Skip to main content

A prototype public docket site for the Connecticut Public Utilities Regulatory Authority

Utility Dockets and Filings

Interrogatory responses

Answers to questions 159

ResponseFiled by Connecticut Light and Power Company dba Eversource Energy51 files
Part of docket 26-05-10Open
  • Electric
Application of The Connecticut Light and Power Company d/b/a Eversource Energy to Amend its Rate Schedules

Files51

Search terms highlighted
Eversource rate increase is on 36 pages across 17 files of the text below, highlighted. Go to the first matchClear highlighting
Words on different pages
Words on different pages
Words on different pages

Text of RRU-159 Attachment 23.xlsx

Sheet names, column headings and text cells; numbers left out · first 300,000 characters

Text of RRU-159 Attachment 23.pdf

Extracted from the file · 1,160 pages · 16,330,154 characters

Text of RRU-159 Attachment 22.xlsx

Sheet names, column headings and text cells; numbers left out · first 300,000 characters

Text of RRU-159 Attachment 22.pdf

Extracted from the file · 1,203 pages · 14,349,246 characters

Text of RRU-159 Attachment 21.xlsx

Sheet names, column headings and text cells; numbers left out · first 300,000 characters

Text of RRU-159 Attachment 21.pdf

Extracted from the file · 1,203 pages · 13,880,364 characters

Text of RRU-159 Attachment 20.xlsx

Sheet names, column headings and text cells; numbers left out

Text of RRU-159 Attachment 20.pdf

Extracted from the file · 16 pages · 151,762 characters

Text of RRU-159 Attachment 19.xlsx

Sheet names, column headings and text cells; numbers left out

Text of RRU-159 Attachment 19.pdf

Extracted from the file · 1 page · 5,328 characters

Text of RRU-159 Attachment 18.xlsx

Sheet names, column headings and text cells; numbers left out · first 300,000 characters

Text of RRU-159 Attachment 18.pdf

Extracted from the file · 640 pages · 7,983,236 characters

Text of RRU-159 Attachment 17.xlsx

Sheet names, column headings and text cells; numbers left out · first 300,000 characters

Text of RRU-159 Attachment 17.pdf

Extracted from the file · 855 pages · 14,651,941 characters

Text of RRU-159 Attachment 16.xlsx

Sheet names, column headings and text cells; numbers left out · first 300,000 characters

Text of RRU-159 Attachment 16.pdf

Extracted from the file · 489 pages · 7,076,557 characters

Text of RRU-159 Attachment 15.xlsx

Sheet names, column headings and text cells; numbers left out · first 300,000 characters

Text of RRU-159 Attachment 15.pdf

Extracted from the file · 897 pages · 15,723,777 characters

Text of RRU-159 Attachment 14 .pdf

Extracted from the file · 1 page · 2,589 characters

Text of RRU-159 Attachment 14.xlsx

Sheet names, column headings and text cells; numbers left out

Text of RRU-159 Attachment 13.xlsx

Sheet names, column headings and text cells; numbers left out

Text of RRU-159 Attachment 13.pdf

Extracted from the file · 1 page · 427 characters

Text of RRU-159 Attachment 12.xlsx

Sheet names, column headings and text cells; numbers left out · first 300,000 characters

Text of RRU-159 Attachment 12.pdf

Extracted from the file · 802 pages · 14,341,138 characters

Text of RRU-159 Attachment 11.xlsx

Sheet names, column headings and text cells; numbers left out · first 300,000 characters

Text of RRU-159 Attachment 11.pdf

Extracted from the file · 858 pages · 15,906,152 characters

Text of RRU-159 Attachment 10.xlsx

Sheet names, column headings and text cells; numbers left out

Text of RRU-159 Attachment 10.pdf

Extracted from the file · 1 page · 822 characters

Text of RRU-159 Attachment 09.xlsx

Sheet names, column headings and text cells; numbers left out · first 300,000 characters

Text of RRU-159 Attachment 09.pdf

Extracted from the file · 449 pages · 7,355,312 characters

Text of RRU-159 Attachment 08.xlsx

Sheet names, column headings and text cells; numbers left out · first 300,000 characters

Text of RRU-159 Attachment 08.pdf

Extracted from the file · 867 pages · 13,878,236 characters

Text of RRU-159 Attachment 07.xlsx

Sheet names, column headings and text cells; numbers left out · first 300,000 characters

Text of RRU-159 Attachment 07.pdf

Extracted from the file · 869 pages · 15,728,932 characters

Text of RRU-159 Attachment 06.xlsx

Sheet names, column headings and text cells; numbers left out · first 300,000 characters

2 pages match
  1. Page 8 of 459

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued October 23, 2026 RRU-159 Attachment 6 CONFIDENTIAL Page 8 of 459 work_order_number MTCX0011 MTOH1B15 MTOH1B15 MTOH4N15 MTOH4N15 MTSL0011 MTUG0011 MTWO0011 NOPM0011 NTKMAJ11 NTPAY111 NTSMT011 OFFN0011 OMSR1DC1 OMSS1DC1 ONST0011 OPMG0011 OPMG0111 OTMS0011 PEBAC111 PSTK0011 PSTK0211 PSTK0411 PSTK0611 PSTK1611 PSTK2011 PSTK2411 PT2W0011 PT3H0011 PT3S0011 PTBL0011 PTCD0011 PWCD1028 description Maintenance - Corrective (Overhead) ELEC. MAINT. FAC. INSPECT./FLT INDI ELEC. MAINT. FAC. INSPECT./FLT INDI ELEC. MAINT. FAC. INSPECT./FLT INDI ELEC. MAINT. FAC. INSPECT./FLT INDI Maintenance - Street Lights UG Conduit Maint Material Write-offs Non Operating Property Management Inspection - Network Majors CT Res Incentives-Netting Pmt Direc Non Tracked SMT Expense Payroll ENTERPRISE OMS REPORTING - CL&P ENTERPRISE OMS SYSTEM - CL&P Oncall / Standby Operating Property Management Operating Property Management Other metering support CA AWO PT-EMPL BFS AC Preferred Stock Preferred Stock Preferred Stock Preferred Stock Preferred Stock Preferred Stock Preferred Stock Temporary Work Temporary Work Temporary Work Other Tax - CLP Non-Utility Distrib Prepaid PropTax-CLP Distribution Private work for FP CD01028 PYAC0011 Payroll Accrual - Source Entity 11 PYAC0011 Payroll Accrual - Source Entity 11 PYAC0011 Payroll Accrual - Source Entity 11 PYAC0011 Payroll Accrual - Source Entity 11 PYAC0011 Payroll Accrual - Source Entity 11 long_description MTCX0011OPSNTRELEXPENSES11 Fault Indicators (MTOH) CT ELECTRIC MAINTENANCE FACILITY INSPECTIONS NON DESIGN/ FAULT Fault Indicators (MTOH) CT ELECTRIC MAINTENANCE FACILITY INSPECTIONS NON DESIGN/ FAULT Fault Indicators (MTOH) CT ELECTRIC MAINTENANCE FACILITY INSPECTIONS NON DESIGN / FAULT INTICATOR - NEW LONDON Fault Indicators (MTOH) CT ELECTRIC MAINTENANCE FACILITY INSPECTIONS NON DESIGN / FAULT INTICATOR - NEW LONDON MTSL0011OPSNTRELEXPENSES11 MTUG0011OPSNTRELEXPENSES11 Material Write-offs NOPM0011NT011 ISDB0011OPSNTRELEXPENSES11 Inspection of Network Majors by Field Ops. CT Res Incentives-Netting Pmt Direct-Quaresma Non Tracked SMT Expense OFFN0011EMPBENPAY11 ENTERPRISE OMS REPORTING - CL&P ENTERPRISE OMS SYSTEM - CL&P ONST0011OPSNTRELEXPENSES11 OPMG0011NT011 OPMG0111NT011 OTMS0011OPSNTRELEXPENSES11 CA AWO PT-EMPL BFS AC Preferred StockNT011 Preferred StockNT011 Preferred StockNT011 Preferred StockNT011 Preferred StockNT011 Preferred StockNT011 Preferred StockNT011 Temporary Work Temporary Work Temporary Work Other Tax - CLP Non-Utility Distrib PTCD0011NT011 Private work for FP CD01028 Payroll Accrual - Source Entity 11 cost_element_group Fees + Payment - FP0 Fees + Payment - FP0 Fees + Payment - FP0 Fees + Payment - FP0 Fees + Payment - FP0 Fees + Payment - FP0 Fees + Payment - FP0 Fees + Payment - FP0 Fees + Payment - FP0 Fees + Payment - FP0 Fees + Payment - FP0 Fees + Payment - FP0 Fees + Payment - FP0 Fees + Payment - FP0 Fees + Payment - FP0 Fees + Payment - FP0 Fees + Payment - FP0 Fees + Payment - FP0 Fees + Payment - FP0 Fees + Payment - FP0 Fees + Payment - FP0 Fees + Payment - FP0 Fees + Payment - FP0 Fees + Payment - FP0 Fees + Payment - FP0 Fees + Payment - FP0 Fees + Payment - FP0 Fees + Payment - FP0 Fees + Payment - FP0 Fees + Payment - FP0 Fees + Payment - FP0 Fees + Payment - FP0 Fees + Payment - FP0 ferc_account 593040 583000 107010 107010 583000 596050 594010 588000 417111 584000 555000 593100 242E20 107010 107010 580000 589002 589003 586110 926000 238110 238120 238130 238140 238410 238450 238430 185010 185010 185010 408201 165900 186010 percent Fees + Payment - FP0 580000 0.043 Fees + Payment - FP0 581000 0.025 Fees + Payment - FP0 902002 0.013 Fees + Payment - FP0 588154 0.067 Fees + Payment - FP0 593000 0.206 Fees + Payment - FP0 903004 0.03 Fees + Payment - FP0 586000 0.038 Fees + Payment - FP0 584000 0.024 Fees + Payment - FP0 184010 0.051 Fees + Payment - FP0 107100 0.446 Fees + Payment - FP0 163020 0.031 582000 555850 555000 107010 928000 228450 228200 556000 594000 593000 592010 592040 592050 592080 418000 588005 454200 584000 593040 594260 583000 583270 588152 143L20 143L20 107010 107010 596000 0.026 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 0.91 0.09 0.09 0.91 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 Payroll Accrual - Source Entity 11 Payroll Accrual - Source Entity 11 Payroll Accrual - Source Entity 11 Payroll Accrual - Source Entity 11 Payroll Accrual - Source Entity 11 PYAC0011 Payroll Accrual - Source Entity 11 PYAC0011 Payroll Accrual - Source Entity 11 Payroll Accrual - Source Entity 11 Payroll Accrual - Source Entity 11 PYAC0011 Payroll Accrual - Source Entity 11 PYAC0011 Payroll Accrual - Source Entity 11 Payroll Accrual - Source Entity 11 Payroll Accrual - Source Entity 11 PYAC0011 Payroll Accrual - Source Entity 11 PYAC0011 Payroll Accrual - Source Entity 11 Payroll Accrual - Source Entity 11 Payroll Accrual - Source Entity 11 PYAC0011 RECFC011 RECPP211 RESENGY1 RGST0311 RIDGFLD1 RISK0011 RMFM0011 RMOU0011 RMOX0011 RMSQ0011 RMSQ0211 RMSQ0311 RMSQ0611 RNTNO011 RODEO011 ROPIN011 RPEU0011 RPEX0011 RPMH0011 RRSP0011 RUBB0011 SAFE0011 SGENOPPO SGSMBUSI SHCE11C1 SHCE11C2 SLPW2M15 Payroll Accrual - Source Entity 11 Fuel Cell Projects CT LREC/ZREC program Resilient Energy Center 2015-2017 Regulatory Assessments RIDGEFIELD RIGHT OF WAY ENVIRONMENT Risk Envision Repair/Maintain-Fiber Microwave Repair / Maintain Other underground Repair / Maintain Other overhead Dist Sta Xfmr Corrective Main SDist Sta Breaker CM Dist Sta Maint Misc Equip Dist Sta Battery Maint Rental revenues Non OP CT Linemen Rodeo charges Operating Property Revenue-CT Repair - Emergent (Underground) Repair - Emergent (Overhead) Repair - Manholes RESPONSE& RESTORE SPECIALIST Rubber Goods Safety CL&P EE Expense CL&P EE Expense SCEF - Web SCEF - C2 NO PPWK ATTACHED, CANCELLING - STLT Fuel Cell Projects-Rybka CT LREC/ZREC program Resilient Energy Center (partnership with UCONN) 2015-2017 Regulatory Assessments RIDGFIELD R-O-W ENVIRONMENTAL ASSESSMENT OF FORMER RAILROAD BED SOILS IMPACTED BY ARSENIC Risk Envision-Ouimette RMFM0011OPSNTRELEXPENSES11 RMOU0011OPSNTRELEXPENSES11 RMOX0011OPSNTRELEXPENSES11 RMSQ0011OPSNTRELEXPENSES11 RMSQ0211OPSNTRELEXPENSES11 RMSQ0311OPSNTRELEXPENSES11 RMSQ0611OPSNTRELEXPENSES11 Rental revenues Non OP Charging for 2015 linemen rodeo Eversource - CT ROPIN011NT011 RPEU0011OPSNTRELEXPENSES11 RPEX0011OPSNTRELEXPENSES11 RPMH0011OPSNTRELEXPENSES11 RRSP0011-OPSNTRELEXPENSES11, WO set up for Response Specialist Ops (RSO) -Lines use only RUBB0011OPSNTRELEXPENSES11 SAFE0011OPSNTRELEXPENSES11 SGENOPPOSCGCI SGSMBUSISCGCI Shared Clean Energy Facility (SCEF) Project - Web Shared Clean Energy Facility (SCEF) Project - C2 STREET LIGHT PRIVATE WORK BLANKET WO CHESHIRE Fees + Payment - FP0 Fees + Payment - FP0 Fees + Payment - FP0 Fees + Payment - FP0 Fees + Payment - FP0 Fees + Payment - FP0 Fees + Payment - FP0 Fees + Payment - FP0 Fees + Payment - FP0 Fees + Payment - FP0 Fees + Payment - FP0 Fees + Payment - FP0 Fees + Payment - FP0 Fees + Payment - FP0 Fees + Payment - FP0 Fees + Payment - FP0 Fees + Payment - FP0 Fees + Payment - FP0 Fees + Payment - FP0 Fees + Payment - FP0 Fees + Payment - FP0 Fees + Payment - FP0 Fees + Payment - FP0 Fees + Payment - FP0 Fees + Payment - FP0 Fees + Payment - FP0 Fees + Payment - FP0 Fees + Payment - FP0 SM1ANWSN SMOV0011 SMUG0011 SOCE11C1 SOMR0011 SPCDD011 SPOL0011 SSBRN11J STORE011 STRM3CJE STRM3CJE STST0011 SUPP0011 SURVEY11 SUTP0211 SVOH1SEX SVOH2LEX SVOH2WEX SWTS0011 SWTX0011 SO MEADOW 1A NW PROTECTOR SENSOR Small tools - overhead Small tools - underground SOC Equipment Somers Solar SP Contractor Delay Damages Special Olympics Support BRANFORD11J SS VOICE RADIO Stores clearing CLEARING WORK ORDER FOR STRM113C CLEARING WORK ORDER FOR STRM113C Station structure CM Supplemental 3RD PARTY POLE SURVEY WORK Sales/Use Tax Payments DARIEN, CLIFF, 24, Charles Pappas HARWINTON, SCOVILLE HILL, 130, Mari EXPENSE BLANKET OH SERVICE WORK - W Switching, substation Switching - Overhead SO MEADOW 1A NETWORK PROTECTOR SENSOR PART OF THE DIGITAL GRID RELAY PROJECT - SOUTH MEADOW 1A THE SENSORS ARE BEING ADDED TO THE NW PROTECTOR RELAYS BEING INSTALLED THROUGHOUT CONNECTICUT. SENSORS CANNOT OPERATE WITHOUT THE NW PROTECTOR RELAYS Work order is to be used to capture costs for retrofitting relays for network protectors SMOV0011OPSNTRELEXPENSES11 SMUG0011OPSNTRELEXPENSES11 SOC Equipment as part of the larger Ops funded project. Somers Solar SP Contractor Delay Damages-Morowsky Special Olympics Support - Labor Only SUBSTATION VOICE RADIO SET UP - INTERNAL STORE011OPSNTRELEXPENSES11 CLEARING WORK ORDER FOR STRM113C CLEARING WORK ORDER FOR STRM113C STST0011OPSNTRELEXPENSES11 SUPP0011EMPBENPAY11 This w/o is to charge time spent surveying pole for compliance for attachments as requested by customer Sales/Use Tax Payments NO DESC AVAILABLE NO DESC AVAILABLE NO DESC AVAILABLE SWTS0011OPSNTRELEXPENSES11 SWTX0011OPSNTRELEXPENSES11 Fees + Payment - FP0 Fees + Payment - FP0 Fees + Payment - FP0 Fees + Payment - FP0 Fees + Payment - FP0 Fees + Payment - FP0 Fees + Payment - FP0 Fees + Payment - FP0 Fees + Payment - FP0 Fees + Payment - FP0 Fees + Payment - FP0 Fees + Payment - FP0 Fees + Payment - FP0 Fees + Payment - FP0 Fees + Payment - FP0 Fees + Payment - FP0 Fees + Payment - FP0 Fees + Payment - FP0 Fees + Payment - FP0 Fees + Payment - FP0 107010 583275 584275 107010 555855 555430 920000 107010 163020 107010 108030 591060 228340 580000 408630 593000 593000 593000 582000 583000 1 1 1 1 1 1 1 1 1 0.7886 0.2114 1 1 1 1 1 1 1 1 1 TALCOT01 TCOTW001 TFEE0011 TFMINS11 TFMIUG11 DSCADA SYST RES TALCOTT TALCOTT MOUNTAIN TOWER REPLACEMENT Bank Service Fees Precap Overhead Equipment Install Precap UG Equipment Install Fees + Payment - FP0 Fees + Payment - FP0 Fees + Payment - FP0 Fees + Payment - FP0 Fees + Payment - FP0 107010 107010 930200 107010 107010 1 1 1 1 1 TFMPUR11 TINS0111 TINS0411 TINS0511 TNTP0011 TORRT001 TOWG1DC2 TOWG1DC3 TOWG1DC4 TRAN1601 TRDC0111 TRDT0011 TRIN0011 TRMS0011 TRMT0011 TROM0011 TXPCTC11 TXPY0011 TXPY0111 UBCP0011 UCLAIM11 UI000111 UILGEN00 Precap Overhead Equip Purchases Claims & Insurance Claims & Insurance Claims & Insurance Credit Disconnects and Reconnects TORRINGTON MGP COAL TAR SITE TOWER REPLACEMENT-MADISON TOWER REPLACEMENT-CHAPEL HILL TOWER REPLACEMENT-TALCOTT MT. Air/Hydraulic Floor Jack Debt Compliance Fees Debt Interest Accrual Vehicle Inventory Training/Safety - Meter Service Transformer Maintenance - Dist Training Conn Corporation Business Tax Tax Payments Tax Payments Union Business Company Paid Unclaimed Property (Escheat) UI UIL Charges Fees + Payment - FP0 Fees + Payment - FP0 Fees + Payment - FP0 Fees + Payment - FP0 Fees + Payment - FP0 Fees + Payment - FP0 Fees + Payment - FP0 Fees + Payment - FP0 Fees + Payment - FP0 Fees + Payment - FP0 Fees + Payment - FP0 Fees + Payment - FP0 Fees + Payment - FP0 Fees + Payment - FP0 Fees + Payment - FP0 Fees + Payment - FP0 Fees + Payment - FP0 Fees + Payment - FP0 Fees + Payment - FP0 Fees + Payment - FP0 Fees + Payment - FP0 Fees + Payment - FP0 Fees + Payment - FP0 107010 408600 925000 165010 903004 228450 107010 107010 107010 107010 930200 237TC0 154070 586152 595000 588154 236120 236140 408620 588110 253010 565000 143L20 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 V1758553 VEHC0011 VEHPE011 VIDEOWAL VOLUDB6A WCSR0011 WINST001 CT Elec D Fleet Capital Vehicles Vehicle Clearing Vehicle registration VIDEO WALL BERLIN SOC TS VOLUNTN DB PURCH PWR-RECS WINSTED MGP COAL TAR SITE Fees + Payment - FP0 Fees + Payment - FP0 Fees + Payment - FP0 Fees + Payment - FP0 Fees + Payment - FP0 Fees + Payment - FP0 Fees + Payment - FP0 107010 184010 165VC0 107010 584000 555855 228450 1 1 1 1 1 1 1 ZAPGOLSB ZAP GUARDS OLD SAYBROOK Fees + Payment - FP0 107010 1 4E720362 (CH) P#5438 - P#5439: SPLICE OUT WH Fees + Payment - FP0 107010 1 4E720539 GXC17C16 GXC17C17 GXC17C19 GXC17C21 GXC17C22 JK>HH6833 (LAWN BOX)--REPLACE 17 X Gas Alert Sens (2) 2NP Stevens Ground Rod Driver (1) 2AD Wade Defibrillators (3) 2EA Dolan Fiberglass Jib (2) 2AD Begley Burndy Wedge (2) 2EA Dolan Fees + Payment - FP0 Fees + Payment - FP0 Fees + Payment - FP0 Fees + Payment - FP0 Fees + Payment - FP0 Fees + Payment - FP0 107010 107010 107010 107010 107010 107010 1 1 1 1 1 1 GXC17C23 Mobile Desks (3) 2AA Grohs Fees + Payment - FP0 107010 1 1N720848 JDB/P# 33766/REPLACED 50KVA XFRMR/I Fees + Payment - FP0 107010 1 4N620422 3/29/16-Tree down, replaced c/o, po Fees + Payment - FP0 107010 1 2M722045 JC/200 PARK RD. NAUG Electric Serv Fees + Payment - FP0 107010 1 1S721018 DM/59 HARDING RD OLD GRN: INST 1/0 Fees + Payment - FP0 107010 1 1S721003 DL; 2 OPPER RD; Electric Service Ex Fees + Payment - FP0 107010 1 2M722094 Municipal Light Fault Locate and Re Fees + Payment - FP0 107010 1 1N720842 JDB ESO 4/26/17 WESTPORT - 9 CRAWF Fees + Payment - FP0 107010 1 1N720793 RM 139 Lords Hwy Weston Install pr Fees + Payment - FP0 107010 0.98956 1N720793 RM 139 Lords Hwy Weston Install pr Fees + Payment - FP0 595000 0.01044 5T721381 RSO, 5/31, ENFIELD, MOODY ROAD, POL Fees + Payment - FP0 107010 1 4D720858 RSO GUILFORD, Cornwall Ln -Need to Fees + Payment - FP0 107010 1 3H721395 Capitol Ave Htfd Traffic control UG Fees + Payment - FP0 107010 1 4N621252 MM SMART SWITCH PROGAM TR POLE 7794 Fees + Payment - FP0 594000 0.00158 4N621252 MM SMART SWITCH PROGAM TR POLE 7794 Fees + Payment - FP0 107010 0.99842 Fees + Payment - FP0 Fees + Payment - FP0 108030 926000 1 1 Fees + Payment - FP0 107010 1 Fees + Payment - FP0 107010 1 Fees + Payment - FP0 107010 1 Fees + Payment - FP0 107010 1 Fees + Payment - FP0 107010 1 Fees + Payment - FP0 107010 1 Fees + Payment - FP0 107010 1 Fees + Payment - FP0 Fees + Payment - FP0 107010 186010 1 1 DSCADA System Resiliency Talcott 5-7 Andrews Road, Bloomfield, CT Telecom Tower Facility CS001341 BESOPE11 Danielson Turbine 15C-Remove Deener CA AWO 401K ESOP MATCH 4E621497 JK>HH2016A--INSTALL 75' OF 4/0 DB C 1B720688 WM - 22N3 Rehab, Ridgefield PURCHASE AND INSTALL RF MATERIALS FOR NEW TOWN AT ST. ANDREWS ROAD, BLOOMFOELD, CT PROJECT TCOTW1DC REQUESTER:STEVE FLORIO,MGR: AHRENS Bank Service Fees TFMINS11DT7C Precap UG Equip Install TFMPUR11NT011 Precap Overhead Equipment Purchases-Transformers and Regulators Claims & Insurance Claims & Insurance Claims & Insurance Credit Disconnects and Reconnects TORRINGTON MGP COAL TAR SITE INVESTIGATION AND REMEDIATION TOWER REPLACEMENT-MADISON TOWER REPLACEMENT-CHAPEL HILL TOWER REPLACEMENT-TALCOTT_MT. 22 Ton - Air/Hydraulic floor jack used for installing tire chains, replacing tires or when the lift is not accessible. Debt Compliance Fees Debt Interest Accrual-Curtin TRIN0011NT011 Training/Safety - Meter Service TRMT0011OPSNTRELEXPENSES11 TROM0011OPSNTRELEXPENSES11 Conn Corporation Business Tax Tax Payments Tax Payments Union Business Company Paid UI UIL Charges-Lempa CT Electric Distribution Fleet Capital Vehicle Purchase 1 Material Handler Tandem $94,900 Unit #1758553 VEHC0011NT011 Vehicle registration This is for Video Wall project in SOC in Berlin CT. Quote provided by HB Communications DB PLANNED OBS TROUBLE SHOOTER CHARGES TOWN OF VOLUNTOWN PURCH PWR-RECS - HOMES WINSTED MGP COAL TAR SITE INVESTIGATION AND REMEDIATION CORPORATE RESERVE SITE INSTALLATION OF ZAP GUARDS VARIOUS LOC IN OLD SAYBROOK (CH) P#5438 - P#5439: SPLICE OUT WHAT LOOKS LIKE TREE GROWTH AROUND CONDUCTOR. AP1-YWO Total Cost Less Than 7K JK>HH6833 (LAWN BOX)--REPLACE 17 X 30 LAWN BOX AP1-YWO Total Cost Less Than 7K 2NP (Two) Gas Alert sensors - SC 0419532 @ $ 760 Each Total &1,520 Enos Stevens gas powered ground rod driver s/c 459333 (1) $1760AARON WADE Defibrillators (3) 460803/460802 TOTAL: $6,136 Dolan 2AD - Fiberglass Jib (2) S/C 72030339 $2,686.28ea TOTAL: $5373 2EA - Burndy Wedge (2) s/c 0451519 @ $1,190.50 ea TOTAL: $2,381` ReachDeskSuper-03 Printer Elite for supervisor vehicle. $500 (GROHS) JDB/P# 33766/REPLACED 50KVA XFRMR/INSTALLED 100 AMP CUTOUT & BRACKET/5-31 AP1-YWO Total Cost Less Than 7K 3/29/16-Tree down, replaced c/o, pole #3755 AP1-YWO Total Cost Less Than 7K JC/200 PARK RD. NAUG Electric Service Existing Residential Overhead AP1-YWO Total Cost Less Than 7K DM/59 HARDING RD OLD GRN: INST 1/0 TPX FROM P.1883 TO P.1884 SHIFT 2 SVCS AP1-YWO Total Cost Less Than 7K DL; 2 OPPER RD; Electric Service Existing Residential Overhead AP1-YWO Total Cost Less Than 7K Municipal Light Fault Locate and Repair@ POLE 248 - COMP 6/20 CCC AP1-YWO Total Cost Less Than 7K JDB ESO 4/26/17 WESTPORT - 9 CRAWFORD RD P6838 REPLACE XTRANS AP1-YWO Total Cost Less Than 7K RM 139 Lords Hwy Weston Install primary riser to new pad and db svc AP1-YWO Total Cost Less Than 7K RM 139 Lords Hwy Weston Install primary riser to new pad and db svc AP1-YWO Total Cost Less Than 7K RSO, 5/31, ENFIELD, MOODY ROAD, POLE 21590 AP1-YWO Total Cost Less Than 7K RSO GUILFORD, Cornwall Ln -Need to Replace 153' #2 OH Service @ P8792 AP1-YWO Total Cost Less Than 7K Capitol Ave Htfd Traffic control UG #8 Electric Service Un-Metered AP1-YWO Total Cost Less Than 7K MM SMART SWITCH PROGAM TR POLE 7794 PEQUOT RD 1Q01 NL-YWO Variance - NU Construction Labor MM SMART SWITCH PROGAM TR POLE 7794 PEQUOT RD 1Q01 NL-YWO Variance - NU Construction Labor This project is seeking a partial funding of $725K to complete equipment removals and environmental testing for the deenergized substation Danielson Turbine 15C substation located at 75 Athol St, Dayville CT. The substation was deenergized in 2017 following Distribution Line project CD00588. Substation equipment removals were not completed following the substation deenergization. There will no longer be an Eversource use for the property and Real Estate indicates the property will be evaluated for disposition. CA AWO 401K ESOP MATCH JK>HH2016A--INSTALL 75' OF 4/0 DB CABLE TO CONDO UNIT AP1-YWO Total Cost Less Than 7K WM - 22N3 Rehab, Ridgefield To purchase an add-on software package to PQView called FaultPoint Set up a database link to our exiting saved relay events thru IT that would enable the use of Synergy models to populate algorithms to calculate fault locations based on system parameters and protection relay event logs This proposal includes the cost to fund the purchase and set up the required support from IT and database storage space in order to store system data for software analysis. Project Objectives To identify, locate and repair underground faults within minimal time, limiting customer outage times. This will improve overall system response times and minimize repair times having a direct effect on SAIDI and CAIDI CS002631 PILOT PROG FEEDER FAILURE DETECTION 3R720019 CB CD00815-01 Install line sensor P 3R620630 CD00392 - Reconductor 35L7 Boston P 4E621508 JK>HH533C--INSTALL 55' OF 4/0 DB CA 4E621509 JK>HH533B--INSTALL 45' OF 4/0 DB CA 4E621510 PWCD0901 JK>HH533B--INSTALL 30' OF 4/0 DB CA Private Work for FP CD00901 CB CD00815-01 Install line sensor Pole3524 Green Hollow Rd Plainfield 13B27-F002 AP2-YWO Total Cost Variance Met - Variance :8.0215 MIN.:-50 MAX.:150 CD00392 - Reconductor 35L7 Boston Post Rd - Segment 2 WR 2 of 2 CI-YWO Variance - Contractor Invoice JK>HH533C--INSTALL 55' OF 4/0 DB CABLE TO CONDO UNIT AP1-YWO Total Cost Less Than 7K JK>HH533B--INSTALL 45' OF 4/0 DB CABLE TO CONDO UNIT AP1-YWO Total Cost Less Than 7K JK>HH533B--INSTALL 30' OF 4/0 DB CABLE TO CONDO UNIT AP1-YWO Total Cost Less Than 7K Private Work for FP CD00901
  2. Page 9 of 459

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued October 23, 2026 RRU-159 Attachment 6 CONFIDENTIAL Page 9 of 459 work_order_number description 4E621504 DSN72018 DSN72018 JK>HH533C--INSTALL 35' OF 4/0 DB CA (50): Miscellaneous, Refurbishment (50): Miscellaneous, Refurbishment 2M721858 Jpt-72 Colony St BRI (Frnt)P4320 - 1B720940 1+3 ENCLAVE DR Electric Service N 1B720942 11-17 MOORLAND DR Electric Service 5D720651 39 CANTERBURY RD, POLE#27, SHIFT TO 2M721032 (DF) drhm(I) 277/480 Padmount XF & 3H720896 NJB WEST ST R.H. RPL CUTOUT & RISER 3H720981 PEAK0111 CFDS0111 WF-1221-1223-Broad St-Htfd-@ sb-336 Peaker Contractual Obligations Kleen Energy Systems 4N521323 PD-247 Shore Rd/Old Lyme REPLACE PC 4D720970 CS002241 (DF) Ple 1229 - (R/I) CV svc & cond Sandbank 30F S/S – Remove Substatio 1S720604 BK 1011 WASHINGTON BLVD INSTALL 3RD 4D720645 Cottage Rd, #11 Old Saybrook/TL-INS 1S620993 PH; 151 BROOKSIDE RD; INSTALL 200AM 5T721621 6/27 - RSO - STAFFORD, CHARTER AVE 2M721691 (DF) Drhm, (R/I) DB 2ndry & HH- & s 4N720645 SM-2 WASHINGTON ST, STGN- INSTL 250 4N720645 SM-2 WASHINGTON ST, STGN- INSTL 250 1S720716 DM/356 DAVIS AVE GREENWICH: INST 3" 4D621010 SH-Convo#399782-(MakeReadyREIMB) - 4E621233 JK>PAD 533--EXTEND DB SEC TO (3) NE 2M721694 RTM-Willow Brook Ball Park. 9A-Tran 2M721694 KVLIB011 RTM-Willow Brook Ball Park. 9A-Tran WD Payroll KV Expense 2M722333 AMM 268 N MAIN ST , WATERBURY. REP 3R620629 ALRM0011 CD00392 - Reconductor 35L7 Boston P Station Alarms CM CASW0911 24R (D) YardSubstationYardCorrectiv 3H721758 WF-109 Pond Rd-Windsor-@ pole-1853, 1S720478 DSN62046 DSN62047 DSN62047 INVT0011 DM/8 PARK AVE GREENWICH: INTERCEPT (40): Installation of a hand rail (40): Replacement of the control ho (40): Replacement of the control ho Inventory offset 4E621624 MN HIGHLAND TERR HMPTN PHASE IC, 3 4E621624 MN HIGHLAND TERR HMPTN PHASE IC, 3 5T721737 RSO, 7/12, ENFIELD, ELM STREET, CAB 4D720149 CS000611 CS000611 CB//GUILFORD, MOOSE HILL RD//UPGRAD Install 3rd Xfmr & 23kV Switchgear Install 3rd Xfmr & 23kV Switchgear 3H721840 RSO, 7/13, E HARTFORD, ROBERTS ST, 4D720143 CT17D017 TS 174 CEDAR ST BFD P6716 & 44072 I W HARTLAND SITEBOSS INSTALL 2M722269 Municipal Light Fault Locate and Re 2M722269 CT17D012 CT17D012 Municipal Light Fault Locate and Re 56 Prospect St SiteBoss Install 56 Prospect St SiteBoss Install 4N721202 SM-122 RYDER RD, N STGN-Install new 2M721829 DM 5/18 E MITCHELL AVE CHESHIRE - D 5T721647 6/30 - RSO/AWC - ENFIELD, BRAINARD 5T721575 Woods Rd, Somers - Extend 1 ph prim 4N720562 SM Y-18695-2017 YELLOW TAG REPLACE 3R620743 CD00647-02, 28J1 convert OH, Branfo 4E720505 (CH) P#3444: WRK COMP'D_RSO/AWC/RSO 5T720405 Avery St., South Windsor - Relocate 3H720325 HARTFORD,ANN ST REPLACE A MAINS BET 2C620304 PT Conv# 461290-MakeReadyNonReimb-C 2M720697 RTM-220 Coe Ave, Mer. Relocate Pole 2M720697 DSN72010 RTM-220 Coe Ave, Mer. Relocate Pole (30): Install new Driveways. DSN720 2M722285 CDOT151-273, PN 492601-03 CIS #9 - 2M722285 CDOT151-273, PN 492601-03 CIS #9 - 4D721191 Boston Post Rd, Old Saybrook/TL-7/2 4D721191 SMTR0011 TXCT0011 Boston Post Rd, Old Saybrook/TL-7/2 Small Tool Repair (Repair Shop) CT Tax Offset 1N720986 JES; 659 DANBURY RD. WILTON. REPLAC 1N720986 SVOH5DEX JES; 659 DANBURY RD. WILTON. REPLAC BROOKLYN, CREAMERY BROOK, 120, Dani 4D721143 MGSP0111 MGSP0111 TS OLD POST RD CLINTON P2388 CHANGE Management & Supervision Management & Supervision 1S721416 DM/STRICKLAND RD COS COB: 11R56 CAB 4E721001 JK>POLE 867--REPLACE TERMINATOR AT 4E721001 JK>POLE 867--REPLACE TERMINATOR AT 1S721128 Interlaken - Cap inspection and rep 1S721128 Interlaken - Cap inspection and rep 5T721742 7/13 - RSO/TOLOH - VERNON, TAYLOR S 2M721697 DSN72020 PT Conv# 505840-MakeReadyNonReimb-V replacement of 48V DC Battery bank 4E720454 (CH) P#207: CHG DROP_MTR DEPT TO CH 1S720506 DOST0011 DL; 970 STILLWATER RD; TRANSFER TO District Operations (Stations) 2M722310 Municipal Light Fault Locate and Re 2L720357 Winchester--S. Main St. (100) 3034 5T721792 GXC16C68 GXC16C69 AWC 7/20 VERNON, SCHOOLBROOK RD - R UG Harnesses (5) 2NR FEAL Water Pumps (3) 2NR Leonard 3R621049 CD00471-09 Conversion Work Inst.Ste 2M720395 (DF) Prospect- Ple 94 Change cutout 3R720097 CAL - CD00849-01 - Ckt 28A1 MBI Ini 3R720097 CAL - CD00849-01 - Ckt 28A1 MBI Ini 2M721289 AMM 15 WHITEHALL PL, FARMINGTON. D 1S720372 DL; 16 EMERY DR E; REPLACE BACKYARD 2M721364 CS000741 VHPTX011 CRCL0011 RTM-216 Percival Ave, Ber. ESO-9A-C Parker 22U-Remove Substation CA AWO VEHCL PROPERTY TAX Credit & Collections 2W620297 RENTX011 CT17D024 PHD Elec Maint Replace/Renewal/Ob Rental Revenue TALCOTT TO GOOSE HILL MICROW INSTAL 1N621658 ROCKV001 RWPY1011 WX00AE11 AJC 7 FAIRFIELD AVE WSPT Electric S ROCKVILLE MGP COAL TAR SITE Renewables WK COMP RESERVE 1N720847 CEBR11C1 ESO 9A 4/29/17-WESTPORT = 22 MAPLE CT Bill Redesign 1B522254 11CUSENG SCMN0011 Key Rock Rd, Newtown, pole top fire Customer Engagement Minor Storm Charging 3H721884 GX170009 GX170010 GX170011 GX170012 EAST HARTFORD, MULCAHY DRIVE - XFMR FLIR E4-NIST IR Cameras FLIR E4-NIST IR Cameras FLIR E4-NIST IR Cameras Gas Detectors and Accessories 5T721904 EVGM0011 8/7 - RSO/AWC - PLEASANT VALLEY RD, Vegetation Management 1S720997 NETWD011 PH; 165 BOUTON ST W; INSTALL NEW 20 Payroll Payable 2M722338 AMM 155 SONGBIRD LN,FARM. DB PRIMAR 2M722338 AMM 155 SONGBIRD LN,FARM. DB PRIMAR 1B721722 NEW MILFORD 20 EVERWOOD DR NEW MIL 3R621020 CD00471-01Elim. 23U Voluntown S/S C 2M722247 DM 35 Niagara St WTBY P#6803 Change 2M621929 AMM WARREN ST,WATERBURY. SHIFT FRO long_description JK>HH533C--INSTALL 35' OF 4/0 DB CABLE TO CONDO UNIT AP1-YWO Total Cost Less Than 7K Cedar Heights 4R - Refurbish the switchgear enclosure Cedar Heights 4R - Refurbish the switchgear enclosure Jpt-72 Colony St BRI (Frnt)P4320 - Existing Residential Overhead - MLC AP1-YWO Total Cost Less Than 7K 1+3 ENCLAVE DR Electric Service New UG Residential Meter Dept Set AP1-YWO Total Cost Less Than 7K 11-17 MOORLAND DR Electric Service New UG Residential Meter Dept Set AP1-YWO Total Cost Less Than 7K 39 CANTERBURY RD, POLE#27, SHIFT TO NEW POLE#27, REJECT POLE AP1-YWO Total Cost Less Than 7K (DF) drhm(I) 277/480 Padmount XF & 400A DB svc -- New Com/Ind DESG (DN) AP2-YWO Total Cost Variance Met - Variance :1.0538 MIN.:-50 MAX.:50 NJB WEST ST R.H. RPL CUTOUT & RISER ON P#1481 CUST OUTAGE ON 6/2/17? @ 5PM AP2-YWO Total Cost Variance Met - Variance :4.7256 MIN.:-50 MAX.:50 WF-1221-1223-Broad St-Htfd-@ sb-3368, rpl ug svc. AP2-YWO Total Cost Variance Met - Variance :33.2649 MIN.:-50 MAX.:50 Peaker Contractual Obligations Kleen Energy Systems PD-247 Shore Rd/Old Lyme REPLACE PCB XFMR P#1911 CL-YWO Variance - Contractor Labor (DF) Ple 1229 - (R/I) CV svc & conduit - EMROD DB DESG (ARDB) AP2-YWO Total Cost Variance Met - Variance :-44.9095 MIN.:-50 MAX.:50 Furnish necessary engineering and design to retire the Sandbank 30F substation. Remove all equipment including transformer, recloser, switches, etc. Also remove the fence and trap rock. Remove all foundations to below grade or remove completely, if practical. Perform environmental remediation as required. Loam and seed the site for grass growth to minimize erosion. Turn the site over to the Real Estate Department for sale with the provision that an easement is obtained for an overhead line. The 30F-1X transformer will be put in inventory and then relocated to Judd Brook 32R for installation there (reference Project #201338). All other equipment will be scrapped. BK 1011 WASHINGTON BLVD INSTALL 3RD TRANSFORMER IN LOOP 300KVA AP2-YWO Total Cost Variance Met - Variance :37.0399 MIN.:-40 MAX.:40 Cottage Rd, #11 Old Saybrook/TL-INST 4/03CT OH-DB SVC [WORKS W/ WR#2914467] AP1-YWO Total Cost Less Than 7K PH; 151 BROOKSIDE RD; INSTALL 200AMP DB, REMOVE 100AMP DB SERVICE AP1-YWO Total Cost Less Than 7K 6/27 - RSO - STAFFORD, CHARTER AVE - FOLLOW UP REQUIRED - REPLACE XFMR P-18140 AP1-YWO Total Cost Less Than 7K (DF) Drhm, (R/I) DB 2ndry & HH- & svc - Elec Svc Existing Residential DESG (DN) CI-YWO Variance - Contractor Invoice SM-2 WASHINGTON ST, STGN- INSTL 250 KVA 1 PH XFMR/ IT METER AP2-YWO Total Cost Variance Met - Variance :112.9059 MIN.:-50 MAX.:150 SM-2 WASHINGTON ST, STGN- INSTL 250 KVA 1 PH XFMR/ IT METER AP2-YWO Total Cost Variance Met - Variance :112.9059 MIN.:-50 MAX.:150 DM/356 DAVIS AVE GREENWICH: INST 3" SVC RISER, 350MCM DB SVC, 2-200AMP METERS AP1-YWO Total Cost Less Than 7K SH-Convo#399782-(MakeReadyREIMB) - VZ Parent Convo#378446 AP1-YWO Total Cost Less Than 7K JK>PAD 533--EXTEND DB SEC TO (3) NEW HH'S FOR CONDO UNITS NL-YWO Variance - NU Construction Labor RTM-Willow Brook Ball Park. 9A-Transformer Fire. Replaced 500KVA 277/480 AP3-YWO Resource Variance Met- Labor 3 <= 32 OR 3.36 <= 30 And Contractor $0 <= 2000 RTM-Willow Brook Ball Park. 9A-Transformer Fire. Replaced 500KVA 277/480 AP3-YWO Resource Variance Met- Labor 3 <= 32 OR 3.36 <= 30 And Contractor $0 <= 2000 WD Payroll KV Expense-Morrison AMM 268 N MAIN ST , WATERBURY. REPLACE BROKEN HANDHOLE. AP1-YWO Total Cost Less Than 7K CD00392 - Reconductor 35L7 Boston Post Rd - Segment 2 WR 1 of 2 CI-YWO Variance - Contractor Invoice ALRM0011OPSNTRELEXPENSES11 24R (D) YardSubstationYardCorrective Distribution - Substation Yard NO AWOCS-AWOCS REASON CODE AND DESCRIPTION NOT FOUND. WF-109 Pond Rd-Windsor-@ pole-1853,inst new oh/db svc to hse AP1-YWO Total Cost Less Than 7K DM/8 PARK AVE GREENWICH: INTERCEPT EXIST DB SVC, 4/0 DB SVC, 200AMP AP1-YWO Total Cost Less Than 7K Installation of a hand rail and yard lights Replacement of the control house asbestos tiled flooring Replacement of the control house asbestos tiled flooring Inventory offset-Ouimette MN HIGHLAND TERR HMPTN PHASE IC, 3 LOTS. AP1-YWO Total Cost Less Than 7K MN HIGHLAND TERR HMPTN PHASE IC, 3 LOTS. AP1-YWO Total Cost Less Than 7K RSO, 7/12, ENFIELD, ELM STREET, CABLE FAULT, RPLC FAULT INDICATORS MHC AP1-YWO Total Cost Less Than 7K CB//GUILFORD, MOOSE HILL RD//UPGRADE FUSES/CUTOUTS TO 140K POLE 2 AP1-YWO Total Cost Less Than 7K Scitico 27H - Install a new 27H-3X transformer position, 27H-3X1-4 MOD, 27H-3S station srvice, 27H-3H PTs, new double-bus 23kV PCE switchgear and underground tie cables to each existing 23kV ring bus. Scitico 27H - Install a new 27H-3X transformer position, 27H-3X1-4 MOD, 27H-3S station srvice, 27H-3H PTs, new double-bus 23kV PCE switchgear and underground tie cables to each existing 23kV ring bus. RSO, 7/13, E HARTFORD, ROBERTS ST, RPLC 8' ARM pole 4138/shift 1/0 ACSR AP1-YWO Total Cost Less Than 7K TS 174 CEDAR ST BFD P6716 & 44072 INS 1000WMH FLOODS AP1-YWO Total Cost Less Than 7K Install a SiteBoss alarm panel and remove the old Badger E500 alarm panel. Municipal Light Fault Locate and Repair@ POLE 4150 - COMP 7-8-17 CCC AP1-YWO Total Cost Less Than 7K Municipal Light Fault Locate and Repair@ POLE 4150 - COMP 7-8-17 CCC AP1-YWO Total Cost Less Than 7K Install a SiteBoss alarm panel and remove the old Badger E500 alarm panel. Install a SiteBoss alarm panel and remove the old Badger E500 alarm panel. SM-122 RYDER RD, N STGN-Install new 150' OH/DB service AP1-YWO Total Cost Less Than 7K DM 5/18 E MITCHELL AVE CHESHIRE - DB FAULT Replace Cable VLT#B to PAD#C AP2-YWO Total Cost Variance Met - Variance :15.3973 MIN.:-40 MAX.:40 6/30 - RSO/AWC - ENFIELD, BRAINARD RD, 9A - EVERSOURCE P-2503 complete in field AP2-YWO Total Cost Variance Met - Variance :29.3618 MIN.:-50 MAX.:50 Woods Rd, Somers - Extend 1 ph primary AP2-YWO Total Cost Variance Met - Variance :-24.137 MIN.:-50 MAX.:50 SM Y-18695-2017 YELLOW TAG REPLACE CAPACITOR P#3051 AP2-YWO Total Cost Variance Met - Variance :30.1932 MIN.:-50 MAX.:50 CD00647-02, 28J1 convert OH, Branford, 1 of 3 CL-YWO Variance - Contractor Labor (CH) P#3444: WRK COMP'D_RSO/AWC/RSO 4/8_9A AP3-YWO Resource Variance Met- Labor 19 <= 32 OR 35.64 <= 30 And Contractor $1435.56 <= 2000 Avery St., South Windsor - Relocate facilities for The Town Road Work HARTFORD,ANN ST REPLACE A MAINS BETWEEN SB1607 & SB1831 AP2-YWO Total Cost Variance Met - Variance :-27.189 MIN.:-30 MAX.:30 PT Conv# 461290-MakeReadyNonReimb-Comcast-ParentConv# 450571 AP1-YWO Total Cost Less Than 7K RTM-220 Coe Ave, Mer. Relocate Poles for new Enterance 100% Chargeable MS-YWO Variance - Multiple Setups RTM-220 Coe Ave, Mer. Relocate Poles for new Enterance 100% Chargeable MS-YWO Variance - Multiple Setups Install new Driveways CDOT151-273, PN 492601-03 CIS #9 - OH Riser 9521 JE-YWO Variance Job Type Exclusion CDOT151-273, PN 492601-03 CIS #9 - OH Riser 9521 JE-YWO Variance Job Type Exclusion Boston Post Rd, Old Saybrook/TL-7/25-P#1712,P#1714,P#2949,P#2949-1/2. Buchetto CL-YWO Variance - Contractor Labor Boston Post Rd, Old Saybrook/TL-7/25-P#1712,P#1714,P#2949,P#2949-1/2. Buchetto CL-YWO Variance - Contractor Labor SMTR0011OPSNTRELEXPENSES11 CT Tax Offset-Ouimette JES; 659 DANBURY RD. WILTON. REPLACE BAD POLE & RE ROUT LINES. 19024.. AP3-YWO Resource Variance Met- Labor 8 <= 32 OR -19.14 <= 30 And Contractor $1030.89 <= 2000 JES; 659 DANBURY RD. WILTON. REPLACE BAD POLE & RE ROUT LINES. 19024.. AP3-YWO Resource Variance Met- Labor 8 <= 32 OR -19.14 <= 30 And Contractor $1030.89 <= 2000 NO DESC AVAILABLE TS OLD POST RD CLINTON P2388 CHANGE POT TO 25KVA AP1-YWO Total Cost Less Than 7K MGSP0111NT011 MGSP0111NT011 DM/STRICKLAND RD COS COB: 11R56 CABLE FAILURE/REPLACE CABLE AT MH117 TO MH127 AP2-YWO Total Cost Variance Met - Variance :8.429 MIN.:-20 MAX.:20 JK>POLE 867--REPLACE TERMINATOR AT RISER POLE, RESORE POWER TO NORMAL AP1-YWO Total Cost Less Than 7K JK>POLE 867--REPLACE TERMINATOR AT RISER POLE, RESORE POWER TO NORMAL AP1-YWO Total Cost Less Than 7K Interlaken - Cap inspection and repair @ pole 689 schedule ASAP-LOAD RELIEF AP1-YWO Total Cost Less Than 7K Interlaken - Cap inspection and repair @ pole 689 schedule ASAP-LOAD RELIEF AP1-YWO Total Cost Less Than 7K 7/13 - RSO/TOLOH - VERNON, TAYLOR ST - 9A - FRONTIER POLE 1105 AP2-YWO Total Cost Variance Met - Variance :-25.8548 MIN.:-50 MAX.:50 PT Conv# 505840-MakeReadyNonReimb-VerizonWireless-ParentConv# 500248 AP1-YWO Total Cost Less Than 7K Boulevard 45 - Replace the failing battery and charger (CH) P#207: CHG DROP_MTR DEPT TO CHG MTR #97987663. AP1-YWO Total Cost Less Than 7K DL; 970 STILLWATER RD; TRANSFER TO FRONTIER POLE 113347/NEW OH/DB RISER AP1-YWO Total Cost Less Than 7K DOST0011OPSNTRELEXPENSES11 Municipal Light Fault Locate and Repair@ POLE L1-654 Replaced 140ft of #4 CBL. CI-YWO Variance - Contractor Invoice Winchester--S. Main St. (100) 3034 Rem 3ph riser, cable, & xfmr bank in vault AP2-YWO Total Cost Variance Met - Variance :14.143 MIN.:-50 MAX.:50 AWC 7/20 VERNON, SCHOOLBROOK RD - RPL 25KVA XFRMR & CUTOUT P#6505 AP1-YWO Total Cost Less Than 7K 2NR - UG Harnesses (5) - 3@2XL s/c 462038 @$730.88ea - 2@XL s/c 462037$735.06 TOTAL: $3,665.00 2NR - Water Pumps (3) s/c 0452792 @ $827 ea TOTAL: $2481 CD00471-09 Conversion Work Inst.Step Down XF's No.Shore & Wylie School Job 4 AP2-YWO Total Cost Variance Met - Variance :-12.178 MIN.:-30 MAX.:30 (DF) Prospect- Ple 94 Change cutouts, TERRY Rd PROSPECT AP1-YWO Total Cost Less Than 7K CAL - CD00849-01 - Ckt 28A1 MBI Initiative Design Work, Norwalk AP1-YWO Total Cost Less Than 7K CAL - CD00849-01 - Ckt 28A1 MBI Initiative Design Work, Norwalk AP1-YWO Total Cost Less Than 7K AMM 15 WHITEHALL PL, FARMINGTON. DB SECONDARY CABLE FAULT. MADE REPAIRS. CI-YWO Variance - Contractor Invoice DL; 16 EMERY DR E; REPLACE BACKYARD POLE AND INSTALL NEW OH/DB SVC RISER AP2-YWO Total Cost Variance Met - Variance :53.9906 MIN.:-50 MAX.:150 RTM-216 Percival Ave, Ber. ESO-9A-Car vs P#8431 POST CONSTRUCTION AP2-YWO Total Cost Variance Met - Variance :54.3288 MIN.:-50 MAX.:150 Parker 22U - REmove all equipment, foundations, fence and trap rocks. All equipment will be scrapped except for the transformer (22U-1X) which will be evaluated for possible use as system spare, but most likely it will be scrapped. The substation site should be cleared and turned over to real estate for sale. The substation is schedule to be de-energized by 12/31/15. CA AWO VEHCL PROPERTY TAX CRCL0011NT011 PHD Elec Maint Replace/Renewal/Obsol OH DESG (AROH) P# 6615 AP2-YWO Total Cost Variance Met - Variance :47.7694 MIN.:-50 MAX.:50 RENTX011NT011 Install a new feed line to the existing dishes at Talcott. Install a new microwave radio to Goose Hill. AJC 7 FAIRFIELD AVE WSPT Electric Service New Residential Overhead P 25864 ROCKVILLE MGP COAL TAR SITE INVESTIGATION AND REMEDIATION CORPORATE RESERVE SITE Renewables WK COMP RESERVE-Mantville ESO 9A 4/29/17-WESTPORT = 22 MAPLE AVE, P#26017 !!!!! AP1-YWO Total Cost Less Than 7K CT Electric Residential Bill Redesign Key Rock Rd, Newtown, pole top fire need to repl p#2477 40/2 NOTIFY# 496101 AP2-YWO Total Cost Variance Met - Variance :100.357 MIN.:-50 MAX.:150 Customer Engagement-Quaresma SCMN0011OPSNTRELEXPENSES11 EAST HARTFORD, MULCAHY DRIVE - XFMR RMVED/TIED SEC CRIB AP1-YWO Total Cost Less Than 7K FLIR E4-NIST Infrared Cameras, 80 X 60 for Western District FLIR E4-NIST Infrared Cameras, 80 X 60 for Central District FLIR E4-NIST Infrared Cameras, 80 X 60 for Eastern District Stock Code # 0419532 (3) Gas Detector: Stock Code# 0439496 (1) Gas Detector Calibration & Bump Test Docking Station 8/7 - RSO/AWC - PLEASANT VALLEY RD,SW-GENERATOR INSTALLED CI-YWO Variance - Contractor Invoice EVGM0011NT011 PH; 165 BOUTON ST W; INSTALL NEW 200AMP DB; REPLACE POLE 925 AP1-YWO Total Cost Less Than 7K Payroll Payable - Morrison AMM 155 SONGBIRD LN,FARM. DB PRIMARY CABLE FAULT. MADE REPAIRS. AP2-YWO Total Cost Variance Met - Variance :-39.9293 MIN.:-50 MAX.:50 AMM 155 SONGBIRD LN,FARM. DB PRIMARY CABLE FAULT. MADE REPAIRS. AP2-YWO Total Cost Variance Met - Variance :-39.9293 MIN.:-50 MAX.:50 NEW MILFORD 20 EVERWOOD DR NEW MILFORD , RUN NEW 4/0 DB SVC PAD 1343 AP1-YWO Total Cost Less Than 7K CD00471-01Elim. 23U Voluntown S/S Conversion Work #5 AP2-YWO Total Cost Variance Met - Variance :-18.003 MIN.:-20 MAX.:20 DM 35 Niagara St WTBY P#6803 Change Recloser & Control 13F68-70S AP2-YWO Total Cost Variance Met - Variance :8.9673 MIN.:-40 MAX.:40 AMM WARREN ST,WATERBURY. SHIFT FRONTIER POLE 8795 AP1-YWO Total Cost Less Than 7K cost_element_group ferc_account percent Fees + Payment - FP0 Fees + Payment - FP0 Fees + Payment - FP0 107010 108030 107010 1 0.2 0.8 Fees + Payment - FP0 107010 1 Fees + Payment - FP0 107010 1 Fees + Payment - FP0 107010 1 Fees + Payment - FP0 107010 1 Fees + Payment - FP0 107010 1 Fees + Payment - FP0 107010 1 Fees + Payment - FP0 Fees + Payment - FP0 Fees + Payment - FP0 107010 555420 555420 1 1 1 Fees + Payment - FP0 107010 1 Fees + Payment - FP0 Fees + Payment - FP0 107010 108030 1 1 Fees + Payment - FP0 107010 1 Fees + Payment - FP0 107010 1 Fees + Payment - FP0 107010 1 Fees + Payment - FP0 107010 1 Fees + Payment - FP0 107010 1 Fees + Payment - FP0 595000 0.04695 Fees + Payment - FP0 107010 0.95305 Fees + Payment - FP0 107010 1 Fees + Payment - FP0 107010 1 Fees + Payment - FP0 107010 1 Fees + Payment - FP0 107010 0.95925 Fees + Payment - FP0 Fees + Payment - FP0 594000 242440 0.04075 1 Fees + Payment - FP0 107010 1 Fees + Payment - FP0 Fees + Payment - FP0 107010 592150 1 1 Fees + Payment - FP0 591000 1 Fees + Payment - FP0 107010 1 Fees + Payment - FP0 Fees + Payment - FP0 Fees + Payment - FP0 Fees + Payment - FP0 Fees + Payment - FP0 107010 107010 107010 108030 154010 1 1 0.8 0.2 1 Fees + Payment - FP0 107010 0.9822 Fees + Payment - FP0 595000 0.0178 Fees + Payment - FP0 107010 1 Fees + Payment - FP0 Fees + Payment - FP0 Fees + Payment - FP0 107010 107010 108030 1 0.99815554 0.00184446 Fees + Payment - FP0 107010 1 Fees + Payment - FP0 Fees + Payment - FP0 107010 107010 1 1 Fees + Payment - FP0 107010 0.53913 Fees + Payment - FP0 Fees + Payment - FP0 Fees + Payment - FP0 108030 108030 107010 0.46087 0.09090909 0.90909091 Fees + Payment - FP0 107010 1 Fees + Payment - FP0 107010 1 Fees + Payment - FP0 107010 1 Fees + Payment - FP0 107010 1 Fees + Payment - FP0 107010 1 Fees + Payment - FP0 107010 1 Fees + Payment - FP0 107010 1 Fees + Payment - FP0 107010 1 Fees + Payment - FP0 107010 1 Fees + Payment - FP0 107010 1 Fees + Payment - FP0 593000 0.01399 Fees + Payment - FP0 Fees + Payment - FP0 107010 107010 0.98601 1 Fees + Payment - FP0 107010 0.99427 Fees + Payment - FP0 593000 0.00573 Fees + Payment - FP0 107010 0.98844 Fees + Payment - FP0 Fees + Payment - FP0 Fees + Payment - FP0 593000 588250 241040 0.01156 1 1 Fees + Payment - FP0 594000 0.00085 Fees + Payment - FP0 Fees + Payment - FP0 107010 593000 0.99915 1 Fees + Payment - FP0 Fees + Payment - FP0 Fees + Payment - FP0 107010 580000 590000 1 0.63 0.37 Fees + Payment - FP0 107010 1 Fees + Payment - FP0 594000 0.28738 Fees + Payment - FP0 107010 0.71262 Fees + Payment - FP0 107010 0.27715 Fees + Payment - FP0 595000 0.72285 Fees + Payment - FP0 107010 1 Fees + Payment - FP0 Fees + Payment - FP0 107010 107010 1 1 Fees + Payment - FP0 107010 1 Fees + Payment - FP0 Fees + Payment - FP0 107010 582000 1 1 Fees + Payment - FP0 107010 1 Fees + Payment - FP0 107010 1 Fees + Payment - FP0 Fees + Payment - FP0 Fees + Payment - FP0 107010 107010 107010 1 1 1 Fees + Payment - FP0 107010 1 Fees + Payment - FP0 107010 1 Fees + Payment - FP0 594000 0.14856 Fees + Payment - FP0 107010 0.85144 Fees + Payment - FP0 107010 1 Fees + Payment - FP0 107010 1 Fees + Payment - FP0 Fees + Payment - FP0 Fees + Payment - FP0 Fees + Payment - FP0 107010 108030 165905 903005 1 1 1 1 Fees + Payment - FP0 Fees + Payment - FP0 Fees + Payment - FP0 107010 454200 107010 1 1 1 Fees + Payment - FP0 Fees + Payment - FP0 Fees + Payment - FP0 Fees + Payment - FP0 107010 228450 908100 228200 1 1 1 1 Fees + Payment - FP0 Fees + Payment - FP0 107010 107010 1 1 Fees + Payment - FP0 Fees + Payment - FP0 Fees + Payment - FP0 107010 908100 593140 1 1 1 Fees + Payment - FP0 Fees + Payment - FP0 Fees + Payment - FP0 Fees + Payment - FP0 Fees + Payment - FP0 107010 107010 107010 107010 107010 1 1 1 1 1 Fees + Payment - FP0 Fees + Payment - FP0 107010 593100 1 1 Fees + Payment - FP0 Fees + Payment - FP0 107010 242030 1 1 Fees + Payment - FP0 594000 0.14884 Fees + Payment - FP0 107010 0.85116 Fees + Payment - FP0 107010 1 Fees + Payment - FP0 107010 1 Fees + Payment - FP0 107010 1 Fees + Payment - FP0 107010 1
  3. Page 10 of 459

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued October 23, 2026 RRU-159 Attachment 6 CONFIDENTIAL Page 10 of 459 4E621238 work_order_number PATROL REPAIRS, PORTLAND, 0-100 CIR description 3R621038 CD00471-05 Conversion Work Install 2M720591 WC-1/14 - ESO - 1280 MARION RD CHES 3R621019 CS000231 CD00471-01Elim. 23U Voluntown S/S C Goodwin Lane 22 - Remove Substation 4N621485 MM SMART SWITCH 11Y6 POLES 405 W MA 4N621485 MM SMART SWITCH 11Y6 POLES 405 W MA 2M722328 GXC17C02 GXC17C05 GXC17C06 GXC17C08 GXC17C09 ESO 5/21/17 - WOLCOTT - 27 COUNTY R EZ-Squeeze Kits (12) 2EK Syskowski Jumper Clamp Loadbreak 2AD WADE Timco Phase ID 2NP Stevens HOT STICK CUTTER 2NP Stevens 5400 LOAD BUSTERS (2) 2NP Stevens 4D621682 Attanwanhood Trl, #1 Old Saybrook/T 1B521909 ESO Mill Plain Rd DNBY- CarVsPole55 2W620038 PHD Elec Maint Replace/Renewal/Obs 2W620038 PHD Elec Maint Replace/Renewal/Obs 3L721835 WATERFORD POLE 3764 50 HPS COBRA CO 3H721456 RSO, 6/10, WINDSOR, BROOKVIEW RD, 9 5T721787 Hall HillRd.,23,Somers,install 4/0q 5T721787 Hall HillRd.,23,Somers,install 4/0q 2C720130 OMSL0011 CT17D007 CT17D007 CT17D008 CT17D008 replace and relocate svc from oh to COMP CCC 3/21/2022 WETHERSFIELD-41 W PEAK BATTERY REPLACEMENT W PEAK BATTERY REPLACEMENT WILLIMANTIC SBA BATTERY REPLACEMENT WILLIMANTIC SBA BATTERY REPLACEMENT ZAPGMNCH ZAP GUARDS MANCHESTER 1B622145 RM 39 Putnam Park Rd Bethel PER SH 2M720601 WC-1/2 - ESO 233 Matthews St Bristo 2M720601 WC-1/2 - ESO 233 Matthews St Bristo 2M720601 WC-1/2 - ESO 233 Matthews St Bristo 2M721272 RTM-46 Norris St, Wtby. Frontier Po 3R620488 F1711016 F1711016 WINDSOR, POQUONOCK AVE - INSTALL LI Field Eng Office Fitout (Bldgs) Field Eng Office Fitout (Bldgs) 4N320643 O Colony Rd,P1840,OL(P4031 Swan Av) 4N320643 O Colony Rd,P1840,OL(P4031 Swan Av) 2M722553 CT17D015 CT17D015 Greystone Rd,Wtby. Make upgrades on PROSPECT RS SITEBOSS INSTALL PROSPECT RS SITEBOSS INSTALL 2M722406 JC/Crestwood Dr Naug Fuse 5255 Anim long_description PATROL REPAIRS, PORTLAND, 0-100 CIRCUITS CL-YWO Variance - Contractor Labor CD00471-05 Conversion Work Install Open Point Btwn. Stepdowns P#2046 AP2-YWO Total Cost Variance Met - Variance :-30.5759 MIN.:-50 MAX.:50 WC-1/14 - ESO - 1280 MARION RD CHESHIRE P# 815 HIT ON 1/8 CASE # 2017-495 AP1-YWO Total Cost Less Than 7K CD00471-01Elim. 23U Voluntown S/S Conversion Work #4 AP2-YWO Total Cost Variance Met - Variance :-32.8857 MIN.:-40 MAX.:40 Remove and scrap all steel structures and electrical equipment in the substation including the transformers. All foundations will be cut below grade, trap rock and fence will be removed. Environmental remediation of the site soil will be covered under this project if necessary. MM SMART SWITCH 11Y6 POLES 405 W MAIN ST EAST LYME NL-YWO Variance - NU Construction Labor MM SMART SWITCH 11Y6 POLES 405 W MAIN ST EAST LYME NL-YWO Variance - NU Construction Labor ESO 5/21/17 - WOLCOTT - 27 COUNTY RD P# 2312 - no addtl info to date 6/28 AP1-YWO Total Cost Less Than 7K 2EK - EZ-Squeeze Kit, 490RKI (1) @ $841.46, 490DRMSK1 (4) @841.46. 490DWMSK1 (5) @ 868.42, 490DWMCK1 (2) @ 847.63, TOTAL: 10244.66 2AD - Jumper Clamp Loadbreak & P/U w/duck bill head (3) : s/c 464113 : $2,704ea TOTAL: $8112 AARON WADE 2NP - (1) Timco Phase Identification / SC 187808 / $ 1,933.64 Enos Stevens 2NP - (1) Hot stick cutter / SC 188854 / $ 1,421.58 Enos Stevens 2NP - (2) 5400 Load busters / SC 194431 / $ 2,030.00 Each TOTAL: $4060 Enos Stevens Attanwanhood Trl, #1 Old Saybrook/TL--REPL #4 AL SVC W/#2 70' AP1-YWO Total Cost Less Than 7K ESO Mill Plain Rd DNBY- CarVsPole55 Braced-Frontier to Set New 8/21/15 AP3-YWO Resource Variance Met- Labor 13 <= 32 OR 112.2 <= 30 And Contractor $1546.34 <= 2000 PHD Elec Maint Replace/Renewal/Obsol OH DESG (AROH) CI-YWO Variance - Contractor Invoice PHD Elec Maint Replace/Renewal/Obsol OH DESG (AROH) CI-YWO Variance - Contractor Invoice WATERFORD POLE 3764 50 HPS COBRA COMPLETED 7/24 CHE AP1-YWO Total Cost Less Than 7K RSO, 6/10, WINDSOR, BROOKVIEW RD, 9A, POLE 4230 REPLACE LED LIGHT AP1-YWO Total Cost Less Than 7K Hall HillRd.,23,Somers,install 4/0qpxsec,(2) risers 200,400amp 3phase 120/208 AP1-YWO Total Cost Less Than 7K Hall HillRd.,23,Somers,install 4/0qpxsec,(2) risers 200,400amp 3phase 120/208 AP1-YWO Total Cost Less Than 7K replace and relocate svc from oh to db pole 406 upper main st sharon appt needed AP1-YWO Total Cost Less Than 7K OMSL0011OPSNTRELEXPENSES11 Replace existing batteries at West Peak which have reached end of life. Replace existing batteries at West Peak which have reached end of life. Replace existing batteries at Willimantic SBA which have reached end of life. Replace existing batteries at Willimantic SBA which have reached end of life. INSTALLATION OF ZAP GUARDS VARIOUS LOC IN MANCHESTER RM 39 Putnam Park Rd Bethel PER SHOOTER NEED CUT AND KICK ALSO TREE TRIMMING AP1-YWO Total Cost Less Than 7K WC-1/2 - ESO 233 Matthews St Bristol CAR VS POLE # 3674 CASE # 17-00090 AP1-YWO Total Cost Less Than 7K WC-1/2 - ESO 233 Matthews St Bristol CAR VS POLE # 3674 CASE # 17-00090 AP1-YWO Total Cost Less Than 7K WC-1/2 - ESO 233 Matthews St Bristol CAR VS POLE # 3674 CASE # 17-00090 AP1-YWO Total Cost Less Than 7K RTM-46 Norris St, Wtby. Frontier Pole Reject P#62-1/2 AP1-YWO Total Cost Less Than 7K WINDSOR, POQUONOCK AVE - INSTALL LINE SENSOR AT 1PH RECLOSER 24J3-160R AP2-YWO Total Cost Variance Met - Variance :32.6622 MIN.:-50 MAX.:150 Tolland - Field Engineering Office Fitout - Bldgs Tolland - Field Engineering Office Fitout - Bldgs O Colony Rd,P1840,OL(P4031 Swan Av)/Elec Maint T Call - Repairs/Obsol OH (AROH) AP2-YWO Total Cost Variance Met - Variance :11.5968 MIN.:-50 MAX.:50 O Colony Rd,P1840,OL(P4031 Swan Av)/Elec Maint T Call - Repairs/Obsol OH (AROH) AP2-YWO Total Cost Variance Met - Variance :11.5968 MIN.:-50 MAX.:50 Greystone Rd,Wtby. Make upgrades on 64496,64497,G413&64500 for animal protection AP1-YWO Total Cost Less Than 7K Install a SiteBoss alarm panel and remove the old Badger E500 alarm panel. Install a SiteBoss alarm panel and remove the old Badger E500 alarm panel. JC/Crestwood Dr Naug Fuse 5255 Animal Protection AP1-YWO Total Cost Less Than 7K CT17D037 Lake Rd ARDs CT17D038 11REDMRE 00000001 Windsor ISO BCC and CONVEX DR - Lak Residential Demand Response DVR Replacement Project 5T720934 Winderemere Ave 160, Ellington. OH/ GXCOS60E SOC MONITOR DELL 1S720173 PH; 16 RAIDERS LN; INSTALL 400AMP D 2M721686 EJC 370 New Britain Ave, Newington 1B720920 JS - 50 Sawmill Rd, Danb, Inst\Rem 2M722809 Jpt-Robert Holcomb Way Plnv P9730 - 5D620884 RA CD00078-02 install 333KVA S/D Ta 2M721441 3/25/17 ESO 657 WATERTOWN AVE CAR V 2M720946 600 STRAITS TPK WTN./ REPLACE POLE& 2M720946 600 STRAITS TPK WTN./ REPLACE POLE& 1B720968 CB - CDOT - 34-305 & 345 Move 2 1B720968 CB - CDOT - 34-305 & 345 Move 2 1S720834 APCAA111 DL; WASHINGTON BLVD; FAULT TO 3 STA AP Contracts Non 4E721257 (CH) PAD#4263: EXTEND PRIM'Y TO PAD 4E721257 (CH) PAD#4263: EXTEND PRIM'Y TO PAD 1N720860 JES; 31A8 Capacitor Solution - New 2M722839 00000011 RSO SOUTHINGTON, Belleview Ave - I Non - Productive Labor 1S721577 21 LEEDS ST STAMFORD/ REPLACED SERV 3H722032 8/4 - RSO - ROCKY HILL, WEST ST - R 3H722032 CT17D019 8/4 - RSO - ROCKY HILL, WEST ST - R CHESHIRE TO W PEAK MICROWAVE UPGRAD 5T721834 Florence Ave, Ellington. Install cu 5T721871 Brook View Dr, Vernon. Change singl 1S721517 DL; GREYROCK PLElectric Service Un- 4D720245 Stanford Hill Rd, #32 Essex/TL-REPL 5D720752 DG P#359 6 WESTFORD RD EASTFORD RPL 2M722861 WC-8/10 SOUTHINGTON, BRISTOL ST - 9 5T721689 MOUNTAIN VIEW RD, SOMERS - 9A POLE 2M722592 AMM 65 BENEDICT ST,WTBY. REPLACED 2M722592 AMM 65 BENEDICT ST,WTBY. REPLACED 4N720929 MM SERVC RISER TO PEDESTALL POLE214 2L720851 WATERTOWN - BUCKINGHAM / REPLACE RE GXCORS7A RSO SAMSUNG TV 1S721154 RL 75 Stonehedge Dr S, Grn Replace 1B721402 TB- 29 WEST ST INSTALL NEW X OVER P 2M720579 WC-ESO 12/24 LONG HILL RD WATEBURY 3H622565 NEW BRITAIN AV, W HTFD - Conv#45560 3H622565 NEW BRITAIN AV, W HTFD - Conv#45560 3H622565 NEW BRITAIN AV, W HTFD - Conv#45560 4N721175 MM REPLACE 75' SERVICE AT POLE 25 2M722919 RTM-1821 N Broad St, Mer. 9A Car vs 4E721256 10117230 10117230 10117231 10117231 RSO 8/6 MIDDLETOWN, CRYSTAL LAKE RD Sale of Streetlights Mansfield Sale of Streetlights Mansfield Sale of Streetlights Chester Sale of Streetlights Chester 3H722171 XL-CDOT 63-633, electrical work to 3H722171 XL-CDOT 63-633, electrical work to 5T721909 Llynwood Dr 37, Vernon. Upgrade OH 2M722316 Jpt-Milton Rd BRI P9340 - Rplc'd ro 2M722316 Jpt-Milton Rd BRI P9340 - Rplc'd ro 2M722316 Jpt-Milton Rd BRI P9340 - Rplc'd ro 4E720807 JV Spring View Windham- between pad 1S721624 DL; 33 ELM TREE PL, STAMFORD: REPLA 2M623051 WC/ESO -11/17 Union ST/ Brass Mill 5D620845 RA CD00078-02 JC B/B 12S1/21D3 co 5D620845 RA CD00078-02 JC B/B 12S1/21D3 co 4E721241 (CH) P#4204: CHG OH DROP_#2 TPX_45' 1N721098 JES; 66 WHITE FALL LN NEW CANAAN.; 3R620628 CD00392 - Transfer 35L7-90T from P. 3R620628 CD00392 - Transfer 35L7-90T from P. 3R620628 CD00392 - Transfer 35L7-90T from P. 3R620628 CD00392 - Transfer 35L7-90T from P. 4D721115 (DF) Midspn Ples 1533-3826- Make OH 5T721885 EMMR0011 Diamond Ledge Rd.,6,Stafford run 12 Employment Claims 4D721154 CB//Madison, 74 Wall St//New db ped 2M721033 PT Conv# 493259-MakeReadyNonReimb-F 1S620848 BK WOODRIDGE DR S @ LONG RIDGE CHAN 3H722049 DKH - Kennedy Rd, Wsr - Replace rec 4N721368 PD-RSO 8/5- LYME, 120 BLOOD ST- P# cost_element_group ferc_account percent Fees + Payment - FP0 107010 1 Fees + Payment - FP0 107010 1 Fees + Payment - FP0 107010 1 Fees + Payment - FP0 Fees + Payment - FP0 107010 108030 1 1 Fees + Payment - FP0 594000 0.00147 Fees + Payment - FP0 107010 0.99853 Fees + Payment - FP0 Fees + Payment - FP0 Fees + Payment - FP0 Fees + Payment - FP0 Fees + Payment - FP0 Fees + Payment - FP0 107010 107010 107010 107010 107010 107010 1 1 1 1 1 1 Fees + Payment - FP0 107010 1 Fees + Payment - FP0 107010 1 Fees + Payment - FP0 593000 0.95087 Fees + Payment - FP0 107010 0.04913 Fees + Payment - FP0 107010 1 Fees + Payment - FP0 107010 1 Fees + Payment - FP0 593000 0.01949 Fees + Payment - FP0 107010 0.98051 Fees + Payment - FP0 Fees + Payment - FP0 Fees + Payment - FP0 Fees + Payment - FP0 Fees + Payment - FP0 Fees + Payment - FP0 107010 596000 107010 108030 107010 108030 1 1 0.93457944 0.06542056 0.93457944 0.06542056 Fees + Payment - FP0 107010 1 Fees + Payment - FP0 107010 1 Fees + Payment - FP0 107010 0.08305 Fees + Payment - FP0 108030 0.06447 Fees + Payment - FP0 587000 0.85248 Fees + Payment - FP0 107010 1 Fees + Payment - FP0 Fees + Payment - FP0 Fees + Payment - FP0 107010 108030 107010 1 0.09092332 0.90907668 Fees + Payment - FP0 593000 0.00941 Fees + Payment - FP0 107010 0.99059 Fees + Payment - FP0 Fees + Payment - FP0 Fees + Payment - FP0 107010 108030 107010 1 0.09090909 0.90909091 Fees + Payment - FP0 107010 1 CONVEX has requested a new ARD from the Lake Rd generator to CONVEX. ISO would also like to upgrade their existing ARD to the Generator to make use of the fiber at Lake Rd. At the same time, we will upgrade the existing substation ARD to CONVEX over the new AVA-E IP backhaul equipment. This work order will be for CL&P equipment needed at Lake Rd. to provide 3 new terminations that can make use of the corporate network and fiber. Fees + Payment - FP0 CONVEX has requested a new ARD from the Lake Rd generator to CONVEX. ISO would also like to upgrade their existing ARD to the Generator to make use of the fiber at Lake Rd. At the same time, we will upgrade the existing substation ARD to CONVEX over the new AVA-E IP backhaul equipment. This work order will be for CL&P equipment needed at Windsor to provide 3 new terminations that can make use of the corporate network and fiber. Residential Demand Response-Krawczyk The DVR that is being replaced is a computer that is beyond its expected life cycle and requires frequent maintenance. Winderemere Ave 160, Ellington. OH/DB svc 4/0 375 ft from XFR-P-33646. Mtr dept AP1-YWO Total Cost Less Than 7K NEW 43IN DELL ULTRA HD 4K MULTI CLIENT MONITOR. $1102.03 QUOTATION ON 11/28/16 PER FRED G PH; 16 RAIDERS LN; INSTALL 400AMP DB SERVICE, REMOVE OH POLE LINE/SERVICE AP2-YWO Total Cost Variance Met - Variance :56.1339 MIN.:-50 MAX.:150 EJC 370 New Britain Ave, Newington P#4835 FTR Replaced Pole, Shift Facilities AP1-YWO Total Cost Less Than 7K JS - 50 Sawmill Rd, Danb, Inst\Rem OH/DB Svc (28M3) AP1-YWO Total Cost Less Than 7K Jpt-Robert Holcomb Way Plnv P9730 - Un-Metered - VERIZON ANTENNA AP1-YWO Total Cost Less Than 7K RA CD00078-02 install 333KVA S/D Taylor Hilll Rd off RT 138 Griswold AP2-YWO Total Cost Variance Met - Variance :-31.9432 MIN.:-50 MAX.:50 3/25/17 ESO 657 WATERTOWN AVE CAR VS POLE#7269 CASE#17-25314 AP1-YWO Total Cost Less Than 7K 600 STRAITS TPK WTN./ REPLACE POLE& RISER CUT KICK AP2-YWO Total Cost Variance Met - Variance :46.7562 MIN.:-50 MAX.:50 600 STRAITS TPK WTN./ REPLACE POLE& RISER CUT KICK AP2-YWO Total Cost Variance Met - Variance :46.7562 MIN.:-50 MAX.:50 CB - CDOT - 34-305 & 345 Move 2 JE-YWO Variance Job Type Exclusion CB - CDOT - 34-305 & 345 Move 2 JE-YWO Variance Job Type Exclusion DL; WASHINGTON BLVD; FAULT TO 3 STAMFORD LIGHTS AP2-YWO Total Cost Variance Met - Variance :32.5896 MIN.:-50 MAX.:50 A/P Contracts Non (CH) PAD#4263: EXTEND PRIM'Y TO PAD#4264_UNITS 5-8, 18-21_PHASE 2 AP2-YWO Total Cost Variance Met - Variance :-28.7598 MIN.:-50 MAX.:50 (CH) PAD#4263: EXTEND PRIM'Y TO PAD#4264_UNITS 5-8, 18-21_PHASE 2 AP2-YWO Total Cost Variance Met - Variance :-28.7598 MIN.:-50 MAX.:50 JES; 31A8 Capacitor Solution - New Canaan Silvermine Rd PL 27... AP2-YWO Total Cost Variance Met - Variance :4.9118 MIN.:-40 MAX.:40 RSO SOUTHINGTON, Belleview Ave - Installed 15 KV arrestor at Pad A CI-YWO Variance - Contractor Invoice 00000011EMPBENPAY11 21 LEEDS ST STAMFORD/ REPLACED SERVICE WITH 40' #2 - ALL WORK COMPLETE AP1-YWO Total Cost Less Than 7K 8/4 - RSO - ROCKY HILL, WEST ST - RPL 3-50KVA 120/208 BANK POLE 1406 AP2-YWO Total Cost Variance Met - Variance :-42.569 MIN.:-50 MAX.:50 8/4 - RSO - ROCKY HILL, WEST ST - RPL 3-50KVA 120/208 BANK POLE 1406 AP2-YWO Total Cost Variance Met - Variance :-42.569 MIN.:-50 MAX.:50 Upgrade the microwave equipment from DS3 to OC3 capacity to provide sufficient backhaul to enable microwave to be an alternate path from fiber and increase capacity. Florence Ave, Ellington. Install cutout for XFR, Upswing Bkt P-993 AP1-YWO Total Cost Less Than 7K Brook View Dr, Vernon. Change single phase to C Phase. Fuse Xfr Bank P-30842 AP1-YWO Total Cost Less Than 7K DL; GREYROCK PLElectric Service Un-Metered - POLE#1460 - CONVERSATION #408277 AP1-YWO Total Cost Less Than 7K Stanford Hill Rd, #32 Essex/TL-REPL EX OH SVC FROM P#432 ***BACKYARD FEED*** DG P#359 6 WESTFORD RD EASTFORD RPLC BRKN ARM, CO's, NEED TO INST(3) ARRESTERS AP2-YWO Total Cost Variance Met - Variance :15.2523 MIN.:-50 MAX.:50 WC-8/10 SOUTHINGTON, BRISTOL ST - 9A P 2647 - CAR V POLE & 3 PH BANK XFRMS AP2-YWO Total Cost Variance Met - Variance :-4.2993 MIN.:-50 MAX.:50 MOUNTAIN VIEW RD, SOMERS - 9A POLE 11075-COMPLETE AP1-YWO Total Cost Less Than 7K AMM 65 BENEDICT ST,WTBY. REPLACED XFMR BANK. REPLACED 3 CUTOUTS. CL-YWO Variance - Contractor Labor AMM 65 BENEDICT ST,WTBY. REPLACED XFMR BANK. REPLACED 3 CUTOUTS. CL-YWO Variance - Contractor Labor MM SERVC RISER TO PEDESTALL POLE214 PEQOUT AVE OH/DB MLC AP1-YWO Total Cost Less Than 7K WATERTOWN - BUCKINGHAM / REPLACE RECLOSER AND CONTROL - YELLOW TAG DC-YWO Variance - Design/Construction NEW SAMSUNG 50 IN TV FOR PAUL'S OFFICE WITH 3 YR WARRANTY. QUOTE PROVIDED BY ERGONOMIC GROUP: TOTAL $860.81 RL 75 Stonehedge Dr S, Grn Replace #4 AL OH service with 1/0 TPX AP1-YWO Total Cost Less Than 7K TB- 29 WEST ST INSTALL NEW X OVER POLE AND DB SERVICE AP1-YWO Total Cost Less Than 7K WC-ESO 12/24 LONG HILL RD WATEBURY - POLE # 6550- 9A AP3-YWO Resource Variance Met- Labor 0 <= 32 OR -100 <= 30 And Contractor $1630.79 <= 2000 NEW BRITAIN AV, W HTFD - Conv#455605 - TPA DUE BY 3/19 AP2-YWO Total Cost Variance Met - Variance :17.9129 MIN.:-50 MAX.:50 NEW BRITAIN AV, W HTFD - Conv#455605 - TPA DUE BY 3/19 AP2-YWO Total Cost Variance Met - Variance :17.9129 MIN.:-50 MAX.:50 NEW BRITAIN AV, W HTFD - Conv#455605 - TPA DUE BY 3/19 AP2-YWO Total Cost Variance Met - Variance :17.9129 MIN.:-50 MAX.:50 MM REPLACE 75' SERVICE AT POLE 2500 ALL WORK COMPLETE AP1-YWO Total Cost Less Than 7K RTM-1821 N Broad St, Mer. 9A Car vs P#3141. Frontier Replaced. POST CONSTRUCTION AP2-YWO Total Cost Variance Met - Variance :-29.3137 MIN.:-50 MAX.:50 RSO 8/6 MIDDLETOWN, CRYSTAL LAKE RD PASCARELLI AP2-YWO Total Cost Variance Met - Variance :32.0064 MIN.:-50 MAX.:150 Record the sale of street lights to the town of Mansfield Record the sale of street lights to the town of Mansfield Record the sale of street lights to the town of Chester Record the sale of street lights to the town of Chester XL-CDOT 63-633, electrical work to relocate service along Woodland St, Hartford JE-YWO Variance Job Type Exclusion XL-CDOT 63-633, electrical work to relocate service along Woodland St, Hartford JE-YWO Variance Job Type Exclusion Llynwood Dr 37, Vernon. Upgrade OH XFR on P-1479 25 KVA to 50 KVA, Low voltage AP1-YWO Total Cost Less Than 7K Jpt-Milton Rd BRI P9340 - Rplc'd rotted xarm with Ridge Pin Const. AP1-YWO Total Cost Less Than 7K Jpt-Milton Rd BRI P9340 - Rplc'd rotted xarm with Ridge Pin Const. AP1-YWO Total Cost Less Than 7K Jpt-Milton Rd BRI P9340 - Rplc'd rotted xarm with Ridge Pin Const. AP1-YWO Total Cost Less Than 7K JV Spring View Windham- between pad#92 & #93 requires replmt ** 17B-5319 *** CL-YWO Variance - Contractor Labor DL; 33 ELM TREE PL, STAMFORD: REPLACE #2 100FT SERVICE- ALL WORK COMPLET AP1-YWO Total Cost Less Than 7K WC/ESO -11/17 Union ST/ Brass Mill Rd Wtby 9A- POLE # 3308-9 & BASE AP2-YWO Total Cost Variance Met - Variance :-48.4881 MIN.:-50 MAX.:50 RA CD00078-02 JC B/B 12S1/21D3 convert RT 138 p50 (600's) to 12S1 r.o.w. AP2-YWO Total Cost Variance Met - Variance :7.3617 MIN.:-20 MAX.:20 RA CD00078-02 JC B/B 12S1/21D3 convert RT 138 p50 (600's) to 12S1 r.o.w. AP2-YWO Total Cost Variance Met - Variance :7.3617 MIN.:-20 MAX.:20 (CH) P#4204: CHG OH DROP_#2 TPX_45'_MTR DEPT TO CHG MTR #98849099. AP1-YWO Total Cost Less Than 7K JES; 66 WHITE FALL LN NEW CANAAN.; Elec Svc Existing Residential POLE 8525... AP1-YWO Total Cost Less Than 7K CD00392 - Transfer 35L7-90T from P.7242 to P.6475 - Segment 1 AP2-YWO Total Cost Variance Met - Variance :-45.4462 MIN.:-50 MAX.:50 CD00392 - Transfer 35L7-90T from P.7242 to P.6475 - Segment 1 AP2-YWO Total Cost Variance Met - Variance :-45.4462 MIN.:-50 MAX.:50 CD00392 - Transfer 35L7-90T from P.7242 to P.6475 - Segment 1 AP2-YWO Total Cost Variance Met - Variance :-45.4462 MIN.:-50 MAX.:50 CD00392 - Transfer 35L7-90T from P.7242 to P.6475 - Segment 1 AP2-YWO Total Cost Variance Met - Variance :-45.4462 MIN.:-50 MAX.:50 (DF) Midspn Ples 1533-3826- Make OH svc Connec - 100A upgd- Residential Overhead AP1-YWO Total Cost Less Than 7K Diamond Ledge Rd.,6,Stafford run 120'2tpx 100amp meter p-3723 AP1-YWO Total Cost Less Than 7K Employment Claims CB//Madison, 74 Wall St//New db pedestal svc for town lights AP1-YWO Total Cost Less Than 7K PT Conv# 493259-MakeReadyNonReimb-Fibertech-ParentConv# 490746 AP2-YWO Total Cost Variance Met - Variance :-28.8835 MIN.:-50 MAX.:50 BK WOODRIDGE DR S @ LONG RIDGE CHANGE TAP A to C phase, AP1-YWO Total Cost Less Than 7K DKH - Kennedy Rd, Wsr - Replace recloser upper unit P2982. AP2-YWO Total Cost Variance Met - Variance :.4686 MIN.:-40 MAX.:40 PD-RSO 8/5- LYME, 120 BLOOD ST- P# 2723 AP1-YWO Total Cost Less Than 7K 107010 1 Fees + Payment - FP0 Fees + Payment - FP0 Fees + Payment - FP0 107010 908100 107010 1 1 1 Fees + Payment - FP0 107010 1 Fees + Payment - FP0 107010 1 Fees + Payment - FP0 107010 1 Fees + Payment - FP0 593000 1 Fees + Payment - FP0 107010 1 Fees + Payment - FP0 107010 1 Fees + Payment - FP0 107010 1 Fees + Payment - FP0 107010 1 Fees + Payment - FP0 107010 0.83606 Fees + Payment - FP0 594000 0.16394 Fees + Payment - FP0 107010 0.99973 Fees + Payment - FP0 593000 0.00027 Fees + Payment - FP0 Fees + Payment - FP0 107010 232CA0 1 1 Fees + Payment - FP0 107010 0.98711 Fees + Payment - FP0 595000 0.01289 Fees + Payment - FP0 107010 1 Fees + Payment - FP0 Fees + Payment - FP0 107010 9200NP 1 1 Fees + Payment - FP0 107010 1 Fees + Payment - FP0 107010 0.38208 Fees + Payment - FP0 Fees + Payment - FP0 583000 107010 0.61792 1 Fees + Payment - FP0 107010 1 Fees + Payment - FP0 107010 1 Fees + Payment - FP0 107010 1 Fees + Payment - FP0 107010 1 Fees + Payment - FP0 107010 1 Fees + Payment - FP0 107010 1 Fees + Payment - FP0 107010 1 Fees + Payment - FP0 107010 0.53226 Fees + Payment - FP0 593000 0.46774 Fees + Payment - FP0 107010 1 Fees + Payment - FP0 107010 1 Fees + Payment - FP0 107010 1 Fees + Payment - FP0 107010 1 Fees + Payment - FP0 107010 1 Fees + Payment - FP0 107010 1 Fees + Payment - FP0 594000 0.03003 Fees + Payment - FP0 593000 0.03027 Fees + Payment - FP0 107010 0.9397 Fees + Payment - FP0 107010 1 Fees + Payment - FP0 107010 1 Fees + Payment - FP0 Fees + Payment - FP0 Fees + Payment - FP0 Fees + Payment - FP0 Fees + Payment - FP0 107010 108040 108030 108030 108040 1 0.00990099 0.99009901 0.99009901 0.00990099 Fees + Payment - FP0 107010 0.99659 Fees + Payment - FP0 594000 0.00341 Fees + Payment - FP0 107010 1 Fees + Payment - FP0 108030 0.41837 Fees + Payment - FP0 107010 0.32653 Fees + Payment - FP0 593000 0.2551 Fees + Payment - FP0 107010 1 Fees + Payment - FP0 107010 1 Fees + Payment - FP0 107010 1 Fees + Payment - FP0 107010 0.99999 Fees + Payment - FP0 593000 0.00001 Fees + Payment - FP0 107010 1 Fees + Payment - FP0 107010 1 Fees + Payment - FP0 108030 0.54157 Fees + Payment - FP0 107010 0.35922 Fees + Payment - FP0 594000 0.00488 Fees + Payment - FP0 593000 0.09433 Fees + Payment - FP0 107010 1 Fees + Payment - FP0 Fees + Payment - FP0 107010 923000 1 1 Fees + Payment - FP0 107010 1 Fees + Payment - FP0 107010 1 Fees + Payment - FP0 593000 1 Fees + Payment - FP0 107010 1 Fees + Payment - FP0 107010 1
  4. Page 11 of 459

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued October 23, 2026 RRU-159 Attachment 6 CONFIDENTIAL Page 11 of 459 work_order_number description 4N720868 MM RELOCATE POLE LINE FOR NEW LONDO 1B722028 JS - 6 Hewlett Rd, Nw Frfld, Inst\R 1S721672 DL; 179 FOX RIDGE RD; P#9982 REPLAC 1S721192 LGCS0011 RL:174 MANSFIELD AVE: 9A 5/20/17- D Customer Service 2M722960 DM 453 W Main St CHES P#289 Change 2M722960 DM 453 W Main St CHES P#289 Change 2M722960 DM 453 W Main St CHES P#289 Change 5T721629 ANDOVER, BEAR SWAMP RD - VOLTAGE CO 1G621155 CT17D042 RL:120 Valley Dr::Elec Svc New Resi AVA-E, Frost Bridge ARD 5T721783 RSO, 7/19, EAST WINDSOR, CHURCH STR 4N621399 ESO 9A 9/5/ Pole 20865 - Fellows 4N720048 GCC / ROTTEN POLE / FRONTIER I&R PO 4N721015 GCC / RMV XFMR OVERLOADED / INSTALL 1N720608 JDB 18 FLICKER LN NWLK SHIFT POLE 6 5T721877 8/3 - RSO - SULLIVAN AVE, SOUTH WIN 5T721877 CS002810 8/3 - RSO - SULLIVAN AVE, SOUTH WIN DC Battery Voltage Monitoring 4N720994 MM 36F5 Install new CAPACITOR POLE# 4N720921 INVT0211 AGNFSO11 RECLZ011 MM WTFD, E. Wood - Replace 50' #2 O Inventory Offset CA AWO AGENCY FEES LVL LREC/ZREC Program CTCOM011 CTCRBER1 CTCRC011 CTE DK24|05|01 New Comp Stakhers Install Card Reader for Berlin Lab Customer Research - Online Communit 4E721121 CS001891 MN 129 MAIN ST E HMPTN AT P-12 INST TRIANGLE 11A REPL BUS W SWITCHGEAR CASE1811 TRDE0811 PYAC0111 PYAC0111 PYAC0111 PYAC0111 PYAC0111 PYAC0111 IPPNF111 14L (D & T) YardSubstationYardTD 25 2018 Series a Accrued Int. CL&P D Payroll Accrual - Source Entity 1T Payroll Accrual - Source Entity 1T Payroll Accrual - Source Entity 1T Payroll Accrual - Source Entity 1T Payroll Accrual - Source Entity 1T Payroll Accrual - Source Entity 1T Purchase Power- COGEN Non Firm 5D720640 135 WESTON RD, P#2497 Elec Maint Po 2M722167 RTM-315 Bee St, Mer. 9A-ESO-Car vs 2M722167 RTM-315 Bee St, Mer. 9A-ESO-Car vs 4E721058 CT16D029 JK>POLE 242--RMV 3PH PRI RISER, DB BOLTON MW UPGR W/REUSED MA EQUIP 2M721793 RTM-533 S Broad St, Mer. Frontier A 2M722893 CD00927 - CDOT 151-326 - I84 Mix Ma 2M721080 WC-2/18/17 ESO 46 ROUND HILL RD BRI 2C720129 rpl poles ins xfrmr bank ins new oh 5T721478 532 N MAIN ST, SUFFIELD / APPT - RE 2L720630 BURLINGTON-MILFORD ST / PRIORITY RE 2L420582 Kent, 373 Kent Hollow Rd -- ins new 2M722797 AMM 455 CHASE PKWY,WTBY. PART POWER 2M722797 INVT0411 AMM 455 CHASE PKWY,WTBY. PART POWER Inventory Offset 1B721538 2 ROCKWELL RD extend primary pole l 1B721538 DSN72030 2 ROCKWELL RD extend primary pole l (50): Refurbish the switchgear roof 1S721300 DL; 3 WEED CIR; 1PH UG Svc - Replac 3H721993 7/26 - BLOOMFIELD, CHATEAU MARGAUX 5T522213 ESO 12/9 MAIN ST, SOMERS - MVA CAUS 2M721634 AMM 75 RESERVOIR RD FARMINGTON. RE 4E720481 (CH) P#474: WRK COMP'D_RSO 4/3_ RPL 3H721933 Replace OH svc / new attachment poi 4E720569 DSN72001 DSN72001 JV 66 Back Rd Windham Ct replace se (50): Miscellaneous- Rebuild of dis (50): Miscellaneous- Rebuild of dis 3H721681 DSQ72033 DSQ72033 South Main St.Manchester Pole 3881 (50): Replace the failed 9A-3X1-4 m (50): Replace the failed 9A-3X1-4 m 2W522136 PHD VT *REJECT POLES* - SHIFT AF 3H721721 Htfd TRINITY ST - C6843 replace 250 1S620701 RL BELLE HAVEN REMOVE OVERHEAD ON M 5T721785 RSO, 7/19, ENFIELD, POST OFFICE, PO 2M722719 JC/RSO 7/28 MIDDLEBURY, SOUTH ST - 2M723308 Jpt-77 Bradley St BRI P8486 - New R 4N721645 MM RPLCE 3 LEAKING XFRMRS ALL WORK 4N721645 MM RPLCE 3 LEAKING XFRMRS ALL WORK 4N721645 MM RPLCE 3 LEAKING XFRMRS ALL WORK 1B721957 JS - 4 Woodview Dr, Brkfld, Inst\Re 1B721958 JS - 25 Woodview Dr, Brkfld, Inst\R long_description MM RELOCATE POLE LINE FOR NEW LONDON ROAD WIDENING notify #529767 AP2-YWO Total Cost Variance Met - Variance :-4.1735 MIN.:-40 MAX.:40 JS - 6 Hewlett Rd, Nw Frfld, Inst\Rem OH Svc (28M2) AP1-YWO Total Cost Less Than 7K DL; 179 FOX RIDGE RD; P#9982 REPLACE 25KVA WITH NEW 50KVA XFMR AP1-YWO Total Cost Less Than 7K RL:174 MANSFIELD AVE: 9A 5/20/17- DARIEN - NUE P # 36 45/2 AP1-YWO Total Cost Less Than 7K LGCS0011NT011 DM 453 W Main St CHES P#289 Change XFMR New Open Point P#287 Close Open Point AP1-YWO Total Cost Less Than 7K DM 453 W Main St CHES P#289 Change XFMR New Open Point P#287 Close Open Point AP1-YWO Total Cost Less Than 7K DM 453 W Main St CHES P#289 Change XFMR New Open Point P#287 Close Open Point AP1-YWO Total Cost Less Than 7K ANDOVER, BEAR SWAMP RD - VOLTAGE COMPLAINT - INSTALL 25KVA XFMR P-407 AP1-YWO Total Cost Less Than 7K RL:120 Valley Dr::Elec Svc New Residential DESG 40/2 Pole 36" Silo (DN) AP3-YWO Resource Variance Met- Labor 14 <= 32 OR 62.62 <= 30 And Contractor $1228.29 <= 2000 This WO is to deploy an AVA-E at Frost Bridge 8R substation. The AVA-E will be used to backhaul an ARD phone circuit using the existing network at Frost Bridge. RSO, 7/19, EAST WINDSOR, CHURCH STREET, POLE 25478 - REPLACED XFMR CI-YWO Variance - Contractor Invoice ESO 9A 9/5/ Pole 20865 - Fellows Rd., (Rt 163), Montville AP1-YWO Total Cost Less Than 7K GCC / ROTTEN POLE / FRONTIER I&R POLE / EVERSOURCE TO SHIFT ONTO AP1-YWO Total Cost Less Than 7K GCC / RMV XFMR OVERLOADED / INSTALL A NEW XFMR AP1-YWO Total Cost Less Than 7K JDB 18 FLICKER LN NWLK SHIFT POLE 6545 INSTALL New OH/DB Residential DESG (DN) AP1-YWO Total Cost Less Than 7K 8/3 - RSO - SULLIVAN AVE, SOUTH WINDSOR, P-5026 - UPGRADE QUAD - LOW VOLTAGE AP1-YWO Total Cost Less Than 7K 8/3 - RSO - SULLIVAN AVE, SOUTH WINDSOR, P-5026 - UPGRADE QUAD - LOW VOLTAGE AP1-YWO Total Cost Less Than 7K Implement Station DC Battery Voltage Monitoring as a Backup System to the AT10 Charger Internal Alarm System MM 36F5 Install new CAPACITOR POLE# 264 HARTFORD TRNPKE WTFD AP2-YWO Total Cost Variance Met - Variance :-4.9681 MIN.:-50 MAX.:50 MM WTFD, E. Wood - Replace 50' #2 OH Service ALL WORK COMPLETE AP1-YWO Total Cost Less Than 7K Inventory Offset-Ouimette CA AWO AGENCY FEES LVL0 LREC/ZREC Program-Caron CTE New Comp for Stakeholders - Balmer, Melanie DK 24-05-01 - The electric distribution companies (EDCs) may recover through the Non-Bypassable Federally Mandated Congestion Charge (NBFMCC) any costs that were incurred in the relevant calendar year. Install card reader for meter shop in Torrington AWC to restrict access per e-mails from Karen Palmieri, David Glanovsky, Christopher Kellogg on December 8 & 9 2020. The cost is about $4,000.00. Customer Research - Online Communities - Balmer, Melanie MN 129 MAIN ST E HMPTN AT P-12 INSTALL OH SVC AND A 200A MTR. AP1-YWO Total Cost Less Than 7K PHASE 1. REPLACE EXISTING A1, A2, A3 OPEN BUS CONFIGURATION W A POWER CON STYLE ENCLOSED, DBLE BUS, METAL CLAD SWITCHGEAR. 14L (D & T) YardSubstationYardTD 250 - LTC Voltage Reduction Receiver Testing NO AWOCS-AWOCS REASON CODE AND DESCRIPTION NOT FOUND. 2018 Series a Accrued Int. CL&P D-Rose Payroll Accrual - Source Entity 1T Payroll Accrual - Source Entity 1T Payroll Accrual - Source Entity 1T Payroll Accrual - Source Entity 1T Payroll Accrual - Source Entity 1T Payroll Accrual - Source Entity 1T Purchase Power- COGEN Non Firm 135 WESTON RD, P#2497 Elec Maint Pole Reject - PRIORITY DESG (IFOH) AP1-YWO Total Cost Less Than 7K RTM-315 Bee St, Mer. 9A-ESO-Car vs P#2192. Pole Replaced. Post Construction AP2-YWO Total Cost Variance Met - Variance :-13.7915 MIN.:-50 MAX.:50 RTM-315 Bee St, Mer. 9A-ESO-Car vs P#2192. Pole Replaced. Post Construction AP2-YWO Total Cost Variance Met - Variance :-13.7915 MIN.:-50 MAX.:50 JK>POLE 242--RMV 3PH PRI RISER, DB CABLE, 3PH SVC TO BLDG FOR DEMO (7 MTRS) AP1-YWO Total Cost Less Than 7K The OC3 microwave equipment that was removed from service between Mt Tom GS and Hadley area work center will be moved from the books to the new locations Tolland and Bolton. This work order is for equipment to be located at Bolton AWC. RTM-533 S Broad St, Mer. Frontier Added P#7187. Install Pole Top X-Arm AP1-YWO Total Cost Less Than 7K CD00927 - CDOT 151-326 - I84 Mix Master Rehab - Extend MH's to New Street Level JE-YWO Variance Job Type Exclusion WC-2/18/17 ESO 46 ROUND HILL RD BRISTOL CAR VS POLE # 6728 CASE # 17-6122 AP2-YWO Total Cost Variance Met - Variance :4.5771 MIN.:-50 MAX.:50 rpl poles ins xfrmr bank ins new oh svc 2607 south canaan rd fv DC-YWO Variance - Design/Construction 532 N MAIN ST, SUFFIELD / APPT - RELOCATING DB SVC / METER SOCKET AP1-YWO Total Cost Less Than 7K BURLINGTON-MILFORD ST / PRIORITY REJECT POLE- REPLACE AND SHIFT AP1-YWO Total Cost Less Than 7K Kent, 373 Kent Hollow Rd -- ins new db pri to pad P3092- APPT Wed 10/7 w/Coleman AP2-YWO Total Cost Variance Met - Variance :49.4741 MIN.:-50 MAX.:50 AMM 455 CHASE PKWY,WTBY. PART POWER. REPAIRED PRIMARY CABLE NEAR POLE F8074. AP1-YWO Total Cost Less Than 7K AMM 455 CHASE PKWY,WTBY. PART POWER. REPAIRED PRIMARY CABLE NEAR POLE F8074. AP1-YWO Total Cost Less Than 7K Inventory Offset-Ouimette 2 ROCKWELL RD extend primary pole line install prim. riser to pad + svc CL-YWO Variance - Contractor Labor 2 ROCKWELL RD extend primary pole line install prim. riser to pad + svc CL-YWO Variance - Contractor Labor Peaceable 12N - Refurbish the switchgear enclosure DL; 3 WEED CIR; 1PH UG Svc - Replace Exist w/ UV4/0AL3CT - APPT NEEDED AP1-YWO Total Cost Less Than 7K 7/26 - BLOOMFIELD, CHATEAU MARGAUX - REPLACED PAD 1719 AP2-YWO Total Cost Variance Met - Variance :51.2571 MIN.:-50 MAX.:150 ESO 12/9 MAIN ST, SOMERS - MVA CAUSED P#313 TO BREAK AP2-YWO Total Cost Variance Met - Variance :39.6471 MIN.:-50 MAX.:50 AMM 75 RESERVOIR RD FARMINGTON. REPLACE DB SERVICE & RISER. AP2-YWO Total Cost Variance Met - Variance :-44.6321 MIN.:-50 MAX.:50 (CH) P#474: WRK COMP'D_RSO 4/3_ RPL'D X-ARM__P#5311: NEED TO RPL X-ARM AP1-YWO Total Cost Less Than 7K Replace OH svc / new attachment point AP1-YWO Total Cost Less Than 7K JV 66 Back Rd Windham Ct replace secondary pole with svc riser AP1-YWO Total Cost Less Than 7K Card 11F - Rebuild the distribution control house. Replace entire roof and rebuild structure to support new roof, Install new roof and replace rafters, Install new plywood sheathed 2 1/2 R12 foam insulation to all exterior walls or building, replace and rebuild fascia and soffit, Install Certainteed Iron Max Vertical siding. Card 11F - Rebuild the distribution control house. Replace entire roof and rebuild structure to support new roof, Install new roof and replace rafters, Install new plywood sheathed 2 1/2 R12 foam insulation to all exterior walls or building, replace and rebuild fascia and soffit, Install Certainteed Iron Max Vertical siding. South Main St.Manchester Pole 3881 hit/ Replace with 40/2 AP1-YWO Total Cost Less Than 7K Falls Village 9A - Replace the failed 9A-3X1-4 mobile disconnect switch Falls Village 9A - Replace the failed 9A-3X1-4 mobile disconnect switch PHD VT *REJECT POLES* - SHIFT AFTER FRONTIER SETS POLES AP1-YWO Total Cost Less Than 7K Htfd TRINITY ST - C6843 replace 250w head to new pole AP1-YWO Total Cost Less Than 7K RL BELLE HAVEN REMOVE OVERHEAD ON MAYO AVE AP3-YWO Resource Variance Met- Labor 35 <= 32 OR -37.25 <= 30 And Contractor $1731.29 <= 2000 RSO, 7/19, ENFIELD, POST OFFICE, POLE 12666 - REPLACE OH SVC/REPLACE METER AP1-YWO Total Cost Less Than 7K JC/RSO 7/28 MIDDLEBURY, SOUTH ST - TRUCK TOOK DOWN SVC - RAN 130' #2 SVC AP1-YWO Total Cost Less Than 7K Jpt-77 Bradley St BRI P8486 - New Residential Overhead AP1-YWO Total Cost Less Than 7K MM RPLCE 3 LEAKING XFRMRS ALL WORK COMPLETE CL-YWO Variance - Contractor Labor MM RPLCE 3 LEAKING XFRMRS ALL WORK COMPLETE CL-YWO Variance - Contractor Labor MM RPLCE 3 LEAKING XFRMRS ALL WORK COMPLETE CL-YWO Variance - Contractor Labor JS - 4 Woodview Dr, Brkfld, Inst\Rem OH Svc (14H3) AP1-YWO Total Cost Less Than 7K JS - 25 Woodview Dr, Brkfld, Inst\Rem OH Svc (14H3) AP1-YWO Total Cost Less Than 7K cost_element_group ferc_account percent Fees + Payment - FP0 107010 1 Fees + Payment - FP0 107010 1 Fees + Payment - FP0 107010 1 Fees + Payment - FP0 Fees + Payment - FP0 107010 923000 1 1 Fees + Payment - FP0 595000 0.08859 Fees + Payment - FP0 583000 0.35438 Fees + Payment - FP0 593000 0.55703 Fees + Payment - FP0 107010 1 Fees + Payment - FP0 Fees + Payment - FP0 107010 107010 1 1 Fees + Payment - FP0 107010 1 Fees + Payment - FP0 107010 1 Fees + Payment - FP0 107010 1 Fees + Payment - FP0 107010 1 Fees + Payment - FP0 107010 1 Fees + Payment - FP0 593000 0.06445 Fees + Payment - FP0 Fees + Payment - FP0 107010 107010 0.93555 1 Fees + Payment - FP0 107010 1 Fees + Payment - FP0 Fees + Payment - FP0 Fees + Payment - FP0 Fees + Payment - FP0 107010 163020 431400 555850 1 1 1 1 Fees + Payment - FP0 Fees + Payment - FP0 Fees + Payment - FP0 903000 107010 903003 1 1 1 Fees + Payment - FP0 Fees + Payment - FP0 107010 107010 1 1 Fees + Payment - FP0 Fees + Payment - FP0 Fees + Payment - FP0 Fees + Payment - FP0 Fees + Payment - FP0 Fees + Payment - FP0 Fees + Payment - FP0 Fees + Payment - FP0 Fees + Payment - FP0 582000 237BD0 593000 107100 580000 582000 584000 588154 555000 1 1 0.022 0.571 0.014 0.29 0.061 0.042 1 Fees + Payment - FP0 107010 1 Fees + Payment - FP0 593000 0.03285 Fees + Payment - FP0 107010 0.96715 Fees + Payment - FP0 Fees + Payment - FP0 107010 107010 1 1 Fees + Payment - FP0 107010 1 Fees + Payment - FP0 108030 1 Fees + Payment - FP0 107010 1 Fees + Payment - FP0 107010 1 Fees + Payment - FP0 107010 1 Fees + Payment - FP0 107010 1 Fees + Payment - FP0 107010 1 Fees + Payment - FP0 107010 0.97333 Fees + Payment - FP0 Fees + Payment - FP0 594000 154PV0 0.02667 1 Fees + Payment - FP0 107010 0.99584 Fees + Payment - FP0 Fees + Payment - FP0 595000 107010 0.00416 1 Fees + Payment - FP0 107010 1 Fees + Payment - FP0 107010 1 Fees + Payment - FP0 107010 1 Fees + Payment - FP0 107010 1 Fees + Payment - FP0 107010 1 Fees + Payment - FP0 107010 1 Fees + Payment - FP0 Fees + Payment - FP0 Fees + Payment - FP0 107010 107010 108030 1 0.80049278 0.19950722 Fees + Payment - FP0 Fees + Payment - FP0 Fees + Payment - FP0 107010 107010 108030 1 0.83760322 0.16239678 Fees + Payment - FP0 107010 1 Fees + Payment - FP0 107010 1 Fees + Payment - FP0 107010 1 Fees + Payment - FP0 107010 1 Fees + Payment - FP0 107010 1 Fees + Payment - FP0 107010 1 Fees + Payment - FP0 107010 0.1426 Fees + Payment - FP0 594000 0.76355 Fees + Payment - FP0 595000 0.09385 Fees + Payment - FP0 107010 1 Fees + Payment - FP0 107010 1 Fees + Payment - FP0 107010 1 Fees + Payment - FP0 107010 1 Fees + Payment - FP0 107010 1 Fees + Payment - FP0 107010 1 Fees + Payment - FP0 107010 1 Fees + Payment - FP0 107010 1 Fees + Payment - FP0 107010 1 Fees + Payment - FP0 107010 1 Fees + Payment - FP0 107010 0.91543 Fees + Payment - FP0 595000 0.08457 Fees + Payment - FP0 107010 1 Fees + Payment - FP0 107010 1 Fees + Payment - FP0 107010 1 Fees + Payment - FP0 108030 0.2647 Fees + Payment - FP0 593000 0.39707 Fees + Payment - FP0 107010 0.33823 Fees + Payment - FP0 107010 1 Fees + Payment - FP0 107010 0.6435 Fees + Payment - FP0 594000 0.3565 Fees + Payment - FP0 107010 1 Fees + Payment - FP0 107010 1 Fees + Payment - FP0 107010 1 Fees + Payment - FP0 107010 1 Fees + Payment - FP0 107010 1 Fees + Payment - FP0 107010 1 Fees + Payment - FP0 107010 1 Fees + Payment - FP0 107010 1 Fees + Payment - FP0 107010 1 Fees + Payment - FP0 107010 1 Fees + Payment - FP0 107010 1 Fees + Payment - FP0 107010 1 Fees + Payment - FP0 107010 1 Fees + Payment - FP0 Fees + Payment - FP0 107010 908000 1 1 Fees + Payment - FP0 Fees + Payment - FP0 Fees + Payment - FP0 Fees + Payment - FP0 107010 108030 107010 108030 1 1 0.80000058 0.19999942 Fees + Payment - FP0 107010 1 Fees + Payment - FP0 107010 1 Fees + Payment - FP0 107010 1 Windsor Battery Back Up Engineering design costs for Windsor battery backup project 1985 Blue Hills Ave Ext. Windsor, CT WINBAT01 Windsor Battery Back Up 1S721960 PH; 71 KENSETT LN; INSTALL 4/0, 200 4D321128 cb//high st @ ridge rd, chester//sh 1B721941 JS - 3 East St, Danb, Inst\Rem OH S 2M722559 Municipal Light Fault Locate and Re 2M621676 Jpt-ESO-24 Matthews St Brstl P248 - 3H721263 HARTFORD, NEW BRITAIN AVE REPLACE 2 2M422728 Jpt-298 South St Brstl P2901-S - 9a 4N721466 RSO 8/17 - SALEM, WEST RD - PAD # 1 4N721466 RSO 8/17 - SALEM, WEST RD - PAD # 1 2M622949 Jpt-ESO-5 Paul St Plnv P3110 & P125 3H621467 MAIN ST, HARTFORD - REPLACE VACUUM 2M722757 RSO NEW BRITAIN, Biruta St - Replac 2M621782 PT Convo #402122-MakeReadyWirelessA 2M621782 PT Convo #402122-MakeReadyWirelessA 2M621782 PT Convo #402122-MakeReadyWirelessA 3L721945 TORRINGTON POLE 3560 150 HPS COBRA 4D521524 CDOT 59-161/CD00610, UG civil work 4D521524 CDOT 59-161/CD00610, UG civil work 3H721865 RSO,7/16, WEST HARTFORD, KANE STREE 4N721203 SM-240 BOSTON POST RD, WTRFRD- RMV 1G621297 RL:10 Glenville Rd: Verizon replace 3H722035 RSO, 8/5, WINDSOR, KENDRICK LANE - 5T721759 Hall Hill Rd.353,Somers, install 25 1B622090 WOOD, 120 WEST LAKE RD, OH SVC CHEC 2L720624 Torrington--Lincoln Ave. 1114S Repl 2W620826 JDB 54 PORTER HILL RD MIDDLEBURY R 4N621724 MM REPLACE SERVICE RSO 12/20 NL, BR 1N720916 JDB 10 STURGESS COMMONS WSPT POLE 5 2W421201 PHD BM/ Pole 1342 Install 600 Amp s 1S721581 RL:59 View St West Electric Service 2M722186 JC/47 RED ROBIN RD NAUG- NEED NEW 3R720043 EIDR0011 CAL - CD00849-01 - Ckt 21M15 MBI In EIA INT RATE BUY-DN LOANS-REGLTORY 3R720018 CS002471 DSN52019 DSN52019 CB CD00815-01Install line sensor Po STEPSTONE 35L XFMR & PCE INSTALL (30): Rebuild two OCB's. 32G-19T-2 (30): Rebuild two OCB's. 32G-19T-2 4N621483 SM-249 PALMER NECK RD, STGN- RPLC P 3H721195 BLOOMFIELD BLUE HILLS AVE POLE 18 - 4D720194 CB//MADISON, 57 MIDDLE BEACH RD W// PH; 71 KENSETT LN; INSTALL 4/0, 200AMP UG SERVICE AP1-YWO Total Cost Less Than 7K cb//high st @ ridge rd, chester//shift to ATT pole 749 & 750 AP2-YWO Total Cost Variance Met - Variance :28.1567 MIN.:-50 MAX.:150 JS - 3 East St, Danb, Inst\Rem OH Svc (11A76) AP1-YWO Total Cost Less Than 7K Municipal Light Fault Locate and Repair@ POLE 1259 - COMP 8/2 CCC AP1-YWO Total Cost Less Than 7K Jpt-ESO-24 Matthews St Brstl P248 - 9a - Shift 3PH Facilities Rplc 25 Kva AP2-YWO Total Cost Variance Met - Variance :101.535 MIN.:-50 MAX.:150 HARTFORD, NEW BRITAIN AVE REPLACE 250W HPS P-4962 - COMP 6-8-17 CCC AP1-YWO Total Cost Less Than 7K Jpt-298 South St Brstl P2901-S - 9a - Rplc Pole/Span & SW Guy in concrete AP2-YWO Total Cost Variance Met - Variance :68.3096 MIN.:-50 MAX.:150 RSO 8/17 - SALEM, WEST RD - PAD # 142 / NEED TO RETURN FIX PROBLEM AP1-YWO Total Cost Less Than 7K RSO 8/17 - SALEM, WEST RD - PAD # 142 / NEED TO RETURN FIX PROBLEM AP1-YWO Total Cost Less Than 7K Jpt-ESO-5 Paul St Plnv P3110 & P12539 - Rplc Poles Shift 1PH Delta DE Xarm AP2-YWO Total Cost Variance Met - Variance :3.4593 MIN.:-50 MAX.:50 MAIN ST, HARTFORD - REPLACE VACUUM SWITCH MH 731 AP3-YWO Resource Variance Met- Labor 126 <= 32 OR -72.58 <= 30 And Contractor $1577.83 <= 2000 RSO NEW BRITAIN, Biruta St - Replace 50' #2 OH Service @ P53400 AP1-YWO Total Cost Less Than 7K PT Convo #402122-MakeReadyWirelessAttachReimb-Frontier-Parent Convo # 397483 AP1-YWO Total Cost Less Than 7K PT Convo #402122-MakeReadyWirelessAttachReimb-Frontier-Parent Convo # 397483 AP1-YWO Total Cost Less Than 7K PT Convo #402122-MakeReadyWirelessAttachReimb-Frontier-Parent Convo # 397483 AP1-YWO Total Cost Less Than 7K TORRINGTON POLE 3560 150 HPS COBRA COMPLETED 8/3 CHE AP1-YWO Total Cost Less Than 7K CDOT 59-161/CD00610, UG civil work 35L9/35L7, long hill rd, Guilford, stage1 AP2-YWO Total Cost Variance Met - Variance :-35.8544 MIN.:-40 MAX.:40 CDOT 59-161/CD00610, UG civil work 35L9/35L7, long hill rd, Guilford, stage1 AP2-YWO Total Cost Variance Met - Variance :-35.8544 MIN.:-40 MAX.:40 RSO,7/16, WEST HARTFORD, KANE STREET - INS 3 ELBOW ARR P-3173/REBUILT RISER AP2-YWO Total Cost Variance Met - Variance :-6.6382 MIN.:-50 MAX.:50 SM-240 BOSTON POST RD, WTRFRD- RMV OH SVC AND INSTL OH-DB AP1-YWO Total Cost Less Than 7K RL:10 Glenville Rd: Verizon replaced pole 68060 VZ 5 50/2 Car vs pole 9A CL-YWO Variance - Contractor Labor RSO, 8/5, WINDSOR, KENDRICK LANE - REPLACED HH 1596B AP1-YWO Total Cost Less Than 7K Hall Hill Rd.353,Somers, install 25KVA 120' 1/0tpx new40/2 4/0db service AP1-YWO Total Cost Less Than 7K WOOD, 120 WEST LAKE RD, OH SVC CHECK EXISTING DROP TO 2 , SET METER AP1-YWO Total Cost Less Than 7K Torrington--Lincoln Ave. 1114S Repl & relocate stub pole AP1-YWO Total Cost Less Than 7K JDB 54 PORTER HILL RD MIDDLEBURY REPLACE POLE 61480 & SHIFT CONV#449244 AP1-YWO Total Cost Less Than 7K MM REPLACE SERVICE RSO 12/20 NL, BRAEMER PL P 7607 ALL WORK COMPLETE JDB 10 STURGESS COMMONS WSPT POLE 5337 INSTALLED 50KVA/CUTOUT/6-13-2017 AP1-YWO Total Cost Less Than 7K PHD BM/ Pole 1342 Install 600 Amp switches CL-YWO Variance - Contractor Labor RL:59 View St West Electric Service Existing Residl OH Install 3 meters remove 2 AP1-YWO Total Cost Less Than 7K JC/47 RED ROBIN RD NAUG- NEED NEW HH & 4 POS.CONNECTORS AP1-YWO Total Cost Less Than 7K CAL - CD00849-01 - Ckt 21M15 MBI Initiative Design Work, Weston AP1-YWO Total Cost Less Than 7K EIDR0011ETT2013 CB CD00815-01Install line sensor Pole D1455 GreenHollow Rd Plainfield 13B21-F002 AP2-YWO Total Cost Variance Met - Variance :.4642 MIN.:-50 MAX.:50 INSTALL A NEW 60 MVA 115/23 KV XFORMER W 4 FEEDER SWITCHGEAR. Rebuild two OCB's. 32G-19T-2 and 32G-30T-2. Rebuild two OCB's. 32G-19T-2 and 32G-30T-2. SM-249 PALMER NECK RD, STGN- RPLC POLE/, INSTL XFMR/INSTL OH-DB SVC AP2-YWO Total Cost Variance Met - Variance :82.3711 MIN.:-50 MAX.:150 BLOOMFIELD BLUE HILLS AVE POLE 18 - 9A AP2-YWO Total Cost Variance Met - Variance :139.4207 MIN.:-50 MAX.:150 CB//MADISON, 57 MIDDLE BEACH RD W//NEW SVC, SHIFT POLE/WORKS W TEMP RMVL AP1-YWO Total Cost Less Than 7K
  5. Page 12 of 459

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued October 23, 2026 RRU-159 Attachment 6 CONFIDENTIAL Page 12 of 459 work_order_number description 2M621532 Jpt-32 Sandra Ave Plymth P2625 - 9a 2M621532 Jpt-32 Sandra Ave Plymth P2625 - 9a 2M621532 Jpt-32 Sandra Ave Plymth P2625 - 9a 5T721538 6/20 - RSO - ANDOVER, SKINNER HILL 5T721538 6/20 - RSO - ANDOVER, SKINNER HILL 5T721538 6/20 - RSO - ANDOVER, SKINNER HILL 5T721538 6/20 - RSO - ANDOVER, SKINNER HILL 3H720291 HARTFORD, HOMESTEAD AVE C8448 city 3H721262 LGEM0011 LGBK0011 HARTFORD, NEW BRITAIN AVE REPLACED Employment Bankruptcy 2M722833 Jpt-RSO- Park Hill Rd BRI - Rplc'd 4N721805 DSN72049 CT17D033 GCC / RMV EXISTING OVERHEAD SVC AND Enfield 12C - Replace A/C Unit DSN7 Windsor Paging Network Materials 3H621565 WF-51+53+55- Maple Ave-Windsor-@ po 3R720326 CD00471-01 Reconfig. Ovhd Lines in 2M722403 JC/Deerfield Ln Bethany Animal Prot 1S521266 PH; 13 Juniper Rd, Darien Relocate 1S521266 PH; 13 Juniper Rd, Darien Relocate 1S521266 10117224 10117224 10117225 10117225 PH; 13 Juniper Rd, Darien Relocate Sale of Street Lights in East Lyme Sale of Street Lights in East Lyme Sale of Street Lights in Darien Sale of Street Lights in Darien 3H722149 453 Wash St Htfd replace 250w Head 3H722173 XL-CDOT 63-633, electrical work to 3H722173 10117235 10117235 10117236 10117236 XL-CDOT 63-633, electrical work to Sale of Street Lights Old Saybrook Sale of Street Lights Old Saybrook Sale of Street Lights Granby Sale of Street Lights Granby 3H520140 12/16 ESO FOREST ST MANCHESTER CAR 4E621246 PATROL REPAIRS, WINDHAM, 0-100 CIRC 2M722207 DSCCNTRL PSTK0711 LTDB4411 WC-6/19 SOUTHINGTON, CLARK ST - 9A DSCADA CONTROL PROGRAMMING Preferred Stock Long Term Debt2014 Series A 2M722576 UICLASS3 COEX0011 PSTK0511 TOWG1DC1 DM RSO 7/19 CREAMERY RD, DURHAM - B UIL Class III Communication - External Preferred Stock TOWER REPLACEMENT-GOOSE HILL-HADDAM 5T721465 CS00009B DSN72051 6/12 - RSO/AWC - WILLINGTON, HANCOC CEDAR HEIGHTS 4R-PURCH S/S REMOTE R Replace A/C Unit 1S811292 RL;159 Breezy Hill Rd; Elec Svc Exi 1S811292 RL;159 Breezy Hill Rd; Elec Svc Exi 1S811292 RL;159 Breezy Hill Rd; Elec Svc Exi 4N721078 GXC17C36 GXC17C37 GCC / REMOVE CUT-OUTS AND INSTALL A Hilti Rotary Drill (1) 2NR Phase ID Set (4) 2NR GXC17C39 GXC17C43 GXC17C45 GXC17C50 GXC17C51 Mobile Desk (1) Grohs Cutters (3) 2NR Engel Reach Desk Elite (4) 2NP Kennedy Driver, Ground Rod (1) 2AD Grohs Pinpointers w/batt kit (3) 2BB LaHa GXC17C52 Ratcheting MH Lifter 2NP Iacolo 4N720030 RSO/AWC - 1/6 LEDYARD, IRON ST 9A P 4N721063 SM-108 SOMERSETT DR, GRTN-EXST DB S 3R621035 CD00471-04 Conversion Work Install 4D721118 NS- 25 Aspen Dr, Mad- FOLLOW UP WOR 2M720318 DSQ72046 DSQ72046 BRCH0011 EJC Deming St, Newington P#914 Cut& (50): Replace failed 4A-10T-6Switch (50): Replace failed 4A-10T-6Switch Brochures 2M722543 Jpt-RSO- Middle St BRI P6285 - 9a - 1N721071 TRDC0011 DSQ72053 DSQ72053 JDB SPRING HILL AVE,NWLK - 9A HBA R Debt Compliance Fees (50): Replace Failed 30R-4X1-4 Swit (50): Replace Failed 30R-4X1-4 Swit 5T721771 PTEX0011 CTNRS011 Pleasant View Dr. Vernon P1733 repl Local PropTax - CLP Distribution CT Non Res-Program Administration 5D720332 EXLEY RD, POLE # 933, FRONTIER REJE 3H721987 HARTFORD, WALNUT ST - P-CH9493 - IN 3H721988 HARTFORD, SIGOURNEY ST- C7394 - INS 2M723627 Jpt-Lexington Ave Wtby P62509 - Rpl 4D720220 CB//MADISON, 75 NEW RD//SVC UPGRADE 2W620005 PHD Elec Maint Replace/Renewal/Ob 2M723981 BERLCIRC BERLCIRC TAP ON TPX SVC TO NEW PARALLEL OWNE BERLIN CENTRAL SYSTEMS BERLIN CENTRAL SYSTEMS 5D720552 DG P#2493 DOW RD PLAINFIELD FRNTR P 5D720552 DG P#2493 DOW RD PLAINFIELD FRNTR P 5D720552 DG P#2493 DOW RD PLAINFIELD FRNTR P 1B722315 RSO OXFORD, Oakwood Dr - Digu up - 2L720676 DSN72012 DSN72013 GCFL0011 KENT,45 KENT CORNWALL RD//RUN NEW O (50): HVAC system, DSN72012 (50): A/C Unit with Hydrogen sensin Gold Coast - Fleet 4N721068 COMPLETED 6/27 CCC - Fault Locate a 4E520958 DSN72045 DSN72045 RA CDOT 163-203 RT 66, Windham Fencing Fencing 4D721781 PT-2017 Double Poles-Pole# 4149-Old 3R621050 CD00471-10 Conversion Work Install 3R621050 LENMIE11 CD00471-10 Conversion Work Install CA AWO MISC-ALL OTHERS 5T721716 AWC 7/9 EAST WINDSOR OMELIA RD - RE 2M722458 JC/9A, 5/27 266 Jones Rd, Naugatuck 2M722458 MADSN001 20101601 CTIPAD20 JC/9A, 5/27 266 Jones Rd, Naugatuck Madison AWC Site #67 GUILFORD 29F-REPLACE RECLOSER CONTR CT New Apprentices Tablets long_description Jpt-32 Sandra Ave Plymth P2625 - 9a - Shift Open Wire DE Sec. AP1-YWO Total Cost Less Than 7K Jpt-32 Sandra Ave Plymth P2625 - 9a - Shift Open Wire DE Sec. AP1-YWO Total Cost Less Than 7K Jpt-32 Sandra Ave Plymth P2625 - 9a - Shift Open Wire DE Sec. AP1-YWO Total Cost Less Than 7K 6/20 - RSO - ANDOVER, SKINNER HILL RD - REMOVE IDLE 10KVA XFMR P-446 AP1-YWO Total Cost Less Than 7K 6/20 - RSO - ANDOVER, SKINNER HILL RD - REMOVE IDLE 10KVA XFMR P-446 AP1-YWO Total Cost Less Than 7K 6/20 - RSO - ANDOVER, SKINNER HILL RD - REMOVE IDLE 10KVA XFMR P-446 AP1-YWO Total Cost Less Than 7K 6/20 - RSO - ANDOVER, SKINNER HILL RD - REMOVE IDLE 10KVA XFMR P-446 AP1-YWO Total Cost Less Than 7K HARTFORD, HOMESTEAD AVE C8448 city pole replace 250w head AP1-YWO Total Cost Less Than 7K HARTFORD, NEW BRITAIN AVE REPLACED 250W HPS P-5038 - COMP 6/8/17 CCC AP1-YWO Total Cost Less Than 7K LGEM0011NT011 LGBK0011NT011 Jpt-RSO- Park Hill Rd BRI - Rplc'd 4 (Frnt) Poles & 1 Xfrm AP2-YWO Total Cost Variance Met - Variance :104.2948 MIN.:-50 MAX.:150 GCC / RMV EXISTING OVERHEAD SVC AND INSTALL A NEW OVERHEAD SVC AP1-YWO Total Cost Less Than 7K A/C Unit This work order covers equipment needed in Windsor to improve the contention mechanism for holding off paging and RCLMS transmitter controllers. WF-51+53+55- Maple Ave-Windsor-@ pole-864, rpl oh svc to building. CD00471-01 Reconfig. Ovhd Lines in Front of 23U S/S AP2-YWO Total Cost Variance Met - Variance :-17.2137 MIN.:-40 MAX.:40 JC/Deerfield Ln Bethany Animal Protection AP1-YWO Total Cost Less Than 7K PH; 13 Juniper Rd, Darien Relocate OH facilities to UG for customer CL-YWO Variance - Contractor Labor PH; 13 Juniper Rd, Darien Relocate OH facilities to UG for customer CL-YWO Variance - Contractor Labor PH; 13 Juniper Rd, Darien Relocate OH facilities to UG for customer CL-YWO Variance - Contractor Labor Record the sale of street lights to the town of East Lyme Record the sale of street lights to the town of East Lyme Record the sale of street lights to the town of Darien Record the sale of street lights to the town of Darien 453 Wash St Htfd replace 250w Head CH8192 AP1-YWO Total Cost Less Than 7K XL-CDOT 63-633, electrical work to relocate service along Kent St, Hartford JE-YWO Variance Job Type Exclusion XL-CDOT 63-633, electrical work to relocate service along Kent St, Hartford JE-YWO Variance Job Type Exclusion record the sale of street lights to the town of Old Saybrook record the sale of street lights to the town of Old Saybrook record the sale of street lights to the town of Granby record the sale of street lights to the town of Granby 12/16 ESO FOREST ST MANCHESTER CAR VS POLE #2262 / NOT DONE CI-YWO Variance - Contractor Invoice PATROL REPAIRS, WINDHAM, 0-100 CIRCUITS AP2-YWO Total Cost Variance Met - Variance :34.2892 MIN.:-50 MAX.:50 WC-6/19 SOUTHINGTON, CLARK ST - 9A P3900 -REPLCD POLE, ARMS, CUTOUTS AP2-YWO Total Cost Variance Met - Variance :94.7582 MIN.:-50 MAX.:150 Set up the controls in DSCADA enabling the SOC operators to communicate and perform switching, etc. Preferred StockDIST11 Long Term Debt2014 Series A NT011 DM RSO 7/19 CREAMERY RD, DURHAM - BROKEN P 1092 AP1-YWO Total Cost Less Than 7K UIL Class III-Ouimette COEX0011NT011 Preferred StockDIST11 TOWER REPLACEMENT-GOOSE HILL-HADDAM 6/12 - RSO/AWC - WILLINGTON, HANCOCK RD POLE 1044 AP1-YWO Total Cost Less Than 7K PURCHASE 29 CBS ARCSAFE REMOTE RACKING UNITS FOR SUBSTATIONS THAT CURRENTLY DO NOT HAVE A SYSTEM THAT WORKS SAFELY __________________________________________CMK Replace A/C Unit RL;159 Breezy Hill Rd; Elec Svc Existing Residential DESG (DN) AP1-YWO Total Cost Less Than 7K RL;159 Breezy Hill Rd; Elec Svc Existing Residential DESG (DN) AP1-YWO Total Cost Less Than 7K RL;159 Breezy Hill Rd; Elec Svc Existing Residential DESG (DN) AP1-YWO Total Cost Less Than 7K GCC / REMOVE CUT-OUTS AND INSTALL A NEW CUT-OUTS AP2-YWO Total Cost Variance Met - Variance :-15.0233 MIN.:-50 MAX.:50 2NR - Hilti Rotary Drill (1) s/c 0441221 TOTAL: $889 Leonard 2NR - Phase ID Set S/C 194723 @ 1875ea TOTAL: $7500 Leonard ReachDeskSuper-03 Printer Elite for supervisor vehicle. $500 (GROHS) 2NR - 3 cutters stock code 500655 ( $ 2.758ea ) TOTAL: $5355 - ENGEL 2NP - (4) The Reach Desk Elite w/ Inverter, Printer Stand and X-grip Phone Mount - $500ea TOTAL: $2,000 2AD - DRIVER, GROUND ROD, Gasoline Powered, 2” Barrel, Honda engine. 2” Bottom Assembly, with Striker, S/C 545041 - $ 1591.25 2BB - Pin Pointers w/battery kit (3) (Locator, Fault, Secondary Cable, DB, (Pinpointer)) s/c 571914 $1796/510195 $266 TOTAL: $6186 2NP - (2) XTIRPA ratcheting manhole cover lifter - 1500 ea TOTAL: $3000.00 RSO/AWC - 1/6 LEDYARD, IRON ST 9A P1247 LEMIEUX/LEARNED/BONGO/ DOWLING AP1-YWO Total Cost Less Than 7K SM-108 SOMERSETT DR, GRTN-EXST DB SVC TO BE ABNDND/ CUST INSTL NEW PIPE 4/0 DB AP1-YWO Total Cost Less Than 7K CD00471-04 Conversion Work Install Open Point P#41 Rte.49 North AP1-YWO Total Cost Less Than 7K NS- 25 Aspen Dr, Mad- FOLLOW UP WORK- RPLC BROKEN DB STREETLIGHT AP1-YWO Total Cost Less Than 7K EJC Deming St, Newington P#914 Cut&Kick, Shift Facilities AP1-YWO Total Cost Less Than 7K Newington 4A - Replace the failed 4A-10T-6 disconnect switch. Newington 4A - Replace the failed 4A-10T-6 disconnect switch. BRCH0011NT011 Jpt-RSO- Middle St BRI P6285 - 9a - Replaced pole Shifted 3PH Tan & 3PH Tap CI-YWO Variance - Contractor Invoice JDB SPRING HILL AVE,NWLK - 9A HBA REPL POLE#26 07/19/17 AP3-YWO Resource Variance Met- Labor 23 <= 32 OR 37.03 <= 30 And Contractor $0 <= 2000 Debt Compliance Fees Green Hill 30R - Replace the failed 30R-4X1-4 MOD switch for mobile transformer position Green Hill 30R - Replace the failed 30R-4X1-4 MOD switch for mobile transformer position Pleasant View Dr. Vernon P1733 replace rotten cross arm AP1-YWO Total Cost Less Than 7K Local PropTax - CLP Distribution CT Non Res-Program Administration-Augelli EXLEY RD, POLE # 933, FRONTIER REJECT, SET NEW 40'/2, POLE SHIFT AP1-YWO Total Cost Less Than 7K HARTFORD, WALNUT ST - P-CH9493 - INSTALL 250W HPS COBRA AND RECONNECT UG FEED AP1-YWO Total Cost Less Than 7K HARTFORD, SIGOURNEY ST- C7394 - INSTALL 400W HPS COBRA CONNECT UG FEED AP1-YWO Total Cost Less Than 7K Jpt-Lexington Ave Wtby P62509 - Rplc'd Pole - PER KEN GROHS - XFMR WAS NOT REPL CI-YWO Variance - Contractor Invoice CB//MADISON, 75 NEW RD//SVC UPGRADE 200A/RPL SVC W #2TPX IF ITS #4TPX AP1-YWO Total Cost Less Than 7K PHD Elec Maint Replace/Renewal/Obsol OH DESG (AROH) AP1-YWO Total Cost Less Than 7K TAP ON TPX SVC TO NEW PARALLEL OWNERS SERVICE RISER, MTR SET REQ'D AP1-YWO Total Cost Less Than 7K CT VOICE RADIO SYSTEM PROJECT - BERLIN WAN CIRCUITS CT VOICE RADIO SYSTEM PROJECT - BERLIN WAN CIRCUITS DG P#2493 DOW RD PLAINFIELD FRNTR POLE RPLC CLP TO SHIFT AP1-YWO Total Cost Less Than 7K DG P#2493 DOW RD PLAINFIELD FRNTR POLE RPLC CLP TO SHIFT AP1-YWO Total Cost Less Than 7K DG P#2493 DOW RD PLAINFIELD FRNTR POLE RPLC CLP TO SHIFT AP1-YWO Total Cost Less Than 7K RSO OXFORD, Oakwood Dr - Digu up - damage done by S+S paving (see T/T) AP1-YWO Total Cost Less Than 7K KENT,45 KENT CORNWALL RD//RUN NEW OH/DB SVC TO BARN FROMP#15464 ON GREENWOOD LN AP1-YWO Total Cost Less Than 7K Fry Brook 13B - Install an air conditioning unit Tunnel 12S - Install an air condiitoning unit Gold Coast Payments - Fleet COMPLETED 6/27 CCC - Fault Locate and Repair@ POLE 2986 NO POWER UG AP1-YWO Total Cost Less Than 7K RA CDOT 163-203 RT 66, Windham - 100% reimburse for TT & access road JE-YWO Variance Job Type Exclusion Enfield 12C - REplace the deteriorated fence Enfield 12C - REplace the deteriorated fence PT-2017 Double Poles-Pole# 4149-Old Quarry Rd, Guilford CT-Conv# 362600 AP1-YWO Total Cost Less Than 7K CD00471-10 Conversion Work Install Step Down XF Bennett Rd AP2-YWO Total Cost Variance Met - Variance :-26.4673 MIN.:-40 MAX.:40 CD00471-10 Conversion Work Install Step Down XF Bennett Rd AP2-YWO Total Cost Variance Met - Variance :-26.4673 MIN.:-40 MAX.:40 CA AWO MISC-ALL OTHERS AWC 7/9 EAST WINDSOR OMELIA RD - REPLACED 3 CUTOUTS P-1792 EW-YWO Variance - Emergent Work JC/9A, 5/27 266 Jones Rd, Naugatuck - car vs. pole 6001 AP1-YWO Total Cost Less Than 7K JC/9A, 5/27 266 Jones Rd, Naugatuck - car vs. pole 6001 AP1-YWO Total Cost Less Than 7K Madison AWC Site #67-Rose PROPOSED REPLACEMENT OF 4 COOPER RECLOSERS WITH SIEMENS FOR GUILFORD 29F1-2, GUILFORD 29F2-2, MEADOW 28J1-2 AND MEADOW 28J2-2 ______________________________________JEL This work order is to purchase 30 new ipads for CT new apprentices for an estimated amount of $36,682.5. cost_element_group ferc_account percent Fees + Payment - FP0 107010 0.10597 Fees + Payment - FP0 593000 0.85935 Fees + Payment - FP0 108030 0.03468 Fees + Payment - FP0 583000 0.4698 Fees + Payment - FP0 107010 0.15166 Fees + Payment - FP0 595000 0.06101 Fees + Payment - FP0 108030 0.31753 Fees + Payment - FP0 107010 1 Fees + Payment - FP0 Fees + Payment - FP0 Fees + Payment - FP0 107010 923000 923000 1 1 1 Fees + Payment - FP0 107010 1 Fees + Payment - FP0 Fees + Payment - FP0 Fees + Payment - FP0 107010 107010 107010 1 1 1 Fees + Payment - FP0 107010 1 Fees + Payment - FP0 107010 1 Fees + Payment - FP0 107010 1 Fees + Payment - FP0 595000 0.00604 Fees + Payment - FP0 593000 0.00251 Fees + Payment - FP0 Fees + Payment - FP0 Fees + Payment - FP0 Fees + Payment - FP0 Fees + Payment - FP0 107010 108040 108030 108040 108030 0.99145 0.00497512 0.99502488 0.00497512 0.99502488 Fees + Payment - FP0 107010 1 Fees + Payment - FP0 107010 0.99841 Fees + Payment - FP0 Fees + Payment - FP0 Fees + Payment - FP0 Fees + Payment - FP0 Fees + Payment - FP0 594000 108040 108030 108040 108030 0.00159 0.00990099 0.99009901 0.00990099 0.99009901 Fees + Payment - FP0 107010 1 Fees + Payment - FP0 107010 1 Fees + Payment - FP0 Fees + Payment - FP0 Fees + Payment - FP0 Fees + Payment - FP0 107010 107010 238140 237TB0 1 1 1 1 Fees + Payment - FP0 Fees + Payment - FP0 Fees + Payment - FP0 Fees + Payment - FP0 Fees + Payment - FP0 107010 254540 923021 238130 107010 1 1 1 1 1 Fees + Payment - FP0 Fees + Payment - FP0 Fees + Payment - FP0 107010 107010 107010 1 1 1 Fees + Payment - FP0 107010 0.125 Fees + Payment - FP0 594000 0.8138 Fees + Payment - FP0 108030 0.0612 Fees + Payment - FP0 Fees + Payment - FP0 Fees + Payment - FP0 107010 107010 107010 1 1 1 Fees + Payment - FP0 Fees + Payment - FP0 Fees + Payment - FP0 Fees + Payment - FP0 Fees + Payment - FP0 107010 107010 107010 107010 107010 1 1 1 1 1 Fees + Payment - FP0 107010 1 Fees + Payment - FP0 107010 1 Fees + Payment - FP0 107010 1 Fees + Payment - FP0 107010 1 Fees + Payment - FP0 107010 1 Fees + Payment - FP0 Fees + Payment - FP0 Fees + Payment - FP0 Fees + Payment - FP0 107010 107010 108030 930101 1 0.8 0.2 1 Fees + Payment - FP0 107010 1 Fees + Payment - FP0 Fees + Payment - FP0 Fees + Payment - FP0 Fees + Payment - FP0 107010 930200 108030 107010 1 1 0.12094441 0.87905559 Fees + Payment - FP0 Fees + Payment - FP0 Fees + Payment - FP0 107010 408110 923000 1 1 1 Fees + Payment - FP0 107010 1 Fees + Payment - FP0 107010 1 Fees + Payment - FP0 107010 1 Fees + Payment - FP0 107010 1 Fees + Payment - FP0 107010 1 Fees + Payment - FP0 107010 1 Fees + Payment - FP0 Fees + Payment - FP0 Fees + Payment - FP0 107010 108030 107010 1 0.0053988 0.9946012 Fees + Payment - FP0 107010 0.1658 Fees + Payment - FP0 593000 0.71503 Fees + Payment - FP0 108030 0.11917 Fees + Payment - FP0 107010 1 Fees + Payment - FP0 Fees + Payment - FP0 Fees + Payment - FP0 Fees + Payment - FP0 107010 107010 107010 184010 1 1 1 1 Fees + Payment - FP0 107010 1 Fees + Payment - FP0 Fees + Payment - FP0 Fees + Payment - FP0 593000 107010 108030 1 0.79514401 0.20485599 Fees + Payment - FP0 108030 1 Fees + Payment - FP0 594000 0.01084 Fees + Payment - FP0 Fees + Payment - FP0 107010 921990 0.98916 1 Fees + Payment - FP0 107010 1 Fees + Payment - FP0 107010 0.19998 Fees + Payment - FP0 Fees + Payment - FP0 Fees + Payment - FP0 Fees + Payment - FP0 593000 228450 107010 107010 0.80002 1 1 1 Fees + Payment - FP0 107010 1 Fees + Payment - FP0 107010 1 Fees + Payment - FP0 593000 1 Fees + Payment - FP0 107010 1 Fees + Payment - FP0 107010 0.26394 Fees + Payment - FP0 593000 0.73212 Fees + Payment - FP0 595000 0.00394 Fees + Payment - FP0 107010 1 Fees + Payment - FP0 107010 1 Fees + Payment - FP0 107010 1 Fees + Payment - FP0 107010 1 Fees + Payment - FP0 594000 0.33086 Fees + Payment - FP0 107010 0.66914 Fees + Payment - FP0 107010 1 Fees + Payment - FP0 107010 1 Fees + Payment - FP0 107010 1 Fees + Payment - FP0 107010 1 Fees + Payment - FP0 595000 0.00555 Fees + Payment - FP0 107010 0.99445 Fees + Payment - FP0 583000 0.17999 Fees + Payment - FP0 593000 0.09599 Fees + Payment - FP0 107010 0.72402 Fees + Payment - FP0 Fees + Payment - FP0 Fees + Payment - FP0 107010 107010 431110 1 1 1 This work order is to purchase 56 new ipads for the 2021 CT new apprentices. Per Jonathan Bradley's email dated 3/17/2021 requesting the purchase of 56 ipad at $1,250.00 per tablet for a total amount of $70,000.00. CTIPAD21 CT New Apprentices Tablets 5T721752 RSO, 7/15, ENFIELD, ELM STREET, POL 2M722664 JC/RSO 7/22 NAUGATUCK, NEW HAVEN RD 5T720693 JV COVENTRY, SOUTH ST - SHIFT FRONT 3R620648 BC- CD00746-03 Inst 333kVA Step Xfm 3R620648 BC- CD00746-03 Inst 333kVA Step Xfm 3R620648 BC- CD00746-03 Inst 333kVA Step Xfm 1B620261 44 KENOSIA AVE Elec Maint Trouble C 3H622162 HARTFORD, LYME/ BURNHAM STREET 6373 1S722546 RL: 20 Edgar Rd:Replace #1 AL prim 3H721859 42 Grassmere Ave., W. Htfd - Instal 1B720430 BLITZ, NM, OLD PARK LN, POLE #10, E 1B720430 BLITZ, NM, OLD PARK LN, POLE #10, E 2M722408 WC 7/6 SOUTHINGTON, MINE HOLLOW RD/ LIDAREVL LIDAR & ALT TECHNOLOGY 1N721713 RSO; 11/24; BAYBERRY LN WSPT; REFER 1N621689 JDB 18 OX YOKE LN NWLK P9366 EXTEND 4N720196 GCC / EVERS/INSTALL NEW POLE/PRI RI 4N720196 GCC / EVERS/INSTALL NEW POLE/PRI RI 4N620638 PD-Tillley/Green/Pearl NLD/Parking 4N620638 PD-Tillley/Green/Pearl NLD/Parking 4N620638 PD-Tillley/Green/Pearl NLD/Parking 5T720674 CT17D013 UNCLOC11 Alice Dr, Coventry. Shift Frontier Berlin South Penthouse SiteBoss Ins Unc. Line of Credit Expenses Per LIsa's email dated 4/2/2021, requesting to increase the number of iPad for CT to 60 at $1,250/iPad. RSO, 7/15, ENFIELD, ELM STREET, POLE 2139, REFER TO AWC TO RPLC 9A AP2-YWO Total Cost Variance Met - Variance :35.4939 MIN.:-50 MAX.:150 JC/RSO 7/22 NAUGATUCK, NEW HAVEN RD- 9A P3602 - BROKEN POLE AP1-YWO Total Cost Less Than 7K JV COVENTRY, SOUTH ST - SHIFT FRONTIER POLES 391, 392 AND 393 AP1-YWO Total Cost Less Than 7K BC- CD00746-03 Inst 333kVA Step Xfmr Bnk pole 996, Shore Rd CL-YWO Variance - Contractor Labor BC- CD00746-03 Inst 333kVA Step Xfmr Bnk pole 996, Shore Rd CL-YWO Variance - Contractor Labor BC- CD00746-03 Inst 333kVA Step Xfmr Bnk pole 996, Shore Rd CL-YWO Variance - Contractor Labor 44 KENOSIA AVE Elec Maint Trouble Call - Repairs/Obsolescence OH PR2/17/16 AP1-YWO Total Cost Less Than 7K HARTFORD, LYME/ BURNHAM STREET 6373 AP1-YWO Total Cost Less Than 7K RL: 20 Edgar Rd:Replace #1 AL primary, cutout & arrester already replaced AP2-YWO Total Cost Variance Met - Variance :-34.5233 MIN.:-50 MAX.:50 42 Grassmere Ave., W. Htfd - Install new OH/DB svc (single-phase, 120/208) AP1-YWO Total Cost Less Than 7K BLITZ, NM, OLD PARK LN, POLE #10, ES SHIFT TEL HAS SET, DBL POLE AP1-YWO Total Cost Less Than 7K BLITZ, NM, OLD PARK LN, POLE #10, ES SHIFT TEL HAS SET, DBL POLE AP1-YWO Total Cost Less Than 7K WC 7/6 SOUTHINGTON, MINE HOLLOW RD/LONG BOTTOM - 9A P93393 AP1-YWO Total Cost Less Than 7K UCONN 2ND AMENDED AND RESTATED RESEARCH PROJECT(S) MONITORS ROADSIDE VEGETATION AND UTILITY INFRASTRUCTURE. ASSET - POLE STRUCTURE INTEGRITY MODEL RSO; 11/24; BAYBERRY LN WSPT; REFER TO AWC TO REPL #2 SVC AP1-YWO Total Cost Less Than 7K JDB 18 OX YOKE LN NWLK P9366 EXTEND PRI INS 50KVA & OH/DB SVC DESG (DN) AP2-YWO Total Cost Variance Met - Variance :-19.5236 MIN.:-40 MAX.:40 GCC / EVERS/INSTALL NEW POLE/PRI RISER TO PAD MTD XFMR NL-YWO Variance - NU Construction Labor GCC / EVERS/INSTALL NEW POLE/PRI RISER TO PAD MTD XFMR NL-YWO Variance - NU Construction Labor PD-Tillley/Green/Pearl NLD/Parking lot overhead service refeeds NL-YWO Variance - NU Construction Labor PD-Tillley/Green/Pearl NLD/Parking lot overhead service refeeds NL-YWO Variance - NU Construction Labor PD-Tillley/Green/Pearl NLD/Parking lot overhead service refeeds NL-YWO Variance - NU Construction Labor Alice Dr, Coventry. Shift Frontier pole sets, Replace open wire sec and XFR'S AP2-YWO Total Cost Variance Met - Variance :-24.9807 MIN.:-50 MAX.:50 Install a SiteBoss alarm panel and remove the old Badger E500 alarm panel. Unc. Line of Credit Expenses-Savage
  6. Page 13 of 459

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued October 23, 2026 RRU-159 Attachment 6 CONFIDENTIAL Page 13 of 459 work_order_number description 2C720081 EHAMP001 rmv tree guy ins stub pole 1172 col E Hampton AWC #66 2L720778 BETHLEHEM,384 MAIN ST. N.//Elec Svc 4D621442 PATROL REPAIRS, 11J45 - BRANFORD 1S721524 DL; RIVERBANK RD; REPLACE/RELOCATE 2L620133 Burlington, Milford St - AWC/ 2/5/ 3H721986 HARTFORD, ANN ST-C6661 - INSTALL 25 2M722399 WC 7/5 SOUTHINGTON, CAMPGROUND RD - 2M722436 RSO/AWC 7/10 CHESHIRE, W JOHNSON AV 4N621240 MM SMART SWITCH REPROGRAM RECLOSER 4N621240 MM SMART SWITCH REPROGRAM RECLOSER 4E720513 MS17M011 UCONN219 RSO 4/9/17 Jurczyk, Franklin - rep WIND/RAIN OCT 29-30 ALL DIV SS SECURITY 40% DISTRIBUTION 5D720575 RGST0611 LTDB2211 RSO, 5/5, STARKWEATHER ROAD, 9A GN Regulatory Assessments-Retail Trans Long Term Debt2007 Series C 1B722785 BR 38 Twin Oaks Beacon Falls New Re 1B722786 BR 76 Fieldstone Ln Beacon Falls Ne 4E721442 CD252007 5 CHILDS RD E HMPTN AT P-2674 INSTA CL&P 900 MHZ Greenwich 4E721958 MN 31, LOT 16 BARBERS WAY HEBRON A 3R720020 CAL - CD00849-01 - Ckt 21M1 MBI Ini 3R720020 MBLD2011 MBLD2011 MBLD2011 CAL - CD00849-01 - Ckt 21M1 MBI Ini Maintain Buildings Maintain Buildings Maintain Buildings 1S721655 DM/7 INDIAN HEAD RD RIVERSIDE: INST 2M721096 79-229, Route 71 Meriden, W Main St 1N721146 CT17D040 CS000094 JES; 269 MILLSTONE RD. WILTON.; REL Colorado Trucks Lowband Radios BLACK ROCK 11H-PURCH S/S REMOTE RAC 3L722822 LEDYARD POLE 6045 250 HPS COBRA COM 5D621134 BC - CD00450-08 - Re-cond, Inst/Rmv 3R621018 CD00471-01Elim. 23U Voluntown S/S C 3H721776 7/9 - HARAWC - WINDSOR, PARK RD - E 3H722155 JWL @ 877-879 CAPITOL AVE replace 3H722156 8/18 - RSO/HAROH - EAST HARTFORD, 5T721250 5/16 RSO & ESO PUCKER ST,COVENTRY 9 3H721937 AWC 7/24 MANCHESTER HARTFORD RD 9A 4D721830 COMP 12/30 CCC-Municipal Light Faul 4D721830 COMP 12/30 CCC-Municipal Light Faul 5D720743 RSO 6/2 GRISWOLD, BITGOOD RD- 9A P1 4N721464 PD-44 Indianola Rd Niantic/Replace 3H720698 WETHERSFIELD, BERLIN TPKE, 9A REPLA 3H721728 RSO/AWC, 7/3, WEST HARTFORD, CONCOR 1N621292 ASEE0011 JES; WILLARD RD. NWLK.; IR INSP. AS&E 4N721497 GCC / REMOVE AND INSTALL OVERHEAD S long_description rmv tree guy ins stub pole 1172 college hill rd AP1-YWO Total Cost Less Than 7K E Hampton AWC #66-Rose BETHLEHEM,384 MAIN ST. N.//Elec Svc New Com/Ind IT Meter//FAIRGROUNDS// AP1-YWO Total Cost Less Than 7K PATROL REPAIRS, 11J45 - BRANFORD AP2-YWO Total Cost Variance Met - Variance :11.1984 MIN.:-20 MAX.:20 DL; RIVERBANK RD; REPLACE/RELOCATE 2 POLES FOR STAMFORD BRIDGE CL-YWO Variance - Contractor Labor Burlington, Milford St - AWC/ 2/5/ (9A) AP2-YWO Total Cost Variance Met - Variance :59.231 MIN.:-50 MAX.:150 HARTFORD, ANN ST-C6661 - INSTALL 250W HPS AND RECONNECT UG FEED AP1-YWO Total Cost Less Than 7K WC 7/5 SOUTHINGTON, CAMPGROUND RD - REPLACED 50 KVA XFMR / cutout / tbracket AP1-YWO Total Cost Less Than 7K RSO/AWC 7/10 CHESHIRE, W JOHNSON AVE - RECONDUCTERING 250' CONDUIT/CABLE CI-YWO Variance - Contractor Invoice MM SMART SWITCH REPROGRAM RECLOSER POLE 916 JEROME FROM RADIAL TO SECT 1Q01 AP2-YWO Total Cost Variance Met - Variance :42.4481 MIN.:-50 MAX.:50 MM SMART SWITCH REPROGRAM RECLOSER POLE 916 JEROME FROM RADIAL TO SECT 1Q01 AP2-YWO Total Cost Variance Met - Variance :42.4481 MIN.:-50 MAX.:50 RSO 4/9/17 Jurczyk, Franklin - replaced arrestors @ 383 & 385, replace OH xfrm AP1-YWO Total Cost Less Than 7K WIND/RAIN OCT 29-30 ALL DIV UCONN PROFESSER ON SEBATICAL TO ASSIST EVERSOURCE WITH RESEARCH AND DEVELOPMENT OF SOFTWARE THAT WILL ASSIST WITH CYBER SECURITY FOR EQUIPMENT ON EE SYSTEM. BEGINS SEPT THROUGH YEAR END. RSO, 5/5, STARKWEATHER ROAD, 9A GNESDA, POLE 430, HBV, SHIFT TO NEW POLE AP1-YWO Total Cost Less Than 7K Regulatory Assessments-Retail Transmission-Caron Long Term Debt2007 Series C BR 38 Twin Oaks Beacon Falls New Residential Underground AP1-YWO Total Cost Less Than 7K BR 76 Fieldstone Ln Beacon Falls New Residential Underground AP1-YWO Total Cost Less Than 7K 5 CHILDS RD E HMPTN AT P-2674 INSTALL OH SVC TO GAS CO POLE, UNMETERED ANTENNA AP1-YWO Total Cost Less Than 7K CL&P 900 MHZ RADIO PROJECT-Greenwich EQUIP CONTACT: P.SCHUBERTH MN 31, LOT 16 BARBERS WAY HEBRON AT HH-417-B INSTALL DB SVC & 200A MTR AP1-YWO Total Cost Less Than 7K CAL - CD00849-01 - Ckt 21M1 MBI Initiative Design Work, Westport CL-YWO Variance - Contractor Labor CAL - CD00849-01 - Ckt 21M1 MBI Initiative Design Work, Westport CL-YWO Variance - Contractor Labor Maintain Buildings-Rose Maintain Buildings-Rose Maintain Buildings-Rose DM/7 INDIAN HEAD RD RIVERSIDE: INST 3" SVC RISER, 350MCM DB SVC, 400AMP AP1-YWO Total Cost Less Than 7K 79-229, Route 71 Meriden, W Main St - Rebuild SB254 to MH & Test Pit JE-YWO Variance Job Type Exclusion JES; 269 MILLSTONE RD. WILTON.; RELOCATE OH SVC. POLE 21268... AP1-YWO Total Cost Less Than 7K A request has come in to order 25 mobile radios for a new wave of Colorado Pickup trucks transportation ordered. PURCHASE 29 CBS ARCSAFE REMOTE RACKING UNITS FOR SUBSTATIONS THAT CURRENTLY DO NOT HAVE A SYSTEM THAT WORKS SAFELY __________________________________________CMK LEDYARD POLE 6045 250 HPS COBRA COMPLETED 10/24 EHA AP1-YWO Total Cost Less Than 7K BC - CD00450-08 - Re-cond, Inst/Rmv River/RR Xing Structures, Town of Preston CL-YWO Variance - Contractor Labor CD00471-01Elim. 23U Voluntown S/S Conversion Work #3 CI-YWO Variance - Contractor Invoice 7/9 - HARAWC - WINDSOR, PARK RD - EVERSOURCE POLE 156 AP2-YWO Total Cost Variance Met - Variance :69.5323 MIN.:-50 MAX.:150 JWL @ 877-879 CAPITOL AVE replace svc from sb3177. AP1-YWO Total Cost Less Than 7K 8/18 - RSO/HAROH - EAST HARTFORD, SEDGEWICK RD, P2646, 9A AP2-YWO Total Cost Variance Met - Variance :73.2456 MIN.:-50 MAX.:150 5/16 RSO & ESO PUCKER ST,COVENTRY 9A EW-YWO Variance - Emergent Work AWC 7/24 MANCHESTER HARTFORD RD 9A - REPLACED QUAD SERVICE FROM P-4700 AP1-YWO Total Cost Less Than 7K COMP 12/30 CCC-Municipal Light Fault Locate and Repair@ POLE 93 NO VOLTAGE AP1-YWO Total Cost Less Than 7K COMP 12/30 CCC-Municipal Light Fault Locate and Repair@ POLE 93 NO VOLTAGE AP1-YWO Total Cost Less Than 7K RSO 6/2 GRISWOLD, BITGOOD RD- 9A P1789 - WEBB/GEMBEL/CIVARDI , NOT COMP AP2-YWO Total Cost Variance Met - Variance :85.6143 MIN.:-50 MAX.:150 PD-44 Indianola Rd Niantic/Replace OH svc drop AP1-YWO Total Cost Less Than 7K WETHERSFIELD, BERLIN TPKE, 9A REPLACE P1738 45/2 AP2-YWO Total Cost Variance Met - Variance :-47.6215 MIN.:-50 MAX.:50 RSO/AWC, 7/3, WEST HARTFORD, CONCORD STREET REPLACED 150' SEC WITH 4/0 AP1-YWO Total Cost Less Than 7K JES; WILLARD RD. NWLK.; IR INSP. - Minor DESG (IFOH) - POLE 13273 AP1-YWO Total Cost Less Than 7K ASEE0011ALLOCCLEARING11 GCC / REMOVE AND INSTALL OVERHEAD SERVICE TO HOME AP1-YWO Total Cost Less Than 7K cost_element_group ferc_account percent Fees + Payment - FP0 Fees + Payment - FP0 107010 228450 1 1 Fees + Payment - FP0 107010 1 Fees + Payment - FP0 107010 1 Fees + Payment - FP0 107010 1 Fees + Payment - FP0 107010 1 Fees + Payment - FP0 107010 1 Fees + Payment - FP0 107010 1 Fees + Payment - FP0 107010 1 Fees + Payment - FP0 594000 0.00308 Fees + Payment - FP0 107010 0.99692 Fees + Payment - FP0 Fees + Payment - FP0 Fees + Payment - FP0 107010 593140 107010 1 1 1 Fees + Payment - FP0 Fees + Payment - FP0 Fees + Payment - FP0 107010 928000 2371B0 1 1 1 Fees + Payment - FP0 107010 1 Fees + Payment - FP0 107010 1 Fees + Payment - FP0 Fees + Payment - FP0 107010 107010 1 1 Fees + Payment - FP0 107010 1 Fees + Payment - FP0 107010 0.9522 Fees + Payment - FP0 Fees + Payment - FP0 Fees + Payment - FP0 Fees + Payment - FP0 593000 163020 921000 184010 0.0478 0.2 0.62 0.18 Fees + Payment - FP0 107010 1 Fees + Payment - FP0 108030 1 Fees + Payment - FP0 Fees + Payment - FP0 Fees + Payment - FP0 107010 107010 107010 1 1 1 Fees + Payment - FP0 107010 1 Fees + Payment - FP0 107010 1 Fees + Payment - FP0 107010 1 Fees + Payment - FP0 107010 1 Fees + Payment - FP0 107010 1 Fees + Payment - FP0 107010 1 Fees + Payment - FP0 107010 1 Fees + Payment - FP0 107010 1 Fees + Payment - FP0 596000 0.01735 Fees + Payment - FP0 107010 0.98265 Fees + Payment - FP0 107010 1 Fees + Payment - FP0 107010 1 Fees + Payment - FP0 107010 1 Fees + Payment - FP0 107010 1 Fees + Payment - FP0 Fees + Payment - FP0 107010 107010 1 1 Fees + Payment - FP0 107010 1 Fees + Payment - FP0 107010 1 Fees + Payment - FP0 107010 0.95068 Fees + Payment - FP0 593000 0.04932 Fees + Payment - FP0 107010 1 Fees + Payment - FP0 594000 0.6581 Fees + Payment - FP0 107010 0.3419 Fees + Payment - FP0 107010 1 Fees + Payment - FP0 593000 0.41245 Fees + Payment - FP0 108030 0.19996 Fees + Payment - FP0 Fees + Payment - FP0 Fees + Payment - FP0 107010 108030 107010 0.38759 0.09090909 0.90909091 Fees + Payment - FP0 594000 0.21819 Fees + Payment - FP0 107010 0.78181 Fees + Payment - FP0 107010 1 Fees + Payment - FP0 Fees + Payment - FP0 107010 186010 1 1 Fees + Payment - FP0 107010 1 Fees + Payment - FP0 107010 1 Fees + Payment - FP0 107010 1 Fees + Payment - FP0 107010 1 Fees + Payment - FP0 107010 1 Fees + Payment - FP0 107010 1 Fees + Payment - FP0 107010 1 Fees + Payment - FP0 107010 1 Fees + Payment - FP0 107010 1 Fees + Payment - FP0 107010 1 Fees + Payment - FP0 107010 0.99744 Fees + Payment - FP0 594000 0.00256 Fees + Payment - FP0 107010 1 Fees + Payment - FP0 107010 1 Fees + Payment - FP0 107010 1 Fees + Payment - FP0 107010 1 Fees + Payment - FP0 107010 1 Fees + Payment - FP0 594000 0.20216 Fees + Payment - FP0 107010 0.79784 Fees + Payment - FP0 107010 1 Fees + Payment - FP0 107010 0.9356 Fees + Payment - FP0 593000 0.0644 Fees + Payment - FP0 Fees + Payment - FP0 Fees + Payment - FP0 Fees + Payment - FP0 Fees + Payment - FP0 107010 107010 93111X 228450 107010 1 1 1 1 1 Fees + Payment - FP0 107010 1 Fees + Payment - FP0 107010 1 Fees + Payment - FP0 107010 0.97431 Fees + Payment - FP0 594000 0.02569 Fees + Payment - FP0 107010 1 Fees + Payment - FP0 Fees + Payment - FP0 Fees + Payment - FP0 107010 107010 107010 1 1 1 Fees + Payment - FP0 Fees + Payment - FP0 Fees + Payment - FP0 Fees + Payment - FP0 107010 107010 928000 555000 1 1 1 1 Fees + Payment - FP0 Fees + Payment - FP0 107010 107010 1 1 Fees + Payment - FP0 107010 1 Fees + Payment - FP0 593000 0.00511 Fees + Payment - FP0 107010 0.98057 Fees + Payment - FP0 594000 0.01432 Fees + Payment - FP0 107010 1 Fees + Payment - FP0 107010 0.63595 Fees + Payment - FP0 593000 0.36405 Fees + Payment - FP0 107010 1 Fees + Payment - FP0 107010 1 Fees + Payment - FP0 107010 1 Fees + Payment - FP0 107010 1 Fees + Payment - FP0 107010 1 This rubber blanket cart will be in the Berlin dielectric lab to maneuver rubber blankets around the lab. CTCART25 Blanket Cart for CT Dielectric Lab 3H721029 EJL - 270 Wetherell St.Manch.Reloca 3H721029 EJL - 270 Wetherell St.Manch.Reloca 2M622924 Waterbury Rd Prospect 9A - (POST CO 3H721751 7/5 - AWC - WETHERSFIELD, OLD PEPPE 3H721751 7/5 - AWC - WETHERSFIELD, OLD PEPPE 4E720228 (CH) HH#313A: NEED TO CHG COVER_HH# 5T621064 Shenipsit Lake Rd, Tolland. BBA P-3 5T621064 Shenipsit Lake Rd, Tolland. BBA P-3 5T621064 DNLTW1DC DNLTW1DC Shenipsit Lake Rd, Tolland. BBA P-3 DANIELSON TOWER REPLACEMENT DANIELSON TOWER REPLACEMENT 4N621217 ESO 9A - 08/15/16 GREEN HAVEN STONI 4N621217 ESO 9A - 08/15/16 GREEN HAVEN STONI 4D721230 cb//branford, farm river rd//rpl li 1S721343 PW1N0011 DM/DAVIS & LE GRANDE AVE GRN: P.679 Private Work 3H723179 12/2 - RSO - HARTFORD, ELLIOT ST - 5D720811 DG P#2456 1 BEATTIE AVE THOMPSON FR 4D720334 NS- Maple Ave, OS- Mittigate Outage 1B720145 CDOT 34-313 Danbury - CIS#2 - relo 1S721069 PH; 51 LENOX AVE; Replace OH Servic 2C720133 ins new db svc to beckley furnace l 2M722088 Municipal Light Fault Locate and Re 2M721945 ESO/AWC 5/26 WATERBURY, MERIDEN RD 1S720200 DM/461 STANWICH RD GREENWICH: CAR V 2M622249 EJC 718 West Main St, Waterbury P#1 1N621850 RM -CD00667, Recloser @ P-4977 Knap 1N621850 RM -CD00667, Recloser @ P-4977 Knap 4E721884 MN 426 CABIN RD COLCH AT P-2297 RE 4N621769 MM ALL WORK COMPLETE GORTON ST,POLE 1G520706 DM/6 Grove ST COS COB: PRIORITY DE 2M722933 DM/ESO 9A 6/10/17 - CHESHIRE - P#85 4E720266 (CH) HH#204A: CHG HDP TO POLYCRETE_ 2M721636 Jpt-Terryville Ave BRI (Frnt)P6309 2M721636 Jpt-Terryville Ave BRI (Frnt)P6309 1B721855 36 HAYES LN relocate to mid-span E 2M720867 RTM-SMITHFIELD AVE, MERIDEN. POLE 8 2M720867 RTM-SMITHFIELD AVE, MERIDEN. POLE 8 4E620324 MDEC0011 RENTIL11 HUNTBRK1 IT1D1203 491 COOK HILL RD LEB REPL 4 POLES, Misc. Dist expense (small tools) CA AWO RENT - INTERNAL Montville Hunts Brook Fly Ash SIMSBURY WIRELESS EXPANSION PROJECT 4N621470 MM STUB POLE, 95s ANCHOR, SPAN GUY, 2M723013 Jpt-RSO-518 Jerome Ave BRI P2073 - 1B722524 TB 154 ENTERPRISE DR INSTALL NEW PR 1B722524 TB 154 ENTERPRISE DR INSTALL NEW PR 3H720736 RSO 3/23 -- WEST HARTFORD, 134 OAKW 5T721678 CT16D027 CT16D028 Sandy Beach 130, Ellington. Upgrade BERLIN SOUTH CAMPUS FIBER RUNS TOLLAND AWC MW UPGRADE W/USED EQUIP 2M720949 PTRACK13 RGST0411 BORDE011 RTM-220 Berlin Tpke, Ber. Relocate PURCHASE RADIO RECEIVER CARDS Regulatory Assessments Borderline Purchases 3H722164 NWKTW101 8/17 RSO-AWC, WHARTFORD, SEQUIN RD TOWER REPLACEMENT-NORWALK 4D721307 cb//branford, 15 pawson rd//oh svc 4E621328 BC - CDOT 41-118 - Relocate facilit 4E621328 BC - CDOT 41-118 - Relocate facilit 4E621328 BC - CDOT 41-118 - Relocate facilit 2M722162 Municipal Light Fault Locate and Re 2M722853 AMM 32 DEPOT PL, FARMINGTON. REPLA 2M722853 AMM 32 DEPOT PL, FARMINGTON. REPLA 4E720474 (CH) P#2427: RPL EXIST'G OH/DB SVC 2M722550 Nelson Ave,Wtby. Make upgrades on p 4D621494 S Main St, Deep River/TL-ESO - 9A - 1S720461 RL:11 Watch Hill Dr:Elec Existing R 2L720762 TORRINGTON - FRANKLIN ST / ADD LIGH Per Teams call with Matthew Chamberlain 10-10-2025, the estimated cost is $3,705.00. This is from EverGreen Sheet Metal, Inc. The vendor is fabricating a blanket cart from stainless steel. EJL - 270 Wetherell St.Manch.Relocate 25KVA/Pri./Remove tree guy/P-5188 AP2-YWO Total Cost Variance Met - Variance :113.508 MIN.:-50 MAX.:150 EJL - 270 Wetherell St.Manch.Relocate 25KVA/Pri./Remove tree guy/P-5188 AP2-YWO Total Cost Variance Met - Variance :113.508 MIN.:-50 MAX.:150 Waterbury Rd Prospect 9A - (POST CONSTRUCTION) AP2-YWO Total Cost Variance Met - Variance :-26.9179 MIN.:-40 MAX.:40 7/5 - AWC - WETHERSFIELD, OLD PEPPERIDGE LA - REPLACED CUTOUT/TERM/RISER AP1-YWO Total Cost Less Than 7K 7/5 - AWC - WETHERSFIELD, OLD PEPPERIDGE LA - REPLACED CUTOUT/TERM/RISER AP1-YWO Total Cost Less Than 7K (CH) HH#313A: NEED TO CHG COVER_HH#311G: COMP'D_FAULT LOCATED/RPR'D/CHG'D AP1-YWO Total Cost Less Than 7K Shenipsit Lake Rd, Tolland. BBA P-35 all work done in field AP1-YWO Total Cost Less Than 7K Shenipsit Lake Rd, Tolland. BBA P-35 all work done in field AP1-YWO Total Cost Less Than 7K Shenipsit Lake Rd, Tolland. BBA P-35 all work done in field AP1-YWO Total Cost Less Than 7K DANIELSON TOWER REPLACEMENT - CL&P DANIELSON TOWER REPLACEMENT - CL&P ESO 9A - 08/15/16 GREEN HAVEN STONINGTON car v pole 6781 AP1-YWO Total Cost Less Than 7K ESO 9A - 08/15/16 GREEN HAVEN STONINGTON car v pole 6781 AP1-YWO Total Cost Less Than 7K cb//branford, farm river rd//rpl light head p 38780R w full cutoff, shield AP1-YWO Total Cost Less Than 7K DM/DAVIS & LE GRANDE AVE GRN: P.67972 REPLACE XARMS AP1-YWO Total Cost Less Than 7K Private Work 12/2 - RSO - HARTFORD, ELLIOT ST - NEED TO REPLACE 150W C9116 AP1-YWO Total Cost Less Than 7K DG P#2456 1 BEATTIE AVE THOMPSON FRNTR POLE RPLC, 25 KVA, OH SVC AP1-YWO Total Cost Less Than 7K NS- Maple Ave, OS- Mittigate Outages- Ins COs on XFMRs Downstream P 596 AP1-YWO Total Cost Less Than 7K CDOT 34-313 Danbury - CIS#2 - reloc service to Wells Fargo JE-YWO Variance Job Type Exclusion PH; 51 LENOX AVE; Replace OH Service AP1-YWO Total Cost Less Than 7K ins new db svc to beckley furnace lower rd north canaan AP1-YWO Total Cost Less Than 7K Municipal Light Fault Locate and Repair@ POLE 3 - COMP 7-6-17 CCC AP1-YWO Total Cost Less Than 7K ESO/AWC 5/26 WATERBURY, MERIDEN RD - 9A P 9259 AP1-YWO Total Cost Less Than 7K DM/461 STANWICH RD GREENWICH: CAR VS POLE 73690-S AP1-YWO Total Cost Less Than 7K EJC 718 West Main St, Waterbury P#121 Repl Alum Stlt Pole and Heads AP2-YWO Total Cost Variance Met - Variance :-11.0863 MIN.:-50 MAX.:50 RM -CD00667, Recloser @ P-4977 Knapp St - Norwalk AP2-YWO Total Cost Variance Met - Variance :23.7919 MIN.:-30 MAX.:30 RM -CD00667, Recloser @ P-4977 Knapp St - Norwalk AP2-YWO Total Cost Variance Met - Variance :23.7919 MIN.:-30 MAX.:30 MN 426 CABIN RD COLCH AT P-2297 REPLACE OH SVC, MIDSPAN,10 FT OFF OF POLE. AP1-YWO Total Cost Less Than 7K MM ALL WORK COMPLETE GORTON ST,POLE 1740 - REPLACED 70' 2 STRAND SERVICE DM/6 Grove ST COS COB: PRIORITY DESG (IFOH) - POLE#119 CL-YWO Variance - Contractor Labor DM/ESO 9A 6/10/17 - CHESHIRE - P#853 RESAG OH SVC 1308 S MERIDEN RD AP1-YWO Total Cost Less Than 7K (CH) HH#204A: CHG HDP TO POLYCRETE_DISC/RE-CONN SVC FOR SOCKET CHANGE-OUT. AP1-YWO Total Cost Less Than 7K Jpt-Terryville Ave BRI (Frnt)P6309 - 9a - DUMP TRUCK BROUGHT POLE & WIRE DOWN AP2-YWO Total Cost Variance Met - Variance :29.3622 MIN.:-50 MAX.:50 Jpt-Terryville Ave BRI (Frnt)P6309 - 9a - DUMP TRUCK BROUGHT POLE & WIRE DOWN AP2-YWO Total Cost Variance Met - Variance :29.3622 MIN.:-50 MAX.:50 36 HAYES LN relocate to mid-span Existing Residential Overhead AP1-YWO Total Cost Less Than 7K RTM-SMITHFIELD AVE, MERIDEN. POLE 80551 AP1-YWO Total Cost Less Than 7K RTM-SMITHFIELD AVE, MERIDEN. POLE 80551 AP1-YWO Total Cost Less Than 7K 491 COOK HILL RD LEB REPL 4 POLES, 3 SPANS OF, INS STUB POLE & ANC, SHIFT FAC's CL-YWO Variance - Contractor Labor MDEC0011ALLOCCLEARING11 CA AWO RENT - INTERNAL Montville Hunts Brook Fly Ash - Environmental Reserve. Had to re-create becuase he it didn't come over in the conversaion. SIMSBURY WIRELESS EXPANSION PROJECT_260S CISCO EQUIPMENT - NWN QUOTE OP78746 CONTACT: BOB D'EON X3094 PROJECT: IT1DLANA MM STUB POLE, 95s ANCHOR, SPAN GUY, SDWLK GUY COLMANST NEW LONDON notif #490181 AP1-YWO Total Cost Less Than 7K Jpt-RSO-518 Jerome Ave BRI P2073 - RAN NEW 100' #2 SVS MIDSPANNED AP1-YWO Total Cost Less Than 7K TB 154 ENTERPRISE DR INSTALL NEW PRIMARY SVC AND 300 KVA XFMR AP2-YWO Total Cost Variance Met - Variance :49.4991 MIN.:-50 MAX.:50 TB 154 ENTERPRISE DR INSTALL NEW PRIMARY SVC AND 300 KVA XFMR AP2-YWO Total Cost Variance Met - Variance :49.4991 MIN.:-50 MAX.:50 RSO 3/23 -- WEST HARTFORD, 134 OAKWOOD AVE- POLE # 1082 - 9A AP2-YWO Total Cost Variance Met - Variance :-11.2451 MIN.:-50 MAX.:50 Sandy Beach 130, Ellington. Upgrade 15 KVA to 25 KVA for solar project. P-2353 AP1-YWO Total Cost Less Than 7K Pull fiber from Berlin OBA communications room to Berlin South Main communications room. Fiber to be pulled from East Building communications room to Berlin South Bldg. The OC3 microwave equipment that was removed from service between Mt Tom GS and Hadley area work center will be moved from the books to the new locations Tolland and Bolton. This work order is for equipment to be located at Tolland AWC. RTM-220 Berlin Tpke, Ber. Relocate P#99264 & P#4728 100% Reimbursable AP1-YWO Total Cost Less Than 7K PURCHASE RADIO RECEIVER CARDS 2013 Regulatory Assessments Borderline Purchases 8/17 RSO-AWC, WHARTFORD, SEQUIN RD 9A - REPLACED POLE AP1-YWO Total Cost Less Than 7K TOWER REPLACEMENT-NORWALK PROJECT: NWKTW1DC1 CONTACT: STEVE FLORIO cb//branford, 15 pawson rd//oh svc upgrade AP1-YWO Total Cost Less Than 7K BC - CDOT 41-118 - Relocate facilities on RT 66 for bridge replacement STAGE 1 JE-YWO Variance Job Type Exclusion BC - CDOT 41-118 - Relocate facilities on RT 66 for bridge replacement STAGE 1 JE-YWO Variance Job Type Exclusion BC - CDOT 41-118 - Relocate facilities on RT 66 for bridge replacement STAGE 1 JE-YWO Variance Job Type Exclusion Municipal Light Fault Locate and Repair@ POLE 3758 - COMP 6/17 CCC AP1-YWO Total Cost Less Than 7K AMM 32 DEPOT PL, FARMINGTON. REPLACED 3 PH BANK ON POLE 2350 & ADDED 3 CUTOUTS. AP1-YWO Total Cost Less Than 7K AMM 32 DEPOT PL, FARMINGTON. REPLACED 3 PH BANK ON POLE 2350 & ADDED 3 CUTOUTS. AP1-YWO Total Cost Less Than 7K (CH) P#2427: RPL EXIST'G OH/DB SVC WITH NEW 4/0 OH/DB SVC_85' AP1-YWO Total Cost Less Than 7K Nelson Ave,Wtby. Make upgrades on pole 6791, 6789 & 6787 for animal protection. AP1-YWO Total Cost Less Than 7K S Main St, Deep River/TL-ESO - 9A - 10/12 Car vs Pole 337 AP1-YWO Total Cost Less Than 7K RL:11 Watch Hill Dr:Elec Existing Residential OH/DB Remove span Tpx & OH service AP1-YWO Total Cost Less Than 7K TORRINGTON - FRANKLIN ST / ADD LIGHTS BEHIND SLOVAK CLUB AP1-YWO Total Cost Less Than 7K
  7. Page 14 of 459

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued October 23, 2026 RRU-159 Attachment 6 CONFIDENTIAL Page 14 of 459 work_order_number description 4N720646 MM NEW MID SPAN SERVICE POLE 1200 H 4N621416 PD-187 West Main St East Lyme/Car V 3R621017 CD00471-01Elim. 23U Voluntown S/S C 4D720251 CB//MADISON, HULL RD//RELOCATE SECO 2M724513 Jpt-7 Pickett Ln Farm (Frnt)P6024 - 4E620817 Elec Maint Trouble Call - Repairs/O 2M722602 WC-RSO 7/21 SOUTHINGTON, WEST ST - 3H721767 7/8 RSO, WINDSOR COLONIAL DR - 9A T 2M720552 Municipal Light Fault Locate and Re 2L721541 SW CDOT 086-091 BRIDGE REPL RT# 109 HVDCGRID HVDC GRID HARDENING 3R620120 BW 2015 SR Highway Crossing, Locati 2M722455 WC 7/11 SOUTHINGTON, MAIN ST - REPL 2M722455 WC 7/11 SOUTHINGTON, MAIN ST - REPL 1S721431 RL:1 Lillian Ter: Replace OH Servic 1N721672 AJC 54 WILTON RD WSPT REPLACE POLE 3H622080 HTFD 3080 MAIN STREET City to repla DCDW0011 DISTRIBUTION CLEARANCE ADMIN/WRITER 4N820210 MM REPLACE DAMAGED SERVICE WIRE FRO 3L722875 PLYMOUTH POLE 1711 150 HPS PTT FIXT 2M721806 AMM RED OAK HILL RD,FARMINGTON. SH 2M820194 AMM 12 GILLETTE WAY FARM. Municipa 2M820195 PSTK1811 PSTK0311 AMM 12 GILLETTE WAY,FARM. Municipa Preferred Stock Preferred Stock 4N720274 PD-9 Fairhaven Rd East Lyme/Disconn 4N720274 PSTK0111 PD-9 Fairhaven Rd East Lyme/Disconn Preferred Stock 3R621059 CD00471-01 Elim. 23U S/S & Inst. Te 2L721475 CT17D022 Hartland--Center St. (157) 4154 Run SOAPSTONE TO LONG HILL MICROW UPGRA 5T820043 COMP 3/2 CCC - ENFIELD THE MEADOWS 3L722556 BLOOMFIELD POLE 5616 100 HPS PTT & 3R620095 CD00103-13 11M3 seg 13 resiliency p 3R620095 CD00103-13 11M3 seg 13 resiliency p 3R620095 CD00103-13 11M3 seg 13 resiliency p 1N721075 ACTP0011 DSN72033 DSN72016 DSN72017 JDB 144 MAIN ST, NORWALK- BAD DB PR Accounts Payable offset (50): Miscellaneous (50): Miscellaneous; Refurbishment (50): Miscellaneous, Refurbishment 4N721319 DSN82001 DSN82001 PD-7/28 INST. NEW XFORMER AND 3/CUT (50): A/C Unit DSN82001 (50): A/C Unit DSN82001 2W620247 PHD JC/ POLE 9436 FRONTIER SHIFT 2W620247 PHD JC/ POLE 9436 FRONTIER SHIFT 2W620247 PHD JC/ POLE 9436 FRONTIER SHIFT 2W620247 PHD JC/ POLE 9436 FRONTIER SHIFT 3L722823 LEDYARD POLE 96 50 HPS COBRA COMPLE 1N522133 AJC 128 MATHER ST WLTN INSTALL RISE 4N721153 PD-27 Lincoln Rd WTFD/Disconnect-re 4N721153 PD-27 Lincoln Rd WTFD/Disconnect-re 2M621311 (DF) (R/I) PTT Light pole 1586 - -6 1B622120 8-13 PRINCESS PINE LN Electric Ser 5W120380 STRM1D6Y 22787474 22787475 CT17D048 PR 103752, seg01, UCONN East Bldg, WO CREATED TO RECORD INVOICES FROM UNINTENTIONAL ISLAND & FREQ EE Ground Lidar Project Berlin OpenSky Router Replacement 11MEYE21 CT Elec Fleet Cap Purch - Mobileye 2L620240 DSQ72015 MBLD0311 11ENSTAP TRAF0011 TRAF0011 TRAF0011 TRAF0011 TRAF0011 TRAF0011 TRAF0011 TRAF0011 SW CDOT 086-091 BRIDGE REPL RT# 109 (50): Miscellaneous replacement of Maintain Buildings CL&P EE Expense POLICE/TRAFFIC CONTROL POLICE/TRAFFIC CONTROL POLICE/TRAFFIC CONTROL POLICE/TRAFFIC CONTROL POLICE/TRAFFIC CONTROL POLICE/TRAFFIC CONTROL POLICE/TRAFFIC CONTROL POLICE/TRAFFIC CONTROL 2M622292 WC-39 Luke St,Propsect. Car v Pole 1N721556 BORXE011 LTDB0611 PSTK1311 GXC18W01 GXC18W81 APAY0011 RM - CDOT173-415, test-pits, RT 57 WME BORD GRANVILL & SOUTWICK JAN 13 Long Term Debt2004 Series A Preferred Stock WILLIAMS - Transformer Testers Printer M426FDW Accounts Payable Processing 3R420243 CD00316-02; 11C14 Resiliency; Recon 3L820579 CS000212 CS002788 CS002788 GX170017 GX170023 GX170024 GX170025 GX170027 GX170029 BORXR011 CT17D021 STAMFORD POLE 16917 250 HPS COBRA C Torr Term 8A S/S Lighting Upgrades THOMASTON 2B SWITCHGEAR THOMASTON 2B SWITCHGEAR NPT Threading Machine Die Head Two SF6 Multi Analyzers & Adapters Milwaukee Cable Cutter and Crimper Western Div Wireless Phasing Meters DMA-35CRT Hydrometer - Data Logging Snowblowers ICB Borderline Revs elim LONG HILL TO SOAPSTONE MICROW UPGRA 2M721153 CAR VS SVC; RPL TPX SVC TO COMM REP 2M723162 WC-9/3 RSO P#1468 INSTLLD, CO NEED 3H620959 CT17D028 Elliot St Htfd C9103 City Pole 9a North Stonington Paging Base 3L820837 FARMINGTON POLE 1076 70 HPS COBRA - RESILEVL RESILIENCY PROG FUNDING LEVELS 1B722973 CS000711 JS - Larson Dr, Danb, Rem OH Neut, Remove Substation FM1CNWSN FARMINGTON 1C NW SENSOR RELAY 4D720314 S Cove Rd II, #34 Old Saybrook/TL-I 2M721951 CS000701 EJC 116 South Mountain Dr, New Brit Naugstuck 19K-Remove Substation 4N621319 Elec Svc New Com/Ind DESG (DN) 4N621319 DSN82002 Elec Svc New Com/Ind DESG (DN) (50): Activate 24A19 Feeder Positio 2M821305 CDOT 17-186 - RTE 6 Bristol Road Wi 2M821305 ILP611C1 CS001941 CDOT 17-186 - RTE 6 Bristol Road Wi 2016 LC - Network 4500 Switch-ES CT Jewett City 21D-Remove Substation 4E721709 CT17D032 GXC18C29 GXC18C30 GXC18C31 GXC18C33 GXC18C35 GXC18C36 GXC18C38 GXC18C39 APCOG111 Elec Maint Trouble Call - Repairs/O Berlin paging network materials Utility Light (1) Begley 2AD Climbing Hooks (1) 2NR LED Stand Light Kit (1) 2NR Engel Impulse Phaser w/clamp (4) Gas Detector (4) Voltage Detector (2) Voltage Detector (6) 2NP Clickshare (1) AP Contract admin-COGENS 1N721109 DSQ82006 DSQ82006 LD !!!! NORFIELD RD WESTON INS AMPA (50): Replace Failed 13C-2X High an (50): Replace Failed 13C-2X High an 1B721060 RDUT0011 SIMSB001 PSTK2211 104 MAIN ST Elec Svc Existing Resi Restricted Duty Simsbury AWC Site #68 Preferred Stock 5D621348 DG P#981 RSO 12/24 CONVERSE RD, WOO 3H421552 MANCHESTER, HARTFORD RD - Dressing long_description MM NEW MID SPAN SERVICE POLE 1200 HOUSE 213 SHORE RD MLC METER SER TO SET METER AP1-YWO Total Cost Less Than 7K PD-187 West Main St East Lyme/Car VS P# 1224 NL-YWO Variance - NU Construction Labor CD00471-01Elim. 23U Voluntown S/S Conversion Work #2 AP2-YWO Total Cost Variance Met - Variance :-28.5624 MIN.:-30 MAX.:30 CB//MADISON, HULL RD//RELOCATE SECONDARY,XF (EXISTING CROSS FUSE) AP1-YWO Total Cost Less Than 7K Jpt-7 Pickett Ln Farm (Frnt)P6024 - Existing Residential Overhead - MLC AP1-YWO Total Cost Less Than 7K Elec Maint Trouble Call - Repairs/Obsolescence OH (AROH) AP1-YWO Total Cost Less Than 7K WC-RSO 7/21 SOUTHINGTON, WEST ST - 9A P92660 PICK UP SNAGGED WIRE - REPLD SVC 7/8 RSO, WINDSOR COLONIAL DR - 9A TRUCK TOOK DOWN WIRES - RAN 125' SERVICE AP1-YWO Total Cost Less Than 7K Municipal Light Fault Locate and Repair@ POLE 4 - COMP 4/11 CCC AP1-YWO Total Cost Less Than 7K SW CDOT 086-091 BRIDGE REPL RT# 109 (THOMASTON RD) MORRIS (Inst Primary/Neutral) JE-YWO Variance Job Type Exclusion UCONN 2ND AMENDED AND RESTATED RESEARCH PROJECT(S) HARDENING OF EE HVDC SYSTEMS AGAINST GEOMAGNETIC DISTURBANCE AND MONOPOLE OPERATION OF THE HVDC SYSTEM. ASSET - MODEL HVDC SYSTEMS INCLUDING HVDC CONVERTER STATION, REACTIVE POWER COMPENSATION DEVICES, CONVERTER TRANSFORMERS AND HVDC OH LINE OR CABLE BW 2015 SR Highway Crossing, LocationID46668676, Pole 3472 & 3473 CI-YWO Variance - Contractor Invoice WC 7/11 SOUTHINGTON, MAIN ST - REPLACED 3 PH BANK & 2 CUTOUTS P86145 AP2-YWO Total Cost Variance Met - Variance :20.4912 MIN.:-50 MAX.:50 WC 7/11 SOUTHINGTON, MAIN ST - REPLACED 3 PH BANK & 2 CUTOUTS P86145 AP2-YWO Total Cost Variance Met - Variance :20.4912 MIN.:-50 MAX.:50 RL:1 Lillian Ter: Replace OH Service 110' #2 Tpx AP1-YWO Total Cost Less Than 7K AJC 54 WILTON RD WSPT REPLACE POLE 1205 INSTALL P RISER & PAD REM P DB PRI & DH HTFD 3080 MAIN STREET City to replace pole CH8668 AP1-YWO Total Cost Less Than 7K DCDW0011OPSNTRELEXPENSES11 work order to be used by Distribution Clearance Administrator and Distribution Clearance Writer under CT Grid management MM REPLACE DAMAGED SERVICE WIRE FROM POLE 1517TO HOUSE AP1-YWO Total Cost Less Than 7K PLYMOUTH POLE 1711 150 HPS PTT FIXTURE IS WORKING 03/01 NTW AP1-YWO Total Cost Less Than 7K AMM RED OAK HILL RD,FARMINGTON. SHIFT FRONTIER POLE 360. AP1-YWO Total Cost Less Than 7K AMM 12 GILLETTE WAY FARM. Municipal Light Fault Locate and Repair@ POLE 2926. AP1-YWO Total Cost Less Than 7K AMM 12 GILLETTE WAY,FARM. Municipal Light Fault Locate and Repair@ POLE 2927. AP1-YWO Total Cost Less Than 7K Preferred StockNT011 Preferred StockDIST11 PD-9 Fairhaven Rd East Lyme/Disconnect-reconnect OH svc for upgrade. AP1-YWO Total Cost Less Than 7K PD-9 Fairhaven Rd East Lyme/Disconnect-reconnect OH svc for upgrade. AP1-YWO Total Cost Less Than 7K Preferred StockDIST11 CD00471-01 Elim. 23U S/S & Inst. Temp. 500KVA Step XF's for Conversion AP2-YWO Total Cost Variance Met - Variance :-19.1314 MIN.:-30 MAX.:30 Hartland--Center St. (157) 4154 Run new oh svc & set meter AP1-YWO Total Cost Less Than 7K Upgrade the microwave equipment from DS3 to OC3 capacity to provide sufficient backhaul to enable microwave to be an alternate path from fiber and increase capacity. COMP 3/2 CCC - ENFIELD THE MEADOWS P#18 - RPL BLK FG POLE & PTT 150HPS AP1-YWO Total Cost Less Than 7K BLOOMFIELD POLE 5616 100 HPS PTT & BROWN SQUARE POLE AP1-YWO Total Cost Less Than 7K CD00103-13 11M3 seg 13 resiliency part 1 AP2-YWO Total Cost Variance Met - Variance :8.3386 MIN.:-30 MAX.:30 CD00103-13 11M3 seg 13 resiliency part 1 AP2-YWO Total Cost Variance Met - Variance :8.3386 MIN.:-30 MAX.:30 CD00103-13 11M3 seg 13 resiliency part 1 AP2-YWO Total Cost Variance Met - Variance :8.3386 MIN.:-30 MAX.:30 JDB 144 MAIN ST, NORWALK- BAD DB PRIM P#20241 07/19/17 AP2-YWO Total Cost Variance Met - Variance :6.2892 MIN.:-50 MAX.:50 Accounts Payable offset-Ouimette Southington 4C - Refurbish the switchgear enclosure Prospect Street 22E - REfurbish the switchgear enclosure - ROOF REPLACEMENT Byram 13C - Refurbish the switchgear enclosure PD-7/28 INST. NEW XFORMER AND 3/CUT OUTS ON 7057 AP1-YWO Total Cost Less Than 7K Rocky Hill 3R - Replace failing A/C Unit and Install Hydrogen Detection System Rocky Hill 3R - Replace failing A/C Unit and Install Hydrogen Detection System PHD JC/ POLE 9436 FRONTIER SHIFT AP1-YWO Total Cost Less Than 7K PHD JC/ POLE 9436 FRONTIER SHIFT AP1-YWO Total Cost Less Than 7K PHD JC/ POLE 9436 FRONTIER SHIFT AP1-YWO Total Cost Less Than 7K PHD JC/ POLE 9436 FRONTIER SHIFT AP1-YWO Total Cost Less Than 7K LEDYARD POLE 96 50 HPS COBRA COMPLETED 10/24 EHA AP1-YWO Total Cost Less Than 7K AJC 128 MATHER ST WLTN INSTALL RISER FOR 480V 3PH DELTA SERVICE P24555 AP1-YWO Total Cost Less Than 7K PD-27 Lincoln Rd WTFD/Disconnect-reconnect for svc upgrade/Net meter AP1-YWO Total Cost Less Than 7K PD-27 Lincoln Rd WTFD/Disconnect-reconnect for svc upgrade/Net meter AP1-YWO Total Cost Less Than 7K (DF) (R/I) PTT Light pole 1586 - -6/11 ESO 9A - Car v light pole- COMP 12/28 CCC CL-YWO Variance - Contractor Labor 8-13 PRINCESS PINE LN Electric Service New UG Residential Meter Dept Set AP1-YWO Total Cost Less Than 7K PR 103752, seg01, UCONN East Bldg, U.G., Mansfield WORK ORDER TO BE USED TO RECORD THE INVOICES RECEIVED FROM CONTRACTORS FOR STORM REST- ORATION WORK. COSTS CLEARED OUT TO WORK ORDER SET UP FOR EACH SPECIFIC STORM WHEN INVOICE RELEASE 4 OF PO - UCONN Unintentional islanding & frequency response analysis Eversource Distribution Systems under various weather conditions RELEASE 5 OF PO - UCONN EE Ground Lidar Project (technology) Eversource Distribution Systems under various weather conditions This WO is to replace the EOL cisco 2800 series router used by OpenSky on site. CT Elec Fleet Capital Purchase - Mobileye $208,078.47 Mobileye Safety Mechanism hardware & installation 153 Units SW CDOT 086-091 BRIDGE REPL RT# 109 (THOMASTON RD) MORRIS (Rem Primary/Neutral) JE-YWO Variance Job Type Exclusion Cos Cob 11R - Replace the failed HMI system MBLD0311NT011 11ENSTAP11RES POLICE/TRAFFIC CONTROL POLICE/TRAFFIC CONTROL POLICE/TRAFFIC CONTROL POLICE/TRAFFIC CONTROL POLICE/TRAFFIC CONTROL POLICE/TRAFFIC CONTROL POLICE/TRAFFIC CONTROL POLICE/TRAFFIC CONTROL WC-39 Luke St,Propsect. Car v Pole 2507 AP1-YWO Total Cost Less Than 7K RM - CDOT173-415, test-pits, RT 57 BRIDGE REPAIR - WESTON JE-YWO Variance Job Type Exclusion BORXE011NT011 Long Term Debt2004 Series A Preferred StockDIST11 WILLIAMS - Transformer Testers Printer M426FDW Accounts Payable Processing CD00316-02; 11C14 Resiliency; Recon. RT 81 w 336 TW pole 602 to 637; WO 3 of 3 AP2-YWO Total Cost Variance Met - Variance :-6.1021 MIN.:-20 MAX.:20 STAMFORD POLE 16917 250 HPS COBRA COMPLETED 12/20 NTW AP1-YWO Total Cost Less Than 7K Install and/or upgrade S/S lighting fixtures and additional 120VAC outlets at various CL&P Substations. All fixtures will be ordered & stocked at BCS and s/b charged to the appropriate WO # when they are picked up at the warehouse. Refurbish switchgear body, excludes roof. Refurbish roof after moratorium Refurbish switchgear body, excludes roof. Refurbish roof after moratorium Universal NPT Threading Machine Die Head Model # 26152 Two - Dilo SF6 Multi Analyzer (Dilo Item # 3-038R-R303V0 Model Q-23398) and Two adapter Kits Accessories plus misc accessories (heater blankets, scale, etc) One Each Milwaukee M18 FORCE LOGIC 12 ton Crimper (Cat # 2778-22) and M18 FORCE LOGIC 1590 ACSR Cable Cutter (Cat # 2777-21) Three phasing meters for Western AWCs - Norwalk, Torrington, Stamford. Hastings Phase-Tell III wireless Phasing Meter ALBER DMA35-CRT Hydrometer with data logging Three Snowblowers for Construction Group ICB Borderline Revs elim Upgrade the microwave equipment from DS3 to OC3 capacity to provide sufficient backhaul to enable microwave to be an alternate path from fiber and increase capacity. CAR VS SVC; RPL TPX SVC TO COMM REPAIR/UPGRADE FROM POLE 61693 AP1-YWO Total Cost Less Than 7K WC-9/3 RSO P#1468 INSTLLD, CO NEED RHANG TPX TO NEW POLE + HANG SRV TO HOUSE AP1-YWO Total Cost Less Than 7K Elliot St Htfd C9103 City Pole 9a Replace 250W head AP1-YWO Total Cost Less Than 7K The existing equipment is at the end of its useful life. New equipment including a superior timing mechanism are proposed. No Stonington Radio Tower Site FARMINGTON POLE 1076 70 HPS COBRA - COMP 2/3/18 TOL AP1-YWO Total Cost Less Than 7K UCONN 2ND AMENDED AND RESTATED RESEARCH PROJECT(S) IDENTIFY WHICH PROGRAMS TO CONTINUE & FUNDING LEVELS OF RESILIENCY PROGRAMS BEYOND 2017 Asset - STOCHASTIC DYNAMIC PROGRAMMING MODEL JS - Larson Dr, Danb, Rem OH Neut, Inst OH Sec (28M13) AP1-YWO Total Cost Less Than 7K Greens Farms 22W - Remove all equipment, foundations, fence and trap rocks. All equipment will be scrapped except for the transformers (22W-1X, 22W-2X and 22W-3X). All three transformers will be evaluated for possible use as system spare and it is likely that we keep one. The substation site should be cleared and turned over to Real Estate for sale. Farmington 1C NETWORK PROTECTOR SENSOR PART OF THE DIGITAL GRID RELAY PROJECT - FARMINGTON 1C SS THE SENSORS ARE BEING ADDED TO THE NW PROTECTOR RELAYS BEING INSTALLED THROUGHOUT CONNECTICUT. SENSORS CANNOT OPERATE WITHOUT THE NW PROTECTOR RELAYS Work order is to be used to capture costs for retrofitting relays for network protectors S Cove Rd II, #34 Old Saybrook/TL-INST 4/03CT OH-DB SVC@P#576 *FLOOD PLAIN INST* EJC 116 South Mountain Dr, New Britain P#98992 Repl Svc to Midspan per T-Ticket AP1-YWO Total Cost Less Than 7K Naugatuck 19K - Remove all equipment, foundations, fence and trap rocks. All equipment will be scrapped except for the transformer (19K-1X) which will be evaluated for possible use as system spare. The substation site should be cleared and turned over to Real Estate for sale. Elec Svc New Com/Ind DESG (DN) cost_element_group ferc_account percent Fees + Payment - FP0 107010 1 Fees + Payment - FP0 107010 1 Fees + Payment - FP0 107010 1 Fees + Payment - FP0 107010 1 Fees + Payment - FP0 107010 1 Fees + Payment - FP0 593000 1 Fees + Payment - FP0 107010 1 Fees + Payment - FP0 107010 1 Fees + Payment - FP0 107010 1 Fees + Payment - FP0 107010 1 Fees + Payment - FP0 107010 1 Fees + Payment - FP0 107010 1 Fees + Payment - FP0 107010 0.64902 Fees + Payment - FP0 593000 0.35098 Fees + Payment - FP0 107010 1 Fees + Payment - FP0 107010 1 Fees + Payment - FP0 107010 1 Fees + Payment - FP0 581440 1 Fees + Payment - FP0 107010 1 Fees + Payment - FP0 107010 1 Fees + Payment - FP0 107010 1 Fees + Payment - FP0 107010 1 Fees + Payment - FP0 Fees + Payment - FP0 Fees + Payment - FP0 107010 238420 238120 1 1 1 Fees + Payment - FP0 107010 0.69919 Fees + Payment - FP0 Fees + Payment - FP0 108030 238110 0.30081 1 Fees + Payment - FP0 107010 1 Fees + Payment - FP0 Fees + Payment - FP0 107010 107010 1 1 Fees + Payment - FP0 107010 1 Fees + Payment - FP0 107010 1 Fees + Payment - FP0 107010 0.82446 Fees + Payment - FP0 593000 0.1287 Fees + Payment - FP0 594000 0.04684 Fees + Payment - FP0 Fees + Payment - FP0 Fees + Payment - FP0 Fees + Payment - FP0 Fees + Payment - FP0 107010 232010 107010 107010 107010 1 1 1 1 1 Fees + Payment - FP0 Fees + Payment - FP0 Fees + Payment - FP0 107010 108030 107010 1 0.20000027 0.79999973 Fees + Payment - FP0 595000 0.34974 Fees + Payment - FP0 108030 0.05076 Fees + Payment - FP0 107010 0.09987 Fees + Payment - FP0 593000 0.49963 Fees + Payment - FP0 107010 1 Fees + Payment - FP0 107010 1 Fees + Payment - FP0 107010 0.67133 Fees + Payment - FP0 108030 0.32867 Fees + Payment - FP0 107010 1 Fees + Payment - FP0 107010 1 Fees + Payment - FP0 Fees + Payment - FP0 Fees + Payment - FP0 Fees + Payment - FP0 Fees + Payment - FP0 108030 593000 107010 107010 107010 1 1 1 1 1 Fees + Payment - FP0 107010 1 Fees + Payment - FP0 Fees + Payment - FP0 Fees + Payment - FP0 Fees + Payment - FP0 Fees + Payment - FP0 Fees + Payment - FP0 Fees + Payment - FP0 Fees + Payment - FP0 Fees + Payment - FP0 Fees + Payment - FP0 Fees + Payment - FP0 Fees + Payment - FP0 108030 107010 921006 908100 596000 593000 594000 584000 580000 587000 595000 583000 1 1 1 1 0.0171 0.4501 0.0866 0.0576 0.2318 0.017 0.0388 0.101 Fees + Payment - FP0 107010 1 Fees + Payment - FP0 Fees + Payment - FP0 Fees + Payment - FP0 Fees + Payment - FP0 Fees + Payment - FP0 Fees + Payment - FP0 Fees + Payment - FP0 594000 55501X 237CD0 238170 107010 107010 923000 1 1 1 1 1 1 1 Fees + Payment - FP0 107010 1 Fees + Payment - FP0 Fees + Payment - FP0 Fees + Payment - FP0 Fees + Payment - FP0 Fees + Payment - FP0 Fees + Payment - FP0 Fees + Payment - FP0 Fees + Payment - FP0 Fees + Payment - FP0 Fees + Payment - FP0 Fees + Payment - FP0 Fees + Payment - FP0 107010 107010 108030 107010 107010 107010 107010 107010 107010 107010 44711X 107010 1 1 0.02 0.98 1 1 1 1 1 1 1 1 Fees + Payment - FP0 107010 1 Fees + Payment - FP0 107010 1 Fees + Payment - FP0 Fees + Payment - FP0 107010 107010 1 1 Fees + Payment - FP0 107010 1 Fees + Payment - FP0 107010 1 Fees + Payment - FP0 Fees + Payment - FP0 107010 108030 1 1 Fees + Payment - FP0 107010 1 Fees + Payment - FP0 107010 1 Fees + Payment - FP0 Fees + Payment - FP0 107010 108030 1 1 Fees + Payment - FP0 583000 0.11354 Fees + Payment - FP0 Fees + Payment - FP0 107010 107010 0.88646 1 Fees + Payment - FP0 107010 0.99379 Fees + Payment - FP0 Fees + Payment - FP0 Fees + Payment - FP0 594000 107010 108030 0.00621 1 1 Fees + Payment - FP0 Fees + Payment - FP0 Fees + Payment - FP0 Fees + Payment - FP0 Fees + Payment - FP0 Fees + Payment - FP0 Fees + Payment - FP0 Fees + Payment - FP0 Fees + Payment - FP0 Fees + Payment - FP0 Fees + Payment - FP0 107010 107010 107010 107010 107010 107010 107010 107010 107010 107010 232260 1 1 1 1 1 1 1 1 1 1 1 Fees + Payment - FP0 Fees + Payment - FP0 Fees + Payment - FP0 107010 107010 108030 1 0.78059097 0.21940903 Fees + Payment - FP0 Fees + Payment - FP0 Fees + Payment - FP0 Fees + Payment - FP0 107010 588114 228450 238400 1 1 1 1 Fees + Payment - FP0 107010 1 Fees + Payment - FP0 107010 1 Fees + Payment - FP0 107010 1 Fees + Payment - FP0 596000 0.19779 Fees + Payment - FP0 107010 0.80221 Fees + Payment - FP0 107010 1 Fees + Payment - FP0 107010 1 Elec Svc New Com/Ind DESG (DN) WL9LNWSN WILLIAMS 9L NW PROTECTOR SENSOR 2M820189 COMP 1/20/18 CCC - Municipal Light 2M820189 COMP 1/20/18 CCC - Municipal Light 4E720811 RSO/AWC 5/24 COLCHESTER, LEBANON AV 1B820016 25 CREST RD Electric Service Existi Flax Hill 24A - Activate 24A19 Feeder Position CDOT 17-186 - RTE 6 Bristol Road Widening - Additional Pole Sets to New Depth JE-YWO Variance Job Type Exclusion CDOT 17-186 - RTE 6 Bristol Road Widening - Additional Pole Sets to New Depth JE-YWO Variance Job Type Exclusion 4500 Switch Replacements - IT 2016 Lifecycle - ES CT Jewett City 21D - Remove the substation. All of the equipment will be removed, including the foundations, fence and trap rock. The transformer will be sold for scrap and the site will be turned over to Real Estate for sale. An easement must be maintained becuase overhead lines will continue to cross the site. Elec Maint Trouble Call - Repairs/Obsolescence OH (AROH) AP2-YWO Total Cost Variance Met - Variance :-1.0265 MIN.:-50 MAX.:50 This work order covers equipment needed in Berlin to improve the contention mechanism for holding off paging and RCLMS transmitter controllers. 2AD - Milwaukee Utility Light Model 2122-21HD (1) $745 2EK - Climbing Hooks (1) Hydron Inc. TOTAL: $1306.67 2NR - M18LED HP Stand Light Kit - (1) TOTAL $1,250 ENGEL 335 - INSTRUMENT, IMPULSE PHASER, W/ 2-1/8 IN CLAMP ON (4) s/c 522410 $2,060.44ea TOTAL: $8,241.76 335 - DETECTOR,GAS, FOR OXIGEN, HYDROGEN SULFIDE, CARBON MONOXIDE COMBUSTIBLES 0-100LEL (4) s/c 519396 $760.85ea TOTAL: $3,043.40 335 - DETECTOR,VOLTAGE, NON-CONTACT, AUDIBLE & VISUAL INDICATION, 240 V-230 KV RANGE, W/ KIT, 4544 DETECTO (2) s/c 519464 $641.75ea TOTAL: $1,283.49 DETECTOR,VOLTAGE, NON-CONTACT, AUDIBLE & VISUAL INDICATION, 240 V-230 KV RANGE, W/ KIT, 4544 DETECTO (6) s/c 519464 $641.75ea TOTAL: $3,850.46 Clickshare Meeting Equipment and Software AP Contract admin-COGENS LD !!!! NORFIELD RD WESTON INS AMPAC POLE#31102 MINOR INFRARED SURVEY AP3-YWO Resource Variance Met- Labor 28 <= 32 OR -82.24 <= 30 And Contractor $0 <= 2000 Replace Failed 13C-2X High and Low Side Arresters Replace Failed 13C-2X High and Low Side Arresters 104 MAIN ST Elec Svc Existing Residential pr6/2/17 AP2-YWO Total Cost Variance Met - Variance :97.5358 MIN.:-50 MAX.:150 Restricted Duty Simsbury AWC Site #68-Rose Preferred StockNT011 DG P#981 RSO 12/24 CONVERSE RD, WOODSTOCK - HBV - WEBB CLP TO SHIFT NOT COMP AP1-YWO Total Cost Less Than 7K MANCHESTER, HARTFORD RD - Dressing Mill 8H - Relay & Sensor NL-YWO Variance - NU Construction Labor WILLIAMS NEW LONDON NETWORK PROTECTOR SENSOR PART OF THE DIGITAL GRID RELAY PROJECT - WILLIAMS 9L SS NEW LONDON THE SENSORS ARE BEING ADDED TO THE NW PROTECTOR RELAYS BEING INSTALLED THROUGHOUT CONNECTICUT. SENSORS CANNOT OPERATE WITHOUT THE NW PROTECTOR RELAYS Work order is to be used to capture costs for retrofitting relays for network protectors COMP 1/20/18 CCC - Municipal Light Fault Locate and Repair@ POLE 7 AP1-YWO Total Cost Less Than 7K COMP 1/20/18 CCC - Municipal Light Fault Locate and Repair@ POLE 7 AP1-YWO Total Cost Less Than 7K RSO/AWC 5/24 COLCHESTER, LEBANON AVE (RT 16) 9A POLE 3 1/4 AP1-YWO Total Cost Less Than 7K 25 CREST RD Electric Service Existing Residential Overhead AP1-YWO Total Cost Less Than 7K
  8. Page 15 of 459

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued October 23, 2026 RRU-159 Attachment 6 CONFIDENTIAL Page 15 of 459 work_order_number MTOH4D15 MTOH4D15 description ELEC. MAINT. FAC. INSPECT./FLT INDI ELEC. MAINT. FAC. INSPECT./FLT INDI 2L820645 SW CDOT 05-114 RT 219/318 ROAD IMPR 1S721357 INVT0611 RL:Byram Shore Rdf:9A DIGUP- 245 BY Inventory Offset 4E820580 RA CDOT 163-203 RT 66 - outage nor 4E820580 RA CDOT 163-203 RT 66 - outage nor long_description Fault Indicators (MTOH) CT ELECTRIC MAINTENANCE FACILITY INSPECTIONS NON DESIGN / FAULT INTICATOR - MADISON Fault Indicators (MTOH) CT ELECTRIC MAINTENANCE FACILITY INSPECTIONS NON DESIGN / FAULT INTICATOR - MADISON SW CDOT 05-114 RT 219/318 ROAD IMPROVEMENTS BARKHAMSTED JE-YWO Variance Job Type Exclusion RL:Byram Shore Rdf:9A DIGUP- 245 BYRAM SHORE RD GREENWICH Riser Pole 81785 AP1-YWO Total Cost Less Than 7K Inventory Offset-Ouimettte RA CDOT 163-203 RT 66 - outage north side of bridge JE-YWO Variance Job Type Exclusion RA CDOT 163-203 RT 66 - outage north side of bridge JE-YWO Variance Job Type Exclusion CT OpenSky Router Replacement This WO is to replace the EOL cisco 2800 series router used by OpenSky on site. This WO is to upgrade the OpenSky system from SR10A.0 to SR10A.4. Included in this WO are 10 EOL Router replacements for the sites listed below. Eversource facilities where the assets will be located: 107 Selden St, Berlin, CT 06037 414 Chapel Hill Rd, Oakdale, CT 06370 207 Garden Circle, Waterbury CT 06704 135 New Rd, Madison, CT 06443 20 Barnabas Rd, Newtown, CT 06470 Butternut Hollow Rd, Greenwich, CT 18 Kluge Rd, Prospect, CT 06712 626 Glenbrook Rd, Stamford, CT 06906 Taugwonk Rd, Stonington, CT 06378 349 Mountain St, Willimantic, CT 06226 CT17D047 CT17D047 EVGM2411 CT OpenSky Router Replacement 2024 CT Veg OM Labor 1N820137 LD 41 WOLFPIT AVE NORWALK RECONDUCT 1N820137 LD 41 WOLFPIT AVE NORWALK RECONDUCT 4D820623 Roamtree Dr, Old Saybrook/TL-5/4/18 4D820623 Roamtree Dr, Old Saybrook/TL-5/4/18 1B820583 2-4-6 PUTNAM LN Electric Service Ne 2M620318 RTM-101 Warren St, Mer. Frontier Po 2M820141 DSQ82011 DSQ82011 AMM 130 FREIGHT ST,WTBY. ENVIRONME (50): Replace Failed Battery DSQ820 (50): Replace Failed Battery DSQ820 2M620312 RTM-371 S Curtis St, Mer. Frontier 1N820555 MJP - CD00348 - 102-363 - (6)Phase 1G621258 RL: Paterson Ave: Electric Service 1B620115 CS000092 RR- 104 Forty Acre Mtn Rd Danbury, BALDWIN 13F - PURCH S/S REMOTE RACK F11WRELY FREIGHT 11W DIGITAL GRID RELAYS 4N821037 CDOT 152-158/CD01102, UG civil desi 4N821038 CDOT 152-158/CD01102, UG cable pull 2M722589 DSQ62048 DSQ62048 WINDCIRC EJC 279 Oak St, NB P#5724 Replaced (40): Replace failed 11B61 3ph regu (40): Replace failed 11B61 3ph regu WINDSOR CENTRAL SYSTEMS 5T621525 CS00278E CS00278E CS00278G CS00278G LTDB1811 ESO 8/22 Conklin Rd Stafford p 7056 NORWALK 9S-27.6kV SWITCHGEAR NORWALK 9S-27.6kV SWITCHGEAR BYRAM 13C SWITCHGEAR BYRAM 13C SWITCHGEAR Long Term Debt2007 Series A 2M722755 EJC 14 Carmel St, New Britain P#336 2W620538 Proj#CD00699-13B33 Relocate for Tra 2W620538 SENCT24A CT18D003 CT18D003 Proj#CD00699-13B33 Relocate for Tra CT 2024 Sentinel Meter installs & P SONET Upgrades SONET Upgrades 5T721223 Relocate 39E1 23kV From Hamlton Rd. 5T721223 Relocate 39E1 23kV From Hamlton Rd. 5T721223 Relocate 39E1 23kV From Hamlton Rd. 2M720734 *EMERGENCY* SHIFT TO FRONTIER DBL P 2M821520 AMM 25 HATTERS LN,FARM. REPLACE & 1N421438 SMSS0011 DSQ82008 DSQ82008 RM 50 POWDER HORN HILL WESTON REPLA Small Tools - Stations Replacement of failed Newington 4AReplacement of failed Newington 4A- 3H722126 8/15 - HAROH - AVON, FAR HILLS DR - 4N721280 PD-15 Blue Heron Rd Niantic/Install 1S721203 DL; SYLVAN KNOLL RD; REPLACE POLE 5 1N620110 LD WEST CEDAR ST NORWALK RECONDUCTO 2M722156 EJC 412R South Main St, NB P#294 Ru 2M722157 Municipal Light Fault Locate and Re 2M722157 Municipal Light Fault Locate and Re 2M722157 Municipal Light Fault Locate and Re 4E820807 PUGT0011 (CH) P#1868: CHG OH DROP_DAMANGED D Precap UG Transfomer Install (CFI) 5D820187 DV220E11 DV200E11 DV451E11 DV496E11 RSO,2/14, WOODSTOCK, ROCKY HILL ROA CA AWO CLP$2.20S STOCK CA AWO CLP$2.00S STOCK CA AWO CLP4.50%S STOCK CA AWO CLP4.96%S STOCK 1N621985 RM 10 Ridge Ln Weston Replace Exis 3R621058 TRANRE11 MS18H011 SUTP0311 CD00471-01 Elim. 23U S/S Install 13 $25 reimbursement for transformer HEATWAVE JUN 29-JUL 7 2018 - ALL RE Sales/Use Tax Payments 2M722211 DSQ82009 EJC Webster Ct, Newington Replace P Weston 21M - Replace 4 Failed GE IA 2M820295 Jpt-RSO-320 Farmington Ave Plnv P15 4E820604 RA CDOT 163-203 RT 66 - outage sou 4E820604 DSN72034 DSQ82025 DSQ82025 RA CDOT 163-203 RT 66 - outage sou (50): Refurbish the switchgear roof (40): Replace Failed A/C Unit DSQ82 (40): Replace Failed A/C Unit DSQ82 2M721926 AMM 47 BURNT HILL RD FARMINGTON. R 4N621741 MM REPLACE SERVICE 48 LONGVIEW ST, 2W720002 F1811065 F1811065 AMM WAKELEE RD,WTBY. Municipal Lig Install fluid handling system Install fluid handling system 4E821053 Elec Svc Line Extension/Development 4N820787 DSQ82029 DSQ82029 GCC / I&R XFMR AND INSTALL A NEW 15 Rebuild Failed 1A-5X Load Tap Chang Rebuild Failed 1A-5X Load Tap Chang 1B821744 JS - 47 West Wooster St, Danb, Inst 3L821890 RTM-COMP 9/28/18 CCC MERIDEN POLE 4 3H722019 RSO, 8/3, MANCHESTER, DARTMOUTH, P5 5T721995 RSO, 8/21, ENFIELD, ENFIELD STREET, 3L821930 GX170032 GX170033 GX180002 GX180004 COMP 10/03/18 CCC POLE 4032 NEEDS T DUCT RODDR Cable Cutters Die Set Kit Varidesk Exec 40 1N820553 MJP - CD00348 - 102-363 - (2)Phase 1S821631 (50,0): DL; 50 SEASIDE AVE; Electri 1S821631 (50,0): DL; 50 SEASIDE AVE; Electri This WO is to replace the EOL cisco 2800 series router used by OpenSky on site. This WO is to upgrade the OpenSky system from SR10A.0 to SR10A.4. Included in this WO are 10 EOL Router replacements for the sites listed below. Eversource facilities where the assets will be located: 107 Selden St, Berlin, CT 06037 414 Chapel Hill Rd, Oakdale, CT 06370 207 Garden Circle, Waterbury CT 06704 135 New Rd, Madison, CT 06443 20 Barnabas Rd, Newtown, CT 06470 Butternut Hollow Rd, Greenwich, CT 18 Kluge Rd, Prospect, CT 06712 626 Glenbrook Rd, Stamford, CT 06906 Taugwonk Rd, Stonington, CT 06378 349 Mountain St, Willimantic, CT 06226 2024 CT Veg OM Labor - Tracey, Emily LD 41 WOLFPIT AVE NORWALK RECONDUCTOR LINE FROM ENTRANCE POLE#23558 AP2-YWO Total Cost Variance Met - Variance :-2.4311 MIN.:-30 MAX.:30 LD 41 WOLFPIT AVE NORWALK RECONDUCTOR LINE FROM ENTRANCE POLE#23558 AP2-YWO Total Cost Variance Met - Variance :-2.4311 MIN.:-30 MAX.:30 Roamtree Dr, Old Saybrook/TL-5/4/18 replace xfmrs, 3 c/o's @ pole2834 cost_element_group Fees + Payment - FP0 Fees + Payment - FP0 ferc_account 583000 107010 percent 0.91 0.09 Fees + Payment - FP0 107010 1 Fees + Payment - FP0 Fees + Payment - FP0 107010 232100 1 1 Fees + Payment - FP0 107010 0.06577 Fees + Payment - FP0 593000 0.93423 Fees + Payment - FP0 107010 0.92687989 Fees + Payment - FP0 Fees + Payment - FP0 108030 593100 0.07312011 1 Fees + Payment - FP0 107010 0.99536 Fees + Payment - FP0 593000 0.00464 Fees + Payment - FP0 593000 0.13486 Fees + Payment - FP0 107010 0.86514 Fees + Payment - FP0 107010 1 Fees + Payment - FP0 107010 1 Fees + Payment - FP0 Fees + Payment - FP0 Fees + Payment - FP0 595000 108030 107010 1 0.15506683 0.84493317 Fees + Payment - FP0 107010 1 Fees + Payment - FP0 107010 1 Fees + Payment - FP0 107010 1 Fees + Payment - FP0 Fees + Payment - FP0 107010 107010 1 1 Fees + Payment - FP0 107010 1 Fees + Payment - FP0 107010 1 Fees + Payment - FP0 107010 1 Fees + Payment - FP0 Fees + Payment - FP0 Fees + Payment - FP0 Fees + Payment - FP0 107010 107010 108030 107010 1 0.8 0.2 1 Fees + Payment - FP0 Fees + Payment - FP0 Fees + Payment - FP0 Fees + Payment - FP0 Fees + Payment - FP0 Fees + Payment - FP0 107010 107010 108030 108030 107010 2371A0 1 0.82521561 0.17478439 0.2 0.8 1 Fees + Payment - FP0 107010 1 Fees + Payment - FP0 107010 0.96015 Fees + Payment - FP0 Fees + Payment - FP0 Fees + Payment - FP0 Fees + Payment - FP0 594000 107010 108030 107010 0.03985 1 0.04761905 0.95238095 Fees + Payment - FP0 593000 0.01465 Fees + Payment - FP0 107010 0.96839 Fees + Payment - FP0 594000 0.01696 Fees + Payment - FP0 107010 1 Fees + Payment - FP0 107010 1 Fees + Payment - FP0 Fees + Payment - FP0 Fees + Payment - FP0 Fees + Payment - FP0 107010 588250 108030 107010 1 1 0.13449273 0.86550727 Fees + Payment - FP0 107010 1 Fees + Payment - FP0 107010 1 Fees + Payment - FP0 107010 1 Fees + Payment - FP0 107010 1 Fees + Payment - FP0 107010 1 Fees + Payment - FP0 107010 0.47773 Fees + Payment - FP0 108030 0.47773 Fees + Payment - FP0 596000 0.04454 Fees + Payment - FP0 Fees + Payment - FP0 107010 584280 1 1 Fees + Payment - FP0 Fees + Payment - FP0 Fees + Payment - FP0 Fees + Payment - FP0 Fees + Payment - FP0 107010 437040 437025 437430 437440 1 1 1 1 1 Fees + Payment - FP0 107010 1 Fees + Payment - FP0 Fees + Payment - FP0 Fees + Payment - FP0 Fees + Payment - FP0 107010 252500 593140 143970 1 1 1 1 Fees + Payment - FP0 Fees + Payment - FP0 107010 107010 1 1 Fees + Payment - FP0 107010 1 Fees + Payment - FP0 593000 0.22658 Fees + Payment - FP0 Fees + Payment - FP0 Fees + Payment - FP0 Fees + Payment - FP0 107010 107010 107010 108030 0.77342 1 0.81632955 0.18367045 Fees + Payment - FP0 107010 1 Fees + Payment - FP0 107010 1 Fees + Payment - FP0 Fees + Payment - FP0 Fees + Payment - FP0 107010 108030 107010 1 0.14 0.86 Fees + Payment - FP0 107010 1 Fees + Payment - FP0 Fees + Payment - FP0 Fees + Payment - FP0 107010 108030 107010 1 0.23395089 0.76604911 Fees + Payment - FP0 107010 1 Fees + Payment - FP0 107010 1 Fees + Payment - FP0 107010 1 Fees + Payment - FP0 107010 1 Fees + Payment - FP0 Fees + Payment - FP0 Fees + Payment - FP0 Fees + Payment - FP0 Fees + Payment - FP0 107010 107010 107010 107010 107010 1 1 1 1 1 Fees + Payment - FP0 107010 1 Fees + Payment - FP0 108030 0.24322273 Fees + Payment - FP0 107010 0.75677727 Fees + Payment - FP0 108030 1 Fees + Payment - FP0 Fees + Payment - FP0 107010 903003 1 1 Fees + Payment - FP0 107010 1 Fees + Payment - FP0 107010 1 Fees + Payment - FP0 107010 1 Fees + Payment - FP0 107010 1 Fees + Payment - FP0 107010 1 Fees + Payment - FP0 Fees + Payment - FP0 Fees + Payment - FP0 Fees + Payment - FP0 Fees + Payment - FP0 Fees + Payment - FP0 Fees + Payment - FP0 Fees + Payment - FP0 Fees + Payment - FP0 Fees + Payment - FP0 Fees + Payment - FP0 Fees + Payment - FP0 Fees + Payment - FP0 107010 108030 107010 107010 108030 108040 108030 108040 108030 108040 108040 108030 108040 1 0.07894737 0.92105263 1 0.99009901 0.00990099 0.99009901 0.00990099 0.99009901 0.00990099 0.00990099 0.99009901 0.00990099 Roamtree Dr, Old Saybrook/TL-5/4/18 replace xfmrs, 3 c/o's @ pole2834 2-4-6 PUTNAM LN Electric Service New UG Residential Meter Dept Set RTM-101 Warren St, Mer. Frontier Pole Reject. P#4730 AP1-YWO Total Cost Less Than 7K AMM 130 FREIGHT ST,WTBY. ENVIRONMENTAL SITE MONITORING. 3PH DB XFMR 773. AP1-YWO Total Cost Less Than 7K Sandy Hook 37F - Replace the failed battery Sandy Hook 37F - Replace the failed battery RTM-371 S Curtis St, Mer. Frontier Pole Reject. P#1610 AP2-YWO Total Cost Variance Met - Variance :2.6562 MIN.:-50 MAX.:50 MJP - CD00348 - 102-363 - (6)Phase 2: Civil (includes bridge material) JE-YWO Variance Job Type Exclusion RL: Paterson Ave: Electric Service Un-Metered Pole 73219 AP1-YWO Total Cost Less Than 7K RR- 104 Forty Acre Mtn Rd Danbury, ATT p #4268 needs to be replaced PR01/20/16 AP1-YWO Total Cost Less Than 7K PURCHASE 29 CBS ARCSAFE REMOTE RACKING UNITS FOR SUBSTATIONS THAT CURRENTLY DO NOT HAVE A SYSTEM THAT WORKS SAFELY __________________________________________CMK Digital Grid Relays - FREIGHT STREET 11W Work order is to be used to capture costs for retrofitting relays for network protectors CDOT 152-158/CD01102, UG civil design, I395 bridge, Waterford JE-YWO Variance Job Type Exclusion CDOT 152-158/CD01102, UG cable pull, I395 bridge, Waterford JE-YWO Variance Job Type Exclusion EJC 279 Oak St, NB P#5724 Replaced Xfrmr, Installed C/Os, POST CONSTRUCTION AP1-YWO Total Cost Less Than 7K Replace failed 11B61 3ph regulator Replace failed 11B61 3ph regulator CT VOICE RADIO SYSTEM PROJECT - WINDSOR WAN CIRCUITS ESO 8/22 Conklin Rd Stafford p 7056/ 7060 AP1-YWO Total Cost Less Than 7K Refurbish switchgear body, excludes roof. Refurbish roof after moratorium Refurbish switchgear body, excludes roof. Refurbish roof after moratorium Refurbish switchgear body, excludes roof. Refurbish roof after moratorium Refurbish switchgear body, excludes roof. Refurbish roof after moratorium Long Term Debt2007 Series A EJC 14 Carmel St, New Britain P#3362 Replaced Xfrmr, Added Fuses, POST CONST AP1-YWO Total Cost Less Than 7K Proj#CD00699-13B33 Relocate for Trans, Part 3 of 6: Chase Pkwy w/ 556 CL-YWO Variance - Contractor Labor Proj#CD00699-13B33 Relocate for Trans, Part 3 of 6: Chase Pkwy w/ 556 CL-YWO Variance - Contractor Labor This work order will be used under the 2024 annual meter project is approved for 2024 Sentinel work and programming Install a JMUX at Windsor and cutover circuits to this new JMUX. Remove the East Springfield AWC DMX. Upgrade any out of date firmware on the JMUX networks. Order spares for the DMX network. Install a JMUX at Windsor and cutover circuits to this new JMUX. Remove the East Springfield AWC DMX. Upgrade any out of date firmware on the JMUX networks. Order spares for the DMX network. Relocate 39E1 23kV From Hamlton Rd. to new Schoephoester Rd. Windsor Locks JE-YWO Variance Job Type Exclusion Relocate 39E1 23kV From Hamlton Rd. to new Schoephoester Rd. Windsor Locks JE-YWO Variance Job Type Exclusion Relocate 39E1 23kV From Hamlton Rd. to new Schoephoester Rd. Windsor Locks JE-YWO Variance Job Type Exclusion *EMERGENCY* SHIFT TO FRONTIER DBL POLE 10093 - Property Damage OH (INSOH) AP1-YWO Total Cost Less Than 7K AMM 25 HATTERS LN,FARM. REPLACE & RELOCATE OH SERVICE TO NEW ATTACHMENT POINT. AP1-YWO Total Cost Less Than 7K RM 50 POWDER HORN HILL WESTON REPLACE OPEN SEC POLE#13557 PER LINE DEPT AP1-YWO Total Cost Less Than 7K Small Tools - Stations Newington 4A - Replace the failed 4A-3H potential Transformers Newington 4A - Replace the failed 4A-3H potential Transformers 8/15 - HAROH - AVON, FAR HILLS DR - SECONDARY FAULT UNDER DRIVEWAY AP2-YWO Total Cost Variance Met - Variance :70.5939 MIN.:-50 MAX.:150 PD-15 Blue Heron Rd Niantic/Install new OH/DB residential service AP1-YWO Total Cost Less Than 7K DL; SYLVAN KNOLL RD; REPLACE POLE 597 & 598/SHIFT PRIMARY CL-YWO Variance - Contractor Labor LD WEST CEDAR ST NORWALK RECONDUCTOR PRI 24A10-73S-24A10-92T TD 941 POLE#23020 CI-YWO Variance - Contractor Invoice EJC 412R South Main St, NB P#294 Run Tpx to Pole and to House, M/L/C AP1-YWO Total Cost Less Than 7K Municipal Light Fault Locate and Repair @ POLE 2561 - COMP 6/22 CCC AP1-YWO Total Cost Less Than 7K Municipal Light Fault Locate and Repair @ POLE 2561 - COMP 6/22 CCC AP1-YWO Total Cost Less Than 7K Municipal Light Fault Locate and Repair @ POLE 2561 - COMP 6/22 CCC AP1-YWO Total Cost Less Than 7K (CH) P#1868: CHG OH DROP_DAMANGED DURING MARCH STORMS AP1-YWO Total Cost Less Than 7K PUGT0011OPSNTRELEXPENSES11 RSO,2/14, WOODSTOCK, ROCKY HILL ROAD AP1-YWO Total Cost Less Than 7K CA AWO CLP$2.20S STOCK CA AWO CLP$2.00S STOCK CA AWO CLP4.50%S STOCK 1963 CA AWO CLP4.96%S STOCK RM 10 Ridge Ln Weston Replace Existing Residential Overhead svc CD00471-01 Elim. 23U S/S Install 13B25-160R P#4 w/pole replacements CL-YWO Variance - Contractor Labor $25 reimbursement for transformer upgrades - Amnott, Katherine HEATWAVE JUN 29-JUL 7 2018 - ALL REGIONS Sales/Use Tax Payments EJC Webster Ct, Newington Replace PTT Poles Damaged by Landscaping Contractor AP2-YWO Total Cost Variance Met - Variance :-24.1926 MIN.:-50 MAX.:50 Weston 21M - Replace the failed GE IAC relays Jpt-RSO-320 Farmington Ave Plnv P1515 - REPL 1000 WATT BULB AND EYE AP1-YWO Total Cost Less Than 7K RA CDOT 163-203 RT 66 - outage south side of bridge JE-YWO Variance Job Type Exclusion RA CDOT 163-203 RT 66 - outage south side of bridge JE-YWO Variance Job Type Exclusion Bates Rock 21K - Refurbish the switchgear enclosure Replace Failed A/C Unit Replace Failed A/C Unit AMM 47 BURNT HILL RD FARMINGTON. REPLACE DB STREETLIGHT HEAD. POLE 2502. AP1-YWO Total Cost Less Than 7K MM REPLACE SERVICE 48 LONGVIEW ST, NEW LODON ALL WORK COMPLETE AMM WAKELEE RD,WTBY. Municipal Light Fault Locate and Repair@ POLE L2A7. AP1-YWO Total Cost Less Than 7K Stamford Garage - Install new fluid handling system. Stamford Garage - Install new fluid handling system. Elec Svc Line Extension/Development DESG (DN) GCC / I&R XFMR AND INSTALL A NEW 150' OVERHEAD SERVICE TO HOME AP1-YWO Total Cost Less Than 7K Rebuild Failed 1A-5X Load Tap Changer (LTC) Rebuild Failed 1A-5X Load Tap Changer (LTC) JS - 47 West Wooster St, Danb, Inst\Rem OH Svc (11A74) AP1-YWO Total Cost Less Than 7K RTM-COMP 9/28/18 CCC MERIDEN POLE 42 BR SQ & RMV 150 HPS PTT, INST 51W LED PTT AP1-YWO Total Cost Less Than 7K RSO, 8/3, MANCHESTER, DARTMOUTH, P5501 REPLACED XFMR AP1-YWO Total Cost Less Than 7K RSO, 8/21, ENFIELD, ENFIELD STREET, P 2932 - REPLACED 60' OF 1/0 QUAD AP1-YWO Total Cost Less Than 7K COMP 10/03/18 CCC POLE 4032 NEEDS TO BE STRAIGHTENED & NEEDS 28W LED PTT AP1-YWO Total Cost Less Than 7K Two - CNDX 08083840 400 ft DUCT RODDR Seven Battery operated Cable cutters transfer from GX170031 which incorrectly has and expense FERC Account (593000) Die set kit including Milwaukee Model # 49-22-8400 6 pc 1 inch cutting depth and Milwaukee Model # 49-22-8410 9 pc 2 inch cutting depth Varidesk adjustable workspace Exec 40 for Dave Samal's office MJP - CD00348 - 102-363 - (2)Phase 1: Civil work required JE-YWO Variance Job Type Exclusion DL; 50 SEASIDE AVE; Electric Service Existing Residential Overhead DL; 50 SEASIDE AVE; Electric Service Existing Residential Overhead Furnish necessary engineering and design using a 2011 annual work order to retire the Oak St. 43 substation; scrap the transformer, remove the fence, traprock and sell the site. CS003001 Retire Substation 1S821317 CSWK0011 SH-Convo#671325-MakeReadyReimb - Ci Customer Service Week 1N820554 MJP - CD00348 - 102-363 - (3)Phase 1S821300 RL:150 Old Kings Hwy; Electric Serv 3L821505 WATERBURY POLE 7175 150 HPS COBRA C 3R621016 CD00471-01Elim. 23U Voluntown S/S C 1N820551 MJP - CD00348 - 102-363 - (1)Phase 1S820537 F1811042 F1811042 DSN82020 10117243 10117243 10117244 10117244 10117246 10117246 10117247 10117247 10117248 COMP. 05/06/2019 STM Muni FLR ir@ Replace dock leveler pump Replace dock leveler pump (50): LED Lighting Upgrades DSN8202 Sale of Streetlights Farmington Sale of Streetlights Farmington Sale of Streetlights Westbrook Sale of Streetlights Westbrook Sale of Streetlights Sprague Sale of Streetlights Sprague Sale of Streetlights Sterling Sale of Streetlights Sterling Sale of Streetlights Mansfield 2018 SH-Convo#671325-MakeReadyReimb - Cingular WL Parent Convo#655137 AP1-YWO Total Cost Less Than 7K Customer Service Week-Quarsema MJP - CD00348 - 102-363 - (3)Phase 1: Electrical UG work required JE-YWO Variance Job Type Exclusion RL:150 Old Kings Hwy; Electric Service Existing Residential Overhead 110' #2 tpx AP1-YWO Total Cost Less Than 7K WATERBURY POLE 7175 150 HPS COBRA COMPLETED 04/09 CHE AP1-YWO Total Cost Less Than 7K CD00471-01Elim. 23U Voluntown S/S Conversion Work #1 AP2-YWO Total Cost Variance Met - Variance :6.287 MIN.:-30 MAX.:30 MJP - CD00348 - 102-363 - (1)Phase 1: OH Work, Inst. Poles 30239, 30240 & PB JE-YWO Variance Job Type Exclusion COMP. 05/06/2019 STM Muni FLR ir@ POLE 2143 NO PWR UG- NEEDS FIXTURE AP1-YWO Total Cost Less Than 7K Norwalk - Replace dock leveler hydraulic pump and motor Norwalk - Replace dock leveler hydraulic pump and motor Waterside 22M - Replace existing lightig with LED lights. Record the sale of street lights to the town of Farmington 2018 Record the sale of street lights to the town of Farmington 2018 Record the sale of street lights to the town of Westbrook 2018 Record the sale of street lights to the town of Westbrook 2018 Record the sale of street lights Sprague Record the sale of street lights Sprague Record the sale of street lights Sterling Record the sale of street lights Sterling Record the sale of street lights for Mansfield 2018
  9. Page 16 of 459

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued October 23, 2026 RRU-159 Attachment 6 CONFIDENTIAL Page 16 of 459 work_order_number 10117248 description Sale of Streetlights Mansfield 2018 1N820466 MJP - CD00348 - 102-363 - (4)Phase 1N820466 DSQ82031 MJP - CD00348 - 102-363 - (4)Phase (50): Replace Failing A/C Unit and 1S821166 Elec Maint Replace/Renewal/Obsol OH 3H722608 DSSP0011 13 Pinecrest Dr.E.Hartf. Replace op Dist Sta Care and Support 1B821681 SH-Convo#672962-MakeReadyNonReimib 1B821681 APCY0011 SH-Convo#672962-MakeReadyNonReimib Accnts Payable - Contract Admin-CY 2M722145 EJC 40 Cedar St, Newington P#445 FT 1B720883 20119704 20119704 DV204E11 DV324E11 23 SIMPAUG TPKE Elec Svc Existing SOUTH END 1G - REFURBISH SWITCHGEAR SOUTH END 1G - REFURBISH SWITCHGEAR CA AWO CLP$2.04S STOCK CA AWO CLP$3.24S STOCK 3H820563 3150 Main St Htfd C8671 Replace 250 2M721164 WC-2/25/17 ESO 267 SANDY HILL RD MI 4D721190 (DF) - PATROL REPAIRS 11C12 - DEEP 5T720994 CS009048 CAPWK011 VERNON, E MAIN ST - REPLACED 400W H DSCADA LTC Controls Upgrade Default WO 4 Capital Work-100% EXP 4N821586 PT5D0011 GCC / I&R OVERHEAD SERVICE TO HOME Temporary Work 2M722205 CT17D003 INST 3CT UG SVC FROM HH1242 TO NEW Southbury CSP Battery Replacement 3H722174 8/19 RSO HARTFORD, SWHITNEY ST P#68 3R520162 CD00389-03 Convert Tanner Marsh & 2L720118 Winsted, 170 Williams Ave MK CONV#4 2L720118 Winsted, 170 Williams Ave MK CONV#4 2C620204 rpl ples relocate 1xfrmr ins 3phase 2M722903 ESO 9A 6/8 WATERBURY, 593 SYLVAN AV 2M621783 PT Convo# 402134-MakeReadyWirelessA 2M621783 PT Convo# 402134-MakeReadyWirelessA 2M621783 PT Convo# 402134-MakeReadyWirelessA 2M723018 CS00278B CS00278B CS00278C CS00278C EJC 66 Clifford St, Newington P#602 LAKEVIEW 31A SWITCHGEAR LAKEVIEW 31A SWITCHGEAR WESTON 21M SWITCHGEAR WESTON 21M SWITCHGEAR 4D721127 NS- 13 Blue Heron Ln, CL- Ins 4/0 A 1N821115 CT17D035 JES; 610 OLD STAMFORD RD. NEW CANAA SIMSBURY TOWER LIGHT MONITORING CT17D036 CONVEX - Lake Road ARDs 3R420248 MP - CD00320-02 - 30R8 - Reconducto 4N721070 COMPLETED 6/29 CCC-Fault Locate and 3H522527 CS00278Q CS00278Q DSQ82028 DSQ82035 DSQ82035 TPA/Rplc P1561 & provide DE guy.Con TODD 30L SWITCHGEAR TODD 30L SWITCHGEAR (50): Replace Failed SWGR A/C Unit (60): Replace Failed 23Q-1T-6 Motor (60): Replace Failed 23Q-1T-6 Motor F1811102 Newtown EOC Expansion F1811102 Newtown EOC Expansion 3R621047 GCMT0011 INVT0711 APLZR111 CD00471-09 Conversion Work Forge Hi Gold Coast - Meter Inventory Offset Accounts Payable LREC/ZREC 5D621289 DG P#1258 96 RED BRIDGE RD THOMPSON 5D520553 BC - CD00450-02 - New 3PH Ovrbld,Re 5D520553 BC - CD00450-02 - New 3PH Ovrbld,Re 5D520553 DSN62035 DSN62035 CS000096 BC - CD00450-02 - New 3PH Ovrbld,Re (40): Refurbishment of the switchge (40): Refurbishment of the switchge S LEONARD 23N-PURCH S/S REMOTE RACK 3R620494 DSQ82047 DSQ82047 GXC18W99 BLOOMFIELD, SIMSBURY RD - INSTALL L (60): Replace Failed 21J-10T-6 Swit (60): Replace Failed 21J-10T-6 Swit WILLIAMS - Storm Room Printer GXC19C01 3PH ID T&R w/Cables 5T822402 CDOT 134-147 Orcuttville Rd. Rt 319 5T822402 CDOT 134-147 Orcuttville Rd. Rt 319 2M721761 PWCD1152 AMM 1305 FARMINGTON AVE, FARM. 9A C Private Work for FP CD01152 2L821480 Print HOLD cust material 7/4 JFC - 2L821480 Print HOLD cust material 7/4 JFC - 4D720134 11EDSTUD FP11FIBR LTDB1411 LTDB1511 DSN72055 CT18D001 DSN82009 DSN82009 GXC18E30 REVUPF11 GXC18C57 GXC18C62 GXC18C63 GXC18C67 GXC18C68 GXC18C70 Hartlands Dr, #35 Old Saybrook/TL-P Educate the Students Norwalk - Lakeview ADSS Fiber Long Term Debt2006 Series A Long Term Debt2006 Series A (30): Add Landscaping DSN72055 2018 CT BATTERY REPLACEMENTS (50): Replace Failing Battery DSN82 (50): Replace Failing Battery DSN82 SCADA controlled switchgear Revolver Upfront Expenses Crimper Dies (2) Phasing Stx & Adaptor (2) 2NR Bomb Blankets (8) 2NR iPAD (2) 2NR GoLights (2) 2BB Drive Assembly 7' 2NP Iacolo 2C820221 SW CDOT 99-114/115 MAIN ST N CANAAN 2C820221 CS002151 CS002151 CS00278N CS00278N SW CDOT 99-114/115 MAIN ST N CANAAN Recloser Automation Recloser Automation SO NAUGATUCK 21L SWITCHGEAR SO NAUGATUCK 21L SWITCHGEAR 4N820536 Quanaduck Rd, Stonington/TL-02-26-1 4N820536 Quanaduck Rd, Stonington/TL-02-26-1 4N820536 VHAC0011 GX180011 GX180013 GX180016 GX180017 GX180018 Quanaduck Rd, Stonington/TL-02-26-1 Preventable Motor Vehicle Accident 18V Hydraulic Cutter and Battery Ratiometer DTR Model 8510 HILTI Combi Hammer Snow Removal Equip - Sanders Five Duarack Drawer Assemblies 3L822274 HARTFORD POLE 9052 RMV 92W, INST 92 CS002691 Race Hill 15D - Remove S/S 1S821141 MS18P011 DM/36 HEUSTED DR OLD GRN: INST 3" S WIND/RAIN FRI DEC 21 2018 2M322581 CDOT 17-186 - RTE 6 Bristol Road Wi 2M322581 CDOT 17-186 - RTE 6 Bristol Road Wi 2W421636 JD 492601 13F64 RELOCATE OH LINE CD 2W421636 JD 492601 13F64 RELOCATE OH LINE CD 2W421636 CS002785 CS002785 CT18D005 JD 492601 13F64 RELOCATE OH LINE CD STONY HILL 48C SWITCHGEAR STONY HILL 48C SWITCHGEAR GPS Norwalk AWC 5W220907 RA CDOT 32-130 Main St., Coventry 1B822375 DSN82008 CDOT 18-136 - Brookfield Streetscap (50): Replace Deteriorated Driveway 4N720046 CFICT18B MM REPLACE SERVICE 9A SPITHEAD RD. CT 2019 Meter Purchases 2M622666 Jpt-777 Wolcott St Wtby (Frnt)P7539 2M821147 CD00080-16 - Network Replacement-UG 2M821147 CD00080-16 - Network Replacement-UG long_description Record the sale of street lights for Mansfield 2018 MJP - CD00348 - 102-363 - (4)Phase 1: Removal of Existing OH Pole Line JE-YWO Variance Job Type Exclusion MJP - CD00348 - 102-363 - (4)Phase 1: Removal of Existing OH Pole Line JE-YWO Variance Job Type Exclusion Replace Failing A/C Unit and Install Hydrogen Detection Elec Maint Replace/Renewal/Obsol OH DESG (AROH) AP1-YWO Total Cost Less Than 7K 13 Pinecrest Dr.E.Hartf. Replace open wire service P- 3341 AP1-YWO Total Cost Less Than 7K DSSP0011OPSNTRELEXPENSES11 SH-Convo#672962-MakeReadyNonReimib Parent Convo#657857 NO AWOCS-AWOCS REASON CODE AND DESCRIPTION NOT FOUND. SH-Convo#672962-MakeReadyNonReimib Parent Convo#657857 NO AWOCS-AWOCS REASON CODE AND DESCRIPTION NOT FOUND. Accnts Payable - Contract Admin-CY EJC 40 Cedar St, Newington P#445 FTR to Replace Pole, Shift Facilities AP1-YWO Total Cost Less Than 7K 23 SIMPAUG TPKE Elec Svc Existing Residential pr4/27/17 AP2-YWO Total Cost Variance Met - Variance :66.3019 MIN.:-50 MAX.:150 SOUTH END 1G - REFURBISH SWITCHGEAR PHASE 4 SOUTH END 1G - REFURBISH SWITCHGEAR PHASE 4 CA AWO CLP$2.04S STOCK CA AWO CLP$3.24S STOCK 3150 Main St Htfd C8671 Replace 250w head to new city pole AP1-YWO Total Cost Less Than 7K WC-2/25/17 ESO 267 SANDY HILL RD MIDDLEBURY CAR VS POLE # F5107 AP2-YWO Total Cost Variance Met - Variance :19.5987 MIN.:-50 MAX.:50 (DF) - PATROL REPAIRS 11C12 - DEEP RIVER (POST CONSTRUCTION) AP3-YWO Resource Variance Met- Labor 58 <= 32 OR -96.66 <= 30 And Contractor $0 <= 2000 VERNON, E MAIN ST - REPLACED 400W HPS FLOOD @ POLE 9s - COMP 5/25/17 CCC AP1-YWO Total Cost Less Than 7K Furnish necessary engineering and design to replace existing radio-controlled Transformer Load Tap Changer (LTC) Voltage Reduction System with a DSCADA controlled LTC Voltage Reduction System at various Eversource Connecticut substations. This system is used to lower the Distribution voltage (2% or 5%) during certain Transmission contingencies to help stabilize the system. The DSCADA signal will be transmitted via radio from the control house to the LTC receiver, to avoid the expense of adding additional conduit, if no conduit is available. If conduit is available, the devices will be connected via fiber cable. Default work order used when capital is installed by a work order has not yet been created. Used by Click Mobile for timesheets. THIS WORK ORDER IS 100% EXPENSE. GCC / I&R OVERHEAD SERVICE TO HOME Temporary Work INST 3CT UG SVC FROM HH1242 TO NEW RESIDENTIAL LOT12 AP1-YWO Total Cost Less Than 7K Replace existing batteries at Southbury CSP which have reached end of life. 8/19 RSO HARTFORD, SWHITNEY ST P#6850 REPLACED 90' SVC WIRE AP1-YWO Total Cost Less Than 7K CD00389-03 Convert Tanner Marsh & Clapboard Hill & Hang Steps CI-YWO Variance - Contractor Invoice Winsted, 170 Williams Ave MK CONV#488774-MAKEREADYNON-REIMB AP2-YWO Total Cost Variance Met - Variance :-28.6419 MIN.:-50 MAX.:50 Winsted, 170 Williams Ave MK CONV#488774-MAKEREADYNON-REIMB AP2-YWO Total Cost Variance Met - Variance :-28.6419 MIN.:-50 MAX.:50 rpl ples relocate 1xfrmr ins 3phase banl and oh svc camp sloane indian mt rd AP2-YWO Total Cost Variance Met - Variance :-.1457 MIN.:-50 MAX.:50 ESO 9A 6/8 WATERBURY, 593 SYLVAN AVE - 9A P7260 AP1-YWO Total Cost Less Than 7K PT Convo# 402134-MakeReadyWirelessAttachReimb-Frontier-Parent Convo# 397492 AP1-YWO Total Cost Less Than 7K PT Convo# 402134-MakeReadyWirelessAttachReimb-Frontier-Parent Convo# 397492 AP1-YWO Total Cost Less Than 7K PT Convo# 402134-MakeReadyWirelessAttachReimb-Frontier-Parent Convo# 397492 AP1-YWO Total Cost Less Than 7K EJC 66 Clifford St, Newington P#6022 Replaced Pole, Xfrmr, Shift Facilities AP2-YWO Total Cost Variance Met - Variance :134.8751 MIN.:-50 MAX.:150 Refurbish switchgear body, excludes roof. Refurbish roof after moratorium Refurbish switchgear body, excludes roof. Refurbish roof after moratorium Refurbish switchgear body, excludes roof. Refurbish roof after moratorium Refurbish switchgear body, excludes roof. Refurbish roof after moratorium NS- 13 Blue Heron Ln, CL- Ins 4/0 AL to House from HH 432A AP1-YWO Total Cost Less Than 7K JES; 610 OLD STAMFORD RD. NEW CANAAN.; Elec Svc Existing Residential pl 671... MCPHEE ELECTRIC WILL PURCHASE THE EQUIPMENT AND PERFORM THE WORK FOR SIMSBURY TOWER LIGHT MONITORING CONVEX has requested a new ARD from the Lake Rd generator to CONVEX. ISO would also like to upgrade their existing ARD to the Generator to make use of the fiber at Lake Rd. At the same time, we will upgrade the existing substation ARD to CONVEX over the new AVA-E IP backhaul equipment. This work order will be for CL&P equipment needed at Berlin to provide 4 new terminations that can make use of the corporate network and fiber to TOCA and TOCB from Lake Rd. SS and Gen. MP - CD00320-02 - 30R8 - Reconductor RTE 80-BB to 336TW - 2 of 2, Madison MS-YWO Variance - Multiple Setups COMPLETED 6/29 CCC-Fault Locate and Repair@POLE 2794 NO POWER UG AP1-YWO Total Cost Less Than 7K TPA/Rplc P1561 & provide DE guy.Conv#281746 billable 5' for com top mount Ant AP1-YWO Total Cost Less Than 7K Refurbish switchgear body, excludes roof. Refurbish roof after moratorium Refurbish switchgear body, excludes roof. Refurbish roof after moratorium Replace Failed SWGR A/C Unit Thompson 23Q - Replace the failed 23Q-1T-6 motor operated disconnect switch Thompson 23Q - Replace the failed 23Q-1T-6 motor operated disconnect switch Newtown - Expansion of space is required to support additional staffing for Storm Response. Newtown - Expansion of space is required to support additional staffing for Storm Response. CD00471-09 Conversion Work Forge Hill Rd Job 2 AP2-YWO Total Cost Variance Met - Variance :-4.4317 MIN.:-20 MAX.:20 Gold Coast Payments - Meter Inventory Offset-Ouimette Accounts Payable LREC/ZREC DG P#1258 96 RED BRIDGE RD THOMPSON FRNTR POLE RPLC CLP TO SHIFT CO P#1259 AP1-YWO Total Cost Less Than 7K BC - CD00450-02 - New 3PH Ovrbld,Re-cond. & Convert 1PH Undrbld (1 of 5) 472157 CL-YWO Variance - Contractor Labor BC - CD00450-02 - New 3PH Ovrbld,Re-cond. & Convert 1PH Undrbld (1 of 5) 472157 CL-YWO Variance - Contractor Labor BC - CD00450-02 - New 3PH Ovrbld,Re-cond. & Convert 1PH Undrbld (1 of 5) 472157 CL-YWO Variance - Contractor Labor Refurbishment of the switchgear enclosure. Refurbishment of the switchgear enclosure. PURCHASE 29 CBS ARCSAFE REMOTE RACKING UNITS FOR SUBSTATIONS THAT CURRENTLY DO NOT HAVE A SYSTEM THAT WORKS SAFELY __________________________________________CMK BLOOMFIELD, SIMSBURY RD - INSTALL LINE SENSORS FOR FEEDER METERING 44 S/S AP1-YWO Total Cost Less Than 7K Replace Failed 21J-10T-6 Switch Replace Failed 21J-10T-6 Switch WILLIAMS - Storm Room Printer 3BF - 3 Phase ID Transmitter & Receiver w/Cables s/c 589220/589239-42/602082-84. Unit Cost: $5k CDOT 134-147 Orcuttville Rd. Rt 319 Stafford Phase 2 pole relocations JE-YWO Variance Job Type Exclusion CDOT 134-147 Orcuttville Rd. Rt 319 Stafford Phase 2 pole relocations JE-YWO Variance Job Type Exclusion AMM 1305 FARMINGTON AVE, FARM. 9A CAR VS POLE. SHIFT TO NEW FRONTIER POLE 76. AP1-YWO Total Cost Less Than 7K Private Work for FP CD01152 86 HAGEMAN SHEAN RD GOSH/ PRI RISER/25KVA PAD/ 4/0 SVC cost_element_group Fees + Payment - FP0 ferc_account 108030 percent 0.99009901 Fees + Payment - FP0 108030 0.95435 Fees + Payment - FP0 Fees + Payment - FP0 593000 107010 0.04565 1 Fees + Payment - FP0 107010 1 Fees + Payment - FP0 Fees + Payment - FP0 107010 582280 1 1 Fees + Payment - FP0 107010 0.84103 Fees + Payment - FP0 Fees + Payment - FP0 593000 23401X 0.15897 1 Fees + Payment - FP0 107010 1 Fees + Payment - FP0 Fees + Payment - FP0 Fees + Payment - FP0 Fees + Payment - FP0 Fees + Payment - FP0 107010 108030 107010 437030 437070 1 0.1 0.9 1 1 Fees + Payment - FP0 107010 1 Fees + Payment - FP0 107010 1 Fees + Payment - FP0 107010 1 Fees + Payment - FP0 Fees + Payment - FP0 Fees + Payment - FP0 107010 107010 580000 1 1 1 Fees + Payment - FP0 Fees + Payment - FP0 107010 185010 1 1 Fees + Payment - FP0 Fees + Payment - FP0 107010 107010 1 1 Fees + Payment - FP0 107010 1 Fees + Payment - FP0 107010 1 Fees + Payment - FP0 107010 0.94768 Fees + Payment - FP0 593000 0.05232 Fees + Payment - FP0 107010 1 Fees + Payment - FP0 107010 1 Fees + Payment - FP0 593000 0.39707 Fees + Payment - FP0 107010 0.33823 Fees + Payment - FP0 108030 0.2647 Fees + Payment - FP0 Fees + Payment - FP0 Fees + Payment - FP0 Fees + Payment - FP0 Fees + Payment - FP0 107010 108030 107010 108030 107010 1 0.01999988 0.98000012 0.04680887 0.95319113 Fees + Payment - FP0 107010 1 Fees + Payment - FP0 Fees + Payment - FP0 107010 107010 1 1 Fees + Payment - FP0 107010 1 Fees + Payment - FP0 107010 1 Fees + Payment - FP0 107010 1 Fees + Payment - FP0 Fees + Payment - FP0 Fees + Payment - FP0 Fees + Payment - FP0 Fees + Payment - FP0 Fees + Payment - FP0 107010 107010 108030 107010 107010 108030 1 0.87166702 0.12833298 1 0.87770276 0.12229724 Fees + Payment - FP0 107010 0.91173412 Fees + Payment - FP0 108030 0.08826588 Fees + Payment - FP0 Fees + Payment - FP0 Fees + Payment - FP0 Fees + Payment - FP0 107010 586000 154PC0 232LZ0 1 1 1 1 Fees + Payment - FP0 107010 1 Fees + Payment - FP0 107010 0.96536 Fees + Payment - FP0 594000 0.02063 Fees + Payment - FP0 Fees + Payment - FP0 Fees + Payment - FP0 Fees + Payment - FP0 593000 107010 108030 107010 0.01401 0.8 0.2 1 Fees + Payment - FP0 Fees + Payment - FP0 Fees + Payment - FP0 Fees + Payment - FP0 107010 108030 107010 107010 1 0.14846773 0.85153227 1 Fees + Payment - FP0 107010 1 Fees + Payment - FP0 107010 0.98957 Fees + Payment - FP0 594000 0.01043 Fees + Payment - FP0 Fees + Payment - FP0 107010 186010 1 1 Fees + Payment - FP0 107010 0.99175542 Fees + Payment - FP0 584280 0.00824458 Fees + Payment - FP0 Fees + Payment - FP0 Fees + Payment - FP0 Fees + Payment - FP0 Fees + Payment - FP0 Fees + Payment - FP0 Fees + Payment - FP0 Fees + Payment - FP0 Fees + Payment - FP0 Fees + Payment - FP0 Fees + Payment - FP0 Fees + Payment - FP0 Fees + Payment - FP0 Fees + Payment - FP0 Fees + Payment - FP0 Fees + Payment - FP0 Fees + Payment - FP0 107010 908100 107010 237CT0 237CT0 107010 107010 107010 108030 107010 186RV0 107010 107010 107010 107010 107010 107010 1 1 1 1 1 1 1 0.95471954 0.04528046 1 1 1 1 1 1 1 1 Fees + Payment - FP0 107010 0.99822 Fees + Payment - FP0 Fees + Payment - FP0 Fees + Payment - FP0 Fees + Payment - FP0 Fees + Payment - FP0 593000 108030 107010 107010 108030 0.00178 0.04911358 0.95088642 0.82995843 0.17004157 Fees + Payment - FP0 107010 0.45699 Fees + Payment - FP0 595000 0.08769 Fees + Payment - FP0 Fees + Payment - FP0 Fees + Payment - FP0 Fees + Payment - FP0 Fees + Payment - FP0 Fees + Payment - FP0 Fees + Payment - FP0 594000 184010 107010 107010 107010 107010 107010 0.45532 1 1 1 1 1 1 Fees + Payment - FP0 107010 1 Fees + Payment - FP0 108030 1 Fees + Payment - FP0 Fees + Payment - FP0 107010 593140 1 1 Fees + Payment - FP0 594000 0.15832 Fees + Payment - FP0 107010 0.84168 Fees + Payment - FP0 594000 0.22827 Fees + Payment - FP0 593000 0.01163 Fees + Payment - FP0 Fees + Payment - FP0 Fees + Payment - FP0 Fees + Payment - FP0 107010 107010 108030 107010 0.7601 0.79999991 0.20000009 1 Fees + Payment - FP0 107010 1 Fees + Payment - FP0 Fees + Payment - FP0 107010 107010 1 1 Fees + Payment - FP0 Fees + Payment - FP0 107010 107010 1 1 Fees + Payment - FP0 107010 1 Fees + Payment - FP0 594260 0.00042661 Fees + Payment - FP0 107010 0.99957339 Fees + Payment - FP0 Fees + Payment - FP0 Fees + Payment - FP0 Fees + Payment - FP0 Fees + Payment - FP0 Fees + Payment - FP0 107010 923000 107010 186EEB 908100 431110 1 1 1 1 1 1 Fees + Payment - FP0 107010 1 Fees + Payment - FP0 107010 1 Fees + Payment - FP0 Fees + Payment - FP0 107010 107010 1 1 Fees + Payment - FP0 107010 1 Fees + Payment - FP0 Fees + Payment - FP0 107010 586200 1 1 Fees + Payment - FP0 107010 0.96619 86 HAGEMAN SHEAN RD GOSH/ PRI RISER/25KVA PAD/ 4/0 SVC Hartlands Dr, #35 Old Saybrook/TL-POLE 496 - NEED NEW 60' SVC TO HOUSE AP1-YWO Total Cost Less Than 7K Educate the Students-Krawczyk Installation of ADSS Fiber - Norwalk to Lakeview 9S47 Long Term Debt2006 Series A NT011 Long Term Debt2006 Series A DIST11 Add Landscaping THIS IS FOR THE 2018 BATTERY REPLACEMENTS TO BE DONE BY OUTSIDE CONTRACTOR CONNECTICUT HAS 24 SITES Replace Failing Battery Replace Failing Battery SCADA controlled pad mounted switch gear initiative as part of company wide initiative to retrofit all exisiting automated pad mounted switchgear on the distribution system. Installed pilot system will remain in the training yard as a training aid for future use. ~ approximately $50K Revolver Upfront Expenses-Rose 2AD - Crimper Dies (2) s/c 569102 $634.99ea TOTAL: $1269.98 Wade 2NR - Phasing Sticks & DB Adapter (2) s/c 524484/571920/500659 TOTAL: $4652.25 Ellenberg 2NR - Bomb Blankets (x8) s/c 505968 $1235.43ea TOTAL: $9883.44 Ellenberg 2NR - iPAD (2) TOTAL: $2378 Engel 2BB - Light, "GoLight" (2) Programmable, wireless emote, magnetic attachment, 35 watt HID Bulb, 3000 Lumen S/C 570360 $503.94EA TOTAL: $1007.88 2NP - Drive End Assembly, 7'. s/c 567969 @$700ea TOTAL: $700 Iacolo SW CDOT 99-114/115 MAIN ST N CANAAN (RR XING IMPROVEMENTS) JE-YWO Variance Job Type Exclusion SW CDOT 99-114/115 MAIN ST N CANAAN (RR XING IMPROVEMENTS) JE-YWO Variance Job Type Exclusion Jefferson Hill 26F - Install new station FORM 6 Reclosers on the 26F1 feeder to address Recloser Automation (RA). This project also includes installation of a DSCADA communications system that will allow the SOC to remotely apply the control fast-trip feature prior to commencing any live-line feeder work. The overall project includes complete installation of all necessary protection settings, control and communications devices. Jefferson Hill 26F - Install new station FORM 6 Reclosers on the 26F1 feeder to address Recloser Automation (RA). This project also includes installation of a DSCADA communications system that will allow the SOC to remotely apply the control fast-trip feature prior to commencing any live-line feeder work. The overall project includes complete installation of all necessary protection settings, control and communications devices. Refurbish switchgear body, excludes roof. Refurbish roof after moratorium Refurbish switchgear body, excludes roof. Refurbish roof after moratorium Quanaduck Rd, Stonington/TL-02-26-18 REPLACED XFMR WITH ABOVE GROUND XFMR & PAD AP2-YWO Total Cost Variance Met - Variance :27.7279 MIN.:-50 MAX.:50 Quanaduck Rd, Stonington/TL-02-26-18 REPLACED XFMR WITH ABOVE GROUND XFMR & PAD AP2-YWO Total Cost Variance Met - Variance :27.7279 MIN.:-50 MAX.:50 Quanaduck Rd, Stonington/TL-02-26-18 REPLACED XFMR WITH ABOVE GROUND XFMR & PAD AP2-YWO Total Cost Variance Met - Variance :27.7279 MIN.:-50 MAX.:50 Preventable Motor Vehicle Accident Burndy Mfg. 18 V Hydraulic Cutter stock #501145 and Battery Charger stock #589591 to replace an older unit which cannot be restored AEMC Ratiometer DTRModel 8510 (12 Units for Eastern) to replace discontinued model which cannot be properly repaired and calibrated by the manufacturer HILTI Combihammer Performance Package TE 80 AC/AVR for General Construction Group Two tailgate mounted salt and sand spreaders for Newtown and Torrington AWCs Five Durarack drawers for the Apparatus Test Vans. part number CRC 06-2100-001 HARTFORD POLE 9052 RMV 92W, INST 92W COMPLETED 07/20 TOL AP1-YWO Total Cost Less Than 7K Race Hill 15D - remove deenergize substation PER HOANG HUYNH - DO NOT CLOSE WO - REMOVAL WORK NOT COMPLETE - ENVIRONMENTAL CHARGES STILL PENDING AND FOUNDATION WORK NEEDED. it DM/36 HEUSTED DR OLD GRN: INST 3" SEC RISER, 4/0 QPX, 200AMP 4W 120/208 AP1-YWO Total Cost Less Than 7K WIND/RAIN FRI DEC 21 2018 CDOT 17-186 - RTE 6 Bristol Road Widening - UG Secondary SVC JE-YWO Variance Job Type Exclusion CDOT 17-186 - RTE 6 Bristol Road Widening - UG Secondary SVC JE-YWO Variance Job Type Exclusion JD 492601 13F64 RELOCATE OH LINE CDOT 151-273- SEG 2 JE-YWO Variance Job Type Exclusion JD 492601 13F64 RELOCATE OH LINE CDOT 151-273- SEG 2 JE-YWO Variance Job Type Exclusion JD 492601 13F64 RELOCATE OH LINE CDOT 151-273- SEG 2 JE-YWO Variance Job Type Exclusion Refurbish switchgear body, excludes roof. Refurbish roof after moratorium Refurbish switchgear body, excludes roof. Refurbish roof after moratorium Install a GPS node and antenna hardware at Norwalk AWC. Connect any applicable devices to this GPS node.Facility located at 9 Tindall Ave RA CDOT 32-130 Main St., Coventry - STA 16+00 to 19+00 (pole 32 to pole 30) JE-YWO Variance Job Type Exclusion CDOT 18-136 - Brookfield Streetscape - Relocate 205, 206 JE-YWO Variance Job Type Exclusion Replace Deteriorated Driveway MM REPLACE SERVICE 9A SPITHEAD RD. WATERFORD @ P1558 This work order will be used temporarily in 2018 until the 2019 annual meter project is approved for 2019 purchases/work. Jpt-777 Wolcott St Wtby (Frnt)P7539-S - 9a - Rplc'd 2 Stubs Shifted Svc Riser AP1-YWO Total Cost Less Than 7K CD00080-06 - UG Electrical - Old Firehouse Rd - Install Switch Gear & 4/0 Pri CD00080-06 - UG Electrical - Old Firehouse Rd - Install Switch Gear & 4/0 Pri GRIDEVAL TRDV0011 DSQ82004 11ADMNBD 11AHESLM BINVFO11 GRID RESILIENCY EVALUATION Training (Phys & Non-Phys)-Dev (50): Replace Failed 1G01 DPAC Rela Aministration-Bid CLP - HEAR CA AWO COMMITTEE FEES 2L720526 THOMASTON - WATERTOWN AVE SUNOCO - 3H722493 COMP 1/27/18 CCC - WETHERSFIELD, RE 5D820008 CT17D058 49 N. CHESTNUT ST, POLE#25, INSTALL NO BLOOMFIELD 2A DMXTEND 5T721777 Lower Butcher Rd 70, Ellington. Rec 1N721862 ISMD0011 9A !!!!!!!!!!!RSO 12/23; NEWTOWN TP Install Meters & Dev (pre-cap/CFI) 2M621859 (CH) P#'S 948 & 5947: SHFT PRIORITY UCONN 2ND AMENDED AND RESTATED RESEARCH PROJECT(S) ID CONTRIBUTION OF RESILIENCY INTERVENTIONS TO SYSTEM LEVEL POWER GRID RESILIENCY AND PREVENT/SHORTEN OUTAGES AND SYSTEM IMPACTS W/CONSTRAINTS ASSET - SYSTEM PERFORMANCE ASSESSMENT MODEL TRDV0011NT011 Replace Failed 1G01 DPAC Relay Aministration-Bid-Quaresma CLP - HEAR - Tran, Thuy T CA AWO COMMITTEE FEES THOMASTON - WATERTOWN AVE SUNOCO - CHANGING SVC FROM OH TO DB AP1-YWO Total Cost Less Than 7K COMP 1/27/18 CCC - WETHERSFIELD, REPLACE ST LT POLE 3230 18' BROWN 70W PTT AP1-YWO Total Cost Less Than 7K 49 N. CHESTNUT ST, POLE#25, INSTALL 50KVA , SPLIT CRIB FROM POLE#1570 Install a DMXtend at North Bloomfield 2A. Cutover all the required circuits to the DMXtend. Lower Butcher Rd 70, Ellington. Reconnect DB svc at pole and house P-35000 AP1-YWO Total Cost Less Than 7K 9A !!!!!!!!!!!RSO 12/23; NEWTOWN TPKE WESTON; CAR V P31920-21 AP1-YWO Total Cost Less Than 7K ISMD0011OPSNTRELEXPENSES11 (CH) P#'S 948 & 5947: SHFT PRIORITY POLES_WATERBURY_MIB PROJECT AP1-YWO Total Cost Less Than 7K
  10. Page 17 of 459

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued October 23, 2026 RRU-159 Attachment 6 CONFIDENTIAL Page 17 of 459 work_order_number description 2M621859 (CH) P#'S 948 & 5947: SHFT PRIORITY 2M722889 DM/RSO 8/13 WOLCOTT, LONG SWAMP RD- 4D621517 Bokum Rd, Essex/TL-11/20/16 9A car 1B721557 BR 121 Lantern Park Ln N Southbury 3R420245 bwg/CD000320 pole replacements&reco 1S821939 CM-Conv#673174-MakeReadyNonReimb-MC 1S821939 CM-Conv#673174-MakeReadyNonReimb-MC 1S821939 GXC18W97 CM-Conv#673174-MakeReadyNonReimb-MC ESCOBAR - 2 Replacement clamp for I 4N620204 SM-WHITEHALL AVE, STONINGTON - CarV 1S720532 PH; 3/4/17 ESO - 1070 HIGH RIDGE RD 3H721946 JWL... 119-121 BLUE HILLS AVE. run 3H721946 5T920069 DSQ92004 DSQ92004 PW5D0011 JWL... 119-121 BLUE HILLS AVE. run *Ald/MAP COMP*(40): BC - CD00563-05 (30): Replace Failed 29J-1X3-4 Swi (30): Replace Failed 29J-1X3-4 Swi Private Work 5T920058 GNDIS111 GNDIS211 CDOT 129-115 Turnpike Rd. Somers Br Get Tax Credit-Purchase GN/Disc Get Tax Credit-Purchase GN/Disc 3R620616 RA CD00571-08 Install 3-167KVA S/D 3R620616 RA CD00571-08 Install 3-167KVA S/D 3R620616 GMPR0011 CT18D002 RA CD00571-08 Install 3-167KVA S/D GMP-Purchase Pwr-RECs SO WINDSOR 14L JMUX CIRCUITS 5T822185 DSQ92009 DSN82059 DSN82059 8 Belle Ave.Enfield Replace service Van Dyke 12 - Replace Failed Auto-T (30): Replace Deteriorated Driveway (30): Replace Deteriorated Driveway 1B920812 MBLD2411 MBLD2411 MBLD2411 EKCG2411 EKONKSR1 (50): 261 WOODBURY RD Elec Maint Tr Maintain Buildings Maintain Buildings Maintain Buildings 2024 CG EK Disconnects CT MTR DSCADA Sys Res Ekonk 4N822540 RA Project CDOT 113-107 - reloc fa 4E821066 BC - CDOT 41-118 - Relocate facilit 4E821066 BC - CDOT 41-118 - Relocate facilit long_description (CH) P#'S 948 & 5947: SHFT PRIORITY POLES_WATERBURY_MIB PROJECT AP1-YWO Total Cost Less Than 7K DM/RSO 8/13 WOLCOTT, LONG SWAMP RD- 9A P 5000 - LONGO/KENNEY AP1-YWO Total Cost Less Than 7K Bokum Rd, Essex/TL-11/20/16 9A car vs pole 156 see attached TT AP2-YWO Total Cost Variance Met - Variance :37.7622 MIN.:-50 MAX.:50 BR 121 Lantern Park Ln N Southbury Yellow Tag CL-YWO Variance - Contractor Labor bwg/CD000320 pole replacements&reconductor Rte 80 30R8 BB to 336TW,Killingworth CI-YWO Variance - Contractor Invoice CM-Conv#673174-MakeReadyNonReimb-MCI Parent Conv#657452 NO AWOCS-AWOCS REASON CODE AND DESCRIPTION NOT FOUND. CM-Conv#673174-MakeReadyNonReimb-MCI Parent Conv#657452 NO AWOCS-AWOCS REASON CODE AND DESCRIPTION NOT FOUND. CM-Conv#673174-MakeReadyNonReimb-MCI Parent Conv#657452 NO AWOCS-AWOCS REASON CODE AND DESCRIPTION NOT FOUND. ESCOBAR - 2 Replacement clamp for Impulse Phaser SM-WHITEHALL AVE, STONINGTON - CarVsP2370- Replaced 45' CLASS 2 AP3-YWO Resource Variance Met- Labor 19 <= 32 OR 67.31 <= 30 And Contractor $916.52 <= 2000 PH; 3/4/17 ESO - 1070 HIGH RIDGE RD STAMFORD CAR VS POLE# 9654 CASE# 1703040002 EW-YWO Variance - Emergent Work JWL... 119-121 BLUE HILLS AVE. run new svc from P5709 AP1-YWO Total Cost Less Than 7K JWL... 119-121 BLUE HILLS AVE. run new svc from P5709 AP1-YWO Total Cost Less Than 7K BC - CD00563-05 - Install SR on pole 1969, Birch Rd Replace Failed 29J-1X3-4 Switches Replace Failed 29J-1X3-4 Switches Private Work CDOT 129-115 Turnpike Rd. Somers Bridge replacement project JE-YWO Variance Job Type Exclusion Get Tax Credit-Purchase GN/Disc-Chandler Get Tax Credit-Purchase GN/Disc-Chandler RA CD00571-08 Install 3-167KVA S/D's Sunset Ave Putnam CI-YWO Variance - Contractor Invoice RA CD00571-08 Install 3-167KVA S/D's Sunset Ave Putnam CI-YWO Variance - Contractor Invoice RA CD00571-08 Install 3-167KVA S/D's Sunset Ave Putnam CI-YWO Variance - Contractor Invoice GMP-Purchase Pwr-RECs-Caron TO MOVE THE EXISTING CIRCUITS AT SO WINDSOR 14L TO THE RECENTLY INSTALLED JMUX. THEN CANCEL THE FRONTIER CIRCUITS 8 Belle Ave.Enfield Replace service from P- 14154 AP1-YWO Total Cost Less Than 7K Replace Failed Auto-Throwover Switch Replace Deteriorated Driveway Replace Deteriorated Driveway 261 WOODBURY RD Elec Maint Trouble Call - Repairs/Obsolescence OH Maintain Buildings-Rose Maintain Buildings-Rose Maintain Buildings-Rose 2024 CG EK Disconnects CT MTR DSCADA System Resiliency EKONK RA Project CDOT 113-107 - relocate facilities to perm location Stage 2 BC - CDOT 41-118 - Relocate facilities on RT 66 for bridge replacement STAGE 2 JE-YWO Variance Job Type Exclusion BC - CDOT 41-118 - Relocate facilities on RT 66 for bridge replacement STAGE 2 JE-YWO Variance Job Type Exclusion cost_element_group ferc_account percent Fees + Payment - FP0 593000 0.03381 Fees + Payment - FP0 107010 1 Fees + Payment - FP0 107010 1 Fees + Payment - FP0 107010 1 Fees + Payment - FP0 107010 1 Fees + Payment - FP0 594000 0.00467 Fees + Payment - FP0 107010 0.96502 Fees + Payment - FP0 Fees + Payment - FP0 593000 107010 0.03031 1 Fees + Payment - FP0 107010 1 Fees + Payment - FP0 107010 1 Fees + Payment - FP0 107010 0.69918 Fees + Payment - FP0 Fees + Payment - FP0 Fees + Payment - FP0 Fees + Payment - FP0 Fees + Payment - FP0 108030 107010 108030 107010 186010 0.30082 1 0.16266356 0.83733644 1 Fees + Payment - FP0 Fees + Payment - FP0 Fees + Payment - FP0 107010 236140 421TX0 1 1 1 Fees + Payment - FP0 593000 0.00167 Fees + Payment - FP0 107010 0.98178 Fees + Payment - FP0 Fees + Payment - FP0 Fees + Payment - FP0 594000 555950 107010 0.01655 1 1 Fees + Payment - FP0 Fees + Payment - FP0 Fees + Payment - FP0 Fees + Payment - FP0 107010 107010 108030 107010 1 1 0.13962104 0.86037896 Fees + Payment - FP0 Fees + Payment - FP0 Fees + Payment - FP0 Fees + Payment - FP0 Fees + Payment - FP0 Fees + Payment - FP0 107010 163020 921000 184010 107010 107010 1 0.45 0.45 0.1 1 1 Fees + Payment - FP0 107010 1 Fees + Payment - FP0 107010 0.99012 Fees + Payment - FP0 593000 0.00988 Fees + Payment - FP0 107010 1 Fees + Payment - FP0 Fees + Payment - FP0 107010 107010 1 1 Fees + Payment - FP0 107010 1 Fees + Payment - FP0 Fees + Payment - FP0 Fees + Payment - FP0 Fees + Payment - FP0 Fees + Payment - FP0 Fees + Payment - FP0 Fees + Payment - FP0 Fees + Payment - FP0 107010 107010 107010 107010 107010 107010 107010 107010 1 1 1 1 1 1 1 1 Fees + Payment - FP0 107010 1 Fees + Payment - FP0 107010 0.99223 Fees + Payment - FP0 593000 0.00649 Fees + Payment - FP0 594000 0.00128 Fees + Payment - FP0 Fees + Payment - FP0 108030 589000 1 1 Fees + Payment - FP0 Fees + Payment - FP0 Fees + Payment - FP0 Fees + Payment - FP0 Fees + Payment - FP0 Fees + Payment - FP0 Fees + Payment - FP0 Fees + Payment - FP0 107010 237CP0 108030 107010 107010 107010 107010 107010 1 1 0.14634359 0.85365641 1 1 1 1 Fees + Payment - FP0 107010 0.99837 Fees + Payment - FP0 593000 0.00163 Fees + Payment - FP0 107010 1 Fees + Payment - FP0 107010 1 Fees + Payment - FP0 Fees + Payment - FP0 107010 107010 1 1 Fees + Payment - FP0 Fees + Payment - FP0 Fees + Payment - FP0 Fees + Payment - FP0 Fees + Payment - FP0 108030 107010 108030 107010 108030 1 0.80081517 0.19918483 0.8 0.2 Fees + Payment - FP0 Fees + Payment - FP0 Fees + Payment - FP0 Fees + Payment - FP0 Fees + Payment - FP0 Fees + Payment - FP0 Fees + Payment - FP0 Fees + Payment - FP0 Fees + Payment - FP0 Fees + Payment - FP0 Fees + Payment - FP0 Fees + Payment - FP0 107010 107010 107010 107010 107010 107010 108030 107010 108030 107010 107010 107010 1 1 1 1 1 0.8 0.2 0.8 0.2 1 1 1 Fees + Payment - FP0 594000 1 Fees + Payment - FP0 107010 1 Fees + Payment - FP0 Fees + Payment - FP0 Fees + Payment - FP0 Fees + Payment - FP0 Fees + Payment - FP0 Fees + Payment - FP0 593000 107010 108030 107010 108030 107010 1 0.83252776 0.16747224 1 0.11843155 0.88156845 Fees + Payment - FP0 107010 1 Fees + Payment - FP0 107010 1 Fees + Payment - FP0 Fees + Payment - FP0 107010 107010 1 1 Fees + Payment - FP0 Fees + Payment - FP0 Fees + Payment - FP0 108030 107010 108030 1 0.8 0.2 Fees + Payment - FP0 594000 1 Fees + Payment - FP0 165960 1 Fees + Payment - FP0 107010 1 Fees + Payment - FP0 107010 1 Fees + Payment - FP0 593000 0.01565 Fees + Payment - FP0 107010 0.98435 Fees + Payment - FP0 Fees + Payment - FP0 107010 107010 1 1 Fees + Payment - FP0 107010 1 Fees + Payment - FP0 107010 0.32323 Fees + Payment - FP0 593000 0.44444 Fees + Payment - FP0 108030 0.23233 Fees + Payment - FP0 107010 1 Fees + Payment - FP0 593000 0.14421 Fees + Payment - FP0 108030 0.54736 Fees + Payment - FP0 107010 0.30843 Fees + Payment - FP0 107010 1 Fees + Payment - FP0 107010 1 Fees + Payment - FP0 107010 0.99907 Fees + Payment - FP0 Fees + Payment - FP0 Fees + Payment - FP0 Fees + Payment - FP0 Fees + Payment - FP0 Fees + Payment - FP0 Fees + Payment - FP0 Fees + Payment - FP0 593000 107010 107010 107010 107010 107010 107010 107010 0.00093 1 1 1 1 1 1 1 Fees + Payment - FP0 107010 0.99887768 Fees + Payment - FP0 Fees + Payment - FP0 Fees + Payment - FP0 Fees + Payment - FP0 594030 583000 108030 107010 0.00112232 1 0.1164018 0.8835982 Fees + Payment - FP0 107010 1 Fees + Payment - FP0 107010 1 Fees + Payment - FP0 107010 0.79636458 Fees + Payment - FP0 Fees + Payment - FP0 Fees + Payment - FP0 Fees + Payment - FP0 108030 107010 108030 107010 0.20363542 0.8 0.2 1 Fees + Payment - FP0 107010 1 Oxford 26N new SEL ICON 3 Commerce Drive, Oxford, CT Control house OXFD0001 OXFORD SEL ICON - 26N 4E621348 CTGISGRD (CH) P#3720: WORK COMP'D_ESO 9/3_CA GIS GRID SCALING 1N821513 LD 26 ORLANDO PL NORWALK TROUBLE R 3H822312 GX180027 GX180028 GX180029 GX180030 GX18C100 GX18C101 GX18C102 RF-3 N Fairfield St,Manchester,Relo Worker's Grounds Barricade/Gas Cylinder Rack 44 Gallon Flammable Cabinet Fluke 712 RTD Process Calibrator Auger Adapters (2) 2AD Zelenski Gas Detectors (2) 2NP Iacolo Portable Radio Kit (15) 2EB 4E920002 RA Project CDOT 052-091 RT 207 Fran 3H723020 4-118 - Relocate facilities for int 3H723020 4-118 - Relocate facilities for int 3H723020 4-118 - Relocate facilities for int 4D821742 RROW0011 11/17/18 54 Fairview Dr, Madison rp Distribution ROW 4M910087 LTDB1111 DSQ92011 DSQ92011 GXC19W10 GXC19W12 GXC19W17 GXC19W21 Replace 300A Solids with 600A Disco Long Term Debt2005 Series A (30): Replace Failed Battery DSQ920 (30): Replace Failed Battery DSQ920 WIILAMS - Climbing belts and gear WALLACE - 4 Manhole Guards WALLACE - Hydraulic Impact Wrench THERIAULT -Card Reader 5T821166 CDOT134-147 W. Stafford Rd. Rte 190 5T821166 CDOT134-147 W. Stafford Rd. Rte 190 3L823415 BRANFORD POLE 5918 RMV 36W, INST 30 1S822292 DL; 102 W Broad St;, BURNT POLE TOP 2W620982 CS003161 RL:1255 E Main St Wtby CAR V POLE Install Backup Relays 2W221783 DSQ62030 DSQ62030 DSN82057 DSN82057 PHD BM/ REPL B CU NEUT W/ 1/0 NEUT, Replace Failed A/C Unit Replace Failed A/C Unit Replace Failed 3A12-1W Reactors & Replace Failed 3A12-1W Reactors & GXC19C32 GXC19C37 GXC19C38 GXC19C39 GXC19C40 CS00278T CS00278T DSQ92023 DSQ92023 DERHOST1 ML191110 DSN82019 Electric Dryer (1) Kelly Bar Anchor Wrench (2) Ladder, Extension (6) Dead End 'Hot Arms' (18) Spider Rope/Reel System (3) FOXWOODS CASINO 43P SWITCHGEAR FOXWOODS CASINO 43P SWITCHGEAR (30): Replace Failed 2B-2X Load Tap (30): Replace Failed 2B-2X Load Tap DER HOST CAP DATA + MAP Network printer for BCS (40): LED Lighting Upgrades DSN8201 1N821689 RM- CDOT 173-415 - REINFORCE DUCT B 2M623162 RTM-Municipal Light Fault Locate an 4N721234 DSN82026 DSN82026 DSN92021 DSN72048 DSN72048 MM REPLACE 150 SERVICE POLE 2357 M (50): LED Lighting Upgrades DSN8202 (50): LED Lighting Upgrades DSN8202 (30): Upgrade Lighting DSN92021 Scitico 27H-Replace A/C Unit Scitico 27H-Replace A/C Unit 4D721302 CB//Branford, 480 Shore Dr/New oh s 3H723287 HARTFORD, MAIN ST CH7097 replace 25 1S722078 2M921044 DM/600 NORTH ST GRN: RELOCATE (2) P **PMV CD01031-01 INSTALL NEW TR 4C1 3S220797 DSN92013 DSN92013 JMS Blmfld Barn Hill Rd - SET 2 POL (30): Rebuild Failing 44-2X Load Ta (30): Rebuild Failing 44-2X Load Ta 1N920602 RM- CDOT 173-415 - RT 57 - 1 test p RGST0111 Regulatory Assessments 1N821098 MJP - CD00348 - 102-363 - (5)Phase 3L920794 Pole ID: 4167 RMV 70 HPS PTT INSTAL 5D920268 RA Project CDOT 123-066 RT 14 Scotl 5D920268 RA Project CDOT 123-066 RT 14 Scotl 4N821095 17CCDH11 MM REPLACE 100' SERVICE WIRE NEW 20 CT Disconnects Handhelds (CH) P#3720: WORK COMP'D_ESO 9/3_CAR V POLE_SET & SHFT'D NEW AP2-YWO Total Cost Variance Met - Variance :70.5819 MIN.:-50 MAX.:150 The project scope is for RAMTeCH to provide (2) onsite personnel and that will work alongside Eversource GIS technicians and (8) offsite RAMTeCH personnel to complete scaling of the CT Grids. Grid scaling is prerequisite for several pending GIS data quality improvement projects. LD 26 ORLANDO PL NORWALK TROUBLE REPORT, POLE 6855 AP1-YWO Total Cost Less Than 7K RF-3 N Fairfield St,Manchester,Relocate OH SVC Worker's Grounds for Tolland Stations 12 Cylinder (4X3) Barricade - Gas Cylinder Rack 44 Gal Flammable Cabinet Fluke 712 RTD Process Calibrator 2AD - Auger Adapters (2) @ 799.07ea TOTAL: $1,598.14 2NP - Gas Detectors (2) s/c 519396 @ 800ea TOTAL: 1600 Portable Radio Kit (15) @ $800ea TOTAL: $12,000 2EB Montgomery RA Project CDOT 052-091 RT 207 Franklin JE-YWO Variance Job Type Exclusion 4-118 - Relocate facilities for intersection relocation RT 10 - 50% Re-Im JE-YWO Variance Job Type Exclusion 4-118 - Relocate facilities for intersection relocation RT 10 - 50% Re-Im JE-YWO Variance Job Type Exclusion 4-118 - Relocate facilities for intersection relocation RT 10 - 50% Re-Im JE-YWO Variance Job Type Exclusion 11/17/18 54 Fairview Dr, Madison rplcd riser p# 3991 & installed 3 splices AP1-YWO Total Cost Less Than 7K Distribution ROW-Rose Replace 300A Solids with 600A Disconnects Long Term Debt2005 Series A Replace Failed Battery Replace Failed Battery WIILAMS - Climbing belts and gear WALLACE - 4 Manhole Guards WALLACE - Hydraulic Impact Wrench THERIAULT -Card Reader CDOT134-147 W. Stafford Rd. Rte 190 Stafford Reconductor 336 TW Phase 1 JE-YWO Variance Job Type Exclusion CDOT134-147 W. Stafford Rd. Rte 190 Stafford Reconductor 336 TW Phase 1 JE-YWO Variance Job Type Exclusion BRANFORD POLE 5918 RMV 36W, INST 30W AP1-YWO Total Cost Less Than 7K DL; 102 W Broad Street Stamford, Frontier P 793 needs new pole had 3 phs bank RL:1255 E Main St Wtby CAR V POLE Replaced 8602 45/2 transfer 50kva 5D720755 RA 2M622538 JC/Elec Maint Trouble Call - Proper replace Frontier defective po 2M622538 JC/Elec Maint Trouble Call - Proper 2M622538 JC/Elec Maint Trouble Call - Proper 5T721740 RSO, 7/13, ANDOVER, BUNKER HILL RD 2L621090 ESO 10/27 BETHLEHEM, PADDY HOLLOW R 2L621090 ESO 10/27 BETHLEHEM, PADDY HOLLOW R 2L621090 ESO 10/27 BETHLEHEM, PADDY HOLLOW R 3R621026 CD00471-01 Recond. & Convert Gate S 2M621693 (DF)(R/I)Spcr Tang w/Answay- Guy- 1 5D520552 CD00450-01 RIGHT OF WAY FROM RIVER 5D520552 CT19D018 GXC19E12 GXC19E13 GXC19E14 GXC19E15 GXC19E17 GXC19E18 CD00450-01 RIGHT OF WAY FROM RIVER OC-12 DIVERSITY UPGRADE CANAL 15Q GOLIGHT LANTERN (1) 2AY Gas Detector (1) 3H3 CAPSTAN (1) 3H2 relay, time delay for breaker (1) Arm Assembly 13128 - 2AY (1) Arm Assembly 13129 - 2AY (1) 2M920603 (50): CD01046-06, Smart Switch Recl 2M920603 GCOH0011 CS003081 CS003081 (50): CD01046-06, Smart Switch Recl Gold Coast - OH Replace Failing 1X LTC Control Replace Failing 1X LTC Control 4D720997 NS- 17 Halls Rd, WB- Ins 4/0 AL to 4D720998 (DF) (I) 4/0 Simple svc Off of HH23 1S921110 TC : 3143 HIGH RIDGE RD STM: REPLA 1S921110 DSN82063 DSN82063 2L920577 TC : 3143 HIGH RIDGE RD STM: REPLA Replacement of low side mobile conn Replacement of low side mobile conn CRP - TOP OF P#1717 BROKE; NEEDS TO 2M722022 DM 6/5 CHESHIRE, 214 ACADEMY RD - 9 Beacon Falls 11N - Install back-up transformer protection relays for the 11N-1X and 11N-2X transformers. PHD BM/ REPL B CU NEUT W/ 1/0 NEUT, REFRAME POLE TOPS Card 11F - Replace the failed air conditioning unit. Card 11F - Replace the failed air conditioning unit. Replace Failed 3A12-1W Reactors & Arresters Replace Failed 3A12-1W Reactors & Arresters 2BB - Electric Dryer Model GTX42EASJWW (1) @ $616.90 FOSTER 2AD - Kelly Bar Anchor Wrench (2) @ $620ea TOTAL: $1240 Zelenski 2BB - Ladder Ext/ 32' (1) @ 778.60ea; 24' (5) @ $719.99ea TOTAL: $4,378.55 FOSTER 2EA - Dead End 'Hot Arms' (18) @ $889ea TOTAL: $16,000 Wojciak 2EA - Spider Rope/Reel System (3) @$4,270ea TOTAL: $12,810 Wojciak Refurbish switchgear body, excludes roof. Refurbish roof after moratorium Refurbish switchgear body, excludes roof. Refurbish roof after moratorium Replace Failed 2B-2X Load Tap Changer Control Replace Failed 2B-2X Load Tap Changer Control System upgrade to existing and in queue DER projects to develop online mapping and other analytical tools to better understand the localized impact of DER penetration for select locations Berlin - Network Printer for BCS Cedar Heights 4R - Replace existing lightig with LED lights. RM- CDOT 173-415 - REINFORCE DUCT BANK - WESTON JE-YWO Variance Job Type Exclusion RTM-Municipal Light Fault Locate and Repair@ POLE 1 - COMP 12/21 ASP AP1-YWO Total Cost Less Than 7K MM REPLACE 150 SERVICE POLE 2357 METER SERVICE TO INSTALL 200A METER DESG (DN) AP1-YWO Total Cost Less Than 7K Peaceable 12N - Replace existing lightig with LED lights. Peaceable 12N - Replace existing lightig with LED lights. Upgrade Lighting Scitico 27H Replace A/C Unit Scitico 27H Replace A/C Unit CB//Branford, 480 Shore Dr/New oh svc AP1-YWO Total Cost Less Than 7K HARTFORD, MAIN ST CH7097 replace 250 w head when pole is replaced AP1-YWO Total Cost Less Than 7K DM/600 NORTH ST GRN: RELOCATE (2) POLES FOR 3-LOT SUBDIVISION AP2-YWO Total Cost Variance Met - Variance :-37.3145 MIN.:-50 MAX.:50 CD01031 4C19 INSTALL NEW TR 4C19-91T P-93099 SEG 1 JMS Blmfld Barn Hill Rd - SET 2 POLES, RECONDUCTOR, INSTALL 3-1PH RECL Rebuild Failing 44-2X Load Tap Changer (LTC) DSN92013 Rebuild Failing 44-2X Load Tap Changer (LTC) DSN92013 RM- CDOT 173-415 - RT 57 - 1 test pit - WESTON JE-YWO Variance Job Type Exclusion Regulatory Assessments MJP - CD00348 - 102-363 - (5)Phase 1: OH Work, Relocate P. 12008 JE-YWO Variance Job Type Exclusion Pole ID: 4167 RMV 70 HPS PTT INSTALL 28W LED PTT COMP 2/11/19 CHE1 AP1-YWO Total Cost Less Than 7K RA Project CDOT 123-066 RT 14 Scotland Stage 1 JE-YWO Variance Job Type Exclusion RA Project CDOT 123-066 RT 14 Scotland Stage 1 JE-YWO Variance Job Type Exclusion MM REPLACE 100' SERVICE WIRE NEW 200A MTR BY MTR SERVC AP1-YWO Total Cost Less Than 7K RA replace Frontier defective pole 564 Bethel Rd AP1-YWO Total Cost Less Than 7K JC/Elec Maint Trouble Call - Property Damage OH (INSOH) AP1-YWO Total Cost Less Than 7K JC/Elec Maint Trouble Call - Property Damage OH (INSOH) AP1-YWO Total Cost Less Than 7K JC/Elec Maint Trouble Call - Property Damage OH (INSOH) AP1-YWO Total Cost Less Than 7K RSO, 7/13, ANDOVER, BUNKER HILL RD BAD PAD XFMR REF P-753 AP1-YWO Total Cost Less Than 7K ESO 10/27 BETHLEHEM, PADDY HOLLOW RD, CAR VPOLE B13 AP1-YWO Total Cost Less Than 7K ESO 10/27 BETHLEHEM, PADDY HOLLOW RD, CAR VPOLE B13 AP1-YWO Total Cost Less Than 7K ESO 10/27 BETHLEHEM, PADDY HOLLOW RD, CAR VPOLE B13 AP1-YWO Total Cost Less Than 7K CD00471-01 Recond. & Convert Gate St - Place 1Ph. on Phase B AP2-YWO Total Cost Variance Met - Variance :-26.0201 MIN.:-30 MAX.:30 (DF)(R/I)Spcr Tang w/Answay- Guy- 1 Ph Tap, Shift Facilities-DESG conv# 393900 AP1-YWO Total Cost Less Than 7K CD00450-01 RIGHT OF WAY FROM RIVER CROSSING AT 12STUNNEL TO RT 169 NL-YWO Variance - NU Construction Labor CD00450-01 RIGHT OF WAY FROM RIVER CROSSING AT 12STUNNEL TO RT 169 NL-YWO Variance - NU Construction Labor Diversify the DMX OC-12 ring from Frost Bridge 8R to Stevenson 14A. 2AY - LANTERN, GOLIGHT, LED, PROGRAMMABLE REMOTE, 900 FT L X 70 FT W W SPOT BEAN / Qty: 1 unit / Stock Code: 570360 / $525.58 per unit/ Total: $525.58 - Michael 3H3 - Gas Detector, GasALertMax XT II (Oxygen, explosive, carbon monoxide, hydrogen sulfide) / SC: 519396 / $800.00 per unit / Total: $800.00 - Wilkins 3H2 - CAPSTAN, 7-1/4 IN DIA, 8 IN W, 4000 LB LIFT CAPACITY, AL ALLOY, FOR 2-7/16 IN SHAFT / Qty: 1 unit / SC: 542662 / $589.00 per unit / Total: $589.00 - Wilkins 3H2 - RELAY,TIME DELAY, FOR HICO BREAKER / Qty: 1 unit / SC: 528594 / $547.00 per unit / $547.00 - Wilkins 2AY - Arm Assemby for material handler trucks, Item #: 13128 / Qty: 1 unit / $1,420.71 per unit / Total: $1,420.71 2AY - Arm Assembly for material handler truck, Item #: 13129 / Qty: 1 unit: /$1,469.59 per unit / Total: $1,469.59 CD01046-06, Smart Switch Recloser, Durham 30K13-4403 CD01046-06, Smart Switch Recloser, Durham 30K13-4403 Gold Coast Payments - Overhead Furnish necessary engineering and design using a 2012 annual work order to replace the failing 1X LTC control, control relays at South End 1G substation Furnish necessary engineering and design using a 2012 annual work order to replace the failing 1X LTC control, control relays at South End 1G substation NS- 17 Halls Rd, WB- Ins 4/0 AL to New Gargage from HH 330A AP1-YWO Total Cost Less Than 7K (DF) (I) 4/0 Simple svc Off of HH2371-A - New Residential Underground AP1-YWO Total Cost Less Than 7K CTF: 3143 HIGH RIDGE RD STM: REPLACE 85' #2TPX OH SVC 200 AMP UPGRADE CTF: 3143 HIGH RIDGE RD STM: REPLACE 85' #2TPX OH SVC 200 AMP UPGRADE Replacement of low side mobile connection pole and cable Replacement of low side mobile connection pole and cable TOP OF P#1717 BROKE; NEEDS TO BE REPLACED DM 6/5 CHESHIRE, 214 ACADEMY RD - 9A P4867 AP1-YWO Total Cost Less Than 7K

Text of RRU-159 Attachment 05.xlsx

Sheet names, column headings and text cells; numbers left out · first 300,000 characters

Text of RRU-159 Attachment 05.pdf

Extracted from the file · 879 pages · 16,073,548 characters

Text of RRU-159 Attachment 04.xlsx

Sheet names, column headings and text cells; numbers left out

Text of RRU-159 Attachment 04.pdf

Extracted from the file · 5 pages · 20,994 characters

Text of RRU-159 Attachment 03.xlsx

Sheet names, column headings and text cells; numbers left out · first 300,000 characters

Text of RRU-159 Attachment 03.pdf

Extracted from the file · 840 pages · 14,413,580 characters

Text of RRU-159 Attachment 02.xlsx

Sheet names, column headings and text cells; numbers left out · first 300,000 characters

Text of RRU-159 Attachment 02.pdf

Extracted from the file · 1,137 pages · 16,605,462 characters

Text of RRU-159 Attachment 01.xlsx

Sheet names, column headings and text cells; numbers left out

Text of RRU-159 Attachment 01.pdf

Extracted from the file · 1 page · 1,403 characters

As listed on the current system

Question(s) Answered 159 (Connecticut Light and Power Company dba Eversource Energy) Date Filed: 11/06/2026

This filing on the current system (opens in a new tab)