearing CT 11 2024 Sale of Vehicles CT 11 2025 Sale of Vehicles long_description RA CDOT 32-130 Main St. Coventry - STA 24+00 to 31+50 (pole 25 to 20) JE-YWO Variance Job Type Exclusion RA CDOT 32-130 Main St. Coventry - STA 23+00 to 24+00 (pole 26) JE-YWO Variance Job Type Exclusion cost_element_group ferc_account percent Salvage -M02 108040 1 Salvage -M02 Salvage -M02 Salvage -M02 108040 108040 108040 1 1 1 Salvage -M02 Remove and scrap all steel structures and electrical equipment in the substation including the transformers. All foundations will be cut below grade, trap rock and fence will be removed. Environmental remediation of the site soil will be covered under this project if necessary. Salvage -M02 STORE011OPSNTRELEXPENSES11 Salvage -M02 CT 11 2024 Sale of Vehicles Salvage -M02 CT 11 2025 Sale of Vehicles Salvage -M02 108040 1 108040 163010 108040 108040 1 1 1 1 Riverside 2R Replace Battery Install Release, scope also includes replacing the battery charger<!-- RICH TEXT -->

Text of RRU-159 Attachment 19.xlsx

Sheet names, column headings and text cells; numbers left out

Text of RRU-159 Attachment 19.pdf

Extracted from the file · 1 page · 5,328 characters

Text of RRU-159 Attachment 18.xlsx

Sheet names, column headings and text cells; numbers left out · first 300,000 characters

Text of RRU-159 Attachment 18.pdf

Extracted from the file · 640 pages · 7,983,236 characters

Text of RRU-159 Attachment 17.xlsx

Sheet names, column headings and text cells; numbers left out · first 300,000 characters

Text of RRU-159 Attachment 17.pdf

Extracted from the file · 855 pages · 14,651,941 characters

Text of RRU-159 Attachment 16.xlsx

Sheet names, column headings and text cells; numbers left out · first 300,000 characters

Text of RRU-159 Attachment 16.pdf

Extracted from the file · 489 pages · 7,076,557 characters

Text of RRU-159 Attachment 15.xlsx

Sheet names, column headings and text cells; numbers left out · first 300,000 characters

Text of RRU-159 Attachment 15.pdf

Extracted from the file · 897 pages · 15,723,777 characters

Text of RRU-159 Attachment 14 .pdf

Extracted from the file · 1 page · 2,589 characters

Text of RRU-159 Attachment 14.xlsx

Sheet names, column headings and text cells; numbers left out

Text of RRU-159 Attachment 13.xlsx

Sheet names, column headings and text cells; numbers left out

Text of RRU-159 Attachment 13.pdf

Extracted from the file · 1 page · 427 characters

Text of RRU-159 Attachment 12.xlsx

Sheet names, column headings and text cells; numbers left out · first 300,000 characters

Text of RRU-159 Attachment 12.pdf

Extracted from the file · 802 pages · 14,341,138 characters

Text of RRU-159 Attachment 11.xlsx

Sheet names, column headings and text cells; numbers left out · first 300,000 characters

Text of RRU-159 Attachment 11.pdf

Extracted from the file · 858 pages · 15,906,152 characters

Text of RRU-159 Attachment 10.xlsx

Sheet names, column headings and text cells; numbers left out

Text of RRU-159 Attachment 10.pdf

Extracted from the file · 1 page · 822 characters

Text of RRU-159 Attachment 09.xlsx

Sheet names, column headings and text cells; numbers left out · first 300,000 characters

Text of RRU-159 Attachment 09.pdf

Extracted from the file · 449 pages · 7,355,312 characters

Text of RRU-159 Attachment 08.xlsx

Sheet names, column headings and text cells; numbers left out · first 300,000 characters

Text of RRU-159 Attachment 08.pdf

Extracted from the file · 867 pages · 13,878,236 characters

Text of RRU-159 Attachment 07.xlsx

Sheet names, column headings and text cells; numbers left out · first 300,000 characters

Text of RRU-159 Attachment 07.pdf

Extracted from the file · 869 pages · 15,728,932 characters

Text of RRU-159 Attachment 06.xlsx

Sheet names, column headings and text cells; numbers left out · first 300,000 characters

Text of RRU-159 Attachment 06.pdf

Extracted from the file · 459 pages · 8,128,897 characters

Text of RRU-159 Attachment 05.xlsx

Sheet names, column headings and text cells; numbers left out · first 300,000 characters

Text of RRU-159 Attachment 05.pdf

Extracted from the file · 879 pages · 16,073,548 characters

Text of RRU-159 Attachment 04.xlsx

Sheet names, column headings and text cells; numbers left out

Text of RRU-159 Attachment 04.pdf

Extracted from the file · 5 pages · 20,994 characters

Text of RRU-159 Attachment 03.xlsx

Sheet names, column headings and text cells; numbers left out · first 300,000 characters

Text of RRU-159 Attachment 03.pdf

Extracted from the file · 840 pages · 14,413,580 characters

Text of RRU-159 Attachment 02.xlsx

Sheet names, column headings and text cells; numbers left out · first 300,000 characters

Text of RRU-159 Attachment 02.pdf

Extracted from the file · 1,137 pages · 16,605,462 characters

Text of RRU-159 Attachment 01.xlsx

Sheet names, column headings and text cells; numbers left out

Text of RRU-159 Attachment 01.pdf

Extracted from the file · 1 page · 1,403 characters

As listed on the current system

Question(s) Answered 159 (Connecticut Light and Power Company dba Eversource Energy) Date Filed: 11/06/2026

This filing on the current system (opens in a new tab)