Skip to main content

A prototype public docket site for the Connecticut Public Utilities Regulatory Authority

Utility Dockets and Filings

Interrogatory responses

Answers to questions 159

ResponseFiled by Connecticut Light and Power Company dba Eversource Energy51 files
Part of docket 26-05-10Open
  • Electric
Application of The Connecticut Light and Power Company d/b/a Eversource Energy to Amend its Rate Schedules

Files51

Search terms highlighted
Eversource rate increase is on 36 pages across 17 files of the text below, highlighted. Go to the first matchClear highlighting
Words on different pages
Words on different pages
Words on different pages

Text of RRU-159 Attachment 23.xlsx

Sheet names, column headings and text cells; numbers left out · first 300,000 characters

Text of RRU-159 Attachment 23.pdf

Extracted from the file · 1,160 pages · 16,330,154 characters

Text of RRU-159 Attachment 22.xlsx

Sheet names, column headings and text cells; numbers left out · first 300,000 characters

Text of RRU-159 Attachment 22.pdf

Extracted from the file · 1,203 pages · 14,349,246 characters

Text of RRU-159 Attachment 21.xlsx

Sheet names, column headings and text cells; numbers left out · first 300,000 characters

Text of RRU-159 Attachment 21.pdf

Extracted from the file · 1,203 pages · 13,880,364 characters

Text of RRU-159 Attachment 20.xlsx

Sheet names, column headings and text cells; numbers left out

Text of RRU-159 Attachment 20.pdf

Extracted from the file · 16 pages · 151,762 characters

Text of RRU-159 Attachment 19.xlsx

Sheet names, column headings and text cells; numbers left out

Text of RRU-159 Attachment 19.pdf

Extracted from the file · 1 page · 5,328 characters

Text of RRU-159 Attachment 18.xlsx

Sheet names, column headings and text cells; numbers left out · first 300,000 characters

Text of RRU-159 Attachment 18.pdf

Extracted from the file · 640 pages · 7,983,236 characters

Text of RRU-159 Attachment 17.xlsx

Sheet names, column headings and text cells; numbers left out · first 300,000 characters

Text of RRU-159 Attachment 17.pdf

Extracted from the file · 855 pages · 14,651,941 characters

Text of RRU-159 Attachment 16.xlsx

Sheet names, column headings and text cells; numbers left out · first 300,000 characters

Text of RRU-159 Attachment 16.pdf

Extracted from the file · 489 pages · 7,076,557 characters

Text of RRU-159 Attachment 15.xlsx

Sheet names, column headings and text cells; numbers left out · first 300,000 characters

Text of RRU-159 Attachment 15.pdf

Extracted from the file · 897 pages · 15,723,777 characters

Text of RRU-159 Attachment 14 .pdf

Extracted from the file · 1 page · 2,589 characters

Text of RRU-159 Attachment 14.xlsx

Sheet names, column headings and text cells; numbers left out

Text of RRU-159 Attachment 13.xlsx

Sheet names, column headings and text cells; numbers left out

Text of RRU-159 Attachment 13.pdf

Extracted from the file · 1 page · 427 characters

Text of RRU-159 Attachment 12.xlsx

Sheet names, column headings and text cells; numbers left out · first 300,000 characters

Text of RRU-159 Attachment 12.pdf

Extracted from the file · 802 pages · 14,341,138 characters

Text of RRU-159 Attachment 11.xlsx

Sheet names, column headings and text cells; numbers left out · first 300,000 characters

Text of RRU-159 Attachment 11.pdf

Extracted from the file · 858 pages · 15,906,152 characters

Text of RRU-159 Attachment 10.xlsx

Sheet names, column headings and text cells; numbers left out

Text of RRU-159 Attachment 10.pdf

Extracted from the file · 1 page · 822 characters

Text of RRU-159 Attachment 09.xlsx

Sheet names, column headings and text cells; numbers left out · first 300,000 characters

Text of RRU-159 Attachment 09.pdf

Extracted from the file · 449 pages · 7,355,312 characters

Text of RRU-159 Attachment 08.xlsx

Sheet names, column headings and text cells; numbers left out · first 300,000 characters

Text of RRU-159 Attachment 08.pdf

Extracted from the file · 867 pages · 13,878,236 characters

Text of RRU-159 Attachment 07.xlsx

Sheet names, column headings and text cells; numbers left out · first 300,000 characters

Text of RRU-159 Attachment 07.pdf

Extracted from the file · 869 pages · 15,728,932 characters

Text of RRU-159 Attachment 06.xlsx

Sheet names, column headings and text cells; numbers left out · first 300,000 characters

Text of RRU-159 Attachment 06.pdf

Extracted from the file · 459 pages · 8,128,897 characters

Words on different pages

This spreadsheet is large. Its searchable text keeps the sheet names, column headings and text cells and stops at 300,000 characters, so search may miss words further in. Download the file for every cell and figure.

  1. Part 25 of 77

    CS001421 | Battery Upgrades | South Windsor 14L - UPgrade the existing battery set to include capacity for the additional Cip v5 equipment. | Employee Expenses-EE0 CS001524 | Recloser Automation | East Bantam 19U - Install new station FORM 6 Reclosers on Eversource CT feeders to address Recloser Automation. This project also includes installation of a DSCADA communications system that will allow the SOC to remotely apply the control fast-trip feature prior to commencing any live-line feeder work. The overall project includes complete installation of all necessary protection settings, control and communications devices. | Employee Expenses-EE0 CS001526 | Recloser Automation | Cornwall 37J - Install new station FORM 6 Reclosers on Eversource CT feeders to address Recloser Automation. This project also includes installation of a DSCADA communications system that will allow the SOC to remotely apply the control fast-trip feature prior to commencing any live-line feeder work. The overall project includes complete installation of all necessary protection settings, control and communications devices. | Employee Expenses-EE0 CS001661 | Mansfield 12J Install 12J-4X transf | Furnish necessary engineering and design to create a 23kV source at Mansfield 12J substation to replace the existing 27.6kV transformer and associated feeders. Work includes the following installation:_x000D__x000D_ • One 69-115/23kV 62.5MVA (12J-4X) transformer_x000D__x000D_ • One new lineup of 23kV Double Bus Metaclad Switchgear_x000D__x000D_ • Three 115kV circuit switchers_x000D__x000D_ • One 115kV Motor Operated Disconnect Switch_x000D__x000D_ • Replacement of existing electromechanical relays for the 12J-1X, 12J-2X transformers with new microprocessor based SEL relays_x000D__x000D_ • Installation of l 12J-3S, 12J-4S, 12J-3H, 12J-4H transformers_x000D__x000D_ • Installation of six 115kV cable potheads [(2) cable pothead structures] and arresters_x000D__x000D_ • Approximately 1500 ft. total 115kV XLPE cable 500 ft. per phase _x000D__x000D_ • Install new ground grid to cover the expended fenced area_x000D__x000D_ • 25kV power cables between switchgear and riser poles (located outside of the substation fence)t_x000D__x000D_ • Required conduits and foundations for new equipment_x000D__x000D_ _x000D__x000D_ | Employee Expenses-EE0 CS001751 | Install New Feeder (DG) | Tracy 14M - Establish a new feeder position 14M13 for a DG project associated with the RES Americas' 20MW PV DG project. The new 14M13 overhead feeder position will be between 14M-14T-6 and 14M-15T-6 bus switches. A new vacuum 23kV circuit breaker 14M13-2 will be installed using steel spans on the existing foundation, a new group operated disconnec tswitch14M13-5, a new set of PTs and arresters will also be installed. | Employee Expenses-EE0 CS001951 | South MeaSpare Transformer Assembly | Spare Transformer Assembly - Purchase, assemble, fill and test a system spare transformer for storage at the South Meadow Storage Facility in Hartford, CT. The new system spare will be 60 MVA, 115-23kV, 14.2% impedance. Catalog ID 465287. This new spare will take the place of the existing spare (Catalog 443766) which will be moved from the SOuth Meadow Storage Facility to Tracy 14M substation in September. | Employee Expenses-EE0 CS002816 | DC Battery Voltage Monitoring | Bloomfield 3B - Implement station DC Battery Voltage Monitoring as a backup system to the AT10 charger internal alarm system. | Employee Expenses-EE0
  2. Part 26 of 77

    CS005951 | PI Vision Transformer Monitor Repl | This project will replace transformer monitoring displays used by the substation technical engineering group to monitor asset health real-time by visualizing data collected using online equipment monitors. An external vendor will be funded to create these displays in PI Vision, an existing visualization tool on the Eversource network. A new PI Asset Framework database will be developed. The structure of the dashboard includes an Overview page and nine sub-pages. The objective of the Overview page is to provide users a quick look at the health of each transformer and to highlight via color coding the potential issues to be investigated further. | Employee Expenses-EE0 CSBD11C1 | CTE Supplier Billing DCKT | CTE Supplier Billing DCKT | Employee Expenses-EE0 CSKD0011 | Common Stock Dividend | Common Stock DividendNT011 | Employee Expenses-EE0 CSTC0011 | Customer Care | Customer Care EPO Credit | Employee Expenses-EE0 CSTR0011 | Clean / stock truck | Clean / stock truck | Employee Expenses-EE0 CT13D001 | NEW MILFORD OC-3 MICROWAVE EXPANSIO | ADD AN ADDITIONA OC-3 MICROWAVE HOP BETWEEN SOUTH MOUNTAIN TO NEW MILFORD AND NEW MILFORD TO NEWTOWN. REQUESTER: M. CARBARY______MGR. G. BLANCHARD | Employee Expenses-EE0 CT13D002 | SOUTH MOUNTAIN OC-3 MICROWAVE EXPAN | ADD AN ADDITIONA OC-3 MICROWAVE HOP BETWEEN TALCOTT MOUNTAIN TO SOUTH MOUNTAI TO NEW MILFORD RADIO SITES. REQUESTER: M. CARBARY______MGR. G. BLANCHARD | Employee Expenses-EE0 CT13D003 | BERLIN MULTIPLEXER FOR OC-2 MICRO. | ADDTION DMXTEND MULTIPLEXER IN BERLIN TO SUPPORT THE TALCOTT-SOUTH MOUNTAIN- NEW MILFORD-NEWTOWN OC-3 MICROWAVE EXPANSION REQUESTER: M. CARBARY______MGR. G. BLANCHARD | Employee Expenses-EE0 CT13D004 | TALCOTT MOUNTAIN OC-3 MICROWAVE EXP | ADD AN ADDITIONAL OC-3 MICROWAVE HOP BETWEEND TALCOTT MOUNTAIN AND SOUTH MOUNTAIN RADIO SITES. REQUESTER: M. CARBARY______MGR. G. BLANCHARD | Employee Expenses-EE0 CT13D005 | NEWTOWN OC-3 MICROWAVE EXPANSION | ADD AN ADDITIONAL OC-3 MICROWAVE HOP BETWEEND NEW MILFORD AND NEWTOWN RADIO SITES. REQUESTER: M. CARBARY______MGR. G. BLANCHARD | Employee Expenses-EE0 CT13D006 | HARTFORD AWC LOWBAND REPEATER SYSTE | REPLACE BASE STATIONS FOR THE HARTFORD TRUCK RADION SYSTEM. THIS WILL REPLACE AGING BASE STATIONS AS WELL AS INCREASE FUNCTIONALITY. PROJECT IT1DWANA | Employee Expenses-EE0 CT13D007 | MANCHESTER 3A LOWBAND REPEATER SYST | REPLACE BASE STATIONS FOR THE MAN. 3A TRUCK RADIO SYSTEM. THIS WILL REPLACE AGING BASE STATIONS AS WELL AS INCREASE FUNCTIONALITY. PROJECT IT1DWANA | Employee Expenses-EE0 CT13D008 | ROCKY HILL 3R LOWBAND REPEATER SYST | REPLACE BASE STATIONS FOR THE ROCKY HILL 3R RADIO SYSTEM. THIS WILL REPLACE AGING BASE STATIONS AS WELL AS INCREASE FUNCTIONALITY. PROJECT IT1DWANA | Employee Expenses-EE0 CT13D009 | TALCOTT MT TS LOWBAND REPEATER SYST | REPLACE BASE STATIONS FOR THE TALCOLT MT RS RADIO SYSTEM. THIS WILL REPLACE AGING BASE STATIONS AS WELL AS INCREASE FUNCTIONALITY. PROJECT IT1DWANA | Employee Expenses-EE0 CT13D010 | MIDDLETOWN AWC LOWBAND REPEATER SYS | REPLACE BASE STATIONS FOR THE MIDDLETOWN AWC RADIO SYSTEM. THIS WILL REPLACE AGING BASE STATIONS AS WELL AS INCREASE FUNCTIONALITY. PROJECT IT1DWANA | Employee Expenses-EE0 CT13D012 | GREENWICH AWC 10 M ETHERNET | BRING EXPANDED CONNECTIVITY TO THE GREENWICH AWC. THIS WORK ORDER WILL COVER ALL ASSOCIATED EQUIP, CONTRACTOR & LABOR. PROJECT IT1DWANA | Employee Expenses-EE0 CT13D015 | UNIION REPLACEMENT TOWER LIGHTS | REPLACEMENT TOWER LIGHTS FOR UNION TOWER . REQUESTER: M. CARBARY PROJECT: IT1DWANA | Employee Expenses-EE0 CT13D016 | NEW MILFORD REPLACEMENT TOWER LIGHT | REPLACEMENT TOWER LIGHTS FOR NEW MILFORD TOWER . REQUESTER: M. CARBARY PROJECT: IT1DWANA | Employee Expenses-EE0 CT13D017 | GOOSE HILL REPLACEMENT TOWER LIGHTS | REPLACEMENT TOWER LIGHTS FOR GOOSE HILL TOWER . REQUESTER: M. CARBARY PROJECT: IT1DWANA | Employee Expenses-EE0
  3. Part 27 of 77

    CT13D018 | MANCHESTER REPLACEMENT TOWER LIGHTS | REPLACEMENT TOWER LIGHTS FOR MANCHESTER TOWER . REQUESTER: M. CARBARY PROJECT: IT1DWANA | Employee Expenses-EE0 CT13D019 | TALCOTT MT REPLACEMENT TOWER LIGHTS | REPLACEMENT TOWER LIGHTS FOR TALCOTT MTN TOWER . REQUESTER: M. CARBARY PROJECT: IT1DWANA | Employee Expenses-EE0 CT14D001 | MADISON AWC - MADISON LOWBAND REPEA | REPLACE BASE STATIONS FOR THE MADISON TRUCK RADIO SYSTEM. THIS WILL REPLACE AGING BASE STATIONS AS WELL AS INCREASE FUNCTIONALITY. PROJECT IT1DWANA | Employee Expenses-EE0 CT14D003 | GOOSE HILL RADIO SITE-MADISON LOWBA | REPLACE BASE STATIONS FOR THE MADISON TRUCK TO TRUCK RADIO SYSTEM. THIS WILL REPLACE AGAING BASE STATIONS AS WELL AS INCREASE THE FUNCTIONALITY. PROJECT IT1DWANA | Employee Expenses-EE0 CT14D008 | ASENTRIA ALARM REMOTE 4 GOOSE HILL | THE LARSE ALARM RTU IS OBSOLETE AND NEEDS TO BE REPLACED PROJECT IT1DWANA REQUESTER:TOM MULINSKI/WRONA MGR: AHRENS | Employee Expenses-EE0 CT14D009 | ASENTRIA ALARM REMOTE FOR STAMFORD | THE LARSE ALARM RTU IS OBSOLETE AND NEEDS TO BE REPLACED_@ 626 GLENBROOK ROAD, STAMFORD PROJECT IT1DWANA REQUESTER:TOM MULINSKI/WRONA MGR: AHRENS | Employee Expenses-EE0 CT14D010 | ASENTRIA ALARM REMOTE FOR BERLIN PE | TELECOM ROOM, THE LARSE ALARM RTU IS OBSOLETE AND NEEDS TO BE REPLACED @ 107 SELDEN ST PENTHOUSE LOCATION PROJECT IT1DWANA | Employee Expenses-EE0 CT14D011 | ASENTRIA ALARM REMOTE 4 CHESHIRE TE | THE LARSE ALARM RTU IS OBSOLETE AND NEEDS TO BE REPLACED_@ 705 WEST JOHNSON AVE, CHESHIRE (AWC) PROJECT IT1DWANA | Employee Expenses-EE0 CT14D030 | BOLTON-E SPRINGFIELD MICROWAVE UPGR | REPLACE EXISTING DVM6-45 EQUIPMENT WHICH IS AT THE END OF ITS USEFUL SERVICE LIFE. REQUESTOR:DOLLY WRONA, MGR: JIM AHRENS Added install / remove waveguid - removal estimated at $7800, new install $5350 | Employee Expenses-EE0 CT14D031 | BERLIN TOWARD TALCOTT MICROWAVE UPG | REPLACE EXISTING DVM6-45 EQUIPMENT WHICH IS AT THE END OF ITS USEFUL SERVICE LIFE AT 107 SELDEN STREET, BERLIN, CT CUPOLA AND MUX ROOM | Employee Expenses-EE0 CT14D032 | MANCHESTER MICROWAVE UPGRADE | REPLACE EXISTING DVM6-45 EQUIPMENT WHICH IS AT THE END OF ITS USEFUL SERVICE LIFE AT OLCOTT STREET, MANCHESTER, CT ( MANCHESTER SS LOCATION) | Employee Expenses-EE0 CT14D033 | TALCOTT MICROWARE UPGRADE | REPLACE EXISTING DVM6-45 EQUIPMENT WHICH IS AT THE END OF ITS USEFUL SERVICE LIFE AT HOSKINS ROAD, BLOOMFIELD, CT | Employee Expenses-EE0 CT14D034 | UNION OC-3 MICROWAVE | PART OF LARGER PROJECT TO REROUTE MICROWAVE NETWORK SERVING HADLEY TO AVOID MT TOM GEN STATION WHICH IS BEING DECOMMISSIONED | Employee Expenses-EE0 CT15D001 | Waterbury Portable Radios | This WO will be used to order (10) TK-3180 portable radios that are needed for Waterbury districts operations. | Employee Expenses-EE0 CT15D002 | DSCADA DR Telecom - CL&P | This WO will be order various telecom equpiment that is required to have DSCADA DR talk to the various SCADA systems. - CL&P | Employee Expenses-EE0 CT15D007 | N LNDN BATTERY & CHRGER BACKUP | New London AWC Battery & Charger install to provide 48v backup for communications equipment | Employee Expenses-EE0 CT15D008 | Grounding Upgrade Tower Sites | Site grounding upgrade plus additional ground bars to support microwave equipment and mobile radio for Tower sites | Employee Expenses-EE0 CT16D003 | BERLIN SOUTH SITEBOSS INSTALL | Install a SiteBoss alarm panel and remove the old Larse alarm panel in Berlin (NU South) | Employee Expenses-EE0 CT16D004 | GOOSE HILL DNX-11 PROTECTION SHELF | Install a protection shelf and card in the Goose Hill DNX-11. Improves reduncancy of system | Employee Expenses-EE0 CT16D006 | SO MTN TO SOAPSTONE MICROWAVE UPGR | Upgrade the microwave equipment from DS3 to OC3 capacity to provide sufficient backhaul to enable microwave to be an alternate patch from fiber and increase capacity. | Employee Expenses-EE0
  4. Part 28 of 77

    CT16D007 | 2016 LOWBAND MOBILE RADIOS | Connecticut Mobile Radios - Statewide initiative - 2016 | Employee Expenses-EE0 CT16D019 | BERLIN TO W PEAK MICROW UPGRADE | BERLIN TO WEST PEAK MICROWAVE UPGRADE - Upgrade microwave equipment from DS3 to OC3 capacity to provide sufficient backhaul to Berlin to enable microwave to be an alternate path from fiber and increase capacity. | Employee Expenses-EE0 CT16D020 | W Peak to Berlin Microwave Upgrade | WEST PEAK TO BERLIN MICROWAVE UPGRADE - Upgrade the microwave equipment from DS3 to OC3 capacity to provide sufficient backhaul to Berlin to enable microwave to be an alternate path from fiber and increase capacity. | Employee Expenses-EE0 CT16D021 | NORWALK PAGING BASE | NORWALK PAGING BASE: Replace the paging base that was installed in the Norwalk Harbor plant with a new base located at the Tindall Ave AWC. Does not include antenna work covered under the tower project. | Employee Expenses-EE0 CT16D022 | HADDAM NECK 14B SITEBOSS ALARM | Install a SiteBoss alarm panel and remove the old Larse alarm panel @ Haddam Neck 14B Haddam CT | Employee Expenses-EE0 CT16D023 | MILLSTONE 15G SITEBOSS INSTALL ALAR | Install a SiteBoss alarm panel and remove the old Larse alarm panel @ Millstone 15G Waterford CT | Employee Expenses-EE0 CT17D001 | 56P BATTERY REPLACEMENT | Replace existing batteries at 56 Prospect Street which have reached end of life. | Employee Expenses-EE0 CT17D004 | STAMFORD SHELTER BATTERY REPLACE | Replace existing batteries at Stamford Shelter which have reached end of life. | Employee Expenses-EE0 CT17D011 | Stamford AWC DMX Install | Install a DMX fiber mux at the Stamford AWC. Roll services to the new DMX and remove the old comm equipment. | Employee Expenses-EE0 CT17D014 | GREENWICH CSP RS SITEBOSS INSTALL | Install a SiteBoss alarm panel and remove the old Badger E500 alarm panel. | Employee Expenses-EE0 CT17D016 | SOUTHINGTON SITEBOSS INSTALL | Install a SiteBoss alarm panel and remove the old Badger E500 alarm panel. | Employee Expenses-EE0 CT17D018 | WINDSOR DATA CTR SITEBOSS INSTALL | Install a SiteBoss alarm panel and remove the old Badger E500 alarm panel. | Employee Expenses-EE0 CT17D031 | Chapel Hill Paging Base | The existing equipment is at the end of its useful life. New equipment including a superior timing mechanism are proposed. Chapel Hill Rd, Montville | Employee Expenses-EE0 CT17D034 | Construction Reps Lowband Radios | A request has come in to order radios for mobile/portable radios to be ordered for certain construction reps who do not currently have radios. These radios are needed for switching per TD800 | Employee Expenses-EE0 CTEHI011 | CTE Hardship Inbox 21-07-01; 26 | CTE Hardship Inbox 21-07-01; 26-Balmer | Employee Expenses-EE0 CTGRT411 | CT Gross Earnings Tax | CT Gross Earnings Tax-Rose | Employee Expenses-EE0 CTLD1DC2 | EQUIPMENT TO PROVIDE 10 MB ETHERNET | PURCHASE AND INSTALL STEEL CONDUIT FOR 10 MB ETHERNET CIRCUIT REQUESTOR-ED ARIOLA - MANAGER GERRY BLANCHARD | Employee Expenses-EE0 CTLDA011 | CTE LIDR Administrative Costs | Employee Expenses-EE0 CTLID011 | CTE Low Inc Disc Dkt 17-12-03RELL | CTE Low Inc Disc Dkt 17-12-03RELL Motion 51-Balmer | Employee Expenses-EE0 CTLIFT23 | New Forklift for CT Dielectrics Lab | This work order will be used to purchase a new electric lift truck. The equipment will be used in the CT Dielectric Lab. The price is estimated at $40,000.00. | Employee Expenses-EE0 CTME0111 | CTMEEC | CTMEEC | Employee Expenses-EE0 CTREG011 | CT Regulatory Costs | CT Regulatory Costs-Amnott | Employee Expenses-EE0 CTRSNWTN | NEWTOWN REG EOC SECURITY | Cyber and physical security for regional EOC's. Security hardware for DSCADA system, installation of security cameras and card readers. NEWTOWN | Employee Expenses-EE0
  5. Part 29 of 77

    CTRTHTFD | HARTFORD REG EOC TELCOM | TELECOMMUNICATION FOR HARTFORD REGIONAL EOC. LOCAL AND WAN EQUIPMENT TO SUPPORT DSCADA, AVTEK RADIO FIBER OPITC INSTALLATION TO HARTFORD AND ANCILLARY EQUIPMENT | Employee Expenses-EE0 CTRTNLND | NEW LONDON REG EOC TELECOM | TELECOMMUNICATION FOR NEW LONDON REGIONAL EOC. LOCAL AND WAN EQUIPMENT TO SUPPORT DSCADA, AVTEK RADIO FIBER OPTIC INSTALLATION TO HARTFORD AND ANCILLARY EQUIPMENT | Employee Expenses-EE0 CTRTNWTN | NEWTOWN REG EOC TELECOM | TELECOMMUNICATION FOR NEWTOWN REGIONAL EOC. LOCAL AND WAN EQUIPMENT TO SUPPORT DSCADA, AVTEK RADIO FIBER OPITC INSTALLATION TO HARTFORD AND ANCILLARY EQUIPMENT | Employee Expenses-EE0 CTVTN16C | CTVT Wiring 2016 | CTVT Wiring-name change G Flannery | Employee Expenses-EE0 DGDFLT11 | ENFIELD, NEVINS, 2, RONALD L MORGAN | This AWO is created to support Maximo functionality which requires an FWO but DG program/project does not. All DG "no fwo needed" will be directed to this AWO as a Maximo "defaultAWO" | Employee Expenses-EE0 DISE0011 | Discount Expense | Discount Expense | Employee Expenses-EE0 | 43001X DONAT111 | Get Tax Credit-Donation | Get Tax Credit-Donation-Chandler | Employee Expenses-EE0 | 4261T0 DRCM0011 | Dist Sta Recloser CM | DRCM0011OPSNTRELEXPENSES11 | Employee Expenses-EE0 DSCADA14 | ELEC PROJ DSCADA RETROFITS | PRE- CHECKS TO THE CONTROLS AS WELL AS OTHER CHECKLIST ITEMS THAT MAY NEED TO BE PERFORMED BY THE ELECTRIC MAINTENANCE DEPARTMENT | Employee Expenses-EE0 DSCADA2W | DSCADA PROGRAM - WATERBURY DISTRICT | BASE RADIO INSTALLATION DSCADA PROGRAM | Employee Expenses-EE0 DSCN0145 | NORTHEAST SIMSBURY 43F - REPL FAILE | ASSUME CHARGES FOR THE REPLACEMENT OF THE FAILED ARI CONDITIONING UNIT. | Employee Expenses-EE0 DSCN9166 | SHUNOCK 32P - INSTALL TRANSDUCERS | SHUNOCK 32P - INSTALL TRANSDUCERS _________________________________EG | Employee Expenses-EE0 DSEQ8026 | CHIPPEN HILL 15U - REBUILD FAILED B | ASSUME CHARGES FOR THE REBUILD OF THE FAILED SPARE BREAKER. _________________________EG | Employee Expenses-EE0 DSEQ8029 | CEDAR HEIGHTS 4R-RPL FAILING ANNUNC | REPLACE FAILING ANNUNCIATOR ___________________________CIR | Employee Expenses-EE0 DSHK0011 | Dist Sta Housekeeping | DSHK0011OPSNTRELEXPENSES11 | Employee Expenses-EE0 DSIP0011 | Dist Sta Inspect | DSIP0011OPSNTRELEXPENSES11 | Employee Expenses-EE0 DSN12044 | (60): Install new breaker. DSN1204 | INSTALL A 25 KV SINGLE-PHASE CABLE AND FUSED CUTOUT TO STATION SERVICE TRANSFORMER INSTALL A 3 INCH STEEL CONDUIT AND 25 KV CABLE FROM THE YARD PAD-MOUNTED 15 MVA STEP-DOWN XFMR | Employee Expenses-EE0 DSN22023 | SOUTH END 1G-REPLC FAILING 1X 2X LT | REPLACE THE FAILING 1X AND 2X LTC CONTROL RELAYS ___________________________________________EZ | Employee Expenses-EE0 DSN22043 | (60): Retire Substation, remove all | RETIRE SUBSTATION -ALL OF THE EQUIPMENT INCL- UDING FENCE AND TRAPROCK SHOULD BE REMOVED AND SCRAPPED - UPON COMPLETION THE SITE WILL BE TURNED OVER TO REAL ESTATE TO SELL | Employee Expenses-EE0 DSN32010 | (50): Miscellaneous: Remote racking | INSTALLATION OF A REMOTE RACKING UNIT FOR SWITCHGEAR BREAKERS __________________________________________CMK | Employee Expenses-EE0 DSN32014 | MOBILE BATT TRLR #16902 - BUILD BAT | BUILD A NEW MOBILE BATTERY TRAILER #16901 __________________________________________JJD | Employee Expenses-EE0 DSN32049 | WINSTED 22F - REMOVE FOUNDATION | REMOVE ALL UNUSED FOUNDATIONS SIX INCHES BELOW GRADE ___________________________________________EG | Employee Expenses-EE0 DSN32053 | VAN DYKE 12 - REPLACE FAILING CUTOU | REPLACEMENT OF THE FAILING SMD-20 CUTOUTS ON THE 12-3S1-1 AND 12-4S1-1 __________________________________________CMK | Employee Expenses-EE0 DSN42001 | MOBILE BATTERY TRAILER 1146364-BUIL | BUILD A NEW MOBILE BATTER TRAILER #1146364 __________________________________________JJD | Employee Expenses-EE0
  6. Part 30 of 77

    DSN42003 | SOUTH COVENTRY 17Y-REMOVE FENCE & F | REMOVE THE FENCE, FOUNDATIONS & TRAP-ROCK, THE AREA WILL BE LOAMED AND SEEDED TO RETURN IT TO ITS ORIGINAL STATE. THE EQUIPMENT HAS BEEN REMOVED AND THE SITE WILL BE SOLD | Employee Expenses-EE0 DSN42020 | SOUTH NAUGATUCK 21L-RPLC FAILING AN | REPLACE THE FAILING 21L-1X ANNUNCIATOR __________________________________________CMK | Employee Expenses-EE0 DSN42025 | TORRRINGTON TERMINAL 8A-RPLC LIGHTN | REPLACEMENT OF THE INADEQUATE LIGHTING FIXTURES ___________________________________________EZ | Employee Expenses-EE0 DSN42027 | MANCHESTER 3A - REPLACE LIGHTING FI | REPLACEMENT OF THE INADEQUATE LIGHTING FIXTURES ___________________________________________EZ | Employee Expenses-EE0 DSN42041 | (50): Install equipment for network | Install equipment for network communications pilot. | Employee Expenses-EE0 DSN42046 | Replace Deteriorating Fence | Replacement of the deteriorated fence (appr 100 ft) and gate | Employee Expenses-EE0 DSN52002 | Beacon Falls 11N - Replace ATS swit | Beacon Falls 11N - Replace the failing auto-throwover switch. | Employee Expenses-EE0 DSN52038 | Noera 13H - Replace the phone circu | Noera 13H - Upgrade the DSCADA equipment to transition the DSCADA system over to the fiber SONET ring. | Employee Expenses-EE0 DSN52039 | (50): Install an air conditioning s | Carmel Hill 11S - Install an air conditioning unit. | Employee Expenses-EE0 DSN62001 | Chippen Hill 15U LTC control Relay | Chippen Hill 15U - Replace the failing 15U-2X Load Tap Changer control relay. | Employee Expenses-EE0 DSN72014 | Arrester replacement on the 11R-1X | Cos Cob 11R - Replace the failing 11R-1X high and low side arresters | Employee Expenses-EE0 DSQ32018 | MYSTIC 13K - REPLACE FAILED A/C UNI | REPLACEMENT OF THE FAILED A/C UNIT IN THE CONTROL HOUSE ___________________________________________EG | Employee Expenses-EE0 DSQ42012 | EAST BANTAM 19U-RPLC FAILED SWGR W/ | INSTALL A NEW POLE TOP RECLOSER AND CONTROL TO REPLACE/BYPASS THE 19U1 SWITCHGEAR FEEDER POSITION_- ONLY INSTALLING THE RECLOSER WORK ORDER_________________________________EZ | Employee Expenses-EE0 DSQ62013 | (50): Flax Hill 24A-3X low side Arr | Flax Hill 24A - REplace the failed 24A-3X low side arresters. | Employee Expenses-EE0 DSQ62024 | Replace Failed Relay | Norwalk 9S - Replace the failed 9S-45 SEL-351S relay. | Employee Expenses-EE0 DSQ62025 | (50): Battery Charger DSQ62025 | Carmel Hill 11S - Replace the failed battery charger. | Employee Expenses-EE0 DSQ62043 | (40): Refinish the 4.8 kV switchgea | Refinish the 4.8 kV switchgear enclosure | Employee Expenses-EE0 DSYM0011 | Dispatch - System | DSYM0011OPSNTRELEXPENSES11 | Employee Expenses-EE0 DV190E11 | CA AWO CLP-1.90S STOCK | CA AWO CLP-1.90S STOCK | Employee Expenses-EE0 DV206E11 | CA AWO CLP$2.06S STOCK | CA AWO CLP$2.06S STOCK | Employee Expenses-EE0 DV209E11 | CA AWO CLP$2.09S STOCK | CA AWO CLP$2.09S STOCK | Employee Expenses-EE0 DV390E11 | CA AWO CLP3.90%S STOCK | CA AWO CLP3.90%S STOCK | Employee Expenses-EE0 DV450E11 | CA AWO CLP4.50%S STOCK | CA AWO CLP4.50%S STOCK 1951 | Employee Expenses-EE0 DV528E11 | CA AWO CLP5.28%S STOCK | CA AWO CLP5.28%S STOCK | Employee Expenses-EE0 DV656E11 | CA AWO CLP6.56%S STOCK | CA AWO CLP6.56%S STOCK | Employee Expenses-EE0 EEC23001 | Eversource Energy Ctr May 2023 | This AWO is being set up to pay the May 2023 Payment for the Eversource Energy center agreement with UCONN. | Employee Expenses-EE0 ELSP0211 | Electric Supply | Electric Supply | Employee Expenses-EE0 | 2421H0 EMPP0011 | Emergency Preparedness | EMPP0011OPSNTRELEXPENSES11 | Employee Expenses-EE0 ENFLDAW1 | SITE #58 ENFIELD AREA WORK CENTER | REMEDIATION SITE #58 ENFIELD AREA WORK CENTER | Employee Expenses-EE0 EPLD0011 | Engineering/Planning/Design | EPLD0011OPSNTRELEXPENSES11 | Employee Expenses-EE0 ERRU0011 | Envir Resp/Remediation - Undergrnd | ERRU0011OPSNTRELEXPENSES11 | Employee Expenses-EE0
  7. Part 31 of 77

    ERRX0011 | Envir Resp/Remediation - Overhead | ERRX0011OPSNTRELEXPENSES11 | Employee Expenses-EE0 ESSB0011 | 11 SS Clearing Blanket CT | ESSB0011ALLOCCLEARING11 | Employee Expenses-EE0 | 107ES0 ESSL0011 | 11 OH Clearing Blanket CT | ESSL0011ALLOCCLEARING11 | Employee Expenses-EE0 | 107ES0 ES_001CS | CHESHIRE AWC ES 140 FT SST | CHESHIRE AWC LOC ES-001 VOICE RADIO SET UP_x000D__x000D_ | Employee Expenses-EE0 ETRE0011 | Tree Trimming | ETRE0011NT011 | Employee Expenses-EE0 EVTC0011 | Event Sponsorship - Company Funded | EVTC0011NT011 | Employee Expenses-EE0 EXCVT101 | 2001 CL&P EXCAVATING CONTRACTOR ARE | WORK ORDER TO COLLECT FOR DISTRIBUTION, CHARGES FROM EXCAVATION CONTRACTS FOR THE 9 CL&P DESIGNATED AREAS - MATERIAL REQUEST # 86884800 AND 15984800 BY D SODERSTROM | Employee Expenses-EE0 F1411025 | CL&P Backup SOC | Establishment of CL&P Backup SOC in Windsor | Employee Expenses-EE0 F1511011 | Newtown Glygol System | Newtown Glygol System Replacement | Employee Expenses-EE0 F1511070 | East Hampton Gate Door Closer | Install Hydraulic Door Closer on Gate Door in East Hampton | Employee Expenses-EE0 F1511090 | Hartford Gate Intercom | Hartford Gate Intercom | Employee Expenses-EE0 F1611010 | New London Gate Intercom | New London Gate Intercom Replacement | Employee Expenses-EE0 F1611014 | Cheshire Security Cameras (4) | Cheshire Security Cameras (4) | Employee Expenses-EE0 F1711013 | Myrock Substation Office Fitout | Myrock Substation Office Fitout - Structures | Employee Expenses-EE0 FALU0011 | Fault Locating (Underground) | FALU0011OPSNTRELEXPENSES11 | Employee Expenses-EE0 FALX0011 | Fault Locating (DB/Overhead) | FALX0011OPSNTRELEXPENSES11 | Employee Expenses-EE0 FC161102 | Bunker Hill Tower Radio Equipment | Bunker Hill Tower Radio Equipment - Freight Street Consolidation | Employee Expenses-EE0 FC161103 | Waterbury Freight St. Equipment | Waterbury Freight Street Non-Site Specific Equipment | Employee Expenses-EE0 FC161104 | Higganum Tower Radio Equipment | Higganum Tower Radio Equipment - Freight Street Consolidation | Employee Expenses-EE0 FC161107 | Prospect Tower Radio Equipment | Prospect Tower Radio Equipment - Freight Street Consolidation | Employee Expenses-EE0 FC161109 | Southbury Tower Radio Equipment | Southbury Tower Radio Equipment - Freight Street Consolidation | Employee Expenses-EE0 FC161110 | Cheshire Tower Radio Equipment | Cheshire Tower Radio Equipment | Employee Expenses-EE0 FRMS0011 | Safety/Prot Clothing/Small Tools | Safety/Prot Clothing/Small Tools- Meter Service | Employee Expenses-EE0 FRPC0011 | Small Tools Fire Reta/Prot Cloth | FRPC0011NT011 | Employee Expenses-EE0 FRPC0111 | Fire Retardant/Protective Clothing | Fire Retardant/Protective Clothing & Safety Supplies | Employee Expenses-EE0 GEIA0011 | Generation Interc Agreements | GEIA0011OPSNTRELEXPENSES11 | Employee Expenses-EE0 GENE0011 | Generators | GENE0011OPSNTRELEXPENSES11 | Employee Expenses-EE0 GOLDC011 | Gold Coast Anniversary Payment | Gold Coast Anniversary Payment | Employee Expenses-EE0 | 242GC0 GOOSEHLL | GOOSE HILL MICROWAVE | EAST HAMPTON TOWER REPLACEMENT - MICROWAVE BETWEEN E HAMPTON TOWER AND GOOSE HILL | Employee Expenses-EE0 GSUP0011 | General Supplies MDEC | General Supplies MDEC | Employee Expenses-EE0 GX160002 | Mini SF6 Processing Module | Portable mini SF6 processing module includes 16' service hose with Dilo Dn8 couplers requested by John Carroll | Employee Expenses-EE0 GX160016 | Fluke Digital Multimeter 87V/E2 | Fluke Digital Multimeter 87V/E2 | Employee Expenses-EE0 GX160023 | HEPA Vac | HEPA Vac | Employee Expenses-EE0 GX160024 | Hydraulic Hand Pump Kit | Hydraulic Hand Pump Kit part # 0709426 | Employee Expenses-EE0 GX160025 | Snow Removal Equipment | Snow removal equipment | Employee Expenses-EE0 GX160026 | Projector and Accessories | Snow removal equipment | Employee Expenses-EE0 GX160027 | Dynatel Cable Locator | Dynatel Cable Locator | Employee Expenses-EE0
  8. Part 32 of 77

    GX160030 | Fiber Termination Kit & Blades | Fiber Termination Kit & Blades | Employee Expenses-EE0 GX170001 | Nomenclature Printers Durlabel | Duralbel Nomenclature Printers (2) | Employee Expenses-EE0 GX170002 | Work Zone Protection Sign Kit FE | Work Zone Protection Sign Kit 10 Stock Code #466238 | Employee Expenses-EE0 GX170003 | Greenlee Conduit Bender and Acc | Greenlee Conduit Bender stock code 184031 and Accessories stock code 184032 2 Units | Employee Expenses-EE0 GX170007 | DTR 8510 Ratiometer | Chauvin Arnoux High Performance Ratiometer model DTR 8510 for Ct Station Ops East - two units | Employee Expenses-EE0 GX210019 | PoleForeman V5.7 - SagLine V3.6 Sof | PoleForeman V5.7- Engineering Analysis Software Site License - CL&P only $136,659_x000D__x000D_ SagLine V3.6 - Engineering Analysis Software Site License - CL&P only $43,155_x000D__x000D_ Requested by Wayne Gagnon_x000D__x000D_ | Employee Expenses-EE0 GX210027 | Laptop Vehicle Mounts | Purchase of laptop vehicle mounts; total $125845. 81 units. Supplier Gamber Johnson | Employee Expenses-EE0 GXC14W68 | Purchase Epson EX7230 Projector | PURCHASE Epson EX7230 Projector | Employee Expenses-EE0 GXC16C22 | 2 x 80" Monitors w/install | to purchase 2 x 80" monitors and move 50" monitor. Service and Installation TOTAL $16,868. | Employee Expenses-EE0 GXC16C52 | Hot Line Cutters (4) Begley 2AD | Hot Line Cutters (4) for 2AD OH Chesire s/c188854 @ $1421.13ea TOTAL: $5685 | Employee Expenses-EE0 GXC16C61 | Cutter Cable (2) 2NR Engel | 2NR - CUTTER CABLE- 2 - 0445410 $ 2589.23ea TOTAL: $5178.46 | Employee Expenses-EE0 GXC16C63 | Pump Hydraulic (2) 2NR Engel | 2NR - PUMP HYDRUICL-2-0448372 $ 2697.00 TOTAL: $5395 | Employee Expenses-EE0 GXC16C64 | Potential Tester (2) 2NR Engel | 2NR - POTENTIAL TESTER -2 -0443314 $ 586.93 TOTAL: $1175 | Employee Expenses-EE0 GXC16W02 | 42" Samsung Television - $3,362.6 | 2 replacement cutter heads stock code 458692 cost is $553.00 each; 1106 - Pagliaro | Employee Expenses-EE0 GXC16W45 | HILTI Impact Drill 549.47 each = 10 | HILTI Impact Drill 549.47 each = 1098.54 | Employee Expenses-EE0 GXC17C10 | Pin Pointer w/Battery (1) 2NP Stev | 2NP - (1) Pin pointer / SC 190521 / $ 1,717,00 / (1) Battery for pin pointer / SC 190522 / $266.30 TOTAL: $1987 Enos Stevens | Employee Expenses-EE0 GXC17C11 | Chainsaw w/16" Bar 2BB Blair | 2BB - 1 x 3.06 CI Chainsaw w/16" Bar, s/c 465252, TOTAL: $625.00 | Employee Expenses-EE0 GXC17C12 | Public Safety Kit w/Defrib (2) 2EB | 2EB - (2) - S/C 460802 DEVICE, PUBLIC SAFETY KIT W/ RX COPY AND PLUSTRAC 5, ZOLL AEDPLUS, DEFRIBULATOR - $1848 each TOTAL: $3696 MANLEY | Employee Expenses-EE0 GXC17C13 | Crimper, Die, 6 ton (1) 2BB LaHaie | 2BB - Crimper, Die, 6 ton. S/C 0455630 TOTAL: $1785 LaHaie | Employee Expenses-EE0 GXC17C15 | Gas Detector Docking Stat - Stevens | 2NP - (One) Gas Detector Calibration + Bump Docking station SC 0439496 @ $1,982 Enos Stevens | Employee Expenses-EE0 GXC17C27 | EZ Squeeze (3) HB Mobility Belt (3) | 2AD - 490DRMS EZ-Squeeze w/ Inner Rope & Snap Hooks (3) @516.16ea / 20182MP3-25BH Heritage Buck Mobilty Belt, 25 DEE, w/ Long Gut Strap, 3 Extra Holes in the Gut Strap. (3) @ 612.50ea TOTAL: $3,400 | Employee Expenses-EE0 GXC17C28 | AED (3) 2EK | 2EK - AED S/C 460802 (3) $1,849EA Total: 5547 | Employee Expenses-EE0 GXC17C29 | Cutter Heads (3) 2EK | 2EK - Cutter Heads (Candlestick) (3) $500ea TOTAL: 1500 S/C 465047 | Employee Expenses-EE0 GXC17C30 | Reach Desk Veh (4) 2NR Baret | 2NR - ReachDeskSuper-03 Printer Elite for supervisor vehicle. $500 (BARET) TOTAL $2,000_x000D__x000D_ | Employee Expenses-EE0 GXC17C31 | UG Harness (1) HEEL 2NR | 2NR - UG Harnesses (1) s/c 462036 @$735ea FEEL | Employee Expenses-EE0 GXC17C32 | Filler Valve Assy (6) 2NR Leonard | 2NR - Filler Valve Assy Guage (6) s/c 0445316 804.65ea TOTAL: $4850 Leonard | Employee Expenses-EE0
  9. Part 33 of 77

    GXC17C33 | Hilti Rotary Drill (1) 2NR Leonard | 2NR - Hilti Rotary Drill (1) s/c 0441221 TOTAL: $889 Leonard | Employee Expenses-EE0 GXC17C34 | Buck Fit Harness/EZ Squeeze Kit (1) | 2AD - Buck Fit Harness M (1) @ $523.18 / EZ Squeeze Kit @ $871.12 TOTAL: $1400 | Employee Expenses-EE0 GXCOS70A | SOC MONITOR | WORK ORDER FOR 2017 SOC MONITOR | Employee Expenses-EE0 GXCOS70B | DISTRIBUTION SIMULATION/TRAINING RM | Costs to cover the remodel work needed to convert the CONVEX Off-shift Operator Room into a Distribution Simulator Training Classroom. _x000D__x000D_ Estimated costs: $25k (requestor: Bill Newport)_x000D__x000D_ Red Thread (furniture repair, reconfiguration and new): $4,000_x000D__x000D_ A/Z: HVAC, electrical work, data wiring, window treatments, etc.: $20,000_x000D__x000D_ | Employee Expenses-EE0 GXENG16A | PLC TT TRAINING GRIDEDGE | TRAINING SETUP EQUIPMENT AND LABOR FOR PLC TT TRAINING. GRIDEDGE IS THE VENDOR W QUOTE OF $23,475. | Employee Expenses-EE0 GXENG16B | PROJECTOR FOR SYSTEM RESILIENCY | PURCHASE A PROJECTOR FOR THE SYSTEM RESILIENCY GROUP | Employee Expenses-EE0 HAND0011 | Material Handling | HAND0011NT011 | Employee Expenses-EE0 HQDC0111 | H/Q Phase 2-DC | H/Q Phase 2-DC | Employee Expenses-EE0 HQNET111 | H/Q Phase 1-DC-NEET | H/Q Phase 1-DC-NEET | Employee Expenses-EE0 HQVET111 | H/Q Phase 1-DC-VET | H/Q Phase 1-DC-VET | Employee Expenses-EE0 HUTP0011 | Highway Use Tax Payment | Highway Use Tax Payment | Employee Expenses-EE0 ICBAP011 | ICB Work Order | ICB Work Order-McDonald | Employee Expenses-EE0 | 23401X INCW0011 | Inclement Weather | INCW0011OPSNTRELEXPENSES11 | Employee Expenses-EE0 INSPC2AD | 2020 FAULT INDICATOR CHESHIRE 2AD | THIS IS PART OF THE DB FAULT INDICATOR INSPECTION AND REPLACEMENT PROGRAM FOR 2020 | Employee Expenses-EE0 INTOHE11 | CA AWO INTEREST OTHER | CA AWO INTEREST OTHER | Employee Expenses-EE0 IRMT0011 | Install & Remove Meters | IRMT0011OPSNTRELEXPENSES11 | Employee Expenses-EE0 ISOV0011 | Inspect- Overhead | ISOV0011 | Employee Expenses-EE0 ISPL0011 | Inspect - Poles | ISPL0011OPSNTRELEXPENSES11 | Employee Expenses-EE0 ISSB0011 | Inspect Bulk Stations | Inspect Bulk Stations | Employee Expenses-EE0 ISST0011 | Inspect Distribution Stations | Inspect Distribution Stations | Employee Expenses-EE0 ISSV0011 | Inspect - Stray Voltage | ISSV0011OPSNTRELEXPENSES11 | Employee Expenses-EE0 ISTA0011 | Dist Sta Misc PM | ISTA0011OPSNTRELEXPENSES11 | Employee Expenses-EE0 ISTE0011 | Inspect/Test Environmental | ISTE0011 | Employee Expenses-EE0 ISUN0011 | Inspect - Underground | ISUN0011OPSNTRELEXPENSES11 | Employee Expenses-EE0 IT1D1303 | CL&P WIRELESS PROJECT | CL&P WIRELESS PROJECT CISCO EQUIPMENT - NWN QUOTE OP81290 CONTACT: BOB D'EON X3094 PROJECT: IT1DLANA | Employee Expenses-EE0 ITRU0011 | Install Transform Regula undergrnd | ITRU0011OPSNTRELEXPENSES11 | Employee Expenses-EE0 IVCL0011 | Invoice Clearing | IVCL0011NT011 | Employee Expenses-EE0 KICK0011 | Kick Out Corrections | Waiting for kick out reclass | Employee Expenses-EE0 LDSM0011 | Locate/DigSafe/Markout | LDSM0011OPSNTRELEXPENSES11 | Employee Expenses-EE0 LEAS0011 | Lease | LEAS0011NT011 | Employee Expenses-EE0 | 232PA0 LGFR0011 | Federal Regulatory | LGFR0011NT011 | Employee Expenses-EE0 LGLT0011 | Litigation | LGLT0011NT011 | Employee Expenses-EE0 LGSR0011 | State Regulatory | LGSR0011NT011 | Employee Expenses-EE0 LNGT1DC3 | LONG HILL - FREIGHT STREET WORK | LONG HILL - FREIGHT STREET WORK AS PART OF THE LONG HILL TOWER MOVE EQUIPMENT WILL BE PURCHASED FOR THE FREIGHT STREET SITE AS WELL AS LABOR TO INSTALL. | Employee Expenses-EE0 LOBBY011 | Lobby Stock Clearing | LOBBY011ALLOCCLEARING11 | Employee Expenses-EE0 LTDB0711 | Long Term Debt2004 Series A | Long Term Debt2004 Series A | Employee Expenses-EE0 | 237CD0 LTDB1011 | Long Term Debt2005 Series A | Long Term Debt2005 Series A | Employee Expenses-EE0 | 237CP0 LTDB1911 | Long Term Debt2007 Series A | Long Term Debt2007 Series A | Employee Expenses-EE0 | 2371A0
  10. Part 34 of 77

    LTDB2311 | Long Term Debt2007 Series C | Long Term Debt2007 Series C | Employee Expenses-EE0 | 2371B0 LTDSF011 | LTD Self Funded Pmts | LTD Self Funded Pmts | Employee Expenses-EE0 LYMR0011 | East Lyme | East Lyme | Employee Expenses-EE0 LZREC011 | LREC/ZREC Program | LZREC011LREC11 | Employee Expenses-EE0 MAPP0011 | Mapping | MAPP0011OPSNTRELEXPENSES11 | Employee Expenses-EE0 MBLD0011 | Maintain Buildings | MBLD0011NT011 | Employee Expenses-EE0 MBLD0111 | Maintain Buildings | MBLD0111NT011 | Employee Expenses-EE0 MBLD0411 | Maintain Buildings | MBLD0411NT011 | Employee Expenses-EE0 MBLD0611 | Maintain Buildings | MBLD0611NT011 | Employee Expenses-EE0 MBLD0711 | Maintain Buildings | MBLD0711NT011 | Employee Expenses-EE0 MBLD0811 | Maintain Buildings | MBLD0811NT011 | Employee Expenses-EE0 MBLD0911 | Maintain Buildings | MBLD0911NT011 | Employee Expenses-EE0 MBLD1011 | Maintain Buildings | MBLD1011NT011 | Employee Expenses-EE0 MBLD1111 | Maintain Buildings | MBLD1111NT011 | Employee Expenses-EE0 MBLD1211 | Maintain Buildings | MBLD1211NT011 | Employee Expenses-EE0 MBLD1311 | Maintain Buildings | MBLD1311NT011 | Employee Expenses-EE0 MBLD1411 | Maintain Buildings | MBLD1411NT011 | Employee Expenses-EE0 MBLD1511 | Maintain Buildings | MBLD1511NT011 | Employee Expenses-EE0 MBLD1611 | Maintain Buildings | MBLD1611NT011 | Employee Expenses-EE0 MBLD1911 | Maintain Buildings | MBLD1911NT011 | Employee Expenses-EE0 MBLD3111 | Maintain Buildings | MBLD3111NT011 | Employee Expenses-EE0 MBLD3211 | Maintain Buildings | MBLD3211NT011 | Employee Expenses-EE0 MBLD3311 | Maintain Buildings | Maintain Buildings | Employee Expenses-EE0 MC22NT01 | Newtown Microwave Upgrade | Newtown Microwave Upgrades MCRO22NT | Employee Expenses-EE0 MCRO2201 | New Milford Microwave Upgrade | New Milford Microwave Upgrade | Employee Expenses-EE0 METRET11 | Electric Meter retirement | METRET11NT011 | Employee Expenses-EE0 MGSP0011 | Management & Supervision | MGSP0011OPSNTRELEXPENSES11 | Employee Expenses-EE0 MISC0011 | Miscellaneous Deduction | MISC0011EMPBENPAY11 | Employee Expenses-EE0 MMSX0011 | Misc maintenance & Support | Misc maintenance & Support-Daignault | Employee Expenses-EE0 MRDG0011 | Meter Reading | MRDG0011NT011 | Employee Expenses-EE0 MSAD0011 | Meter Service - Administration | MSAD0011OPSNTRELEXPENSES11 | Employee Expenses-EE0 MTCU0011 | Maintenance Corrective Undergrnd | MTCU0011OPSNTRELEXPENSES11 | Employee Expenses-EE0 MTCX0011 | Maintenance - Corrective (Overhead) | MTCX0011OPSNTRELEXPENSES11 | Employee Expenses-EE0 MTOH1B15 | ELEC. MAINT. FAC. INSPECT./FLT INDI | Fault Indicators (MTOH) CT ELECTRIC MAINTENANCE FACILITY INSPECTIONS NON DESIGN/ FAULT | Employee Expenses-EE0 MTOH4N15 | ELEC. MAINT. FAC. INSPECT./FLT INDI | Fault Indicators (MTOH) CT ELECTRIC MAINTENANCE FACILITY INSPECTIONS NON DESIGN / FAULT INTICATOR - NEW LONDON | Employee Expenses-EE0 MTSL0011 | Maintenance - Street Lights | MTSL0011OPSNTRELEXPENSES11 | Employee Expenses-EE0 MTUG0011 | UG Conduit Maint | MTUG0011OPSNTRELEXPENSES11 | Employee Expenses-EE0 MTWO0011 | Material Write-offs | Material Write-offs | Employee Expenses-EE0 NOPM0011 | Non Operating Property Management | NOPM0011NT011 | Employee Expenses-EE0 NTKMAJ11 | Inspection - Network Majors | ISDB0011OPSNTRELEXPENSES11 Inspection of Network Majors by Field Ops. | Employee Expenses-EE0 NTPAY111 | CT Res Incentives-Netting Pmt Direc | CT Res Incentives-Netting Pmt Direct-Quaresma | Employee Expenses-EE0 NTSMT011 | Non Tracked SMT Expense | Non Tracked SMT Expense | Employee Expenses-EE0 OFFN0011 | Payroll | OFFN0011EMPBENPAY11 | Employee Expenses-EE0 | 242E20 OMSR1DC1 | ENTERPRISE OMS REPORTING - CL&P | ENTERPRISE OMS REPORTING - CL&P | Employee Expenses-EE0 OMSS1DC1 | ENTERPRISE OMS SYSTEM - CL&P | ENTERPRISE OMS SYSTEM - CL&P | Employee Expenses-EE0 ONST0011 | Oncall / Standby | ONST0011OPSNTRELEXPENSES11 | Employee Expenses-EE0 OPMG0011 | Operating Property Management | OPMG0011NT011 | Employee Expenses-EE0

Text of RRU-159 Attachment 05.pdf

Extracted from the file · 879 pages · 16,073,548 characters

Text of RRU-159 Attachment 04.xlsx

Sheet names, column headings and text cells; numbers left out

Text of RRU-159 Attachment 04.pdf

Extracted from the file · 5 pages · 20,994 characters

Text of RRU-159 Attachment 03.xlsx

Sheet names, column headings and text cells; numbers left out · first 300,000 characters

Text of RRU-159 Attachment 03.pdf

Extracted from the file · 840 pages · 14,413,580 characters

Text of RRU-159 Attachment 02.xlsx

Sheet names, column headings and text cells; numbers left out · first 300,000 characters

Text of RRU-159 Attachment 02.pdf

Extracted from the file · 1,137 pages · 16,605,462 characters

Text of RRU-159 Attachment 01.xlsx

Sheet names, column headings and text cells; numbers left out

Text of RRU-159 Attachment 01.pdf

Extracted from the file · 1 page · 1,403 characters

As listed on the current system

Question(s) Answered 159 (Connecticut Light and Power Company dba Eversource Energy) Date Filed: 11/06/2026

This filing on the current system (opens in a new tab)