Interrogatory responses

Answers to questions 159

ResponseFiled by Connecticut Light and Power Company dba Eversource Energy51 files
Part of docket 26-05-10Open
  • Electric
Application of The Connecticut Light and Power Company d/b/a Eversource Energy to Amend its Rate Schedules

Files51

Search terms highlighted
Eversource rate increase is on 36 pages across 17 files of the text below, highlighted. Go to the first matchClear highlighting
Words on different pages
Words on different pages
Words on different pages

Text of RRU-159 Attachment 23.xlsx

Sheet names, column headings and text cells; numbers left out · first 300,000 characters

Text of RRU-159 Attachment 23.pdf

Extracted from the file · 1,160 pages · 16,330,154 characters

Text of RRU-159 Attachment 22.xlsx

Sheet names, column headings and text cells; numbers left out · first 300,000 characters

Text of RRU-159 Attachment 22.pdf

Extracted from the file · 1,203 pages · 14,349,246 characters

Text of RRU-159 Attachment 21.xlsx

Sheet names, column headings and text cells; numbers left out · first 300,000 characters

Text of RRU-159 Attachment 21.pdf

Extracted from the file · 1,203 pages · 13,880,364 characters

Text of RRU-159 Attachment 20.xlsx

Sheet names, column headings and text cells; numbers left out

Text of RRU-159 Attachment 20.pdf

Extracted from the file · 16 pages · 151,762 characters

Text of RRU-159 Attachment 19.xlsx

Sheet names, column headings and text cells; numbers left out

Text of RRU-159 Attachment 19.pdf

Extracted from the file · 1 page · 5,328 characters

Text of RRU-159 Attachment 18.xlsx

Sheet names, column headings and text cells; numbers left out · first 300,000 characters

Text of RRU-159 Attachment 18.pdf

Extracted from the file · 640 pages · 7,983,236 characters

Text of RRU-159 Attachment 17.xlsx

Sheet names, column headings and text cells; numbers left out · first 300,000 characters

Text of RRU-159 Attachment 17.pdf

Extracted from the file · 855 pages · 14,651,941 characters

Text of RRU-159 Attachment 16.xlsx

Sheet names, column headings and text cells; numbers left out · first 300,000 characters

Text of RRU-159 Attachment 16.pdf

Extracted from the file · 489 pages · 7,076,557 characters

Text of RRU-159 Attachment 15.xlsx

Sheet names, column headings and text cells; numbers left out · first 300,000 characters

Text of RRU-159 Attachment 15.pdf

Extracted from the file · 897 pages · 15,723,777 characters

Text of RRU-159 Attachment 14 .pdf

Extracted from the file · 1 page · 2,589 characters

Text of RRU-159 Attachment 14.xlsx

Sheet names, column headings and text cells; numbers left out

Text of RRU-159 Attachment 13.xlsx

Sheet names, column headings and text cells; numbers left out

Text of RRU-159 Attachment 13.pdf

Extracted from the file · 1 page · 427 characters

Text of RRU-159 Attachment 12.xlsx

Sheet names, column headings and text cells; numbers left out · first 300,000 characters

Text of RRU-159 Attachment 12.pdf

Extracted from the file · 802 pages · 14,341,138 characters

Text of RRU-159 Attachment 11.xlsx

Sheet names, column headings and text cells; numbers left out · first 300,000 characters

Text of RRU-159 Attachment 11.pdf

Extracted from the file · 858 pages · 15,906,152 characters

Text of RRU-159 Attachment 10.xlsx

Sheet names, column headings and text cells; numbers left out

Text of RRU-159 Attachment 10.pdf

Extracted from the file · 1 page · 822 characters

Words on different pages

This spreadsheet is large. Its searchable text keeps the sheet names, column headings and text cells and stops at 300,000 characters, so search may miss words further in. Download the file for every cell and figure.

  1. Part 48 of 77

    DSN72001 | (50): Miscellaneous- Rebuild of dis | Card 11F - Rebuild the distribution control house. Replace entire roof and rebuild structure to support new roof, Install new roof and replace rafters, Install new plywood sheathed 2 1/2 R12 foam insulation to all exterior walls or building, replace and rebuild fascia and soffit, Install Certainteed Iron Max Vertical siding. | Material-M00 3H721681 | South Main St.Manchester Pole 3881 | South Main St.Manchester Pole 3881 hit/ Replace with 40/2_x000D_ AP1-YWO Total Cost Less Than 7K | Material-M00 DSQ72033 | (50): Replace the failed 9A-3X1-4 m | Falls Village 9A - Replace the failed 9A-3X1-4 mobile disconnect switch | Material-M00 2W522136 | PHD VT *REJECT POLES* - SHIFT AF | PHD VT *REJECT POLES* - SHIFT AFTER FRONTIER SETS POLES_x000D_ AP1-YWO Total Cost Less Than 7K | Material-M00 3H721721 | Htfd TRINITY ST - C6843 replace 250 | Htfd TRINITY ST - C6843 replace 250w head to new pole_x000D_ AP1-YWO Total Cost Less Than 7K | Material-M00 1S620701 | RL BELLE HAVEN REMOVE OVERHEAD ON M | RL BELLE HAVEN REMOVE OVERHEAD ON MAYO AVE_x000D_ AP3-YWO Resource Variance Met- Labor 35 <= 32 OR -37.25 <= 30 And Contractor $1731.29 <= 2000 | Material-M00 5T721785 | RSO, 7/19, ENFIELD, POST OFFICE, PO | RSO, 7/19, ENFIELD, POST OFFICE, POLE 12666 - REPLACE OH SVC/REPLACE METER_x000D_ AP1-YWO Total Cost Less Than 7K | Material-M00 2M722719 | JC/RSO 7/28 MIDDLEBURY, SOUTH ST - | JC/RSO 7/28 MIDDLEBURY, SOUTH ST - TRUCK TOOK DOWN SVC - RAN 130' #2 SVC_x000D_ AP1-YWO Total Cost Less Than 7K | Material-M00 2M723308 | Jpt-77 Bradley St BRI P8486 - New R | Jpt-77 Bradley St BRI P8486 - New Residential Overhead_x000D_ AP1-YWO Total Cost Less Than 7K | Material-M00 4N721645 | MM RPLCE 3 LEAKING XFRMRS ALL WORK | MM RPLCE 3 LEAKING XFRMRS ALL WORK COMPLETE_x000D_ CL-YWO Variance - Contractor Labor | Material-M00 1B721957 | JS - 4 Woodview Dr, Brkfld, Inst\Re | JS - 4 Woodview Dr, Brkfld, Inst\Rem OH Svc (14H3)_x000D_ AP1-YWO Total Cost Less Than 7K | Material-M00 1B721958 | JS - 25 Woodview Dr, Brkfld, Inst\R | JS - 25 Woodview Dr, Brkfld, Inst\Rem OH Svc (14H3)_x000D_ AP1-YWO Total Cost Less Than 7K | Material-M00 WINBAT01 | Windsor Battery Back Up | Windsor Battery Back Up_x000D__x000D_ Engineering design costs for Windsor battery backup project_x000D__x000D_ _x000D__x000D_ 1985 Blue Hills Ave Ext. Windsor, CT_x000D__x000D_ | Material-M00 1S721960 | PH; 71 KENSETT LN; INSTALL 4/0, 200 | PH; 71 KENSETT LN; INSTALL 4/0, 200AMP UG SERVICE_x000D_ AP1-YWO Total Cost Less Than 7K | Material-M00 4D321128 | cb//high st @ ridge rd, chester//sh | cb//high st @ ridge rd, chester//shift to ATT pole 749 & 750_x000D_ AP2-YWO Total Cost Variance Met - Variance :28.1567 MIN.:-50 MAX.:150 | Material-M00 1B721941 | JS - 3 East St, Danb, Inst\Rem OH S | JS - 3 East St, Danb, Inst\Rem OH Svc (11A76)_x000D_ AP1-YWO Total Cost Less Than 7K | Material-M00 2M722559 | Municipal Light Fault Locate and Re | Municipal Light Fault Locate and Repair@ POLE 1259 - COMP 8/2 CCC_x000D_ AP1-YWO Total Cost Less Than 7K | Material-M00 2M621676 | Jpt-ESO-24 Matthews St Brstl P248 - | Jpt-ESO-24 Matthews St Brstl P248 - 9a - Shift 3PH Facilities Rplc 25 Kva_x000D_ AP2-YWO Total Cost Variance Met - Variance :101.535 MIN.:-50 MAX.:150 | Material-M00 3H721263 | HARTFORD, NEW BRITAIN AVE REPLACE 2 | HARTFORD, NEW BRITAIN AVE REPLACE 250W HPS P-4962 - COMP 6-8-17 CCC_x000D_ AP1-YWO Total Cost Less Than 7K | Material-M00 2M422728 | Jpt-298 South St Brstl P2901-S - 9a | Jpt-298 South St Brstl P2901-S - 9a - Rplc Pole/Span & SW Guy in concrete_x000D_ AP2-YWO Total Cost Variance Met - Variance :68.3096 MIN.:-50 MAX.:150 | Material-M00 4N721466 | RSO 8/17 - SALEM, WEST RD - PAD # 1 | RSO 8/17 - SALEM, WEST RD - PAD # 142 / NEED TO RETURN FIX PROBLEM_x000D_ AP1-YWO Total Cost Less Than 7K | Material-M00 2M622949 | Jpt-ESO-5 Paul St Plnv P3110 & P125 | Jpt-ESO-5 Paul St Plnv P3110 & P12539 - Rplc Poles Shift 1PH Delta DE Xarm_x000D_
  2. Part 49 of 77

    AP2-YWO Total Cost Variance Met - Variance :3.4593 MIN.:-50 MAX.:50 | Material-M00 3H621467 | MAIN ST, HARTFORD - REPLACE VACUUM | MAIN ST, HARTFORD - REPLACE VACUUM SWITCH MH 731_x000D_ AP3-YWO Resource Variance Met- Labor 126 <= 32 OR -72.58 <= 30 And Contractor $1577.83 <= 2000 | Material-M00 2M722757 | RSO NEW BRITAIN, Biruta St - Replac | RSO NEW BRITAIN, Biruta St - Replace 50' #2 OH Service @ P53400_x000D_ AP1-YWO Total Cost Less Than 7K | Material-M00 2M621782 | PT Convo #402122-MakeReadyWirelessA | PT Convo #402122-MakeReadyWirelessAttachReimb-Frontier-Parent Convo # 397483_x000D_ AP1-YWO Total Cost Less Than 7K | Material-M00 3L721945 | TORRINGTON POLE 3560 150 HPS COBRA | TORRINGTON POLE 3560 150 HPS COBRA COMPLETED 8/3 CHE_x000D_ AP1-YWO Total Cost Less Than 7K | Material-M00 4D521524 | CDOT 59-161/CD00610, UG civil work | CDOT 59-161/CD00610, UG civil work 35L9/35L7, long hill rd, Guilford, stage1_x000D_ AP2-YWO Total Cost Variance Met - Variance :-35.8544 MIN.:-40 MAX.:40 | Material-M00 3H721865 | RSO,7/16, WEST HARTFORD, KANE STREE | RSO,7/16, WEST HARTFORD, KANE STREET - INS 3 ELBOW ARR P-3173/REBUILT RISER_x000D_ AP2-YWO Total Cost Variance Met - Variance :-6.6382 MIN.:-50 MAX.:50 | Material-M00 4N721203 | SM-240 BOSTON POST RD, WTRFRD- RMV | SM-240 BOSTON POST RD, WTRFRD- RMV OH SVC AND INSTL OH-DB_x000D_ AP1-YWO Total Cost Less Than 7K | Material-M00 1G621297 | RL:10 Glenville Rd: Verizon replace | RL:10 Glenville Rd: Verizon replaced pole 68060 VZ 5 50/2 Car vs pole 9A_x000D_ CL-YWO Variance - Contractor Labor | Material-M00 3H722035 | RSO, 8/5, WINDSOR, KENDRICK LANE - | RSO, 8/5, WINDSOR, KENDRICK LANE - REPLACED HH 1596B_x000D_ AP1-YWO Total Cost Less Than 7K | Material-M00 5T721759 | Hall Hill Rd.353,Somers, install 25 | Hall Hill Rd.353,Somers, install 25KVA 120' 1/0tpx new40/2 4/0db service_x000D_ AP1-YWO Total Cost Less Than 7K | Material-M00 1B622090 | WOOD, 120 WEST LAKE RD, OH SVC CHEC | WOOD, 120 WEST LAKE RD, OH SVC CHECK EXISTING DROP TO 2 , SET METER_x000D_ AP1-YWO Total Cost Less Than 7K | Material-M00 2L720624 | Torrington--Lincoln Ave. 1114S Repl | Torrington--Lincoln Ave. 1114S Repl & relocate stub pole_x000D_ AP1-YWO Total Cost Less Than 7K | Material-M00 2W620826 | JDB 54 PORTER HILL RD MIDDLEBURY R | JDB 54 PORTER HILL RD MIDDLEBURY REPLACE POLE 61480 & SHIFT CONV#449244_x000D_ AP1-YWO Total Cost Less Than 7K | Material-M00 4N621724 | MM REPLACE SERVICE RSO 12/20 NL, BR | MM REPLACE SERVICE RSO 12/20 NL, BRAEMER PL P 7607 ALL WORK COMPLETE_x000D_ | Material-M00 1N720916 | JDB 10 STURGESS COMMONS WSPT POLE 5 | JDB 10 STURGESS COMMONS WSPT POLE 5337 INSTALLED 50KVA/CUTOUT/6-13-2017_x000D_ AP1-YWO Total Cost Less Than 7K | Material-M00 2W421201 | PHD BM/ Pole 1342 Install 600 Amp s | PHD BM/ Pole 1342 Install 600 Amp switches_x000D_ CL-YWO Variance - Contractor Labor | Material-M00 1S721581 | RL:59 View St West Electric Service | RL:59 View St West Electric Service Existing Residl OH Install 3 meters remove 2_x000D_ AP1-YWO Total Cost Less Than 7K | Material-M00 2M722186 | JC/47 RED ROBIN RD NAUG- NEED NEW | JC/47 RED ROBIN RD NAUG- NEED NEW HH & 4 POS.CONNECTORS_x000D_ AP1-YWO Total Cost Less Than 7K | Material-M00 3R720043 | CAL - CD00849-01 - Ckt 21M15 MBI In | CAL - CD00849-01 - Ckt 21M15 MBI Initiative Design Work, Weston_x000D_ AP1-YWO Total Cost Less Than 7K | Material-M00 EIDR0011 | EIA INT RATE BUY-DN LOANS-REGLTORY | EIDR0011ETT2013 | Material-M00 3R720018 | CB CD00815-01Install line sensor Po | CB CD00815-01Install line sensor Pole D1455 GreenHollow Rd Plainfield 13B21-F002_x000D_ AP2-YWO Total Cost Variance Met - Variance :.4642 MIN.:-50 MAX.:50 | Material-M00 CS002471 | STEPSTONE 35L XFMR & PCE INSTALL | INSTALL A NEW 60 MVA 115/23 KV XFORMER W 4 FEEDER SWITCHGEAR. | Material-M00 DSN52019 | (30): Rebuild two OCB's. 32G-19T-2 | Rebuild two OCB's. 32G-19T-2 and 32G-30T-2. | Material-M00
  3. Part 50 of 77

    4N621483 | SM-249 PALMER NECK RD, STGN- RPLC P | SM-249 PALMER NECK RD, STGN- RPLC POLE/, INSTL XFMR/INSTL OH-DB SVC_x000D_ AP2-YWO Total Cost Variance Met - Variance :82.3711 MIN.:-50 MAX.:150 | Material-M00 3H721195 | BLOOMFIELD BLUE HILLS AVE POLE 18 - | BLOOMFIELD BLUE HILLS AVE POLE 18 - 9A_x000D_ AP2-YWO Total Cost Variance Met - Variance :139.4207 MIN.:-50 MAX.:150 | Material-M00 4D720194 | CB//MADISON, 57 MIDDLE BEACH RD W// | CB//MADISON, 57 MIDDLE BEACH RD W//NEW SVC, SHIFT POLE/WORKS W TEMP RMVL_x000D_ AP1-YWO Total Cost Less Than 7K | Material-M00 2M621532 | Jpt-32 Sandra Ave Plymth P2625 - 9a | Jpt-32 Sandra Ave Plymth P2625 - 9a - Shift Open Wire DE Sec._x000D_ AP1-YWO Total Cost Less Than 7K | Material-M00 5T721538 | 6/20 - RSO - ANDOVER, SKINNER HILL | 6/20 - RSO - ANDOVER, SKINNER HILL RD - REMOVE IDLE 10KVA XFMR P-446_x000D_ AP1-YWO Total Cost Less Than 7K | Material-M00 3H720291 | HARTFORD, HOMESTEAD AVE C8448 city | HARTFORD, HOMESTEAD AVE C8448 city pole replace 250w head_x000D_ AP1-YWO Total Cost Less Than 7K | Material-M00 3H721262 | HARTFORD, NEW BRITAIN AVE REPLACED | HARTFORD, NEW BRITAIN AVE REPLACED 250W HPS P-5038 - COMP 6/8/17 CCC_x000D_ AP1-YWO Total Cost Less Than 7K | Material-M00 LGEM0011 | Employment | LGEM0011NT011 | Material-M00 LGBK0011 | Bankruptcy | LGBK0011NT011 | Material-M00 2M722833 | Jpt-RSO- Park Hill Rd BRI - Rplc'd | Jpt-RSO- Park Hill Rd BRI - Rplc'd 4 (Frnt) Poles & 1 Xfrm_x000D_ AP2-YWO Total Cost Variance Met - Variance :104.2948 MIN.:-50 MAX.:150 | Material-M00 4N721805 | GCC / RMV EXISTING OVERHEAD SVC AND | GCC / RMV EXISTING OVERHEAD SVC AND INSTALL A NEW OVERHEAD SVC_x000D_ AP1-YWO Total Cost Less Than 7K | Material-M00 DSN72049 | Enfield 12C - Replace A/C Unit DSN7 | A/C Unit | Material-M00 CT17D033 | Windsor Paging Network Materials | This work order covers equipment needed in Windsor to improve the contention mechanism for holding off paging and RCLMS transmitter controllers. | Material-M00 3H621565 | WF-51+53+55- Maple Ave-Windsor-@ po | WF-51+53+55- Maple Ave-Windsor-@ pole-864, rpl oh svc to building._x000D_ | Material-M00 3R720326 | CD00471-01 Reconfig. Ovhd Lines in | CD00471-01 Reconfig. Ovhd Lines in Front of 23U S/S_x000D_ AP2-YWO Total Cost Variance Met - Variance :-17.2137 MIN.:-40 MAX.:40 | Material-M00 2M722403 | JC/Deerfield Ln Bethany Animal Prot | JC/Deerfield Ln Bethany Animal Protection_x000D_ AP1-YWO Total Cost Less Than 7K | Material-M00 1S521266 | PH; 13 Juniper Rd, Darien Relocate | PH; 13 Juniper Rd, Darien Relocate OH facilities to UG for customer_x000D_ CL-YWO Variance - Contractor Labor | Material-M00 Sale of Street Lights in East Lyme | Record the sale of street lights to the town of East Lyme | Material-M00 Sale of Street Lights in Darien | Record the sale of street lights to the town of Darien | Material-M00 3H722149 | 453 Wash St Htfd replace 250w Head | 453 Wash St Htfd replace 250w Head CH8192_x000D_ AP1-YWO Total Cost Less Than 7K | Material-M00 3H722173 | XL-CDOT 63-633, electrical work to | XL-CDOT 63-633, electrical work to relocate service along Kent St, Hartford_x000D_ JE-YWO Variance Job Type Exclusion | Material-M00 Sale of Street Lights Old Saybrook | record the sale of street lights to the town of Old Saybrook | Material-M00 Sale of Street Lights Granby | record the sale of street lights to the town of Granby | Material-M00 3H520140 | 12/16 ESO FOREST ST MANCHESTER CAR | 12/16 ESO FOREST ST MANCHESTER CAR VS POLE #2262 / NOT DONE_x000D_ CI-YWO Variance - Contractor Invoice | Material-M00 4E621246 | PATROL REPAIRS, WINDHAM, 0-100 CIRC | PATROL REPAIRS, WINDHAM, 0-100 CIRCUITS_x000D_ AP2-YWO Total Cost Variance Met - Variance :34.2892 MIN.:-50 MAX.:50 | Material-M00 2M722207 | WC-6/19 SOUTHINGTON, CLARK ST - 9A | WC-6/19 SOUTHINGTON, CLARK ST - 9A P3900 -REPLCD POLE, ARMS, CUTOUTS_x000D_ AP2-YWO Total Cost Variance Met - Variance :94.7582 MIN.:-50 MAX.:150 | Material-M00
  4. Part 51 of 77

    DSCCNTRL | DSCADA CONTROL PROGRAMMING | Set up the controls in DSCADA enabling the SOC operators to communicate and perform switching, etc. | Material-M00 PSTK0711 | Preferred Stock | Preferred StockDIST11 | Material-M00 LTDB4411 | Long Term Debt2014 Series A | Long Term Debt2014 Series A NT011 | Material-M00 | 237TB0 2M722576 | DM RSO 7/19 CREAMERY RD, DURHAM - B | DM RSO 7/19 CREAMERY RD, DURHAM - BROKEN P 1092_x000D_ AP1-YWO Total Cost Less Than 7K | Material-M00 UICLASS3 | UIL Class III | UIL Class III-Ouimette | Material-M00 COEX0011 | Communication - External | COEX0011NT011 | Material-M00 PSTK0511 | Preferred Stock | Preferred StockDIST11 | Material-M00 TOWG1DC1 | TOWER REPLACEMENT-GOOSE HILL-HADDAM | TOWER REPLACEMENT-GOOSE HILL-HADDAM | Material-M00 5T721465 | 6/12 - RSO/AWC - WILLINGTON, HANCOC | 6/12 - RSO/AWC - WILLINGTON, HANCOCK RD POLE 1044_x000D_ AP1-YWO Total Cost Less Than 7K | Material-M00 CS00009B | CEDAR HEIGHTS 4R-PURCH S/S REMOTE R | PURCHASE 29 CBS ARCSAFE REMOTE RACKING UNITS FOR SUBSTATIONS THAT CURRENTLY DO NOT HAVE A SYSTEM THAT WORKS SAFELY __________________________________________CMK | Material-M00 DSN72051 | Replace A/C Unit | Replace A/C Unit | Material-M00 1S811292 | RL;159 Breezy Hill Rd; Elec Svc Exi | RL;159 Breezy Hill Rd; Elec Svc Existing Residential DESG (DN)_x000D_ AP1-YWO Total Cost Less Than 7K | Material-M00 4N721078 | GCC / REMOVE CUT-OUTS AND INSTALL A | GCC / REMOVE CUT-OUTS AND INSTALL A NEW CUT-OUTS_x000D_ AP2-YWO Total Cost Variance Met - Variance :-15.0233 MIN.:-50 MAX.:50 | Material-M00 GXC17C36 | Hilti Rotary Drill (1) 2NR | 2NR - Hilti Rotary Drill (1) s/c 0441221 TOTAL: $889 Leonard | Material-M00 GXC17C37 | Phase ID Set (4) 2NR | 2NR - Phase ID Set S/C 194723 @ 1875ea TOTAL: $7500 Leonard | Material-M00 GXC17C39 | Mobile Desk (1) Grohs | ReachDeskSuper-03 Printer Elite for supervisor vehicle. $500 (GROHS)_x000D__x000D_ | Material-M00 GXC17C43 | Cutters (3) 2NR Engel | 2NR - 3 cutters stock code 500655 ( $ 2.758ea ) TOTAL: $5355 - ENGEL | Material-M00 GXC17C45 | Reach Desk Elite (4) 2NP Kennedy | 2NP - (4) The Reach Desk Elite w/ Inverter, Printer Stand and X-grip Phone Mount - $500ea TOTAL: $2,000 | Material-M00 GXC17C50 | Driver, Ground Rod (1) 2AD Grohs | 2AD - DRIVER, GROUND ROD, Gasoline Powered, 2” Barrel, Honda engine. 2” Bottom Assembly, with Striker, S/C 545041 - $ 1591.25 | Material-M00 GXC17C51 | Pinpointers w/batt kit (3) 2BB LaHa | 2BB - Pin Pointers w/battery kit (3) (Locator, Fault, Secondary Cable, DB, (Pinpointer)) s/c 571914 $1796/510195 $266 TOTAL: $6186 | Material-M00 GXC17C52 | Ratcheting MH Lifter 2NP Iacolo | 2NP - (2) XTIRPA ratcheting manhole cover lifter - 1500 ea TOTAL: $3000.00_x000D__x000D_ | Material-M00 4N720030 | RSO/AWC - 1/6 LEDYARD, IRON ST 9A P | RSO/AWC - 1/6 LEDYARD, IRON ST 9A P1247 LEMIEUX/LEARNED/BONGO/ DOWLING_x000D_ AP1-YWO Total Cost Less Than 7K | Material-M00 4N721063 | SM-108 SOMERSETT DR, GRTN-EXST DB S | SM-108 SOMERSETT DR, GRTN-EXST DB SVC TO BE ABNDND/ CUST INSTL NEW PIPE 4/0 DB_x000D_ AP1-YWO Total Cost Less Than 7K | Material-M00 3R621035 | CD00471-04 Conversion Work Install | CD00471-04 Conversion Work Install Open Point P#41 Rte.49 North_x000D_ AP1-YWO Total Cost Less Than 7K | Material-M00 4D721118 | NS- 25 Aspen Dr, Mad- FOLLOW UP WOR | NS- 25 Aspen Dr, Mad- FOLLOW UP WORK- RPLC BROKEN DB STREETLIGHT_x000D_ AP1-YWO Total Cost Less Than 7K | Material-M00 2M720318 | EJC Deming St, Newington P#914 Cut& | EJC Deming St, Newington P#914 Cut&Kick, Shift Facilities_x000D_ AP1-YWO Total Cost Less Than 7K | Material-M00 DSQ72046 | (50): Replace failed 4A-10T-6Switch | Newington 4A - Replace the failed 4A-10T-6 disconnect switch. | Material-M00 BRCH0011 | Brochures | BRCH0011NT011 | Material-M00 2M722543 | Jpt-RSO- Middle St BRI P6285 - 9a - | Jpt-RSO- Middle St BRI P6285 - 9a - Replaced pole Shifted 3PH Tan & 3PH Tap_x000D_ CI-YWO Variance - Contractor Invoice | Material-M00
  5. Part 52 of 77

    1N721071 | JDB SPRING HILL AVE,NWLK - 9A HBA R | JDB SPRING HILL AVE,NWLK - 9A HBA REPL POLE#26 07/19/17_x000D_ AP3-YWO Resource Variance Met- Labor 23 <= 32 OR 37.03 <= 30 And Contractor $0 <= 2000 | Material-M00 TRDC0011 | Debt Compliance Fees | Debt Compliance Fees | Material-M00 DSQ72053 | (50): Replace Failed 30R-4X1-4 Swit | Green Hill 30R - Replace the failed 30R-4X1-4 MOD switch for mobile transformer position | Material-M00 5T721771 | Pleasant View Dr. Vernon P1733 repl | Pleasant View Dr. Vernon P1733 replace rotten cross arm_x000D_ AP1-YWO Total Cost Less Than 7K | Material-M00 PTEX0011 | Local PropTax - CLP Distribution | Local PropTax - CLP Distribution | Material-M00 CTNRS011 | CT Non Res-Program Administration | CT Non Res-Program Administration-Augelli | Material-M00 5D720332 | EXLEY RD, POLE # 933, FRONTIER REJE | EXLEY RD, POLE # 933, FRONTIER REJECT, SET NEW 40'/2, POLE SHIFT_x000D_ AP1-YWO Total Cost Less Than 7K | Material-M00 3H721987 | HARTFORD, WALNUT ST - P-CH9493 - IN | HARTFORD, WALNUT ST - P-CH9493 - INSTALL 250W HPS COBRA AND RECONNECT UG FEED_x000D_ AP1-YWO Total Cost Less Than 7K | Material-M00 3H721988 | HARTFORD, SIGOURNEY ST- C7394 - INS | HARTFORD, SIGOURNEY ST- C7394 - INSTALL 400W HPS COBRA CONNECT UG FEED_x000D_ AP1-YWO Total Cost Less Than 7K | Material-M00 2M723627 | Jpt-Lexington Ave Wtby P62509 - Rpl | Jpt-Lexington Ave Wtby P62509 - Rplc'd Pole - PER KEN GROHS - XFMR WAS NOT REPL_x000D_ CI-YWO Variance - Contractor Invoice | Material-M00 4D720220 | CB//MADISON, 75 NEW RD//SVC UPGRADE | CB//MADISON, 75 NEW RD//SVC UPGRADE 200A/RPL SVC W #2TPX IF ITS #4TPX_x000D_ AP1-YWO Total Cost Less Than 7K | Material-M00 2W620005 | PHD Elec Maint Replace/Renewal/Ob | PHD Elec Maint Replace/Renewal/Obsol OH DESG (AROH)_x000D_ AP1-YWO Total Cost Less Than 7K | Material-M00 2M723981 | TAP ON TPX SVC TO NEW PARALLEL OWNE | TAP ON TPX SVC TO NEW PARALLEL OWNERS SERVICE RISER, MTR SET REQ'D_x000D_ AP1-YWO Total Cost Less Than 7K | Material-M00 BERLCIRC | BERLIN CENTRAL SYSTEMS | CT VOICE RADIO SYSTEM PROJECT - BERLIN WAN CIRCUITS | Material-M00 5D720552 | DG P#2493 DOW RD PLAINFIELD FRNTR P | DG P#2493 DOW RD PLAINFIELD FRNTR POLE RPLC CLP TO SHIFT_x000D_ AP1-YWO Total Cost Less Than 7K | Material-M00 1B722315 | RSO OXFORD, Oakwood Dr - Digu up - | RSO OXFORD, Oakwood Dr - Digu up - damage done by S+S paving (see T/T)_x000D_ AP1-YWO Total Cost Less Than 7K | Material-M00 2L720676 | KENT,45 KENT CORNWALL RD//RUN NEW O | KENT,45 KENT CORNWALL RD//RUN NEW OH/DB SVC TO BARN FROMP#15464 ON GREENWOOD LN_x000D_ AP1-YWO Total Cost Less Than 7K | Material-M00 DSN72012 | (50): HVAC system, DSN72012 | Fry Brook 13B - Install an air conditioning unit | Material-M00 DSN72013 | (50): A/C Unit with Hydrogen sensin | Tunnel 12S - Install an air condiitoning unit | Material-M00 GCFL0011 | Gold Coast - Fleet | Gold Coast Payments - Fleet | Material-M00 4N721068 | COMPLETED 6/27 CCC - Fault Locate a | COMPLETED 6/27 CCC - Fault Locate and Repair@ POLE 2986 NO POWER UG_x000D_ AP1-YWO Total Cost Less Than 7K | Material-M00 4E520958 | RA CDOT 163-203 RT 66, Windham - | RA CDOT 163-203 RT 66, Windham - 100% reimburse for TT & access road_x000D_ JE-YWO Variance Job Type Exclusion | Material-M00 DSN72045 | Fencing | Enfield 12C - REplace the deteriorated fence | Material-M00 4D721781 | PT-2017 Double Poles-Pole# 4149-Old | PT-2017 Double Poles-Pole# 4149-Old Quarry Rd, Guilford CT-Conv# 362600_x000D_ AP1-YWO Total Cost Less Than 7K | Material-M00 3R621050 | CD00471-10 Conversion Work Install | CD00471-10 Conversion Work Install Step Down XF Bennett Rd_x000D_ AP2-YWO Total Cost Variance Met - Variance :-26.4673 MIN.:-40 MAX.:40 | Material-M00 LENMIE11 | CA AWO MISC-ALL OTHERS | CA AWO MISC-ALL OTHERS | Material-M00 5T721716 | AWC 7/9 EAST WINDSOR OMELIA RD - RE | AWC 7/9 EAST WINDSOR OMELIA RD - REPLACED 3 CUTOUTS P-1792_x000D_ EW-YWO Variance - Emergent Work | Material-M00
  6. Part 53 of 77

    2M722458 | JC/9A, 5/27 266 Jones Rd, Naugatuck | JC/9A, 5/27 266 Jones Rd, Naugatuck - car vs. pole 6001_x000D_ AP1-YWO Total Cost Less Than 7K | Material-M00 MADSN001 | Madison AWC Site #67 | Madison AWC Site #67-Rose | Material-M00 GUILFORD 29F-REPLACE RECLOSER CONTR | PROPOSED REPLACEMENT OF 4 COOPER RECLOSERS WITH SIEMENS FOR GUILFORD 29F1-2, GUILFORD 29F2-2, MEADOW 28J1-2 AND MEADOW 28J2-2 ______________________________________JEL | Material-M00 CTIPAD20 | CT New Apprentices Tablets | This work order is to purchase 30 new ipads for CT new apprentices for an estimated amount of $36,682.5. | Material-M00 CTIPAD21 | CT New Apprentices Tablets | This work order is to purchase 56 new ipads for the 2021 CT new apprentices._x000D__x000D_ _x000D__x000D_ Per Jonathan Bradley's email dated 3/17/2021 requesting the purchase of 56 ipad at $1,250.00 per tablet for a total amount of $70,000.00._x000D__x000D_ _x000D__x000D_ Per LIsa's email dated 4/2/2021, requesting to increase the number of iPad for CT to 60 at $1,250/iPad. | Material-M00 5T721752 | RSO, 7/15, ENFIELD, ELM STREET, POL | RSO, 7/15, ENFIELD, ELM STREET, POLE 2139, REFER TO AWC TO RPLC 9A_x000D_ AP2-YWO Total Cost Variance Met - Variance :35.4939 MIN.:-50 MAX.:150 | Material-M00 2M722664 | JC/RSO 7/22 NAUGATUCK, NEW HAVEN RD | JC/RSO 7/22 NAUGATUCK, NEW HAVEN RD- 9A P3602 - BROKEN POLE_x000D_ AP1-YWO Total Cost Less Than 7K | Material-M00 5T720693 | JV COVENTRY, SOUTH ST - SHIFT FRONT | JV COVENTRY, SOUTH ST - SHIFT FRONTIER POLES 391, 392 AND 393_x000D_ AP1-YWO Total Cost Less Than 7K | Material-M00 3R620648 | BC- CD00746-03 Inst 333kVA Step Xfm | BC- CD00746-03 Inst 333kVA Step Xfmr Bnk pole 996, Shore Rd_x000D_ CL-YWO Variance - Contractor Labor | Material-M00 1B620261 | 44 KENOSIA AVE Elec Maint Trouble C | 44 KENOSIA AVE Elec Maint Trouble Call - Repairs/Obsolescence OH PR2/17/16_x000D_ AP1-YWO Total Cost Less Than 7K | Material-M00 3H622162 | HARTFORD, LYME/ BURNHAM STREET 6373 | HARTFORD, LYME/ BURNHAM STREET 6373_x000D_ AP1-YWO Total Cost Less Than 7K | Material-M00 1S722546 | RL: 20 Edgar Rd:Replace #1 AL prim | RL: 20 Edgar Rd:Replace #1 AL primary, cutout & arrester already replaced_x000D_ AP2-YWO Total Cost Variance Met - Variance :-34.5233 MIN.:-50 MAX.:50 | Material-M00 3H721859 | 42 Grassmere Ave., W. Htfd - Instal | 42 Grassmere Ave., W. Htfd - Install new OH/DB svc (single-phase, 120/208)_x000D_ AP1-YWO Total Cost Less Than 7K | Material-M00 1B720430 | BLITZ, NM, OLD PARK LN, POLE #10, E | BLITZ, NM, OLD PARK LN, POLE #10, ES SHIFT TEL HAS SET, DBL POLE_x000D_ AP1-YWO Total Cost Less Than 7K | Material-M00 2M722408 | WC 7/6 SOUTHINGTON, MINE HOLLOW RD/ | WC 7/6 SOUTHINGTON, MINE HOLLOW RD/LONG BOTTOM - 9A P93393_x000D_ AP1-YWO Total Cost Less Than 7K | Material-M00 LIDAREVL | LIDAR & ALT TECHNOLOGY | UCONN 2ND AMENDED AND RESTATED RESEARCH PROJECT(S)_x000D__x000D_ MONITORS ROADSIDE VEGETATION AND UTILITY INFRASTRUCTURE. ASSET - POLE STRUCTURE INTEGRITY MODEL | Material-M00 1N721713 | RSO; 11/24; BAYBERRY LN WSPT; REFER | RSO; 11/24; BAYBERRY LN WSPT; REFER TO AWC TO REPL #2 SVC_x000D_ AP1-YWO Total Cost Less Than 7K | Material-M00 1N621689 | JDB 18 OX YOKE LN NWLK P9366 EXTEND | JDB 18 OX YOKE LN NWLK P9366 EXTEND PRI INS 50KVA & OH/DB SVC DESG (DN)_x000D_ AP2-YWO Total Cost Variance Met - Variance :-19.5236 MIN.:-40 MAX.:40 | Material-M00 4N720196 | GCC / EVERS/INSTALL NEW POLE/PRI RI | GCC / EVERS/INSTALL NEW POLE/PRI RISER TO PAD MTD XFMR_x000D_ NL-YWO Variance - NU Construction Labor | Material-M00 4N620638 | PD-Tillley/Green/Pearl NLD/Parking | PD-Tillley/Green/Pearl NLD/Parking lot overhead service refeeds_x000D_ NL-YWO Variance - NU Construction Labor | Material-M00 5T720674 | Alice Dr, Coventry. Shift Frontier | Alice Dr, Coventry. Shift Frontier pole sets, Replace open wire sec and XFR'S_x000D_ AP2-YWO Total Cost Variance Met - Variance :-24.9807 MIN.:-50 MAX.:50 | Material-M00
  7. Part 54 of 77

    CT17D013 | Berlin South Penthouse SiteBoss Ins | Install a SiteBoss alarm panel and remove the old Badger E500 alarm panel. | Material-M00 UNCLOC11 | Unc. Line of Credit Expenses | Unc. Line of Credit Expenses-Savage | Material-M00 2C720081 | rmv tree guy ins stub pole 1172 col | rmv tree guy ins stub pole 1172 college hill rd_x000D_ AP1-YWO Total Cost Less Than 7K | Material-M00 EHAMP001 | E Hampton AWC #66 | E Hampton AWC #66-Rose | Material-M00 2L720778 | BETHLEHEM,384 MAIN ST. N.//Elec Svc | BETHLEHEM,384 MAIN ST. N.//Elec Svc New Com/Ind IT Meter//FAIRGROUNDS//_x000D_ AP1-YWO Total Cost Less Than 7K | Material-M00 4D621442 | PATROL REPAIRS, 11J45 - BRANFORD | PATROL REPAIRS, 11J45 - BRANFORD_x000D_ AP2-YWO Total Cost Variance Met - Variance :11.1984 MIN.:-20 MAX.:20 | Material-M00 1S721524 | DL; RIVERBANK RD; REPLACE/RELOCATE | DL; RIVERBANK RD; REPLACE/RELOCATE 2 POLES FOR STAMFORD BRIDGE_x000D_ CL-YWO Variance - Contractor Labor | Material-M00 2L620133 | Burlington, Milford St - AWC/ 2/5/ | Burlington, Milford St - AWC/ 2/5/ (9A)_x000D_ AP2-YWO Total Cost Variance Met - Variance :59.231 MIN.:-50 MAX.:150 | Material-M00 3H721986 | HARTFORD, ANN ST-C6661 - INSTALL 25 | HARTFORD, ANN ST-C6661 - INSTALL 250W HPS AND RECONNECT UG FEED_x000D_ AP1-YWO Total Cost Less Than 7K | Material-M00 2M722399 | WC 7/5 SOUTHINGTON, CAMPGROUND RD - | WC 7/5 SOUTHINGTON, CAMPGROUND RD - REPLACED 50 KVA XFMR / cutout / tbracket_x000D_ AP1-YWO Total Cost Less Than 7K | Material-M00 2M722436 | RSO/AWC 7/10 CHESHIRE, W JOHNSON AV | RSO/AWC 7/10 CHESHIRE, W JOHNSON AVE - RECONDUCTERING 250' CONDUIT/CABLE_x000D_ CI-YWO Variance - Contractor Invoice | Material-M00 4N621240 | MM SMART SWITCH REPROGRAM RECLOSER | MM SMART SWITCH REPROGRAM RECLOSER POLE 916 JEROME FROM RADIAL TO SECT 1Q01_x000D_ AP2-YWO Total Cost Variance Met - Variance :42.4481 MIN.:-50 MAX.:50 | Material-M00 4E720513 | RSO 4/9/17 Jurczyk, Franklin - rep | RSO 4/9/17 Jurczyk, Franklin - replaced arrestors @ 383 & 385, replace OH xfrm_x000D_ AP1-YWO Total Cost Less Than 7K | Material-M00 MS17M011 | WIND/RAIN OCT 29-30 ALL DIV | WIND/RAIN OCT 29-30 ALL DIV | Material-M00 UCONN219 | SS SECURITY 40% DISTRIBUTION | UCONN PROFESSER ON SEBATICAL TO ASSIST EVERSOURCE WITH RESEARCH AND DEVELOPMENT OF SOFTWARE THAT WILL ASSIST WITH CYBER SECURITY FOR EQUIPMENT ON EE SYSTEM. BEGINS SEPT THROUGH YEAR END. | Material-M00 5D720575 | RSO, 5/5, STARKWEATHER ROAD, 9A GN | RSO, 5/5, STARKWEATHER ROAD, 9A GNESDA, POLE 430, HBV, SHIFT TO NEW POLE_x000D_ AP1-YWO Total Cost Less Than 7K | Material-M00 RGST0611 | Regulatory Assessments-Retail Trans | Regulatory Assessments-Retail Transmission-Caron | Material-M00 LTDB2211 | Long Term Debt2007 Series C | Long Term Debt2007 Series C | Material-M00 | 2371B0 1B722785 | BR 38 Twin Oaks Beacon Falls New Re | BR 38 Twin Oaks Beacon Falls New Residential Underground_x000D_ AP1-YWO Total Cost Less Than 7K | Material-M00 1B722786 | BR 76 Fieldstone Ln Beacon Falls Ne | BR 76 Fieldstone Ln Beacon Falls New Residential Underground_x000D_ AP1-YWO Total Cost Less Than 7K | Material-M00 4E721442 | 5 CHILDS RD E HMPTN AT P-2674 INSTA | 5 CHILDS RD E HMPTN AT P-2674 INSTALL OH SVC TO GAS CO POLE, UNMETERED ANTENNA_x000D_ AP1-YWO Total Cost Less Than 7K | Material-M00 CD252007 | CL&P 900 MHZ Greenwich | CL&P 900 MHZ RADIO PROJECT-Greenwich EQUIP CONTACT: P.SCHUBERTH | Material-M00 4E721958 | MN 31, LOT 16 BARBERS WAY HEBRON A | MN 31, LOT 16 BARBERS WAY HEBRON AT HH-417-B INSTALL DB SVC & 200A MTR_x000D_ AP1-YWO Total Cost Less Than 7K | Material-M00 3R720020 | CAL - CD00849-01 - Ckt 21M1 MBI Ini | CAL - CD00849-01 - Ckt 21M1 MBI Initiative Design Work, Westport_x000D_ CL-YWO Variance - Contractor Labor | Material-M00 MBLD2011 | Maintain Buildings | Maintain Buildings-Rose | Material-M00 1S721655 | DM/7 INDIAN HEAD RD RIVERSIDE: INST | DM/7 INDIAN HEAD RD RIVERSIDE: INST 3" SVC RISER, 350MCM DB SVC, 400AMP_x000D_ AP1-YWO Total Cost Less Than 7K | Material-M00
  8. Part 55 of 77

    2M721096 | 79-229, Route 71 Meriden, W Main St | 79-229, Route 71 Meriden, W Main St - Rebuild SB254 to MH & Test Pit_x000D_ JE-YWO Variance Job Type Exclusion | Material-M00 1N721146 | JES; 269 MILLSTONE RD. WILTON.; REL | JES; 269 MILLSTONE RD. WILTON.; RELOCATE OH SVC. POLE 21268..._x000D_ AP1-YWO Total Cost Less Than 7K | Material-M00 CT17D040 | Colorado Trucks Lowband Radios | A request has come in to order 25 mobile radios for a new wave of Colorado Pickup trucks transportation ordered. | Material-M00 CS000094 | BLACK ROCK 11H-PURCH S/S REMOTE RAC | PURCHASE 29 CBS ARCSAFE REMOTE RACKING UNITS FOR SUBSTATIONS THAT CURRENTLY DO NOT HAVE A SYSTEM THAT WORKS SAFELY __________________________________________CMK | Material-M00 3L722822 | LEDYARD POLE 6045 250 HPS COBRA COM | LEDYARD POLE 6045 250 HPS COBRA COMPLETED 10/24 EHA_x000D_ AP1-YWO Total Cost Less Than 7K | Material-M00 5D621134 | BC - CD00450-08 - Re-cond, Inst/Rmv | BC - CD00450-08 - Re-cond, Inst/Rmv River/RR Xing Structures, Town of Preston_x000D_ CL-YWO Variance - Contractor Labor | Material-M00 3R621018 | CD00471-01Elim. 23U Voluntown S/S C | CD00471-01Elim. 23U Voluntown S/S Conversion Work #3_x000D_ CI-YWO Variance - Contractor Invoice | Material-M00 3H721776 | 7/9 - HARAWC - WINDSOR, PARK RD - E | 7/9 - HARAWC - WINDSOR, PARK RD - EVERSOURCE POLE 156_x000D_ AP2-YWO Total Cost Variance Met - Variance :69.5323 MIN.:-50 MAX.:150 | Material-M00 3H722155 | JWL @ 877-879 CAPITOL AVE replace | JWL @ 877-879 CAPITOL AVE replace svc from sb3177._x000D_ AP1-YWO Total Cost Less Than 7K | Material-M00 3H722156 | 8/18 - RSO/HAROH - EAST HARTFORD, | 8/18 - RSO/HAROH - EAST HARTFORD, SEDGEWICK RD, P2646, 9A_x000D_ AP2-YWO Total Cost Variance Met - Variance :73.2456 MIN.:-50 MAX.:150 | Material-M00 5T721250 | 5/16 RSO & ESO PUCKER ST,COVENTRY 9 | 5/16 RSO & ESO PUCKER ST,COVENTRY 9A_x000D_ EW-YWO Variance - Emergent Work | Material-M00 3H721937 | AWC 7/24 MANCHESTER HARTFORD RD 9A | AWC 7/24 MANCHESTER HARTFORD RD 9A - REPLACED QUAD SERVICE FROM P-4700_x000D_ AP1-YWO Total Cost Less Than 7K | Material-M00 4D721830 | COMP 12/30 CCC-Municipal Light Faul | COMP 12/30 CCC-Municipal Light Fault Locate and Repair@ POLE 93 NO VOLTAGE_x000D_ AP1-YWO Total Cost Less Than 7K | Material-M00 5D720743 | RSO 6/2 GRISWOLD, BITGOOD RD- 9A P1 | RSO 6/2 GRISWOLD, BITGOOD RD- 9A P1789 - WEBB/GEMBEL/CIVARDI , NOT COMP_x000D_ AP2-YWO Total Cost Variance Met - Variance :85.6143 MIN.:-50 MAX.:150 | Material-M00 4N721464 | PD-44 Indianola Rd Niantic/Replace | PD-44 Indianola Rd Niantic/Replace OH svc drop_x000D_ AP1-YWO Total Cost Less Than 7K | Material-M00 3H720698 | WETHERSFIELD, BERLIN TPKE, 9A REPLA | WETHERSFIELD, BERLIN TPKE, 9A REPLACE P1738 45/2_x000D_ AP2-YWO Total Cost Variance Met - Variance :-47.6215 MIN.:-50 MAX.:50 | Material-M00 3H721728 | RSO/AWC, 7/3, WEST HARTFORD, CONCOR | RSO/AWC, 7/3, WEST HARTFORD, CONCORD STREET REPLACED 150' SEC WITH 4/0_x000D_ AP1-YWO Total Cost Less Than 7K | Material-M00 1N621292 | JES; WILLARD RD. NWLK.; IR INSP. - | JES; WILLARD RD. NWLK.; IR INSP. - Minor DESG (IFOH) - POLE 13273_x000D_ AP1-YWO Total Cost Less Than 7K | Material-M00 ASEE0011 | AS&E | ASEE0011ALLOCCLEARING11 | Material-M00 4N721497 | GCC / REMOVE AND INSTALL OVERHEAD S | GCC / REMOVE AND INSTALL OVERHEAD SERVICE TO HOME_x000D_ AP1-YWO Total Cost Less Than 7K | Material-M00 CTCART25 | Blanket Cart for CT Dielectric Lab | This rubber blanket cart will be in the Berlin dielectric lab to maneuver rubber blankets around the lab. _x000D__x000D_ _x000D__x000D_ Per Teams call with Matthew Chamberlain 10-10-2025, the estimated cost is $3,705.00. This is from EverGreen Sheet Metal, Inc. The vendor is fabricating a blanket cart from stainless steel. | Material-M00 3H721029 | EJL - 270 Wetherell St.Manch.Reloca | EJL - 270 Wetherell St.Manch.Relocate 25KVA/Pri./Remove tree guy/P-5188_x000D_ AP2-YWO Total Cost Variance Met - Variance :113.508 MIN.:-50 MAX.:150 | Material-M00
  9. Part 56 of 77

    2M622924 | Waterbury Rd Prospect 9A - (POST CO | Waterbury Rd Prospect 9A - (POST CONSTRUCTION)_x000D_ AP2-YWO Total Cost Variance Met - Variance :-26.9179 MIN.:-40 MAX.:40 | Material-M00 3H721751 | 7/5 - AWC - WETHERSFIELD, OLD PEPPE | 7/5 - AWC - WETHERSFIELD, OLD PEPPERIDGE LA - REPLACED CUTOUT/TERM/RISER_x000D_ AP1-YWO Total Cost Less Than 7K | Material-M00 4E720228 | (CH) HH#313A: NEED TO CHG COVER_HH# | (CH) HH#313A: NEED TO CHG COVER_HH#311G: COMP'D_FAULT LOCATED/RPR'D/CHG'D_x000D_ AP1-YWO Total Cost Less Than 7K | Material-M00 5T621064 | Shenipsit Lake Rd, Tolland. BBA P-3 | Shenipsit Lake Rd, Tolland. BBA P-35 all work done in field_x000D_ AP1-YWO Total Cost Less Than 7K | Material-M00 DNLTW1DC | DANIELSON TOWER REPLACEMENT | DANIELSON TOWER REPLACEMENT - CL&P | Material-M00 4N621217 | ESO 9A - 08/15/16 GREEN HAVEN STONI | ESO 9A - 08/15/16 GREEN HAVEN STONINGTON car v pole 6781_x000D_ AP1-YWO Total Cost Less Than 7K | Material-M00 4D721230 | cb//branford, farm river rd//rpl li | cb//branford, farm river rd//rpl light head p 38780R w full cutoff, shield_x000D_ AP1-YWO Total Cost Less Than 7K | Material-M00 1S721343 | DM/DAVIS & LE GRANDE AVE GRN: P.679 | DM/DAVIS & LE GRANDE AVE GRN: P.67972 REPLACE XARMS_x000D_ AP1-YWO Total Cost Less Than 7K | Material-M00 PW1N0011 | Private Work | Private Work | Material-M00 3H723179 | 12/2 - RSO - HARTFORD, ELLIOT ST - | 12/2 - RSO - HARTFORD, ELLIOT ST - NEED TO REPLACE 150W C9116_x000D_ AP1-YWO Total Cost Less Than 7K | Material-M00 5D720811 | DG P#2456 1 BEATTIE AVE THOMPSON FR | DG P#2456 1 BEATTIE AVE THOMPSON FRNTR POLE RPLC, 25 KVA, OH SVC_x000D_ AP1-YWO Total Cost Less Than 7K | Material-M00 4D720334 | NS- Maple Ave, OS- Mittigate Outage | NS- Maple Ave, OS- Mittigate Outages- Ins COs on XFMRs Downstream P 596_x000D_ AP1-YWO Total Cost Less Than 7K | Material-M00 1B720145 | CDOT 34-313 Danbury - CIS#2 - relo | CDOT 34-313 Danbury - CIS#2 - reloc service to Wells Fargo_x000D_ JE-YWO Variance Job Type Exclusion | Material-M00 1S721069 | PH; 51 LENOX AVE; Replace OH Servic | PH; 51 LENOX AVE; Replace OH Service_x000D_ AP1-YWO Total Cost Less Than 7K | Material-M00 2C720133 | ins new db svc to beckley furnace l | ins new db svc to beckley furnace lower rd north canaan_x000D_ AP1-YWO Total Cost Less Than 7K | Material-M00 2M722088 | Municipal Light Fault Locate and Re | Municipal Light Fault Locate and Repair@ POLE 3 - COMP 7-6-17 CCC_x000D_ AP1-YWO Total Cost Less Than 7K | Material-M00 2M721945 | ESO/AWC 5/26 WATERBURY, MERIDEN RD | ESO/AWC 5/26 WATERBURY, MERIDEN RD - 9A P 9259_x000D_ AP1-YWO Total Cost Less Than 7K | Material-M00 1S720200 | DM/461 STANWICH RD GREENWICH: CAR V | DM/461 STANWICH RD GREENWICH: CAR VS POLE 73690-S_x000D_ AP1-YWO Total Cost Less Than 7K | Material-M00 2M622249 | EJC 718 West Main St, Waterbury P#1 | EJC 718 West Main St, Waterbury P#121 Repl Alum Stlt Pole and Heads_x000D_ AP2-YWO Total Cost Variance Met - Variance :-11.0863 MIN.:-50 MAX.:50 | Material-M00 1N621850 | RM -CD00667, Recloser @ P-4977 Knap | RM -CD00667, Recloser @ P-4977 Knapp St - Norwalk_x000D_ AP2-YWO Total Cost Variance Met - Variance :23.7919 MIN.:-30 MAX.:30 | Material-M00 4E721884 | MN 426 CABIN RD COLCH AT P-2297 RE | MN 426 CABIN RD COLCH AT P-2297 REPLACE OH SVC, MIDSPAN,10 FT OFF OF POLE._x000D_ AP1-YWO Total Cost Less Than 7K | Material-M00 4N621769 | MM ALL WORK COMPLETE GORTON ST,POLE | MM ALL WORK COMPLETE GORTON ST,POLE 1740 - REPLACED 70' 2 STRAND SERVICE_x000D_ | Material-M00 1G520706 | DM/6 Grove ST COS COB: PRIORITY DE | DM/6 Grove ST COS COB: PRIORITY DESG (IFOH) - POLE#119_x000D_ CL-YWO Variance - Contractor Labor | Material-M00 2M722933 | DM/ESO 9A 6/10/17 - CHESHIRE - P#85 | DM/ESO 9A 6/10/17 - CHESHIRE - P#853 RESAG OH SVC 1308 S MERIDEN RD_x000D_ AP1-YWO Total Cost Less Than 7K | Material-M00 4E720266 | (CH) HH#204A: CHG HDP TO POLYCRETE_ | (CH) HH#204A: CHG HDP TO POLYCRETE_DISC/RE-CONN SVC FOR SOCKET CHANGE-OUT._x000D_
  10. Part 57 of 77

    AP1-YWO Total Cost Less Than 7K | Material-M00 2M721636 | Jpt-Terryville Ave BRI (Frnt)P6309 | Jpt-Terryville Ave BRI (Frnt)P6309 - 9a - DUMP TRUCK BROUGHT POLE & WIRE DOWN_x000D_ AP2-YWO Total Cost Variance Met - Variance :29.3622 MIN.:-50 MAX.:50 | Material-M00 1B721855 | 36 HAYES LN relocate to mid-span E | 36 HAYES LN relocate to mid-span Existing Residential Overhead_x000D_ AP1-YWO Total Cost Less Than 7K | Material-M00 2M720867 | RTM-SMITHFIELD AVE, MERIDEN. POLE 8 | RTM-SMITHFIELD AVE, MERIDEN. POLE 80551_x000D_ AP1-YWO Total Cost Less Than 7K | Material-M00 4E620324 | 491 COOK HILL RD LEB REPL 4 POLES, | 491 COOK HILL RD LEB REPL 4 POLES, 3 SPANS OF, INS STUB POLE & ANC, SHIFT FAC's_x000D_ CL-YWO Variance - Contractor Labor | Material-M00 MDEC0011 | Misc. Dist expense (small tools) | MDEC0011ALLOCCLEARING11 | Material-M00 RENTIL11 | CA AWO RENT - INTERNAL | CA AWO RENT - INTERNAL | Material-M00 | 93111X HUNTBRK1 | Montville Hunts Brook Fly Ash | Montville Hunts Brook Fly Ash - Environmental Reserve. Had to re-create becuase he it didn't come over in the conversaion. | Material-M00 IT1D1203 | SIMSBURY WIRELESS EXPANSION PROJECT | SIMSBURY WIRELESS EXPANSION PROJECT_260S CISCO EQUIPMENT - NWN QUOTE OP78746 CONTACT: BOB D'EON X3094 PROJECT: IT1DLANA | Material-M00 4N621470 | MM STUB POLE, 95s ANCHOR, SPAN GUY, | MM STUB POLE, 95s ANCHOR, SPAN GUY, SDWLK GUY COLMANST NEW LONDON notif #490181_x000D_ AP1-YWO Total Cost Less Than 7K | Material-M00 2M723013 | Jpt-RSO-518 Jerome Ave BRI P2073 - | Jpt-RSO-518 Jerome Ave BRI P2073 - RAN NEW 100' #2 SVS MIDSPANNED_x000D_ AP1-YWO Total Cost Less Than 7K | Material-M00 1B722524 | TB 154 ENTERPRISE DR INSTALL NEW PR | TB 154 ENTERPRISE DR INSTALL NEW PRIMARY SVC AND 300 KVA XFMR_x000D_ AP2-YWO Total Cost Variance Met - Variance :49.4991 MIN.:-50 MAX.:50 | Material-M00 3H720736 | RSO 3/23 -- WEST HARTFORD, 134 OAKW | RSO 3/23 -- WEST HARTFORD, 134 OAKWOOD AVE- POLE # 1082 - 9A_x000D_ AP2-YWO Total Cost Variance Met - Variance :-11.2451 MIN.:-50 MAX.:50 | Material-M00 5T721678 | Sandy Beach 130, Ellington. Upgrade | Sandy Beach 130, Ellington. Upgrade 15 KVA to 25 KVA for solar project. P-2353_x000D_ AP1-YWO Total Cost Less Than 7K | Material-M00 CT16D027 | BERLIN SOUTH CAMPUS FIBER RUNS | Pull fiber from Berlin OBA communications room to Berlin South Main communications room. Fiber to be pulled from East Building communications room to Berlin South Bldg. | Material-M00 CT16D028 | TOLLAND AWC MW UPGRADE W/USED EQUIP | The OC3 microwave equipment that was removed from service between Mt Tom GS and Hadley area work center will be moved from the books to the new locations Tolland and Bolton. This work order is for equipment to be located at Tolland AWC. | Material-M00 2M720949 | RTM-220 Berlin Tpke, Ber. Relocate | RTM-220 Berlin Tpke, Ber. Relocate P#99264 & P#4728 100% Reimbursable_x000D_ AP1-YWO Total Cost Less Than 7K | Material-M00 PTRACK13 | PURCHASE RADIO RECEIVER CARDS | PURCHASE RADIO RECEIVER CARDS 2013 | Material-M00 RGST0411 | Regulatory Assessments | Regulatory Assessments | Material-M00 BORDE011 | Borderline Purchases | Borderline Purchases | Material-M00 3H722164 | 8/17 RSO-AWC, WHARTFORD, SEQUIN RD | 8/17 RSO-AWC, WHARTFORD, SEQUIN RD 9A - REPLACED POLE_x000D_ AP1-YWO Total Cost Less Than 7K | Material-M00 NWKTW101 | TOWER REPLACEMENT-NORWALK | TOWER REPLACEMENT-NORWALK PROJECT: NWKTW1DC1 CONTACT: STEVE FLORIO | Material-M00 4D721307 | cb//branford, 15 pawson rd//oh svc | cb//branford, 15 pawson rd//oh svc upgrade_x000D_ AP1-YWO Total Cost Less Than 7K | Material-M00 4E621328 | BC - CDOT 41-118 - Relocate facilit | BC - CDOT 41-118 - Relocate facilities on RT 66 for bridge replacement STAGE 1_x000D_ JE-YWO Variance Job Type Exclusion | Material-M00 2M722162 | Municipal Light Fault Locate and Re | Municipal Light Fault Locate and Repair@ POLE 3758 - COMP 6/17 CCC_x000D_ AP1-YWO Total Cost Less Than 7K | Material-M00

Text of RRU-159 Attachment 09.pdf

Extracted from the file · 449 pages · 7,355,312 characters

Text of RRU-159 Attachment 08.xlsx

Sheet names, column headings and text cells; numbers left out · first 300,000 characters

Text of RRU-159 Attachment 08.pdf

Extracted from the file · 867 pages · 13,878,236 characters

Text of RRU-159 Attachment 07.xlsx

Sheet names, column headings and text cells; numbers left out · first 300,000 characters

Text of RRU-159 Attachment 07.pdf

Extracted from the file · 869 pages · 15,728,932 characters

Text of RRU-159 Attachment 06.xlsx

Sheet names, column headings and text cells; numbers left out · first 300,000 characters

Text of RRU-159 Attachment 06.pdf

Extracted from the file · 459 pages · 8,128,897 characters

Text of RRU-159 Attachment 05.xlsx

Sheet names, column headings and text cells; numbers left out · first 300,000 characters

Text of RRU-159 Attachment 05.pdf

Extracted from the file · 879 pages · 16,073,548 characters

Text of RRU-159 Attachment 04.xlsx

Sheet names, column headings and text cells; numbers left out

Text of RRU-159 Attachment 04.pdf

Extracted from the file · 5 pages · 20,994 characters

Text of RRU-159 Attachment 03.xlsx

Sheet names, column headings and text cells; numbers left out · first 300,000 characters

Text of RRU-159 Attachment 03.pdf

Extracted from the file · 840 pages · 14,413,580 characters

Text of RRU-159 Attachment 02.xlsx

Sheet names, column headings and text cells; numbers left out · first 300,000 characters

Text of RRU-159 Attachment 02.pdf

Extracted from the file · 1,137 pages · 16,605,462 characters

Text of RRU-159 Attachment 01.xlsx

Sheet names, column headings and text cells; numbers left out

Text of RRU-159 Attachment 01.pdf

Extracted from the file · 1 page · 1,403 characters

As listed on the current system

Question(s) Answered 159 (Connecticut Light and Power Company dba Eversource Energy) Date Filed: 11/06/2026

This filing on the current system (opens in a new tab)