Skip to main content

A prototype public docket site for the Connecticut Public Utilities Regulatory Authority

Utility Dockets and Filings

Interrogatory responses

Answers to questions 159

ResponseFiled by Connecticut Light and Power Company dba Eversource Energy51 files
Part of docket 26-05-10Open
  • Electric
Application of The Connecticut Light and Power Company d/b/a Eversource Energy to Amend its Rate Schedules

Files51

Search terms highlighted
Eversource rate increase is on 36 pages across 17 files of the text below, highlighted. Go to the first matchClear highlighting
Words on different pages
Words on different pages
Words on different pages

Text of RRU-159 Attachment 23.xlsx

Sheet names, column headings and text cells; numbers left out · first 300,000 characters

Text of RRU-159 Attachment 23.pdf

Extracted from the file · 1,160 pages · 16,330,154 characters

Text of RRU-159 Attachment 22.xlsx

Sheet names, column headings and text cells; numbers left out · first 300,000 characters

Text of RRU-159 Attachment 22.pdf

Extracted from the file · 1,203 pages · 14,349,246 characters

Text of RRU-159 Attachment 21.xlsx

Sheet names, column headings and text cells; numbers left out · first 300,000 characters

Text of RRU-159 Attachment 21.pdf

Extracted from the file · 1,203 pages · 13,880,364 characters

Text of RRU-159 Attachment 20.xlsx

Sheet names, column headings and text cells; numbers left out

Text of RRU-159 Attachment 20.pdf

Extracted from the file · 16 pages · 151,762 characters

Text of RRU-159 Attachment 19.xlsx

Sheet names, column headings and text cells; numbers left out

Text of RRU-159 Attachment 19.pdf

Extracted from the file · 1 page · 5,328 characters

Text of RRU-159 Attachment 18.xlsx

Sheet names, column headings and text cells; numbers left out · first 300,000 characters

Text of RRU-159 Attachment 18.pdf

Extracted from the file · 640 pages · 7,983,236 characters

Text of RRU-159 Attachment 17.xlsx

Sheet names, column headings and text cells; numbers left out · first 300,000 characters

Text of RRU-159 Attachment 17.pdf

Extracted from the file · 855 pages · 14,651,941 characters

Text of RRU-159 Attachment 16.xlsx

Sheet names, column headings and text cells; numbers left out · first 300,000 characters

Text of RRU-159 Attachment 16.pdf

Extracted from the file · 489 pages · 7,076,557 characters

Text of RRU-159 Attachment 15.xlsx

Sheet names, column headings and text cells; numbers left out · first 300,000 characters

Text of RRU-159 Attachment 15.pdf

Extracted from the file · 897 pages · 15,723,777 characters

Text of RRU-159 Attachment 14 .pdf

Extracted from the file · 1 page · 2,589 characters

Text of RRU-159 Attachment 14.xlsx

Sheet names, column headings and text cells; numbers left out

Text of RRU-159 Attachment 13.xlsx

Sheet names, column headings and text cells; numbers left out

Text of RRU-159 Attachment 13.pdf

Extracted from the file · 1 page · 427 characters

Text of RRU-159 Attachment 12.xlsx

Sheet names, column headings and text cells; numbers left out · first 300,000 characters

Text of RRU-159 Attachment 12.pdf

Extracted from the file · 802 pages · 14,341,138 characters

Text of RRU-159 Attachment 11.xlsx

Sheet names, column headings and text cells; numbers left out · first 300,000 characters

Text of RRU-159 Attachment 11.pdf

Extracted from the file · 858 pages · 15,906,152 characters

Text of RRU-159 Attachment 10.xlsx

Sheet names, column headings and text cells; numbers left out

Text of RRU-159 Attachment 10.pdf

Extracted from the file · 1 page · 822 characters

Text of RRU-159 Attachment 09.xlsx

Sheet names, column headings and text cells; numbers left out · first 300,000 characters

Text of RRU-159 Attachment 09.pdf

Extracted from the file · 449 pages · 7,355,312 characters

Text of RRU-159 Attachment 08.xlsx

Sheet names, column headings and text cells; numbers left out · first 300,000 characters

Text of RRU-159 Attachment 08.pdf

Extracted from the file · 867 pages · 13,878,236 characters

Text of RRU-159 Attachment 07.xlsx

Sheet names, column headings and text cells; numbers left out · first 300,000 characters

Text of RRU-159 Attachment 07.pdf

Extracted from the file · 869 pages · 15,728,932 characters

Words on different pages

This spreadsheet is large. Its searchable text keeps the sheet names, column headings and text cells and stops at 300,000 characters, so search may miss words further in. Download the file for every cell and figure.

  1. Part 40 of 77

    4N720645 | SM-2 WASHINGTON ST, STGN- INSTL 250 | SM-2 WASHINGTON ST, STGN- INSTL 250 KVA 1 PH XFMR/ IT METER_x000D_ AP2-YWO Total Cost Variance Met - Variance :112.9059 MIN.:-50 MAX.:150 | Fees + Payment - FP0 1S720716 | DM/356 DAVIS AVE GREENWICH: INST 3" | DM/356 DAVIS AVE GREENWICH: INST 3" SVC RISER, 350MCM DB SVC, 2-200AMP METERS_x000D_ AP1-YWO Total Cost Less Than 7K | Fees + Payment - FP0 4D621010 | SH-Convo#399782-(MakeReadyREIMB) - | SH-Convo#399782-(MakeReadyREIMB) - VZ Parent Convo#378446_x000D_ AP1-YWO Total Cost Less Than 7K | Fees + Payment - FP0 4E621233 | JK>PAD 533--EXTEND DB SEC TO (3) NE | JK>PAD 533--EXTEND DB SEC TO (3) NEW HH'S FOR CONDO UNITS_x000D_ NL-YWO Variance - NU Construction Labor | Fees + Payment - FP0 2M721694 | RTM-Willow Brook Ball Park. 9A-Tran | RTM-Willow Brook Ball Park. 9A-Transformer Fire. Replaced 500KVA 277/480_x000D_ AP3-YWO Resource Variance Met- Labor 3 <= 32 OR 3.36 <= 30 And Contractor $0 <= 2000 | Fees + Payment - FP0 KVLIB011 | WD Payroll KV Expense | WD Payroll KV Expense-Morrison | Fees + Payment - FP0 2M722333 | AMM 268 N MAIN ST , WATERBURY. REP | AMM 268 N MAIN ST , WATERBURY. REPLACE BROKEN HANDHOLE._x000D_ AP1-YWO Total Cost Less Than 7K | Fees + Payment - FP0 3R620629 | CD00392 - Reconductor 35L7 Boston P | CD00392 - Reconductor 35L7 Boston Post Rd - Segment 2 WR 1 of 2_x000D_ CI-YWO Variance - Contractor Invoice | Fees + Payment - FP0 ALRM0011 | Station Alarms CM | ALRM0011OPSNTRELEXPENSES11 | Fees + Payment - FP0 CASW0911 | 24R (D) YardSubstationYardCorrectiv | 24R (D) YardSubstationYardCorrective Distribution - Substation Yard_x000D_ NO AWOCS-AWOCS REASON CODE AND DESCRIPTION NOT FOUND. | Fees + Payment - FP0 3H721758 | WF-109 Pond Rd-Windsor-@ pole-1853, | WF-109 Pond Rd-Windsor-@ pole-1853,inst new oh/db svc to hse_x000D_ AP1-YWO Total Cost Less Than 7K | Fees + Payment - FP0 1S720478 | DM/8 PARK AVE GREENWICH: INTERCEPT | DM/8 PARK AVE GREENWICH: INTERCEPT EXIST DB SVC, 4/0 DB SVC, 200AMP_x000D_ AP1-YWO Total Cost Less Than 7K | Fees + Payment - FP0 DSN62046 | (40): Installation of a hand rail | Installation of a hand rail and yard lights | Fees + Payment - FP0 DSN62047 | (40): Replacement of the control ho | Replacement of the control house asbestos tiled flooring | Fees + Payment - FP0 INVT0011 | Inventory offset | Inventory offset-Ouimette | Fees + Payment - FP0 4E621624 | MN HIGHLAND TERR HMPTN PHASE IC, 3 | MN HIGHLAND TERR HMPTN PHASE IC, 3 LOTS._x000D_ AP1-YWO Total Cost Less Than 7K | Fees + Payment - FP0 5T721737 | RSO, 7/12, ENFIELD, ELM STREET, CAB | RSO, 7/12, ENFIELD, ELM STREET, CABLE FAULT, RPLC FAULT INDICATORS MHC_x000D_ AP1-YWO Total Cost Less Than 7K | Fees + Payment - FP0 4D720149 | CB//GUILFORD, MOOSE HILL RD//UPGRAD | CB//GUILFORD, MOOSE HILL RD//UPGRADE FUSES/CUTOUTS TO 140K POLE 2_x000D_ AP1-YWO Total Cost Less Than 7K | Fees + Payment - FP0 CS000611 | Install 3rd Xfmr & 23kV Switchgear | Scitico 27H - Install a new 27H-3X transformer position, 27H-3X1-4 MOD, 27H-3S station srvice, 27H-3H PTs, new double-bus 23kV PCE switchgear and underground tie cables to each existing 23kV ring bus. | Fees + Payment - FP0 3H721840 | RSO, 7/13, E HARTFORD, ROBERTS ST, | RSO, 7/13, E HARTFORD, ROBERTS ST, RPLC 8' ARM pole 4138/shift 1/0 ACSR_x000D_ AP1-YWO Total Cost Less Than 7K | Fees + Payment - FP0 4D720143 | TS 174 CEDAR ST BFD P6716 & 44072 I | TS 174 CEDAR ST BFD P6716 & 44072 INS 1000WMH FLOODS_x000D_ AP1-YWO Total Cost Less Than 7K | Fees + Payment - FP0 CT17D017 | W HARTLAND SITEBOSS INSTALL | Install a SiteBoss alarm panel and remove the old Badger E500 alarm panel. | Fees + Payment - FP0 2M722269 | Municipal Light Fault Locate and Re | Municipal Light Fault Locate and Repair@ POLE 4150 - COMP 7-8-17 CCC_x000D_ AP1-YWO Total Cost Less Than 7K | Fees + Payment - FP0 CT17D012 | 56 Prospect St SiteBoss Install | Install a SiteBoss alarm panel and remove the old Badger E500 alarm panel. | Fees + Payment - FP0
  2. Part 41 of 77

    4N721202 | SM-122 RYDER RD, N STGN-Install new | SM-122 RYDER RD, N STGN-Install new 150' OH/DB service_x000D_ AP1-YWO Total Cost Less Than 7K | Fees + Payment - FP0 2M721829 | DM 5/18 E MITCHELL AVE CHESHIRE - D | DM 5/18 E MITCHELL AVE CHESHIRE - DB FAULT Replace Cable VLT#B to PAD#C_x000D_ AP2-YWO Total Cost Variance Met - Variance :15.3973 MIN.:-40 MAX.:40 | Fees + Payment - FP0 5T721647 | 6/30 - RSO/AWC - ENFIELD, BRAINARD | 6/30 - RSO/AWC - ENFIELD, BRAINARD RD, 9A - EVERSOURCE P-2503 complete in field_x000D_ AP2-YWO Total Cost Variance Met - Variance :29.3618 MIN.:-50 MAX.:50 | Fees + Payment - FP0 5T721575 | Woods Rd, Somers - Extend 1 ph prim | Woods Rd, Somers - Extend 1 ph primary_x000D_ AP2-YWO Total Cost Variance Met - Variance :-24.137 MIN.:-50 MAX.:50 | Fees + Payment - FP0 4N720562 | SM Y-18695-2017 YELLOW TAG REPLACE | SM Y-18695-2017 YELLOW TAG REPLACE CAPACITOR P#3051_x000D_ AP2-YWO Total Cost Variance Met - Variance :30.1932 MIN.:-50 MAX.:50 | Fees + Payment - FP0 3R620743 | CD00647-02, 28J1 convert OH, Branfo | CD00647-02, 28J1 convert OH, Branford, 1 of 3_x000D_ CL-YWO Variance - Contractor Labor | Fees + Payment - FP0 4E720505 | (CH) P#3444: WRK COMP'D_RSO/AWC/RSO | (CH) P#3444: WRK COMP'D_RSO/AWC/RSO 4/8_9A_x000D_ AP3-YWO Resource Variance Met- Labor 19 <= 32 OR 35.64 <= 30 And Contractor $1435.56 <= 2000 | Fees + Payment - FP0 5T720405 | Avery St., South Windsor - Relocate | Avery St., South Windsor - Relocate facilities for The Town Road Work_x000D_ | Fees + Payment - FP0 3H720325 | HARTFORD,ANN ST REPLACE A MAINS BET | HARTFORD,ANN ST REPLACE A MAINS BETWEEN SB1607 & SB1831_x000D_ AP2-YWO Total Cost Variance Met - Variance :-27.189 MIN.:-30 MAX.:30 | Fees + Payment - FP0 2C620304 | PT Conv# 461290-MakeReadyNonReimb-C | PT Conv# 461290-MakeReadyNonReimb-Comcast-ParentConv# 450571_x000D_ AP1-YWO Total Cost Less Than 7K | Fees + Payment - FP0 2M720697 | RTM-220 Coe Ave, Mer. Relocate Pole | RTM-220 Coe Ave, Mer. Relocate Poles for new Enterance 100% Chargeable_x000D_ MS-YWO Variance - Multiple Setups | Fees + Payment - FP0 DSN72010 | (30): Install new Driveways. DSN720 | Install new Driveways | Fees + Payment - FP0 2M722285 | CDOT151-273, PN 492601-03 CIS #9 - | CDOT151-273, PN 492601-03 CIS #9 - OH Riser 9521_x000D_ JE-YWO Variance Job Type Exclusion | Fees + Payment - FP0 4D721191 | Boston Post Rd, Old Saybrook/TL-7/2 | Boston Post Rd, Old Saybrook/TL-7/25-P#1712,P#1714,P#2949,P#2949-1/2. Buchetto_x000D_ CL-YWO Variance - Contractor Labor | Fees + Payment - FP0 SMTR0011 | Small Tool Repair (Repair Shop) | SMTR0011OPSNTRELEXPENSES11 | Fees + Payment - FP0 TXCT0011 | CT Tax Offset | CT Tax Offset-Ouimette | Fees + Payment - FP0 1N720986 | JES; 659 DANBURY RD. WILTON. REPLAC | JES; 659 DANBURY RD. WILTON. REPLACE BAD POLE & RE ROUT LINES. 19024.._x000D_ AP3-YWO Resource Variance Met- Labor 8 <= 32 OR -19.14 <= 30 And Contractor $1030.89 <= 2000 | Fees + Payment - FP0 SVOH5DEX | BROOKLYN, CREAMERY BROOK, 120, Dani | NO DESC AVAILABLE | Fees + Payment - FP0 4D721143 | TS OLD POST RD CLINTON P2388 CHANGE | TS OLD POST RD CLINTON P2388 CHANGE POT TO 25KVA_x000D_ AP1-YWO Total Cost Less Than 7K | Fees + Payment - FP0 MGSP0111 | Management & Supervision | MGSP0111NT011 | Fees + Payment - FP0 1S721416 | DM/STRICKLAND RD COS COB: 11R56 CAB | DM/STRICKLAND RD COS COB: 11R56 CABLE FAILURE/REPLACE CABLE AT MH117 TO MH127_x000D_ AP2-YWO Total Cost Variance Met - Variance :8.429 MIN.:-20 MAX.:20 | Fees + Payment - FP0 4E721001 | JK>POLE 867--REPLACE TERMINATOR AT | JK>POLE 867--REPLACE TERMINATOR AT RISER POLE, RESORE POWER TO NORMAL_x000D_ AP1-YWO Total Cost Less Than 7K | Fees + Payment - FP0 1S721128 | Interlaken - Cap inspection and rep | Interlaken - Cap inspection and repair @ pole 689 schedule ASAP-LOAD RELIEF_x000D_ AP1-YWO Total Cost Less Than 7K | Fees + Payment - FP0 5T721742 | 7/13 - RSO/TOLOH - VERNON, TAYLOR S | 7/13 - RSO/TOLOH - VERNON, TAYLOR ST - 9A - FRONTIER POLE 1105_x000D_
  3. Part 42 of 77

    AP2-YWO Total Cost Variance Met - Variance :-25.8548 MIN.:-50 MAX.:50 | Fees + Payment - FP0 2M721697 | PT Conv# 505840-MakeReadyNonReimb-V | PT Conv# 505840-MakeReadyNonReimb-VerizonWireless-ParentConv# 500248_x000D_ AP1-YWO Total Cost Less Than 7K | Fees + Payment - FP0 DSN72020 | replacement of 48V DC Battery bank | Boulevard 45 - Replace the failing battery and charger | Fees + Payment - FP0 4E720454 | (CH) P#207: CHG DROP_MTR DEPT TO CH | (CH) P#207: CHG DROP_MTR DEPT TO CHG MTR #97987663._x000D_ AP1-YWO Total Cost Less Than 7K | Fees + Payment - FP0 1S720506 | DL; 970 STILLWATER RD; TRANSFER TO | DL; 970 STILLWATER RD; TRANSFER TO FRONTIER POLE 113347/NEW OH/DB RISER_x000D_ AP1-YWO Total Cost Less Than 7K | Fees + Payment - FP0 DOST0011 | District Operations (Stations) | DOST0011OPSNTRELEXPENSES11 | Fees + Payment - FP0 2M722310 | Municipal Light Fault Locate and Re | Municipal Light Fault Locate and Repair@ POLE L1-654 Replaced 140ft of #4 CBL._x000D_ CI-YWO Variance - Contractor Invoice | Fees + Payment - FP0 2L720357 | Winchester--S. Main St. (100) 3034 | Winchester--S. Main St. (100) 3034 Rem 3ph riser, cable, & xfmr bank in vault_x000D_ AP2-YWO Total Cost Variance Met - Variance :14.143 MIN.:-50 MAX.:50 | Fees + Payment - FP0 5T721792 | AWC 7/20 VERNON, SCHOOLBROOK RD - R | AWC 7/20 VERNON, SCHOOLBROOK RD - RPL 25KVA XFRMR & CUTOUT P#6505_x000D_ AP1-YWO Total Cost Less Than 7K | Fees + Payment - FP0 GXC16C68 | UG Harnesses (5) 2NR FEAL | 2NR - UG Harnesses (5) - 3@2XL s/c 462038 @$730.88ea - 2@XL s/c 462037$735.06 TOTAL: $3,665.00 | Fees + Payment - FP0 GXC16C69 | Water Pumps (3) 2NR Leonard | 2NR - Water Pumps (3) s/c 0452792 @ $827 ea TOTAL: $2481 | Fees + Payment - FP0 3R621049 | CD00471-09 Conversion Work Inst.Ste | CD00471-09 Conversion Work Inst.Step Down XF's No.Shore & Wylie School Job 4_x000D_ AP2-YWO Total Cost Variance Met - Variance :-12.178 MIN.:-30 MAX.:30 | Fees + Payment - FP0 2M720395 | (DF) Prospect- Ple 94 Change cutout | (DF) Prospect- Ple 94 Change cutouts, TERRY Rd PROSPECT_x000D_ AP1-YWO Total Cost Less Than 7K | Fees + Payment - FP0 3R720097 | CAL - CD00849-01 - Ckt 28A1 MBI Ini | CAL - CD00849-01 - Ckt 28A1 MBI Initiative Design Work, Norwalk_x000D_ AP1-YWO Total Cost Less Than 7K | Fees + Payment - FP0 2M721289 | AMM 15 WHITEHALL PL, FARMINGTON. D | AMM 15 WHITEHALL PL, FARMINGTON. DB SECONDARY CABLE FAULT. MADE REPAIRS._x000D_ CI-YWO Variance - Contractor Invoice | Fees + Payment - FP0 1S720372 | DL; 16 EMERY DR E; REPLACE BACKYARD | DL; 16 EMERY DR E; REPLACE BACKYARD POLE AND INSTALL NEW OH/DB SVC RISER_x000D_ AP2-YWO Total Cost Variance Met - Variance :53.9906 MIN.:-50 MAX.:150 | Fees + Payment - FP0 2M721364 | RTM-216 Percival Ave, Ber. ESO-9A-C | RTM-216 Percival Ave, Ber. ESO-9A-Car vs P#8431 POST CONSTRUCTION_x000D_ AP2-YWO Total Cost Variance Met - Variance :54.3288 MIN.:-50 MAX.:150 | Fees + Payment - FP0 CS000741 | Parker 22U-Remove Substation | Parker 22U - REmove all equipment, foundations, fence and trap rocks. All equipment will be scrapped except for the transformer (22U-1X) which will be evaluated for possible use as system spare, but most likely it will be scrapped. The substation site should be cleared and turned over to real estate for sale. The substation is schedule to be de-energized by 12/31/15. | Fees + Payment - FP0 VHPTX011 | CA AWO VEHCL PROPERTY TAX | CA AWO VEHCL PROPERTY TAX | Fees + Payment - FP0 CRCL0011 | Credit & Collections | CRCL0011NT011 | Fees + Payment - FP0 2W620297 | PHD Elec Maint Replace/Renewal/Ob | PHD Elec Maint Replace/Renewal/Obsol OH DESG (AROH) P# 6615_x000D_ AP2-YWO Total Cost Variance Met - Variance :47.7694 MIN.:-50 MAX.:50 | Fees + Payment - FP0 RENTX011 | Rental Revenue | RENTX011NT011 | Fees + Payment - FP0 CT17D024 | TALCOTT TO GOOSE HILL MICROW INSTAL | Install a new feed line to the existing dishes at Talcott. Install a new microwave radio to Goose Hill. | Fees + Payment - FP0
  4. Part 43 of 77

    1N621658 | AJC 7 FAIRFIELD AVE WSPT Electric S | AJC 7 FAIRFIELD AVE WSPT Electric Service New Residential Overhead P 25864_x000D_ | Fees + Payment - FP0 ROCKV001 | ROCKVILLE MGP COAL TAR SITE | ROCKVILLE MGP COAL TAR SITE INVESTIGATION AND REMEDIATION CORPORATE RESERVE SITE | Fees + Payment - FP0 RWPY1011 | Renewables | Renewables | Fees + Payment - FP0 WX00AE11 | WK COMP RESERVE | WK COMP RESERVE-Mantville | Fees + Payment - FP0 1N720847 | ESO 9A 4/29/17-WESTPORT = 22 MAPLE | ESO 9A 4/29/17-WESTPORT = 22 MAPLE AVE, P#26017 !!!!!_x000D_ AP1-YWO Total Cost Less Than 7K | Fees + Payment - FP0 CEBR11C1 | CT Bill Redesign | CT Electric Residential Bill Redesign | Fees + Payment - FP0 1B522254 | Key Rock Rd, Newtown, pole top fire | Key Rock Rd, Newtown, pole top fire need to repl p#2477 40/2 NOTIFY# 496101_x000D_ AP2-YWO Total Cost Variance Met - Variance :100.357 MIN.:-50 MAX.:150 | Fees + Payment - FP0 11CUSENG | Customer Engagement | Customer Engagement-Quaresma | Fees + Payment - FP0 SCMN0011 | Minor Storm Charging | SCMN0011OPSNTRELEXPENSES11 | Fees + Payment - FP0 3H721884 | EAST HARTFORD, MULCAHY DRIVE - XFMR | EAST HARTFORD, MULCAHY DRIVE - XFMR RMVED/TIED SEC CRIB_x000D_ AP1-YWO Total Cost Less Than 7K | Fees + Payment - FP0 GX170009 | FLIR E4-NIST IR Cameras | FLIR E4-NIST Infrared Cameras, 80 X 60 for Western District | Fees + Payment - FP0 GX170010 | FLIR E4-NIST IR Cameras | FLIR E4-NIST Infrared Cameras, 80 X 60 for Central District | Fees + Payment - FP0 GX170011 | FLIR E4-NIST IR Cameras | FLIR E4-NIST Infrared Cameras, 80 X 60 for Eastern District | Fees + Payment - FP0 GX170012 | Gas Detectors and Accessories | Stock Code # 0419532 (3) Gas Detector: Stock Code# 0439496 (1) Gas Detector Calibration & Bump Test Docking Station | Fees + Payment - FP0 5T721904 | 8/7 - RSO/AWC - PLEASANT VALLEY RD, | 8/7 - RSO/AWC - PLEASANT VALLEY RD,SW-GENERATOR INSTALLED_x000D_ CI-YWO Variance - Contractor Invoice | Fees + Payment - FP0 EVGM0011 | Vegetation Management | EVGM0011NT011 | Fees + Payment - FP0 1S720997 | PH; 165 BOUTON ST W; INSTALL NEW 20 | PH; 165 BOUTON ST W; INSTALL NEW 200AMP DB; REPLACE POLE 925_x000D_ AP1-YWO Total Cost Less Than 7K | Fees + Payment - FP0 NETWD011 | Payroll Payable | Payroll Payable - Morrison | Fees + Payment - FP0 2M722338 | AMM 155 SONGBIRD LN,FARM. DB PRIMAR | AMM 155 SONGBIRD LN,FARM. DB PRIMARY CABLE FAULT. MADE REPAIRS._x000D_ AP2-YWO Total Cost Variance Met - Variance :-39.9293 MIN.:-50 MAX.:50 | Fees + Payment - FP0 1B721722 | NEW MILFORD 20 EVERWOOD DR NEW MIL | NEW MILFORD 20 EVERWOOD DR NEW MILFORD , RUN NEW 4/0 DB SVC PAD 1343_x000D_ AP1-YWO Total Cost Less Than 7K | Fees + Payment - FP0 3R621020 | CD00471-01Elim. 23U Voluntown S/S C | CD00471-01Elim. 23U Voluntown S/S Conversion Work #5_x000D_ AP2-YWO Total Cost Variance Met - Variance :-18.003 MIN.:-20 MAX.:20 | Fees + Payment - FP0 2M722247 | DM 35 Niagara St WTBY P#6803 Change | DM 35 Niagara St WTBY P#6803 Change Recloser & Control 13F68-70S_x000D_ AP2-YWO Total Cost Variance Met - Variance :8.9673 MIN.:-40 MAX.:40 | Fees + Payment - FP0 2M621929 | AMM WARREN ST,WATERBURY. SHIFT FRO | AMM WARREN ST,WATERBURY. SHIFT FRONTIER POLE 8795_x000D_ AP1-YWO Total Cost Less Than 7K | Fees + Payment - FP0 4E621238 | PATROL REPAIRS, PORTLAND, 0-100 CIR | PATROL REPAIRS, PORTLAND, 0-100 CIRCUITS_x000D_ CL-YWO Variance - Contractor Labor | Fees + Payment - FP0 3R621038 | CD00471-05 Conversion Work Install | CD00471-05 Conversion Work Install Open Point Btwn. Stepdowns P#2046_x000D_ AP2-YWO Total Cost Variance Met - Variance :-30.5759 MIN.:-50 MAX.:50 | Fees + Payment - FP0 2M720591 | WC-1/14 - ESO - 1280 MARION RD CHES | WC-1/14 - ESO - 1280 MARION RD CHESHIRE P# 815 HIT ON 1/8 CASE # 2017-495_x000D_ AP1-YWO Total Cost Less Than 7K | Fees + Payment - FP0 3R621019 | CD00471-01Elim. 23U Voluntown S/S C | CD00471-01Elim. 23U Voluntown S/S Conversion Work #4_x000D_
  5. Part 44 of 77

    AP2-YWO Total Cost Variance Met - Variance :-32.8857 MIN.:-40 MAX.:40 | Fees + Payment - FP0 CS000231 | Goodwin Lane 22 - Remove Substation | Remove and scrap all steel structures and electrical equipment in the substation including the transformers. All foundations will be cut below grade, trap rock and fence will be removed. Environmental remediation of the site soil will be covered under this project if necessary. | Fees + Payment - FP0 4N621485 | MM SMART SWITCH 11Y6 POLES 405 W MA | MM SMART SWITCH 11Y6 POLES 405 W MAIN ST EAST LYME_x000D_ NL-YWO Variance - NU Construction Labor | Fees + Payment - FP0 2M722328 | ESO 5/21/17 - WOLCOTT - 27 COUNTY R | ESO 5/21/17 - WOLCOTT - 27 COUNTY RD P# 2312 - no addtl info to date 6/28_x000D_ AP1-YWO Total Cost Less Than 7K | Fees + Payment - FP0 GXC17C02 | EZ-Squeeze Kits (12) 2EK Syskowski | 2EK - EZ-Squeeze Kit, 490RKI (1) @ $841.46, 490DRMSK1 (4) @841.46. 490DWMSK1 (5) @ 868.42, 490DWMCK1 (2) @ 847.63, TOTAL: 10244.66 | Fees + Payment - FP0 GXC17C05 | Jumper Clamp Loadbreak 2AD WADE | 2AD - Jumper Clamp Loadbreak & P/U w/duck bill head (3) : s/c 464113 : $2,704ea TOTAL: $8112 AARON WADE | Fees + Payment - FP0 GXC17C06 | Timco Phase ID 2NP Stevens | 2NP - (1) Timco Phase Identification / SC 187808 / $ 1,933.64 Enos Stevens | Fees + Payment - FP0 GXC17C08 | HOT STICK CUTTER 2NP Stevens | 2NP - (1) Hot stick cutter / SC 188854 / $ 1,421.58 Enos Stevens | Fees + Payment - FP0 GXC17C09 | 5400 LOAD BUSTERS (2) 2NP Stevens | 2NP - (2) 5400 Load busters / SC 194431 / $ 2,030.00 Each TOTAL: $4060 Enos Stevens | Fees + Payment - FP0 4D621682 | Attanwanhood Trl, #1 Old Saybrook/T | Attanwanhood Trl, #1 Old Saybrook/TL--REPL #4 AL SVC W/#2 70'_x000D_ AP1-YWO Total Cost Less Than 7K | Fees + Payment - FP0 1B521909 | ESO Mill Plain Rd DNBY- CarVsPole55 | ESO Mill Plain Rd DNBY- CarVsPole55 Braced-Frontier to Set New 8/21/15_x000D_ AP3-YWO Resource Variance Met- Labor 13 <= 32 OR 112.2 <= 30 And Contractor $1546.34 <= 2000 | Fees + Payment - FP0 2W620038 | PHD Elec Maint Replace/Renewal/Obs | PHD Elec Maint Replace/Renewal/Obsol OH DESG (AROH)_x000D_ CI-YWO Variance - Contractor Invoice | Fees + Payment - FP0 3L721835 | WATERFORD POLE 3764 50 HPS COBRA CO | WATERFORD POLE 3764 50 HPS COBRA COMPLETED 7/24 CHE_x000D_ AP1-YWO Total Cost Less Than 7K | Fees + Payment - FP0 3H721456 | RSO, 6/10, WINDSOR, BROOKVIEW RD, 9 | RSO, 6/10, WINDSOR, BROOKVIEW RD, 9A, POLE 4230 REPLACE LED LIGHT_x000D_ AP1-YWO Total Cost Less Than 7K | Fees + Payment - FP0 5T721787 | Hall HillRd.,23,Somers,install 4/0q | Hall HillRd.,23,Somers,install 4/0qpxsec,(2) risers 200,400amp 3phase 120/208_x000D_ AP1-YWO Total Cost Less Than 7K | Fees + Payment - FP0 2C720130 | replace and relocate svc from oh to | replace and relocate svc from oh to db pole 406 upper main st sharon appt needed_x000D_ AP1-YWO Total Cost Less Than 7K | Fees + Payment - FP0 OMSL0011 | COMP CCC 3/21/2022 WETHERSFIELD-41 | OMSL0011OPSNTRELEXPENSES11 | Fees + Payment - FP0 CT17D007 | W PEAK BATTERY REPLACEMENT | Replace existing batteries at West Peak which have reached end of life. | Fees + Payment - FP0 CT17D008 | WILLIMANTIC SBA BATTERY REPLACEMENT | Replace existing batteries at Willimantic SBA which have reached end of life. | Fees + Payment - FP0 ZAPGMNCH | ZAP GUARDS MANCHESTER | INSTALLATION OF ZAP GUARDS VARIOUS LOC_x000D_ IN MANCHESTER | Fees + Payment - FP0 1B622145 | RM 39 Putnam Park Rd Bethel PER SH | RM 39 Putnam Park Rd Bethel PER SHOOTER NEED CUT AND KICK ALSO TREE TRIMMING_x000D_ AP1-YWO Total Cost Less Than 7K | Fees + Payment - FP0 2M720601 | WC-1/2 - ESO 233 Matthews St Bristo | WC-1/2 - ESO 233 Matthews St Bristol CAR VS POLE # 3674 CASE # 17-00090_x000D_ AP1-YWO Total Cost Less Than 7K | Fees + Payment - FP0 2M721272 | RTM-46 Norris St, Wtby. Frontier Po | RTM-46 Norris St, Wtby. Frontier Pole Reject P#62-1/2_x000D_ AP1-YWO Total Cost Less Than 7K | Fees + Payment - FP0
  6. Part 45 of 77

    3R620488 | WINDSOR, POQUONOCK AVE - INSTALL LI | WINDSOR, POQUONOCK AVE - INSTALL LINE SENSOR AT 1PH RECLOSER 24J3-160R_x000D_ AP2-YWO Total Cost Variance Met - Variance :32.6622 MIN.:-50 MAX.:150 | Fees + Payment - FP0 F1711016 | Field Eng Office Fitout (Bldgs) | Tolland - Field Engineering Office Fitout - Bldgs | Fees + Payment - FP0 4N320643 | O Colony Rd,P1840,OL(P4031 Swan Av) | O Colony Rd,P1840,OL(P4031 Swan Av)/Elec Maint T Call - Repairs/Obsol OH (AROH)_x000D_ AP2-YWO Total Cost Variance Met - Variance :11.5968 MIN.:-50 MAX.:50 | Fees + Payment - FP0 2M722553 | Greystone Rd,Wtby. Make upgrades on | Greystone Rd,Wtby. Make upgrades on 64496,64497,G413&64500 for animal protection_x000D_ AP1-YWO Total Cost Less Than 7K | Fees + Payment - FP0 CT17D015 | PROSPECT RS SITEBOSS INSTALL | Install a SiteBoss alarm panel and remove the old Badger E500 alarm panel. | Fees + Payment - FP0 2M722406 | JC/Crestwood Dr Naug Fuse 5255 Anim | JC/Crestwood Dr Naug Fuse 5255 Animal Protection_x000D_ AP1-YWO Total Cost Less Than 7K | Fees + Payment - FP0 CT17D037 | Lake Rd ARDs | CONVEX has requested a new ARD from the Lake Rd generator to CONVEX. ISO would also like to upgrade their existing ARD_x000D__x000D_ to the Generator to make use of the fiber at Lake Rd. At the same time, we will upgrade the existing substation ARD to CONVEX over the new AVA-E IP backhaul equipment. This work order will be for CL&P equipment needed at Lake Rd. to provide 3 new terminations that can make use of the corporate network and fiber. | Fees + Payment - FP0 CT17D038 | Windsor ISO BCC and CONVEX DR - Lak | CONVEX has requested a new ARD from the Lake Rd generator to CONVEX. ISO would also like to upgrade their existing ARD_x000D__x000D_ to the Generator to make use of the fiber at Lake Rd. At the same time, we will upgrade the existing substation ARD to CONVEX over the new AVA-E IP backhaul equipment. This work order will be for CL&P equipment needed at Windsor to provide 3 new terminations that can make use of the corporate network and fiber. | Fees + Payment - FP0 11REDMRE | Residential Demand Response | Residential Demand Response-Krawczyk | Fees + Payment - FP0 DVR Replacement Project | The DVR that is being replaced is a computer that is beyond its expected life cycle and requires frequent maintenance. | Fees + Payment - FP0 5T720934 | Winderemere Ave 160, Ellington. OH/ | Winderemere Ave 160, Ellington. OH/DB svc 4/0 375 ft from XFR-P-33646. Mtr dept_x000D_ AP1-YWO Total Cost Less Than 7K | Fees + Payment - FP0 GXCOS60E | SOC MONITOR DELL | NEW 43IN DELL ULTRA HD 4K MULTI CLIENT MONITOR. $1102.03_x000D__x000D_ QUOTATION ON 11/28/16 PER FRED G | Fees + Payment - FP0 1S720173 | PH; 16 RAIDERS LN; INSTALL 400AMP D | PH; 16 RAIDERS LN; INSTALL 400AMP DB SERVICE, REMOVE OH POLE LINE/SERVICE_x000D_ AP2-YWO Total Cost Variance Met - Variance :56.1339 MIN.:-50 MAX.:150 | Fees + Payment - FP0 2M721686 | EJC 370 New Britain Ave, Newington | EJC 370 New Britain Ave, Newington P#4835 FTR Replaced Pole, Shift Facilities_x000D_ AP1-YWO Total Cost Less Than 7K | Fees + Payment - FP0 1B720920 | JS - 50 Sawmill Rd, Danb, Inst\Rem | JS - 50 Sawmill Rd, Danb, Inst\Rem OH/DB Svc (28M3)_x000D_ AP1-YWO Total Cost Less Than 7K | Fees + Payment - FP0 2M722809 | Jpt-Robert Holcomb Way Plnv P9730 - | Jpt-Robert Holcomb Way Plnv P9730 - Un-Metered - VERIZON ANTENNA_x000D_ AP1-YWO Total Cost Less Than 7K | Fees + Payment - FP0 5D620884 | RA CD00078-02 install 333KVA S/D Ta | RA CD00078-02 install 333KVA S/D Taylor Hilll Rd off RT 138 Griswold_x000D_ AP2-YWO Total Cost Variance Met - Variance :-31.9432 MIN.:-50 MAX.:50 | Fees + Payment - FP0 2M721441 | 3/25/17 ESO 657 WATERTOWN AVE CAR V | 3/25/17 ESO 657 WATERTOWN AVE CAR VS POLE#7269 CASE#17-25314_x000D_ AP1-YWO Total Cost Less Than 7K | Fees + Payment - FP0 2M720946 | 600 STRAITS TPK WTN./ REPLACE POLE& | 600 STRAITS TPK WTN./ REPLACE POLE& RISER CUT KICK_x000D_
  7. Part 46 of 77

    AP2-YWO Total Cost Variance Met - Variance :46.7562 MIN.:-50 MAX.:50 | Fees + Payment - FP0 1B720968 | CB - CDOT - 34-305 & 345 Move 2 | CB - CDOT - 34-305 & 345 Move 2_x000D_ JE-YWO Variance Job Type Exclusion | Fees + Payment - FP0 1S720834 | DL; WASHINGTON BLVD; FAULT TO 3 STA | DL; WASHINGTON BLVD; FAULT TO 3 STAMFORD LIGHTS_x000D_ AP2-YWO Total Cost Variance Met - Variance :32.5896 MIN.:-50 MAX.:50 | Fees + Payment - FP0 APCAA111 | AP Contracts Non | A/P Contracts Non | Fees + Payment - FP0 | 232CA0 4E721257 | (CH) PAD#4263: EXTEND PRIM'Y TO PAD | (CH) PAD#4263: EXTEND PRIM'Y TO PAD#4264_UNITS 5-8, 18-21_PHASE 2_x000D_ AP2-YWO Total Cost Variance Met - Variance :-28.7598 MIN.:-50 MAX.:50 | Fees + Payment - FP0 1N720860 | JES; 31A8 Capacitor Solution - New | JES; 31A8 Capacitor Solution - New Canaan Silvermine Rd PL 27..._x000D_ AP2-YWO Total Cost Variance Met - Variance :4.9118 MIN.:-40 MAX.:40 | Fees + Payment - FP0 2M722839 | RSO SOUTHINGTON, Belleview Ave - I | RSO SOUTHINGTON, Belleview Ave - Installed 15 KV arrestor at Pad A_x000D_ CI-YWO Variance - Contractor Invoice | Fees + Payment - FP0 Non - Productive Labor | 00000011EMPBENPAY11 | Fees + Payment - FP0 | 9200NP 1S721577 | 21 LEEDS ST STAMFORD/ REPLACED SERV | 21 LEEDS ST STAMFORD/ REPLACED SERVICE WITH 40' #2 - ALL WORK COMPLETE_x000D_ AP1-YWO Total Cost Less Than 7K | Fees + Payment - FP0 3H722032 | 8/4 - RSO - ROCKY HILL, WEST ST - R | 8/4 - RSO - ROCKY HILL, WEST ST - RPL 3-50KVA 120/208 BANK POLE 1406_x000D_ AP2-YWO Total Cost Variance Met - Variance :-42.569 MIN.:-50 MAX.:50 | Fees + Payment - FP0 CT17D019 | CHESHIRE TO W PEAK MICROWAVE UPGRAD | Upgrade the microwave equipment from DS3 to OC3 capacity to provide sufficient backhaul to enable microwave to be an alternate path from fiber and increase capacity. | Fees + Payment - FP0 5T721834 | Florence Ave, Ellington. Install cu | Florence Ave, Ellington. Install cutout for XFR, Upswing Bkt P-993_x000D_ AP1-YWO Total Cost Less Than 7K | Fees + Payment - FP0 5T721871 | Brook View Dr, Vernon. Change singl | Brook View Dr, Vernon. Change single phase to C Phase. Fuse Xfr Bank P-30842_x000D_ AP1-YWO Total Cost Less Than 7K | Fees + Payment - FP0 1S721517 | DL; GREYROCK PLElectric Service Un- | DL; GREYROCK PLElectric Service Un-Metered - POLE#1460 - CONVERSATION #408277_x000D_ AP1-YWO Total Cost Less Than 7K | Fees + Payment - FP0 4D720245 | Stanford Hill Rd, #32 Essex/TL-REPL | Stanford Hill Rd, #32 Essex/TL-REPL EX OH SVC FROM P#432 ***BACKYARD FEED***_x000D_ | Fees + Payment - FP0 5D720752 | DG P#359 6 WESTFORD RD EASTFORD RPL | DG P#359 6 WESTFORD RD EASTFORD RPLC BRKN ARM, CO's, NEED TO INST(3) ARRESTERS_x000D_ AP2-YWO Total Cost Variance Met - Variance :15.2523 MIN.:-50 MAX.:50 | Fees + Payment - FP0 2M722861 | WC-8/10 SOUTHINGTON, BRISTOL ST - 9 | WC-8/10 SOUTHINGTON, BRISTOL ST - 9A P 2647 - CAR V POLE & 3 PH BANK XFRMS_x000D_ AP2-YWO Total Cost Variance Met - Variance :-4.2993 MIN.:-50 MAX.:50 | Fees + Payment - FP0 5T721689 | MOUNTAIN VIEW RD, SOMERS - 9A POLE | MOUNTAIN VIEW RD, SOMERS - 9A POLE 11075-COMPLETE_x000D_ AP1-YWO Total Cost Less Than 7K | Fees + Payment - FP0 2M722592 | AMM 65 BENEDICT ST,WTBY. REPLACED | AMM 65 BENEDICT ST,WTBY. REPLACED XFMR BANK. REPLACED 3 CUTOUTS._x000D_ CL-YWO Variance - Contractor Labor | Fees + Payment - FP0 4N720929 | MM SERVC RISER TO PEDESTALL POLE214 | MM SERVC RISER TO PEDESTALL POLE214 PEQOUT AVE OH/DB MLC_x000D_ AP1-YWO Total Cost Less Than 7K | Fees + Payment - FP0 2L720851 | WATERTOWN - BUCKINGHAM / REPLACE RE | WATERTOWN - BUCKINGHAM / REPLACE RECLOSER AND CONTROL - YELLOW TAG_x000D_ DC-YWO Variance - Design/Construction | Fees + Payment - FP0 GXCORS7A | RSO SAMSUNG TV | NEW SAMSUNG 50 IN TV FOR PAUL'S OFFICE WITH 3 YR WARRANTY._x000D__x000D_ QUOTE PROVIDED BY ERGONOMIC GROUP: TOTAL $860.81 | Fees + Payment - FP0 1S721154 | RL 75 Stonehedge Dr S, Grn Replace | RL 75 Stonehedge Dr S, Grn Replace #4 AL OH service with 1/0 TPX_x000D_
  8. Part 47 of 77

    AP1-YWO Total Cost Less Than 7K | Fees + Payment - FP0 1B721402 | TB- 29 WEST ST INSTALL NEW X OVER P | TB- 29 WEST ST INSTALL NEW X OVER POLE AND DB SERVICE_x000D_ AP1-YWO Total Cost Less Than 7K | Fees + Payment - FP0 2M720579 | WC-ESO 12/24 LONG HILL RD WATEBURY | WC-ESO 12/24 LONG HILL RD WATEBURY - POLE # 6550- 9A_x000D_ AP3-YWO Resource Variance Met- Labor 0 <= 32 OR -100 <= 30 And Contractor $1630.79 <= 2000 | Fees + Payment - FP0 3H622565 | NEW BRITAIN AV, W HTFD - Conv#45560 | NEW BRITAIN AV, W HTFD - Conv#455605 - TPA DUE BY 3/19_x000D_ AP2-YWO Total Cost Variance Met - Variance :17.9129 MIN.:-50 MAX.:50 | Fees + Payment - FP0 4N721175 | MM REPLACE 75' SERVICE AT POLE 25 | MM REPLACE 75' SERVICE AT POLE 2500 ALL WORK COMPLETE_x000D_ AP1-YWO Total Cost Less Than 7K | Fees + Payment - FP0 2M722919 | RTM-1821 N Broad St, Mer. 9A Car vs | RTM-1821 N Broad St, Mer. 9A Car vs P#3141. Frontier Replaced. POST CONSTRUCTION_x000D_ AP2-YWO Total Cost Variance Met - Variance :-29.3137 MIN.:-50 MAX.:50 | Fees + Payment - FP0 4E721256 | RSO 8/6 MIDDLETOWN, CRYSTAL LAKE RD | RSO 8/6 MIDDLETOWN, CRYSTAL LAKE RD PASCARELLI_x000D_ AP2-YWO Total Cost Variance Met - Variance :32.0064 MIN.:-50 MAX.:150 | Fees + Payment - FP0 Sale of Streetlights Mansfield | Record the sale of street lights to the town of Mansfield | Fees + Payment - FP0 Sale of Streetlights Chester | Record the sale of street lights to the town of Chester | Fees + Payment - FP0 3H722171 | XL-CDOT 63-633, electrical work to | XL-CDOT 63-633, electrical work to relocate service along Woodland St, Hartford_x000D_ JE-YWO Variance Job Type Exclusion | Fees + Payment - FP0 5T721909 | Llynwood Dr 37, Vernon. Upgrade OH | Llynwood Dr 37, Vernon. Upgrade OH XFR on P-1479 25 KVA to 50 KVA, Low voltage_x000D_ AP1-YWO Total Cost Less Than 7K | Fees + Payment - FP0 2M722316 | Jpt-Milton Rd BRI P9340 - Rplc'd ro | Jpt-Milton Rd BRI P9340 - Rplc'd rotted xarm with Ridge Pin Const._x000D_ AP1-YWO Total Cost Less Than 7K | Fees + Payment - FP0 4E720807 | JV Spring View Windham- between pad | JV Spring View Windham- between pad#92 & #93 requires replmt ** 17B-5319 ***_x000D_ CL-YWO Variance - Contractor Labor | Fees + Payment - FP0 1S721624 | DL; 33 ELM TREE PL, STAMFORD: REPLA | DL; 33 ELM TREE PL, STAMFORD: REPLACE #2 100FT SERVICE- ALL WORK COMPLET_x000D_ AP1-YWO Total Cost Less Than 7K | Fees + Payment - FP0 2M623051 | WC/ESO -11/17 Union ST/ Brass Mill | WC/ESO -11/17 Union ST/ Brass Mill Rd Wtby 9A- POLE # 3308-9 & BASE_x000D_ AP2-YWO Total Cost Variance Met - Variance :-48.4881 MIN.:-50 MAX.:50 | Fees + Payment - FP0 5D620845 | RA CD00078-02 JC B/B 12S1/21D3 co | RA CD00078-02 JC B/B 12S1/21D3 convert RT 138 p50 (600's) to 12S1 r.o.w._x000D_ AP2-YWO Total Cost Variance Met - Variance :7.3617 MIN.:-20 MAX.:20 | Fees + Payment - FP0 4E721241 | (CH) P#4204: CHG OH DROP_#2 TPX_45' | (CH) P#4204: CHG OH DROP_#2 TPX_45'_MTR DEPT TO CHG MTR #98849099._x000D_ AP1-YWO Total Cost Less Than 7K | Fees + Payment - FP0 1N721098 | JES; 66 WHITE FALL LN NEW CANAAN.; | JES; 66 WHITE FALL LN NEW CANAAN.; Elec Svc Existing Residential POLE 8525..._x000D_ AP1-YWO Total Cost Less Than 7K | Fees + Payment - FP0 3R620628 | CD00392 - Transfer 35L7-90T from P. | CD00392 - Transfer 35L7-90T from P.7242 to P.6475 - Segment 1_x000D_ AP2-YWO Total Cost Variance Met - Variance :-45.4462 MIN.:-50 MAX.:50 | Fees + Payment - FP0 4D721115 | (DF) Midspn Ples 1533-3826- Make OH | (DF) Midspn Ples 1533-3826- Make OH svc Connec - 100A upgd- Residential Overhead_x000D_ AP1-YWO Total Cost Less Than 7K | Fees + Payment - FP0 5T721885 | Diamond Ledge Rd.,6,Stafford run 12 | Diamond Ledge Rd.,6,Stafford run 120'2tpx 100amp meter p-3723_x000D_ AP1-YWO Total Cost Less Than 7K | Fees + Payment - FP0 EMMR0011 | Employment Claims | Employment Claims | Fees + Payment - FP0 4D721154 | CB//Madison, 74 Wall St//New db ped | CB//Madison, 74 Wall St//New db pedestal svc for town lights_x000D_
  9. Part 48 of 77

    AP1-YWO Total Cost Less Than 7K | Fees + Payment - FP0 2M721033 | PT Conv# 493259-MakeReadyNonReimb-F | PT Conv# 493259-MakeReadyNonReimb-Fibertech-ParentConv# 490746_x000D_ AP2-YWO Total Cost Variance Met - Variance :-28.8835 MIN.:-50 MAX.:50 | Fees + Payment - FP0 1S620848 | BK WOODRIDGE DR S @ LONG RIDGE CHAN | BK WOODRIDGE DR S @ LONG RIDGE CHANGE TAP A to C phase,_x000D_ AP1-YWO Total Cost Less Than 7K | Fees + Payment - FP0 3H722049 | DKH - Kennedy Rd, Wsr - Replace rec | DKH - Kennedy Rd, Wsr - Replace recloser upper unit P2982._x000D_ AP2-YWO Total Cost Variance Met - Variance :.4686 MIN.:-40 MAX.:40 | Fees + Payment - FP0 4N721368 | PD-RSO 8/5- LYME, 120 BLOOD ST- P# | PD-RSO 8/5- LYME, 120 BLOOD ST- P# 2723_x000D_ AP1-YWO Total Cost Less Than 7K | Fees + Payment - FP0 4N720868 | MM RELOCATE POLE LINE FOR NEW LONDO | MM RELOCATE POLE LINE FOR NEW LONDON ROAD WIDENING notify #529767_x000D_ AP2-YWO Total Cost Variance Met - Variance :-4.1735 MIN.:-40 MAX.:40 | Fees + Payment - FP0 1B722028 | JS - 6 Hewlett Rd, Nw Frfld, Inst\R | JS - 6 Hewlett Rd, Nw Frfld, Inst\Rem OH Svc (28M2)_x000D_ AP1-YWO Total Cost Less Than 7K | Fees + Payment - FP0 1S721672 | DL; 179 FOX RIDGE RD; P#9982 REPLAC | DL; 179 FOX RIDGE RD; P#9982 REPLACE 25KVA WITH NEW 50KVA XFMR_x000D_ AP1-YWO Total Cost Less Than 7K | Fees + Payment - FP0 1S721192 | RL:174 MANSFIELD AVE: 9A 5/20/17- D | RL:174 MANSFIELD AVE: 9A 5/20/17- DARIEN - NUE P # 36 45/2_x000D_ AP1-YWO Total Cost Less Than 7K | Fees + Payment - FP0 LGCS0011 | Customer Service | LGCS0011NT011 | Fees + Payment - FP0 2M722960 | DM 453 W Main St CHES P#289 Change | DM 453 W Main St CHES P#289 Change XFMR New Open Point P#287 Close Open Point_x000D_ AP1-YWO Total Cost Less Than 7K | Fees + Payment - FP0 5T721629 | ANDOVER, BEAR SWAMP RD - VOLTAGE CO | ANDOVER, BEAR SWAMP RD - VOLTAGE COMPLAINT - INSTALL 25KVA XFMR P-407_x000D_ AP1-YWO Total Cost Less Than 7K | Fees + Payment - FP0 1G621155 | RL:120 Valley Dr::Elec Svc New Resi | RL:120 Valley Dr::Elec Svc New Residential DESG 40/2 Pole 36" Silo (DN)_x000D_ AP3-YWO Resource Variance Met- Labor 14 <= 32 OR 62.62 <= 30 And Contractor $1228.29 <= 2000 | Fees + Payment - FP0 CT17D042 | AVA-E, Frost Bridge ARD | This WO is to deploy an AVA-E at Frost Bridge 8R substation. The AVA-E will be used to backhaul an ARD phone circuit using the existing network at Frost Bridge. | Fees + Payment - FP0 5T721783 | RSO, 7/19, EAST WINDSOR, CHURCH STR | RSO, 7/19, EAST WINDSOR, CHURCH STREET, POLE 25478 - REPLACED XFMR_x000D_ CI-YWO Variance - Contractor Invoice | Fees + Payment - FP0 4N621399 | ESO 9A 9/5/ Pole 20865 - Fellows | ESO 9A 9/5/ Pole 20865 - Fellows Rd., (Rt 163), Montville_x000D_ AP1-YWO Total Cost Less Than 7K | Fees + Payment - FP0 4N720048 | GCC / ROTTEN POLE / FRONTIER I&R PO | GCC / ROTTEN POLE / FRONTIER I&R POLE / EVERSOURCE TO SHIFT ONTO_x000D_ AP1-YWO Total Cost Less Than 7K | Fees + Payment - FP0 4N721015 | GCC / RMV XFMR OVERLOADED / INSTALL | GCC / RMV XFMR OVERLOADED / INSTALL A NEW XFMR_x000D_ AP1-YWO Total Cost Less Than 7K | Fees + Payment - FP0 1N720608 | JDB 18 FLICKER LN NWLK SHIFT POLE 6 | JDB 18 FLICKER LN NWLK SHIFT POLE 6545 INSTALL New OH/DB Residential DESG (DN)_x000D_ AP1-YWO Total Cost Less Than 7K | Fees + Payment - FP0 5T721877 | 8/3 - RSO - SULLIVAN AVE, SOUTH WIN | 8/3 - RSO - SULLIVAN AVE, SOUTH WINDSOR, P-5026 - UPGRADE QUAD - LOW VOLTAGE_x000D_ AP1-YWO Total Cost Less Than 7K | Fees + Payment - FP0 CS002810 | DC Battery Voltage Monitoring | Implement Station DC Battery Voltage Monitoring as a Backup System to the AT10 Charger Internal Alarm System | Fees + Payment - FP0 4N720994 | MM 36F5 Install new CAPACITOR POLE# | MM 36F5 Install new CAPACITOR POLE# 264 HARTFORD TRNPKE WTFD_x000D_ AP2-YWO Total Cost Variance Met - Variance :-4.9681 MIN.:-50 MAX.:50 | Fees + Payment - FP0 4N720921 | MM WTFD, E. Wood - Replace 50' #2 O | MM WTFD, E. Wood - Replace 50' #2 OH Service ALL WORK COMPLETE_x000D_
  10. Part 49 of 77

    AP1-YWO Total Cost Less Than 7K | Fees + Payment - FP0 INVT0211 | Inventory Offset | Inventory Offset-Ouimette | Fees + Payment - FP0 AGNFSO11 | CA AWO AGENCY FEES LVL | CA AWO AGENCY FEES LVL0 | Fees + Payment - FP0 RECLZ011 | LREC/ZREC Program | LREC/ZREC Program-Caron | Fees + Payment - FP0 CTCOM011 | CTE DK24|05|01 New Comp Stakhers | CTE New Comp for Stakeholders - Balmer, Melanie_x000D__x000D_ DK 24-05-01 - The electric distribution companies (EDCs) may recover through the Non-Bypassable Federally Mandated Congestion Charge (NBFMCC) any costs that were incurred in the relevant calendar year. | Fees + Payment - FP0 CTCRBER1 | Install Card Reader for Berlin Lab | Install card reader for meter shop in Torrington AWC to restrict access per e-mails from Karen Palmieri, David Glanovsky, Christopher Kellogg on December 8 & 9 2020. The cost is about $4,000.00. | Fees + Payment - FP0 CTCRC011 | Customer Research - Online Communit | Customer Research - Online Communities - Balmer, Melanie | Fees + Payment - FP0 4E721121 | MN 129 MAIN ST E HMPTN AT P-12 INST | MN 129 MAIN ST E HMPTN AT P-12 INSTALL OH SVC AND A 200A MTR._x000D_ AP1-YWO Total Cost Less Than 7K | Fees + Payment - FP0 CS001891 | TRIANGLE 11A REPL BUS W SWITCHGEAR | PHASE 1. REPLACE EXISTING A1, A2, A3 OPEN BUS CONFIGURATION W A POWER CON STYLE ENCLOSED, DBLE BUS, METAL CLAD SWITCHGEAR. | Fees + Payment - FP0 CASE1811 | 14L (D & T) YardSubstationYardTD 25 | 14L (D & T) YardSubstationYardTD 250 - LTC Voltage Reduction Receiver Testing_x000D_ NO AWOCS-AWOCS REASON CODE AND DESCRIPTION NOT FOUND. | Fees + Payment - FP0 TRDE0811 | 2018 Series a Accrued Int. CL&P D | 2018 Series a Accrued Int. CL&P D-Rose | Fees + Payment - FP0 | 237BD0 PYAC0111 | Payroll Accrual - Source Entity 1T | Payroll Accrual - Source Entity 1T | Fees + Payment - FP0 IPPNF111 | Purchase Power- COGEN Non Firm | Purchase Power- COGEN Non Firm | Fees + Payment - FP0 5D720640 | 135 WESTON RD, P#2497 Elec Maint Po | 135 WESTON RD, P#2497 Elec Maint Pole Reject - PRIORITY DESG (IFOH)_x000D_ AP1-YWO Total Cost Less Than 7K | Fees + Payment - FP0 2M722167 | RTM-315 Bee St, Mer. 9A-ESO-Car vs | RTM-315 Bee St, Mer. 9A-ESO-Car vs P#2192. Pole Replaced. Post Construction_x000D_ AP2-YWO Total Cost Variance Met - Variance :-13.7915 MIN.:-50 MAX.:50 | Fees + Payment - FP0 4E721058 | JK>POLE 242--RMV 3PH PRI RISER, DB | JK>POLE 242--RMV 3PH PRI RISER, DB CABLE, 3PH SVC TO BLDG FOR DEMO (7 MTRS)_x000D_ AP1-YWO Total Cost Less Than 7K | Fees + Payment - FP0 CT16D029 | BOLTON MW UPGR W/REUSED MA EQUIP | The OC3 microwave equipment that was removed from service between Mt Tom GS and Hadley area work center will be moved from the books to the new locations Tolland and Bolton. This work order is for equipment to be located at Bolton AWC. | Fees + Payment - FP0 2M721793 | RTM-533 S Broad St, Mer. Frontier A | RTM-533 S Broad St, Mer. Frontier Added P#7187. Install Pole Top X-Arm_x000D_ AP1-YWO Total Cost Less Than 7K | Fees + Payment - FP0 2M722893 | CD00927 - CDOT 151-326 - I84 Mix Ma | CD00927 - CDOT 151-326 - I84 Mix Master Rehab - Extend MH's to New Street Level_x000D_ JE-YWO Variance Job Type Exclusion | Fees + Payment - FP0 2M721080 | WC-2/18/17 ESO 46 ROUND HILL RD BRI | WC-2/18/17 ESO 46 ROUND HILL RD BRISTOL CAR VS POLE # 6728 CASE # 17-6122_x000D_ AP2-YWO Total Cost Variance Met - Variance :4.5771 MIN.:-50 MAX.:50 | Fees + Payment - FP0 2C720129 | rpl poles ins xfrmr bank ins new oh | rpl poles ins xfrmr bank ins new oh svc 2607 south canaan rd fv_x000D_ DC-YWO Variance - Design/Construction | Fees + Payment - FP0 5T721478 | 532 N MAIN ST, SUFFIELD / APPT - RE | 532 N MAIN ST, SUFFIELD / APPT - RELOCATING DB SVC / METER SOCKET_x000D_ AP1-YWO Total Cost Less Than 7K | Fees + Payment - FP0 2L720630 | BURLINGTON-MILFORD ST / PRIORITY RE | BURLINGTON-MILFORD ST / PRIORITY REJECT POLE- REPLACE AND SHIFT_x000D_ AP1-YWO Total Cost Less Than 7K | Fees + Payment - FP0

Text of RRU-159 Attachment 06.pdf

Extracted from the file · 459 pages · 8,128,897 characters

Text of RRU-159 Attachment 05.xlsx

Sheet names, column headings and text cells; numbers left out · first 300,000 characters

Text of RRU-159 Attachment 05.pdf

Extracted from the file · 879 pages · 16,073,548 characters

Text of RRU-159 Attachment 04.xlsx

Sheet names, column headings and text cells; numbers left out

Text of RRU-159 Attachment 04.pdf

Extracted from the file · 5 pages · 20,994 characters

Text of RRU-159 Attachment 03.xlsx

Sheet names, column headings and text cells; numbers left out · first 300,000 characters

Text of RRU-159 Attachment 03.pdf

Extracted from the file · 840 pages · 14,413,580 characters

Text of RRU-159 Attachment 02.xlsx

Sheet names, column headings and text cells; numbers left out · first 300,000 characters

Text of RRU-159 Attachment 02.pdf

Extracted from the file · 1,137 pages · 16,605,462 characters

Text of RRU-159 Attachment 01.xlsx

Sheet names, column headings and text cells; numbers left out

Text of RRU-159 Attachment 01.pdf

Extracted from the file · 1 page · 1,403 characters

As listed on the current system

Question(s) Answered 159 (Connecticut Light and Power Company dba Eversource Energy) Date Filed: 11/06/2026

This filing on the current system (opens in a new tab)