Interrogatory responses

Answers to questions 159

ResponseFiled by Connecticut Light and Power Company dba Eversource Energy51 files
Part of docket 26-05-10Open
  • Electric
Application of The Connecticut Light and Power Company d/b/a Eversource Energy to Amend its Rate Schedules

Files51

Search terms highlighted
Eversource rate increase is on 36 pages across 17 files of the text below, highlighted. Go to the first matchClear highlighting
Words on different pages
Words on different pages
Words on different pages

Text of RRU-159 Attachment 23.xlsx

Sheet names, column headings and text cells; numbers left out · first 300,000 characters

Text of RRU-159 Attachment 23.pdf

Extracted from the file · 1,160 pages · 16,330,154 characters

Text of RRU-159 Attachment 22.xlsx

Sheet names, column headings and text cells; numbers left out · first 300,000 characters

Text of RRU-159 Attachment 22.pdf

Extracted from the file · 1,203 pages · 14,349,246 characters

Text of RRU-159 Attachment 21.xlsx

Sheet names, column headings and text cells; numbers left out · first 300,000 characters

Text of RRU-159 Attachment 21.pdf

Extracted from the file · 1,203 pages · 13,880,364 characters

Text of RRU-159 Attachment 20.xlsx

Sheet names, column headings and text cells; numbers left out

Text of RRU-159 Attachment 20.pdf

Extracted from the file · 16 pages · 151,762 characters

Text of RRU-159 Attachment 19.xlsx

Sheet names, column headings and text cells; numbers left out

Text of RRU-159 Attachment 19.pdf

Extracted from the file · 1 page · 5,328 characters

Text of RRU-159 Attachment 18.xlsx

Sheet names, column headings and text cells; numbers left out · first 300,000 characters

Text of RRU-159 Attachment 18.pdf

Extracted from the file · 640 pages · 7,983,236 characters

Words on different pages

This spreadsheet is large. Its searchable text keeps the sheet names, column headings and text cells and stops at 300,000 characters, so search may miss words further in. Download the file for every cell and figure.

  1. Part 55 of 76

    3L030454 | DEEP RIVER POST TOP LED REPLACEMENT | DEEP RIVER POST TOP LED REPLACEMENTS 3000K 1 OF 1_x000D_ | Reimbursables-R02 3L030455 | ESSEX POST TOP LED REPLACEMENTS 300 | ESSEX POST TOP LED REPLACEMENTS 3000K 1 OF 1_x000D_ | Reimbursables-R02 3L030456 | GUILFORD POST TOP LED REPLACEMENTS | GUILFORD POST TOP LED REPLACEMENTS 3000K 1 OF 1_x000D_ | Reimbursables-R02 3L030457 | HADDAM POST TOP LED REPLACEMENTS 30 | HADDAM POST TOP LED REPLACEMENTS 3000K 1 OF 1_x000D_ | Reimbursables-R02 3L030459 | MADISON POST TOP LED REPLACEMENTS 3 | MADISON POST TOP LED REPLACEMENTS 3000K 1 OF 1_x000D_ | Reimbursables-R02 3L030460 | NORTH BRANFORD POST TOP LED REPLACE | NORTH BRANFORD POST TOP LED REPLACEMENTS 3000K 1 OF 1_x000D_ | Reimbursables-R02 3L030464 | WESTBROOK POST TOP LED REPLACEMENTS | WESTBROOK POST TOP LED REPLACEMENTS 3000K 1 OF 1_x000D_ | Reimbursables-R02 3L030467 | BRISTOL POST TOP LED REPLACMENTS 30 | BRISTOL POST TOP LED REPLACMENTS 3000L 1 OF 2_x000D_ | Reimbursables-R02 3L030468 | BRISTOL POST TOP LED REPLACMENTS 30 | BRISTOL POST TOP LED REPLACMENTS 3000L 2 OF 2_x000D_ | Reimbursables-R02 3L030474 | (40): CHESHIRE POST TOP LED REPLACE | CHESHIRE POST TOP LED REPLACEMENTS 3000K 1 OF 1_x000D_ | Reimbursables-R02 3L030476 | DURHAM POST TOP LED REPLACEMENTS 30 | DURHAM POST TOP LED REPLACEMENTS 3000K 1 OF 1_x000D_ | Reimbursables-R02 3L030479 | FARMINGTON POST TOP LED REPLACEMENT | FARMINGTON POST TOP LED REPLACEMENTS 3000K 1 OF 2_x000D_ | Reimbursables-R02 3L030480 | FARMINGTON POST TOP LED REPLACEMENT | FARMINGTON POST TOP LED REPLACEMENTS 3000K 2 OF 2_x000D_ | Reimbursables-R02 3L030481 | KENSINGTON (berlin) POST TOP LED RE | KENSINGTON (berlin) POST TOP LED REPLACEMENTS 3000K 1 OF 1_x000D_ | Reimbursables-R02 3L030577 | COLCHESTER POST TOP LED REPLACEMENT | COLCHESTER POST TOP LED REPLACEMENTS 3000K_x000D_ | Reimbursables-R02 3L030580 | EAST HADDAM POST TOP LED REPLACEMEN | EAST HADDAM POST TOP LED REPLACEMENTS 3000K_x000D_ | Reimbursables-R02 3L030582 | EAST HAMPTON POST TOP LED REPLACEME | EAST HAMPTON POST TOP LED REPLACEMENTS 3000K_x000D_ | Reimbursables-R02 3L030590 | HEBRON POST TOP LED REPLACEMENTS 30 | HEBRON POST TOP LED REPLACEMENTS 3000K_x000D_ | Reimbursables-R02 3L030591 | MANCHESTER POST TOP LED REPLACEMENT | MANCHESTER POST TOP LED REPLACEMENTS 3000K_x000D_ | Reimbursables-R02 3L030592 | MARLBOROUGH POST TOP LED REPLACEMEN | MARLBOROUGH POST TOP LED REPLACEMENTS 3000K_x000D_ | Reimbursables-R02 3L030595 | MIDDLEBURY POST TOP LED REPLACEMENT | MIDDLEBURY POST TOP LED REPLACEMENTS 3000K_x000D_ | Reimbursables-R02 3L030596 | MIDDLEFIELD POST TOP LED REPLACEMEN | MIDDLEFIELD POST TOP LED REPLACEMENTS 3000K_x000D_ | Reimbursables-R02 3L030597 | MIDDLETOWN POST TOP LED REPLACEMENT | MIDDLETOWN POST TOP LED REPLACEMENTS 3000K_x000D_ | Reimbursables-R02 3L030598 | NAUGATUCK POST TOP LED REPLACEMENTS | NAUGATUCK POST TOP LED REPLACEMENTS 3000K_x000D_ | Reimbursables-R02 3L030599 | NEW BRITAIN POST TOP LED REPLACEMEN | NEW BRITAIN POST TOP LED REPLACEMENTS 3000K_x000D_ | Reimbursables-R02 3L030600 | PLAINVILLE POST TOP LED REPLACEMENT | PLAINVILLE POST TOP LED REPLACEMENTS 3000_x000D_ | Reimbursables-R02 3L030601 | PLANTSVILLE POST TOP LED REPLACEMEN | PLANTSVILLE POST TOP LED REPLACEMENTS 3000K_x000D_ | Reimbursables-R02 3L030602 | PORTLAND POST TOP LED REPLACEMENTS | PORTLAND POST TOP LED REPLACEMENTS 3000K_x000D_ | Reimbursables-R02 3L030607 | SOUTHINGTON POST TOP LED REPLACEMEN | SOUTHINGTON POST TOP LED REPLACEMENTS 3000K_x000D_ | Reimbursables-R02 3L030613 | WATERBURY POST TOP LED REPLACEMENTS | WATERBURY POST TOP LED REPLACEMENTS 3000K_x000D_ | Reimbursables-R02 3L030615 | WETHERSFIELD POST TOP LED REPLACEME | WETHERSFIELD POST TOP LED REPLACEMENTS 3000K_x000D_ | Reimbursables-R02 3L030616 | WINDHAM POST TOP LED REPLACEMENTS 3 | WINDHAM POST TOP LED REPLACEMENTS 3000K_x000D_ | Reimbursables-R02
  2. Part 56 of 76

    3L030681 | WOODSTOCK PRIVATE COBRA LED REPLACE | WOODSTOCK PRIVATE COBRA LED REPLACEMENT 3000K_x000D_ | Reimbursables-R02 3L520898 | HPS 100W PTT @ PID 79 - COMPLETED 1 | HPS 100W PTT @ PID 79 - COMPLETED 11/6/15 HARES1_x000D_ AP1-YWO Total Cost Less Than 7K | Reimbursables-R02 3L620313 | Municipal Light Fault Locate and Re | Municipal Light Fault Locate and Repair @ PID 4569 NO FEED ON POLES_x000D_ AP1-YWO Total Cost Less Than 7K | Reimbursables-R02 3L620438 | WESTPORT POLE 29551 100 MH PDL - CO | WESTPORT POLE 29551 100 MH PDL - COMPLETED 3/18/16 NTW_x000D_ | Reimbursables-R02 3L620719 | SOUTH WINDSOR POLE 2977 400 HPS COB | SOUTH WINDSOR POLE 2977 400 HPS COBRA - COMPLETED 3/18/16 TOL_x000D_ | Reimbursables-R02 3L620841 | PROSPECT POLE 1597 70 HPS COBRA (SE | PROSPECT POLE 1597 70 HPS COBRA (SEMI TO FULL) - COMPLETED 3/18/16 WTB_x000D_ | Reimbursables-R02 3L620897 | BETHEL POLE 29 70 HPS COBRA - COMPL | BETHEL POLE 29 70 HPS COBRA - COMPLETED 3/9/16 NTW_x000D_ | Reimbursables-R02 3L620934 | WATERBURY POLE G7635 400 HPS FLOOD | WATERBURY POLE G7635 400 HPS FLOOD - COMPLETED 3/11/16 WTB_x000D_ AP1-YWO Total Cost Less Than 7K | Reimbursables-R02 3L620966 | STAMFORD POLE 17 70 HPS PTT - COMP | STAMFORD POLE 17 70 HPS PTT - COMPLETED 3/18/16 NTW_x000D_ | Reimbursables-R02 3L620985 | WINDSOR POLE 2987 70 HPS COBRA - CO | WINDSOR POLE 2987 70 HPS COBRA - COMPLETED 3/18/16 TOL_x000D_ | Reimbursables-R02 3L620990 | BEACON FALLS POLE 22721 250 HPS COB | BEACON FALLS POLE 22721 250 HPS COBRA - COMPLETED 3/18/16 WTB_x000D_ | Reimbursables-R02 3L620993 | WATERBURY POLE 63621 400 HPS COBRA | WATERBURY POLE 63621 400 HPS COBRA - COMPLETED 3/18/16 WTB_x000D_ | Reimbursables-R02 3L620994 | WATERTOWN POLE 6112 70 HPS COBRA - | WATERTOWN POLE 6112 70 HPS COBRA - COMPLETED 3/18/16 WTB_x000D_ | Reimbursables-R02 3L620995 | WINDSOR POLE 2652 70 HPS COBRA - CO | WINDSOR POLE 2652 70 HPS COBRA - COMPLETED 3/18/16 TOL_x000D_ | Reimbursables-R02 3L620996 | MANCHESTER POLE 7984 250 HPS COBRA | MANCHESTER POLE 7984 250 HPS COBRA - COMPLETED 3/18/16 TOL_x000D_ | Reimbursables-R02 3L620999 | WATERBURY POLE 5141 100 HPS COBRA - | WATERBURY POLE 5141 100 HPS COBRA - COMPLETED 3/18/16 HAR_x000D_ | Reimbursables-R02 3L621000 | MERIDEN POLE 5569 70 HPS COBRA - CO | MERIDEN POLE 5569 70 HPS COBRA - COMPLETED 3/18/16 SIM_x000D_ | Reimbursables-R02 3L621875 | STONINGTON POLE 7264 100 HPS PTT 43 | STONINGTON POLE 7264 100 HPS PTT 430740 & BROWN SQUARE 175189_x000D_ AP1-YWO Total Cost Less Than 7K | Reimbursables-R02 3L622637 | Municipal Light Fault Locate and Re | Municipal Light Fault Locate and Repair @ POLE 1210 NO POWER_x000D_ CL-YWO Variance - Contractor Labor | Reimbursables-R02 3L623404 | Municipal Light Fault Locate and Re | Municipal Light Fault Locate and Repair@ POLE C6404 NO POWER_x000D_ AP1-YWO Total Cost Less Than 7K | Reimbursables-R02 3L721076 | HARTFORD POLE 6156 150 HPS COBRA CO | HARTFORD POLE 6156 150 HPS COBRA COMP 4/13 TOL_x000D_ AP1-YWO Total Cost Less Than 7K | Reimbursables-R02 3L721151 | BLOOMFIELD, CHESTNUT HILL RD, P-54 | BLOOMFIELD, CHESTNUT HILL RD, P-5481 REMOVED 100W HPS PTT/NEED TO REPLACE_x000D_ AP1-YWO Total Cost Less Than 7K | Reimbursables-R02 3L721835 | WATERFORD POLE 3764 50 HPS COBRA CO | WATERFORD POLE 3764 50 HPS COBRA COMPLETED 7/24 CHE_x000D_ AP1-YWO Total Cost Less Than 7K | Reimbursables-R02 3L721945 | TORRINGTON POLE 3560 150 HPS COBRA | TORRINGTON POLE 3560 150 HPS COBRA COMPLETED 8/3 CHE_x000D_ AP1-YWO Total Cost Less Than 7K | Reimbursables-R02 3L722556 | BLOOMFIELD POLE 5616 100 HPS PTT & | BLOOMFIELD POLE 5616 100 HPS PTT & BROWN SQUARE POLE_x000D_ AP1-YWO Total Cost Less Than 7K | Reimbursables-R02 3L722822 | LEDYARD POLE 6045 250 HPS COBRA COM | LEDYARD POLE 6045 250 HPS COBRA COMPLETED 10/24 EHA_x000D_ AP1-YWO Total Cost Less Than 7K | Reimbursables-R02 3L722823 | LEDYARD POLE 96 50 HPS COBRA COMPLE | LEDYARD POLE 96 50 HPS COBRA COMPLETED 10/24 EHA_x000D_
  3. Part 57 of 76

    AP1-YWO Total Cost Less Than 7K | Reimbursables-R02 3L722875 | PLYMOUTH POLE 1711 150 HPS PTT FIXT | PLYMOUTH POLE 1711 150 HPS PTT FIXTURE IS WORKING 03/01 NTW_x000D_ AP1-YWO Total Cost Less Than 7K | Reimbursables-R02 3L820579 | STAMFORD POLE 16917 250 HPS COBRA C | STAMFORD POLE 16917 250 HPS COBRA COMPLETED 12/20 NTW_x000D_ AP1-YWO Total Cost Less Than 7K | Reimbursables-R02 3L820837 | FARMINGTON POLE 1076 70 HPS COBRA - | FARMINGTON POLE 1076 70 HPS COBRA - COMP 2/3/18 TOL_x000D_ AP1-YWO Total Cost Less Than 7K | Reimbursables-R02 3L821505 | WATERBURY POLE 7175 150 HPS COBRA C | WATERBURY POLE 7175 150 HPS COBRA COMPLETED 04/09 CHE_x000D_ AP1-YWO Total Cost Less Than 7K | Reimbursables-R02 3L821619 | COMP 5/23/18 CCC-LEDYARD POLE 2807 | COMP 5/23/18 CCC-LEDYARD POLE 2807 BROWN SQ POLE & 51W PTT 601648_x000D_ AP1-YWO Total Cost Less Than 7K | Reimbursables-R02 3L821890 | RTM-COMP 9/28/18 CCC MERIDEN POLE 4 | RTM-COMP 9/28/18 CCC MERIDEN POLE 42 BR SQ & RMV 150 HPS PTT, INST 51W LED PTT_x000D_ AP1-YWO Total Cost Less Than 7K | Reimbursables-R02 3L821930 | COMP 10/03/18 CCC POLE 4032 NEEDS T | COMP 10/03/18 CCC POLE 4032 NEEDS TO BE STRAIGHTENED & NEEDS 28W LED PTT_x000D_ AP1-YWO Total Cost Less Than 7K | Reimbursables-R02 3L822274 | HARTFORD POLE 9052 RMV 92W, INST 92 | HARTFORD POLE 9052 RMV 92W, INST 92W COMPLETED 07/20 TOL_x000D_ AP1-YWO Total Cost Less Than 7K | Reimbursables-R02 3L823415 | BRANFORD POLE 5918 RMV 36W, INST 30 | BRANFORD POLE 5918 RMV 36W, INST 30W_x000D_ AP1-YWO Total Cost Less Than 7K | Reimbursables-R02 3L920069 | SOUTH WINDSOR POST TOP LED REPLACEM | SOUTH WINDSOR POST TOP LED REPLACEMENTS (7 OF 11) | Reimbursables-R02 3L920070 | SOUTH WINDSOR POST TOP LED REPLACEM | SOUTH WINDSOR POST TOP LED REPLACEMENTS (8 OF 11) | Reimbursables-R02 3L920794 | Pole ID: 4167 RMV 70 HPS PTT INSTAL | Pole ID: 4167 RMV 70 HPS PTT INSTALL 28W LED PTT COMP 2/11/19 CHE1_x000D_ AP1-YWO Total Cost Less Than 7K | Reimbursables-R02 3L921304 | WOODSTOCK VALLEY PRIVATE LED COBRA | WOODSTOCK VALLEY PRIVATE LED COBRA REPLACEMENT 3000K 1 OF 1_x000D_ | Reimbursables-R02 3R420243 | CD00316-02; 11C14 Resiliency; Recon | CD00316-02; 11C14 Resiliency; Recon. RT 81 w 336 TW pole 602 to 637; WO 3 of 3_x000D_ AP2-YWO Total Cost Variance Met - Variance :-6.1021 MIN.:-20 MAX.:20 | Reimbursables-R02 3R420245 | bwg/CD000320 pole replacements&reco | bwg/CD000320 pole replacements&reconductor Rte 80 30R8 BB to 336TW,Killingworth_x000D_ CI-YWO Variance - Contractor Invoice | Reimbursables-R02 3R420248 | MP - CD00320-02 - 30R8 - Reconducto | MP - CD00320-02 - 30R8 - Reconductor RTE 80-BB to 336TW - 2 of 2, Madison_x000D_ MS-YWO Variance - Multiple Setups | Reimbursables-R02 3R420330 | CD00283-02 Ashford, RT 44, Knowlto | CD00283-02 Ashford, RT 44, Knowlton Hill Rd (pole 1089) to (pole 1120)_x000D_ CL-YWO Variance - Contractor Labor | Reimbursables-R02 3R520161 | CD00389-01 Remove Autos & Convert | CD00389-01 Remove Autos & Convert Boston Post Rd, Guilford_x000D_ CI-YWO Variance - Contractor Invoice | Reimbursables-R02 3R520162 | CD00389-03 Convert Tanner Marsh & | CD00389-03 Convert Tanner Marsh & Clapboard Hill & Hang Steps_x000D_ CI-YWO Variance - Contractor Invoice | Reimbursables-R02 3R520167 | CD00387-04 Replace Pad 312 Rt 1 | CD00387-04 Replace Pad 312 Rt 1 Guilford_x000D_ CI-YWO Variance - Contractor Invoice | Reimbursables-R02 3R520199 | CD00390-02 - System Resiliency - St | CD00390-02 - System Resiliency - Step Down XFMRs - Wildrose & Sam Hill_x000D_ CI-YWO Variance - Contractor Invoice | Reimbursables-R02 3R620039 | JL 2015 SR highway crossing Locatio | JL 2015 SR highway crossing Location ID 139937542 Pole 946 & 947_x000D_ CL-YWO Variance - Contractor Labor | Reimbursables-R02 3R620095 | CD00103-13 11M3 seg 13 resiliency p | CD00103-13 11M3 seg 13 resiliency part 1_x000D_ AP2-YWO Total Cost Variance Met - Variance :8.3386 MIN.:-30 MAX.:30 | Reimbursables-R02
  4. Part 58 of 76

    3R620120 | BW 2015 SR Highway Crossing, Locati | BW 2015 SR Highway Crossing, LocationID46668676, Pole 3472 & 3473_x000D_ CI-YWO Variance - Contractor Invoice | Reimbursables-R02 3R620286 | MK SR Highway Crossing, LocationID- | MK SR Highway Crossing, LocationID-46921324, Poles-4515,4514_x000D_ CI-YWO Variance - Contractor Invoice | Reimbursables-R02 3R620320 | BC-CD00630-02 SR Hwy Xng Upg;Obj ID | BC-CD00630-02 SR Hwy Xng Upg;Obj ID(135331980&139930744), I-691@Lewis Ave 417412_x000D_ AP2-YWO Total Cost Variance Met - Variance :-4.2222 MIN.:-30 MAX.:30 | Reimbursables-R02 3R620361 | SR Highway Crossing Upgrades CD0063 | SR Highway Crossing Upgrades CD00631-02 Object ID (46795754) E. River Rd_x000D_ | Reimbursables-R02 3R620362 | CD00631 SR HIGWY XING UPGRADES OBJE | CD00631 SR HIGWY XING UPGRADES OBJECT ID (46818750) HARTFORD RD_x000D_ | Reimbursables-R02 3R620488 | WINDSOR, POQUONOCK AVE - INSTALL LI | WINDSOR, POQUONOCK AVE - INSTALL LINE SENSOR AT 1PH RECLOSER 24J3-160R_x000D_ AP2-YWO Total Cost Variance Met - Variance :32.6622 MIN.:-50 MAX.:150 | Reimbursables-R02 3R620494 | BLOOMFIELD, SIMSBURY RD - INSTALL L | BLOOMFIELD, SIMSBURY RD - INSTALL LINE SENSORS FOR FEEDER METERING 44 S/S_x000D_ AP1-YWO Total Cost Less Than 7K | Reimbursables-R02 3R620616 | RA CD00571-08 Install 3-167KVA S/D | RA CD00571-08 Install 3-167KVA S/D's Sunset Ave Putnam_x000D_ CI-YWO Variance - Contractor Invoice | Reimbursables-R02 3R620628 | CD00392 - Transfer 35L7-90T from P. | CD00392 - Transfer 35L7-90T from P.7242 to P.6475 - Segment 1_x000D_ AP2-YWO Total Cost Variance Met - Variance :-45.4462 MIN.:-50 MAX.:50 | Reimbursables-R02 3R620629 | CD00392 - Reconductor 35L7 Boston P | CD00392 - Reconductor 35L7 Boston Post Rd - Segment 2 WR 1 of 2_x000D_ CI-YWO Variance - Contractor Invoice | Reimbursables-R02 3R620630 | CD00392 - Reconductor 35L7 Boston P | CD00392 - Reconductor 35L7 Boston Post Rd - Segment 2 WR 2 of 2_x000D_ CI-YWO Variance - Contractor Invoice | Reimbursables-R02 3R620648 | BC- CD00746-03 Inst 333kVA Step Xfm | BC- CD00746-03 Inst 333kVA Step Xfmr Bnk pole 996, Shore Rd_x000D_ CL-YWO Variance - Contractor Labor | Reimbursables-R02 3R620743 | CD00647-02, 28J1 convert OH, Branfo | CD00647-02, 28J1 convert OH, Branford, 1 of 3_x000D_ CL-YWO Variance - Contractor Labor | Reimbursables-R02 3R621016 | CD00471-01Elim. 23U Voluntown S/S C | CD00471-01Elim. 23U Voluntown S/S Conversion Work #1_x000D_ AP2-YWO Total Cost Variance Met - Variance :6.287 MIN.:-30 MAX.:30 | Reimbursables-R02 3R621017 | CD00471-01Elim. 23U Voluntown S/S C | CD00471-01Elim. 23U Voluntown S/S Conversion Work #2_x000D_ AP2-YWO Total Cost Variance Met - Variance :-28.5624 MIN.:-30 MAX.:30 | Reimbursables-R02 3R621018 | CD00471-01Elim. 23U Voluntown S/S C | CD00471-01Elim. 23U Voluntown S/S Conversion Work #3_x000D_ CI-YWO Variance - Contractor Invoice | Reimbursables-R02 3R621019 | CD00471-01Elim. 23U Voluntown S/S C | CD00471-01Elim. 23U Voluntown S/S Conversion Work #4_x000D_ AP2-YWO Total Cost Variance Met - Variance :-32.8857 MIN.:-40 MAX.:40 | Reimbursables-R02 3R621020 | CD00471-01Elim. 23U Voluntown S/S C | CD00471-01Elim. 23U Voluntown S/S Conversion Work #5_x000D_ AP2-YWO Total Cost Variance Met - Variance :-18.003 MIN.:-20 MAX.:20 | Reimbursables-R02 3R621025 | CD00471-01 Elim. 23U Voluntown S/S | CD00471-01 Elim. 23U Voluntown S/S - Convert Machine Shop w/XFbank_x000D_ AP3-YWO Resource Variance Met- Labor 4 <= 32 OR 300 <= 30 And Contractor $351.6 <= 2000 | Reimbursables-R02 3R621026 | CD00471-01 Recond. & Convert Gate S | CD00471-01 Recond. & Convert Gate St - Place 1Ph. on Phase B_x000D_ AP2-YWO Total Cost Variance Met - Variance :-26.0201 MIN.:-30 MAX.:30 | Reimbursables-R02 3R621028 | CD00471-01 Elim. 23U Voluntown S/S | CD00471-01 Elim. 23U Voluntown S/S Convert School & Housing Authority Phase A_x000D_ AP2-YWO Total Cost Variance Met - Variance :-25.243 MIN.:-30 MAX.:30 | Reimbursables-R02
  5. Part 59 of 76

    3R621031 | CD00471-02 Conversion Work Install | CD00471-02 Conversion Work Install Step Down XF Rte.165 - Place on Phase C_x000D_ AP2-YWO Total Cost Variance Met - Variance :-28.6336 MIN.:-40 MAX.:40 | Reimbursables-R02 3R621032 | CD00471-03 Conversion Work Rte.49 S | CD00471-03 Conversion Work Rte.49 South_x000D_ AP2-YWO Total Cost Variance Met - Variance :-25.124 MIN.:-30 MAX.:30 | Reimbursables-R02 3R621034 | CD00471-04 Conversion Work Install | CD00471-04 Conversion Work Install Step Down XF Rte.49 North_x000D_ AP2-YWO Total Cost Variance Met - Variance :32.2343 MIN.:-40 MAX.:40 | Reimbursables-R02 3R621035 | CD00471-04 Conversion Work Install | CD00471-04 Conversion Work Install Open Point P#41 Rte.49 North_x000D_ AP1-YWO Total Cost Less Than 7K | Reimbursables-R02 3R621036 | CD00471-04 Conversion Work Install | CD00471-04 Conversion Work Install Step Down XF Rte.49 North_x000D_ AP2-YWO Total Cost Variance Met - Variance :2.0975 MIN.:-40 MAX.:40 | Reimbursables-R02 3R621037 | CD00471-05 Conversion Work Install | CD00471-05 Conversion Work Install Step Down XF Shetucket Tpke P#449_x000D_ AP2-YWO Total Cost Variance Met - Variance :-30.923 MIN.:-40 MAX.:40 | Reimbursables-R02 3R621038 | CD00471-05 Conversion Work Install | CD00471-05 Conversion Work Install Open Point Btwn. Stepdowns P#2046_x000D_ AP2-YWO Total Cost Variance Met - Variance :-30.5759 MIN.:-50 MAX.:50 | Reimbursables-R02 3R621047 | CD00471-09 Conversion Work Forge Hi | CD00471-09 Conversion Work Forge Hill Rd Job 2_x000D_ AP2-YWO Total Cost Variance Met - Variance :-4.4317 MIN.:-20 MAX.:20 | Reimbursables-R02 3R621049 | CD00471-09 Conversion Work Inst.Ste | CD00471-09 Conversion Work Inst.Step Down XF's No.Shore & Wylie School Job 4_x000D_ AP2-YWO Total Cost Variance Met - Variance :-12.178 MIN.:-30 MAX.:30 | Reimbursables-R02 3R621050 | CD00471-10 Conversion Work Install | CD00471-10 Conversion Work Install Step Down XF Bennett Rd_x000D_ AP2-YWO Total Cost Variance Met - Variance :-26.4673 MIN.:-40 MAX.:40 | Reimbursables-R02 3R621058 | CD00471-01 Elim. 23U S/S Install 13 | CD00471-01 Elim. 23U S/S Install 13B25-160R P#4 w/pole replacements_x000D_ CL-YWO Variance - Contractor Labor | Reimbursables-R02 3R621059 | CD00471-01 Elim. 23U S/S & Inst. Te | CD00471-01 Elim. 23U S/S & Inst. Temp. 500KVA Step XF's for Conversion_x000D_ AP2-YWO Total Cost Variance Met - Variance :-19.1314 MIN.:-30 MAX.:30 | Reimbursables-R02 3R720018 | CB CD00815-01Install line sensor Po | CB CD00815-01Install line sensor Pole D1455 GreenHollow Rd Plainfield 13B21-F002_x000D_ AP2-YWO Total Cost Variance Met - Variance :.4642 MIN.:-50 MAX.:50 | Reimbursables-R02 3R720019 | CB CD00815-01 Install line sensor P | CB CD00815-01 Install line sensor Pole3524 Green Hollow Rd Plainfield 13B27-F002_x000D_ AP2-YWO Total Cost Variance Met - Variance :8.0215 MIN.:-50 MAX.:150 | Reimbursables-R02 3R720020 | CAL - CD00849-01 - Ckt 21M1 MBI Ini | CAL - CD00849-01 - Ckt 21M1 MBI Initiative Design Work, Westport_x000D_ CL-YWO Variance - Contractor Labor | Reimbursables-R02 3R720043 | CAL - CD00849-01 - Ckt 21M15 MBI In | CAL - CD00849-01 - Ckt 21M15 MBI Initiative Design Work, Weston_x000D_ AP1-YWO Total Cost Less Than 7K | Reimbursables-R02 3R720059 | CAL - CD00849-01 - Ckt 23K12 MBI In | CAL - CD00849-01 - Ckt 23K12 MBI Initiative Design Work, Westport_x000D_ AP1-YWO Total Cost Less Than 7K | Reimbursables-R02 3R720097 | CAL - CD00849-01 - Ckt 28A1 MBI Ini | CAL - CD00849-01 - Ckt 28A1 MBI Initiative Design Work, Norwalk_x000D_ AP1-YWO Total Cost Less Than 7K | Reimbursables-R02 3R720326 | CD00471-01 Reconfig. Ovhd Lines in | CD00471-01 Reconfig. Ovhd Lines in Front of 23U S/S_x000D_ AP2-YWO Total Cost Variance Met - Variance :-17.2137 MIN.:-40 MAX.:40 | Reimbursables-R02 3S220797 | JMS Blmfld Barn Hill Rd - SET 2 POL | JMS Blmfld Barn Hill Rd - SET 2 POLES, RECONDUCTOR, INSTALL 3-1PH RECL_x000D_ | Reimbursables-R02
  6. Part 60 of 76

    3S321466 | CDOT 17-186 - RTE 6 Farmington Road | CDOT 17-186 - RTE 6 Farmington Road Widening - OH 6 of 6 - Scott Swamp Rd_x000D_ JE-YWO Variance Job Type Exclusion | Reimbursables-R02 3S420666 | Farmington Ave. Farm. @ UConn Heath | Farmington Ave. Farm. @ UConn Heath Center. Adjust MH covers @ 10 locations_x000D_ AP2-YWO Total Cost Variance Met - Variance :29.7392 MIN.:-40 MAX.:40 | Reimbursables-R02 3S520060 | Elec Svc Existing Com/Ind DESG (DN) | Elec Svc Existing Com/Ind DESG (DN)_x000D_ | Reimbursables-R02 3S521081 | DB LOOP URD AT DUNCASTER WOOD, GRAN | DB LOOP URD AT DUNCASTER WOOD, GRANBY_x000D_ JE-YWO Variance Job Type Exclusion | Reimbursables-R02 3S521505 | 16 BARNARD DR, SIMSBURY / REPLACE O | 16 BARNARD DR, SIMSBURY / REPLACE OH SVC W/ #2 TPX_x000D_ | Reimbursables-R02 3S620038 | W HTFD, South Main St., Replaced Ne | W HTFD, South Main St., Replaced Network Protector and transformer U-259_x000D_ | Reimbursables-R02 3S620064 | SIMSBURY 995 HOPMEADOW WESTMINSTER | SIMSBURY 995 HOPMEADOW WESTMINSTER SCHOOL LINE RELO (PHASE 1)_x000D_ AP1-YWO Total Cost Less Than 7K | Reimbursables-R02 900MHZ RADIO SITE BUILD - GREENWICH | 900MHZ RADIO SITE BUILD - GREENWICH | Reimbursables-R02 CL&P MHZ RADIO PROJECT SOUTHINGTON | CL&P MHZ RADIO PROJECT SOUTHINGTON | Reimbursables-R02 CL&P MHZ RADIO PROJECT STONE RANCH CTSP | Reimbursables-R02 CL&P MHZ RADIO PROJECT WESTBROOK CT | CL&P MHZ RADIO PROJECT WESTBROOK CTSP | Reimbursables-R02 CL&P 900 MHZ RADIO PROJECT LAKEVIEW | CL&P 900 MHZ RADIO PROJECT LAKEVIEW SS | Reimbursables-R02 CL&P 900 MHZ RADIO PROJECT LITCHFIE | CL&P 900 MHZ RADIO PROJECT LITCHFIELD CTSP | Reimbursables-R02 CL&P 900 MHZ RADIO PROJECT MONROE | CL&P 900 MHZ RADIO PROJECT MONROE | Reimbursables-R02 CL&P 900 MHZ RADIO PROJECT RIDGEFIE | CL&P 900 MHZ RADIO PROJECT RIDGEFIELD | Reimbursables-R02 CL&P 900 MHZ RADIO PROJECT OXFORD C | CL&P 900 MHZ RADIO PROJECT OXFORD CTSP | Reimbursables-R02 CL&P 900 MHZ RADIO PROJECT SOUTHBUR | CL&P 900 MHZ RADIO PROJECT SOUTHBURY CTSP | Reimbursables-R02 CL&P 900 MHZ RADIO PROJECT WILTON C | CL&P 900 MHZ RADIO PROJECT WILTON CTSP | Reimbursables-R02 CL&P 900 MHZ PROJECT - BROOKLYN | CL&P 900 MHZ PROJECT - BROOKLY CROWN CASTLE 116 GRANT HILL ROAD | Reimbursables-R02 TOLLAND 900 MHZ RADIO SITE WORK | TOLLAND 900 MHZ RADIO SITE WORK | Reimbursables-R02 900 MHZ RADIO SITE WORK-GOOSE HILL- | 900 MHZ RADIO SITE WORK-GOOSE HILL-SHELTER REQUESTOR - P. SCHUBERTH MANAGER-G. BLANCHARD | Reimbursables-R02 CL&P 900 MHZ RADIO PROJECT UNION | CL&P 900 MHZ RADIO PROJECT UNION | Reimbursables-R02 CL&P 900 MHZ RADIO PROJECT THOMPSON | CL&P 900 MHZ RADIO PROJECT THOMPSON | Reimbursables-R02 900 MHZ RADIO SITE WORK-DISASTER RE | 900 MHZ RADIO SITE WORK-DISASTER RECOVERY EQUIPMENT REQUESTOR - P. SCHUBERTH MANAGER-G. BLANCHARD | Reimbursables-R02 CL&P 900 MHZ RADIO PROJECT - TALCOT | CL&P 900 MHZ RADIO PROJECT - TALCOTT MOUNTAIN | Reimbursables-R02 CL&P 900 MHZ RADIO PROJECT - STONIN | CL&P 900 MHZ RADIO PROJECT - STONINGTON | Reimbursables-R02 900 MHZ RADIOS - HOLDING WORKORDER | 900 MHZ RADIOS - HOLDING WORKORDER | Reimbursables-R02 CL&P 900 MHZ RADIO PROJECT-MOHAWK M | CL&P 900 MHZ RADIO PROJECT-MOHAWK MTN-GOSHEN | Reimbursables-R02 CL&P 900 MHZ RADIO PROJECT-W ROCK R | CL&P 900 MHZ RADIO PROJECT-WEST ROCK RIDGE NEW HAVEN | Reimbursables-R02 CL&P 900 MHZ RADIO PROJECT-TOTOKET | CL&P 900 MHZ RADIO PROJECT - TOTOKET RIDGE - NORTH GUILFORD | Reimbursables-R02 CL&P 900 MHZ RADIO PROJECT-JOHN TOM | CL&P 900 MHZ RADIO PROJECT - JOHN TOM HILL GLASTONBURY | Reimbursables-R02 CL&P 900 MHZ RADIO PROJECT-TROOP C | CL&P 900 MHZ RADIO PROJECT-TROOP C TOLLAND | Reimbursables-R02 CL&P 900 MHZ RADIO PROJECT-VINEGAR | CL&P 900 MHZ RADIO PROJECT-VINEGAR HILL - LEDYARD | Reimbursables-R02 CL&P 900 MHZ RADIO PROJCT-N EAGLEVI | CL&P 900 MHZ RADIO PROJECT - NORTH EAGLEVILLE ROAD - STORRS | Reimbursables-R02 CL&P 900 MHZ RADIO PROJCT-EKONK_- S | CL&P 900 MHZ RADIO PROJECT - STERLING | Reimbursables-R02
  7. Part 61 of 76

    CL&P 900 MHZ RADIO PROJCT-WESTPORT | CL&P 900 MHZ RADIO PROJECT - WESTPORT | Reimbursables-R02 CL&P 900 MHZ RADIO PROJCT-WEST PEAK | CL&P 900 MHZ RADIO PROJECT - WEST PEAK BROOKLYN CT | Reimbursables-R02 CL&P 900 MHZ RADIO PROJCT-PROSPECT | CL&P 900 MHZ RADIO PROJECT - PROSPECT | Reimbursables-R02 CL&P 900 MHZ RADIO PROJCT-SOUTH MOU | CL&P 900 MHZ RADIO PROJECT - SOUTH MOUNTAIN BRISTOL CT | Reimbursables-R02 CL&P 900 MHZ RADIO PROJCT-WOODBURY | CL&P 900 MHZ RADIO PROJECT - WOODBURY------ 202 GREAT HILL ROAD | Reimbursables-R02 CL&P 900 MHZ RADIO PROJCT-COOPER ST | CL&P 900 MHZ RADIO PROJECT - COOPER STREET- 46 COOPER STREET, MERIDEN CT CONTACT: P.SCHUBERTH-MANAGER: G. BLANCHARD | Reimbursables-R02 CL&P 900 MHZ RADIO PROJCT-NEWINGTON | CL&P 900 MHZ RADIO PROJECT - NEWINGTON- 3333 BERLIN TURNPIKE, NEWINGTON CONTACT: P.SCHUBERTH-MANAGER: G. BLANCHARD | Reimbursables-R02 CL&P 900 MHZ BALD HILL UNION | CL&P 900 MHZ RADIO PROJECT - BALD HILL ROAD, UNION CT PURCHASE ANTENNA SYSTEM FOR DSCADA BASE AND CONTRACTOR LABOR | Reimbursables-R02 4D031057 | (40,0): NS- 78 Longshore Ln, Reloca | NS- 78 Longshore Ln, Relocate P 380, Ins 4/0 AL to House, Rmv Oh Svc_x000D_ | Reimbursables-R02 4D031358 | 30 OLD POST RD, CL Primary Metering | Elec Svc New Com/Ind IT Meter DESG (DN) | Reimbursables-R02 4D130005 | 4 Pelton Ave, Old Saybrook: new OH | to design: 4 Pelton Ave, Old Saybrook: new OH service | Reimbursables-R02 4D130044 | ALL WORK COMPLETE | Elec Maint Trouble Call - Repairs/Obsolescence OH (AROH) | Reimbursables-R02 4D220696 | TS- BRADLEY AVE. BRANFORD. P#37212. | TS- BRADLEY AVE. BRANFORD. P#37212. INST THREE 900A IN-LINE SWITCHES_x000D_ | Reimbursables-R02 4D321128 | cb//high st @ ridge rd, chester//sh | cb//high st @ ridge rd, chester//shift to ATT pole 749 & 750_x000D_ AP2-YWO Total Cost Variance Met - Variance :28.1567 MIN.:-50 MAX.:150 | Reimbursables-R02 4D421399 | 9/6,ESO,9A,car vp3036 trouble ticke | 9/6,ESO,9A,car vp3036 trouble ticket & timesheet in documents_x000D_ AP2-YWO Total Cost Variance Met - Variance :39.5828 MIN.:-50 MAX.:50 | Reimbursables-R02 4D520654 | CD00423, seg01, 30R13/11J58 ROW rel | CD00423, seg01, 30R13/11J58 ROW relocate, U.G., Guilford_x000D_ CL-YWO Variance - Contractor Labor | Reimbursables-R02 4D520695 | NS- P 272 Cow Hill Rd, CL- Shift to | NS- P 272 Cow Hill Rd, CL- Shift to Frontier Pole 272_x000D_ | Reimbursables-R02 4D521360 | Notify 299187 (child 311443), Billa | Notify 299187 (child 311443), Billable, DAS pole 1870, Old Saybrook_x000D_ | Reimbursables-R02 4D521524 | CDOT 59-161/CD00610, UG civil work | CDOT 59-161/CD00610, UG civil work 35L9/35L7, long hill rd, Guilford, stage1_x000D_ AP2-YWO Total Cost Variance Met - Variance :-35.8544 MIN.:-40 MAX.:40 | Reimbursables-R02 4D620226 | Elec Maint Replace/Renewal/Obsol OH | Elec Maint Replace/Renewal/Obsol OH DESG (AROH)_x000D_ AP1-YWO Total Cost Less Than 7K | Reimbursables-R02 4D620423 | MV-MADISON CREWS REPLACED REJECT PO | MV-MADISON CREWS REPLACED REJECT POLE 1170_x000D_ AP1-YWO Total Cost Less Than 7K | Reimbursables-R02 4D620654 | NS- P 692 Cow Hill Rd, KW- Shift to | NS- P 692 Cow Hill Rd, KW- Shift to New Pole, Rmv 600A Disconnects_x000D_ CL-YWO Variance - Contractor Labor | Reimbursables-R02 4D620709 | CB//GUILFORD, 95 HART RD//RELOCATE | CB//GUILFORD, 95 HART RD//RELOCATE OH SVC_x000D_ | Reimbursables-R02 4D620878 | ESO - 6/4 Stevenstown Rd. Westbrook | ESO - 6/4 Stevenstown Rd. Westbrook CAR V POLE 651- FOLLOW UP WORK REQUIRED_x000D_ AP2-YWO Total Cost Variance Met - Variance :99.9865 MIN.:-50 MAX.:150 | Reimbursables-R02 4D621010 | SH-Convo#399782-(MakeReadyREIMB) - | SH-Convo#399782-(MakeReadyREIMB) - VZ Parent Convo#378446_x000D_ AP1-YWO Total Cost Less Than 7K | Reimbursables-R02 4D621073 | NS- 215 Old Mail Trl, WB- Ins Oh Sv | NS- 215 Old Mail Trl, WB- Ins Oh Svc from P 1005_x000D_ AP1-YWO Total Cost Less Than 7K | Reimbursables-R02 4D621162 | PATROL REPAIRS 30R10 - GUILFORD | PATROL REPAIRS 30R10 - GUILFORD_x000D_
  8. Part 62 of 76

    CL-YWO Variance - Contractor Labor | Reimbursables-R02 4D621215 | (DF) Ple 957 -(R/I) Pole & 1 Ph tpo | (DF) Ple 957 -(R/I) Pole & 1 Ph tpo & 1 Ph tap ESO 9A_x000D_ AP2-YWO Total Cost Variance Met - Variance :94.7836 MIN.:-50 MAX.:150 | Reimbursables-R02 4D621244 | PATROL REPAIRS, 30R8, MADISON | PATROL REPAIRS, 30R8, MADISON_x000D_ CL-YWO Variance - Contractor Labor | Reimbursables-R02 4D621412 | ESO- 9A Pole - P 2473- Hemlock Dr, | ESO- 9A Pole - P 2473- Hemlock Dr, KW- FOLLOW UP WORK- Rplc Pole & Shift_x000D_ AP2-YWO Total Cost Variance Met - Variance :50.483 MIN.:-50 MAX.:150 | Reimbursables-R02 4D621438 | (DF) PATROL REPAIRS, 30R9, WESTBROO | (DF) PATROL REPAIRS, 30R9, WESTBROOK_x000D_ AP1-YWO Total Cost Less Than 7K | Reimbursables-R02 4D621442 | PATROL REPAIRS, 11J45 - BRANFORD | PATROL REPAIRS, 11J45 - BRANFORD_x000D_ AP2-YWO Total Cost Variance Met - Variance :11.1984 MIN.:-20 MAX.:20 | Reimbursables-R02 4D621494 | S Main St, Deep River/TL-ESO - 9A - | S Main St, Deep River/TL-ESO - 9A - 10/12 Car vs Pole 337_x000D_ AP1-YWO Total Cost Less Than 7K | Reimbursables-R02 4D621517 | Bokum Rd, Essex/TL-11/20/16 9A car | Bokum Rd, Essex/TL-11/20/16 9A car vs pole 156 see attached TT_x000D_ AP2-YWO Total Cost Variance Met - Variance :37.7622 MIN.:-50 MAX.:50 | Reimbursables-R02 4D621682 | Attanwanhood Trl, #1 Old Saybrook/T | Attanwanhood Trl, #1 Old Saybrook/TL--REPL #4 AL SVC W/#2 70'_x000D_ AP1-YWO Total Cost Less Than 7K | Reimbursables-R02 4D720127 | CB//Guilford, Boston Post Rd @ Notc | CB//Guilford, Boston Post Rd @ Notch Hill Rd//9A follow up,Install lights,ins_x000D_ NL-YWO Variance - NU Construction Labor | Reimbursables-R02 4D720134 | Hartlands Dr, #35 Old Saybrook/TL-P | Hartlands Dr, #35 Old Saybrook/TL-POLE 496 - NEED NEW 60' SVC TO HOUSE_x000D_ AP1-YWO Total Cost Less Than 7K | Reimbursables-R02 4D720143 | TS 174 CEDAR ST BFD P6716 & 44072 I | TS 174 CEDAR ST BFD P6716 & 44072 INS 1000WMH FLOODS_x000D_ AP1-YWO Total Cost Less Than 7K | Reimbursables-R02 4D720149 | CB//GUILFORD, MOOSE HILL RD//UPGRAD | CB//GUILFORD, MOOSE HILL RD//UPGRADE FUSES/CUTOUTS TO 140K POLE 2_x000D_ AP1-YWO Total Cost Less Than 7K | Reimbursables-R02 4D720188 | Bahr Rd, #3 Deep River/TL-INST (65' | Bahr Rd, #3 Deep River/TL-INST (65',4/03CT) OH-DB SVC FROM P#423 ON W ELM ST_x000D_ AP1-YWO Total Cost Less Than 7K | Reimbursables-R02 4D720194 | CB//MADISON, 57 MIDDLE BEACH RD W// | CB//MADISON, 57 MIDDLE BEACH RD W//NEW SVC, SHIFT POLE/WORKS W TEMP RMVL_x000D_ AP1-YWO Total Cost Less Than 7K | Reimbursables-R02 4D720220 | CB//MADISON, 75 NEW RD//SVC UPGRADE | CB//MADISON, 75 NEW RD//SVC UPGRADE 200A/RPL SVC W #2TPX IF ITS #4TPX_x000D_ AP1-YWO Total Cost Less Than 7K | Reimbursables-R02 4D720245 | Stanford Hill Rd, #32 Essex/TL-REPL | Stanford Hill Rd, #32 Essex/TL-REPL EX OH SVC FROM P#432 ***BACKYARD FEED***_x000D_ | Reimbursables-R02 4D720251 | CB//MADISON, HULL RD//RELOCATE SECO | CB//MADISON, HULL RD//RELOCATE SECONDARY,XF (EXISTING CROSS FUSE)_x000D_ AP1-YWO Total Cost Less Than 7K | Reimbursables-R02 4D720272 | RSO 2/22 -- WESTBROOK, 798 HORSE HI | RSO 2/22 -- WESTBROOK, 798 HORSE HILL RD- POLE # 2211 - NEEDS 60' OF #2 SERVICE_x000D_ AP1-YWO Total Cost Less Than 7K | Reimbursables-R02 4D720286 | 48 LINDEN AVE (IN OWENEGO BEACH CLU | 48 LINDEN AVE (IN OWENEGO BEACH CLUB) P37670 RPL SVC //PRE CHECK OVER ROOF_x000D_ AP1-YWO Total Cost Less Than 7K | Reimbursables-R02 4D720301 | CB//GUILFORD, CHAFFINCH ISLAND RD// | CB//GUILFORD, CHAFFINCH ISLAND RD//INSTALL CUTOUTS VARIOUS LOCATIONS (3ORMORE)_x000D_ AP1-YWO Total Cost Less Than 7K | Reimbursables-R02 4D720314 | S Cove Rd II, #34 Old Saybrook/TL-I | S Cove Rd II, #34 Old Saybrook/TL-INST 4/03CT OH-DB SVC@P#576 *FLOOD PLAIN INST*_x000D_ | Reimbursables-R02 4D720334 | NS- Maple Ave, OS- Mittigate Outage | NS- Maple Ave, OS- Mittigate Outages- Ins COs on XFMRs Downstream P 596_x000D_ AP1-YWO Total Cost Less Than 7K | Reimbursables-R02
  9. Part 63 of 76

    4D720484 | NS- 1 Sag Ter, WB- Ins 4/0 AL from | NS- 1 Sag Ter, WB- Ins 4/0 AL from New HH 831A, Rmv Oh Svc- P 831_x000D_ AP1-YWO Total Cost Less Than 7K | Reimbursables-R02 4D720605 | TS 7 FERRY LA 40778 EC RMV OH SVC I | TS 7 FERRY LA 40778 EC RMV OH SVC INSTALL OH/DB SVC NOT SURE IF APPOINT REQUIRED_x000D_ AP1-YWO Total Cost Less Than 7K | Reimbursables-R02 4D720645 | Cottage Rd, #11 Old Saybrook/TL-INS | Cottage Rd, #11 Old Saybrook/TL-INST 4/03CT OH-DB SVC [WORKS W/ WR#2914467]_x000D_ AP1-YWO Total Cost Less Than 7K | Reimbursables-R02 4D720858 | RSO GUILFORD, Cornwall Ln -Need to | RSO GUILFORD, Cornwall Ln -Need to Replace 153' #2 OH Service @ P8792_x000D_ AP1-YWO Total Cost Less Than 7K | Reimbursables-R02 4D720970 | (DF) Ple 1229 - (R/I) CV svc & cond | (DF) Ple 1229 - (R/I) CV svc & conduit - EMROD DB DESG (ARDB)_x000D_ AP2-YWO Total Cost Variance Met - Variance :-44.9095 MIN.:-50 MAX.:50 | Reimbursables-R02 4D720997 | NS- 17 Halls Rd, WB- Ins 4/0 AL to | NS- 17 Halls Rd, WB- Ins 4/0 AL to New Gargage from HH 330A_x000D_ AP1-YWO Total Cost Less Than 7K | Reimbursables-R02 4D720998 | (DF) (I) 4/0 Simple svc Off of HH23 | (DF) (I) 4/0 Simple svc Off of HH2371-A - New Residential Underground_x000D_ AP1-YWO Total Cost Less Than 7K | Reimbursables-R02 4D721002 | (DF) HH2638-A (I) 350 mcm svc 200A- | (DF) HH2638-A (I) 350 mcm svc 200A- New Residential UG w/CIAC Line Set_x000D_ AP1-YWO Total Cost Less Than 7K | Reimbursables-R02 4D721115 | (DF) Midspn Ples 1533-3826- Make OH | (DF) Midspn Ples 1533-3826- Make OH svc Connec - 100A upgd- Residential Overhead_x000D_ AP1-YWO Total Cost Less Than 7K | Reimbursables-R02 4D721118 | NS- 25 Aspen Dr, Mad- FOLLOW UP WOR | NS- 25 Aspen Dr, Mad- FOLLOW UP WORK- RPLC BROKEN DB STREETLIGHT_x000D_ AP1-YWO Total Cost Less Than 7K | Reimbursables-R02 4D721127 | NS- 13 Blue Heron Ln, CL- Ins 4/0 A | NS- 13 Blue Heron Ln, CL- Ins 4/0 AL to House from HH 432A_x000D_ AP1-YWO Total Cost Less Than 7K | Reimbursables-R02 4D721143 | TS OLD POST RD CLINTON P2388 CHANGE | TS OLD POST RD CLINTON P2388 CHANGE POT TO 25KVA_x000D_ AP1-YWO Total Cost Less Than 7K | Reimbursables-R02 4D721154 | CB//Madison, 74 Wall St//New db ped | CB//Madison, 74 Wall St//New db pedestal svc for town lights_x000D_ AP1-YWO Total Cost Less Than 7K | Reimbursables-R02 4D721175 | RSO 7/23 - MADISON, 393 COPSE RD- P | RSO 7/23 - MADISON, 393 COPSE RD- POLE # 847-_x000D_ AP1-YWO Total Cost Less Than 7K | Reimbursables-R02 4D721190 | (DF) - PATROL REPAIRS 11C12 - DEEP | (DF) - PATROL REPAIRS 11C12 - DEEP RIVER (POST CONSTRUCTION)_x000D_ AP3-YWO Resource Variance Met- Labor 58 <= 32 OR -96.66 <= 30 And Contractor $0 <= 2000 | Reimbursables-R02 4D721191 | Boston Post Rd, Old Saybrook/TL-7/2 | Boston Post Rd, Old Saybrook/TL-7/25-P#1712,P#1714,P#2949,P#2949-1/2. Buchetto_x000D_ CL-YWO Variance - Contractor Labor | Reimbursables-R02 4D721230 | cb//branford, farm river rd//rpl li | cb//branford, farm river rd//rpl light head p 38780R w full cutoff, shield_x000D_ AP1-YWO Total Cost Less Than 7K | Reimbursables-R02 4D721302 | CB//Branford, 480 Shore Dr/New oh s | CB//Branford, 480 Shore Dr/New oh svc_x000D_ AP1-YWO Total Cost Less Than 7K | Reimbursables-R02 4D721307 | cb//branford, 15 pawson rd//oh svc | cb//branford, 15 pawson rd//oh svc upgrade_x000D_ AP1-YWO Total Cost Less Than 7K | Reimbursables-R02 4D721781 | PT-2017 Double Poles-Pole# 4149-Old | PT-2017 Double Poles-Pole# 4149-Old Quarry Rd, Guilford CT-Conv# 362600_x000D_ AP1-YWO Total Cost Less Than 7K | Reimbursables-R02 4D721830 | COMP 12/30 CCC-Municipal Light Faul | COMP 12/30 CCC-Municipal Light Fault Locate and Repair@ POLE 93 NO VOLTAGE_x000D_ AP1-YWO Total Cost Less Than 7K | Reimbursables-R02 4D820623 | Roamtree Dr, Old Saybrook/TL-5/4/18 | Roamtree Dr, Old Saybrook/TL-5/4/18 replace xfmrs, 3 c/o's @ pole2834_x000D_ | Reimbursables-R02 4D821742 | 11/17/18 54 Fairview Dr, Madison rp | 11/17/18 54 Fairview Dr, Madison rplcd riser p# 3991 & installed 3 splices_x000D_
  10. Part 64 of 76

    AP1-YWO Total Cost Less Than 7K | Reimbursables-R02 4D921778 | 25 wildwood dr branford/rpl, reloca | MAV/cb//branford. 25 wildwood dr//relocate oh svc to midspan (ec cut tap)_x000D_ | Reimbursables-R02 4E030228 | WRTN - DM/JK>POLE 650--REMOVE TEMPO | JK>POLE 650--REMOVE TEPORARY POLES & POLE LINE, INSTALL OH LINES BACK TO NORMAL_x000D_ | Reimbursables-R02 4E030999 | MV-NEW DG PROJECT CD01409-01 FOR CP | MV-NEW DG PROJECT CD01409-01 FOR CP EAST HAMPTON SOLAR 1 LLC_x000D_ CL-YWO Variance - Contractor Labor | Reimbursables-R02 4E031149 | JK>REF POLE 1368--INSTALL NEW POLE, | JK>SEE REMARKS | Reimbursables-R02 4E031197 | TO STORES 3/27/23-- Install 6A10-7 | CD01220-05 Install 6A10-90T on 7859 Middle St, Middletown | Reimbursables-R02 4E031225 | (40): CD01220-10 Install 6A4-72S o | CD01220-10 Install 6A4-72S on 3101 Middle St, Middletown | Reimbursables-R02 4E031228 | TO STORES 3/27/23--MG (40): CD01220 | CD01220-10 Install 7A77-72S on pole 994 Country Club Rd, Middletown | Reimbursables-R02 4E031581 | CDOT 82-320 Refeed lights at St Joh | CDOT 82-320 Refeed lights at St John's Square_x000D_ JE-YWO Variance Job Type Exclusion | Reimbursables-R02 4E031856 | (20): CDOT 40-144 First Move for Br | CDOT 40-144 First Move for Bridge Rebuild 151 Moodus | Reimbursables-R02 4E031876 | CON40 MJGw; (30): CDOT 40-144 Final | CDOT 40-144 Final (Perm) Move for Bridge Rebuild 151 Moodus | Reimbursables-R02 4E031966 | (40): JK/DM>POLE 1200--PRIORITY REJ | JK>POLE 1200--PRIORITY REJECT POLE, INSTALL 40/2 POLE, SHIFT FACILITIES_x000D_ | Reimbursables-R02 4E420687 | printed Elec Maint Trouble Call - P | printed Elec Maint Trouble Call - Property Damage OH (INSOH)_x000D_ | Reimbursables-R02 4E420727 | car vs pole 1561 6/30/14 | car vs pole 1561 6/30/14_x000D_ AP1-YWO Total Cost Less Than 7K | Reimbursables-R02 4E420733 | 74 MIDDLE HADDAM RD E HMPTN AT NEW | 74 MIDDLE HADDAM RD E HMPTN AT NEW P-40 INST PRI RISER, PAD XF, SVC_x000D_ AP3-YWO Resource Variance Met- Labor 12 <= 32 OR 29.54 <= 30 And Contractor $1020.59 <= 2000 | Reimbursables-R02 4E520935 | RA CDOT 163-203 RT 66, Bridge#0049 | RA CDOT 163-203 RT 66, Bridge#00490 over Natchaug River, Windham - stage 1_x000D_ JE-YWO Variance Job Type Exclusion | Reimbursables-R02 4E520936 | RA CDOT 163-203 RT 66, Bridge#0049 | RA CDOT 163-203 RT 66, Bridge#00490 over Natchaug River, Windham - stage 2_x000D_ JE-YWO Variance Job Type Exclusion | Reimbursables-R02 4E520958 | RA CDOT 163-203 RT 66, Windham - | RA CDOT 163-203 RT 66, Windham - 100% reimburse for TT & access road_x000D_ JE-YWO Variance Job Type Exclusion | Reimbursables-R02 4E521445 | INSTALL DB SVC TO NEW HOME .H.H. 50 | INSTALL DB SVC TO NEW HOME .H.H. 500 WORK W/2536773_x000D_ AP1-YWO Total Cost Less Than 7K | Reimbursables-R02 4E521666 | 11/14/15- CUST TOOK DOWN SVC WIRE, | 11/14/15- CUST TOOK DOWN SVC WIRE, SEE ATTCHED T TICKET_x000D_ | Reimbursables-R02 4E521680 | TW Verizon antenna billable make re | TW Verizon antenna billable make ready Conv 320155_x000D_ AP1-YWO Total Cost Less Than 7K | Reimbursables-R02 4E521848 | ESO/AWC GLAS, Roaring Brook Plaza-S | ESO/AWC GLAS, Roaring Brook Plaza-StructureFire- Pad#1886 - FD Case #8481500848_x000D_ AP2-YWO Total Cost Variance Met - Variance :6.4019 MIN.:-50 MAX.:50 | Reimbursables-R02 4E620127 | COLCHESTER AVE E HMPTN 9A AT FRO | COLCHESTER AVE E HMPTN 9A AT FRONTIER POLE 64, REPL XF, SHIFT FACILITIES_x000D_ AP1-YWO Total Cost Less Than 7K | Reimbursables-R02 4E620254 | JK>POLE 651--REPLACE POLE W/35', AN | JK>POLE 651--REPLACE POLE W/35', ANCHOR, SECONDARY & SERVICE_x000D_ | Reimbursables-R02 4E620324 | 491 COOK HILL RD LEB REPL 4 POLES, | 491 COOK HILL RD LEB REPL 4 POLES, 3 SPANS OF, INS STUB POLE & ANC, SHIFT FAC's_x000D_ CL-YWO Variance - Contractor Labor | Reimbursables-R02 4E620345 | Elec Maint Trouble Call - Repairs/O | Elec Maint Trouble Call - Repairs/Obsolescence OH (AROH)_x000D_ | Reimbursables-R02

Text of RRU-159 Attachment 17.pdf

Extracted from the file · 855 pages · 14,651,941 characters

Text of RRU-159 Attachment 16.xlsx

Sheet names, column headings and text cells; numbers left out · first 300,000 characters

Text of RRU-159 Attachment 16.pdf

Extracted from the file · 489 pages · 7,076,557 characters

Text of RRU-159 Attachment 15.xlsx

Sheet names, column headings and text cells; numbers left out · first 300,000 characters

Text of RRU-159 Attachment 15.pdf

Extracted from the file · 897 pages · 15,723,777 characters

Text of RRU-159 Attachment 14 .pdf

Extracted from the file · 1 page · 2,589 characters

Text of RRU-159 Attachment 14.xlsx

Sheet names, column headings and text cells; numbers left out

Text of RRU-159 Attachment 13.xlsx

Sheet names, column headings and text cells; numbers left out

Text of RRU-159 Attachment 13.pdf

Extracted from the file · 1 page · 427 characters

Text of RRU-159 Attachment 12.xlsx

Sheet names, column headings and text cells; numbers left out · first 300,000 characters

Text of RRU-159 Attachment 12.pdf

Extracted from the file · 802 pages · 14,341,138 characters

Text of RRU-159 Attachment 11.xlsx

Sheet names, column headings and text cells; numbers left out · first 300,000 characters

Text of RRU-159 Attachment 11.pdf

Extracted from the file · 858 pages · 15,906,152 characters

Text of RRU-159 Attachment 10.xlsx

Sheet names, column headings and text cells; numbers left out

Text of RRU-159 Attachment 10.pdf

Extracted from the file · 1 page · 822 characters

Text of RRU-159 Attachment 09.xlsx

Sheet names, column headings and text cells; numbers left out · first 300,000 characters

Text of RRU-159 Attachment 09.pdf

Extracted from the file · 449 pages · 7,355,312 characters

Text of RRU-159 Attachment 08.xlsx

Sheet names, column headings and text cells; numbers left out · first 300,000 characters

Text of RRU-159 Attachment 08.pdf

Extracted from the file · 867 pages · 13,878,236 characters

Text of RRU-159 Attachment 07.xlsx

Sheet names, column headings and text cells; numbers left out · first 300,000 characters

Text of RRU-159 Attachment 07.pdf

Extracted from the file · 869 pages · 15,728,932 characters

Text of RRU-159 Attachment 06.xlsx

Sheet names, column headings and text cells; numbers left out · first 300,000 characters

Text of RRU-159 Attachment 06.pdf

Extracted from the file · 459 pages · 8,128,897 characters

Text of RRU-159 Attachment 05.xlsx

Sheet names, column headings and text cells; numbers left out · first 300,000 characters

Text of RRU-159 Attachment 05.pdf

Extracted from the file · 879 pages · 16,073,548 characters

Text of RRU-159 Attachment 04.xlsx

Sheet names, column headings and text cells; numbers left out

Text of RRU-159 Attachment 04.pdf

Extracted from the file · 5 pages · 20,994 characters

Text of RRU-159 Attachment 03.xlsx

Sheet names, column headings and text cells; numbers left out · first 300,000 characters

Text of RRU-159 Attachment 03.pdf

Extracted from the file · 840 pages · 14,413,580 characters

Text of RRU-159 Attachment 02.xlsx

Sheet names, column headings and text cells; numbers left out · first 300,000 characters

Text of RRU-159 Attachment 02.pdf

Extracted from the file · 1,137 pages · 16,605,462 characters

Text of RRU-159 Attachment 01.xlsx

Sheet names, column headings and text cells; numbers left out

Text of RRU-159 Attachment 01.pdf

Extracted from the file · 1 page · 1,403 characters

As listed on the current system

Question(s) Answered 159 (Connecticut Light and Power Company dba Eversource Energy) Date Filed: 11/06/2026

This filing on the current system (opens in a new tab)