Interrogatory responses
Answers to questions 159
Files51
RRU-159_Final.pdf
PDF · 116 KB · 1 pageText searchable
Download RRU-159_Final.pdfRead the text of RRU-159_Final.pdf
RRU-159 Attachment 25.xlsx
Excel · 5.7 MBText searchable
Download RRU-159 Attachment 25.xlsxRead the text of RRU-159 Attachment 25.xlsx
RRU-159 Attachment 24.xlsx
Excel · 5.6 MBText searchable
Download RRU-159 Attachment 24.xlsxRead the text of RRU-159 Attachment 24.xlsx
RRU-159 Attachment 24.pdf
PDF · 239 MB
Open on the current system: RRU-159 Attachment 24.pdf (opens in a new tab)
RRU-159 Attachment 23.xlsx
Excel · 12 MBText searchable
Download RRU-159 Attachment 23.xlsxRead the text of RRU-159 Attachment 23.xlsx
RRU-159 Attachment 23.pdf
PDF · 89 MB · 1,160 pagesText searchable
Download RRU-159 Attachment 23.pdfRead the text of RRU-159 Attachment 23.pdf
RRU-159 Attachment 22.xlsx
Excel · 12 MBText searchable
Download RRU-159 Attachment 22.xlsxRead the text of RRU-159 Attachment 22.xlsx
RRU-159 Attachment 22.pdf
PDF · 89 MB · 1,203 pagesText searchable
Download RRU-159 Attachment 22.pdfRead the text of RRU-159 Attachment 22.pdf
RRU-159 Attachment 21.xlsx
Excel · 12 MBText searchable
Download RRU-159 Attachment 21.xlsxRead the text of RRU-159 Attachment 21.xlsx
RRU-159 Attachment 21.pdf
PDF · 88 MB · 1,203 pagesText searchable
Download RRU-159 Attachment 21.pdfRead the text of RRU-159 Attachment 21.pdf
RRU-159 Attachment 20.xlsx
Excel · 117 KBText searchable
Download RRU-159 Attachment 20.xlsxRead the text of RRU-159 Attachment 20.xlsx
RRU-159 Attachment 20.pdf
PDF · 624 KB · 16 pagesText searchable
Download RRU-159 Attachment 20.pdfRead the text of RRU-159 Attachment 20.pdf
RRU-159 Attachment 19.xlsx
Excel · 32 KBText searchable
Download RRU-159 Attachment 19.xlsxRead the text of RRU-159 Attachment 19.xlsx
RRU-159 Attachment 19.pdf
PDF · 117 KB · 1 pageText searchable
Download RRU-159 Attachment 19.pdfRead the text of RRU-159 Attachment 19.pdf
RRU-159 Attachment 18.xlsx
Excel · 6.7 MBText searchable
Download RRU-159 Attachment 18.xlsxRead the text of RRU-159 Attachment 18.xlsx
RRU-159 Attachment 18.pdf
PDF · 48 MB · 640 pagesText searchable
Download RRU-159 Attachment 18.pdfRead the text of RRU-159 Attachment 18.pdf
RRU-159 Attachment 17.xlsx
Excel · 11 MBText searchable
Download RRU-159 Attachment 17.xlsxRead the text of RRU-159 Attachment 17.xlsx
RRU-159 Attachment 17.pdf
PDF · 82 MB · 855 pagesText searchable
Download RRU-159 Attachment 17.pdfRead the text of RRU-159 Attachment 17.pdf
RRU-159 Attachment 16.xlsx
Excel · 6.7 MBText searchable
Download RRU-159 Attachment 16.xlsxRead the text of RRU-159 Attachment 16.xlsx
RRU-159 Attachment 16.pdf
PDF · 46 MB · 489 pagesText searchable
Download RRU-159 Attachment 16.pdfRead the text of RRU-159 Attachment 16.pdf
RRU-159 Attachment 15.xlsx
Excel · 12 MBText searchable
Download RRU-159 Attachment 15.xlsxRead the text of RRU-159 Attachment 15.xlsx
RRU-159 Attachment 15.pdf
PDF · 85 MB · 897 pagesText searchable
Download RRU-159 Attachment 15.pdfRead the text of RRU-159 Attachment 15.pdf
RRU-159 Attachment 14 .pdf
PDF · 71 KB · 1 pageText searchable
Download RRU-159 Attachment 14 .pdfRead the text of RRU-159 Attachment 14 .pdf
RRU-159 Attachment 14.xlsx
Excel · 29 KBText searchable
Download RRU-159 Attachment 14.xlsxRead the text of RRU-159 Attachment 14.xlsx
RRU-159 Attachment 13.xlsx
Excel · 26 KBText searchable
Download RRU-159 Attachment 13.xlsxRead the text of RRU-159 Attachment 13.xlsx
RRU-159 Attachment 13.pdf
PDF · 56 KB · 1 pageText searchable
Download RRU-159 Attachment 13.pdfRead the text of RRU-159 Attachment 13.pdf
RRU-159 Attachment 12.xlsx
Excel · 12 MBText searchable
Download RRU-159 Attachment 12.xlsxRead the text of RRU-159 Attachment 12.xlsx
RRU-159 Attachment 12.pdf
PDF · 82 MB · 802 pagesText searchable
Download RRU-159 Attachment 12.pdfRead the text of RRU-159 Attachment 12.pdf
RRU-159 Attachment 11.xlsx
Excel · 12 MBText searchable
Download RRU-159 Attachment 11.xlsxRead the text of RRU-159 Attachment 11.xlsx
RRU-159 Attachment 11.pdf
PDF · 86 MB · 858 pagesText searchable
Download RRU-159 Attachment 11.pdfRead the text of RRU-159 Attachment 11.pdf
RRU-159 Attachment 10.xlsx
Excel · 27 KBText searchable
Download RRU-159 Attachment 10.xlsxRead the text of RRU-159 Attachment 10.xlsx
RRU-159 Attachment 10.pdf
PDF · 60 KB · 1 pageText searchable
Download RRU-159 Attachment 10.pdfRead the text of RRU-159 Attachment 10.pdf
RRU-159 Attachment 09.xlsx
Excel · 7.1 MBText searchable
Download RRU-159 Attachment 09.xlsxRead the text of RRU-159 Attachment 09.xlsx
RRU-159 Attachment 09.pdf
PDF · 46 MB · 449 pagesText searchable
Download RRU-159 Attachment 09.pdfRead the text of RRU-159 Attachment 09.pdf
RRU-159 Attachment 08.xlsx
Excel · 12 MBText searchable
Download RRU-159 Attachment 08.xlsxRead the text of RRU-159 Attachment 08.xlsx
RRU-159 Attachment 08.pdf
PDF · 86 MB · 867 pagesText searchable
Download RRU-159 Attachment 08.pdfRead the text of RRU-159 Attachment 08.pdf
RRU-159 Attachment 07.xlsx
Excel · 12 MBText searchable
Download RRU-159 Attachment 07.xlsxRead the text of RRU-159 Attachment 07.xlsx
RRU-159 Attachment 07.pdf
PDF · 84 MB · 869 pagesText searchable
Download RRU-159 Attachment 07.pdfRead the text of RRU-159 Attachment 07.pdf
RRU-159 Attachment 06.xlsx
Excel · 7.0 MBText searchable
Download RRU-159 Attachment 06.xlsxRead the text of RRU-159 Attachment 06.xlsx
RRU-159 Attachment 06.pdf
PDF · 47 MB · 459 pagesText searchable
Download RRU-159 Attachment 06.pdfRead the text of RRU-159 Attachment 06.pdf
RRU-159 Attachment 05.xlsx
Excel · 12 MBText searchable
Download RRU-159 Attachment 05.xlsxRead the text of RRU-159 Attachment 05.xlsx
RRU-159 Attachment 05.pdf
PDF · 87 MB · 879 pagesText searchable
Download RRU-159 Attachment 05.pdfRead the text of RRU-159 Attachment 05.pdf
RRU-159 Attachment 04.xlsx
Excel · 39 KBText searchable
Download RRU-159 Attachment 04.xlsxRead the text of RRU-159 Attachment 04.xlsx
RRU-159 Attachment 04.pdf
PDF · 163 KB · 5 pagesText searchable
Download RRU-159 Attachment 04.pdfRead the text of RRU-159 Attachment 04.pdf
RRU-159 Attachment 03.xlsx
Excel · 12 MBText searchable
Download RRU-159 Attachment 03.xlsxRead the text of RRU-159 Attachment 03.xlsx
RRU-159 Attachment 03.pdf
PDF · 86 MB · 840 pagesText searchable
Download RRU-159 Attachment 03.pdfRead the text of RRU-159 Attachment 03.pdf
RRU-159 Attachment 02.xlsx
Excel · 12 MBText searchable
Download RRU-159 Attachment 02.xlsxRead the text of RRU-159 Attachment 02.xlsx
RRU-159 Attachment 02.pdf
PDF · 91 MB · 1,137 pagesText searchable
Download RRU-159 Attachment 02.pdfRead the text of RRU-159 Attachment 02.pdf
RRU-159 Attachment 01.xlsx
Excel · 24 KBText searchable
Download RRU-159 Attachment 01.xlsxRead the text of RRU-159 Attachment 01.xlsx
RRU-159 Attachment 01.pdf
PDF · 86 KB · 1 pageText searchable
Download RRU-159 Attachment 01.pdfRead the text of RRU-159 Attachment 01.pdf
Text of RRU-159 Attachment 23.xlsx
Sheet names, column headings and text cells; numbers left out · first 300,000 characters
Text of RRU-159 Attachment 23.pdf
Extracted from the file · 1,160 pages · 16,330,154 characters
Text of RRU-159 Attachment 22.xlsx
Sheet names, column headings and text cells; numbers left out · first 300,000 characters
Text of RRU-159 Attachment 22.pdf
Extracted from the file · 1,203 pages · 14,349,246 characters
Text of RRU-159 Attachment 21.xlsx
Sheet names, column headings and text cells; numbers left out · first 300,000 characters
Text of RRU-159 Attachment 21.pdf
Extracted from the file · 1,203 pages · 13,880,364 characters
Text of RRU-159 Attachment 20.xlsx
Sheet names, column headings and text cells; numbers left out
Text of RRU-159 Attachment 20.pdf
Extracted from the file · 16 pages · 151,762 characters
Text of RRU-159 Attachment 19.xlsx
Sheet names, column headings and text cells; numbers left out
Text of RRU-159 Attachment 19.pdf
Extracted from the file · 1 page · 5,328 characters
Text of RRU-159 Attachment 18.xlsx
Sheet names, column headings and text cells; numbers left out · first 300,000 characters
Text of RRU-159 Attachment 18.pdf
Extracted from the file · 640 pages · 7,983,236 characters
Text of RRU-159 Attachment 17.xlsx
Sheet names, column headings and text cells; numbers left out · first 300,000 characters
Text of RRU-159 Attachment 17.pdf
Extracted from the file · 855 pages · 14,651,941 characters
Text of RRU-159 Attachment 16.xlsx
Sheet names, column headings and text cells; numbers left out · first 300,000 characters
Text of RRU-159 Attachment 16.pdf
Extracted from the file · 489 pages · 7,076,557 characters
Text of RRU-159 Attachment 15.xlsx
Sheet names, column headings and text cells; numbers left out · first 300,000 characters
Text of RRU-159 Attachment 15.pdf
Extracted from the file · 897 pages · 15,723,777 characters
Text of RRU-159 Attachment 14 .pdf
Extracted from the file · 1 page · 2,589 characters
Text of RRU-159 Attachment 14.xlsx
Sheet names, column headings and text cells; numbers left out
Text of RRU-159 Attachment 13.xlsx
Sheet names, column headings and text cells; numbers left out
Text of RRU-159 Attachment 13.pdf
Extracted from the file · 1 page · 427 characters
Text of RRU-159 Attachment 12.xlsx
Sheet names, column headings and text cells; numbers left out · first 300,000 characters
Text of RRU-159 Attachment 12.pdf
Extracted from the file · 802 pages · 14,341,138 characters
Text of RRU-159 Attachment 11.xlsx
Sheet names, column headings and text cells; numbers left out · first 300,000 characters
Text of RRU-159 Attachment 11.pdf
Extracted from the file · 858 pages · 15,906,152 characters
Text of RRU-159 Attachment 10.xlsx
Sheet names, column headings and text cells; numbers left out
Text of RRU-159 Attachment 10.pdf
Extracted from the file · 1 page · 822 characters
Text of RRU-159 Attachment 09.xlsx
Sheet names, column headings and text cells; numbers left out · first 300,000 characters
Text of RRU-159 Attachment 09.pdf
Extracted from the file · 449 pages · 7,355,312 characters
Text of RRU-159 Attachment 08.xlsx
Sheet names, column headings and text cells; numbers left out · first 300,000 characters
Page 844 of 867
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued October 23, 2026 RRU-159 Attachment 8 Page 844 of 867 work_order_number description long_description cost_element_group ferc_account percent Battery Replacement Greenwich Hospital 5 Perryridge Rd. Greenwich, CT CT22D006 Battery Replacement Greenwich Hosp CT22D006 Battery Replacement Greenwich Hosp Labor-L01 108030 0.04761905 Labor-L01 107010 0.95238095 Labor-L01 107010 0.95238095 Labor-L01 108030 0.04761905 Labor-L01 108030 0.04761905 Labor-L01 107010 0.95238095 Labor-L01 107010 1 Labor-L01 107010 0.95238095 Labor-L01 108030 0.04761905 Labor-L01 107010 0.95238095 Labor-L01 108030 0.04761905 Labor-L01 108030 0.04761905 Labor-L01 107010 0.95238095 Labor-L01 108030 0.04761905 Labor-L01 107010 0.95238095 Labor-L01 107010 0.95238095 Labor-L01 108030 0.04761905 Labor-L01 108030 0.04761905 Labor-L01 107010 0.95238095 Labor-L01 108030 0.04761905 Labor-L01 Labor-L01 Labor-L01 107010 108030 107010 0.95238095 0.04761905 0.95238095 Labor-L01 108030 0.04761905 Labor-L01 Labor-L01 Labor-L01 107010 108030 107010 0.95238095 0.04761905 0.95238095 Labor-L01 107010 1 Labor-L01 107010 1 Labor-L01 108030 0.15526316 Labor-L01 107010 0.84473684 Labor-L01 107010 1 Labor-L01 108030 0.04761905 Labor-L01 107010 0.95238095 Labor-L01 107010 1 Labor-L01 107010 1 Labor-L01 107010 1 Labor-L01 107010 0.95182821 Labor-L01 108030 0.04817179 Labor-L01 107010 1 Labor-L01 Labor-L01 Labor-L01 107010 108030 107010 1 0.04761905 0.95238095 Labor-L01 108030 0.04761905 Labor-L01 107010 0.95238095 Labor-L01 107010 1 Labor-L01 108030 0.04761905 Labor-L01 107010 0.95238095 Labor-L01 107010 0.95238095 Labor-L01 108030 0.04761905 Labor-L01 107010 0.8974359 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 108030 107010 108030 107010 107010 108030 0.1025641 1 0.10313901 0.89686099 0.91803279 0.08196721 Labor-L01 107010 1 Labor-L01 Labor-L01 Labor-L01 107010 903000 902003 1 1 1 Labor-L01 107010 1 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 903000 107010 903003 107010 903000 1 1 1 1 1 Labor-L01 107010 0.84915027 Battery Replacement Greenwich Hospital 5 Perryridge Rd. Greenwich, CT Battery Replacement Tolland AWC 48 Tolland Stage Rd, Tolland, CT CT22D007 Battery Replacement Tolland AWC Battery Replacement Tolland AWC 48 Tolland Stage Rd, Tolland, CT CT22D007 Battery Replacement Tolland AWC Battery Replacement Williams 9L 469 Williams St. New London, CT CT22D008 Battery Replacement Williams 9L CT22D008 Battery Replacement Williams 9L Battery Replacement Williams 9L 469 Williams St. New London, CT CT22D010 New London AWC SEL ICON New London AWC SEL ICON 63R Myrock Avenue, Waterford, CT Asset location: telecom room Battery Replacement Cheshire Shelter 705 W. Johnson Ave, Cheshire, CT CT22D012 Battery replacement Cheshire Shelte Battery Replacement Cheshire Shelter 705 W. Johnson Ave, Cheshire, CT CT22D012 Battery replacement Cheshire Shelte CT22D013 Battery Replacement East Hampton Battery Replacement East Hampton Line 22 East High St. East Hampton, CT Battery Replacement East Hampton Line 22 East High St. East Hampton, CT CT22D013 Battery Replacement East Hampton Battery Replacement Norwalk Hbr Shelter Tindall Ave, Norwalk, CT CT22D014 Battery Replacement Norwalk Hbr Battery Replacement Norwalk Hbr Shelter Tindall Ave, Norwalk, CT CT22D014 Battery Replacement Norwalk Hbr CT22D015 Battery Replacement Torrington CT22D015 Battery Replacement Torrington Battery Replacement Torrington S/C Battery Replacement Torrington S/C Battery Replacement Westport 180A Bayberry Lane, Westport, CT CT22D016 Battery Replacement Westport CT22D016 Battery Replacement Westport Battery Replacement Westport 180A Bayberry Lane, Westport, CT Battery Replacement Montville Fire Dept 911 Route 32 Uncasville, CT CT22D017 Battery Replacement Montville Battery Replacement Montville Fire Dept 911 Route 32 Uncasville, CT CT22D017 Battery Replacement Montville CT23D001 Battery Replacement Cedar Heights CT23D001 CT23D002 CT23D002 Battery Replacement Cedar Heights Battery Replacement Danbury Crows N Battery Replacement Danbury Crows N CT23D003 Battery Replacement Lakeview 31A CT23D003 CT23D004 CT23D004 Battery Replacement Lakeview 31A Battery Replacement Berlin East Lab Battery Replacement Berlin East Lab CT23D006 HVAC Replacement Willimantic CT23D007 HVAC Replacement Cheshire Battery Replacement Cedar Heights 64 Rapids Road, Stamford, CT Battery Replacement Cedar Heights 64 Rapids Road, Stamford, CT Battery Replacement Danbury Crows Nest Battery Replacement Danbury Crows Nest Battery Replacement Lakeview 31A Lakeview Ave, New Canaan Battery Replacement Lakeview 31A Lakeview Ave, New Canaan Battery Replacement Berlin East Lab Battery Replacement Berlin East Lab HVAC Replacement Willimantic 349 Mountain St Windham HVAC Replacement Cheshire 705 W Johnson Ave HVAC Replacement Ridgefield 22N Off Prospect Street, Ridgefield, CT CT23D009 HVAC Replacement Ridgefield HVAC Replacement Ridgefield 22N Off Prospect Street, Ridgefield, CT CT23D009 HVAC Replacement Ridgefield CT23D010 HVAC Replacement Prospect HVAC Replacement Prospect RS 18 Kluge Rd, Prospect, CT HVAC Replacement Greenwich Hospital 5 Perryridge Rd. Greenwich, CT CT23D011 HVAC Replacement Greenwich Hosp HVAC Replacement Greenwich Hospital 5 Perryridge Rd. Greenwich, CT CT23D011 HVAC Replacement Greenwich Hosp Site 47 SEL ICON 107 Selden St, Berlin, CT Telecom Room CT23D012 Site 47 SEL ICON CT Delta Controllers Delta Controllers Various Stations CT23D013 CT Delta Controllers Sasco Creek ADSS 30 Maple Lane, Westport, CT Control house CT23D014 Sasco Creek ADSS HVAC Replacement So. Mtn 790 Willis Street, Bristol, CT Radio Shelter CT23D017 So Mtn Bristol HVAC Replacement HVAC Replacement So. Mtn 790 Willis Street, Bristol, CT Radio Shelter CT23D017 So Mtn Bristol HVAC Replacement CT24CAPEQUIP - 2024 Capital Equipment Dist Comm Lab Equipment Test equipment for lab environment 107 Selden St, Berlin CT Distribution Communication Office CT240001 Lab Equipment Berlin Plumtree FXS FXO Cards Plumtree FXS FXO Cards 16 Walnut Hill Rd, Bethel, CT Control house CT24D001 CT24D002 CT24D002 Plumtree FXS FXO Cards 56 Prospect St Batteries 56 Prospect St Batteries CT24D003 New London Batteries CT24D003 New London Batteries CT24D004 Stamford AWC Batteries CT24D005 So. Mtn HVAC Replacement CT24D005 So. Mtn HVAC Replacement CT24D006 Willimantic HVAC Replacement CT24D006 Willimantic HVAC Replacement CT24D007 West Hartland HVAC Replacement CT24D007 CT24D008 CT24D009 CT24D009 CT24D010 CT24D010 West Hartland HVAC Replacement Sopastone site boss HVAC Replacement Coventry HVAC Replacement Coventry HVAC Replacement Wilton St Police HVAC Replacement Wilton St Police 56 Prospect St Hartford, CT Batteries 56 Prospect St Hartford, CT Batteries 63R Myrock Ave, Waterford, CT New London Batteries 63R Myrock Ave, Waterford, CT New London Batteries 626 Glenbrook Rd. Stamford, CT Stamford AWC Batteries So. Mtn HVAC Replacement 790 Willis Street, Bristol, CT So. Mtn HVAC Replacement 790 Willis Street, Bristol, CT Willimantic HVAC Replacement 349 Mountain St, Windham, CT Willimantic HVAC Replacement 349 Mountain St, Windham, CT West Hartland HVAC Replacement 2 Center Hill Rd, West Hartland, CT West Hartland HVAC Replacement 2 Center Hill Rd, West Hartland, CT 1554 Highland Avenue, Torrington, CT Radio Shelter 400 Riley Rd Coventry CT 400 Riley Rd Coventry CT 46 Fernwood Lane Wilton CT 46 Fernwood Lane Wilton CT Greenwich Hospital Cell Modems Installation Install cell modems to keep the connectivity of the field devices with the SCADA network after the master radio backbone is disconnected by Verizon. Procure and deploy ~ 50 cell modems 5 Perryridge Rd, Greenwich, CT 06830 Telecom Shelter CT24D012 Greenwich Hospital Cell Modems SEL ICON for SCADA Access TOC-B 107 Selden Street, Berlin, MA Comm Room CT24SC01 CTAFP011 CTBGD011 SEL ICON SCADA Access Solution CT AFP Docket 20-07-04 CT Payments Docket 21-07-01 CTCART25 Blanket Cart for CT Dielectric Lab CTCOM011 CTCRBER1 CTCRC011 CTDBCONV CTDDP011 CTE DK24|05|01 New Comp Stakhers Install Card Reader for Berlin Lab Customer Research - Online Communit DB CONVERSION CT CT Elec Data Dashboard Docket 21-07 CT AFP Docket 20-07-04-Quarsema CT Payments Docket 21-07-01-Balmer This rubber blanket cart will be in the Berlin dielectric lab to maneuver rubber blankets around the lab. Per Teams call with Matthew Chamberlain 10-10-2025, the estimated cost is $3,705.00. This is from EverGreen Sheet Metal, Inc. The vendor is fabricating a blanket cart from stainless steel. CTE New Comp for Stakeholders - Balmer, Melanie DK 24-05-01 - The electric distribution companies (EDCs) may recover through the Non-Bypassable Federally Mandated Congestion Charge (NBFMCC) any costs that were incurred in the relevant calendar year. Install card reader for meter shop in Torrington AWC to restrict access per e-mails from Karen Palmieri, David Glanovsky, Christopher Kellogg on December 8 & 9 2020. The cost is about $4,000.00. Customer Research - Online Communities - Balmer, Melanie THIS IS A MAP CONSOLIDATION PORTION OF THE GIS MAPPING PROJECT. CONTRACTORS WILL REVIEW AND CONSOLIDATE PAPER/CAD/GIS AND UPDATE THE GIS MAPPING SYSTEM. END RESULT IS ONE LOCATION FOR ALL MAPS USING NEW SOURCE SOFTWARE CT Elec Data Dashboard Docket 21-07-01 Order #15-Balmer CT Voice Radio 2024 Project Close out Materials & Labor [8:50 AM] Preci, Nikoll S Close-Out [8:49 AM] Preci, Nikoll S CT Voice Radio 2024 Project Close out Materials & Labor CTDM241D CT Voice Radio 2024 closeout CT Voice Radio 2024 Project Close out Materials & Labor [8:50 AM] Preci, Nikoll S Close-Out [8:49 AM] Preci, Nikoll S CT Voice Radio 2024 Project Close out Materials & Labor CTDM241D CTDMR11D CTDOBLE1 CTDRA011 CT Voice Radio 2024 closeout DMR Project Close Out CT Dist CT VOICE RADIO SYSTEM PROJECT - DMR Project Close out Labor-L01 Labor-L01 108030 107010 0.15084973 1 Doble Test Equipment CTE LIDR Call Handling Dkt 17-12-03 This work order was created to accept the charges for the doble test equipment from Doble Engineering. The total estimated cost is $756,000.00 which will be split between CT (85%) and WMA (15%). CT = $642,600 WMA = $113,400 CTE LIDR Call Handling Dkt 17-12-03 - Balmer, Melanie Labor-L01 Labor-L01 107010 908000 1 1 Labor-L01 Labor-L01 107010 908000 1 1 A project authorization for $19,994,000 is being requested to fund the IT Scope of Work to support the construction of a new CT Distribution System Operation Center (SOC) at the existing Windsor Facility. The new Windsor SOC will be designed like the Mass Ave Control Room to support a physical layout and system visualization tools that encourage communication and visibility between desks. This model has been identified as an industry best practice. Once constructed, the new Windsor SOC will improve our operational efficiency, meeting NERC-CIP best practices. The audio and video display systems will increase operational awareness and efficiencies to include a Human Performance centric design needed to operate the modern distribution system and the distribution grid of the future. Additionally, the video wall display boards will enhance overall awareness by leveraging current and new graphical user interfaces as they become available; this will enhance operations ability to assess and analyze system events. This PAF scope of work includes the purchase, installation, and configuration of Computer, Audio-Visual, and KVM (Keyboard, Video, and Mouse) equipment which must be purchased to outfit the SOC with technology needed for system operations. CTDSOC11 CTEHI011 New Windsor SOC ITand AV Equipment CTE Hardship Inbox 21-07-01; 26 CTE Hardship Inbox 21-07-01; 26-Balmer CT DSCADA OpenSky Replacement Investigate options for Open Sky replacement and DSCADA support in CT including private radio and cellular. Statewide CT CTFAN001 CTFARM20 CTFT20E2 CTGISGPS CTGISGRD CTGRID11 CTGRT411 CTIPAD20 CT DSCADA Open Sky Replaement CT Meter Farm Project This work order will capture charges related to the Connecticut Meter Farm being built by Tesco. The purchase order number is 10996182. Itron Riva AMI meters will be installed to test the communication attributes. This test will help decide which type of AMI system should be pursued. The 3 farms cost $94,290.00. All above information provided by George Townsend's e-mail dated 4/10/2020. Labor-L01 Labor-L01 107010 107010 1 1 Newtown Smart Board/TV purchase CT DIRECT BURIED GPS GIS GRID SCALING Other-Electric Vehicles CT Gross Earnings Tax CT New Apprentices Tablets This work order is to purchase a smart board TV for Newtown, CT Field Training Organization (1FT). Per Dan Chambrello's email dated 7/20/20, requesting the purchase of a smart board in Newtown. The estimated cost is $13,000. The project scope is for DAVEY RESOURCE The project scope is for RAMTeCH to provide (2) onsite personnel and that will work alongside Eversource GIS technicians and (8) offsite RAMTeCH personnel to complete scaling of the CT Grids. Grid scaling is prerequisite for several pending GIS data quality improvement projects. Other-Electric Vehicles-Quaresma CT Gross Earnings Tax-Rose This work order is to purchase 30 new ipads for CT new apprentices for an estimated amount of $36,682.5. Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 107010 107010 107010 908EV0 408620 107010 1 1 1 1 1 1 Labor-L01 107010 1 Labor-L01 107010 1 This work order is to purchase 56 new ipads for the 2021 CT new apprentices. Per Jonathan Bradley's email dated 3/17/2021 requesting the purchase of 56 ipad at $1,250.00 per tablet for a total amount of $70,000.00. CTIPAD21 CT New Apprentices Tablets Per LIsa's email dated 4/2/2021, requesting to increase the number of iPad for CT to 60 at $1,250/iPad. This work order is to purchase 20 iPads, the accessories, and a charging station for the Berlin training classroom. CTIPAD25 iPads for Berlin Training Classroom Per Alex Chasson-Colebourn's e-mail dated 2/19/2025, the purchase includes: (20) iPads (inlcuding cases and accessories) @ $1,321.01 each = $26,420.20 (1) LocknCharge charging station = $668.35 Total estimated cost = $27,088.55Page 845 of 867
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued October 23, 2026 RRU-159 Attachment 8 Page 845 of 867 work_order_number CTLD1DC2 CTLDA011 CTLID011 CTLIFT23 CTME0111 CTMONITR description EQUIPMENT TO PROVIDE 10 MB ETHERNET CTE LIDR Administrative Costs CTE Low Inc Disc Dkt 17-12-03RELL New Forklift for CT Dielectrics Lab CTMEEC CT BATTERY MONITORING long_description PURCHASE AND INSTALL STEEL CONDUIT FOR 10 MB ETHERNET CIRCUIT REQUESTOR-ED ARIOLA - MANAGER GERRY BLANCHARD CTE Low Inc Disc Dkt 17-12-03RELL Motion 51-Balmer This work order will be used to purchase a new electric lift truck. The equipment will be used in the CT Dielectric Lab. The price is estimated at $40,000.00. CTMEEC Add battery monitoring to key facilities in Connecticut to enhance the reliability of the DC power System and minimize the possibility of DC power loss and catastrophic failure. cost_element_group Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 ferc_account 107010 908000 908000 107010 565000 107010 percent Labor-L01 108030 0.04177378 Labor-L01 Labor-L01 Labor-L01 107010 920000 920000 0.95822622 1 1 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 107010 920000 920000 920000 920000 920000 920000 908000 107010 107010 107010 107010 107010 1 1 1 1 1 1 1 1 1 1 1 1 1 Labor-L01 107010 1 Labor-L01 107010 1 Labor-L01 107010 1 Labor-L01 107010 1 Labor-L01 107010 1 Labor-L01 107010 1 Labor-L01 107010 1 Labor-L01 107010 0.95238095 Labor-L01 108030 0.04761905 Labor-L01 107010 1 Labor-L01 107010 1 Labor-L01 107010 1 Labor-L01 107010 1 Labor-L01 107010 1 1 1 1 1 1 1 This work order is to purchase CT Technical Training Timpson Training Unit (Timpson Meter Panel) for the Berlin Training Yard. Per Dan Chambrello's e-mail dated 1/13/2022, the unit cost approximately $350,000. CTMTRPNL Timpson Training Unit Per (Chris Richard's email 10/2/20)- requesting the purchase of a tent from Extreme Canopy for $93510.00 for Matt Greges. This work order is to purchase CT Technical Training Timpson Training Unit (Timpson Meter Panel) for the Berlin Training Yard. Per Dan Chambrello's e-mail dated 1/13/2022, the unit cost approximately $350,000. CTMTRPNL CTNRS011 CTNRS311 Timpson Training Unit CT Non Res-Program Administration CT Non Res-Customer Application Fee Per (Chris Richard's email 10/2/20)- requesting the purchase of a tent from Extreme Canopy for $93510.00 for Matt Greges. CT Non Res-Program Administration-Augelli CT Non Res-Customer Application Fees-Augelli This work order was created to accept the charges for the Overhead curriculum development project which is a piece of the overall electric curriculum development project (CTMTRTRN) for Field Training. Per Alex Chasson-Colebourn , the vendor (Index AR) quote is $1,400,000 and the vendor (Mosaic) quote is $1,566,000. The internal labor cost is estimated to be $33,333 each month for 18 months. The costs (direct and indirect) will be distributed according to the PAF $4,200,195. CTOHTRNG CTPBRO11 CTREG011 CTRES011 CTRES211 CTRES311 CTRES511 CTREW011 CTRSHTFD CTRSNWTN CTRTHTFD CTRTNLND CTRTNWTN Overhead Curriculum Development CT PBR Regulatory Reporting Process CT Regulatory Costs CT Residential Tariff O&M CT Res O&M-Admin Contractors CT Res O&M- Admin Other CT Res O&M-Customer App Fees CTE RRES & ESS DK 23-05-01; 7 HTFD REG EOC SS SECURITY NEWTOWN REG EOC SECURITY HARTFORD REG EOC TELCOM NEW LONDON REG EOC TELECOM NEWTOWN REG EOC TELECOM CT = 35% = $1,470,068 EMA = 35% = $1,470,068 NH = 20% = $840,039 WMA = 10% = $420,019 CT PBR Regulatory Reporting Process - Savage, Jessica CT Regulatory Costs-Amnott CT Residential Tariff O&M-Quarsema CT Res O&M-Admin Contractors-Quaresma CT Res O&M- Admin Other-Quaresma CT Res O&M-Customer App Fees-Quaresma CTE RRES & ESS DK 23-05-01; 7 - Balmer, Melanie Cyber and physical security for regional EOC's. Security hardware for DSCADA system, installation of security cameras and card readers. Cyber and physical security for regional EOC's. Security hardware for DSCADA system, installation of security cameras and card readers. NEWTOWN TELECOMMUNICATION FOR HARTFORD REGIONAL EOC. LOCAL AND WAN EQUIPMENT TO SUPPORT DSCADA, AVTEK RADIO FIBER OPITC INSTALLATION TO HARTFORD AND ANCILLARY EQUIPMENT TELECOMMUNICATION FOR NEW LONDON REGIONAL EOC. LOCAL AND WAN EQUIPMENT TO SUPPORT DSCADA, AVTEK RADIO FIBER OPTIC INSTALLATION TO HARTFORD AND ANCILLARY EQUIPMENT TELECOMMUNICATION FOR NEWTOWN REGIONAL EOC. LOCAL AND WAN EQUIPMENT TO SUPPORT DSCADA, AVTEK RADIO FIBER OPITC INSTALLATION TO HARTFORD AND ANCILLARY EQUIPMENT Norwalk ACW SEL ICON 2 Tindall Ave, Norwalk, CT radio room CTSEL001 Norwalk AWC SEL ICON Newtown ACW SEL ICON 20 Barnabas Rd, Newtown CT radio room CTSEL002 Newtown SEL ICON CTTL2301 CT Elec D Fleet Capital Tool Purcha CTTL2304 CT Elec Fleet Capital Tool Purchase CTTL2307 CT Elec Fleet Capital Tool Purchase CT Electric Distribution Fleet Capital Tool Purchase Vehicle Diagnostic Equipment - 4 - Berlin 3 Danielson 1 The current diagnostic equipment is outdated and can no longer be updated to our current model year. The diagnostic equipment will allow us to perform diagnostic repairs to our vehicles and reduce vehicle repair time. CT Electric Distribution Fleet Capital Tool Purchase CT Fleet Operations is requestig funds to purchase 6 additional HYTORQ tools for the garages that don't have them. The tool is needed to properly torque the turret bolts at the annual inspection. The CT garages are HFD,STM,WTBY,MDS,TOR,EHP. CT Electric Distribution Fleet Capital Tool Purchase Newtown Fleet Repair Garage is requesting capital funds for the purchase of a new tire machine to replace the existing unrepairable tire machine. CT Elec Fleet Capital Tool Purchase CT Electric Distribution Fleet Capital Tool Purchase Hytorq Torque Tool CT Fleet Operations is requesting funds to purchase 1 additional HYTORQ tool for the HFD garage. The tool is needed to properly torque the turret bolts at the equipments annual inspection. CTTL2309 CTTL2313 CT Elec D Fleet Capital Tool Purcha CTTL2314 CT Elec D Fleet Capital Tools CTTL2314 CT Elec D Fleet Capital Tools CT Electric Distribution Fleet Capital Tool Purchase 5 Jump packs for CT Garages, TLN, DNL, BER, TORR, WBY Jump pack used to jump start units 5 for 5 garages life exp of tool is 6 years They replace obsolete units we now have No need to call vendor for jump starts average savings per year is $600 per pack. CT Electric Distribution Fleet Capital Tool Purchase CT Operations is requesting Fleet Capital funds to mount new tire equipment and shop work bench in Newtown garage. CT Electric Distribution Fleet Capital Tool Purchase CT Operations is requesting Fleet Capital funds to mount new tire equipment and shop work bench in Newtown garage. CT Elec D Fleet Capital Tools CT Electric Distribution Fleet Capital Tool Purchase Calipers for accurate inspections of leveling chains Estimate service life 8-10 years There is no replacement cost This is for 6 units @ $809.95 each CTTL2316 CT Electric Distribution Fleet Capital Tool Purchase The current diagnostic equipment is outdated and can no longer be updated to our current model year. The diagnostic equipment will allow us to perform diagnostic repairs to our vehicles and reduce vehicle repair time. E.Hampton, Newtown, New London, Norwalk. CTTL2402 CT Elec D Fleet Capital Tools CTTL2406 CT Elec D Fleet Capital Tools CTTL2408 CT Fleet Capital Tool Purchases CTTL2409 CT Fleet Capital Tool Purchases CT Electric Distribution Fleet Capital Tool Purchase Cordless battery powered tools for service trucks, to provide safer more ergonomic repairs. 16 sets for all 16 Service Trucks CT Electric Distribution Fleet Capital Tool Purchase 14 sets Altec specific tools for maintenance of DM47-B Digger Derricks, to provide safer and more ergonomic repairs. 1 set of tools per each CT garage. CT Electric Distribution Fleet Capital Tool Purchase Digital fluid pressure gauges to measure hydraulic pressures on bucket trucks. Required for proper preventative maintenance procedures, testing and repair. Cost includes quantity of 13 gauges, one for each CT garage. CTTL2412 CT Elec D Fleet Capital Tools CT Electric Distribution Fleet Capital Tool Purchase 4 Vehicle Lifts. The vehicle lifts are used to perform repairs on the bucket trucks. The tool will allow technicians to perform proper repairs. 15T 12872 - 2 are for the Berlin garage, 1 for Norwalk garage and one for the Madison garage. $50,185ea - $200,740 + $6,694.68tx = $207,434.68 Labor-L01 107010 1 CTTL2501 CT Elec D Fleet Capital Tools-2025 2025-CT Electric Distribution Fleet Capital Tool Purchase 5 Vehicle Portable Lifts - $50,185ea = $250,925. + $8,368.35 Tax = $259,293.35 The vehicle lift is used to perform repairs on the bucket trucks. The tool will allow technicians to perform proper repairs. Two are for the Berlin Garage, 1 Stamford and 1 Tolland. Labor-L01 107010 1 Labor-L01 107010 1 Labor-L01 107010 1 Labor-L01 107010 1 Labor-L01 107010 1 Labor-L01 107010 1 Labor-L01 107010 1 Labor-L01 107010 1 Labor-L01 107010 1 Labor-L01 107010 1 Labor-L01 107010 1 Labor-L01 107010 1 Labor-L01 Labor-L01 107010 107010 1 1 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 107010 593000 107010 594030 108030 1 1 1 1 1 CTTL2502 CT Elec D Fleet Capital Tools-2025 CTTL2503 CT Elec D Fleet Capital Tools-2025 CTTL2504 CT Elec D Fleet Capital Tools-2025 CTTL2505 CT Elec D Fleet Capital Tools-2025 CTTL2506 CT Elec D Fleet Capital Tool-2025 CTTL2507 CT Elec D Fleet Capital Tools-2025 CTTL2508 CT Elec D Fleet Capital Tool Purcha CTTL2509 CT Elec D Fleet Capital Vehicles CTTL2510 CT Elec D Fleet Capital Tools CTTL2511 CT Elec D Fleet Capital Tools CTTL2512 CT Elec D Fleet Capital Tools CTTL2513 CTTRAIN1 CT Elec D Fleet Capital Tools SMART BOARDS FOR TRAINING 2025-CT Electric Distribution Fleet Capital Tool Purchase Vehicle Diagnostic Equipment 4 units $9,683.16ea = $38,732.67 The current diagnostic equipment is outdated and can no longer be updated to our current model year. The diagnostic equipment will allow us to perform diagnostic repairs to our vehicles and reduce vehicle repair time. Tolland, Torrington, Hartford and Stamford garages. 2025-CT Electric Distribution Fleet Capital Tool Purchase The hose cutter is used to repair and fabricate hydraulic hoses. The tool will allow technicians to perform for Norwalk garage. 2025-CT Electric Distribution Fleet Capital Tool Purchase Computer and batter cabinet needed to charge our diagnostic computers and batteries. Cabinet should have a life expectancy of 20+ years and will help to maintain sensitive equipment consolidated and dust free in a garage environment. 2025-CT Electric Distribution Fleet Capital Tool Purchase Replace aged and defective metal cutting saw. New saw capable of cutting all materials used by Fleet. 2025-CT Electric Distribution Fleet Capital Tool Purchase Parts washer needed to replace older parts washer that is needed to clean parts to be reused. Parts washer should have a life expectancy of around 10 years. 2025-CT Electric Distribution Fleet Capital Tool Purchase Allow Mobile weight on vehicles to determine safe loading of unit. This way we do not have to bring units to public scales. Life expectancy is 20 years. 2025-CT Electric Distribution Fleet Capital Tool Purchase Horizontal & Vertical Band Saw for use in light fabrication work, cutting flat stock and pipe. 2025-CT Electric Distribution Fleet Capital Tool Purchase 2 Jack stands are used to safely support vehicle while on the post lifts. The tool allow technicians to safely perform repairs while on the lifts. Stamford Garage 2025-CT Electric Distribution Fleet Capital Tool Purchase CT Fleet Operatioins is requesting Fleet Capital funds to upgrade existing wheel balancer machine that is at the end of its useful life. 2025-CT Electric Distribution Fleet Capital Tool Purchase CT Fleet Operations is requesting Fleet capital funds to replace an inoperable transmission jack for the Hartford garage. 2025-CT Electric Distribution Fleet Capital Tool Purchase CT Electric is requesting the purchase of a fire rated cabinet for chemical storage. 2025-CT Electric Distribution Fleet Capital Tool Purchase Pressure washer will help the technicians to diagnose oil leaks, Chesire garage. PURCHASE AND INSTALL 2 SMART BOARDS FOR TRAINING This work order was created to accept the charges for the applications developed for new electric equipment training. The costs will be distributed according to the PAF. CT = 35% = $771,750: $154,350 each year from 2026 - 2030 EMA = 35% = $771,750: $154,350 each year from 2026 -2030 NH = 20% = $441,000: $88,200 each year from 2026 - 2030 WMA = 10% = $220,500: $44,100 each year from 2026 -2030 CTVT Wiring-name change G Flannery DEEP Grid Side Enhancements project - this work order is for contractor labor costs associated with the on-line portal software that will enable customers to facilitate interconnections of DER requests. URD/Direct Bury Inspection-UG-Annual-Tmpl CTTRNEQP CTVTN16C CUSWEB17 DBINSU11 DBLPOL11 New Electric Equipment Applications CTVT Wiring 2016 CUSTOMER ON-LINE PORTAL URD/Direct Bury Inspection-UG Double Pole Removal Blanket AWO DCDW0011 DCFAST11 DERHOST1 DISTRIBUTION CLEARANCE ADMIN/WRITER DC FAST-Electric Vehicles DER HOST CAP DATA + MAP DCDW0011OPSNTRELEXPENSES11 work order to be used by Distribution Clearance Administrator and Distribution Clearance Writer under CT Grid management DC FAST-Electric Vehicles-Quaresma System upgrade to existing and in queue DER projects to develop online mapping and other analytical tools to better understand the localized impact of DER penetration for select locations Labor-L01 Labor-L01 Labor-L01 581440 908EV0 107010 1 1 1 LODESTAR SAND RD CANAAN P#CD01400 Reimb CD01398 Lodestar Norfolk LODESTAR SAND ROAD CANAAN P# CD01400 INT - 33391 Advance payments DGPRJECT work order for CD01398 - INT-35916, Town of Norfolk / Lodestar generation facility at 599 Greenwoods Road East, Norfolk, CT 06058. 4MW AC PV Installation - Matt Riiska Labor-L01 Labor-L01 252500 252500 1 1 DG221594 DG231823 DG252722 DG252734 DGDFLT11 Reimb CD01594 Louth Cal Haddam Quar Reimb CD01823 Verogy E Windsor II Reimbursables for CD02722 Reimbursables for CD02734 ENFIELD, NEVINS, 2, RONALD L MORGAN CD01594 DGPRJECT work order for reimbursables paid for the construction project at Haddam Quarter Rd. Durham, CT. INT-40603 Louth Callan Renewables LLC Advance Payments for CD01823 - INT49986, Verogy East Windsor Solar II LLC Reimbursables for CD02722 Reimbursables for CD02734 This AWO is created to support Maximo functionality which requires an FWO but DG program/project does not. All DG "no fwo needed" will be directed to this AWO as a Maximo "defaultAWO" Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 252500 186010 252500 252500 186010 1 1 1 1 1 DGERGRID INTEGRATE DG ENERGY RESOURCES UCONN 2ND AMENDED AND RESTATED RESEARCH PROJECT(S) PREDICT SOLAR POWER AT SPECIFIC LOCATIONS ON THE GRID. ASSET - MODEL FOR ESTIMATION OF PHOTOVOLTAIC (pv) OUTPUT VARIABILITY AND ACTUAL SYSTEM PERFORMANCE W/HIGH PV LEVELS Labor-L01 107010 1 Labor-L01 186010 1 Labor-L01 186010 1 Labor-L01 Labor-L01 186010 186010 1 1 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 186010 186010 186010 186010 186010 186010 1 1 1 1 1 1 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 186010 186010 186010 186010 186010 186010 186010 588133 43001X 107010 107010 108030 107010 108030 1 1 1 1 1 1 1 1 1 1 1 1 1 1 Labor-L01 107010 1 Labor-L01 107010 1 Labor-L01 107010 1 Labor-L01 107010 1 Labor-L01 107010 1 Labor-L01 107010 1 Labor-L01 107010 1 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 107010 923000 186ITL 108030 107010 1 1 1 0.09090909 0.90909091 DG20LSSR DG221398 DGPM1459 DG PM Cost for CD01459 DGPM1594 DG PM Cost for CD01594 Hadm Qtr DGPM1682 DGPM1705 DG PM Cost for CD01682 GRE DGPM COST FOR CD01705 DGPM1776 DGPM1812 DGPM1836 DGPM1957 DGPM1961 DGPM2080 DG PM Cost for CD01776 IND solar DGPM1812 DGPM Cost for CD01836 DG PM COST FOR CD01957 DGPM COST FOR CD01961 DG PM COST FOR CD02080 DGPM2136 DGPM2247 DGPM2353 DGPM2406 DGPM2408 DGPM2433 DGPM2525 DHRD0011 DISE0011 DMCN22PR DMCN24PR DMCN24RT DMCN25PR DMCN25RT DGPM COST FOR CD02136 DGPM COST FOR CD02247 DGPM COST FOR CD02353 DG PM COST FOR CD02406 DG PM COST FOR CD02408 DG PM COST FOR CD02433 DG PM COST FOR CD02525 Desktop PC Hardware Discount Expense 2022 Intercompany Purchases 2024 Intercompany Purchases 2024 Intercompany Transfers 2025 Intercompany Purchases 2025 Intercompany Transfers DG PM Cost for CD01459 CTEC thompson family land trust project. INT 33894 & 33895 3 meters $97,138 inital payment Project Management work order for CD01594 - INT-40603 LCR (Louth Callan Renewables) generation project at Haddam Quarter DG Project COst for GRE Mulnite #2 project. Greenskis INT-41866 / CD01682 DGPM COST FOR CD01705 DG PM Cost for Independence soalr cobb rd project / 524 New London Rd colchester CT INT-51890 / CD01776 DG PM Cost FOR CD01812 DG PM Cost FOR CD01836 | INT-51492 | The Nevar Company, Oakdale DG PM COST FOR CD01957 DGPM COST FOR CD01961 DG PM COST FOR CD02080 DG PM Cost FOR CD02136 | INT-67007 | VCP Realty, Warrenville Road, Mansfield | DGPM COST FOR CD02247 DGPM COST FOR CD02353 DG PM COST FOR CD02406 DG PM COST FOR CD02408 DG PM COST FOR CD02433 DG PM COST FOR CD02525 DHRD0011OPSNTRELEXPENSES21 Discount Expense 2022 Intercompany Purchases 2024 Intercompany Purchases 2024 Intercompany Transfers 2025 Intercompany Purchases 2025 Intercompany Transfers CT DMX Replacements 107 Selden Street, Berlin, CT East Comm Room DMX23001 CT DMX Replacements New Britain CT DMX Replacements Berlin OBA 107 Selden Street, Berlin, CT East Comm Room DMX23002 Berlin OBA DMX Replacements CT DMX Replacements Stepstone 50 Stepstone Hill Rd, Guilford, CT control house DMX23003 Stepstone DMX Replacements CT DMX Replacements Green Hill 775 Green Hill Rd, Madison, CT control house DMX23004 Green Hill DMX Replacement CT DMX Replacements Bokum 49 Bokum Rd. Old Saybrook, CT control house DMX23005 Bokum DMX replacements CT DMX Replacements Branford 11J 272 E. Main St. Branford, CT control house DMX23006 Branford DMX Replacements CT DMX Replacements Goose Hill 330 Pokornoy Road, Haddam, CT radio shelter DMX23008 Goose Hill DMX replacements CT DMX Replacements Chapel Hill 414 Chapel Hill Road, Montville, CT Radio shelter DMX23009 DN093411 DN110411 DNLTW1DC DNLTW1DC CTDMX Replacements Chapel HIll DN 23-09-34-SB7 CL&P DN 23-11-04-SB7 CL&P DANIELSON TOWER REPLACEMENT DANIELSON TOWER REPLACEMENT DN 23-09-34-SB7 CL&P - Savage, Jessica DN 23-11-04-SB7 CL&P - Savage, Jessica DANIELSON TOWER REPLACEMENT - CL&P DANIELSON TOWER REPLACEMENT - CL&PPage 846 of 867
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued October 23, 2026 RRU-159 Attachment 8 Page 846 of 867 work_order_number DONAT111 DONAT211 DONAT311 DOST0011 DRCM0011 DSCADA14 DSCADA2W DSCCNTRL DSCN0145 DSCN0145 DSCN0147 DSCN8136 DSCN9124 DSCN9166 DSEQ2003 DSEQ2003 DSEQ8026 DSEQ8029 DSEQ8029 DSHK0011 DSIP0011 DSN03003 DSN03003 DSN03005 DSN03005 DSN03006 DSN03006 DSN03008 DSN03008 DSN03009 DSN03010 DSN03011 DSN03011 DSN03013 DSN03013 DSN03014 DSN03014 DSN03015 DSN03015 DSN03016 DSN03016 DSN03017 DSN03018 DSN03018 DSN03019 DSN03019 DSN03020 DSN03020 DSN03021 DSN03021 DSN03022 DSN03023 DSN03023 DSN03028 DSN03028 DSN03029 DSN03029 DSN03031 DSN03032 DSN12002 DSN12002 DSN12029 DSN12044 DSN22023 DSN22023 DSN22043 DSN32010 DSN32014 DSN32049 DSN32053 DSN32053 DSN42001 DSN42003 DSN42020 DSN42020 DSN42025 DSN42025 DSN42027 DSN42027 DSN42029 DSN42029 DSN42041 DSN42046 DSN42046 DSN52002 DSN52019 DSN52019 DSN52038 DSN52039 DSN52043 DSN62001 DSN62001 DSN62035 DSN62035 DSN62046 DSN62047 DSN62047 DSN72001 DSN72001 DSN72010 DSN72012 DSN72013 DSN72014 DSN72014 DSN72016 DSN72017 DSN72018 DSN72018 DSN72020 DSN72020 DSN72030 DSN72033 DSN72034 DSN72044 DSN72044 DSN72045 DSN72045 DSN72048 DSN72048 DSN72049 DSN72049 DSN72050 DSN72050 DSN72051 DSN72051 DSN72052 DSN72052 DSN72055 DSN82001 DSN82001 DSN82002 DSN82008 DSN82008 DSN82009 DSN82009 DSN82011 DSN82011 DSN82016 DSN82016 DSN82019 DSN82019 DSN82020 DSN82020 DSN82026 DSN82026 DSN82031 DSN82046 DSN82046 DSN82048 DSN82048 DSN82057 DSN82057 DSN82059 DSN82059 DSN82063 DSN82063 DSN92009 DSN92009 DSN92010 DSN92010 DSN92012 DSN92012 DSN92013 DSN92013 DSN92021 DSN92021 DSN92022 DSN92022 DSN92030 DSN92044 DSN92044 DSN92048 DSN92048 DSN92049 DSN92049 DSN92053 DSN92057 DSN92058 DSN92061 DSN92061 DSN92067 DSQ03011 DSQ03011 DSQ03015 DSQ03015 DSQ03016 DSQ03016 DSQ03022 DSQ03022 DSQ03026 DSQ03026 DSQ03030 DSQ03030 DSQ22029 DSQ22029 DSQ32018 DSQ32018 DSQ42012 DSQ42012 DSQ62013 DSQ62013 DSQ62024 DSQ62024 DSQ62025 DSQ62025 DSQ62030 DSQ62030 DSQ62043 DSQ62043 DSQ62048 DSQ62048 DSQ72015 DSQ72015 DSQ72033 DSQ72033 DSQ72046 description Get Tax Credit-Donation Get Tax Credit-Donation Get Tax Credit-Donation District Operations (Stations) Dist Sta Recloser CM ELEC PROJ DSCADA RETROFITS DSCADA PROGRAM - WATERBURY DISTRICT DSCADA CONTROL PROGRAMMING NORTHEAST SIMSBURY 43F - REPL FAILE NORTHEAST SIMSBURY 43F - REPL FAILE BRANFORD 11J - RPL POSITRON TELECOM NORTH BLOOMFIELD 2A - INSTALL DISCO TRIANGLE 11A - RPL STATION SVC XFMR SHUNOCK 32P - INSTALL TRANSDUCERS Westbrook 20S-1X Low Side Arresters Westbrook 20S-1X Low Side Arresters CHIPPEN HILL 15U - REBUILD FAILED B CEDAR HEIGHTS 4R-RPL FAILING ANNUNC CEDAR HEIGHTS 4R-RPL FAILING ANNUNC Dist Sta Housekeeping Dist Sta Inspect (50): Replace Failing Battery & Cha (50): Replace Failing Battery & Cha Torrington 8A Install Batt Monitor Torrington 8A Install Batt Monitor (30): Replace Failed 12F42 Arrester (30): Replace Failed 12F42 Arrester (30): Replace Failing A/C Unit DSN0 (30): Replace Failing A/C Unit DSN0 Dooley 30K - Upgrade A/C Unit, Inst (30): Install A/C Unit, Hydrogen Mianus 16Q Install AC Unit,Hydro Mo Mianus 16Q Install AC Unit,Hydro Mo Tomac 12H Install A/C Unit,Hydro Mo Tomac 12H Install A/C Unit,Hydro Mo CosCob 11R Install A/C Unit,Hydr Mo CosCob 11R Install A/C Unit,Hydr Mo N Greenwich 27K Inst A/C Unit, Hydr N Greenwich 27K Inst A/C Unit, Hydr Newtown 12M Install A/C Unit,Hydro Newtown 12M Install A/C Unit,Hydro Rocky River 12Y Inst A/C Unit,Hydro Shepaug 13A Install A/C Unit, Hydro Shepaug 13A Install A/C Unit, Hydro Mid River 28M Instal A/C Unit,Hydro Mid River 28M Instal A/C Unit,Hydro Ridgefield 22N Instal A/C Unit,Hydr Ridgefield 22N Instal A/C Unit,Hydr Christian 31C Instal A/C Unit,Hydro Christian 31C Instal A/C Unit,Hydro Beac Falls 11N Insl A/C Unit,Hydro Triangle 11A Install A/C Unit,Hydr Triangle 11A Install A/C Unit,Hydr Bristol 11K Inst Grd Studs on 4.8kV Bristol 11K Inst Grd Studs on 4.8kV (30): Replace Failing 14R66-19U-1R(30): Replace Failing 14R66-19U-1R(30): Install Battery Monitor DSN03 (30): Install Primary Battery Monit WESTON 21M-REPLACE 115 KV INSULATOR WESTON 21M-REPLACE 115 KV INSULATOR (50): Installation of oil containme (60): Install new breaker. DSN1204 SOUTH END 1G-REPLC FAILING 1X 2X LT SOUTH END 1G-REPLC FAILING 1X 2X LT (60): Retire Substation, remove all (50): Miscellaneous: Remote racking MOBILE BATT TRLR #16902 - BUILD BAT WINSTED 22F - REMOVE FOUNDATION VAN DYKE 12 - REPLACE FAILING CUTOU VAN DYKE 12 - REPLACE FAILING CUTOU MOBILE BATTERY TRAILER 1146364-BUIL SOUTH COVENTRY 17Y-REMOVE FENCE & F SOUTH NAUGATUCK 21L-RPLC FAILING AN SOUTH NAUGATUCK 21L-RPLC FAILING AN TORRRINGTON TERMINAL 8A-RPLC LIGHTN TORRRINGTON TERMINAL 8A-RPLC LIGHTN MANCHESTER 3A - REPLACE LIGHTING FI MANCHESTER 3A - REPLACE LIGHTING FI (30): Install new relay Relay DSN42 (30): Install new relay Relay DSN42 (50): Install equipment for network Replace Deteriorating Fence Replace Deteriorating Fence Beacon Falls 11N - Replace ATS swit (30): Rebuild two OCB's. 32G-19T-2 (30): Rebuild two OCB's. 32G-19T-2 Noera 13H - Replace the phone circu (50): Install an air conditioning s (50): Install new vacuum breakers i Chippen Hill 15U LTC control Relay Chippen Hill 15U LTC control Relay (40): Refurbishment of the switchge (40): Refurbishment of the switchge (40): Installation of a hand rail (40): Replacement of the control ho (40): Replacement of the control ho (50): Miscellaneous- Rebuild of dis (50): Miscellaneous- Rebuild of dis (30): Install new Driveways. DSN720 (50): HVAC system, DSN72012 (50): A/C Unit with Hydrogen sensin Arrester replacement on the 11R-1X Arrester replacement on the 11R-1X (50): Miscellaneous; Refurbishment (50): Miscellaneous, Refurbishment (50): Miscellaneous, Refurbishment (50): Miscellaneous, Refurbishment replacement of 48V DC Battery bank replacement of 48V DC Battery bank (50): Refurbish the switchgear roof (50): Miscellaneous (50): Refurbish the switchgear roof W Brookfield 14H Inst A/C, H2 and F W Brookfield 14H Inst A/C, H2 and F Fencing Fencing Scitico 27H-Replace A/C Unit Scitico 27H-Replace A/C Unit Enfield 12C - Replace A/C Unit DSN7 Enfield 12C - Replace A/C Unit DSN7 W9indsor Locks 14K - Replace A/C Un W9indsor Locks 14K - Replace A/C Un Replace A/C Unit Replace A/C Unit Rockville 14W - Replace A/C Unit Rockville 14W - Replace A/C Unit (30): Add Landscaping DSN72055 (50): A/C Unit DSN82001 (50): A/C Unit DSN82001 (50): Activate 24A19 Feeder Positio (50): Replace Deteriorated Driveway (50): Replace Deteriorated Driveway (50): Replace Failing Battery DSN82 (50): Replace Failing Battery DSN82 (50): Upgrade Substation Lighting D (50): Upgrade Substation Lighting D (50): LED Lighting Upgrades DSN8201 (50): LED Lighting Upgrades DSN8201 (40): LED Lighting Upgrades DSN8201 (40): LED Lighting Upgrades DSN8201 (50): LED Lighting Upgrades DSN8202 (50): LED Lighting Upgrades DSN8202 (50): LED Lighting Upgrades DSN8202 (50): LED Lighting Upgrades DSN8202 (50): Install A/C Unit & Hydrogen D Refurbish Switchgear Roof Refurbish Switchgear Roof (30): LED Lighting Upgrades DSN8204 (30): LED Lighting Upgrades DSN8204 Replace Failed 3A12-1W Reactors & Replace Failed 3A12-1W Reactors & (30): Replace Deteriorated Driveway (30): Replace Deteriorated Driveway Replacement of low side mobile conn Replacement of low side mobile conn (30): Rebuild Failing 23-1X Load Ta (30): Rebuild Failing 23-1X Load Ta (30): Rebuild Failing 23-2X Load Ta (30): Rebuild Failing 23-2X Load Ta (30): Rebuild Failing 44-1X Load Ta (30): Rebuild Failing 44-1X Load Ta (30): Rebuild Failing 44-2X Load Ta (30): Rebuild Failing 44-2X Load Ta (30): Upgrade Lighting DSN92021 (30): Upgrade Lighting DSN92021 Prospect St 22E Upgrade Lighting Prospect St 22E Upgrade Lighting (30): Install Battery Monitoring Sy Todd 30L Install A/C and Hydrogen Todd 30L Install A/C and Hydrogen (30): Replace Deteriorated Fence DS (30): Replace Deteriorated Fence DS Plumtree 30G LED Lighting Upgra Plumtree 30G LED Lighting Upgra (30): Install Battery Monitor DSN92 (30): Install Shed DSN92057 (30): Install Shed DSN92058 (30): LED Lighting Upgrades DSN9206 (30): LED Lighting Upgrades DSN9206 (30): Replace Failing 14S-1H,14S-2H Lakeview 31A Replace 31A-1X and 31A Lakeview 31A Replace 31A-1X and 31A (50): Replace 12F-6X Low Side Arres (50): Replace 12F-6X Low Side Arres (30): Rebuild Failed 12F-6X Load Ta (30): Rebuild Failed 12F-6X Load Ta VanDyke12 Rplc Faild 1215-2k-2 Vacu VanDyke12 Rplc Faild 1215-2k-2 Vacu (40): Replace Failed 27H-1X3-4 Swit (40): Replace Failed 27H-1X3-4 Swit (30): Replace Failed 14A-1H Potenti (30): Replace Failed 14A-1H Potenti NORWALK 9S - REPLACE FAILED ARRESTE NORWALK 9S - REPLACE FAILED ARRESTE MYSTIC 13K - REPLACE FAILED A/C UNI MYSTIC 13K - REPLACE FAILED A/C UNI EAST BANTAM 19U-RPLC FAILED SWGR W/ EAST BANTAM 19U-RPLC FAILED SWGR W/ (50): Flax Hill 24A-3X low side Arr (50): Flax Hill 24A-3X low side Arr Replace Failed Relay Replace Failed Relay (50): Battery Charger DSQ62025 (50): Battery Charger DSQ62025 Replace Failed A/C Unit Replace Failed A/C Unit (40): Refinish the 4.8 kV switchgea (40): Refinish the 4.8 kV switchgea (40): Replace failed 11B61 3ph regu (40): Replace failed 11B61 3ph regu (50): Miscellaneous replacement of (50): Miscellaneous replacement of (50): Replace the failed 9A-3X1-4 m (50): Replace the failed 9A-3X1-4 m (50): Replace failed 4A-10T-6Switch long_description Get Tax Credit-Donation-Chandler Get Tax Credit-Donation-Chandler Get Tax Credit-Donation-Chandler DOST0011OPSNTRELEXPENSES11 DRCM0011OPSNTRELEXPENSES11 PRE- CHECKS TO THE CONTROLS AS WELL AS OTHER CHECKLIST ITEMS THAT MAY NEED TO BE PERFORMED BY THE ELECTRIC MAINTENANCE DEPARTMENT BASE RADIO INSTALLATION DSCADA PROGRAM Set up the controls in DSCADA enabling the SOC operators to communicate and perform switching, etc. ASSUME CHARGES FOR THE REPLACEMENT OF THE FAILED ARI CONDITIONING UNIT. ASSUME CHARGES FOR THE REPLACEMENT OF THE FAILED ARI CONDITIONING UNIT. REPLACE AND RELOCATE POSITRON TELECOM EQUIP . BRANFORD 11J -__________________________________DWS The disconnects will be installed on the 23-kV #1 bus and 23-kV #3 bus. NORTH BLOOMFIELD 2A SAFETY SWITCHES RPL EXISTING (1) 15KA XFMR NEW FUSED SAFETY SWITCH WILL NEED TO BE INSTALLED AS PART OF THIS EFFORT. TRIANGLE 11A SHUNOCK 32P - INSTALL TRANSDUCERS _________________________________EG Westbrook 20S - Replace Failed 20S-1X Low Side Arresters Westbrook 20S - Replace Failed 20S-1X Low Side Arresters ASSUME CHARGES FOR THE REBUILD OF THE FAILED SPARE BREAKER. _________________________EG REPLACE FAILING ANNUNCIATOR ___________________________CIR REPLACE FAILING ANNUNCIATOR ___________________________CIR DSHK0011OPSNTRELEXPENSES11 DSIP0011OPSNTRELEXPENSES11 Replace Failing Battery & Charger Replace Failing Battery & Charger Install Battery Monitor - Torrington Terminal 8A Install Battery Monitor - Torrington Terminal 8A Replace Failed 12F42 Arresters Replace Failed 12F42 Arresters Replace Failing A/C Unit DSN03008 Replace Failing A/C Unit DSN03008 Upgrade A/C Unit, Install Hydrogen Monitor & Fire Alarm Install A/C Unit, Hydrogen Monitor & Fire Alarm Install A/C Unit, Hydrogen Monitor & Fire Alarm DSN03011. Mianus 16Q Install A/C Unit, Hydrogen Monitor & Fire Alarm DSN03011. Mianus 16Q Install A/C Unit, Hydrogen Monitor & Fire Alarm DSN03013 Tomac 12H Install A/C Unit, Hydrogen Monitor & Fire Alarm DSN03013 Tomac 12H Install A/C Unit, Hydrogen Monitor & Fire Alarm DSN03014 Cos Cob 11R Install A/C Unit, Hydrogen Monitor & Fire Alarm DSN03014 Cos Cob 11R Install A/C Unit, Hydrogen Monitor & Fire Alarm DSN03015 North Greenwich 27K Install A/C Unit, Hydrogen Monitor & Fire Alarm DSN03015 North Greenwich 27K Install A/C Unit, Hydrogen Monitor & Fire Alarm DSN03016 Newtown 12M Install A/C Unit, Hydrogen Monitor & Fire Alarm DSN03016 Newtown 12M Install A/C Unit, Hydrogen Monitor & Fire Alarm DSN03017 Rocky River 12Y Install A/C Unit, Hydrogen Monitor & Fire Alarm DSN03018 Shepaug 13A Install A/C Unit, Hydrogen Monitor & Fire Alarm DSN03018 Shepaug 13A Install A/C Unit, Hydrogen Monitor & Fire Alarm DSN03019. Middle River 28M Install A/C Unit, Hydrogen Monitor & Fire Alarm DSN03019. Middle River 28M Install A/C Unit, Hydrogen Monitor & Fire Alarm DSN03020. Ridgefield 22N Install A/C Unit, Hydrogen Monitor & Fire Alarm DSN03020. Ridgefield 22N Install A/C Unit, Hydrogen Monitor & Fire Alarm DSN03021. Christian 31C Install A/C Unit, Hydrogen Monitor & Fire Alarm DSN03021. Christian 31C Install A/C Unit, Hydrogen Monitor & Fire Alarm DSN03022. Beacon Falls 11N Install A/C Unit, Hydrogen Monitor & Fire Alarm DSN03023. Triangle 11A Install A/C Unit, Hydrogen Monitor & Fire Alarm DSN03023. Triangle 11A Install Ground Studs on the 4.8kV Switchgear. Bristol 11K Install Ground Studs on the 4.8kV Switchgear. Bristol 11K Replace Failing 14R66-19U-1R-3 Switch Replace Failing 14R66-19U-1R-3 Switch Install Battery Monitor see also DSQ62006 Install Primary Battery Monitor REPLACEMENT OF THE 115 KV HOLLOW CORE INSULATORS ON SWITCHES 21M-1X1-4, 21M-2X1-4, AND 21M-3X1-4 (MOBILE POSITION) ___________________________________________EG REPLACEMENT OF THE 115 KV HOLLOW CORE INSULATORS ON SWITCHES 21M-1X1-4, 21M-2X1-4, AND 21M-3X1-4 (MOBILE POSITION) ___________________________________________EG INSTALLATION OF AN OIL CONTAINMENT BERM PER SPCC REGULATIONS ___________________________________________EG INSTALL A 25 KV SINGLE-PHASE CABLE AND FUSED CUTOUT TO STATION SERVICE TRANSFORMER INSTALL A 3 INCH STEEL CONDUIT AND 25 KV CABLE FROM THE YARD PAD-MOUNTED 15 MVA STEP-DOWN XFMR REPLACE THE FAILING 1X AND 2X LTC CONTROL RELAYS ___________________________________________EZ REPLACE THE FAILING 1X AND 2X LTC CONTROL RELAYS ___________________________________________EZ RETIRE SUBSTATION -ALL OF THE EQUIPMENT INCL- UDING FENCE AND TRAPROCK SHOULD BE REMOVED AND SCRAPPED - UPON COMPLETION THE SITE WILL BE TURNED OVER TO REAL ESTATE TO SELL INSTALLATION OF A REMOTE RACKING UNIT FOR SWITCHGEAR BREAKERS __________________________________________CMK BUILD A NEW MOBILE BATTERY TRAILER #16901 __________________________________________JJD REMOVE ALL UNUSED FOUNDATIONS SIX INCHES BELOW GRADE ___________________________________________EG REPLACEMENT OF THE FAILING SMD-20 CUTOUTS ON THE 12-3S1-1 AND 12-4S1-1 __________________________________________CMK REPLACEMENT OF THE FAILING SMD-20 CUTOUTS ON THE 12-3S1-1 AND 12-4S1-1 __________________________________________CMK BUILD A NEW MOBILE BATTER TRAILER #1146364 __________________________________________JJD REMOVE THE FENCE, FOUNDATIONS & TRAP-ROCK, THE AREA WILL BE LOAMED AND SEEDED TO RETURN IT TO ITS ORIGINAL STATE. THE EQUIPMENT HAS BEEN REMOVED AND THE SITE WILL BE SOLD REPLACE THE FAILING 21L-1X ANNUNCIATOR __________________________________________CMK REPLACE THE FAILING 21L-1X ANNUNCIATOR __________________________________________CMK REPLACEMENT OF THE INADEQUATE LIGHTING FIXTURES ___________________________________________EZ REPLACEMENT OF THE INADEQUATE LIGHTING FIXTURES ___________________________________________EZ REPLACEMENT OF THE INADEQUATE LIGHTING FIXTURES ___________________________________________EZ REPLACEMENT OF THE INADEQUATE LIGHTING FIXTURES ___________________________________________EZ INSTALL NEW RELAY RELAY INSTALL NEW RELAY RELAY Install equipment for network communications pilot. Replacement of the deteriorated fence (appr 100 ft) and gate Replacement of the deteriorated fence (appr 100 ft) and gate Beacon Falls 11N - Replace the failing auto-throwover switch. Rebuild two OCB's. 32G-19T-2 and 32G-30T-2. Rebuild two OCB's. 32G-19T-2 and 32G-30T-2. Noera 13H - Upgrade the DSCADA equipment to transition the DSCADA system over to the fiber SONET ring. Carmel Hill 11S - Install an air conditioning unit. Middle River 28M - Install new vacuum breakers in the 28M11 & 28M12 feeder positions. Chippen Hill 15U - Replace the failing 15U-2X Load Tap Changer control relay. Chippen Hill 15U - Replace the failing 15U-2X Load Tap Changer control relay. Refurbishment of the switchgear enclosure. Refurbishment of the switchgear enclosure. Installation of a hand rail and yard lights Replacement of the control house asbestos tiled flooring Replacement of the control house asbestos tiled flooring Card 11F - Rebuild the distribution control house. Replace entire roof and rebuild structure to support new roof, Install new roof and replace rafters, Install new plywood sheathed 2 1/2 R12 foam insulation to all exterior walls or building, replace and rebuild fascia and soffit, Install Certainteed Iron Max Vertical siding. Card 11F - Rebuild the distribution control house. Replace entire roof and rebuild structure to support new roof, Install new roof and replace rafters, Install new plywood sheathed 2 1/2 R12 foam insulation to all exterior walls or building, replace and rebuild fascia and soffit, Install Certainteed Iron Max Vertical siding. Install new Driveways Fry Brook 13B - Install an air conditioning unit Tunnel 12S - Install an air condiitoning unit Cos Cob 11R - Replace the failing 11R-1X high and low side arresters Cos Cob 11R - Replace the failing 11R-1X high and low side arresters Prospect Street 22E - REfurbish the switchgear enclosure - ROOF REPLACEMENT Byram 13C - Refurbish the switchgear enclosure Cedar Heights 4R - Refurbish the switchgear enclosure Cedar Heights 4R - Refurbish the switchgear enclosure Boulevard 45 - Replace the failing battery and charger Boulevard 45 - Replace the failing battery and charger Peaceable 12N - Refurbish the switchgear enclosure Southington 4C - Refurbish the switchgear enclosure Bates Rock 21K - Refurbish the switchgear enclosure Install A/C Unit and Hydrogen detection. West Brookfield 14H Install A/C Unit and Hydrogen detection. West Brookfield 14H Enfield 12C - REplace the deteriorated fence Enfield 12C - REplace the deteriorated fence Scitico 27H Replace A/C Unit Scitico 27H Replace A/C Unit A/C Unit A/C Unit Windsor Locks 14K Replace A/C Unit Windsor Locks 14K Replace A/C Unit Replace A/C Unit Replace A/C Unit Replace A/C Unit Replace A/C Unit Add Landscaping Rocky Hill 3R - Replace failing A/C Unit and Install Hydrogen Detection System Rocky Hill 3R - Replace failing A/C Unit and Install Hydrogen Detection System Flax Hill 24A - Activate 24A19 Feeder Position Replace Deteriorated Driveway Replace Deteriorated Driveway Replace Failing Battery Replace Failing Battery Glenbrook 1K - Replace existing lightig with LED lights. Glenbrook 1K - Replace existing lightig with LED lights. Bulls Bridge 11M - Replace lighting with LED lights Bulls Bridge 11M - Replace lighting with LED lights Cedar Heights 4R - Replace existing lightig with LED lights. Cedar Heights 4R - Replace existing lightig with LED lights. Waterside 22M - Replace existing lightig with LED lights. Waterside 22M - Replace existing lightig with LED lights. Peaceable 12N - Replace existing lightig with LED lights. Peaceable 12N - Replace existing lightig with LED lights. Install A/C Unit & Hydrogen Detection Refurbish Switchgear Roof Refurbish Switchgear Roof LED Lighting Upgrades LED Lighting Upgrades Replace Failed 3A12-1W Reactors & Arresters Replace Failed 3A12-1W Reactors & Arresters Replace Deteriorated Driveway Replace Deteriorated Driveway Replacement of low side mobile connection pole and cable Replacement of low side mobile connection pole and cable Rebuild Failing 23-1X Load Tap Changer (LTC) Rebuild Failing 23-1X Load Tap Changer (LTC) Rebuild Failing 23-2X Load Tap Changer (LTC) DSN92010 Rebuild Failing 23-2X Load Tap Changer (LTC) DSN92010 Rebuild Failing 44-1X Load Tap Changer (LTC) DSN92012 Rebuild Failing 44-1X Load Tap Changer (LTC) DSN92012 Rebuild Failing 44-2X Load Tap Changer (LTC) DSN92013 Rebuild Failing 44-2X Load Tap Changer (LTC) DSN92013 Upgrade Lighting Upgrade Lighting Upgrade Lighting DSN92022. Upgrade Lighting DSN92022. Install Battery Monitoring System Install A/C Unit and Hydrogen/Fire Monitor. Todd 30L Install A/C Unit and Hydrogen/Fire Monitor. Todd 30L Replace Deteriorated Fence Replace Deteriorated Fence LED Lighting Upgrades. Plumtree 30G LED Lighting Upgrades. Plumtree 30G Install Battery Monitor Install Shed Install Shed DSN92058 - updated location to E.Hartford 12-2019 LED Lighting Upgrades DSN92061 LED Lighting Upgrades DSN92061 Replace Failing 14S-1H,14S-2H &14S-3H Potential Transformers DSN92067 Replace Failed 31A-1X and 31A-2X Ion Meters Replace Failed 31A-1X and 31A-2X Ion Meters Replace 12F-6X Low Side Arresters Replace 12F-6X Low Side Arresters Rebuild Failed 12F-6X Load Tap Changer (LTC) Rebuild Failed 12F-6X Load Tap Changer (LTC) Replace Failed 1215-2k-2 Vacuum Switch and Control. Van Dyke 12 Replace Failed 1215-2k-2 Vacuum Switch and Control. Van Dyke 12 Replace Failed 27H-1X3-4 Switch Replace Failed 27H-1X3-4 Switch Replace Failed 14A-1H Potential Transformers (PTs) DSQ03030 Replace Failed 14A-1H Potential Transformers (PTs) DSQ03030 REPLACEMENT OF THE FAILED 9S43 FEEDER ARRESTER. NORWALK 9S - ___________________________________________EG REPLACEMENT OF THE FAILED 9S43 FEEDER ARRESTER. NORWALK 9S - ___________________________________________EG REPLACEMENT OF THE FAILED A/C UNIT IN THE CONTROL HOUSE ___________________________________________EG REPLACEMENT OF THE FAILED A/C UNIT IN THE CONTROL HOUSE ___________________________________________EG INSTALL A NEW POLE TOP RECLOSER AND CONTROL TO REPLACE/BYPASS THE 19U1 SWITCHGEAR FEEDER POSITION_- ONLY INSTALLING THE RECLOSER WORK ORDER_________________________________EZ INSTALL A NEW POLE TOP RECLOSER AND CONTROL TO REPLACE/BYPASS THE 19U1 SWITCHGEAR FEEDER POSITION_- ONLY INSTALLING THE RECLOSER WORK ORDER_________________________________EZ Flax Hill 24A - REplace the failed 24A-3X low side arresters. Flax Hill 24A - REplace the failed 24A-3X low side arresters. Norwalk 9S - Replace the failed 9S-45 SEL-351S relay. Norwalk 9S - Replace the failed 9S-45 SEL-351S relay. Carmel Hill 11S - Replace the failed battery charger. Carmel Hill 11S - Replace the failed battery charger. Card 11F - Replace the failed air conditioning unit. Card 11F - Replace the failed air conditioning unit. Refinish the 4.8 kV switchgear enclosure Refinish the 4.8 kV switchgear enclosure Replace failed 11B61 3ph regulator Replace failed 11B61 3ph regulator Cos Cob 11R - Replace the failed HMI system Cos Cob 11R - Replace the failed HMI system Falls Village 9A - Replace the failed 9A-3X1-4 mobile disconnect switch Falls Village 9A - Replace the failed 9A-3X1-4 mobile disconnect switch Newington 4A - Replace the failed 4A-10T-6 disconnect switch. cost_element_group Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 ferc_account 4261T0 236140 408210 582000 592130 594000 107010 107010 107010 108030 107010 107010 107010 107010 108030 107010 107010 107010 108030 582090 582240 107010 108030 107010 108030 107010 108030 107010 108030 107010 107010 108030 107010 108030 107010 107010 108030 108030 107010 108030 107010 107010 108030 107010 107010 108030 107010 108030 107010 108030 108030 107010 108030 107010 108030 108030 107010 107010 107010 107010 108030 107010 107010 107010 108030 108030 107010 107010 108030 108030 107010 107010 108030 107010 108030 107010 108030 107010 108030 108030 107010 107010 107010 108030 107010 107010 108030 107010 107010 107010 107010 108030 107010 108030 107010 107010 108030 107010 108030 107010 107010 107010 107010 108030 107010 107010 108030 107010 107010 108030 107010 107010 107010 108030 107010 107010 108030 108030 107010 107010 108030 107010 108030 108030 107010 107010 108030 107010 108030 107010 107010 108030 107010 107010 108030 107010 108030 108030 107010 107010 108030 108030 107010 107010 108030 107010 107010 108030 107010 108030 107010 108030 108030 107010 107010 108030 107010 108030 107010 108030 107010 108030 107010 108030 107010 108030 107010 108030 107010 108030 107010 107010 108030 107010 108030 107010 107010 107010 107010 108030 107010 108030 107010 108030 107010 107010 108030 108030 107010 107010 108030 108030 107010 107010 108030 107010 108030 107010 108030 108030 107010 107010 108030 107010 108030 107010 108030 107010 108030 107010 108030 108030 107010 107010 108030 108030 percent 1 1 1 1 1 1 1 1 0.6355 0.3645 1 1 1 1 0.05350515 0.94649485 1 0.8 0.2 1 1 0.80814917 0.19185083 0.8 0.2 0.8 0.2 0.8 0.2 1 1 0.2 0.8 0.2 0.8 0.8 0.2 0.2 0.8 0.2 0.8 1 0.2 0.8 0.8 0.2 0.8 0.2 0.8 0.2 1 0.8 0.2 0.8 0.2 0.2 0.8 1 1 0.8 0.2 1 1 0.8 0.2 1 1 1 1 0.2 0.8 1 1 0.8 0.2 0.8 0.2 0.8 0.2 0.2 0.8 1 0.80002493 0.19997507 1 0.80000058 0.19999942 1 1 1 0.90969804 0.09030196 0.8 0.2 1 0.8 0.2 0.80049278 0.19950722 1 1 1 0.8651289 0.1348711 1 1 0.2 0.8 0.85028162 0.14971838 1 1 1 0.2 0.8 0.79514401 0.20485599 0.11843155 0.88156845 0.85658915 0.14341085 0.85658915 0.14341085 0.125 0.875 0.85658915 0.14341085 1 0.20000027 0.79999973 1 0.25 0.75 0.95471954 0.04528046 0.82293176 0.17706824 0.21466772 0.78533228 0.77192982 0.22807018 0.22807018 0.77192982 0.83252776 0.16747224 1 0.8 0.2 0.8 0.2 0.8 0.2 0.13962104 0.86037896 0.8 0.2 0.8 0.2 0.8 0.2 0.8 0.2 0.8 0.2 0.8 0.2 0.8 0.2 1 0.2 0.8 0.80000002 0.19999998 0.8 0.2 1 1 1 0.8 0.2 1 0.2 0.8 0.2 0.8 0.8 0.2 0.2 0.8 0.8 0.2 0.2 0.8 0.8 0.2 0.8 0.2 0.8 0.2 0.19661017 0.80338983 0.73764259 0.26235741 0.76571429 0.23428571 0.80081517 0.19918483 0.99753086 0.00246914 0.8 0.2 0.19063545 0.80936455 0.83760322 0.16239678 0.2Page 847 of 867
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued October 23, 2026 RRU-159 Attachment 8 Page 847 of 867 work_order_number DSQ72046 DSQ72048 DSQ72050 DSQ72050 DSQ72052 DSQ72052 DSQ72053 DSQ72053 DSQ82004 DSQ82004 DSQ82005 DSQ82005 DSQ82006 DSQ82006 DSQ82008 DSQ82008 DSQ82009 DSQ82009 DSQ82011 DSQ82011 DSQ82025 DSQ82025 DSQ82028 DSQ82028 DSQ82029 DSQ82029 DSQ82030 DSQ82030 DSQ82031 DSQ82031 DSQ82035 DSQ82035 DSQ82045 DSQ82045 DSQ82047 DSQ82047 DSQ92004 DSQ92004 DSQ92007 DSQ92007 DSQ92009 DSQ92009 DSQ92011 DSQ92011 DSQ92014 DSQ92014 DSQ92017 DSQ92017 DSQ92023 DSQ92023 DSQ92040 DSQ92040 description (50): Replace failed 4A-10T-6Switch (50): Replace 14H-4x1-4 motor opera (50): Replace Failed 67 Relays on t (50): Replace Failed 67 Relays on t (30): Replace Failed Load Tap Chang (30): Replace Failed Load Tap Chang (50): Replace Failed 30R-4X1-4 Swit (50): Replace Failed 30R-4X1-4 Swit (50): Replace Failed 1G01 DPAC Rela (50): Replace Failed 1G01 DPAC Rela Replace Failed Heater Replace Failed Heater (50): Replace Failed 13C-2X High an (50): Replace Failed 13C-2X High an Replacement of failed Newington 4AReplacement of failed Newington 4AWeston 21M - Replace 4 Failed GE IA Weston 21M - Replace 4 Failed GE IA (50): Replace Failed Battery DSQ820 (50): Replace Failed Battery DSQ820 (40): Replace Failed A/C Unit DSQ82 (40): Replace Failed A/C Unit DSQ82 (50): Replace Failed SWGR A/C Unit (50): Replace Failed SWGR A/C Unit Rebuild Failed 1A-5X Load Tap Chang Rebuild Failed 1A-5X Load Tap Chang (50): Replace Failed A/C Unit DSQ82 (50): Replace Failed A/C Unit DSQ82 (50): Replace Failing A/C Unit and (50): Replace Failing A/C Unit and (60): Replace Failed 23Q-1T-6 Motor (60): Replace Failed 23Q-1T-6 Motor (50): Replace Failed High & Low Sid (50): Replace Failed High & Low Sid (60): Replace Failed 21J-10T-6 Swit (60): Replace Failed 21J-10T-6 Swit (30): Replace Failed 29J-1X3-4 Swi (30): Replace Failed 29J-1X3-4 Swi Lake View 31A Rplc fail 31A-3X ION Lake View 31A Rplc fail 31A-3X ION Van Dyke 12 - Replace Failed Auto-T Van Dyke 12 - Replace Failed Auto-T (30): Replace Failed Battery DSQ920 (30): Replace Failed Battery DSQ920 (30): Replace Failed Auto Throwover (30): Replace Failed Auto Throwover Replace failed water heater Replace failed water heater (30): Replace Failed 2B-2X Load Tap (30): Replace Failed 2B-2X Load Tap (30): Replace Failed 1C-2H Potentia (30): Replace Failed 1C-2H Potentia DSRTACLS DSSP0011 DSTR0011 DSYM0011 DV190E11 DV200E11 DV204E11 DV206E11 DV209E11 DV220E11 DV324E11 DV390E11 DV450E11 DV451E11 DV496E11 DV528E11 DV656E11 DVINC011 EAST4801 ECBL2025 EDREM011 EEC23001 EEC24001 EEC25001 EEIBE011 EEIBR011 EHAMP001 RTAC LINE SENSORS DSCADA Dist Sta Care and Support Dist Sta Trouble Response Dispatch - System CA AWO CLP-1.90S STOCK CA AWO CLP$2.00S STOCK CA AWO CLP$2.04S STOCK CA AWO CLP$2.06S STOCK CA AWO CLP$2.09S STOCK CA AWO CLP$2.20S STOCK CA AWO CLP$3.24S STOCK CA AWO CLP3.90%S STOCK CA AWO CLP4.50%S STOCK CA AWO CLP4.50%S STOCK CA AWO CLP4.96%S STOCK CA AWO CLP5.28%S STOCK CA AWO CLP6.56%S STOCK Dividend Interest Income 4.8kV Grounding Eastern 2025 Eastern CT Cable Educational Reimbursements Eversource Energy Ctr May 2023 Eversource Energy Center 2024 2025 Energy Center EE Incr Bid Recover Exp Amortizatio EE Incr Bid Recover Rev Amortizatio E Hampton AWC #66 EHFTTE22 EHTWR1DC EIAR0011 EIDR0011 EIIN0011 EKCG2411 EKONKSR1 ELSP0211 EMMR0011 EMPP0011 ENFLDAW1 ENFLDMS2 East Hampton Tools & Equipment E HAMPTON TOWER REPLACEMENT EIA GAS Delivery Rebate EIA INT RATE BUY-DN LOANS-REGLTORY EIA DG INCENTIVE income 2024 CG EK Disconnects CT MTR DSCADA Sys Res Ekonk Electric Supply Employment Claims Emergency Preparedness SITE #58 ENFIELD AREA WORK CENTER Enfield 2 Main Street long_description Newington 4A - Replace the failed 4A-10T-6 disconnect switch. West Brookfield 14H - Replace the 14H-4X1-4 motor operated disconnect switch Prospect 22E - Replace the failed 11R51 feeder relays Prospect 22E - Replace the failed 11R51 feeder relays Load Tap Changer (LTC) Load Tap Changer (LTC) Green Hill 30R - Replace the failed 30R-4X1-4 MOD switch for mobile transformer position Green Hill 30R - Replace the failed 30R-4X1-4 MOD switch for mobile transformer position Replace Failed 1G01 DPAC Relay Replace Failed 1G01 DPAC Relay Replace Failed Heater Replace Failed Heater Replace Failed 13C-2X High and Low Side Arresters Replace Failed 13C-2X High and Low Side Arresters Newington 4A - Replace the failed 4A-3H potential Transformers Newington 4A - Replace the failed 4A-3H potential Transformers Weston 21M - Replace the failed GE IAC relays Weston 21M - Replace the failed GE IAC relays Sandy Hook 37F - Replace the failed battery Sandy Hook 37F - Replace the failed battery Replace Failed A/C Unit Replace Failed A/C Unit Replace Failed SWGR A/C Unit Replace Failed SWGR A/C Unit Rebuild Failed 1A-5X Load Tap Changer (LTC) Rebuild Failed 1A-5X Load Tap Changer (LTC) Replace Failed A/C Unit Replace Failed A/C Unit Replace Failing A/C Unit and Install Hydrogen Detection Replace Failing A/C Unit and Install Hydrogen Detection Thompson 23Q - Replace the failed 23Q-1T-6 motor operated disconnect switch Thompson 23Q - Replace the failed 23Q-1T-6 motor operated disconnect switch Replace Failed High & Low Side 14R-1X Arresters Replace Failed High & Low Side 14R-1X Arresters Replace Failed 21J-10T-6 Switch Replace Failed 21J-10T-6 Switch Replace Failed 29J-1X3-4 Switches Replace Failed 29J-1X3-4 Switches Lake View 31A - Replace Failed 31A-3X ION meter Lake View 31A - Replace Failed 31A-3X ION meter Replace Failed Auto-Throwover Switch Replace Failed Auto-Throwover Switch Replace Failed Battery Replace Failed Battery Replace Failed Auto Throwover Replace Failed Auto Throwover Replace failed water heater Replace failed water heater Replace Failed 2B-2X Load Tap Changer Control Replace Failed 2B-2X Load Tap Changer Control Replace Failed 1C-2H Potential Transformers (PTs) Replace Failed 1C-2H Potential Transformers (PTs) planning to have 600 sensors on the system we will need to plan to have 12 RTACS. 6 RTACS for the Production DSCADA System and 6 RTACS for the Disaster Recovery System. We have 4 right now. Will need to order 8 more. The stock code is 458864, $2,850 per RTAC. Total for 8 RTACS: $22,800. DSSP0011OPSNTRELEXPENSES11 DSTR0011OPSNTRELEXPENSES11 DSYM0011OPSNTRELEXPENSES11 CA AWO CLP-1.90S STOCK CA AWO CLP$2.00S STOCK CA AWO CLP$2.04S STOCK CA AWO CLP$2.06S STOCK CA AWO CLP$2.09S STOCK CA AWO CLP$2.20S STOCK CA AWO CLP$3.24S STOCK CA AWO CLP3.90%S STOCK CA AWO CLP4.50%S STOCK 1951 CA AWO CLP4.50%S STOCK 1963 CA AWO CLP4.96%S STOCK CA AWO CLP5.28%S STOCK CA AWO CLP6.56%S STOCK DVINC011NT011 4.8KV DELTA GROUNDING Eastern Division 2025 CABLE FOR EASTERN CT EDREM011EMPBENPAY11 This AWO is being set up to pay the May 2023 Payment for the Eversource Energy center agreement with UCONN. This AWO is being set up to pay the May 2024 Payment for the Eversource Energy center agreement with UCONN. This AWO is being set up to pay the 2025 Payments for the Eversource Energy center agreement with UCONN. EE Incr Bid Recover Exp Amortization-Rose EE Incr Bid Recover Rev Amortization-Rose E Hampton AWC #66-Rose cost_element_group Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 ferc_account 107010 107010 107010 108030 108030 107010 108030 107010 107010 108030 108030 107010 107010 108030 108030 107010 108030 107010 108030 107010 107010 108030 108030 107010 108030 107010 107010 108030 108030 107010 107010 108030 108030 107010 108030 107010 108030 107010 107010 108030 108030 107010 108030 107010 107010 108030 107010 108030 107010 108030 108030 107010 percent 0.8 1 0.83116883 0.16883117 0.2 0.8 0.12094441 0.87905559 0.81118881 0.18881119 0.2 0.8 0.78059097 0.21940903 0.13449273 0.86550727 0.07284768 0.92715232 0.15506683 0.84493317 0.81632955 0.18367045 0.21052632 0.78947368 0.23395089 0.76604911 0.78632479 0.21367521 0.15121951 0.84878049 0.87770276 0.12229724 0.09024764 0.90975236 0.14846773 0.85153227 0.16266356 0.83733644 0.85406699 0.14593301 0.21944444 0.78055556 0.14634359 0.85365641 0.8 0.2 0.8 0.2 0.8 0.2 0.2 0.8 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 107010 582280 582250 581440 437010 437025 437030 437050 437060 437040 437070 437410 437420 437430 437440 437450 437460 419000 107010 107010 920000 107010 107010 107010 555000 555000 228450 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 107010 107010 908000 908000 908000 107010 107010 2421H0 920000 580000 228450 228450 1 1 1 1 1 1 1 1 1 1 1 1 Labor-L01 Labor-L01 Labor-L01 Labor-L01 107010 580000 594240 593150 1 1 1 1 Labor-L01 107010 1 Labor-L01 107010 1 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 107010 107010 107010 107010 107010 107010 107010 107010 107010 107010 107010 107010 1 1 1 1 1 1 1 1 1 1 1 1 Labor-L01 107010 1 Labor-L01 107010 1 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 107010 107010 107010 107010 107010 107010 1 1 1 1 1 1 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 107010 107010 107010 107010 107010 107010 107010 1 1 1 1 1 1 1 Labor-L01 107010 1 Labor-L01 107010 1 Labor-L01 Labor-L01 107010 107010 1 1 Labor-L01 Labor-L01 Labor-L01 107010 107010 107010 1 1 1 Labor-L01 Labor-L01 Labor-L01 107010 107010 107010 1 1 1 Labor-L01 Labor-L01 Labor-L01 107010 107010 107010 1 1 1 Labor-L01 Labor-L01 Labor-L01 Labor-L01 107010 107010 107010 107010 1 1 1 1 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 107010 154000 107ES0 107ES0 594260 593100 593100 593100 593100 593100 593100 593100 920000 107010 584000 593000 593000 1 1 1 1 1 1 1 1 1 1 1 1 1 0.7999 0.1 0.1001 1 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 107010 107010 107010 107010 107010 107010 107010 107010 107010 108030 107010 108030 108030 107010 108030 107010 107010 108030 1 1 1 1 1 1 1 1 0.95237558 0.04762442 0.90907668 0.09092332 0.07894737 0.92105263 0.14 0.86 0.93632959 0.06367041 Labor-L01 107010 0.91173412 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 108030 107010 107010 108030 107010 108030 107010 108030 107010 108030 107010 107010 0.08826588 1 0.9530432 0.0469568 0.92716684 0.07283316 0.94117647 0.05882353 0.95280817 0.04719183 1 1 This work order is to purchase a power reel for the apprentices in East Hampton. The estimated cost is $1,538 per Bridget Bentley's e-mail dated 1/25/2022. Per Dan Chambrello's e-mail dated 10-5-2022, there will be $85K split evenly between East Hampton, Newtown, Madison, and Hartford for craft school tools and equipment. EAST HAMPTON TOWER REPLACEMENT - CL&P EIAR0011ETT2013 EIDR0011ETT2013 This work order captures the ISO revenues to be sent to customers. Forward Capacity (Wholesale Marketing) - sell capacity on the market for customers. 2024 CG EK Disconnects CT MTR DSCADA System Resiliency EKONK Electric Supply Employment Claims EMPP0011OPSNTRELEXPENSES11 REMEDIATION SITE #58 ENFIELD AREA WORK CENTER Enfield 2 Main Street - Atashian, Austin This work order was created to accept the charges for the Field Engineering / Field Communication curriculum development project for Field Training. ENGCOMCT EPLD0011 ERRU0011 ERRX0011 Field Engineering / Communication Engineering/Planning/Design Envir Resp/Remediation - Undergrnd Envir Resp/Remediation - Overhead ES_001CS CHESHIRE AWC ES 140 FT SST ES_003LH LONG HILL SBA 280 FT ES_004SM ES_005PR ES_008MA ES_009WB ES_010GH ES_012BS ES_018CO ES_022CP ES_025NS ES_026SG ES_028CL ES_033WH ES_004 SOUTH MOUNTAIN VOICE RADIO ES-005 PROSPECT RS ES 150 FT ES_008 MADISON AWC VOICE RADIO ES_009 WESTBROOK STATE POLICE TRP F GooseHillRS_ES_280ft_SST ES_012 BERLIN SOUTH VOICE RADIO ES-018 COLCHESTER CSP 320FT Chapel Hill RS North Stonington III SBA Stonington SBA ES-028 COLEBROOK LCD ES-033 WEST HARTLAND NESM ES_038TC TALCOTTRS ES 185FT SST ES_043TL TOLLAND AWC ES 95 FT SST ES_045UN ES_047CV ES_051TH ES_055WL ES_056EK ES_058GR UNIONRS ES 180 FT SST Coventry CCI ES-051 THOMPSON CSP 180 FT Willimantic_SBA_SST ES_056 EKONK ES_058 GREENWICH VOICE RADIO ES_060NO ES_062WI ES_066NW ES_067OX ES_068SO ES_074NM ES_077LI ES_060 NORWALK AWC VOICE RADIO ES_062 WILTON VOICE RADIO ES-066 NEWTOWN AWC ES 180 FT ES-O67 OXFORD CSP ES-068 SOUTHBURY CASSIDY CSP 180FT ES_074 NEW MILFORD RS ES-077 LITCHFIELD TRPL CSP 180FT ES_081SH SHARON LCD SST ES_082CH CHURCH HILL LCD SST The costs will be distributed according to the PAF. CT = 35% = $1,434,017 EMA = 35% = $1,403,598 NH = 20% = $807,924 WMA = 10% = $401,029 EPLD0011OPSNTRELEXPENSES11 ERRU0011OPSNTRELEXPENSES11 ERRX0011OPSNTRELEXPENSES11 CHESHIRE AWC LOC ES-001 VOICE RADIO SET UP LONG HILL SBA LOC ES-001 VOICE RADIO SET UP VOICE RADIO SET UP VOICE RADIO SET UP VOICE RADIO SET UP VOICE RADIO SET UP VOICE RADIO SET UP - GOOSE HILL VOICE RADIO SET UP VOICE RADIO SET UP - COLCHESTER VOICE RADIO SET UP - CHAPEL HILL VOICE RADIO SET UP - NO STONINGTON VOICE RADIO SET UP - STONINGTON VOICE RADIO SET UP VOICE RADIO SET UP TALCOTT RS LOC ES-001 VOICE RADIO SET UP TOLLAND AWC LOC ES-043 VOICE RADIO SET UP UNION LOC ES-045 VOICE RADIO SET UP VOICE RADIO SET UP - COVENTRY VOICE RADIO SET UP VOICE RADIO SET UP - WILLIMANTIC VOICE RADIO SET UP VOICE RADIO SET UP VOICE RADIO SET UP VOICE RADIO SET UP VOICE RADIO SET UP VOICE RADIO SET UP VOICE RADIO SET UP VOICE RADIO SET UP VOICE RADIO SET UP SHARON LOC ES-081 VOICE RADIO SET UP CHURCH HILL LOC ES-082 VOICE RADIO SET UP SALISBURY 21J LOC ES-084 VOICE RADIO SET UP ES_084SL ES_086SS SALISBURY 21J ES NEW ES_086 SOAPSTONE VOICE RADIO ES_090HF ES_106BR ES_127NL HARTFORD AWC ES RT ES_106 BRANFORD VOICE RADIO NEW LONDON AREA WORK CENTER ES_136CA ES_153DL ES_154EH ES_136 CANTON 5R VOICE RADIO ES_153 DANIELSON AWC East HamptonAWC_ES_120ft_SST ES_234FA ES_259ST ES_271EW ES_234 FARMINGTON1C VOICE RADIO ES_295 STAMFORD AWC VOICE RADIO ES_271 EAST WINDSOR AWC VOICE RADIO ES_278KT ES_281ME ES_286RI ES_WFSWH KENT ATC 150FT MP ES-281 MERIDEN COOPER ST ES 60 FT ES-286 RIDGEFIELD 22N ES 85 FT Freight Street Waterbury Warehouse ES0046GR ESPCTE11 ESSB0011 ESSL0011 ESVINX11 ETRE0011 ETRE2311 ETRE2411 ETRE2511 EVGM0011 EVGM2411 EVGM2511 EVTC0011 EXCVT101 EXCVT101 EXCVT101 EXP01141 Voice Radio Site 46 Greenwich CT ELECTRIC EMERGENCY SPARES 11 SS Clearing Blanket CT 11 OH Clearing Blanket CT Positive Detect-Stray-Volt-ESE-Repa Tree Trimming 2023 CT Distribution Tree Trimming 2024 CT Distribution Tree Trimming 2025 CT Distribution Tree Trimming Vegetation Management 2024 CT Veg OM Labor 2025 CT Veg OM Labor Event Sponsorship - Company Funded 2001 CL&P EXCAVATING CONTRACTOR ARE 2001 CL&P EXCAVATING CONTRACTOR ARE 2001 CL&P EXCAVATING CONTRACTOR ARE Expense portion of CD01141 F11WRELY F1411025 F1511011 F1511070 F1511090 F1611010 F1611014 F1611048 F1711013 F1711013 F1711016 F1711016 F1811042 F1811042 F1811065 F1811065 F1811101 F1811101 FREIGHT 11W DIGITAL GRID RELAYS CL&P Backup SOC Newtown Glygol System East Hampton Gate Door Closer Hartford Gate Intercom New London Gate Intercom Cheshire Security Cameras (4) Tolland High Garage Bay Light Myrock Substation Office Fitout Myrock Substation Office Fitout Field Eng Office Fitout (Bldgs) Field Eng Office Fitout (Bldgs) Replace dock leveler pump Replace dock leveler pump Install fluid handling system Install fluid handling system AV Equipment for conf room AV Equipment for conf room F1811102 Newtown EOC Expansion F1811102 F1811144 F1911083 F1911083 F1911107 F1911107 F1911130 F1911130 F1911139 F1911139 F1911140 F1911152 Newtown EOC Expansion Madison Ext Carpet Stair Treads EH Lower Level Breakroom Renovation EH Lower Level Breakroom Renovation Stamford Main Corridor Upgrades Stamford Main Corridor Upgrades New Britain Fan Motor Replacement New Britain Fan Motor Replacement LED Replacement LED Replacement Install new workstations Install card reader FARMINGTON 1C LOC ES-234 VOICE RADIO SET UP HARTFORD AWC LOC ES-090 VOICE RADIO SET UP VOICE RADIO SET UP VOICE RADIO SET UP - NEW LONDON VOICE RADIO SET UP VOICE RADIO SET UP VOICE RADIO SET UP - EAST HAMPTON AWC FARMINGTON 1C LOC ES-234 VOICE RADIO SET UP VOICE RADIO SET UP VOICE RADIO SET UP KENT ATC LOC ES-278 VOICE RADIO SET UP VOICE RADIO SET UP VOICE RADIO SET UP VOICE RADIO SET UP In support of CT Voice Radio Project, WO to track all Engineering, Procurement & Construction for "Site 46" . CT ELECTRIC EMERGENCY SPARES - Savage, Jessica ESSB0011ALLOCCLEARING11 ESSL0011ALLOCCLEARING11 Positive Detect-Stray-Volt-ESE-Repair-Annual-Desg ETRE0011NT011 2023 CT Distribution Tree Trimming-Slossberg 2024 CT Distribution Tree Trimming - Tracey, Emily 2025 CT Distribution Tree Trimming - Tracey, Emily EVGM0011NT011 2024 CT Veg OM Labor - Tracey, Emily 2025 CT Veg OM Labor - Tracey, Emily EVTC0011NT011 WORK ORDER TO COLLECT FOR DISTRIBUTION, CHARGES FROM EXCAVATION CONTRACTS FOR THE 9 CL&P DESIGNATED AREAS - MATERIAL REQUEST # 86884800 AND 15984800 BY D SODERSTROM WORK ORDER TO COLLECT FOR DISTRIBUTION, CHARGES FROM EXCAVATION CONTRACTS FOR THE 9 CL&P DESIGNATED AREAS - MATERIAL REQUEST # 86884800 AND 15984800 BY D SODERSTROM WORK ORDER TO COLLECT FOR DISTRIBUTION, CHARGES FROM EXCAVATION CONTRACTS FOR THE 9 CL&P DESIGNATED AREAS - MATERIAL REQUEST # 86884800 AND 15984800 BY D SODERSTROM Expense portion of CD01141 Digital Grid Relays - FREIGHT STREET 11W Work order is to be used to capture costs for retrofitting relays for network protectors Establishment of CL&P Backup SOC in Windsor Newtown Glygol System Replacement Install Hydraulic Door Closer on Gate Door in East Hampton Hartford Gate Intercom New London Gate Intercom Replacement Cheshire Security Cameras (4) Replace High Garage Bay Light in Tolland Myrock Substation Office Fitout - Structures Myrock Substation Office Fitout - Structures Tolland - Field Engineering Office Fitout - Bldgs Tolland - Field Engineering Office Fitout - Bldgs Norwalk - Replace dock leveler hydraulic pump and motor Norwalk - Replace dock leveler hydraulic pump and motor Stamford Garage - Install new fluid handling system. Stamford Garage - Install new fluid handling system. Newtown - AV Project Newtown Conference Room Newtown - AV Project Newtown Conference Room Newtown - Expansion of space is required to support additional staffing for Storm Response. Newtown - Expansion of space is required to support additional staffing for Storm Response. Madison Ext Carpet Stair Treads EH Lower Level Breakroom Renovation EH Lower Level Breakroom Renovation Stamford Main Corridor Upgrades Stamford Main Corridor Upgrades New Britain Fan Motor Replacement New Britain Fan Motor Replacement Hartford Sheldon St - LED Replacement in Garage & Paddle Fan Installation in Stores' Room Hartford Sheldon St - LED Replacement in Garage & Paddle Fan Installation in Stores' Room Newtown - Install new workstations for Engineering Planning Sections Norwalk - Install card reader Meter ServicePage 848 of 867
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued October 23, 2026 RRU-159 Attachment 8 Page 848 of 867 work_order_number F2111036 F2111036 F2111038 F2111038 F2111050 F2111050 F2111084 F2111084 F2111086 F2111111 F2111111 F2111113 F2111113 F2111152 F2111153 F2111153 F2111154 F2111160 F2111166 F2111166 F2111170 F2111170 F2111179 F2111179 F2111184 F2111188 F2111188 F2111193 F2111193 F2211001 F2211001 F2211004 F2211004 F2211005 F2211007 F2211011 F2211011 F2211012 F2211012 F2211013 F2211013 F2211014 F2211014 F2211016 F2211016 F2211018 F2211018 F2211019 F2211019 F2211024 F2211026 F2211026 F2211028 F2211028 F2211031 F2211031 F2211034 F2211034 F2211041 F2211041 F2211043 F2211043 F2211044 F2211044 F2211047 F2211047 F2211049 F2211050 F2211052 F2211052 F2211054 F2211054 F2211056 F2211057 F2211057 F2211059 F2211059 F2211060 F2211060 F2211062 F2211062 F2211063 F2211063 F2211067 F2211069 F2211075 F2211075 F2211076 F2211077 F2211077 F2211084 F2211084 F2211088 F2211088 F2211090 F2211094 F2211094 F2211097 F2211097 F2211101 F2211101 F2211102 F2211102 F2211104 F2211104 F2211105 F2211107 F2211107 F2211108 F2211108 F2211110 F2211110 F2211111 F2211111 F2211115 F2211117 F2211121 F2211124 F2211124 F2211126 F2211126 F2211127 F2211127 F2211132 F2211132 F2211135 F2211135 F2211141 F2211141 F2211148 F2211148 F2211152 F2211152 F2211155 F2211155 F2211157 F2211157 F2211161 F2211161 F2211162 F2211162 F2211163 F2211163 F2211165 F2211165 F2211167 F2211167 F2211170 F2211170 F2211171 F2211171 F2211173 F2211177 F2211177 F2211179 F2211180 F2211180 F2311001 F2311001 F2311002 F2311002 F2311003 F2311003 F2311004 F2311004 F2311005 F2311007 F2311007 F2311008 F2311008 F2311009 F2311009 F2311011 F2311011 F2311012 F2311012 F2311013 F2311013 F2311014 F2311014 F2311015 F2311016 F2311017 F2311017 F2311018 F2311018 F2311019 F2311019 F2311020 F2311020 F2311021 F2311021 F2311022 F2311022 F2311023 F2311023 F2311026 F2311026 F2311027 F2311027 F2311028 F2311028 F2311032 description 1250 Hooksett Rd - Site Improvement 1250 Hooksett Rd - Site Improvement Stamford Generator Damper Motor Stamford Generator Damper Motor Windsor SOC Renovation Windsor SOC Renovation Norwalk-Tindall Window Replacements Norwalk-Tindall Window Replacements Cheshire Break Room Refrigerator Burner Replacements Burner Replacements Lockset Replacement Lockset Replacement NEW Gen Office Work Stations Bldgs. Replace catch basin Replace catch basin ATC Garage Building Envelope Assess Install Fleet Garage HVAC BMS Tolland Watersource HP Replacement Tolland Watersource HP Replacement New London Door Hardware & Lock New London Door Hardware & Lock BCW Generator Replacement BCW Generator Replacement Waterford Mailsorter Station Entry Gate Intercom Entry Gate Intercom NOR-Tindal 2ndFl RR Sanitary Piping NOR-Tindal 2ndFl RR Sanitary Piping Tolland Garage Entry Doors Tolland Garage Entry Doors Hart-Sheldon St Victaulic Piping Hart-Sheldon St Victaulic Piping Exit Gate Motorized Operator Replac Norwalk-Tindall Electric Strike Bushing Pit Decking Replacement Bushing Pit Decking Replacement Actuator and Valve Replacement Actuator and Valve Replacement Dry-Type Transformer Replacement Dry-Type Transformer Replacement HAR-Sheldon Xenta Controller HAR-Sheldon Xenta Controller HAR-Sheldon Back Flow Preventer HAR-Sheldon Back Flow Preventer Entry Gate Card Reader Post Replac Entry Gate Card Reader Post Replac Stamford Mens RR Automation Stamford Mens RR Automation East Hampton Elec Outlets NOR-Tindall Main Switchgear Replace NOR-Tindall Main Switchgear Replace New Britain Roof Drain/Rain Leader New Britain Roof Drain/Rain Leader electrical panel replacement electrical panel replacement Dock Leveler Replacement Dock Leveler Replacement Replace lift cover Replace lift cover Cheshire Drag Chain Assembly Cheshire Drag Chain Assembly Replace hydraulic valve & pump Replace hydraulic valve & pump Danielson Sewer Line/Flush Valve Danielson Sewer Line/Flush Valve Madison Elec Ops Supervisor Outlets Danielson Card Reader-Elect Door TOR Fleet Gar Veh Lift Replacement TOR Fleet Gar Veh Lift Replacement Cheshire Garage PRV Replacement Cheshire Garage PRV Replacement East Hampton Yard Paving Madison Elec Heater Assembly Madison Elec Heater Assembly BCW Annex-Warehouse Storeroom BCW Annex-Warehouse Storeroom Madison Electric Ceiling Replacemen Madison Electric Ceiling Replacemen NOR-Tindall Store Front Door/Frame NOR-Tindall Store Front Door/Frame Cheshire AV Equipment/Installation Cheshire AV Equipment/Installation EH Card Reader Control Module EH Electric for Pressure Washer Replace elevator lighting Replace elevator lighting Purchase 3 1-Ton HVAC Units TOR Schedule/Planner Work Station TOR Schedule/Planner Work Station power/data/cooling upgrades power/data/cooling upgrades Replace Store Room OH Doors Replace Store Room OH Doors New London Line Rm Furniture Replace ice machine Replace ice machine BMS Control Panels BMS Control Panels New London-Replace Fire Supp Pipe New London-Replace Fire Supp Pipe EH Auditorium Acoustical Wall Panel EH Auditorium Acoustical Wall Panel Tolland Garage Lift Replacement Tolland Garage Lift Replacement Tolland Mail Sorter Overhead Door Operator Replacement Overhead Door Operator Replacement East Hampton Electrical _ Light Pol East Hampton Electrical _ Light Pol Replace OH Door Operator Replace OH Door Operator Stamford HVAC Split Systm Replc Stamford HVAC Split Systm Replc Wtby-Freight St. - Fence Enclosure VP card reader & camera replc Cheshire - VP Office Furniture Material Lift Replacement Material Lift Replacement Rplc. Mini Splits & Exhaust Fan Rplc. Mini Splits & Exhaust Fan Stamford-Compressor Replacement Stamford-Compressor Replacement Replace curbing Replace curbing Falls Village - Fence Replacement Falls Village - Fence Replacement ATC Garage Transaction Window ATC Garage Transaction Window Waterbury-Freight Fuel Tank Removal Waterbury-Freight Fuel Tank Removal Exterior Hand Rail Replacement Exterior Hand Rail Replacement Heat Pump Installation Heat Pump Installation Paving & Gate Operator Replacement Paving & Gate Operator Replacement Replace air reals Replace air reals Replace Gas Monitoring System Replace Gas Monitoring System Newtown - Replace HVAC ducts Newtown - Replace HVAC ducts Waterbury - Replace Gate Intercom Waterbury - Replace Gate Intercom Supervisor/Lineman Area Rennovation Supervisor/Lineman Area Rennovation Main Breaker Replacement Main Breaker Replacement Electrical Panel Removal Electrical Panel Removal Add lighting along fence line Loading Dock Leveler Replacement Loading Dock Leveler Replacement Parking Lot Cameras New London - Window Replacement New London - Window Replacement Overhead Door Barrel Replacement Overhead Door Barrel Replacement Replace jack pump Replace jack pump Replace oil pump Replace oil pump Air Compressor replacement Air Compressor replacement Install Signage Install fiber line Install fiber line Crane Tagline Replacement Crane Tagline Replacement Office Renovation Office Renovation Stamford - Mother's Room Stamford - Mother's Room Cheshire - UG Furniture Cheshire - UG Furniture Replace Garage OH Doors Replace Garage OH Doors Mothers Room Mothers Room Mothers Room Stamford - Mother's Room RTU Replacement RTU Replacement Replace dock leveler Replace dock leveler Fan Coil Replacement Fan Coil Replacement Hartford - Pressure Washer Hartford - Pressure Washer Replace Garage exhaust fan Replace Garage exhaust fan Replace Destratification Fan Replace Destratification Fan Fall Protection Ladder Improvements Fall Protection Ladder Improvements Line Room Electrical Outlets Line Room Electrical Outlets Water Infiltration Prevention Water Infiltration Prevention ATC - Air Compressor Replacements ATC - Air Compressor Replacements Madison Garage Electrical long_description Torrington - 1250 Hooksett Rd - Site Improvements Torrington - 1250 Hooksett Rd - Site Improvements Stamford Generator Damper Motor Replacement Stamford Generator Damper Motor Replacement Windsor SOC Renovation - Design Windsor SOC Renovation - Design Norwalk-Tindall Window Replacements Norwalk-Tindall Window Replacements Cheshire Break Room Refrigerator Berlin ATC - Burner Replacements Berlin ATC - Burner Replacements Norwalk Tindall Ave - Lockset Replacement Norwalk Tindall Ave - Lockset Replacement NEW Gen Office Work Stations Bldgs. - Includes Demo, Walls, Ceiling, HVAC, Lighting, Electrical, and Data Drops. Torrington - Replace catch basin Torrington - Replace catch basin Berlin - ATC Garage Building Envelope Assessment Project Norwalk Tindall - Fleet Garage ALC HVAC BMS Installation Tolland Watersource HP Replacement Tolland Watersource HP Replacement New London Door Hardware & Lock Replacement - Throughout Building New London Door Hardware & Lock Replacement - Throughout Building BCW Generator Replacement BCW Generator Replacement Waterford Mailsorter Station Replacement - Building Lobby Norwalk Tindall Ave - Install new entry gate intercom Norwalk Tindall Ave - Install new entry gate intercom NOR-Tindall Ave. 2nd Fl RR Sanitary Piping Replacement NOR-Tindall Ave. 2nd Fl RR Sanitary Piping Replacement Tolland Garage Entry Doors Tolland Garage Entry Doors Hart-Sheldon St Victaulic Piping Replacement - 3rd Floor Hart-Sheldon St Victaulic Piping Replacement - 3rd Floor Norwalk Tindall Ave - Exit Gate Motorized Operator Replacement Norwalk-Tindall Electric Strike Replacement - Loading Dock Man Door Electric Meter Dept.BCW - Bushing Pit Decking Replacement BCW - Bushing Pit Decking Replacement Newtown - Actuator and Valve Replacement Newtown - Actuator and Valve Replacement BCW - Dry-Type Transformer Replacement BCW - Dry-Type Transformer Replacement HAR-Sheldon Xenta Controller Replacement - 3rd Floor HAR-Sheldon Xenta Controller Replacement - 3rd Floor HAR-Sheldon Back Flow Preventer Replacement - Basement HAR-Sheldon Back Flow Preventer Replacement - Basement Torrington - Entry Gate Card Reader Post Replacement Torrington - Entry Gate Card Reader Post Replacement Stamford Basement Mens RR Hands Free Automation Stamford Basement Mens RR Hands Free Automation East Hampton Elec Outlets - Trailer Shed - Yard NOR-Tindall Main Switchgear Replacement - Basement Level NOR-Tindall Main Switchgear Replacement - Basement Level New Britain Roof Drain/Rain Leader Replacement - Shop Area New Britain Roof Drain/Rain Leader Replacement - Shop Area Hartford Sheldon St - electrical panel replacement Hartford Sheldon St - electrical panel replacement BCW - Dock Leveler Replacement BCW - Dock Leveler Replacement Berlin ATC Garage - Replace covers over the vehicle lifts are damaged and need replacement Berlin ATC Garage - Replace covers over the vehicle lifts are damaged and need replacement Cheshire Drag Chain Assembly Replacement - Repair Garage Cheshire Drag Chain Assembly Replacement - Repair Garage Hartford - Replace hydraulic valve & pump Hartford - Replace hydraulic valve & pump Danielson Sewer Line/Flush Valve Replacement Danielson Sewer Line/Flush Valve Replacement Madison Elec Ops Supervisor Outlets Danielson Card Reader-Electrician's Door TOR Fleet Gar Veh Lift Replacement TOR Fleet Gar Veh Lift Replacement Cheshire Garage PRV Replacement - Repair Garage Cheshire Garage PRV Replacement - Repair Garage East Hampton Yard Paving Madison Elec Heater Assembly Replacement - Throughout 1st Floor Madison Elec Heater Assembly Replacement - Throughout 1st Floor BCW Annex-Warehouse Storeroom - 225 Episcopal Road BCW Annex-Warehouse Storeroom - 225 Episcopal Road Madison Electric Ceiling Replacement - 1st Floor Hallway between Eversource & Tenant Space Madison Electric Ceiling Replacement - 1st Floor Hallway between Eversource & Tenant Space NOR-Tindall Ave. Store Front Door/Frame Replacement - Main Entrance NOR-Tindall Ave. Store Front Door/Frame Replacement - Main Entrance Cheshire AV Equipment/Installation - 1st Floor Office Cheshire AV Equipment/Installation - 1st Floor Office EH Card Reader Control Module Replacement - Rear Gate EH Electric for Pressure Washer - Garage Waterford - Replace elevator lighting & batteries Waterford - Replace elevator lighting & batteries Hartford-Sheldon St. - Purchase 3 1-Ton Portable HVAC Units TOR Schedule/Planner Work Station - Main Bldg. Supervisor Office TOR Schedule/Planner Work Station - Main Bldg. Supervisor Office Cheshire - power/data/cooling upgrades Cheshire - power/data/cooling upgrades Danielson - Replace Store Room OH Doors Danielson - Replace Store Room OH Doors New London Line Rm Furniture - 1st Floor Lineroom Hartford - Replace ice machine Hartford - Replace ice machine Hartford - BMS Control Panels Hartford - BMS Control Panels New London-Replace Fire Suppression Pipe - Covered Truck Parking Area New London-Replace Fire Suppression Pipe - Covered Truck Parking Area EH Auditorium Acoustical Wall Panel EH Auditorium Acoustical Wall Panel Tolland Garage Lift Replacement Tolland Garage Lift Replacement Tolland Mail Sorter Newtown - Overhead Door Operator Replacement Newtown - Overhead Door Operator Replacement East Hampton Electrical _ Light Pole Replacement East Hampton Electrical _ Light Pole Replacement Berlin ATC - Replace OH Door Operator Berlin ATC - Replace OH Door Operator Stamford HVAC Split Systm Replacement Stamford HVAC Split Systm Replacement Wtby-Freight St. - Store Room Fence Enclosure Cheshire - VP card reader & camera replacement Cheshire - VP Office Furniture Waterbury - Freight Street - Material Lift Replacement in Yard Waterbury - Freight Street - Material Lift Replacement in Yard New London - Data Closets Replace Mini Split System & Exhaust Fan New London - Data Closets Replace Mini Split System & Exhaust Fan Stamford-Compressor Replacement (Fleet Garage) Stamford-Compressor Replacement (Fleet Garage) Danielson Curb and Driveway Apron Replacement Danielson Curb and Driveway Apron Replacement Falls Village - Fence Replacement Falls Village - Fence Replacement Berlin - ATC Garage Transaction Window (1st Floor) Berlin - ATC Garage Transaction Window (1st Floor) Waterbury-Freight Fuel Tank Removal Waterbury-Freight Fuel Tank Removal New London - Exterior Hand Rail Replacement New London - Exterior Hand Rail Replacement Waterbury - Freight St - Heat Pump Installation Waterbury - Freight St - Heat Pump Installation Waterbury-Freight - Main Entrance Paving & Gate Operator Replacement Waterbury-Freight - Main Entrance Paving & Gate Operator Replacement Stamford - Due to safety concerns replacement of two low pressure dual arms along with two air reels, existing units are leaking due to age of equipment. Stamford - Due to safety concerns replacement of two low pressure dual arms along with two air reels, existing units are leaking due to age of equipment. Berlin ATC Vehicle Gas Monitoring System Berlin ATC Vehicle Gas Monitoring System Newtown - Replace HVAC ducts Newtown - Replace HVAC ducts Waterbury - Replace Gate Intercom Waterbury - Replace Gate Intercom Falls Village - Supervisor/Lineman Area Rennovation Falls Village - Supervisor/Lineman Area Rennovation Falls Village - Main Breaker Replacement Falls Village - Main Breaker Replacement Torrington - Electrical Panel Removal Torrington - Electrical Panel Removal New London Additional Security Lighting and Electric along fence line Berlin - BCW East Loading Dock Leveler Replacement Berlin - BCW East Loading Dock Leveler Replacement Hartford Sheldon St - Parking Lot Cameras New London - Window Replacement New London - Window Replacement Newtown - Fleet Garage Overhead Door Barrel Replacement Newtown - Fleet Garage Overhead Door Barrel Replacement Cheshire - Replace jack pump Cheshire - Replace jack pump Waterbury Freight - Replace oil pump Waterbury Freight - Replace oil pump Hartford Sheldon St - Air Compressor replacement Hartford Sheldon St - Air Compressor replacement Waterbury Freight - Install new signage Berlin BCW Annex-225 Episcopal Rd. Berlin Ct -Fiber Line Berlin BCW Annex-225 Episcopal Rd. Berlin Ct -Fiber Line Torrington - Electric Maintenance Crane Tagline Replacement Torrington - Electric Maintenance Crane Tagline Replacement Freight Street office renovation Freight Street office renovation Stamford - Mother's Room (Structures) Stamford - Mother's Room (Structures) Cheshire - UG Furniture Cheshire - UG Furniture Hartford - Sheldon St - Replace Garage OH Doors Hartford - Sheldon St - Replace Garage OH Doors Nowarlk - Tindall - Mothers Room(Structures) Nowarlk - Tindall - Mothers Room(Structures) Nowarlk - Tindall - Mothers Room (GP) Stamford - Mother's Room (GP) Newtown - Substation Space RTU Replacement Newtown - Substation Space RTU Replacement Berlin BCW - Replace dock leveler Berlin BCW - Replace dock leveler Norwalk - Tindall Ave - Fan Coil Replacement Norwalk - Tindall Ave - Fan Coil Replacement Hartford - Pressure Washer Hartford - Pressure Washer East Hampton - Replace Garage exhaust fan East Hampton - Replace Garage exhaust fan Berlin ATC - Replace Destratification Fan Berlin ATC - Replace Destratification Fan Berlin Central Warehouse - Fall Protection Ladder Improvements Berlin Central Warehouse - Fall Protection Ladder Improvements East Hampton - Line Room Electrical Outlets East Hampton - Line Room Electrical Outlets New London - Water Infiltration Prevetion (Phase 2) New London - Water Infiltration Prevetion (Phase 2) Berlin - ATC - Air Compressor Replacements Berlin - ATC - Air Compressor Replacements Madison Garage Electrical cost_element_group Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 ferc_account 108030 107010 107010 108030 108030 107010 108030 107010 107010 107010 108030 108030 107010 107010 108030 107010 107010 107010 107010 108030 108030 107010 107010 108030 107010 108030 107010 108030 107010 108030 107010 107010 108030 107010 107010 108030 107010 108030 107010 108030 107010 107010 108030 107010 108030 107010 108030 108030 107010 107010 108030 107010 108030 107010 107010 108030 107010 108030 107010 108030 107010 108030 108030 107010 107010 108030 107010 107010 108030 107010 107010 108030 107010 108030 107010 108030 107010 108030 107010 107010 108030 107010 108030 107010 107010 107010 108030 107010 108030 107010 108030 107010 108030 107010 107010 108030 107010 108030 107010 108030 107010 108030 107010 108030 107010 107010 107010 108030 107010 108030 107010 108030 108030 107010 107010 107010 107010 107010 108030 108030 107010 108030 107010 108030 107010 108030 107010 107010 108030 108030 107010 108030 107010 107010 108030 107010 108030 108030 107010 108030 107010 108030 107010 108030 107010 108030 107010 107010 108030 107010 108030 107010 108030 107010 107010 107010 108030 108030 107010 107010 108030 107010 108030 107010 108030 107010 108030 107010 107010 108030 107010 108030 107010 108030 108030 107010 107010 108030 107010 108030 107010 107010 108030 107010 107010 108030 108030 107010 108030 107010 108030 107010 107010 108030 108030 107010 108030 107010 108030 107010 108030 107010 107010 percent 0.04828577 0.95171423 0.95238095 0.04761905 0.05 0.95 0.0599419 0.9400581 1 0.91666667 0.08333333 0.04761905 0.95238095 1 0.19811321 0.80188679 1 1 0.95238095 0.04761905 0.04761905 0.95238095 0.95238095 0.04761905 1 0.04761905 0.95238095 0.05559468 0.94440532 0.04761905 0.95238095 0.9022613 0.0977387 1 1 0.04761905 0.95238095 0.04761905 0.95238095 0.04761905 0.95238095 0.9296875 0.0703125 0.95238095 0.04761905 0.86465774 0.13534226 0.0862069 0.9137931 1 0.02473195 0.97526805 0.03937008 0.96062992 0.95238104 0.04761896 0.79952006 0.20047994 0.95238095 0.04761905 0.95238095 0.04761905 0.04999854 0.95000146 0.4 0.6 1 1 0.04761905 0.95238095 0.95238095 0.04761905 1 0.04761905 0.95238095 0.09886218 0.90113782 0.0476194 0.9523806 0.95779451 0.04220549 0.92894195 0.07105805 1 1 0.9009009 0.0990991 1 0.04761905 0.95238095 0.04454169 0.95545831 0.04761905 0.95238095 1 0.22857143 0.77142857 0.29776233 0.70223767 0.16216216 0.83783784 0.04761905 0.95238095 0.04772911 0.95227089 1 0.95238095 0.04761905 0.95238095 0.04761905 0.95238095 0.04761905 0.05010686 0.94989314 1 1 1 0.95238095 0.04761905 0.04784131 0.95215869 0.70094843 0.29905157 0.05020197 0.94979803 0.04761905 0.95238095 0.95238095 0.04761905 0.67114094 0.32885906 0.04761914 0.95238086 0.95238095 0.04761905 0.95238095 0.04761905 0.04761905 0.95238095 0.04761905 0.95238095 0.04761905 0.95238095 0.04761905 0.95238095 0.06899473 0.93100527 0.94999062 0.05000938 0.61111111 0.38888889 1 0.0496706 0.9503294 1 0.95238095 0.04761905 0.04992729 0.95007271 0.95238095 0.04761905 0.95238095 0.04761905 0.95238095 0.04761905 1 0.09889803 0.90110197 0.74792244 0.25207756 0.96415797 0.03584203 0.91201923 0.08798077 0.22408964 0.77591036 0.76429637 0.23570363 0.91448598 0.08551402 1 1 0.06759443 0.93240557 0.97114063 0.02885937 0.03132803 0.96867197 0.04761905 0.95238095 0.09090909 0.90909091 0.95 0.05 0.04761905 0.95238095 0.04761905 0.95238095 0.4047496 0.5952504 0.18547714 0.81452286 1 F2311033 BCW - Repace Catch Basin Labor-L01 107010 0.77434679 F2311033 F2311034 F2311036 F2311037 F2311037 F2311038 F2311038 F2311039 F2311039 F2311040 BCW - Repace Catch Basin Tolland - Conference Room Chairs and Panel Tolland - Field Engineering Chair Replacements Stamford - Replace water cooler Stamford - Replace water cooler Waterbury Freight - Replace lighting with LEDs Waterbury Freight - Replace lighting with LEDs New Britain - Security Fence Replacement New Britain - Security Fence Replacement New London - Addition of 4 Security Cameras Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 108030 107010 107010 107010 108030 107010 108030 108030 107010 107010 0.22565321 1 1 0.95238095 0.04761905 0.74948545 0.25051455 0.04761905 0.95238095 1 Conference Room Chairs and Panel Field Engineering Chair Replacement Replace water cooler Replace water cooler Install LEDs Install LEDs Security Fence Replacement Security Fence Replacement Addition of 4 Security CamerasPage 849 of 867
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued October 23, 2026 RRU-159 Attachment 8 Page 849 of 867 work_order_number F2311041 F2311041 F2311042 F2311043 F2311045 F2311045 F2311046 F2311046 F2311047 F2311048 F2311049 F2311049 F2311050 F2311050 F2311051 F2311051 F2311052 F2311052 F2311053 F2311053 F2311054 F2311054 F2311055 F2311056 F2311056 F2311057 F2311057 F2311058 F2311058 F2311059 F2311060 F2311060 F2311061 F2311061 F2311062 F2311062 F2311063 F2311063 F2311064 F2311064 description Replace Concrete Pad in Yard Replace Concrete Pad in Yard Install bottle filling station Training Yard Electrical Improvemen Replace emergency lighting Replace emergency lighting Replace Garage Welder Outlets Replace Garage Welder Outlets Furniture Pressure Washer Replacement Exterior Door Replacement Exterior Door Replacement Replace split system Replace split system Interior Door Replacement Interior Door Replacement Replace piping & coils Replace piping & coils Door Replacement Door Replacement Fixed ladder replacement Fixed ladder replacement Line Supervisor Furniture Replc. Truck Canopy Design Truck Canopy Design Fleet Inground Lift Valve Replc. Fleet Inground Lift Valve Replc. Repair Garage Office Renovation Repair Garage Office Renovation Repair Garage Office Furniture Replace OH Door Replace OH Door Fleet Garage - Fencing Replc. Fleet Garage - Fencing Replc. Install Fixed ladder & safety rail Install Fixed ladder & safety rail Two Exterior Man Door Replacement Two Exterior Man Door Replacement Install crash bars Install crash bars F2311065 Install panic bars on doors F2311065 F2311067 F2311067 F2311070 F2311070 F2311072 F2311072 F2311073 F2311073 F2311074 F2311074 F2311075 F2311075 F2311076 F2311076 F2311077 F2311077 F2311078 F2311078 F2311079 F2311080 F2311080 F2311081 F2311081 F2311082 F2311082 F2311083 F2311083 F2311084 F2311084 F2311085 F2311086 F2311086 F2311087 F2311087 F2311088 F2311089 F2311090 F2311090 F2311091 F2311092 F2311092 Install panic bars on doors Door Frame Replacement Door Frame Replacement Madison - LED Lighting Replacements Madison - LED Lighting Replacements Replace security fence Replace security fence Replace HVAC mechanicals Replace HVAC mechanicals Exterior Door Replacement Exterior Door Replacement Restroom Renovations Restroom Renovations Install Hybrid truck outlets Install Hybrid truck outlets Grease Dispensing Pump Grease Dispensing Pump New Britain - LED Replacements New Britain - LED Replacements Replace BMS System Structural Steel Installation Structural Steel Installation Replace fire damper Replace fire damper Replace Exterior Electrical Panel Replace Exterior Electrical Panel Replace ice machine Replace ice machine Interior Renovation - Construction Interior Renovation - Construction Interior Renovation - Furniture Parking Lot & Overhang LED Lighting Parking Lot & Overhang LED Lighting Roof Ladder & Steel Column Replc. Roof Ladder & Steel Column Replc. Install snow guards for roof Office Renovation - Furniture Construction Construction Winsdors SOC Reno - Furniture Replace Exit and Emergency Lights Replace Exit and Emergency Lights F2311093 Stamford - RTU #5 Replacememt F2311093 Stamford - RTU #5 Replacememt Tolland - OSHA Audit requires panic hardware to exit from Electrical Rooms equipped with equipment rated 800A or more. Replace existing hardware and install panic bars on door. Tolland - OSHA Audit requires panic hardware to exit from Electrical Rooms equipped with equipment rated 800A or more. Replace existing hardware and install panic bars on door. Berlin - BCW NW - Door Frame Replacement Berlin - BCW NW - Door Frame Replacement Madison - LED Lighting Replacements - Tenant Space Madison - LED Lighting Replacements - Tenant Space New London - Replace security fence New London - Replace security fence Waterbury Freight Street HVAC mechanical replacement Waterbury Freight Street HVAC mechanical replacement Waterbury - Freight - Exterior Door Replacement Waterbury - Freight - Exterior Door Replacement Waterbury - Freight Street - Restroom Renovations Waterbury - Freight Street - Restroom Renovations Waterbury Freight street Hybrid truck outlets Waterbury Freight street Hybrid truck outlets Waterbury - Freight Street - Grease Dispensing Pump Waterbury - Freight Street - Grease Dispensing Pump New Britain - LED Replacements in a few locations throughout the building New Britain - LED Replacements in a few locations throughout the building New Britain - Replace BMS System Installation of 8'x6"x6" angle iron to support concrete roof decking, steel was fastened to exterior wall to support. Installation included lift and removal/reinstall of metal studs in order to gain access to location. Installation of 8'x6"x6" angle iron to support concrete roof decking, steel was fastened to exterior wall to support. Installation included lift and removal/reinstall of metal studs in order to gain access to location. Newtown - Replace fire damper Newtown - Replace fire damper Stamford - Replace Exterior Electrical Panel Stamford - Replace Exterior Electrical Panel New Britain - Replace Ice Machine New Britain - Replace Ice Machine Torrington - Substation Group Interior Renovation - Construction Torrington - Substation Group Interior Renovation - Construction Torrington - Substation Group Interior Renovation - Furniture Waterbury - Freight - Parking Lot LED & Overhang LED Lighting Waterbury - Freight - Parking Lot LED & Overhang LED Lighting Danielson - Roof Ladder & Steel Column Replacement Danielson - Roof Ladder & Steel Column Replacement Berlin Central Warehouse Shed Snow Guards Installation Waterbury Freight Substation Group - Office Renovation - Furniture Waterbury Freight - Substation Group - Office Renovation - Construction Waterbury Freight - Substation Group - Office Renovation - Construction Furniture to support the Windsor SOC Renovation Berlin ATC - Replace Exit and Emergency Lights Berlin ATC - Replace Exit and Emergency Lights Stamford - RTU #5 Replacememt Replacement of failed rooftop unit #5 with new Trane unit, this includes but not limited to the following; new 5 ton unit, crane pick off hours, electrical, gas connections, roof walkway matts and ALC controls. Stamford - RTU #5 Replacememt Replacement of failed rooftop unit #5 with new Trane unit, this includes but not limited to the following; new 5 ton unit, crane pick off hours, electrical, gas connections, roof walkway matts and ALC controls. F2311097 IT Closet HVAC Unit Installation Stamford - IT Closet HVAC Unit Installation Replacement of failed HVAC split system within the basement IT Closet with new ductless mini split cooling only unit. In addition installing a new ductless mini split system within the 1st. Floor IT Closet which currently does not have a unit. Both installations include but not limited to; (2) 2.5 ton Mitsubishi units, mechanical installation, electrical, roofing for pitch boxes, ALC controls and demo of failed unit. F2311097 F2311098 F2311098 F2311101 F2311101 F2311103 F2311103 F2311105 F2311107 F2311107 F2311108 F2311108 F2311109 F2311109 F2311110 F2311110 F2311111 F2311111 F2311112 F2311112 F2311113 F2311113 F2311115 F2311116 F2311116 F2311117 F2311117 F2311118 F2311120 F2311121 F2311122 F2311123 F2311123 F2311124 F2311125 F2311125 IT Closet HVAC Unit Installation East Hampton - Garage Ramp Replc. East Hampton - Garage Ramp Replc. Replace RTU Replace RTU Replace water heater Replace water heater Install EV Charging Stations Replace roof ladder Replace roof ladder Air Compressor Dryer Replacement Air Compressor Dryer Replacement Waterbury - Freight - Lockers Waterbury - Freight - Lockers Replace Air Handling Unit Replace Air Handling Unit Install automatic Glycol system Install automatic Glycol system Replace parking lot lighting Replace parking lot lighting Replace metal door Replace metal door Install conduit run for generator Install landscaping Install landscaping furniture furniture Install power & data Purchase White Boards Install power & data furniture Replace 2 ice machines Replace 2 ice machines furniture Replace drain Replace drain F2311126 F2311128 F2311128 F2311129 F2311129 F2311130 F2311130 F2311131 F2311131 F2311132 F2311132 F2311133 F2311133 F2311134 F2311134 F2311135 F2311135 F2311136 F2311136 F2311137 F2311137 F2311138 F2311138 F2311140 F2311140 F2311141 F2311142 F2311142 F2311143 F2311143 F2311144 F2311144 F2311145 F2311145 F2311146 F2311146 F2311147 F2311147 F2311148 F2311148 F2311149 F2311149 F2311151 F2311151 F2311152 F2311152 F2311153 Install Furniture - 2nd & 3rd Floor New London EOC Renovation New London EOC Renovation Replace RTU & Sink Replace RTU & Sink Replace Overhead Door Operator Replace Overhead Door Operator Install Power & Data to Workstation Install Power & Data to Workstation LED - Lighting Installation LED - Lighting Installation York RTU Blower Motor Replacement York RTU Blower Motor Replacement water main replacement water main replacement Hot Water Heater Replacement Hot Water Heater Replacement Madison - Exterior Stair Rplc. Madison - Exterior Stair Rplc. Replace oil water Sep Cover Replace oil water Sep Cover Heat Pump Replacements Heat Pump Replacements Madison - Roof Drain Replacement Madison - Roof Drain Replacement Torrington - RSO Office (Furniture) RSO Office - Power and Data RSO Office - Power and Data AHU #2 Cooling Fan Replacement AHU #2 Cooling Fan Replacement East Hampton - Yard Paving East Hampton - Yard Paving Newtown - Transformer Concrete Pad Newtown - Transformer Concrete Pad Replace rooftop rtu Replace rooftop rtu Replace lighting Replace lighting Replace door Replace door Replace water heater, etc. Replace water heater, etc. Replace garage basins Replace garage basins Power, Data & Security Installation Power, Data & Security Installation BMS Firewall F2311155 Remove & Replace Trees F2311155 Remove & Replace Trees F2311156 Cast Iron Drain Replacment F2311156 Cast Iron Drain Replacment F2311157 Garage Heat Installation F2311157 Garage Heat Installation F2311159 F2311160 F2311160 Overhead Electric Outlets Install Madison - Apprentice Lockers Madison - Apprentice Lockers F2311166 High Bay Concrete & Steel Plate F2311166 F2311167 F2311167 F2311168 F2311168 F2311169 F2311169 F2311170 F2311170 High Bay Concrete & Steel Plate Garage Light Replacements Garage Light Replacements Southington - Septic Tank Covers Southington - Septic Tank Covers Slide Gate & Operator Rplc. Slide Gate & Operator Rplc. Window Rplc. & Facade Improvments Window Rplc. & Facade Improvments F2311171 Exterior Pole Fixtures & Bollard F2311172 Madison - Card Reader New London EOC Renovation New London EOC Renovation East Hampton Replace RTU and Janitors Sink East Hampton Replace RTU and Janitors Sink New Britain - Replace Overhead Door Operator New Britain - Replace Overhead Door Operator Hartford - Sheldon - Installing power and data to new workstations to the 2nd & 3rd floors in the transmission, test and community relations areas. Hartford - Sheldon - Installing power and data to new workstations to the 2nd & 3rd floors in the transmission, test and community relations areas. Waterbury - Freight St - LED Lighting Installation Waterbury - Freight St - LED Lighting Installation Stamford - York RTU Blower Motor Replacement Stamford - York RTU Blower Motor Replacement Waterbury Freight - water main replacement Waterbury Freight - water main replacement New London - Hot Water Heater Replacement New London - Hot Water Heater Replacement Madison - Exterior Stair Replacement Madison - Exterior Stair Replacement Waterbury Freight - Replace Oil water seperator cover Waterbury Freight - Replace Oil water seperator cover Waterbury - Freight - Heat Pump Replacements (2) Waterbury - Freight - Heat Pump Replacements (2) Madison - Roof Drain Replacement Madison - Roof Drain Replacement Torrington - RSO Office (Furniture) Torrington - RSO Office - Power and Data Torrington - RSO Office - Power and Data Newtown - AHU #2 Cooling Fan Replacement Newtown - AHU #2 Cooling Fan Replacement East Hampton - Yard Paving East Hampton - Yard Paving Newtown - Transformer Concrete Pad Newtown - Transformer Concrete Pad New Britain - Rooftop RTU Replacement New Britain - Rooftop RTU Replacement Newtown - Replacement of two (2) failed interior High Bay Fixtures along with two (2) failed exterior Flood Fixture. Newtown - Replacement of two (2) failed interior High Bay Fixtures along with two (2) failed exterior Flood Fixture. Torrington - Exterior Frame - Door Replacement Torrington - Exterior Frame - Door Replacement Madison Water Heater, Shower Valve and Bottle Fill Station Replacement Madison Water Heater, Shower Valve and Bottle Fill Station Replacement Hartford Sheldon St - Replace garage basins Hartford Sheldon St - Replace garage basins Waterbury - Freight - Extra Power, Data & Security Installations Waterbury - Freight - Extra Power, Data & Security Installations Norwalk - Tindall Ave - BMS Firewall Hartford - Sheldon - Remove & Replace Trees The hartford city forest department has granted permission to remove dangerous trees from the lower parking lot and for the replanting of 2 new species of trees in their place that will not grow as large. Hartford - Sheldon - Remove & Replace Trees The hartford city forest department has granted permission to remove dangerous trees from the lower parking lot and for the replanting of 2 new species of trees in their place that will not grow as large. Waterbury - Freight St - Cast Iron Drain Replacement With increased usuage, there are multiple cast iron waste pipes that are leaking due to age. Waterbury - Freight St - Cast Iron Drain Replacement With increased usuage, there are multiple cast iron waste pipes that are leaking due to age. Waterbury - Freight St - Garage Heat Installation Area used to receive resisdual heat from steam boilers which would temper the area. There are now hot water boilers in the garage and the garage is not heated. There aremultiple water lines running through it. New heaters will temper the area to prevent pipes from freezing. Waterbury - Freight St - Garage Heat Installation Area used to receive resisdual heat from steam boilers which would temper the area. There are now hot water boilers in the garage and the garage is not heated. There aremultiple water lines running through it. New heaters will temper the area to prevent pipes from freezing. New London - Garage Addition of Overheard Electric Outlets Needed for Mechanics Tool Box and IPads Madison - Apprentice Lockers Madison - Apprentice Lockers Berlin - Service Bldg - High Bay Concrete & Steel Plate Installation Install new concrete to level out floor and install steel plate at over head door where forklifts enter to protect concrete from continuing to chip. Concrete was chipping causing a tripping hazard and safety concerns Berlin - Service Bldg - High Bay Concrete & Steel Plate Installation Install new concrete to level out floor and install steel plate at over head door where forklifts enter to protect concrete from continuing to chip. Concrete was chipping causing a tripping hazard and safety concerns Tolland - Garage Light Replacements Tolland - Garage Light Replacements Septic system has crumbling covers & risers that bring access to ground level. System requires new covers and risers due to age. Septic system has crumbling covers & risers that bring access to ground level. System requires new covers and risers due to age. Newtown - Slide Gate and Operator Replacement Newtown - Slide Gate and Operator Replacement Norwalk - Window Replacements & Façade Improvements Norwalk - Window Replacements & Façade Improvements Newtown - Exterior Pole Fixtures & Bollard Replacement Replacement of four (4) failed pole fixtures replacing LED fixtures along with the replacement of one (1) failed bollard fixture. Madison - Card Reader Employees need additional access to building other than Test Department F2311173 F2311173 long_description cost_element_group Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 ferc_account 107010 108030 107010 107010 107010 108030 108030 107010 107010 107010 107010 108030 107010 108030 107010 108030 108030 107010 108030 107010 108030 107010 107010 108030 107010 107010 108030 108030 107010 107010 107010 108030 107010 108030 107010 108030 108030 107010 108030 107010 percent 0.89154605 0.10845395 1 1 0.95238095 0.04761905 0.04999765 0.95000235 1 1 0.95238095 0.04761905 0.95238095 0.04761905 0.95238095 0.04761905 0.15701861 0.84298139 0.04990734 0.95009266 0.04761905 0.95238095 1 0.06134969 0.93865031 0.95 0.05 0.10224439 0.89775561 1 0.95238095 0.04761905 0.95238095 0.04761905 0.86477987 0.13522013 0.0499375 0.9500625 0.05839673 0.94160327 Labor-L01 108030 0.04761905 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 107010 107010 108030 107010 108030 107010 108030 108030 107010 107010 108030 108030 107010 108030 107010 107010 108030 108030 107010 107010 107010 108030 107010 108030 108030 107010 108030 107010 107010 108030 107010 107010 108030 108030 107010 107010 107010 108030 107010 107010 108030 107010 0.95238095 0.94222222 0.05777778 0.95238095 0.04761905 0.95238095 0.04761905 0.01880405 0.98119595 0.90075316 0.09924684 0.07987926 0.92012074 0.04761905 0.95238095 0.95238095 0.04761905 0.04761905 0.95238095 1 0.95238095 0.04761905 0.95238095 0.04761905 0.04761905 0.95238095 0.04761905 0.95238095 0.85290934 0.14709066 1 0.9261301 0.0738699 0.04773414 0.95226586 1 1 0.04011231 0.95988769 1 0.04761905 0.95238095 Labor-L01 108030 0.02371844 Labor-L01 107010 0.97628156 Labor-L01 108030 0.06666667 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 107010 107010 108030 108030 107010 107010 108030 107010 107010 108030 108030 107010 107010 108030 107010 108030 107010 108030 108030 107010 108030 107010 107010 108030 107010 108030 107010 107010 107010 107010 107010 107010 108030 107010 107010 108030 0.93333333 0.95238095 0.04761905 0.04761905 0.95238095 0.95238095 0.04761905 1 0.95238095 0.04761905 0.04761905 0.95238095 0.95 0.05 0.93973175 0.06026825 0.98143564 0.01856436 0.46734329 0.53265671 0.0483871 0.9516129 1 0.04761905 0.95238095 0.04690432 0.95309568 1 1 1 1 0.83887381 0.16112619 1 0.94974278 0.05025722 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 107010 108030 107010 107010 108030 108030 107010 108030 107010 108030 107010 108030 107010 107010 108030 107010 108030 107010 108030 108030 107010 108030 107010 107010 108030 107010 108030 107010 108030 107010 108030 107010 107010 108030 108030 107010 108030 107010 108030 107010 108030 107010 108030 107010 107010 108030 107010 1 0.05 0.95 0.9333837 0.0666163 0.04761905 0.95238095 0.04761905 0.95238095 0.04761905 0.95238095 0.04761905 0.95238095 0.81843575 0.18156425 0.95238095 0.04761905 0.82250376 0.17749624 0.04761905 0.95238095 0.02673797 0.97326203 0.69464705 0.30535295 1 0.04761905 0.95238095 0.04761905 0.95238095 0.04761905 0.95238095 0.95238095 0.04761905 0.02834502 0.97165498 0.04761905 0.95238095 0.04761905 0.95238095 0.0749385 0.9250615 0.04761905 0.95238095 0.95238095 0.04761905 1 Labor-L01 108030 0.67996988 Labor-L01 107010 0.32003012 Labor-L01 108030 0.04761905 Labor-L01 107010 0.95238095 Labor-L01 107010 0.95238095 Labor-L01 108030 0.04761905 Labor-L01 Labor-L01 Labor-L01 107010 108030 107010 1 0.04761905 0.95238095 Labor-L01 108030 0.04761905 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 107010 108030 107010 107010 108030 108030 107010 107010 108030 0.95238095 0.04761905 0.95238095 0.95238095 0.04761905 0.09090909 0.90909091 0.55171688 0.44828312 Labor-L01 107010 1 Labor-L01 107010 1 Generator Circuits Newtown - Fleet Garage - Generator Circuits Identified during the latest power outage, the Fleet Garage exterior lighting along with exterior pole fixtures located on the three (3) levels of stored materials are not on the generator. These circuits along with two (2) circuits located in the Supervisors office will be relocated to the generator panel. System will be tested once completed. Labor-L01 108030 0.04761905 Generator Circuits Newtown - Fleet Garage - Generator Circuits Identified during the latest power outage, the Fleet Garage exterior lighting along with exterior pole fixtures located on the three (3) levels of stored materials are not on the generator. These circuits along with two (2) circuits located in the Supervisors office will be relocated to the generator panel. System will be tested once completed. Labor-L01 107010 0.95238095 Madison Replace Concrete Pad in Yard Madison Replace Concrete Pad in Yard Southington - Install water bottle filling station Berlin - Training Yard Electrical Improvement New Britain - Replace emergency lighting New Britain - Replace emergency lighting New London - Replace Garage Welder Outlets New London - Replace Garage Welder Outlets New London - Purchase furniture to redesign layout to accommodate additional cubes. Norwalk - Tindall Ave -Fleet Garage Pressure Washer Replacement Falls Village - Exterior Door Replacement Falls Village - Exterior Door Replacement New Britain - Data Closet HVAC Split System Replacement New Britain - Data Closet HVAC Split System Replacement Torrington - Substation Group Interior Door Replacement Torrington - Substation Group Interior Door Replacement Berlin ATC - Replace Heating System Piping and Coils Berlin ATC - Replace Heating System Piping and Coils Hartford Sheldon St - Door Replacement Hartford Sheldon St - Door Replacement Hartford Sheldon St - Fixed ladder replacement Hartford Sheldon St - Fixed ladder replacement Tolland - Line Supervisor Furniture Replacement New London - Electric Operations Truck Canopy Design New London - Electric Operations Truck Canopy Design Newtown - Fleet Inground Lift Valve Replacement Newtown - Fleet Inground Lift Valve Replacement Cheshire - Repair Garage Office Renovation Cheshire - Repair Garage Office Renovation Cheshire - Repair Garage Office Furniture BCW - Replace overhead door BCW - Replace overhead door Berlin - Fleet Garage - Fencing Replacement Berlin - Fleet Garage - Fencing Replacement Waterbury Freight - Replace Fixed ladder & safety railing Waterbury Freight - Replace Fixed ladder & safety railing Falls Village - Two Exterior Man Door Replacement Falls Village - Two Exterior Man Door Replacement New Britain - Door Hardware Safety - Security Device. Performed walk through to identify safety and security concerns regarding exterior door hardware. Installation of four exit devices (crash bars), removal of maglock for installation of electric strike, installation of door closers along with installation of remaining cores to match company pyramid system New Britain - Door Hardware Safety - Security Device. Performed walk through to identify safety and security concerns regarding exterior door hardware. Installation of four exit devices (crash bars), removal of maglock for installation of electric strike, installation of door closers along with installation of remaining cores to match company pyramid system Stamford - IT Closet HVAC Unit Installation Replacement of failed HVAC split system within the basement IT Closet with new ductless mini split cooling only unit. In addition installing a new ductless mini split system within the 1st. Floor IT Closet which currently does not have a unit. Both installations include but not limited to; (2) 2.5 ton Mitsubishi units, mechanical installation, electrical, roofing for pitch boxes, ALC controls and demo of failed unit. East Hampton - Garage Ramp Replacement East Hampton - Garage Ramp Replacement Waterbury Freight - Replace RTU - RTU serving 2nd floor meeting area above locker room has failed. This area of the building is indepenent of the cooling tower loop for the building. Waterbury Freight - Replace RTU - RTU serving 2nd floor meeting area above locker room has failed. This area of the building is indepenent of the cooling tower loop for the building. East Hampton - Replace water heater East Hampton - Replace water heater Stamford - Electric Vehicle Charge Point Charger Installation Stamford - Roof Guard Railing - Roof Ladder Replacement Stamford - Roof Guard Railing - Roof Ladder Replacement Cheshire - Air Compressor Dryer Replacement Cheshire - Air Compressor Dryer Replacement Watebury - Freight - Installation of 20 Lockers Watebury - Freight - Installation of 20 Lockers East Hampton Replace Air Handling Unit East Hampton Replace Air Handling Unit New Britain - Glycol Automatic Feeding System New Britain - Glycol Automatic Feeding System Harford Sheldon St - Lower parking area was leased to CCMC hospital, Eversource has terminated the lease. Proposing to relight parking lot with LED fixtures. Harford Sheldon St - Lower parking area was leased to CCMC hospital, Eversource has terminated the lease. Proposing to relight parking lot with LED fixtures. Stamford - Replacement of Metal Door to Electrical Room Stamford - Replacement of Metal Door to Electrical Room Norwalk Tindall Ave - Install conduit run for generator Waterbury Freight - AWC is reopening after being closed since 2016, property has overgrown shrubs and dead brush out front along the street. Replacing with new landscaping. Waterbury Freight - AWC is reopening after being closed since 2016, property has overgrown shrubs and dead brush out front along the street. Replacing with new landscaping. Stamford - Line Supervisor Cubicle - furniture Stamford - Line Supervisor Cubicle - furniture Stamford - Line Supervisor Cubicle - Power and Data Tolland Seminar Room Marker White Boards. Newtown - Line Supervisor Cubicle - Power and Data Newtown - Line Supervisor Cubicle Berlin BCW and Berlin ATC - Replace 2 ice machines Berlin BCW and Berlin ATC - Replace 2 ice machines Madison - Apprentice Group has expanded and needs additional furniture for employees. East Hampton Garage Drain Replacement East Hampton Garage Drain Replacement Hartford - Sheldon St - Install Furniture 2nd & 3rd Floor in the transmission, test and community relations areasPage 850 of 867
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued October 23, 2026 RRU-159 Attachment 8 Page 850 of 867 work_order_number F2311174 F2311174 F2311175 F2311175 F2411002 F2411003 F2411004 F2411004 F2411006 F2411006 F2411007 F2411007 F2411008 F2411008 description Replace 215 LEDs Replace 215 LEDs New oil water collector cover New oil water collector cover Install roof drain bracings install new lockers install new lockers install new lockers Electrical Outlet Installations Electrical Outlet Installations Car charger replacement Car charger replacement Replace generator & switchgear Replace generator & switchgear F2411009 Southington - Lift Station Rplc. F2411009 F2411010 F2411010 F2411011 F2411011 F2411012 F2411012 F2411013 F2411013 F2411015 F2411015 F2411016 F2411016 F2411017 F2411017 F2411018 F2411018 F2411019 F2411019 F2411020 F2411020 F2411021 F2411021 F2411022 F2411022 Southington - Lift Station Rplc. Windsor ERP Site - 2024 Windsor ERP Site - 2024 Overhead Door Replcement Overhead Door Replcement Replace ladder & stair case Replace ladder & stair case Canopy - Replace steel column Canopy - Replace steel column ATC Post Indicator System ATC Post Indicator System Replace gate operator Replace gate operator East Hampton Building Redesign East Hampton Building Redesign Replace pipe & manhole Replace pipe & manhole Motor & Pump Replacement Motor & Pump Replacement Replace Generator Regulator Replace Generator Regulator Danielson Addition of Block Heaters Danielson Addition of Block Heaters Exit Device Replacement Exit Device Replacement F2411023 F2411025 F2411025 F2411026 F2411026 Berlin - ATC - Roof Railing Install Replace Truck Chargers and Block H Replace Truck Chargers and Block H Replace truck lift Replace truck lift F2411027 Roof Stair Rplc & Code Upgrades F2411027 Roof Stair Rplc & Code Upgrades F2411028 F2411030 F2411031 F2411031 F2411033 F2411033 F2411035 F2411035 F2411036 F2411036 F2411037 F2411037 F2411038 F2411039 F2411039 F2411040 F2411043 F2411043 F2411044 F2411044 F2411045 F2411045 F2411046 F2411046 F2411047 F2411047 F2411048 F2411049 Danielson - Lineroom Carrels Tolland - Lineworker Carrels Replace OH Door Operator Replace OH Door Operator Replace Electrical Panel Replace Electrical Panel Replace LEDs Replace LEDs Replace roof stairs Replace roof stairs Replace paving Replace paving Install Training Yard Bldg Replace concrete pad Replace concrete pad Install new electrical E Hampton - Fac Maint Rm Reno E Hampton - Fac Maint Rm Reno Madison Tree Replacement Madison Tree Replacement Stamford - VAV Replacement Stamford - VAV Replacement Install window treatments Install window treatments Restroom Renovation Restroom Renovation Install circuit Carrells for the Line Shop F2411050 East Hampton - Compressor Replc. F2411050 F2411051 F2411051 East Hampton - Compressor Replc. EV Charging Station Replacement EV Charging Station Replacement F2411052 Locker Room/Shower Room Renovation F2411053 F2411055 F2411057 F2411057 Call Center - Furniture Install drain kit New Britain - Call Ctr - Bldgs New Britain - Call Ctr - Bldgs F2411058 Madison - Cage Storage F2411059 F2411060 F2411060 F2411061 F2411061 Madison Electrical Service Redesign Replace loading dock Replace loading dock Stamford - RTU Replacement Stamford - RTU Replacement F2411062 Fleet Garage Bathroom Renovation F2411062 F2411063 F2411063 F2411064 F2411064 F2411065 F2411065 F2411067 F2411067 F2411068 F2411068 F2411069 F2411069 F2411070 F2411070 F2411071 F2411071 Fleet Garage Bathroom Renovation Replace BMS Controller Replace BMS Controller Roof Walk Off Replacement Roof Walk Off Replacement Replace asphalt & curbing Replace asphalt & curbing Chilled Water Pipe Replacement Chilled Water Pipe Replacement Hartford BMS system replacement Hartford BMS system replacement VP office renovation VP office renovation Replace regulator Replace regulator Newtown - Lift Power Unti Rplc. Newtown - Lift Power Unti Rplc. F2411072 Stamford - Loading Dock Rplc. F2411072 Stamford - Loading Dock Rplc. F2411073 Circuit Installation for Rapid Pole F2411074 Communication Conduit Replacement F2411074 F2411076 F2411076 F2411077 F2411077 F2411079 F2411079 F2411080 Communication Conduit Replacement Madison - Outside Air Damper Rplc. Madison - Outside Air Damper Rplc. Newtown - Catch Basin and Paving Newtown - Catch Basin and Paving Install Ductwork Install Ductwork WF - Install sound system F2411082 Loading Dock Railing Replacement F2411082 F2411083 F2411083 F2411084 F2411084 F2411085 F2411085 Loading Dock Railing Replacement Replace ALC Equipment Replace ALC Equipment Replace ATC Lift Replace ATC Lift Replace condensor fan motor Replace condensor fan motor F2411086 New Britain - Replace Pavement long_description Tolland - Lighting Replacement and Arc Flash Study Tolland - Lighting Replacement and Arc Flash Study BCW - New oil water collector cover BCW - New oil water collector cover BCW - Install roof drain bracings. Tolland Lineworker Lockers - to accommodate additional staff increase. Danielson Lineroom lockers to accommodate addtional staff. Danielson Lineroom lockers to accommodate addtional staff. Berlin - ATC - Electrical Outlet Installations Berlin - ATC - Electrical Outlet Installations Hartford Sheldon St - Car charger replacement Hartford Sheldon St - Car charger replacement Waterbury Freight - Replace generator & switchgear Waterbury Freight - Replace generator & switchgear Southington - Lift Station Replacement Sewage lift station has 2 pumps that have failed and a pump controller that is inoperable, proposing to replace pumps and control panel to move water from the basement to the septic tank. Southington - Lift Station Replacement Sewage lift station has 2 pumps that have failed and a pump controller that is inoperable, proposing to replace pumps and control panel to move water from the basement to the septic tank. Windsor ERP Site - Environmental oversight, erosion and sediment management; hydroseeding and irrigation system Windsor ERP Site - Environmental oversight, erosion and sediment management; hydroseeding and irrigation system Waterbury - Freight - Overhead Door Replacement Waterbury - Freight - Overhead Door Replacement Hartford Sheldon St - Replace ladder & stair case Hartford Sheldon St - Replace ladder & stair case Cheshire - Canopy - Replace steel column Cheshire - Canopy - Replace steel column Berlin - Install ATC Post Indicator System Berlin - Install ATC Post Indicator System East Hampton - Replace gate operator East Hampton - Replace gate operator East Hampton Building Redesign East Hampton Building Redesign Berlin Warehouse pipe and manhole replacement Berlin Warehouse pipe and manhole replacement Newtown - Well #1 Motor & Pump Replacement Newtown - Well #1 Motor & Pump Replacement Newtown - Replace Fleet Garage and Bldg Generator Regulator Newtown - Replace Fleet Garage and Bldg Generator Regulator Danielson Addition of Block Heaters Danielson Addition of Block Heaters Torrington - Exit Device Replacement Torrington - Exit Device Replacement Berlin - ATC - Roof Railing Installation Safety concerns have been raised about the existing railing system on the roof of the ATC Garage. This project will install a compliant railing system to mitigate the potential danger associated with working near the edge of the roof. Madison - Replace Truck Chargers and Block Heaters Madison - Replace Truck Chargers and Block Heaters Berlin ATC Truck Lift Replacement Berlin ATC Truck Lift Replacement Madison - Roof Stair Replacement & Code Upgrades Existing Stairs to Mezzanine and Upper roof are not code compliant Madison - Roof Stair Replacement & Code Upgrades Existing Stairs to Mezzanine and Upper roof are not code compliant Danielson - Lineroom Carrels Addition of lineworker carrels to accomodate staff growth. Tolland - Lineworker Carrels, needed for additional staff for Electric Operations Stamford - Replace overhead door operator Stamford - Replace overhead door operator BCW - Replace electrical panels BCW - Replace electrical panels Stamford - Replace failed LED Lighting Stamford - Replace failed LED Lighting New London - Replace roof stairs New London - Replace roof stairs Cheshire - Replace paving Cheshire - Replace paving Berlin - Build Training Yard Restroom Building (Electric) Waterbury Freight - Replace concrete pad Waterbury Freight - Replace concrete pad Danielson Lineroom Install new electrical East Hampton Facilities Maintenance Room Renovation East Hampton Facilities Maintenance Room Renovation Madison Tree Replacement Madison Tree Replacement Stamford - Chiller Automated Glycol Feed System - VAV Replacement Stamford - Chiller Automated Glycol Feed System - VAV Replacement BCW Conference Room - Replace & Install new window treatments BCW Conference Room - Replace & Install new window treatments Torrington - Main Building Restroom Renovation Torrington - Main Building Restroom Renovation Hartford Sheldon St - installation of circuit for rapid pole set trailer Madison - Carrells for the Line Shop East Hampton - Compressor Replacement Replace two exsisting compressors with one unit to reduce noise levels and for greater effeciency. East Hampton - Compressor Replacement Replace two exsisting compressors with one unit to reduce noise levels and for greater effeciency. Madison - EV Charging Station Replacement to upgrade to new standard. Madison - EV Charging Station Replacement to upgrade to new standard. Madison - Locker Room/Shower Room Renovation Initial funding for the renovation to the exisiting locker rooms and showers which are dated and do not function well. New Britain - Call Center - Furniture Supply and install sixteen (16) workstations including chairs. Norwalk Tindall Ave - Install drain kit at Fleet Garage New Britain - Call Center construction New Britain - Call Center construction Madison - Cage Storage Test Department requires lockable storage for equipment Madison Electrical Service Redesign Professional Engineering services needed to design for replacement of existing electrical service to building which is obsolete. Discovered during Arch Flash Study. Hartford Sheldon St - Replace loading dock Hartford Sheldon St - Replace loading dock Stamford - RTU Replacement Stamford - RTU Replacement Hartford - Sheldon St - Fleet Garage Bathroom Renovation Bathroom & shower area are in a dilipidated state showers are very small and difficult to use, only 1 of 2 is functioning Hartford - Sheldon St - Fleet Garage Bathroom Renovation Bathroom & shower area are in a dilipidated state showers are very small and difficult to use, only 1 of 2 is functioning Stamford - Replace BMS Controller Stamford - Replace BMS Controller Falls Village - Roof Walk Off Replacement Falls Village - Roof Walk Off Replacement Berlin Webster St - Remove and Replace Asphalt and curbing in Warehouse Berlin Webster St - Remove and Replace Asphalt and curbing in Warehouse Hartford - Sheldon - Chilled Water Pipe Replacement Hartford - Sheldon - Chilled Water Pipe Replacement Hartford BMS system replacement Hartford BMS system replacement Hartford - VP office renovation Hartford - VP office renovation Stamford - Replacement of failed check valve along with lock ladder and add an air regulator to the vehicle lift at the Stamford Garage - these are all safety related items. Stamford - Replacement of failed check valve along with lock ladder and add an air regulator to the vehicle lift at the Stamford Garage - these are all safety related items. Newtown - Lift Power Unti Replacement Newtown - Lift Power Unti Replacement Stamford - Loading Dock Replacement Replacement shall include removal and replacement of front loading dock wall, installation of new dock bumpers and painting of existing columns. Stamford - Loading Dock Replacement Replacement shall include removal and replacement of front loading dock wall, installation of new dock bumpers and painting of existing columns. Waterbury - Freight - Circuit Installation for Rapid Pole Trailer Rapid pole set trailer requires dedicated outlet for power Waterbury - Freight - Communication Conduit Replacement Communication cable for the gate intercom needs to be excavated and replaced due to the deterioation of the underground conduit. The driveway will need to be sawcut and excavated. Waterbury - Freight - Communication Conduit Replacement Communication cable for the gate intercom needs to be excavated and replaced due to the deterioation of the underground conduit. The driveway will need to be sawcut and excavated. Madison - Replace Outside Air Dampers Madison - Replace Outside Air Dampers Newtown - Catch Basin and Paving Newtown - Catch Basin and Paving Torrington - Installation Of Insulated HVAC Ductwork Torrington - Installation Of Insulated HVAC Ductwork WF - Install sound system Waterbury - Freight - Loading Dock Railing Replacement Base of loading railing has rotted off the surface of the dock leaving the railing supported and at risk of falling over and providing no support. Waterbury - Freight - Loading Dock Railing Replacement Base of loading railing has rotted off the surface of the dock leaving the railing supported and at risk of falling over and providing no support. Norwalk - Tindall Ave ALC Equipment Replacement. Replaced failed Automated Logic Controls equipment - two (2) ZN551 and one (1) AAR - lost all communication with system on 1st floor Norwalk - Tindall Ave ALC Equipment Replacement. Replaced failed Automated Logic Controls equipment - two (2) ZN551 and one (1) AAR - lost all communication with system on 1st floor Berlin ATC Lift Replacement Berlin ATC Lift Replacement Stamford - Chiller Condenser Fan Motor Replacement Stamford - Chiller Condenser Fan Motor Replacement cost_element_group Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 ferc_account 107010 108030 107010 108030 107010 107010 108030 107010 107010 108030 107010 108030 108030 107010 percent 0.95 0.05 0.94650206 0.05349794 1 1 0.04761905 0.95238095 0.81784705 0.18215295 0.95374735 0.04625265 0.01337011 0.98662989 Labor-L01 107010 0.95238095 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 108030 107010 108030 108030 107010 108030 107010 108030 107010 107010 108030 108030 107010 107010 108030 107010 108030 108030 107010 108030 107010 107010 108030 107010 108030 0.04761905 0.95238095 0.04761905 0.04761905 0.95238095 0.04761905 0.95238095 0.11672561 0.88327439 0.79359787 0.20640213 0.04992432 0.95007568 0.95 0.05 0.8 0.2 0.06976744 0.93023256 0.04759515 0.95240485 0.95238095 0.04761905 0.95238095 0.04761905 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 107010 108030 107010 107010 108030 1 0.04761905 0.95238095 0.95 0.05 Labor-L01 108030 0.04761905 Labor-L01 107010 0.95238095 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 107010 107010 107010 108030 108030 107010 108030 107010 108030 107010 107010 108030 107010 108030 107010 107010 107010 108030 107010 108030 107010 108030 107010 108030 108030 107010 107010 107010 1 1 0.95238095 0.04761905 0.04761905 0.95238095 0.04761905 0.95238095 0.04761905 0.95238095 0.95380256 0.04619744 1 0.04761905 0.95238095 1 0.95238095 0.04761905 0.95238095 0.04761905 0.95238095 0.04761905 0.95238095 0.04761905 0.05 0.95 1 1 Labor-L01 107010 0.95238095 Labor-L01 Labor-L01 Labor-L01 108030 107010 108030 0.04761905 0.95 0.05 Labor-L01 107010 1 Labor-L01 Labor-L01 Labor-L01 Labor-L01 107010 107010 108030 107010 1 1 0.06801179 0.93198821 Labor-L01 107010 1 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 107010 107010 108030 108030 107010 1 0.81532109 0.18467891 0.04761905 0.95238095 Labor-L01 107010 0.95881136 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 108030 107010 108030 108030 107010 108030 107010 108030 107010 108030 107010 107010 108030 108030 107010 108030 107010 0.04118864 0.95238095 0.04761905 0.04761905 0.95238095 0.04761905 0.95238095 0.04761905 0.95238095 0.0790368 0.9209632 0.93106618 0.06893382 0.03247184 0.96752816 0.05 0.95 Labor-L01 108030 0.05198019 Labor-L01 107010 0.94801981 Labor-L01 107010 1 Labor-L01 107010 0.94746432 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 108030 108030 107010 108030 107010 108030 107010 107010 0.05253568 0.05 0.95 0.04761905 0.95238095 0.04761905 0.95238095 1 Labor-L01 107010 0.95238053 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 108030 108030 107010 107010 108030 107010 108030 0.04761947 0.04761905 0.95238095 0.95 0.05 0.95238095 0.04761905 Labor-L01 107010 0.95195215 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 108030 107010 108030 107010 108030 0.04804785 0.95238095 0.04761905 0.95238095 0.04761905 Labor-L01 108030 0.0299222 Labor-L01 107010 0.9700778 Labor-L01 108030 0.33514493 Labor-L01 107010 0.66485507 Labor-L01 107010 1 Labor-L01 108030 0.04761905 Labor-L01 Labor-L01 Labor-L01 107010 108030 107010 0.95238095 0.09090909 0.90909091 Labor-L01 107010 1 Labor-L01 108030 0.04761905 Labor-L01 107010 0.95238095 Labor-L01 107010 0.95456281 Labor-L01 Labor-L01 Labor-L01 108030 108030 107010 0.04543719 0.08174863 0.91825137 Labor-L01 107010 1 Labor-L01 107010 1 Labor-L01 Labor-L01 Labor-L01 107010 107010 108030 1 0.91129931 0.08870069 Labor-L01 107010 0.95238095 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 108030 108030 107010 108030 107010 107010 107010 108030 108030 107010 107010 107010 108030 107010 0.04761905 0.04761905 0.95238095 0.04761905 0.95238095 1 0.95238095 0.04761905 0.07501875 0.92498125 1 0.95238095 0.04761905 1 Labor-L01 Labor-L01 107010 107010 1 1 New Britain - Replace Pavement Replacement of failing asphalt in specified areas due to erosion surrounding the space where transformers are stored- this has become a safety concern and requested by Material Logistics. New Britain - Replace Pavement Replacement of failing asphalt in specified areas due to erosion surrounding the space where transformers are stored- this has become a safety concern and requested by Material Logistics. F2411086 F2411087 F2411087 F2411089 F2411089 New Britain - Replace Pavement Perimeter Heat Pump replacement Perimeter Heat Pump replacement Tolland - Replace Truck Outlets Tolland - Replace Truck Outlets F2411090 Madison - Lower Gate Relocation F2411090 Madison - Lower Gate Relocation F2411091 Replace Oil Separator Alarm F2411091 Replace Oil Separator Alarm F2411092 Line Shop Dehumidifier F2411093 AHU5 Return Duct Replacement F2411093 F2411094 F2411094 AHU5 Return Duct Replacement Torrington - Chair Replacement Torrington - Chair Replacement F2411095 AV System Supply & Installation F2411096 CO and NO2 Sensors Replacement F2411096 CO and NO2 Sensors Replacement F2411097 Locker Room Installation F2411097 F2411098 F2411098 Locker Room Installation Energy Efficiency Group Renovation Energy Efficiency Group Renovation F2411099 Energy Efficiency Group Renovation F2411100 Overhead Door Operator Installation F2411101 F2411102 F2411102 Electrical Service & Sitework Madison Workstations Madison Workstations F2411103 MRC Vehicle Storage F2411103 F2411104 F2411104 F2411106 F2411106 F2411107 F2411108 F2411108 F2411109 F2411109 F2411110 F2411111 F2411111 F2411112 MRC Vehicle Storage Replace compressor Replace compressor Replace chain hoist Replace chain hoist VP Furniture Replace Elec Panels Replace Elec Panels Replace flagpole Replace flagpole Install add'l cameras Madison - Install Elec Ops Cage Madison - Install Elec Ops Cage Add Add'l Linemans' Lockers F2411113 F2411114 Cheshire - Truck Canopy Purchase sit stand Waterbury Freight - Perimeter Heat Pump replacement Waterbury Freight - Perimeter Heat Pump replacement Tolland - Replace Truck Outlets Tolland - Replace Truck Outlets Madison - Lower Gate Relocation The lower parking lot has limited space for secure parking for company and personal vehicles, where vandalism has occurred. This would allow the lower gated area to be expanded and increase the amount of secure parking spots. Madison - Lower Gate Relocation The lower parking lot has limited space for secure parking for company and personal vehicles, where vandalism has occurred. This would allow the lower gated area to be expanded and increase the amount of secure parking spots. Madison - Replace Oil Separator Alarm Exsisting Alarm has failed Madison - Replace Oil Separator Alarm Exsisting Alarm has failed East Hampton - Line Shop Dehumidifer Commercial level dehumidifier is needed to control excessive humidity levels in this area. East Hampton - AHU5 Return Duct Replacment The renovation of the locker room in 2018 removed the return duct off AH5 and made it 100% outside air. Humidity is not being properly removed from the space. East Hampton - AHU5 Return Duct Replacment The renovation of the locker room in 2018 removed the return duct off AH5 and made it 100% outside air. Humidity is not being properly removed from the space. Torrington - Chair Replacement Torrington - Chair Replacement Hartford - Sheldon - AV System Supply & Installation for VP Office VP office being constructed on 3rd floor requiring AV system for conferences etc. Torrington - Fleet Garage CO and NO2 Sensors Replacement Replacement of failed Carbon Monoxide and Nitrogen Dioxide sensors including mounting boxes - three (3) of each within the Fleet Garage. Torrington - Fleet Garage CO and NO2 Sensors Replacement Replacement of failed Carbon Monoxide and Nitrogen Dioxide sensors including mounting boxes - three (3) of each within the Fleet Garage. Torrington - Locker Room Installation Installation of four (4) sets of 3 tier gear lockers for linemen along with three (3) stand up lockers for women's room due to new hires. Torrington - Locker Room Installation Installation of four (4) sets of 3 tier gear lockers for linemen along with three (3) stand up lockers for women's room due to new hires. Stamford -Energy Efficiency Group Renovation (Bldgs) Stamford -Energy Efficiency Group Renovation (Bldgs) Stamford - Energy Efficiency Group Renovation (GP) Supply and install workstation's per new design. Torrington - Overhead Door Operator Installation Installation of a overhead door operator including all safety devices, push button and electrical. Currently employees manually open door and are expressing a safety concern for possible injuries. Hartford - Sheldon - Poleyard Electrical Service & Sitework new electircal service needed to supply switchgear & transformer storage area Madison Test Department Work Stations Madison Test Department Work Stations Waterbury - Freight - MRC Vehicle Storage steel truss needs relocation to accommodate MRC, data & power Waterbury - Freight - MRC Vehicle Storage steel truss needs relocation to accommodate MRC, data & power Norwalk - Tindall Ave Fleet Garage Air Compressor Replacement Norwalk - Tindall Ave Fleet Garage Air Compressor Replacement Falls Village - Replace chain hoist Falls Village - Replace chain hoist Hartford - Sheldon St. - VP Furniture New Briatin - Electrical Panel Replacements New Briatin - Electrical Panel Replacements Madison - Replace flagpole Madison - Replace flagpole Hartford Sheldon St - Install additional cameras. Madison - Install Elec Ops Cage Madison - Install Elec Ops Cage Danielson add additonal Linemans' Lockers Cheshire - Truck Canopy Design of Truck Canopy for additional parking. New London (Waterford) - Replace Existing Worksurface with Sit StandPage 851 of 867
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued October 23, 2026 RRU-159 Attachment 8 Page 851 of 867 work_order_number description F2411115 Mini-Split HVAC Unit Replacement F2411115 F2411117 F2411117 F2411118 F2411118 Mini-Split HVAC Unit Replacement Windsor Locks Warehouse Renovation Windsor Locks Warehouse Renovation Wat Whse Renovation - Bldgs Wat Whse Renovation - Bldgs F2411119 Store Room Office Renovation F2411119 F2411120 F2411120 F2411121 F2411121 F2411123 F2411123 Store Room Office Renovation Replace Loading Dock Bumper Replace Loading Dock Bumper Replace boiler motor Replace boiler motor Replace OH door operators Replace OH door operators F2411124 Store Room - Office Renovation F2411124 F2411125 F2411125 Store Room - Office Renovation Compressor Air Dryer Replacment Compressor Air Dryer Replacment F2411126 Loading Dock Replacement F2411126 Loading Dock Replacement F2411128 Stamford - VCT Replacement F2411128 Stamford - VCT Replacement F2411131 Rear Exit Door Replacement F2411131 Rear Exit Door Replacement F2411132 Door Frame Replacement F2411132 Door Frame Replacement F2411133 F2411134 F2411134 F2411135 Oil Dispenser Replacement Sprinkler Replacement Sprinkler Replacement Remove underground tank F2411136 Desk Chair Replacements F2411136 F2411137 F2411139 F2411141 F2411142 F2411142 F2411143 Desk Chair Replacements Replace Inground Lift Install (2) Electrical Circuits Aimia Chairs - Eng Dept Lineman's Rm Construction Lineman's Rm Construction Furniture F2411144 Linemen Supervisor Room Renovation F2411144 Linemen Supervisor Room Renovation F2411145 Linemen Supervisor Room Reno - GP F2411145 F2411146 F2411146 F2411147 F2411147 Linemen Supervisor Room Reno - GP Lineman Rm Construction Lineman Rm Construction Lineman Rm Furniture Lineman Rm Furniture F2411149 Men & Women's Sink Drain Rplc. F2411149 Men & Women's Sink Drain Rplc. F2411150 Roll Up Door Replacement F2411150 Roll Up Door Replacement F2411151 Power & Data for (2) Workstations F2411152 F2411153 F2411153 F2411156 F2411157 F2411157 Install (2) Workstations Replace electrical power Replace electrical power New Signage Replacement Of Heat Loop Pump Replacement Of Heat Loop Pump F2411159 Door Strike Replacement F2411159 F2411160 F2411160 Door Strike Replacement Garage Facade Replacement Garage Facade Replacement F2411161 Replacement of Exterior Pole Lights F2411161 Replacement of Exterior Pole Lights F2411162 Break Room Electrical Circuit F2411163 Gas Unit Heater Replacements F2411163 Gas Unit Heater Replacements F2411164 Torrington - Huddle Room F2411164 F2411165 F2411165 Torrington - Huddle Room Install emergency circuit Install emergency circuit F2411166 Gate Valve Replacement F2411166 Gate Valve Replacement F2411167 Newtown - AHU Replacement (2) F2411168 Freight - Install Panic Bars F2411169 ALC Controller Replacement F2411169 ALC Controller Replacement F2411170 Gate Intercom Replacement F2411170 Gate Intercom Replacement F2511001 Window Rplc. & Facade Improvements F2511001 Window Rplc. & Facade Improvements F2511002 Waste Pipe Vent Replacement F2511002 F2511003 F2511003 F2511004 F2511004 Waste Pipe Vent Replacement Madison - Replace Roof Drain Madison - Replace Roof Drain Replace catch basin Replace catch basin F2511005 F2511006 F2511006 F2511007 F2511007 F2511008 F2511008 F2511009 F2511010 F2511010 F2511011 F2511011 F2511012 F2511013 F2511014 F2511015 F2511016 F2511016 F2511017 F2511017 F2511018 F2511018 Cheshire - BMS System BCW - Replace switchgear BCW - Replace switchgear Replace exhaust fan Replace exhaust fan EOC Furniture EOC Furniture Install electrical circuits Storm room renovation Storm room renovation Replace El Panel Feeder Replace El Panel Feeder Hartford -Install additional outlet Tolland - Install Water Pressure Pu Install fluid distribution reels New London EOC Renovation - AV Replace generator Replace generator Replace Electrical Panels Replace Electrical Panels Replace ice machine Replace ice machine F2511019 F2511020 F2511020 F2511021 F2511021 F2511022 F2511022 F2511023 F2511024 F2511024 F2511025 F2511025 F2511026 F2511026 F2511027 F2511027 F2511028 F2511029 F2511029 F2511030 F2511031 F2511032 F2511033 Hartford - Sheldon - Gear Lockers WF - Replace Garage Generator WF - Replace Garage Generator Replace vehicle lift Replace vehicle lift Replace Lift Control Box Replace Lift Control Box Roof Railings Installations LED light fixture replacement LED light fixture replacement Replace concrete Replace concrete Replace Gen Lift Pump Replace Gen Lift Pump Replace Gas Piping Replace Gas Piping Tolland Meter Service Furniture Replace Generator block heater Replace Generator block heater Install card reader Install glass white board Install Restroom Exhaust Fan Install new threshold & hinge F2511034 Catch Basin Replacement F2511034 Catch Basin Replacement F2511035 Line Room Card Reader Installation F2511035 Line Room Card Reader Installation F2511036 Security Camera Replacement F2511036 F2511037 F2511037 F2511038 F2511038 F2511039 F2511039 F2511040 F2511040 F2511041 Security Camera Replacement Chilled water bypass valve Chilled water bypass valve RReplace Eye Wash Station RReplace Eye Wash Station Berlin Warehouse new catch basin Berlin Warehouse new catch basin Replace Exterior LED Fixture Replace Exterior LED Fixture Add Pedestal Truck Outlets F2511042 Linemen Room Receptacle F2511043 Electric Unit Heater Installation F2511043 Electric Unit Heater Installation F2511044 F2511045 F2511045 Equipment Charging Station Block Heater Replacement Block Heater Replacement long_description Berlin - Central Warehouse - Offices Mini-Split HVAC Unit Replacement There is a mini-split HVAC system serving the centralized office and conference room in the middle of the building that has become unreliable and is beyond its useful lifetime. This project will replace the unit as well as relocate the existing outdoor condensing unit inside the building to better protect it from the elements and improve reliability. Berlin - Central Warehouse - Offices Mini-Split HVAC Unit Replacement There is a mini-split HVAC system serving the centralized office and conference room in the middle of the building that has become unreliable and is beyond its useful lifetime. This project will replace the unit as well as relocate the existing outdoor condensing unit inside the building to better protect it from the elements and improve reliability. Windsor Locks Warehouse Renovation - Bldgs Windsor Locks Warehouse Renovation - Bldgs Waterbury Warehouse Renovation - Buildings Waterbury Warehouse Renovation - Buildings Hartford - Sheldon - Store Room Office Renovation Proposing to install new flooring paint and relocate printer to accommodate an additional employee being added to the store room staff Hartford - Sheldon - Store Room Office Renovation Proposing to install new flooring paint and relocate printer to accommodate an additional employee being added to the store room staff Newtown - Loading Dock Truck Bumper's Replacement Newtown - Loading Dock Truck Bumper's Replacement New Britain - Boiler Motor Replacement New Britain - Boiler Motor Replacement Waterbury Freight - Replace OH door operators and replace with ones with safeties. Waterbury Freight - Replace OH door operators and replace with ones with safeties. Cheshire - Store Room - Office Renovation Proposing to install new flooring paint and relocate printer to accommodate an additional employee being added to the store room staff Cheshire - Store Room - Office Renovation Proposing to install new flooring paint and relocate printer to accommodate an additional employee being added to the store room staff Newtown - Fleet Garage - Compressor Air Dryer Replacment Newtown - Fleet Garage - Compressor Air Dryer Replacment New Britain - Loading Dock Replacement Replacement of loading dock at specified area. This section of loading dock overhangs the building basement entry way. The steel along with concrete has been identified by engineers as unsafe and a potential hazard. This area will be demoed and replaced per engineer design. New Britain - Loading Dock Replacement Replacement of loading dock at specified area. This section of loading dock overhangs the building basement entry way. The steel along with concrete has been identified by engineers as unsafe and a potential hazard. This area will be demoed and replaced per engineer design. Stamford - VCT Replacement Replace failing VCT Flooring in high traffic area with new LVT - this was identified during a safety audit as a possible tripping hazard. Stamford - VCT Replacement Replace failing VCT Flooring in high traffic area with new LVT - this was identified during a safety audit as a possible tripping hazard. Waterbury - Freight - Rear Exit Door Replacement Rear exit door is rusted through allowing air,rodents etc to enter building Waterbury - Freight - Rear Exit Door Replacement Rear exit door is rusted through allowing air,rodents etc to enter building New Britain - Electrical Room - Door Frame Replacement Replacement of failing wood door along with frame for the electrical room, in addition the concrete flooring will be addressed which has multiple spalling areas that are safety concerns. New Britain - Electrical Room - Door Frame Replacement Replacement of failing wood door along with frame for the electrical room, in addition the concrete flooring will be addressed which has multiple spalling areas that are safety concerns. Torrington - Oil Dispenser Replacement Replacement of failed oil dispenser along with reel, new unit will be Alemite Reel with a Lincoln Oil Dispensing Gun. Hartford Sheldon St - Sprinkler Replacement Hartford Sheldon St - Sprinkler Replacement Southington - Remove underground tank Hartford - Sheldon - Desk Chair Replacements Requesting to remove & replace 24 desk chairs Hartford - Sheldon - Desk Chair Replacements Requesting to remove & replace 24 desk chairs Torrington - Fleet Garage Inground Lift Replacement Newtown - Install (2) Electrical Circuits Stores Office Stamford Engineering Dept - Replace 8 chairs Falls Village - Linemen Room Construction - Bldgs Falls Village - Linemen Room Construction - Bldgs Falls Village - Linemen Room Furniture - GP Norwalk - Tindall - Linemen Supervisor Room Renovation (Bldgs) Per Eversource design, project includes but not limited to - demo existing furniture, replace flooring as needed, electrical, data, patch and painting of space. Norwalk - Tindall - Linemen Supervisor Room Renovation (Bldgs) Per Eversource design, project includes but not limited to - demo existing furniture, replace flooring as needed, electrical, data, patch and painting of space. Norwalk - Tindall - Linemen Supervisor Room Renovation - GP Per Eversource design, project includes but not limited to - demo existing furniture, replace flooring as needed, electrical, data, patch and painting of space. Norwalk - Tindall - Linemen Supervisor Room Renovation - GP Per Eversource design, project includes but not limited to - demo existing furniture, replace flooring as needed, electrical, data, patch and painting of space. Stamford - Linemen Supervisor Room Renovation - Construction - Bldgs Stamford - Linemen Supervisor Room Renovation - Construction - Bldgs Stamford - Linemen Supervisor Room Renovation -Furniture - GP Stamford - Linemen Supervisor Room Renovation -Furniture - GP New Britain - Men & Women's Sink Drain Replacement Replacement of 2nd Floor sink drains in both the men's and women's bathrooms - Drains have begun to corrode causing leaks. Included is the replacement of pipe insulation. New Britain - Men & Women's Sink Drain Replacement Replacement of 2nd Floor sink drains in both the men's and women's bathrooms - Drains have begun to corrode causing leaks. Included is the replacement of pipe insulation. Torrington - Fleet Garage - Roll Up Door Replacement Replacement of failing roll up door identified during a safety audit. Torrington - Fleet Garage - Roll Up Door Replacement Replacement of failing roll up door identified during a safety audit. Hartford - Sheldon - Power & Data for (2) Workstations Field Ops has 2 new supervisors starting that will need workstations Hartord - Sheldon - Install (2) Workstations Field Ops has 2 new supervisors starting that will need workstations Madison Garage Replacing electrical power Madison Garage Replacing electrical power Waterbury Freight - emergency egress & way finding signage Norwalk Tindall Ave - Replacement Of Heat Loop Pump Norwalk Tindall Ave - Replacement Of Heat Loop Pump Stamford - Door Strike Replacement Replacement of failed door strike along with power pack for Door #15. Stamford - Door Strike Replacement Replacement of failed door strike along with power pack for Door #15. East Hampton AWC Garage Façade Review and Design East Hampton AWC Garage Façade Review and Design Newtown - Replacement of Exterior Pole Lights Replacement of eight (8) failed LED pole light fixtures with new units including the replacement of one (1) failed high bay fixture within the Fleet Garage. Newtown - Replacement of Exterior Pole Lights Replacement of eight (8) failed LED pole light fixtures with new units including the replacement of one (1) failed high bay fixture within the Fleet Garage. Norwalk - Tindall - Break Room Electrical Circuit Install a separate circuit for refrigerator located in second floor breakroom, circuit will consist of but not limited to installation of electrical conduit, circuit breaker, wire and electrical boxes. Stamford - Gas Unit Heater Replacements (2) Replace two failed unit heaters with two new Modine gas units - failed units are over twenty five years in age. Stamford - Gas Unit Heater Replacements (2) Replace two failed unit heaters with two new Modine gas units - failed units are over twenty five years in age. Torrington - Huddle Room Create a Huddle Room - Utilizing an existing office. Space will consist of a new door, carpet, vinyle base, paint and patch along with existing furniture in storage. Torrington - Huddle Room Create a Huddle Room - Utilizing an existing office. Space will consist of a new door, carpet, vinyle base, paint and patch along with existing furniture in storage. Hartford Sheldon St - Install emergency circuit in Ops area Hartford Sheldon St - Install emergency circuit in Ops area New Britain - Gate Valve Replacement Replacement of failed gate valve (currently leaking) on domestic water line with new ball valve also including expansion tank and pressure regulator. New Britain - Gate Valve Replacement Replacement of failed gate valve (currently leaking) on domestic water line with new ball valve also including expansion tank and pressure regulator. Newtown - Engineering for AHU Replacement (2) Engineering for the replacement of two (2) AHU's along with interior ductwork. Waterbury - Freight - Install Panic Bars Ops & safety are requesting panic devices with alarms to be installed on emergency doors to deter from doors being propped open to the exterior of the building Stamford - ALC Controller Replacement Replace failed ALC Controller that operates five (5) gas unit heaters within the stores material area. Stamford - ALC Controller Replacement Replace failed ALC Controller that operates five (5) gas unit heaters within the stores material area. Norwalk - Tindall - Gate Intercom Replacement Replacement of failed intercom at the Grand Street Gate. Norwalk - Tindall - Gate Intercom Replacement Replacement of failed intercom at the Grand Street Gate. Norwalk -Tindall - Window Replacement & Facade Improvements North Side - Windows have reached the end of their useful Life cycle Norwalk -Tindall - Window Replacement & Facade Improvements North Side - Windows have reached the end of their useful Life cycle Newtown - Fleet Garage - Waste Pipe Vent Replacement Replacement of failed waste vent piping including roof stand-off's. Existing ABS piping failed (seperated) due age and wooden supoorts, new supports will be roof blocks and friction clamps. Newtown - Fleet Garage - Waste Pipe Vent Replacement Replacement of failed waste vent piping including roof stand-off's. Existing ABS piping failed (seperated) due age and wooden supoorts, new supports will be roof blocks and friction clamps. Madison - Replace Roof Drain Madison - Replace Roof Drain New London - Replace Catch Basin & Fill Sink Hole New London - Replace Catch Basin & Fill Sink Hole cost_element_group ferc_account percent Labor-L01 108030 0.04761905 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 107010 108030 107010 108030 107010 0.95238095 0.05 0.95 0.05 0.95 Labor-L01 108030 0.04489016 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 107010 108030 107010 108030 107010 108030 107010 0.95510984 0.04761905 0.95238095 0.04761905 0.95238095 0.04761905 0.95238095 Labor-L01 107010 0.95238095 Labor-L01 Labor-L01 Labor-L01 108030 107010 108030 0.04761905 0.95238095 0.04761905 Labor-L01 108030 0.02614924 Labor-L01 107010 0.97385076 Labor-L01 108030 0.04993488 Labor-L01 107010 0.95006512 Labor-L01 108030 0.04761926 Labor-L01 107010 0.95238074 Labor-L01 107010 0.95 Labor-L01 108030 0.05 Labor-L01 Labor-L01 Labor-L01 Labor-L01 107010 108030 107010 108030 1 0.04761905 0.95238095 1 Labor-L01 107010 0.95238095 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 108030 107010 107010 107010 108030 107010 107010 0.04761905 1 1 1 0.05063291 0.94936709 1 Labor-L01 107010 0.93248175 Labor-L01 108030 0.06751825 Labor-L01 108030 0.05 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 107010 107010 108030 108030 107010 0.95 0.94353519 0.05646481 0.05 0.95 Labor-L01 107010 0.95 Labor-L01 108030 0.05 Labor-L01 108030 0.05 Labor-L01 107010 0.95 Labor-L01 107010 1 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 107010 107010 108030 107010 108030 107010 1 0.95238095 0.04761905 1 0.04761905 0.95238095 Labor-L01 107010 0.95 Labor-L01 Labor-L01 Labor-L01 108030 108030 107010 0.05 0.05 0.95 Labor-L01 107010 0.95238076 Labor-L01 108030 0.04761924 Labor-L01 107010 1 Labor-L01 107010 0.95238095 Labor-L01 108030 0.04761905 Labor-L01 107010 0.90884977 Labor-L01 Labor-L01 Labor-L01 108030 108030 107010 0.09115023 0.04761905 0.95238095 Labor-L01 108030 0.04761905 Labor-L01 107010 0.95238095 Labor-L01 107010 1 Labor-L01 107010 1 Labor-L01 107010 0.95238095 Labor-L01 108030 0.04761905 Labor-L01 107010 0.95 Labor-L01 108030 0.05 Labor-L01 108030 0.05 Labor-L01 107010 0.95 Labor-L01 108030 0.05 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 107010 108030 107010 108030 107010 0.95 0.05 0.95 0.05 0.95 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 107010 108030 107010 107010 108030 107010 108030 107010 108030 107010 108030 107010 107010 107010 107010 107010 108030 107010 108030 107010 108030 107010 1 0.05 0.95 0.95 0.05 0.95 0.05 1 0.05 0.95 0.05 0.95 1 1 1 1 0.05 0.95 0.05 0.95 0.05 0.95 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 107010 107010 108030 107010 108030 108030 107010 107010 107010 108030 107010 108030 108030 107010 107010 108030 107010 108030 107010 107010 107010 107010 107010 1 0.95 0.05 0.95 0.05 0.05 0.95 1 0.95 0.05 0.95 0.05 0.05 0.95 0.95 0.05 1 0.05 0.95 1 1 1 1 Labor-L01 107010 0.95 Labor-L01 108030 0.05 Labor-L01 108030 0.05 Labor-L01 107010 0.95 Labor-L01 107010 0.95238092 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 108030 108030 107010 107010 108030 107010 108030 108030 107010 107010 0.04761908 0.05 0.95 0.95 0.05 0.95 0.05 0.05 0.95 1 Labor-L01 107010 1 Labor-L01 107010 0.95 Labor-L01 108030 0.05 Labor-L01 Labor-L01 Labor-L01 107010 108030 107010 1 0.05 0.95 Cheshire - BMS System Install ofl BMS system throughout the AWC BCW - Replace switchgear BCW - Replace switchgear Stamford - Replacement Of Failed Exhaust Fan Stamford - Replacement Of Failed Exhaust Fan New London EOC Renovation - Furniture New London EOC Renovation - Furniture Newtown - Installation Of Electrical Circuits Electric Maintenance Shop. Due to company growth, the installation of two (2) 20 amp - 120 volt power circuits within the Electric Mainteance Shop. These circuits will be added in order to separate existing loads which currenly is on one (1) power source and keeps tripping the breaker becoming a safety concern. Transmission Warehouse - Pole Setting RMT Storm Room Renovation Transmission Warehouse - Pole Setting RMT Storm Room Renovation Madison AWC Elec Panel Feeder Replacement Madison AWC Elec Panel Feeder Replacement Hartford - Install additional outlets Tolland - Install Water Pressure Pump Madison Garage Install Fluid Distribution Reels New London EOC Renovation - AV BCW - NE Corner Replace Generator BCW - NE Corner Replace Generator BCW - Replace Electrical Panels BCW - Replace Electrical Panels Madison - Replace ice machine Madison - Replace ice machine Hartford - Sheldon - Gear Lockers Additonal gear lockers are needed due to growth in personnel roster. Waterbury Freight - Fleet garage generator replacement Waterbury Freight - Fleet garage generator replacement Cheshire - Replace vehicle lift Cheshire - Replace vehicle lift East Hampton - Replace Garage Lift Control Box & Saddle Adapters East Hampton - Replace Garage Lift Control Box & Saddle Adapters Berlin Central Warehouse Roof Railings Installations Hartford Sheldon St - LED light fixture replacement Hartford Sheldon St - LED light fixture replacement Norwalk Tindall Ave - Replacement Of Failing Concrete Norwalk Tindall Ave - Replacement Of Failing Concrete Torrington - Generator Lift Pump Replacement Torrington - Generator Lift Pump Replacement Waterbury Freight - Replace Gas Piping Waterbury Freight - Replace Gas Piping Tolland Meter Service Furniture. Meter Service requested workstation for Supervisor to work out of this location. Newtown - Generator Block Heater Replacement Newtown - Generator Block Heater Replacement Danielson Storm Room - Install Card Reader Hartford Sheldon St - Install Glass White Board East Hampton - Install Restroom Exhaust Fan Madison - Install a new threshhold and continuous hinge to secure front door. Waterbury - Freight St - Catch Basin Replacement 2 catch basins are collapsing inward due to concrete crumbling and layers of brick work crumbling. Waterbury - Freight St - Catch Basin Replacement 2 catch basins are collapsing inward due to concrete crumbling and layers of brick work crumbling. East Hampton - Line Room Card Reader Installation Electric Operations would like to limit access to the line room. East Hampton - Line Room Card Reader Installation Electric Operations would like to limit access to the line room. Hartford - Sheldon - Security Camera Replacement Security has discovered 13 cameras that require replacement due them not functioning, new cameras will have new wiring pulled to support higher data transmission rates required for clarity. This was discovered during two recent events involving motor vehicle accidents. Hartford - Sheldon - Security Camera Replacement Security has discovered 13 cameras that require replacement due them not functioning, new cameras will have new wiring pulled to support higher data transmission rates required for clarity. This was discovered during two recent events involving motor vehicle accidents. Hartford Sheldon St - Chilled water bypass valve Hartford Sheldon St - Chilled water bypass valve East Hampton - Replace Eye Wash Station in Storeroom East Hampton - Replace Eye Wash Station in Storeroom Berlin Warehouse new catch basin Berlin Warehouse new catch basin Falls Village - Replace Exterior LED Fixture Falls Village - Replace Exterior LED Fixture Danielson Add Pedestal Truck Outlets Torrington - Linemen Room Receptacle Installation Installation of receptacles for linemen charging stations. New Britain - Electric Unit Heater Installation Replacement of two (2) failed gas unit heaters with new electric units, new units will be connected into the existing building BMS. New Britain - Electric Unit Heater Installation Replacement of two (2) failed gas unit heaters with new electric units, new units will be connected into the existing building BMS. Falls Village - Equipment Charging Station Installation of electrical circuit for new electric Walkie Reach, icluding but not limited to - disconnect, breaker, conduit along with panel shutdown. Falls Village - Block Heater Replacement Falls Village - Block Heater ReplacementPage 852 of 867
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued October 23, 2026 RRU-159 Attachment 8 Page 852 of 867 work_order_number F2511046 description Hot Water Heater Replacement long_description Torrington - Hot Water Heater Replacement Replacement of failed 80 gallon Hubble water heater with new State 80 gallon unit. Scope consists of but not limited to, abatement of contaminated pipe insulation, new water valves, expansion tank, insulate water pipes, installation of a disconnect along with new 480 volt electrical circuit. F2511046 Hot Water Heater Replacement F2511047 F2511048 East Hampton - Line Striping Tolland Meter Shop Card Reader F2511049 Bellviiew - Catch Basin Replacement F2511049 F2511050 F2511050 F2511052 F2511053 F2511053 F2511054 F2511054 Bellviiew - Catch Basin Replacement Hartford - Replace fence Hartford - Replace fence Install Poleyard forklift shelte Replacement Of Weaver Pump Replacement Of Weaver Pump Replace electrical panel board Replace electrical panel board F2511055 F2511056 F2511057 F2511058 F2511058 Mothers Room Furniture Install add'l lockers Replace picnic tables Replace Elevator Door Operator Replace Elevator Door Operator F2511059 Card Reader Replacement F2511059 F2511060 F2511061 Card Reader Replacement Install card rdr ped extension Tolland Mother's Room Table F2511062 Waterbury - Freight - Desk Carrels F2511063 Personnel Renovations F2511063 F2511064 F2511064 Personnel Renovations Paving replacement Paving replacement F2511065 Norwalk - Tindall - Sit/Stand Desk F2511065 F2511066 F2511066 F2511067 F2511068 F2511068 F2511069 F2511069 F2511070 Norwalk - Tindall - Sit/Stand Desk Catch Basin Replacement Catch Basin Replacement Madison AWC Line Striping East Hampton - Replace Paving East Hampton - Replace Paving Replace Oil Pump Replace Oil Pump Madison - Replace Picnic Table Torrington - Hot Water Heater Replacement Replacement of failed 80 gallon Hubble water heater with new State 80 gallon unit. Scope consists of but not limited to, abatement of contaminated pipe insulation, new water valves, expansion tank, insulate water pipes, installation of a disconnect along with new 480 volt electrical circuit. East Hampton - Line Striping Existing striping in parking lot is no longer visible for parking spaces. Tolland Meter Shop Card Reader Southington - Bellviiew - Catch Basin Replacement Three catch basins have collapsed in parking lot which require replacement due to the inablilty of them to safely support the weight of a vehicle. Southington - Bellviiew - Catch Basin Replacement Three catch basins have collapsed in parking lot which require replacement due to the inablilty of them to safely support the weight of a vehicle. Hartford - Replace fence Hartford - Replace fence Hartford - Poleyard forklift shelter Norwalk Tindall Ave - Replacement Of Weaver Pump Norwalk Tindall Ave - Replacement Of Weaver Pump Stamford - Replace Electrical Panel Board Stamford - Replace Electrical Panel Board East Eampton - Mothers Room Furniture Room was requested for employee at the AWC Tolland - Install add'l Line Room Lockers East Hampton - Replace picnic tables New London - Replace Elevator Door Operator New London - Replace Elevator Door Operator Norwalk - Tindall - Card Reader Replacement Replacement of failed card reader along with associated wiring located at the Grand Street Entry Gate Norwalk - Tindall - Card Reader Replacement Replacement of failed card reader along with associated wiring located at the Grand Street Entry Gate Madison - Install Card Reader Pedestal Extension Tolland Mother's Room Table Waterbury - Freight - Desk Carrels Purcahse and supply 12 desk Carrels Watebury Freight - Personnel Renovations Waterbury Field ops is expanding their workforce and requesting additional furniture and renovation of their area. Watebury Freight - Personnel Renovations Waterbury Field ops is expanding their workforce and requesting additional furniture and renovation of their area. Hartford Sheldon St - Replace paving Hartford Sheldon St - Replace paving Norwalk - Tindall - Sit/Stand Desk Supply and install sit/stand desk along with ergonomics chair based on evaluation. Norwalk - Tindall - Sit/Stand Desk Supply and install sit/stand desk along with ergonomics chair based on evaluation. Newtown - Catch Basin Replacement Newtown - Catch Basin Replacement Madison AWC Line Striping East Hampton - Replace Paving East Hampton - Replace Paving Torrington - Fleet Garage Replace Oil Pump Torrington - Fleet Garage Replace Oil Pump Madison - Replace Picnic Table F2511071 Catch Basin Replacement (2) Berlin - Warehouse - Catch Basin Replacement 2 Catch basins at the warehouse are extremely damaged. The metal grate on both is rotting with the risk of falling in and the concrete around it is eroded with the same risk of falling in. The area needs to be excavated, sawcut and replacement catch basins to be installed with new paving around the area. cost_element_group ferc_account percent Labor-L01 108030 0.05 Labor-L01 107010 0.95 Labor-L01 Labor-L01 107010 107010 1 1 Labor-L01 107010 0.95 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 108030 108030 107010 107010 107010 108030 107010 108030 0.05 0.05 0.95 1 0.95 0.05 0.95 0.05 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 107010 107010 107010 107010 108030 1 1 1 0.95 0.05 Labor-L01 108030 0.05 Labor-L01 Labor-L01 Labor-L01 107010 107010 107010 0.95 1 1 Labor-L01 107010 1 Labor-L01 108030 0.05 Labor-L01 Labor-L01 Labor-L01 107010 108030 107010 0.95 0.05 0.95 Labor-L01 108030 0.05 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 107010 108030 107010 107010 108030 107010 107010 108030 107010 0.95 0.05 0.95 1 0.05 0.95 0.95 0.05 1 Labor-L01 107010 0.95 Labor-L01 Labor-L01 Labor-L01 108030 107010 108030 0.05 0.95 0.05 Labor-L01 107010 0.95 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 108030 108030 107010 107010 108030 0.05 0.05 0.95 0.95 0.05 Labor-L01 108030 0.05 Labor-L01 107010 0.95 Labor-L01 108030 0.05 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 107010 108030 107010 107010 108030 107010 108030 107010 108030 108030 107010 0.95 0.05 0.95 0.95 0.05 0.95 0.05 0.95 0.05 0.05 0.95 Labor-L01 108030 0.05 Labor-L01 107010 0.95 Labor-L01 108030 0.05 F2511071 F2511072 F2511072 Catch Basin Replacement (2) Replace Overhead Door and Operator Replace Overhead Door and Operator F2511073 New Britain - Heat Pump Replacement F2511073 F2511074 F2511074 F2511075 F2511075 New Britain - Heat Pump Replacement Tolland - Replace Catch Basin Tolland - Replace Catch Basin Replace for Chiller/Boilers Replace for Chiller/Boilers F2511076 3T Split System Replacement F2511076 3T Split System Replacement F2511077 Carbon Monoxide System Guard Rail F2511077 F2511078 F2511078 F2511079 F2511079 F2511080 F2511080 F2511081 F2511081 F2511082 F2511082 Carbon Monoxide System Guard Rail Replace of Fleet Air Hose Reels Replace of Fleet Air Hose Reels Replace ice machine Replace ice machine Replace Sanitary Piping Replace Sanitary Piping Replace concrete & metal wall Replace concrete & metal wall New Britain - Meter Lab Furniture New Britain - Meter Lab Furniture F2511083 Concrete Backfill Pump Out Tank F2511083 Concrete Backfill Pump Out Tank F2511084 ATC - Slide Gate Replacement F2511084 F2511085 F2511085 F2511086 ATC - Slide Gate Replacement Replace ice machine Replace ice machine Install Electrical Circuit Berlin - Warehouse - Catch Basin Replacement 2 Catch basins at the warehouse are extremely damaged. The metal grate on both is rotting with the risk of falling in and the concrete around it is eroded with the same risk of falling in. The area needs to be excavated, sawcut and replacement catch basins to be installed with new paving around the area. New Britain - Replace Overhead Door and Operator New Britain - Replace Overhead Door and Operator New Britain - Heat Pump Replacement Replacement of failed heat pump including the replacement of vibration eliminators, replacement of 2" copper piping due to pin holes and the installation of isolation valves New Britain - Heat Pump Replacement Replacement of failed heat pump including the replacement of vibration eliminators, replacement of 2" copper piping due to pin holes and the installation of isolation valves Tolland - Replace Catch Basin Tolland - Replace Catch Basin Stamford - Replace for Chiller/Boilers Stamford - Replace for Chiller/Boilers Southington - Bellviiew - 3T Split System Replacement 3ton split system that serves the radio equipment has failed and requires replacement. This unit serves the radio equipment room located in the basment of the Southington convex bldg. the radio equipment is currently in an overheated state. Southington - Bellviiew - 3T Split System Replacement 3ton split system that serves the radio equipment has failed and requires replacement. This unit serves the radio equipment room located in the basment of the Southington convex bldg. the radio equipment is currently in an overheated state. Berlin - ATC Garage - Carbon Monoxide System Guard Rail Install The carbon-monoxide removal unit at the ATC garage is currently unprotected. This project will install guardrails around the unit for protection to keep the unit functioning to extract carbon monoxide from the truck bays from vehicle exhaust as designed. Berlin - ATC Garage - Carbon Monoxide System Guard Rail Install The carbon-monoxide removal unit at the ATC garage is currently unprotected. This project will install guardrails around the unit for protection to keep the unit functioning to extract carbon monoxide from the truck bays from vehicle exhaust as designed. Stamford - Replacement Of Fleet Air Hose Reels Stamford - Replacement Of Fleet Air Hose Reels New Britain - Replace Ice Machine New Britain - Replace Ice Machine Norwalk Tindall Ave - Replacement of Sanitary Piping Norwalk Tindall Ave - Replacement of Sanitary Piping Danielson - Replace Truck Bay concrete & metal wall Danielson - Replace Truck Bay concrete & metal wall New Britain - Meter Lab Furniture New Britain - Meter Lab Furniture New London - Concrete Backfill Pump Out Tank Existing Drain for an abandoned Oil/water separator has been compromised and oily water was surfacing up to the ground floor. Exposing the tank and backfilling with concrete is necessary to mitgate this issue. New London - Concrete Backfill Pump Out Tank Existing Drain for an abandoned Oil/water separator has been compromised and oily water was surfacing up to the ground floor. Exposing the tank and backfilling with concrete is necessary to mitgate this issue. Berlin - ATC - Slide Gate Replacement The slide gate at the ATC is no longer working properly and they have requested to have it replaced. Berlin - ATC - Slide Gate Replacement The slide gate at the ATC is no longer working properly and they have requested to have it replaced. Norwalk Tindall Ave - Replace ice machine Norwalk Tindall Ave - Replace ice machine Stamford - Install Of Electrical Circuit Labor-L01 Labor-L01 Labor-L01 Labor-L01 107010 107010 108030 107010 0.95 0.95 0.05 1 F2511087 Hybrid Bucket Truck Receptacles Torrington - Hybrid Bucket Truck Receptacles With the arrival of new Hybrid Bucket Trucks, installation of eighteen (18) 20 amp -120 volt receptacles - 2 receptacles per parking space. Each parking space will accommodate for the truck block heater and lift battery charger. Included as part of this project is the installation of a new 100/3 panel, update of both the arc flash rating and the one-line diagram. This will complete the entire loading dock parking spaces to include two (2) receptacles per space. Labor-L01 F2511087 Hybrid Bucket Truck Receptacles F2511088 F2511089 F2511090 Freight - Install Camera Install Air Monitor Install EV Charging Stations F2511091 Tindall - Flushometer Replacements F2511091 Tindall - Flushometer Replacements F2511092 Madison - Lock Set Replacement F2511092 Madison - Lock Set Replacement F2511093 Fleet Garage Ergonomics Furniture F2511093 Fleet Garage Ergonomics Furniture F2511094 Fleet Garage - Erogonmic Furniture F2511094 Fleet Garage - Erogonmic Furniture F2511095 Pedestrian Gate Replacement F2511095 Pedestrian Gate Replacement F2511096 Card Reader Pedestal Replacement F2511096 Card Reader Pedestal Replacement F2511097 EOC RTU Replacement F2511097 EOC RTU Replacement F2511098 Tolland - Oil Dispenser Pump F2511098 Tolland - Oil Dispenser Pump F2511099 BCW - Fire Door Replacement F2511099 BCW - Fire Door Replacement F2511100 Electric Room Door Replacement F2511100 F2511101 F2511101 F2511102 F2511102 F2511104 F2511104 F2511105 F2511105 Electric Room Door Replacement Replace electric boiler Replace electric boiler Replace Oil Water Separator Pump Replace Oil Water Separator Pump Hartford - Replace building pump Hartford - Replace building pump Newtown - Ergonomics Sit/Stand Desk Newtown - Ergonomics Sit/Stand Desk F2511106 New London - Paving of Eroded Area F2511106 New London - Paving of Eroded Area F2511107 Southington - Ramp Removal F2511107 Southington - Ramp Removal F2511108 Post Lift Pump Replacement F2511108 Post Lift Pump Replacement F2511109 Oil Distribution Pump Replacment F2511109 F2511110 F2511110 F2511111 F2511111 Oil Distribution Pump Replacment wash bay fan installation wash bay fan installation Ugrade safety items per audit Ugrade safety items per audit F2511112 Torrington - Mother's Room F2511113 Madison - Concrete Replacement F2511113 Madison - Concrete Replacement F2511114 Security Controllers & Cabinet Rplc F2511114 F2511115 F2511115 Security Controllers & Cabinet Rplc Ergonomics Sit/Stand Desk Ergonomics Sit/Stand Desk F2511116 Freight - Fence Replacement F2511116 F2511117 F2511117 F2511118 F2511118 Freight - Fence Replacement Replace Fastrak Door Replace Fastrak Door Replace Unit Heater Replace Unit Heater F2511119 Boiler Circulator Pump Replacement F2511119 Boiler Circulator Pump Replacement F2511120 Hartford - Sheldon - Catch Basin R F2511120 Hartford - Sheldon - Catch Basin R F2511121 Electric Unit Heater Replacement F2511121 F2511122 F2511122 F2511123 F2511124 Electric Unit Heater Replacement Pressure Washer Replacement Pressure Washer Replacement Card Reader Installation Replace underground cable F2511125 Office Chari Replacements F2511125 F2511126 Office Chari Replacements Fire supression compressor Torrington - Hybrid Bucket Truck Receptacles With the arrival of new Hybrid Bucket Trucks, installation of eighteen (18) 20 amp -120 volt receptacles - 2 receptacles per parking space. Each parking space will accommodate for the truck block heater and lift battery charger. Included as part of this project is the installation of a new 100/3 panel, update of both the arc flash rating and the one-line diagram. This will complete the entire loading dock parking spaces to include two (2) receptacles per space. Waterbury - Freight - Install Camera A homeless person accessing the patio and there is no camera in that area. New Britain - Install Air Monitor in basement Newtown -Install 3 dual head ChargePoint EV Charging Stations Norwalk - Tindall - Flushometer Replacements Replacement of three (3) failed Sloan Flushometers. Norwalk - Tindall - Flushometer Replacements Replacement of three (3) failed Sloan Flushometers. Madison - Lock Set Replacement Replace passage handles with locksets for Apprentice room. Madison - Lock Set Replacement Replace passage handles with locksets for Apprentice room. Norwalk - Tindall - Fleet Garage Ergonomics Furniture Supply and install sit/stand desk along with ergonomics chair based on evaluation. Norwalk - Tindall - Fleet Garage Ergonomics Furniture Supply and install sit/stand desk along with ergonomics chair based on evaluation. Stamford - Fleet Garage - Erogonmic Furniture Supply and install sit/stand desk along with ergonomics chair based on evaluation. Stamford - Fleet Garage - Erogonmic Furniture Supply and install sit/stand desk along with ergonomics chair based on evaluation. Cheshire - Pedestrian Gate Replacement Pedestrian gate has corroded through posts which don’t allow it to close completely, this is a security concern for the property. Cheshire - Pedestrian Gate Replacement Pedestrian gate has corroded through posts which don’t allow it to close completely, this is a security concern for the property. Stamford - Entry Gate Card Reader Pedestal Replacement Replacement of the entry gate card reader pedestal, existing unit has decayed beyond repair due to being in the exterior elements. Stamford - Entry Gate Card Reader Pedestal Replacement Replacement of the entry gate card reader pedestal, existing unit has decayed beyond repair due to being in the exterior elements. Hartford - Sheldon - EOC RTU Replacement EOC Rooftop unit has mutiple refrigerant leaks and requires frequent repairs, this unit serves only the eoc. Hartford - Sheldon - EOC RTU Replacement EOC Rooftop unit has mutiple refrigerant leaks and requires frequent repairs, this unit serves only the eoc. Tolland - Oil Dispenser Pump Oil Dispenser Pump in the garage has failed. Tolland - Oil Dispenser Pump Oil Dispenser Pump in the garage has failed. Berlin - BCW - Fire Door Replacement Issues were identified with this door that requires replacement to get back in compliance with safety standards in the event of an emergency. Berlin - BCW - Fire Door Replacement Issues were identified with this door that requires replacement to get back in compliance with safety standards in the event of an emergency. Cheshire - Electric Room Door Replacement Replacing door so that it has both panic hardware and opens away from the electrical room as required by Building Code. Cheshire - Electric Room Door Replacement Replacing door so that it has both panic hardware and opens away from the electrical room as required by Building Code. Waterbury Freight - Replace electric boiler Waterbury Freight - Replace electric boiler Tolland - Replace Oil Water Separator Pump Tolland - Replace Oil Water Separator Pump Hartford - Replace building pump Hartford - Replace building pump Newtown - Ergonomics Sit/Stand Desk Newtown - Ergonomics Sit/Stand Desk New London Myrock - Paving of Eroded Area Removal of approximately 1800 square feet of eroded asphalt which has become a safety concern - Replacing with 2" binder and 2" top coat. New London Myrock - Paving of Eroded Area Removal of approximately 1800 square feet of eroded asphalt which has become a safety concern - Replacing with 2" binder and 2" top coat. Southington - Ramp Removal The handicap ramp located on the side of the building has detoriorated beyond repair. The wood is rotting, and the steel components are rusting through, creating safety concerns. Southington - Ramp Removal The handicap ramp located on the side of the building has detoriorated beyond repair. The wood is rotting, and the steel components are rusting through, creating safety concerns. Cheshire - Post Lift Pump Replacement Postlift has a failed hydraulic ram pump leaving lift inoperable. Cheshire - Post Lift Pump Replacement Postlift has a failed hydraulic ram pump leaving lift inoperable. Watebury - Freight - Oil Distribution Pump Replacment 2 oil pumps for the high pressure bulk distribution system require replacement Watebury - Freight - Oil Distribution Pump Replacment 2 oil pumps for the high pressure bulk distribution system require replacement East Hampton - wash bay fan installation East Hampton - wash bay fan installation Falls Village - Upgrade Safety Items - access ladder to roof, loading dock railing along with loading dock stairs, install fall protection around HVAC equipment located on the roof including walkway pads. Falls Village - Upgrade Safety Items - access ladder to roof, loading dock railing along with loading dock stairs, install fall protection around HVAC equipment located on the roof including walkway pads. Torrington - Mother's Room Request for a Mother's Room at the Torrington Facility - Creating a Mother's Room consisting of a mini refrigerator, window film on door glass, signage, lockset and chair. Madison - Concrete Replacement Cracked concrete apron in front of repair Garage requires repalcement due to safety concerns due to size of the spalling that an cause injuries. Madison - Concrete Replacement Cracked concrete apron in front of repair Garage requires repalcement due to safety concerns due to size of the spalling that an cause injuries. Chehire - Security Controllers & Cabinet Replacement security controller has failed and requires a new cabinet to accommodate larger battery sizes for adequate back up. Chehire - Security Controllers & Cabinet Replacement security controller has failed and requires a new cabinet to accommodate larger battery sizes for adequate back up. Newtown - Material Logistics Ergonomics Sit/Stand Desk Newtown - Material Logistics Ergonomics Sit/Stand Desk Waterbury - Freight - Fence Replacement Third party vehicle accident impacted through the two layers of perimeter fence. Requiring the replacement of 4 posts and sections of fabric and barb wire. Waterbury - Freight - Fence Replacement Third party vehicle accident impacted through the two layers of perimeter fence. Requiring the replacement of 4 posts and sections of fabric and barb wire. Berlin Central Warehouse Replace Fastrak Door Berlin Central Warehouse Replace Fastrak Door New Britain - Warehouse Replace Unit Heater New Britain - Warehouse Replace Unit Heater Norwalk - Tindall - Boiler Circulator Pump Replacement 108030 0.05 Labor-L01 107010 0.95 Labor-L01 Labor-L01 Labor-L01 107010 107010 107010 1 1 1 Labor-L01 108030 0.05 Labor-L01 107010 0.95 Labor-L01 107010 0.95 Labor-L01 108030 0.05 Labor-L01 108030 0.05 Labor-L01 107010 0.95 Labor-L01 107010 0.95 Labor-L01 108030 0.05 Labor-L01 107010 0.95 Labor-L01 108030 0.05 Labor-L01 107010 0.95 Labor-L01 108030 0.05 Labor-L01 107010 0.95 Labor-L01 108030 0.05 Labor-L01 107010 0.95 Labor-L01 108030 0.05 Labor-L01 108030 0.05 Labor-L01 107010 0.95 Labor-L01 107010 0.95 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 108030 107010 108030 108030 107010 107010 108030 107010 108030 0.05 0.95 0.05 0.05 0.95 0.95 0.05 0.95 0.05 Labor-L01 107010 0.95 Labor-L01 108030 0.05 Labor-L01 107010 0.95 Labor-L01 108030 0.05 Labor-L01 107010 0.95 Labor-L01 108030 0.05 Labor-L01 108030 0.05 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 107010 108030 107010 108030 107010 0.95 0.05 0.95 0.05 0.95 Labor-L01 107010 1 Labor-L01 108030 0.05 Labor-L01 107010 0.95 Labor-L01 108030 0.05 Labor-L01 Labor-L01 Labor-L01 107010 107010 108030 0.95 0.95 0.05 Labor-L01 108030 0.05 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 107010 107010 108030 108030 107010 0.95 0.95 0.05 0.05 0.95 Labor-L01 108030 0.05 Labor-L01 107010 0.95 Labor-L01 107010 0.95 Labor-L01 108030 0.05 Labor-L01 107010 0.95 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 108030 107010 108030 107010 107010 0.05 0.95 0.05 1 1 Labor-L01 107010 0.95 Labor-L01 Labor-L01 108030 108030 0.05 0.05 Norwalk - Tindall - Boiler Circulator Pump Replacement Hartford - Sheldon - Catch Basin Replacement Three catch basins are cracked and in danger of collapse, proposing to also line strip loading dock area Hartford - Sheldon - Catch Basin Replacement Three catch basins are cracked and in danger of collapse, proposing to also line strip loading dock area Norwalk Tindall Ave - Electric Unit Heater Replacement Replacement of two (2) failed electric unit heaters Norwalk Tindall Ave - Electric Unit Heater Replacement Replacement of two (2) failed electric unit heaters Danielson - Pressure Washer Replacement Danielson - Pressure Washer Replacement Falls Village - Card Reader Installation Training Yard Underground Cable Replacement Newtown - Office Chari Replacements Tenant-Driven, replacement of 25 office chairs. Existing chairs are old and not functioning correctly, new units will be company standard Amia - Navy in color. Newtown - Office Chari Replacements Tenant-Driven, replacement of 25 office chairs. Existing chairs are old and not functioning correctly, new units will be company standard Amia - Navy in color. Hartford - Replace Fire supression compressorPage 853 of 867
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued October 23, 2026 RRU-159 Attachment 8 Page 853 of 867 work_order_number F2511126 F2511127 F2511128 F2511128 F2511129 F2511129 F2511130 F2511130 F2511131 F2511131 F2511132 F2511132 F2511133 F2511133 F2511134 F2511134 F2511135 F2511135 F2511136 F2511136 F2511137 F2511137 F2511138 F2511138 F2511139 F2511139 F2511140 F2511140 F2511141 F2511143 F2511143 F2511145 F2511145 F2511146 F2511146 F2511147 F2511147 F2511148 F2511148 F2511151 F2511152 F2511152 FALU0011 FALX0011 FAULTLOC FC161102 FC161103 FC161104 FC161107 FC161109 FC161110 FIIRP2AG FIIRP2NP FIR2AX22 FIRCNT22 FIRCT023 FIRCT023 FIRCT024 FIRCT024 FIRCTC25 FIRCTC25 FIRCTE25 FIRCTW25 FIRCTW25 FIREAS22 description Fire supression compressor New Britain - IP Camera Installatio Replace Ice Machine Replace Ice Machine Ergonomics Sit/Stand Desk Ergonomics Sit/Stand Desk Berlin Warehouse Furniture Berlin Warehouse Furniture Circulator Heat Pump Replacement Circulator Heat Pump Replacement Install Ergonomic work station Install Ergonomic work station Replace Unit Heater Replace Unit Heater Windsor Locks Whse - Replace Fence Windsor Locks Whse - Replace Fence Falls Village - Install Pole Yard Falls Village - Install Pole Yard Hartford - Replace Door Hartford - Replace Door Pump & Damper Motor Replacement Pump & Damper Motor Replacement Newtown - Replace LED Fixture Newtown - Replace LED Fixture Replace stairwell roof Replace stairwell roof Replace Fire Alarm Devices Replace Fire Alarm Devices Install Hallway Receptacle Torrington - Replace LED FixturesTo Torrington - Replace LED FixturesTo Replace LED Fixtures Replace LED Fixtures Stamford - Flushometer Replacement Stamford - Flushometer Replacement Replace Faucet Replace Faucet Replace Electric Baseboard Unit Hea Replace Electric Baseboard Unit Hea Install Electric Vehicle Charger Replace Swing Gate Replace Swing Gate Fault Locating (Underground) Fault Locating (DB/Overhead) UG CABLE FAULT LOCATOR VAN Bunker Hill Tower Radio Equipment Waterbury Freight St. Equipment Higganum Tower Radio Equipment Prospect Tower Radio Equipment Southbury Tower Radio Equipment Cheshire Tower Radio Equipment 2021 FAULT INDICATOR NEWTOWN 2AG 2021 FAULT INDICATOR HARTFORD 2NP 2022 Fault Indicator Madison 2AX 2022 Final FI Adj - Cntral 100% cap 2023 Direct Buried Inspection - Map 2023 Direct Buried Inspection - Map 2024 Direct Buried Inspections 2024 Direct Buried Inspections 2025 DB Inspections - Central 2025 DB Inspections - Central 2025 DB Inspections - Eastern 2025 DB Inspections - Western 2025 DB Inspections - Western 2022 Final FI Adj - Eastrn 100% cap long_description Hartford - Replace Fire supression compressor New Britain - Replace IP Camera New London - Replace Ice Machine New London - Replace Ice Machine Newtown - Ergonomics Sit/Stand Desk Newtown - Ergonomics Sit/Stand Desk Berlin Warehouse Furniture Berlin Warehouse Furniture Norwalk - Tindall - Gas Boiler #2 Circulator Heat Pump Replacement Norwalk - Tindall - Gas Boiler #2 Circulator Heat Pump Replacement Waterbury Freight - Install Ergonomic work station Waterbury Freight - Install Ergonomic work station New London Myrock - Fleet Garage - Replace Unit Heater New London Myrock - Fleet Garage - Replace Unit Heater Windsor Locks Whse - Replace Fence Windsor Locks Whse - Replace Fence Falls Village - Install Pole Yard Falls Village - Install Pole Yard Hartford - Replace Door Hartford - Replace Door Cheshire - Cooling Tower Pump & Damper Motor Replacement Cheshire - Cooling Tower Pump & Damper Motor Replacement Newtown - Replace LED Fixture Newtown - Replace LED Fixture Waterbury Freight - Replace stairwell roof Waterbury Freight - Replace stairwell roof New Britain - Replace Fire Alarm Devices New Britain - Replace Fire Alarm Devices Stamford - Install Hallway Receptacle Torrington - Replace LED Fixtures Torrington - Replace LED Fixtures Falls Village - Replace LED Fixtures Falls Village - Replace LED Fixtures Stamford - Flushometer Replacement Stamford - Flushometer Replacement Norwalk Tindall Ave - Replace Faucet Norwalk Tindall Ave - Replace Faucet New Britain - Replace Electric Baseboard Unit Heater New Britain - Replace Electric Baseboard Unit Heater Tolland - Install Electric Vehicle Charger New Britain - Replace Swing Gate New Britain - Replace Swing Gate FALU0011OPSNTRELEXPENSES11 FALX0011OPSNTRELEXPENSES11 PURCHASE 2 MOBILE AUTOMATIC CABLE FAULT LOCATOR VANS, ONE IN CONNECTICUT, ONE IN EASTERN MASS Bunker Hill Tower Radio Equipment - Freight Street Consolidation Waterbury Freight Street Non-Site Specific Equipment Higganum Tower Radio Equipment - Freight Street Consolidation Prospect Tower Radio Equipment - Freight Street Consolidation Southbury Tower Radio Equipment - Freight Street Consolidation Cheshire Tower Radio Equipment THIS IS PART OF THE DB FAULT INDICATOR INSPECTION AND REPLACEMENT PROGRAM FOR 2021 THIS IS PART OF THE DB FAULT INDICATOR INSPECTION AND REPLACEMENT PROGRAM FOR 2021 The purpose of this project is to fund Year 3, 2022, of the Direct Buried (DB) inspection program and replace approximately 4,982 fault indicators throughout Connecticut. MADISON 401 The purpose of this work order is to receive the final, year-end 2022 fault indicator adjustment for Central division. This work order will collect charges for all CT fault indicator replacements in CT in 2023. Project assumes 6372 locations and 2 fault indicators per location (12,744) This work order will collect charges for all CT fault indicator replacements in CT in 2023. Project assumes 6372 locations and 2 fault indicators per location (12,744) This work order will collect charges for all CT fault indicator replacements in CT in 2024. Project estimates a required 8,000 fault indicators for a total cost of $3.891M. This work order will collect charges for all CT fault indicator replacements in CT in 2024. Project estimates a required 8,000 fault indicators for a total cost of $3.891M. This work order will collect charges for CT fault indicator replacements in Central CT in 2025. This work order will collect charges for CT fault indicator replacements in Central CT in 2025. This work order will collect charges for CT fault indicator replacements in Eastern CT for 2025 This work order will collect charges for CT fault indicator replacements in Western CT in 2025. This work order will collect charges for CT fault indicator replacements in Western CT in 2025. The purpose of this work order is to receive the final, year-end 2022 fault indicator adjustment for Eastern division. cost_element_group Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 ferc_account 107010 107010 107010 108030 107010 108030 107010 108030 108030 107010 108030 107010 108030 107010 107010 108030 107010 108030 108030 107010 107010 108030 108030 107010 107010 108030 108030 107010 107010 108030 107010 108030 107010 108030 107010 107010 108030 108030 107010 107010 107010 108030 584020 584020 107010 107010 107010 107010 107010 107010 107010 107010 107010 107010 107010 583000 107010 583000 107010 107010 583000 107010 107010 583000 107010 FM1CNWSN FP11FIBR FARMINGTON 1C NW SENSOR RELAY Norwalk - Lakeview ADSS Fiber Farmington 1C NETWORK PROTECTOR SENSOR PART OF THE DIGITAL GRID RELAY PROJECT - FARMINGTON 1C SS THE SENSORS ARE BEING ADDED TO THE NW PROTECTOR RELAYS BEING INSTALLED THROUGHOUT CONNECTICUT. SENSORS CANNOT OPERATE WITHOUT THE NW PROTECTOR RELAYS Work order is to be used to capture costs for retrofitting relays for network protectors Installation of ADSS Fiber - Norwalk to Lakeview 9S47 Labor-L01 Labor-L01 107010 107010 1 1 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 107010 107010 586152 593000 588250 555440 555430 555855 242320 163020 920018 184010 184010 586000 583000 593000 592000 163020 584000 580000 588260 228230 908100 908100 555950 236140 421TX0 1 1 1 1 1 1 1 1 1 0.3 0.6 0.1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 FREIGHT STREET WTBY 11W NETWORK PROTECTOR SENSOR PART OF THE DIGITAL GRID RELAY PROJECT - FREIGHT STREET 11W THE SENSORS ARE BEING ADDED TO THE NW PROTECTOR RELAYS BEING INSTALLED THROUGHOUT CONNECTICUT. SENSORS CANNOT OPERATE WITHOUT THE NW PROTECTOR RELAYS Work order is to be used to capture costs for retrofitting relays for network protectors percent 0.95 1 0.95 0.05 0.95 0.05 0.95 0.05 0.05 0.95 0.05 0.95 0.05 0.95 0.95 0.05 0.95 0.05 0.05 0.95 0.95 0.05 0.05 0.95 0.95 0.05 0.05 0.95 1 0.05 0.95 0.05 0.95 0.05 0.95 0.95 0.05 0.05 0.95 1 0.95 0.05 1 1 1 1 1 1 1 1 1 1 1 1 1 0.09090908 0.90909092 0.09090911 0.90909089 0.9 0.1 1 0.9 0.1 1 FR11WNWS FRAD1D01 FRMS0011 FRPC0011 FRPC0111 FSCC0011 FSCE0011 FSCR0011 GARN0011 GCFA0011 GCFA0011 GCFA0011 GCFL0011 GCMT0011 GCOH0011 GCRS0011 GCSS0011 GCST0011 GCUG0011 GEIA0011 GENE0011 GLIB0011 GMBATS11 GMINOV11 GMPR0011 GNDIS111 GNDIS211 FREIGHT ST 11W NW PROTECTOR SENSOR FRAD Installation CT Safety/Prot Clothing/Small Tools Small Tools Fire Reta/Prot Cloth Fire Retardant/Protective Clothing Purchase Capacity-Fusion Solar Purchase Energy-Fusion Solar Purchase Rec's-Fusion Solar Garnishment Gold Coast - Facilities Gold Coast - Facilities Gold Coast - Facilities Gold Coast - Fleet Gold Coast - Meter Gold Coast - OH Gold Coast - RSO Gold Coast - Stations Gold Coast - Stores Gold Coast - UG Generation Interc Agreements Generators General Liability Battery Storage CT Grid Mod Innovation Pilot-CT Grid Mod GMP-Purchase Pwr-RECs Get Tax Credit-Purchase GN/Disc Get Tax Credit-Purchase GN/Disc GNSR2301 GOLDA011 GOLDC011 GOOSEHLL GR000011 Install 4RF base radio Greenwich Gold Coast Annual Payment Gold Coast Anniversary Payment GOOSE HILL MICROWAVE Workers Compensation Gold Coast Annual Payment Gold Coast Anniversary Payment EAST HAMPTON TOWER REPLACEMENT - MICROWAVE BETWEEN E HAMPTON TOWER AND GOOSE HILL GR000011EMPBENPAY11 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 107010 242GA0 242GC0 107010 925000 1 1 1 1 1 GRIDEVAL GSAD0011 GSPR0011 GSUP0011 GX160002 GX160013 GX160016 GX160019 GX160020 GX160021 GX160023 GX160024 GX160025 GX160026 GX160027 GX160030 GX160032 GX160034 GX160042 GX160043 GX160044 GX170001 GX170002 GX170003 GX170007 GX170009 GX170010 GX170011 GX170012 GX170017 GX170023 GX170024 GX170025 GX170027 GX170029 GX170032 GX170033 GX180002 GX180004 GX180011 GX180013 GX180016 GX180017 GX180018 GX180019 GX180020 GX180021 GX180023 GX180024 GX180025 GX180027 GX180028 GX180029 GX180030 GX18C100 GX18C101 GX18C102 GX190003 GX190004 GX190005 GX190007 GX190008 GX190011 GX190015 GX190016 GX190017 GX190019 GX190021 GX190022 GX190023 GX190024 GX190026 GX190027 GX190029 GX190030 GX190031 GX190032 GX190033 GX190036 GX190039 GX190040 GRID RESILIENCY EVALUATION Gold Coast - Administration Purchase of RECs General Supplies MDEC Mini SF6 Processing Module AMETEK Annunciator Stock 462879 Fluke Digital Multimeter 87V/E2 Pipe Bender 184031 Truck Tool Box 390-0-02 Digital Phasing Sticks HEPA Vac Hydraulic Hand Pump Kit Snow Removal Equipment Projector and Accessories Dynatel Cable Locator Fiber Termination Kit & Blades Inverter Generator Honda EU 20001 Milwaukee Rigid Combo Impact Kit Secure Job Boxes East Hampton (12) Secure Job Boxes Cheshire (38) TI Network Test Set 616001 Nomenclature Printers Durlabel Work Zone Protection Sign Kit FE Greenlee Conduit Bender and Acc DTR 8510 Ratiometer FLIR E4-NIST IR Cameras FLIR E4-NIST IR Cameras FLIR E4-NIST IR Cameras Gas Detectors and Accessories NPT Threading Machine Die Head Two SF6 Multi Analyzers & Adapters Milwaukee Cable Cutter and Crimper Western Div Wireless Phasing Meters DMA-35CRT Hydrometer - Data Logging Snowblowers DUCT RODDR Cable Cutters Die Set Kit Varidesk Exec 40 18V Hydraulic Cutter and Battery Ratiometer DTR Model 8510 HILTI Combi Hammer Snow Removal Equip - Sanders Five Duarack Drawer Assemblies Cordless Combo Kit and Die Sets Alber Digital Hydrometer/Interface GETAC Model 2410-I7 Worker's Grounds Cheshire SF6 Multi Analyzer Battery Equipment Worker's Grounds Barricade/Gas Cylinder Rack 44 Gallon Flammable Cabinet Fluke 712 RTD Process Calibrator Auger Adapters (2) 2AD Zelenski Gas Detectors (2) 2NP Iacolo Portable Radio Kit (15) 2EB Phasing Sticks Phasing Tool Hydraulic Punch Driver Set Die Set Upper / Lower Network Access Safety Equip Doble M5400 SFRA Cordless Light Sets Western Netwrks Hot Stick Tester Ground Tester Set 3 Each Doble 9051-UC & 9051-DG Qualitrol RPRR Field Test Kit Motor - Rack Breakers Spider Grounds Flammable Cabinets TS420 Cut-off Saw (Two) Jet Line B-60 #568636 Line Install Ground Set Tester # C403-3220R Model DG-2021 Set-up Kit Two E4 Flir Cameras GPS Units for Stamford AWC Greenlee Speed Knockout Driver Kit Hammer Drill and Bit Set SF6 Recharge Kits Circuit Breaker Test Stations Hydraulic Crimper 18V UCONN 2ND AMENDED AND RESTATED RESEARCH PROJECT(S) ID CONTRIBUTION OF RESILIENCY INTERVENTIONS TO SYSTEM LEVEL POWER GRID RESILIENCY AND PREVENT/SHORTEN OUTAGES AND SYSTEM IMPACTS W/CONSTRAINTS ASSET - SYSTEM PERFORMANCE ASSESSMENT MODEL Gold Coast Payments - Administration Purchase of RECs Holmes General Supplies MDEC Portable mini SF6 processing module includes 16' service hose with Dilo Dn8 couplers requested by John Carroll AMETEK Annunciator Fluke Digital Multimeter 87V/E2 Pipe Bender 184031 Truck Tool Box 390-0-02 Digital Phasing Sticks HEPA Vac Hydraulic Hand Pump Kit part # 0709426 Snow removal equipment Snow removal equipment Dynatel Cable Locator Fiber Termination Kit & Blades Inverter Generator Honda EU 20001 Milwaukee Rigid Combo Impact Kit Secure Job Boxes East Hampton (12) Secure Job Boxes Cheshire (38) ETI Network Test Set 616001 Duralbel Nomenclature Printers (2) Work Zone Protection Sign Kit 10 Stock Code #466238 Greenlee Conduit Bender stock code 184031 and Accessories stock code 184032 2 Units Chauvin Arnoux High Performance Ratiometer model DTR 8510 for Ct Station Ops East - two units FLIR E4-NIST Infrared Cameras, 80 X 60 for Western District FLIR E4-NIST Infrared Cameras, 80 X 60 for Central District FLIR E4-NIST Infrared Cameras, 80 X 60 for Eastern District Stock Code # 0419532 (3) Gas Detector: Stock Code# 0439496 (1) Gas Detector Calibration & Bump Test Docking Station Universal NPT Threading Machine Die Head Model # 26152 Two - Dilo SF6 Multi Analyzer (Dilo Item # 3-038R-R303V0 Model Q-23398) and Two adapter Kits Accessories plus misc accessories (heater blankets, scale, etc) One Each Milwaukee M18 FORCE LOGIC 12 ton Crimper (Cat # 2778-22) and M18 FORCE LOGIC 1590 ACSR Cable Cutter (Cat # 2777-21) Three phasing meters for Western AWCs - Norwalk, Torrington, Stamford. Hastings Phase-Tell III wireless Phasing Meter ALBER DMA35-CRT Hydrometer with data logging Three Snowblowers for Construction Group Two - CNDX 08083840 400 ft DUCT RODDR Seven Battery operated Cable cutters transfer from GX170031 which incorrectly has and expense FERC Account (593000) Die set kit including Milwaukee Model # 49-22-8400 6 pc 1 inch cutting depth and Milwaukee Model # 49-22-8410 9 pc 2 inch cutting depth Varidesk adjustable workspace Exec 40 for Dave Samal's office Burndy Mfg. 18 V Hydraulic Cutter stock #501145 and Battery Charger stock #589591 to replace an older unit which cannot be restored AEMC Ratiometer DTRModel 8510 (12 Units for Eastern) to replace discontinued model which cannot be properly repaired and calibrated by the manufacturer HILTI Combihammer Performance Package TE 80 AC/AVR for General Construction Group Two tailgate mounted salt and sand spreaders for Newtown and Torrington AWCs Five Durarack drawers for the Apparatus Test Vans. part number CRC 06-2100-001 Milwaukee Cordless Combination Kit 18.0v model 2696-29 48-11-1850 and acessories Five Alber Digital Hydrometers with Cell Corder Interface for battery testing Purchase (21) GETAC Model 2410-I7 Worker's Grounds for Cheshire Stations SF6 Multi-Analyzer with built in recovery system for zero emissions testing Hydro Mini Carts Battery Watering Gun and associated safety equipment Worker's Grounds for Tolland Stations 12 Cylinder (4X3) Barricade - Gas Cylinder Rack 44 Gal Flammable Cabinet Fluke 712 RTD Process Calibrator 2AD - Auger Adapters (2) @ 799.07ea TOTAL: $1,598.14 2NP - Gas Detectors (2) s/c 519396 @ 800ea TOTAL: 1600 Portable Radio Kit (15) @ $800ea TOTAL: $12,000 2EB Montgomery Phasing Sticks for East Hampton AWC Phasing Stick/Tool for RSE CCC 216 and 217. One for each CCC Hydraulic Punch Driver Set Torrington Burndy upper and lower crimping die set for electrical cables to be used with 12 ton crimping tool - Grainger part number is Item # 22P176 Network Access Safety Equipment Manhole Ladders, Dewatering Pumps, Portable Generator, 5 Point Harnesses Purch 1 - Eversource CT - Doble M5400 Sweep Ferquency Response Analyzer uote # Q-05334-2 includes discount for trade-in of old unit . Eversource contact is K. Harris. Cordless Light Sets Western Networks Hot Stick Tester and Ground Tester Set 3 Each Doble 9051-UC & 9051-DG Qualitrol RPRR Field Test Kit - KIT-013-1 Electric Motor - Raise/Lower Gear (Motor to rack breakers in and out of service) Twenty Spider Grounds to be used on pad mounted switchgear when installing grounds for the underground for repairs to cable faults Two Flammable Cabinets Two STIHL TS420 Cutoff Saws Blower, Missile, Duct Line for pulling line installation. Complete kit Jet Line B-60 #568636 Ground Set Tester # C403-3220R One Model DG-2021 Set-up Kit, installation manual including programming instructions, one optical programming cable Model DG-285, and one post field installation programming cable Model DG-222 Two E4 FLIR Cameras (Laser Temperature Guns) for the RSE Group 16 GPS Units for Stamford AWC Vehicles Item # 527177 One Greenlee Speed Knockout Driver Kit - 10 Ga Steel Item # 30HK29 MFR Model # 7310SBSP Bosch #11265EVS Spline Rotary Hammer, 13A @ 120 and drill bits Bosch #'s HC4022, HC4032, HC4071, and HC4051. Two S&C Electric Company Vista Switchgear SF6 Regulator Assembly/Kit 12 Circuit Breaker Test Stations Hydraulic Crimper 18V for Torrington Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 107010 580000 555950 588137 107010 107010 107010 107010 107010 107010 107010 107010 107010 107010 107010 107010 107010 107010 107010 107010 107010 107010 107010 107010 107010 107010 107010 107010 107010 107010 107010 107010 107010 107010 107010 107010 107010 107010 107010 107010 107010 107010 107010 107010 107010 107010 107010 107010 107010 107010 107010 107010 107010 107010 107010 107010 107010 107010 107010 107010 107010 107010 107010 107010 107010 107010 107010 107010 107010 107010 107010 107010 107010 107010 107010 107010 107010 107010 107010 107010 107010 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 GX200059 GX200066 Mobile Printer/Scanner Kenwood NX-3320 Labor-L01 Labor-L01 107010 107010 1 1 GX200068 Canon ImageRUNNER 1643iF Labor-L01 107010 1 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 Labor-L01 107010 107010 107010 107010 107010 107010 107010 107010 107010 107010 107010 107010 107010 107010 107010 107010 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 Labor-L01 107010 1 This project will be covering the installation of new FRAD equipment in Berlin and Mass Avenue Data Centers. The FRADs take RS-232 serial circuits and transports them in frame relay packets. Frame relay, combined with the RS-232 serial connection and the Multiprotocol Label Switching (MPLS) pseudo wires, are the chosen solution to transport SCADA to multiple data centers simultaneously. This project is in coordination with the eECS project Safety/Prot Clothing/Small Tools- Meter Service FRPC0011NT011 Fire Retardant/Protective Clothing & Safety Supplies Purchase Capacity-Fusion Solar Purchase Energy-Fusion Solar Purchase Rec's-Fusion Solar GARN0011EMPBENPAY11 Gold Coast Payments - Facilities Gold Coast Payments - Facilities Gold Coast Payments - Facilities Gold Coast Payments - Fleet Gold Coast Payments - Meter Gold Coast Payments - Overhead Gold Coast Payments - RSO Gold Coast Payments - Stations Gold Coast Payments - Stores Gold Coast Payments - Underground GEIA0011OPSNTRELEXPENSES11 GENE0011OPSNTRELEXPENSES11 General Liability Battery Storage CT Grid Mod Innovation Pilot-CT Grid Mod-Quaresma GMP-Purchase Pwr-RECs-Caron Get Tax Credit-Purchase GN/Disc-Chandler Get Tax Credit-Purchase GN/Disc-Chandler Utilize existing 450 MHz antenna system to install a new 4RF base station radio at the Greenwich CTSP radio site. Project includes the installation of the base station radio, the required backhaul equipment and 2 remote radios. Butternut Hollow, Greenwich, CT Telcommunications equipment shelter 8 mobile printers/scanners for Western Supervisors (WAM). Six Kenwood NX-3320 Portable Radio Value Packs Quote CS092120-1 Communication Services - portable radio and desk charger for cable pulling Image RUNNER 1643iF Digital Copier/Printer/ Scanner/Fax System PoleForeman V5.7- Engineering Analysis Software Site License - CL&P only $136,659 SagLine V3.6 - Engineering Analysis Software Site License - CL&P only $43,155 Requested by Wayne Gagnon GX210019 GX210027 GX25W100 GX25W101 GX25W103 GX25W107 GX25W109 GX25W112 GX25W113 GX25W114 GX25W115 GX25W116 GX25W117 GX25W118 GX25W119 GX25W120 PoleForeman V5.7 - SagLine V3.6 Sof Laptop Vehicle Mounts 2AU - MA - Tester/Verifier Tool (2) 2AH - DW - Mushroom Tester (1) @ $5 2AH - DW - Buckingham Rescue (14) 2AH - MT - Jobsite Tool Storage (5) 2AG - JG - Guy Wire Cutter (2) 3N2 - MA - Adapter Reel (1) 3N2 - MA - Lever Operated Hoist (2) 3N2 - MA - Sling (4) 3N2 - MA - Lever Operated Hoist (4) 3N2 - MA - Controller Reel (1) 3N2 - MA - Wire Stripper (2) 2AG - MA - Cable Cutter (1) 3N2 - JD - Climbing Gear Kit (2) 3N2 - JD - Climbing Gear Supply (1) GX25W122 2AG - JG - Crimper (3) @ 555 Purchase of laptop vehicle mounts; total $125845. 81 units. Supplier Gamber Johnson 2AU - MA - Tester/Verifier Tool (2) @ $828.43ea. TOTAL: $1,656.85 2AH - DW - Mushroom Tester (1) @ $594 each. Stock Code 503918 2AH - DW - Buckingham Rescue (14) @ $866.80ea. TOTAL: $12,135.20 Stock Code 590885 2AH - MT - Jobsite Tool Storage (5) @ $650ea. TOTAL: $3,250 2AG - JG - Guy Wire Cutter (2) @ $538.78ea. TOTAL: $1,077.56 3N2 - MA - Adapter Reel W/Truck Winch Adapter (1) @ $1,575 3N2 - MA - Lever Operated Hoist (2) @ $530.49ea. TOTAL: $1,060.98 3N2 - MA - Sling (4) @ $516.01ea. TOTAL: $2,064.02 3N2 - MA - Lever Operated Hoist (4) @ $503.81ea. TOTAL: $2,015.24 3N2 - MA - Controller Reel (1) @ $3,019.38 3N2 - MA - Wire Stripper (2) @ $623.20ea. TOTAL: $1,246.40 2AG - MA - Cable Cutter (1) @ $680.54 3N2 - JD - Climbing Gear Kit (2) @ $5,568.08ea. TOTAL: $11,136.16 3N2 - JD - Climbing Gear Supply Kit (1) @ $3,196.48 2AG - JG - Crimper (3) @ $555 TOTAL 1,665
Text of RRU-159 Attachment 07.xlsx
Sheet names, column headings and text cells; numbers left out · first 300,000 characters
Text of RRU-159 Attachment 07.pdf
Extracted from the file · 869 pages · 15,728,932 characters
Text of RRU-159 Attachment 06.xlsx
Sheet names, column headings and text cells; numbers left out · first 300,000 characters
Text of RRU-159 Attachment 06.pdf
Extracted from the file · 459 pages · 8,128,897 characters
Text of RRU-159 Attachment 05.xlsx
Sheet names, column headings and text cells; numbers left out · first 300,000 characters
Text of RRU-159 Attachment 05.pdf
Extracted from the file · 879 pages · 16,073,548 characters
Text of RRU-159 Attachment 04.xlsx
Sheet names, column headings and text cells; numbers left out
Text of RRU-159 Attachment 04.pdf
Extracted from the file · 5 pages · 20,994 characters
Text of RRU-159 Attachment 03.xlsx
Sheet names, column headings and text cells; numbers left out · first 300,000 characters
Text of RRU-159 Attachment 03.pdf
Extracted from the file · 840 pages · 14,413,580 characters
Text of RRU-159 Attachment 02.xlsx
Sheet names, column headings and text cells; numbers left out · first 300,000 characters
Text of RRU-159 Attachment 02.pdf
Extracted from the file · 1,137 pages · 16,605,462 characters
Text of RRU-159 Attachment 01.xlsx
Sheet names, column headings and text cells; numbers left out
Text of RRU-159 Attachment 01.pdf
Extracted from the file · 1 page · 1,403 characters
As listed on the current system
Question(s) Answered 159 (Connecticut Light and Power Company dba Eversource Energy) Date Filed: 11/06/2026