Skip to main content

A prototype public docket site for the Connecticut Public Utilities Regulatory Authority

Utility Dockets and Filings

Interrogatory responses

Answers to questions 159

ResponseFiled by Connecticut Light and Power Company dba Eversource Energy51 files
Part of docket 26-05-10Open
  • Electric
Application of The Connecticut Light and Power Company d/b/a Eversource Energy to Amend its Rate Schedules

Files51

Search terms highlighted
Eversource rate increase is on 36 pages across 17 files of the text below, highlighted. Go to the first matchClear highlighting
Words on different pages
Words on different pages
Words on different pages

Text of RRU-159 Attachment 23.xlsx

Sheet names, column headings and text cells; numbers left out · first 300,000 characters

Text of RRU-159 Attachment 23.pdf

Extracted from the file · 1,160 pages · 16,330,154 characters

Text of RRU-159 Attachment 22.xlsx

Sheet names, column headings and text cells; numbers left out · first 300,000 characters

Text of RRU-159 Attachment 22.pdf

Extracted from the file · 1,203 pages · 14,349,246 characters

Text of RRU-159 Attachment 21.xlsx

Sheet names, column headings and text cells; numbers left out · first 300,000 characters

Text of RRU-159 Attachment 21.pdf

Extracted from the file · 1,203 pages · 13,880,364 characters

Text of RRU-159 Attachment 20.xlsx

Sheet names, column headings and text cells; numbers left out

Text of RRU-159 Attachment 20.pdf

Extracted from the file · 16 pages · 151,762 characters

Text of RRU-159 Attachment 19.xlsx

Sheet names, column headings and text cells; numbers left out

Text of RRU-159 Attachment 19.pdf

Extracted from the file · 1 page · 5,328 characters

Text of RRU-159 Attachment 18.xlsx

Sheet names, column headings and text cells; numbers left out · first 300,000 characters

Text of RRU-159 Attachment 18.pdf

Extracted from the file · 640 pages · 7,983,236 characters

Text of RRU-159 Attachment 17.xlsx

Sheet names, column headings and text cells; numbers left out · first 300,000 characters

Text of RRU-159 Attachment 17.pdf

Extracted from the file · 855 pages · 14,651,941 characters

Text of RRU-159 Attachment 16.xlsx

Sheet names, column headings and text cells; numbers left out · first 300,000 characters

Text of RRU-159 Attachment 16.pdf

Extracted from the file · 489 pages · 7,076,557 characters

Text of RRU-159 Attachment 15.xlsx

Sheet names, column headings and text cells; numbers left out · first 300,000 characters

Text of RRU-159 Attachment 15.pdf

Extracted from the file · 897 pages · 15,723,777 characters

Text of RRU-159 Attachment 14 .pdf

Extracted from the file · 1 page · 2,589 characters

Text of RRU-159 Attachment 14.xlsx

Sheet names, column headings and text cells; numbers left out

Text of RRU-159 Attachment 13.xlsx

Sheet names, column headings and text cells; numbers left out

Text of RRU-159 Attachment 13.pdf

Extracted from the file · 1 page · 427 characters

Text of RRU-159 Attachment 12.xlsx

Sheet names, column headings and text cells; numbers left out · first 300,000 characters

Text of RRU-159 Attachment 12.pdf

Extracted from the file · 802 pages · 14,341,138 characters

Text of RRU-159 Attachment 11.xlsx

Sheet names, column headings and text cells; numbers left out · first 300,000 characters

Text of RRU-159 Attachment 11.pdf

Extracted from the file · 858 pages · 15,906,152 characters

Text of RRU-159 Attachment 10.xlsx

Sheet names, column headings and text cells; numbers left out

Text of RRU-159 Attachment 10.pdf

Extracted from the file · 1 page · 822 characters

Text of RRU-159 Attachment 09.xlsx

Sheet names, column headings and text cells; numbers left out · first 300,000 characters

Text of RRU-159 Attachment 09.pdf

Extracted from the file · 449 pages · 7,355,312 characters

Text of RRU-159 Attachment 08.xlsx

Sheet names, column headings and text cells; numbers left out · first 300,000 characters

Text of RRU-159 Attachment 08.pdf

Extracted from the file · 867 pages · 13,878,236 characters

Text of RRU-159 Attachment 07.xlsx

Sheet names, column headings and text cells; numbers left out · first 300,000 characters

Text of RRU-159 Attachment 07.pdf

Extracted from the file · 869 pages · 15,728,932 characters

Words on different pages

This spreadsheet is large. Its searchable text keeps the sheet names, column headings and text cells and stops at 300,000 characters, so search may miss words further in. Download the file for every cell and figure.

  1. Part 66 of 77

    SIMSB001 | Simsbury AWC Site #68 | Simsbury AWC Site #68-Rose | Fees + Payment - FP0 PSTK2211 | Preferred Stock | Preferred StockNT011 | Fees + Payment - FP0 5D621348 | DG P#981 RSO 12/24 CONVERSE RD, WOO | DG P#981 RSO 12/24 CONVERSE RD, WOODSTOCK - HBV - WEBB CLP TO SHIFT NOT COMP_x000D_ AP1-YWO Total Cost Less Than 7K | Fees + Payment - FP0 3H421552 | MANCHESTER, HARTFORD RD - Dressing | MANCHESTER, HARTFORD RD - Dressing Mill 8H - Relay & Sensor_x000D_ NL-YWO Variance - NU Construction Labor | Fees + Payment - FP0 WL9LNWSN | WILLIAMS 9L NW PROTECTOR SENSOR | WILLIAMS NEW LONDON NETWORK PROTECTOR SENSOR PART OF THE DIGITAL GRID RELAY PROJECT - WILLIAMS 9L SS NEW LONDON_x000D__x000D_ THE SENSORS ARE BEING ADDED TO THE NW PROTECTOR RELAYS BEING INSTALLED THROUGHOUT CONNECTICUT. SENSORS CANNOT OPERATE WITHOUT THE NW PROTECTOR RELAYS_x000D__x000D_ Work order is to be used to capture costs for retrofitting relays for network protectors | Fees + Payment - FP0 2M820189 | COMP 1/20/18 CCC - Municipal Light | COMP 1/20/18 CCC - Municipal Light Fault Locate and Repair@ POLE 7_x000D_ AP1-YWO Total Cost Less Than 7K | Fees + Payment - FP0 4E720811 | RSO/AWC 5/24 COLCHESTER, LEBANON AV | RSO/AWC 5/24 COLCHESTER, LEBANON AVE (RT 16) 9A POLE 3 1/4_x000D_ AP1-YWO Total Cost Less Than 7K | Fees + Payment - FP0 1B820016 | 25 CREST RD Electric Service Existi | 25 CREST RD Electric Service Existing Residential Overhead_x000D_ AP1-YWO Total Cost Less Than 7K | Fees + Payment - FP0 MTOH4D15 | ELEC. MAINT. FAC. INSPECT./FLT INDI | Fault Indicators (MTOH) CT ELECTRIC MAINTENANCE FACILITY INSPECTIONS NON DESIGN / FAULT INTICATOR - MADISON | Fees + Payment - FP0 2L820645 | SW CDOT 05-114 RT 219/318 ROAD IMPR | SW CDOT 05-114 RT 219/318 ROAD IMPROVEMENTS BARKHAMSTED_x000D_ JE-YWO Variance Job Type Exclusion | Fees + Payment - FP0 1S721357 | RL:Byram Shore Rdf:9A DIGUP- 245 BY | RL:Byram Shore Rdf:9A DIGUP- 245 BYRAM SHORE RD GREENWICH Riser Pole 81785_x000D_ AP1-YWO Total Cost Less Than 7K | Fees + Payment - FP0 INVT0611 | Inventory Offset | Inventory Offset-Ouimettte | Fees + Payment - FP0 4E820580 | RA CDOT 163-203 RT 66 - outage nor | RA CDOT 163-203 RT 66 - outage north side of bridge -_x000D_ JE-YWO Variance Job Type Exclusion | Fees + Payment - FP0 CT17D047 | CT OpenSky Router Replacement | This WO is to replace the EOL cisco 2800 series router used by OpenSky on site. _x000D__x000D_ This WO is to upgrade the OpenSky system from SR10A.0 to SR10A.4._x000D__x000D_ Included in this WO are 10 EOL Router replacements for the sites listed below._x000D__x000D_ Eversource facilities where the assets will be located: _x000D__x000D_ 107 Selden St, Berlin, CT 06037_x000D__x000D_ 414 Chapel Hill Rd, Oakdale, CT 06370_x000D__x000D_ 207 Garden Circle, Waterbury CT 06704_x000D__x000D_ 135 New Rd, Madison, CT 06443_x000D__x000D_ 20 Barnabas Rd, Newtown, CT 06470_x000D__x000D_ Butternut Hollow Rd, Greenwich, CT _x000D__x000D_ 18 Kluge Rd, Prospect, CT 06712_x000D__x000D_ 626 Glenbrook Rd, Stamford, CT 06906_x000D__x000D_ Taugwonk Rd, Stonington, CT 06378_x000D__x000D_ 349 Mountain St, Willimantic, CT 06226 | Fees + Payment - FP0 EVGM2411 | 2024 CT Veg OM Labor | 2024 CT Veg OM Labor - Tracey, Emily | Fees + Payment - FP0 1N820137 | LD 41 WOLFPIT AVE NORWALK RECONDUCT | LD 41 WOLFPIT AVE NORWALK RECONDUCTOR LINE FROM ENTRANCE POLE#23558_x000D_ AP2-YWO Total Cost Variance Met - Variance :-2.4311 MIN.:-30 MAX.:30 | Fees + Payment - FP0 4D820623 | Roamtree Dr, Old Saybrook/TL-5/4/18 | Roamtree Dr, Old Saybrook/TL-5/4/18 replace xfmrs, 3 c/o's @ pole2834_x000D_ | Fees + Payment - FP0 1B820583 | 2-4-6 PUTNAM LN Electric Service Ne | 2-4-6 PUTNAM LN Electric Service New UG Residential Meter Dept Set_x000D_ | Fees + Payment - FP0 2M620318 | RTM-101 Warren St, Mer. Frontier Po | RTM-101 Warren St, Mer. Frontier Pole Reject. P#4730_x000D_ AP1-YWO Total Cost Less Than 7K | Fees + Payment - FP0
  2. Part 67 of 77

    2M820141 | AMM 130 FREIGHT ST,WTBY. ENVIRONME | AMM 130 FREIGHT ST,WTBY. ENVIRONMENTAL SITE MONITORING. 3PH DB XFMR 773._x000D_ AP1-YWO Total Cost Less Than 7K | Fees + Payment - FP0 DSQ82011 | (50): Replace Failed Battery DSQ820 | Sandy Hook 37F - Replace the failed battery | Fees + Payment - FP0 2M620312 | RTM-371 S Curtis St, Mer. Frontier | RTM-371 S Curtis St, Mer. Frontier Pole Reject. P#1610_x000D_ AP2-YWO Total Cost Variance Met - Variance :2.6562 MIN.:-50 MAX.:50 | Fees + Payment - FP0 1N820555 | MJP - CD00348 - 102-363 - (6)Phase | MJP - CD00348 - 102-363 - (6)Phase 2: Civil (includes bridge material)_x000D_ JE-YWO Variance Job Type Exclusion | Fees + Payment - FP0 1G621258 | RL: Paterson Ave: Electric Service | RL: Paterson Ave: Electric Service Un-Metered Pole 73219_x000D_ AP1-YWO Total Cost Less Than 7K | Fees + Payment - FP0 1B620115 | RR- 104 Forty Acre Mtn Rd Danbury, | RR- 104 Forty Acre Mtn Rd Danbury, ATT p #4268 needs to be replaced PR01/20/16_x000D_ AP1-YWO Total Cost Less Than 7K | Fees + Payment - FP0 CS000092 | BALDWIN 13F - PURCH S/S REMOTE RACK | PURCHASE 29 CBS ARCSAFE REMOTE RACKING UNITS FOR SUBSTATIONS THAT CURRENTLY DO NOT HAVE A SYSTEM THAT WORKS SAFELY __________________________________________CMK | Fees + Payment - FP0 F11WRELY | FREIGHT 11W DIGITAL GRID RELAYS | Digital Grid Relays - FREIGHT STREET 11W_x000D__x000D_ Work order is to be used to capture costs for retrofitting relays for network protectors | Fees + Payment - FP0 4N821037 | CDOT 152-158/CD01102, UG civil desi | CDOT 152-158/CD01102, UG civil design, I395 bridge, Waterford_x000D_ JE-YWO Variance Job Type Exclusion | Fees + Payment - FP0 4N821038 | CDOT 152-158/CD01102, UG cable pull | CDOT 152-158/CD01102, UG cable pull, I395 bridge, Waterford_x000D_ JE-YWO Variance Job Type Exclusion | Fees + Payment - FP0 2M722589 | EJC 279 Oak St, NB P#5724 Replaced | EJC 279 Oak St, NB P#5724 Replaced Xfrmr, Installed C/Os, POST CONSTRUCTION_x000D_ AP1-YWO Total Cost Less Than 7K | Fees + Payment - FP0 DSQ62048 | (40): Replace failed 11B61 3ph regu | Replace failed 11B61 3ph regulator | Fees + Payment - FP0 WINDCIRC | WINDSOR CENTRAL SYSTEMS | CT VOICE RADIO SYSTEM PROJECT - WINDSOR WAN CIRCUITS | Fees + Payment - FP0 5T621525 | ESO 8/22 Conklin Rd Stafford p 7056 | ESO 8/22 Conklin Rd Stafford p 7056/ 7060_x000D_ AP1-YWO Total Cost Less Than 7K | Fees + Payment - FP0 CS00278E | NORWALK 9S-27.6kV SWITCHGEAR | Refurbish switchgear body, excludes roof. Refurbish roof after moratorium | Fees + Payment - FP0 CS00278G | BYRAM 13C SWITCHGEAR | Refurbish switchgear body, excludes roof. Refurbish roof after moratorium | Fees + Payment - FP0 LTDB1811 | Long Term Debt2007 Series A | Long Term Debt2007 Series A | Fees + Payment - FP0 | 2371A0 2M722755 | EJC 14 Carmel St, New Britain P#336 | EJC 14 Carmel St, New Britain P#3362 Replaced Xfrmr, Added Fuses, POST CONST_x000D_ AP1-YWO Total Cost Less Than 7K | Fees + Payment - FP0 2W620538 | Proj#CD00699-13B33 Relocate for Tra | Proj#CD00699-13B33 Relocate for Trans, Part 3 of 6: Chase Pkwy w/ 556_x000D_ CL-YWO Variance - Contractor Labor | Fees + Payment - FP0 SENCT24A | CT 2024 Sentinel Meter installs & P | This work order will be used under the 2024 annual meter project is approved for 2024 Sentinel work and programming | Fees + Payment - FP0 CT18D003 | SONET Upgrades | Install a JMUX at Windsor and cutover circuits to this new JMUX. Remove the East Springfield AWC DMX. Upgrade any out of date firmware on the JMUX networks. Order spares for the DMX network. | Fees + Payment - FP0 5T721223 | Relocate 39E1 23kV From Hamlton Rd. | Relocate 39E1 23kV From Hamlton Rd. to new Schoephoester Rd. Windsor Locks_x000D_ JE-YWO Variance Job Type Exclusion | Fees + Payment - FP0 2M720734 | *EMERGENCY* SHIFT TO FRONTIER DBL P | *EMERGENCY* SHIFT TO FRONTIER DBL POLE 10093 - Property Damage OH (INSOH)_x000D_ AP1-YWO Total Cost Less Than 7K | Fees + Payment - FP0
  3. Part 68 of 77

    2M821520 | AMM 25 HATTERS LN,FARM. REPLACE & | AMM 25 HATTERS LN,FARM. REPLACE & RELOCATE OH SERVICE TO NEW ATTACHMENT POINT._x000D_ AP1-YWO Total Cost Less Than 7K | Fees + Payment - FP0 1N421438 | RM 50 POWDER HORN HILL WESTON REPLA | RM 50 POWDER HORN HILL WESTON REPLACE OPEN SEC POLE#13557 PER LINE DEPT_x000D_ AP1-YWO Total Cost Less Than 7K | Fees + Payment - FP0 SMSS0011 | Small Tools - Stations | Small Tools - Stations | Fees + Payment - FP0 DSQ82008 | Replacement of failed Newington 4A- | Newington 4A - Replace the failed 4A-3H potential Transformers | Fees + Payment - FP0 3H722126 | 8/15 - HAROH - AVON, FAR HILLS DR - | 8/15 - HAROH - AVON, FAR HILLS DR - SECONDARY FAULT UNDER DRIVEWAY_x000D_ AP2-YWO Total Cost Variance Met - Variance :70.5939 MIN.:-50 MAX.:150 | Fees + Payment - FP0 4N721280 | PD-15 Blue Heron Rd Niantic/Install | PD-15 Blue Heron Rd Niantic/Install new OH/DB residential service_x000D_ AP1-YWO Total Cost Less Than 7K | Fees + Payment - FP0 1S721203 | DL; SYLVAN KNOLL RD; REPLACE POLE 5 | DL; SYLVAN KNOLL RD; REPLACE POLE 597 & 598/SHIFT PRIMARY_x000D_ CL-YWO Variance - Contractor Labor | Fees + Payment - FP0 1N620110 | LD WEST CEDAR ST NORWALK RECONDUCTO | LD WEST CEDAR ST NORWALK RECONDUCTOR PRI 24A10-73S-24A10-92T TD 941 POLE#23020_x000D_ CI-YWO Variance - Contractor Invoice | Fees + Payment - FP0 2M722156 | EJC 412R South Main St, NB P#294 Ru | EJC 412R South Main St, NB P#294 Run Tpx to Pole and to House, M/L/C_x000D_ AP1-YWO Total Cost Less Than 7K | Fees + Payment - FP0 2M722157 | Municipal Light Fault Locate and Re | Municipal Light Fault Locate and Repair @ POLE 2561 - COMP 6/22 CCC_x000D_ AP1-YWO Total Cost Less Than 7K | Fees + Payment - FP0 4E820807 | (CH) P#1868: CHG OH DROP_DAMANGED D | (CH) P#1868: CHG OH DROP_DAMANGED DURING MARCH STORMS_x000D_ AP1-YWO Total Cost Less Than 7K | Fees + Payment - FP0 PUGT0011 | Precap UG Transfomer Install (CFI) | PUGT0011OPSNTRELEXPENSES11 | Fees + Payment - FP0 5D820187 | RSO,2/14, WOODSTOCK, ROCKY HILL ROA | RSO,2/14, WOODSTOCK, ROCKY HILL ROAD_x000D_ AP1-YWO Total Cost Less Than 7K | Fees + Payment - FP0 DV220E11 | CA AWO CLP$2.20S STOCK | CA AWO CLP$2.20S STOCK | Fees + Payment - FP0 DV200E11 | CA AWO CLP$2.00S STOCK | CA AWO CLP$2.00S STOCK | Fees + Payment - FP0 DV451E11 | CA AWO CLP4.50%S STOCK | CA AWO CLP4.50%S STOCK 1963 | Fees + Payment - FP0 DV496E11 | CA AWO CLP4.96%S STOCK | CA AWO CLP4.96%S STOCK | Fees + Payment - FP0 1N621985 | RM 10 Ridge Ln Weston Replace Exis | RM 10 Ridge Ln Weston Replace Existing Residential Overhead svc_x000D_ | Fees + Payment - FP0 3R621058 | CD00471-01 Elim. 23U S/S Install 13 | CD00471-01 Elim. 23U S/S Install 13B25-160R P#4 w/pole replacements_x000D_ CL-YWO Variance - Contractor Labor | Fees + Payment - FP0 TRANRE11 | $25 reimbursement for transformer | $25 reimbursement for transformer upgrades - Amnott, Katherine | Fees + Payment - FP0 MS18H011 | HEATWAVE JUN 29-JUL 7 2018 - ALL RE | HEATWAVE JUN 29-JUL 7 2018 - ALL REGIONS | Fees + Payment - FP0 SUTP0311 | Sales/Use Tax Payments | Sales/Use Tax Payments | Fees + Payment - FP0 2M722211 | EJC Webster Ct, Newington Replace P | EJC Webster Ct, Newington Replace PTT Poles Damaged by Landscaping Contractor_x000D_ AP2-YWO Total Cost Variance Met - Variance :-24.1926 MIN.:-50 MAX.:50 | Fees + Payment - FP0 DSQ82009 | Weston 21M - Replace 4 Failed GE IA | Weston 21M - Replace the failed GE IAC relays | Fees + Payment - FP0 2M820295 | Jpt-RSO-320 Farmington Ave Plnv P15 | Jpt-RSO-320 Farmington Ave Plnv P1515 - REPL 1000 WATT BULB AND EYE_x000D_ AP1-YWO Total Cost Less Than 7K | Fees + Payment - FP0 4E820604 | RA CDOT 163-203 RT 66 - outage sou | RA CDOT 163-203 RT 66 - outage south side of bridge -_x000D_ JE-YWO Variance Job Type Exclusion | Fees + Payment - FP0 DSN72034 | (50): Refurbish the switchgear roof | Bates Rock 21K - Refurbish the switchgear enclosure | Fees + Payment - FP0
  4. Part 69 of 77

    DSQ82025 | (40): Replace Failed A/C Unit DSQ82 | Replace Failed A/C Unit | Fees + Payment - FP0 2M721926 | AMM 47 BURNT HILL RD FARMINGTON. R | AMM 47 BURNT HILL RD FARMINGTON. REPLACE DB STREETLIGHT HEAD. POLE 2502._x000D_ AP1-YWO Total Cost Less Than 7K | Fees + Payment - FP0 4N621741 | MM REPLACE SERVICE 48 LONGVIEW ST, | MM REPLACE SERVICE 48 LONGVIEW ST, NEW LODON ALL WORK COMPLETE_x000D_ | Fees + Payment - FP0 2W720002 | AMM WAKELEE RD,WTBY. Municipal Lig | AMM WAKELEE RD,WTBY. Municipal Light Fault Locate and Repair@ POLE L2A7._x000D_ AP1-YWO Total Cost Less Than 7K | Fees + Payment - FP0 F1811065 | Install fluid handling system | Stamford Garage - Install new fluid handling system. | Fees + Payment - FP0 4E821053 | Elec Svc Line Extension/Development | Elec Svc Line Extension/Development DESG (DN)_x000D_ | Fees + Payment - FP0 4N820787 | GCC / I&R XFMR AND INSTALL A NEW 15 | GCC / I&R XFMR AND INSTALL A NEW 150' OVERHEAD SERVICE TO HOME_x000D_ AP1-YWO Total Cost Less Than 7K | Fees + Payment - FP0 DSQ82029 | Rebuild Failed 1A-5X Load Tap Chang | Rebuild Failed 1A-5X Load Tap Changer (LTC) | Fees + Payment - FP0 1B821744 | JS - 47 West Wooster St, Danb, Inst | JS - 47 West Wooster St, Danb, Inst\Rem OH Svc (11A74)_x000D_ AP1-YWO Total Cost Less Than 7K | Fees + Payment - FP0 3L821890 | RTM-COMP 9/28/18 CCC MERIDEN POLE 4 | RTM-COMP 9/28/18 CCC MERIDEN POLE 42 BR SQ & RMV 150 HPS PTT, INST 51W LED PTT_x000D_ AP1-YWO Total Cost Less Than 7K | Fees + Payment - FP0 3H722019 | RSO, 8/3, MANCHESTER, DARTMOUTH, P5 | RSO, 8/3, MANCHESTER, DARTMOUTH, P5501 REPLACED XFMR_x000D_ AP1-YWO Total Cost Less Than 7K | Fees + Payment - FP0 5T721995 | RSO, 8/21, ENFIELD, ENFIELD STREET, | RSO, 8/21, ENFIELD, ENFIELD STREET, P 2932 - REPLACED 60' OF 1/0 QUAD_x000D_ AP1-YWO Total Cost Less Than 7K | Fees + Payment - FP0 3L821930 | COMP 10/03/18 CCC POLE 4032 NEEDS T | COMP 10/03/18 CCC POLE 4032 NEEDS TO BE STRAIGHTENED & NEEDS 28W LED PTT_x000D_ AP1-YWO Total Cost Less Than 7K | Fees + Payment - FP0 GX170032 | DUCT RODDR | Two - CNDX 08083840 400 ft DUCT RODDR | Fees + Payment - FP0 GX170033 | Cable Cutters | Seven Battery operated Cable cutters transfer from GX170031 which incorrectly has and expense FERC Account (593000) | Fees + Payment - FP0 GX180002 | Die Set Kit | Die set kit including Milwaukee Model # 49-22-8400 6 pc 1 inch cutting depth and Milwaukee Model # 49-22-8410 9 pc 2 inch cutting depth | Fees + Payment - FP0 GX180004 | Varidesk Exec 40 | Varidesk adjustable workspace Exec 40 for Dave Samal's office | Fees + Payment - FP0 1N820553 | MJP - CD00348 - 102-363 - (2)Phase | MJP - CD00348 - 102-363 - (2)Phase 1: Civil work required_x000D_ JE-YWO Variance Job Type Exclusion | Fees + Payment - FP0 1S821631 | (50,0): DL; 50 SEASIDE AVE; Electri | DL; 50 SEASIDE AVE; Electric Service Existing Residential Overhead_x000D_ | Fees + Payment - FP0 CS003001 | Retire Substation | Furnish necessary engineering and design using a 2011 annual work order to retire the Oak St. 43 substation; scrap_x000D__x000D_ the transformer, remove the fence, traprock and sell the site._x000D__x000D_ | Fees + Payment - FP0 1S821317 | SH-Convo#671325-MakeReadyReimb - Ci | SH-Convo#671325-MakeReadyReimb - Cingular WL Parent Convo#655137_x000D_ AP1-YWO Total Cost Less Than 7K | Fees + Payment - FP0 CSWK0011 | Customer Service Week | Customer Service Week-Quarsema | Fees + Payment - FP0 1N820554 | MJP - CD00348 - 102-363 - (3)Phase | MJP - CD00348 - 102-363 - (3)Phase 1: Electrical UG work required_x000D_ JE-YWO Variance Job Type Exclusion | Fees + Payment - FP0 1S821300 | RL:150 Old Kings Hwy; Electric Serv | RL:150 Old Kings Hwy; Electric Service Existing Residential Overhead 110' #2 tpx_x000D_ AP1-YWO Total Cost Less Than 7K | Fees + Payment - FP0 3L821505 | WATERBURY POLE 7175 150 HPS COBRA C | WATERBURY POLE 7175 150 HPS COBRA COMPLETED 04/09 CHE_x000D_ AP1-YWO Total Cost Less Than 7K | Fees + Payment - FP0
  5. Part 70 of 77

    3R621016 | CD00471-01Elim. 23U Voluntown S/S C | CD00471-01Elim. 23U Voluntown S/S Conversion Work #1_x000D_ AP2-YWO Total Cost Variance Met - Variance :6.287 MIN.:-30 MAX.:30 | Fees + Payment - FP0 1N820551 | MJP - CD00348 - 102-363 - (1)Phase | MJP - CD00348 - 102-363 - (1)Phase 1: OH Work, Inst. Poles 30239, 30240 & PB_x000D_ JE-YWO Variance Job Type Exclusion | Fees + Payment - FP0 1S820537 | COMP. 05/06/2019 STM Muni FLR ir@ | COMP. 05/06/2019 STM Muni FLR ir@ POLE 2143 NO PWR UG- NEEDS FIXTURE_x000D_ AP1-YWO Total Cost Less Than 7K | Fees + Payment - FP0 F1811042 | Replace dock leveler pump | Norwalk - Replace dock leveler hydraulic pump and motor | Fees + Payment - FP0 DSN82020 | (50): LED Lighting Upgrades DSN8202 | Waterside 22M - Replace existing lightig with LED lights. | Fees + Payment - FP0 Sale of Streetlights Farmington | Record the sale of street lights to the town of Farmington 2018 | Fees + Payment - FP0 Sale of Streetlights Westbrook | Record the sale of street lights to the town of Westbrook 2018 | Fees + Payment - FP0 Sale of Streetlights Sprague | Record the sale of street lights Sprague | Fees + Payment - FP0 Sale of Streetlights Sterling | Record the sale of street lights Sterling | Fees + Payment - FP0 Sale of Streetlights Mansfield 2018 | Record the sale of street lights for Mansfield 2018 | Fees + Payment - FP0 1N820466 | MJP - CD00348 - 102-363 - (4)Phase | MJP - CD00348 - 102-363 - (4)Phase 1: Removal of Existing OH Pole Line_x000D_ JE-YWO Variance Job Type Exclusion | Fees + Payment - FP0 DSQ82031 | (50): Replace Failing A/C Unit and | Replace Failing A/C Unit and Install Hydrogen Detection | Fees + Payment - FP0 1S821166 | Elec Maint Replace/Renewal/Obsol OH | Elec Maint Replace/Renewal/Obsol OH DESG (AROH)_x000D_ AP1-YWO Total Cost Less Than 7K | Fees + Payment - FP0 3H722608 | 13 Pinecrest Dr.E.Hartf. Replace op | 13 Pinecrest Dr.E.Hartf. Replace open wire service P- 3341_x000D_ AP1-YWO Total Cost Less Than 7K | Fees + Payment - FP0 DSSP0011 | Dist Sta Care and Support | DSSP0011OPSNTRELEXPENSES11 | Fees + Payment - FP0 1B821681 | SH-Convo#672962-MakeReadyNonReimib | SH-Convo#672962-MakeReadyNonReimib Parent Convo#657857_x000D_ NO AWOCS-AWOCS REASON CODE AND DESCRIPTION NOT FOUND. | Fees + Payment - FP0 APCY0011 | Accnts Payable - Contract Admin-CY | Accnts Payable - Contract Admin-CY | Fees + Payment - FP0 | 23401X 2M722145 | EJC 40 Cedar St, Newington P#445 FT | EJC 40 Cedar St, Newington P#445 FTR to Replace Pole, Shift Facilities_x000D_ AP1-YWO Total Cost Less Than 7K | Fees + Payment - FP0 1B720883 | 23 SIMPAUG TPKE Elec Svc Existing | 23 SIMPAUG TPKE Elec Svc Existing Residential pr4/27/17_x000D_ AP2-YWO Total Cost Variance Met - Variance :66.3019 MIN.:-50 MAX.:150 | Fees + Payment - FP0 SOUTH END 1G - REFURBISH SWITCHGEAR | SOUTH END 1G - REFURBISH SWITCHGEAR PHASE 4 | Fees + Payment - FP0 DV204E11 | CA AWO CLP$2.04S STOCK | CA AWO CLP$2.04S STOCK | Fees + Payment - FP0 DV324E11 | CA AWO CLP$3.24S STOCK | CA AWO CLP$3.24S STOCK | Fees + Payment - FP0 3H820563 | 3150 Main St Htfd C8671 Replace 250 | 3150 Main St Htfd C8671 Replace 250w head to new city pole_x000D_ AP1-YWO Total Cost Less Than 7K | Fees + Payment - FP0 2M721164 | WC-2/25/17 ESO 267 SANDY HILL RD MI | WC-2/25/17 ESO 267 SANDY HILL RD MIDDLEBURY CAR VS POLE # F5107_x000D_ AP2-YWO Total Cost Variance Met - Variance :19.5987 MIN.:-50 MAX.:50 | Fees + Payment - FP0 4D721190 | (DF) - PATROL REPAIRS 11C12 - DEEP | (DF) - PATROL REPAIRS 11C12 - DEEP RIVER (POST CONSTRUCTION)_x000D_ AP3-YWO Resource Variance Met- Labor 58 <= 32 OR -96.66 <= 30 And Contractor $0 <= 2000 | Fees + Payment - FP0 5T720994 | VERNON, E MAIN ST - REPLACED 400W H | VERNON, E MAIN ST - REPLACED 400W HPS FLOOD @ POLE 9s - COMP 5/25/17 CCC_x000D_ AP1-YWO Total Cost Less Than 7K | Fees + Payment - FP0
  6. Part 71 of 77

    CS009048 | DSCADA LTC Controls Upgrade | Furnish necessary engineering and design to replace existing radio-controlled Transformer Load Tap Changer (LTC) Voltage Reduction System with a DSCADA controlled LTC Voltage Reduction System at various Eversource Connecticut substations. This system is used to lower the Distribution voltage (2% or 5%) during certain Transmission contingencies to help stabilize the system. The DSCADA signal will be transmitted via radio from the control house to the LTC receiver, to avoid the expense of adding additional conduit, if no conduit is available. If conduit is available, the devices will be connected via fiber cable. | Fees + Payment - FP0 CAPWK011 | Default WO 4 Capital Work-100% EXP | Default work order used when capital is installed by a work order has not yet been created. Used by Click Mobile for timesheets. THIS WORK ORDER IS 100% EXPENSE. | Fees + Payment - FP0 4N821586 | GCC / I&R OVERHEAD SERVICE TO HOME | GCC / I&R OVERHEAD SERVICE TO HOME_x000D_ | Fees + Payment - FP0 PT5D0011 | Temporary Work | Temporary Work | Fees + Payment - FP0 2M722205 | INST 3CT UG SVC FROM HH1242 TO NEW | INST 3CT UG SVC FROM HH1242 TO NEW RESIDENTIAL LOT12_x000D_ AP1-YWO Total Cost Less Than 7K | Fees + Payment - FP0 CT17D003 | Southbury CSP Battery Replacement | Replace existing batteries at Southbury CSP which have reached end of life. | Fees + Payment - FP0 3H722174 | 8/19 RSO HARTFORD, SWHITNEY ST P#68 | 8/19 RSO HARTFORD, SWHITNEY ST P#6850 REPLACED 90' SVC WIRE_x000D_ AP1-YWO Total Cost Less Than 7K | Fees + Payment - FP0 3R520162 | CD00389-03 Convert Tanner Marsh & | CD00389-03 Convert Tanner Marsh & Clapboard Hill & Hang Steps_x000D_ CI-YWO Variance - Contractor Invoice | Fees + Payment - FP0 2L720118 | Winsted, 170 Williams Ave MK CONV#4 | Winsted, 170 Williams Ave MK CONV#488774-MAKEREADYNON-REIMB_x000D_ AP2-YWO Total Cost Variance Met - Variance :-28.6419 MIN.:-50 MAX.:50 | Fees + Payment - FP0 2C620204 | rpl ples relocate 1xfrmr ins 3phase | rpl ples relocate 1xfrmr ins 3phase banl and oh svc camp sloane indian mt rd_x000D_ AP2-YWO Total Cost Variance Met - Variance :-.1457 MIN.:-50 MAX.:50 | Fees + Payment - FP0 2M722903 | ESO 9A 6/8 WATERBURY, 593 SYLVAN AV | ESO 9A 6/8 WATERBURY, 593 SYLVAN AVE - 9A P7260 -_x000D_ AP1-YWO Total Cost Less Than 7K | Fees + Payment - FP0 2M621783 | PT Convo# 402134-MakeReadyWirelessA | PT Convo# 402134-MakeReadyWirelessAttachReimb-Frontier-Parent Convo# 397492_x000D_ AP1-YWO Total Cost Less Than 7K | Fees + Payment - FP0 2M723018 | EJC 66 Clifford St, Newington P#602 | EJC 66 Clifford St, Newington P#6022 Replaced Pole, Xfrmr, Shift Facilities_x000D_ AP2-YWO Total Cost Variance Met - Variance :134.8751 MIN.:-50 MAX.:150 | Fees + Payment - FP0 CS00278B | LAKEVIEW 31A SWITCHGEAR | Refurbish switchgear body, excludes roof. Refurbish roof after moratorium | Fees + Payment - FP0 CS00278C | WESTON 21M SWITCHGEAR | Refurbish switchgear body, excludes roof. Refurbish roof after moratorium | Fees + Payment - FP0 4D721127 | NS- 13 Blue Heron Ln, CL- Ins 4/0 A | NS- 13 Blue Heron Ln, CL- Ins 4/0 AL to House from HH 432A_x000D_ AP1-YWO Total Cost Less Than 7K | Fees + Payment - FP0 1N821115 | JES; 610 OLD STAMFORD RD. NEW CANAA | JES; 610 OLD STAMFORD RD. NEW CANAAN.; Elec Svc Existing Residential pl 671..._x000D_ | Fees + Payment - FP0 CT17D035 | SIMSBURY TOWER LIGHT MONITORING | MCPHEE ELECTRIC WILL PURCHASE THE EQUIPMENT AND PERFORM THE WORK FOR SIMSBURY TOWER LIGHT MONITORING | Fees + Payment - FP0 CT17D036 | CONVEX - Lake Road ARDs | CONVEX has requested a new ARD from the Lake Rd generator to CONVEX. ISO would also like to upgrade their existing ARD_x000D__x000D_
  7. Part 72 of 77

    to the Generator to make use of the fiber at Lake Rd. At the same time, we will upgrade the existing substation ARD to CONVEX over the new AVA-E IP backhaul equipment. This work order will be for CL&P equipment needed at Berlin to provide 4 new terminations that can make use of the corporate network and fiber to TOCA and TOCB from Lake Rd. SS and Gen. | Fees + Payment - FP0 3R420248 | MP - CD00320-02 - 30R8 - Reconducto | MP - CD00320-02 - 30R8 - Reconductor RTE 80-BB to 336TW - 2 of 2, Madison_x000D_ MS-YWO Variance - Multiple Setups | Fees + Payment - FP0 4N721070 | COMPLETED 6/29 CCC-Fault Locate and | COMPLETED 6/29 CCC-Fault Locate and Repair@POLE 2794 NO POWER UG_x000D_ AP1-YWO Total Cost Less Than 7K | Fees + Payment - FP0 3H522527 | TPA/Rplc P1561 & provide DE guy.Con | TPA/Rplc P1561 & provide DE guy.Conv#281746 billable 5' for com top mount Ant_x000D_ AP1-YWO Total Cost Less Than 7K | Fees + Payment - FP0 CS00278Q | TODD 30L SWITCHGEAR | Refurbish switchgear body, excludes roof. Refurbish roof after moratorium | Fees + Payment - FP0 DSQ82028 | (50): Replace Failed SWGR A/C Unit | Replace Failed SWGR A/C Unit | Fees + Payment - FP0 DSQ82035 | (60): Replace Failed 23Q-1T-6 Motor | Thompson 23Q - Replace the failed 23Q-1T-6 motor operated disconnect switch | Fees + Payment - FP0 F1811102 | Newtown EOC Expansion | Newtown - Expansion of space is required to support additional staffing_x000D__x000D_ for Storm Response. | Fees + Payment - FP0 3R621047 | CD00471-09 Conversion Work Forge Hi | CD00471-09 Conversion Work Forge Hill Rd Job 2_x000D_ AP2-YWO Total Cost Variance Met - Variance :-4.4317 MIN.:-20 MAX.:20 | Fees + Payment - FP0 GCMT0011 | Gold Coast - Meter | Gold Coast Payments - Meter | Fees + Payment - FP0 INVT0711 | Inventory Offset | Inventory Offset-Ouimette | Fees + Payment - FP0 | 154PC0 APLZR111 | Accounts Payable LREC/ZREC | Accounts Payable LREC/ZREC | Fees + Payment - FP0 | 232LZ0 5D621289 | DG P#1258 96 RED BRIDGE RD THOMPSON | DG P#1258 96 RED BRIDGE RD THOMPSON FRNTR POLE RPLC CLP TO SHIFT CO P#1259_x000D_ AP1-YWO Total Cost Less Than 7K | Fees + Payment - FP0 5D520553 | BC - CD00450-02 - New 3PH Ovrbld,Re | BC - CD00450-02 - New 3PH Ovrbld,Re-cond. & Convert 1PH Undrbld (1 of 5) 472157_x000D_ CL-YWO Variance - Contractor Labor | Fees + Payment - FP0 DSN62035 | (40): Refurbishment of the switchge | Refurbishment of the switchgear enclosure. | Fees + Payment - FP0 CS000096 | S LEONARD 23N-PURCH S/S REMOTE RACK | PURCHASE 29 CBS ARCSAFE REMOTE RACKING UNITS FOR SUBSTATIONS THAT CURRENTLY DO NOT HAVE A SYSTEM THAT WORKS SAFELY __________________________________________CMK | Fees + Payment - FP0 3R620494 | BLOOMFIELD, SIMSBURY RD - INSTALL L | BLOOMFIELD, SIMSBURY RD - INSTALL LINE SENSORS FOR FEEDER METERING 44 S/S_x000D_ AP1-YWO Total Cost Less Than 7K | Fees + Payment - FP0 DSQ82047 | (60): Replace Failed 21J-10T-6 Swit | Replace Failed 21J-10T-6 Switch | Fees + Payment - FP0 GXC18W99 | WILLIAMS - Storm Room Printer | WILLIAMS - Storm Room Printer | Fees + Payment - FP0 GXC19C01 | 3PH ID T&R w/Cables | 3BF - 3 Phase ID Transmitter & Receiver w/Cables _x000D__x000D_ s/c 589220/589239-42/602082-84. Unit Cost: $5k | Fees + Payment - FP0 5T822402 | CDOT 134-147 Orcuttville Rd. Rt 319 | CDOT 134-147 Orcuttville Rd. Rt 319 Stafford Phase 2 pole relocations_x000D_ JE-YWO Variance Job Type Exclusion | Fees + Payment - FP0 2M721761 | AMM 1305 FARMINGTON AVE, FARM. 9A C | AMM 1305 FARMINGTON AVE, FARM. 9A CAR VS POLE. SHIFT TO NEW FRONTIER POLE 76._x000D_ AP1-YWO Total Cost Less Than 7K | Fees + Payment - FP0 PWCD1152 | Private Work for FP CD01152 | Private Work for FP CD01152 | Fees + Payment - FP0 2L821480 | Print HOLD cust material 7/4 JFC - | 86 HAGEMAN SHEAN RD GOSH/ PRI RISER/25KVA PAD/ 4/0 SVC_x000D_ | Fees + Payment - FP0 4D720134 | Hartlands Dr, #35 Old Saybrook/TL-P | Hartlands Dr, #35 Old Saybrook/TL-POLE 496 - NEED NEW 60' SVC TO HOUSE_x000D_ AP1-YWO Total Cost Less Than 7K | Fees + Payment - FP0
  8. Part 73 of 77

    11EDSTUD | Educate the Students | Educate the Students-Krawczyk | Fees + Payment - FP0 FP11FIBR | Norwalk - Lakeview ADSS Fiber | Installation of ADSS Fiber - Norwalk to Lakeview 9S47 | Fees + Payment - FP0 LTDB1411 | Long Term Debt2006 Series A | Long Term Debt2006 Series A NT011 | Fees + Payment - FP0 | 237CT0 LTDB1511 | Long Term Debt2006 Series A | Long Term Debt2006 Series A DIST11 | Fees + Payment - FP0 | 237CT0 DSN72055 | (30): Add Landscaping DSN72055 | Add Landscaping | Fees + Payment - FP0 CT18D001 | 2018 CT BATTERY REPLACEMENTS | THIS IS FOR THE 2018 BATTERY REPLACEMENTS TO BE DONE BY OUTSIDE CONTRACTOR CONNECTICUT HAS 24 SITES | Fees + Payment - FP0 DSN82009 | (50): Replace Failing Battery DSN82 | Replace Failing Battery | Fees + Payment - FP0 GXC18E30 | SCADA controlled switchgear | SCADA controlled pad mounted switch gear initiative as part of company wide initiative to retrofit all exisiting automated pad mounted switchgear on the distribution system. Installed pilot system will remain in the training yard as a training aid for future use. ~ approximately $50K | Fees + Payment - FP0 REVUPF11 | Revolver Upfront Expenses | Revolver Upfront Expenses-Rose | Fees + Payment - FP0 | 186RV0 GXC18C57 | Crimper Dies (2) | 2AD - Crimper Dies (2) s/c 569102 $634.99ea TOTAL: $1269.98 Wade | Fees + Payment - FP0 GXC18C62 | Phasing Stx & Adaptor (2) 2NR | 2NR - Phasing Sticks & DB Adapter (2) s/c 524484/571920/500659 TOTAL: $4652.25 Ellenberg | Fees + Payment - FP0 GXC18C63 | Bomb Blankets (8) 2NR | 2NR - Bomb Blankets (x8) s/c 505968 $1235.43ea TOTAL: $9883.44 Ellenberg | Fees + Payment - FP0 GXC18C67 | iPAD (2) 2NR | 2NR - iPAD (2) TOTAL: $2378 Engel | Fees + Payment - FP0 GXC18C68 | GoLights (2) 2BB | 2BB - Light, "GoLight" (2) Programmable, wireless emote, magnetic attachment, 35 watt HID Bulb, 3000 Lumen S/C 570360 $503.94EA TOTAL: $1007.88 | Fees + Payment - FP0 GXC18C70 | Drive Assembly 7' 2NP Iacolo | 2NP - Drive End Assembly, 7'. s/c 567969 @$700ea TOTAL: $700 Iacolo | Fees + Payment - FP0 2C820221 | SW CDOT 99-114/115 MAIN ST N CANAAN | SW CDOT 99-114/115 MAIN ST N CANAAN (RR XING IMPROVEMENTS)_x000D_ JE-YWO Variance Job Type Exclusion | Fees + Payment - FP0 CS002151 | Recloser Automation | Jefferson Hill 26F - Install new station FORM 6 Reclosers on the 26F1 feeder to address Recloser Automation (RA). This project also includes installation of a DSCADA communications system that will allow the SOC to remotely apply the control fast-trip feature prior to commencing any live-line feeder work. The overall project includes complete installation of all necessary protection settings, control and communications devices. | Fees + Payment - FP0 CS00278N | SO NAUGATUCK 21L SWITCHGEAR | Refurbish switchgear body, excludes roof. Refurbish roof after moratorium | Fees + Payment - FP0 4N820536 | Quanaduck Rd, Stonington/TL-02-26-1 | Quanaduck Rd, Stonington/TL-02-26-18 REPLACED XFMR WITH ABOVE GROUND XFMR & PAD_x000D_ AP2-YWO Total Cost Variance Met - Variance :27.7279 MIN.:-50 MAX.:50 | Fees + Payment - FP0 VHAC0011 | Preventable Motor Vehicle Accident | Preventable Motor Vehicle Accident | Fees + Payment - FP0 GX180011 | 18V Hydraulic Cutter and Battery | Burndy Mfg. 18 V Hydraulic Cutter stock #501145 and Battery Charger stock #589591 to replace an older unit which cannot be restored | Fees + Payment - FP0 GX180013 | Ratiometer DTR Model 8510 | AEMC Ratiometer DTRModel 8510 (12 Units for Eastern) to replace discontinued model which cannot be properly repaired and calibrated by the manufacturer | Fees + Payment - FP0 GX180016 | HILTI Combi Hammer | HILTI Combihammer Performance Package TE 80 AC/AVR for General Construction Group | Fees + Payment - FP0 GX180017 | Snow Removal Equip - Sanders | Two tailgate mounted salt and sand spreaders for Newtown and Torrington AWCs | Fees + Payment - FP0
  9. Part 74 of 77

    GX180018 | Five Duarack Drawer Assemblies | Five Durarack drawers for the Apparatus Test Vans. part number CRC 06-2100-001 | Fees + Payment - FP0 3L822274 | HARTFORD POLE 9052 RMV 92W, INST 92 | HARTFORD POLE 9052 RMV 92W, INST 92W COMPLETED 07/20 TOL_x000D_ AP1-YWO Total Cost Less Than 7K | Fees + Payment - FP0 CS002691 | Race Hill 15D - Remove S/S | Race Hill 15D - remove deenergize substation_x000D__x000D_ PER HOANG HUYNH - DO NOT CLOSE WO - REMOVAL WORK NOT COMPLETE - ENVIRONMENTAL CHARGES STILL PENDING AND FOUNDATION WORK NEEDED. it | Fees + Payment - FP0 1S821141 | DM/36 HEUSTED DR OLD GRN: INST 3" S | DM/36 HEUSTED DR OLD GRN: INST 3" SEC RISER, 4/0 QPX, 200AMP 4W 120/208_x000D_ AP1-YWO Total Cost Less Than 7K | Fees + Payment - FP0 MS18P011 | WIND/RAIN FRI DEC 21 2018 | WIND/RAIN FRI DEC 21 2018 | Fees + Payment - FP0 2M322581 | CDOT 17-186 - RTE 6 Bristol Road Wi | CDOT 17-186 - RTE 6 Bristol Road Widening - UG Secondary SVC_x000D_ JE-YWO Variance Job Type Exclusion | Fees + Payment - FP0 2W421636 | JD 492601 13F64 RELOCATE OH LINE CD | JD 492601 13F64 RELOCATE OH LINE CDOT 151-273- SEG 2_x000D_ JE-YWO Variance Job Type Exclusion | Fees + Payment - FP0 CS002785 | STONY HILL 48C SWITCHGEAR | Refurbish switchgear body, excludes roof. Refurbish roof after moratorium | Fees + Payment - FP0 CT18D005 | GPS Norwalk AWC | Install a GPS node and antenna hardware at Norwalk AWC. Connect any applicable devices to this GPS node.Facility located at 9 Tindall Ave | Fees + Payment - FP0 5W220907 | RA CDOT 32-130 Main St., Coventry | RA CDOT 32-130 Main St., Coventry - STA 16+00 to 19+00 (pole 32 to pole 30)_x000D_ JE-YWO Variance Job Type Exclusion | Fees + Payment - FP0 1B822375 | CDOT 18-136 - Brookfield Streetscap | CDOT 18-136 - Brookfield Streetscape - Relocate 205, 206_x000D_ JE-YWO Variance Job Type Exclusion | Fees + Payment - FP0 DSN82008 | (50): Replace Deteriorated Driveway | Replace Deteriorated Driveway | Fees + Payment - FP0 4N720046 | MM REPLACE SERVICE 9A SPITHEAD RD. | MM REPLACE SERVICE 9A SPITHEAD RD. WATERFORD @ P1558_x000D_ | Fees + Payment - FP0 CFICT18B | CT 2019 Meter Purchases | This work order will be used temporarily in 2018 until the 2019 annual meter project is approved for 2019 purchases/work. | Fees + Payment - FP0 2M622666 | Jpt-777 Wolcott St Wtby (Frnt)P7539 | Jpt-777 Wolcott St Wtby (Frnt)P7539-S - 9a - Rplc'd 2 Stubs Shifted Svc Riser_x000D_ AP1-YWO Total Cost Less Than 7K | Fees + Payment - FP0 2M821147 | CD00080-16 - Network Replacement-UG | CD00080-06 - UG Electrical - Old Firehouse Rd - Install Switch Gear & 4/0 Pri_x000D_ | Fees + Payment - FP0 GRIDEVAL | GRID RESILIENCY EVALUATION | UCONN 2ND AMENDED AND RESTATED RESEARCH PROJECT(S)_x000D__x000D_ ID CONTRIBUTION OF RESILIENCY INTERVENTIONS TO SYSTEM LEVEL POWER GRID RESILIENCY AND PREVENT/SHORTEN OUTAGES AND SYSTEM IMPACTS W/CONSTRAINTS_x000D__x000D_ ASSET - SYSTEM PERFORMANCE ASSESSMENT MODEL | Fees + Payment - FP0 TRDV0011 | Training (Phys & Non-Phys)-Dev | TRDV0011NT011 | Fees + Payment - FP0 DSQ82004 | (50): Replace Failed 1G01 DPAC Rela | Replace Failed 1G01 DPAC Relay | Fees + Payment - FP0 11ADMNBD | Aministration-Bid | Aministration-Bid-Quaresma | Fees + Payment - FP0 | 186EEB 11AHESLM | CLP - HEAR | CLP - HEAR - Tran, Thuy T | Fees + Payment - FP0 BINVFO11 | CA AWO COMMITTEE FEES | CA AWO COMMITTEE FEES | Fees + Payment - FP0 2L720526 | THOMASTON - WATERTOWN AVE SUNOCO - | THOMASTON - WATERTOWN AVE SUNOCO - CHANGING SVC FROM OH TO DB_x000D_ AP1-YWO Total Cost Less Than 7K | Fees + Payment - FP0 3H722493 | COMP 1/27/18 CCC - WETHERSFIELD, RE | COMP 1/27/18 CCC - WETHERSFIELD, REPLACE ST LT POLE 3230 18' BROWN 70W PTT_x000D_ AP1-YWO Total Cost Less Than 7K | Fees + Payment - FP0 5D820008 | 49 N. CHESTNUT ST, POLE#25, INSTALL | 49 N. CHESTNUT ST, POLE#25, INSTALL 50KVA , SPLIT CRIB FROM POLE#1570_x000D_ | Fees + Payment - FP0
  10. Part 75 of 77

    CT17D058 | NO BLOOMFIELD 2A DMXTEND | Install a DMXtend at North Bloomfield 2A. Cutover all the required circuits to the DMXtend. | Fees + Payment - FP0 5T721777 | Lower Butcher Rd 70, Ellington. Rec | Lower Butcher Rd 70, Ellington. Reconnect DB svc at pole and house P-35000_x000D_ AP1-YWO Total Cost Less Than 7K | Fees + Payment - FP0 1N721862 | 9A !!!!!!!!!!!RSO 12/23; NEWTOWN TP | 9A !!!!!!!!!!!RSO 12/23; NEWTOWN TPKE WESTON; CAR V P31920-21_x000D_ AP1-YWO Total Cost Less Than 7K | Fees + Payment - FP0 ISMD0011 | Install Meters & Dev (pre-cap/CFI) | ISMD0011OPSNTRELEXPENSES11 | Fees + Payment - FP0 2M621859 | (CH) P#'S 948 & 5947: SHFT PRIORITY | (CH) P#'S 948 & 5947: SHFT PRIORITY POLES_WATERBURY_MIB PROJECT_x000D_ AP1-YWO Total Cost Less Than 7K | Fees + Payment - FP0 2M722889 | DM/RSO 8/13 WOLCOTT, LONG SWAMP RD- | DM/RSO 8/13 WOLCOTT, LONG SWAMP RD- 9A P 5000 - LONGO/KENNEY_x000D_ AP1-YWO Total Cost Less Than 7K | Fees + Payment - FP0 4D621517 | Bokum Rd, Essex/TL-11/20/16 9A car | Bokum Rd, Essex/TL-11/20/16 9A car vs pole 156 see attached TT_x000D_ AP2-YWO Total Cost Variance Met - Variance :37.7622 MIN.:-50 MAX.:50 | Fees + Payment - FP0 1B721557 | BR 121 Lantern Park Ln N Southbury | BR 121 Lantern Park Ln N Southbury Yellow Tag_x000D_ CL-YWO Variance - Contractor Labor | Fees + Payment - FP0 3R420245 | bwg/CD000320 pole replacements&reco | bwg/CD000320 pole replacements&reconductor Rte 80 30R8 BB to 336TW,Killingworth_x000D_ CI-YWO Variance - Contractor Invoice | Fees + Payment - FP0 1S821939 | CM-Conv#673174-MakeReadyNonReimb-MC | CM-Conv#673174-MakeReadyNonReimb-MCI Parent Conv#657452_x000D_ NO AWOCS-AWOCS REASON CODE AND DESCRIPTION NOT FOUND. | Fees + Payment - FP0 GXC18W97 | ESCOBAR - 2 Replacement clamp for I | ESCOBAR - 2 Replacement clamp for Impulse Phaser | Fees + Payment - FP0 4N620204 | SM-WHITEHALL AVE, STONINGTON - CarV | SM-WHITEHALL AVE, STONINGTON - CarVsP2370- Replaced 45' CLASS 2_x000D_ AP3-YWO Resource Variance Met- Labor 19 <= 32 OR 67.31 <= 30 And Contractor $916.52 <= 2000 | Fees + Payment - FP0 1S720532 | PH; 3/4/17 ESO - 1070 HIGH RIDGE RD | PH; 3/4/17 ESO - 1070 HIGH RIDGE RD STAMFORD CAR VS POLE# 9654 CASE# 1703040002_x000D_ EW-YWO Variance - Emergent Work | Fees + Payment - FP0 3H721946 | JWL... 119-121 BLUE HILLS AVE. run | JWL... 119-121 BLUE HILLS AVE. run new svc from P5709_x000D_ AP1-YWO Total Cost Less Than 7K | Fees + Payment - FP0 5T920069 | *Ald/MAP COMP*(40): BC - CD00563-05 | BC - CD00563-05 - Install SR on pole 1969, Birch Rd | Fees + Payment - FP0 DSQ92004 | (30): Replace Failed 29J-1X3-4 Swi | Replace Failed 29J-1X3-4 Switches | Fees + Payment - FP0 PW5D0011 | Private Work | Private Work | Fees + Payment - FP0 5T920058 | CDOT 129-115 Turnpike Rd. Somers Br | CDOT 129-115 Turnpike Rd. Somers Bridge replacement project_x000D_ JE-YWO Variance Job Type Exclusion | Fees + Payment - FP0 GNDIS111 | Get Tax Credit-Purchase GN/Disc | Get Tax Credit-Purchase GN/Disc-Chandler | Fees + Payment - FP0 GNDIS211 | Get Tax Credit-Purchase GN/Disc | Get Tax Credit-Purchase GN/Disc-Chandler | Fees + Payment - FP0 | 421TX0 3R620616 | RA CD00571-08 Install 3-167KVA S/D | RA CD00571-08 Install 3-167KVA S/D's Sunset Ave Putnam_x000D_ CI-YWO Variance - Contractor Invoice | Fees + Payment - FP0 GMPR0011 | GMP-Purchase Pwr-RECs | GMP-Purchase Pwr-RECs-Caron | Fees + Payment - FP0 CT18D002 | SO WINDSOR 14L JMUX CIRCUITS | TO MOVE THE EXISTING CIRCUITS AT SO WINDSOR 14L TO THE RECENTLY INSTALLED JMUX. THEN CANCEL THE FRONTIER CIRCUITS | Fees + Payment - FP0 5T822185 | 8 Belle Ave.Enfield Replace service | 8 Belle Ave.Enfield Replace service from P- 14154_x000D_ AP1-YWO Total Cost Less Than 7K | Fees + Payment - FP0 DSQ92009 | Van Dyke 12 - Replace Failed Auto-T | Replace Failed Auto-Throwover Switch | Fees + Payment - FP0 DSN82059 | (30): Replace Deteriorated Driveway | Replace Deteriorated Driveway | Fees + Payment - FP0

Text of RRU-159 Attachment 06.pdf

Extracted from the file · 459 pages · 8,128,897 characters

Text of RRU-159 Attachment 05.xlsx

Sheet names, column headings and text cells; numbers left out · first 300,000 characters

Text of RRU-159 Attachment 05.pdf

Extracted from the file · 879 pages · 16,073,548 characters

Text of RRU-159 Attachment 04.xlsx

Sheet names, column headings and text cells; numbers left out

Text of RRU-159 Attachment 04.pdf

Extracted from the file · 5 pages · 20,994 characters

Text of RRU-159 Attachment 03.xlsx

Sheet names, column headings and text cells; numbers left out · first 300,000 characters

Text of RRU-159 Attachment 03.pdf

Extracted from the file · 840 pages · 14,413,580 characters

Text of RRU-159 Attachment 02.xlsx

Sheet names, column headings and text cells; numbers left out · first 300,000 characters

Text of RRU-159 Attachment 02.pdf

Extracted from the file · 1,137 pages · 16,605,462 characters

Text of RRU-159 Attachment 01.xlsx

Sheet names, column headings and text cells; numbers left out

Text of RRU-159 Attachment 01.pdf

Extracted from the file · 1 page · 1,403 characters

As listed on the current system

Question(s) Answered 159 (Connecticut Light and Power Company dba Eversource Energy) Date Filed: 11/06/2026

This filing on the current system (opens in a new tab)