Skip to main content

A prototype public docket site for the Connecticut Public Utilities Regulatory Authority

Utility Dockets and Filings

Interrogatory responses

Answers to questions 159

ResponseFiled by Connecticut Light and Power Company dba Eversource Energy51 files
Part of docket 26-05-10Open
  • Electric
Application of The Connecticut Light and Power Company d/b/a Eversource Energy to Amend its Rate Schedules

Files51

Search terms highlighted
Eversource rate increase is on 36 pages across 17 files of the text below, highlighted. Go to the first matchClear highlighting
Words on different pages
Words on different pages
Words on different pages

Text of RRU-159 Attachment 23.xlsx

Sheet names, column headings and text cells; numbers left out · first 300,000 characters

Text of RRU-159 Attachment 23.pdf

Extracted from the file · 1,160 pages · 16,330,154 characters

Text of RRU-159 Attachment 22.xlsx

Sheet names, column headings and text cells; numbers left out · first 300,000 characters

Text of RRU-159 Attachment 22.pdf

Extracted from the file · 1,203 pages · 14,349,246 characters

Text of RRU-159 Attachment 21.xlsx

Sheet names, column headings and text cells; numbers left out · first 300,000 characters

Text of RRU-159 Attachment 21.pdf

Extracted from the file · 1,203 pages · 13,880,364 characters

Text of RRU-159 Attachment 20.xlsx

Sheet names, column headings and text cells; numbers left out

Text of RRU-159 Attachment 20.pdf

Extracted from the file · 16 pages · 151,762 characters

Text of RRU-159 Attachment 19.xlsx

Sheet names, column headings and text cells; numbers left out

Text of RRU-159 Attachment 19.pdf

Extracted from the file · 1 page · 5,328 characters

Text of RRU-159 Attachment 18.xlsx

Sheet names, column headings and text cells; numbers left out · first 300,000 characters

Text of RRU-159 Attachment 18.pdf

Extracted from the file · 640 pages · 7,983,236 characters

Text of RRU-159 Attachment 17.xlsx

Sheet names, column headings and text cells; numbers left out · first 300,000 characters

Text of RRU-159 Attachment 17.pdf

Extracted from the file · 855 pages · 14,651,941 characters

Text of RRU-159 Attachment 16.xlsx

Sheet names, column headings and text cells; numbers left out · first 300,000 characters

Text of RRU-159 Attachment 16.pdf

Extracted from the file · 489 pages · 7,076,557 characters

Text of RRU-159 Attachment 15.xlsx

Sheet names, column headings and text cells; numbers left out · first 300,000 characters

Text of RRU-159 Attachment 15.pdf

Extracted from the file · 897 pages · 15,723,777 characters

Text of RRU-159 Attachment 14 .pdf

Extracted from the file · 1 page · 2,589 characters

Text of RRU-159 Attachment 14.xlsx

Sheet names, column headings and text cells; numbers left out

Text of RRU-159 Attachment 13.xlsx

Sheet names, column headings and text cells; numbers left out

Text of RRU-159 Attachment 13.pdf

Extracted from the file · 1 page · 427 characters

Text of RRU-159 Attachment 12.xlsx

Sheet names, column headings and text cells; numbers left out · first 300,000 characters

Text of RRU-159 Attachment 12.pdf

Extracted from the file · 802 pages · 14,341,138 characters

Text of RRU-159 Attachment 11.xlsx

Sheet names, column headings and text cells; numbers left out · first 300,000 characters

Text of RRU-159 Attachment 11.pdf

Extracted from the file · 858 pages · 15,906,152 characters

Text of RRU-159 Attachment 10.xlsx

Sheet names, column headings and text cells; numbers left out

Text of RRU-159 Attachment 10.pdf

Extracted from the file · 1 page · 822 characters

Text of RRU-159 Attachment 09.xlsx

Sheet names, column headings and text cells; numbers left out · first 300,000 characters

Text of RRU-159 Attachment 09.pdf

Extracted from the file · 449 pages · 7,355,312 characters

Text of RRU-159 Attachment 08.xlsx

Sheet names, column headings and text cells; numbers left out · first 300,000 characters

Text of RRU-159 Attachment 08.pdf

Extracted from the file · 867 pages · 13,878,236 characters

Text of RRU-159 Attachment 07.xlsx

Sheet names, column headings and text cells; numbers left out · first 300,000 characters

Text of RRU-159 Attachment 07.pdf

Extracted from the file · 869 pages · 15,728,932 characters

Text of RRU-159 Attachment 06.xlsx

Sheet names, column headings and text cells; numbers left out · first 300,000 characters

Text of RRU-159 Attachment 06.pdf

Extracted from the file · 459 pages · 8,128,897 characters

Words on different pages

This spreadsheet is large. Its searchable text keeps the sheet names, column headings and text cells and stops at 300,000 characters, so search may miss words further in. Download the file for every cell and figure.

  1. Part 28 of 77

    CT16D007 | 2016 LOWBAND MOBILE RADIOS | Connecticut Mobile Radios - Statewide initiative - 2016 | Employee Expenses-EE0 CT16D019 | BERLIN TO W PEAK MICROW UPGRADE | BERLIN TO WEST PEAK MICROWAVE UPGRADE - Upgrade microwave equipment from DS3 to OC3 capacity to provide sufficient backhaul to Berlin to enable microwave to be an alternate path from fiber and increase capacity. | Employee Expenses-EE0 CT16D020 | W Peak to Berlin Microwave Upgrade | WEST PEAK TO BERLIN MICROWAVE UPGRADE - Upgrade the microwave equipment from DS3 to OC3 capacity to provide sufficient backhaul to Berlin to enable microwave to be an alternate path from fiber and increase capacity. | Employee Expenses-EE0 CT16D021 | NORWALK PAGING BASE | NORWALK PAGING BASE: Replace the paging base that was installed in the Norwalk Harbor plant with a new base located at the Tindall Ave AWC. Does not include antenna work covered under the tower project. | Employee Expenses-EE0 CT16D022 | HADDAM NECK 14B SITEBOSS ALARM | Install a SiteBoss alarm panel and remove the old Larse alarm panel @ Haddam Neck 14B Haddam CT | Employee Expenses-EE0 CT16D023 | MILLSTONE 15G SITEBOSS INSTALL ALAR | Install a SiteBoss alarm panel and remove the old Larse alarm panel @ Millstone 15G Waterford CT | Employee Expenses-EE0 CT17D001 | 56P BATTERY REPLACEMENT | Replace existing batteries at 56 Prospect Street which have reached end of life. | Employee Expenses-EE0 CT17D004 | STAMFORD SHELTER BATTERY REPLACE | Replace existing batteries at Stamford Shelter which have reached end of life. | Employee Expenses-EE0 CT17D011 | Stamford AWC DMX Install | Install a DMX fiber mux at the Stamford AWC. Roll services to the new DMX and remove the old comm equipment. | Employee Expenses-EE0 CT17D014 | GREENWICH CSP RS SITEBOSS INSTALL | Install a SiteBoss alarm panel and remove the old Badger E500 alarm panel. | Employee Expenses-EE0 CT17D016 | SOUTHINGTON SITEBOSS INSTALL | Install a SiteBoss alarm panel and remove the old Badger E500 alarm panel. | Employee Expenses-EE0 CT17D018 | WINDSOR DATA CTR SITEBOSS INSTALL | Install a SiteBoss alarm panel and remove the old Badger E500 alarm panel. | Employee Expenses-EE0 CT17D031 | Chapel Hill Paging Base | The existing equipment is at the end of its useful life. New equipment including a superior timing mechanism are proposed. Chapel Hill Rd, Montville | Employee Expenses-EE0 CT17D034 | Construction Reps Lowband Radios | A request has come in to order radios for mobile/portable radios to be ordered for certain construction reps who do not currently have radios. These radios are needed for switching per TD800 | Employee Expenses-EE0 CTEHI011 | CTE Hardship Inbox 21-07-01; 26 | CTE Hardship Inbox 21-07-01; 26-Balmer | Employee Expenses-EE0 CTGRT411 | CT Gross Earnings Tax | CT Gross Earnings Tax-Rose | Employee Expenses-EE0 CTLD1DC2 | EQUIPMENT TO PROVIDE 10 MB ETHERNET | PURCHASE AND INSTALL STEEL CONDUIT FOR 10 MB ETHERNET CIRCUIT REQUESTOR-ED ARIOLA - MANAGER GERRY BLANCHARD | Employee Expenses-EE0 CTLDA011 | CTE LIDR Administrative Costs | Employee Expenses-EE0 CTLID011 | CTE Low Inc Disc Dkt 17-12-03RELL | CTE Low Inc Disc Dkt 17-12-03RELL Motion 51-Balmer | Employee Expenses-EE0 CTLIFT23 | New Forklift for CT Dielectrics Lab | This work order will be used to purchase a new electric lift truck. The equipment will be used in the CT Dielectric Lab. The price is estimated at $40,000.00. | Employee Expenses-EE0 CTME0111 | CTMEEC | CTMEEC | Employee Expenses-EE0 CTREG011 | CT Regulatory Costs | CT Regulatory Costs-Amnott | Employee Expenses-EE0 CTRSNWTN | NEWTOWN REG EOC SECURITY | Cyber and physical security for regional EOC's. Security hardware for DSCADA system, installation of security cameras and card readers. NEWTOWN | Employee Expenses-EE0
  2. Part 29 of 77

    CTRTHTFD | HARTFORD REG EOC TELCOM | TELECOMMUNICATION FOR HARTFORD REGIONAL EOC. LOCAL AND WAN EQUIPMENT TO SUPPORT DSCADA, AVTEK RADIO FIBER OPITC INSTALLATION TO HARTFORD AND ANCILLARY EQUIPMENT | Employee Expenses-EE0 CTRTNLND | NEW LONDON REG EOC TELECOM | TELECOMMUNICATION FOR NEW LONDON REGIONAL EOC. LOCAL AND WAN EQUIPMENT TO SUPPORT DSCADA, AVTEK RADIO FIBER OPTIC INSTALLATION TO HARTFORD AND ANCILLARY EQUIPMENT | Employee Expenses-EE0 CTRTNWTN | NEWTOWN REG EOC TELECOM | TELECOMMUNICATION FOR NEWTOWN REGIONAL EOC. LOCAL AND WAN EQUIPMENT TO SUPPORT DSCADA, AVTEK RADIO FIBER OPITC INSTALLATION TO HARTFORD AND ANCILLARY EQUIPMENT | Employee Expenses-EE0 CTVTN16C | CTVT Wiring 2016 | CTVT Wiring-name change G Flannery | Employee Expenses-EE0 DGDFLT11 | ENFIELD, NEVINS, 2, RONALD L MORGAN | This AWO is created to support Maximo functionality which requires an FWO but DG program/project does not. All DG "no fwo needed" will be directed to this AWO as a Maximo "defaultAWO" | Employee Expenses-EE0 DISE0011 | Discount Expense | Discount Expense | Employee Expenses-EE0 | 43001X DONAT111 | Get Tax Credit-Donation | Get Tax Credit-Donation-Chandler | Employee Expenses-EE0 | 4261T0 DRCM0011 | Dist Sta Recloser CM | DRCM0011OPSNTRELEXPENSES11 | Employee Expenses-EE0 DSCADA14 | ELEC PROJ DSCADA RETROFITS | PRE- CHECKS TO THE CONTROLS AS WELL AS OTHER CHECKLIST ITEMS THAT MAY NEED TO BE PERFORMED BY THE ELECTRIC MAINTENANCE DEPARTMENT | Employee Expenses-EE0 DSCADA2W | DSCADA PROGRAM - WATERBURY DISTRICT | BASE RADIO INSTALLATION DSCADA PROGRAM | Employee Expenses-EE0 DSCN0145 | NORTHEAST SIMSBURY 43F - REPL FAILE | ASSUME CHARGES FOR THE REPLACEMENT OF THE FAILED ARI CONDITIONING UNIT. | Employee Expenses-EE0 DSCN9166 | SHUNOCK 32P - INSTALL TRANSDUCERS | SHUNOCK 32P - INSTALL TRANSDUCERS _________________________________EG | Employee Expenses-EE0 DSEQ8026 | CHIPPEN HILL 15U - REBUILD FAILED B | ASSUME CHARGES FOR THE REBUILD OF THE FAILED SPARE BREAKER. _________________________EG | Employee Expenses-EE0 DSEQ8029 | CEDAR HEIGHTS 4R-RPL FAILING ANNUNC | REPLACE FAILING ANNUNCIATOR ___________________________CIR | Employee Expenses-EE0 DSHK0011 | Dist Sta Housekeeping | DSHK0011OPSNTRELEXPENSES11 | Employee Expenses-EE0 DSIP0011 | Dist Sta Inspect | DSIP0011OPSNTRELEXPENSES11 | Employee Expenses-EE0 DSN12044 | (60): Install new breaker. DSN1204 | INSTALL A 25 KV SINGLE-PHASE CABLE AND FUSED CUTOUT TO STATION SERVICE TRANSFORMER INSTALL A 3 INCH STEEL CONDUIT AND 25 KV CABLE FROM THE YARD PAD-MOUNTED 15 MVA STEP-DOWN XFMR | Employee Expenses-EE0 DSN22023 | SOUTH END 1G-REPLC FAILING 1X 2X LT | REPLACE THE FAILING 1X AND 2X LTC CONTROL RELAYS ___________________________________________EZ | Employee Expenses-EE0 DSN22043 | (60): Retire Substation, remove all | RETIRE SUBSTATION -ALL OF THE EQUIPMENT INCL- UDING FENCE AND TRAPROCK SHOULD BE REMOVED AND SCRAPPED - UPON COMPLETION THE SITE WILL BE TURNED OVER TO REAL ESTATE TO SELL | Employee Expenses-EE0 DSN32010 | (50): Miscellaneous: Remote racking | INSTALLATION OF A REMOTE RACKING UNIT FOR SWITCHGEAR BREAKERS __________________________________________CMK | Employee Expenses-EE0 DSN32014 | MOBILE BATT TRLR #16902 - BUILD BAT | BUILD A NEW MOBILE BATTERY TRAILER #16901 __________________________________________JJD | Employee Expenses-EE0 DSN32049 | WINSTED 22F - REMOVE FOUNDATION | REMOVE ALL UNUSED FOUNDATIONS SIX INCHES BELOW GRADE ___________________________________________EG | Employee Expenses-EE0 DSN32053 | VAN DYKE 12 - REPLACE FAILING CUTOU | REPLACEMENT OF THE FAILING SMD-20 CUTOUTS ON THE 12-3S1-1 AND 12-4S1-1 __________________________________________CMK | Employee Expenses-EE0 DSN42001 | MOBILE BATTERY TRAILER 1146364-BUIL | BUILD A NEW MOBILE BATTER TRAILER #1146364 __________________________________________JJD | Employee Expenses-EE0
  3. Part 30 of 77

    DSN42003 | SOUTH COVENTRY 17Y-REMOVE FENCE & F | REMOVE THE FENCE, FOUNDATIONS & TRAP-ROCK, THE AREA WILL BE LOAMED AND SEEDED TO RETURN IT TO ITS ORIGINAL STATE. THE EQUIPMENT HAS BEEN REMOVED AND THE SITE WILL BE SOLD | Employee Expenses-EE0 DSN42020 | SOUTH NAUGATUCK 21L-RPLC FAILING AN | REPLACE THE FAILING 21L-1X ANNUNCIATOR __________________________________________CMK | Employee Expenses-EE0 DSN42025 | TORRRINGTON TERMINAL 8A-RPLC LIGHTN | REPLACEMENT OF THE INADEQUATE LIGHTING FIXTURES ___________________________________________EZ | Employee Expenses-EE0 DSN42027 | MANCHESTER 3A - REPLACE LIGHTING FI | REPLACEMENT OF THE INADEQUATE LIGHTING FIXTURES ___________________________________________EZ | Employee Expenses-EE0 DSN42041 | (50): Install equipment for network | Install equipment for network communications pilot. | Employee Expenses-EE0 DSN42046 | Replace Deteriorating Fence | Replacement of the deteriorated fence (appr 100 ft) and gate | Employee Expenses-EE0 DSN52002 | Beacon Falls 11N - Replace ATS swit | Beacon Falls 11N - Replace the failing auto-throwover switch. | Employee Expenses-EE0 DSN52038 | Noera 13H - Replace the phone circu | Noera 13H - Upgrade the DSCADA equipment to transition the DSCADA system over to the fiber SONET ring. | Employee Expenses-EE0 DSN52039 | (50): Install an air conditioning s | Carmel Hill 11S - Install an air conditioning unit. | Employee Expenses-EE0 DSN62001 | Chippen Hill 15U LTC control Relay | Chippen Hill 15U - Replace the failing 15U-2X Load Tap Changer control relay. | Employee Expenses-EE0 DSN72014 | Arrester replacement on the 11R-1X | Cos Cob 11R - Replace the failing 11R-1X high and low side arresters | Employee Expenses-EE0 DSQ32018 | MYSTIC 13K - REPLACE FAILED A/C UNI | REPLACEMENT OF THE FAILED A/C UNIT IN THE CONTROL HOUSE ___________________________________________EG | Employee Expenses-EE0 DSQ42012 | EAST BANTAM 19U-RPLC FAILED SWGR W/ | INSTALL A NEW POLE TOP RECLOSER AND CONTROL TO REPLACE/BYPASS THE 19U1 SWITCHGEAR FEEDER POSITION_- ONLY INSTALLING THE RECLOSER WORK ORDER_________________________________EZ | Employee Expenses-EE0 DSQ62013 | (50): Flax Hill 24A-3X low side Arr | Flax Hill 24A - REplace the failed 24A-3X low side arresters. | Employee Expenses-EE0 DSQ62024 | Replace Failed Relay | Norwalk 9S - Replace the failed 9S-45 SEL-351S relay. | Employee Expenses-EE0 DSQ62025 | (50): Battery Charger DSQ62025 | Carmel Hill 11S - Replace the failed battery charger. | Employee Expenses-EE0 DSQ62043 | (40): Refinish the 4.8 kV switchgea | Refinish the 4.8 kV switchgear enclosure | Employee Expenses-EE0 DSYM0011 | Dispatch - System | DSYM0011OPSNTRELEXPENSES11 | Employee Expenses-EE0 DV190E11 | CA AWO CLP-1.90S STOCK | CA AWO CLP-1.90S STOCK | Employee Expenses-EE0 DV206E11 | CA AWO CLP$2.06S STOCK | CA AWO CLP$2.06S STOCK | Employee Expenses-EE0 DV209E11 | CA AWO CLP$2.09S STOCK | CA AWO CLP$2.09S STOCK | Employee Expenses-EE0 DV390E11 | CA AWO CLP3.90%S STOCK | CA AWO CLP3.90%S STOCK | Employee Expenses-EE0 DV450E11 | CA AWO CLP4.50%S STOCK | CA AWO CLP4.50%S STOCK 1951 | Employee Expenses-EE0 DV528E11 | CA AWO CLP5.28%S STOCK | CA AWO CLP5.28%S STOCK | Employee Expenses-EE0 DV656E11 | CA AWO CLP6.56%S STOCK | CA AWO CLP6.56%S STOCK | Employee Expenses-EE0 EEC23001 | Eversource Energy Ctr May 2023 | This AWO is being set up to pay the May 2023 Payment for the Eversource Energy center agreement with UCONN. | Employee Expenses-EE0 ELSP0211 | Electric Supply | Electric Supply | Employee Expenses-EE0 | 2421H0 EMPP0011 | Emergency Preparedness | EMPP0011OPSNTRELEXPENSES11 | Employee Expenses-EE0 ENFLDAW1 | SITE #58 ENFIELD AREA WORK CENTER | REMEDIATION SITE #58 ENFIELD AREA WORK CENTER | Employee Expenses-EE0 EPLD0011 | Engineering/Planning/Design | EPLD0011OPSNTRELEXPENSES11 | Employee Expenses-EE0 ERRU0011 | Envir Resp/Remediation - Undergrnd | ERRU0011OPSNTRELEXPENSES11 | Employee Expenses-EE0
  4. Part 31 of 77

    ERRX0011 | Envir Resp/Remediation - Overhead | ERRX0011OPSNTRELEXPENSES11 | Employee Expenses-EE0 ESSB0011 | 11 SS Clearing Blanket CT | ESSB0011ALLOCCLEARING11 | Employee Expenses-EE0 | 107ES0 ESSL0011 | 11 OH Clearing Blanket CT | ESSL0011ALLOCCLEARING11 | Employee Expenses-EE0 | 107ES0 ES_001CS | CHESHIRE AWC ES 140 FT SST | CHESHIRE AWC LOC ES-001 VOICE RADIO SET UP_x000D__x000D_ | Employee Expenses-EE0 ETRE0011 | Tree Trimming | ETRE0011NT011 | Employee Expenses-EE0 EVTC0011 | Event Sponsorship - Company Funded | EVTC0011NT011 | Employee Expenses-EE0 EXCVT101 | 2001 CL&P EXCAVATING CONTRACTOR ARE | WORK ORDER TO COLLECT FOR DISTRIBUTION, CHARGES FROM EXCAVATION CONTRACTS FOR THE 9 CL&P DESIGNATED AREAS - MATERIAL REQUEST # 86884800 AND 15984800 BY D SODERSTROM | Employee Expenses-EE0 F1411025 | CL&P Backup SOC | Establishment of CL&P Backup SOC in Windsor | Employee Expenses-EE0 F1511011 | Newtown Glygol System | Newtown Glygol System Replacement | Employee Expenses-EE0 F1511070 | East Hampton Gate Door Closer | Install Hydraulic Door Closer on Gate Door in East Hampton | Employee Expenses-EE0 F1511090 | Hartford Gate Intercom | Hartford Gate Intercom | Employee Expenses-EE0 F1611010 | New London Gate Intercom | New London Gate Intercom Replacement | Employee Expenses-EE0 F1611014 | Cheshire Security Cameras (4) | Cheshire Security Cameras (4) | Employee Expenses-EE0 F1711013 | Myrock Substation Office Fitout | Myrock Substation Office Fitout - Structures | Employee Expenses-EE0 FALU0011 | Fault Locating (Underground) | FALU0011OPSNTRELEXPENSES11 | Employee Expenses-EE0 FALX0011 | Fault Locating (DB/Overhead) | FALX0011OPSNTRELEXPENSES11 | Employee Expenses-EE0 FC161102 | Bunker Hill Tower Radio Equipment | Bunker Hill Tower Radio Equipment - Freight Street Consolidation | Employee Expenses-EE0 FC161103 | Waterbury Freight St. Equipment | Waterbury Freight Street Non-Site Specific Equipment | Employee Expenses-EE0 FC161104 | Higganum Tower Radio Equipment | Higganum Tower Radio Equipment - Freight Street Consolidation | Employee Expenses-EE0 FC161107 | Prospect Tower Radio Equipment | Prospect Tower Radio Equipment - Freight Street Consolidation | Employee Expenses-EE0 FC161109 | Southbury Tower Radio Equipment | Southbury Tower Radio Equipment - Freight Street Consolidation | Employee Expenses-EE0 FC161110 | Cheshire Tower Radio Equipment | Cheshire Tower Radio Equipment | Employee Expenses-EE0 FRMS0011 | Safety/Prot Clothing/Small Tools | Safety/Prot Clothing/Small Tools- Meter Service | Employee Expenses-EE0 FRPC0011 | Small Tools Fire Reta/Prot Cloth | FRPC0011NT011 | Employee Expenses-EE0 FRPC0111 | Fire Retardant/Protective Clothing | Fire Retardant/Protective Clothing & Safety Supplies | Employee Expenses-EE0 GEIA0011 | Generation Interc Agreements | GEIA0011OPSNTRELEXPENSES11 | Employee Expenses-EE0 GENE0011 | Generators | GENE0011OPSNTRELEXPENSES11 | Employee Expenses-EE0 GOLDC011 | Gold Coast Anniversary Payment | Gold Coast Anniversary Payment | Employee Expenses-EE0 | 242GC0 GOOSEHLL | GOOSE HILL MICROWAVE | EAST HAMPTON TOWER REPLACEMENT - MICROWAVE BETWEEN E HAMPTON TOWER AND GOOSE HILL | Employee Expenses-EE0 GSUP0011 | General Supplies MDEC | General Supplies MDEC | Employee Expenses-EE0 GX160002 | Mini SF6 Processing Module | Portable mini SF6 processing module includes 16' service hose with Dilo Dn8 couplers requested by John Carroll | Employee Expenses-EE0 GX160016 | Fluke Digital Multimeter 87V/E2 | Fluke Digital Multimeter 87V/E2 | Employee Expenses-EE0 GX160023 | HEPA Vac | HEPA Vac | Employee Expenses-EE0 GX160024 | Hydraulic Hand Pump Kit | Hydraulic Hand Pump Kit part # 0709426 | Employee Expenses-EE0 GX160025 | Snow Removal Equipment | Snow removal equipment | Employee Expenses-EE0 GX160026 | Projector and Accessories | Snow removal equipment | Employee Expenses-EE0 GX160027 | Dynatel Cable Locator | Dynatel Cable Locator | Employee Expenses-EE0
  5. Part 32 of 77

    GX160030 | Fiber Termination Kit & Blades | Fiber Termination Kit & Blades | Employee Expenses-EE0 GX170001 | Nomenclature Printers Durlabel | Duralbel Nomenclature Printers (2) | Employee Expenses-EE0 GX170002 | Work Zone Protection Sign Kit FE | Work Zone Protection Sign Kit 10 Stock Code #466238 | Employee Expenses-EE0 GX170003 | Greenlee Conduit Bender and Acc | Greenlee Conduit Bender stock code 184031 and Accessories stock code 184032 2 Units | Employee Expenses-EE0 GX170007 | DTR 8510 Ratiometer | Chauvin Arnoux High Performance Ratiometer model DTR 8510 for Ct Station Ops East - two units | Employee Expenses-EE0 GX210019 | PoleForeman V5.7 - SagLine V3.6 Sof | PoleForeman V5.7- Engineering Analysis Software Site License - CL&P only $136,659_x000D__x000D_ SagLine V3.6 - Engineering Analysis Software Site License - CL&P only $43,155_x000D__x000D_ Requested by Wayne Gagnon_x000D__x000D_ | Employee Expenses-EE0 GX210027 | Laptop Vehicle Mounts | Purchase of laptop vehicle mounts; total $125845. 81 units. Supplier Gamber Johnson | Employee Expenses-EE0 GXC14W68 | Purchase Epson EX7230 Projector | PURCHASE Epson EX7230 Projector | Employee Expenses-EE0 GXC16C22 | 2 x 80" Monitors w/install | to purchase 2 x 80" monitors and move 50" monitor. Service and Installation TOTAL $16,868. | Employee Expenses-EE0 GXC16C52 | Hot Line Cutters (4) Begley 2AD | Hot Line Cutters (4) for 2AD OH Chesire s/c188854 @ $1421.13ea TOTAL: $5685 | Employee Expenses-EE0 GXC16C61 | Cutter Cable (2) 2NR Engel | 2NR - CUTTER CABLE- 2 - 0445410 $ 2589.23ea TOTAL: $5178.46 | Employee Expenses-EE0 GXC16C63 | Pump Hydraulic (2) 2NR Engel | 2NR - PUMP HYDRUICL-2-0448372 $ 2697.00 TOTAL: $5395 | Employee Expenses-EE0 GXC16C64 | Potential Tester (2) 2NR Engel | 2NR - POTENTIAL TESTER -2 -0443314 $ 586.93 TOTAL: $1175 | Employee Expenses-EE0 GXC16W02 | 42" Samsung Television - $3,362.6 | 2 replacement cutter heads stock code 458692 cost is $553.00 each; 1106 - Pagliaro | Employee Expenses-EE0 GXC16W45 | HILTI Impact Drill 549.47 each = 10 | HILTI Impact Drill 549.47 each = 1098.54 | Employee Expenses-EE0 GXC17C10 | Pin Pointer w/Battery (1) 2NP Stev | 2NP - (1) Pin pointer / SC 190521 / $ 1,717,00 / (1) Battery for pin pointer / SC 190522 / $266.30 TOTAL: $1987 Enos Stevens | Employee Expenses-EE0 GXC17C11 | Chainsaw w/16" Bar 2BB Blair | 2BB - 1 x 3.06 CI Chainsaw w/16" Bar, s/c 465252, TOTAL: $625.00 | Employee Expenses-EE0 GXC17C12 | Public Safety Kit w/Defrib (2) 2EB | 2EB - (2) - S/C 460802 DEVICE, PUBLIC SAFETY KIT W/ RX COPY AND PLUSTRAC 5, ZOLL AEDPLUS, DEFRIBULATOR - $1848 each TOTAL: $3696 MANLEY | Employee Expenses-EE0 GXC17C13 | Crimper, Die, 6 ton (1) 2BB LaHaie | 2BB - Crimper, Die, 6 ton. S/C 0455630 TOTAL: $1785 LaHaie | Employee Expenses-EE0 GXC17C15 | Gas Detector Docking Stat - Stevens | 2NP - (One) Gas Detector Calibration + Bump Docking station SC 0439496 @ $1,982 Enos Stevens | Employee Expenses-EE0 GXC17C27 | EZ Squeeze (3) HB Mobility Belt (3) | 2AD - 490DRMS EZ-Squeeze w/ Inner Rope & Snap Hooks (3) @516.16ea / 20182MP3-25BH Heritage Buck Mobilty Belt, 25 DEE, w/ Long Gut Strap, 3 Extra Holes in the Gut Strap. (3) @ 612.50ea TOTAL: $3,400 | Employee Expenses-EE0 GXC17C28 | AED (3) 2EK | 2EK - AED S/C 460802 (3) $1,849EA Total: 5547 | Employee Expenses-EE0 GXC17C29 | Cutter Heads (3) 2EK | 2EK - Cutter Heads (Candlestick) (3) $500ea TOTAL: 1500 S/C 465047 | Employee Expenses-EE0 GXC17C30 | Reach Desk Veh (4) 2NR Baret | 2NR - ReachDeskSuper-03 Printer Elite for supervisor vehicle. $500 (BARET) TOTAL $2,000_x000D__x000D_ | Employee Expenses-EE0 GXC17C31 | UG Harness (1) HEEL 2NR | 2NR - UG Harnesses (1) s/c 462036 @$735ea FEEL | Employee Expenses-EE0 GXC17C32 | Filler Valve Assy (6) 2NR Leonard | 2NR - Filler Valve Assy Guage (6) s/c 0445316 804.65ea TOTAL: $4850 Leonard | Employee Expenses-EE0
  6. Part 33 of 77

    GXC17C33 | Hilti Rotary Drill (1) 2NR Leonard | 2NR - Hilti Rotary Drill (1) s/c 0441221 TOTAL: $889 Leonard | Employee Expenses-EE0 GXC17C34 | Buck Fit Harness/EZ Squeeze Kit (1) | 2AD - Buck Fit Harness M (1) @ $523.18 / EZ Squeeze Kit @ $871.12 TOTAL: $1400 | Employee Expenses-EE0 GXCOS70A | SOC MONITOR | WORK ORDER FOR 2017 SOC MONITOR | Employee Expenses-EE0 GXCOS70B | DISTRIBUTION SIMULATION/TRAINING RM | Costs to cover the remodel work needed to convert the CONVEX Off-shift Operator Room into a Distribution Simulator Training Classroom. _x000D__x000D_ Estimated costs: $25k (requestor: Bill Newport)_x000D__x000D_ Red Thread (furniture repair, reconfiguration and new): $4,000_x000D__x000D_ A/Z: HVAC, electrical work, data wiring, window treatments, etc.: $20,000_x000D__x000D_ | Employee Expenses-EE0 GXENG16A | PLC TT TRAINING GRIDEDGE | TRAINING SETUP EQUIPMENT AND LABOR FOR PLC TT TRAINING. GRIDEDGE IS THE VENDOR W QUOTE OF $23,475. | Employee Expenses-EE0 GXENG16B | PROJECTOR FOR SYSTEM RESILIENCY | PURCHASE A PROJECTOR FOR THE SYSTEM RESILIENCY GROUP | Employee Expenses-EE0 HAND0011 | Material Handling | HAND0011NT011 | Employee Expenses-EE0 HQDC0111 | H/Q Phase 2-DC | H/Q Phase 2-DC | Employee Expenses-EE0 HQNET111 | H/Q Phase 1-DC-NEET | H/Q Phase 1-DC-NEET | Employee Expenses-EE0 HQVET111 | H/Q Phase 1-DC-VET | H/Q Phase 1-DC-VET | Employee Expenses-EE0 HUTP0011 | Highway Use Tax Payment | Highway Use Tax Payment | Employee Expenses-EE0 ICBAP011 | ICB Work Order | ICB Work Order-McDonald | Employee Expenses-EE0 | 23401X INCW0011 | Inclement Weather | INCW0011OPSNTRELEXPENSES11 | Employee Expenses-EE0 INSPC2AD | 2020 FAULT INDICATOR CHESHIRE 2AD | THIS IS PART OF THE DB FAULT INDICATOR INSPECTION AND REPLACEMENT PROGRAM FOR 2020 | Employee Expenses-EE0 INTOHE11 | CA AWO INTEREST OTHER | CA AWO INTEREST OTHER | Employee Expenses-EE0 IRMT0011 | Install & Remove Meters | IRMT0011OPSNTRELEXPENSES11 | Employee Expenses-EE0 ISOV0011 | Inspect- Overhead | ISOV0011 | Employee Expenses-EE0 ISPL0011 | Inspect - Poles | ISPL0011OPSNTRELEXPENSES11 | Employee Expenses-EE0 ISSB0011 | Inspect Bulk Stations | Inspect Bulk Stations | Employee Expenses-EE0 ISST0011 | Inspect Distribution Stations | Inspect Distribution Stations | Employee Expenses-EE0 ISSV0011 | Inspect - Stray Voltage | ISSV0011OPSNTRELEXPENSES11 | Employee Expenses-EE0 ISTA0011 | Dist Sta Misc PM | ISTA0011OPSNTRELEXPENSES11 | Employee Expenses-EE0 ISTE0011 | Inspect/Test Environmental | ISTE0011 | Employee Expenses-EE0 ISUN0011 | Inspect - Underground | ISUN0011OPSNTRELEXPENSES11 | Employee Expenses-EE0 IT1D1303 | CL&P WIRELESS PROJECT | CL&P WIRELESS PROJECT CISCO EQUIPMENT - NWN QUOTE OP81290 CONTACT: BOB D'EON X3094 PROJECT: IT1DLANA | Employee Expenses-EE0 ITRU0011 | Install Transform Regula undergrnd | ITRU0011OPSNTRELEXPENSES11 | Employee Expenses-EE0 IVCL0011 | Invoice Clearing | IVCL0011NT011 | Employee Expenses-EE0 KICK0011 | Kick Out Corrections | Waiting for kick out reclass | Employee Expenses-EE0 LDSM0011 | Locate/DigSafe/Markout | LDSM0011OPSNTRELEXPENSES11 | Employee Expenses-EE0 LEAS0011 | Lease | LEAS0011NT011 | Employee Expenses-EE0 | 232PA0 LGFR0011 | Federal Regulatory | LGFR0011NT011 | Employee Expenses-EE0 LGLT0011 | Litigation | LGLT0011NT011 | Employee Expenses-EE0 LGSR0011 | State Regulatory | LGSR0011NT011 | Employee Expenses-EE0 LNGT1DC3 | LONG HILL - FREIGHT STREET WORK | LONG HILL - FREIGHT STREET WORK AS PART OF THE LONG HILL TOWER MOVE EQUIPMENT WILL BE PURCHASED FOR THE FREIGHT STREET SITE AS WELL AS LABOR TO INSTALL. | Employee Expenses-EE0 LOBBY011 | Lobby Stock Clearing | LOBBY011ALLOCCLEARING11 | Employee Expenses-EE0 LTDB0711 | Long Term Debt2004 Series A | Long Term Debt2004 Series A | Employee Expenses-EE0 | 237CD0 LTDB1011 | Long Term Debt2005 Series A | Long Term Debt2005 Series A | Employee Expenses-EE0 | 237CP0 LTDB1911 | Long Term Debt2007 Series A | Long Term Debt2007 Series A | Employee Expenses-EE0 | 2371A0
  7. Part 34 of 77

    LTDB2311 | Long Term Debt2007 Series C | Long Term Debt2007 Series C | Employee Expenses-EE0 | 2371B0 LTDSF011 | LTD Self Funded Pmts | LTD Self Funded Pmts | Employee Expenses-EE0 LYMR0011 | East Lyme | East Lyme | Employee Expenses-EE0 LZREC011 | LREC/ZREC Program | LZREC011LREC11 | Employee Expenses-EE0 MAPP0011 | Mapping | MAPP0011OPSNTRELEXPENSES11 | Employee Expenses-EE0 MBLD0011 | Maintain Buildings | MBLD0011NT011 | Employee Expenses-EE0 MBLD0111 | Maintain Buildings | MBLD0111NT011 | Employee Expenses-EE0 MBLD0411 | Maintain Buildings | MBLD0411NT011 | Employee Expenses-EE0 MBLD0611 | Maintain Buildings | MBLD0611NT011 | Employee Expenses-EE0 MBLD0711 | Maintain Buildings | MBLD0711NT011 | Employee Expenses-EE0 MBLD0811 | Maintain Buildings | MBLD0811NT011 | Employee Expenses-EE0 MBLD0911 | Maintain Buildings | MBLD0911NT011 | Employee Expenses-EE0 MBLD1011 | Maintain Buildings | MBLD1011NT011 | Employee Expenses-EE0 MBLD1111 | Maintain Buildings | MBLD1111NT011 | Employee Expenses-EE0 MBLD1211 | Maintain Buildings | MBLD1211NT011 | Employee Expenses-EE0 MBLD1311 | Maintain Buildings | MBLD1311NT011 | Employee Expenses-EE0 MBLD1411 | Maintain Buildings | MBLD1411NT011 | Employee Expenses-EE0 MBLD1511 | Maintain Buildings | MBLD1511NT011 | Employee Expenses-EE0 MBLD1611 | Maintain Buildings | MBLD1611NT011 | Employee Expenses-EE0 MBLD1911 | Maintain Buildings | MBLD1911NT011 | Employee Expenses-EE0 MBLD3111 | Maintain Buildings | MBLD3111NT011 | Employee Expenses-EE0 MBLD3211 | Maintain Buildings | MBLD3211NT011 | Employee Expenses-EE0 MBLD3311 | Maintain Buildings | Maintain Buildings | Employee Expenses-EE0 MC22NT01 | Newtown Microwave Upgrade | Newtown Microwave Upgrades MCRO22NT | Employee Expenses-EE0 MCRO2201 | New Milford Microwave Upgrade | New Milford Microwave Upgrade | Employee Expenses-EE0 METRET11 | Electric Meter retirement | METRET11NT011 | Employee Expenses-EE0 MGSP0011 | Management & Supervision | MGSP0011OPSNTRELEXPENSES11 | Employee Expenses-EE0 MISC0011 | Miscellaneous Deduction | MISC0011EMPBENPAY11 | Employee Expenses-EE0 MMSX0011 | Misc maintenance & Support | Misc maintenance & Support-Daignault | Employee Expenses-EE0 MRDG0011 | Meter Reading | MRDG0011NT011 | Employee Expenses-EE0 MSAD0011 | Meter Service - Administration | MSAD0011OPSNTRELEXPENSES11 | Employee Expenses-EE0 MTCU0011 | Maintenance Corrective Undergrnd | MTCU0011OPSNTRELEXPENSES11 | Employee Expenses-EE0 MTCX0011 | Maintenance - Corrective (Overhead) | MTCX0011OPSNTRELEXPENSES11 | Employee Expenses-EE0 MTOH1B15 | ELEC. MAINT. FAC. INSPECT./FLT INDI | Fault Indicators (MTOH) CT ELECTRIC MAINTENANCE FACILITY INSPECTIONS NON DESIGN/ FAULT | Employee Expenses-EE0 MTOH4N15 | ELEC. MAINT. FAC. INSPECT./FLT INDI | Fault Indicators (MTOH) CT ELECTRIC MAINTENANCE FACILITY INSPECTIONS NON DESIGN / FAULT INTICATOR - NEW LONDON | Employee Expenses-EE0 MTSL0011 | Maintenance - Street Lights | MTSL0011OPSNTRELEXPENSES11 | Employee Expenses-EE0 MTUG0011 | UG Conduit Maint | MTUG0011OPSNTRELEXPENSES11 | Employee Expenses-EE0 MTWO0011 | Material Write-offs | Material Write-offs | Employee Expenses-EE0 NOPM0011 | Non Operating Property Management | NOPM0011NT011 | Employee Expenses-EE0 NTKMAJ11 | Inspection - Network Majors | ISDB0011OPSNTRELEXPENSES11 Inspection of Network Majors by Field Ops. | Employee Expenses-EE0 NTPAY111 | CT Res Incentives-Netting Pmt Direc | CT Res Incentives-Netting Pmt Direct-Quaresma | Employee Expenses-EE0 NTSMT011 | Non Tracked SMT Expense | Non Tracked SMT Expense | Employee Expenses-EE0 OFFN0011 | Payroll | OFFN0011EMPBENPAY11 | Employee Expenses-EE0 | 242E20 OMSR1DC1 | ENTERPRISE OMS REPORTING - CL&P | ENTERPRISE OMS REPORTING - CL&P | Employee Expenses-EE0 OMSS1DC1 | ENTERPRISE OMS SYSTEM - CL&P | ENTERPRISE OMS SYSTEM - CL&P | Employee Expenses-EE0 ONST0011 | Oncall / Standby | ONST0011OPSNTRELEXPENSES11 | Employee Expenses-EE0 OPMG0011 | Operating Property Management | OPMG0011NT011 | Employee Expenses-EE0
  8. Part 35 of 77

    OPMG0111 | Operating Property Management | OPMG0111NT011 | Employee Expenses-EE0 OTMS0011 | Other metering support | OTMS0011OPSNTRELEXPENSES11 | Employee Expenses-EE0 PEBAC111 | CA AWO PT-EMPL BFS AC | CA AWO PT-EMPL BFS AC | Employee Expenses-EE0 PSTK0011 | Preferred Stock | Preferred StockNT011 | Employee Expenses-EE0 PSTK0211 | Preferred Stock | Preferred StockNT011 | Employee Expenses-EE0 PSTK0411 | Preferred Stock | Preferred StockNT011 | Employee Expenses-EE0 PSTK0611 | Preferred Stock | Preferred StockNT011 | Employee Expenses-EE0 PSTK1611 | Preferred Stock | Preferred StockNT011 | Employee Expenses-EE0 PSTK2011 | Preferred Stock | Preferred StockNT011 | Employee Expenses-EE0 PSTK2411 | Preferred Stock | Preferred StockNT011 | Employee Expenses-EE0 PT2W0011 | Temporary Work | Temporary Work | Employee Expenses-EE0 PT3H0011 | Temporary Work | Temporary Work | Employee Expenses-EE0 PT3S0011 | Temporary Work | Temporary Work | Employee Expenses-EE0 PTBL0011 | Other Tax - CLP Non-Utility Distrib | Other Tax - CLP Non-Utility Distrib | Employee Expenses-EE0 PTCD0011 | Prepaid PropTax-CLP Distribution | PTCD0011NT011 | Employee Expenses-EE0 PWCD1028 | Private work for FP CD01028 | Private work for FP CD01028 | Employee Expenses-EE0 PYAC0011 | Payroll Accrual - Source Entity 11 | Payroll Accrual - Source Entity 11_x000D__x000D_ | Employee Expenses-EE0 RECFC011 | Fuel Cell Projects | Fuel Cell Projects-Rybka | Employee Expenses-EE0 RECPP211 | CT LREC/ZREC program | CT LREC/ZREC program | Employee Expenses-EE0 RESENGY1 | Resilient Energy Center 2015-2017 | Resilient Energy Center (partnership with UCONN) 2015-2017 | Employee Expenses-EE0 RGST0311 | Regulatory Assessments | Regulatory Assessments | Employee Expenses-EE0 RIDGFLD1 | RIDGEFIELD RIGHT OF WAY ENVIRONMENT | RIDGFIELD R-O-W ENVIRONMENTAL ASSESSMENT OF FORMER RAILROAD BED SOILS IMPACTED BY ARSENIC | Employee Expenses-EE0 RISK0011 | Risk Envision | Risk Envision-Ouimette | Employee Expenses-EE0 RMFM0011 | Repair/Maintain-Fiber Microwave | RMFM0011OPSNTRELEXPENSES11 | Employee Expenses-EE0 RMOU0011 | Repair / Maintain Other underground | RMOU0011OPSNTRELEXPENSES11 | Employee Expenses-EE0 RMOX0011 | Repair / Maintain Other overhead | RMOX0011OPSNTRELEXPENSES11 | Employee Expenses-EE0 RMSQ0011 | Dist Sta Xfmr Corrective Main | RMSQ0011OPSNTRELEXPENSES11 | Employee Expenses-EE0 RMSQ0211 | SDist Sta Breaker CM | RMSQ0211OPSNTRELEXPENSES11 | Employee Expenses-EE0 RMSQ0311 | Dist Sta Maint Misc Equip | RMSQ0311OPSNTRELEXPENSES11 | Employee Expenses-EE0 RMSQ0611 | Dist Sta Battery Maint | RMSQ0611OPSNTRELEXPENSES11 | Employee Expenses-EE0 RNTNO011 | Rental revenues Non OP | Rental revenues Non OP | Employee Expenses-EE0 RODEO011 | CT Linemen Rodeo charges | Charging for 2015 linemen rodeo Eversource - CT | Employee Expenses-EE0 ROPIN011 | Operating Property Revenue-CT | ROPIN011NT011 | Employee Expenses-EE0 RPEU0011 | Repair - Emergent (Underground) | RPEU0011OPSNTRELEXPENSES11 | Employee Expenses-EE0 RPEX0011 | Repair - Emergent (Overhead) | RPEX0011OPSNTRELEXPENSES11 | Employee Expenses-EE0 RPMH0011 | Repair - Manholes | RPMH0011OPSNTRELEXPENSES11 | Employee Expenses-EE0 RRSP0011 | RESPONSE& RESTORE SPECIALIST | RRSP0011-OPSNTRELEXPENSES11, WO set up for Response Specialist Ops (RSO) -Lines use only | Employee Expenses-EE0 RUBB0011 | Rubber Goods | RUBB0011OPSNTRELEXPENSES11 | Employee Expenses-EE0 SAFE0011 | Safety | SAFE0011OPSNTRELEXPENSES11 | Employee Expenses-EE0 SGENOPPO | CL&P EE Expense | SGENOPPOSCGCI | Employee Expenses-EE0 | 143L20 SGSMBUSI | CL&P EE Expense | SGSMBUSISCGCI | Employee Expenses-EE0 | 143L20 SHCE11C1 | SCEF - Web | Shared Clean Energy Facility (SCEF) Project - Web | Employee Expenses-EE0 SHCE11C2 | SCEF - C2 | Shared Clean Energy Facility (SCEF) Project - C2 | Employee Expenses-EE0 SLPW2M15 | NO PPWK ATTACHED, CANCELLING - STLT | STREET LIGHT PRIVATE WORK BLANKET WO CHESHIRE | Employee Expenses-EE0
  9. Part 36 of 77

    SM1ANWSN | SO MEADOW 1A NW PROTECTOR SENSOR | SO MEADOW 1A NETWORK PROTECTOR SENSOR PART OF THE DIGITAL GRID RELAY PROJECT - SOUTH MEADOW 1A_x000D__x000D_ THE SENSORS ARE BEING ADDED TO THE NW PROTECTOR RELAYS BEING INSTALLED THROUGHOUT CONNECTICUT. SENSORS CANNOT OPERATE WITHOUT THE NW PROTECTOR RELAYS_x000D__x000D_ Work order is to be used to capture costs for retrofitting relays for network protectors | Employee Expenses-EE0 SMOV0011 | Small tools - overhead | SMOV0011OPSNTRELEXPENSES11 | Employee Expenses-EE0 SMUG0011 | Small tools - underground | SMUG0011OPSNTRELEXPENSES11 | Employee Expenses-EE0 SOCE11C1 | SOC Equipment | SOC Equipment as part of the larger Ops funded project. | Employee Expenses-EE0 SOMR0011 | Somers Solar | Somers Solar | Employee Expenses-EE0 SPCDD011 | SP Contractor Delay Damages | SP Contractor Delay Damages-Morowsky | Employee Expenses-EE0 SPOL0011 | Special Olympics Support | Special Olympics Support - Labor Only | Employee Expenses-EE0 SSBRN11J | BRANFORD11J SS VOICE RADIO | SUBSTATION VOICE RADIO SET UP - INTERNAL | Employee Expenses-EE0 STORE011 | Stores clearing | STORE011OPSNTRELEXPENSES11 | Employee Expenses-EE0 STRM3CJE | CLEARING WORK ORDER FOR STRM113C | CLEARING WORK ORDER FOR STRM113C | Employee Expenses-EE0 STST0011 | Station structure CM | STST0011OPSNTRELEXPENSES11 | Employee Expenses-EE0 SURVEY11 | 3RD PARTY POLE SURVEY WORK | This w/o is to charge time spent surveying pole for compliance for attachments as requested by customer | Employee Expenses-EE0 SUTP0211 | Sales/Use Tax Payments | Sales/Use Tax Payments | Employee Expenses-EE0 SVOH1SEX | DARIEN, CLIFF, 24, Charles Pappas | NO DESC AVAILABLE | Employee Expenses-EE0 SVOH2LEX | HARWINTON, SCOVILLE HILL, 130, Mari | NO DESC AVAILABLE | Employee Expenses-EE0 SVOH2WEX | EXPENSE BLANKET OH SERVICE WORK - W | NO DESC AVAILABLE | Employee Expenses-EE0 SWTS0011 | Switching, substation | SWTS0011OPSNTRELEXPENSES11 | Employee Expenses-EE0 SWTX0011 | Switching - Overhead | SWTX0011OPSNTRELEXPENSES11 | Employee Expenses-EE0 TALCOT01 | DSCADA SYST RES TALCOTT | DSCADA System Resiliency Talcott_x000D__x000D_ 5-7 Andrews Road, Bloomfield, CT_x000D__x000D_ Telecom Tower Facility_x000D__x000D_ | Employee Expenses-EE0 TCOTW001 | TALCOTT MOUNTAIN TOWER REPLACEMENT | PURCHASE AND INSTALL RF MATERIALS FOR NEW TOWN AT ST. ANDREWS ROAD, BLOOMFOELD, CT PROJECT TCOTW1DC REQUESTER:STEVE FLORIO,MGR: AHRENS | Employee Expenses-EE0 TFEE0011 | Bank Service Fees | Bank Service Fees | Employee Expenses-EE0 TFMINS11 | Precap Overhead Equipment Install | TFMINS11DT7C | Employee Expenses-EE0 TFMIUG11 | Precap UG Equipment Install | Precap UG Equip Install | Employee Expenses-EE0 TINS0111 | Claims & Insurance | Claims & Insurance | Employee Expenses-EE0 TINS0411 | Claims & Insurance | Claims & Insurance | Employee Expenses-EE0 TINS0511 | Claims & Insurance | Claims & Insurance | Employee Expenses-EE0 TNTP0011 | Credit Disconnects and Reconnects | Credit Disconnects and Reconnects | Employee Expenses-EE0 TORRT001 | TORRINGTON MGP COAL TAR SITE | TORRINGTON MGP COAL TAR SITE INVESTIGATION AND REMEDIATION | Employee Expenses-EE0 TOWG1DC2 | TOWER REPLACEMENT-MADISON | TOWER REPLACEMENT-MADISON | Employee Expenses-EE0 TOWG1DC3 | TOWER REPLACEMENT-CHAPEL HILL | TOWER REPLACEMENT-CHAPEL HILL | Employee Expenses-EE0 TOWG1DC4 | TOWER REPLACEMENT-TALCOTT MT. | TOWER REPLACEMENT-TALCOTT_MT. | Employee Expenses-EE0 TRAN1601 | Air/Hydraulic Floor Jack | 22 Ton - Air/Hydraulic floor jack used for installing tire chains, replacing tires or when the lift is not accessible. | Employee Expenses-EE0 TRDC0111 | Debt Compliance Fees | Debt Compliance Fees | Employee Expenses-EE0 TRDT0011 | Debt Interest Accrual | Debt Interest Accrual-Curtin | Employee Expenses-EE0 | 237TC0 TRIN0011 | Vehicle Inventory | TRIN0011NT011 | Employee Expenses-EE0 TRMS0011 | Training/Safety - Meter Service | Training/Safety - Meter Service | Employee Expenses-EE0
  10. Part 37 of 77

    TRMT0011 | Transformer Maintenance - Dist | TRMT0011OPSNTRELEXPENSES11 | Employee Expenses-EE0 TROM0011 | Training | TROM0011OPSNTRELEXPENSES11 | Employee Expenses-EE0 TXPCTC11 | Conn Corporation Business Tax | Conn Corporation Business Tax | Employee Expenses-EE0 TXPY0011 | Tax Payments | Tax Payments | Employee Expenses-EE0 TXPY0111 | Tax Payments | Tax Payments | Employee Expenses-EE0 UBCP0011 | Union Business Company Paid | Union Business Company Paid | Employee Expenses-EE0 UCLAIM11 | Unclaimed Property (Escheat) | Employee Expenses-EE0 UI000111 | UI | UI | Employee Expenses-EE0 UILGEN00 | UIL Charges | UIL Charges-Lempa | Employee Expenses-EE0 | 143L20 UNION011 | Union Dues | UNION011EMPBENPAY11 | Employee Expenses-EE0 V1758553 | CT Elec D Fleet Capital Vehicles | CT Electric Distribution Fleet Capital Vehicle Purchase_x000D__x000D_ 1 Material Handler Tandem $94,900 Unit #1758553 | Employee Expenses-EE0 VEHC0011 | Vehicle Clearing | VEHC0011NT011 | Employee Expenses-EE0 VEHPE011 | Vehicle registration | Vehicle registration | Employee Expenses-EE0 | 165VC0 VIDEOWAL | VIDEO WALL BERLIN SOC | This is for Video Wall project in SOC in Berlin CT. Quote provided by HB Communications | Employee Expenses-EE0 VOLUDB6A | TS VOLUNTN DB | DB PLANNED OBS TROUBLE SHOOTER CHARGES TOWN OF VOLUNTOWN | Employee Expenses-EE0 WCSR0011 | PURCH PWR-RECS | PURCH PWR-RECS - HOMES | Employee Expenses-EE0 WINST001 | WINSTED MGP COAL TAR SITE | WINSTED MGP COAL TAR SITE INVESTIGATION AND REMEDIATION CORPORATE RESERVE SITE | Employee Expenses-EE0 ZAPGOLSB | ZAP GUARDS OLD SAYBROOK | INSTALLATION OF ZAP GUARDS VARIOUS LOC_x000D_ IN OLD SAYBROOK | Employee Expenses-EE0 4E720362 | (CH) P#5438 - P#5439: SPLICE OUT WH | (CH) P#5438 - P#5439: SPLICE OUT WHAT LOOKS LIKE TREE GROWTH AROUND CONDUCTOR._x000D_ AP1-YWO Total Cost Less Than 7K | Employee Expenses-EE0 4E720539 | JK>HH6833 (LAWN BOX)--REPLACE 17 X | JK>HH6833 (LAWN BOX)--REPLACE 17 X 30 LAWN BOX_x000D_ AP1-YWO Total Cost Less Than 7K | Employee Expenses-EE0 GXC17C16 | Gas Alert Sens (2) 2NP Stevens | 2NP (Two) Gas Alert sensors - SC 0419532 @ $ 760 Each Total &1,520 Enos Stevens | Employee Expenses-EE0 GXC17C17 | Ground Rod Driver (1) 2AD Wade | gas powered ground rod driver s/c 459333 (1) $1760AARON WADE | Employee Expenses-EE0 GXC17C19 | Defibrillators (3) 2EA Dolan | Defibrillators (3) 460803/460802 TOTAL: $6,136 Dolan | Employee Expenses-EE0 GXC17C21 | Fiberglass Jib (2) 2AD Begley | 2AD - Fiberglass Jib (2) S/C 72030339 $2,686.28ea TOTAL: $5373 | Employee Expenses-EE0 GXC17C22 | Burndy Wedge (2) 2EA Dolan | 2EA - Burndy Wedge (2) s/c 0451519 @ $1,190.50 ea TOTAL: $2,381` | Employee Expenses-EE0 GXC17C23 | Mobile Desks (3) 2AA Grohs | ReachDeskSuper-03 Printer Elite for supervisor vehicle. $500 (GROHS)_x000D__x000D_ | Employee Expenses-EE0 1N720848 | JDB/P# 33766/REPLACED 50KVA XFRMR/I | JDB/P# 33766/REPLACED 50KVA XFRMR/INSTALLED 100 AMP CUTOUT & BRACKET/5-31_x000D_ AP1-YWO Total Cost Less Than 7K | Employee Expenses-EE0 4N620422 | 3/29/16-Tree down, replaced c/o, po | 3/29/16-Tree down, replaced c/o, pole #3755_x000D_ AP1-YWO Total Cost Less Than 7K | Employee Expenses-EE0 2M722045 | JC/200 PARK RD. NAUG Electric Serv | JC/200 PARK RD. NAUG Electric Service Existing Residential Overhead_x000D_ AP1-YWO Total Cost Less Than 7K | Employee Expenses-EE0 1S721018 | DM/59 HARDING RD OLD GRN: INST 1/0 | DM/59 HARDING RD OLD GRN: INST 1/0 TPX FROM P.1883 TO P.1884 SHIFT 2 SVCS_x000D_ AP1-YWO Total Cost Less Than 7K | Employee Expenses-EE0 1S721003 | DL; 2 OPPER RD; Electric Service Ex | DL; 2 OPPER RD; Electric Service Existing Residential Overhead_x000D_ AP1-YWO Total Cost Less Than 7K | Employee Expenses-EE0 2M722094 | Municipal Light Fault Locate and Re | Municipal Light Fault Locate and Repair@ POLE 248 - COMP 6/20 CCC_x000D_ AP1-YWO Total Cost Less Than 7K | Employee Expenses-EE0

Text of RRU-159 Attachment 05.pdf

Extracted from the file · 879 pages · 16,073,548 characters

Text of RRU-159 Attachment 04.xlsx

Sheet names, column headings and text cells; numbers left out

Text of RRU-159 Attachment 04.pdf

Extracted from the file · 5 pages · 20,994 characters

Text of RRU-159 Attachment 03.xlsx

Sheet names, column headings and text cells; numbers left out · first 300,000 characters

Text of RRU-159 Attachment 03.pdf

Extracted from the file · 840 pages · 14,413,580 characters

Text of RRU-159 Attachment 02.xlsx

Sheet names, column headings and text cells; numbers left out · first 300,000 characters

Text of RRU-159 Attachment 02.pdf

Extracted from the file · 1,137 pages · 16,605,462 characters

Text of RRU-159 Attachment 01.xlsx

Sheet names, column headings and text cells; numbers left out

Text of RRU-159 Attachment 01.pdf

Extracted from the file · 1 page · 1,403 characters

As listed on the current system

Question(s) Answered 159 (Connecticut Light and Power Company dba Eversource Energy) Date Filed: 11/06/2026

This filing on the current system (opens in a new tab)