Skip to main content

A prototype public docket site for the Connecticut Public Utilities Regulatory Authority

Utility Dockets and Filings

Interrogatory responses

Answers to questions 159

ResponseFiled by Connecticut Light and Power Company dba Eversource Energy51 files
Part of docket 26-05-10Open
  • Electric
Application of The Connecticut Light and Power Company d/b/a Eversource Energy to Amend its Rate Schedules

Files51

Search terms highlighted
Eversource rate increase is on 36 pages across 17 files of the text below, highlighted. Go to the first matchClear highlighting
Words on different pages
Words on different pages
Words on different pages

Text of RRU-159 Attachment 23.xlsx

Sheet names, column headings and text cells; numbers left out · first 300,000 characters

Text of RRU-159 Attachment 23.pdf

Extracted from the file · 1,160 pages · 16,330,154 characters

Text of RRU-159 Attachment 22.xlsx

Sheet names, column headings and text cells; numbers left out · first 300,000 characters

Text of RRU-159 Attachment 22.pdf

Extracted from the file · 1,203 pages · 14,349,246 characters

Text of RRU-159 Attachment 21.xlsx

Sheet names, column headings and text cells; numbers left out · first 300,000 characters

Text of RRU-159 Attachment 21.pdf

Extracted from the file · 1,203 pages · 13,880,364 characters

Text of RRU-159 Attachment 20.xlsx

Sheet names, column headings and text cells; numbers left out

Text of RRU-159 Attachment 20.pdf

Extracted from the file · 16 pages · 151,762 characters

Text of RRU-159 Attachment 19.xlsx

Sheet names, column headings and text cells; numbers left out

Text of RRU-159 Attachment 19.pdf

Extracted from the file · 1 page · 5,328 characters

Text of RRU-159 Attachment 18.xlsx

Sheet names, column headings and text cells; numbers left out · first 300,000 characters

Text of RRU-159 Attachment 18.pdf

Extracted from the file · 640 pages · 7,983,236 characters

Text of RRU-159 Attachment 17.xlsx

Sheet names, column headings and text cells; numbers left out · first 300,000 characters

Text of RRU-159 Attachment 17.pdf

Extracted from the file · 855 pages · 14,651,941 characters

Text of RRU-159 Attachment 16.xlsx

Sheet names, column headings and text cells; numbers left out · first 300,000 characters

Text of RRU-159 Attachment 16.pdf

Extracted from the file · 489 pages · 7,076,557 characters

Text of RRU-159 Attachment 15.xlsx

Sheet names, column headings and text cells; numbers left out · first 300,000 characters

Text of RRU-159 Attachment 15.pdf

Extracted from the file · 897 pages · 15,723,777 characters

Text of RRU-159 Attachment 14 .pdf

Extracted from the file · 1 page · 2,589 characters

Text of RRU-159 Attachment 14.xlsx

Sheet names, column headings and text cells; numbers left out

Text of RRU-159 Attachment 13.xlsx

Sheet names, column headings and text cells; numbers left out

Text of RRU-159 Attachment 13.pdf

Extracted from the file · 1 page · 427 characters

Text of RRU-159 Attachment 12.xlsx

Sheet names, column headings and text cells; numbers left out · first 300,000 characters

Text of RRU-159 Attachment 12.pdf

Extracted from the file · 802 pages · 14,341,138 characters

Text of RRU-159 Attachment 11.xlsx

Sheet names, column headings and text cells; numbers left out · first 300,000 characters

Text of RRU-159 Attachment 11.pdf

Extracted from the file · 858 pages · 15,906,152 characters

Text of RRU-159 Attachment 10.xlsx

Sheet names, column headings and text cells; numbers left out

Text of RRU-159 Attachment 10.pdf

Extracted from the file · 1 page · 822 characters

Text of RRU-159 Attachment 09.xlsx

Sheet names, column headings and text cells; numbers left out · first 300,000 characters

Text of RRU-159 Attachment 09.pdf

Extracted from the file · 449 pages · 7,355,312 characters

Text of RRU-159 Attachment 08.xlsx

Sheet names, column headings and text cells; numbers left out · first 300,000 characters

Text of RRU-159 Attachment 08.pdf

Extracted from the file · 867 pages · 13,878,236 characters

Text of RRU-159 Attachment 07.xlsx

Sheet names, column headings and text cells; numbers left out · first 300,000 characters

Text of RRU-159 Attachment 07.pdf

Extracted from the file · 869 pages · 15,728,932 characters

Words on different pages

This spreadsheet is large. Its searchable text keeps the sheet names, column headings and text cells and stops at 300,000 characters, so search may miss words further in. Download the file for every cell and figure.

  1. Part 36 of 77

    SLPW2M15 | NO PPWK ATTACHED, CANCELLING - STLT | STREET LIGHT PRIVATE WORK BLANKET WO CHESHIRE | Fees + Payment - FP0 SM1ANWSN | SO MEADOW 1A NW PROTECTOR SENSOR | SO MEADOW 1A NETWORK PROTECTOR SENSOR PART OF THE DIGITAL GRID RELAY PROJECT - SOUTH MEADOW 1A_x000D__x000D_ THE SENSORS ARE BEING ADDED TO THE NW PROTECTOR RELAYS BEING INSTALLED THROUGHOUT CONNECTICUT. SENSORS CANNOT OPERATE WITHOUT THE NW PROTECTOR RELAYS_x000D__x000D_ Work order is to be used to capture costs for retrofitting relays for network protectors | Fees + Payment - FP0 SMOV0011 | Small tools - overhead | SMOV0011OPSNTRELEXPENSES11 | Fees + Payment - FP0 SMUG0011 | Small tools - underground | SMUG0011OPSNTRELEXPENSES11 | Fees + Payment - FP0 SOCE11C1 | SOC Equipment | SOC Equipment as part of the larger Ops funded project. | Fees + Payment - FP0 SOMR0011 | Somers Solar | Somers Solar | Fees + Payment - FP0 SPCDD011 | SP Contractor Delay Damages | SP Contractor Delay Damages-Morowsky | Fees + Payment - FP0 SPOL0011 | Special Olympics Support | Special Olympics Support - Labor Only | Fees + Payment - FP0 SSBRN11J | BRANFORD11J SS VOICE RADIO | SUBSTATION VOICE RADIO SET UP - INTERNAL | Fees + Payment - FP0 STORE011 | Stores clearing | STORE011OPSNTRELEXPENSES11 | Fees + Payment - FP0 STRM3CJE | CLEARING WORK ORDER FOR STRM113C | CLEARING WORK ORDER FOR STRM113C | Fees + Payment - FP0 STST0011 | Station structure CM | STST0011OPSNTRELEXPENSES11 | Fees + Payment - FP0 SUPP0011 | Supplemental | SUPP0011EMPBENPAY11 | Fees + Payment - FP0 SURVEY11 | 3RD PARTY POLE SURVEY WORK | This w/o is to charge time spent surveying pole for compliance for attachments as requested by customer | Fees + Payment - FP0 SUTP0211 | Sales/Use Tax Payments | Sales/Use Tax Payments | Fees + Payment - FP0 SVOH1SEX | DARIEN, CLIFF, 24, Charles Pappas | NO DESC AVAILABLE | Fees + Payment - FP0 SVOH2LEX | HARWINTON, SCOVILLE HILL, 130, Mari | NO DESC AVAILABLE | Fees + Payment - FP0 SVOH2WEX | EXPENSE BLANKET OH SERVICE WORK - W | NO DESC AVAILABLE | Fees + Payment - FP0 SWTS0011 | Switching, substation | SWTS0011OPSNTRELEXPENSES11 | Fees + Payment - FP0 SWTX0011 | Switching - Overhead | SWTX0011OPSNTRELEXPENSES11 | Fees + Payment - FP0 TALCOT01 | DSCADA SYST RES TALCOTT | DSCADA System Resiliency Talcott_x000D__x000D_ 5-7 Andrews Road, Bloomfield, CT_x000D__x000D_ Telecom Tower Facility_x000D__x000D_ | Fees + Payment - FP0 TCOTW001 | TALCOTT MOUNTAIN TOWER REPLACEMENT | PURCHASE AND INSTALL RF MATERIALS FOR NEW TOWN AT ST. ANDREWS ROAD, BLOOMFOELD, CT PROJECT TCOTW1DC REQUESTER:STEVE FLORIO,MGR: AHRENS | Fees + Payment - FP0 TFEE0011 | Bank Service Fees | Bank Service Fees | Fees + Payment - FP0 TFMINS11 | Precap Overhead Equipment Install | TFMINS11DT7C | Fees + Payment - FP0 TFMIUG11 | Precap UG Equipment Install | Precap UG Equip Install | Fees + Payment - FP0 TFMPUR11 | Precap Overhead Equip Purchases | TFMPUR11NT011_x000D__x000D_ Precap Overhead Equipment Purchases-Transformers and Regulators | Fees + Payment - FP0 TINS0111 | Claims & Insurance | Claims & Insurance | Fees + Payment - FP0 TINS0411 | Claims & Insurance | Claims & Insurance | Fees + Payment - FP0 TINS0511 | Claims & Insurance | Claims & Insurance | Fees + Payment - FP0 TNTP0011 | Credit Disconnects and Reconnects | Credit Disconnects and Reconnects | Fees + Payment - FP0 TORRT001 | TORRINGTON MGP COAL TAR SITE | TORRINGTON MGP COAL TAR SITE INVESTIGATION AND REMEDIATION | Fees + Payment - FP0 TOWG1DC2 | TOWER REPLACEMENT-MADISON | TOWER REPLACEMENT-MADISON | Fees + Payment - FP0 TOWG1DC3 | TOWER REPLACEMENT-CHAPEL HILL | TOWER REPLACEMENT-CHAPEL HILL | Fees + Payment - FP0 TOWG1DC4 | TOWER REPLACEMENT-TALCOTT MT. | TOWER REPLACEMENT-TALCOTT_MT. | Fees + Payment - FP0 TRAN1601 | Air/Hydraulic Floor Jack | 22 Ton - Air/Hydraulic floor jack used for installing tire chains, replacing tires or when the lift is not accessible. | Fees + Payment - FP0
  2. Part 37 of 77

    TRDC0111 | Debt Compliance Fees | Debt Compliance Fees | Fees + Payment - FP0 TRDT0011 | Debt Interest Accrual | Debt Interest Accrual-Curtin | Fees + Payment - FP0 | 237TC0 TRIN0011 | Vehicle Inventory | TRIN0011NT011 | Fees + Payment - FP0 TRMS0011 | Training/Safety - Meter Service | Training/Safety - Meter Service | Fees + Payment - FP0 TRMT0011 | Transformer Maintenance - Dist | TRMT0011OPSNTRELEXPENSES11 | Fees + Payment - FP0 TROM0011 | Training | TROM0011OPSNTRELEXPENSES11 | Fees + Payment - FP0 TXPCTC11 | Conn Corporation Business Tax | Conn Corporation Business Tax | Fees + Payment - FP0 TXPY0011 | Tax Payments | Tax Payments | Fees + Payment - FP0 TXPY0111 | Tax Payments | Tax Payments | Fees + Payment - FP0 UBCP0011 | Union Business Company Paid | Union Business Company Paid | Fees + Payment - FP0 UCLAIM11 | Unclaimed Property (Escheat) | Fees + Payment - FP0 UI000111 | UI | UI | Fees + Payment - FP0 UILGEN00 | UIL Charges | UIL Charges-Lempa | Fees + Payment - FP0 | 143L20 V1758553 | CT Elec D Fleet Capital Vehicles | CT Electric Distribution Fleet Capital Vehicle Purchase_x000D__x000D_ 1 Material Handler Tandem $94,900 Unit #1758553 | Fees + Payment - FP0 VEHC0011 | Vehicle Clearing | VEHC0011NT011 | Fees + Payment - FP0 VEHPE011 | Vehicle registration | Vehicle registration | Fees + Payment - FP0 | 165VC0 VIDEOWAL | VIDEO WALL BERLIN SOC | This is for Video Wall project in SOC in Berlin CT. Quote provided by HB Communications | Fees + Payment - FP0 VOLUDB6A | TS VOLUNTN DB | DB PLANNED OBS TROUBLE SHOOTER CHARGES TOWN OF VOLUNTOWN | Fees + Payment - FP0 WCSR0011 | PURCH PWR-RECS | PURCH PWR-RECS - HOMES | Fees + Payment - FP0 WINST001 | WINSTED MGP COAL TAR SITE | WINSTED MGP COAL TAR SITE INVESTIGATION AND REMEDIATION CORPORATE RESERVE SITE | Fees + Payment - FP0 ZAPGOLSB | ZAP GUARDS OLD SAYBROOK | INSTALLATION OF ZAP GUARDS VARIOUS LOC_x000D_ IN OLD SAYBROOK | Fees + Payment - FP0 4E720362 | (CH) P#5438 - P#5439: SPLICE OUT WH | (CH) P#5438 - P#5439: SPLICE OUT WHAT LOOKS LIKE TREE GROWTH AROUND CONDUCTOR._x000D_ AP1-YWO Total Cost Less Than 7K | Fees + Payment - FP0 4E720539 | JK>HH6833 (LAWN BOX)--REPLACE 17 X | JK>HH6833 (LAWN BOX)--REPLACE 17 X 30 LAWN BOX_x000D_ AP1-YWO Total Cost Less Than 7K | Fees + Payment - FP0 GXC17C16 | Gas Alert Sens (2) 2NP Stevens | 2NP (Two) Gas Alert sensors - SC 0419532 @ $ 760 Each Total &1,520 Enos Stevens | Fees + Payment - FP0 GXC17C17 | Ground Rod Driver (1) 2AD Wade | gas powered ground rod driver s/c 459333 (1) $1760AARON WADE | Fees + Payment - FP0 GXC17C19 | Defibrillators (3) 2EA Dolan | Defibrillators (3) 460803/460802 TOTAL: $6,136 Dolan | Fees + Payment - FP0 GXC17C21 | Fiberglass Jib (2) 2AD Begley | 2AD - Fiberglass Jib (2) S/C 72030339 $2,686.28ea TOTAL: $5373 | Fees + Payment - FP0 GXC17C22 | Burndy Wedge (2) 2EA Dolan | 2EA - Burndy Wedge (2) s/c 0451519 @ $1,190.50 ea TOTAL: $2,381` | Fees + Payment - FP0 GXC17C23 | Mobile Desks (3) 2AA Grohs | ReachDeskSuper-03 Printer Elite for supervisor vehicle. $500 (GROHS)_x000D__x000D_ | Fees + Payment - FP0 1N720848 | JDB/P# 33766/REPLACED 50KVA XFRMR/I | JDB/P# 33766/REPLACED 50KVA XFRMR/INSTALLED 100 AMP CUTOUT & BRACKET/5-31_x000D_ AP1-YWO Total Cost Less Than 7K | Fees + Payment - FP0 4N620422 | 3/29/16-Tree down, replaced c/o, po | 3/29/16-Tree down, replaced c/o, pole #3755_x000D_ AP1-YWO Total Cost Less Than 7K | Fees + Payment - FP0 2M722045 | JC/200 PARK RD. NAUG Electric Serv | JC/200 PARK RD. NAUG Electric Service Existing Residential Overhead_x000D_ AP1-YWO Total Cost Less Than 7K | Fees + Payment - FP0 1S721018 | DM/59 HARDING RD OLD GRN: INST 1/0 | DM/59 HARDING RD OLD GRN: INST 1/0 TPX FROM P.1883 TO P.1884 SHIFT 2 SVCS_x000D_ AP1-YWO Total Cost Less Than 7K | Fees + Payment - FP0 1S721003 | DL; 2 OPPER RD; Electric Service Ex | DL; 2 OPPER RD; Electric Service Existing Residential Overhead_x000D_ AP1-YWO Total Cost Less Than 7K | Fees + Payment - FP0
  3. Part 38 of 77

    2M722094 | Municipal Light Fault Locate and Re | Municipal Light Fault Locate and Repair@ POLE 248 - COMP 6/20 CCC_x000D_ AP1-YWO Total Cost Less Than 7K | Fees + Payment - FP0 1N720842 | JDB ESO 4/26/17 WESTPORT - 9 CRAWF | JDB ESO 4/26/17 WESTPORT - 9 CRAWFORD RD P6838 REPLACE XTRANS_x000D_ AP1-YWO Total Cost Less Than 7K | Fees + Payment - FP0 1N720793 | RM 139 Lords Hwy Weston Install pr | RM 139 Lords Hwy Weston Install primary riser to new pad and db svc_x000D_ AP1-YWO Total Cost Less Than 7K | Fees + Payment - FP0 5T721381 | RSO, 5/31, ENFIELD, MOODY ROAD, POL | RSO, 5/31, ENFIELD, MOODY ROAD, POLE 21590_x000D_ AP1-YWO Total Cost Less Than 7K | Fees + Payment - FP0 4D720858 | RSO GUILFORD, Cornwall Ln -Need to | RSO GUILFORD, Cornwall Ln -Need to Replace 153' #2 OH Service @ P8792_x000D_ AP1-YWO Total Cost Less Than 7K | Fees + Payment - FP0 3H721395 | Capitol Ave Htfd Traffic control UG | Capitol Ave Htfd Traffic control UG #8 Electric Service Un-Metered_x000D_ AP1-YWO Total Cost Less Than 7K | Fees + Payment - FP0 4N621252 | MM SMART SWITCH PROGAM TR POLE 7794 | MM SMART SWITCH PROGAM TR POLE 7794 PEQUOT RD 1Q01_x000D_ NL-YWO Variance - NU Construction Labor | Fees + Payment - FP0 CS001341 | Danielson Turbine 15C-Remove Deener | This project is seeking a partial funding of $725K to complete equipment removals and_x000D__x000D_ environmental testing for the deenergized substation Danielson Turbine 15C substation located_x000D__x000D_ at 75 Athol St, Dayville CT. The substation was deenergized in 2017 following Distribution Line_x000D__x000D_ project CD00588. Substation equipment removals were not completed following the substation_x000D__x000D_ deenergization. There will no longer be an Eversource use for the property and Real Estate_x000D__x000D_ indicates the property will be evaluated for disposition. | Fees + Payment - FP0 BESOPE11 | CA AWO 401K ESOP MATCH | CA AWO 401K ESOP MATCH | Fees + Payment - FP0 4E621497 | JK>HH2016A--INSTALL 75' OF 4/0 DB C | JK>HH2016A--INSTALL 75' OF 4/0 DB CABLE TO CONDO UNIT_x000D_ AP1-YWO Total Cost Less Than 7K | Fees + Payment - FP0 1B720688 | WM - 22N3 Rehab, Ridgefield | WM - 22N3 Rehab, Ridgefield_x000D_ | Fees + Payment - FP0 CS002631 | PILOT PROG FEEDER FAILURE DETECTION | To purchase an add-on software package to PQView called FaultPoint_x000D__x000D_ Set up a database link to our exiting saved relay events thru IT that would enable the use of Synergy models to populate algorithms to calculate fault locations based on system parameters and protection relay event logs_x000D__x000D_ This proposal includes the cost to fund the purchase and set up the required support from IT and database storage space in order to store system data for software analysis._x000D__x000D_ Project Objectives_x000D__x000D_ To identify, locate and repair underground faults within minimal time, limiting customer outage times. This will improve overall system response times and minimize repair times having a direct effect on SAIDI and CAIDI_x000D__x000D_ | Fees + Payment - FP0 3R720019 | CB CD00815-01 Install line sensor P | CB CD00815-01 Install line sensor Pole3524 Green Hollow Rd Plainfield 13B27-F002_x000D_ AP2-YWO Total Cost Variance Met - Variance :8.0215 MIN.:-50 MAX.:150 | Fees + Payment - FP0 3R620630 | CD00392 - Reconductor 35L7 Boston P | CD00392 - Reconductor 35L7 Boston Post Rd - Segment 2 WR 2 of 2_x000D_ CI-YWO Variance - Contractor Invoice | Fees + Payment - FP0 4E621508 | JK>HH533C--INSTALL 55' OF 4/0 DB CA | JK>HH533C--INSTALL 55' OF 4/0 DB CABLE TO CONDO UNIT_x000D_ AP1-YWO Total Cost Less Than 7K | Fees + Payment - FP0 4E621509 | JK>HH533B--INSTALL 45' OF 4/0 DB CA | JK>HH533B--INSTALL 45' OF 4/0 DB CABLE TO CONDO UNIT_x000D_ AP1-YWO Total Cost Less Than 7K | Fees + Payment - FP0 4E621510 | JK>HH533B--INSTALL 30' OF 4/0 DB CA | JK>HH533B--INSTALL 30' OF 4/0 DB CABLE TO CONDO UNIT_x000D_ AP1-YWO Total Cost Less Than 7K | Fees + Payment - FP0
  4. Part 39 of 77

    PWCD0901 | Private Work for FP CD00901 | Private Work for FP CD00901 | Fees + Payment - FP0 4E621504 | JK>HH533C--INSTALL 35' OF 4/0 DB CA | JK>HH533C--INSTALL 35' OF 4/0 DB CABLE TO CONDO UNIT_x000D_ AP1-YWO Total Cost Less Than 7K | Fees + Payment - FP0 DSN72018 | (50): Miscellaneous, Refurbishment | Cedar Heights 4R - Refurbish the switchgear enclosure | Fees + Payment - FP0 2M721858 | Jpt-72 Colony St BRI (Frnt)P4320 - | Jpt-72 Colony St BRI (Frnt)P4320 - Existing Residential Overhead - MLC_x000D_ AP1-YWO Total Cost Less Than 7K | Fees + Payment - FP0 1B720940 | 1+3 ENCLAVE DR Electric Service N | 1+3 ENCLAVE DR Electric Service New UG Residential Meter Dept Set_x000D_ AP1-YWO Total Cost Less Than 7K | Fees + Payment - FP0 1B720942 | 11-17 MOORLAND DR Electric Service | 11-17 MOORLAND DR Electric Service New UG Residential Meter Dept Set_x000D_ AP1-YWO Total Cost Less Than 7K | Fees + Payment - FP0 5D720651 | 39 CANTERBURY RD, POLE#27, SHIFT TO | 39 CANTERBURY RD, POLE#27, SHIFT TO NEW POLE#27, REJECT POLE_x000D_ AP1-YWO Total Cost Less Than 7K | Fees + Payment - FP0 2M721032 | (DF) drhm(I) 277/480 Padmount XF & | (DF) drhm(I) 277/480 Padmount XF & 400A DB svc -- New Com/Ind DESG (DN)_x000D_ AP2-YWO Total Cost Variance Met - Variance :1.0538 MIN.:-50 MAX.:50 | Fees + Payment - FP0 3H720896 | NJB WEST ST R.H. RPL CUTOUT & RISER | NJB WEST ST R.H. RPL CUTOUT & RISER ON P#1481 CUST OUTAGE ON 6/2/17? @ 5PM_x000D_ AP2-YWO Total Cost Variance Met - Variance :4.7256 MIN.:-50 MAX.:50 | Fees + Payment - FP0 3H720981 | WF-1221-1223-Broad St-Htfd-@ sb-336 | WF-1221-1223-Broad St-Htfd-@ sb-3368, rpl ug svc._x000D_ AP2-YWO Total Cost Variance Met - Variance :33.2649 MIN.:-50 MAX.:50 | Fees + Payment - FP0 PEAK0111 | Peaker Contractual Obligations | Peaker Contractual Obligations | Fees + Payment - FP0 CFDS0111 | Kleen Energy Systems | Kleen Energy Systems | Fees + Payment - FP0 4N521323 | PD-247 Shore Rd/Old Lyme REPLACE PC | PD-247 Shore Rd/Old Lyme REPLACE PCB XFMR P#1911_x000D_ CL-YWO Variance - Contractor Labor | Fees + Payment - FP0 4D720970 | (DF) Ple 1229 - (R/I) CV svc & cond | (DF) Ple 1229 - (R/I) CV svc & conduit - EMROD DB DESG (ARDB)_x000D_ AP2-YWO Total Cost Variance Met - Variance :-44.9095 MIN.:-50 MAX.:50 | Fees + Payment - FP0 CS002241 | Sandbank 30F S/S – Remove Substatio | Furnish necessary engineering and design to retire the Sandbank 30F substation. Remove all equipment including transformer, recloser, switches, etc. Also remove the fence and trap rock. Remove all foundations to below grade or remove completely, if practical. Perform environmental remediation as required. Loam and seed the site for grass growth to minimize erosion. Turn the site over to the Real Estate Department for sale with the provision that an easement is obtained for an overhead line. The 30F-1X transformer will be put in inventory and then relocated to Judd Brook 32R for installation there (reference Project #201338). All other equipment will be scrapped. | Fees + Payment - FP0 1S720604 | BK 1011 WASHINGTON BLVD INSTALL 3RD | BK 1011 WASHINGTON BLVD INSTALL 3RD TRANSFORMER IN LOOP 300KVA_x000D_ AP2-YWO Total Cost Variance Met - Variance :37.0399 MIN.:-40 MAX.:40 | Fees + Payment - FP0 4D720645 | Cottage Rd, #11 Old Saybrook/TL-INS | Cottage Rd, #11 Old Saybrook/TL-INST 4/03CT OH-DB SVC [WORKS W/ WR#2914467]_x000D_ AP1-YWO Total Cost Less Than 7K | Fees + Payment - FP0 1S620993 | PH; 151 BROOKSIDE RD; INSTALL 200AM | PH; 151 BROOKSIDE RD; INSTALL 200AMP DB, REMOVE 100AMP DB SERVICE_x000D_ AP1-YWO Total Cost Less Than 7K | Fees + Payment - FP0 5T721621 | 6/27 - RSO - STAFFORD, CHARTER AVE | 6/27 - RSO - STAFFORD, CHARTER AVE - FOLLOW UP REQUIRED - REPLACE XFMR P-18140_x000D_ AP1-YWO Total Cost Less Than 7K | Fees + Payment - FP0 2M721691 | (DF) Drhm, (R/I) DB 2ndry & HH- & s | (DF) Drhm, (R/I) DB 2ndry & HH- & svc - Elec Svc Existing Residential DESG (DN)_x000D_ CI-YWO Variance - Contractor Invoice | Fees + Payment - FP0
  5. Part 40 of 77

    4N720645 | SM-2 WASHINGTON ST, STGN- INSTL 250 | SM-2 WASHINGTON ST, STGN- INSTL 250 KVA 1 PH XFMR/ IT METER_x000D_ AP2-YWO Total Cost Variance Met - Variance :112.9059 MIN.:-50 MAX.:150 | Fees + Payment - FP0 1S720716 | DM/356 DAVIS AVE GREENWICH: INST 3" | DM/356 DAVIS AVE GREENWICH: INST 3" SVC RISER, 350MCM DB SVC, 2-200AMP METERS_x000D_ AP1-YWO Total Cost Less Than 7K | Fees + Payment - FP0 4D621010 | SH-Convo#399782-(MakeReadyREIMB) - | SH-Convo#399782-(MakeReadyREIMB) - VZ Parent Convo#378446_x000D_ AP1-YWO Total Cost Less Than 7K | Fees + Payment - FP0 4E621233 | JK>PAD 533--EXTEND DB SEC TO (3) NE | JK>PAD 533--EXTEND DB SEC TO (3) NEW HH'S FOR CONDO UNITS_x000D_ NL-YWO Variance - NU Construction Labor | Fees + Payment - FP0 2M721694 | RTM-Willow Brook Ball Park. 9A-Tran | RTM-Willow Brook Ball Park. 9A-Transformer Fire. Replaced 500KVA 277/480_x000D_ AP3-YWO Resource Variance Met- Labor 3 <= 32 OR 3.36 <= 30 And Contractor $0 <= 2000 | Fees + Payment - FP0 KVLIB011 | WD Payroll KV Expense | WD Payroll KV Expense-Morrison | Fees + Payment - FP0 2M722333 | AMM 268 N MAIN ST , WATERBURY. REP | AMM 268 N MAIN ST , WATERBURY. REPLACE BROKEN HANDHOLE._x000D_ AP1-YWO Total Cost Less Than 7K | Fees + Payment - FP0 3R620629 | CD00392 - Reconductor 35L7 Boston P | CD00392 - Reconductor 35L7 Boston Post Rd - Segment 2 WR 1 of 2_x000D_ CI-YWO Variance - Contractor Invoice | Fees + Payment - FP0 ALRM0011 | Station Alarms CM | ALRM0011OPSNTRELEXPENSES11 | Fees + Payment - FP0 CASW0911 | 24R (D) YardSubstationYardCorrectiv | 24R (D) YardSubstationYardCorrective Distribution - Substation Yard_x000D_ NO AWOCS-AWOCS REASON CODE AND DESCRIPTION NOT FOUND. | Fees + Payment - FP0 3H721758 | WF-109 Pond Rd-Windsor-@ pole-1853, | WF-109 Pond Rd-Windsor-@ pole-1853,inst new oh/db svc to hse_x000D_ AP1-YWO Total Cost Less Than 7K | Fees + Payment - FP0 1S720478 | DM/8 PARK AVE GREENWICH: INTERCEPT | DM/8 PARK AVE GREENWICH: INTERCEPT EXIST DB SVC, 4/0 DB SVC, 200AMP_x000D_ AP1-YWO Total Cost Less Than 7K | Fees + Payment - FP0 DSN62046 | (40): Installation of a hand rail | Installation of a hand rail and yard lights | Fees + Payment - FP0 DSN62047 | (40): Replacement of the control ho | Replacement of the control house asbestos tiled flooring | Fees + Payment - FP0 INVT0011 | Inventory offset | Inventory offset-Ouimette | Fees + Payment - FP0 4E621624 | MN HIGHLAND TERR HMPTN PHASE IC, 3 | MN HIGHLAND TERR HMPTN PHASE IC, 3 LOTS._x000D_ AP1-YWO Total Cost Less Than 7K | Fees + Payment - FP0 5T721737 | RSO, 7/12, ENFIELD, ELM STREET, CAB | RSO, 7/12, ENFIELD, ELM STREET, CABLE FAULT, RPLC FAULT INDICATORS MHC_x000D_ AP1-YWO Total Cost Less Than 7K | Fees + Payment - FP0 4D720149 | CB//GUILFORD, MOOSE HILL RD//UPGRAD | CB//GUILFORD, MOOSE HILL RD//UPGRADE FUSES/CUTOUTS TO 140K POLE 2_x000D_ AP1-YWO Total Cost Less Than 7K | Fees + Payment - FP0 CS000611 | Install 3rd Xfmr & 23kV Switchgear | Scitico 27H - Install a new 27H-3X transformer position, 27H-3X1-4 MOD, 27H-3S station srvice, 27H-3H PTs, new double-bus 23kV PCE switchgear and underground tie cables to each existing 23kV ring bus. | Fees + Payment - FP0 3H721840 | RSO, 7/13, E HARTFORD, ROBERTS ST, | RSO, 7/13, E HARTFORD, ROBERTS ST, RPLC 8' ARM pole 4138/shift 1/0 ACSR_x000D_ AP1-YWO Total Cost Less Than 7K | Fees + Payment - FP0 4D720143 | TS 174 CEDAR ST BFD P6716 & 44072 I | TS 174 CEDAR ST BFD P6716 & 44072 INS 1000WMH FLOODS_x000D_ AP1-YWO Total Cost Less Than 7K | Fees + Payment - FP0 CT17D017 | W HARTLAND SITEBOSS INSTALL | Install a SiteBoss alarm panel and remove the old Badger E500 alarm panel. | Fees + Payment - FP0 2M722269 | Municipal Light Fault Locate and Re | Municipal Light Fault Locate and Repair@ POLE 4150 - COMP 7-8-17 CCC_x000D_ AP1-YWO Total Cost Less Than 7K | Fees + Payment - FP0 CT17D012 | 56 Prospect St SiteBoss Install | Install a SiteBoss alarm panel and remove the old Badger E500 alarm panel. | Fees + Payment - FP0
  6. Part 41 of 77

    4N721202 | SM-122 RYDER RD, N STGN-Install new | SM-122 RYDER RD, N STGN-Install new 150' OH/DB service_x000D_ AP1-YWO Total Cost Less Than 7K | Fees + Payment - FP0 2M721829 | DM 5/18 E MITCHELL AVE CHESHIRE - D | DM 5/18 E MITCHELL AVE CHESHIRE - DB FAULT Replace Cable VLT#B to PAD#C_x000D_ AP2-YWO Total Cost Variance Met - Variance :15.3973 MIN.:-40 MAX.:40 | Fees + Payment - FP0 5T721647 | 6/30 - RSO/AWC - ENFIELD, BRAINARD | 6/30 - RSO/AWC - ENFIELD, BRAINARD RD, 9A - EVERSOURCE P-2503 complete in field_x000D_ AP2-YWO Total Cost Variance Met - Variance :29.3618 MIN.:-50 MAX.:50 | Fees + Payment - FP0 5T721575 | Woods Rd, Somers - Extend 1 ph prim | Woods Rd, Somers - Extend 1 ph primary_x000D_ AP2-YWO Total Cost Variance Met - Variance :-24.137 MIN.:-50 MAX.:50 | Fees + Payment - FP0 4N720562 | SM Y-18695-2017 YELLOW TAG REPLACE | SM Y-18695-2017 YELLOW TAG REPLACE CAPACITOR P#3051_x000D_ AP2-YWO Total Cost Variance Met - Variance :30.1932 MIN.:-50 MAX.:50 | Fees + Payment - FP0 3R620743 | CD00647-02, 28J1 convert OH, Branfo | CD00647-02, 28J1 convert OH, Branford, 1 of 3_x000D_ CL-YWO Variance - Contractor Labor | Fees + Payment - FP0 4E720505 | (CH) P#3444: WRK COMP'D_RSO/AWC/RSO | (CH) P#3444: WRK COMP'D_RSO/AWC/RSO 4/8_9A_x000D_ AP3-YWO Resource Variance Met- Labor 19 <= 32 OR 35.64 <= 30 And Contractor $1435.56 <= 2000 | Fees + Payment - FP0 5T720405 | Avery St., South Windsor - Relocate | Avery St., South Windsor - Relocate facilities for The Town Road Work_x000D_ | Fees + Payment - FP0 3H720325 | HARTFORD,ANN ST REPLACE A MAINS BET | HARTFORD,ANN ST REPLACE A MAINS BETWEEN SB1607 & SB1831_x000D_ AP2-YWO Total Cost Variance Met - Variance :-27.189 MIN.:-30 MAX.:30 | Fees + Payment - FP0 2C620304 | PT Conv# 461290-MakeReadyNonReimb-C | PT Conv# 461290-MakeReadyNonReimb-Comcast-ParentConv# 450571_x000D_ AP1-YWO Total Cost Less Than 7K | Fees + Payment - FP0 2M720697 | RTM-220 Coe Ave, Mer. Relocate Pole | RTM-220 Coe Ave, Mer. Relocate Poles for new Enterance 100% Chargeable_x000D_ MS-YWO Variance - Multiple Setups | Fees + Payment - FP0 DSN72010 | (30): Install new Driveways. DSN720 | Install new Driveways | Fees + Payment - FP0 2M722285 | CDOT151-273, PN 492601-03 CIS #9 - | CDOT151-273, PN 492601-03 CIS #9 - OH Riser 9521_x000D_ JE-YWO Variance Job Type Exclusion | Fees + Payment - FP0 4D721191 | Boston Post Rd, Old Saybrook/TL-7/2 | Boston Post Rd, Old Saybrook/TL-7/25-P#1712,P#1714,P#2949,P#2949-1/2. Buchetto_x000D_ CL-YWO Variance - Contractor Labor | Fees + Payment - FP0 SMTR0011 | Small Tool Repair (Repair Shop) | SMTR0011OPSNTRELEXPENSES11 | Fees + Payment - FP0 TXCT0011 | CT Tax Offset | CT Tax Offset-Ouimette | Fees + Payment - FP0 1N720986 | JES; 659 DANBURY RD. WILTON. REPLAC | JES; 659 DANBURY RD. WILTON. REPLACE BAD POLE & RE ROUT LINES. 19024.._x000D_ AP3-YWO Resource Variance Met- Labor 8 <= 32 OR -19.14 <= 30 And Contractor $1030.89 <= 2000 | Fees + Payment - FP0 SVOH5DEX | BROOKLYN, CREAMERY BROOK, 120, Dani | NO DESC AVAILABLE | Fees + Payment - FP0 4D721143 | TS OLD POST RD CLINTON P2388 CHANGE | TS OLD POST RD CLINTON P2388 CHANGE POT TO 25KVA_x000D_ AP1-YWO Total Cost Less Than 7K | Fees + Payment - FP0 MGSP0111 | Management & Supervision | MGSP0111NT011 | Fees + Payment - FP0 1S721416 | DM/STRICKLAND RD COS COB: 11R56 CAB | DM/STRICKLAND RD COS COB: 11R56 CABLE FAILURE/REPLACE CABLE AT MH117 TO MH127_x000D_ AP2-YWO Total Cost Variance Met - Variance :8.429 MIN.:-20 MAX.:20 | Fees + Payment - FP0 4E721001 | JK>POLE 867--REPLACE TERMINATOR AT | JK>POLE 867--REPLACE TERMINATOR AT RISER POLE, RESORE POWER TO NORMAL_x000D_ AP1-YWO Total Cost Less Than 7K | Fees + Payment - FP0 1S721128 | Interlaken - Cap inspection and rep | Interlaken - Cap inspection and repair @ pole 689 schedule ASAP-LOAD RELIEF_x000D_ AP1-YWO Total Cost Less Than 7K | Fees + Payment - FP0 5T721742 | 7/13 - RSO/TOLOH - VERNON, TAYLOR S | 7/13 - RSO/TOLOH - VERNON, TAYLOR ST - 9A - FRONTIER POLE 1105_x000D_
  7. Part 42 of 77

    AP2-YWO Total Cost Variance Met - Variance :-25.8548 MIN.:-50 MAX.:50 | Fees + Payment - FP0 2M721697 | PT Conv# 505840-MakeReadyNonReimb-V | PT Conv# 505840-MakeReadyNonReimb-VerizonWireless-ParentConv# 500248_x000D_ AP1-YWO Total Cost Less Than 7K | Fees + Payment - FP0 DSN72020 | replacement of 48V DC Battery bank | Boulevard 45 - Replace the failing battery and charger | Fees + Payment - FP0 4E720454 | (CH) P#207: CHG DROP_MTR DEPT TO CH | (CH) P#207: CHG DROP_MTR DEPT TO CHG MTR #97987663._x000D_ AP1-YWO Total Cost Less Than 7K | Fees + Payment - FP0 1S720506 | DL; 970 STILLWATER RD; TRANSFER TO | DL; 970 STILLWATER RD; TRANSFER TO FRONTIER POLE 113347/NEW OH/DB RISER_x000D_ AP1-YWO Total Cost Less Than 7K | Fees + Payment - FP0 DOST0011 | District Operations (Stations) | DOST0011OPSNTRELEXPENSES11 | Fees + Payment - FP0 2M722310 | Municipal Light Fault Locate and Re | Municipal Light Fault Locate and Repair@ POLE L1-654 Replaced 140ft of #4 CBL._x000D_ CI-YWO Variance - Contractor Invoice | Fees + Payment - FP0 2L720357 | Winchester--S. Main St. (100) 3034 | Winchester--S. Main St. (100) 3034 Rem 3ph riser, cable, & xfmr bank in vault_x000D_ AP2-YWO Total Cost Variance Met - Variance :14.143 MIN.:-50 MAX.:50 | Fees + Payment - FP0 5T721792 | AWC 7/20 VERNON, SCHOOLBROOK RD - R | AWC 7/20 VERNON, SCHOOLBROOK RD - RPL 25KVA XFRMR & CUTOUT P#6505_x000D_ AP1-YWO Total Cost Less Than 7K | Fees + Payment - FP0 GXC16C68 | UG Harnesses (5) 2NR FEAL | 2NR - UG Harnesses (5) - 3@2XL s/c 462038 @$730.88ea - 2@XL s/c 462037$735.06 TOTAL: $3,665.00 | Fees + Payment - FP0 GXC16C69 | Water Pumps (3) 2NR Leonard | 2NR - Water Pumps (3) s/c 0452792 @ $827 ea TOTAL: $2481 | Fees + Payment - FP0 3R621049 | CD00471-09 Conversion Work Inst.Ste | CD00471-09 Conversion Work Inst.Step Down XF's No.Shore & Wylie School Job 4_x000D_ AP2-YWO Total Cost Variance Met - Variance :-12.178 MIN.:-30 MAX.:30 | Fees + Payment - FP0 2M720395 | (DF) Prospect- Ple 94 Change cutout | (DF) Prospect- Ple 94 Change cutouts, TERRY Rd PROSPECT_x000D_ AP1-YWO Total Cost Less Than 7K | Fees + Payment - FP0 3R720097 | CAL - CD00849-01 - Ckt 28A1 MBI Ini | CAL - CD00849-01 - Ckt 28A1 MBI Initiative Design Work, Norwalk_x000D_ AP1-YWO Total Cost Less Than 7K | Fees + Payment - FP0 2M721289 | AMM 15 WHITEHALL PL, FARMINGTON. D | AMM 15 WHITEHALL PL, FARMINGTON. DB SECONDARY CABLE FAULT. MADE REPAIRS._x000D_ CI-YWO Variance - Contractor Invoice | Fees + Payment - FP0 1S720372 | DL; 16 EMERY DR E; REPLACE BACKYARD | DL; 16 EMERY DR E; REPLACE BACKYARD POLE AND INSTALL NEW OH/DB SVC RISER_x000D_ AP2-YWO Total Cost Variance Met - Variance :53.9906 MIN.:-50 MAX.:150 | Fees + Payment - FP0 2M721364 | RTM-216 Percival Ave, Ber. ESO-9A-C | RTM-216 Percival Ave, Ber. ESO-9A-Car vs P#8431 POST CONSTRUCTION_x000D_ AP2-YWO Total Cost Variance Met - Variance :54.3288 MIN.:-50 MAX.:150 | Fees + Payment - FP0 CS000741 | Parker 22U-Remove Substation | Parker 22U - REmove all equipment, foundations, fence and trap rocks. All equipment will be scrapped except for the transformer (22U-1X) which will be evaluated for possible use as system spare, but most likely it will be scrapped. The substation site should be cleared and turned over to real estate for sale. The substation is schedule to be de-energized by 12/31/15. | Fees + Payment - FP0 VHPTX011 | CA AWO VEHCL PROPERTY TAX | CA AWO VEHCL PROPERTY TAX | Fees + Payment - FP0 CRCL0011 | Credit & Collections | CRCL0011NT011 | Fees + Payment - FP0 2W620297 | PHD Elec Maint Replace/Renewal/Ob | PHD Elec Maint Replace/Renewal/Obsol OH DESG (AROH) P# 6615_x000D_ AP2-YWO Total Cost Variance Met - Variance :47.7694 MIN.:-50 MAX.:50 | Fees + Payment - FP0 RENTX011 | Rental Revenue | RENTX011NT011 | Fees + Payment - FP0 CT17D024 | TALCOTT TO GOOSE HILL MICROW INSTAL | Install a new feed line to the existing dishes at Talcott. Install a new microwave radio to Goose Hill. | Fees + Payment - FP0
  8. Part 43 of 77

    1N621658 | AJC 7 FAIRFIELD AVE WSPT Electric S | AJC 7 FAIRFIELD AVE WSPT Electric Service New Residential Overhead P 25864_x000D_ | Fees + Payment - FP0 ROCKV001 | ROCKVILLE MGP COAL TAR SITE | ROCKVILLE MGP COAL TAR SITE INVESTIGATION AND REMEDIATION CORPORATE RESERVE SITE | Fees + Payment - FP0 RWPY1011 | Renewables | Renewables | Fees + Payment - FP0 WX00AE11 | WK COMP RESERVE | WK COMP RESERVE-Mantville | Fees + Payment - FP0 1N720847 | ESO 9A 4/29/17-WESTPORT = 22 MAPLE | ESO 9A 4/29/17-WESTPORT = 22 MAPLE AVE, P#26017 !!!!!_x000D_ AP1-YWO Total Cost Less Than 7K | Fees + Payment - FP0 CEBR11C1 | CT Bill Redesign | CT Electric Residential Bill Redesign | Fees + Payment - FP0 1B522254 | Key Rock Rd, Newtown, pole top fire | Key Rock Rd, Newtown, pole top fire need to repl p#2477 40/2 NOTIFY# 496101_x000D_ AP2-YWO Total Cost Variance Met - Variance :100.357 MIN.:-50 MAX.:150 | Fees + Payment - FP0 11CUSENG | Customer Engagement | Customer Engagement-Quaresma | Fees + Payment - FP0 SCMN0011 | Minor Storm Charging | SCMN0011OPSNTRELEXPENSES11 | Fees + Payment - FP0 3H721884 | EAST HARTFORD, MULCAHY DRIVE - XFMR | EAST HARTFORD, MULCAHY DRIVE - XFMR RMVED/TIED SEC CRIB_x000D_ AP1-YWO Total Cost Less Than 7K | Fees + Payment - FP0 GX170009 | FLIR E4-NIST IR Cameras | FLIR E4-NIST Infrared Cameras, 80 X 60 for Western District | Fees + Payment - FP0 GX170010 | FLIR E4-NIST IR Cameras | FLIR E4-NIST Infrared Cameras, 80 X 60 for Central District | Fees + Payment - FP0 GX170011 | FLIR E4-NIST IR Cameras | FLIR E4-NIST Infrared Cameras, 80 X 60 for Eastern District | Fees + Payment - FP0 GX170012 | Gas Detectors and Accessories | Stock Code # 0419532 (3) Gas Detector: Stock Code# 0439496 (1) Gas Detector Calibration & Bump Test Docking Station | Fees + Payment - FP0 5T721904 | 8/7 - RSO/AWC - PLEASANT VALLEY RD, | 8/7 - RSO/AWC - PLEASANT VALLEY RD,SW-GENERATOR INSTALLED_x000D_ CI-YWO Variance - Contractor Invoice | Fees + Payment - FP0 EVGM0011 | Vegetation Management | EVGM0011NT011 | Fees + Payment - FP0 1S720997 | PH; 165 BOUTON ST W; INSTALL NEW 20 | PH; 165 BOUTON ST W; INSTALL NEW 200AMP DB; REPLACE POLE 925_x000D_ AP1-YWO Total Cost Less Than 7K | Fees + Payment - FP0 NETWD011 | Payroll Payable | Payroll Payable - Morrison | Fees + Payment - FP0 2M722338 | AMM 155 SONGBIRD LN,FARM. DB PRIMAR | AMM 155 SONGBIRD LN,FARM. DB PRIMARY CABLE FAULT. MADE REPAIRS._x000D_ AP2-YWO Total Cost Variance Met - Variance :-39.9293 MIN.:-50 MAX.:50 | Fees + Payment - FP0 1B721722 | NEW MILFORD 20 EVERWOOD DR NEW MIL | NEW MILFORD 20 EVERWOOD DR NEW MILFORD , RUN NEW 4/0 DB SVC PAD 1343_x000D_ AP1-YWO Total Cost Less Than 7K | Fees + Payment - FP0 3R621020 | CD00471-01Elim. 23U Voluntown S/S C | CD00471-01Elim. 23U Voluntown S/S Conversion Work #5_x000D_ AP2-YWO Total Cost Variance Met - Variance :-18.003 MIN.:-20 MAX.:20 | Fees + Payment - FP0 2M722247 | DM 35 Niagara St WTBY P#6803 Change | DM 35 Niagara St WTBY P#6803 Change Recloser & Control 13F68-70S_x000D_ AP2-YWO Total Cost Variance Met - Variance :8.9673 MIN.:-40 MAX.:40 | Fees + Payment - FP0 2M621929 | AMM WARREN ST,WATERBURY. SHIFT FRO | AMM WARREN ST,WATERBURY. SHIFT FRONTIER POLE 8795_x000D_ AP1-YWO Total Cost Less Than 7K | Fees + Payment - FP0 4E621238 | PATROL REPAIRS, PORTLAND, 0-100 CIR | PATROL REPAIRS, PORTLAND, 0-100 CIRCUITS_x000D_ CL-YWO Variance - Contractor Labor | Fees + Payment - FP0 3R621038 | CD00471-05 Conversion Work Install | CD00471-05 Conversion Work Install Open Point Btwn. Stepdowns P#2046_x000D_ AP2-YWO Total Cost Variance Met - Variance :-30.5759 MIN.:-50 MAX.:50 | Fees + Payment - FP0 2M720591 | WC-1/14 - ESO - 1280 MARION RD CHES | WC-1/14 - ESO - 1280 MARION RD CHESHIRE P# 815 HIT ON 1/8 CASE # 2017-495_x000D_ AP1-YWO Total Cost Less Than 7K | Fees + Payment - FP0 3R621019 | CD00471-01Elim. 23U Voluntown S/S C | CD00471-01Elim. 23U Voluntown S/S Conversion Work #4_x000D_
  9. Part 44 of 77

    AP2-YWO Total Cost Variance Met - Variance :-32.8857 MIN.:-40 MAX.:40 | Fees + Payment - FP0 CS000231 | Goodwin Lane 22 - Remove Substation | Remove and scrap all steel structures and electrical equipment in the substation including the transformers. All foundations will be cut below grade, trap rock and fence will be removed. Environmental remediation of the site soil will be covered under this project if necessary. | Fees + Payment - FP0 4N621485 | MM SMART SWITCH 11Y6 POLES 405 W MA | MM SMART SWITCH 11Y6 POLES 405 W MAIN ST EAST LYME_x000D_ NL-YWO Variance - NU Construction Labor | Fees + Payment - FP0 2M722328 | ESO 5/21/17 - WOLCOTT - 27 COUNTY R | ESO 5/21/17 - WOLCOTT - 27 COUNTY RD P# 2312 - no addtl info to date 6/28_x000D_ AP1-YWO Total Cost Less Than 7K | Fees + Payment - FP0 GXC17C02 | EZ-Squeeze Kits (12) 2EK Syskowski | 2EK - EZ-Squeeze Kit, 490RKI (1) @ $841.46, 490DRMSK1 (4) @841.46. 490DWMSK1 (5) @ 868.42, 490DWMCK1 (2) @ 847.63, TOTAL: 10244.66 | Fees + Payment - FP0 GXC17C05 | Jumper Clamp Loadbreak 2AD WADE | 2AD - Jumper Clamp Loadbreak & P/U w/duck bill head (3) : s/c 464113 : $2,704ea TOTAL: $8112 AARON WADE | Fees + Payment - FP0 GXC17C06 | Timco Phase ID 2NP Stevens | 2NP - (1) Timco Phase Identification / SC 187808 / $ 1,933.64 Enos Stevens | Fees + Payment - FP0 GXC17C08 | HOT STICK CUTTER 2NP Stevens | 2NP - (1) Hot stick cutter / SC 188854 / $ 1,421.58 Enos Stevens | Fees + Payment - FP0 GXC17C09 | 5400 LOAD BUSTERS (2) 2NP Stevens | 2NP - (2) 5400 Load busters / SC 194431 / $ 2,030.00 Each TOTAL: $4060 Enos Stevens | Fees + Payment - FP0 4D621682 | Attanwanhood Trl, #1 Old Saybrook/T | Attanwanhood Trl, #1 Old Saybrook/TL--REPL #4 AL SVC W/#2 70'_x000D_ AP1-YWO Total Cost Less Than 7K | Fees + Payment - FP0 1B521909 | ESO Mill Plain Rd DNBY- CarVsPole55 | ESO Mill Plain Rd DNBY- CarVsPole55 Braced-Frontier to Set New 8/21/15_x000D_ AP3-YWO Resource Variance Met- Labor 13 <= 32 OR 112.2 <= 30 And Contractor $1546.34 <= 2000 | Fees + Payment - FP0 2W620038 | PHD Elec Maint Replace/Renewal/Obs | PHD Elec Maint Replace/Renewal/Obsol OH DESG (AROH)_x000D_ CI-YWO Variance - Contractor Invoice | Fees + Payment - FP0 3L721835 | WATERFORD POLE 3764 50 HPS COBRA CO | WATERFORD POLE 3764 50 HPS COBRA COMPLETED 7/24 CHE_x000D_ AP1-YWO Total Cost Less Than 7K | Fees + Payment - FP0 3H721456 | RSO, 6/10, WINDSOR, BROOKVIEW RD, 9 | RSO, 6/10, WINDSOR, BROOKVIEW RD, 9A, POLE 4230 REPLACE LED LIGHT_x000D_ AP1-YWO Total Cost Less Than 7K | Fees + Payment - FP0 5T721787 | Hall HillRd.,23,Somers,install 4/0q | Hall HillRd.,23,Somers,install 4/0qpxsec,(2) risers 200,400amp 3phase 120/208_x000D_ AP1-YWO Total Cost Less Than 7K | Fees + Payment - FP0 2C720130 | replace and relocate svc from oh to | replace and relocate svc from oh to db pole 406 upper main st sharon appt needed_x000D_ AP1-YWO Total Cost Less Than 7K | Fees + Payment - FP0 OMSL0011 | COMP CCC 3/21/2022 WETHERSFIELD-41 | OMSL0011OPSNTRELEXPENSES11 | Fees + Payment - FP0 CT17D007 | W PEAK BATTERY REPLACEMENT | Replace existing batteries at West Peak which have reached end of life. | Fees + Payment - FP0 CT17D008 | WILLIMANTIC SBA BATTERY REPLACEMENT | Replace existing batteries at Willimantic SBA which have reached end of life. | Fees + Payment - FP0 ZAPGMNCH | ZAP GUARDS MANCHESTER | INSTALLATION OF ZAP GUARDS VARIOUS LOC_x000D_ IN MANCHESTER | Fees + Payment - FP0 1B622145 | RM 39 Putnam Park Rd Bethel PER SH | RM 39 Putnam Park Rd Bethel PER SHOOTER NEED CUT AND KICK ALSO TREE TRIMMING_x000D_ AP1-YWO Total Cost Less Than 7K | Fees + Payment - FP0 2M720601 | WC-1/2 - ESO 233 Matthews St Bristo | WC-1/2 - ESO 233 Matthews St Bristol CAR VS POLE # 3674 CASE # 17-00090_x000D_ AP1-YWO Total Cost Less Than 7K | Fees + Payment - FP0 2M721272 | RTM-46 Norris St, Wtby. Frontier Po | RTM-46 Norris St, Wtby. Frontier Pole Reject P#62-1/2_x000D_ AP1-YWO Total Cost Less Than 7K | Fees + Payment - FP0
  10. Part 45 of 77

    3R620488 | WINDSOR, POQUONOCK AVE - INSTALL LI | WINDSOR, POQUONOCK AVE - INSTALL LINE SENSOR AT 1PH RECLOSER 24J3-160R_x000D_ AP2-YWO Total Cost Variance Met - Variance :32.6622 MIN.:-50 MAX.:150 | Fees + Payment - FP0 F1711016 | Field Eng Office Fitout (Bldgs) | Tolland - Field Engineering Office Fitout - Bldgs | Fees + Payment - FP0 4N320643 | O Colony Rd,P1840,OL(P4031 Swan Av) | O Colony Rd,P1840,OL(P4031 Swan Av)/Elec Maint T Call - Repairs/Obsol OH (AROH)_x000D_ AP2-YWO Total Cost Variance Met - Variance :11.5968 MIN.:-50 MAX.:50 | Fees + Payment - FP0 2M722553 | Greystone Rd,Wtby. Make upgrades on | Greystone Rd,Wtby. Make upgrades on 64496,64497,G413&64500 for animal protection_x000D_ AP1-YWO Total Cost Less Than 7K | Fees + Payment - FP0 CT17D015 | PROSPECT RS SITEBOSS INSTALL | Install a SiteBoss alarm panel and remove the old Badger E500 alarm panel. | Fees + Payment - FP0 2M722406 | JC/Crestwood Dr Naug Fuse 5255 Anim | JC/Crestwood Dr Naug Fuse 5255 Animal Protection_x000D_ AP1-YWO Total Cost Less Than 7K | Fees + Payment - FP0 CT17D037 | Lake Rd ARDs | CONVEX has requested a new ARD from the Lake Rd generator to CONVEX. ISO would also like to upgrade their existing ARD_x000D__x000D_ to the Generator to make use of the fiber at Lake Rd. At the same time, we will upgrade the existing substation ARD to CONVEX over the new AVA-E IP backhaul equipment. This work order will be for CL&P equipment needed at Lake Rd. to provide 3 new terminations that can make use of the corporate network and fiber. | Fees + Payment - FP0 CT17D038 | Windsor ISO BCC and CONVEX DR - Lak | CONVEX has requested a new ARD from the Lake Rd generator to CONVEX. ISO would also like to upgrade their existing ARD_x000D__x000D_ to the Generator to make use of the fiber at Lake Rd. At the same time, we will upgrade the existing substation ARD to CONVEX over the new AVA-E IP backhaul equipment. This work order will be for CL&P equipment needed at Windsor to provide 3 new terminations that can make use of the corporate network and fiber. | Fees + Payment - FP0 11REDMRE | Residential Demand Response | Residential Demand Response-Krawczyk | Fees + Payment - FP0 DVR Replacement Project | The DVR that is being replaced is a computer that is beyond its expected life cycle and requires frequent maintenance. | Fees + Payment - FP0 5T720934 | Winderemere Ave 160, Ellington. OH/ | Winderemere Ave 160, Ellington. OH/DB svc 4/0 375 ft from XFR-P-33646. Mtr dept_x000D_ AP1-YWO Total Cost Less Than 7K | Fees + Payment - FP0 GXCOS60E | SOC MONITOR DELL | NEW 43IN DELL ULTRA HD 4K MULTI CLIENT MONITOR. $1102.03_x000D__x000D_ QUOTATION ON 11/28/16 PER FRED G | Fees + Payment - FP0 1S720173 | PH; 16 RAIDERS LN; INSTALL 400AMP D | PH; 16 RAIDERS LN; INSTALL 400AMP DB SERVICE, REMOVE OH POLE LINE/SERVICE_x000D_ AP2-YWO Total Cost Variance Met - Variance :56.1339 MIN.:-50 MAX.:150 | Fees + Payment - FP0 2M721686 | EJC 370 New Britain Ave, Newington | EJC 370 New Britain Ave, Newington P#4835 FTR Replaced Pole, Shift Facilities_x000D_ AP1-YWO Total Cost Less Than 7K | Fees + Payment - FP0 1B720920 | JS - 50 Sawmill Rd, Danb, Inst\Rem | JS - 50 Sawmill Rd, Danb, Inst\Rem OH/DB Svc (28M3)_x000D_ AP1-YWO Total Cost Less Than 7K | Fees + Payment - FP0 2M722809 | Jpt-Robert Holcomb Way Plnv P9730 - | Jpt-Robert Holcomb Way Plnv P9730 - Un-Metered - VERIZON ANTENNA_x000D_ AP1-YWO Total Cost Less Than 7K | Fees + Payment - FP0 5D620884 | RA CD00078-02 install 333KVA S/D Ta | RA CD00078-02 install 333KVA S/D Taylor Hilll Rd off RT 138 Griswold_x000D_ AP2-YWO Total Cost Variance Met - Variance :-31.9432 MIN.:-50 MAX.:50 | Fees + Payment - FP0 2M721441 | 3/25/17 ESO 657 WATERTOWN AVE CAR V | 3/25/17 ESO 657 WATERTOWN AVE CAR VS POLE#7269 CASE#17-25314_x000D_ AP1-YWO Total Cost Less Than 7K | Fees + Payment - FP0 2M720946 | 600 STRAITS TPK WTN./ REPLACE POLE& | 600 STRAITS TPK WTN./ REPLACE POLE& RISER CUT KICK_x000D_

Text of RRU-159 Attachment 06.pdf

Extracted from the file · 459 pages · 8,128,897 characters

Text of RRU-159 Attachment 05.xlsx

Sheet names, column headings and text cells; numbers left out · first 300,000 characters

Text of RRU-159 Attachment 05.pdf

Extracted from the file · 879 pages · 16,073,548 characters

Text of RRU-159 Attachment 04.xlsx

Sheet names, column headings and text cells; numbers left out

Text of RRU-159 Attachment 04.pdf

Extracted from the file · 5 pages · 20,994 characters

Text of RRU-159 Attachment 03.xlsx

Sheet names, column headings and text cells; numbers left out · first 300,000 characters

Text of RRU-159 Attachment 03.pdf

Extracted from the file · 840 pages · 14,413,580 characters

Text of RRU-159 Attachment 02.xlsx

Sheet names, column headings and text cells; numbers left out · first 300,000 characters

Text of RRU-159 Attachment 02.pdf

Extracted from the file · 1,137 pages · 16,605,462 characters

Text of RRU-159 Attachment 01.xlsx

Sheet names, column headings and text cells; numbers left out

Text of RRU-159 Attachment 01.pdf

Extracted from the file · 1 page · 1,403 characters

As listed on the current system

Question(s) Answered 159 (Connecticut Light and Power Company dba Eversource Energy) Date Filed: 11/06/2026

This filing on the current system (opens in a new tab)