Skip to main content

A prototype public docket site for the Connecticut Public Utilities Regulatory Authority

Utility Dockets and Filings

Interrogatory responses

Answers to questions 159

ResponseFiled by Connecticut Light and Power Company dba Eversource Energy51 files
Part of docket 26-05-10Open
  • Electric
Application of The Connecticut Light and Power Company d/b/a Eversource Energy to Amend its Rate Schedules

Files51

Search terms highlighted
Eversource rate increase is on 36 pages across 17 files of the text below, highlighted. Go to the first matchClear highlighting
Words on different pages
Words on different pages
Words on different pages

Text of RRU-159 Attachment 23.xlsx

Sheet names, column headings and text cells; numbers left out · first 300,000 characters

Text of RRU-159 Attachment 23.pdf

Extracted from the file · 1,160 pages · 16,330,154 characters

Text of RRU-159 Attachment 22.xlsx

Sheet names, column headings and text cells; numbers left out · first 300,000 characters

Text of RRU-159 Attachment 22.pdf

Extracted from the file · 1,203 pages · 14,349,246 characters

Text of RRU-159 Attachment 21.xlsx

Sheet names, column headings and text cells; numbers left out · first 300,000 characters

Text of RRU-159 Attachment 21.pdf

Extracted from the file · 1,203 pages · 13,880,364 characters

Text of RRU-159 Attachment 20.xlsx

Sheet names, column headings and text cells; numbers left out

Text of RRU-159 Attachment 20.pdf

Extracted from the file · 16 pages · 151,762 characters

Text of RRU-159 Attachment 19.xlsx

Sheet names, column headings and text cells; numbers left out

Text of RRU-159 Attachment 19.pdf

Extracted from the file · 1 page · 5,328 characters

Text of RRU-159 Attachment 18.xlsx

Sheet names, column headings and text cells; numbers left out · first 300,000 characters

Text of RRU-159 Attachment 18.pdf

Extracted from the file · 640 pages · 7,983,236 characters

Text of RRU-159 Attachment 17.xlsx

Sheet names, column headings and text cells; numbers left out · first 300,000 characters

Text of RRU-159 Attachment 17.pdf

Extracted from the file · 855 pages · 14,651,941 characters

Words on different pages

This spreadsheet is large. Its searchable text keeps the sheet names, column headings and text cells and stops at 300,000 characters, so search may miss words further in. Download the file for every cell and figure.

  1. Part 41 of 77

    2M722269 | Municipal Light Fault Locate and Re | Municipal Light Fault Locate and Repair@ POLE 4150 - COMP 7-8-17 CCC_x000D_ AP1-YWO Total Cost Less Than 7K | Other-O00 2M722285 | CDOT151-273, PN 492601-03 CIS #9 - | CDOT151-273, PN 492601-03 CIS #9 - OH Riser 9521_x000D_ JE-YWO Variance Job Type Exclusion | Other-O00 2M722310 | Municipal Light Fault Locate and Re | Municipal Light Fault Locate and Repair@ POLE L1-654 Replaced 140ft of #4 CBL._x000D_ CI-YWO Variance - Contractor Invoice | Other-O00 2M722316 | Jpt-Milton Rd BRI P9340 - Rplc'd ro | Jpt-Milton Rd BRI P9340 - Rplc'd rotted xarm with Ridge Pin Const._x000D_ AP1-YWO Total Cost Less Than 7K | Other-O00 2M722319 | Municipal Light Fault Locate and Re | Municipal Light Fault Locate and Repair@ POLE 13-COMP 7/15/17 CCC_x000D_ AP1-YWO Total Cost Less Than 7K | Other-O00 2M722328 | ESO 5/21/17 - WOLCOTT - 27 COUNTY R | ESO 5/21/17 - WOLCOTT - 27 COUNTY RD P# 2312 - no addtl info to date 6/28_x000D_ AP1-YWO Total Cost Less Than 7K | Other-O00 2M722333 | AMM 268 N MAIN ST , WATERBURY. REP | AMM 268 N MAIN ST , WATERBURY. REPLACE BROKEN HANDHOLE._x000D_ AP1-YWO Total Cost Less Than 7K | Other-O00 2M722338 | AMM 155 SONGBIRD LN,FARM. DB PRIMAR | AMM 155 SONGBIRD LN,FARM. DB PRIMARY CABLE FAULT. MADE REPAIRS._x000D_ AP2-YWO Total Cost Variance Met - Variance :-39.9293 MIN.:-50 MAX.:50 | Other-O00 2M722399 | WC 7/5 SOUTHINGTON, CAMPGROUND RD - | WC 7/5 SOUTHINGTON, CAMPGROUND RD - REPLACED 50 KVA XFMR / cutout / tbracket_x000D_ AP1-YWO Total Cost Less Than 7K | Other-O00 2M722403 | JC/Deerfield Ln Bethany Animal Prot | JC/Deerfield Ln Bethany Animal Protection_x000D_ AP1-YWO Total Cost Less Than 7K | Other-O00 2M722406 | JC/Crestwood Dr Naug Fuse 5255 Anim | JC/Crestwood Dr Naug Fuse 5255 Animal Protection_x000D_ AP1-YWO Total Cost Less Than 7K | Other-O00 2M722408 | WC 7/6 SOUTHINGTON, MINE HOLLOW RD/ | WC 7/6 SOUTHINGTON, MINE HOLLOW RD/LONG BOTTOM - 9A P93393_x000D_ AP1-YWO Total Cost Less Than 7K | Other-O00 2M722436 | RSO/AWC 7/10 CHESHIRE, W JOHNSON AV | RSO/AWC 7/10 CHESHIRE, W JOHNSON AVE - RECONDUCTERING 250' CONDUIT/CABLE_x000D_ CI-YWO Variance - Contractor Invoice | Other-O00 2M722455 | WC 7/11 SOUTHINGTON, MAIN ST - REPL | WC 7/11 SOUTHINGTON, MAIN ST - REPLACED 3 PH BANK & 2 CUTOUTS P86145_x000D_ AP2-YWO Total Cost Variance Met - Variance :20.4912 MIN.:-50 MAX.:50 | Other-O00 2M722458 | JC/9A, 5/27 266 Jones Rd, Naugatuck | JC/9A, 5/27 266 Jones Rd, Naugatuck - car vs. pole 6001_x000D_ AP1-YWO Total Cost Less Than 7K | Other-O00 2M722472 | WC (LOT59) 271 N Ridge Ct SOG INST | WC (LOT59) 271 N Ridge Ct SOG INST DB SVC FROM HH#1633A TO HSE#271_x000D_ AP1-YWO Total Cost Less Than 7K | Other-O00 2M722543 | Jpt-RSO- Middle St BRI P6285 - 9a - | Jpt-RSO- Middle St BRI P6285 - 9a - Replaced pole Shifted 3PH Tan & 3PH Tap_x000D_ CI-YWO Variance - Contractor Invoice | Other-O00 2M722550 | Nelson Ave,Wtby. Make upgrades on p | Nelson Ave,Wtby. Make upgrades on pole 6791, 6789 & 6787 for animal protection._x000D_ AP1-YWO Total Cost Less Than 7K | Other-O00 2M722553 | Greystone Rd,Wtby. Make upgrades on | Greystone Rd,Wtby. Make upgrades on 64496,64497,G413&64500 for animal protection_x000D_ AP1-YWO Total Cost Less Than 7K | Other-O00 2M722559 | Municipal Light Fault Locate and Re | Municipal Light Fault Locate and Repair@ POLE 1259 - COMP 8/2 CCC_x000D_ AP1-YWO Total Cost Less Than 7K | Other-O00 2M722574 | DM RSO 7/19 CHESHIRE, HUCKINS RD P | DM RSO 7/19 CHESHIRE, HUCKINS RD P#5862 - REPLACED XFMR, 2 CUTOUTS_x000D_ AP1-YWO Total Cost Less Than 7K | Other-O00 2M722576 | DM RSO 7/19 CREAMERY RD, DURHAM - B | DM RSO 7/19 CREAMERY RD, DURHAM - BROKEN P 1092_x000D_ AP1-YWO Total Cost Less Than 7K | Other-O00 2M722589 | EJC 279 Oak St, NB P#5724 Replaced | EJC 279 Oak St, NB P#5724 Replaced Xfrmr, Installed C/Os, POST CONSTRUCTION_x000D_ AP1-YWO Total Cost Less Than 7K | Other-O00
  2. Part 42 of 77

    2M722592 | AMM 65 BENEDICT ST,WTBY. REPLACED | AMM 65 BENEDICT ST,WTBY. REPLACED XFMR BANK. REPLACED 3 CUTOUTS._x000D_ CL-YWO Variance - Contractor Labor | Other-O00 2M722602 | WC-RSO 7/21 SOUTHINGTON, WEST ST - | WC-RSO 7/21 SOUTHINGTON, WEST ST - 9A P92660 PICK UP SNAGGED WIRE - REPLD SVC_x000D_ | Other-O00 2M722664 | JC/RSO 7/22 NAUGATUCK, NEW HAVEN RD | JC/RSO 7/22 NAUGATUCK, NEW HAVEN RD- 9A P3602 - BROKEN POLE_x000D_ AP1-YWO Total Cost Less Than 7K | Other-O00 2M722719 | JC/RSO 7/28 MIDDLEBURY, SOUTH ST - | JC/RSO 7/28 MIDDLEBURY, SOUTH ST - TRUCK TOOK DOWN SVC - RAN 130' #2 SVC_x000D_ AP1-YWO Total Cost Less Than 7K | Other-O00 2M722755 | EJC 14 Carmel St, New Britain P#336 | EJC 14 Carmel St, New Britain P#3362 Replaced Xfrmr, Added Fuses, POST CONST_x000D_ AP1-YWO Total Cost Less Than 7K | Other-O00 2M722757 | RSO NEW BRITAIN, Biruta St - Replac | RSO NEW BRITAIN, Biruta St - Replace 50' #2 OH Service @ P53400_x000D_ AP1-YWO Total Cost Less Than 7K | Other-O00 2M722797 | AMM 455 CHASE PKWY,WTBY. PART POWER | AMM 455 CHASE PKWY,WTBY. PART POWER. REPAIRED PRIMARY CABLE NEAR POLE F8074._x000D_ AP1-YWO Total Cost Less Than 7K | Other-O00 2M722809 | Jpt-Robert Holcomb Way Plnv P9730 - | Jpt-Robert Holcomb Way Plnv P9730 - Un-Metered - VERIZON ANTENNA_x000D_ AP1-YWO Total Cost Less Than 7K | Other-O00 2M722833 | Jpt-RSO- Park Hill Rd BRI - Rplc'd | Jpt-RSO- Park Hill Rd BRI - Rplc'd 4 (Frnt) Poles & 1 Xfrm_x000D_ AP2-YWO Total Cost Variance Met - Variance :104.2948 MIN.:-50 MAX.:150 | Other-O00 2M722839 | RSO SOUTHINGTON, Belleview Ave - I | RSO SOUTHINGTON, Belleview Ave - Installed 15 KV arrestor at Pad A_x000D_ CI-YWO Variance - Contractor Invoice | Other-O00 2M722853 | AMM 32 DEPOT PL, FARMINGTON. REPLA | AMM 32 DEPOT PL, FARMINGTON. REPLACED 3 PH BANK ON POLE 2350 & ADDED 3 CUTOUTS._x000D_ AP1-YWO Total Cost Less Than 7K | Other-O00 2M722861 | WC-8/10 SOUTHINGTON, BRISTOL ST - 9 | WC-8/10 SOUTHINGTON, BRISTOL ST - 9A P 2647 - CAR V POLE & 3 PH BANK XFRMS_x000D_ AP2-YWO Total Cost Variance Met - Variance :-4.2993 MIN.:-50 MAX.:50 | Other-O00 2M722889 | DM/RSO 8/13 WOLCOTT, LONG SWAMP RD- | DM/RSO 8/13 WOLCOTT, LONG SWAMP RD- 9A P 5000 - LONGO/KENNEY_x000D_ AP1-YWO Total Cost Less Than 7K | Other-O00 2M722892 | CD00927 - CDOT 151-326 - I84 Mix Ma | CD00927 - CDOT 151-326 - I84 Mix Master Rehab - Remove Streetlights &Secondaries_x000D_ JE-YWO Variance Job Type Exclusion | Other-O00 2M722893 | CD00927 - CDOT 151-326 - I84 Mix Ma | CD00927 - CDOT 151-326 - I84 Mix Master Rehab - Extend MH's to New Street Level_x000D_ JE-YWO Variance Job Type Exclusion | Other-O00 2M722903 | ESO 9A 6/8 WATERBURY, 593 SYLVAN AV | ESO 9A 6/8 WATERBURY, 593 SYLVAN AVE - 9A P7260 -_x000D_ AP1-YWO Total Cost Less Than 7K | Other-O00 2M722919 | RTM-1821 N Broad St, Mer. 9A Car vs | RTM-1821 N Broad St, Mer. 9A Car vs P#3141. Frontier Replaced. POST CONSTRUCTION_x000D_ AP2-YWO Total Cost Variance Met - Variance :-29.3137 MIN.:-50 MAX.:50 | Other-O00 2M722933 | DM/ESO 9A 6/10/17 - CHESHIRE - P#85 | DM/ESO 9A 6/10/17 - CHESHIRE - P#853 RESAG OH SVC 1308 S MERIDEN RD_x000D_ AP1-YWO Total Cost Less Than 7K | Other-O00 2M722960 | DM 453 W Main St CHES P#289 Change | DM 453 W Main St CHES P#289 Change XFMR New Open Point P#287 Close Open Point_x000D_ AP1-YWO Total Cost Less Than 7K | Other-O00 2M723013 | Jpt-RSO-518 Jerome Ave BRI P2073 - | Jpt-RSO-518 Jerome Ave BRI P2073 - RAN NEW 100' #2 SVS MIDSPANNED_x000D_ AP1-YWO Total Cost Less Than 7K | Other-O00 2M723018 | EJC 66 Clifford St, Newington P#602 | EJC 66 Clifford St, Newington P#6022 Replaced Pole, Xfrmr, Shift Facilities_x000D_ AP2-YWO Total Cost Variance Met - Variance :134.8751 MIN.:-50 MAX.:150 | Other-O00 2M723162 | WC-9/3 RSO P#1468 INSTLLD, CO NEED | WC-9/3 RSO P#1468 INSTLLD, CO NEED RHANG TPX TO NEW POLE + HANG SRV TO HOUSE_x000D_ AP1-YWO Total Cost Less Than 7K | Other-O00
  3. Part 43 of 77

    2M723308 | Jpt-77 Bradley St BRI P8486 - New R | Jpt-77 Bradley St BRI P8486 - New Residential Overhead_x000D_ AP1-YWO Total Cost Less Than 7K | Other-O00 2M723627 | Jpt-Lexington Ave Wtby P62509 - Rpl | Jpt-Lexington Ave Wtby P62509 - Rplc'd Pole - PER KEN GROHS - XFMR WAS NOT REPL_x000D_ CI-YWO Variance - Contractor Invoice | Other-O00 2M723981 | TAP ON TPX SVC TO NEW PARALLEL OWNE | TAP ON TPX SVC TO NEW PARALLEL OWNERS SERVICE RISER, MTR SET REQ'D_x000D_ AP1-YWO Total Cost Less Than 7K | Other-O00 2M724513 | Jpt-7 Pickett Ln Farm (Frnt)P6024 - | Jpt-7 Pickett Ln Farm (Frnt)P6024 - Existing Residential Overhead - MLC_x000D_ AP1-YWO Total Cost Less Than 7K | Other-O00 2M820093 | JC/278 SPERRY RD. BETHANY/ NEW CV S | JC/278 SPERRY RD. BETHANY/ NEW CV SVC 4/0 POLE IN BACK YARD DO WITH WR3100314_x000D_ AP1-YWO Total Cost Less Than 7K | Other-O00 2M820141 | AMM 130 FREIGHT ST,WTBY. ENVIRONME | AMM 130 FREIGHT ST,WTBY. ENVIRONMENTAL SITE MONITORING. 3PH DB XFMR 773._x000D_ AP1-YWO Total Cost Less Than 7K | Other-O00 2M820189 | COMP 1/20/18 CCC - Municipal Light | COMP 1/20/18 CCC - Municipal Light Fault Locate and Repair@ POLE 7_x000D_ AP1-YWO Total Cost Less Than 7K | Other-O00 2M820194 | AMM 12 GILLETTE WAY FARM. Municipa | AMM 12 GILLETTE WAY FARM. Municipal Light Fault Locate and Repair@ POLE 2926._x000D_ AP1-YWO Total Cost Less Than 7K | Other-O00 2M820195 | AMM 12 GILLETTE WAY,FARM. Municipa | AMM 12 GILLETTE WAY,FARM. Municipal Light Fault Locate and Repair@ POLE 2927._x000D_ AP1-YWO Total Cost Less Than 7K | Other-O00 2M820295 | Jpt-RSO-320 Farmington Ave Plnv P15 | Jpt-RSO-320 Farmington Ave Plnv P1515 - REPL 1000 WATT BULB AND EYE_x000D_ AP1-YWO Total Cost Less Than 7K | Other-O00 2M821147 | CD00080-16 - Network Replacement-UG | CD00080-06 - UG Electrical - Old Firehouse Rd - Install Switch Gear & 4/0 Pri_x000D_ | Other-O00 2M821305 | CDOT 17-186 - RTE 6 Bristol Road Wi | CDOT 17-186 - RTE 6 Bristol Road Widening - Additional Pole Sets to New Depth_x000D_ JE-YWO Variance Job Type Exclusion | Other-O00 2M821520 | AMM 25 HATTERS LN,FARM. REPLACE & | AMM 25 HATTERS LN,FARM. REPLACE & RELOCATE OH SERVICE TO NEW ATTACHMENT POINT._x000D_ AP1-YWO Total Cost Less Than 7K | Other-O00 2M920603 | (50): CD01046-06, Smart Switch Recl | CD01046-06, Smart Switch Recloser, Durham 30K13-4403_x000D_ | Other-O00 2M921044 | **PMV CD01031-01 INSTALL NEW TR 4C1 | CD01031 4C19 INSTALL NEW TR 4C19-91T P-93099 SEG 1 | Other-O00 2M921045 | *PMV CD01031-01 Install 556 Spacer | CD01031-01 Install 3PH 556TW on East St WO# 1 of 2 | Other-O00 2M921046 | **PMV CD01031-01 Install 556 Space | CD01031-01 Install 3PH 556TW on East St WO# 2 of 2 | Other-O00 2M921047 | **PMV CD01031-04 Install 750 AL A | CD01031-4 Install 500 AL AC 4C19 ROW X-ing East St, Southington | Other-O00 2M921048 | **PMV - CD01031 -01 Install 556 Spa | Elec Proj Reconductor/Relocate/Conversion Specific | Other-O00 2M921131 | **PMV CD01031-01 Install 556 Space | Elec Proj Reconductor/Relocate/Conversion Specific | Other-O00 2M921219 | CD00925-02 Convert Washington Ave, | Elec Proj Reconductor/Relocate/Conversion Specific | Other-O00 2M921334 | CD00925-02 Install TR 11W45-91T P# | Elec Proj Cable Replacement Specific - Conventional UG DESG (MIBPROJ) | Other-O00 2M922954 | CD00925-09. Remove South Leonard 23 | Elec Proj Reliability Specific Conventional UG DESG (TBD) | Other-O00 2M923048 | PROJECTS -CDOT 17-187 RT 72 & 69 In | Elec Proj Highway Relocation Reimbursable DESG (DH) | Other-O00 2M923060 | CD00925-09. Remove 23N2 cable (2) | Elec Proj Reliability Specific Conventional UG DESG (TBD) | Other-O00 2M923082 | CD00925-09. Remove 11W45 cable (3) | Elec Proj Reliability Specific Conventional UG DESG (TBD) | Other-O00 2M923083 | EJC 119 Apple Hill,Newington HH#15 | EJC 119 Apple Hill,Newington HH#157B Disc/Rec DB Svc for Slipjoint Inst,M/L/C_x000D_ AP1-YWO Total Cost Less Than 7K | Other-O00
  4. Part 44 of 77

    2M923134 | CD00925-09. Remove cable to 23N sub | Elec Proj Reliability Specific Conventional UG DESG (TBD) | Other-O00 2M923159 | CD00925-04 - S. Leonard 23N SS Elim | CD00925-04 - S. Leonard 23N SS Eleimination - 23N2 Conveersion - Baldwin St | Other-O00 2M923160 | CD00925-04 - S. Leonard 23N SS Elim | CD00925-05 - S. Leonard 23N SS Eleimination - TR/RR - Pole 4929 Baldwin St | Other-O00 2M923161 | CD00925-04 - S. Leonard 23N SS Elim | CD00925-04 - S. Leonard 23N SS Eleimination - 23N2 Conveersion - E. Liberty St | Other-O00 2M923162 | CD00925-04 - S. Leonard 23N SS Elim | CD00925-04 - S. Leonard 23N SS Eleimination - 23N2 Conveersion - River St | Other-O00 2M923163 | CD00925-04 - S. Leonard 23N SS Elim | CD00925-05 - S. Leonard 23N SS Eleimination - SR - Pole 62634 - E. Liberty St | Other-O00 2M923592 | RTM-Yale Acres, Meriden. OH/DB Conv | RTM-Yale Acres, Meriden. OH/DB Conversion. Phase 1 of 6 (C-01) CD00551-02_x000D_ AP2-YWO Total Cost Variance Met - Variance :-3.9788 MIN.:-40 MAX.:40 | Other-O00 2M923734 | RTM-1 Washington Hts, Mer. Existing | RTM-1 Washington Hts, Mer. Existing Res Upgrade. Replace OH Svc. M/L-C 200A 1PH_x000D_ AP1-YWO Total Cost Less Than 7K | Other-O00 2M924043 | EJC 62 New Britain Rd, Berlin Repl | EJC 62 New Britain Rd, Berlin Repl 3ph Bank, Inst OH/DB Svc to Pedestal, M/L/C_x000D_ | Other-O00 2W221783 | PHD BM/ REPL B CU NEUT W/ 1/0 NEUT, | PHD BM/ REPL B CU NEUT W/ 1/0 NEUT, REFRAME POLE TOPS_x000D_ | Other-O00 2W420876 | ran new down guy and reconnected | ran new down guy and reconnected ESO_x000D_ AP1-YWO Total Cost Less Than 7K | Other-O00 2W421123 | VT/CONFIRMING/UNKNOWN POLE NUMBER/c | VT/CONFIRMING/UNKNOWN POLE NUMBER/car vs pole_x000D_ | Other-O00 2W421201 | PHD BM/ Pole 1342 Install 600 Amp s | PHD BM/ Pole 1342 Install 600 Amp switches_x000D_ CL-YWO Variance - Contractor Labor | Other-O00 2W421609 | JAM CHANGE OUT SW GEAR AND CABLE FA | JAM CHANGE OUT SW GEAR AND CABLE FAULT_x000D_ | Other-O00 2W421636 | JD 492601 13F64 RELOCATE OH LINE CD | JD 492601 13F64 RELOCATE OH LINE CDOT 151-273- SEG 2_x000D_ JE-YWO Variance Job Type Exclusion | Other-O00 2W421645 | JD 492601 13F64 REMOVE/RELOCATE OH | JD 492601 13F64 REMOVE/RELOCATE OH LINE-CDOT 151-273 - SEG 2_x000D_ JE-YWO Variance Job Type Exclusion | Other-O00 2W520098 | ROTTED FRNTR POLE #8951 INSTALLED R | ROTTED FRNTR POLE #8951 INSTALLED RIDGE PIN NEUTRAL CLAMP & SHIFTED_x000D_ | Other-O00 2W521082 | VT/RUN NEW OH SVC - TAKEN OUT BY S | VT/RUN NEW OH SVC - TAKEN OUT BY STORM - NEW MAST INSTALLED_x000D_ AP1-YWO Total Cost Less Than 7K | Other-O00 2W521224 | ESO 7/12 COOKE ST, WATERBURY - CAR | ESO 7/12 COOKE ST, WATERBURY - CAR VS P# 14126_x000D_ | Other-O00 2W521519 | VT/INSTALL 120' 4/0 TPX FROM HANDHO | VT/INSTALL 120' 4/0 TPX FROM HANDHOLE TO NEW HOUSE_x000D_ | Other-O00 2W521547 | Lantern Park Dr., Naugatuck - Cable | Lantern Park Dr., Naugatuck - Cable Replacement_x000D_ | Other-O00 2W521628 | P.1114 CAR FIRE VS POLE RISER PIPE | P.1114 CAR FIRE VS POLE RISER PIPE MELTED NEEDS TO BE REPLACED_x000D_ AP1-YWO Total Cost Less Than 7K | Other-O00 2W522049 | PHD Elec Maint Replace/Renewal/Obs | PHD Elec Maint Replace/Renewal/Obsol OH DESG (AROH)_x000D_ AP2-YWO Total Cost Variance Met - Variance :112.0869 MIN.:-50 MAX.:150 | Other-O00 2W522136 | PHD VT *REJECT POLES* - SHIFT AF | PHD VT *REJECT POLES* - SHIFT AFTER FRONTIER SETS POLES_x000D_ AP1-YWO Total Cost Less Than 7K | Other-O00 2W522187 | PHD Elec Maint Replace/Renewal/Ob | PHD Elec Maint Replace/Renewal/Obsol OH DESG (AROH)_x000D_ AP1-YWO Total Cost Less Than 7K | Other-O00 2W522237 | PHD JAM Frontier reject poles nee | PHD JAM Frontier reject poles need to be changed over_x000D_ AP1-YWO Total Cost Less Than 7K | Other-O00 2W620005 | PHD Elec Maint Replace/Renewal/Ob | PHD Elec Maint Replace/Renewal/Obsol OH DESG (AROH)_x000D_ AP1-YWO Total Cost Less Than 7K | Other-O00
  5. Part 45 of 77

    2W620038 | PHD Elec Maint Replace/Renewal/Obs | PHD Elec Maint Replace/Renewal/Obsol OH DESG (AROH)_x000D_ CI-YWO Variance - Contractor Invoice | Other-O00 2W620080 | PHD Elec Maint Replace/Renewal/Ob | PHD Elec Maint Replace/Renewal/Obsol OH DESG (AROH)_x000D_ AP1-YWO Total Cost Less Than 7K | Other-O00 2W620099 | PHD Elec Maint Replace/Renewal/Obs | PHD Elec Maint Replace/Renewal/Obsol OH DESG (AROH)_x000D_ AP1-YWO Total Cost Less Than 7K | Other-O00 2W620198 | PHD Elec Maint Replace/Renewal/Ob | PHD Elec Maint Replace/Renewal/Obsol OH DESG (AROH)_x000D_ AP1-YWO Total Cost Less Than 7K | Other-O00 2W620247 | PHD JC/ POLE 9436 FRONTIER SHIFT | PHD JC/ POLE 9436 FRONTIER SHIFT_x000D_ AP1-YWO Total Cost Less Than 7K | Other-O00 2W620270 | PHD JC/ POLE 8971 FRONTIER SHIFT | PHD JC/ POLE 8971 FRONTIER SHIFT_x000D_ AP1-YWO Total Cost Less Than 7K | Other-O00 2W620297 | PHD Elec Maint Replace/Renewal/Ob | PHD Elec Maint Replace/Renewal/Obsol OH DESG (AROH) P# 6615_x000D_ AP2-YWO Total Cost Variance Met - Variance :47.7694 MIN.:-50 MAX.:50 | Other-O00 2W620324 | VT/REMOVE EXISTING LIGHT...INSTALL | VT/REMOVE EXISTING LIGHT...INSTALL 100W LED COBRA HEAD ON 12' BRACKET_x000D_ | Other-O00 2W620538 | Proj#CD00699-13B33 Relocate for Tra | Proj#CD00699-13B33 Relocate for Trans, Part 3 of 6: Chase Pkwy w/ 556_x000D_ CL-YWO Variance - Contractor Labor | Other-O00 2W620715 | CAR VS FRONTIER POLE #35 POLE IS CR | CAR VS FRONTIER POLE #35 POLE IS CRACKED & ROTTED SHOULD BE REPLACED_x000D_ AP2-YWO Total Cost Variance Met - Variance :66.1647 MIN.:-50 MAX.:150 | Other-O00 2W620798 | DM 5/3 ESO CAR VS POLE WATERBURY RD | DM 5/3 ESO CAR VS POLE WATERBURY RD PRSPCT P#1366 CONV#393701_x000D_ AP1-YWO Total Cost Less Than 7K | Other-O00 2W620826 | JDB 54 PORTER HILL RD MIDDLEBURY R | JDB 54 PORTER HILL RD MIDDLEBURY REPLACE POLE 61480 & SHIFT CONV#449244_x000D_ AP1-YWO Total Cost Less Than 7K | Other-O00 2W620862 | VT/WC-27 Williams Dr, Prospect. SHI | VT/WC-27 Williams Dr, Prospect. SHIFT TO NEW FRONTIER POLE 1775_x000D_ AP1-YWO Total Cost Less Than 7K | Other-O00 2W620907 | JS - 64 Garrigus Ct, Wlctt, Repl PA | JS - 64 Garrigus Ct, Wlctt, Repl PAD XFMR (30L26)_x000D_ AP1-YWO Total Cost Less Than 7K | Other-O00 2W620982 | RL:1255 E Main St Wtby CAR V POLE | RL:1255 E Main St Wtby CAR V POLE Replaced 8602 45/2 transfer 50kva_x000D_ | Other-O00 2W720002 | AMM WAKELEE RD,WTBY. Municipal Lig | AMM WAKELEE RD,WTBY. Municipal Light Fault Locate and Repair@ POLE L2A7._x000D_ AP1-YWO Total Cost Less Than 7K | Other-O00 3H030708 | Electric Service Un-Metered--2/12-- | Electric Service Un-Metered--2/12---HTFD-60 Curtiss St-------pole# 4119_x000D_ | Other-O00 3H031622 | (50): EAST HARTFORD, MAPLEWOOD AVE, | EAST HARTFORD, MAPLEWOOD AVE, REPL ROTTEN POLE #1886S_x000D_ | Other-O00 3H031702 | (30): BLOOMFIELD, TERRY PLAINS, REP | BLOOMFIELD, TERRY PLAINS, REP P2598 3/200AMP CUTOUTS,3/18KV /10 DEAD END ARM | Other-O00 3H031780 | CDOT 42-317 Ensign St. Civil Work | CDOT 42-317 Ensign St. Civil Work Rt. 2 Safety Improvements_x000D_ JE-YWO Variance Job Type Exclusion | Other-O00 3H031783 | Rplc. 3 poles to accomodate new tra | Rplc. 3 poles to accomodate new traffic signals Main, Broad, Maple, Rt 2_x000D_ JE-YWO Variance Job Type Exclusion | Other-O00 3H031811 | COMP (*)(50): Low Voltage Issue 1C2 | Low Voltage Issue 1C20 - Hunter Drive, West Hartford, 4.8 kV Stepdown Area_x000D_ | Other-O00 3H032171 | NJB 115/117 BEDFORD ST RMV EXIST SV | NJB115/117 BEDFORD ST HTFD RMV EXIST SVC&INSTL 000' 4/0-3CT FROM MH#5617 TO G | Other-O00 3H032301 | Waterville Rd Avon - Install new 12 | Install new 1200KVAR unit on pole 280 located Waterville Rd Avon_x000D_ | Other-O00 3H032318 | NJB 280 SAYBROOKE ST HTFD RMV EXIST | Other-O00 3H032645 | WAITING MUNI 12-16-21 - CR-12 LOSTB | CR-12 LOSTBROOK RD. SIMSBURY, REM OH SVC, INS OH-UG SVC OFF POLE 2480_x000D_ | Other-O00
  6. Part 46 of 77

    3H032682 | (60,0): RF-520 Bush Hill Rd,Manches | RF-520 Bush Hill Rd,Manchester,Elec Svc New Residential DESG (DN)_x000D_ | Other-O00 3H032770 | Work here FCOMp: JTR, 141 Preston S | JTR, 141 Preston St, HTFD, Replace Priority Reject P-230,Repl 1 sec of OWS w/TPX_x000D_ | Other-O00 3H032920 | JTR, Seabury Dr, Bloomfield, Replac | JTR, Seabury Dr, Bloomfield, Replace DB Cable (ID: 2218)_x000D_ | Other-O00 3H033013 | HTFD, NAUGATUCK ST - REPL 35/2 & MI | replace 35-2 pole and missing muni street light_x000D_ | Other-O00 3H033436 | FCOMP ALDEN ONE PENDING FARMINGTON, | 11/11- RSO - P4250 NEEDS TO BE STRAIGHTENED. NO OUTAGE. | Other-O00 3H033620 | (30): WEST HARTFORD, WOODLAWN ST - | Other-O00 3H420289 | JWL. RUN NEW OH SVC . RUN MID SPAN | JWL. RUN NEW OH SVC . RUN MID SPAN TO AVOID 2ND FLOOR. TOO CLOSE!!! AP1 -WO TOTAL COST LESS THAN 7K | Other-O00 3H421552 | MANCHESTER, HARTFORD RD - Dressing | MANCHESTER, HARTFORD RD - Dressing Mill 8H - Relay & Sensor_x000D_ NL-YWO Variance - NU Construction Labor | Other-O00 3H422062 | Prospect St EH / 10.2.14 / P527 / 9 | Prospect St EH / 10.2.14 / P527 / 9A_x000D_ AP2-YWO Total Cost Variance Met - Variance :-28.0599 MIN.:-40 MAX.:40 | Other-O00 3H520140 | 12/16 ESO FOREST ST MANCHESTER CAR | 12/16 ESO FOREST ST MANCHESTER CAR VS POLE #2262 / NOT DONE_x000D_ CI-YWO Variance - Contractor Invoice | Other-O00 3H521526 | RF-758 Rainbow Rd,Windsor,Remove Pr | RF-758 Rainbow Rd,Windsor,Remove Primary SVC and Pad 3215_x000D_ AP3-YWO Resource Variance Met- Labor 114 <= 32 OR -70.38 <= 30 And Contractor $0 <= 2000 | Other-O00 3H522527 | TPA/Rplc P1561 & provide DE guy.Con | TPA/Rplc P1561 & provide DE guy.Conv#281746 billable 5' for com top mount Ant_x000D_ AP1-YWO Total Cost Less Than 7K | Other-O00 3H522597 | NJB AWC 12/04 HTFD BUCKINGHAM ST HT | NJB AWC 12/04 HTFD BUCKINGHAM ST HTFD. REPLCAE P#2374 35/2 (Stlght UG Feed)_x000D_ | Other-O00 3H620015 | WF-41 Zion St-Htfd-@ mh# 4908, rpl | WF-41 Zion St-Htfd-@ mh# 4908, rpl ug svc._x000D_ | Other-O00 3H620101 | 394 Tolland Tpk.Manch. Disconn.3PH | 394 Tolland Tpk.Manch. Disconn.3PH service from P-3954_x000D_ AP1-YWO Total Cost Less Than 7K | Other-O00 3H620115 | HARTFORD, FRANKLIN AVE @ STANDISH S | HARTFORD, FRANKLIN AVE @ STANDISH ST REBUILD HEX VLT 606_x000D_ AP3-YWO Resource Variance Met- Labor 62 <= 32 OR -95.41 <= 30 And Contractor $0 <= 2000 | Other-O00 3H620395 | Hartford, Broad St - car vs pole 5 | Hartford, Broad St - car vs pole 5138- need to replace 150 cobra head_x000D_ AP1-YWO Total Cost Less Than 7K | Other-O00 3H620866 | HARTFORD, SCARBOROUGH ST city to re | HARTFORD, SCARBOROUGH ST city to replace pole C9051_x000D_ AP1-YWO Total Cost Less Than 7K | Other-O00 3H620959 | Elliot St Htfd C9103 City Pole 9a | Elliot St Htfd C9103 City Pole 9a Replace 250W head_x000D_ AP1-YWO Total Cost Less Than 7K | Other-O00 3H621240 | DKH - Tower Ave, Htfd - P# 8053 - P | DKH - Tower Ave, Htfd - P# 8053 - Problem with 2N10-53z recloser_x000D_ AP1-YWO Total Cost Less Than 7K | Other-O00 3H621384 | HOMESTEAD AVE, HARTFORD Replace CH8 | HOMESTEAD AVE, HARTFORD Replace CH8470 and 250w head_x000D_ AP1-YWO Total Cost Less Than 7K | Other-O00 3H621467 | MAIN ST, HARTFORD - REPLACE VACUUM | MAIN ST, HARTFORD - REPLACE VACUUM SWITCH MH 731_x000D_ AP3-YWO Resource Variance Met- Labor 126 <= 32 OR -72.58 <= 30 And Contractor $1577.83 <= 2000 | Other-O00 3H621509 | Bidwell St, Manchester - Need to re | Bidwell St, Manchester - Need to replace bad arrester 02 - P-9099 8/11 - HAROH -_x000D_ AP1-YWO Total Cost Less Than 7K | Other-O00 3H621565 | WF-51+53+55- Maple Ave-Windsor-@ po | WF-51+53+55- Maple Ave-Windsor-@ pole-864, rpl oh svc to building._x000D_ | Other-O00 3H621641 | Hartford, Asylum Ave 300B-2 repl 4 | Hartford, Asylum Ave 300B-2 repl 4ways in Hex5856 all 3 phases_x000D_ AP1-YWO Total Cost Less Than 7K | Other-O00 3H621725 | RF-1150 Elm St Ext.,RHl,Install 3PH | RF-1150 Elm St Ext.,RHl,Install 3PH XFMR Bank on pole4966 & install OH/UG SVC_x000D_
  7. Part 47 of 77

    AP1-YWO Total Cost Less Than 7K | Other-O00 3H621940 | 85 WOODLAND- HTFD C6266 Replace 250 | 85 WOODLAND- HTFD C6266 Replace 250w head_x000D_ AP1-YWO Total Cost Less Than 7K | Other-O00 3H622038 | 9/19 - ESO - MANCHESTER, LOVE LN, 9 | 9/19 - ESO - MANCHESTER, LOVE LN, 9A CAR V POLE 2828 - Replace with 40/2_x000D_ AP1-YWO Total Cost Less Than 7K | Other-O00 3H622080 | HTFD 3080 MAIN STREET City to repla | HTFD 3080 MAIN STREET City to replace pole CH8668_x000D_ AP1-YWO Total Cost Less Than 7K | Other-O00 3H622085 | HTFD, Wyllys St, CH9366 replaced 1 | HTFD, Wyllys St, CH9366 replaced 143w led head_x000D_ AP1-YWO Total Cost Less Than 7K | Other-O00 3H622137 | 99 HENDERSON RD, MANCH - PT Conv# 4 | 99 HENDERSON RD, MANCH - PT Conv# 448570-TPA-Fibertech-ParentConv# 447025_x000D_ | Other-O00 3H622162 | HARTFORD, LYME/ BURNHAM STREET 6373 | HARTFORD, LYME/ BURNHAM STREET 6373_x000D_ AP1-YWO Total Cost Less Than 7K | Other-O00 3H622496 | WF-40-44 Lawrence St-Htfd-@pole-300 | WF-40-44 Lawrence St-Htfd-@pole-3002, rpl oh svc to building._x000D_ | Other-O00 3H622553 | 12/7 - RSO - HARTFORD, SEQUIN ST - | 12/7 - RSO - HARTFORD, SEQUIN ST - 18' DB POLE 10816 BROKEN, MADE SAFE_x000D_ AP1-YWO Total Cost Less Than 7K | Other-O00 3H622565 | NEW BRITAIN AV, W HTFD - Conv#45560 | NEW BRITAIN AV, W HTFD - Conv#455605 - TPA DUE BY 3/19_x000D_ AP2-YWO Total Cost Variance Met - Variance :17.9129 MIN.:-50 MAX.:50 | Other-O00 3H622617 | WF-424-426 New Britain Ave-Htfd-@ m | WF-424-426 New Britain Ave-Htfd-@ mh-2828, rpl ug svc to building._x000D_ AP2-YWO Total Cost Variance Met - Variance :36.9082 MIN.:-50 MAX.:150 | Other-O00 3H622751 | WETHERSFIELD, WELLS RD, RPL POLE#1 | WETHERSFIELD, WELLS RD, RPL POLE#1496 40/2_x000D_ AP1-YWO Total Cost Less Than 7K | Other-O00 3H720005 | 12/31 - HAROH - MANCHESTER, CENTE | 12/31 - HAROH - MANCHESTER, CENTER ST, EVERSOURCE P-1500 set 35/2_x000D_ AP1-YWO Total Cost Less Than 7K | Other-O00 3H720215 | WEST HARTFORD S MAIN - 9A - EVERSOU | WEST HARTFORD S MAIN - 9A - EVERSOURCE P-3059_x000D_ AP1-YWO Total Cost Less Than 7K | Other-O00 3H720291 | HARTFORD, HOMESTEAD AVE C8448 city | HARTFORD, HOMESTEAD AVE C8448 city pole replace 250w head_x000D_ AP1-YWO Total Cost Less Than 7K | Other-O00 3H720325 | HARTFORD,ANN ST REPLACE A MAINS BET | HARTFORD,ANN ST REPLACE A MAINS BETWEEN SB1607 & SB1831_x000D_ AP2-YWO Total Cost Variance Met - Variance :-27.189 MIN.:-30 MAX.:30 | Other-O00 3H720396 | WF 2/10 - HAROH - BLOOMFIELD, TIMOT | WF 2/10 - HAROH - BLOOMFIELD, TIMOTHY LANE ST LT POLE 6049 - COMP 2/21/17 CCC_x000D_ AP1-YWO Total Cost Less Than 7K | Other-O00 3H720397 | HARTFORD, JEFFERSON ST - ST LT POLE | HARTFORD, JEFFERSON ST - ST LT POLE 2444 TROUBLE CALL_x000D_ AP1-YWO Total Cost Less Than 7K | Other-O00 3H720409 | Htfd, Gillet St Replace A mains 2 | Htfd, Gillet St Replace A mains 2 sections_x000D_ AP2-YWO Total Cost Variance Met - Variance :-33.7248 MIN.:-50 MAX.:50 | Other-O00 3H720573 | RSO 2/27 WINDSOR, HANSOM HILL RD - | RSO 2/27 WINDSOR, HANSOM HILL RD - DB FAULT REPLACED HANDHOLE 1232C_x000D_ AP1-YWO Total Cost Less Than 7K | Other-O00 3H720590 | RSO& AWC, 3/4, HARTFORD, VINE STREE | RSO& AWC, 3/4, HARTFORD, VINE STREET, 9A REPLACED 4/0 TPX 3743 TO 3742_x000D_ AP1-YWO Total Cost Less Than 7K | Other-O00 3H720698 | WETHERSFIELD, BERLIN TPKE, 9A REPLA | WETHERSFIELD, BERLIN TPKE, 9A REPLACE P1738 45/2_x000D_ AP2-YWO Total Cost Variance Met - Variance :-47.6215 MIN.:-50 MAX.:50 | Other-O00 3H720736 | RSO 3/23 -- WEST HARTFORD, 134 OAKW | RSO 3/23 -- WEST HARTFORD, 134 OAKWOOD AVE- POLE # 1082 - 9A_x000D_ AP2-YWO Total Cost Variance Met - Variance :-11.2451 MIN.:-50 MAX.:50 | Other-O00 3H720840 | 603 Broad St-Htfd metered St light | 603 Broad St-Htfd metered St light service_x000D_ AP1-YWO Total Cost Less Than 7K | Other-O00 3H720896 | NJB WEST ST R.H. RPL CUTOUT & RISER | NJB WEST ST R.H. RPL CUTOUT & RISER ON P#1481 CUST OUTAGE ON 6/2/17? @ 5PM_x000D_
  8. Part 48 of 77

    AP2-YWO Total Cost Variance Met - Variance :4.7256 MIN.:-50 MAX.:50 | Other-O00 3H720933 | AWC/RSO, 4/14, MANCHESTER, E MIDDLE | AWC/RSO, 4/14, MANCHESTER, E MIDDLE TPKE No double pole_x000D_ AP1-YWO Total Cost Less Than 7K | Other-O00 3H720935 | RF-970 Marshall Phelps Rd,Windsor, | RF-970 Marshall Phelps Rd,Windsor, Install new OH/UG Sec SVC_x000D_ AP2-YWO Total Cost Variance Met - Variance :-5.3741 MIN.:-50 MAX.:50 | Other-O00 3H720981 | WF-1221-1223-Broad St-Htfd-@ sb-336 | WF-1221-1223-Broad St-Htfd-@ sb-3368, rpl ug svc._x000D_ AP2-YWO Total Cost Variance Met - Variance :33.2649 MIN.:-50 MAX.:50 | Other-O00 3H721029 | EJL - 270 Wetherell St.Manch.Reloca | EJL - 270 Wetherell St.Manch.Relocate 25KVA/Pri./Remove tree guy/P-5188_x000D_ AP2-YWO Total Cost Variance Met - Variance :113.508 MIN.:-50 MAX.:150 | Other-O00 3H721131 | 8/22 - HAROH - WINDSOR POQUONOCK AV | 8/22 - HAROH - WINDSOR POQUONOCK AVE - REPLACED 2 OH/DB SERVICES P-5248_x000D_ AP2-YWO Total Cost Variance Met - Variance :3.3243 MIN.:-50 MAX.:50 | Other-O00 3H721195 | BLOOMFIELD BLUE HILLS AVE POLE 18 - | BLOOMFIELD BLUE HILLS AVE POLE 18 - 9A_x000D_ AP2-YWO Total Cost Variance Met - Variance :139.4207 MIN.:-50 MAX.:150 | Other-O00 3H721259 | Mountain St Htffd POLE 3435 Install | Mountain St Htffd POLE 3435 Installed 90' duplex_x000D_ AP1-YWO Total Cost Less Than 7K | Other-O00 3H721262 | HARTFORD, NEW BRITAIN AVE REPLACED | HARTFORD, NEW BRITAIN AVE REPLACED 250W HPS P-5038 - COMP 6/8/17 CCC_x000D_ AP1-YWO Total Cost Less Than 7K | Other-O00 3H721263 | HARTFORD, NEW BRITAIN AVE REPLACE 2 | HARTFORD, NEW BRITAIN AVE REPLACE 250W HPS P-4962 - COMP 6-8-17 CCC_x000D_ AP1-YWO Total Cost Less Than 7K | Other-O00 3H721333 | 5/24 RSO WIndsor Ravine Rd P 3195 | 5/24 RSO WIndsor Ravine Rd P 3195 Replace pole/crossarm_x000D_ AP2-YWO Total Cost Variance Met - Variance :22.2081 MIN.:-50 MAX.:50 | Other-O00 3H721365 | NJB 60P HICKSVILLE RD CROM INSTL 60 | NJB 60P HICKSVILLE RD CROM INSTL 60' #2 TPX FROM POLE#2024 TO CUST POLE SVC_x000D_ AP1-YWO Total Cost Less Than 7K | Other-O00 3H721395 | Capitol Ave Htfd Traffic control UG | Capitol Ave Htfd Traffic control UG #8 Electric Service Un-Metered_x000D_ AP1-YWO Total Cost Less Than 7K | Other-O00 3H721456 | RSO, 6/10, WINDSOR, BROOKVIEW RD, 9 | RSO, 6/10, WINDSOR, BROOKVIEW RD, 9A, POLE 4230 REPLACE LED LIGHT_x000D_ AP1-YWO Total Cost Less Than 7K | Other-O00 3H721681 | South Main St.Manchester Pole 3881 | South Main St.Manchester Pole 3881 hit/ Replace with 40/2_x000D_ AP1-YWO Total Cost Less Than 7K | Other-O00 3H721721 | Htfd TRINITY ST - C6843 replace 250 | Htfd TRINITY ST - C6843 replace 250w head to new pole_x000D_ AP1-YWO Total Cost Less Than 7K | Other-O00 3H721728 | RSO/AWC, 7/3, WEST HARTFORD, CONCOR | RSO/AWC, 7/3, WEST HARTFORD, CONCORD STREET REPLACED 150' SEC WITH 4/0_x000D_ AP1-YWO Total Cost Less Than 7K | Other-O00 3H721751 | 7/5 - AWC - WETHERSFIELD, OLD PEPPE | 7/5 - AWC - WETHERSFIELD, OLD PEPPERIDGE LA - REPLACED CUTOUT/TERM/RISER_x000D_ AP1-YWO Total Cost Less Than 7K | Other-O00 3H721758 | WF-109 Pond Rd-Windsor-@ pole-1853, | WF-109 Pond Rd-Windsor-@ pole-1853,inst new oh/db svc to hse_x000D_ AP1-YWO Total Cost Less Than 7K | Other-O00 3H721767 | 7/8 RSO, WINDSOR COLONIAL DR - 9A T | 7/8 RSO, WINDSOR COLONIAL DR - 9A TRUCK TOOK DOWN WIRES - RAN 125' SERVICE_x000D_ AP1-YWO Total Cost Less Than 7K | Other-O00 3H721776 | 7/9 - HARAWC - WINDSOR, PARK RD - E | 7/9 - HARAWC - WINDSOR, PARK RD - EVERSOURCE POLE 156_x000D_ AP2-YWO Total Cost Variance Met - Variance :69.5323 MIN.:-50 MAX.:150 | Other-O00 3H721840 | RSO, 7/13, E HARTFORD, ROBERTS ST, | RSO, 7/13, E HARTFORD, ROBERTS ST, RPLC 8' ARM pole 4138/shift 1/0 ACSR_x000D_ AP1-YWO Total Cost Less Than 7K | Other-O00 3H721859 | 42 Grassmere Ave., W. Htfd - Instal | 42 Grassmere Ave., W. Htfd - Install new OH/DB svc (single-phase, 120/208)_x000D_ AP1-YWO Total Cost Less Than 7K | Other-O00
  9. Part 49 of 77

    3H721865 | RSO,7/16, WEST HARTFORD, KANE STREE | RSO,7/16, WEST HARTFORD, KANE STREET - INS 3 ELBOW ARR P-3173/REBUILT RISER_x000D_ AP2-YWO Total Cost Variance Met - Variance :-6.6382 MIN.:-50 MAX.:50 | Other-O00 3H721884 | EAST HARTFORD, MULCAHY DRIVE - XFMR | EAST HARTFORD, MULCAHY DRIVE - XFMR RMVED/TIED SEC CRIB_x000D_ AP1-YWO Total Cost Less Than 7K | Other-O00 3H721933 | Replace OH svc / new attachment poi | Replace OH svc / new attachment point_x000D_ AP1-YWO Total Cost Less Than 7K | Other-O00 3H721937 | AWC 7/24 MANCHESTER HARTFORD RD 9A | AWC 7/24 MANCHESTER HARTFORD RD 9A - REPLACED QUAD SERVICE FROM P-4700_x000D_ AP1-YWO Total Cost Less Than 7K | Other-O00 3H721946 | JWL... 119-121 BLUE HILLS AVE. run | JWL... 119-121 BLUE HILLS AVE. run new svc from P5709_x000D_ AP1-YWO Total Cost Less Than 7K | Other-O00 3H721986 | HARTFORD, ANN ST-C6661 - INSTALL 25 | HARTFORD, ANN ST-C6661 - INSTALL 250W HPS AND RECONNECT UG FEED_x000D_ AP1-YWO Total Cost Less Than 7K | Other-O00 3H721987 | HARTFORD, WALNUT ST - P-CH9493 - IN | HARTFORD, WALNUT ST - P-CH9493 - INSTALL 250W HPS COBRA AND RECONNECT UG FEED_x000D_ AP1-YWO Total Cost Less Than 7K | Other-O00 3H721988 | HARTFORD, SIGOURNEY ST- C7394 - INS | HARTFORD, SIGOURNEY ST- C7394 - INSTALL 400W HPS COBRA CONNECT UG FEED_x000D_ AP1-YWO Total Cost Less Than 7K | Other-O00 3H721993 | 7/26 - BLOOMFIELD, CHATEAU MARGAUX | 7/26 - BLOOMFIELD, CHATEAU MARGAUX - REPLACED PAD 1719_x000D_ AP2-YWO Total Cost Variance Met - Variance :51.2571 MIN.:-50 MAX.:150 | Other-O00 3H722019 | RSO, 8/3, MANCHESTER, DARTMOUTH, P5 | RSO, 8/3, MANCHESTER, DARTMOUTH, P5501 REPLACED XFMR_x000D_ AP1-YWO Total Cost Less Than 7K | Other-O00 3H722032 | 8/4 - RSO - ROCKY HILL, WEST ST - R | 8/4 - RSO - ROCKY HILL, WEST ST - RPL 3-50KVA 120/208 BANK POLE 1406_x000D_ AP2-YWO Total Cost Variance Met - Variance :-42.569 MIN.:-50 MAX.:50 | Other-O00 3H722035 | RSO, 8/5, WINDSOR, KENDRICK LANE - | RSO, 8/5, WINDSOR, KENDRICK LANE - REPLACED HH 1596B_x000D_ AP1-YWO Total Cost Less Than 7K | Other-O00 3H722049 | DKH - Kennedy Rd, Wsr - Replace rec | DKH - Kennedy Rd, Wsr - Replace recloser upper unit P2982._x000D_ AP2-YWO Total Cost Variance Met - Variance :.4686 MIN.:-40 MAX.:40 | Other-O00 3H722079 | RSO/AWC, 8/9, AVON, LOVELY STREET, | RSO/AWC, 8/9, AVON, LOVELY STREET, P421 9A_x000D_ AP2-YWO Total Cost Variance Met - Variance :-4.5576 MIN.:-50 MAX.:50 | Other-O00 3H722126 | 8/15 - HAROH - AVON, FAR HILLS DR - | 8/15 - HAROH - AVON, FAR HILLS DR - SECONDARY FAULT UNDER DRIVEWAY_x000D_ AP2-YWO Total Cost Variance Met - Variance :70.5939 MIN.:-50 MAX.:150 | Other-O00 3H722149 | 453 Wash St Htfd replace 250w Head | 453 Wash St Htfd replace 250w Head CH8192_x000D_ AP1-YWO Total Cost Less Than 7K | Other-O00 3H722155 | JWL @ 877-879 CAPITOL AVE replace | JWL @ 877-879 CAPITOL AVE replace svc from sb3177._x000D_ AP1-YWO Total Cost Less Than 7K | Other-O00 3H722156 | 8/18 - RSO/HAROH - EAST HARTFORD, | 8/18 - RSO/HAROH - EAST HARTFORD, SEDGEWICK RD, P2646, 9A_x000D_ AP2-YWO Total Cost Variance Met - Variance :73.2456 MIN.:-50 MAX.:150 | Other-O00 3H722164 | 8/17 RSO-AWC, WHARTFORD, SEQUIN RD | 8/17 RSO-AWC, WHARTFORD, SEQUIN RD 9A - REPLACED POLE_x000D_ AP1-YWO Total Cost Less Than 7K | Other-O00 3H722171 | XL-CDOT 63-633, electrical work to | XL-CDOT 63-633, electrical work to relocate service along Woodland St, Hartford_x000D_ JE-YWO Variance Job Type Exclusion | Other-O00 3H722173 | XL-CDOT 63-633, electrical work to | XL-CDOT 63-633, electrical work to relocate service along Kent St, Hartford_x000D_ JE-YWO Variance Job Type Exclusion | Other-O00 3H722174 | 8/19 RSO HARTFORD, SWHITNEY ST P#68 | 8/19 RSO HARTFORD, SWHITNEY ST P#6850 REPLACED 90' SVC WIRE_x000D_ AP1-YWO Total Cost Less Than 7K | Other-O00 3H722415 | 175 N. Main St., W. Htfd - REPL OH | 175 N. Main St., W. Htfd - REPL OH svc / New attachment point-WORK BY HTFD OH_x000D_ AP1-YWO Total Cost Less Than 7K | Other-O00
  10. Part 50 of 77

    3H722493 | COMP 1/27/18 CCC - WETHERSFIELD, RE | COMP 1/27/18 CCC - WETHERSFIELD, REPLACE ST LT POLE 3230 18' BROWN 70W PTT_x000D_ AP1-YWO Total Cost Less Than 7K | Other-O00 3H722608 | 13 Pinecrest Dr.E.Hartf. Replace op | 13 Pinecrest Dr.E.Hartf. Replace open wire service P- 3341_x000D_ AP1-YWO Total Cost Less Than 7K | Other-O00 3H723020 | 4-118 - Relocate facilities for int | 4-118 - Relocate facilities for intersection relocation RT 10 - 50% Re-Im_x000D_ JE-YWO Variance Job Type Exclusion | Other-O00 3H723179 | 12/2 - RSO - HARTFORD, ELLIOT ST - | 12/2 - RSO - HARTFORD, ELLIOT ST - NEED TO REPLACE 150W C9116_x000D_ AP1-YWO Total Cost Less Than 7K | Other-O00 3H723287 | HARTFORD, MAIN ST CH7097 replace 25 | HARTFORD, MAIN ST CH7097 replace 250 w head when pole is replaced_x000D_ AP1-YWO Total Cost Less Than 7K | Other-O00 3H820160 | WINDSOR RAINBOW RD P#256 FUSE BLEW | WINDSOR RAINBOW RD P#256 FUSE BLEW ON RISER POLE# 256_x000D_ AP3-YWO Resource Variance Met- Labor 3 <= 32 OR -3.18 <= 30 And Contractor $1551.87 <= 2000 | Other-O00 3H820327 | AWC UG 2/9 HARTFORD, PARK ST SB 938 | AWC UG 2/9 HARTFORD, PARK ST SB 938 BURNING SEC INST NE 4/0 3PHSE SRV TO 701_x000D_ NL-YWO Variance - NU Construction Labor | Other-O00 3H820563 | 3150 Main St Htfd C8671 Replace 250 | 3150 Main St Htfd C8671 Replace 250w head to new city pole_x000D_ AP1-YWO Total Cost Less Than 7K | Other-O00 3H820695 | 4-118 - Relocate facilities to the | 4-118 - Relocate facilities to the NEW Town Farms Rd 50% Re-Im_x000D_ JE-YWO Variance Job Type Exclusion | Other-O00 3H822312 | RF-3 N Fairfield St,Manchester,Relo | RF-3 N Fairfield St,Manchester,Relocate OH SVC_x000D_ | Other-O00 3H920073 | HARTFORD, 877 TOWER AVE @ P5382 ru | HARTFORD, 877 TOWER AVE @ P5382 run new 90ft OH svc, CHANGE METER_x000D_ AP1-YWO Total Cost Less Than 7K | Other-O00 3H922458 | (50,0): Columbus Cir,East Hartford, | Columbus Cir,East Hartford,Elec Svc Line Extension/Development DESG (DN)_x000D_ | Other-O00 3H922469 | RF-597 Burnside Ave, East Hartford, | RF-597 Burnside Ave, East Hartford, Replace SVC with #2 TPX_x000D_ AP1-YWO Total Cost Less Than 7K | Other-O00 3H923040 | RF-21 Bancroft Rd,East Hartford,Rep | RF-21 Bancroft Rd,East Hartford,Replace Damaged OH SVC_x000D_ AP1-YWO Total Cost Less Than 7K | Other-O00 3H923346 | 10/25---HTFD-34 Shultas Pl-----new | 10/25---HTFD-34 Shultas Pl-----new OH 200A service_x000D_ AP1-YWO Total Cost Less Than 7K | Other-O00 3H923407 | 10/25---BLOOM-11 Mayfair Ct----LINE | 10/25---BLOOM-11 Mayfair Ct----LINEWORK REQUIRE TRIPLEX NEEDS TO BE CHANGE_x000D_ AP1-YWO Total Cost Less Than 7K | Other-O00 3H923415 | CR- 60-62 ENFIELD ST HARTFORD, REPL | CR- 60-62 ENFIELD ST HARTFORD, REPLACE OH SVC OFF POLE 4956_x000D_ AP1-YWO Total Cost Less Than 7K | Other-O00 3H923418 | 11/5---W HTFD-94 Flagg Rd-----OH 20 | 11/5---W HTFD-94 Flagg Rd-----OH 200A service upgrade-power off at pole_x000D_ AP1-YWO Total Cost Less Than 7K | Other-O00 3H923519 | CR-5 BUCKBOARD LN AVON, REPLACE OH | CR-5 BUCKBOARD LN AVON, REPLACE OH SVC OFF POLE 3518_x000D_ AP1-YWO Total Cost Less Than 7K | Other-O00 3H923696 | RF-185 Main St,Manchester,Pole#5223 | RF-185 Main St,Manchester,Pole#5223, Replace SVC_x000D_ AP1-YWO Total Cost Less Than 7K | Other-O00 3L030008 | DARIEN LED POST TOP REPLACEMENTS 30 | DARIEN LED POST TOP REPLACEMENTS 3000K_x000D_ | Other-O00 3L030009 | STAMFORD LED POST TOP REPLACEMENTS | STAMFORD LED POST TOP REPLACEMENTS 3000K_x000D_ | Other-O00 3L030030 | PUTNAM LED POST TOP REPLACEMENTS 30 | PUTNAM LED POST TOP REPLACEMENTS 3000K_x000D_ | Other-O00 3L030035 | THOMPSON LED POST TOP REPLACEMENTS | THOMPSON LED POST TOP REPLACEMENTS 3000K_x000D_ | Other-O00 3L030053 | PRESTON LED POST TOP REPLACEMENTS 3 | PRESTON LED POST TOP REPLACEMENTS 3000K_x000D_ | Other-O00 3L030055 | NEW CANAAN LED POST TOP REPLACEMENT | NEW CANAAN LED POST TOP REPLACEMENTS 3000K_x000D_ | Other-O00

Text of RRU-159 Attachment 16.pdf

Extracted from the file · 489 pages · 7,076,557 characters

Text of RRU-159 Attachment 15.xlsx

Sheet names, column headings and text cells; numbers left out · first 300,000 characters

Text of RRU-159 Attachment 15.pdf

Extracted from the file · 897 pages · 15,723,777 characters

Text of RRU-159 Attachment 14 .pdf

Extracted from the file · 1 page · 2,589 characters

Text of RRU-159 Attachment 14.xlsx

Sheet names, column headings and text cells; numbers left out

Text of RRU-159 Attachment 13.xlsx

Sheet names, column headings and text cells; numbers left out

Text of RRU-159 Attachment 13.pdf

Extracted from the file · 1 page · 427 characters

Text of RRU-159 Attachment 12.xlsx

Sheet names, column headings and text cells; numbers left out · first 300,000 characters

Text of RRU-159 Attachment 12.pdf

Extracted from the file · 802 pages · 14,341,138 characters

Text of RRU-159 Attachment 11.xlsx

Sheet names, column headings and text cells; numbers left out · first 300,000 characters

Text of RRU-159 Attachment 11.pdf

Extracted from the file · 858 pages · 15,906,152 characters

Text of RRU-159 Attachment 10.xlsx

Sheet names, column headings and text cells; numbers left out

Text of RRU-159 Attachment 10.pdf

Extracted from the file · 1 page · 822 characters

Text of RRU-159 Attachment 09.xlsx

Sheet names, column headings and text cells; numbers left out · first 300,000 characters

Text of RRU-159 Attachment 09.pdf

Extracted from the file · 449 pages · 7,355,312 characters

Text of RRU-159 Attachment 08.xlsx

Sheet names, column headings and text cells; numbers left out · first 300,000 characters

Text of RRU-159 Attachment 08.pdf

Extracted from the file · 867 pages · 13,878,236 characters

Text of RRU-159 Attachment 07.xlsx

Sheet names, column headings and text cells; numbers left out · first 300,000 characters

Text of RRU-159 Attachment 07.pdf

Extracted from the file · 869 pages · 15,728,932 characters

Text of RRU-159 Attachment 06.xlsx

Sheet names, column headings and text cells; numbers left out · first 300,000 characters

Text of RRU-159 Attachment 06.pdf

Extracted from the file · 459 pages · 8,128,897 characters

Text of RRU-159 Attachment 05.xlsx

Sheet names, column headings and text cells; numbers left out · first 300,000 characters

Text of RRU-159 Attachment 05.pdf

Extracted from the file · 879 pages · 16,073,548 characters

Text of RRU-159 Attachment 04.xlsx

Sheet names, column headings and text cells; numbers left out

Text of RRU-159 Attachment 04.pdf

Extracted from the file · 5 pages · 20,994 characters

Text of RRU-159 Attachment 03.xlsx

Sheet names, column headings and text cells; numbers left out · first 300,000 characters

Text of RRU-159 Attachment 03.pdf

Extracted from the file · 840 pages · 14,413,580 characters

Text of RRU-159 Attachment 02.xlsx

Sheet names, column headings and text cells; numbers left out · first 300,000 characters

Text of RRU-159 Attachment 02.pdf

Extracted from the file · 1,137 pages · 16,605,462 characters

Text of RRU-159 Attachment 01.xlsx

Sheet names, column headings and text cells; numbers left out

Text of RRU-159 Attachment 01.pdf

Extracted from the file · 1 page · 1,403 characters

As listed on the current system

Question(s) Answered 159 (Connecticut Light and Power Company dba Eversource Energy) Date Filed: 11/06/2026

This filing on the current system (opens in a new tab)