Skip to main content

A prototype public docket site for the Connecticut Public Utilities Regulatory Authority

Utility Dockets and Filings

Interrogatory responses

Answers to questions 159

ResponseFiled by Connecticut Light and Power Company dba Eversource Energy51 files
Part of docket 26-05-10Open
  • Electric
Application of The Connecticut Light and Power Company d/b/a Eversource Energy to Amend its Rate Schedules

Files51

Search terms highlighted
Eversource rate increase is on 36 pages across 17 files of the text below, highlighted. Go to the first matchClear highlighting
Words on different pages
Words on different pages
Words on different pages

Text of RRU-159 Attachment 23.xlsx

Sheet names, column headings and text cells; numbers left out · first 300,000 characters

Text of RRU-159 Attachment 23.pdf

Extracted from the file · 1,160 pages · 16,330,154 characters

Text of RRU-159 Attachment 22.xlsx

Sheet names, column headings and text cells; numbers left out · first 300,000 characters

Text of RRU-159 Attachment 22.pdf

Extracted from the file · 1,203 pages · 14,349,246 characters

Text of RRU-159 Attachment 21.xlsx

Sheet names, column headings and text cells; numbers left out · first 300,000 characters

Text of RRU-159 Attachment 21.pdf

Extracted from the file · 1,203 pages · 13,880,364 characters

Text of RRU-159 Attachment 20.xlsx

Sheet names, column headings and text cells; numbers left out

Text of RRU-159 Attachment 20.pdf

Extracted from the file · 16 pages · 151,762 characters

Text of RRU-159 Attachment 19.xlsx

Sheet names, column headings and text cells; numbers left out

Text of RRU-159 Attachment 19.pdf

Extracted from the file · 1 page · 5,328 characters

Text of RRU-159 Attachment 18.xlsx

Sheet names, column headings and text cells; numbers left out · first 300,000 characters

Text of RRU-159 Attachment 18.pdf

Extracted from the file · 640 pages · 7,983,236 characters

Text of RRU-159 Attachment 17.xlsx

Sheet names, column headings and text cells; numbers left out · first 300,000 characters

Text of RRU-159 Attachment 17.pdf

Extracted from the file · 855 pages · 14,651,941 characters

Words on different pages

This spreadsheet is large. Its searchable text keeps the sheet names, column headings and text cells and stops at 300,000 characters, so search may miss words further in. Download the file for every cell and figure.

  1. Part 3 of 77

    11HEINEL | CL&P EE Expense | 11HEINEL11LI | Other-O00 11HEMUFA | HES-Multi Family | HES-Multi Family-Lempa | Other-O00 11INTECH | CL&P EE Expense | 11INTECH11OTHER | Other-O00 11MAPLAN | CL&P EE Expense | 11MAPLAN11OTHER | Other-O00 11MEYE21 | CT Elec Fleet Cap Purch - Mobileye | CT Elec Fleet Capital Purchase - Mobileye $208,078.47_x000D__x000D_ Mobileye Safety Mechanism hardware & installation 153 Units | Other-O00 11NECONS | CL&P EE Expense | 11NECONS11RES | Other-O00 11OPMAIN | CL&P EE Expense | 11OPMAIN11CI | Other-O00 11PLANNI | CL&P EE Expense | 11PLANNI11OTHER | Other-O00 11PRIME0 | CL&P EE Expense | 11PRIME011CI | Other-O00 11RECOMM | CL&P EE Expense | 11RECOMM11CI | Other-O00 11REDEDE | CL&P EE Expense | 11REDEDE11OTHER | Other-O00 11REDMRE | Residential Demand Response | Residential Demand Response-Krawczyk | Other-O00 11REGULA | CL&P EE Expense | 11REGULA11OTHER | Other-O00 11RELIGH | CL&P EE Expense | 11RELIGH11RES | Other-O00 11RELOBI | CL&P EE Expense | 11RELOBI11OTHER | Other-O00 | 242RE0 11RELOPR | CL&P EE Expense | 11RELOPR11RES | Other-O00 11RESERV | CL&P EE Expense | 11RESERV11OTHER | Other-O00 | 254PJ0 11SBLODE | CL&P EE Expense | 11SBLODE11OTHER | Other-O00 11SBMPAY | CL&P EE Expense | 11SBMPAY11OTHER | Other-O00 | 186S10 11SBREPY | Customer Loan Repayment | Customer Loan Repayment-Darragjati | Other-O00 | 253EE0 11SMBUSI | CL&P EE Expense | 11SMBUSI11CI | Other-O00 11SMRELN | Residential Loan payable-SMART E | Residential Loan payable-SMART E-Desrosieurs | Other-O00 | 242SE0 11TRASYS | CL&P Tracking Sys EE Expense | CL&P Tracking Sys EE Expense-Desrosiers | Other-O00 16CCFS11 | 2016 CG CT Electric FCS | FCS Rollout Project (already approved) that will implement Itron’s Field Collection System (FCS) for CT in addition to providing interfaces to Meter Data Management for C2 Billing. | Other-O00 16CCMR11 | Handhelds for CT Electric (11) | Handhelds for CT Electric in 2016 | Other-O00 17CCAR11 | CT AMR Solutions | Other-O00 17CCDH11 | CT Disconnects Handhelds | Other-O00 1864N011 | Tax Liability for Non-Cash Cont N-R | Tax Liability for Non-Cash Cont N-R | Other-O00 | 1864N0 1864W011 | CIAC Goss-Up of Taxes Refundable | CIAC Goss-Up of Taxes Refundable | Other-O00 | 1864W0 19CGMR11 | CT AMR Solutions | Other-O00 19CTETRN | CT Electric tools &equipment | This work order is to pay 37.5% of the Field Training Royal flush invoice, a total cost of $27,000. Per Randy 12/2/19 | Other-O00 1B030056 | HEL 15 DD BY 10/24/22 (50,513857580 | JS - 97 South St, Danb, Inst\Rem OH Svc (11A77)_x000D_ | Other-O00 1B030148 | COMPLETED KD-EVENT #4074131 REPLC C | Elec Maint Trouble Call - Repairs/Obsolescence OH (AROH) | Other-O00 1B031024 | COMPLETED WM - 22 South St, Rdgfld, | 22 SOUTH ST Elec Svc New Com/Ind DESG_x000D_ | Other-O00 1B031933 | COMPLETED 261 Wilton Rd E, Ridgefie | JS - 261 Wilton Rd E, Rdgfld, Rem OH Sec & Svc, Inst OH/DB Sec & DB Svc (22N3)_x000D_ | Other-O00 1B032048 | BR Bethany Rd Beacon Falls Pole 263 | BR Bethany Rd Beacon Falls Pole 26351 Load Balancing 11N81_x000D_ | Other-O00 1B032446 | JS - 9 Long Ridge Rd, Danb, Inst 1p | JS - 9 Long Ridge Rd, Danb, Inst 1ph Pri Riser, DB Pri, Pri HH & DB XFMR (11A77)_x000D_ | Other-O00 1B032471 | CD01357 - Reconductor Wagon Wheel R | CD01357 - Reconductor Wagon Wheel Rd Pole 1170 - 1325 w/ 1/0 TW_x000D_ | Other-O00 1B032554 | APPRENTICES (50): FRISBIE RD Elec P | FRISBIE RD Elec Proj Reconductor/Relocate/Conversion Annual DESG_x000D_ | Other-O00 1B032555 | MATERIAL (50,0): 129 MAIN ST N Ligh | 129 MAIN ST N Lighting - Area - Non-roadway / Private Roadway (DA)_x000D_ | Other-O00 1B032601 | JS - Country Club Rd, Ridgefield, R | CP-64 Country Club rd, replace pole_x000D_ | Other-O00 1B032667 | JS - 1 Two Pence Rd, Rdgfld, Rem OH | JS - 1 Two Pence Rd, Rdgfld, Rem OH Svc & Inst OH/DB Svc (22N5)_x000D_ | Other-O00 1B032685 | COMPLETED (50) TURNOVER 10 ROWLEDGE | Elec Maint Trouble Call - Repairs/Obsolescence OH (AROH)_x000D_ | Other-O00
  2. Part 4 of 77

    1B032703 | COMPLETED 25 Gilbert St, Rem DB Svc | JS - 25 Gilbert St, Danb, Rem DB Svc, Repl DB XFMR & Conn Cust DB Svc (22N4)_x000D_ | Other-O00 1B032789 | (50,0): BR 736 - 740 Championship D | BR 736 - 740 Championship Dr Oxford New UG Residential Meter Dept Set_x000D_ | Other-O00 1B032859 | COMPLETE-(20): KD-EVENT #4384967 RE | Elec Maint Trouble Call - Repairs/Obsolescence OH (AROH) | Other-O00 1B032871 | MPB; 4 OAK RIDGE RD BETHEL- P#1295 | MPB; 4 OAK RIDGE RD BETHEL- P#1295 RMV OH TEMP, INST #2 TPX OH SVC_x000D_ | Other-O00 1B032980 | (50,0): 61-67 BRENTWOOD CIR Electri | 63-66 BRENTWOOD CIR Electric Service New UG Residential Meter Dept Set_x000D_ | Other-O00 1B033211 | COMPLETED 29 Comstock St, Danb, Ins | JS - 29 Comstock St, Danb, Inst\Rem OH Svc (11A73)_x000D_ | Other-O00 1B0E0011 | Purchase of Energy | Purchase of Energy | Other-O00 1B0R0011 | Purchase of Recs | Purchase of Recs-Rose | Other-O00 1B0R0111 | PURCHASE of RECs | PURCHASE of RECs - Ed Morawsky | Other-O00 1B130070 | (30): KD-EVENT # 4389912 REPL P 365 | KD-EVENT # 4389912 REPL P 3650 | Other-O00 1B320712 | AF - ELEC MAINT REPL/RENEWAL/OBSOL | AF - ELEC MAINT REPL/REN/OBSOL OH DESG(AROH)POLE RECORDS/ JO INT BILLING POLE 263 AP1 -WO TOTAL COST LESS THAN 7K | Other-O00 1B321594 | TB- 772 MONROE TPKE POLE 268 INSTAL | TB- 772 MONROE TPKE POLE 268 INSTALL CV SERVICE_x000D_ | Other-O00 1B420020 | WM, SHELTER ROCK RD, DANBURY, PHASE | BR, SHELTER ROCK RD, DANBURY, PHASE OFF GLASSS COMPLETED AP1 -WO TOTAL COST LESS THAN 7K | Other-O00 1B420651 | BR Pad 13 Hickory Ln Roxbury Repair | BR Pad 13 Hickory Ln Roxbury Repair Primary Fault DB (ARDB) Completed_x000D_ AP1-YWO Total Cost Less Than 7K | Other-O00 1B420672 | BR, Big Buck Ln, Brookfield, cable | BR, Big Buck Ln, Brookfield, cable fault bet sw 45 & pad 46 Completed_x000D_ AP1-YWO Total Cost Less Than 7K | Other-O00 1B420682 | MT- Completed in Field on 5/08/14 b | MT- Completed in Field on 5/08/14 by ESO_x000D_ AP1-YWO Total Cost Less Than 7K | Other-O00 1B421221 | WM, Shelter Rock Rd, Danbury, welde | WM, Shelter Rock Rd, Danbury, welded manhole cover_x000D_ AP1-YWO Total Cost Less Than 7K | Other-O00 1B422408 | ESO hattertown rd monroe tree broke | ESO hattertown rd monroe tree broke x arm_x000D_ | Other-O00 1B520312 | BR Hut Hill Rd, Bridgewater ESO Wor | BR Hut Hill Rd, Bridgewater ESO Work #3217 Completed in Field_x000D_ | Other-O00 1B520862 | BR Rt 39 New Fairfield Replaced Xfr | BR Rt 39 New Fairfield Replaced Xfrm Completed in Field_x000D_ | Other-O00 1B520865 | APPLE BLOSSOM LN New UG Residenti | APPLE BLOSSOM LN New UG Residential Meter Dept Set pr 3/31_x000D_ | Other-O00 1B520888 | 1-4-179A-179B PRINCESS PINE LN | 1-4-179A-179B PRINCESS PINE LN New UG Residential Meter Dept Set_x000D_ AP1-YWO Total Cost Less Than 7K | Other-O00 1B521850 | Meadows End Rd, Monroe, p.#206 poor | Meadows End Rd, Monroe, p.#206 poor condition should be replaced_x000D_ AP1-YWO Total Cost Less Than 7K | Other-O00 1B521883 | BR 153 Wilton Rd Ridgefield Tree vs | BR 153 Wilton Rd Ridgefield Tree vs Line Completed in Field_x000D_ | Other-O00 1B521909 | ESO Mill Plain Rd DNBY- CarVsPole55 | ESO Mill Plain Rd DNBY- CarVsPole55 Braced-Frontier to Set New 8/21/15_x000D_ AP3-YWO Resource Variance Met- Labor 13 <= 32 OR 112.2 <= 30 And Contractor $1546.34 <= 2000 | Other-O00 1B522090 | NF, 6A ROCK RIDGE CT, RUN DB SEC N | NF, 6A ROCK RIDGE CT, RUN DB SEC NEW HH THEN DB SVC, TOTAL 475' 350MCM RUN_x000D_ | Other-O00 1B522254 | Key Rock Rd, Newtown, pole top fire | Key Rock Rd, Newtown, pole top fire need to repl p#2477 40/2 NOTIFY# 496101_x000D_ AP2-YWO Total Cost Variance Met - Variance :100.357 MIN.:-50 MAX.:150 | Other-O00 1B522296 | AF - 3PA-CONV#310934 - Replace pole | AF - 3PA-CONV#310934 - Replace pole 2007 pr TS 1/28_x000D_ AP1-YWO Total Cost Less Than 7K | Other-O00 1B522443 | RM-101395, REPLACE CABLE, Scenic Hi | RM-101395, REPLACE CABLE, Scenic Hill LN pad 46 & 47- Monroe_x000D_
  3. Part 5 of 77

    CL-YWO Variance - Contractor Labor | Other-O00 1B620051 | CB - CDOT 34-305 & 345 Move 1 | CB - CDOT 34-305 & 345 Move 1_x000D_ JE-YWO Variance Job Type Exclusion | Other-O00 1B620115 | RR- 104 Forty Acre Mtn Rd Danbury, | RR- 104 Forty Acre Mtn Rd Danbury, ATT p #4268 needs to be replaced PR01/20/16_x000D_ AP1-YWO Total Cost Less Than 7K | Other-O00 1B620199 | 15 BATES PL Elec Svc New Residenti | 15 BATES PL Elec Svc New Residential PR2/4/16_x000D_ | Other-O00 1B620226 | DP, WASH 165 SHEARER RD, PRIORITY | DP, WASH 165 SHEARER RD, PRIORITY REJECT POLE#3474, 1PH , ANCHOR_x000D_ CL-YWO Variance - Contractor Labor | Other-O00 1B620261 | 44 KENOSIA AVE Elec Maint Trouble C | 44 KENOSIA AVE Elec Maint Trouble Call - Repairs/Obsolescence OH PR2/17/16_x000D_ AP1-YWO Total Cost Less Than 7K | Other-O00 1B620362 | NORTH ST replace recloser 22N5-71 | NORTH ST replace recloser 22N5-71s Y-17131-2016 pole 5024 PR3/2/16_x000D_ | Other-O00 1B620819 | JDB WEBATUCK RD SHERMAN COMPLETED, | JDB WEBATUCK RD SHERMAN COMPLETED, ESO 5/7 9A pole 929_x000D_ AP2-YWO Total Cost Variance Met - Variance :63.2336 MIN.:-50 MAX.:150 | Other-O00 1B621325 | SH-Convo#342618-(MakeReadyNonReimb) | SH-Convo#342618-(MakeReadyNonReimb) - Fibertech Parent Convo#338911_x000D_ AP2-YWO Total Cost Variance Met - Variance :-30.9342 MIN.:-40 MAX.:40 | Other-O00 1B621534 | ROX, 142 EAST FLAG SWAMP, TEL REPL | ROX, 142 EAST FLAG SWAMP, TEL REPL POLE. HANG POT AND OH/DB SVC FOR GATE_x000D_ AP1-YWO Total Cost Less Than 7K | Other-O00 1B621706 | BM/ INS 3P PRI RISER, RUN 390' 1AL | BM/ INS 3P PRI RISER, RUN 390' 1AL 4CT TO NEW 500KVA PAD_x000D_ AP2-YWO Total Cost Variance Met - Variance :24.7788 MIN.:-50 MAX.:50 | Other-O00 1B622090 | WOOD, 120 WEST LAKE RD, OH SVC CHEC | WOOD, 120 WEST LAKE RD, OH SVC CHECK EXISTING DROP TO 2 , SET METER_x000D_ AP1-YWO Total Cost Less Than 7K | Other-O00 1B622120 | 8-13 PRINCESS PINE LN Electric Ser | 8-13 PRINCESS PINE LN Electric Service New UG Residential Meter Dept Set_x000D_ AP1-YWO Total Cost Less Than 7K | Other-O00 1B622145 | RM 39 Putnam Park Rd Bethel PER SH | RM 39 Putnam Park Rd Bethel PER SHOOTER NEED CUT AND KICK ALSO TREE TRIMMING_x000D_ AP1-YWO Total Cost Less Than 7K | Other-O00 1B622282 | RL Black Rock Tpke, Redding replace | RL Black Rock Tpke, Redding replace DB primary cable from Riser P#969 to PAD200_x000D_ AP2-YWO Total Cost Variance Met - Variance :1.7385 MIN.:-40 MAX.:40 | Other-O00 1B622283 | PH; 661 Redding Rd, Redding, replac | PH; 661 Redding Rd, Redding, replace DB primary from Riser P#1181 to PAD3_x000D_ AP2-YWO Total Cost Variance Met - Variance :3.1947 MIN.:-40 MAX.:40 | Other-O00 1B720029 | Electric Service Existing Residenti | Electric Service Existing Residential Overhead (PHD)_x000D_ | Other-O00 1B720072 | 9A COMPLETED, 124 Calhoun, Washingt | 9A COMPLETED, 124 Calhoun, Washington, car vs. pole 1773, TEL REPLACED,SHIFTED_x000D_ AP1-YWO Total Cost Less Than 7K | Other-O00 1B720073 | 9A COMPLETED23 Hooppole Hill, Woodb | 9A COMPLETED23 Hooppole Hill, Woodbury, car vs. pole FRONTIER REPLACED POLE W5_x000D_ AP1-YWO Total Cost Less Than 7K | Other-O00 1B720145 | CDOT 34-313 Danbury - CIS#2 - relo | CDOT 34-313 Danbury - CIS#2 - reloc service to Wells Fargo_x000D_ JE-YWO Variance Job Type Exclusion | Other-O00 1B720242 | ESO, White Deer Rocks Rd, Woodbury | ESO, White Deer Rocks Rd, Woodbury - Car vs Pole 1215_x000D_ AP2-YWO Total Cost Variance Met - Variance :116.5616 MIN.:-50 MAX.:150 | Other-O00 1B720378 | BRANCHVILLE replace cap bank pole 5 | BRANCHVILLE replace cap bank pole 559 pr3/1/17_x000D_ NL-YWO Variance - NU Construction Labor | Other-O00 1B720417 | OLD BROOKFIELD RD Elec Maint Troub | OLD BROOKFIELD RD Elec Maint Trouble Call - Repairs/Obsolescence DB pr3/9/17_x000D_ CL-YWO Variance - Contractor Labor | Other-O00 1B720430 | BLITZ, NM, OLD PARK LN, POLE #10, E | BLITZ, NM, OLD PARK LN, POLE #10, ES SHIFT TEL HAS SET, DBL POLE_x000D_
  4. Part 6 of 77

    AP1-YWO Total Cost Less Than 7K | Other-O00 1B720453 | Brookfield, Meadow Brook Rd - Front | Brookfield, Meadow Brook Rd - Frontier pole shift 1384 pr3/11/17_x000D_ AP1-YWO Total Cost Less Than 7K | Other-O00 1B720502 | COMPL IN FIELD; REPL 100AMP C/O @ P | COMPL IN FIELD; REPL 100AMP C/O @ PL 2622_x000D_ | Other-O00 1B720688 | WM - 22N3 Rehab, Ridgefield | WM - 22N3 Rehab, Ridgefield_x000D_ | Other-O00 1B720873 | TB- ELGIN AVE BETHEL SHIFT FRONTIER | TB- ELGIN AVE BETHEL SHIFT FRONTIER P 30_x000D_ AP1-YWO Total Cost Less Than 7K | Other-O00 1B720883 | 23 SIMPAUG TPKE Elec Svc Existing | 23 SIMPAUG TPKE Elec Svc Existing Residential pr4/27/17_x000D_ AP2-YWO Total Cost Variance Met - Variance :66.3019 MIN.:-50 MAX.:150 | Other-O00 1B720920 | JS - 50 Sawmill Rd, Danb, Inst\Rem | JS - 50 Sawmill Rd, Danb, Inst\Rem OH/DB Svc (28M3)_x000D_ AP1-YWO Total Cost Less Than 7K | Other-O00 1B720940 | 1+3 ENCLAVE DR Electric Service N | 1+3 ENCLAVE DR Electric Service New UG Residential Meter Dept Set_x000D_ AP1-YWO Total Cost Less Than 7K | Other-O00 1B720942 | 11-17 MOORLAND DR Electric Service | 11-17 MOORLAND DR Electric Service New UG Residential Meter Dept Set_x000D_ AP1-YWO Total Cost Less Than 7K | Other-O00 1B720968 | CB - CDOT - 34-305 & 345 Move 2 | CB - CDOT - 34-305 & 345 Move 2_x000D_ JE-YWO Variance Job Type Exclusion | Other-O00 1B720975 | 116 N LAKE SHORE DR Elec Svc New R | 116 N LAKE SHORE DR Elec Svc New Residential_x000D_ AP1-YWO Total Cost Less Than 7K | Other-O00 1B721039 | 15 DD BY 6/27/22 (50): 4 FINANCE DR | 4 FINANCE DR Elec Svc New Com/Ind_x000D_ | Other-O00 1B721060 | 104 MAIN ST Elec Svc Existing Resi | 104 MAIN ST Elec Svc Existing Residential pr6/2/17_x000D_ AP2-YWO Total Cost Variance Met - Variance :97.5358 MIN.:-50 MAX.:150 | Other-O00 1B721402 | TB- 29 WEST ST INSTALL NEW X OVER P | TB- 29 WEST ST INSTALL NEW X OVER POLE AND DB SERVICE_x000D_ AP1-YWO Total Cost Less Than 7K | Other-O00 1B721538 | 2 ROCKWELL RD extend primary pole l | 2 ROCKWELL RD extend primary pole line install prim. riser to pad + svc_x000D_ CL-YWO Variance - Contractor Labor | Other-O00 1B721557 | BR 121 Lantern Park Ln N Southbury | BR 121 Lantern Park Ln N Southbury Yellow Tag_x000D_ CL-YWO Variance - Contractor Labor | Other-O00 1B721722 | NEW MILFORD 20 EVERWOOD DR NEW MIL | NEW MILFORD 20 EVERWOOD DR NEW MILFORD , RUN NEW 4/0 DB SVC PAD 1343_x000D_ AP1-YWO Total Cost Less Than 7K | Other-O00 1B721855 | 36 HAYES LN relocate to mid-span E | 36 HAYES LN relocate to mid-span Existing Residential Overhead_x000D_ AP1-YWO Total Cost Less Than 7K | Other-O00 1B721941 | JS - 3 East St, Danb, Inst\Rem OH S | JS - 3 East St, Danb, Inst\Rem OH Svc (11A76)_x000D_ AP1-YWO Total Cost Less Than 7K | Other-O00 1B721946 | JS - 17 Beckett St, Danb, Inst\Rem | JS - 17 Beckett St, Danb, Inst\Rem OH Svc (28M1)_x000D_ AP1-YWO Total Cost Less Than 7K | Other-O00 1B721957 | JS - 4 Woodview Dr, Brkfld, Inst\Re | JS - 4 Woodview Dr, Brkfld, Inst\Rem OH Svc (14H3)_x000D_ AP1-YWO Total Cost Less Than 7K | Other-O00 1B721958 | JS - 25 Woodview Dr, Brkfld, Inst\R | JS - 25 Woodview Dr, Brkfld, Inst\Rem OH Svc (14H3)_x000D_ AP1-YWO Total Cost Less Than 7K | Other-O00 1B722028 | JS - 6 Hewlett Rd, Nw Frfld, Inst\R | JS - 6 Hewlett Rd, Nw Frfld, Inst\Rem OH Svc (28M2)_x000D_ AP1-YWO Total Cost Less Than 7K | Other-O00 1B722315 | RSO OXFORD, Oakwood Dr - Digu up - | RSO OXFORD, Oakwood Dr - Digu up - damage done by S+S paving (see T/T)_x000D_ AP1-YWO Total Cost Less Than 7K | Other-O00 1B722524 | TB 154 ENTERPRISE DR INSTALL NEW PR | TB 154 ENTERPRISE DR INSTALL NEW PRIMARY SVC AND 300 KVA XFMR_x000D_ AP2-YWO Total Cost Variance Met - Variance :49.4991 MIN.:-50 MAX.:50 | Other-O00 1B722785 | BR 38 Twin Oaks Beacon Falls New Re | BR 38 Twin Oaks Beacon Falls New Residential Underground_x000D_ AP1-YWO Total Cost Less Than 7K | Other-O00
  5. Part 7 of 77

    1B722786 | BR 76 Fieldstone Ln Beacon Falls Ne | BR 76 Fieldstone Ln Beacon Falls New Residential Underground_x000D_ AP1-YWO Total Cost Less Than 7K | Other-O00 1B722807 | JS - 26 Linda La, Nw Frfld, Inst OH | JS - 26 Linda La, Nw Frfld, Inst OH/DB Svc (14H4)_x000D_ AP1-YWO Total Cost Less Than 7K | Other-O00 1B722973 | JS - Larson Dr, Danb, Rem OH Neut, | JS - Larson Dr, Danb, Rem OH Neut, Inst OH Sec (28M13)_x000D_ AP1-YWO Total Cost Less Than 7K | Other-O00 1B820016 | 25 CREST RD Electric Service Existi | 25 CREST RD Electric Service Existing Residential Overhead_x000D_ AP1-YWO Total Cost Less Than 7K | Other-O00 1B820583 | 2-4-6 PUTNAM LN Electric Service Ne | 2-4-6 PUTNAM LN Electric Service New UG Residential Meter Dept Set_x000D_ | Other-O00 1B821681 | SH-Convo#672962-MakeReadyNonReimib | SH-Convo#672962-MakeReadyNonReimib Parent Convo#657857_x000D_ NO AWOCS-AWOCS REASON CODE AND DESCRIPTION NOT FOUND. | Other-O00 1B821744 | JS - 47 West Wooster St, Danb, Inst | JS - 47 West Wooster St, Danb, Inst\Rem OH Svc (11A74)_x000D_ AP1-YWO Total Cost Less Than 7K | Other-O00 1B822339 | APPRENTICES 15 DD BY 11/17/22 (50,0 | 25 BRIDGE Elec Svc New Com/Ind DESG pr9/14/18_x000D_ | Other-O00 1B822375 | CDOT 18-136 - Brookfield Streetscap | CDOT 18-136 - Brookfield Streetscape - Relocate 205, 206_x000D_ JE-YWO Variance Job Type Exclusion | Other-O00 1B920812 | (50): 261 WOODBURY RD Elec Maint Tr | 261 WOODBURY RD Elec Maint Trouble Call - Repairs/Obsolescence OH_x000D_ | Other-O00 1B921722 | BM/ REPL PAD 872 WITH SAME | BM/ REPL PAD 872 WITH SAME_x000D_ NL-YWO Variance - NU Construction Labor | Other-O00 1B922289 | 101395 1552 Replace cable from P | 101395 1552 Replace cable from POLE 1296 to PAD 316 Old Field Ln, Redding_x000D_ CL-YWO Variance - Contractor Labor | Other-O00 1B922605 | Electric Service New Residential Un | Electric Service New Residential Underground_x000D_ AP1-YWO Total Cost Less Than 7K | Other-O00 1B923067 | 15 DD BY 1/5/23 (40,0): CP- 15 Wild | CP- 15 Wildwood Ln, Install new UG SVC_x000D_ | Other-O00 1B923313 | 5 HIGH ST Electric Service Existing | 5 HIGH ST Electric Service Existing Residential Overhead pr10/24/19_x000D_ AP1-YWO Total Cost Less Than 7K | Other-O00 1BOE0011 | Purchase of Energy | Purchase of Energy-Rose | Other-O00 1G520647 | RL:48 Clapboard Ridge Rd; Elec Svc | RL:48 Clapboard Ridge Rd; Elec Svc Existing Residential IT Meter 600 Amps (DN)_x000D_ AP2-YWO Total Cost Variance Met - Variance :109.6871 MIN.:-50 MAX.:150 | Other-O00 1G520706 | DM/6 Grove ST COS COB: PRIORITY DE | DM/6 Grove ST COS COB: PRIORITY DESG (IFOH) - POLE#119_x000D_ CL-YWO Variance - Contractor Labor | Other-O00 1G520761 | DM/107 DOUBLING RD GREENWICH: RELOC | DM/107 DOUBLING RD GREENWICH: RELOCATE OH LINES TO UNDERGROUND_x000D_ AP2-YWO Total Cost Variance Met - Variance :-23.6492 MIN.:-50 MAX.:50 | Other-O00 1G620304 | RL 30 Butternut Hollow/P#70537/Tree | RL 30 Butternut Hollow/P#70537/Tree broke pole,see ticket/Alex M._x000D_ | Other-O00 1G620491 | RL:35 Mooreland Rd; Elec Svc New Re | RL:35 Mooreland Rd; Elec Svc New Residential IT 600 amp Meter DESG_x000D_ NO AWOCS-AWOCS REASON CODE AND DESCRIPTION NOT FOUND. | Other-O00 1G620693 | Elec Svc New Com/Ind IT Meter DESG | Elec Svc New Com/Ind IT Meter DESG (DN)_x000D_ AP2-YWO Total Cost Variance Met - Variance :-18.0765 MIN.:-40 MAX.:40 | Other-O00 1G621024 | RL:10 Broad St: Elec Svc New Reside | RL:10 Broad St: Elec Svc New Residential IT 800 Amps Meter DESG_x000D_ AP1-YWO Total Cost Less Than 7K | Other-O00 1G621097 | RL:900 Lake Ave: Greenwich pole Ve | RL:900 Lake Ave: Greenwich pole Verizon Pole VZ 225 75656_x000D_ AP1-YWO Total Cost Less Than 7K | Other-O00 1G621155 | RL:120 Valley Dr::Elec Svc New Resi | RL:120 Valley Dr::Elec Svc New Residential DESG 40/2 Pole 36" Silo (DN)_x000D_ AP3-YWO Resource Variance Met- Labor 14 <= 32 OR 62.62 <= 30 And Contractor $1228.29 <= 2000 | Other-O00
  6. Part 8 of 77

    1G621163 | DM/32 MEETING HOUSE RD GRN: REPL P. | DM/32 MEETING HOUSE RD GRN: REPL P.80483 & 73715 - CUSTOMER COMPLAINT_x000D_ AP2-YWO Total Cost Variance Met - Variance :-35.0579 MIN.:-40 MAX.:40 | Other-O00 1G621184 | RL:ZACCHEUS MEAD GREENWICH 9A POLE | RL:ZACCHEUS MEAD GREENWICH 9A POLE 73577 ESO_x000D_ AP2-YWO Total Cost Variance Met - Variance :40.0956 MIN.:-50 MAX.:50 | Other-O00 1G621238 | RL:North Maple Ave: Electric Servic | RL:North Maple Ave: Electric Service Un-Metered for school zone lights_x000D_ AP1-YWO Total Cost Less Than 7K | Other-O00 1G621249 | RL:Patterson Ave: Electric Service | RL:Patterson Ave: Electric Service Un-Metered pole 70468_x000D_ AP1-YWO Total Cost Less Than 7K | Other-O00 1G621258 | RL: Paterson Ave: Electric Service | RL: Paterson Ave: Electric Service Un-Metered Pole 73219_x000D_ AP1-YWO Total Cost Less Than 7K | Other-O00 1G621297 | RL:10 Glenville Rd: Verizon replace | RL:10 Glenville Rd: Verizon replaced pole 68060 VZ 5 50/2 Car vs pole 9A_x000D_ CL-YWO Variance - Contractor Labor | Other-O00 1M320139 | 588, NF, DP, Bear Mt Rd, AT&T to R | 588, NF, DP, Bear Mt Rd, AT&T to Repl Detriorated pole 1315_x000D_ AP1-YWO Total Cost Less Than 7K | Other-O00 1M420090 | KENT, CAMEL HILL RD,CAMP FRANCIS , | KENT, CAMEL HILL RD,CAMP FRANCIS , DEMO 2 OF 4 REM OH SECSVC METER RANGER CABIN AP1 -WO TOTAL COST LESS THAN 7K | Other-O00 1N030200 | LD WALL ST NOR CD01024-06 Remv Xfm | LD WALL ST NOR CD01024-06 Remv Xfmr from Vlt 866_x000D_ CL-YWO Variance - Contractor Labor | Other-O00 1N030547 | MATERIAL (FOLLOW UP) JDB - CDOT158- | Elec Proj Highway Relocation Non-Reimbursable DESG (DH) | Other-O00 1N030555 | JDB 6/7: LINDEN HTS NORWALK:POLE#94 | JDB 6/7: LINDEN HTS NORWALK:POLE#945 REPLACED 50 KVA AND ELBOW ARRESTOR_x000D_ | Other-O00 1N120458 | JDB 6 CAPTAINS WALK NWLK INSTALL250 | JDB 6 CAPTAINS WALK NWLK INSTALL250W HPS COBRA Canceled_x000D_ | Other-O00 1N130045 | JES; 30 EVERGREEN AVE. WILTON. REPL | 9/1: P# 3487/EVERGREEN AVE WILTON 4330130 / NEEDS GUY WIRE | Other-O00 1N221114 | JDB 10 ARCH ST,NWLK TRUCK HIT POLE | JDB 10 ARCH ST,NWLK TRUCK HIT POLE #9577 SEE TT INFO 06/01/12_x000D_ AP1-YWO Total Cost Less Than 7K | Other-O00 1N321978 | JDB 165 GRUMMAN AVE NWLK P32758 Ele | JDB 165 GRUMMAN AVE NWLK P32758 Elec Proj Maintain Voltage Annual DESG (DK)_x000D_ CL-YWO Variance - Contractor Labor | Other-O00 1N322459 | JES: 3 DUKE PL. NORWALK, CAR VS POL | JES: 3 DUKE PL. NORWALK, CAR VS POLE MADE TEMP REPAIRS, P# 9012 SEE TT 11-15-13_x000D_ AP1-YWO Total Cost Less Than 7K | Other-O00 1N420695 | am/PN 103612, Seg 1 - Civil Work Re | am/PN 103612, Seg 1 - Civil Work Relocate Vlt 39_x000D_ CI-YWO Variance - Contractor Invoice | Other-O00 1N421438 | RM 50 POWDER HORN HILL WESTON REPLA | RM 50 POWDER HORN HILL WESTON REPLACE OPEN SEC POLE#13557 PER LINE DEPT_x000D_ AP1-YWO Total Cost Less Than 7K | Other-O00 1N422555 | AF-Elec Proj Cable Repl Spec - Butl | AF-Elec Proj Cable Repl Spec - Butler Ln - New Canaan, CT_x000D_ CI-YWO Variance - Contractor Invoice | Other-O00 1N520002 | RM- 101395, Cable Replacement - Mes | RM- 101395, Cable Replacement - Messex Ln - Weston_x000D_ | Other-O00 1N522133 | AJC 128 MATHER ST WLTN INSTALL RISE | AJC 128 MATHER ST WLTN INSTALL RISER FOR 480V 3PH DELTA SERVICE P24555_x000D_ AP1-YWO Total Cost Less Than 7K | Other-O00 1N522299 | KS 645 POST RD E, WSPT P# 18505 INS | KS 645 POST RD E, WSPT P# 18505 INS PRI RISER, DB PRI, PRI VLT, & 300KVA PAD_x000D_ AP2-YWO Total Cost Variance Met - Variance :19.9624 MIN.:-50 MAX.:50 | Other-O00 1N522364 | AJC 183 HEMLOCK HILL RD NC UPGRD TR | AJC 183 HEMLOCK HILL RD NC UPGRD TRANS & INST RISER FOR 320A SC SERV POLE 5713_x000D_ | Other-O00 1N620110 | LD WEST CEDAR ST NORWALK RECONDUCTO | LD WEST CEDAR ST NORWALK RECONDUCTOR PRI 24A10-73S-24A10-92T TD 941 POLE#23020_x000D_ CI-YWO Variance - Contractor Invoice | Other-O00
  7. Part 9 of 77

    1N620657 | CONV 484563 - RM-CDOT 158-0211, PHA | CONV 484563 - RM-CDOT 158-0211, PHASE I, NEWTOWN TRPK / RT 15 - WESTPORT_x000D_ JE-YWO Variance Job Type Exclusion | Other-O00 1N620810 | RM 159 Godfrey Rd East Weston Repl | RM 159 Godfrey Rd East Weston Replace pole 31846 per tele request !!!_x000D_ AP2-YWO Total Cost Variance Met - Variance :24.4577 MIN.:-50 MAX.:150 | Other-O00 1N620926 | LD 14 MAIN STREET NOR PARKING LOT R | LD 14 MAIN STREET NOR PARKING LOT RPL POLE#27127 RPL TO LED'S FROM HPS LIGHTS_x000D_ AP2-YWO Total Cost Variance Met - Variance :42.7862 MIN.:-50 MAX.:50 | Other-O00 1N620945 | LD WESTPORT NETWORK RPL SEC MAIN'S | LD WESTPORT NETWORK RPL SEC MAIN'S & RECRAB 3 MH#'S TO TYPE B PROJ #103358-13_x000D_ AP2-YWO Total Cost Variance Met - Variance :2.4156 MIN.:-10 MAX.:10 | Other-O00 1N621035 | KS 9 COLONIAL RD, WSPT P# 781 INS C | KS 9 COLONIAL RD, WSPT P# 781 INS CROSSOVER POLE & 200A OH/DB SVC_x000D_ AP1-YWO Total Cost Less Than 7K | Other-O00 1N621145 | JDB EAST AVE NWLK P2890 RMV ARMLESS | JDB EAST AVE NWLK P2890 RMV ARMLESS INSTALL 6' XARM OH DESG (AROH)_x000D_ AP1-YWO Total Cost Less Than 7K | Other-O00 1N621166 | JES; 345 NEWTOWN TPKE, WESTON-BROKE | JES; 345 NEWTOWN TPKE, WESTON-BROKEN P#31868 & 31870 08/09/16_x000D_ | Other-O00 1N621292 | JES; WILLARD RD. NWLK.; IR INSP. - | JES; WILLARD RD. NWLK.; IR INSP. - Minor DESG (IFOH) - POLE 13273_x000D_ AP1-YWO Total Cost Less Than 7K | Other-O00 1N621466 | AJC BEACHSIDE AVE WSPT RPL DB PRI | AJC BEACHSIDE AVE WSPT RPL DB PRI FROM POLE#25131 TO PAD#127 PROJ#101395-09_x000D_ CL-YWO Variance - Contractor Labor | Other-O00 1N621473 | ESO 8/13 Grays Farm Rd Westport pol | ESO 8/13 Grays Farm Rd Westport pole 17813_x000D_ AP1-YWO Total Cost Less Than 7K | Other-O00 1N621475 | AJC BUTLER LN NC INS PIPE& RPL DB | AJC BUTLER LN NC INS PIPE& RPL DB PRI FROM POLE#24732 TO PAD#221 PROJ#101395-09_x000D_ AP2-YWO Total Cost Variance Met - Variance :29.9076 MIN.:-40 MAX.:40 | Other-O00 1N621658 | AJC 7 FAIRFIELD AVE WSPT Electric S | AJC 7 FAIRFIELD AVE WSPT Electric Service New Residential Overhead P 25864_x000D_ | Other-O00 1N621689 | JDB 18 OX YOKE LN NWLK P9366 EXTEND | JDB 18 OX YOKE LN NWLK P9366 EXTEND PRI INS 50KVA & OH/DB SVC DESG (DN)_x000D_ AP2-YWO Total Cost Variance Met - Variance :-19.5236 MIN.:-40 MAX.:40 | Other-O00 1N621793 | AJC 2 BRIGHTFIELD LN WSPT Electric | AJC 2 BRIGHTFIELD LN WSPT Electric Service New Residential Underground HH30203A_x000D_ | Other-O00 1N621850 | RM -CD00667, Recloser @ P-4977 Knap | RM -CD00667, Recloser @ P-4977 Knapp St - Norwalk_x000D_ AP2-YWO Total Cost Variance Met - Variance :23.7919 MIN.:-30 MAX.:30 | Other-O00 1N621866 | AJC 6 KELLER LN WSPT MIDTAP Electri | AJC 6 KELLER LN WSPT MIDTAP Electric Service Existing Residential Overhead P9106_x000D_ | Other-O00 1N621985 | RM 10 Ridge Ln Weston Replace Exis | RM 10 Ridge Ln Weston Replace Existing Residential Overhead svc_x000D_ | Other-O00 1N720013 | JDB FILLOW ST NWLK P1746 FUSE COORD | JDB FILLOW ST NWLK P1746 FUSE COORDINATION Annual DESG (DR)_x000D_ AP1-YWO Total Cost Less Than 7K | Other-O00 1N720608 | JDB 18 FLICKER LN NWLK SHIFT POLE 6 | JDB 18 FLICKER LN NWLK SHIFT POLE 6545 INSTALL New OH/DB Residential DESG (DN)_x000D_ AP1-YWO Total Cost Less Than 7K | Other-O00 1N720793 | RM 139 Lords Hwy Weston Install pr | RM 139 Lords Hwy Weston Install primary riser to new pad and db svc_x000D_ AP1-YWO Total Cost Less Than 7K | Other-O00 1N720842 | JDB ESO 4/26/17 WESTPORT - 9 CRAWF | JDB ESO 4/26/17 WESTPORT - 9 CRAWFORD RD P6838 REPLACE XTRANS_x000D_ AP1-YWO Total Cost Less Than 7K | Other-O00 1N720847 | ESO 9A 4/29/17-WESTPORT = 22 MAPLE | ESO 9A 4/29/17-WESTPORT = 22 MAPLE AVE, P#26017 !!!!!_x000D_ AP1-YWO Total Cost Less Than 7K | Other-O00 1N720848 | JDB/P# 33766/REPLACED 50KVA XFRMR/I | JDB/P# 33766/REPLACED 50KVA XFRMR/INSTALLED 100 AMP CUTOUT & BRACKET/5-31_x000D_ AP1-YWO Total Cost Less Than 7K | Other-O00
  8. Part 10 of 77

    1N720860 | JES; 31A8 Capacitor Solution - New | JES; 31A8 Capacitor Solution - New Canaan Silvermine Rd PL 27..._x000D_ AP2-YWO Total Cost Variance Met - Variance :4.9118 MIN.:-40 MAX.:40 | Other-O00 1N720916 | JDB 10 STURGESS COMMONS WSPT POLE 5 | JDB 10 STURGESS COMMONS WSPT POLE 5337 INSTALLED 50KVA/CUTOUT/6-13-2017_x000D_ AP1-YWO Total Cost Less Than 7K | Other-O00 1N720986 | JES; 659 DANBURY RD. WILTON. REPLAC | JES; 659 DANBURY RD. WILTON. REPLACE BAD POLE & RE ROUT LINES. 19024.._x000D_ AP3-YWO Resource Variance Met- Labor 8 <= 32 OR -19.14 <= 30 And Contractor $1030.89 <= 2000 | Other-O00 1N721071 | JDB SPRING HILL AVE,NWLK - 9A HBA R | JDB SPRING HILL AVE,NWLK - 9A HBA REPL POLE#26 07/19/17_x000D_ AP3-YWO Resource Variance Met- Labor 23 <= 32 OR 37.03 <= 30 And Contractor $0 <= 2000 | Other-O00 1N721075 | JDB 144 MAIN ST, NORWALK- BAD DB PR | JDB 144 MAIN ST, NORWALK- BAD DB PRIM P#20241 07/19/17_x000D_ AP2-YWO Total Cost Variance Met - Variance :6.2892 MIN.:-50 MAX.:50 | Other-O00 1N721098 | JES; 66 WHITE FALL LN NEW CANAAN.; | JES; 66 WHITE FALL LN NEW CANAAN.; Elec Svc Existing Residential POLE 8525..._x000D_ AP1-YWO Total Cost Less Than 7K | Other-O00 1N721109 | LD !!!! NORFIELD RD WESTON INS AMPA | LD !!!! NORFIELD RD WESTON INS AMPAC POLE#31102 MINOR INFRARED SURVEY_x000D_ AP3-YWO Resource Variance Met- Labor 28 <= 32 OR -82.24 <= 30 And Contractor $0 <= 2000 | Other-O00 1N721146 | JES; 269 MILLSTONE RD. WILTON.; REL | JES; 269 MILLSTONE RD. WILTON.; RELOCATE OH SVC. POLE 21268..._x000D_ AP1-YWO Total Cost Less Than 7K | Other-O00 1N721556 | RM - CDOT173-415, test-pits, RT 57 | RM - CDOT173-415, test-pits, RT 57 BRIDGE REPAIR - WESTON_x000D_ JE-YWO Variance Job Type Exclusion | Other-O00 1N721672 | AJC 54 WILTON RD WSPT REPLACE POLE | AJC 54 WILTON RD WSPT REPLACE POLE 1205 INSTALL P RISER & PAD REM P DB PRI & DH_x000D_ | Other-O00 1N721713 | RSO; 11/24; BAYBERRY LN WSPT; REFER | RSO; 11/24; BAYBERRY LN WSPT; REFER TO AWC TO REPL #2 SVC_x000D_ AP1-YWO Total Cost Less Than 7K | Other-O00 1N721862 | 9A !!!!!!!!!!!RSO 12/23; NEWTOWN TP | 9A !!!!!!!!!!!RSO 12/23; NEWTOWN TPKE WESTON; CAR V P31920-21_x000D_ AP1-YWO Total Cost Less Than 7K | Other-O00 1N820137 | LD 41 WOLFPIT AVE NORWALK RECONDUCT | LD 41 WOLFPIT AVE NORWALK RECONDUCTOR LINE FROM ENTRANCE POLE#23558_x000D_ AP2-YWO Total Cost Variance Met - Variance :-2.4311 MIN.:-30 MAX.:30 | Other-O00 1N820466 | MJP - CD00348 - 102-363 - (4)Phase | MJP - CD00348 - 102-363 - (4)Phase 1: Removal of Existing OH Pole Line_x000D_ JE-YWO Variance Job Type Exclusion | Other-O00 1N820551 | MJP - CD00348 - 102-363 - (1)Phase | MJP - CD00348 - 102-363 - (1)Phase 1: OH Work, Inst. Poles 30239, 30240 & PB_x000D_ JE-YWO Variance Job Type Exclusion | Other-O00 1N820553 | MJP - CD00348 - 102-363 - (2)Phase | MJP - CD00348 - 102-363 - (2)Phase 1: Civil work required_x000D_ JE-YWO Variance Job Type Exclusion | Other-O00 1N820554 | MJP - CD00348 - 102-363 - (3)Phase | MJP - CD00348 - 102-363 - (3)Phase 1: Electrical UG work required_x000D_ JE-YWO Variance Job Type Exclusion | Other-O00 1N820555 | MJP - CD00348 - 102-363 - (6)Phase | MJP - CD00348 - 102-363 - (6)Phase 2: Civil (includes bridge material)_x000D_ JE-YWO Variance Job Type Exclusion | Other-O00 1N820556 | MJP - CD00348 - 102-363 - (7)Phase | MJP - CD00348 - 102-363 - (7)Phase 2: Electrical UG work required_x000D_ NO AWOCS-AWOCS REASON CODE AND DESCRIPTION NOT FOUND. | Other-O00 1N821098 | MJP - CD00348 - 102-363 - (5)Phase | MJP - CD00348 - 102-363 - (5)Phase 1: OH Work, Relocate P. 12008_x000D_ JE-YWO Variance Job Type Exclusion | Other-O00 1N821115 | JES; 610 OLD STAMFORD RD. NEW CANAA | JES; 610 OLD STAMFORD RD. NEW CANAAN.; Elec Svc Existing Residential pl 671..._x000D_ | Other-O00 1N821513 | LD 26 ORLANDO PL NORWALK TROUBLE R | LD 26 ORLANDO PL NORWALK TROUBLE REPORT, POLE 6855_x000D_ AP1-YWO Total Cost Less Than 7K | Other-O00
  9. Part 11 of 77

    1N821689 | RM- CDOT 173-415 - REINFORCE DUCT B | RM- CDOT 173-415 - REINFORCE DUCT BANK - WESTON_x000D_ JE-YWO Variance Job Type Exclusion | Other-O00 1N920602 | RM- CDOT 173-415 - RT 57 - 1 test p | RM- CDOT 173-415 - RT 57 - 1 test pit - WESTON_x000D_ JE-YWO Variance Job Type Exclusion | Other-O00 1S030025 | TC 120 ROCK SPRING RD STM: P#6578 R | CTF: 120 ROCK SPRING RD STM: REPLACE OH SVC TO 1/0 TPX OH 400 AMPS - 3 METERS_x000D_ | Other-O00 1S030417 | TC 330 DUNDEE RD, STM; P# 11409 UPG | TC 330 DUNDEE RD, STM; P# 11409 UPG SVC TO 200 AMPS_x000D_ | Other-O00 1S030725 | AJC 056-315 -Weaver St /Glenville | MJP - 056-315 - Glenville Rd Intersection Improvements | Other-O00 1S030900 | TC 34 DAVENPORT RIDGE LN, STM; 200 | TC 34 DAVENPORT RIDGE LN, STM; 200 AMP OH SVC UPG_x000D_ | Other-O00 1S031003 | RL:86 Cutler Rd: Elec Svc New Resid | RL:86 Cutler Rd:Elec Svc New Residential IT Meter DESG 800 amps_x000D_ | Other-O00 1S031233 | ***MJP/31 River Rd/GRN/Misc CD01048 | MJP - River Rd, Greenwich - Misc CD01048 Close Out Work | Other-O00 1S031250 | *** DL; CD#01428; LOCKWOOD AVE; REP | DL; LOCKWOOD AVE; REPLACE P# 12660 INST NEW 900A SWITCHES & REPL P#17477_x000D_ | Other-O00 1S031782 | (30): RL 31 QUAIL RD, GRN REPLACE P | RL 31 QUAIL RD, GRN Pole is leaning | Other-O00 1S031786 | appt 12/27 MJP/18 Hoyt St/DAR/Repla | MJP/18 Hoyt St/DAR/Shift to New FTR Defective Pole 1759_x000D_ | Other-O00 1S031798 | AE/TC 67 WOODRIDGE DR S, STM; UPG O | TC 67 WOODRIDGE DR S, STM; UPG OH SVC 200 AMPS, REPL LINE W/ #2ALTPX_x000D_ | Other-O00 1S031963 | MJP/1335 E Main St/STM/Relocate Str | MJP/1335 E Main St/STM/Relocate Str Light P 11720 & Other Misc Work_x000D_ JE-YWO Variance Job Type Exclusion | Other-O00 1S032158 | MJP/1290 E Main St/STM/Install 50' | MJP/1290 E Main St/STM/Install 50' Poles 8169 & 5797 for Clearance over Weed Ave_x000D_ JE-YWO Variance Job Type Exclusion | Other-O00 1S320711 | 103808-03 SECONDARY DUCTS & HANDHO | 103808-03 SECONDARY DUCTS & HANDHOLES - CIVIL MATERIALS ONLY_x000D_ AP2-YWO Total Cost Variance Met - Variance :-44.1629 MIN.:-50 MAX.:50 | Other-O00 1S420578 | RM- CDOT 135-307, Temp Relocate Pol | RM- CDOT 135-307, Temp Relocate Poles 5797, 5798 E MAIN ST - STAMFORD_x000D_ JE-YWO Variance Job Type Exclusion | Other-O00 1S421351 | CD00340-00 REPLACE 1G18 CABLE w/1 | CD00340-00 REPLACE 1G18 CABLE w/1000MCM MH696 to MH698_x000D_ CI-YWO Variance - Contractor Invoice | Other-O00 1S520664 | PH; 48 SALISBURY RD; Electric Servi | PH; 48 SALISBURY RD; Electric Service New Residential SC w/CIAC Line Set_x000D_ | Other-O00 1S520964 | DL Relocate OH service | DL Relocate OH service_x000D_ AP1-YWO Total Cost Less Than 7K | Other-O00 1S521266 | PH; 13 Juniper Rd, Darien Relocate | PH; 13 Juniper Rd, Darien Relocate OH facilities to UG for customer_x000D_ CL-YWO Variance - Contractor Labor | Other-O00 1S521599 | DL; ESO 9A FAIRFIELD AVE; P#1736/ | DL; ESO 9A FAIRFIELD AVE; P#1736/REPLACE RECLOSER - UPPER UNIT-**YELLOW TAG**_x000D_ AP2-YWO Total Cost Variance Met - Variance :-30.3396 MIN.:-40 MAX.:40 | Other-O00 1S521821 | RM- CDOT 135-307, Temp Relocate Pol | RM- CDOT 135-307, Temp Relocate Poles Boston post Rd - DARIEN_x000D_ JE-YWO Variance Job Type Exclusion | Other-O00 1S620343 | PH; 0 Shadbush Ln/P#13752/Tree brok | PH; 0 Shadbush Ln/P#13752/Tree broke pole/Rep 25 kVa & cutout/See TT/Alex M._x000D_ | Other-O00 1S620701 | RL BELLE HAVEN REMOVE OVERHEAD ON M | RL BELLE HAVEN REMOVE OVERHEAD ON MAYO AVE_x000D_ AP3-YWO Resource Variance Met- Labor 35 <= 32 OR -37.25 <= 30 And Contractor $1731.29 <= 2000 | Other-O00 1S620848 | BK WOODRIDGE DR S @ LONG RIDGE CHAN | BK WOODRIDGE DR S @ LONG RIDGE CHANGE TAP A to C phase,_x000D_ AP1-YWO Total Cost Less Than 7K | Other-O00 1S620993 | PH; 151 BROOKSIDE RD; INSTALL 200AM | PH; 151 BROOKSIDE RD; INSTALL 200AMP DB, REMOVE 100AMP DB SERVICE_x000D_ AP1-YWO Total Cost Less Than 7K | Other-O00
  10. Part 12 of 77

    1S621329 | DL; 20 DEAN ST; REPLACE 2 FRNTR POL | DL; 20 DEAN ST; REPLACE 2 FRNTR POLES/NEW OH SEC RISER TO HH/DB SVC_x000D_ AP2-YWO Total Cost Variance Met - Variance :26.9456 MIN.:-50 MAX.:150 | Other-O00 1S720173 | PH; 16 RAIDERS LN; INSTALL 400AMP D | PH; 16 RAIDERS LN; INSTALL 400AMP DB SERVICE, REMOVE OH POLE LINE/SERVICE_x000D_ AP2-YWO Total Cost Variance Met - Variance :56.1339 MIN.:-50 MAX.:150 | Other-O00 1S720189 | DL; 425 FAIRFIELD AVE; CUSTOMER CON | DL; 425 FAIRFIELD AVE; CUSTOMER CONNECTIONS IN NEW PAD XFMR & METER WORK_x000D_ AP1-YWO Total Cost Less Than 7K | Other-O00 1S720200 | DM/461 STANWICH RD GREENWICH: CAR V | DM/461 STANWICH RD GREENWICH: CAR VS POLE 73690-S_x000D_ AP1-YWO Total Cost Less Than 7K | Other-O00 1S720372 | DL; 16 EMERY DR E; REPLACE BACKYARD | DL; 16 EMERY DR E; REPLACE BACKYARD POLE AND INSTALL NEW OH/DB SVC RISER_x000D_ AP2-YWO Total Cost Variance Met - Variance :53.9906 MIN.:-50 MAX.:150 | Other-O00 1S720461 | RL:11 Watch Hill Dr:Elec Existing R | RL:11 Watch Hill Dr:Elec Existing Residential OH/DB Remove span Tpx & OH service_x000D_ AP1-YWO Total Cost Less Than 7K | Other-O00 1S720478 | DM/8 PARK AVE GREENWICH: INTERCEPT | DM/8 PARK AVE GREENWICH: INTERCEPT EXIST DB SVC, 4/0 DB SVC, 200AMP_x000D_ AP1-YWO Total Cost Less Than 7K | Other-O00 1S720491 | RL:205 Glenville Rd; Electric Servi | RL:205 Glenville Rd; Electric Service New Residential Overhead_x000D_ AP1-YWO Total Cost Less Than 7K | Other-O00 1S720506 | DL; 970 STILLWATER RD; TRANSFER TO | DL; 970 STILLWATER RD; TRANSFER TO FRONTIER POLE 113347/NEW OH/DB RISER_x000D_ AP1-YWO Total Cost Less Than 7K | Other-O00 1S720520 | DL; 2 SELLECK ST; NEW 3PH PRIMARY R | DL; 2 SELLECK ST; NEW 3PH PRIMARY RISER TO NEW PAD XFMR - BLT_x000D_ NL-YWO Variance - NU Construction Labor | Other-O00 1S720532 | PH; 3/4/17 ESO - 1070 HIGH RIDGE RD | PH; 3/4/17 ESO - 1070 HIGH RIDGE RD STAMFORD CAR VS POLE# 9654 CASE# 1703040002_x000D_ EW-YWO Variance - Emergent Work | Other-O00 1S720569 | RL:Ettl Ln: Replace poles 79977, 79 | RL:Ettl Ln: Replace poles 79977, 79976 Install 3 spans 1/0 tpx remove open wire_x000D_ AP2-YWO Total Cost Variance Met - Variance :21.7787 MIN.:-50 MAX.:50 | Other-O00 1S720604 | BK 1011 WASHINGTON BLVD INSTALL 3RD | BK 1011 WASHINGTON BLVD INSTALL 3RD TRANSFORMER IN LOOP 300KVA_x000D_ AP2-YWO Total Cost Variance Met - Variance :37.0399 MIN.:-40 MAX.:40 | Other-O00 1S720716 | DM/356 DAVIS AVE GREENWICH: INST 3" | DM/356 DAVIS AVE GREENWICH: INST 3" SVC RISER, 350MCM DB SVC, 2-200AMP METERS_x000D_ AP1-YWO Total Cost Less Than 7K | Other-O00 1S720834 | DL; WASHINGTON BLVD; FAULT TO 3 STA | DL; WASHINGTON BLVD; FAULT TO 3 STAMFORD LIGHTS_x000D_ AP2-YWO Total Cost Variance Met - Variance :32.5896 MIN.:-50 MAX.:50 | Other-O00 1S720980 | CIR# 22M9 REHAB FROM CIRCUIT PATROL | CIR# 22M9 REHAB FROM CIRCUIT PATROL (CHARGE ANIMAL GUARDS TO 17XRELIN)_x000D_ AP2-YWO Total Cost Variance Met - Variance :2.5791 MIN.:-50 MAX.:50 | Other-O00 1S720997 | PH; 165 BOUTON ST W; INSTALL NEW 20 | PH; 165 BOUTON ST W; INSTALL NEW 200AMP DB; REPLACE POLE 925_x000D_ AP1-YWO Total Cost Less Than 7K | Other-O00 1S721003 | DL; 2 OPPER RD; Electric Service Ex | DL; 2 OPPER RD; Electric Service Existing Residential Overhead_x000D_ AP1-YWO Total Cost Less Than 7K | Other-O00 1S721018 | DM/59 HARDING RD OLD GRN: INST 1/0 | DM/59 HARDING RD OLD GRN: INST 1/0 TPX FROM P.1883 TO P.1884 SHIFT 2 SVCS_x000D_ AP1-YWO Total Cost Less Than 7K | Other-O00 1S721069 | PH; 51 LENOX AVE; Replace OH Servic | PH; 51 LENOX AVE; Replace OH Service_x000D_ AP1-YWO Total Cost Less Than 7K | Other-O00 1S721128 | Interlaken - Cap inspection and rep | Interlaken - Cap inspection and repair @ pole 689 schedule ASAP-LOAD RELIEF_x000D_ AP1-YWO Total Cost Less Than 7K | Other-O00 1S721154 | RL 75 Stonehedge Dr S, Grn Replace | RL 75 Stonehedge Dr S, Grn Replace #4 AL OH service with 1/0 TPX_x000D_ AP1-YWO Total Cost Less Than 7K | Other-O00

Text of RRU-159 Attachment 16.pdf

Extracted from the file · 489 pages · 7,076,557 characters

Text of RRU-159 Attachment 15.xlsx

Sheet names, column headings and text cells; numbers left out · first 300,000 characters

Text of RRU-159 Attachment 15.pdf

Extracted from the file · 897 pages · 15,723,777 characters

Text of RRU-159 Attachment 14 .pdf

Extracted from the file · 1 page · 2,589 characters

Text of RRU-159 Attachment 14.xlsx

Sheet names, column headings and text cells; numbers left out

Text of RRU-159 Attachment 13.xlsx

Sheet names, column headings and text cells; numbers left out

Text of RRU-159 Attachment 13.pdf

Extracted from the file · 1 page · 427 characters

Text of RRU-159 Attachment 12.xlsx

Sheet names, column headings and text cells; numbers left out · first 300,000 characters

Text of RRU-159 Attachment 12.pdf

Extracted from the file · 802 pages · 14,341,138 characters

Text of RRU-159 Attachment 11.xlsx

Sheet names, column headings and text cells; numbers left out · first 300,000 characters

Text of RRU-159 Attachment 11.pdf

Extracted from the file · 858 pages · 15,906,152 characters

Text of RRU-159 Attachment 10.xlsx

Sheet names, column headings and text cells; numbers left out

Text of RRU-159 Attachment 10.pdf

Extracted from the file · 1 page · 822 characters

Text of RRU-159 Attachment 09.xlsx

Sheet names, column headings and text cells; numbers left out · first 300,000 characters

Text of RRU-159 Attachment 09.pdf

Extracted from the file · 449 pages · 7,355,312 characters

Text of RRU-159 Attachment 08.xlsx

Sheet names, column headings and text cells; numbers left out · first 300,000 characters

Text of RRU-159 Attachment 08.pdf

Extracted from the file · 867 pages · 13,878,236 characters

Text of RRU-159 Attachment 07.xlsx

Sheet names, column headings and text cells; numbers left out · first 300,000 characters

Text of RRU-159 Attachment 07.pdf

Extracted from the file · 869 pages · 15,728,932 characters

Text of RRU-159 Attachment 06.xlsx

Sheet names, column headings and text cells; numbers left out · first 300,000 characters

Text of RRU-159 Attachment 06.pdf

Extracted from the file · 459 pages · 8,128,897 characters

Text of RRU-159 Attachment 05.xlsx

Sheet names, column headings and text cells; numbers left out · first 300,000 characters

Text of RRU-159 Attachment 05.pdf

Extracted from the file · 879 pages · 16,073,548 characters

Text of RRU-159 Attachment 04.xlsx

Sheet names, column headings and text cells; numbers left out

Text of RRU-159 Attachment 04.pdf

Extracted from the file · 5 pages · 20,994 characters

Text of RRU-159 Attachment 03.xlsx

Sheet names, column headings and text cells; numbers left out · first 300,000 characters

Text of RRU-159 Attachment 03.pdf

Extracted from the file · 840 pages · 14,413,580 characters

Text of RRU-159 Attachment 02.xlsx

Sheet names, column headings and text cells; numbers left out · first 300,000 characters

Text of RRU-159 Attachment 02.pdf

Extracted from the file · 1,137 pages · 16,605,462 characters

Text of RRU-159 Attachment 01.xlsx

Sheet names, column headings and text cells; numbers left out

Text of RRU-159 Attachment 01.pdf

Extracted from the file · 1 page · 1,403 characters

As listed on the current system

Question(s) Answered 159 (Connecticut Light and Power Company dba Eversource Energy) Date Filed: 11/06/2026

This filing on the current system (opens in a new tab)