Skip to main content

A prototype public docket site for the Connecticut Public Utilities Regulatory Authority

Utility Dockets and Filings

Interrogatory responses

Answers to questions 159

ResponseFiled by Connecticut Light and Power Company dba Eversource Energy51 files
Part of docket 26-05-10Open
  • Electric
Application of The Connecticut Light and Power Company d/b/a Eversource Energy to Amend its Rate Schedules

Files51

Search terms highlighted
Eversource rate increase is on 36 pages across 17 files of the text below, highlighted. Go to the first matchClear highlighting
Words on different pages
Words on different pages
Words on different pages

Text of RRU-159 Attachment 23.xlsx

Sheet names, column headings and text cells; numbers left out · first 300,000 characters

Text of RRU-159 Attachment 23.pdf

Extracted from the file · 1,160 pages · 16,330,154 characters

Text of RRU-159 Attachment 22.xlsx

Sheet names, column headings and text cells; numbers left out · first 300,000 characters

Text of RRU-159 Attachment 22.pdf

Extracted from the file · 1,203 pages · 14,349,246 characters

Text of RRU-159 Attachment 21.xlsx

Sheet names, column headings and text cells; numbers left out · first 300,000 characters

Text of RRU-159 Attachment 21.pdf

Extracted from the file · 1,203 pages · 13,880,364 characters

Text of RRU-159 Attachment 20.xlsx

Sheet names, column headings and text cells; numbers left out

Text of RRU-159 Attachment 20.pdf

Extracted from the file · 16 pages · 151,762 characters

Text of RRU-159 Attachment 19.xlsx

Sheet names, column headings and text cells; numbers left out

Text of RRU-159 Attachment 19.pdf

Extracted from the file · 1 page · 5,328 characters

Text of RRU-159 Attachment 18.xlsx

Sheet names, column headings and text cells; numbers left out · first 300,000 characters

Text of RRU-159 Attachment 18.pdf

Extracted from the file · 640 pages · 7,983,236 characters

Text of RRU-159 Attachment 17.xlsx

Sheet names, column headings and text cells; numbers left out · first 300,000 characters

Text of RRU-159 Attachment 17.pdf

Extracted from the file · 855 pages · 14,651,941 characters

Words on different pages

This spreadsheet is large. Its searchable text keeps the sheet names, column headings and text cells and stops at 300,000 characters, so search may miss words further in. Download the file for every cell and figure.

  1. Part 58 of 77

    4D130044 | ALL WORK COMPLETE | Elec Maint Trouble Call - Repairs/Obsolescence OH (AROH) | Other-O00 4D220696 | TS- BRADLEY AVE. BRANFORD. P#37212. | TS- BRADLEY AVE. BRANFORD. P#37212. INST THREE 900A IN-LINE SWITCHES_x000D_ | Other-O00 4D321128 | cb//high st @ ridge rd, chester//sh | cb//high st @ ridge rd, chester//shift to ATT pole 749 & 750_x000D_ AP2-YWO Total Cost Variance Met - Variance :28.1567 MIN.:-50 MAX.:150 | Other-O00 4D421399 | 9/6,ESO,9A,car vp3036 trouble ticke | 9/6,ESO,9A,car vp3036 trouble ticket & timesheet in documents_x000D_ AP2-YWO Total Cost Variance Met - Variance :39.5828 MIN.:-50 MAX.:50 | Other-O00 4D520654 | CD00423, seg01, 30R13/11J58 ROW rel | CD00423, seg01, 30R13/11J58 ROW relocate, U.G., Guilford_x000D_ CL-YWO Variance - Contractor Labor | Other-O00 4D520695 | NS- P 272 Cow Hill Rd, CL- Shift to | NS- P 272 Cow Hill Rd, CL- Shift to Frontier Pole 272_x000D_ | Other-O00 4D521360 | Notify 299187 (child 311443), Billa | Notify 299187 (child 311443), Billable, DAS pole 1870, Old Saybrook_x000D_ | Other-O00 4D521524 | CDOT 59-161/CD00610, UG civil work | CDOT 59-161/CD00610, UG civil work 35L9/35L7, long hill rd, Guilford, stage1_x000D_ AP2-YWO Total Cost Variance Met - Variance :-35.8544 MIN.:-40 MAX.:40 | Other-O00 4D620226 | Elec Maint Replace/Renewal/Obsol OH | Elec Maint Replace/Renewal/Obsol OH DESG (AROH)_x000D_ AP1-YWO Total Cost Less Than 7K | Other-O00 4D620423 | MV-MADISON CREWS REPLACED REJECT PO | MV-MADISON CREWS REPLACED REJECT POLE 1170_x000D_ AP1-YWO Total Cost Less Than 7K | Other-O00 4D620654 | NS- P 692 Cow Hill Rd, KW- Shift to | NS- P 692 Cow Hill Rd, KW- Shift to New Pole, Rmv 600A Disconnects_x000D_ CL-YWO Variance - Contractor Labor | Other-O00 4D620709 | CB//GUILFORD, 95 HART RD//RELOCATE | CB//GUILFORD, 95 HART RD//RELOCATE OH SVC_x000D_ | Other-O00 4D620878 | ESO - 6/4 Stevenstown Rd. Westbrook | ESO - 6/4 Stevenstown Rd. Westbrook CAR V POLE 651- FOLLOW UP WORK REQUIRED_x000D_ AP2-YWO Total Cost Variance Met - Variance :99.9865 MIN.:-50 MAX.:150 | Other-O00 4D621010 | SH-Convo#399782-(MakeReadyREIMB) - | SH-Convo#399782-(MakeReadyREIMB) - VZ Parent Convo#378446_x000D_ AP1-YWO Total Cost Less Than 7K | Other-O00 4D621073 | NS- 215 Old Mail Trl, WB- Ins Oh Sv | NS- 215 Old Mail Trl, WB- Ins Oh Svc from P 1005_x000D_ AP1-YWO Total Cost Less Than 7K | Other-O00 4D621162 | PATROL REPAIRS 30R10 - GUILFORD | PATROL REPAIRS 30R10 - GUILFORD_x000D_ CL-YWO Variance - Contractor Labor | Other-O00 4D621215 | (DF) Ple 957 -(R/I) Pole & 1 Ph tpo | (DF) Ple 957 -(R/I) Pole & 1 Ph tpo & 1 Ph tap ESO 9A_x000D_ AP2-YWO Total Cost Variance Met - Variance :94.7836 MIN.:-50 MAX.:150 | Other-O00 4D621244 | PATROL REPAIRS, 30R8, MADISON | PATROL REPAIRS, 30R8, MADISON_x000D_ CL-YWO Variance - Contractor Labor | Other-O00 4D621412 | ESO- 9A Pole - P 2473- Hemlock Dr, | ESO- 9A Pole - P 2473- Hemlock Dr, KW- FOLLOW UP WORK- Rplc Pole & Shift_x000D_ AP2-YWO Total Cost Variance Met - Variance :50.483 MIN.:-50 MAX.:150 | Other-O00 4D621438 | (DF) PATROL REPAIRS, 30R9, WESTBROO | (DF) PATROL REPAIRS, 30R9, WESTBROOK_x000D_ AP1-YWO Total Cost Less Than 7K | Other-O00 4D621442 | PATROL REPAIRS, 11J45 - BRANFORD | PATROL REPAIRS, 11J45 - BRANFORD_x000D_ AP2-YWO Total Cost Variance Met - Variance :11.1984 MIN.:-20 MAX.:20 | Other-O00 4D621494 | S Main St, Deep River/TL-ESO - 9A - | S Main St, Deep River/TL-ESO - 9A - 10/12 Car vs Pole 337_x000D_ AP1-YWO Total Cost Less Than 7K | Other-O00 4D621517 | Bokum Rd, Essex/TL-11/20/16 9A car | Bokum Rd, Essex/TL-11/20/16 9A car vs pole 156 see attached TT_x000D_ AP2-YWO Total Cost Variance Met - Variance :37.7622 MIN.:-50 MAX.:50 | Other-O00 4D621682 | Attanwanhood Trl, #1 Old Saybrook/T | Attanwanhood Trl, #1 Old Saybrook/TL--REPL #4 AL SVC W/#2 70'_x000D_ AP1-YWO Total Cost Less Than 7K | Other-O00 4D720127 | CB//Guilford, Boston Post Rd @ Notc | CB//Guilford, Boston Post Rd @ Notch Hill Rd//9A follow up,Install lights,ins_x000D_
  2. Part 59 of 77

    NL-YWO Variance - NU Construction Labor | Other-O00 4D720134 | Hartlands Dr, #35 Old Saybrook/TL-P | Hartlands Dr, #35 Old Saybrook/TL-POLE 496 - NEED NEW 60' SVC TO HOUSE_x000D_ AP1-YWO Total Cost Less Than 7K | Other-O00 4D720143 | TS 174 CEDAR ST BFD P6716 & 44072 I | TS 174 CEDAR ST BFD P6716 & 44072 INS 1000WMH FLOODS_x000D_ AP1-YWO Total Cost Less Than 7K | Other-O00 4D720149 | CB//GUILFORD, MOOSE HILL RD//UPGRAD | CB//GUILFORD, MOOSE HILL RD//UPGRADE FUSES/CUTOUTS TO 140K POLE 2_x000D_ AP1-YWO Total Cost Less Than 7K | Other-O00 4D720188 | Bahr Rd, #3 Deep River/TL-INST (65' | Bahr Rd, #3 Deep River/TL-INST (65',4/03CT) OH-DB SVC FROM P#423 ON W ELM ST_x000D_ AP1-YWO Total Cost Less Than 7K | Other-O00 4D720194 | CB//MADISON, 57 MIDDLE BEACH RD W// | CB//MADISON, 57 MIDDLE BEACH RD W//NEW SVC, SHIFT POLE/WORKS W TEMP RMVL_x000D_ AP1-YWO Total Cost Less Than 7K | Other-O00 4D720220 | CB//MADISON, 75 NEW RD//SVC UPGRADE | CB//MADISON, 75 NEW RD//SVC UPGRADE 200A/RPL SVC W #2TPX IF ITS #4TPX_x000D_ AP1-YWO Total Cost Less Than 7K | Other-O00 4D720245 | Stanford Hill Rd, #32 Essex/TL-REPL | Stanford Hill Rd, #32 Essex/TL-REPL EX OH SVC FROM P#432 ***BACKYARD FEED***_x000D_ | Other-O00 4D720251 | CB//MADISON, HULL RD//RELOCATE SECO | CB//MADISON, HULL RD//RELOCATE SECONDARY,XF (EXISTING CROSS FUSE)_x000D_ AP1-YWO Total Cost Less Than 7K | Other-O00 4D720272 | RSO 2/22 -- WESTBROOK, 798 HORSE HI | RSO 2/22 -- WESTBROOK, 798 HORSE HILL RD- POLE # 2211 - NEEDS 60' OF #2 SERVICE_x000D_ AP1-YWO Total Cost Less Than 7K | Other-O00 4D720286 | 48 LINDEN AVE (IN OWENEGO BEACH CLU | 48 LINDEN AVE (IN OWENEGO BEACH CLUB) P37670 RPL SVC //PRE CHECK OVER ROOF_x000D_ AP1-YWO Total Cost Less Than 7K | Other-O00 4D720301 | CB//GUILFORD, CHAFFINCH ISLAND RD// | CB//GUILFORD, CHAFFINCH ISLAND RD//INSTALL CUTOUTS VARIOUS LOCATIONS (3ORMORE)_x000D_ AP1-YWO Total Cost Less Than 7K | Other-O00 4D720314 | S Cove Rd II, #34 Old Saybrook/TL-I | S Cove Rd II, #34 Old Saybrook/TL-INST 4/03CT OH-DB SVC@P#576 *FLOOD PLAIN INST*_x000D_ | Other-O00 4D720334 | NS- Maple Ave, OS- Mittigate Outage | NS- Maple Ave, OS- Mittigate Outages- Ins COs on XFMRs Downstream P 596_x000D_ AP1-YWO Total Cost Less Than 7K | Other-O00 4D720484 | NS- 1 Sag Ter, WB- Ins 4/0 AL from | NS- 1 Sag Ter, WB- Ins 4/0 AL from New HH 831A, Rmv Oh Svc- P 831_x000D_ AP1-YWO Total Cost Less Than 7K | Other-O00 4D720605 | TS 7 FERRY LA 40778 EC RMV OH SVC I | TS 7 FERRY LA 40778 EC RMV OH SVC INSTALL OH/DB SVC NOT SURE IF APPOINT REQUIRED_x000D_ AP1-YWO Total Cost Less Than 7K | Other-O00 4D720645 | Cottage Rd, #11 Old Saybrook/TL-INS | Cottage Rd, #11 Old Saybrook/TL-INST 4/03CT OH-DB SVC [WORKS W/ WR#2914467]_x000D_ AP1-YWO Total Cost Less Than 7K | Other-O00 4D720858 | RSO GUILFORD, Cornwall Ln -Need to | RSO GUILFORD, Cornwall Ln -Need to Replace 153' #2 OH Service @ P8792_x000D_ AP1-YWO Total Cost Less Than 7K | Other-O00 4D720970 | (DF) Ple 1229 - (R/I) CV svc & cond | (DF) Ple 1229 - (R/I) CV svc & conduit - EMROD DB DESG (ARDB)_x000D_ AP2-YWO Total Cost Variance Met - Variance :-44.9095 MIN.:-50 MAX.:50 | Other-O00 4D720997 | NS- 17 Halls Rd, WB- Ins 4/0 AL to | NS- 17 Halls Rd, WB- Ins 4/0 AL to New Gargage from HH 330A_x000D_ AP1-YWO Total Cost Less Than 7K | Other-O00 4D720998 | (DF) (I) 4/0 Simple svc Off of HH23 | (DF) (I) 4/0 Simple svc Off of HH2371-A - New Residential Underground_x000D_ AP1-YWO Total Cost Less Than 7K | Other-O00 4D721002 | (DF) HH2638-A (I) 350 mcm svc 200A- | (DF) HH2638-A (I) 350 mcm svc 200A- New Residential UG w/CIAC Line Set_x000D_ AP1-YWO Total Cost Less Than 7K | Other-O00 4D721115 | (DF) Midspn Ples 1533-3826- Make OH | (DF) Midspn Ples 1533-3826- Make OH svc Connec - 100A upgd- Residential Overhead_x000D_ AP1-YWO Total Cost Less Than 7K | Other-O00 4D721118 | NS- 25 Aspen Dr, Mad- FOLLOW UP WOR | NS- 25 Aspen Dr, Mad- FOLLOW UP WORK- RPLC BROKEN DB STREETLIGHT_x000D_ AP1-YWO Total Cost Less Than 7K | Other-O00
  3. Part 60 of 77

    4D721127 | NS- 13 Blue Heron Ln, CL- Ins 4/0 A | NS- 13 Blue Heron Ln, CL- Ins 4/0 AL to House from HH 432A_x000D_ AP1-YWO Total Cost Less Than 7K | Other-O00 4D721143 | TS OLD POST RD CLINTON P2388 CHANGE | TS OLD POST RD CLINTON P2388 CHANGE POT TO 25KVA_x000D_ AP1-YWO Total Cost Less Than 7K | Other-O00 4D721154 | CB//Madison, 74 Wall St//New db ped | CB//Madison, 74 Wall St//New db pedestal svc for town lights_x000D_ AP1-YWO Total Cost Less Than 7K | Other-O00 4D721175 | RSO 7/23 - MADISON, 393 COPSE RD- P | RSO 7/23 - MADISON, 393 COPSE RD- POLE # 847-_x000D_ AP1-YWO Total Cost Less Than 7K | Other-O00 4D721190 | (DF) - PATROL REPAIRS 11C12 - DEEP | (DF) - PATROL REPAIRS 11C12 - DEEP RIVER (POST CONSTRUCTION)_x000D_ AP3-YWO Resource Variance Met- Labor 58 <= 32 OR -96.66 <= 30 And Contractor $0 <= 2000 | Other-O00 4D721191 | Boston Post Rd, Old Saybrook/TL-7/2 | Boston Post Rd, Old Saybrook/TL-7/25-P#1712,P#1714,P#2949,P#2949-1/2. Buchetto_x000D_ CL-YWO Variance - Contractor Labor | Other-O00 4D721230 | cb//branford, farm river rd//rpl li | cb//branford, farm river rd//rpl light head p 38780R w full cutoff, shield_x000D_ AP1-YWO Total Cost Less Than 7K | Other-O00 4D721302 | CB//Branford, 480 Shore Dr/New oh s | CB//Branford, 480 Shore Dr/New oh svc_x000D_ AP1-YWO Total Cost Less Than 7K | Other-O00 4D721307 | cb//branford, 15 pawson rd//oh svc | cb//branford, 15 pawson rd//oh svc upgrade_x000D_ AP1-YWO Total Cost Less Than 7K | Other-O00 4D721781 | PT-2017 Double Poles-Pole# 4149-Old | PT-2017 Double Poles-Pole# 4149-Old Quarry Rd, Guilford CT-Conv# 362600_x000D_ AP1-YWO Total Cost Less Than 7K | Other-O00 4D721830 | COMP 12/30 CCC-Municipal Light Faul | COMP 12/30 CCC-Municipal Light Fault Locate and Repair@ POLE 93 NO VOLTAGE_x000D_ AP1-YWO Total Cost Less Than 7K | Other-O00 4D820623 | Roamtree Dr, Old Saybrook/TL-5/4/18 | Roamtree Dr, Old Saybrook/TL-5/4/18 replace xfmrs, 3 c/o's @ pole2834_x000D_ | Other-O00 4D821742 | 11/17/18 54 Fairview Dr, Madison rp | 11/17/18 54 Fairview Dr, Madison rplcd riser p# 3991 & installed 3 splices_x000D_ AP1-YWO Total Cost Less Than 7K | Other-O00 4D921778 | 25 wildwood dr branford/rpl, reloca | MAV/cb//branford. 25 wildwood dr//relocate oh svc to midspan (ec cut tap)_x000D_ | Other-O00 4E030228 | WRTN - DM/JK>POLE 650--REMOVE TEMPO | JK>POLE 650--REMOVE TEPORARY POLES & POLE LINE, INSTALL OH LINES BACK TO NORMAL_x000D_ | Other-O00 4E030999 | MV-NEW DG PROJECT CD01409-01 FOR CP | MV-NEW DG PROJECT CD01409-01 FOR CP EAST HAMPTON SOLAR 1 LLC_x000D_ CL-YWO Variance - Contractor Labor | Other-O00 4E031149 | JK>REF POLE 1368--INSTALL NEW POLE, | JK>SEE REMARKS | Other-O00 4E031197 | TO STORES 3/27/23-- Install 6A10-7 | CD01220-05 Install 6A10-90T on 7859 Middle St, Middletown | Other-O00 4E031225 | (40): CD01220-10 Install 6A4-72S o | CD01220-10 Install 6A4-72S on 3101 Middle St, Middletown | Other-O00 4E031228 | TO STORES 3/27/23--MG (40): CD01220 | CD01220-10 Install 7A77-72S on pole 994 Country Club Rd, Middletown | Other-O00 4E031581 | CDOT 82-320 Refeed lights at St Joh | CDOT 82-320 Refeed lights at St John's Square_x000D_ JE-YWO Variance Job Type Exclusion | Other-O00 4E031856 | (20): CDOT 40-144 First Move for Br | CDOT 40-144 First Move for Bridge Rebuild 151 Moodus | Other-O00 4E031876 | CON40 MJGw; (30): CDOT 40-144 Final | CDOT 40-144 Final (Perm) Move for Bridge Rebuild 151 Moodus | Other-O00 4E031966 | (40): JK/DM>POLE 1200--PRIORITY REJ | JK>POLE 1200--PRIORITY REJECT POLE, INSTALL 40/2 POLE, SHIFT FACILITIES_x000D_ | Other-O00 4E420687 | printed Elec Maint Trouble Call - P | printed Elec Maint Trouble Call - Property Damage OH (INSOH)_x000D_ | Other-O00 4E420727 | car vs pole 1561 6/30/14 | car vs pole 1561 6/30/14_x000D_ AP1-YWO Total Cost Less Than 7K | Other-O00 4E420733 | 74 MIDDLE HADDAM RD E HMPTN AT NEW | 74 MIDDLE HADDAM RD E HMPTN AT NEW P-40 INST PRI RISER, PAD XF, SVC_x000D_
  4. Part 61 of 77

    AP3-YWO Resource Variance Met- Labor 12 <= 32 OR 29.54 <= 30 And Contractor $1020.59 <= 2000 | Other-O00 4E520935 | RA CDOT 163-203 RT 66, Bridge#0049 | RA CDOT 163-203 RT 66, Bridge#00490 over Natchaug River, Windham - stage 1_x000D_ JE-YWO Variance Job Type Exclusion | Other-O00 4E520936 | RA CDOT 163-203 RT 66, Bridge#0049 | RA CDOT 163-203 RT 66, Bridge#00490 over Natchaug River, Windham - stage 2_x000D_ JE-YWO Variance Job Type Exclusion | Other-O00 4E520958 | RA CDOT 163-203 RT 66, Windham - | RA CDOT 163-203 RT 66, Windham - 100% reimburse for TT & access road_x000D_ JE-YWO Variance Job Type Exclusion | Other-O00 4E521445 | INSTALL DB SVC TO NEW HOME .H.H. 50 | INSTALL DB SVC TO NEW HOME .H.H. 500 WORK W/2536773_x000D_ AP1-YWO Total Cost Less Than 7K | Other-O00 4E521666 | 11/14/15- CUST TOOK DOWN SVC WIRE, | 11/14/15- CUST TOOK DOWN SVC WIRE, SEE ATTCHED T TICKET_x000D_ | Other-O00 4E521680 | TW Verizon antenna billable make re | TW Verizon antenna billable make ready Conv 320155_x000D_ AP1-YWO Total Cost Less Than 7K | Other-O00 4E521848 | ESO/AWC GLAS, Roaring Brook Plaza-S | ESO/AWC GLAS, Roaring Brook Plaza-StructureFire- Pad#1886 - FD Case #8481500848_x000D_ AP2-YWO Total Cost Variance Met - Variance :6.4019 MIN.:-50 MAX.:50 | Other-O00 4E620127 | COLCHESTER AVE E HMPTN 9A AT FRO | COLCHESTER AVE E HMPTN 9A AT FRONTIER POLE 64, REPL XF, SHIFT FACILITIES_x000D_ AP1-YWO Total Cost Less Than 7K | Other-O00 4E620254 | JK>POLE 651--REPLACE POLE W/35', AN | JK>POLE 651--REPLACE POLE W/35', ANCHOR, SECONDARY & SERVICE_x000D_ | Other-O00 4E620324 | 491 COOK HILL RD LEB REPL 4 POLES, | 491 COOK HILL RD LEB REPL 4 POLES, 3 SPANS OF, INS STUB POLE & ANC, SHIFT FAC's_x000D_ CL-YWO Variance - Contractor Labor | Other-O00 4E620345 | Elec Maint Trouble Call - Repairs/O | Elec Maint Trouble Call - Repairs/Obsolescence OH (AROH)_x000D_ | Other-O00 4E620656 | 36 ABBEY EH AT P-1249 INSTALL A ST | 36 ABBEY EH AT P-1249 INSTALL A STUB POLE & GUYING, ** Contractor to work ***_x000D_ AP1-YWO Total Cost Less Than 7K | Other-O00 4E620817 | Elec Maint Trouble Call - Repairs/O | Elec Maint Trouble Call - Repairs/Obsolescence OH (AROH)_x000D_ AP1-YWO Total Cost Less Than 7K | Other-O00 4E621047 | (CH) EAST HADDAM_TO WRITE_ESO 7/10 | (CH) EAST HADDAM_TO WRITE_ESO 7/10 Mill rd East Haddam pole 2311_x000D_ AP2-YWO Total Cost Variance Met - Variance :148.1196 MIN.:-50 MAX.:150 | Other-O00 4E621233 | JK>PAD 533--EXTEND DB SEC TO (3) NE | JK>PAD 533--EXTEND DB SEC TO (3) NEW HH'S FOR CONDO UNITS_x000D_ NL-YWO Variance - NU Construction Labor | Other-O00 4E621235 | PATROL REPAIRS, EAST HAMPTON, 0-100 | PATROL REPAIRS, EAST HAMPTON, 0-100 CIRCUITS_x000D_ AP2-YWO Total Cost Variance Met - Variance :39.2199 MIN.:-50 MAX.:50 | Other-O00 4E621238 | PATROL REPAIRS, PORTLAND, 0-100 CIR | PATROL REPAIRS, PORTLAND, 0-100 CIRCUITS_x000D_ CL-YWO Variance - Contractor Labor | Other-O00 4E621246 | PATROL REPAIRS, WINDHAM, 0-100 CIRC | PATROL REPAIRS, WINDHAM, 0-100 CIRCUITS_x000D_ AP2-YWO Total Cost Variance Met - Variance :34.2892 MIN.:-50 MAX.:50 | Other-O00 4E621247 | (CH) PATROL REPAIRS, MIDDLETOWN, 0- | (CH) PATROL REPAIRS, MIDDLETOWN, 0-100 CIRCUITS_x000D_ AP3-YWO Resource Variance Met- Labor 153 <= 32 OR -86.41 <= 30 And Contractor $0 <= 2000 | Other-O00 4E621328 | BC - CDOT 41-118 - Relocate facilit | BC - CDOT 41-118 - Relocate facilities on RT 66 for bridge replacement STAGE 1_x000D_ JE-YWO Variance Job Type Exclusion | Other-O00 4E621348 | (CH) P#3720: WORK COMP'D_ESO 9/3_CA | (CH) P#3720: WORK COMP'D_ESO 9/3_CAR V POLE_SET & SHFT'D NEW_x000D_ AP2-YWO Total Cost Variance Met - Variance :70.5819 MIN.:-50 MAX.:150 | Other-O00 4E621449 | (CH) HH#385A: CHG LAWNBOX & TAG_HH# | (CH) HH#385A: CHG LAWNBOX & TAG_HH#385B: CHG POLYCRETE & TAG._x000D_ AP2-YWO Total Cost Variance Met - Variance :-20.3294 MIN.:-50 MAX.:50 | Other-O00 4E621497 | JK>HH2016A--INSTALL 75' OF 4/0 DB C | JK>HH2016A--INSTALL 75' OF 4/0 DB CABLE TO CONDO UNIT_x000D_
  5. Part 62 of 77

    AP1-YWO Total Cost Less Than 7K | Other-O00 4E621504 | JK>HH533C--INSTALL 35' OF 4/0 DB CA | JK>HH533C--INSTALL 35' OF 4/0 DB CABLE TO CONDO UNIT_x000D_ AP1-YWO Total Cost Less Than 7K | Other-O00 4E621506 | JK>HH533C--INSTALL 15' OF 4/0 DB CA | JK>HH533C--INSTALL 15' OF 4/0 DB CABLE TO CONDO UNIT_x000D_ AP1-YWO Total Cost Less Than 7K | Other-O00 4E621507 | JK>HH533C--INSTALL 35' OF 4/0 DB CA | JK>HH533C--INSTALL 35' OF 4/0 DB CABLE TO CONDO UNIT_x000D_ AP1-YWO Total Cost Less Than 7K | Other-O00 4E621508 | JK>HH533C--INSTALL 55' OF 4/0 DB CA | JK>HH533C--INSTALL 55' OF 4/0 DB CABLE TO CONDO UNIT_x000D_ AP1-YWO Total Cost Less Than 7K | Other-O00 4E621509 | JK>HH533B--INSTALL 45' OF 4/0 DB CA | JK>HH533B--INSTALL 45' OF 4/0 DB CABLE TO CONDO UNIT_x000D_ AP1-YWO Total Cost Less Than 7K | Other-O00 4E621510 | JK>HH533B--INSTALL 30' OF 4/0 DB CA | JK>HH533B--INSTALL 30' OF 4/0 DB CABLE TO CONDO UNIT_x000D_ AP1-YWO Total Cost Less Than 7K | Other-O00 4E621511 | JK>HH533B--INSTALL 10' OF 4/0 DB CA | JK>HH533B--INSTALL 10' OF 4/0 DB CABLE TO CONDO UNIT_x000D_ AP1-YWO Total Cost Less Than 7K | Other-O00 4E621512 | JK>HH533B--INSTALL 35' OF 4/0 DB CA | JK>HH533B--INSTALL 35' OF 4/0 DB CABLE TO CONDO UNIT_x000D_ AP1-YWO Total Cost Less Than 7K | Other-O00 4E621513 | JK>HH533B--INSTALL 45' OF 4/0 DB CA | JK>HH533B--INSTALL 45' OF 4/0 DB CABLE TO CONDO UNIT_x000D_ AP1-YWO Total Cost Less Than 7K | Other-O00 4E621624 | MN HIGHLAND TERR HMPTN PHASE IC, 3 | MN HIGHLAND TERR HMPTN PHASE IC, 3 LOTS._x000D_ AP1-YWO Total Cost Less Than 7K | Other-O00 4E720228 | (CH) HH#313A: NEED TO CHG COVER_HH# | (CH) HH#313A: NEED TO CHG COVER_HH#311G: COMP'D_FAULT LOCATED/RPR'D/CHG'D_x000D_ AP1-YWO Total Cost Less Than 7K | Other-O00 4E720235 | (CH) P#437: WORK COMP'D_RSO/AWC 2/ | (CH) P#437: WORK COMP'D_RSO/AWC 2/21_REPLACED ROTTED POLE & SHFT'D_x000D_ AP1-YWO Total Cost Less Than 7K | Other-O00 4E720266 | (CH) HH#204A: CHG HDP TO POLYCRETE_ | (CH) HH#204A: CHG HDP TO POLYCRETE_DISC/RE-CONN SVC FOR SOCKET CHANGE-OUT._x000D_ AP1-YWO Total Cost Less Than 7K | Other-O00 4E720331 | 32 FERNWOOD DR COLCH AT P- 2298 FTR | 32 FERNWOOD DR COLCH AT P- 2298 FTR POLE IS SET, SHIFT FACILITIES. DBL POLES_x000D_ AP1-YWO Total Cost Less Than 7K | Other-O00 4E720341 | 3/2 MIDDLETOWN, WESTLAKE RD, YELLOW | 3/2 MIDDLETOWN, WESTLAKE RD, YELLOW TAG Y-18557-2017 ** 17B-2340 ***_x000D_ AP1-YWO Total Cost Less Than 7K | Other-O00 4E720362 | (CH) P#5438 - P#5439: SPLICE OUT WH | (CH) P#5438 - P#5439: SPLICE OUT WHAT LOOKS LIKE TREE GROWTH AROUND CONDUCTOR._x000D_ AP1-YWO Total Cost Less Than 7K | Other-O00 4E720376 | Buckley Rd, Salem/TL-TRANSFER EX OH | Buckley Rd, Salem/TL-TRANSFER EX OH-DB SVC TO NEW 40/2 P#792 [36"HH INCLUDED]_x000D_ AP1-YWO Total Cost Less Than 7K | Other-O00 4E720394 | RSO/AWC 3/15 PORTLAND, HIGH ST POLE | RSO/AWC 3/15 PORTLAND, HIGH ST POLE 1082 SVC REPLACED_x000D_ AP1-YWO Total Cost Less Than 7K | Other-O00 4E720401 | MN LAKE DR E HMPTN AT P-244 REPLACE | MN LAKE DR E HMPTN AT P-244 REPLACE POLE, SHIFT FACILITIES. THIS IS A 9A._x000D_ AP2-YWO Total Cost Variance Met - Variance :-10.9133 MIN.:-50 MAX.:50 | Other-O00 4E720451 | (CH) P#97: WORK COMP'D_RSO 3/30-3/3 | (CH) P#97: WORK COMP'D_RSO 3/30-3/31_9A_FRNTR SET_WE SHFT'D_x000D_ AP1-YWO Total Cost Less Than 7K | Other-O00 4E720454 | (CH) P#207: CHG DROP_MTR DEPT TO CH | (CH) P#207: CHG DROP_MTR DEPT TO CHG MTR #97987663._x000D_ AP1-YWO Total Cost Less Than 7K | Other-O00 4E720474 | (CH) P#2427: RPL EXIST'G OH/DB SVC | (CH) P#2427: RPL EXIST'G OH/DB SVC WITH NEW 4/0 OH/DB SVC_85'_x000D_ AP1-YWO Total Cost Less Than 7K | Other-O00 4E720481 | (CH) P#474: WRK COMP'D_RSO 4/3_ RPL | (CH) P#474: WRK COMP'D_RSO 4/3_ RPL'D X-ARM__P#5311: NEED TO RPL X-ARM_x000D_ AP1-YWO Total Cost Less Than 7K | Other-O00 4E720504 | JV RSO 4/7 WINDHAM, BEACON RD - REP | JV RSO 4/7 WINDHAM, BEACON RD - REPOLACED 200'AL SVC_x000D_ AP1-YWO Total Cost Less Than 7K | Other-O00
  6. Part 63 of 77

    4E720505 | (CH) P#3444: WRK COMP'D_RSO/AWC/RSO | (CH) P#3444: WRK COMP'D_RSO/AWC/RSO 4/8_9A_x000D_ AP3-YWO Resource Variance Met- Labor 19 <= 32 OR 35.64 <= 30 And Contractor $1435.56 <= 2000 | Other-O00 4E720513 | RSO 4/9/17 Jurczyk, Franklin - rep | RSO 4/9/17 Jurczyk, Franklin - replaced arrestors @ 383 & 385, replace OH xfrm_x000D_ AP1-YWO Total Cost Less Than 7K | Other-O00 4E720539 | JK>HH6833 (LAWN BOX)--REPLACE 17 X | JK>HH6833 (LAWN BOX)--REPLACE 17 X 30 LAWN BOX_x000D_ AP1-YWO Total Cost Less Than 7K | Other-O00 4E720569 | JV 66 Back Rd Windham Ct replace se | JV 66 Back Rd Windham Ct replace secondary pole with svc riser_x000D_ AP1-YWO Total Cost Less Than 7K | Other-O00 4E720596 | MN 85 SILLIMANVILLE RD E HMPTN AT P | MN 85 SILLIMANVILLE RD E HMPTN AT P-1818 INS SECDY, XING POLE, OH SVC & MTR._x000D_ AP2-YWO Total Cost Variance Met - Variance :117.088 MIN.:-50 MAX.:150 | Other-O00 4E720622 | JV 60 LOVERS LN WINDHAM INST OH XFM | JV 60 LOVERS LN WINDHAM INST OH XFMR RPLC PL TOP SPCR INST OH SVC_x000D_ AP1-YWO Total Cost Less Than 7K | Other-O00 4E720707 | JK>POLE 102--REPLACE POLE & SPAN OF | JK>POLE 102--REPLACE POLE & SPAN OF SEC/SVC FOR OH TRESPASS_x000D_ AP1-YWO Total Cost Less Than 7K | Other-O00 4E720785 | MN 39 LOT 27 HIGHLAND TERR E HMPTN | MN 39 LOT 27 HIGHLAND TERR E HMPTN AT HH-652-A INSTALL DB SVC & A METER_x000D_ AP1-YWO Total Cost Less Than 7K | Other-O00 4E720807 | JV Spring View Windham- between pad | JV Spring View Windham- between pad#92 & #93 requires replmt ** 17B-5319 ***_x000D_ CL-YWO Variance - Contractor Labor | Other-O00 4E720811 | RSO/AWC 5/24 COLCHESTER, LEBANON AV | RSO/AWC 5/24 COLCHESTER, LEBANON AVE (RT 16) 9A POLE 3 1/4_x000D_ AP1-YWO Total Cost Less Than 7K | Other-O00 4E720849 | RSO/EH - 5/26 MIDDLETOWN, WASHINGTO | RSO/EH - 5/26 MIDDLETOWN, WASHINGTON ST - 9A P3088 STROM / HOAR_x000D_ AP2-YWO Total Cost Variance Met - Variance :80.0182 MIN.:-50 MAX.:150 | Other-O00 4E721001 | JK>POLE 867--REPLACE TERMINATOR AT | JK>POLE 867--REPLACE TERMINATOR AT RISER POLE, RESORE POWER TO NORMAL_x000D_ AP1-YWO Total Cost Less Than 7K | Other-O00 4E721058 | JK>POLE 242--RMV 3PH PRI RISER, DB | JK>POLE 242--RMV 3PH PRI RISER, DB CABLE, 3PH SVC TO BLDG FOR DEMO (7 MTRS)_x000D_ AP1-YWO Total Cost Less Than 7K | Other-O00 4E721121 | MN 129 MAIN ST E HMPTN AT P-12 INST | MN 129 MAIN ST E HMPTN AT P-12 INSTALL OH SVC AND A 200A MTR._x000D_ AP1-YWO Total Cost Less Than 7K | Other-O00 4E721241 | (CH) P#4204: CHG OH DROP_#2 TPX_45' | (CH) P#4204: CHG OH DROP_#2 TPX_45'_MTR DEPT TO CHG MTR #98849099._x000D_ AP1-YWO Total Cost Less Than 7K | Other-O00 4E721256 | RSO 8/6 MIDDLETOWN, CRYSTAL LAKE RD | RSO 8/6 MIDDLETOWN, CRYSTAL LAKE RD PASCARELLI_x000D_ AP2-YWO Total Cost Variance Met - Variance :32.0064 MIN.:-50 MAX.:150 | Other-O00 4E721257 | (CH) PAD#4263: EXTEND PRIM'Y TO PAD | (CH) PAD#4263: EXTEND PRIM'Y TO PAD#4264_UNITS 5-8, 18-21_PHASE 2_x000D_ AP2-YWO Total Cost Variance Met - Variance :-28.7598 MIN.:-50 MAX.:50 | Other-O00 4E721442 | 5 CHILDS RD E HMPTN AT P-2674 INSTA | 5 CHILDS RD E HMPTN AT P-2674 INSTALL OH SVC TO GAS CO POLE, UNMETERED ANTENNA_x000D_ AP1-YWO Total Cost Less Than 7K | Other-O00 4E721485 | 51 BABCOCK HILL RD LEBANON AT P-9 R | 51 BABCOCK HILL RD LEBANON AT P-9 REPL XF, INST CUTOUT, AT P-7 INS OH SVC & MTR._x000D_ AP1-YWO Total Cost Less Than 7K | Other-O00 4E721709 | Elec Maint Trouble Call - Repairs/O | Elec Maint Trouble Call - Repairs/Obsolescence OH (AROH)_x000D_ AP2-YWO Total Cost Variance Met - Variance :-1.0265 MIN.:-50 MAX.:50 | Other-O00 4E721884 | MN 426 CABIN RD COLCH AT P-2297 RE | MN 426 CABIN RD COLCH AT P-2297 REPLACE OH SVC, MIDSPAN,10 FT OFF OF POLE._x000D_ AP1-YWO Total Cost Less Than 7K | Other-O00 4E721958 | MN 31, LOT 16 BARBERS WAY HEBRON A | MN 31, LOT 16 BARBERS WAY HEBRON AT HH-417-B INSTALL DB SVC & 200A MTR_x000D_ AP1-YWO Total Cost Less Than 7K | Other-O00
  7. Part 64 of 77

    4E820154 | (CH) P#1866: OH DROP_30'_LINE SET 4 | (CH) P#1866: OH DROP_30'_LINE SET 4T MTR_RMV AERIAL TRESPASS._x000D_ AP1-YWO Total Cost Less Than 7K | Other-O00 4E820580 | RA CDOT 163-203 RT 66 - outage nor | RA CDOT 163-203 RT 66 - outage north side of bridge -_x000D_ JE-YWO Variance Job Type Exclusion | Other-O00 4E820604 | RA CDOT 163-203 RT 66 - outage sou | RA CDOT 163-203 RT 66 - outage south side of bridge -_x000D_ JE-YWO Variance Job Type Exclusion | Other-O00 4E820807 | (CH) P#1868: CHG OH DROP_DAMANGED D | (CH) P#1868: CHG OH DROP_DAMANGED DURING MARCH STORMS_x000D_ AP1-YWO Total Cost Less Than 7K | Other-O00 4E821053 | Elec Svc Line Extension/Development | Elec Svc Line Extension/Development DESG (DN)_x000D_ | Other-O00 4E821066 | BC - CDOT 41-118 - Relocate facilit | BC - CDOT 41-118 - Relocate facilities on RT 66 for bridge replacement STAGE 2_x000D_ JE-YWO Variance Job Type Exclusion | Other-O00 4E920002 | RA Project CDOT 052-091 RT 207 Fran | RA Project CDOT 052-091 RT 207 Franklin_x000D_ JE-YWO Variance Job Type Exclusion | Other-O00 4E921832 | WRTN - DM : D.O.T. 40 WEST HIGH ST | D.O.T. WEST HIGH ST/RT 66 INSTALL POLE, ANC, GUY SHIFT FACILITIES. ESLRRA_x000D_ | Other-O00 4E921852 | MJG - CD01111-01 - Install TR 22R1- | MJG - CD01111-01 - Install TR 22R1-91T on Pole 550 Founders Road_x000D_ AP2-YWO Total Cost Variance Met - Variance :26.2659 MIN.:-30 MAX.:30 | Other-O00 4M020394 | 7 lots Subdiv-Partially Completed y | 7 lots Subdiv-Partially Completed years ago-(Design for lots-3,4,5,6 )_x000D_ AP1-YWO Total Cost Less Than 7K | Other-O00 4M221036 | pole 2067 prim de/3ph. riser pole s | pole 2067 prim de/3ph. riser pole splitting. NEED to repl & shift now E. Cook_x000D_ | Other-O00 4M320057 | Pole 1253 -40/3 pole has been set, | Pole 1253 -40/3 pole has been set, (R/I) anc- Guy & Pole top, Shift wires &Light_x000D_ AP1-YWO Total Cost Less Than 7K | Other-O00 4M910087 | Replace 300A Solids with 600A Disco | Replace 300A Solids with 600A Disconnects_x000D_ | Other-O00 4N030035 | MJG - CD01065-01, 11B1 Reconductor, | CD01065-01, 11B1 Reconductor, Ledyard 2of2 | Other-O00 4N030428 | (40): CDOT120-90 $ Replace Bridge#' | CDOT120-90 Replace Bridge#'s01140,05401,twin culverts Rte.82 @ East Branch 8 Mil | Other-O00 4N030429 | (20): CDOT120-90 Bridge Site Backfe | Other-O00 4N030430 | (20): CDOT120-90 Bridge Site Backfe | Other-O00 4N030431 | (30): CDOT120-90 Replace Bridge Sit | CDOT120-90 Replace Bridge Site Restore Rte.82 @ East Branch 8 Mil | Other-O00 4N030432 | (20): CDOT120-90 Bridge Site Backfe | CDOT120-90 Bridge Site Backfeed - Fuse Coordination p# 1215 | Other-O00 4N030433 | (20): CDOT120-90 Bridge Site Backfe | CDOT120-90 Bridge Site Backfeed - Open Normally Open Tie p# 3527 | Other-O00 4N030544 | PD-14 Boulevard Court N. London/Rep | PD-14 Boulevard Court N. London/Repl OH svc drop wit 65ft #2TPX from P# 6357_x000D_ | Other-O00 4N030570 | MAV PD-5 Jerome Rd N. London/Instal | MAV PD-5 Jerome Rd N. London/Install +/- 110ft 4/0 3CT OH/DB from P# 1112_x000D_ AP1-YWO Total Cost Less Than 7K | Other-O00 4N031326 | AWC-MV- I/R 250 MID-SPAN OH SVC | AWC-MV- I/R 250 MID-SPAN OH SVC_x000D_ | Other-O00 4N031432 | (40): DB-install 13 xfmr c/o & fix | DB-install 13 xfmr c/o on Button Rd, North Stonington_x000D_ | Other-O00 4N031566 | TL - INDIAN ROCK RD, #13 NIANTIC / | Indian Rock Rd, #13 Niantic/TL- REPLACE+RELOCATE EX OH SVC BY APPOINTMENT_x000D_ | Other-O00 4N031748 | MF - OSWEGATCHIE RD WATERFORD:POLE | 10/30: OSWEGATCHIE RD WATERFORD:POLE#914 POLE AND GUY NEED TO BE REPLACED ASAP | Other-O00 4N130014 | Sandpiper Point Rd, #3 Old Lyme/TL- | Sandpiper Point Rd, #3 Old Lyme/TL- UPGRADE OH XFMR@P#2226+INST NEW OH-DB SVC_x000D_ | Other-O00 4N130057 | RIGGS - MV - STONINGTON 1-2 PARK AV | MAV-MV- INST 200' DB SVC TO 1-2_x000D_ | Other-O00 4N320633 | Grassy Hill Rd, #88 Old Lyme/Elec S | Grassy Hill Rd, #88 Old Lyme/Elec Svc Existing Residential DESG (DN)_x000D_ AP1-YWO Total Cost Less Than 7K | Other-O00
  8. Part 65 of 77

    4N320643 | O Colony Rd,P1840,OL(P4031 Swan Av) | O Colony Rd,P1840,OL(P4031 Swan Av)/Elec Maint T Call - Repairs/Obsol OH (AROH)_x000D_ AP2-YWO Total Cost Variance Met - Variance :11.5968 MIN.:-50 MAX.:50 | Other-O00 4N420900 | **CANCEL***SEE 2369539*** MV 250W | **CANCEL***SEE 2369539*** MV 250W_x000D_ | Other-O00 4N421040 | **CANCEL** SEE 2376939** 07/03/14 P | **CANCEL** SEE 2376939** 07/03/14 Pole 5013 replace mh 100 w head ESO_x000D_ | Other-O00 4N421163 | ELYM - FLR - WINSTON RD EAST LYME-P | ELYM - FLR - WINSTON RD EAST LYME-PID 11618 70 HPS PTT-BAD CABLE FROM HH TO POLE_x000D_ AP1-YWO Total Cost Less Than 7K | Other-O00 4N421261 | 07/03/14 Pole 5013 replace mh 100 w | 07/03/14 Pole 5013 replace mh 100 w head ESO_x000D_ AP1-YWO Total Cost Less Than 7K | Other-O00 4N520050 | RA Project CDOT 113-107 - relocate | RA Project CDOT 113-107 - relocate facilities for bridge construction Stage 1_x000D_ JE-YWO Variance Job Type Exclusion | Other-O00 4N520390 | STONINGTON COTTRELL ST - HPS 150W C | STONINGTON COTTRELL ST - HPS 150W COBRA @ PID 2401_x000D_ AP1-YWO Total Cost Less Than 7K | Other-O00 4N521143 | 08/15 ESO LAWRENCE CT PRESTON BROK | 08/15 ESO LAWRENCE CT PRESTON BROKEN POLE 2469_x000D_ AP1-YWO Total Cost Less Than 7K | Other-O00 4N521323 | PD-247 Shore Rd/Old Lyme REPLACE PC | PD-247 Shore Rd/Old Lyme REPLACE PCB XFMR P#1911_x000D_ CL-YWO Variance - Contractor Labor | Other-O00 4N521430 | 9A 11/6/15-CAR VS POLE 1163- SEE AT | 9A 11/6/15-CAR VS POLE 1163- SEE ATTACHED TT_x000D_ AP1-YWO Total Cost Less Than 7K | Other-O00 4N620016 | PD-849 Pequot Ave NLD/Replace exist | PD-849 Pequot Ave NLD/Replace existing P# 10836/Replace ASAP pole is leaning._x000D_ | Other-O00 4N620201 | MM JOSHUATOWN FUSESAVER RECLOSER PO | MM JOSHUATOWN FUSESAVER RECLOSER POLE 481_x000D_ NL-YWO Variance - NU Construction Labor | Other-O00 4N620204 | SM-WHITEHALL AVE, STONINGTON - CarV | SM-WHITEHALL AVE, STONINGTON - CarVsP2370- Replaced 45' CLASS 2_x000D_ AP3-YWO Resource Variance Met- Labor 19 <= 32 OR 67.31 <= 30 And Contractor $916.52 <= 2000 | Other-O00 4N620334 | GCC / INSTALL A NEW 50KVA XFMR W/CU | GCC / INSTALL A NEW 50KVA XFMR W/CUT-OUT AND NEW 1/0 AL TPX OH SVC TO BUILDING_x000D_ | Other-O00 4N620359 | ESO 1/28 OXOBOXO DAM RD MONTVILLE C | ESO 1/28 OXOBOXO DAM RD MONTVILLE CARVSPOLE_x000D_ AP1-YWO Total Cost Less Than 7K | Other-O00 4N620422 | 3/29/16-Tree down, replaced c/o, po | 3/29/16-Tree down, replaced c/o, pole #3755_x000D_ AP1-YWO Total Cost Less Than 7K | Other-O00 4N620614 | PD-18 Bartlett Place WTFD/Install n | PD-18 Bartlett Place WTFD/Install new pole due to woodpecker damage_x000D_ AP1-YWO Total Cost Less Than 7K | Other-O00 4N620638 | PD-Tillley/Green/Pearl NLD/Parking | PD-Tillley/Green/Pearl NLD/Parking lot overhead service refeeds_x000D_ NL-YWO Variance - NU Construction Labor | Other-O00 4N620766 | GCC / REMOVE AND RELOCATE FACILITIE | GCC / REMOVE AND RELOCATE FACILITIES / STREET LITES_x000D_ | Other-O00 4N620866 | SM-1 LAMBERTS LN, STGN- EVRSRC RPLC | SM-1 LAMBERTS LN, STGN- EVRSRC RPLC 2 POLES INSTALL OH-DB SVC- APPNT REQ_x000D_ AP2-YWO Total Cost Variance Met - Variance :-6.923 MIN.:-50 MAX.:50 | Other-O00 4N620924 | PD-Bayonet St P# 11494/Replace faul | PD-Bayonet St P# 11494/Replace fault indicators_x000D_ | Other-O00 4N621025 | GCC / RMV OPEN WIRE SECONDARY AND I | GCC / RMV OPEN WIRE SECONDARY AND INSTALL NEW 1/0 AL TPX SEC AND RESAG OH SVC_x000D_ AP2-YWO Total Cost Variance Met - Variance :146.9926 MIN.:-50 MAX.:150 | Other-O00 4N621217 | ESO 9A - 08/15/16 GREEN HAVEN STONI | ESO 9A - 08/15/16 GREEN HAVEN STONINGTON car v pole 6781_x000D_ AP1-YWO Total Cost Less Than 7K | Other-O00 4N621221 | ESO 9/1/16-HAWKS NEST RD., OLD LYME | ESO 9/1/16-HAWKS NEST RD., OLD LYME BACKHOE V POLE 761_x000D_ AP1-YWO Total Cost Less Than 7K | Other-O00 4N621240 | MM SMART SWITCH REPROGRAM RECLOSER | MM SMART SWITCH REPROGRAM RECLOSER POLE 916 JEROME FROM RADIAL TO SECT 1Q01_x000D_
  9. Part 66 of 77

    AP2-YWO Total Cost Variance Met - Variance :42.4481 MIN.:-50 MAX.:50 | Other-O00 4N621252 | MM SMART SWITCH PROGAM TR POLE 7794 | MM SMART SWITCH PROGAM TR POLE 7794 PEQUOT RD 1Q01_x000D_ NL-YWO Variance - NU Construction Labor | Other-O00 4N621263 | PD-P# 105S Ocean Ave Car vs Pole | PD-P# 105S Ocean Ave Car vs Pole_x000D_ AP1-YWO Total Cost Less Than 7K | Other-O00 4N621268 | CDOT 137-159, RT27 Mystic, Civil, | CDOT 137-159, RT27 Mystic, Civil, work @ I-95 /13K1 & 13K2_x000D_ JE-YWO Variance Job Type Exclusion | Other-O00 4N621269 | CDOT 137-159 Mysttic Ckt. 13K1 & 13 | CDOT 137-159 Mysttic Ckt. 13K1 & 13K2 UG and Riser cables + splicing_x000D_ JE-YWO Variance Job Type Exclusion | Other-O00 4N621319 | Elec Svc New Com/Ind DESG (DN) | Elec Svc New Com/Ind DESG (DN)_x000D_ | Other-O00 4N621398 | ESO 9A 9/7/16-Cow Hill Rd., Groton/ | ESO 9A 9/7/16-Cow Hill Rd., Groton/Mystic /NEED TO RETURN & FIX PRIMARY RISER_x000D_ AP1-YWO Total Cost Less Than 7K | Other-O00 4N621399 | ESO 9A 9/5/ Pole 20865 - Fellows | ESO 9A 9/5/ Pole 20865 - Fellows Rd., (Rt 163), Montville_x000D_ AP1-YWO Total Cost Less Than 7K | Other-O00 4N621416 | PD-187 West Main St East Lyme/Car V | PD-187 West Main St East Lyme/Car VS P# 1224_x000D_ NL-YWO Variance - NU Construction Labor | Other-O00 4N621419 | MM POLE 2551 S. LEDYARD RD10/14/201 | MM POLE 2551 S. LEDYARD RD10/14/2016 REPLACED INSULTATOR ALL WORK COMPLETE_x000D_ | Other-O00 4N621464 | MM STUB POLE 2701S 9A ALL WORK COM | MM STUB POLE 2701S 9A ALL WORK COMPLETE DOT hit pole 2701 notify 491208_x000D_ | Other-O00 4N621470 | MM STUB POLE, 95s ANCHOR, SPAN GUY, | MM STUB POLE, 95s ANCHOR, SPAN GUY, SDWLK GUY COLMANST NEW LONDON notif #490181_x000D_ AP1-YWO Total Cost Less Than 7K | Other-O00 4N621483 | SM-249 PALMER NECK RD, STGN- RPLC P | SM-249 PALMER NECK RD, STGN- RPLC POLE/, INSTL XFMR/INSTL OH-DB SVC_x000D_ AP2-YWO Total Cost Variance Met - Variance :82.3711 MIN.:-50 MAX.:150 | Other-O00 4N621485 | MM SMART SWITCH 11Y6 POLES 405 W MA | MM SMART SWITCH 11Y6 POLES 405 W MAIN ST EAST LYME_x000D_ NL-YWO Variance - NU Construction Labor | Other-O00 4N621600 | ESO 10/19 RAYMOND HILL RD, MONTVILL | ESO 10/19 RAYMOND HILL RD, MONTVILLE - CAR VS P#4492 MADE SAFE FOR NOW_x000D_ AP1-YWO Total Cost Less Than 7K | Other-O00 4N621608 | 11/23/16 9A CAR V POLE - HARTFORD N | 11/23/16 9A CAR V POLE - HARTFORD NEW LOND TPKE MNTVILE_x000D_ AP1-YWO Total Cost Less Than 7K | Other-O00 4N621635 | GCC / FRONTIER I&R POLE / SHIFT FAC | GCC / FRONTIER I&R POLE / SHIFT FACILITES/INSTALL NEW SVC RISER TO DB SVC TO HOM_x000D_ AP1-YWO Total Cost Less Than 7K | Other-O00 4N621724 | MM REPLACE SERVICE RSO 12/20 NL, BR | MM REPLACE SERVICE RSO 12/20 NL, BRAEMER PL P 7607 ALL WORK COMPLETE_x000D_ | Other-O00 4N621741 | MM REPLACE SERVICE 48 LONGVIEW ST, | MM REPLACE SERVICE 48 LONGVIEW ST, NEW LODON ALL WORK COMPLETE_x000D_ | Other-O00 4N621769 | MM ALL WORK COMPLETE GORTON ST,POLE | MM ALL WORK COMPLETE GORTON ST,POLE 1740 - REPLACED 70' 2 STRAND SERVICE_x000D_ | Other-O00 4N720015 | RSO 1/2/, LIBERTY ST, STONINGTON - | RSO 1/2/, LIBERTY ST, STONINGTON - 9A - pole # 7004- needs to be replaced_x000D_ CI-YWO Variance - Contractor Invoice | Other-O00 4N720030 | RSO/AWC - 1/6 LEDYARD, IRON ST 9A P | RSO/AWC - 1/6 LEDYARD, IRON ST 9A P1247 LEMIEUX/LEARNED/BONGO/ DOWLING_x000D_ AP1-YWO Total Cost Less Than 7K | Other-O00 4N720046 | MM REPLACE SERVICE 9A SPITHEAD RD. | MM REPLACE SERVICE 9A SPITHEAD RD. WATERFORD @ P1558_x000D_ | Other-O00 4N720048 | GCC / ROTTEN POLE / FRONTIER I&R PO | GCC / ROTTEN POLE / FRONTIER I&R POLE / EVERSOURCE TO SHIFT ONTO_x000D_ AP1-YWO Total Cost Less Than 7K | Other-O00 4N720100 | CD00526-07 FLANDERS CIVIL WORK | CD00526-07 FLANDERS CIVIL WORK_x000D_ CL-YWO Variance - Contractor Labor | Other-O00 4N720196 | GCC / EVERS/INSTALL NEW POLE/PRI RI | GCC / EVERS/INSTALL NEW POLE/PRI RISER TO PAD MTD XFMR_x000D_ NL-YWO Variance - NU Construction Labor | Other-O00
  10. Part 67 of 77

    4N720237 | PD-Pequot Ct and West End Ave Niant | PD-Pequot Ct and West End Ave Niantic set new 45-2 & shifted facilities_x000D_ AP2-YWO Total Cost Variance Met - Variance :85.6706 MIN.:-50 MAX.:150 | Other-O00 4N720247 | SM-265 NW CRNR RD, N STGN- FRNT RPL | SM-265 NW CRNR RD, N STGN- FRNT RPLC PLE, OH XFMR, OH-DB SVC_x000D_ AP3-YWO Resource Variance Met- Labor 26 <= 32 OR 166.67 <= 30 And Contractor $571.4 <= 2000 | Other-O00 4N720274 | PD-9 Fairhaven Rd East Lyme/Disconn | PD-9 Fairhaven Rd East Lyme/Disconnect-reconnect OH svc for upgrade._x000D_ AP1-YWO Total Cost Less Than 7K | Other-O00 4N720369 | SM-PURA DBL PLE P234- ELM ST, GRTN | SM-PURA DBL PLE P234- ELM ST, GRTN_x000D_ AP1-YWO Total Cost Less Than 7K | Other-O00 4N720562 | SM Y-18695-2017 YELLOW TAG REPLACE | SM Y-18695-2017 YELLOW TAG REPLACE CAPACITOR P#3051_x000D_ AP2-YWO Total Cost Variance Met - Variance :30.1932 MIN.:-50 MAX.:50 | Other-O00 4N720645 | SM-2 WASHINGTON ST, STGN- INSTL 250 | SM-2 WASHINGTON ST, STGN- INSTL 250 KVA 1 PH XFMR/ IT METER_x000D_ AP2-YWO Total Cost Variance Met - Variance :112.9059 MIN.:-50 MAX.:150 | Other-O00 4N720646 | MM NEW MID SPAN SERVICE POLE 1200 H | MM NEW MID SPAN SERVICE POLE 1200 HOUSE 213 SHORE RD MLC METER SER TO SET METER_x000D_ AP1-YWO Total Cost Less Than 7K | Other-O00 4N720816 | MM YELLOW TAG-Y-18666-2017 HALLS RD | MM YELLOW TAG-Y-18666-2017 HALLS RD (RT 1) POLE 2309 REPLACE CAP BANK_x000D_ AP2-YWO Total Cost Variance Met - Variance :36.4507 MIN.:-50 MAX.:50 | Other-O00 4N720868 | MM RELOCATE POLE LINE FOR NEW LONDO | MM RELOCATE POLE LINE FOR NEW LONDON ROAD WIDENING notify #529767_x000D_ AP2-YWO Total Cost Variance Met - Variance :-4.1735 MIN.:-40 MAX.:40 | Other-O00 4N720921 | MM WTFD, E. Wood - Replace 50' #2 O | MM WTFD, E. Wood - Replace 50' #2 OH Service ALL WORK COMPLETE_x000D_ AP1-YWO Total Cost Less Than 7K | Other-O00 4N720929 | MM SERVC RISER TO PEDESTALL POLE214 | MM SERVC RISER TO PEDESTALL POLE214 PEQOUT AVE OH/DB MLC_x000D_ AP1-YWO Total Cost Less Than 7K | Other-O00 4N720977 | GCC / REMOVE AND INSTALL CUT-OUTS A | GCC / REMOVE AND INSTALL CUT-OUTS AT TWO LOCATIONS, SAME ROAD_x000D_ AP1-YWO Total Cost Less Than 7K | Other-O00 4N720994 | MM 36F5 Install new CAPACITOR POLE# | MM 36F5 Install new CAPACITOR POLE# 264 HARTFORD TRNPKE WTFD_x000D_ AP2-YWO Total Cost Variance Met - Variance :-4.9681 MIN.:-50 MAX.:50 | Other-O00 4N721015 | GCC / RMV XFMR OVERLOADED / INSTALL | GCC / RMV XFMR OVERLOADED / INSTALL A NEW XFMR_x000D_ AP1-YWO Total Cost Less Than 7K | Other-O00 4N721063 | SM-108 SOMERSETT DR, GRTN-EXST DB S | SM-108 SOMERSETT DR, GRTN-EXST DB SVC TO BE ABNDND/ CUST INSTL NEW PIPE 4/0 DB_x000D_ AP1-YWO Total Cost Less Than 7K | Other-O00 4N721068 | COMPLETED 6/27 CCC - Fault Locate a | COMPLETED 6/27 CCC - Fault Locate and Repair@ POLE 2986 NO POWER UG_x000D_ AP1-YWO Total Cost Less Than 7K | Other-O00 4N721070 | COMPLETED 6/29 CCC-Fault Locate and | COMPLETED 6/29 CCC-Fault Locate and Repair@POLE 2794 NO POWER UG_x000D_ AP1-YWO Total Cost Less Than 7K | Other-O00 4N721078 | GCC / REMOVE CUT-OUTS AND INSTALL A | GCC / REMOVE CUT-OUTS AND INSTALL A NEW CUT-OUTS_x000D_ AP2-YWO Total Cost Variance Met - Variance :-15.0233 MIN.:-50 MAX.:50 | Other-O00 4N721153 | PD-27 Lincoln Rd WTFD/Disconnect-re | PD-27 Lincoln Rd WTFD/Disconnect-reconnect for svc upgrade/Net meter_x000D_ AP1-YWO Total Cost Less Than 7K | Other-O00 4N721175 | MM REPLACE 75' SERVICE AT POLE 25 | MM REPLACE 75' SERVICE AT POLE 2500 ALL WORK COMPLETE_x000D_ AP1-YWO Total Cost Less Than 7K | Other-O00 4N721202 | SM-122 RYDER RD, N STGN-Install new | SM-122 RYDER RD, N STGN-Install new 150' OH/DB service_x000D_ AP1-YWO Total Cost Less Than 7K | Other-O00 4N721203 | SM-240 BOSTON POST RD, WTRFRD- RMV | SM-240 BOSTON POST RD, WTRFRD- RMV OH SVC AND INSTL OH-DB_x000D_ AP1-YWO Total Cost Less Than 7K | Other-O00

Text of RRU-159 Attachment 16.pdf

Extracted from the file · 489 pages · 7,076,557 characters

Text of RRU-159 Attachment 15.xlsx

Sheet names, column headings and text cells; numbers left out · first 300,000 characters

Text of RRU-159 Attachment 15.pdf

Extracted from the file · 897 pages · 15,723,777 characters

Text of RRU-159 Attachment 14 .pdf

Extracted from the file · 1 page · 2,589 characters

Text of RRU-159 Attachment 14.xlsx

Sheet names, column headings and text cells; numbers left out

Text of RRU-159 Attachment 13.xlsx

Sheet names, column headings and text cells; numbers left out

Text of RRU-159 Attachment 13.pdf

Extracted from the file · 1 page · 427 characters

Text of RRU-159 Attachment 12.xlsx

Sheet names, column headings and text cells; numbers left out · first 300,000 characters

Text of RRU-159 Attachment 12.pdf

Extracted from the file · 802 pages · 14,341,138 characters

Text of RRU-159 Attachment 11.xlsx

Sheet names, column headings and text cells; numbers left out · first 300,000 characters

Text of RRU-159 Attachment 11.pdf

Extracted from the file · 858 pages · 15,906,152 characters

Text of RRU-159 Attachment 10.xlsx

Sheet names, column headings and text cells; numbers left out

Text of RRU-159 Attachment 10.pdf

Extracted from the file · 1 page · 822 characters

Text of RRU-159 Attachment 09.xlsx

Sheet names, column headings and text cells; numbers left out · first 300,000 characters

Text of RRU-159 Attachment 09.pdf

Extracted from the file · 449 pages · 7,355,312 characters

Text of RRU-159 Attachment 08.xlsx

Sheet names, column headings and text cells; numbers left out · first 300,000 characters

Text of RRU-159 Attachment 08.pdf

Extracted from the file · 867 pages · 13,878,236 characters

Text of RRU-159 Attachment 07.xlsx

Sheet names, column headings and text cells; numbers left out · first 300,000 characters

Text of RRU-159 Attachment 07.pdf

Extracted from the file · 869 pages · 15,728,932 characters

Text of RRU-159 Attachment 06.xlsx

Sheet names, column headings and text cells; numbers left out · first 300,000 characters

Text of RRU-159 Attachment 06.pdf

Extracted from the file · 459 pages · 8,128,897 characters

Text of RRU-159 Attachment 05.xlsx

Sheet names, column headings and text cells; numbers left out · first 300,000 characters

Text of RRU-159 Attachment 05.pdf

Extracted from the file · 879 pages · 16,073,548 characters

Text of RRU-159 Attachment 04.xlsx

Sheet names, column headings and text cells; numbers left out

Text of RRU-159 Attachment 04.pdf

Extracted from the file · 5 pages · 20,994 characters

Text of RRU-159 Attachment 03.xlsx

Sheet names, column headings and text cells; numbers left out · first 300,000 characters

Text of RRU-159 Attachment 03.pdf

Extracted from the file · 840 pages · 14,413,580 characters

Text of RRU-159 Attachment 02.xlsx

Sheet names, column headings and text cells; numbers left out · first 300,000 characters

Text of RRU-159 Attachment 02.pdf

Extracted from the file · 1,137 pages · 16,605,462 characters

Text of RRU-159 Attachment 01.xlsx

Sheet names, column headings and text cells; numbers left out

Text of RRU-159 Attachment 01.pdf

Extracted from the file · 1 page · 1,403 characters

As listed on the current system

Question(s) Answered 159 (Connecticut Light and Power Company dba Eversource Energy) Date Filed: 11/06/2026

This filing on the current system (opens in a new tab)