Interrogatory responses
Answers to questions 159
Files51
RRU-159_Final.pdf
PDF · 116 KB · 1 pageText searchable
Download RRU-159_Final.pdfRead the text of RRU-159_Final.pdf
RRU-159 Attachment 25.xlsx
Excel · 5.7 MBText searchable
Download RRU-159 Attachment 25.xlsxRead the text of RRU-159 Attachment 25.xlsx
RRU-159 Attachment 24.xlsx
Excel · 5.6 MBText searchable
Download RRU-159 Attachment 24.xlsxRead the text of RRU-159 Attachment 24.xlsx
RRU-159 Attachment 24.pdf
PDF · 239 MB
Open on the current system: RRU-159 Attachment 24.pdf (opens in a new tab)
RRU-159 Attachment 23.xlsx
Excel · 12 MBText searchable
Download RRU-159 Attachment 23.xlsxRead the text of RRU-159 Attachment 23.xlsx
RRU-159 Attachment 23.pdf
PDF · 89 MB · 1,160 pagesText searchable
Download RRU-159 Attachment 23.pdfRead the text of RRU-159 Attachment 23.pdf
RRU-159 Attachment 22.xlsx
Excel · 12 MBText searchable
Download RRU-159 Attachment 22.xlsxRead the text of RRU-159 Attachment 22.xlsx
RRU-159 Attachment 22.pdf
PDF · 89 MB · 1,203 pagesText searchable
Download RRU-159 Attachment 22.pdfRead the text of RRU-159 Attachment 22.pdf
RRU-159 Attachment 21.xlsx
Excel · 12 MBText searchable
Download RRU-159 Attachment 21.xlsxRead the text of RRU-159 Attachment 21.xlsx
RRU-159 Attachment 21.pdf
PDF · 88 MB · 1,203 pagesText searchable
Download RRU-159 Attachment 21.pdfRead the text of RRU-159 Attachment 21.pdf
RRU-159 Attachment 20.xlsx
Excel · 117 KBText searchable
Download RRU-159 Attachment 20.xlsxRead the text of RRU-159 Attachment 20.xlsx
RRU-159 Attachment 20.pdf
PDF · 624 KB · 16 pagesText searchable
Download RRU-159 Attachment 20.pdfRead the text of RRU-159 Attachment 20.pdf
RRU-159 Attachment 19.xlsx
Excel · 32 KBText searchable
Download RRU-159 Attachment 19.xlsxRead the text of RRU-159 Attachment 19.xlsx
RRU-159 Attachment 19.pdf
PDF · 117 KB · 1 pageText searchable
Download RRU-159 Attachment 19.pdfRead the text of RRU-159 Attachment 19.pdf
RRU-159 Attachment 18.xlsx
Excel · 6.7 MBText searchable
Download RRU-159 Attachment 18.xlsxRead the text of RRU-159 Attachment 18.xlsx
RRU-159 Attachment 18.pdf
PDF · 48 MB · 640 pagesText searchable
Download RRU-159 Attachment 18.pdfRead the text of RRU-159 Attachment 18.pdf
RRU-159 Attachment 17.xlsx
Excel · 11 MBText searchable
Download RRU-159 Attachment 17.xlsxRead the text of RRU-159 Attachment 17.xlsx
RRU-159 Attachment 17.pdf
PDF · 82 MB · 855 pagesText searchable
Download RRU-159 Attachment 17.pdfRead the text of RRU-159 Attachment 17.pdf
RRU-159 Attachment 16.xlsx
Excel · 6.7 MBText searchable
Download RRU-159 Attachment 16.xlsxRead the text of RRU-159 Attachment 16.xlsx
RRU-159 Attachment 16.pdf
PDF · 46 MB · 489 pagesText searchable
Download RRU-159 Attachment 16.pdfRead the text of RRU-159 Attachment 16.pdf
RRU-159 Attachment 15.xlsx
Excel · 12 MBText searchable
Download RRU-159 Attachment 15.xlsxRead the text of RRU-159 Attachment 15.xlsx
RRU-159 Attachment 15.pdf
PDF · 85 MB · 897 pagesText searchable
Download RRU-159 Attachment 15.pdfRead the text of RRU-159 Attachment 15.pdf
RRU-159 Attachment 14 .pdf
PDF · 71 KB · 1 pageText searchable
Download RRU-159 Attachment 14 .pdfRead the text of RRU-159 Attachment 14 .pdf
RRU-159 Attachment 14.xlsx
Excel · 29 KBText searchable
Download RRU-159 Attachment 14.xlsxRead the text of RRU-159 Attachment 14.xlsx
RRU-159 Attachment 13.xlsx
Excel · 26 KBText searchable
Download RRU-159 Attachment 13.xlsxRead the text of RRU-159 Attachment 13.xlsx
RRU-159 Attachment 13.pdf
PDF · 56 KB · 1 pageText searchable
Download RRU-159 Attachment 13.pdfRead the text of RRU-159 Attachment 13.pdf
RRU-159 Attachment 12.xlsx
Excel · 12 MBText searchable
Download RRU-159 Attachment 12.xlsxRead the text of RRU-159 Attachment 12.xlsx
RRU-159 Attachment 12.pdf
PDF · 82 MB · 802 pagesText searchable
Download RRU-159 Attachment 12.pdfRead the text of RRU-159 Attachment 12.pdf
RRU-159 Attachment 11.xlsx
Excel · 12 MBText searchable
Download RRU-159 Attachment 11.xlsxRead the text of RRU-159 Attachment 11.xlsx
RRU-159 Attachment 11.pdf
PDF · 86 MB · 858 pagesText searchable
Download RRU-159 Attachment 11.pdfRead the text of RRU-159 Attachment 11.pdf
RRU-159 Attachment 10.xlsx
Excel · 27 KBText searchable
Download RRU-159 Attachment 10.xlsxRead the text of RRU-159 Attachment 10.xlsx
RRU-159 Attachment 10.pdf
PDF · 60 KB · 1 pageText searchable
Download RRU-159 Attachment 10.pdfRead the text of RRU-159 Attachment 10.pdf
RRU-159 Attachment 09.xlsx
Excel · 7.1 MBText searchable
Download RRU-159 Attachment 09.xlsxRead the text of RRU-159 Attachment 09.xlsx
RRU-159 Attachment 09.pdf
PDF · 46 MB · 449 pagesText searchable
Download RRU-159 Attachment 09.pdfRead the text of RRU-159 Attachment 09.pdf
RRU-159 Attachment 08.xlsx
Excel · 12 MBText searchable
Download RRU-159 Attachment 08.xlsxRead the text of RRU-159 Attachment 08.xlsx
RRU-159 Attachment 08.pdf
PDF · 86 MB · 867 pagesText searchable
Download RRU-159 Attachment 08.pdfRead the text of RRU-159 Attachment 08.pdf
RRU-159 Attachment 07.xlsx
Excel · 12 MBText searchable
Download RRU-159 Attachment 07.xlsxRead the text of RRU-159 Attachment 07.xlsx
RRU-159 Attachment 07.pdf
PDF · 84 MB · 869 pagesText searchable
Download RRU-159 Attachment 07.pdfRead the text of RRU-159 Attachment 07.pdf
RRU-159 Attachment 06.xlsx
Excel · 7.0 MBText searchable
Download RRU-159 Attachment 06.xlsxRead the text of RRU-159 Attachment 06.xlsx
RRU-159 Attachment 06.pdf
PDF · 47 MB · 459 pagesText searchable
Download RRU-159 Attachment 06.pdfRead the text of RRU-159 Attachment 06.pdf
RRU-159 Attachment 05.xlsx
Excel · 12 MBText searchable
Download RRU-159 Attachment 05.xlsxRead the text of RRU-159 Attachment 05.xlsx
RRU-159 Attachment 05.pdf
PDF · 87 MB · 879 pagesText searchable
Download RRU-159 Attachment 05.pdfRead the text of RRU-159 Attachment 05.pdf
RRU-159 Attachment 04.xlsx
Excel · 39 KBText searchable
Download RRU-159 Attachment 04.xlsxRead the text of RRU-159 Attachment 04.xlsx
RRU-159 Attachment 04.pdf
PDF · 163 KB · 5 pagesText searchable
Download RRU-159 Attachment 04.pdfRead the text of RRU-159 Attachment 04.pdf
RRU-159 Attachment 03.xlsx
Excel · 12 MBText searchable
Download RRU-159 Attachment 03.xlsxRead the text of RRU-159 Attachment 03.xlsx
RRU-159 Attachment 03.pdf
PDF · 86 MB · 840 pagesText searchable
Download RRU-159 Attachment 03.pdfRead the text of RRU-159 Attachment 03.pdf
RRU-159 Attachment 02.xlsx
Excel · 12 MBText searchable
Download RRU-159 Attachment 02.xlsxRead the text of RRU-159 Attachment 02.xlsx
RRU-159 Attachment 02.pdf
PDF · 91 MB · 1,137 pagesText searchable
Download RRU-159 Attachment 02.pdfRead the text of RRU-159 Attachment 02.pdf
RRU-159 Attachment 01.xlsx
Excel · 24 KBText searchable
Download RRU-159 Attachment 01.xlsxRead the text of RRU-159 Attachment 01.xlsx
RRU-159 Attachment 01.pdf
PDF · 86 KB · 1 pageText searchable
Download RRU-159 Attachment 01.pdfRead the text of RRU-159 Attachment 01.pdf
Text of RRU-159 Attachment 23.xlsx
Sheet names, column headings and text cells; numbers left out · first 300,000 characters
Text of RRU-159 Attachment 23.pdf
Extracted from the file · 1,160 pages · 16,330,154 characters
Text of RRU-159 Attachment 22.xlsx
Sheet names, column headings and text cells; numbers left out · first 300,000 characters
Text of RRU-159 Attachment 22.pdf
Extracted from the file · 1,203 pages · 14,349,246 characters
Text of RRU-159 Attachment 21.xlsx
Sheet names, column headings and text cells; numbers left out · first 300,000 characters
Text of RRU-159 Attachment 21.pdf
Extracted from the file · 1,203 pages · 13,880,364 characters
Text of RRU-159 Attachment 20.xlsx
Sheet names, column headings and text cells; numbers left out
Text of RRU-159 Attachment 20.pdf
Extracted from the file · 16 pages · 151,762 characters
Text of RRU-159 Attachment 19.xlsx
Sheet names, column headings and text cells; numbers left out
Text of RRU-159 Attachment 19.pdf
Extracted from the file · 1 page · 5,328 characters
Text of RRU-159 Attachment 18.xlsx
Sheet names, column headings and text cells; numbers left out · first 300,000 characters
Text of RRU-159 Attachment 18.pdf
Extracted from the file · 640 pages · 7,983,236 characters
Text of RRU-159 Attachment 17.xlsx
Sheet names, column headings and text cells; numbers left out · first 300,000 characters
Text of RRU-159 Attachment 17.pdf
Extracted from the file · 855 pages · 14,651,941 characters
Text of RRU-159 Attachment 16.xlsx
Sheet names, column headings and text cells; numbers left out · first 300,000 characters
Page 478 of 489
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued October 23, 2026 RRU-159 Attachment 16 Page 478 of 489 work_order_number description GXC23W26 2AG - MT - Primary Voltage Tester 6 GXC23W27 2AH - DW - Transformer tester 6 @ $ long_description 2AG - MT - Primary Voltage Tester 6 @ $616 cost_element_group ferc_account percent Other-O00 107010 1 Other-O00 107010 1 Other-O00 107010 1 Other-O00 107010 1 Other-O00 107010 1 Other-O00 107010 1 Other-O00 107010 1 Other-O00 107010 1 Other-O00 107010 1 Other-O00 Other-O00 107010 107010 1 1 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 107010 107010 107010 107010 107010 107010 107010 107010 107010 107010 107010 107010 107010 107010 1 1 1 1 1 1 1 1 1 1 1 1 1 1 Other-O00 107010 1 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 107010 107010 107010 107010 107010 107010 107010 107010 107010 107010 107010 107010 107010 107010 1 1 1 1 1 1 1 1 1 1 1 1 1 1 Other-O00 107010 1 Other-O00 107010 1 Other-O00 107010 1 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 107010 107010 107010 107010 107010 107010 107010 107010 107010 107010 107010 107010 107010 107010 107010 107010 107010 107010 107010 107010 107010 107010 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 107010 107010 107010 107010 107010 1 1 1 1 1 Other-O00 107010 1 Other-O00 Other-O00 Other-O00 107010 107010 107010 1 1 1 Other-O00 107010 1 Other-O00 107010 1 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 107010 107010 107010 107010 107010 1 1 1 1 1 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 107010 107010 107010 107010 107010 107010 107010 107010 107010 107010 107010 107010 107010 1 1 1 1 1 1 1 1 1 1 1 1 1 Other-O00 Other-O00 Other-O00 Other-O00 107010 107010 107010 107010 1 1 1 1 Other-O00 Other-O00 Other-O00 Other-O00 107010 107010 107010 107010 1 1 1 1 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 107010 107010 107010 107010 107010 107010 107010 107010 107010 107010 107010 107010 107010 107010 107010 107010 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 Other-O00 Other-O00 107010 107010 1 1 Other-O00 107010 1 Other-O00 107010 1 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 107010 107010 107010 107010 107010 107010 1 1 1 1 1 1 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 107010 107010 107010 107010 107010 107010 107010 107010 107010 107010 107010 107010 107010 107010 107010 107010 107010 107010 107010 107010 108030 107010 107010 107010 107010 107010 107010 107010 107010 107010 107010 107010 107010 107010 107010 107010 107010 107010 107010 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 Other-O00 107010 1 2AH - DW - Transformer tester 6 @ $585 2AG - MT - Crimper 1 @ $6.3K GXC23W30 2AG - MT - Crimper 1 @ $6.3k GXC23W31 2AG - MT - Power Saw 1 @ $6.3k GXC23W32 2AG - MT - Vari Desks for EOC 2 @ $ GXC23W33 2AU - TB - Customer Ladder Kit 1 @ GXC23W34 2AU - TB - Pelsue Rescue Trip 1 @ $ GXC23W35 2AU - TB - Pelsue Lifeguard Rescue GXC23W36 2AU - TB - Pelsue Rescue Hoist 1 @ GXC23W37 GXC23W38 3N2 - JD - Digital Phasing kit 1 @ 2AH-DW-RATCHET KITS 3 @ 900 GXC23W39 GXC23W41 GXC23W42 GXC23W43 GXC23W44 GXC23W45 GXC23W46 GXC23W47 GXC23W48 GXC23W49 GXC23W50 GXC23W51 GXC23W56 GXC24C01 2AH - PN - Trauma Backpack 8 @ $537 3N2 - CS - Hydraulic Pole Tamp 2 @ 2AG - CS - Hydraulic Pole Tamp 1 @ 2AU - CS - Hydraulic Pole Tamp 1 @ 266 - Ground Allocation 2023 3N2 - CS - OX Kit w/ BuckRigger 2 @ 2AH - DW - Phase Identification 4 @ 2AH - DW - Bucket Accessorie Kit 15 2AG - MT - Power Tools 9 @ $2.8k 2AG - MT - Replacement Tool Kits 3W3 - RS - UG Blower (1) 2AG - MT - Office Furniture (1) 2AH - DW - Cable Feeding Wheel (2) Rotary Hammers (2) and Crimpers (4) GXC24C02 Hot Stick Tester (1) GXC24C04 GXC24C05 GXC24C06 GXC24C07 GXC24C08 GXC24C09 GXC24C10 GXC24C11 GXC24C12 GXC24C13 GXC24C14 GXC24C15 GXC24C17 GXC24C18 TP9300 Headsets (3) Apprentice Initial Issue Kits (3) Reels (4), 1,000 foot. Gesture Chairs, Red Thread (24) Burndy Die-less Crimpers (2) Hand Held Transformer Tester (24) Rope Reels (3) Switch Sticks (4) Loadbuster (1) Ground Matts (2) NP Test Set (1) Milwaukee Crimping Jaw Head (4) Crimpers (3) bare tool Potential Testers (5) GXC24C19 New Vehicle Setup (2) - Tools GXC24C20 Rescue Eq Rail/WInch/Kit (13) GXC24C21 Hydraulic Stick Saw (3) GXC24C22 GXC24C24 GXC24C26 GXC24C27 GXC24C28 GXC24C29 GXC24C30 GXC24C31 GXC24C32 GXC24C33 GXC24C34 GXC24C35 GXC24C36 GXC24C38 GXC24C39 GXC24C40 GXC24C42 GXC24C43 GXC24C44 GXC24C45 GXC24C46 GXC24C47 White Board - Remarkable (2) MH Pump Kit (2) Manlhole Lifter (3) Transformer Tester (10) Manhole Lift (3) Apprentice Inititial Issue Kit (5) Rod, Pull Rope Cap (6) Lantern, GoLight (11) Lantern, GoLight (6) CEMBRE Cutting Head 120mm (6) Grounding Mat w/Storage Bag (1) Digital Phasing Kit w/Adapter (3) Wire Strippers (24) Buckohm Harness Kits w/Lanyard Grip, Cable 5" (6) Saw, Chain, Hydr 13' (1) Voltage Detectors (5) Initial Issue Truck Tool Kit (4) UG Camera w/Accesories (2) UG Camera System w/Accesories (1) Potential Testers (6) Brigade Vehicle Camera System (5) GXC24C48 GXC24C50 GXC24C51 GXC24C52 GXC24C53 New Vehicle Initial Issue Equipment Potential Tester Kit (5) Bierer Grounds Tester GT400-2 (1) Cable Skinner, Mid-Span 477MCM (15) Cable Skinner, Mid-Span (12) GXC24C54 Initial Tool Issue Vehicles NEW (4) GXC24C55 GXC24C56 GXC24C57 Submersable Pump 2" (1) Phasing Kits (4) Milwaukee 6 Ton Crimper (2) GXC24C58 Hydraulic Tampers (3) GXC24C60 Manhole Rescue Kit (4) GXC24C61 GXC24C63 GXC24C64 GXC24C65 GXC24C66 Grounding Kits (20) Sling, Transformer (2) Printer, HP 9730e (1) Chainsaws (4) Hook Sheave (2) GXC24C67 GXC24C69 GXC24E01 GXC24E02 GXC24E05 GXC24E10 GXC24E11 GXC24E12 GXC24E14 GXC24E15 GXC24E16 GXC24E17 GXC24E18 40ft Telescopic Stick w/boot (1) Initial Issue Truck Tool Kit 2BC - Danielson Graybar 2024 3H2 - New London Hoist 2024 2AY - Climbing Gear 2024 2AX - Madison Ladder 2024 3H2 - Graybar Tool Order 2024 2AX - Madison Forklife Base 2024 3H2 - Ratchet New London 2024 3H2 - New London Tool Box 2024 2AX - Madison Cutters 2024 3H2 - New London Swivels 2024 2BC - Danielson Hastings 2024 GXC24E19 GXC24E20 GXC24E21 GXC24E22 3H2 - New London Camera 2024 2AY - East Hampton Load Buster 3H2 - New London Amp Tester 2024 2BC - Danielson Mushroom Tester 202 GXC24E23 GXC24E25 GXC24E28 GXC24E29 2AY - E. Hampton Pulling Block 2024 2AX - Madison Truck Tools 2024 2BC - Danielson Crimper 2024 2AX - Madison Dival Order 2024 GXC24E30 GXC24E32 GXC24E33 GXC24E34 GXC24E35 GXC24E36 GXC24E38 GXC24E39 GXC24E40 GXC24E42 GXC24E44 GXC24E45 GXC24E47 GXC24E48 GXC24E50 GXC24E51 3H2 - New London Tools 2024 2BC - Danielson Impact 2024 2BC - Danielson Graybar Tool 2024 2AY Climbing Gear 2024 3H2 - Climbing Gear 2024 2BC - Danielson Loadranger 2024 2BC - Danielson UPSC 2024 3H2 - New London Hook 2024 2BC - Danielson Blocks 2024 3H2 - New London Tool Order 2024 2AX - Madison Dival Tools 2024 3H3-Eastern UG Camera 3H2 - New London Loading 2024 2MS- Eastern Brigade System 2024 3H2 - New London Rope 2024 2BC - Danielson Ladder 2024 GXC24E55 GXC24E56 2AX - Madison Skinner 2024 3H2 - New London Skinner GXC24E57 3H2 - New London Driver, Ground Rod GXC24E58 3H2 - New London Guiderail 2024 GXC24E60 GXC24E63 GXC24E64 GXC24E65 GXC24E66 GXC24E68 3H2 - Harness Kit @ $1.4k Wrench, Multi-Helix Adapter (4) 2AY - BT - Phasing Sticks (3) 2BC - KH - Hydraulic Tamp (1) 2BC - KH - Climbing Gear Kit (1) 2AX - Madison Tester 2024 GXC24E69 GXC24E70 GXC24E71 GXC24E72 GXC24E73 GXC24E74 GXC24E76 GXC24E77 GXC24E78 GXC24E79 GXC24E80 GXC24E81 GXC24E82 GXC24E83 GXC24E84 GXC24E85 GXC24E86 GXC24E87 GXC24E88 GXC24E89 GXC24E91 GXC24S02 GXC24S04 GXC24S06 GXC24S07 GXC24S08 GXC24S11 GXC24S12 GXC24S13 GXC24S14 GXC24S15 GXC24S18 GXC24S21 GXC24S22 GXC24S24 GXC24S25 GXC24S26 GXC24S27 GXC24S28 Block Handline East Hampton 3H2 - New London Rain Gear 2024 3H2 - New London Meter Kit 2024 2AY - East Hampton Crimpers 2024 2BC Danielson Adapter 2024 3H2 - New London Batteries 2024 3H2 - New London Kits 2024 2AY - East Hampton Bar 2024 2AX - Madison Cable Stripper 2024 2BC Danielson Wire 2024 3H2 New London Headsets 2024 3H2 New London GX Tools 2024 2BC Batteries 2024 3H2 Retractable Stick 2024 2AY - Clamp Meters 2024 3H2 New London Graybar Tools 2024 2BC Danielson Tools 2024 2AX Madison Tools 2024 3H2 - New London Tool Kits 2024 2BC Danielson Graybar Tools 2024 3H2 Swivel Tools 2024 2EK - BW - Yale Maxibraid Line (3) 2EB - BW - Rotary Hammer Kit (2) 2EB - BW - M18 5.0AH Battery (2) 2EA - BW - Ground Testing Kit (1) 2EA - AP - Golight LED Lantern (1) 2EA - BW - Indicator, Phase Sequenc 2EB - BW - Detector, Voltage, Non-C 2EK - BW - Hoist, Chain, Lever Oper 2EK - BW - Rule, Telescopic, 5-50 F 2EK - BW - Bar, Expanding and Tampi 2EA - BW - Milawuakee Jaw Cutters ( 2EK - BW - 9 Strap Hoists 2EK - BW - Running Boards (4) 2EK - BW - Tripsaver Reset Tools 2EK - BW - Impact Wrenches (6) 2EA - BW - Ladders (9) 2EK - BW - Ladders (5) 2EB - BW - Power Saw (2) GXC24S33 2EB - MM - Phasing Sticks (3) 2AG - MT - Power Saw 1 @ $6.3K 2AG - MT - Vari Desks for EOC 2 @ $850 2AU - TB - Customer Ladder Kit 1 @ 594 2AU - TB - Pelsue Rescue Trip 1 @ $2.5k 2AU - TB - Pelsue Lifeguard Rescue System 1 @ $3.6k 2AU - TB - Pelsue Rescue Hoist 1 @ $1.9k 3N2 - JD - Digital Phasing kit 1 @ $1.8k 2AH-DW-RATCHET KITS 3 @ 900 2AH - PN - Trauma Backpack 8 @ $537 3N2 - CS - Hydraulic Pole Tamp 2 @ $3k each 2AG - CS - Hydraulic Pole Tamp 1 @ $3k 2AU - CS - Hydraulic Pole Tamp 1 @ $3k 266 - Ground Allocation 2023 3N2 - CS - OX Kit w/ BuckRigger 2 @$4.8k 2AH - DW - Phase Identification 4 @ $2.2k 2AH - DW - Bucket Accessorie Kit 15 @ $532 2AG - MT - Power Tools 9 @ $2.8k 2AG - MT - Replacement Tool Kits 24 @ $588ea 3W3 - RS - UG Blower 1 @ $1,021.88 2AG - MT - Office Furniture 1 @$3,549.96 2AH - DW - Greetext Cable Feeding Wheel (2) @ $1,189.25ea TOTAL: $2,378.50 M18 Max Rotary Hammer Kit (2) @ $1,,5.82ea / M18 6T Linear Utility Crimper (4) @ $1,524.91ea; TOTAL: $8,111.28 Hot Stick Tester (1) s/c 579925, TOTAL: $2,800 TP9300 Headsets (3) @ $509.60ea TOTAL: $1,600 Apprentice Initial Issue Kits (3) @ $4,667.45 ea, TOTAL: $14,002.35 Reels (4), s/c 591162 @ $524.22ea TOTAL: $2,097 - Zelenski Chairs (24), Red Thread Gesture Chairs, s/c 850988 @ $1,199.32ea+, TOTAL: $30,439.68 - MENARD Burndy Die-less Battery Crimpers (2) @ $3918ea, Total $7836 - Ellenberg Hand Held Transformer Tester (24), S/C 579295 @ $697ea, Total: $16,496 - Leonard Rope Reels (3), s/c 570738 @ $696ea, Total: $2,088 - Zelenski Switch Sticks (4), s/c 571566 @ $515ea, TOTAL: $2060 - Zelenski Loadbuster (1), s/c 501241 @ $3,100ea, TOTAL: $3,100 - Iacolo Ground Matts (2) s/c 508328 @ 561.25 ea, TOTAL: $1,122.50 - Zelenski NP Test Set (1), 616004-10 @ $13,000 / 616001-10 @ $24,000 / 131-1115-31 @ $950, TOTAL: $37,950 - Pandolfo Milwaukee Crimping Jaw Heads (4) #45FD48 @ $906.57ea, Total: $3,628.00 - Zelenski Milwaukee Crimpers (3) part # 2678-20 bare tool @ $1,600ea, TOTAL: $4,800 - Iacolo Potential Testers (5), s/c 519464 @ $800ea, TOTAL: $4,000 - Iacolo New Vehicle Setup (2) - Tools @ $5,240.43ea, TOTAL: $10,485 - Tait 42" Buckingham Guardrail w/rescue winch, rescue kit (13) s/c 580675,500739 @ $1,919.86ea, TOTAL: $24,958.18 - Flynn 2NP - Hydraulic Stick Saw (3) s/c 501346 @ $1,570ea, TOTAL: $4,710 - Iacolo 2NP - Remarkable White Board (2) @ $1,904.72 (1) / 634.91 (1), TOTAL: $2,540 MH Pump Kit (2) s/c 570635 @ $827.05ea / TOTAL: $1,654.10 - Ellenberg 335 - Manhole Lifter (3) s/c 050112 @ $1,499ea / Total: $4,497 - Leonard 335 - Transformer Tester (10) s/c 579295 @ $541.67ea, TOTAL: $5,416.72 - Leonard 335 - Manhole Lift (3) s/c 570396 @ $657.60ea, TOTAL: $1,972.80 - Leonard Apprentice Initial Issue Kit (5) I/N 150-TSA0124 @ $4,667.45ea, TOTAL: $23,337.25 - Tait 2AD - Rod, Pull Rope Cap, 3000'/6"w (6) s/c 570754 @ $682ea, TOTAL: $4,092 - Zelenski 2NP - Lantern, GoLight Item 570360 (11) @$537.29ea. TOTAL: $5911 335 - Lantern, GoLight Item 570359 (6) @$537.29ea. CEMBRE Cutting Head, 120mm (6) @ $4,085ea, TOTAL: $16,340 - Ellenberg 2NP - Grounding Mat w/Storage Bag (1) s/c 508329 @ $1,200ea TOTAL: $1,200 - Iacolo 2NP - Digital Phasing Kit (3) w/Hipot Adaptor s/c 524484 @ $2,267ea TOTAL: $6,800 - Iacolo 2AD - Wire Strippers (24) @ $831ea TOTAL: $19,944 - Zelenski Buckohm Harness/Buck OX Block w/sling/ Secondary Lanyard, $6,900 - Tait 2AD - Grip, Cable, 5” (6) s/c 569710 @ $638.68ea TOTAL WO: $3,835 Saw, Chain, Hydr 13’ (1) s/c 501346 @ $2,193.93ea Voltage Detectors (5) s/c 519464 @ $4,404ea, TOTAL: $22,020. - Tait 2BB - Initial Issue Truck Tool Kit (4) @ $4,702.73ea, TOTAL: $18,811 - Tait 16' Motorized camera system w/10" Tablet, Dual Mode Thermal Camera (2) @ $30,393ea, TOTAL: $60,786 - Pandolfo 16' Motorized camera system w/10" Tablet, Dual Mode Thermal Camera (1) @ $30,393ea, TOTAL: $30,393 - UG Cheshire Tester, Detector, Potential, Salisbury 249V to 230kV (6) s/c 503918 @ $577.10ea, TOTAL: $3,463 Brigade Vehicle Camera Safety System (5) @$4,172.47ea, TOTAL: $20,862.35 2BB - New Vehicle Initial Issue Equipment; TOTAL: $38,843.10 2NP - Tester, Detector, Potential, Self-Testing complete kit (5) - s/c519464 TOTAL: $4,500 Bierer Grounds Tester GT400-2 (1); s/c603920 @ $4,300ea Skinner, Cable, Mid-Span, 477 KCM Compact, 150 Mil (15) s/c 581295 @ $530ea, TOTAL: $7,950 - Iacolo Skinner, Cable, Mid-Span, 477 KCM Compact, 150 Mil (12) s/c 581295 @ $530ea, TOTAL: $6,360 - Zelenski 2AD - New Vehicle Setup (4) - Tools @ $9,976ea, TOTAL: $39,904 Zelenski 335 - Submersable Pump 2" (1) @ $563.20 TOTAL: $563.20 - Leonard 2AD - Phasing Kits (4) s/c 524484 @ $2,201ea TOTAL: $8,804 - Zelenski 2NP - Milwaukee 6 Ton Crimper (2) @ $3,100ea TOTAL $6,200 - Iacolo 2AD - Hydraulic Tampers (3) s/c 571695 @ $4,137.04ea Total: $12,411.12 - Zelenski 335 - Manhole Rescue Kit (4) s/c 500740 @ $823.32ea Total: $3,293.26 2BB - Grounding Kits (20) s/c 622225 @ $3,211.51ea Total: $64,230.40 - Foster 2AD - Sling, Transformer, Lifting, 5-7' 9600lb (2) s/c 571152 @ $1,125ea Total: $2,250 - Barilla 2BB - Printer, HP 9730e (1) @ $594ea, TOTAL: $594 - Foster 2AD - Chainsaw, Powerhead, 4.0 HP, 16-20" s/c 590211, 4 @ $556.55ea, TOTAL: $2,266.22 - Zelenski 335 - Hook Sheave 24” 4k Capacity (2) @ $1,131.20ea TOTAL: $2,262.40 - Leonard 2NP - 40ft Telescopic Stick w/boot (1) @ $1,038ea - Stevens Initial issue Tool Kit, Crimper (4) @ $1,524.91ea / Crimping Jaw (6) @ $466.37ea / Replacement Blades (6) @ $211.53ea / TOTAL $10,047.04 2BC - Danielson Graybar 2024 3H2 - New London Hoist 2024 2AY - Climbing Gear 2024 2AX - Madison Ladder 2024 3H2 - Graybar Tool Order 2024 2AX - Madison Forklife Base 2024 3H2 - New London Tool Box 2024 2AX - Madison Cutters 2024 3H2 - New London Swivels 2024 2BC - Danielson Hastings 2024 3H2 - New London Camera 2024 2AY - East Hampton Load Buster 3H2 - New London Amp Tester 2024 2BC - Danielson Mushroom Tester 2024 2AY - East Hampton Pulling Blocks 2024 2AX - Madison Truck Tools 2024 2BC - Danielson Crimper 2024 2AX - Madison Dival Order 2024 GX Order 2BC - Danielson Impact 2024 2BC - Danielson Graybar Tool 2024 2AY Climbing Gear 2024 3H2 - Climbing Gear 2024 2BC - Danielson Loadranger 2024 2BC - Danielson UPSC 2024 3H2 - New London Hook 2024 2BC - Danielson Blocks 2024 3H2 - New London Tool Order 2024 2AX - Madison Dival Tools 2024 3H3- Eastern UG Camera 3H2 - New London Loading 2024 2MS- Eastern Brigade System 2024 3H2 - New London Rope 2024 2BC - Danielson Ladder 2024 2AX - Madison Skinner 2024 10 @ $529 each New London Skinner 2024 - 15 @ $529 each 3H2 - New London Driver, Ground Rod 2024 4 @ $1.7K EACH 3H2 - New London Guiderail 2024 8 @ $1.7k 3H2 - Harness Kit 6 @ $1.4k Wrench, Anchor, Multi-Helix Adapter (4) s/c 504736 @ $774ea, TOTAL: $3,096 - Vargas 2AY - BT - Phasing Sticks (3) @ $2,342.95ea. TOTAL: $7,028.85 2BC - KH - Hydraulic Tamp (1) @ $2,133.43 2BC - KH - Climbing Gear Kit (1) @3,953.07 2AX - Madison Tester 2024 Block Handline East Hampton 3H2 - New London Rain Gear 2024 3H2 - New London Meter Kit 2024 2AY - East Hampton Crimpers 2024 2BC Danielson Adapter 2024 3H2 - New London Batteries 2024 3H2 - New London Kits 2024 2AY - East Hampton Bar 2024 2AX - Madison Cable Stripper 2024 2BC Danielson Wire 2024 3H2 New London Headsets 2024 3H2 New London GX Tools 2024 2BC Batteries 2024 3H2 Retractable Stick 2024 2AY - Clamp Meters 2024 3H2 New London Graybar Tools 2024 2BC Danielson Tools 2024 2AX Madison Tools 2024 3H2 - New London Tool Kits 2024 2BC Danielson Graybar Tools 2024 3H2 Swivel Tools 2024 2EK - BW - Yale Maxibraid Line (3) @ $1,639.87ea TOTAL: $4,919.61 2EB - BW - Rotary Hammer Kit (2) @ $1,005.82ea TOTAL: $2,011.64 2EB - BW - M18 5.0AH Battery 10-Pack (2) @ $1,045.56ea TOTAL: $2,099.12 2EA - BW - Ground Testing Kit (1) @ $4,619.54 2EA - AP - Golight LED Lantern (1) @ $503.94 2EA - BW - Indicator, Phase Sequence, Rotary Type, 0-600 V, 60 HZ (2) @ $684.76ea TOTAL: $1,369.52 2EB - BW - Detector, Voltage, Non-Contact, 240 V-230 KV Range (4) @ $596.35ea TOTAL: $2,385.39 2EK - BW - Hoist, Chain, Lever Operated, 5ft Lift, 3 Ton Capacity (2) @ $588.68ea TOTAL: $1,177.36 2EK - BW - Rule, Telescopic, 5-50 FT, Fiberglass (5) @ $785.69 TOTAL: $3,928.44 2EK - BW - Bar, Expanding and Tamping, 10FT LG, Handle Fiberglass (4) @ $720.56 TOTAL: $2,882.22 2EA - BW - Indicator, Phase Sequence, Rotary Type, 0-600 V, 60 HZ (2) @ $684.76ea TOTAL: $1,369.52 2EK - BW - 9 Strap Hoists @ $587.39ea TOTAL: $5,286.48 2EK - BW - Spacer Cable Running Boards (4) @ $3,684.62 TOTAL: 14,738.48 2EK - BW - Tripsaver Reset Tools (12) @ $506.14ea TOTAL: $6,073.71 2EK - BW - Impact Wrenches (6) @ $1,175ea TOTAL: $7,050.00 2EA - BW - Ladders (9) @ $646ea TOTAL: $5,814 2EK - BW - Ladders (5) @ $646ea TOTAL: $3,230 2EB - BW - Power Saw (2) @ $2,267.10ea TOTAL: 4,534.20 2EB - MM - Phasing Sticks (3) @ $2,342.95 ea. TOTAL: $7,028.85Page 479 of 489
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued October 23, 2026 RRU-159 Attachment 16 Page 479 of 489 work_order_number description GXC24S34 GXC24S35 GXC24S36 GXC24S37 GXC24S38 GXC24S39 2EB - BW - Voltage Detectors (2) 2EA - BW - Tree Wire Skinners (13) 2EB - BW - Tree Wire Skinners (13) 2EK - BW - Tree Wire Skinners (14) 2EK - BW - Milwaukee Crimpers (5) 2EK - DS - CEMBRE HYD Cutting Tool long_description 2EB - BW - Voltage Detectors (2) @ $ 577.10 ea. TOTAL: $1,154.20 2EA - BW - Tree Wire Skinners (13) @ $529.58 ea. TOTAL: $6,884.54 2EB - BW - Tree Wire Skinners (13) @ $529.58 ea. TOTAL: $6,884.54 2EK - BW - Tree Wire Skinners (14) @ $529.58 ea. TOTAL: $7,414.12 2EK - BW - Milwaukee Crimpers (5) @ $2,903.33 ea. TOTAL: $14,516.65 2EK - DS - CEMBRE HYD Cutting Tool (1) @ $1095 ea + Universal Power Units (3) @ 604.16 ea TOTAL: $2,907.48 cost_element_group ferc_account percent Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 107010 107010 107010 107010 107010 107010 1 1 1 1 1 1 Other-O00 Other-O00 Other-O00 Other-O00 107010 107010 107010 107010 1 1 1 1 Other-O00 107010 1 Other-O00 107010 1 Other-O00 107010 1 Other-O00 107010 1 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 107010 107010 107010 107010 107010 107010 107010 107010 107010 107010 107010 107010 107010 107010 107010 107010 107010 107010 107010 107010 107010 107010 107010 107010 107010 107010 107010 107010 107010 107010 107010 107010 107010 107010 107010 107010 107010 107010 107010 107010 108030 107010 107010 107010 107010 107010 107010 107010 107010 107010 107010 107010 107010 107010 107010 107010 107010 107010 107010 107010 107010 107010 107010 107010 107010 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 0.95238095 0.04761905 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 Other-O00 107010 1 Other-O00 107010 1 Other-O00 107010 1 Other-O00 Other-O00 Other-O00 107010 107010 107010 1 1 1 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 107010 107010 107010 107010 107010 107010 107010 107010 107010 107010 107010 107010 107010 107010 107010 107010 107010 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 Other-O00 Other-O00 Other-O00 107010 107010 107010 1 1 1 Other-O00 Other-O00 107010 107010 1 1 Other-O00 107010 1 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 107010 107010 107010 107010 107010 1 1 1 1 1 Other-O00 107010 1 Other-O00 107010 1 Other-O00 Other-O00 Other-O00 107010 107010 107010 1 1 1 Other-O00 107010 1 Other-O00 107010 1 Other-O00 107010 1 Other-O00 107010 1 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 107010 107010 107010 107010 107010 1 1 1 1 1 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 107010 107010 107010 107010 107010 107010 107010 107010 107010 107010 107010 107010 107010 107010 107010 107010 107010 107010 107010 107010 107010 107010 107010 107010 107010 107010 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 107010 107010 107010 107010 107010 107010 107010 107010 1 1 1 1 1 1 1 1 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 107010 107010 107010 107010 107010 107010 107010 107010 107010 107010 1 1 1 1 1 1 1 1 1 1 2EA - BW - 400 Park Road, Waterbury Electrical Work TOTAL: $18,153 this is site electrical work at our new show up site in Watertown. We had to get a new electric service drop and a bunch of wiring done / installation of outlets for hybrid bucket truck charging / engine block heater outlets (winter) as well as a meter socket/disconnect for our show up site job trailer. This infrastructure was just installed at a site we leased at 400 Park Road in Watertown. We have a 3 year lease with options to renew for an additional 3 years. GXC24S40 GXC24S41 GXC24S42 GXC24S44 2EA - BW - 400 Park Road, Waterbury 2EK - DS - Hydron Climbing Gear Kit 2EB - MM - Hydron Climbing Gear Kit 2EK - BW - Truck Ladders (9) GXC24S49 2EA - FS - Multi Capital Tool Order GXC24S50 2EA - BW - Graybar Safety Truck Kit GXC24S51 2EB - BW - Graybar Safety Truck Kit GXC24S52 2EK - BW - Graybar Safety Truck Kit 2EK - DS - Hydron Climbing Gear Kits (3) @ 4,553.86 TOTAL: $13,662.58 2EB - MM - Hydron Climbing Gear Kits (6) @ 4,553.86 TOTAL: $27,323.16 2EK - BW - Truck Ladders (9) @646 ea TOTAL: $5,814 2EA - FS - Multi Capital Tool Order TOTAL: $16,760.96 See attached email/invoice for itemized breakout 2EA - BW - Graybar Safety Truck Kit (2) @ $55,515.45 ea TOTAL: $111,030.90 2EB - BW - Graybar Safety Truck Kit (3) @ $55,515.45 ea TOTAL: $166,546.35 2EK - BW - Graybar Safety Truck Kit (4) @ $55,515.45 ea TOTAL: $222,061.80 2EB - BW - Buckingham Self Rescue Devices (4) @ $795.64 ea TOTAL: $3,182.56 GXC24S54 GXC24W01 GXC24W02 GXC24W03 GXC24W04 GXC24W05 GXC24W06 GXC24W08 GXC24W09 GXC24W10 GXC24W11 GXC24W17 GXC24W18 GXC24W19 GXC24W22 GXC24W25 GXC24W27 GXC24W28 GXC24W29 GXC24W30 GXC24W31 GXC24W32 GXC24W33 GXC24W34 GXC24W35 GXC24W36 GXC24W37 GXC24W38 GXC24W39 GXC24W41 GXC24W45 GXC24W48 GXC24W55 GXC24W56 GXC24W57 GXC24W58 GXC24W60 GXC24W61 GXC24W62 GXC24W63 GXC24W63 GXC24W65 GXC24W66 GXC24W67 GXC24W68 GXC24W69 GXC24W70 GXC24W71 GXC24W72 GXC24W73 GXC24W74 GXC24W75 GXC24W76 GXC24W79 GXC24W81 GXC24W82 GXC24W83 GXC24W84 GXC24W85 GXC24W86 GXC24W87 GXC24W88 GXC24W93 GXC24W94 GXC24W95 2EB - BW - Buckingham Self Rescue 2AU - TB - Hasting Ground Tester(1) 2AU - TB - Partial OH Truck Kit (1) 3W2 - RS - Chain Saw (1) 3N2 - CS - Shelving (1) 3N2 - JD - Extension Ladder (4) 2AH - DW - 150kcmil Skinners (6) 3N2 - CS - Block, Stringing (1) 2AH - DW - Steel Wheels for Pulling 2AU - PG - BT Self Rescue (6) 2AU - TB - Hydraulic Drills (2) 3N2 - Crimp Insulinks (6) 3N2 - Chain Saw (1) 2AU - Cable Cutter (1) 3W2 - RS - Pulley Wheel Kit (1) 2AG - MT - Hydraulic Drills (6) 2MG - Cable Grip (1) 2MG - 336 Conductor Tool (2) 2MG- Synthetic Rope (2) 3W2 - Ratchet/Driver Kit (2) 2MG - Dual Latch Hoist (2) 2A2 - Manhole Cover Lifter (3) 2AU - Hydraulic Impact Wrench (1) 3W2 - Pulley Sheave for Conduit (2) 2MG - Hot Line Clamp (2) 2AG - Voltage Detector (2) 3W2 - Voltage Detector (1) 2A2 - Voltage Detector (3) 3N2 - Voltage Detector (4) 2AH - Compression Tool (2) 2AU - Hot-Line Wire Stripper (5) 337 - Kevlar Safety Blanket (9) 2AG - MT - Hydraulic cutters (8) 3W3 - SP - Vault Inspection Camera 337 - SP - Vault Inspection Camera 2A2 - SP - Vault Inspection Camera 2AU - TB - Rescue tripod (1) 2AU - TB - Bucket Truck Tool Kit(2) 2AU - TB - New Digger Tool kit (1) 2AH - DW - Gate (1) 2AH - DW - Gate (1) Brigade Vehicle Camera System (10) 3W2 - RS - Safety Harness (1) 3N2 - CS - OH Line and Safety tools 3W2 - RS - Climbing Gear (1) 3N2 - CS - Reel, Rope Pole Mount(2) 3W2 - RS - Cable reel stands (2) 3N2 - JD - Tensioning Brake Kit (1) 3W2 - RS - PI Lit Flares lights (2) 2AH - DW - Tamper (1) 3W3-RS-Confined Space Harness (1) 2AU-TB-Condux wire pulling kit (1) 2AU - TB - phase identifier (1) 2AU - Phase Sequence Indicator (13) 2AU - Manual Cutter (6) 3N2 - 556 Connector Tool (2) 2AU - Cable Grip (3) 3N2 - Lever Operated Hoist (2) 3N2 - 336 Conductor Tool (2) 2AH - Voltage Detector (4) 3N2 - Loadbuster Tool (1) 3N2 - 7 Ft Kelly Bar (2) 2MG - Wire Stripper (2) 3N2 - Cable Grip (1) 2MG - Lever Operated Hoist (2) GXC25C01 Jumper, Electrical, Clamp, 14' (12) GXC25C02 Skinner, Wire, Mid-Span (21) GXC25C03 32" Monitors (10) GXC25C04 GXC25C05 GXC25C06 Chainsaw (1) Jumpers (12) Milwaukee 6T Crimper Cutter (3) GXC25C07 GXC25C08 GXC25C09 GXC25C10 GXC25C12 GXC25C13 GXC25C14 GXC25C15 GXC25C16 GXC25C17 GXC25C18 GXC25C19 GXC25C20 GXC25C22 GXC25C23 GXC25C24 GXC25C25 Mat, Grounding, Protection, 4x8 (1) Snatch Block w/hook (6) Arc Suppression Blankets (12) Rope, Synthetic, Mule Tape (4) Gear Lockers (6) Airmaster Fans (2) Milwaukee Cordless Cbl Cutter (5) Milwaukee Crimping Jaw (8) Underground MLW Kit (1) Klein Tool Kit (2) Safety Flares (30) Apprent Initial Issue Tool Kit (8) Stick Saw 13' (4) Tamper (2) Loadbuster Tool (8) Manhole Ladder System (4) Impact Kits (10) GXC25C26 GXC25C27 GXC25C28 Salisbury Voltage Detector (6) Milwaukee Crimper/Cutters (4) Hartford AV System Upgrade GXC25C29 GXC25C2X Hydraulic Tamp (2) Central Pole Climbing Gear 2025 GXC25C30 27kv Loadranger Flex1 wCounter/Case GXC25C31 GXC25C32 GXC25C33 GXC25C34 GXC25C35 Pole Tamper (2) Loadbusters (3) Climbing Kits (4) Initial Issue 477 Skinners (20) 65 cal Suit Enespro Kit (25) GXC25C36 Hubbell Wireholder (1) GXC25C37 Anchor, Screw Drive End Assy (2) GXC25C38 GXC25C39 GXC25C3X Chain Saw 14" (1) MH Pump Kit (2) 2NR Tester Kit 2025 GXC25C40 Harness,FR,X-Style (3) GXC25C42 Hydraulic Drills/Complete (6) GXC25C43 Telescopic Stick w/Boot 40' (1) GXC25C44 Storage Locker (4) GXC25C45 GXC25C46 GXC25C47 GXC25C48 GXC25C49 Drill Winch Kit (2) Initial Issue Truck Tool Kit (4) Cable Guides 10k/LB (6) New Truck Tools Setup (1) Cable Tension Grip (6) GXC25C50 GXC25C51 GXC25C52 GXC25C53 GXC25C54 GXC25C55 GXC25C56 GXC25C57 GXC25C59 GXC25C60 GXC25C62 GXC25C63 GXC25C65 GXC25C66 GXC25C67 GXC25C68 GXC25C69 GXC25C70 GXC25C72 GXC25C75 GXC25C76 GXC25C77 GXC25C79 GXC25C80 GXC25C81 GXC25C82 Cordless Impact Wrench (2) Meter Clamp (6) Cooper Nova Cable Control M18 6T Crimper (8) Arc Suppression Blanket (12) 65 Cal Suits (6) Ladder, 24' Extension (2) Stick,Gripall,Clamp,Hot Line (1) Meter Kit, Phase (10) Milwaukee Crimping Kit (1) Cable Fault Locater Testers (2) Ferrometal Locator (1) MH Pullers (4) Milwaukee Dieless Press (2) Voltage Detector (1) Voltage Detector (12) Adj Inline Belt w/Accessories (2) Compression Tool, One Hand Op (1) Milwaukee Impact Drivers (4) First Aid Kits/Trauma Kits (20) High Pressure Cable Cutter Kit (2) Wire Cutters (3) 24' Extension Ladder (2) 8" Submersible Pump (2) Cable Cutter, 28" (2) Cable Cutter, 28" (2) GXC25C83 GXC25C84 GXC25C85 GXC25C86 GXC25C87 GXC25C88 GXC25C89 GXC25C94 Adapter, Reel (3) GPS Receiver, 6"/Truck (12) Stick, Retractable Hook (2) Stick, Retractable Hook (1) Sling, Transformer, 9.6k (4) Chain Saw, 14" (1) Milwaukee Dieless Press (2) Reel/Rod/Tape (12) GXC25C99 GXC25E01 GXC25E02 GXC25E03 GXC25E05 GXC25E06 GXC25E07 GXC25E09 GXC25E10 GXC25E11 2NR - SE - Line Gear Kit 2 @ $9k ea New London Shield GX 2025 3H2 - Truck Tool Kits 2025 2AY - Chain Hoist 2025 3H2 - Jaw Cutting Tool 2025 3H2 - New London Mats 2025 2BC - Jack Jumper Danielson 2025 2BC - Truck Tool Safety 2025 2AY - Safety Climing Gear 2025 3H2 - Sling Tool 2025 2AU - TB - Hastings Ground Tester (1) @ $4,350ea 2AU - TB - partial truck kit for new o/h line truck (1) @ $8,675ea 3W2 - RS - Chain Saw 570890 (1) @ $670ea 3N2 - CS - Shelving for new tool storage room (1) @ $7,035.03 3N2 - JD - Little Giant 24' Hyperlite Type 1AA Fiberglass Extension Ladder (4) @ $646ea TOTAL: $2,584 2AH - DW - 336, 150kcmil skinners, Stock code is 571654 (6) @ $518ea TOTAL: $3,108 3N2 - CS - Block, Stringing, Universal, 2500 lb work load limit. Stock Code 568629 (1) @ $3,500ea 2AH - DW - UG Wire Steel Wheels for Pulling (13) @ $630.85ea TOTAL: $7,885.63 2AU - PG - 30/SR W/ARC RATED BAG BUCKET TRUCK SELF RESCUE (6) @ $516.19ea TOTAL: $3,097.13 2AU - TB - Hydraulic Drills for Bucket Truck (2) @ $1,020ea TOTAL: $2,040 3N2 - Crimp Insulinks (6) @ $685.41ea TOTAL: $4,112.46 3N2 - Chain Saw (1) @ $671.96 2AU - Cable Cutter (1) @ $579.67 3W2 - RS - Pulley Wheel Kit (1) @ $3,129.92 2AG - MT - Hydraulic Drills (6) @ $990ea TOTAL: $5,940 2MG - MJE # 529243 - Cable Grip (1) @ $1,370.26 2MG - MJE # 529243 - 336 Conductor Tool (2) @ $1,178.30ea TOTAL: $2,356.60 2MG - MJE # 529243 - 5/16IN DIA, 3k ft. Synthetic Rope (2) @ $1,150.61ea TOTAL: $2,301.22 3W2 - MJE # 529243 - Ratchet/Driver Kit (2) @ $972.96ea TOTAL: $1,945.92 2MG - MJE # 529243 - Dual Latch Hoist (2) @ $912.66ea TOTAL: $1,825.32 2A2 - MJE # 529243 - Manhole Cover Lifter (3) @ $900.19ea TOTAL: $2,700.58 2AU - MJE # 529243 - Hydraulic Impact Wrench (1) @ $880.05 3W2 - MJE # 529243 - Pulley Sheave for 3 in. Conduit (2) @ $665.78ea TOTAL: $1,331.55 2MG - MJE # 529243 - Hot Line Clamp (2) @ $617.22ea TOTAL: $1,234.44 2AG - MJE # 529243 - Voltage Detector (2) @ $612.90ea TOTAL: $1,225.80 3W2 - MJE # 529243 - Voltage Detector (1) @ $585.11 2A2 - MJE # 529243 - Voltage Detector (3) @ $580.67ea TOTAL: $1,742.01 3N2 - MJE # 529243 - Voltage Detector (4) @ $577.10ea TOTAL: $2,308.40 2AH - MJE # 529243 - Compression Tool (2) @ $541.75ea TOTAL: $1,083.50 2AU - MJE # 529243 - Hot-Line Wire Stripper (5) @ $518.60ea TOTAL: $2,593 337 - MJE # 529243 - Kevlar Safety Blanket (9) @ $3,499.96ea TOTAL: $31,499.62 2AG - MT - Hydraulic remote cutters for primary cable (4) @ $2,000ea TOTAL: $8,000 3W3 - SP - Vault Inspection Pole Camera System (1) @ $31,000 337 - SP - Vault Inspection Pole Camera System (1) @ $31,000 2A2 - SP - Vault Inspection Pole Camera System (1) @ $31,000 2AU - TB - Rescue tripod for UNDEGROUND (1) @ $2,535 2AU - TB - truck kit for the new OH bucket (2) @ $47,715ea TOTAL: $95,430 2AU - TB - New Digger Tool kit (1) @ $29,477 2AH - DW - Broken Gate for 9 Tindall Ave, Norwalk (1) @ $24,495 2AH - DW - Broken Gate for 9 Tindall Ave, Norwalk (1) @ $24,495 Brigade Vehicle Camera Safety System (10) @$4,172.47ea, TOTAL: $41,724.70 3W2 - RS - Safety Harness (1) @ $5,336.56 3N2 - CS - OH Line and Safety tools for new hire qualified linemen (4) @ $2,381.89ea TOTAL: $9,527.56 3W2 - RS - Climbing Gear (1) @ $14,854.16 3N2 - CS - Reel, Rope Pole Mounted for pulling line installation, 3000 capacity (2) @ $2,417.69ea TOTAL: $4,835.38 3W2 - RS - Cable reel stands (2) @ $1,403ea TOTAL: $2,806 3N2 - JD - Tensioning Brake Kit w/ Reel Bar for reel trailer (1) @ $4,782 3W2 - RS - PI Lit Flares lights (2) @ $725ea TOTAL: $1,450 2AH - DW - Tamper, Stock Code 571695 (1) @ $2,169.30 3W3 - RS - Confined Space Harness (1) @ $3,356.40 2AU - TB - Condux wire pulling kit (1) @ $7,356.50 2AU - TB - phase identifier (1) @ $2,099.40 2AU - Phase Sequence Indicator (13) @ $760.85ea TOTAL: $9,891 2AU - Manual Cutter (6) @ $717ea TOTAL: $4,302 3N2 - 556 Connector Tool (2) @ $1,880.50ea TOTAL: $3,761 2AU - Cable Grip (3) @ $1,162ea TOTAL: $3,486 3N2 - Lever Operated Hoist (2) @ $1,291.50ea TOTAL: $2,583 3N2 - 336 Conductor Tool (2) @ $1,213.50ea TOTAL: $2,427 2AH - Voltage Detector (4) @ $591ea TOTAL: $2,364 3N2 - Loadbuster Tool (1) @ $2,363 3N2 - 7 Ft Kelly Bar (2) @ $1,080ea TOTAL: $2,160 2MG - Wire Stripper (2) @ $732.50ea TOTAL: $1,465 3N2 - Cable Grip (1) @ $1,370 2MG - Lever Operated Hoist (2) @ $546.50ea TOTAL: $1,093 2AD - Jumper, Electrical, Clamp, 14ft (12) s/c 522855 @ $592.76ea TOTAL: $7,106.76 - Zelenski 2BB - Skinner, Wire, Mid-Span (21) s/c 622294 (14) @ 931.50ea / s/c 622295 (7) @ 931.50ea, TOTAL: $19,561.50 2BB - 32" Monitors (10) Dell UltraSharp U3223QE / IT - SCTASK0741652 @ 596.83ea, TOTAL: $5,968.30 2AD - Chainsaw (1) s/c 570890 @ $710.29 2BB - Hastings Jumpers (12); 25KV 2/0-12 @ 607.14ea, 15' (3) @ 671.82, 20' (3) @ 768.74, 25' (3) @ 865.65, TOTAL: $8,740.05 2NP - Milwaukee 6 Ton Crimper Cutter (3) $1,533ea, TOTAL: $4,600 - Iacolo 2BB - Mat, Grounding, Protection, 4x8 (1) / s/c 505092 @ 2,992.25ea, TOTAL: $2,992.25 - Foster 335 - Snatch Block w/hook (6), s/c 108275 8" (3) @ 1505.20ea, s/c 108371 10" (3) @ 1650.20ea, TOTAL: $9,466.20 - Leonard 335 - Arc Suppression Blankets (12) @ $1,750ea, TOTAL: $21,000 - Leonard 2AD - Rope, Synthetic, Mule Tape (4), s/c 508809 @ $635.16ea, TOTAL: $2.540.64 2NP - Gear Locker w/door, 24x24 (6) @ 710.42, TOTAL: $4,262.52 Airmaster Fans (2), Item 15E708 @ 573.72ea., TOTAL: $1,147.44 - Loveless Milwaukee Cordless Cable Cutter (5), Item 45FD45 @ 2,192.31, TOTAL: $10,961.55 Milwaukee Crimping Jaw (8), item 45FD48 @791.84ea, TOTAL: $6,334.72 - Loveless Underground MLW Kit w/Cable CUtter and Tower Light @ $7,114.51ea, TOTAL: $7,114.51 2NP - Klein Tool Kit (2) #BAT20LW1 @ $750ea, TOTAL: $1,500 - Iacolo 2NR - Safety Flare (30), PI-LIT sequential paired flare orange sides, red top, 10/set @ $725ea, TOTAL: $21,750 - Flynn Initial issue Tool Kit (8) @ $5,192, TOTAL: $41,536 2AD - Stick Saw 13' (4) s/c 501346 @ $2193.93ea, TOTAL: $8,775.72 '2BB - Tamper (2), 72" (1) @ 2,689.00 / 71" (1) @ 2,375.00, TOTAL: $5,064.00 2AD - Loadbuster Tool (8) s/c 572019 @ 2,282.42, TOTAL: $18,259.36 335 - Manhole Ladder System (4), s/c 604852 @ 594.25ea, TOTAL: $2,376.00 2AD - Impact Kits (10), AMPSEZ-ES-KIT @ $3,190ea, TOTAL: $46,880.00 335 - Salisbury Voltage Detector (6), s/c 519464 @ $898.05ea, TOTAL: $5,388.32 Milwaukee Crimper/Cutters @ $2,061, TOTAL: $8,244 - Ellenberg AVI SPL AV System Upgrade Hartford 214 A/B Hydraulic Tamp (2) s/c 571695 @ $1,750ea, TOTAL: $3,500 Central Pole Climbing Gear 2025 2AD - 27 KV LoadRanger Flex1 w/Counter/Case @ $1,890ea, TOTAL: $1,890 2BB - Pole Tamper 72" (2) @ $3,775.92ea, TOTAL: $7,551.84 2NP - Loadbusters (3) s/c 572019 @ $2,466.67, TOTAL: $7,400 2AD - Climbing Kits (4) Initial Issue @ $7,688.82ea, TOTAL: $30,755.28 2BB - 477 Skinners (20) s/c 581295 @ $529.58ea, TOTAL: $10,591.60 2NR - 65 cal Suit Enespro Kit (25) @ various, TOTAL: $70,743.69 2NP - Hubbell Wireholder (1) @ $1,514.68, TOTAL: $1,600 2NP - Anchor, screw Drive end Assmbly s/c 567969 @ 1200ea, TOTAL: $2,400 2AD - Saw, Power, Chain, 14" s/c 570890 @ $694.37ea, TOTAL: $694.37 MH Pump Kit (2) @ $1,774.24ea, TOTAL: $3,548.48 - Ellenberg 2NR Tester Kit 2025 2AD - Harness, FR, X-Style,L,W/Front Nylon Sternal Loop, s/c 501141 @ $543.85ea, TOTAL: $1,632.00 2NP - Hydraulic Drills/Complete (6) s/c various, $1,600ea, TOTAL: $9,600 - Iacolo 2NP - Telescopic Stick w/boot 40ft (1) @ $1,038ea, TOTAL: $1,038. 335 - Storage Locker (4) @ $572.28ea, TOTAL: $2,289.12 - Leonard 2NP - Drill Winch Kits (2) @ $1,601.32, TOTAL: $3,202.64 2NP - Initial Issue Truck Tool Kit (4) @ $9,480ea - Iacolo 2AD – Cable Guides – 10k/LB (6) s/c 501129 @ $796.30ea, TOTAL: $4,777.80 - Zelenski 2BB - New Truck Tools Setup, Greybar, TOTAL $5,240.43 - Tait 2AD - GRIP,CABLE, TENSION, LINE WIRE, 0.7-1.25 IN DIA CABLE RANGE, W/ PARALLEL AGGRESSIVE JAW, SPRING LOAD (6), s/c 569731 @ $776.48ea, TOTAL: $4,658.88 2BB - TK119573991T Cordless Impact Wrenches Impact Wrenc (2) @ $505.63ea, TOTAL: $1011.26 2BB - CLAMP, METER, W/ FLEXIBLE CURRENT PROBE, FOR CLAMP ON AC / DC UP TO 1000V (6) s/c 568864 @ 567.77ea, TOTAL: $3,307.27 2NP - CABLE, CONTROL, ARMOURED, 14 PAIR, 12/C, 40 FT LG, W/ ARMOR COVERING, 2 CONNECTORS, FOR COOPER NOVA (21) s/c 500965 @ $1,368.76ea, TOTAL: $28,744.05 2NR - M18 6T CRIMPER W/ FIXED BG (8) @ $1,019.91, TOTAL: $8,159.30 335 - BLANKET,SAFETY, ARC-SUPPRESSION, 4 X 8 FT, BALLISTIC KEVLAR, ASTM 2676, W/ 7 LAYER ARAMID, BRAND: NO (12) s/c 505967 @ $2,568.97, TOTAL: $30,827.64 2NR - 65 cal Suit Enespro Kit (6) @ $2,821.17ea, TOTAL: $16,927.02 - Flynn 2NP - Ladder, Extension 24' Fiberglass (2) s/c 621284 @ $646.00ea, TOTAL: $1,292 - Gonsalves 2NP - STICK,GRIPALL, CLAMP, HOT LINE (1) s/c 571596, @ $624.35ea, TOTAL: $624.35 - Spence 2NP - Meter Kit, Phase (10) s/c 524484 @ $2,421.09ea, TOTAL: $24, 210.87 - Spence 2AD - Milwaukee Crimping Kit (1) @ $4,972.17ea, TOTAL: $4,972.17 - Zelenski 335 - Tester, Cable Fault Locator (2), s/c 571914/915 @ $2,200.69/$2,419resp, TOTAL: $4,620 - Leonard 335 - Locator, Ferrometal, Backlit, Battery Powered s/c 571922 @ $884.00ea TOTAL: $884.00 - Leonard 2NR – MH Pullers (4), s/c 501121 @ $1,869.54, TOTAL: $7,478.16 – Ellenberg 2NR - Milwaukee 2876-22 Dieless Press (2) @ $4,368.13ea, TOTAL: $8,736.26 - Ellenberg 2AD - Voltage Detector (1) s/c 503918 @ $596.35ea, TOTAL: $596.35 - Zelenski 2BB - Voltage Detector (12), s/c 519464 @ $880.62ea, TOTAL: $10567.45 - Tait 2AD - Adjustable Inline Body Belt s/accessories (2) @ $1,147.04ea, TOTAL: $2,294.08 - Zelenski 2AD - Compression Tool, One Hand Oper (1), s/c 500315 @ $559.30ea, TOTAL: $559.30 - Barilla 2NP - Milwaukee Impact Drivers (4) @ $2,308.06ea, TOTAL: $9,232.24 - Bourgoin 2AD - First Aid Kit/Trauma Kit (20) @ $523.06ea, TOTAL: $10,461.20 – Zelenski 2AD – High Pressure Cable Cutter Kit (2) @ $3555.65ea+ , TOTAL: $7,346.08 - Wade 2NP - Wire Cutters (3) @ $2,771.53ea, TOTAL: $8,314.59 - Bourgoin 2AD - Ladder, Extension, 24' (2), s/c 621284 @ $1,335.09ea, TOTAL: $2,670.18 335 - 8" Submersible Pump (2) @ $648.80ea, TOTAL: $1,297.60 - Leonard 2AD - 28" Cable Cutter (2) @ $581.57 s/c 569037, TOTAL: $1,163.14 - Gonsalves 335 - 28" Cable Cutter (2) @ $581.57 s/c 569037, TOTAL: $1,163.14 - Gonsalves 2EB - AJE - Adapter, Reel, w/Truck Winch Adapter (3) @ $1,524.18ea, TOTAL: $4,572.54 - Gonsalves 2AD - GPS Receiver, Truck Navigator, 6" screen (12) s/c 527177, TOTAL: $7,641.65. 2NP - STICK, RETRACTABLE HOOK, SHOT GUN CAM LEVER ACTION, FOR DB ELBOW SWITCHNG (2) s/c 571561, TOTAL: $1,261.24 - Gonsalves 2BB - STICK, RETRACTABLE HOOK, SHOTGUN, HOT LINE, 5 FT 2-3/4 IN TO 8 FT LG, FOR GRIP ALL CLAMPSTICK TELESC (1), s/c 571539, TOTAL: $594.80 - Gonsalves 2NP - SLING, TRANSFORMER, LIFTING, 5-7 FT LG, 9600 LB, POLY PLUS, W/ 4-LEG (4), TOTAL: $2,091.50 - Gonsalves 2AD - Chain Saw, 14" (1) s/c 570890 @ $694.37ea, TOTAL: $694.37 - Zelenski 2NR - Milwaukee 2876-22 Dieless Press (2) @ $4,368.13ea, TOTAL: $8,736.26 - Ellenberg 2AD - Reel (6in, 2k ft) x 4 @ $696ea / Rod (Pull Rope Cap, 3k ft, 6in) x 4 @ $682ea / Tape (Mule, 6k lb, 1k ft reel) x 4 @ $542ea; TOTAL: $7,680 - Zelenski 2NR - SE - Line Gear Kit 2 @ $9k each New London Shield GX 2025 3H2 - Truck Tool Kits 2025 2AY - Chain Hoist 2025 3H2 - Jaw Cutting Tool 2025 3H2 - New London Mats 2025 2BC - Jack Jumper Danielson 2025 2BC - Truck Tool Safety 2025 2AY - Safety Climing Gear 2025 3H2 - Sling Tool 2025Page 480 of 489
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued October 23, 2026 RRU-159 Attachment 16 Page 480 of 489 work_order_number description GXC25E13 3H3 - UG Truck Kits 2025 GXC25E14 2AY - Heater Tool 2025 GXC25E15 2BC - Safety Equipment 2025 GXC25E16 2BC - Bushing Tool 2025 GXC25E17 3H2 - New London Ladders 2025 GXC25E18 3H2 - Bucket Truck Tools GXC25E19 2AY - Switch Stick GXC25E1X 2BC Danielson Harness 2025 GXC25E20 3H2 - Chain Saw New London GXC25E21 2BC - Milwaukee Tool Kits GXC25E22 2BC - Guy Wire Cutter Tool GXC25E23 2BC - Crimper Tool 2025 GXC25E24 2AX - Madison Tool Order 2025 GXC25E25 2BC - Danielson Graybar Tool Order GXC25E26 2BC - Danielson Jumper Tools GXC25E27 3H2 - Tool Locker New London GXC25E28 2BC - Climbing Kits Danielson GXC25E30 2AY - Tool Truck Kits GXC25E31 2AX - Tools and Lights GXC25E33 2BC - Danielson Tank Pump GXC25E34 3H3 - New London UG Tools GXC25E35 2AY - East Hampton Ropes 2025 GXC25E36 2BC - Hoist Danielson 2025 GXC25E37 2AX - Madison Rescue Tool GXC25E38 3H2 - Tool Kits GX GXC25E39 New London Tools 2025 GXC25E3X 3H2 - Snatch Tool New London 2025 GXC25E40 3H2 - New London Rope 2025 GXC25E41 3H2 - New London Pliers 2025 GXC25E42 2BC - Danielson Tools 2025 GXC25E43 3H2 - Insulator New London GXC25E44 2BC - Danielson Lights 2025 GXC25E45 2AY - Crimpers East Hampton GXC25E46 2BC - Hot Stick Danielson 2025 GXC25E47 3H2 - Detector New London 2025 GXC25E48 3H2 - New London Tools GXC25E49 2BC - Danielson Tools 2025 GXC25E50 2BC - Danielson Wrap Tools GXC25E51 3H2 - Pulley New London GXC25E53 Madison Tool Block 2025 GXC25E54 Harness Tool Order GXC25E55 Danielson Tool Belt 2025 GXC25E56 New London 2025 Tools GXC25E57 2BC Danielson Tools GXC25E58 3H2 - Tool New London GXC25E59 Madison Tool Order GXC25E60 2AY - East Hampton Tools GXC25E61 2AY - East Hampton Tools GXC25E62 2BC Danielson Tool Order GXC25E63 New London Tool Order 3h2 GXC25E64 2BC Anchor Order GXC25E65 Madison Tool Order 2025 GXC25E67 New London Tools GXC25E68 2AY - East Hampton Tools 2025 GXC25E69 2BC - Danielson Tools 2025 GXC25E70 East Hampton Tester Tool GXC25E71 New London Materials 2025 GXC25E72 New London Tool Order 2025 GXC25E74 New London Tools 2025 GXC25E75 2BC Tools 2025 GXC25E76 Madison Tool Order 2025 GXC25E77 Danielson Tools 2025 GXC25E78 2BC Danielson Tool Order 2025 GXC25E79 2AX- Madison Tool Order GXC25E80 3H2 - New London Tool Order GXC25E81 2BC- Danielson Tools 2025 GXC25E83 2BC - Danielson Tool Kits GXC25E84 Danielson Tools Lacmac GXC25E85 2BC Printer Topaz GXC25E86 New London Rain Gear 2025 GXC25E87 3H2 - New London Tools GXC25E88 2025 East Hampton Tools GXC25E89 3H2 - TC - First Aid Trauma Kits GXC25E90 2AY - TC - OX BLOCK HANDLING GXC25E91 2AY - TC - SELF RESCUE SYSTEM GXC25E92 2BC Danielson Tools 2025 GXC25S01 2EA - CM - Staple Gun (1) GXC25S02 GXC25S04 2EA - FS - Kelly Bar Adapter 2EK - DS - Meter (2) GXC25S05 2EK - DS - Generator (3) GXC25S06 2EA - BW - Headset (1) @ $2,003.46 GXC25S07 2EB - BW - Headset (1) @ $2,003.46 GXC25S08 2EK - BW - Headset (1) @ $2,003.46 long_description 3H3 - UG Truck Kits 2025 2AY - Heater Tool 2025 2BC - Safety Equipment 2025 2BC - Bushing Tool 2025 3H2 - New London Ladders 2025 3H2 - Bucket Truck Tools 2AY - Switch Stick 2BC Danielson Harness 2025 3H2 - Chain Saw New London 2BC - Milwaukee Tool Kits 2BC - Guy Wire Cutter Tool 2BC - Crimper Tool 2025 2AX - Madison Tool Order 2025 2BC - Danielson Graybar Tool Order 2BC - Danielson Jumper Tools Tool Locker New London 2BC - Climbing Kits Danielson 2AY - Tool Truck Kits 2AX - Tools and Lights 2BC - Danielson Tank Pump 3H3 - New London UG Tools 2AY - East Hampton Ropes 2025 2BC - Hoist Danielson 2025 Madison Rescue Tool 3H2 - Tool Kits GX New London Tools 2025 3H2 - Snatch Tool New London 2025 3H2 - New London Rope 2025 3H2 - New London Pliers 2025 2BC - Danielson Tools 2025 3H2 - Insulator New London 2BC - Danielson Lights 2025 2AY - Crimpers East Hampton 2BC - Hot Stick Danielson 2025 3H2 - Detector New London 2025 3H2 - New London Tools 2BC - Danielson Tools 2025 2BC - Danielson Wrap Tools 3H2 - Pulley New London Madison Tool Block 2025 Harness Tool Order Danielson Tool Belt 2025 New London 2025 Tools 2BC Danielson Tools 3H2 - Tool New London Madison Tool Order 2AY - East Hampton Tools 2AY - East Hampton Tools 2BC Danielson Tool Order New London Tool Order 3h2 2BC Anchor Order Madison Tool Order 2025 New London Tools 2AY - East Hampton Tools 2025 2BC - Danielson Tools 2025 East Hampton Tester Tool New London Materials 2025 New London Tool Order 2025 New London Tools 2025 2BC Tools 2025 Madison Tool Order 2025 Danielson Tools 2025 2BC Danielson Tool Order 2025 2AX- Madison Tool Order 3H2 - New London Tool Order 2BC- Danielson Tools 2025 2BC - Danielson Tool Kits Danielson Tools Lacmac 2BC Printer Topaz New London Rain Gear 2025 New London Tools 2025 East Hampton Tools First aid trauma kits 22 @ $523 each 2AY - TC - OX BLOCK HANDLING KITS 22 @ $1,707 2AY - TC - SELF RESCUE SYSTEM 16 @ $866 2BC Danielson Tools 2025 2EA - CM - Staple Gun (1) @ $1,048.59 ea. TOTAL: $1,048.59 cost_element_group Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 ferc_account percent 107010 107010 107010 107010 107010 107010 107010 107010 107010 107010 107010 107010 107010 107010 107010 107010 107010 107010 107010 107010 107010 107010 107010 107010 107010 107010 107010 107010 107010 107010 107010 107010 107010 107010 107010 107010 107010 107010 107010 107010 107010 107010 107010 107010 107010 107010 107010 107010 107010 107010 107010 107010 107010 107010 107010 107010 107010 107010 107010 107010 107010 107010 107010 107010 107010 107010 107010 107010 107010 107010 107010 107010 107010 107010 107010 107010 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 Other-O00 107010 1 Other-O00 Other-O00 107010 107010 1 1 Other-O00 107010 1 Other-O00 107010 1 Other-O00 107010 1 Other-O00 107010 1 Other-O00 107010 1 Other-O00 107010 1 Other-O00 107010 1 Other-O00 107010 1 Other-O00 107010 1 Other-O00 107010 1 Other-O00 107010 1 Other-O00 107010 1 Other-O00 107010 1 Other-O00 107010 1 Other-O00 107010 1 Other-O00 107010 1 Other-O00 107010 1 Other-O00 107010 1 Other-O00 107010 1 Other-O00 107010 1 Other-O00 107010 1 Other-O00 Other-O00 Other-O00 Other-O00 107010 107010 107010 107010 1 1 1 1 Other-O00 107010 1 Other-O00 107010 1 Other-O00 107010 1 Other-O00 107010 1 Other-O00 107010 1 Other-O00 107010 1 Other-O00 107010 1 Other-O00 107010 1 Other-O00 107010 1 Other-O00 107010 1 Other-O00 107010 1 Other-O00 Other-O00 Other-O00 107010 107010 107010 1 1 1 Other-O00 Other-O00 107010 107010 1 1 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 107010 107010 107010 107010 107010 107010 107010 107010 107010 107010 107010 107010 107010 107010 107010 107010 107010 107010 107010 107010 107010 107010 107010 107010 107010 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 107010 107010 107010 107010 107010 107010 107010 107010 107010 107010 107010 107010 107010 107010 107010 107010 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 2EA - FS - Kelly Bar Adapter (1) @ $602.77 ea. TOTAL: $602.77 2EK - DS - Meter (2) @ $1,579.93 ea. TOTAL: $3,159.86 2EK - DS - Generator (3) @ $1,495.03 ea. TOTAL: $4,485.09 2EA - BW - Headset (1) @ $2,003.46 ea TOTAL: $2,003.46 2EB - BW - Headset (1) @ $2,003.46 ea TOTAL: $2,003.46 2EK - BW - Headset (1) @ $2,003.46 ea TOTAL: $2,003.46 2EA - FS - Crimper Kit (2) @ $2,060.43 ea TOTAL: 4,120.86 GXC25S09 2EA - FS - Crimper Kit (2) GXC25S10 2EK - DS - Tarpaulin, Tongs, Tamper GXC25S11 2EK - BW - Drill Winches (4) GXC25S12 2EA - AT - Voltage Detector (2) GXC25S13 2EK - AT - Battery Tester (1) GXC25S14 2EB - AT - Chainsaw (1) GXC25S15 2EA - AT - Ox Block Kit (2) GXC25S16 2EB - MM - Stapler (2), Crimper (2) GXC25S17 2EK - DS - Climbing Gear (1) GXC25S18 2EB - DS - Hot Sticks (3) GXC25S19 2EK - DS - Hot Sticks (4) GXC25S22 2EA - AT - Voltage Detector (1) GXC25S23 2EB - AT - GPS (5) 2EK - DS - Tarpaulin (2) @$538.59 ea, Tongs (2) @$502.15, Tongs (1) @1,288.00 EA, Tamper (1) @ $1,718. Total: $4,585.33 2EK - BW - Drill Winches (4) @ $1,442.86. TOTAL: $5,771.44 2EA - AT - Voltage Detector (2) @633.42 TOTAL: 1,266.84 2EK - AT - Battery Tester (1) @ 639.76 TOTAL: $639.76 2EB - AT - Chainsaw (1) @ 517.81 TOTAL: $517.81 2EA - AT - Ox Block Kit (2) @ $2,136.60 ea. TOTAL: $4,273.20 2EB - MM - Stapler (2) @786.12 ea, Crimper (2) @ $2,884.00 ea TOTAL: $7,341.44 2EK - DS - Climbing Gear (1) @ $977.02 TOTAL: $977.02 2EB - DS - Hot Sticks (3) @ $617.25 TOTAL: $1,851.75 2EK - DS - Hot Sticks (4) @ $617.25 TOTAL: $2,469.00 2EA - AT - Voltage Detector (1) @614.24 TOTAL: 614.24 2EB - AT - Global Positioning Systems (5) @ 626.36 ea. TOTAL: 3,131.80 2EB - AT - Cable Cutter Ratchet (1) @ 564.61 ea. TOTAL: 564.61 GXC25S24 2EB - AT - Cable Cutter Ratchet (1) GXC25S25 2EK - AT - Tool, 556 Connectors (1) GXC25S26 2EK - AT - Tool, 336 Conductors (1) GXC25S28 2EA - CM - Cable Strippers (6) GXC25S29 GXC25S30 GXC25S31 GXC25S32 2EB - MM - Adapter, Reel (3) Initial Issue BT Tool Kit (4) Cent Initial Issue BT Tool Kits (3) East Initial Issue BT Tool Kit (2) West GXC25S33 Hastings Lever Chain Hoist (6) GXC25S34 2EA - AT - Tamper (1) GXC25S35 2EB - AT - 2-Way Radio (6) GXC25S36 2EB - AT - Cable Grip (8) GXC25S37 2EB - AT - Block Kit (1) 2EK - AT - Tool, 556 Connectors (1) @ 1,935.50 TOTAL: 1,935.50 2EK - AT - Tool, 336 Conductors (1) @ 1,250.00 TOTAL: 1,250 2EA - CM - Cable Strippers (6) @ $930 ea. TOTAL: $5,580.00 2EB - MM - Adapter, Reel (3) @ $565.22 ea. TOTAL: $1,695.65 2EK - Initial Issue Bucket Truck Tool Kits (4) Central @ $8,288ea, TOTAL: $33,152.00 - Wojciak 2EB - Initial Issue Bucket Truck Tool Kits (3) Eastern @ $8,288ea, TOTAL: $24,864.00 - Wojciak 2EA - Initial Issue Bucket Truck Tool Kits (2) Western @ $8,288ea, Total: $16,576.00 - Wojciak 2EK - Hastings Lever Chain Hoist LB015 1.5T (2) @ $1,033.14ea, LB030 3.0T (4) @ $1,365.82ea, TOTAL: $7,530 - Stolze 2EA - AT - Tamper (1) @ $2,259.69. TOTAL: $2,259.69 2EB - AT - 2-Way Radio (6) @$1,092.30 ea TOTAL: $6,553.80 2EB - AT - Cable Grip (8) @ $658.62 ea TOTAL: $5,268.93 2EB - AT - Block Kit (1) @ $3,244.93 TOTAL: $3,244.93 2EB - AT - Global Positioning Systems (3) @ $647.25 ea TOTAL: $$1,941.75 GXC25S38 2EB - AT - GPS (3) GXC25S39 2EB - AT - Switch Stick Pin Lock 2 GXC25S40 2EB - AT - Switch Stick Universal 2 GXC25S41 2EB - AT - Chainsaw (1) GXC25S42 2EK - AT - Poles (2) GXC25S43 Voltage Phasing Meter Kit (4) GXC25S45 GXC25S46 GXC25S47 Cutting Jaw (2) Cordless Tools (4) GRAININC-002 Ladder, Extension, 24FT (10) GXC25S48 GXC25S49 12" EHS Guy Wire Cutting Jaw (1) Meter Kit, Phasing/Testing Kit (4) GXC25S50 GXC25S51 GXC25S52 GXC25S53 GXC25S54 GXC25S55 GXC25S56 GXC25S57 GXC25S58 GXC25S60 GXC25S61 GXC25S62 GXC25S63 GXC25S64 GXC25S65 GXC25S66 GXC25S67 GXC25S68 GXC25S69 GXC25S70 GXC25S71 GXC25S72 GXC25S73 GXC25S74 GXC25S75 Crimping Tool Battery Platform (1) Site Prep and Fence Installation Climbing Gear, Hydron GPS Receiver (5) Hyperlite Extension Ladder 24' (2) Chain Saw (2) Mushroom Testers (2) Trauma Back Pack (4) Modular Tool Storage (1) Kelly Bar, 7' (1) Tool Box (1) Grip, Tension, Parallel Jaw Kit (1) Pole Tongs (2) Climbing Gear Kit - New Hire Replacement Harness and Tether Kit Ox Blocks (2) Climbing Gear Kit - New Hire (1) Chain Saw (14") (1) Chain Saw (1) Oxford Yard Truck Outlets Adapter, Reel (3) Cable Cutter, 28" (1) Stick, Switch, 35' Tele (3) Sling, 6.6k (6) First Aid Kit, Trauma, Backpack (4) GXC25S76 GXC25W01 GXC25W02 GXC25W03 GXC25W04 GXC25W05 GXC25W06 GXC25W07 GXC25W08 GXC25W09 GXC25W10 GXC25W11 GXC25W12 GXC25W13 GXC25W14 GXC25W15 2EB - Trip Saver Tester (620671) 2AU - TB - TRAUMA BACKPACK (15) 337 - DW - Remote Cutters (10) 3N2 - JD-OX Block Sling Handline(4) 3N2 - JD-Climbing Gear-Melanson (1) 2AG - MT - Ladder (14) 2AG - MT - Cone Light Kit (4) 2AG - MT - Hydraulic Drill (2) 2AG - MT - AMPACT Tool Kit (2) 2AG - MT - Remote Cable Cutter (2) 3N2 - CS - 556 Cable Connector (2) 3N2-CS-Wrench, Impact Hydraulic (3) 3N2 - CS - Truck Tool Kit (3) 3N2 - JD - Climbing gear kit (1) 3W2 - RS - Lever Operated Hoist (1) 2AH - DW - Cable Cutter (1) 2EB - AT - Switch Stick Pin Lock (2) @ $622.53 ea TOTAL: $1,245.06 2EB - AT - Switch Stick Universal Head (2) @ $541.76 ea TOTAL: $1,083.52 2EB - AT - Chainsaw (1) @ $517.81 ea TOTAL: $517.81 2EK - AT - Poles (2) @ $1,064.34 ea TOTAL: $2,128.70 2EK - Voltage Phasing Meter Kit w/Pole (4) @ $1,700ea, TOTAL: $6,800 2EB - Cutting Jaw (2) @ $649.78ea, TOTAL: $1,299.56 - Mills 2EA - Cordless Crimping Tool (1) @ $2,306.83ea, Fencing Stapler Cordless Tool Kit (1) @ $848.69ea, Cordless Impact Wrench Kit (2) @ $822.29ea, TOTAL: $4,802 - Marsella 2EB - Ladder, Extension, Type 1AA, 24' (10), s/c 621284 @ $613.75ea, TOTAL: $6,137.50 - Mills 2EA - 12" EHS Guy Wire Cutting Jaw (1) @$514.85ea, TOTAL: $514.85 - Marsella 2EA - Meter Kit, Phasing and Testing Kit (4) s/c 524482 @ $1,202.53ea, TOTAL: $4,810.12 - Smalley 2EA - Cordless Crimping Tool Battery Platform (1), cat# 786VM3 @ $2,306.83ea, TOTAL: $2,306.83 - Marsella 2EB - Site Preparation and Fence Installation, Tree Removal and Stump Grinding 20k, Grading 29k, Fencing and installation 16k, TOTAL: 65k. 2EK - Hydron, Climbing gear, EZ Squeeze w/Tough Rope (1) @ $1,235.16, Bigbuck Titanium Climber Kit (1) @$1,439.64, Med Adjustable Belt (1) @ $746.08, Secondary (1) @ $558.56, TOTAL: $3,979.44 - Stolze 2EB - RECEIVER,ELECTRONIC, GLOBAL POSITIONING SYSTEM, DEZL OTR610, TRUCK NAVIGATOR, 6 IN SCREEN, LIFETIME (5) s/c 527177 @ $626.36ea, TOTAL: $3,131.80 2EA - Hyperlite Extension Ladder 24' (2) $613.75ea, TOTAL: $1,227.50 - Smalley 2EA - Saw, Power, Chain, 8.82 LB, 35.2 CC (2) s/c 570890 @ $672ea, TOTAL: $1,344.00 - Marsella 2EB - Tester, Non Contact, 80-275 kv, Instrument (2) s/c 571931 @ $531.94, TOTAL: $1,064 - Hayward 2EK - Custom Trauma backpack kit w/burn blanket (4) @ $523.06ea, TOTAL: $2,092.24 - Stolze 2EK - Husky Modular Tool Storage 72" (1) @ $701.59ea, TOTAL: $701.59 - Stolze 2EB - Bar, Extension Assembly, Kelly Bar, 7' s/c 567970 @ $1,501.29ea, TOTAL: $1,501.29 - Mills 2EB - Tool Box (1) @ $599.99ea, TOTAL: $599.99 - Mills 2EB - Grip, Tension, Parallel Jaw Kit, s/c 589931 @ $1,450.77ea, TOTAL: $1,450.77 - Mills 2EB - Pole Tongs (2) s/c 570398 @ $690.18ea, TOTAL: $1,380.36 - Mills 2EB - Climbing Gear Kit - New Hire (1) @ $5,041.48ea, TOTAL: $5041.48 - MIlls 2EB - Replacement Harness and Tether Kit (1) @ $525.96ea, TOTAL: $525.96 - Mills 2EB - Ox Blocks (2) @ $666.24ea, TOTAL: $1,332.48 - Mills 2EA - Climbing Gear Kit - New Hire (1) @ $5,125.48ea, TOTAL: $5,125.48 - MIlls 2EA - 14" Chain Saw (1) @ 733.80ea, TOTAL: $733.80 - Marsella 2EA - Chain Saw (1) @ 721.95ea, TOTAL: $721.95 - Marsella 2EA - Oxford Yard Capital Improvement / LUPO Electric LLC / Truck Outlets, Receptacles, Wiring, Circuits, Plugs, Grounding Posts, Backfill and regrade. TOTAL: $16,775.00 - Wojciak 2EB - AJE - Adapter, Reel, w/Truck Winch Adapter (3) @ $1,524.18ea, TOTAL: $4,572.54 - Gonsalves 2EB - 28" Cable Cutter (1) @ $564.61 s/c 569037, TOTAL: $564.61 - Gonsalves 2EK - Stick, Switch, Telescopic 35' (3) s/c 571566 @ Various EA, TOTAL: $1,659.29 - Gonsalves 2EK - SLING, 1/2 IN DIA, 20-40 IN LEG LG, VERTICAL 6600 LB SAFE WORKLOAD, POLYESTER, W/ 4 LEG, 12 STRAND (6), $3,207.50 2EA - First Aid Kit, Trauma, Backpack (4), s/c 620134 @ $565.65ea, TOTAL: $2,262.58 - Smalley 2EB - Trip Saver Tester (620671) - 4 @ $505 2AU - TB - TRAUMA BACKPACK w water gel blanket (15) @ $548ea. TOTAL: $8,220 337 - DW - Remote Cutters: Stock Code is 569033 @ $683.31ea. TOTAL: $6,833.10 3N2 - JD - OX Block Sling Handline 100' (4) @ $1,234.24ea. TOTAL: $4,936.96 3N2 - JD - Climbing Gear - Melanson (1) @ $3,669.52 2AG - MT - Ladder (14) @ $650ea. TOTAL: $9,100 2AG - MT - Cone Light Kit (4) @ $725ea. TOTAL: $2,900 2AG - MT - Hydraulic Drill (2) @ $950ea. TOTAL: $1,900 2AG - MT - AMPACT Tool Kit (2) @ $2,000ea. TOTAL: $4,000 2AG - MT - Remote Cable Cutter (2) @ $3,000ea. TOTAL: $6,000 3N2 - CS - 556 Cable Connector (2) @ $1,880.69ea. TOTAL: $3,761 3N2 - CS - Wrench, Impact Hydraulic (3) @ $989.01ea. TOTAL: $2,967.03 3N2 - CS - KIT, Material Handler Truck Tooling and Equipment (3) @ $40,000 TOTAL: $120,000 3N2 - JD - Climbing gear kit for new hire qualified lineman (1) @ $4,781.20 3W2 - RS - Lever Operated Hoist (1) @ $594.25 2AH - DW - Cable Cutter (1) @ $580.63Page 481 of 489
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued October 23, 2026 RRU-159 Attachment 16 Page 481 of 489 work_order_number description GXC25W16 2AH - DW - Computer Monitor Kit (8) GXC25W17 3N2 - CS - Load Buster (2) GXC25W18 3N2 - CS - Hotstick (2) GXC25W19 2AH - DW - Ratchet, Driver, Kit (2) GXC25W20 2AU - TB - Voltage Detector (1) GXC25W21 3N2 - CS - Decent System Kit (4) GXC25W22 3N2 - CS - Chain Operated Hoist (2) GXC25W23 3W3 - RS - UG Retrieval System (5) GXC25W24 3N2 - CS - Power Supply Module (3) GXC25W25 2AH - DW - Grounding Tester Kit (2) GXC25W26 3N2-CS-Buckingham Aerial Bucket (4) GXC25W29 3N2 - CS - Safety Flare (8) GXC25W30 2AG - BA - Toolbox for Truck (1) GXC25W31 2AH - DW - Extendo Stick (4) GXC25W32 3W2 - RS - Tension Grip (9) GXC25W33 3W2 - RS - Loadbuster Tool (3) GXC25W34 3N2 - CS - 336 Conductor Tool (2) GXC25W35 2MG - CS - Storage Tray (2) GXC25W36 3W3 - RS - Ratchet Driver Kit (1) GXC25W37 337 - DW - Wrench Set (1) GXC25W38 337 - DW - Sling Assembly (1) GXC25W39 2AG - MT - Voltage Detector (1) GXC25W40 2AH - DW - Ratchet Crimper (1) GXC25W41 2AH - DW - Voltage Detector (1) GXC25W42 2AH - DW - Compression Tool (1) GXC25W43 2AH - DW - Cable Tension Grip (1) GXC25W44 2AH - DW - Meter Clamp (1) GXC25W45 3N2 - CS - Storage Tray (1) GXC25W46 2AG - BA - Lug-All hoist (15) GXC25W47 3N2 - CS - Klein Grips 1684-5F (1) GXC25W48 3N2 - CS - Sheeve cable Greenlee(1) GXC25W49 2AH - DW - Tool Box for Truck (1) GXC25W50 3N2 - GC - Chain Hoist (2) GXC25W51 3N2 - CS - Utility Crimper (3) GXC25W52 3W2 - MA - Cable Ratchet Cutter (8) GXC25W53 3W2 - MA - Cable Tension Grip (2) GXC25W54 3W2 - MA - Compression Tool (2) GXC25W55 2AU - MA - Power Supply Module (2) GXC25W56 2AH - MA - GoLight LED Lantern (1) GXC25W57 337 - DW - Utility Crimper (2) GXC25W58 2AH - DW - Cable Cutter Kits (10) GXC25W59 3N2 - CS - Traffic Safety Signs (1) GXC25W60 2AU - TB - Remote Cutter (1) GXC25W61 2AU - TB - Milwaukee Crimper (3) GXC25W62 2AU - TB - Milwaukee Stapler (5) GXC25W63 2AU - TB - TIMCO 5" Clamp (1) GXC25W64 2AU - TB - Digger Truck Tool Kit(2) GXC25W65 2AU - TB - Dual Voltage Load Box(1) GXC25W66 2MG - GC - Guy Wire Cutter (3) GXC25W67 2AU - TB - Cable Joint Tool (3) GXC25W69 2AU - TB - S&C Loadbuster (4) GXC25W70 2AU - TB - Milwaukee Truck Kit (1) GXC25W71 2AH - DW - Pulling Rope Swivel (5) GXC25W72 3N2 - CS - Switch Stick (4) GXC25W73 3W3 - RS - Ratchet Driver Kit (1) GXC25W74 2AH - DW - Ratchet Crimper (1) GXC25W75 2AH - DW - Cable Cutter Ratchet (1) GXC25W76 3W3 - RS - Compression Tool (1) GXC25W77 2AU - TB - Cable Cutter Ratchet (1) GXC25W78 2AH - DW - Compression Tool (1) GXC25W79 2AH - DW - Meter Clamp (1) GXC25W80 2MG - CS - Rope Pulling Swivel (1) GXC25W81 337 - DW - Meter Clamp (1) GXC25W82 2AU - TB - Pulling Sheave (4) GXC25W83 2AU - MT - Crimping Tool (4) GXC25W84 2AU - MT - Jobsite Tool Boxes (5) GXC25W86 2MG - CS - 400 ft. Duct Rodder (1) GXC25W88 2AG - JG - Bucket Descender (3) GXC25W89 3N2 - CS - Padmount Sling (4) GXC25W90 337 - DW - Fluke Meter (1) GXC25W91 2AG - JG - Phasing Meter (1) GXC25W92 2AG - JG - Reel of Mule Tape (1) GXC25W93 3N2 - CS - Chain Saw 590211 18" (2) GXC25W94 3N2 - CS - Mushroom tester (4) GXC25W95 337 - DW - Voltage Detector (1) GXC25W96 2AG - JG - AED (3) GXC25W97 3W2 - MA - Lever Operated Hoist (2) GXC25W98 2AU - MA - Voltage Detector (1) GXC25W99 2AH - MA - Voltage Detector (2) GXC25X97 GXC2E101 GXC2E102 GXC2E104 GXC2E105 GXC2E106 GXC2E108 GXC2E109 GXC2E110 GXC2E111 GXC2E113 GXC2E115 GXC2E117 GXC2E118 GXC2E119 GXC2E120 GXC2E122 GXC2E123 GXC2E124 2AD - KZ - Guy Grips (569710) 12 @ 2BC - Danielson Hoist 2022 2AX - Hydron Inc Madison 2022 2BC - Danielson Radios 2022 2BC - Danielson Chairs 2022 2AY - Milwaukee Tool Order 2022 2AY - New Impact tool for East Hamp 2AX - Headset Madison 2022 2BC - Danielson Go Lights 2022 3H2 - Manhole Items New London 2022 3H2 - Tiger Equipment Dival 2022 3H2 - Die Kit New London 2022 2AX - Dival Supplies Madison 2022 2BC - Danielson Sherman and Reilly 3H2 - Ground Rod Driver 2022 2AX - Lever Chain Hoist Madison 202 3H2 - Milwaukee Graybar Order 2022 3H2 - Impulse Phaser New London 202 2AX -Hydron Corp Madison 2022 GXC2E128 CABLE CUTTER STEEL JAWS GXC2E129 GXC2E130 GXC2E131 GXC2E132 ROTARY HAMMER KIT 2BC - Danielson Monitors 2022 2AY - East Hampton Graybar Order 20 2AY - East Hampton Printer 2022 GXCORS7A GXCOS60B GXCOS60C RSO SAMSUNG TV SOC Monitor Display SOC CABINETS GXCOS60E GXCOS70A SOC MONITOR DELL SOC MONITOR long_description 2AH - DW - Computer Monitor Kit (8) @ $1,375.48ea. TOTAL: $11,003.84 3N2 - CS - Load Buster - Stock Code 572019 (2) @ $2,282.42ea. TOTAL: $4,564.84 3N2 - CS - Hotstick #571595 (2) @ $597.80ea. TOTAL: $1,195.60 2AH - DW - Ratchet, Driver, Kit (2) @ $972.96ea. TOTAL: $ 1,945.92 2AU - TB - Voltage Detector (1) @ $586.59 3N2 - CS - Aerial Bucket Decent System Kit (4) @ $853.05ea. TOTAL: $3,412.20 3N2 - CS - Chain Operated Hoist (2) @ $795.50ea. TOTAL: $1,591 3W3 - RS - UG department confined space retrieval system (5) @ $6,950ea. TOTAL: $34,750 3N2 - CS - Cordless 9V power supply module for Tripsaver (3) @ $506ea. TOTAL: $1,518.43 2AH - DW - Grounding Tester Kit (2) @ $4,615.38ea. TOTAL: $9,230.76 3N2 - CS - Buckingham Aerial Bucket System (4) @ $825ea. TOTAL: $3,300 3N2 - CS - pi lit lights Safety Flare (8) @ $750ea. TOTAL: $6,000 2AG - BA - Toolbox for Truck (1) @ $620 2AH - DW - Extendo Stick (4) (Stock Code # 571566) @ $541.76ea. TOTAL: $2,167.04 3W2 - RS - Tension Grip (9) @ $1,499.15ea. TOTAL: $13,492.38 3W2 - RS - Loadbuster Tool (3) @ $2,441.43ea. TOTAL: $7,324.30 3N2 - CS - 336 Conductor Tool (2) @ $1,213.65ea. TOTAL: $2,427.30 2MG - CS - Storage Tray (2) @ $513.07ea. TOTAL: $1,026.14 3W3 - RS - Ratchet Driver Kit (1) @ $972.96 337 - DW - Wrench Set (1) @ $664.96 337 - DW - Sling Assembly (1) @ $623.23 2AG - MT - Voltage Detector (1) @ $614.24 2AH - DW - Ratchet Crimper (1) @ $600.03 2AH - DW - Voltage Detector (1) @ $599.38 2AH - DW - Compression Tool (1) @ $561.13 2AH - DW - Cable Tension Grip (1) @ $537.03 2AH - DW - Meter Clamp (1) @ $526.95 3N2 - CS - Storage Tray (1) @ $513.07 2AG - BA - Lug-All hoist 2 ton web strap with hot stick rings (15) @ $513.37ea. TOTAL: $7,700.55 3N2 - CS - Klein Grips 1684-5F (1) @ $599.93 3N2 - CS - Sheeve cable Greenlee (1) @ $582.64 2AH - DW - Tool Box for Truck (1) @ $8,000 3N2 - GC - Chain Hoist (2) @ $774.16ea. TOTAL: $1,548.32 3N2 - CS - Milwaukee 6T Linear Utility Crimper (3) @ $3,295.48ea. TOTAL: $9,886.44 3W2 - MA - Cable Ratchet Cutter (8) @ $899ea. TOTAL: $7,192 3W2 - MA - Cable Tension Grip (2) @ $776.50ea. TOTAL: $1,553 3W2 - MA - Compression Tool (2) @ $558ea. TOTAL: $1,116 2AU - MA - Power Supply Module (2) @ $500.50ea. TOTAL: $1,001 2AH - MA - GoLight LED Lantern (1) @ $508 337 - DW - 11T Dieless Latched Linear Utility Crimper (2876-22) (2) @ $4,368.13ea. TOTAL: $8,736.26 2AH - DW - Cable Cutter Kits Crimper Tool (2678-20) (10) @ $1,647.74ea. TOTAL: $16,477.40 3N2 - CS - Traffic Logic Safety Signs (1) @ $5,347.28 2AU - TB - Milwaukee Remote Cutter (1) @ $4,120 2AU - TB - Milwaukee 2678-20 Crimper (3) @ $1,648ea. TOTAL: $4,943 2AU - TB - Milwaukee 2843 Stapler (5) @ $606ea. TOTAL: $3,031 2AU - TB - TIMCO 5" Clamp for impulse phase (1) @ $998.50 2AU - TB - Digger Truck Tool Kit (2) @ $7,888.85ea. TOTAL: $15,777.70 2AU - TB - Dual Voltage Load Box (1) @ $17,985 2MG - GC - Milwaukee Guy Wire Cutter (3) @ $514.85ea. TOTAL: $1,544.55 2AU - TB - CJT Speed System Cable Joint Tool (3) @ $819.19ea. TOTAL: $2,457.57 2AU - TB - S&C Loadbuster (4) @ $2,936.26 TOTAL: $11,745 2AU - TB - Milwaukee Truck Kit (1) @ $4,574 2AH - DW - Pulling Rope Swivel (5) @ $569.11ea. TOTAL: $2,845.54 3N2 - CS - Switch Stick (4) @ $541.76ea. TOTAL: $2,167.04 3W3 - RS - Ratchet Driver Kit (1) @ $972.96 2AH - DW - Ratchet Crimper (1) @ $600.03 2AH - DW - Cable Cutter Ratchet (1) @ $587.86 3W3 - RS - Compression Tool (1) @ $558.18 2AU - TB - Cable Cutter Ratchet (1) @ $511.12 2AH - DW - Compression Tool (1) @ $553.71 2AH - DW - Meter Clamp (1) @ $513.50 2MG - CS - Rope Pulling Swivel (1) @ $604.4 337 - DW - Meter Clamp (1) @ $572.61 2AU - TB - Pulling Sheave (4) @ $760ea. TOTAL: $3,040 2AU - MT - Crimping tool for Oh primary and Ug cables (4) @ $4,400ea. TOTAL: $17,600 2AU - MT - Jobsite Tool Boxes for Storage (5) @ $650ea. TOTAL: $3,200 2MG - CS - 400 ft. Duct Rodder (1) @ $1,151.65 2AG - JG - Buckingham Bucket Descender (3) @ $760.43ea. TOTAL: $2,281.29 3N2 - CS - Padmount Sling for Material Handler (4) @ $572.33ea. TOTAL: $2,289.32 337 - DW - Fluke Meter (1) @ $502.92 2AG - JG - Wireless Phasing Meter (1) @ $3,509.89 2AG - JG - Reel of Mule Tape (1) @ $511.55 3N2 - CS - Chain Saw 590211 18" (2) @ $535.98ea. TOTAL: $1,071.96 3N2 - CS - Mushroom tester 519464 (4) @ $895.15ea. TOTAL: $3,580.60 337 - DW - Voltage Detector, Stock Code 503918 (1) @ $594.42 2AG - JG - AED (3) @ $1,681.80ea. TOTAL: $5,045.40 3W2 - MA - Lever Operated Hoist (2) @ $783.95ea. TOTAL: $1,567.90 2AU - MA - Voltage Detector (1) @ $639.27 2AH - MA - Voltage Detector (2) @ $612.72ea. TOTAL: $1,225.44 2AD - KZ - Guy Grips (569710) 12 @ $640 each 2BC - Danielson Hoist 2022 2AX - Hydron Inc Madison 2022 2BC - Danielson Radios 2022 2BC - Danielson Chairs 2022 2AY - Milwaukee Tool Order 2022 2AY - New Impact tool for East Hampton 2BC - Danielson Go Lights 2022 3H2 - Manhole Items New London 2022 3H2 - Tiger Equipment Dival 2022 3H2 - Die Kit New London 2022 2AX - Dival Supplies Madison 2022 2BC - Danielson Sherman and Reilly 2022 3H2 - Ground Rod Driver 2022 2AX - Lever Chain Hoist Madison 2022 3H2 - Milwaukee Graybar Order 2022 3H2 - Impulse Phaser New London 2022 2AX -Hydron Corp Madison 2022 2BC - (4) M18 CABLE CUTTER STEEL JAWS cost_element_group Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 ferc_account percent 107010 107010 107010 107010 107010 107010 107010 107010 107010 107010 107010 107010 107010 107010 107010 107010 107010 107010 107010 107010 107010 107010 107010 107010 107010 107010 107010 107010 107010 107010 107010 107010 107010 107010 107010 107010 107010 107010 107010 107010 107010 107010 107010 107010 107010 107010 107010 107010 107010 107010 107010 107010 107010 107010 107010 107010 107010 107010 107010 107010 107010 107010 107010 107010 107010 107010 107010 107010 107010 107010 107010 107010 107010 107010 107010 107010 107010 107010 107010 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 107010 107010 107010 107010 107010 107010 107010 107010 107010 107010 107010 107010 107010 107010 107010 107010 107010 107010 107010 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 Other-O00 107010 1 Other-O00 Other-O00 Other-O00 Other-O00 107010 107010 107010 107010 1 1 1 1 Other-O00 Other-O00 Other-O00 107010 107010 107010 1 1 1 Other-O00 Other-O00 107010 107010 1 1 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 107010 107010 107010 107010 107010 1 1 1 1 1 Other-O00 107010 1 Other-O00 107010 1 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 107010 107010 107010 107010 107010 107010 107010 107010 1 1 1 1 1 1 1 1 Other-O00 107010 1 Other-O00 107010 1 Other-O00 107010 1 Other-O00 107010 1 Other-O00 107010 1 Other-O00 107010 1 Other-O00 107010 1 Other-O00 107010 1 Other-O00 107010 1 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 107010 107010 107010 107010 107010 107010 107010 107010 107010 107010 107010 107010 107010 107010 107010 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 107010 107010 107010 107010 107010 107010 1 1 1 1 1 1 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 107010 107010 107010 107010 107010 107010 107010 107010 107010 107010 107010 107010 107010 107010 107010 107010 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 2BC - (1) M18 1IN SDS PLUS ROTARY HAMMER KIT 2BC - Danielson Monitors 2022 2AY - East Hampton Graybar Order 2022 2AY - East Hampton Printer 2022 NEW SAMSUNG 50 IN TV FOR PAUL'S OFFICE WITH 3 YR WARRANTY. QUOTE PROVIDED BY ERGONOMIC GROUP: TOTAL $860.81 NEW 31.5IN 320NITS 8MS COMMERICAL DISPLAY, PROGRAM AND INSTALLATION FROM HR COMMUNICATIONS INC. $2K TOTAL PER QUOTATION ON 8/11/16. 18 CABINETS FOR SOC AND LATERAL FILE CABINETS FOR CONTROL ROOM NEW 43IN DELL ULTRA HD 4K MULTI CLIENT MONITOR. $1102.03 QUOTATION ON 11/28/16 PER FRED G WORK ORDER FOR 2017 SOC MONITOR Costs to cover the remodel work needed to convert the CONVEX Off-shift Operator Room into a Distribution Simulator Training Classroom. Estimated costs: $25k (requestor: Bill Newport) Red Thread (furniture repair, reconfiguration and new): $4,000 A/Z: HVAC, electrical work, data wiring, window treatments, etc.: $20,000 GXCOS70B GXENG16A GXENG16B GXENG20B GXENG20C DISTRIBUTION SIMULATION/TRAINING RM PLC TT TRAINING GRIDEDGE PROJECTOR FOR SYSTEM RESILIENCY MAPPING PRINTER Power Quality Monitor GXENG21A Hardware Berlin Lab Viavi GXENG22A HP T2600 Color Design/Jet GXENG23A GXENG23B GXENG23D GXENG23E GXENG23F GXENG24A GXMS21C1 GXRS2001 Hartford HP Printer 16C Go Light Stamford FED Torrington Printer Power Quality Monitors -Danielson Trip Saver Data Software Trip Saver Data Software 24 CAP TOOL CHARGED TO MS21C011 Pinpointer & Chargeable battery GXRS2004 4 GOLIGHTS - #570360 GXRS2006 20 Altec Jib wire holder GXRS2014 40 ALTEC JIB WIREHOLDER GXRS2016 30 BUCK OX BLOCK TRAINING SETUP EQUIPMENT AND LABOR FOR PLC TT TRAINING. GRIDEDGE IS THE VENDOR W QUOTE OF $23,475. PURCHASE A PROJECTOR FOR THE SYSTEM RESILIENCY GROUP PURCHASE MAPPING PRINTER PURCHASE Power Quality Monitor Hardware and Licensing for Berlin Lab Viavi Test Set - In support of testing of lab backhaul circuits HP T2600ps MFP 35" Color DesignJet Printer/Copier/Scanner for Tolland Melanie Remington - Sue Gaylord HP T2600ps MFP 36" Color DesignJet Printer/Copier/Scanner for Hartford Melanie Remington - Orwin Watson 1 Go Lights for Joe Bell Stamford FED (16W). Stock Code # is 570359 Melanie Remington - Joe Bell Torrington Printer Topaz CCC 16W 2 Power quality monitors - Danielson. $15K each Trip Saver Data Software Trip Saver Data Software CAP TOOL CHARGED TO MS21C011 Pinpointer @ $2365.71 each, qty 8 , rechargeable battery for pinpointer @347.14 each, qty 11, plug shipping. Golights - @ 504.74 ea. Qty: 4 Item# 570360 LANTERN, GOLIGHT, LED, PROGRAMMABLE REMOTE, 900 FT L X 70 FT W SPOT BEAM Qty: 20, Altec P/N 970796564, @ $521.89 ea ALTEC WIREHOLDER FOR 3 IN. ROUND JIB;; INCLUDES QTY (1) BALL LOCK PIN, 4.13 IN LENGTH;KIT Qty: 40, Altec P/N 970796564, @ $551.89 ea ALTEC WIREHOLDER FOR 3 IN. ROUND JIB;; INCLUDES QTY (1) BALL LOCK PIN, 4.13 IN LENGTH;KIT Qty 30 @$654.67 EA ITEM# 50061A-4/80 BUCK OX BLOCK 4' SLING W/80' LINE JPM - FARMINGTON VALLEY EQUIBUTLER, STEPHEN M21D-911112653516 JPM - FOSKETT EQUIPMENTPOST, LEE21A- 911112653528 GXRS2096 Chain Saws - RSO Tools GXRS2102 40 Wireholders for trucks RSO: Qty 40 @$590 EA ITEM# 970796564, 40 Wireholders for trucks @590 per Altec Supply Golights - @ 504.74 ea. Qty: 4 Item# 570360 LANTERN, GOLIGHT, LED, PROGRAMMABLE REMOTE, 900 FT L X 70 FT W SPOT BEAM GXRS2108 10 GOLIGHTS GXRS2201 NSA 40 Cal Arcguard Switching kits GXRS2202 2 Service Testers #571940 GXRS2204 GXRS2301 GXRS2302 GXRS2304 GXRS2305 GXRS2308 GXRS2309 GXRS2310 GXRS2311 GXRS2312 GXRS2313 GXRS2315 GXRS2316 GXRS2317 GXRS2318 15 24' Ladder - RSO 25KV LOAD RANGER XLT-1 W/COUNTR CAS Dival LG Hyperlite Ladder Graybar 40 Load Ranger XLT-1 Graybar 20 Milwaukee Took Kits Reach Desk Front Seat Elite 40 Tester Detector 240V to 230kV 15 Gas Powered Chain Saw Graybar 10 HARP Material UPSC 12 Restore-Lite Graybar 40 Bierer HP-72DCXLK Hydron 8 Lineman Climbing Kit Golight Light with Base Graybar Current Limiting Fuse Kit 126 Dival LG Hyperlite Ladder GXRS2319 GXRS2320 GXRS2321 GXRS2401 GXRS2402 GXRS2403 Graybar Various Testers 4 VonTester Graybar 10 Milwaukee Took Kits 12 Mat, Grounding, non-skid 30 Stick Cutter Cable Graybar 25 Milwaukee Tool Kits GXRS2404 GXRS2405 GXRS2406 GXRS2407 GXRS2408 GXRS2409 GXRS2410 GXRS2411 GXRS2412 GXRS2413 GXRS2414 GXRS2415 GXRS2416 GXRS2417 GXRS2418 GXRS2501 Graybar Hastings and Hubbell Graybar 40 Fluke Kit Set Chance 15 Tester Complete Kit Backup Camera System - RSO Richards LDW1500 Drill Winch Stick Saw HS43177-NUX 2 Stihl Chainsaws Tester, Non-Contact 80-275 KV Dival OH Grounding Kits Graybar Indicator and Cutter Tester, Phasing and Hi Pot, Digital Full Body Harness Lineman Drill Winch Kit Milwaukee 3300R Power Supply Hydraulic Stick Saw 5 Testers, Service Conductors RSO: Qty 8 @$1,614.90 ea 8 ea. NSA 40 Cal Arcguard Switching kits, total $13,046.80 RSO: 2 Service Testers 2 ea. - S/C 571940 Bierer ST 800 FPL Service Tester @ 2699.50 RSO TOOLS: Qty 15 @$684.92 EA S/C 570351 24' Ladder @654.44 ea, with padded top V-Rung accessory ($30.48 ea) 25KV LOAD RANGER XLT-1 W/COUNTER AND CAS. Quote from Graybar, $63,032.80 LG Hyperlite 28' Ext Ladder and Hyperlite Type 1AA fiberglass ladder, v-bar, 24', Quote from Dival on 5/5/2023 - $6,749 40 Load Ranger XLT-1. Quote from Graybar on 6/9/2023, $66,992 20 Milwaukee Tool Kits. Quote from Graybar on 6/13/2023, $108,061 Reach Desk Front Seat Elite for Laptop Use, includes printer stand, phone mount and Wagan 425 Watt Power Inverter. Quote from AutoExec on 8/7/2023, $2,600 40 Tester Detector 240V to 230kV including Case and Shotgun Adapter. 40 ea. Total $33,237.62 15 Gas Powered Chain Saw; 14 in bar, 35.2 cc, 8.83 lbs, recommended for aerial use. 15 ea., $10,415.55 Graybar HARP Material. Quote from Graybar on 8/15/2023, 10 each @ $3,183.89, Total $31,838.90 UPSC 12 Restore-Lite Case, Meter Head and Locking Kit 10KV/A, 300 AMP Connectors. Quote from UPSC on 8/11/2023, $60,732 Graybar 40 Bierer & Associates HP-72DCXLK. Quote from Graybar on 8/31/2023, $76,791.20. 4 Medium Climbing kit @$3,714.87 ea and 4 Large Climbing Kit @$3,714.87 ea, $29,718.87 Total. Quote from Hydron Incorporated on 9/11/2023. Golight Light - programmable, wireless remote, suction cup and magnetic mount base S/C 570369. 12 ea @$537.29, $6,447.48 Total. Graybar Current Limiting Fuse Kit. Quote from Graybar on 9/14/2023, 40 ea @$1,542.86 , Total $61,714.40 Dival Little Giant Hyperlite Type 1AA fiberglass ladder, v-bar, 24'. Quote from Dival on 9/28/2023, 126 @ $622.50 ea., Total $78,435 Graybar Service Conductor Tester 8 ea. S/C 532351 - $2783.52 ea. / 22,268.16 Graybar Fault Locator 8 ea. S/C 571914 - $1,914.84 ea. / 15,318.72 Graybar Phasing and Hi-Pot Tester 8 ea. S/C 524483 - $4,068.71 ea. / $32,549.68 Graybar Ground Set Tester 10 ea. S/C 571925 - $4,072.63 ea. / $40,726.30 Graybar Hot Stick Tester 10 ea. S/C 579925 - 2,599.92 ea. / $25,999.20 4 ea. (VonTester – SST15-832) S/C 571946 at $16,688 ea. / $66,752.00 10 Milwaukee Tool Kits. Quote from Graybar on 11/2/2023, $4638.55 ea. Total $46,385.50 Mat, Grounding, non-skid S/C 508328, 12ea. @ $683.17 ea., Total $8,198 Stick Cutter Cable, 6' S/C 569033 @ $661.78 ea., Total $19,853 25 Milwaukee Tool Kits. Quote from Graybar on 4/24/2024, $114,933 Hastings ST-235 – 25ea. @ 575.38ea. – 14,384.50 Hubbell C4031022 – 10ea. @ 766.51ea. – 7,665.10 Quote from Graybar on 4/24/2024, Total - 22,049.60 40 Fluke Kit Set (Voltage Wire, Tester and Thermal Imager) $1,747.66 ea, Quote from Graybar on 5/16/2024, Total $69,906.40 15 Chance Tester, Phasing and Hi-Pot, Analog Complete Kit, 15 ea. S/C 524485 @ $3053.88 ea. – Total $ 45,808.20 10 Brigade 360 Camera Vehicle Pilot Backup Camera System with Installation, Total $41,724.70 10 Lineman Drill Winch w/ case, Soft Shackle & Pulley, Total $14,428.60 10 Stick Saw HS43177-NUX, Quote from Graybar, Total 32,224.50 2 Stihl Chainsaw (Stihl MS 261 C-M Chainsaw and Stihl MS 201 C-E Chainsaw) Total $12,523.69 Tester, Non-Contact 80-275 KV, S/C 571931, Total $13,298.50 Bierer custom 3H grounds set kit, Quote from Dival, Total $321,152 Graybar indicator, phase sequence, rotating type S/C 522276 -20 ea. @ $684.77 ea. / $13,695.40 and Graybar cable cutter S/C 569010 – 2 ea. @ $ 693.93 ea. / $1,387.86 Tester, Phasing and Hi Pot, Digital, S/C 524484, Quanity 15 @ $2,342.95 each, Total $35,144.25 Harness, Full Body,FR X Style, S/C 507568, Quamity 1 @ $544.68 Lineman Drill Winch Kit (Richards LDW1500-0 winch with Milwaukee 2903-20 Drill Driver) 90 each @ $16,01.32, Total $144,188.80 Milwaukee Elec Tool ROLL-ON 7200W/3600W 2.5KWH POWER SUPPLY 5 each @$4,054.04, Total $20,270.20 Hydraulic Stick Saw, S/C 501346, Qty 12 @ $2,267.09, Total $27,205.17 5 Testers, Service Conductors @$3,621.98ea. TOTAL: $18,109.90Page 482 of 489
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued October 23, 2026 RRU-159 Attachment 16 Page 482 of 489 work_order_number description GXRS2502 2 Meter Clamps GXRS2503 2 50ft Poles long_description 2 Meter Clamps @ $543.28ea. TOTAL: $1,086.56 cost_element_group ferc_account percent Other-O00 107010 1 Other-O00 107010 1 Other-O00 107010 1 Other-O00 107010 1 Other-O00 107010 1 Other-O00 107010 1 Other-O00 107010 1 Other-O00 107010 1 Other-O00 Other-O00 107010 107010 1 1 Other-O00 107010 1 Other-O00 107010 1 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 107010 107010 107010 107010 107010 107010 107010 107010 107010 107010 107010 107010 107010 1 1 1 1 1 1 1 1 1 1 1 1 1 Other-O00 107010 1 Other-O00 Other-O00 107010 107010 1 1 Other-O00 107010 1 Other-O00 107010 1 Other-O00 107010 1 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 107010 107010 107010 107010 107010 107010 107010 107010 107010 1 1 1 1 1 1 1 1 1 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 107010 107010 107010 107010 107010 1 1 1 1 1 Other-O00 107010 1 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 107010 107010 107010 107010 107010 107010 107010 107010 107010 107010 107010 107010 107010 1 1 1 1 1 1 1 1 1 1 1 1 1 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 107010 107010 107010 107010 107010 107010 107010 107010 107010 107010 107010 107010 1 1 1 1 1 1 1 1 1 1 1 1 Other-O00 107010 1 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 107010 107010 107010 107010 107010 107010 107010 107010 107010 107010 107010 107010 107010 107010 107010 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 Other-O00 Other-O00 Other-O00 Other-O00 107010 107010 107010 107010 1 1 1 1 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 107010 107010 107010 107010 107010 107010 107010 1 1 1 1 1 1 1 Other-O00 Other-O00 Other-O00 Other-O00 107010 107010 107010 107010 1 1 1 1 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 107010 107010 107010 107010 107010 107010 107010 107010 107010 107010 107010 107010 107010 107010 107010 107010 107010 107010 107010 107010 107010 107010 107010 107010 107010 107010 107010 107010 107010 107010 107010 107010 107010 107010 107010 107010 107010 107010 107010 107010 107010 107010 107010 107010 107010 107010 107010 107010 107010 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 107010 107010 107010 107010 107010 107010 107010 107010 107010 107010 107010 107010 107010 107010 107010 107010 107010 107010 107010 107010 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 2 50ft Poles @$636.34ea. TOTAL: $1,272,68 1 Electrical Enclosure @$977.73 ea. TOTAL: 977.73 GXRS2504 1 Electrical Enclosure GXRS2505 1 Ratchet Kit GXRS2506 1 45ft Pole GXRS2507 1 45ft Pole GXRS2508 1 Storage Tray Bucket GXRS2509 1 Floodlight GXRS2510 GXRS2512 1 Meter Clamps 12 Hydraulic Stick Saws GXRS2513 30 Secondary Res. Restoration Kits GXRS2514 1 Hydraulic Cable Cutter GXRS2515 GXRS2516 GXRS2517 GXRS2518 GXRS2519 GXRS2520 GXRS2521 GXRS2522 GXRS2524 GXRS2525 GXRS2528 GXRS2529 GXRS2530 3 40' Ladders RTK Jan 2025 Material Reclass RTK Feb 2025 Material Reclass RTK Mar 2025 Material Reclass RTK Apr 2025 Material Reclass RTK Jun 2025 Material Reclass RTK Jul 2025 Material Reclass RTK Aug 2025 Material Reclass 10 Line Fault Locator Testers RTK Sep 2025 Material Reclass 1 Battery Kit 1 Plier Kit 1 Hand Spot Light Kit GXRS2531 12 Chainsaws GXRS2532 GXSOC20A RTK Oct & Nov 2025 Material Reclass 5000 Series Ironhorse chair - SOC GXSOC20B 4 Headed Monitors for Hartford EOC GXSOC20C 2 27" Viewsonic Monitors -Colorio 1 Ratchet Kit @$972.96ea. TOTAL: $972.96 1 45ft Pole @ $744.34. TOTAL: $744.34 1 45ft Pole @ $579.07. TOTAL: $579.07 1 Storage Tray Bucket @ $558.52. TOTAL: $558.52 1 Floodlight @ $532.30. TOTAL: $532.30 1 Meter Clamps @ $567.77 ea. TOTAL: $567.77 12 Hydraulic Stick Saws @ $2,267.09 ea. TOTAL: $27,205.17 30 Secondary Residential Restoration Kits @ 3,182.76 ea. TOTAL: $95,482.82 1 Hydraulic Cable Cutter @ $2,117.36 ea. TOTAL: $2,117.36 3 40' Ladders @ $1,041.66 ea. TOTAL: $3,124.97 This work order serves to reclass all qualifying capital material charged to RTK O&M to capital in Jan 2025. Materials include (1) meter clamp, (2) voltage detectors, and (2) compression tools. TOTAL: $3,165.66 This work order serves to reclass all qualifying capital material charged to RTK O&M to capital in Feb 2025. Materials include (1) ratchet driver, (1) cable cutter. TOTAL: $1,612.41 This work order serves to reclass all qualifying capital material charged to RTK O&M to capital in Mar 2025. Materials include (1) meter clamp, (1) compression tool, (2) voltage detectors, (2) crimpers, (1) cable cutter. TOTAL: $4,119.04 This work order serves to reclass all qualifying capital material charged to RTK O&M to capital in Apr 2025. Materials include (1) compression tool This work order serves to reclass all qualifying capital material charged to RTK O&M to capital in Jun 2025. Materials include (1) battery, (1) compression tool, (3) voltage detectors, (1) cable cutter, (1) decent system kit. TOTAL: $5,552.94 This work order serves to reclass all qualifying capital material charged to RTK O&M to capital in Jul 2025. Materials include (1) compression tool, (1) manual cutter, (20) decent system kits, (2) cable assemblys. TOTAL: $21,588.97 This work order serves to reclass all qualifying capital material charged to RTK O&M to capital in Aug 2025. Materials include (9) Safety Sleeves and (2) Storage Trays. TOTAL: 5,688.58 10 Line Fault Locator Testers @ $2,656.05 ea. TOTAL: $26,560.51 This work order serves to reclass all qualifying capital material charged to RTK O&M to capital in Sep 2025. Materials include (1) Cable Cutter 1 Battery Kit. Total: $7,670 1 Plier Kit. Total: $1,080.50 1 Hand Spot Light Kit. Total: $679.50 12 Chainsaws (6 - 16in Chainsaws @ $566.56 ea, 6 - 14in Chainsaws @ $694.37 ea) TOTAL: $7,565.56 This work order serves to reclass all qualifying capital material charged to RTK O&M to capital in Aug 2025. Materials include (3) meter clamps, (1) harness, (1) swivel, (3) voltage detectors, (1) Cable cutter, (1) Oil Pump. TOTAL: $13,044.59 GXSOC21A 4 Monitors & 1 docking station GXSOC21B GXSOC22A GXT22006 GXT22011 GXT22020 GXT22036 GXT22077 GXT22078 GXT22085 5 Veridesks desk modules Laptop Canon Digital Copier/Printer Grounding Test Sets 3 50' Lengths ARBITER SYSTEMS 931A PAM CT East Fendall Eyewash Unit Prospect 22E Hilti Equipment Mgmt Syst - CT East Hilti Equipment Mmgt Syst -CT West Meggers and TTR’s - Waterbury GXT22090 GXT22999 GXT23009 GXT23011 GXT23012 Reel Stands - Construction CT Temp WO for NOV Capital Tool Battery Storage Cabinets - RSE ENPAC Cylinder stand A scaffolding assembly - Hartford GXT23013 Milwaukee Impact Wrench Kit -Centra GXT23014 GXT23015 GXT23016 GXT23017 GXT23018 GXT23019 GXT23020 GXT23021 GXT23022 GXT23023 GXT23024 GXT23025 GXT23026 3 Phasing testers - Central SS 17 chairs for SS Cheshire DTR 8510 Tools for Madison SS Ops DTR 8510 Tools for New London SS Grinder Paddle Switch -Central SS Air Monitor Devices - Norwalk SS Air Monitor Devices - Stamford SS WRENCH SET-#572563 Danielson Elevating Motors - SS Ops West Job Boxes & Tools for SS Madison Ladders (6ft -24ft) for Hartford SS Desk & Chairs - Windsor Locks 14K 15 CHAIRS - HARTFORD SS 2NT GXT23027 GXT23028 GXT23029 GXT23030 GXT23032 GXT23033 GXT23034 GXT23035 GXT23042 GXT23043 GXT23044 GXT23045 5 Shotgun switch sticks - Cheshire 5 Pelsue Retractable Lanyards -CMS 2 Cordless Crimping Tool Kits -2EV Milwaukee Magnetic Drill Press -2EV Maypole (Fall Limiter) -New London Parabolic Pinpointer -Model 251 -FE Cordless Crimping Tool Kits -2EV 2 A/C unit for Riverside 2R Truck box -E Hampton 2NH Laser level Detector 65 Cal suits - SS Central 3 Rescue Kits - RSE GXT23046 Cordless Crimping Tool Kit - 2NH GXT23048 GXT23049 GXT23050 GXT23053 GXT23054 GXT23057 GXT23058 GXT23059 GXT23060 GXT23061 GXT23062 GXT23063 GXT23065 GXT23066 GXT23067 Harness - East Hampton 2NH Propper Rigging lifting chains 2 Jobsite boxes CMS shop in Berlin Magnetic Drill Kit - E Hampton DTR 8510 Tools for East Hampton SS DILO SF6 fittings and hoses - 2BW Drill Press set - Hartford 2NT Drill Kit and bit set - Hartford Harnesses for New Hires - FE East Tools for CMS Electricians Tools for Station Ops East -2BW Drill set +bit kit for CMS Construc Atmospheric Testers - 2EV Square Punches Tool -Construction Harnesses for New Hires - FE West GXT23069 GXT23070 GXT23072 GXT23073 Pallet Jack - FE Waterbury Megger tester - Torrington 3N4 Torrington E/M shop tools 3N4 Manhole cover lifter -2EV GXT23076 GXT23077 GXT23078 GXT23079 GXT23999 GXT23WBY GXT24001 Hand-Pump Hydraulic Driver New Alber hydrometer - Central SS Tools for new EM Trucks - Northwest Milwaukee Cordless tool kit - 3H4 Temp WO for SS Ops D Capital Tool Waterbury SS Shop Setup -2BD CMS Milwaukee Tool Kits GXT24002 GXT24003 GXT24004 GXT24005 Remote Racking System - 2BH Pallet Jack - Hartford 2NT (2) Portable Rebar Cutters - 2EV Dayton manual Pallet Jacket -2CB GXT24006 GXT24007 GXT24009 GXT24010 GXT24012 GXT24013 GXT24015 GXT24016 GXT24017 GXT24018 GXT24019 GXT24020 GXT24021 GXT24022 GXT24023 GXT24024 GXT24025 GXT24026 GXT24027 GXT24028 GXT24029 GXT24030 GXT24031 GXT24033 GXT24034 GXT24035 GXT24036 GXT24037 GXT24038 GXT24039 GXT24040 GXT24041 GXT24042 GXT24043 GXT24044 GXT24045 GXT24046 GXT24047 GXT24048 GXT24049 GXT24050 GXT24WBY GXT25001 GXT25002 GXT25003 GXT25004 GXT25005 GXT25006 GXT25007 Ground testing set -2NT 1 Fluke Multimeter - RSE Rigging for Construction -153 Tools Outfit 4 New Trailers - 2EV 5 fluke amp meters - CMS Berlin 154 CMS Battery Cart Load Box 65 Cal suits - RSE Insulated tool kits for SS batterie Torque wrench sets - 2NT Cable Protector Ramps for CMS 154 Grounds Storage Jobsite Box -SW Combination Cordless Tool Kits -3H4 Blackline gas monitor - CMS 154 Cordless Cable Cutter Kit- S Meadow 3 New Ladders for Tolland SS Ops 1 New Cable Set - Tolland SS Ops Confined Space Safety Syst - SW SS Nitrogen Bottle Rack -Eastern Breaker Operation Cord/Plug - 2BG 15 Spider Grounding Kits Combination Cordless Tool Kits -3H4 Grainger Substation Job Boxes GE Magne-Blast Breaker Op Plug Vaisala DGA Monitor For Transformer Cordless Cable Cutter Kit -2EV Brigade Backeye Backup Camera Wheeler Rex Threading Kit Oil Pump Filter and Access Network Oil Sample Valves Fluke Digital Multimeter - Cheshire Greenlee Conduit Rack Breaker Secondary Blocks Portable AC Power Supply Milwaukee Demo Saw Nitrogen Bottle Lifter Central New Hire Kits Stihl Saw and Water Tank PVC Heating Blanket D Hi-Visibility Safety Grounds Flag Blackline Gas Meter Transformer Turns Ratio Waterbury SS Shop Setup 2024 10’ Umbilical Cord Fluke Digital Multimeter Tolland New Hire Kit Chain Bridle Westinghouse DHP Breaker Central Hi-Pot Test Sets-154 Central Hi-Pot Test Sets-2CB GXT25008 GXT25009 GXT25010 GXT25011 GXT25012 GXT25013 GXT25014 GXT25015 GXT25016 GXT25017 GXT25018 GXT25019 GXT25020 GXT25021 GXT25022 GXT25023 GXT25024 GXT25025 GXT25026 GXT25027 Central Hi-Pot Test Sets-2NT Central Hi-Pot Test Sets-2BG Eastern Hi-Pot Test Sets-3H4 Eastern Hi-Pot Test Sets-2BY Eastern Hi-Pot Test Sets-2BW Eastern Hi-Pot Test Sets-2NH Ladders and Scaffolds Fluke 87V meter CPC-100 test sets CPC-100 test sets Digital Hydrometer Western Hi-Pot Tests -2BD Western Hi-Pot Tests -2BH Western Hi-Pot Tests -3N4 Western Hi-Pot Tests -2BT Western Hi-Pot Tests -3W4 Omicron ARCO 400 - 3CL Omicron ARCO 400 - 3CM Rebar Tie Gun Harness and Lanyards 5000 Series Ironhorse chair for SOC, Qty 1 at $4,400 ea Equipment for two additional full operator consoles in Hartford, due to our current operations under the pandemic. 4 monitors per desk at $800 a piece and probably $500 for the stand (per Glazier, Fred) 2 viewsonic 27" touchscreen monitors. Equipment for Berlin SOC: 4 monitors at $850 a piece and 1 docking station (per Glazier, Fred) Equipment for Berlin SOC: 5 Veridesks desk modules that go on desks that allow people to work standing up. $495/ea plus tax = $2,632.16 The purchase a laptop for a contractor helping with the eECS Project (SCADA Project). Canon imageCLASS X MF1643iF II Digital Copier/Printer/Scanner/Fax System(Newtown AWC to replace Canon iR1025iF RYAN ID S4243 – Substation), $1,495 Grounding Test Sets 3 50' Lengths, $2,700 Two (2) ARBITER SYSTEMS 931A Power System Analyzers W/power DSA including 811 Series Configured Universal Test Plug Lead for CT East. Fendall Eyewash Station including a Set of Eyewash Solution Replacement Cartridges @ Prospect 22E in Greensich to replace plumbed eyewash stations thay are failing. The cost incudes two workdays for removal of old and installation of the new unit. Hilti Equipment Management- CT East. Equipment management system to keep track of inventory, location, regulatory calibration requirements, and repair costs. Total costs: 17,868.10 Hilti Equipment Management- CT West. Equipment management system to keep track of inventory, location, regulatory calibration requirements, and repair costs. Total costs: 17,868.10 Capital tools (Meggers and TTR’s) are needed to outfit the new Waterbury AWC Substation group. Reel jacks for large cable reels. Quote from Graybar for Stands and spindle. Total costs: $3,917.16. Reel Jacks for large cable reels. This style jack is ergonomically designed to prevent soft tissue injuries versus the previous design. CT Temp WO for NOV Capital Tool for SS and FE. WO to be used to capture all the capital tools for 2022 for RSE 8 Battery Storage Cabinets with installation for RSE Berlin, cabinet costs, $1,509 ea, installation costs $3,147. Total costs: $15,217 ENPAC Cylinder stand for substation nitrogen bottle storage, Qty: 1, Costs: $700.86 +shipping a scaffolding assembly for the Hartford district to perform elevated work safely with substations. Total costs: 2,802.86 Milwaukee Impact Wrench Kit, Qty: 6 for Central SS, cost: $525.35 each Specs attached Wireless phasing tester 4-69KV with adapter for Central SS. Qty: 3 each items: 571919, 567827 Total costs: 9,968.70 17 chairs for Electricians office area in the Cheshire AWC to Replace worn out/outdated office chairs . Total costs: $16,615.22 DTR 8510 Tools to replace the ones missing safeguards which makes them unusable. For Madison Station Ops. Total costs: $14,976.25 DTR 8510 Tools to replace the ones missing safeguards which makes them unusable. For New London Station Ops. Total costs: $10,607.15 Milwaukee Grinder Paddle Switch, Qty: 6 for Central SS, cost: $504.80 each, total costs:3,028.8. Blackline air monitor devices for underground network transformer maintenance for Norwalk SS Ops. Total costs: $5,727.90 Blackline air monitor devices for underground network transformer maintenance for Stamford SS Ops. Total costs: $12,676.90 WRENCH SET, COMBINATION, METRIC, 10-22 MM, CHROME PLATED, 13 PC, 6 PT, item#572563, Qty 2, total costs: $1,329.92 Elevating Motors for racking circuit breakers into and out of their cubicles for Station Ops West. Qty: 3 @ $,2,995, total estimates: $9500 Tools for future projects and Job Box/Cabinet for storage for Madison SS Ops. Total costs: $16,545.56 Ladders (6ft Qty: 3- 24ft Qty 2) for Hartford SS. Total costs: $2,208.42 quote and specs from Dival attached 1 Desk & 2 Chairs (combo) for Windsor Locks 14K. Total costs: $1,000 15 replacement Chairs for Hartford SS shop - quote from Red Thread total costs: $9,276.20 (delivery, installation included). unit cost: $575.08 5 Shotgun switch sticks - Cheshire item#571597, estimated costs: $2,500 STICK,GRIPALL, CLAMP, HOT LINE, 1-1/4 IN DIA, 8 FT LG, 1 PC 5 Pelsue Retractable Lanyards for use exclusively with the Malta Grabber fall protection trailer. Unit cost: $1,189, total $5,945 2 Milwaukee Cordless Crimping Tool Kit 18V to replace the ones currently non-operational to facilitate daily work inside the substation. $4,700 ea, total costs: $9,400 Milwaukee Magnetic Drill Press to replace an old tool with damaged.faulty cord, not working magnetic base. Item# 40LJ21 from Grainger, Qty: 1 Cost: 1,301.01 Maypole (Fall Limiter) to safely complete work on top of transformers for New London SS. Qty: 1, costs: $2,109.89 (price from 04/2022) Quote needs to be updated. Parabolic Pinpointer, Model #251 from Radar Engineers, Qty: 1, Costs:$3,900, for Distribution Cordless Crimping Tool Kits for high volume crimping jobs on construction projects, Qty: 2, Unit price $872.42, total costs: 1744.84 2 A/C unit for Riverside 2R, total costs: 2,697.44 A truck box (new retractable harnesses included in quote) for the East Hampton Electrician, cost: $970.99, Qty: 1 Laser level Detector, needed for setting heights on slabs and support structures. purchased with Pcard John Weigert, costs: $1,400 65 Cal suits, Qty: 35 Require 65 cal suit for change in safety requirement to replace 40 cal suits for Central Station Ops. Total costs: $98,465.36 Rescue Kits for RSE, Qty: 3, $1,154.3 ea, total costs: $3,462.9 Need for rescue set up when in going into Vaults. MILWAUKEE Cordless Crimping Tool Kit, item# 45FD42, Qty: 1, cost: $3,124.74 for East Hampton Shop to be used on various jobs. New harness for electrician in East Hampton AWC, item# 501141, Qty: 1, cost: $790.3 for East Hampton Shop to be used on various jobs. Propper Rigging. These 4 way adjustable lifting chains were needed to properly lift the Trenwa being installed on our Bunker Hill job. purchased with Steven Woods Pcard costs: $605.13 2 KNAACK jobsite boxes for CMS shop in Berlin to store grounding equipment. @$850.65 ea, total costs: 1,701.30 MILWAUKEE Magnetic Drill Kit for E Hampton various station repairs. Item# 48UT16, costs$ 3,416.93 DTR 8510 Tools to replace the ones missing safeguards which makes them unusable. Due to safety requirements, all equipment will need to be replaced. For East Hampton Station Ops. Total costs: $11,674.50 DILO SF6 fittings and hoses needed for SF6 breaker maintenance for Danielson shop. Total costs: $14,813.80 Drill Press set (replacement) for Hartford, total costs: 5,498.96 Milwaukee Cordless Rotary Hammer Drill Kit and a bit set. Tools are capable of drilling through brick and concrete for some current AC and light upgrade projects as well as upcoming electrical projects. Specs attached. BuckOhm Dielectric X-Style Harnesses for New Hires for FE East for distribution transformer testing. Total costs: $7,677.18 Tools for Station Central Maintenance Services Electricians to better perform the added scopes and job assignments within the Eversource territory. Total costs: $13,761.80 Various tools are needed for projects and substation maintenances for Station Ops East. DR#662550 tools for Tracy OCB Project. Total costs: $7,582.47 Milwaukee Drill set with bit kit for CMS Construction, total costs; $2,796.57 Atmospheric Testers and accessories for Station Construction to manhole gas meters and to replace outdated and broken meters. Total costs: $10,327.78 Square Punches Tool necessary to cut Control Panels in Substations to install Test Devices and Meters. Total costs: 3,278.69 BuckOhm Dielectric Harnesses for New Hires for FE West for distribution transformer testing. Total costs: $3,626.06 Pallet Jack needed for FE Waterbury to safetly move the recloser pallets around. Total costs: $683.14 Meggar Meg-Ohm meter is needed to perform breaker maintenance. Item#571937, costs: $2,115.38 Torrington E/M shop tools. These Gas Meters are needed to monitor and ensure work area is safe to facilitate Network maintenance and inspections. Total costs: $5,400.30 Manhole cover lifter, item#570396, total costs: $871 Hand-Pump Hydraulic Driver. This tool will make installing test devices in live control cabinets safer for the Employee and Equipment. New Alber hydrometer for our annual battery maintenances. This is a tool that is utilized for battery maintenance for D/T. Qty: 1, total costs: $5,000 Standard Tools to outfit 2 new EM trucks for Northwest SS Ops. Tool list with Manufacturer, Part number and unit cost is attached. Tota costs: $11,138.82 Milwaukee Cordless tool kit to replaced old Dewalt kit. This would be a punchout through grainger. TK94613601T Milwaukee Cordless Combination Kit. Snow blower purchased with Pcard by Abdrew Coppola, ref#911116371064 02/2024 WO to capture the setup costs (test equipment, tools, material, etc) for SS Waterbury shop. Milwaukee Tool Kits for CMS Construction, total costs; $6,815.93 Remote Racking System with remote switching kit for Stoney Hill 48C substation. Total costs: $25,420 Dayton manual Pallet Jacket, item #30LU67, costs:$630.39 to replace the one failed in Hartford (2) Portable Rebar Cuttersto perform civil work on projects in substations. Tool promotes efficiency and production while providing a safer method of cutting rebar compared to using a chop saw on the jobsites Dayton manual Pallet Jacket hand truck, item #2TUR8, costs:$572.87 for Tolland shop a ground testing set, ITEM#603920, to replace the one failed for Hartford SS Ops. costs: $3,100 Fluke Multimeter combo for RSE to properly perform their planned maintenance and troubleshooting tasks. Qty: 1, total costs: $ 614.31 Rigging needed to install shoring safely and correctly at Middle River SS. Substation Construction 2EV has received (4) tool new trailers from Transportation that will be utilized on our substation construction projects. Our Chiefs will be outfitting these trailers suited to their needs. This will mean the purchase of construction materials, toolboxes, tools, shelving and cabinetry etc. Each Chief will be outfitting the Tool Trailer to his individual needs and requirements. 5 fluke amp meters for the CMS shop in Berlin @ $585.15 ea, total costs: $2,925.75 CMS Battery Cart Load Box to facilitate a simulated load to perform necessary compliance testing on our mobile battery carts for KF2 BES battery compliance. Total costs: 16,035 65 Cal suits for RSE for network switching and maintenance. Total costs: $165,046.33 8 Insulated tool kits for working on substation batteries. 2 Kits each for CMS, and Cheshire, Hartford and Tolland AWCs. Quote attached from Dival is for 1 pair/kit. Total costs: $25,659.20 Torque wrench sets, total costs $2,581.90, quote and specs from Graybar 8 Cable Protector Ramps for CMS, total costs: $6,374.64 Grounds Storage Jobsite Box -Qty 6 @852.92 ea for SS Ops SW Combination Cordless Tool Kits for new electricians for New London, TK9973113T, Qty 2, $919.99 ea. Blackline gas monitor for our CMS shop in Berlin. (used for D and T), total costs: $3,343.95 Cordless Cable Cutter Kit, M18, MILWAUKEE for the project at South Meadow for cutting cables. Qty: 1, costs: $4,300.32 3 New Ladders for Tolland, item #s 621284,621285, total costs: $1,995 1 New Cable set for our testing equipment for Tolland, Total costs: $1,850. Can be used for D and T. Confined Space Safety System for SW SS Ops, Qty: 3, total costs: $14,325. Nitrogen bottle storage rack -Eastern, purchased from Kensington Welding with Jason's Pcard, total costs: $1626.09 Breaker Operation Cord/Plug for timing test all PowerVac Circuit Breakers. Qty: 1 costs: $2,210.5 15 Spider Grounding Kits to supply the RSE electricians with the spider grounding kits for grounding needs on the distribution system. Item#521783, total costs: $14,769.10 Combination Cordless Tool Kits for new electricians for New London, TK9973113T, Qty 1, $919.99 ea., DR 719852 Job Boxes for Substation grounds to be stored at appropriate substations. To be purchased from Grainger qty 12 @$834.88 and $553.59 shipping, Total $10,572.15 GE Magne-Blast Breaker Operation Plug. Tool is for timing test all GE Magna Blast Circuit Breakers and breakers with similar control power contacts. Qty: 1 costs: $1,750 New portable Vaisala gas monitors to install on substation transformers used to monitor oil. Quote from Vaisala 6/13/2024, Total $51,051 Cordless Cable Cutter Kit, M18, MILWAUKEE for Upgrade to existing tool to reduce soft tissue injuries. Qty: 1, costs: $4,358.50 CT Station Ops is to purchase the Backup Camera System (Qty 6) as a useful safety tool to reduce PMVAs. Quote from Brigade, Total $33,379.76 Wheeler Rex Threading Kit. Upgrade to existing tool to reduce soft tissue injuries. Quote from Graybar on 5/6/2024, $20,796.21. Oil filter pump and accessories. To be used in draining and processing oil for recloser, LTC, and network transformer maintenance. Qute from PHI on 7/16/2024, Total $5,552.99 Oil sample valves from Swagelock to safely take the oil samples on network transformer, Total $4,228.20 A Fluke Multimeter for new electrician, Item# Fluke-87-V, Qty: 1, Costs: $582.24 Greenlee mobile bar and pipe rack: 1,000 lb load Capacity, Total $1,064.90 Breaker secondary block item 1 is for DHP style breakers and item 2 is for Magna Blast Breakers, Total $2,300 EGO Battery Powered Portable Power Station. Total $3,144.07 Milwaukee M18 FUEL ONE-KEY 18V Lithium-Ion Brushless Cordless 9 in. Cut Off Saw (Tool-Only) - outfitting van for new third crew. Quote attached, Total $652.16 Nitogen Bottle lifter Item #999 ECL-8, Quote from Maine Oxy, Total $2,075 New hire kits are needed to onboard electricians into the work force. Quote from Dival 10/22/2024, 3 Qty @ $4,996.50 each, Total $14,989.50 14” Stihl Gasoline Powered Cutquik Saw, Total $1,299.99 and Stihl Portable Pressurized 10L water tank, Total $147.35 Greenlee PVC Heating Blanket for 2"-3" to bend pipes, Total $976 FLAG, SAFETY, GROUNDS, 17-1/2 IN H, 16-1/2 IN W, VINYL, HI-VISIBILITY ORANGE, REFLECTIVE STRIPS, Magnetic with Pole, Quote from Dival, Qty 135 @ $144.50 each, Total $19,507.50 Blackline G7C pumped, H2S, CO, LEL-MPS & O2, 2 year term purc. with accessories, Quote from Dival, Total $20,752.95 Transformer Turns Ratio Item # 571933, Qty 6 @ $4,021.98 each, Total $24,131.88 WO to capture the setup costs (test equipment, tools, material, etc) for SS Waterbury shop for 2024. Some costs got moved to GXT24WBY so GXT23WBY won't go beyond $300K 10' Umbilical Cord For DH (18 Pin Disconnects) Style Breakers, Product CBS-DH-UM, Qty 1, Total $2,750 Fluke Digital Multimeter, CAT III 1000V/CAT IV 600V, TRMS, 1,000 V Max AC Volt Measurement, 6,000, Item # 6MR09, Total $554.83 New Hire Kit, Quote from Dival, $5,234.30 9/32" X 1 O' 4-LEG G100 CHAIN BRIDLE, ADJUSTABLE: QOSA, item # QO-9/32 Westinghouse DHP breaker operation plug, Product CBT-DHP, Quote from Circuit Breaker Sales NE TESTER, HIPOT, 50 KV, Item # 583482, Qty 1, Total $10,000 TESTER, HIPOT, 50 KV, Item # 583482, Qty 1, Total $10,000 TESTER, HIPOT, 50 KV, Item # 583482, Qty 1, Total $10,000 TESTER, HIPOT, 50 KV, Item # 583482, Qty 1, Total $10,000 Combination Cordless Tool Kits for new electricians for New London, TK9973113T, Qty 2, $919.99 ea. TESTER, HIPOT, 50 KV, Item # 583482, Qty 1, Total $10,000 TESTER, HIPOT, 50 KV, Item # 583482, Qty 1, Total $10,000 TESTER, HIPOT, 50 KV, Item # 583482, Qty 1, Total $10,000 American Ladders and Scaffolds. Total $4,169.25 Fluke 87V meter. Cost $510.26 + $448.03= $958.32 CPC-100 test sets to perform 3 phase high current injecting testing. Cost $104,893.01 CPC-100 test sets to perform 3 phase high current injecting testing. Cost $209,786.01 HYDROMETER, DIGITAL, W/ SPECIFIC GRAVITY, CARRYING CASE, DATA LOGGER, NIST CALIBRATION, INFRARED AND SERIAL INTERFACE Qty 1, Total $6,150 AC Hipot, 50KV, 120V/15A, Qty 1, Total $9,500 AC Hipot, 50KV, 120V/15A, Qty 1, Total $9,500 AC Hipot, 50KV, 120V/15A, Qty 1, Total $9,500 AC Hipot, 50KV, 120V/15A, Qty 1, Total $9,500 AC Hipot, 50KV, 120V/15A, Qty 1, Total $9,500 Omicron ARCO 400 adapters for Viper Single-Phase reclosers. Cost $33,755.49 Omicron ARCO 400 adapters for Viper Single-Phase reclosers. 10 at $2,620 ea. Total Cost $28,182.75 Tool to tie Rebar. Total $6,550 Full body harness, shock absorbing and secondary lanyards. Total Cost $3,442Page 483 of 489
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued October 23, 2026 RRU-159 Attachment 16 Page 483 of 489 work_order_number description GXT25030 Milwaukee Combination Kit GXT25031 Truck drawer and toolbox GXT25032 Adjustable Jack GXT25033 Digital Theodolite GXT25034 New Hire Kit GXT25035 Swage, lower dies, yoke GXT25036 Scaffolding GXT25042 Safety Harness GXT25043 Portable Generator GXT25044 42-pin cable GXT25045 Paint sprayer GXT25046 Remote Hydraulic Cutter GXT25047 Phase ID Model 6000 GXT25050 Mobile Transformer Testing GXT25051 Digital Multimeters GXT25052 Zoll AED Plus GXTBARON BARON Oil Processing Unit GXTBARON HAND0011 HELENE11 HQDC0111 HQNET111 HQVET111 HRWK0011 HSAN0011 HSPN0011 HTFDTE22 HUNTBRK1 HUTP0011 BARON Oil Processing Unit Material Handling Unbill Mutual Aid WO Storm Helene H/Q Phase 2-DC H/Q Phase 1-DC-NEET H/Q Phase 1-DC-VET Workers Compensation Admin Health Savings Accounts Fees + Payment - FP0 Hartford Tools & Equipment Montville Hunts Brook Fly Ash Highway Use Tax Payment HVDCGRID ICBAP011 ILP611C1 INCN0011 INCW0011 INSPC2AD INSPC2AG INSPC2BB INSPC2NP INSR3O11 INSRAO11 INTOHE11 INVT0011 INVT0211 INVT0311 INVT0411 INVT0511 INVT0611 INVT0711 INVT0811 INVT0911 IPC011C1 IPC111C1 IPC111C2 IPC211C1 IPC311C1 IPC411C1 IPC911C1 IPPNF111 IPPNF211 IRMT0011 ISMD0011 ISMDG011 ISOV0011 ISPL0011 ISSB0011 ISST0011 ISSV0011 ISTA0011 ISTE0011 ISUN0011 IT1D1203 IT1D1204 IT1D1303 ITRO0111 ITRU0011 IVCL0011 JANT0911 JANT0911 JANT0911 KICK0011 KVLIB011 L1WTNF11 L2INTA11 LABPRINT LDSM0011 LEAS0011 LEDCNV01 LENMIE11 LFAC0011 LGBK0011 LGCS0011 LGEM0011 LGFR0011 LGLT0011 LGSR0011 HVDC GRID HARDENING ICB Work Order 2016 LC - Network 4500 Switch-ES CT Incentive Payment Inclement Weather 2020 FAULT INDICATOR CHESHIRE 2AD 2020 FAULT INDICATOR NEWTOWN 2AG 2020 FAULT INDICATOR TOLLAND 2BB 2020 FAULT INDICATOR HARTFORD 2NP CA AWO PBL LIAB CLAIMS CA AWO WORK COMP CLAIM CA AWO INTEREST OTHER Inventory offset Inventory Offset Inventory Offset Inventory Offset Inventory Offset Inventory Offset Inventory Offset Inventory Offset Inventory Offset 2020 PC Replacements CL&P (11) 2021 PC Replacements - CL&P (11) 2021 PC Replacements - CL&P (11) 2022 PC Replacements - CL&P (11) 2023 PC Replacements - CL&P (11) 2024 PC Replacements CL&P Elec 2019 PC Replacement - ES CT CO 11 Purchase Power- COGEN Non Firm Non-Firm COGEN Purchased Power Install & Remove Meters Install Meters & Dev (pre-cap/CFI) Install Meters & Dev (pre-cap/CFI) Inspect- Overhead Inspect - Poles Inspect Bulk Stations Inspect Distribution Stations Inspect - Stray Voltage Dist Sta Misc PM Inspect/Test Environmental Inspect - Underground SIMSBURY WIRELESS EXPANSION PROJECT CL&P WIRELESS UPGRADE PROJECT CL&P WIRELESS PROJECT Install Transformers & Regs-overhea Install Transform Regula undergrnd Invoice Clearing Janitorial Janitorial Janitorial Kick Out Corrections WD Payroll KV Expense LVL 1 Witness Test Interconnec LVL 2 Interconnect Desktop Label Printer Locate/DigSafe/Markout Lease LED Streetlight Incentive CA AWO MISC-ALL OTHERS NU LOCAL FACILITIES JAN 2013 Bankruptcy Customer Service Employment Federal Regulatory Litigation State Regulatory LIDAREVL LNGT1DC3 LOBBY011 LOSSDE11 LSPY0011 LTD00011 LTDB0611 LTDB0711 LTDB1011 LTDB1111 LTDB1411 LTDB1511 LTDB1811 LTDB1911 LTDB2211 LTDB2311 LTDB4411 LTDBJE11 LTDSF011 LYME0011 LYMR0011 LZREC011 MADSN001 MAPP0011 MBLD0011 MBLD0011 MBLD0011 MBLD0111 MBLD0111 MBLD0111 MBLD0311 MBLD0411 MBLD0411 MBLD0411 MBLD0611 MBLD0611 MBLD0711 MBLD0811 MBLD0811 MBLD0811 MBLD0911 MBLD0911 MBLD0911 MBLD1011 MBLD1111 MBLD1111 MBLD1111 MBLD1211 MBLD1211 MBLD1211 MBLD1311 MBLD1311 MBLD1311 MBLD1411 MBLD1411 MBLD1411 MBLD1511 MBLD1611 MBLD1611 MBLD1611 MBLD1911 MBLD1911 MBLD1911 MBLD2011 MBLD2011 MBLD2011 MBLD2411 MBLD2411 MBLD2411 MBLD3111 MBLD3211 MBLD3311 MBLD3311 MBLD3311 MBLD4111 MBLD5511 MBLDW111 MC22NT01 MC22NT01 MC22SM01 MC22TM01 MCIN0011 MCRO2201 MCRO2201 MDEC0011 MDSNTE22 MEAL0111 MEDRAE11 METRET11 MGSP0011 MGSP0111 MGSP0111 MHINSU11 MHMMNT11 MILE0111 MISC0011 ML191103 ML191110 ML201115 ML201135 ML201136 ML221101 LIDAR & ALT TECHNOLOGY LONG HILL - FREIGHT STREET WORK Lobby Stock Clearing CA AWO LOSS REAQD DEBT Loss Payments STD Accrual Long Term Debt2004 Series A Long Term Debt2004 Series A Long Term Debt2005 Series A Long Term Debt2005 Series A Long Term Debt2006 Series A Long Term Debt2006 Series A Long Term Debt2007 Series A Long Term Debt2007 Series A Long Term Debt2007 Series C Long Term Debt2007 Series C Long Term Debt2014 Series A CA AWO LTD BENEFIT LTD Self Funded Pmts East Lyme East Lyme LREC/ZREC Program Madison AWC Site #67 Mapping Maintain Buildings Maintain Buildings Maintain Buildings Maintain Buildings Maintain Buildings Maintain Buildings Maintain Buildings Maintain Buildings Maintain Buildings Maintain Buildings Maintain Buildings Maintain Buildings Maintain Buildings Maintain Buildings Maintain Buildings Maintain Buildings Maintain Buildings Maintain Buildings Maintain Buildings Maintain Buildings Maintain Buildings Maintain Buildings Maintain Buildings Maintain Buildings Maintain Buildings Maintain Buildings Maintain Buildings Maintain Buildings Maintain Buildings Maintain Buildings Maintain Buildings Maintain Buildings Maintain Buildings Maintain Buildings Maintain Buildings Maintain Buildings Maintain Buildings Maintain Buildings Maintain Buildings Maintain Buildings Maintain Buildings Maintain Buildings Maintain Buildings Maintain Buildings Maintain Buildings Maintain Buildings Maintain Buildings Maintain Buildings Maintain Buildings Maintain Buildings Maintain Bldg-BCW Annex Maintain Bldg-Waterbury Warehouse Maintain Bldg-Windsor Locks Warehou Newtown Microwave Upgrade Newtown Microwave Upgrade S. Mtn Microwave Upgrade Talcott Mtn Microwave Upgrade Margin Collateral Interest New Milford Microwave Upgrade New Milford Microwave Upgrade Misc. Dist expense (small tools) Madison Tools & Equipment Meals CA AWO MEDICAL RES ADJ Electric Meter retirement Management & Supervision Management & Supervision Management & Supervision Manhole/Vault Inspection Manhole Major Maintenance-UG Mileage Miscellaneous Deduction Berlin - Upgrade Warehouse Radios Network printer for BCS Newington Canon ImageRunner Printer Purchase copier Newington Tablets & Keyboards Solar Stop Signs long_description Milwaukee combination kit for new electrician to use for several things: cleaning switches, unbolting/torquing devices, drilling holes to mount equipment, cutting wood for structure installation, etc. Truck toolbox and drawers to hold tools and equipment on newly received truck Adjustable pallet jack for the Western CT Field Engineering Test’s Freight St Recloser Shop that will work with the Viper-SEL 651R controls that come on a smaller pallet. The adjustable jack will it to work with the current situation and the future. DT8-05LS 5-Sec. Laser Sight Digital Theodolite, with Optical Plummet Electrician new hire kit. Cable/ground swage dies, lower die block, Yoke Scaffolding Safety Harness Portable Generator 42 pin cables are accessories for Omicron ARCO400 recloser test sets Handheld paint sprayer and spray tip REMOTE HYDRLC CUTTER 1 0000PSI CUTS UP TO 2156 KCMIL ACSR UP TO 2" COP & ALUM Phase ID model 6000 will be used to determine phasing on distribution circuits throughout Connecticut. Phase identification is required to determine what phase loads are connected to in the field. This information will be utilized to perform load balancing within the distribution circuits. Balanced loads will help prevent circuit overloads, equipment damage, low voltage and stray voltage. RCP2 19-Pin Controller Adapter are needed to test commission relay settings for reclosers on mobile transformers with 19 pin cables using the Omicron Arco 400 test set. Digital multimeters are used frequently in low voltage substation work and troubleshoot/repairing substation control equipment. Zoll AED Plus. The creation of a third crew within our department; they currently do not have this safety device available to them in the field. WO for Baron Oil Processing Unit This WO is relinked to CS00626 in April 2024. Relink email attached WO for Baron Oil Processing Unit This WO is relinked to CS00626 in April 2024. Relink email attached HAND0011NT011 Mutual Aid WO for Storm Helene. To capture unbillable costs associated with the support to the deploment of CT crews to Appalachian (AEP) - Hurricane Helene H/Q Phase 2-DC H/Q Phase 1-DC-NEET H/Q Phase 1-DC-VET Workers Compensation Admin-Mantville Health Savings Accounts - Caruso, Ann M HSPN0011EMPBENPAY11 Per Dan Chambrello's e-mail dated 10-5-2022, there will be $85K split evenly between East Hampton, Newtown, Madison, and Hartford for craft school tools and equipment. Montville Hunts Brook Fly Ash - Environmental Reserve. Had to re-create becuase he it didn't come over in the conversaion. Highway Use Tax Payment UCONN 2ND AMENDED AND RESTATED RESEARCH PROJECT(S) HARDENING OF EE HVDC SYSTEMS AGAINST GEOMAGNETIC DISTURBANCE AND MONOPOLE OPERATION OF THE HVDC SYSTEM. ASSET - MODEL HVDC SYSTEMS INCLUDING HVDC CONVERTER STATION, REACTIVE POWER COMPENSATION DEVICES, CONVERTER TRANSFORMERS AND HVDC OH LINE OR CABLE ICB Work Order-McDonald 4500 Switch Replacements - IT 2016 Lifecycle - ES CT INCN0011EMPBENPAY11 INCW0011OPSNTRELEXPENSES11 THIS IS PART OF THE DB FAULT INDICATOR INSPECTION AND REPLACEMENT PROGRAM FOR 2020 THIS IS PART OF THE DB FAULT INDICATOR INSPECTION AND REPLACEMENT PROGRAM FOR 2020 THIS IS PART OF THE DB FAULT INDICATOR INSPECTION AND REPLACEMENT PROGRAM FOR 2020 THIS IS PART OF THE DB FAULT INDICATOR INSPECTION AND REPLACEMENT PROGRAM FOR 2020 CA AWO PBL LIAB CLAIMS CA AWO WORK COMP CLAIMS CA AWO INTEREST OTHER Inventory offset-Ouimette Inventory Offset-Ouimette Inventory Offset-Ouimette Inventory Offset-Ouimette Inventory Offset-Ouimette Inventory Offset-Ouimettte Inventory Offset-Ouimette Inventory Offset-Ouimette Inventory Offset-Ouimette 2020 Modern Desktop - PC Replacements CL&P (11) 2021 Modern Desktop - PC Replacements CL&P (11) 2021 Modern Desktop - PC Replacements CL&P (11) 2022 Modern Desktop - PC Replacements CL&P (11) 2023 Modern Desktop - PC Replacements CL&P Elec (11) 2024 Modern Desktop - PC Replacements CL&P Elec (11) PC Replacement - IT 2019 Lifecycle - CL&P (11), 158 computers Purchase Power- COGEN Non Firm Non-Firm COGEN Purchased Power IRMT0011OPSNTRELEXPENSES11 ISMD0011OPSNTRELEXPENSES11 Install Meters & Dev (pre-cap/CFI) - Balmer, Melanie ISOV0011 ISPL0011OPSNTRELEXPENSES11 Inspect Bulk Stations Inspect Distribution Stations ISSV0011OPSNTRELEXPENSES11 ISTA0011OPSNTRELEXPENSES11 ISTE0011 ISUN0011OPSNTRELEXPENSES11 SIMSBURY WIRELESS EXPANSION PROJECT_260S CISCO EQUIPMENT - NWN QUOTE OP78746 CONTACT: BOB D'EON X3094 PROJECT: IT1DLANA CL&P WIRELESS UPGRADE PROJECT CISCO EQUIPMENT - NWN QUOTE OP79106 CONTACT: BOB D'EON X3094 PROJECT: IT1DLANA CL&P WIRELESS PROJECT CISCO EQUIPMENT - NWN QUOTE OP81290 CONTACT: BOB D'EON X3094 PROJECT: IT1DLANA Install Transformers & Regs-overhea ITRU0011OPSNTRELEXPENSES11 IVCL0011NT011 JANT0911NT011 JANT0911NT011 JANT0911NT011 Waiting for kick out reclass WD Payroll KV Expense-Morrison LVL 1 Witness Test Interconnect-Annual-Desg LVL 2 Interconnect Desktop label printer from Grainger LDSM0011OPSNTRELEXPENSES11 LEAS0011NT011 As part of the LED Conversion project an incentive is provided to the company CA AWO MISC-ALL OTHERS LFAC0011NT011 LGBK0011NT011 LGCS0011NT011 LGEM0011NT011 LGFR0011NT011 LGLT0011NT011 LGSR0011NT011 UCONN 2ND AMENDED AND RESTATED RESEARCH PROJECT(S) MONITORS ROADSIDE VEGETATION AND UTILITY INFRASTRUCTURE. ASSET - POLE STRUCTURE INTEGRITY MODEL LONG HILL - FREIGHT STREET WORK AS PART OF THE LONG HILL TOWER MOVE EQUIPMENT WILL BE PURCHASED FOR THE FREIGHT STREET SITE AS WELL AS LABOR TO INSTALL. LOBBY011ALLOCCLEARING11 CA AWO LOSS REAQD DEBT Loss Payments LTD00011EMPBENPAY11 Long Term Debt2004 Series A Long Term Debt2004 Series A Long Term Debt2005 Series A Long Term Debt2005 Series A Long Term Debt2006 Series A NT011 Long Term Debt2006 Series A DIST11 Long Term Debt2007 Series A Long Term Debt2007 Series A Long Term Debt2007 Series C Long Term Debt2007 Series C Long Term Debt2014 Series A NT011 CA AWO LTD BENEFIT LTD Self Funded Pmts East Lyme East Lyme LZREC011LREC11 Madison AWC Site #67-Rose MAPP0011OPSNTRELEXPENSES11 MBLD0011NT011 MBLD0011NT011 MBLD0011NT011 MBLD0111NT011 MBLD0111NT011 MBLD0111NT011 MBLD0311NT011 MBLD0411NT011 MBLD0411NT011 MBLD0411NT011 MBLD0611NT011 MBLD0611NT011 MBLD0711NT011 MBLD0811NT011 MBLD0811NT011 MBLD0811NT011 MBLD0911NT011 MBLD0911NT011 MBLD0911NT011 MBLD1011NT011 MBLD1111NT011 MBLD1111NT011 MBLD1111NT011 MBLD1211NT011 MBLD1211NT011 MBLD1211NT011 MBLD1311NT011 MBLD1311NT011 MBLD1311NT011 MBLD1411NT011 MBLD1411NT011 MBLD1411NT011 MBLD1511NT011 MBLD1611NT011 MBLD1611NT011 MBLD1611NT011 MBLD1911NT011 MBLD1911NT011 MBLD1911NT011 Maintain Buildings-Rose Maintain Buildings-Rose Maintain Buildings-Rose Maintain Buildings-Rose Maintain Buildings-Rose Maintain Buildings-Rose MBLD3111NT011 MBLD3211NT011 Maintain Buildings Maintain Buildings Maintain Buildings Maintain Bldg-BCW Annex - Savage, Jessica Maintain Bldg-Waterbury Warehouse - Savage, Jessica Maintain Bldg-Windsor Locks Warehouse - Savage, Jessica Newtown Microwave Upgrades MCRO22NT Newtown Microwave Upgrades MCRO22NT S. Mtn Microwave Upgrade MCRO22SM Talcott Mtn Microwave Upgrade MCRO22TM Margin Collateral Interest New Milford Microwave Upgrade New Milford Microwave Upgrade MDEC0011ALLOCCLEARING11 Per Dan Chambrello's e-mail dated 10-5-2022, there will be $85K split evenly between East Hampton, Newtown, Madison, and Hartford for craft school tools and equipment. MEAL0111 MDEC CAPITALIZATION CA AWO MEDICAL RES ADJ METRET11NT011 MGSP0011OPSNTRELEXPENSES11 MGSP0111NT011 MGSP0111NT011 Manhole/Vault Inspection-UG-Annual-Tmpl Manhole Major Maintenance-UG-Annual-Tmpl MILE0111 MDEC CAPITALIZATION MISC0011EMPBENPAY11 Berlin - Upgrade Warehouse Radios Berlin - Network Printer for BCS Newington Canon ImageRunner Printer Cheshire Storeroom - Purchase copier Newington Tablets & Keyboards for Storerooms Berlin - Solar Stop Signs cost_element_group Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 ferc_account percent 107010 107010 107010 107010 107010 107010 107010 107010 107010 107010 107010 107010 107010 107010 107010 107010 Other-O00 107010 0.86206897 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 108030 163020 908000 565520 565580 565590 925000 242450 242450 107010 228450 408140 0.13793103 1 1 1 1 1 1 1 1 1 1 1 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 107010 23401X 107010 242AX0 588111 107010 107010 107010 107010 925000 925000 419040 154010 163020 154AU0 154PV0 107010 232100 154PC0 154080 186ST0 107010 107010 107010 107010 107010 107010 107010 555000 555000 586000 586200 580000 583000 583060 582240 582240 587000 592030 580000 584000 107010 107010 107010 583100 584080 107010 163020 184010 921995 580000 242440 186010 186010 107010 584200 232PA0 107010 921990 56511X 908000 908000 908000 928003 908000 908000 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 0.34 0.08 0.58 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 107010 107010 163010 428100 228230 926000 237CD0 237CD0 237CP0 237CP0 237CT0 237CT0 2371A0 2371A0 2371B0 2371B0 237TB0 926000 228310 555430 555855 908000 228450 588100 184010 163020 921006 163020 184010 921996 921006 921006 184010 163020 163020 921006 921006 163020 184010 921006 921006 163020 184010 921006 184010 921006 163010 163010 921006 184010 921006 184010 163020 163020 921006 184010 184010 163020 921006 184010 163020 921000 184010 184010 921000 163020 163020 921000 184010 163020 184010 184010 920018 163020 163020 163020 163020 107010 108030 107010 107010 242CO0 107010 108030 107010 107010 588138 926000 108030 908000 580000 590000 584050 594010 588139 930200 107010 107010 107010 107010 107010 107010 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 0.18 0.22 0.6 0.21 0.22 0.57 1 0.62 0.19 0.19 0.06 0.94 1 0.13 0.19 0.68 0.64 0.21 0.15 1 0.12 0.75 0.13 0.2 0.53 0.27 0.7 0.11 0.19 0.2 0.57 0.23 1 0.08 0.86 0.06 0.199 0.615 0.186 0.18 0.62 0.2 0.45 0.45 0.1 1 1 0.52 0.17 0.31 1 1 1 0.94370056 0.05629944 1 1 1 0.9236816 0.0763184 1 1 1 1 1 1 0.63 0.37 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1Page 484 of 489
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued October 23, 2026 RRU-159 Attachment 16 Page 484 of 489 work_order_number description ML221102 Double wide cable racks ML221104 Mobile Trailer Stairs ML221105 Stamford Exterior Racking-Storeroom ML221108 Cable Cutters ML221113 Security Monitor Upgrade ML221114 Norwalk-Tindall Gate Camera Add ML221116 Berlin Central Warehouse Fans ML221118 BCW Whse Signs-Episcopal Rd ML221124 BCW ERP Storm Signs ML221125 East Hampton Racking ML221126 Webster St. Warehouse Fans ML221127 Torrington Inside Racking ML221128 Berlin Warehouse Grill ML231101 Waterbury Propane Cylinder Cabinet ML231102 Falls Village Outside Racking ML231103 Falls Village Inside Shelving ML231104 Waterbury Vestil Forklift Boom ML231105 Warehouse Adapter for Cable Cutter ML231106 Pallet Racking for Episcopal Berlin ML231107 Waterbury Tip Dumpsters ML231108 Berlin Warehouse Removal of Racking ML231109 E Hampton Wire Decks & Pipe Racks ML231110 Norwalk Strapping Machine for Store ML231111 Berlin Battery for TSP Forklift ML231112 Newtown Storeroom Chair Replacement ML231113 Norwalk Storeroom Chair Replacement ML231114 Tindall Ave. Norwalk Gate Camera ML231115 BCW Partition Fence ML231116 Newtown Lithium Battery Lift ML231117 Berlin Three Wrapping Machines ML231119 Falls Village Storage Rack Pad ML231120 Norwalk Screen for Racking ML231121 Berlin Floor Sweeper ML231122 Berlin Floor Scrubber ML231123 Hartford Air Curtain ML231124 Berlin Decking for Two Trailers ML231125 Waterbury Strapping Machine ML231127 Wtby Concrete Blocks for Pole Yard ML231128 Waterbury Strapping Machine ML231129 Berlin Rigging for Reels ML231130 Episcopal Location Fencing ML231132 Episcopal Location Floor Leveling ML231132 Episcopal Location Floor Leveling ML231133 Torrington Indoor Shelving/Racking ML231134 Torrington Tip Dumpsters for Store ML231135 Stamford Cable Reel Stands ML231136 Norwalk Office Furniture & Lockers ML231137 Waterbury Blue Reel Rollers ML241101 Facility Renovations ML241101 Facility Renovations ML241102 Waterbury Facility Improvements ML241104 Danielson Forklift ML241106 Berlin Toyota 8FBE18U ML241107 Berlin Toyota 50-8FGU32 - 6.5K-1 ML241108 Berlin Toyota 50-8FGU32 - 6.5K-2 ML241109 Berlin Doosan 74HP 55kw Engine ML241110 Berlin Electric Forklift #2 ML241111 CWB Toyota Forklift Model 8FBE18U ML241112 Berlin Taylor X360 for BCW ML241113 Berlin Toyota 50-8FGU32 - 6.5K - 3 ML241114 Berlin Doosan 74HP # 1 ML241115 Berlin Toyota Forklift ML241116 Berlin Toyota Forklift ML241117 Berlin Taylor X360 (36K Capacity) ML241118 NRG Electric Forklift 50-8FGU18 ML241119 WEG Forklift 50-8FGU32 ML241122 Norwalk Forklift ML241123 Falls Village Forklift ML241124 Stamford Forklift ML241125 Berlin 8 Truck Stands for Warehouse ML241126 Windsor Locks Printers for Warehous ML241127 Windsor Locks Battery Charger Stand ML241128 Cheshire Toyota Forklift #1 ML241129 Berlin Jibs Booms Model JLT630 ML241130 Hartford Propane Cage for Storeroom ML241131 Torrington Tip Dumpster ML241132 Norwalk Wire Racking for Outside ML241133 Windsor Locks Racking Loc Labeling ML241134 Windsor Locks Railing Installation ML241135 TSP Rider Scrubber for Warehouse ML241136 Berlin BCW Steel Pipe Racks ML241137 Waterbury Lobby Rack Install ML241139 East Hampton Strapping Tools ML241140 Falls Viillage Closed Shelving Unit ML241141 Waterbury Pole Safety Racks (6) ML241142 Berlin Fromme Strapping Tool ML241143 Newtown Rousseau Shelving Units ML241144 East Hampton Lifting Bar ML241145 New London Lobby Rack for Storeroom ML241147 Waterbury Gas Door Repair ML241601 Windsor Locks Warehouse Racking ML251101 Massirio Drive Doosan Forklift ML251102 Tolland Storeroom Strap Machine ML251103 Danielson Doosan Diesel Forklift ML251104 New London Doosan Forklift ML251105 Falls Village Electric Walkie Reach ML251106 Torrington Galvanized Reel Racks ML251107 Newtown Rousseau Shelving Units ML251108 New London Toyota Forklift ML251109 East Hampton Toyota Forklift ML251110 Madison Doosan Forklift ML251111 Norwalk Cable Reel Stands (2) ML251112 Tolland Rack Repair Kits, Brace Kit ML251113 Hartford Anchor Interior Racking ML251114 Waterbury Install Galvanized Racks ML251115 Cheshire Racking & Wire Deck Work ML251116 Waterbury Mariotti Forklift ML251117 Tolland Vestil Boom Lift ML251118 Newtown - Summit ToyotaLift ML251119 Windsor Locks Lockers and Benches ML251120 Windsor Locks 2 Snow Throwers ML251121 Oakdale Variable Reach Forklift ML251122 Torrington Door and Maglock Lobby ML251123 Hartford BODE Racking ML251124 Hartford BODE Cantilever Racking ML251125 Hartford Table & Chairs ML251126 Hartford Refrigerator for Storeroom ML251127 Hartford - Backpack Blower ML251128 Falls Village Steel Pole Racks ML251129 Stamford New Office Furniture ML251129 Stamford New Office Furniture ML251130 Madison Storeroom Shelving ML251131 Hartford Floor Scrubber ML251132 Windsor Locks Reset of Beam Levels ML251133 Waterbury Backpack Blower ML251134 Cheshire Blue Tip Dumpsters Order 1 ML251135 Cheshire Blue Tip Dumpsters Order 2 ML251136 Hartford 16 Cylinder Propane Cage ML251137 Torrington Gas Cylinder Cabinet ML251138 Torrington Backpack Blower ML251139 Stamford Backpack Blower ML251140 Norwalk Pole Safety Racks ML251141 Hartford Additional Outdoor Racking ML251142 Windsor Locks Wire Spool Racking ML251143 Waterbury Storage Door Partitions ML251144 East Hampton Cable Rack ML251145 Stamford Concrete Pad ML251145 Stamford Concrete Pad ML251146 Cheshire Replace Office Flooring ML251146 Cheshire Replace Office Flooring ML251147 Hartford Replace Office Flooring ML251148 Stamford Galvanized Racking ML251149 Newtown Club Car ML251150 Torrington Canon Printer ML251151 Tolland Complete Racking Repairs ML251152 Waterbury Blue Reel Dispensers (2) ML251153 Waterbury Huntingdon Racking ML251154 Stamford Pallet and Reel Racking ML251155 New London Toyota Forklift ML251156 New London Concrete & Racking ML251157 Madison Storage Improvement Project ML251160 Windsor Locks Backpack Blowers ML251161 Windsor Locks File Cabinets Hutches ML251162 Windsor Locks Bin Signs ML251163 Waterbury Racking Reinstall ML251164 Tolland Storeroom Desk Replacement ML251165 Relocate Centilever fom Berlin - WL ML251166 Windsor Locks Cut in Three Levelers ML251168 Falls Village Reel Racks ML251169 Windsor Locks New Inverter ML251170 Newtown Additional Cable Reel Stand ML251171 East Hampton Office Furniture ML251172 East Hampton Storeroom Renovation ML251173 Tolland Flooring Replacement ML251174 Windsor Locks Scale & Bumper Guard ML251175 Berlin Crossarms and Decking MMSX0011 Misc maintenance & Support MN23ABCP Capitalize MN23AB11 MN23ABCP Capitalize MN23AB11 MN23BCAP CAPITALIZE MN23B011 MN23BCAP CAPITALIZE MN23B011 MN23TCAP Capitalize MN23T011 MN23TCAP Capitalize MN23T011 MN24QCAP Capitalize MN24Q/P011 JUN 18 20 MN24QCAP Capitalize MN24Q/P011 JUN 18 20 MN24XCAP Capitalize MN24X011 MN24XCAP Capitalize MN24X011 MRDG0011 Meter Reading MS17M011 WIND/RAIN OCT 29-30 ALL DIV MS18H011 HEATWAVE JUN 29-JUL 7 2018 - ALL RE MS18P011 WIND/RAIN FRI DEC 21 2018 MS20C011 TROP STORM ISAIAS AUG 4 2020 MS21D011 PRESTAGING MAR 12 2021 MS21K011 TROP STORM HENRI AUG 21 2021 MS21L011 NOR'EASTERS OCT 25 2021 MS22ACAP CAPITALIZE MAJOR MS22A011 MS22ACAP CAPITALIZE MAJOR MS22A011 MS22B011 NOR'EASTER JAN 29 2022 MS22BCAP CAPITALIZE MAJOR MS22B011 MS22BCAP CAPITALIZE MAJOR MS22B011 MS22CCAP CAPITALIZE MAJOR MS22C011 MS22CCAP CAPITALIZE MAJOR MS22C011 MS22DCAP CAPITALIZE MAJOR MS22D011 MS22DCAP CAPITALIZE MAJOR MS22D011 MS22ECAP CAPITALIZE MAJOR MS22E011 MS22ECAP CAPITALIZE MAJOR MS22E011 MS22GCAP CAPITALIZE MS22G011 MS22GCAP CAPITALIZE MS22G011 MS22HCAP CAPITALIZE MS22H011 MS22HCAP CAPITALIZE MS22H011 MS22K011 Wind/Rain Dec 23 2022 MS22KCAP CAPITALIZE MS22K011 long_description East Hampton - Purchase Double wide cable racks Newington - Produce more single sets of stairs from doubles and increase safety by adding second railings on mobile Trailers. Stamford Exterior Racking-Storeroom New London - Cable Cutters Newtown - Security Monitor Upgrade Norwalk-Tindall Gate Camera Add - Yard Berlin Central Warehouse Fans BCW Whse Signs-Episcopal Rd BCW ERP Storm Signs East Hampton Racking Webster St. Warehouse Fans Torrington Inside Racking Berlin Warehouse Grill Waterbury Propane Cylinder Storage Cabinet Falls Village Ouside Racking Falls Village Inside Shelving Waterbury Vestil Forklift Boom 18 Bays of Pallet Racking - Episcopal Road Berlin Waterbury Tip Dumpsters for assigned materials that can be used by forklifts prioritizing safety Berlin Warehouse - Removal of Existing Stak Racking System Eastern Storeroom Wire Decks & Pipe Racks Norwalk Strapping Machine for Storeroom Berlin Battery for TSP Forklift Newtown Storeroom Chair Replacement Norwalk Storeroom Chair Replacement Tindall Ave. Norwalk Gate Camera Berlin Central Warehouse Partition Fence Newtown Vantage Lithium Battery Lift for Storeroom Berlin Wultec Wrapping Machines (3 each) for Future Expansion Falls Village Storage Rack Pad Norwalk Screen for Racking Berlin Floor Sweeper Berlin Floor Scrubber Hartford Air Curtain Berlin Decking for Two Drop Deck Trailers - Atlantic Star Trailers Waterbury Strap Machine & Strapping Waterbury Concrete Blocks for Pole Yard Waterbury Strapping Machine for Storeroom Berlin Rigging for Reels Episcopal Location Fencing Episcopal Location Floor Leveling Episcopal Location Floor Leveling Torrington Indoor Shelving / Racking Torrington Tip Dumpsters for Storeroom Yard Stamford Cable Reel Stands Norwalk Office Furniture & Lockers Waterbury Blue Reel Rollers for Storeroom Windsor Locks Facility Renovations Windsor Locks Facility Renovations Waterbury Warehouse Facility Improvements Danielson Forklift Berlin Toyota 8FBE18U Berlin Toyota 50-8FGU32 - 6.5K-1 Berlin Toyota 50-8FGU32 - 6.5K-2 Berlin Doosan Diesel 74HP 55kw Engine, 13,500 lb. Capacity - #2 Toyota 3K Capacity Electric Forklift Model 8FBE18Ua-BCW-2 Berlin Toyota Forklift Model 8FBE18U for CWB Berlin Taylor X360 (36K Capacity) for BCW - #1 Berlin Toyota 50-8FGU32 - 6.5K - 3 Berlin Doosan Diesel 74HP 55kw Engine, 13,500 Capacity # 1 Berlin Toyota Forklift 8FBE18U - 3.5K - 1 Belin Toyota Forklift Model 8FBE18U Berlin Taylor X360 (36K Capacity) for BCW - # 2 NRG Electric Forklift 50-8FGU18 WEG Forklift 50-8FGU32 Norwalk Forklift for Storeroom Falls Village Forklift for Storeroom Stamford Forklift for Storeroom Berlin 8 Truck Stands for Warehouse Windsor Locks 4 Network Printers for Warehouse Windsor Locks Battery Charger Stands Cheshire Toyota Forklift #1 Berlin Jibs Booms Model JLT630 for Storeroom Hartford 16 Cylinder Propane Cage for Storeroom Torrington D-200-HD Tip Dumpster for Storeroom Norwalk Wire Racking for Racks Outside Windsor Locks Racking Location Labeling Windsor Locks Safety Railing Installation and Material TSP Rider Scrubber for Warehouse Berlin BCW Steel Pipe Racks for Storeroom Waterbury Lobby Rack Install for Storeroom East Hampton Strapping Tools for Storeroom Falls Viillage Closed Shelving Unit with Dividers and Installation Waterbury Pole Safety Racks (6) for Wood Poles Berlin Fromme Strapping Tool for Warehouse Newtown Rousseau Shelving Units with Dividers and Installation East Hampton Lifting Bar for Storeroom New London Lobby Rack for Storeroom Waterbury Gas Door Repair and Replacement Lock Windsor Locks Warehouse Racking TSP Bobcat Forklifts D70S-9 Doosan Diesel 74HP 55kw Engine, 15,500 lb. Capacity Tolland Storeroom Strap Machine Danielson Doosan Diesel Forklift Model D60 S-9 13,500Lb Capacity New London Doosan Diesel Forklift Model D60 S-9 13,500Lb Capacity Falls Village Electric Walkie Reach Stacker Torrington Galvanized Cable Reel Racks Newtown Rousseau Shelving Units with Dividers and Installation New London Toyota Forklift Model 50-8FGU32 6,500 Lb Capacity East Hampton Toyota Forklift Model 50-FGU32 6,500 Lb Capacity Madison Doosan Diesel Forklift Model D60 S-9 13,500Lb Capacity Norwalk Cable Reel Stands (2) Tolland Rack Repair Kits, Brace Kits, Pipe Stops Hartford Anchor Interior Racking / Replace pallet racking with galvanized racking Waterbury Install Three Galvanized Cantilever Racks Cheshire Anchor Interior and Exterior Pallet Racking to Concrete. Provide pipe stops and wire decks to add plywood Waterbury Mariotti Forklift for Storeroom Tolland Vestil Boom Lift Newtown - Summit ToyotaLift - Bobcat D60S9 Windsor Locks Lockers and Benches for Staff Windsor Locks 2 Toro Snow Throwers for Warehouse Oakdale Variable Reach 15-16000 Forklift Torrington Door and Maglock Install for Lobby Hartford BODE Racking in Cage Hartford BODE Cantilever Racking Hartford Table & Chairs for Storeroom Hartford Refrigerator for Storeroom Hartford Grainger Backpack Blower Falls Village Steel Pole Racks for Storeroom Stamford New Office Furniture for Storeroom Stamford New Office Furniture for Storeroom Madison Storeroom Shelving Hartford Floor Scrubber Windsor Locks Reset of Beam Levels Waterbury Backpack Blower Cheshire Blue Tip Dumpsters and Capacity Plates (1) Cheshire Blue Tip Dumpsters and Capacity Plates (2) Hartford 16 Cylinder Propane Cage Torrington Gas Cylinder Cabinet for Storeroom Torrington Backpack Blower for Storeroom Stamford Backpack Blower for Storeroom Norwalk Pole Safety Racks for Storeroom Hartford Additional Outdoor Racking for Storeroom Windsor Locks Wire Spool Racking for Warehouse Waterbury Storage Door Partitions for Storeroom East Hampton Cable Rack for Storeroom Stamford Concrete Pad for Securing Pallet Racking Stamford Concrete Pad for Securing Pallet Racking Cheshire Replace Office Flooring Cheshire Replace Office Flooring Hartford Replace Office Flooring Stamford Galvanized Pallet Racking and Installation Newtown Club Car Torrington Canon ImageClass X MF1643if II Digital Copier/Printer/Scanner/Fax System for Storeroom Tolland BODE Complete Racking Repairs Waterbury Blue Reel Dispensers (2) Waterbury Huntingdon Racking - Meter Storage Stamford Pallet Racking Reel Racking and Installation New London Toyota Forklift New London Concrete & Racking Project Madison Storage Improvement Project Windsor Locks Battery Backpack Blowers Windsor Locks Four File Cabinets Hutches Windsor Locks Bin Signs Waterbury Racking Reinstall Tolland Storeroom Desk Replacement Windsor Locks Relocate Centilever from Berlin Windsor Locks Cut in Three Concrete Levelers Falls Village Reel Racks Windsor Locks New Inverter for Warehouse Newtown Additional Cable Reel Stand For Storerroom Yard East Hampton Office Furniture for Storeroom East Hampton Storeroom Renovation Tolland Flooring Replacement Windsor Locks Scale & Bumper Guard Berlin Crossarms and Decking for Warehouse Misc maintenance & Support-Daignault CAPITALIZE MAJOR STORM MN23AB11 SEP 8 2023 CAPITALIZE MAJOR STORM MN23AB11 SEP 8 2023 CAPITALIZE MAJOR STORM MN23B011 FEB 3 2023 CAPITALIZE MAJOR STORM MN23B011 FEB 3 2023 CAPITALIZE MAJOR STORM MN23TCAP, JUL 27, 2023 CAPITALIZE MAJOR STORM MN23TCAP, JUL 27, 2023 CAP MAJOR STRM MN24Q/P011 JUN 18 2024 CAP MAJOR STRM MN24Q/P011 JUN 18 2024 CAP MAJOR STRM MN24X011 AUG 2 2024 CAP MAJOR STRM MN24X011 AUG 2 2024 MRDG0011NT011 WIND/RAIN OCT 29-30 ALL DIV HEATWAVE JUN 29-JUL 7 2018 - ALL REGIONS WIND/RAIN FRI DEC 21 2018 TROP STORM ISAIAS AUG 4 2020 PRESTAGING MAR 12 2021 TROP STORM HENRI AUG 21 2021 NOR'EASTERS OCT 25 2021 CAPITALIZE MAJOR STORM MS22A011 JAN 17 2022 CAPITALIZE MAJOR STORM MS22A011 JAN 17 2022 NOR'EASTER JAN 29 2022 CAPITALIZE MAJOR STORM MS22B011 JAN 29 2022 CAPITALIZE MAJOR STORM MS22B011 JAN 29 2022 CAPITALIZE MAJOR STORM MS22C011 FEB 18 2022 CAPITALIZE MAJOR STORM MS22C011 FEB 18 2022 CAPITALIZE MAJOR STORM MS22D011 FEB 25 2022 CAPITALIZE MAJOR STORM MS22D011 FEB 25 2022 CAPITALIZE MAJOR STORM MS22E011 MAR 12 2022 CAPITALIZE MAJOR STORM MS22E011 MAR 12 2022 CAPITALIZE MAJOR STORM MS22G011 OCT 13 2022 CAPITALIZE MAJOR STORM MS22G011 OCT 13 2022 CAPITALIZE MAJOR STORM MS22H011 NOV 11 2022 CAPITALIZE MAJOR STORM MS22H011 NOV 11 2022 WIND/RAIN DEC 23 2022 CAPITALIZE MAJOR STORM MS22K011 DEC 23 2022 cost_element_group Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 ferc_account percent 107010 1 107010 1 107010 1 107010 1 107010 1 107010 1 107010 1 107010 1 107010 1 107010 1 107010 1 107010 1 107010 1 107010 1 107010 1 107010 1 107010 1 107010 1 107010 1 107010 1 108030 1 107010 1 107010 1 107010 1 107010 1 107010 1 107010 1 107010 1 107010 1 107010 1 107010 1 107010 1 107010 1 107010 1 107010 1 107010 1 107010 1 107010 1 107010 1 107010 1 107010 1 107010 0.91027367 108030 0.08972633 107010 1 107010 1 107010 1 107010 1 107010 1 107010 0.94904908 108030 0.05095092 107010 1 107010 1 107010 1 107010 1 107010 1 107010 1 107010 1 107010 1 107010 1 107010 1 107010 1 107010 1 107010 1 107010 1 107010 1 107010 1 107010 1 107010 1 107010 1 107010 1 107010 1 107010 1 107010 1 107010 1 107010 1 107010 1 107010 1 107010 1 107010 1 107010 1 107010 1 107010 1 107010 1 107010 1 107010 1 107010 1 107010 1 107010 1 107010 1 107010 1 107010 1 107010 1 107010 1 107010 1 107010 1 107010 1 107010 1 107010 1 107010 1 107010 1 107010 1 107010 1 107010 1 107010 1 107010 1 107010 1 107010 1 107010 1 107010 1 107010 1 107010 1 107010 1 107010 1 107010 1 107010 1 107010 1 107010 1 107010 1 107010 1 108030 0.08267151 107010 0.91732849 107010 1 107010 1 107010 1 107010 1 107010 1 107010 1 107010 1 107010 1 107010 1 107010 1 107010 1 107010 1 107010 1 107010 1 107010 1 108030 0.1634619 107010 0.8365381 108030 0.04761905 107010 0.95238095 107010 1 107010 1 107010 1 107010 1 107010 1 107010 1 107010 1 107010 1 107010 1 107010 1 107010 1 107010 1 107010 1 107010 1 107010 1 107010 1 107010 1 107010 1 107010 1 107010 1 107010 1 107010 1 107010 1 107010 1 107010 1 107010 1 580000 1 107010 0.8 108030 0.2 108030 0.20000013 107010 0.79999987 108030 0.2 107010 0.8 107010 0.8 108030 0.2 107010 0.8 108030 0.2 902002 1 593140 1 593140 1 593140 1 593140 1 593140 1 593140 1 593140 1 107010 0.79999997 108030 0.20000003 593140 1 107010 0.79999995 108030 0.20000005 108030 0.20000011 107010 0.79999989 108030 0.20000121 107010 0.79999879 107010 0.79999998 108030 0.20000002 108030 0.20000021 107010 0.79999979 108030 0.20000007 107010 0.79999993 593140 1 108030 0.2Page 485 of 489
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued October 23, 2026 RRU-159 Attachment 16 Page 485 of 489 work_order_number description MS22KCAP CAPITALIZE MS22K011 MS23B011 WINTRY MIX JAN 25 2023 MS23BCAP Jan 25, 2023 Wintry Mix Cap MS23BCAP Jan 25, 2023 Wintry Mix Cap MS23C011 Wind/Wintry Mix Feb 22-23 2023 MS23CCAP Capitalize MS23CCAP Feb 22/23 2023 MS23CCAP Capitalize MS23CCAP Feb 22/23 2023 MS23D011 SNOW/WIND FEB 28 2023 MS23DCAP MS23DCAP MS23DCAP MS23DCAP MS23E011 WINTRY MIX MAR 3 2023 MS23ECAP MS23E011 CAPITALIZATION MS23ECAP MS23E011 CAPITALIZATION MS23F011 NOR'EASTER MAR 13 2023 MS23FCAP Capitalize MS23F011 MS23FCAP Capitalize MS23F011 MS23G011 HURRICANE LEE SEP 16 2023 MS23GCAP Capitalize MS23G011 MS23GCAP Capitalize MS23G011 MS23H011 WIND/RAIN DEC 10 2023 MS23HCAP Capitalize MS23H011 MS23HCAP Capitalize MS23H011 MS23J011 WIND/RAIN DEC 17 2023 MS23JCAP Capitalize MS23J011 MS23JCAP Capitalize MS23J011 MS24A011 WIND/RAIN JAN 9-10 2024 MS24ACAP Capitalize MS24A011 MS24ACAP Capitalize MS24A011 MS24B011 WIND/RAIN JAN 13 2024 MS24BCAP Capitalize MS24B011 MS24BCAP Capitalize MS24B011 MS24C011 NOR'EASTER FEB 13 2024 MS24CCAP Capitalize MS24C011 MS24CCAP Capitalize MS24C011 MS24D011 WIND/RAIN FEB 28 2024 MS24DCAP Capitalize MS24D011 MS24DCAP Capitalize MS24D011 MS24E011 WIND MAR 11 2024 MS24ECAP Capitalize MS24E011 MS24ECAP Capitalize MS24E011 MS24F011 WIND/RAIN APR 3 2024 MS24FCAP Capitalize MS24F011 MS24FCAP Capitalize MS24F011 MS24G011 T-STORMS JUN 26 2024 MS24GCAP Capitalize MS24G011 MS24GCAP Capitalize MS24G011 MS24H011 T-STORMS JUN 30 2024 MS24HCAP Capitalize MS24H011 MS24HCAP Capitalize MS24H011 MS24J011 WIND AUG 10 2024 MS24JCAP Capitalize MS24J011 MS24JCAP Capitalize MS24J011 MS24K011 WIND/RAIN DEC 10 2024 MS24KCAP Capitalize MS24F011 MS24KCAP Capitalize MS24F011 MS25A011 T-STORMS JUL 3 2025 MS25B011 WIND/RAIN OCT 12 2025 MS25C011 WIND NOV 5 2025 MS25D011 WIND DEC 19 2025 MSAD0011 Meter Service - Administration MSXX0011 Indirect Storm Expense MTCU0011 Maintenance Corrective Undergrnd MTCX0011 Maintenance - Corrective (Overhead) MTOH1B15 ELEC. MAINT. FAC. INSPECT./FLT INDI MTOH1B15 ELEC. MAINT. FAC. INSPECT./FLT INDI MTOH4D15 ELEC. MAINT. FAC. INSPECT./FLT INDI MTOH4D15 ELEC. MAINT. FAC. INSPECT./FLT INDI MTOH4N15 ELEC. MAINT. FAC. INSPECT./FLT INDI MTOH4N15 ELEC. MAINT. FAC. INSPECT./FLT INDI MTRDSK11 2 Meter shop desk setups MTSL0011 Maintenance - Street Lights MTUG0011 UG Conduit Maint MTWO0011 Material Write-offs MUDCT011 MUD-Electric Vehicles MV231103 Berlin Pick-up Truck #2 N2SMT011 Non Tracked SMT Expense NETWD011 Payroll Payable NGCCIE11 CA AWO INT EXP - OCI NOPM0011 Non Operating Property Management NRREC011 Non-Residential NRES Sale of RECs NTKMAJ11 Inspection - Network Majors NTMTR111 Net Meter Purchased Power NTPAY111 CT Res Incentives-Netting Pmt Direc NTSMT011 Non Tracked SMT Expense NWBE1DC1 NARROW BAND BASE STATION FOR BERLIN long_description CAPITALIZE MAJOR STORM MS22K011 DEC 23 2022 WINTRY MIX JAN 25 2023 CAPITALIZE MAJOR STORM MS23B011 JAN 25 2023 CAPITALIZE MAJOR STORM MS23B011 JAN 25 2023 WIND/WINTRY MIX FEB 22-23 2023 CAPITALIZE MAJOR STORM MS23C011 FEB 22/23 2023 CAPITALIZE MAJOR STORM MS23C011 FEB 22/23 2023 SNOW/WIND FEB 28 2023 CAPITALIZE MAJOR STORM MS23D011 FEB 28 2023 CAPITALIZE MAJOR STORM MS23D011 FEB 28 2023 WINTRY MIX MAR 3 2023 CAPITALIZE MAJOR STORM MS23E011 MAR 3, 2023 CAPITALIZE MAJOR STORM MS23E011 MAR 3, 2023 NOR'EASTER MAR 13 2023 CAPITALIZE MAJOR STORM MS23F011 MAR 13, 2023 CAPITALIZE MAJOR STORM MS23F011 MAR 13, 2023 HURRICANE LEE SEP 16 2023 CAPITALIZE MAJOR STORM MS23G011, LEE SEP 16, 2023 CAPITALIZE MAJOR STORM MS23G011, LEE SEP 16, 2023 WIND/RAIN DEC 10 2023 CAPITALIZE MAJOR STORM MS23H011 DEC 10 2023 CAPITALIZE MAJOR STORM MS23H011 DEC 10 2023 WIND/RAIN DEC 17 2023 CAP MAJOR STRM MS23J011 DEC 17 2023 CAP MAJOR STRM MS23J011 DEC 17 2023 WIND/RAIN JAN 9-10 2024 Capitalize MS24A011 JAN 9 2024 Capitalize MS24A011 JAN 9 2024 WIND/RAIN JAN 13 2024 CAP MAJOR STRM MS24B011 WIND/RAIN FROM JAN 12, 2024 CAP MAJOR STRM MS24B011 WIND/RAIN FROM JAN 12, 2024 NOR'EASTER FEB 13 2024 CAP CT MAJOR STRM MS24C011 Feb 13, 2024 CAP CT MAJOR STRM MS24C011 Feb 13, 2024 WIND/RAIN FEB 28 2024 CAP MAJOR STRM MS24D011 Feb 28 2024 CAP MAJOR STRM MS24D011 Feb 28 2024 WIND MAR 11 2024 Capitalize major storm MS24E011 Mar 11 2024 Capitalize major storm MS24E011 Mar 11 2024 WIND/RAIN APR 3 2024 Capitalize MS24F011 Capitalize MS24F011 T-STORMS JUN 26 2024 CAP MAJOR STRM MS24G011 Jun 26 2024 CAP MAJOR STRM MS24G011 Jun 26 2024 T-STORMS JUN 30 2024 CAP MAJOR STRM MN24X011 Jun 30 2024 CAP MAJOR STRM MN24X011 Jun 30 2024 WIND AUG 10 2024 CAP MAJOR STRM MS24J011 AUG 10 2024 CAP MAJOR STRM MS24J011 AUG 10 2024 WIND/RAIN DEC 10 2024 Capitalize MS24F011 Capitalize MS24F011 T-STORMS JUL 3 2025 WIND/RAIN OCT 12 2025 WIND NOV 5 2025 WIND DECEMBER 19 2025 MSAD0011OPSNTRELEXPENSES11 Indirect Storm Expense (e.g., wires down kits) MTCU0011OPSNTRELEXPENSES11 MTCX0011OPSNTRELEXPENSES11 Fault Indicators (MTOH) CT ELECTRIC MAINTENANCE FACILITY INSPECTIONS NON DESIGN/ FAULT Fault Indicators (MTOH) CT ELECTRIC MAINTENANCE FACILITY INSPECTIONS NON DESIGN/ FAULT Fault Indicators (MTOH) CT ELECTRIC MAINTENANCE FACILITY INSPECTIONS NON DESIGN / FAULT INTICATOR - MADISON Fault Indicators (MTOH) CT ELECTRIC MAINTENANCE FACILITY INSPECTIONS NON DESIGN / FAULT INTICATOR - MADISON Fault Indicators (MTOH) CT ELECTRIC MAINTENANCE FACILITY INSPECTIONS NON DESIGN / FAULT INTICATOR - NEW LONDON Fault Indicators (MTOH) CT ELECTRIC MAINTENANCE FACILITY INSPECTIONS NON DESIGN / FAULT INTICATOR - NEW LONDON 2 Meter shop desk setups - requested by Patrick Capel MTSL0011OPSNTRELEXPENSES11 MTUG0011OPSNTRELEXPENSES11 Material Write-offs MUD-Electric Vehicles-Quaresma Berlin 2023 LiV9DX Extended Cab Pick-up Truck #2 Non Tracked SMT Expense Payroll Payable - Morrison CA AWO INT EXP - OCI NOPM0011NT011 Non-Residential NRES Sale of RECs-Holmes ISDB0011OPSNTRELEXPENSES11 Inspection of Network Majors by Field Ops. Net Meter Purchased Power CT Res Incentives-Netting Pmt Direct-Quaresma Non Tracked SMT Expense NARROW BAND BASE STATION FOR BERLIN INCLUDING RADIO cost_element_group Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 ferc_account percent 107010 0.8 593140 1 108030 0.2 107010 0.8 593140 1 108030 0.20000006 107010 0.79999994 593140 1 107010 0.79999936 108030 0.20000064 593140 1 107010 0.79999949 108030 0.20000051 593140 1 108030 0.2 107010 0.8 593140 1 108030 0.2 107010 0.8 593140 1 108030 0.2 107010 0.8 593140 1 107010 0.8 108030 0.2 593140 1 108030 0.2 107010 0.8 593140 1 108030 0.2 107010 0.8 593140 1 107010 0.8 108030 0.2 593140 1 108030 0.2 107010 0.8 593140 1 107010 0.8 108030 0.2 593140 1 108030 0.2 107010 0.8 593140 1 107010 0.8 108030 0.2 593140 1 108030 0.2 107010 0.8 593140 1 107010 0.8 108030 0.2 593140 1 108030 0.2 107010 0.8 593140 1 593140 1 593140 1 593140 1 586110 1 593000 1 594030 1 593040 1 583000 0.91 107010 0.09 583000 0.91 107010 0.09 107010 0.09 583000 0.91 107010 1 596050 1 594010 1 588000 1 908EV0 1 107010 1 593100 1 242030 1 428000 1 417111 1 447100 1 584000 1 555000 1 555000 1 593100 1 107010 1 NWH2NNWS NWKTW101 NWTNTE22 OFFN0011 OMSCEF11 OMSL0011 OMSR1DC1 OMSS1DC1 ONST0011 NORTH WEST HARTFORD 2N NETWORK PROTECTOR SENSOR PART OF THE DIGITAL GRID RELAY PROJECT - SOUTH END 1G THE SENSORS ARE BEING ADDED TO THE NW PROTECTOR RELAYS BEING INSTALLED THROUGHOUT CONNECTICUT. SENSORS CANNOT OPERATE WITHOUT THE NW PROTECTOR RELAYS Work order is to be used to capture costs for retrofitting relays for network protectors TOWER REPLACEMENT-NORWALK PROJECT: NWKTW1DC1 CONTACT: STEVE FLORIO Per Dan Chambrello's e-mail dated 10-5-2022, there will be $85K split evenly between East Hampton, Newtown, Madison, and Hartford for craft school tools and equipment. OFFN0011EMPBENPAY11 SCEF O & M Work-Quarsema OMSL0011OPSNTRELEXPENSES11 ENTERPRISE OMS REPORTING - CL&P ENTERPRISE OMS SYSTEM - CL&P ONST0011OPSNTRELEXPENSES11 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 107010 107010 107010 242E20 908000 596000 107010 107010 580000 1 1 1 1 1 1 1 1 1 Other-O00 Other-O00 107010 165960 1 1 Other-O00 Other-O00 Other-O00 Other-O00 107010 589002 589003 586110 1 1 1 1 Other-O00 Other-O00 ther-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 107010 228450 595000 555420 926000 926000 555440 555430 107010 555430 555855 454200 228450 555360 920000 238110 238110 238120 238120 238130 238130 238140 238140 238150 238150 238160 238160 238170 238170 238440 238440 238410 238410 238420 238420 238450 238450 238400 238400 238430 238430 185010 185010 185010 185010 185010 185010 408201 165900 408110 431400 107010 908EV0 584280 236140 186010 186010 186010 186010 186010 186010 186010 107010 165000 242970 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 Other-O00 580000 0.043 Other-O00 581000 0.025 Other-O00 902002 0.013 Other-O00 588154 0.067 Other-O00 593000 0.206 Other-O00 903004 0.03 Other-O00 163020 0.031 Other-O00 107100 0.446 Other-O00 184010 0.051 Other-O00 584000 0.024 Other-O00 586000 0.038 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 582000 593000 107100 580000 588154 0.026 0.022 0.571 0.014 0.042 NW HARTFORD 2N NW PROTECTOR SENSOR TOWER REPLACEMENT-NORWALK Newtown Tools & Equipment Payroll SCEF O & M Work COMP CCC 3/21/2022 WETHERSFIELD-41 ENTERPRISE OMS REPORTING - CL&P ENTERPRISE OMS SYSTEM - CL&P Oncall / Standby Eversource Open Sky data network support critical Distribution Automation applications in CT. These radios have now been manufacturer discontinued. In order to have mobile radios to continue supporting Distribution Automation in CT, a last time buy of radios is needed. A budget of $1.2M was set aside for this purpose as a short-term mitigation to keep the system in operation till a new replacement system is identified as part of the Field Area Network Strategy. OPENSKY1 OPFL0011 Open Sky Last Time Buy Operation Fuel-Balance Sheet OPMFINAL OPMG0011 OPMG0111 OTMS0011 FINAL PHASE OUTAGE PREDICTION MODEL Operating Property Management Operating Property Management Other metering support Operation Fuel-Balance Sheet-Caron UCONN 2ND AMENDED AND RESTATED RESEARCH PROJECT(S) FINAL VERSION OF THE OUTAGE PREDICTION MODEL WHOSE PURPOSE IS TO PREDICT POWER OUTAGES FROM AN IMPROVED REPRESENTATION OF WEATHER AND VEG MANAGEMENT IMPACTS IN THE OUTAGE PREDICTION MODEL (OPM) OPMG0011NT011 OPMG0111NT011 OTMS0011OPSNTRELEXPENSES11 Oxford 26N new SEL ICON 3 Commerce Drive, Oxford, CT Control house OXFD0001 PARSONLN PCBMGMT PEAK0111 PEB55111 PEBAC111 PFDC0011 PFDE0011 PIPHSOSI PLNE0011 PLNR0011 POLE0011 PORTLND1 PPCVT111 PRPEXE11 PSTK0011 PSTK0111 PSTK0211 PSTK0311 PSTK0411 PSTK0511 PSTK0611 PSTK0711 PSTK0811 PSTK0911 PSTK1011 PSTK1111 PSTK1211 PSTK1311 PSTK1411 PSTK1511 PSTK1611 PSTK1711 PSTK1811 PSTK1911 PSTK2011 PSTK2111 PSTK2211 PSTK2311 PSTK2411 PSTK2511 PT1B0011 PT2W0011 PT3H0011 PT3S0011 PT5D0011 PT5W0011 PTBL0011 PTCD0011 PTEX0011 PTINT011 PTRACK13 PUBDES11 PUGT0011 PURCH111 PW1N0011 PW5D0011 PWCD0794 PWCD0901 PWCD1028 PWCD1151 PWCD1152 PWMUNX11 PWRCLK11 PY4K0011 OXFORD SEL ICON - 26N RS 103 27 PARSONS LANE PCB REMEDIATION PROGRAM ADMINISTRAT Peaker Contractual Obligations PBOP NNECO CA AWO PT-EMPL BFS AC Plainfield Renewable Energy Plainfield PI PILOT OSISOFT SUPPORT Purchase of Energy Purchase of RECs Pole Attachment license billing PORTLAND RIGHT-OF-WAY: INVESTIGATIO Purch Power - VT Yankee CA AWO INCT ACRU EXPOM Preferred Stock Preferred Stock Preferred Stock Preferred Stock Preferred Stock Preferred Stock Preferred Stock Preferred Stock Preferred Stock Preferred Stock Preferred Stock Preferred Stock Preferred Stock Preferred Stock Preferred Stock Preferred Stock Preferred Stock Preferred Stock Preferred Stock Preferred Stock Preferred Stock Preferred Stock Preferred Stock Preferred Stock Preferred Stock Preferred Stock Temporary Work Temporary Work Temporary Work Temporary Work Temporary Work Temporary Work Other Tax - CLP Non-Utility Distrib Prepaid PropTax-CLP Distribution Local PropTax - CLP Distribution PROPERTY TAX INTEREST PURCHASE RADIO RECEIVER CARDS Public Destination-Electric Vehicle Precap UG Transfomer Install (CFI) Get Tax Credit-Purchase Private Work Private Work Private Work for FP CD00794 Private Work for FP CD00901 Private work for FP CD01028 Private Work for FP CD01151 Private Work for FP CD01152 Street Light-PWMuni-SS-AD Powerclerk CL&P 401K Stock Match PYAC0011 Payroll Accrual - Source Entity 11 PYAC0011 Payroll Accrual - Source Entity 11 PYAC0011 Payroll Accrual - Source Entity 11 PYAC0011 Payroll Accrual - Source Entity 11 PYAC0011 Payroll Accrual - Source Entity 11 PYAC0011 Payroll Accrual - Source Entity 11 PYAC0011 Payroll Accrual - Source Entity 11 PYAC0011 Payroll Accrual - Source Entity 11 PYAC0011 Payroll Accrual - Source Entity 11 PYAC0011 Payroll Accrual - Source Entity 11 PYAC0011 Payroll Accrual - Source Entity 11 PYAC0011 PYAC0111 PYAC0111 PYAC0111 PYAC0111 Payroll Accrual - Source Entity 11 Payroll Accrual - Source Entity 1T Payroll Accrual - Source Entity 1T Payroll Accrual - Source Entity 1T Payroll Accrual - Source Entity 1T RS 103 27 PARSONS LANE DURHAM CT THIS WORK ORDER WILL CAPTURE THE SUPPORT COST S RELATED TO THE PCB REMEDIATION PROGRAM THRU THE FIFTEEN YEAR PROGRAM. Peaker Contractual Obligations CA AWO PT-EMPL BFS AC CA AWO PT-EMPL BFS AC Plainfield Renewable Energy Plainfield SPECTRUM POWER TG TO OSISOFT PI INTERFACE AND DATA INTEGRATION OF SCADA DATA. Purchase of Energy-Rose Purchase of RECs-Rose POLE0011OPSNTRELEXPENSES11 FORMER RAILROAD BED SOILS CORPORATE RESERVE SITE Purch Power - VT Yankee CA AWO INCT ACRU EXPOM Preferred StockNT011 Preferred StockDIST11 Preferred StockNT011 Preferred StockDIST11 Preferred StockNT011 Preferred StockDIST11 Preferred StockNT011 Preferred StockDIST11 Preferred StockNT011 Preferred StockDIST11 Preferred StockNT011 Preferred StockDIST11 Preferred StockNT011 Preferred StockDIST11 Preferred StockNT011 Preferred StockDIST11 Preferred StockNT011 Preferred StockDIST11 Preferred StockNT011 Preferred StockDIST11 Preferred StockNT011 Preferred StockDIST11 Preferred StockNT011 Preferred StockDIST11 Preferred StockNT011 Preferred StockDIST11 Temporary Work Temporary Work Temporary Work Temporary Work Temporary Work Temporary Work Other Tax - CLP Non-Utility Distrib PTCD0011NT011 Local PropTax - CLP Distribution PROPERTY TAX INTEREST - TRAN PURCHASE RADIO RECEIVER CARDS 2013 Public Destination-Electric Vehicle-Quaresma PUGT0011OPSNTRELEXPENSES11 Get Tax Credit-Purchase-Chandler Private Work Private Work Private Work for FP CD00794 Private Work for FP CD00901 Private work for FP CD01028 Private Work for FP CD01151 Private Work for FP CD01152 Street Light-PWMuni-SS-AD Powerclerk CL&P - Amnott, Katherine 401K Stock Match requested by Deb Cottuli on 3/3/15 Payroll Accrual - Source Entity 11 Payroll Accrual - Source Entity 11 Payroll Accrual - Source Entity 11 Payroll Accrual - Source Entity 11 Payroll Accrual - Source Entity 11 Payroll Accrual - Source Entity 11 Payroll Accrual - Source Entity 11 Payroll Accrual - Source Entity 11 Payroll Accrual - Source Entity 11 Payroll Accrual - Source Entity 11 Payroll Accrual - Source Entity 11 Payroll Accrual - Source Entity 11 Payroll Accrual - Source Entity 1T Payroll Accrual - Source Entity 1T Payroll Accrual - Source Entity 1T Payroll Accrual - Source Entity 1TPage 486 of 489
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued October 23, 2026 RRU-159 Attachment 16 Page 486 of 489 work_order_number description PYAC0111 Payroll Accrual - Source Entity 1T PYAC0111 Payroll Accrual - Source Entity 1T PYAC0411 Payroll Accrual - Charge Entity 11 RCVINS11 Recloser - Visual Inspection-OH RDUT0011 Restricted Duty RE221102 Perm Easement Cromwell REC12111 REC Revenues - Class 1 & 2 RECFC011 Fuel Cell Projects RECLZ011 LREC/ZREC Program RECLZ111 Sales of RECs RECNR011 Non-Residential Renewable Energy So RECNR111 Sacrifice/Bid Fees/Reassignment Fee RECNR211 Purchase Account - Quarterly Pts RECPP211 CT LREC/ZREC program RECSC011 Sacrifices and Bid Fees RELAN411 CT REL & Analytic Insight 2024 RELANL11 CT Rel & Analytic Insight RENTI31D CA AWO RENT - INTERNAL RENTI31D CA AWO RENT - INTERNAL RENTI31D CA AWO RENT - INTERNAL RENTIL11 CA AWO RENT - INTERNAL RENTX011 Rental Revenue RESENGY1 Resilient Energy Center 2015-2017 long_description Payroll Accrual - Source Entity 1T Payroll Accrual - Source Entity 1T Payroll Accrual - Charge Entity 11 Recloser - Visual Inspection-OH-Annual-Tmpl Restricted Duty Eversource is granting a Permanent Easement, Temporary right and Temporary Easement to State of CT DOT - 674 Main street, Cromwell, CT REC Revenues - Class 1 & 2 Fuel Cell Projects-Rybka LREC/ZREC Program-Caron Sales of RECs-Rose Non-Residential Renewable Energy Solutions-Rybka Sacrifice/Bid Fees/Reassignment Fees - Rybka, Robert M Purchase Account - Quarterly Payments - Rybka, Robert M CT LREC/ZREC program Sacrifices and Bid Fees CT Reliability & Analytic Insights Transformation CT Reliability & Analytic Insights Transformation CA AWO RENT - INTERNAL CA AWO RENT - INTERNAL CA AWO RENT - INTERNAL CA AWO RENT - INTERNAL RENTX011NT011 Resilient Energy Center (partnership with UCONN) 2015-2017 UCONN 2ND AMENDED AND RESTATED RESEARCH PROJECT(S) IDENTIFY WHICH PROGRAMS TO CONTINUE & FUNDING LEVELS OF RESILIENCY PROGRAMS BEYOND 2017 Asset - STOCHASTIC DYNAMIC PROGRAMMING MODEL Residential Single Family-Elec Vehicles-Lempa Revolver Upfront Expenses-Rose DSCADA System Resiliency Ridgefield RGST0011ETT2013 Regulatory Assessments cost_element_group Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 ferc_account percent 584000 0.061 582000 0.29 242090 1 593040 1 588114 1 186AX0 1 447100 1 555850 1 555850 1 447100 1 555000 1 555850 1 555850 1 555000 1 555850 1 107010 1 107010 1 584000 0.0269 163020 0.9037 583000 0.0694 93111X 1 454200 1 107010 1 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 107010 908EV0 186RV0 107010 928000 1 1 1 1 1 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 165960 165960 928000 928000 928000 228450 228200 556000 594000 593000 592010 592040 592050 592080 592240 418000 228450 588005 454200 45401X 107010 584000 593040 594260 589000 931000 93111X 583000 186AX0 186AX0 186AX0 908EV0 107010 447100 583270 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 Other-O00 Other-O00 186AX0 186AX0 1 1 Other-O00 107010 1 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 107010 908100 588152 186020 107010 447100 593140 593140 593140 593140 593140 1 1 1 1 1 1 1 1 1 1 1 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 107010 555430 555855 555430 555855 107010 583050 143L20 143L20 143L20 107010 107010 108030 107010 908000 447100 228450 107010 596000 1 1 1 1 1 1 1 1 1 1 1 1 0.20243035 0.79756965 1 1 1 1 1 RESILEVL RESSFM11 REVUPF11 RGFDSR01 RGST0011 RESILIENCY PROG FUNDING LEVELS Residential Single Family-Elec Vehi Revolver Upfront Expenses DSCADA Sys Res Ridgefield Regulatory Assessments RGST0111 RGST0211 RGST0311 RGST0411 RGST0611 RIDGFLD1 RISK0011 RMFM0011 RMOU0011 RMOX0011 RMSQ0011 RMSQ0211 RMSQ0311 RMSQ0611 RMSQ0811 RNTNO011 ROCKV001 RODEO011 ROPIN011 ROPINE11 RP241101 RPEU0011 RPEX0011 RPMH0011 RROW0011 RRRNTE11 RRRNTX11 RRSP0011 RS191102 RS241101 RS241103 RSMCHG11 RSOWAMCP RSREC011 RUBB0011 Regulatory Assessments REGULATORY ASSESSMENTS Regulatory Assessments Regulatory Assessments Regulatory Assessments-Retail Trans RIDGEFIELD RIGHT OF WAY ENVIRONMENT Risk Envision Repair/Maintain-Fiber Microwave Repair / Maintain Other underground Repair / Maintain Other overhead Dist Sta Xfmr Corrective Main SDist Sta Breaker CM Dist Sta Maint Misc Equip Dist Sta Battery Maint Dist Sta Environmental Rental revenues Non OP ROCKVILLE MGP COAL TAR SITE CT Linemen Rodeo charges Operating Property Revenue-CT CA AWO OP INCM OTH 2GG Environmental Transfer Act Repair - Emergent (Underground) Repair - Emergent (Overhead) Repair - Manholes Distribution ROW CA AWO RENT ELIMINATIO CA AWO RENT ELIMINATIO RESPONSE& RESTORE SPECIALIST Sale of Fee Property-Cromwell CT Canton - Disposition of 0 Canal St. Disposition - 19 N Main & 21 N Main Residential Managed Chg-Elec Vehicl RSO WAM IMPACT -CAPITAL ADJ Residential RES Sale of Recs Rubber Goods RW241101 RW241102 Access Easement - 18 Russel Street Grant of Easement Ledyard RW251101 N Stonington - Easment Modfication RW251102 RWPY1011 SAFE0011 SALAV011 SATPHONE SCEFRR11 SCMN0011 SCMN2211 SCMN2311 SCMN2411 SCMN2511 Norwich - Easement Modification Renewables Safety Advance Payback SATELLITE PHONES FOR EMERGENCY PLAN SALE of RECs Minor Storm Charging 2022 CL&P Minor Storms 2023 CL&P Minor Storms 2024 CL&P Minor Storms 2025 CL&P Minor Storms SE1GNWSN SEC6E011 SEC6R011 SEIE0011 SEIR0011 SENCT24A SFEQOH11 SGCUENGA SGENOPPO SGSMBUSI SHCE11C1 SHCE11C2 SHELRP11 SHELRP11 SHREC011 SHRR0011 SIMSB001 SLMAT011 SLPW2M15 SO END 1G NW PROTECTOR SENSOR Purchase of Energy Purchase of RECs Purchase of Energy Purchase of RECs CT 2024 Sentinel Meter installs & P Safety Equipment Prev-OH CL&P EE Expense CL&P EE Expense CL&P EE Expense SCEF - Web SCEF - C2 WINSTEAD SHELTER WINSTEAD SHELTER Solar Home Renew Certs Sale of SHREC's Simsbury AWC Site #68 CT Street Light Capital Materials NO PPWK ATTACHED, CANCELLING - STLT SLSBTRCT SubsTrain Lab Smart Board CT 20 Per (Ken Lomax's email 10/23/20)- requesting the purchase of an audio/visual for $18,500.00 and Power&Data for $2,500.00. The total cost is $21,000.00 Other-O00 107010 1 SO MEADOW 1A NW PROTECTOR SENSOR Small tools - overhead Small Tools - Stations SO MEADOW 1A NETWORK PROTECTOR SENSOR PART OF THE DIGITAL GRID RELAY PROJECT - SOUTH MEADOW 1A THE SENSORS ARE BEING ADDED TO THE NW PROTECTOR RELAYS BEING INSTALLED THROUGHOUT CONNECTICUT. SENSORS CANNOT OPERATE WITHOUT THE NW PROTECTOR RELAYS Work order is to be used to capture costs for retrofitting relays for network protectors SMOV0011OPSNTRELEXPENSES11 Small Tools - Stations Other-O00 Other-O00 Other-O00 107010 583275 588250 1 1 1 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 107010 588250 584275 107010 555430 555855 555555 555430 920000 447100 107010 926000 107010 107010 107010 107010 23301X 163020 593000 593000 107010 108030 591060 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 0.7886 0.2114 1 Other-O00 107010 1 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 107010 107010 143990 143990 2421A0 580000 241030 241040 408630 143970 593000 593000 593000 593000 582000 583000 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 107010 107010 588000 930200 107010 107010 1 1 1 1 1 1 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 107010 184010 408600 108010 593000 924000 925000 165010 592050 107010 1 1 1 0.7413 0.2587 1 1 1 1 1 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 583000 903004 228450 107010 107010 107010 107010 107010 184010 580000 584000 594000 593000 1 1 1 1 1 1 1 1 1 0.2318 0.0576 0.0866 0.4501 SM1ANWSN SMOV0011 SMSS0011 REGULATORY ASSESSMENT Regulatory Assessments Regulatory Assessments Regulatory Assessments-Retail Transmission-Caron RIDGFIELD R-O-W ENVIRONMENTAL ASSESSMENT OF FORMER RAILROAD BED SOILS IMPACTED BY ARSENIC Risk Envision-Ouimette RMFM0011OPSNTRELEXPENSES11 RMOU0011OPSNTRELEXPENSES11 RMOX0011OPSNTRELEXPENSES11 RMSQ0011OPSNTRELEXPENSES11 RMSQ0211OPSNTRELEXPENSES11 RMSQ0311OPSNTRELEXPENSES11 RMSQ0611OPSNTRELEXPENSES11 RMSQ0811OPSNTRELEXPENSES11 Rental revenues Non OP ROCKVILLE MGP COAL TAR SITE INVESTIGATION AND REMEDIATION CORPORATE RESERVE SITE Charging for 2015 linemen rodeo Eversource - CT ROPIN011NT011 CA AWO OP INCM OTH 2GG Newtown - Environmental Transfer Act RPEU0011OPSNTRELEXPENSES11 RPEX0011OPSNTRELEXPENSES11 RPMH0011OPSNTRELEXPENSES11 Distribution ROW-Rose CA AWO RENT ELIMINATION ADJUSTMENT CA AWO RENT ELIMINATION ADJUSTMENT RRSP0011-OPSNTRELEXPENSES11, WO set up for Response Specialist Ops (RSO) -Lines use only Sale of Fee Property-Cromwell CT, 535 Main St. Potential sale of the decommissioned substation Propert as Collinsville LLC. Enfield - Disposition of 19 N Main & 21 N Main Residential Managed Chg-Elec Vehicles-Lempa WO SET UP FOR RSO WAM IMPACT - CAPITAL ADJUSTMENT Residential RES Sale of Recs-Holmes RUBB0011OPSNTRELEXPENSES11 Access Easement - 18 Russel Street, Litchfield CT Grant of Access Easement (driveway to home totalling 1.634 SF) abutting owner has been using for over 30 yrs. (Grantee has paid appraisal fee of $2,500 and compensation of $5,200). Grantee will pay all closing and recording costs. Disposition (Grant) of Easement 1012 Shewville Road, Ledyard, CT 45 Frontage Road, North Stonington - Easment Modfication Modification to relocate and release easement acrosss the property of Electric Boat Corporation. Westerly Rd, Norwich - Easement Modification Acquire Easement, Relocate overhead facilities, and sell fee ROW. Renewables SAFE0011OPSNTRELEXPENSES11 SALAV011EMPBENPAY11 Satellite phones to be purchased and located in the area work centers including software, antenna, etc. for storm related emergencies. SALE of RECs SCMN0011OPSNTRELEXPENSES11 2022 CL&P Minor Storms 2023 CL&P Minor Storms 2024 CL&P Minor Storms 2025 CL&P Minor Storms SO END NETWORK PROTECTOR SENSOR PART OF THE DIGITAL GRID RELAY PROJECT - SOUTH END 1G THE SENSORS ARE BEING ADDED TO THE NW PROTECTOR RELAYS BEING INSTALLED THROUGHOUT CONNECTICUT. SENSORS CANNOT OPERATE WITHOUT THE NW PROTECTOR RELAYS Work order is to be used to capture costs for retrofitting relays for network protectors Purchase of Energy-Rose Purchase of RECs-Rose Purchase of Energy-Rose Purchase RECs-Rose This work order will be used under the 2024 annual meter project is approved for 2024 Sentinel work and programming Safety Equipment Prev-OH SGCUENGASCGOTHER SGENOPPOSCGCI SGSMBUSISCGCI Shared Clean Energy Facility (SCEF) Project - Web Shared Clean Energy Facility (SCEF) Project - C2 WINSTEAD SHELTER REPLACEMENT WINSTEAD SHELTER REPLACEMENT Solar Home Renew Certs-Rose Sale of SHREC's-Caron Simsbury AWC Site #68-Rose This work order is to be used for charging capital Street Light materials. It is expected that this work order will only be used to temporarily hold capital material charges prior to them being moved to specific capital work orders once it becomes known where the materials will be utilized. STREET LIGHT PRIVATE WORK BLANKET WO CHESHIRE This work order is to purchase the interactive display installation in the berlin Substation Classroom as part of the pre-engineering and design of the Berlin Yard Substation. INSTALL 4RF BASE RADIO AT SOUTH MOUNTAIN RADIO SITE Utilize existing 450 MHz antenna system to install a new 4RF base station radio at the South Mountain radio site. Project includes the installation of the base station radio, the required backhaul equipment and 2 remote radios. Willis Street, Bristol, CT Telcommunications equipment shelter SMTNSR01 SMTR0011 SMUG0011 SOCE11C1 SOME0011 SOMR0011 SOREG111 SPCDD011 SPOL0011 SPREC011 SPSFTWUP SRP11P11 SSBRN11J SSCANT5R SSFARM1C SSSAL21J STDBT011 STORE011 STORM511 STRM1D6Y STRM3CJE STRM3CJE STST0011 DSCADA System Smith Mtn 4RF Radio Small Tool Repair (Repair Shop) Small tools - underground SOC Equipment Somers Solar Somers Solar Standard service SP Contractor Delay Damages Special Olympics Support Sale of RECs SINGLE POLE ADMIN SFTWRE UPGRADES CA AWO SUP EXC RTR CLP BRANFORD11J SS VOICE RADIO CANTON5R SS VOICE RADIO FARMINGTON1C SS VOICE RADIO SALISBURY21J SS VOICE RADIO Repay ST Borrowing from 01 Stores clearing CA AWO STORM RESERVE WO CREATED TO RECORD INVOICES FROM CLEARING WORK ORDER FOR STRM113C CLEARING WORK ORDER FOR STRM113C Station structure CM SUBFLOOD SUB FLOODING & CLIMAGE CHANGE SMTR0011OPSNTRELEXPENSES11 SMUG0011OPSNTRELEXPENSES11 SOC Equipment as part of the larger Ops funded project. Somers Solar Somers Solar Standard service SP Contractor Delay Damages-Morowsky Special Olympics Support - Labor Only Sale of RECs-Rose ALDEN POLE ADMINISTRATION SOFTWARE UPGRADES CA AWO SUP EXC RTR CLP SUBSTATION VOICE RADIO SET UP - INTERNAL SUBSTATION VOICE RADIO SET UP - INTERNAL FARMINGTON 1C SUBSTATION VOICE RADIO SET UP - INTERNAL SUBSTATION VOICE RADIO SET UP - INTERNAL Repay ST Borrowing from 01 STORE011OPSNTRELEXPENSES11 CA AWO STORM RESERVE WORK ORDER TO BE USED TO RECORD THE INVOICES RECEIVED FROM CONTRACTORS FOR STORM REST- ORATION WORK. COSTS CLEARED OUT TO WORK ORDER SET UP FOR EACH SPECIFIC STORM WHEN INVOICE CLEARING WORK ORDER FOR STRM113C CLEARING WORK ORDER FOR STRM113C STST0011OPSNTRELEXPENSES11 UCONN 2ND AMENDED AND RESTATED RESEARCH PROJECT(S) EVALUATE SS VULNERABILITY OF FLOODING DURING CLIMATE CHANGE SCENARIOS. ASSET HYDROLOGICAL MAPPING, INUNDATION MODEL AND HYDROLOGICAL DAM ROF TOOL This work order was created to accept the charges for the Substation curriculum development project which is a piece of the overall electric curriculum development project (CTMTRTRN) for Field Training. Per Alex Chasson-Colebourn , the vendor (Index AR) quote is $1,400,000 and the vendor (Mosaic) quote is $1,566,000. The internal labor cost is estimated to be $33,333 each month for 18 months. SUBTRNCT SUBUNITS SUNAR011 SUNSA011 SUPPLR11 SURVEY11 SUTP0011 SUTP0111 SUTP0211 SUTP0311 SVOH1SEX SVOH2LEX SVOH2WEX SVOH5DEX SWTS0011 SWTX0011 Substation Curriculum Development Radio Subcriber Units AR - Sundry Billing System CL&P Sales Agreement Supplier Payables 3RD PARTY POLE SURVEY WORK Sales/Use Tax Payments Sales/Use Tax Payments Sales/Use Tax Payments Sales/Use Tax Payments DARIEN, CLIFF, 24, Charles Pappas HARWINTON, SCOVILLE HILL, 130, Mari EXPENSE BLANKET OH SERVICE WORK - W BROOKLYN, CREAMERY BROOK, 120, Dani Switching, substation Switching - Overhead The costs (direct and indirect) will be distributed according to the PAF $4,045,649. CT = 35% = $1,415,977 EMA = 35% = $1,415,977 NH = 20% = $809,130 WMA = 10% = $404,565 Radio Subcriber Units for Voice Radio System Project AR - Sundry Billing System CL&P Sales Agreement-Duncan Supplier Payables This w/o is to charge time spent surveying pole for compliance for attachments as requested by customer Sales/Use Tax Payments Sales/Use Tax Payments Sales/Use Tax Payments Sales/Use Tax Payments NO DESC AVAILABLE NO DESC AVAILABLE NO DESC AVAILABLE NO DESC AVAILABLE SWTS0011OPSNTRELEXPENSES11 SWTX0011OPSNTRELEXPENSES11 DSCADA System Resiliency Talcott 5-7 Andrews Road, Bloomfield, CT Telecom Tower Facility TALCOT01 TCOTW001 TELE0011 TFEE0011 TFMINS11 TFMIUG11 DSCADA SYST RES TALCOTT TALCOTT MOUNTAIN TOWER REPLACEMENT Telecom Carrier Charges Bank Service Fees Precap Overhead Equipment Install Precap UG Equipment Install TFMPUR11 TINS0011 TINS0111 TINS0211 TINS0211 TINS0311 TINS0411 TINS0511 TMAQ0011 TMPCPWTY Precap Overhead Equip Purchases Claims & Insurance Claims & Insurance Claims & Insurance Claims & Insurance Claims & Insurance Claims & Insurance Claims & Insurance Troubleshoot/Maint D Automation Equ WAM Adjustments TMPMAT11 TNTP0011 TORRT001 TOWG1DC1 TOWG1DC2 TOWG1DC3 TOWG1DC4 TPSNSR01 TRADFL11 TRAF0011 TRAF0011 TRAF0011 TRAF0011 Temp cap materials FWO-100% Expense Credit Disconnects and Reconnects TORRINGTON MGP COAL TAR SITE TOWER REPLACEMENT-GOOSE HILL-HADDAM TOWER REPLACEMENT-MADISON TOWER REPLACEMENT-CHAPEL HILL TOWER REPLACEMENT-TALCOTT MT. DSCADA Sys Res Thompson CA AWO ADF BLDG RENT POLICE/TRAFFIC CONTROL POLICE/TRAFFIC CONTROL POLICE/TRAFFIC CONTROL POLICE/TRAFFIC CONTROL PURCHASE AND INSTALL RF MATERIALS FOR NEW TOWN AT ST. ANDREWS ROAD, BLOOMFOELD, CT PROJECT TCOTW1DC REQUESTER:STEVE FLORIO,MGR: AHRENS Telecom Carrier Charges Bank Service Fees TFMINS11DT7C Precap UG Equip Install TFMPUR11NT011 Precap Overhead Equipment Purchases-Transformers and Regulators TINS0011NT011 Claims & Insurance Claims & Insurance Claims & Insurance Claims & Insurance Claims & Insurance Claims & Insurance WO is created for Troubleshooting and Maintenance of Distribution Automation Equipment for Field Engineering Distribution Test. This work is to used as a temporary holding place for WAM adjustments. This work order to be used as a temporary holding place for Stores issues of capital materials that are not able to be charged directly to capital work orders that are still in "design in progress" (unapproved) status. These materials issues will be returned to the storeroom and reissued to the correct, capital work order once it's approved. This work order is not subject to Stores or Lobby Stock loaders. Credit Disconnects and Reconnects TORRINGTON MGP COAL TAR SITE INVESTIGATION AND REMEDIATION TOWER REPLACEMENT-GOOSE HILL-HADDAM TOWER REPLACEMENT-MADISON TOWER REPLACEMENT-CHAPEL HILL TOWER REPLACEMENT-TALCOTT_MT. DSCADA System Resiliency Thompson CA AWO ADF BLDG RENT POLICE/TRAFFIC CONTROL POLICE/TRAFFIC CONTROL POLICE/TRAFFIC CONTROL POLICE/TRAFFIC CONTROLPage 487 of 489
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued October 23, 2026 RRU-159 Attachment 16 Page 487 of 489 work_order_number description TRAF0011 POLICE/TRAFFIC CONTROL TRAF0011 POLICE/TRAFFIC CONTROL TRAF0011 POLICE/TRAFFIC CONTROL TRAF0011 POLICE/TRAFFIC CONTROL TRAN1601 Air/Hydraulic Floor Jack TRAN1911 CT Electric Tool Purchase long_description POLICE/TRAFFIC CONTROL POLICE/TRAFFIC CONTROL POLICE/TRAFFIC CONTROL POLICE/TRAFFIC CONTROL 22 Ton - Air/Hydraulic floor jack used for installing tire chains, replacing tires or when the lift is not accessible. CT Fleet Operations is requesting Fleet Capital funds to upgrade 5 existing Aqueous Parts washers that are at the end of their life use. The 5 Aqueous Parts washers will be placed at 5 different CT Garages to be determined. cost_element_group Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 ferc_account percent 596000 0.0171 587000 0.017 583000 0.101 595000 0.0388 107010 1 Other-O00 107010 1 Other-O00 107010 1 Other-O00 107010 1 Other-O00 107010 1 Other-O00 107010 1 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 Other-O00 107010 252500 588136 930200 930200 237TD0 237BD0 221CF0 237CF0 237CG0 237CH0 237CI0 237CJ0 181CL0 237CL0 237TC0 908000 920000 154070 586152 595000 588154 184010 165VC0 241040 108030 107010 236120 236140 408620 588110 253010 107010 107010 555440 555430 565000 254540 143L20 431110 107010 456990 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 0.04999998 0.95000002 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 Other-O00 107010 1 Other-O00 107010 1 Other-O00 107010 1 Other-O00 107010 1 Other-O00 107010 1 Other-O00 107010 1 CT Electric Fleet Capital Tool Purchase Wheel Balancer Tire Lift, eliminates technicians lifting the tire onto the wheel balancer, 15T, 16027 for the Madison garage. TRAN2201 CT Elec Fleet Capital Tool Purchase CT Electric Fleet Capital Tool Purchase Replacing a defective (Obsolete) Tire Balancer at the Waterbury Garage. This will allow Waterbury mechanics to balance tires instead of bringing tires to Berlin or using a vendor. The life of the machine is about 10 years. The tire machine will sae us $800 a year plus reduced down time for our users. TRAN2202 CT Elec Fleet Capital Tool Purchase CT Electric Fleet Capital Tool Purchase The tire lift will lift a tire to the same height of the vehicle on a car lift. The tool will eliminate technicians lifting the tire onto a vehicle on a lift. TRAN2209 CT Elec Fleet Capital Tool Purchase TRAN2212 CT Fleet Capital Tool Purchase TRAN2218 TRANRE11 TRAV0011 TRDC0011 TRDC0111 TRDE0411 TRDE0811 TRDE0911 TRDE1211 TRDE1611 TRDE2011 TRDE2411 TRDE2811 TRDE3411 TRDE3611 TRDT0011 TRDV0011 TREG1D01 TRIN0011 TRMS0011 TRMT0011 TROM0011 TRV2FO11 TRVACO11 TXCT0011 TXFCT25A TXFCT25A TXPCTC11 TXPY0011 TXPY0111 UBCP0011 UCLAIM11 UCONN219 UCONNSR1 UDRC0011 UDRE0011 UI000111 UICLASS3 UILGEN00 UNCLOC11 UNIONSR1 UWAVR011 CT Elec Fleet Capital Tool Purchase $25 reimbursement for transformer Travel Debt Compliance Fees Debt Compliance Fees 2016 Acc Int -CL&P D 2018 Series a Accrued Int. CL&P D 2019 Series A-CL&P D 2019 Series A Accrued Int-CL&P D 2021 Series A Accrued Int- CL&P 2023 Series A Accr Interest-CL&P 2023 Series B Accrued Interest-CL&P 2024 Series A Accrued Interest -CLP 2025 Series A Issue Expense - CL&P 2025 Series A Accrued Interest - CL Debt Interest Accrual Training (Phys & Non-Phys)-Dev TELECOM ENG REAL ESTATE COST Vehicle Inventory Training/Safety - Meter Service Transformer Maintenance - Dist Training CA AWO REG+OT FEES C2 CA AWO REG+OT ACCRUAL CT Tax Offset CT 2025 Transformers and other Equi CT 2025 Transformers and other Equi Conn Corporation Business Tax Tax Payments Tax Payments Union Business Company Paid Unclaimed Property (Escheat) SS SECURITY 40% DISTRIBUTION UCONN System Resiliency AWO 1 UDR-Purchase Pwr-Capacity UDR-Purchase Pwr-Energy UI UIL Class III UIL Charges Unc. Line of Credit Expenses DSCADA Sys Res Union SHARED TELECOMM BILLING- JAN 13 ACT CT Electric Fleet Capital Tool Purchase The Norwalk Garage is requesting 4 work benches for the new garage expansion project. These benches are needed to work efficiently in the new space. They are made by Durham Manufacturing. CT Electric Fleet Capital Tool Purchase CT Fleet Operations is requesting Fleet Capital funds for a Mobile wheel lift for the Waterbury garage. $25 reimbursement for transformer upgrades - Amnott, Katherine TRAV0011 MDEC CAPITALIZATION Debt Compliance Fees Debt Compliance Fees 2016 Acc Int -CL&P D 2018 Series a Accrued Int. CL&P D-Rose 2019 Series A-CL&P D-Rose 2019 Series A Accrued Int-CL&P D-Rose 2021 Series A Accrued Int- CL&P-Savage 2023 Series A Accr Interest-CL&P-Savage 2023 Series B Accrued Interest - CL&P - Savage, Jessica 2024 Series A Accrued Interest - CL&P - Savage, Jessica 2025 Series A Issue Expense - CL&P 2025 Series A Accrued Interest - CL&P Debt Interest Accrual-Curtin TRDV0011NT011 TELECOM ENGINEERING REAL ESTATE COSTS ( TO REPLACE THE OLD TREG999E WORK ORDER) TRIN0011NT011 Training/Safety - Meter Service TRMT0011OPSNTRELEXPENSES11 TROM0011OPSNTRELEXPENSES11 CA AWO REG+OT FEES C2 CA AWO REG+OT ACCRUAL CT Tax Offset-Ouimette This work order will be used under the 2024 project until the 2025 annual meter project is approved for 2025 work and purchases. This work order will be used under the 2024 project until the 2025 annual meter project is approved for 2025 work and purchases. Conn Corporation Business Tax Tax Payments Tax Payments Union Business Company Paid V1511365 CT Elec D Fleet Capital Vehicle Pu V1558295 CT Elec D Fleet Capital Vehicles V1758553 CT Elec D Fleet Capital Vehicles UCONN PROFESSER ON SEBATICAL TO ASSIST EVERSOURCE WITH RESEARCH AND DEVELOPMENT OF SOFTWARE THAT WILL ASSIST WITH CYBER SECURITY FOR EQUIPMENT ON EE SYSTEM. BEGINS SEPT THROUGH YEAR END. This AWO is being set up to pay the May 2020 Payment. Invoice #1 May 2020, Subject 200100 UDR-Purchase Pwr-Capacity-Caron UDR-Purchase Pwr-Energy-Caron UI UIL Class III-Ouimette UIL Charges-Lempa Unc. Line of Credit Expenses-Savage DSCADA System Resiliency Thompson UWAVR011NT011 CT Electric Distribution Fleet Capital Vehicle Purchase 1 SUV Unit # 1511365 CT Electric Distribution Fleet Capital Vehicle Purchase 1 Digger Derrick Tandem $104,900 Unit #1558295 CT Electric Distribution Fleet Capital Vehicle Purchase 1 Material Handler Tandem $94,900 Unit #1758553 CT Elec D Fleet Capital Vehicle Pur CT Electric Distribution Fleet Capital Vehicle - Transfer 1 2020 Chevy Express Full Cargo Van $25,439.31 Unit #: 2042406 Transferring this unit from MA E (21) to the CT Elec (11). The original WO# was V2042777 V204240T V204278T CT Elec D Fleet Capital Vehicle Trn V2111379 CT Elec D Fleet Capital Vehicle Pur CT Electric Distribution Fleet Capital Vehicle - Transfer 1 2020 Chevy Express Full Cargo Van $25,439.31 Unit #:2042786 Transferring this unit from MA E (21) to the CT Elec (11). The original WO# was V2042777 CT Electric Distribution Fleet Capital Vehicle Purchase 1 Chevy Trailblazer $32,058.20 Unit # 2111379 CT Elec D Fleet Capital Vehicle Pur CT Electric Distribution Fleet Capital Vehicle Purchase 7 Chevy Trailblazers $31,000 ea = $217,000 Unit #'s: 2111613,2111996,2111141,2111144,2111058,2111102,2111379 Other-O00 107010 1 CT Elec D Fleet Capital Vehicles CT Electric Distribution Fleet Capital Vehicle Purchase 5 Ford F150 Pick up trucks $48,622ea = $243,110 Unit #'s: 2122710,2122728,2122781,2122809,2122830 Other-O00 107010 1 107010 1 V2111613 V212211T V2122717 CT Elec D Fleet Capital Vehicle Pu V2255871 CT Elec D Fleet Capital Vehicle Pur CT Electric Distribution Fleet Capital Vehicle 55 Ford F-150 Pickup Trucks $48,622ea = $2,674,210 Unit #'s: 2122717,2122730,2122733,2122734,2122735,2122736,2122739,2122742,2122743,2122746,2122753,2122784,2122787,2122821,2122837,2122838,2122841,2122846,2122847,2122851,2122854,2122859,2122865,2122867,2122868,2122870,2122871,2122872,2122878,222375,222376,222378,22 2379,2222380,2222381,2222383,2222384,2222385,2222387,2222389,2222392,2222395,2222396,2222398,2222399,2222400,2222401,2222402,2222404,2222405,2222406,2222410,2222411,2222413,2222414 Other-O00 CT Electric Distribution Fleet Capital Vehicle Purchase 2 Aerial Squirt Booms - JEMS $180,562.09ea = $361,124.19 Unit #'s: 2255871,2255872 Other-O00 V2257664 CT Elec Distr Fleet Cap Vehicle Pur CT Electric Distribution Fleet Capital Vehicle Purchase 11 Material Handlers $237,044.58 = $2,607,490.38 Unit #'s: 2257492,2257493,2257494,2257495,2257497,2257664,2257665,2257666,2257667,2257668,2257669 107010 1 Other-O00 107010 1 Other-O00 107010 1 Other-O00 107010 1 V2258596 CT Elec Dist Fleet Capital Veh Purc V2288029 CT Elec D Mat Logistic Fleet Vehicl CT Electric Distribution Fleet Capital Vehicle Purchase 7 Material Hanlder - JEMS $308,337.75ea = $2,158,364.25 Unit #'s: 2258244,2258250,2258272,2258458,2258596,2258713,2258844 CT Electric Distribution Fleet Capital Vehicles-Material Logistics 1 Tractor Truck $556,640 Unit #2288029 CT Elec Dist Fleet Capital Vehicle CT Electric Distribution Fleet Capital Vehicle Purchase 3 Reel Trailers $182,617.84ea = $547,853.52 Unit #'s: 2297050,2297060,2297066 Other-O00 107010 1 CT Elec D Fleet Capital Vehicle Pur CT Electric Distribution Fleet Capital Vehicle Purchase 6 Ford Escape's $38,605.02 ea = $231,630.12 Unit #'s: 2311010,2311026,2311185,2311277,2311638,2311733 Other-O00 107010 1 CT Elec D Fleet Capital Vehicle Pur CT Electric Distribution Fleet Capital Vehicle Purchase 1 Chevy Traverse $42,095 Unit #2312795 Unit #'s: 2422050,2422089,2422121,2422808,2422037,2422040 Other-O00 107010 1 CT Elec D Fleet Capital Vehicle Pur CT Electric Distribution Fleet Capital Vehicle Purchase 21 Chevy Colorado PUs $35,490ea = $745,290 Unit #'s: 2321115,2321240,2321130,2321169,2321212,2321216,2321231,2321248,2321250,2321251,2321262,2321585,2321704,2321713,2321732,2321734,2321177,2321093,2321113,2321188 Other-O00 107010 1 CT Elec D Fleet Capital Vehicle Pur CT Electric Distribution Fleet Capital Vehicle Purchase 38 Chevy Colorado's $38,823ea = $1,475,274 Unit #'s: 2321704,2321713,2321732,2321734,2321056,2321058,2321065,2321074,2321076,2321080,2321526,2321536,2321545,2321555,2321557,2321585,2321216,2321218,2321224,2321226,2321234,2321240,2321248,2321250,2321082,2321088,2321098,2321100,2321106,2321108,2321115,2321122 ,2321131,2321139,2321141,2321146,2321148,2321157 Other-O00 107010 1 Other-O00 107010 1 Other-O00 107010 1 V2297050 V2311010 V2312795 V2321115 V2321704 V2322002 CTElec D Fleet Capital Vehicle V2322133 CT Elec D Fleet Capital Vehicles CT Electric Distribution Fleet Capital Vehicle Purchase 5 Ford F150 Pickup Trucks $52,353ea = $261,765 Unit #: 2322002,2322403,2322522,2322578,2322656 CT Electric Distribution Fleet Capital Vehicle Purchase 1 Ford F15 Pickup $52,600 Unit # 2322133 V2322404 CT Elec D Fleet Capital Vehicles CT Electric Distribution Fleet Capital Vehicle Purchase 13 Ford F150 PUs $52,877ea = $687,401 Unit #'s: 2322404,2322189,2322253,2322109,2322881,2322714,2322720,2322117,2322378,2322939,2322676,2322023,2322546 Other-O00 107010 1 V2322565 CT Elec D Fleet Capital Vehicle Pur CT Electric Distribution Fleet Capital Vehicle Purchase 3 Pickup Trucks $47,433.16ea = $142,299.48 Unit #'s: 2322565,2322399,2322377 Other-O00 107010 1 CT Elec D Fleet Capital Vehicle Pur CT Electric Distribution Fleet Capital Vehicle Purchase 5 Ford F150 PU Trucks $48,418 ea = $145,254.00 Unit #: 2322797,2322645,2322338,2322541,2322311 Other-O00 107010 1 Other-O00 107010 1 Other-O00 107010 1 V2322797 V2323406 CT Elec D Fleet Capital Vehicles V2323469 CT Elec D Fleet Capital Vehicle Pur CT Electric Distribution Fleet Capital Vehicle Purchase 5 Ford F350 Pickup Trucks $51,534 ea = $257,670 Unit #'s: 2323406,2323583,2323999,2323120,2323619 CT Electric Distribution Fleet Capital Vehicle Purchase 1 Ford F350 Truck $51,534 Unit # 2323469 CT Elec D Fleet Capital Vehicle Pur CT Electric Distribution Fleet Capital Vehicle Purchase 3 F350 Pickup Trucks $59,909.06ea = $179,727.19 Unit #'s: 2323959,2323960,2323116 Other-O00 107010 1 CT Elec D Fleet Capital Vehicles CT Electric Distribution Fleet Capital Vehicle Purchase 2 Chevy Silverado PUs $59,995ea = $119,990 Unit #'s: 2326746,2326821 Other-O00 107010 1 V2342159 CT Elec D Fleet Capital Vehicles CT Electric Distribution Fleet Capital Vehicle Purchase 10 Transit 250's $49,037ea = $490,370 Unit #'s: 2342159,2342980,2342021,2342095,2342078,2342068,2342939,2342134,2342927,2342059 Other-O00 107010 1 V2342301 CT Elec D Fleet Capital Vehicles CT Electric Distribution Fleet Capital Vehicle Purchase 12 Transit 350's $48,376ea = $580,512 Unit #'s: 2342301,2342029,2342831,2342337,2342304,2342606,2342034,2342804,2342336,2342620,2342325,2342302 Other-O00 107010 1 Other-O00 107010 1 Other-O00 107010 1 Other-O00 107010 1 Other-O00 107010 1 Other-O00 107010 1 Other-O00 107010 1 Other-O00 107010 1 Other-O00 107010 1 Other-O00 107010 1 Other-O00 107010 1 Other-O00 107010 1 Other-O00 107010 1 Other-O00 107010 1 Other-O00 107010 1 Other-O00 107010 1 V2323959 V2326746 V2342887 CT Elec D Fleet Capital Vehicle Pur V2347025 CT Elec D Fleet Veh-Mat Logistics V2356606 CT Elec D Fleet Capital Vehicles CT Electric Distribution Fleet Capital Vehicle Purchase 21 Cargo Vans $43,228.34ea = $952,277.47 Unit #'s: 2342887,2342995,2342428,2342829,2342870,2342897,2342921,2342945,2342970,2342987,2342020,2342080,2342097,2342130,2342138,2342155,2342180,2342199,2342224,2342236,2342254,2342272 CT Electric Distribution Fleet Capital Vehicles-Material Logistics 31 EV Box Truck $427,240 Unit# 2347025 CT Electric Distribution Fleet Capital Vehicle Purchase 1 Material Handler $219,150 Unit # 2356606 CT Elec Dist Fleet Cap Vehicle Purc CT Electric Distribution Fleet Capital Vehicle Purchase 23 Material Handler TT - JEMS $237,044.58ea = $5,452,025.34 Unit #'s: 2357446,2357447,2357448,2357449,2357450,2357451,2357452,2357453,2357454,2357455,2357456,2357457,2357458,2357862,2357863,2357864,2357865,2357866,2357867,2357868,2357869,2357870,2357871 Updated: 2024 - 6 of the above units were moved to a 2023 WO - V2357862 Proj ID: CTEDVH23 Unit #'s: 2357862,2357863,2357868,2357869,235870,2357451 An additional 3 units were moved to WO# V2357446 Project ID: CTEDVH23 Unit #'s: 2357452,2355748,2357454 V2357446 CT Electric Distribution Fleet Capital Vehicles 3 - 2022 Altec Heavy Duty Vehicles $244,162ea = $732,486 These units were originally written under WO V2357446 CTEDVH21 - delivery was delayed therefore re-written under 2023 project. Unit #'s: 2357452,2357458,2357454 V2357452 CT Elec D Fleet Capital Vehicles V2357627 CT Elec D Fleet Capital Vehicles V2357732 CT Elec D Fleet Capital Vehicle Pur CT Electric Distribution Fleet Capital Vehicle Purchase 1 Material Handler $259,325.46 Unit #2357627 CT Electric Distribution Fleet Capital Vehicle - Transfer 1 2023 Material Handler W/Altec AM55E $229,800 - from Svc Co Entity 61 - WO V00SF091 to CT Elec D Entity 11 V2357732 CT Electric Distribution Fleet Capital Vehicles 6 2022 Altec Heavy Duty Vehicles $249,608ea = $1,488,648 These units were originally written under WO V2357446 CTEDVH21 - delivery was delayed therefore re-written under 2023 project. Unit #'s: 2357862,2357863,2357868,2357869,2357870,2357451 V2357862 V2358186 CT Elec D Fleet Capital Vehicles CT Elec D Fleet Capital Vehicle Pur V2358219 CT Elec D Fleet Capital Vehicle Pur V2358662 CT Elec D Fleet Capital Vehicles V2358962 CT Elec D Fleet Capital Vehicles V2392074 CT Elec D Fleet Capital Vehicles V2392076 CT E D Wrkf Exp Flt Cap Vehicle Pur V2392077 CT Elec D Fleet Capital Vehicles CT Electric Distribution Fleet Capital Vehicle Purchase 12 Material Handlers - JEMS $308,337.75ea = $3,700,053 Unit #'s: 2358186,2358397,2358398,2358399,2358458,2358459,2358460,2358567,2358568,2358569,2358566,2358667 CT Electric Distribution Fleet Capital Vehicle Purchase 2 Digger Derricks $270,971.08ea $541,942.16 Unit #'s: 2358219,2358220 CT Electric Distribution Fleet Capital Vehicle Purchase 1 Material Handler $308,047.82 Unit #2358662 CT Electric Distribution Fleet Capital Vehicle Purchase 4 Digger Derricks $248,931.11 ea = $995,724.42 Unit #'s: 2358962,2358963,2358964,2358965 CT Electric Distribution Fleet Capital Vehicle Purchase 1 Rapid Pole Trailer $133,480.00 Unit # 2392074 CT Electric Distribution 2023 Blanket Work Order for Fleet Vehicle UVL's. 1 Rapid Pole Trailer $150,055.00 Unit # 2392076 CT Electric Distribution Fleet Capital Vehicle Purchase 1 Rapid Pole Trailer $150,055 Unit # 2392077 CT Electric Distribution Fleet Capital Purchases 3 Rapid Pole Trailers $150,055ea $450,165 Unit #'s: 2392082,2392083,2392084 V2392082 CT Elec D Fleet Capital Vehicles Other-O00 107010 1 V2402993 CT Elec Fleet Capital Vehicles CT Electric Distribution Fleet Capital Vehicle Purchase 1Toyota Forklift $40,803 Unit # 2402993 Other-O00 107010 1 CT Elec D Fleet Capital Vehicles CT Electric Distribution Fleet Capital Vehicle Purchase 4 Chey Trailblazer's $26,435ea = $105,740 Unit #'s: 2411551,2411798,2411849,2411880 Other-O00 107010 1 CT Elec D Fleet Capital Vehicles CT Electric Distribution Fleet Capital Vehicle Purchase 26 Chevy Trailblazers $26,435ea = $687,310 Unit #'s: 2411620,2411076,2411099,2411738,2411779,2411395,2411717,2411799,2411335,2411824,2411938,2411818,2411725,2411342,2411970,2411995,2411645,2411103,2411144,2411675,2411832,2411319,2411930,2411942,2411160,2411228 Other-O00 107010 1 V241144T V2411620
Text of RRU-159 Attachment 15.xlsx
Sheet names, column headings and text cells; numbers left out · first 300,000 characters
Text of RRU-159 Attachment 15.pdf
Extracted from the file · 897 pages · 15,723,777 characters
Text of RRU-159 Attachment 14 .pdf
Extracted from the file · 1 page · 2,589 characters
Text of RRU-159 Attachment 14.xlsx
Sheet names, column headings and text cells; numbers left out
Text of RRU-159 Attachment 13.xlsx
Sheet names, column headings and text cells; numbers left out
Text of RRU-159 Attachment 13.pdf
Extracted from the file · 1 page · 427 characters
Text of RRU-159 Attachment 12.xlsx
Sheet names, column headings and text cells; numbers left out · first 300,000 characters
Text of RRU-159 Attachment 12.pdf
Extracted from the file · 802 pages · 14,341,138 characters
Text of RRU-159 Attachment 11.xlsx
Sheet names, column headings and text cells; numbers left out · first 300,000 characters
Text of RRU-159 Attachment 11.pdf
Extracted from the file · 858 pages · 15,906,152 characters
Text of RRU-159 Attachment 10.xlsx
Sheet names, column headings and text cells; numbers left out
Text of RRU-159 Attachment 10.pdf
Extracted from the file · 1 page · 822 characters
Text of RRU-159 Attachment 09.xlsx
Sheet names, column headings and text cells; numbers left out · first 300,000 characters
Text of RRU-159 Attachment 09.pdf
Extracted from the file · 449 pages · 7,355,312 characters
Text of RRU-159 Attachment 08.xlsx
Sheet names, column headings and text cells; numbers left out · first 300,000 characters
Text of RRU-159 Attachment 08.pdf
Extracted from the file · 867 pages · 13,878,236 characters
Text of RRU-159 Attachment 07.xlsx
Sheet names, column headings and text cells; numbers left out · first 300,000 characters
Text of RRU-159 Attachment 07.pdf
Extracted from the file · 869 pages · 15,728,932 characters
Text of RRU-159 Attachment 06.xlsx
Sheet names, column headings and text cells; numbers left out · first 300,000 characters
Text of RRU-159 Attachment 06.pdf
Extracted from the file · 459 pages · 8,128,897 characters
Text of RRU-159 Attachment 05.xlsx
Sheet names, column headings and text cells; numbers left out · first 300,000 characters
Text of RRU-159 Attachment 05.pdf
Extracted from the file · 879 pages · 16,073,548 characters
Text of RRU-159 Attachment 04.xlsx
Sheet names, column headings and text cells; numbers left out
Text of RRU-159 Attachment 04.pdf
Extracted from the file · 5 pages · 20,994 characters
Text of RRU-159 Attachment 03.xlsx
Sheet names, column headings and text cells; numbers left out · first 300,000 characters
Text of RRU-159 Attachment 03.pdf
Extracted from the file · 840 pages · 14,413,580 characters
Text of RRU-159 Attachment 02.xlsx
Sheet names, column headings and text cells; numbers left out · first 300,000 characters
Text of RRU-159 Attachment 02.pdf
Extracted from the file · 1,137 pages · 16,605,462 characters
Text of RRU-159 Attachment 01.xlsx
Sheet names, column headings and text cells; numbers left out
Text of RRU-159 Attachment 01.pdf
Extracted from the file · 1 page · 1,403 characters
As listed on the current system
Question(s) Answered 159 (Connecticut Light and Power Company dba Eversource Energy) Date Filed: 11/06/2026