Skip to main content

A prototype public docket site for the Connecticut Public Utilities Regulatory Authority

Utility Dockets and Filings

Interrogatory responses

Answers to questions 159

ResponseFiled by Connecticut Light and Power Company dba Eversource Energy51 files
Part of docket 26-05-10Open
  • Electric
Application of The Connecticut Light and Power Company d/b/a Eversource Energy to Amend its Rate Schedules

Files51

Search terms highlighted
Eversource rate increase is on 36 pages across 17 files of the text below, highlighted. Go to the first matchClear highlighting
Words on different pages
Words on different pages
Words on different pages

Text of RRU-159 Attachment 23.xlsx

Sheet names, column headings and text cells; numbers left out · first 300,000 characters

Text of RRU-159 Attachment 23.pdf

Extracted from the file · 1,160 pages · 16,330,154 characters

Text of RRU-159 Attachment 22.xlsx

Sheet names, column headings and text cells; numbers left out · first 300,000 characters

Text of RRU-159 Attachment 22.pdf

Extracted from the file · 1,203 pages · 14,349,246 characters

Text of RRU-159 Attachment 21.xlsx

Sheet names, column headings and text cells; numbers left out · first 300,000 characters

Text of RRU-159 Attachment 21.pdf

Extracted from the file · 1,203 pages · 13,880,364 characters

Text of RRU-159 Attachment 20.xlsx

Sheet names, column headings and text cells; numbers left out

Text of RRU-159 Attachment 20.pdf

Extracted from the file · 16 pages · 151,762 characters

Text of RRU-159 Attachment 19.xlsx

Sheet names, column headings and text cells; numbers left out

Text of RRU-159 Attachment 19.pdf

Extracted from the file · 1 page · 5,328 characters

Text of RRU-159 Attachment 18.xlsx

Sheet names, column headings and text cells; numbers left out · first 300,000 characters

Text of RRU-159 Attachment 18.pdf

Extracted from the file · 640 pages · 7,983,236 characters

Text of RRU-159 Attachment 17.xlsx

Sheet names, column headings and text cells; numbers left out · first 300,000 characters

Text of RRU-159 Attachment 17.pdf

Extracted from the file · 855 pages · 14,651,941 characters

Text of RRU-159 Attachment 16.xlsx

Sheet names, column headings and text cells; numbers left out · first 300,000 characters

Text of RRU-159 Attachment 16.pdf

Extracted from the file · 489 pages · 7,076,557 characters

Text of RRU-159 Attachment 15.xlsx

Sheet names, column headings and text cells; numbers left out · first 300,000 characters

Text of RRU-159 Attachment 15.pdf

Extracted from the file · 897 pages · 15,723,777 characters

Text of RRU-159 Attachment 14 .pdf

Extracted from the file · 1 page · 2,589 characters

Text of RRU-159 Attachment 14.xlsx

Sheet names, column headings and text cells; numbers left out

Text of RRU-159 Attachment 13.xlsx

Sheet names, column headings and text cells; numbers left out

Text of RRU-159 Attachment 13.pdf

Extracted from the file · 1 page · 427 characters

Text of RRU-159 Attachment 12.xlsx

Sheet names, column headings and text cells; numbers left out · first 300,000 characters

Text of RRU-159 Attachment 12.pdf

Extracted from the file · 802 pages · 14,341,138 characters

Text of RRU-159 Attachment 11.xlsx

Sheet names, column headings and text cells; numbers left out · first 300,000 characters

Text of RRU-159 Attachment 11.pdf

Extracted from the file · 858 pages · 15,906,152 characters

Text of RRU-159 Attachment 10.xlsx

Sheet names, column headings and text cells; numbers left out

Text of RRU-159 Attachment 10.pdf

Extracted from the file · 1 page · 822 characters

Text of RRU-159 Attachment 09.xlsx

Sheet names, column headings and text cells; numbers left out · first 300,000 characters

Text of RRU-159 Attachment 09.pdf

Extracted from the file · 449 pages · 7,355,312 characters

Text of RRU-159 Attachment 08.xlsx

Sheet names, column headings and text cells; numbers left out · first 300,000 characters

Text of RRU-159 Attachment 08.pdf

Extracted from the file · 867 pages · 13,878,236 characters

Text of RRU-159 Attachment 07.xlsx

Sheet names, column headings and text cells; numbers left out · first 300,000 characters

Text of RRU-159 Attachment 07.pdf

Extracted from the file · 869 pages · 15,728,932 characters

Text of RRU-159 Attachment 06.xlsx

Sheet names, column headings and text cells; numbers left out · first 300,000 characters

Text of RRU-159 Attachment 06.pdf

Extracted from the file · 459 pages · 8,128,897 characters

Text of RRU-159 Attachment 05.xlsx

Sheet names, column headings and text cells; numbers left out · first 300,000 characters

2 pages match
  1. Page 1 of 879

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued October 23, 2026 RRU-159 Attachment 5 Page 1 of 879 work_order_number 03CENT48 03EAST48 10117217 10117218 10117219 10117219 11ADMINI 11BUMANA 11BUSUCH 11CIDERE 11CILNPR 11CLENCO 11CUENGA description 4.8KV GROUNDING CENTRAL 4.8KV GROUNDING EASTERN sale of vernon st lts 319.3K sale of Meriden st lts -1,072.7M Wolcott street light sale Wolcott street light sale CL&P EE Expense CL&P EE Expense CL&P EE Expense C & I Demand Response CL&P EE Expense CL&P EE Expense CL&P EE Expense 11EEBORE 11EEK12E 11ENCOBL 11ENOPPO 11EVALUA 11EVCONS 11FLML24 11FLTUVL 11HEDUSE 11HEHVAC 11HEIEMU 11HEINEL 11HEMUFA 11INTECH 11MAPLAN 11NECONS 11OPMAIN 11PLANNI 11PRIME0 11RECOMM 11REDEDE 11REGULA 11RELIGH 11RELOPR 11RESERV 11SMBUSI 11TRASYS 16CCFS11 16CCMR11 17CCAR11 1864N011 1864W011 1B320712 EE Boiler Replacement CL&P EE Expense CL&P EE Expense CL&P EE Expense CL&P EE Expense CL&P EE Expense CT Elec D Fleet Blanket WO-Mat Log CT Electric Fleet Capital UVL CL&P EE Expense CL&P EE Expense HES-Income Eligible-Multi Family CL&P EE Expense HES-Multi Family CL&P EE Expense CL&P EE Expense CL&P EE Expense CL&P EE Expense CL&P EE Expense CL&P EE Expense CL&P EE Expense CL&P EE Expense CL&P EE Expense CL&P EE Expense CL&P EE Expense CL&P EE Expense CL&P EE Expense CL&P Tracking Sys EE Expense 2016 CG CT Electric FCS Handhelds for CT Electric (11) CT AMR Solutions Tax Liability for Non-Cash Cont N-R CIAC Goss-Up of Taxes Refundable AF - ELEC MAINT REPL/RENEWAL/OBSOL 1B321594 TB- 772 MONROE TPKE POLE 268 INSTAL 1B321594 1B420020 TB- 772 MONROE TPKE POLE 268 INSTAL WM, SHELTER ROCK RD, DANBURY, PHASE 1B420651 BR Pad 13 Hickory Ln Roxbury Repair 1B420672 BR, Big Buck Ln, Brookfield, cable 1B420682 MT- Completed in Field on 5/08/14 b 1B421221 WM, Shelter Rock Rd, Danbury, welde 1B422408 ESO hattertown rd monroe tree broke 1B422408 ESO hattertown rd monroe tree broke 1B422408 ESO hattertown rd monroe tree broke 1B520312 BR Hut Hill Rd, Bridgewater ESO Wor 1B520312 BR Hut Hill Rd, Bridgewater ESO Wor 1B520862 BR Rt 39 New Fairfield Replaced Xfr 1B520862 BR Rt 39 New Fairfield Replaced Xfr 1B520862 BR Rt 39 New Fairfield Replaced Xfr 1B520865 APPLE BLOSSOM LN New UG Residenti 1B521850 Meadows End Rd, Monroe, p.#206 poor 1B521850 Meadows End Rd, Monroe, p.#206 poor 1B521850 Meadows End Rd, Monroe, p.#206 poor 1B521850 Meadows End Rd, Monroe, p.#206 poor 1B521883 BR 153 Wilton Rd Ridgefield Tree vs 1B521883 BR 153 Wilton Rd Ridgefield Tree vs long_description 4.8KV GROUNDING CENTRAL Division 4.8KV DELTA GROUNDING Eastern Division record the sale of street lights to the town of vernon value of approx 319.3K Closing date 05/13/16 record the sale of street lights to the town of meriden value of approx 1,1072.7M Closing date 05/13/16 record the sale of street lights to the town of Wolcott record the sale of street lights to the town of Wolcott 11ADMINI11OTHER 11BUMANA11OTHER 11BUSUCH11CI C & I Demand Response-Krawczyk 11CILNPR11CI 11CLENCO11OTHER 11CUENGA11OTHER EE Boiler Replacement in CT 11EEK12E11OTHER 11ENCOBL11CI 11ENOPPO11CI 11EVALUA11OTHER 11EVCONS11OTHER CT Electric Distribution 2024 Blanket Work Order for Fleet Vehicles-Material Logistics CT Electric work order for Fleet UVL. 11HEDUSE11RES 11HEHVAC11RES HES-Income Eligible-Multi Family-Lempa 11HEINEL11LI HES-Multi Family-Lempa 11INTECH11OTHER 11MAPLAN11OTHER 11NECONS11RES 11OPMAIN11CI 11PLANNI11OTHER 11PRIME011CI 11RECOMM11CI 11REDEDE11OTHER 11REGULA11OTHER 11RELIGH11RES 11RELOPR11RES 11RESERV11OTHER 11SMBUSI11CI CL&P Tracking Sys EE Expense-Desrosiers FCS Rollout Project (already approved) that will implement Itron’s Field Collection System (FCS) for CT in addition to providing interfaces to Meter Data Management for C2 Billing. Handhelds for CT Electric in 2016 Tax Liability for Non-Cash Cont N-R CIAC Goss-Up of Taxes Refundable AF - ELEC MAINT REPL/REN/OBSOL OH DESG(AROH)POLE RECORDS/ JO INT BILLING POLE 263 AP1 -WO TOTAL COST LESS THAN 7K TB- 772 MONROE TPKE POLE 268 INSTALL CV SERVICE cost_element_group Employee Expenses-EE0 Employee Expenses-EE0 Employee Expenses-EE0 Employee Expenses-EE0 Employee Expenses-EE0 Employee Expenses-EE0 Employee Expenses-EE0 Employee Expenses-EE0 Employee Expenses-EE0 Employee Expenses-EE0 Employee Expenses-EE0 Employee Expenses-EE0 Employee Expenses-EE0 ferc_account 107010 107010 108030 108030 108040 108030 908100 908100 908100 908100 908100 908100 908100 percent Employee Expenses-EE0 Employee Expenses-EE0 Employee Expenses-EE0 Employee Expenses-EE0 Employee Expenses-EE0 Employee Expenses-EE0 Employee Expenses-EE0 Employee Expenses-EE0 Employee Expenses-EE0 Employee Expenses-EE0 Employee Expenses-EE0 Employee Expenses-EE0 Employee Expenses-EE0 Employee Expenses-EE0 Employee Expenses-EE0 Employee Expenses-EE0 Employee Expenses-EE0 Employee Expenses-EE0 Employee Expenses-EE0 Employee Expenses-EE0 Employee Expenses-EE0 Employee Expenses-EE0 Employee Expenses-EE0 Employee Expenses-EE0 Employee Expenses-EE0 Employee Expenses-EE0 Employee Expenses-EE0 Employee Expenses-EE0 Employee Expenses-EE0 Employee Expenses-EE0 Employee Expenses-EE0 Employee Expenses-EE0 Employee Expenses-EE0 908100 908100 908100 908100 908100 908100 107010 107010 908100 908100 908100 908100 908100 908100 908100 908100 908100 908100 908100 908100 908100 908100 908100 908100 254PJ0 908100 908100 107010 107010 107010 1864N0 1864W0 108030 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 Employee Expenses-EE0 107010 0.77429 Employee Expenses-EE0 Employee Expenses-EE0 108030 107010 0.22571 1 Employee Expenses-EE0 594000 1 Employee Expenses-EE0 594000 1 Employee Expenses-EE0 594000 1 Employee Expenses-EE0 593000 1 Employee Expenses-EE0 108030 0.10433 Employee Expenses-EE0 107010 0.16266 Employee Expenses-EE0 593000 0.73301 Employee Expenses-EE0 108030 0.18919 Employee Expenses-EE0 107010 0.81081 Employee Expenses-EE0 107010 0.16367 Employee Expenses-EE0 583000 0.80196 Employee Expenses-EE0 108030 0.03437 Employee Expenses-EE0 107010 1 Employee Expenses-EE0 107010 0.52752 Employee Expenses-EE0 595000 0.21711 Employee Expenses-EE0 108030 0.06539 Employee Expenses-EE0 583000 0.18998 Employee Expenses-EE0 593000 0.20806 Employee Expenses-EE0 583000 0.28915 Employee Expenses-EE0 107010 0.24202 Employee Expenses-EE0 108030 0.14014 Employee Expenses-EE0 594000 0.12063 Employee Expenses-EE0 598000 0.03939 Employee Expenses-EE0 107010 0.96061 Employee Expenses-EE0 593000 0.45547 Employee Expenses-EE0 107010 0.54453 Employee Expenses-EE0 107010 0.96754 Employee Expenses-EE0 594000 0.03246 Employee Expenses-EE0 108030 0.17638 Employee Expenses-EE0 107010 0.62258 Employee Expenses-EE0 594000 0.01958 Employee Expenses-EE0 583000 0.07313 Employee Expenses-EE0 595000 0.00656 Employee Expenses-EE0 593000 0.09029 Employee Expenses-EE0 596000 0.01148 Employee Expenses-EE0 584000 0.11349 Employee Expenses-EE0 108030 0.10167 Employee Expenses-EE0 593000 0.01333 Employee Expenses-EE0 107010 0.66773 Employee Expenses-EE0 583000 0.10378 Employee Expenses-EE0 107010 0.48999 Employee Expenses-EE0 108030 0.00934 Employee Expenses-EE0 593000 0.50067 Employee Expenses-EE0 107010 0.94406 Employee Expenses-EE0 108030 0.05594 Employee Expenses-EE0 108030 0.18247 Employee Expenses-EE0 107010 0.33013 Employee Expenses-EE0 593000 0.4874 Employee Expenses-EE0 107010 0.25182 Employee Expenses-EE0 108030 0.18559 Employee Expenses-EE0 593000 0.12313 Employee Expenses-EE0 595000 0.05612 Employee Expenses-EE0 594000 0.2943 Employee Expenses-EE0 583000 0.08904 Employee Expenses-EE0 583000 0.24477 Employee Expenses-EE0 107010 0.50728 Employee Expenses-EE0 595000 0.24795 Employee Expenses-EE0 107010 0.97559 Employee Expenses-EE0 593000 0.02441 Employee Expenses-EE0 107010 0.71243 Employee Expenses-EE0 108030 0.28628 Employee Expenses-EE0 594000 0.00129 Employee Expenses-EE0 593000 0.04569 Employee Expenses-EE0 108030 0.07948 Employee Expenses-EE0 107010 0.87483 Employee Expenses-EE0 107010 0.77833 Employee Expenses-EE0 108030 0.22167 Employee Expenses-EE0 107010 1 Employee Expenses-EE0 107010 0.80676 Employee Expenses-EE0 108030 0.19324 Employee Expenses-EE0 107010 0.5687 Employee Expenses-EE0 108030 0.4313 Employee Expenses-EE0 108030 1 Employee Expenses-EE0 107010 1 Employee Expenses-EE0 108030 0.2172 Employee Expenses-EE0 107010 0.24812 Employee Expenses-EE0 593000 0.53468 Employee Expenses-EE0 107010 0.7027 Employee Expenses-EE0 108030 0.2973 Employee Expenses-EE0 107010 0.60788 1 1 1 1 0.00990099 0.99009901 1 1 1 1 1 1 1 TB- 772 MONROE TPKE POLE 268 INSTALL CV SERVICE BR, SHELTER ROCK RD, DANBURY, PHASE OFF GLASSS COMPLETED AP1 -WO TOTAL COST LESS THAN 7K BR Pad 13 Hickory Ln Roxbury Repair Primary Fault DB (ARDB) Completed AP1-YWO Total Cost Less Than 7K BR, Big Buck Ln, Brookfield, cable fault bet sw 45 & pad 46 Completed AP1-YWO Total Cost Less Than 7K MT- Completed in Field on 5/08/14 by ESO AP1-YWO Total Cost Less Than 7K WM, Shelter Rock Rd, Danbury, welded manhole cover AP1-YWO Total Cost Less Than 7K ESO hattertown rd monroe tree broke x arm ESO hattertown rd monroe tree broke x arm ESO hattertown rd monroe tree broke x arm BR Hut Hill Rd, Bridgewater ESO Work #3217 Completed in Field BR Hut Hill Rd, Bridgewater ESO Work #3217 Completed in Field BR Rt 39 New Fairfield Replaced Xfrm Completed in Field BR Rt 39 New Fairfield Replaced Xfrm Completed in Field BR Rt 39 New Fairfield Replaced Xfrm Completed in Field APPLE BLOSSOM LN New UG Residential Meter Dept Set pr 3/31 Meadows End Rd, Monroe, p.#206 poor condition should be replaced AP1-YWO Total Cost Less Than 7K Meadows End Rd, Monroe, p.#206 poor condition should be replaced AP1-YWO Total Cost Less Than 7K Meadows End Rd, Monroe, p.#206 poor condition should be replaced AP1-YWO Total Cost Less Than 7K Meadows End Rd, Monroe, p.#206 poor condition should be replaced AP1-YWO Total Cost Less Than 7K BR 153 Wilton Rd Ridgefield Tree vs Line Completed in Field BR 153 Wilton Rd Ridgefield Tree vs Line Completed in Field BR 153 Wilton Rd Ridgefield Tree vs Line Completed in Field 1B521883 BR 153 Wilton Rd Ridgefield Tree vs 1B521883 BR 153 Wilton Rd Ridgefield Tree vs BR 153 Wilton Rd Ridgefield Tree vs Line Completed in Field BR 153 Wilton Rd Ridgefield Tree vs Line Completed in Field 1B521883 BR 153 Wilton Rd Ridgefield Tree vs 1B522090 NF, 6A ROCK RIDGE CT, RUN DB SEC N 1B522090 NF, 6A ROCK RIDGE CT, RUN DB SEC N 1B522296 AF - 3PA-CONV#310934 - Replace pole 1B522296 AF - 3PA-CONV#310934 - Replace pole 1B522443 RM-101395, REPLACE CABLE, Scenic Hi 1B522443 RM-101395, REPLACE CABLE, Scenic Hi 1B620051 CB - CDOT 34-305 & 345 Move 1 1B620051 CB - CDOT 34-305 & 345 Move 1 1B620051 CB - CDOT 34-305 & 345 Move 1 1B620051 CB - CDOT 34-305 & 345 Move 1 1B620051 CB - CDOT 34-305 & 345 Move 1 1B620051 CB - CDOT 34-305 & 345 Move 1 1B620051 CB - CDOT 34-305 & 345 Move 1 1B620199 15 BATES PL Elec Svc New Residenti 1B620199 15 BATES PL Elec Svc New Residenti 1B620199 15 BATES PL Elec Svc New Residenti 1B620199 15 BATES PL Elec Svc New Residenti 1B620199 15 BATES PL Elec Svc New Residenti NF, 6A ROCK RIDGE CT, RUN DB SEC NEW HH THEN DB SVC, TOTAL 475' 350MCM RUN NF, 6A ROCK RIDGE CT, RUN DB SEC NEW HH THEN DB SVC, TOTAL 475' 350MCM RUN AF - 3PA-CONV#310934 - Replace pole 2007 pr TS 1/28 AP1-YWO Total Cost Less Than 7K AF - 3PA-CONV#310934 - Replace pole 2007 pr TS 1/28 AP1-YWO Total Cost Less Than 7K RM-101395, REPLACE CABLE, Scenic Hill LN pad 46 & 47- Monroe CL-YWO Variance - Contractor Labor RM-101395, REPLACE CABLE, Scenic Hill LN pad 46 & 47- Monroe CL-YWO Variance - Contractor Labor CB - CDOT 34-305 & 345 Move 1 JE-YWO Variance Job Type Exclusion CB - CDOT 34-305 & 345 Move 1 JE-YWO Variance Job Type Exclusion CB - CDOT 34-305 & 345 Move 1 JE-YWO Variance Job Type Exclusion CB - CDOT 34-305 & 345 Move 1 JE-YWO Variance Job Type Exclusion CB - CDOT 34-305 & 345 Move 1 JE-YWO Variance Job Type Exclusion CB - CDOT 34-305 & 345 Move 1 JE-YWO Variance Job Type Exclusion CB - CDOT 34-305 & 345 Move 1 JE-YWO Variance Job Type Exclusion 15 BATES PL Elec Svc New Residential PR2/4/16 15 BATES PL Elec Svc New Residential PR2/4/16 15 BATES PL Elec Svc New Residential PR2/4/16 15 BATES PL Elec Svc New Residential PR2/4/16 15 BATES PL Elec Svc New Residential PR2/4/16 1B620226 DP, WASH 165 SHEARER RD, PRIORITY 1B620226 DP, WASH 165 SHEARER RD, PRIORITY 1B620226 DP, WASH 165 SHEARER RD, PRIORITY 1B620362 NORTH ST replace recloser 22N5-71 DP, WASH 165 SHEARER RD, PRIORITY REJECT POLE#3474, 1PH , ANCHOR CL-YWO Variance - Contractor Labor DP, WASH 165 SHEARER RD, PRIORITY REJECT POLE#3474, 1PH , ANCHOR CL-YWO Variance - Contractor Labor DP, WASH 165 SHEARER RD, PRIORITY REJECT POLE#3474, 1PH , ANCHOR CL-YWO Variance - Contractor Labor NORTH ST replace recloser 22N5-71s Y-17131-2016 pole 5024 PR3/2/16 NORTH ST replace recloser 22N5-71s Y-17131-2016 pole 5024 PR3/2/16 1B620362 NORTH ST replace recloser 22N5-71 1B620819 JDB WEBATUCK RD SHERMAN COMPLETED, 1B620819 JDB WEBATUCK RD SHERMAN COMPLETED, 1B620819 JDB WEBATUCK RD SHERMAN COMPLETED, 1B621325 SH-Convo#342618-(MakeReadyNonReimb) 1B621325 SH-Convo#342618-(MakeReadyNonReimb) 1B621325 SH-Convo#342618-(MakeReadyNonReimb) 1B621325 SH-Convo#342618-(MakeReadyNonReimb) 1B621325 SH-Convo#342618-(MakeReadyNonReimb) 1B621325 SH-Convo#342618-(MakeReadyNonReimb) 1B621534 ROX, 142 EAST FLAG SWAMP, TEL REPL 1B621534 ROX, 142 EAST FLAG SWAMP, TEL REPL 1B621534 ROX, 142 EAST FLAG SWAMP, TEL REPL 1B621706 BM/ INS 3P PRI RISER, RUN 390' 1AL 1B621706 BM/ INS 3P PRI RISER, RUN 390' 1AL 1B622282 RL Black Rock Tpke, Redding replace 1B622282 RL Black Rock Tpke, Redding replace 1B622282 RL Black Rock Tpke, Redding replace 1B622283 PH; 661 Redding Rd, Redding, replac 1B622283 PH; 661 Redding Rd, Redding, replac 1B622283 PH; 661 Redding Rd, Redding, replac 1B720029 Electric Service Existing Residenti 1B720029 Electric Service Existing Residenti JDB WEBATUCK RD SHERMAN COMPLETED, ESO 5/7 9A pole 929 AP2-YWO Total Cost Variance Met - Variance :63.2336 MIN.:-50 MAX.:150 JDB WEBATUCK RD SHERMAN COMPLETED, ESO 5/7 9A pole 929 AP2-YWO Total Cost Variance Met - Variance :63.2336 MIN.:-50 MAX.:150 JDB WEBATUCK RD SHERMAN COMPLETED, ESO 5/7 9A pole 929 AP2-YWO Total Cost Variance Met - Variance :63.2336 MIN.:-50 MAX.:150 SH-Convo#342618-(MakeReadyNonReimb) - Fibertech Parent Convo#338911 AP2-YWO Total Cost Variance Met - Variance :-30.9342 MIN.:-40 MAX.:40 SH-Convo#342618-(MakeReadyNonReimb) - Fibertech Parent Convo#338911 AP2-YWO Total Cost Variance Met - Variance :-30.9342 MIN.:-40 MAX.:40 SH-Convo#342618-(MakeReadyNonReimb) - Fibertech Parent Convo#338911 AP2-YWO Total Cost Variance Met - Variance :-30.9342 MIN.:-40 MAX.:40 SH-Convo#342618-(MakeReadyNonReimb) - Fibertech Parent Convo#338911 AP2-YWO Total Cost Variance Met - Variance :-30.9342 MIN.:-40 MAX.:40 SH-Convo#342618-(MakeReadyNonReimb) - Fibertech Parent Convo#338911 AP2-YWO Total Cost Variance Met - Variance :-30.9342 MIN.:-40 MAX.:40 SH-Convo#342618-(MakeReadyNonReimb) - Fibertech Parent Convo#338911 AP2-YWO Total Cost Variance Met - Variance :-30.9342 MIN.:-40 MAX.:40 ROX, 142 EAST FLAG SWAMP, TEL REPL POLE. HANG POT AND OH/DB SVC FOR GATE AP1-YWO Total Cost Less Than 7K ROX, 142 EAST FLAG SWAMP, TEL REPL POLE. HANG POT AND OH/DB SVC FOR GATE AP1-YWO Total Cost Less Than 7K ROX, 142 EAST FLAG SWAMP, TEL REPL POLE. HANG POT AND OH/DB SVC FOR GATE AP1-YWO Total Cost Less Than 7K BM/ INS 3P PRI RISER, RUN 390' 1AL 4CT TO NEW 500KVA PAD AP2-YWO Total Cost Variance Met - Variance :24.7788 MIN.:-50 MAX.:50 BM/ INS 3P PRI RISER, RUN 390' 1AL 4CT TO NEW 500KVA PAD AP2-YWO Total Cost Variance Met - Variance :24.7788 MIN.:-50 MAX.:50 RL Black Rock Tpke, Redding replace DB primary cable from Riser P#969 to PAD200 AP2-YWO Total Cost Variance Met - Variance :1.7385 MIN.:-40 MAX.:40 RL Black Rock Tpke, Redding replace DB primary cable from Riser P#969 to PAD200 AP2-YWO Total Cost Variance Met - Variance :1.7385 MIN.:-40 MAX.:40 RL Black Rock Tpke, Redding replace DB primary cable from Riser P#969 to PAD200 AP2-YWO Total Cost Variance Met - Variance :1.7385 MIN.:-40 MAX.:40 PH; 661 Redding Rd, Redding, replace DB primary from Riser P#1181 to PAD3 AP2-YWO Total Cost Variance Met - Variance :3.1947 MIN.:-40 MAX.:40 PH; 661 Redding Rd, Redding, replace DB primary from Riser P#1181 to PAD3 AP2-YWO Total Cost Variance Met - Variance :3.1947 MIN.:-40 MAX.:40 PH; 661 Redding Rd, Redding, replace DB primary from Riser P#1181 to PAD3 AP2-YWO Total Cost Variance Met - Variance :3.1947 MIN.:-40 MAX.:40 Electric Service Existing Residential Overhead (PHD) Electric Service Existing Residential Overhead (PHD) 1B720072 9A COMPLETED, 124 Calhoun, Washingt 1B720073 9A COMPLETED23 Hooppole Hill, Woodb 1B720073 9A COMPLETED23 Hooppole Hill, Woodb 1B720242 ESO, White Deer Rocks Rd, Woodbury 1B720242 ESO, White Deer Rocks Rd, Woodbury 1B720378 BRANCHVILLE replace cap bank pole 5 1B720417 OLD BROOKFIELD RD Elec Maint Troub 1B720453 Brookfield, Meadow Brook Rd - Front 1B720453 Brookfield, Meadow Brook Rd - Front 1B720453 Brookfield, Meadow Brook Rd - Front 1B720502 COMPL IN FIELD; REPL 100AMP C/O @ P 1B720502 COMPL IN FIELD; REPL 100AMP C/O @ P 1B720975 116 N LAKE SHORE DR Elec Svc New R 9A COMPLETED, 124 Calhoun, Washington, car vs. pole 1773, TEL REPLACED,SHIFTED AP1-YWO Total Cost Less Than 7K 9A COMPLETED23 Hooppole Hill, Woodbury, car vs. pole FRONTIER REPLACED POLE W5 AP1-YWO Total Cost Less Than 7K 9A COMPLETED23 Hooppole Hill, Woodbury, car vs. pole FRONTIER REPLACED POLE W5 AP1-YWO Total Cost Less Than 7K ESO, White Deer Rocks Rd, Woodbury - Car vs Pole 1215 AP2-YWO Total Cost Variance Met - Variance :116.5616 MIN.:-50 MAX.:150 ESO, White Deer Rocks Rd, Woodbury - Car vs Pole 1215 AP2-YWO Total Cost Variance Met - Variance :116.5616 MIN.:-50 MAX.:150 BRANCHVILLE replace cap bank pole 559 pr3/1/17 NL-YWO Variance - NU Construction Labor OLD BROOKFIELD RD Elec Maint Trouble Call - Repairs/Obsolescence DB pr3/9/17 CL-YWO Variance - Contractor Labor Brookfield, Meadow Brook Rd - Frontier pole shift 1384 pr3/11/17 AP1-YWO Total Cost Less Than 7K Brookfield, Meadow Brook Rd - Frontier pole shift 1384 pr3/11/17 AP1-YWO Total Cost Less Than 7K Brookfield, Meadow Brook Rd - Frontier pole shift 1384 pr3/11/17 AP1-YWO Total Cost Less Than 7K COMPL IN FIELD; REPL 100AMP C/O @ PL 2622 COMPL IN FIELD; REPL 100AMP C/O @ PL 2622 116 N LAKE SHORE DR Elec Svc New Residential AP1-YWO Total Cost Less Than 7K
  2. Page 2 of 879

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued October 23, 2026 RRU-159 Attachment 5 Page 2 of 879 work_order_number description 1B720975 116 N LAKE SHORE DR Elec Svc New R 1B720975 116 N LAKE SHORE DR Elec Svc New R 1B721039 15 DD BY 6/27/22 (50): 4 FINANCE DR 1G520647 RL:48 Clapboard Ridge Rd; Elec Svc 1G520647 RL:48 Clapboard Ridge Rd; Elec Svc 1G520647 RL:48 Clapboard Ridge Rd; Elec Svc 1G520761 DM/107 DOUBLING RD GREENWICH: RELOC 1G520761 DM/107 DOUBLING RD GREENWICH: RELOC 1G520761 DM/107 DOUBLING RD GREENWICH: RELOC 1G520761 DM/107 DOUBLING RD GREENWICH: RELOC 1G520761 DM/107 DOUBLING RD GREENWICH: RELOC 1G620304 RL 30 Butternut Hollow/P#70537/Tree 1G620304 RL 30 Butternut Hollow/P#70537/Tree 1G620304 RL 30 Butternut Hollow/P#70537/Tree 1G620304 RL 30 Butternut Hollow/P#70537/Tree 1G620491 RL:35 Mooreland Rd; Elec Svc New Re 1G620491 RL:35 Mooreland Rd; Elec Svc New Re 1G620491 RL:35 Mooreland Rd; Elec Svc New Re 1G620491 RL:35 Mooreland Rd; Elec Svc New Re 1G620491 RL:35 Mooreland Rd; Elec Svc New Re 1G620693 Elec Svc New Com/Ind IT Meter DESG 1G620693 Elec Svc New Com/Ind IT Meter DESG 1G620693 Elec Svc New Com/Ind IT Meter DESG 1G620693 Elec Svc New Com/Ind IT Meter DESG 1G621024 RL:10 Broad St: Elec Svc New Reside 1G621097 RL:900 Lake Ave: Greenwich pole Ve 1G621163 DM/32 MEETING HOUSE RD GRN: REPL P. 1G621163 DM/32 MEETING HOUSE RD GRN: REPL P. 1G621163 DM/32 MEETING HOUSE RD GRN: REPL P. 1G621238 RL:North Maple Ave: Electric Servic 1G621249 RL:Patterson Ave: Electric Service 1M320139 588, NF, DP, Bear Mt Rd, AT&T to R 1M320139 588, NF, DP, Bear Mt Rd, AT&T to R 1M320139 1M420090 1M420090 588, NF, DP, Bear Mt Rd, AT&T to R KENT, CAMEL HILL RD,CAMP FRANCIS , KENT, CAMEL HILL RD,CAMP FRANCIS , 1N120458 JDB 6 CAPTAINS WALK NWLK INSTALL250 1N221114 JDB 10 ARCH ST,NWLK TRUCK HIT POLE 1N221114 JDB 10 ARCH ST,NWLK TRUCK HIT POLE 1N221114 JDB 10 ARCH ST,NWLK TRUCK HIT POLE 1N321978 JDB 165 GRUMMAN AVE NWLK P32758 Ele 1N321978 JDB 165 GRUMMAN AVE NWLK P32758 Ele 1N321978 JDB 165 GRUMMAN AVE NWLK P32758 Ele 1N321978 JDB 165 GRUMMAN AVE NWLK P32758 Ele 1N321978 JDB 165 GRUMMAN AVE NWLK P32758 Ele 1N322459 JES: 3 DUKE PL. NORWALK, CAR VS POL 1N322459 JES: 3 DUKE PL. NORWALK, CAR VS POL 1N420695 am/PN 103612, Seg 1 - Civil Work Re 1N422555 AF-Elec Proj Cable Repl Spec - Butl 1N422555 AF-Elec Proj Cable Repl Spec - Butl 1N422555 AF-Elec Proj Cable Repl Spec - Butl 1N422555 AF-Elec Proj Cable Repl Spec - Butl 1N520002 RM- 101395, Cable Replacement - Mes 1N522299 KS 645 POST RD E, WSPT P# 18505 INS 1N522299 KS 645 POST RD E, WSPT P# 18505 INS 1N522364 AJC 183 HEMLOCK HILL RD NC UPGRD TR 1N522364 AJC 183 HEMLOCK HILL RD NC UPGRD TR 1N522364 AJC 183 HEMLOCK HILL RD NC UPGRD TR 1N522364 AJC 183 HEMLOCK HILL RD NC UPGRD TR 1N620657 CONV 484563 - RM-CDOT 158-0211, PHA 1N620657 CONV 484563 - RM-CDOT 158-0211, PHA 1N620657 CONV 484563 - RM-CDOT 158-0211, PHA 1N620926 LD 14 MAIN STREET NOR PARKING LOT R 1N620926 LD 14 MAIN STREET NOR PARKING LOT R 1N620926 LD 14 MAIN STREET NOR PARKING LOT R 1N620926 LD 14 MAIN STREET NOR PARKING LOT R 1N620945 LD WESTPORT NETWORK RPL SEC MAIN'S 1N620945 LD WESTPORT NETWORK RPL SEC MAIN'S 1N620945 LD WESTPORT NETWORK RPL SEC MAIN'S 1N621035 KS 9 COLONIAL RD, WSPT P# 781 INS C 1N621145 JDB EAST AVE NWLK P2890 RMV ARMLESS 1N621145 JDB EAST AVE NWLK P2890 RMV ARMLESS 1N621145 JDB EAST AVE NWLK P2890 RMV ARMLESS 1N621166 JES; 345 NEWTOWN TPKE, WESTON-BROKE 1N621166 JES; 345 NEWTOWN TPKE, WESTON-BROKE 1N621166 JES; 345 NEWTOWN TPKE, WESTON-BROKE 1N621166 JES; 345 NEWTOWN TPKE, WESTON-BROKE 1N621466 AJC BEACHSIDE AVE WSPT RPL DB PRI 1N621466 AJC BEACHSIDE AVE WSPT RPL DB PRI 1N621466 AJC BEACHSIDE AVE WSPT RPL DB PRI 1N621473 ESO 8/13 Grays Farm Rd Westport pol 1N621475 AJC BUTLER LN NC INS PIPE& RPL DB 1N621475 AJC BUTLER LN NC INS PIPE& RPL DB 1N621793 AJC 2 BRIGHTFIELD LN WSPT Electric 1N621866 AJC 6 KELLER LN WSPT MIDTAP Electri 1N621866 AJC 6 KELLER LN WSPT MIDTAP Electri 1N720013 JDB FILLOW ST NWLK P1746 FUSE COORD 1N720013 JDB FILLOW ST NWLK P1746 FUSE COORD 1S320711 103808-03 SECONDARY DUCTS & HANDHO 1S420578 RM- CDOT 135-307, Temp Relocate Pol 1S420578 RM- CDOT 135-307, Temp Relocate Pol 1S420578 RM- CDOT 135-307, Temp Relocate Pol 1S420578 RM- CDOT 135-307, Temp Relocate Pol 1S420578 RM- CDOT 135-307, Temp Relocate Pol 1S421351 CD00340-00 REPLACE 1G18 CABLE w/1 1S421351 CD00340-00 REPLACE 1G18 CABLE w/1 1S520664 PH; 48 SALISBURY RD; Electric Servi 1S520964 DL Relocate OH service 1S520964 DL Relocate OH service 1S521599 DL; ESO 9A FAIRFIELD AVE; P#1736/ 1S521599 DL; ESO 9A FAIRFIELD AVE; P#1736/ 1S521821 RM- CDOT 135-307, Temp Relocate Pol 1S521821 RM- CDOT 135-307, Temp Relocate Pol 1S521821 RM- CDOT 135-307, Temp Relocate Pol 1S521821 RM- CDOT 135-307, Temp Relocate Pol 1S620343 PH; 0 Shadbush Ln/P#13752/Tree brok 1S620343 PH; 0 Shadbush Ln/P#13752/Tree brok long_description 116 N LAKE SHORE DR Elec Svc New Residential AP1-YWO Total Cost Less Than 7K 116 N LAKE SHORE DR Elec Svc New Residential AP1-YWO Total Cost Less Than 7K 4 FINANCE DR Elec Svc New Com/Ind RL:48 Clapboard Ridge Rd; Elec Svc Existing Residential IT Meter 600 Amps (DN) AP2-YWO Total Cost Variance Met - Variance :109.6871 MIN.:-50 MAX.:150 RL:48 Clapboard Ridge Rd; Elec Svc Existing Residential IT Meter 600 Amps (DN) AP2-YWO Total Cost Variance Met - Variance :109.6871 MIN.:-50 MAX.:150 RL:48 Clapboard Ridge Rd; Elec Svc Existing Residential IT Meter 600 Amps (DN) AP2-YWO Total Cost Variance Met - Variance :109.6871 MIN.:-50 MAX.:150 DM/107 DOUBLING RD GREENWICH: RELOCATE OH LINES TO UNDERGROUND AP2-YWO Total Cost Variance Met - Variance :-23.6492 MIN.:-50 MAX.:50 DM/107 DOUBLING RD GREENWICH: RELOCATE OH LINES TO UNDERGROUND AP2-YWO Total Cost Variance Met - Variance :-23.6492 MIN.:-50 MAX.:50 DM/107 DOUBLING RD GREENWICH: RELOCATE OH LINES TO UNDERGROUND AP2-YWO Total Cost Variance Met - Variance :-23.6492 MIN.:-50 MAX.:50 DM/107 DOUBLING RD GREENWICH: RELOCATE OH LINES TO UNDERGROUND AP2-YWO Total Cost Variance Met - Variance :-23.6492 MIN.:-50 MAX.:50 DM/107 DOUBLING RD GREENWICH: RELOCATE OH LINES TO UNDERGROUND AP2-YWO Total Cost Variance Met - Variance :-23.6492 MIN.:-50 MAX.:50 RL 30 Butternut Hollow/P#70537/Tree broke pole,see ticket/Alex M. cost_element_group ferc_account percent Employee Expenses-EE0 583000 0.2232 Employee Expenses-EE0 108030 0.16892 Employee Expenses-EE0 107010 1 Employee Expenses-EE0 107010 0.87499 Employee Expenses-EE0 584000 0.10658 Employee Expenses-EE0 595000 0.01843 Employee Expenses-EE0 108030 0.35724 Employee Expenses-EE0 595000 0.02264 Employee Expenses-EE0 107010 0.4806 Employee Expenses-EE0 584000 0.10483 Employee Expenses-EE0 583000 0.03469 Employee Expenses-EE0 583000 0.55713 Employee Expenses-EE0 107010 0.19422 Employee Expenses-EE0 595000 0.07236 Employee Expenses-EE0 108030 0.17629 Employee Expenses-EE0 108030 0.04903 Employee Expenses-EE0 107010 0.80055 Employee Expenses-EE0 583000 0.04441 Employee Expenses-EE0 584000 0.09038 Employee Expenses-EE0 595000 0.01563 Employee Expenses-EE0 108030 0.22193 Employee Expenses-EE0 107010 0.52901 Employee Expenses-EE0 595000 0.13947 Employee Expenses-EE0 593000 0.10959 Employee Expenses-EE0 107010 1 Employee Expenses-EE0 593000 1 Employee Expenses-EE0 108030 0.20909 Employee Expenses-EE0 107010 0.43777 Employee Expenses-EE0 594000 0.35314 Employee Expenses-EE0 107010 1 Employee Expenses-EE0 107010 1 Employee Expenses-EE0 107010 0.26662 Employee Expenses-EE0 108030 0.03808 Employee Expenses-EE0 Employee Expenses-EE0 Employee Expenses-EE0 595000 108030 598000 0.6953 0.86218 0.13782 Employee Expenses-EE0 107010 1 Employee Expenses-EE0 108030 0.23246 Employee Expenses-EE0 107010 0.40336 Employee Expenses-EE0 593000 0.36418 Employee Expenses-EE0 598000 0.00116 Employee Expenses-EE0 583000 0.13286 Employee Expenses-EE0 107010 0.46414 Employee Expenses-EE0 108030 0.36165 Employee Expenses-EE0 595000 0.04019 Employee Expenses-EE0 593000 0.33806 Employee Expenses-EE0 107010 0.66194 Employee Expenses-EE0 107010 1 Employee Expenses-EE0 593000 0.00508 Employee Expenses-EE0 107010 0.82573 Employee Expenses-EE0 584000 0.03469 Employee Expenses-EE0 108030 0.1345 Employee Expenses-EE0 107010 1 Employee Expenses-EE0 584000 0.06957 Employee Expenses-EE0 107010 0.93043 Employee Expenses-EE0 107010 0.58875 Employee Expenses-EE0 583000 0.3405 Employee Expenses-EE0 593000 0.02653 Employee Expenses-EE0 595000 0.04422 Employee Expenses-EE0 108030 0.19269 Employee Expenses-EE0 593000 0.05993 Employee Expenses-EE0 107010 0.74738 Employee Expenses-EE0 108030 0.22294 Employee Expenses-EE0 596000 0.03933 Employee Expenses-EE0 107010 0.58211 Employee Expenses-EE0 594000 0.15562 Employee Expenses-EE0 108030 0.28243 Employee Expenses-EE0 107010 0.70232 Employee Expenses-EE0 594000 0.01525 Employee Expenses-EE0 107010 1 Employee Expenses-EE0 593000 0.44879 Employee Expenses-EE0 107010 0.48859 Employee Expenses-EE0 108030 0.06262 Employee Expenses-EE0 595000 0.0259 Employee Expenses-EE0 583000 0.19944 Employee Expenses-EE0 107010 0.55204 Employee Expenses-EE0 108030 0.22262 Employee Expenses-EE0 108030 0.01626 Employee Expenses-EE0 594000 0.02877 Employee Expenses-EE0 107010 0.95497 Employee Expenses-EE0 107010 1 Employee Expenses-EE0 107010 0.90744 Employee Expenses-EE0 108030 0.09256 Employee Expenses-EE0 107010 1 Employee Expenses-EE0 107010 0.77833 Employee Expenses-EE0 108030 0.22167 Employee Expenses-EE0 107010 0.74799 Employee Expenses-EE0 108030 0.25201 Employee Expenses-EE0 593000 1 Employee Expenses-EE0 594000 0.07589 Employee Expenses-EE0 593000 0.02747 Employee Expenses-EE0 583000 0.12838 Employee Expenses-EE0 108030 0.16798 Employee Expenses-EE0 107010 0.60028 Employee Expenses-EE0 594000 0.73178 Employee Expenses-EE0 108030 0.26822 Employee Expenses-EE0 107010 1 Employee Expenses-EE0 108030 0.20362 Employee Expenses-EE0 107010 0.79638 Employee Expenses-EE0 108030 0.04801 Employee Expenses-EE0 107010 0.95199 Employee Expenses-EE0 594000 0.12141 Employee Expenses-EE0 593000 0.00018 Employee Expenses-EE0 107010 0.70643 Employee Expenses-EE0 108030 0.17198 Employee Expenses-EE0 583000 0.45578 Employee Expenses-EE0 595000 0.05919 RL 30 Butternut Hollow/P#70537/Tree broke pole,see ticket/Alex M. RL 30 Butternut Hollow/P#70537/Tree broke pole,see ticket/Alex M. RL 30 Butternut Hollow/P#70537/Tree broke pole,see ticket/Alex M. RL:35 Mooreland Rd; Elec Svc New Residential IT 600 amp Meter DESG NO AWOCS-AWOCS REASON CODE AND DESCRIPTION NOT FOUND. RL:35 Mooreland Rd; Elec Svc New Residential IT 600 amp Meter DESG NO AWOCS-AWOCS REASON CODE AND DESCRIPTION NOT FOUND. RL:35 Mooreland Rd; Elec Svc New Residential IT 600 amp Meter DESG NO AWOCS-AWOCS REASON CODE AND DESCRIPTION NOT FOUND. RL:35 Mooreland Rd; Elec Svc New Residential IT 600 amp Meter DESG NO AWOCS-AWOCS REASON CODE AND DESCRIPTION NOT FOUND. RL:35 Mooreland Rd; Elec Svc New Residential IT 600 amp Meter DESG NO AWOCS-AWOCS REASON CODE AND DESCRIPTION NOT FOUND. Elec Svc New Com/Ind IT Meter DESG (DN) AP2-YWO Total Cost Variance Met - Variance :-18.0765 MIN.:-40 MAX.:40 Elec Svc New Com/Ind IT Meter DESG (DN) AP2-YWO Total Cost Variance Met - Variance :-18.0765 MIN.:-40 MAX.:40 Elec Svc New Com/Ind IT Meter DESG (DN) AP2-YWO Total Cost Variance Met - Variance :-18.0765 MIN.:-40 MAX.:40 Elec Svc New Com/Ind IT Meter DESG (DN) AP2-YWO Total Cost Variance Met - Variance :-18.0765 MIN.:-40 MAX.:40 RL:10 Broad St: Elec Svc New Residential IT 800 Amps Meter DESG AP1-YWO Total Cost Less Than 7K RL:900 Lake Ave: Greenwich pole Verizon Pole VZ 225 75656 AP1-YWO Total Cost Less Than 7K DM/32 MEETING HOUSE RD GRN: REPL P.80483 & 73715 - CUSTOMER COMPLAINT AP2-YWO Total Cost Variance Met - Variance :-35.0579 MIN.:-40 MAX.:40 DM/32 MEETING HOUSE RD GRN: REPL P.80483 & 73715 - CUSTOMER COMPLAINT AP2-YWO Total Cost Variance Met - Variance :-35.0579 MIN.:-40 MAX.:40 DM/32 MEETING HOUSE RD GRN: REPL P.80483 & 73715 - CUSTOMER COMPLAINT AP2-YWO Total Cost Variance Met - Variance :-35.0579 MIN.:-40 MAX.:40 RL:North Maple Ave: Electric Service Un-Metered for school zone lights AP1-YWO Total Cost Less Than 7K RL:Patterson Ave: Electric Service Un-Metered pole 70468 AP1-YWO Total Cost Less Than 7K 588, NF, DP, Bear Mt Rd, AT&T to Repl Detriorated pole 1315 AP1-YWO Total Cost Less Than 7K 588, NF, DP, Bear Mt Rd, AT&T to Repl Detriorated pole 1315 AP1-YWO Total Cost Less Than 7K 588, NF, DP, Bear Mt Rd, AT&T to Repl Detriorated pole 1315 AP1-YWO Total Cost Less Than 7K KENT, CAMEL HILL RD,CAMP FRANCIS , DEMO 2 OF 4 REM OH SECSVC METER RANGER CABIN AP1 -WO TOTAL COST LESS THAN 7K KENT, CAMEL HILL RD,CAMP FRANCIS , DEMO 2 OF 4 REM OH SECSVC METER RANGER CABIN AP1 -WO TOTAL COST LESS THAN 7K JDB 6 CAPTAINS WALK NWLK INSTALL250W HPS COBRA Canceled JDB 10 ARCH ST,NWLK TRUCK HIT POLE #9577 SEE TT INFO 06/01/12 AP1-YWO Total Cost Less Than 7K JDB 10 ARCH ST,NWLK TRUCK HIT POLE #9577 SEE TT INFO 06/01/12 AP1-YWO Total Cost Less Than 7K JDB 10 ARCH ST,NWLK TRUCK HIT POLE #9577 SEE TT INFO 06/01/12 AP1-YWO Total Cost Less Than 7K JDB 165 GRUMMAN AVE NWLK P32758 Elec Proj Maintain Voltage Annual DESG (DK) CL-YWO Variance - Contractor Labor JDB 165 GRUMMAN AVE NWLK P32758 Elec Proj Maintain Voltage Annual DESG (DK) CL-YWO Variance - Contractor Labor JDB 165 GRUMMAN AVE NWLK P32758 Elec Proj Maintain Voltage Annual DESG (DK) CL-YWO Variance - Contractor Labor JDB 165 GRUMMAN AVE NWLK P32758 Elec Proj Maintain Voltage Annual DESG (DK) CL-YWO Variance - Contractor Labor JDB 165 GRUMMAN AVE NWLK P32758 Elec Proj Maintain Voltage Annual DESG (DK) CL-YWO Variance - Contractor Labor JES: 3 DUKE PL. NORWALK, CAR VS POLE MADE TEMP REPAIRS, P# 9012 SEE TT 11-15-13 AP1-YWO Total Cost Less Than 7K JES: 3 DUKE PL. NORWALK, CAR VS POLE MADE TEMP REPAIRS, P# 9012 SEE TT 11-15-13 AP1-YWO Total Cost Less Than 7K am/PN 103612, Seg 1 - Civil Work Relocate Vlt 39 CI-YWO Variance - Contractor Invoice AF-Elec Proj Cable Repl Spec - Butler Ln - New Canaan, CT CI-YWO Variance - Contractor Invoice AF-Elec Proj Cable Repl Spec - Butler Ln - New Canaan, CT CI-YWO Variance - Contractor Invoice AF-Elec Proj Cable Repl Spec - Butler Ln - New Canaan, CT CI-YWO Variance - Contractor Invoice AF-Elec Proj Cable Repl Spec - Butler Ln - New Canaan, CT CI-YWO Variance - Contractor Invoice RM- 101395, Cable Replacement - Messex Ln - Weston KS 645 POST RD E, WSPT P# 18505 INS PRI RISER, DB PRI, PRI VLT, & 300KVA PAD AP2-YWO Total Cost Variance Met - Variance :19.9624 MIN.:-50 MAX.:50 KS 645 POST RD E, WSPT P# 18505 INS PRI RISER, DB PRI, PRI VLT, & 300KVA PAD AP2-YWO Total Cost Variance Met - Variance :19.9624 MIN.:-50 MAX.:50 AJC 183 HEMLOCK HILL RD NC UPGRD TRANS & INST RISER FOR 320A SC SERV POLE 5713 AJC 183 HEMLOCK HILL RD NC UPGRD TRANS & INST RISER FOR 320A SC SERV POLE 5713 AJC 183 HEMLOCK HILL RD NC UPGRD TRANS & INST RISER FOR 320A SC SERV POLE 5713 AJC 183 HEMLOCK HILL RD NC UPGRD TRANS & INST RISER FOR 320A SC SERV POLE 5713 CONV 484563 - RM-CDOT 158-0211, PHASE I, NEWTOWN TRPK / RT 15 - WESTPORT JE-YWO Variance Job Type Exclusion CONV 484563 - RM-CDOT 158-0211, PHASE I, NEWTOWN TRPK / RT 15 - WESTPORT JE-YWO Variance Job Type Exclusion CONV 484563 - RM-CDOT 158-0211, PHASE I, NEWTOWN TRPK / RT 15 - WESTPORT JE-YWO Variance Job Type Exclusion LD 14 MAIN STREET NOR PARKING LOT RPL POLE#27127 RPL TO LED'S FROM HPS LIGHTS AP2-YWO Total Cost Variance Met - Variance :42.7862 MIN.:-50 MAX.:50 LD 14 MAIN STREET NOR PARKING LOT RPL POLE#27127 RPL TO LED'S FROM HPS LIGHTS AP2-YWO Total Cost Variance Met - Variance :42.7862 MIN.:-50 MAX.:50 LD 14 MAIN STREET NOR PARKING LOT RPL POLE#27127 RPL TO LED'S FROM HPS LIGHTS AP2-YWO Total Cost Variance Met - Variance :42.7862 MIN.:-50 MAX.:50 LD 14 MAIN STREET NOR PARKING LOT RPL POLE#27127 RPL TO LED'S FROM HPS LIGHTS AP2-YWO Total Cost Variance Met - Variance :42.7862 MIN.:-50 MAX.:50 LD WESTPORT NETWORK RPL SEC MAIN'S & RECRAB 3 MH#'S TO TYPE B PROJ #103358-13 AP2-YWO Total Cost Variance Met - Variance :2.4156 MIN.:-10 MAX.:10 LD WESTPORT NETWORK RPL SEC MAIN'S & RECRAB 3 MH#'S TO TYPE B PROJ #103358-13 AP2-YWO Total Cost Variance Met - Variance :2.4156 MIN.:-10 MAX.:10 LD WESTPORT NETWORK RPL SEC MAIN'S & RECRAB 3 MH#'S TO TYPE B PROJ #103358-13 AP2-YWO Total Cost Variance Met - Variance :2.4156 MIN.:-10 MAX.:10 KS 9 COLONIAL RD, WSPT P# 781 INS CROSSOVER POLE & 200A OH/DB SVC AP1-YWO Total Cost Less Than 7K JDB EAST AVE NWLK P2890 RMV ARMLESS INSTALL 6' XARM OH DESG (AROH) AP1-YWO Total Cost Less Than 7K JDB EAST AVE NWLK P2890 RMV ARMLESS INSTALL 6' XARM OH DESG (AROH) AP1-YWO Total Cost Less Than 7K JDB EAST AVE NWLK P2890 RMV ARMLESS INSTALL 6' XARM OH DESG (AROH) AP1-YWO Total Cost Less Than 7K JES; 345 NEWTOWN TPKE, WESTON-BROKEN P#31868 & 31870 08/09/16 JES; 345 NEWTOWN TPKE, WESTON-BROKEN P#31868 & 31870 08/09/16 JES; 345 NEWTOWN TPKE, WESTON-BROKEN P#31868 & 31870 08/09/16 JES; 345 NEWTOWN TPKE, WESTON-BROKEN P#31868 & 31870 08/09/16 AJC BEACHSIDE AVE WSPT RPL DB PRI FROM POLE#25131 TO PAD#127 PROJ#101395-09 CL-YWO Variance - Contractor Labor AJC BEACHSIDE AVE WSPT RPL DB PRI FROM POLE#25131 TO PAD#127 PROJ#101395-09 CL-YWO Variance - Contractor Labor AJC BEACHSIDE AVE WSPT RPL DB PRI FROM POLE#25131 TO PAD#127 PROJ#101395-09 CL-YWO Variance - Contractor Labor ESO 8/13 Grays Farm Rd Westport pole 17813 AP1-YWO Total Cost Less Than 7K AJC BUTLER LN NC INS PIPE& RPL DB PRI FROM POLE#24732 TO PAD#221 PROJ#101395-09 AP2-YWO Total Cost Variance Met - Variance :29.9076 MIN.:-40 MAX.:40 AJC BUTLER LN NC INS PIPE& RPL DB PRI FROM POLE#24732 TO PAD#221 PROJ#101395-09 AP2-YWO Total Cost Variance Met - Variance :29.9076 MIN.:-40 MAX.:40 AJC 2 BRIGHTFIELD LN WSPT Electric Service New Residential Underground HH30203A AJC 6 KELLER LN WSPT MIDTAP Electric Service Existing Residential Overhead P9106 AJC 6 KELLER LN WSPT MIDTAP Electric Service Existing Residential Overhead P9106 JDB FILLOW ST NWLK P1746 FUSE COORDINATION Annual DESG (DR) AP1-YWO Total Cost Less Than 7K JDB FILLOW ST NWLK P1746 FUSE COORDINATION Annual DESG (DR) AP1-YWO Total Cost Less Than 7K 103808-03 SECONDARY DUCTS & HANDHOLES - CIVIL MATERIALS ONLY AP2-YWO Total Cost Variance Met - Variance :-44.1629 MIN.:-50 MAX.:50 RM- CDOT 135-307, Temp Relocate Poles 5797, 5798 E MAIN ST - STAMFORD JE-YWO Variance Job Type Exclusion RM- CDOT 135-307, Temp Relocate Poles 5797, 5798 E MAIN ST - STAMFORD JE-YWO Variance Job Type Exclusion RM- CDOT 135-307, Temp Relocate Poles 5797, 5798 E MAIN ST - STAMFORD JE-YWO Variance Job Type Exclusion RM- CDOT 135-307, Temp Relocate Poles 5797, 5798 E MAIN ST - STAMFORD JE-YWO Variance Job Type Exclusion RM- CDOT 135-307, Temp Relocate Poles 5797, 5798 E MAIN ST - STAMFORD JE-YWO Variance Job Type Exclusion CD00340-00 REPLACE 1G18 CABLE w/1000MCM MH696 to MH698 CI-YWO Variance - Contractor Invoice CD00340-00 REPLACE 1G18 CABLE w/1000MCM MH696 to MH698 CI-YWO Variance - Contractor Invoice PH; 48 SALISBURY RD; Electric Service New Residential SC w/CIAC Line Set DL Relocate OH service AP1-YWO Total Cost Less Than 7K DL Relocate OH service AP1-YWO Total Cost Less Than 7K DL; ESO 9A FAIRFIELD AVE; P#1736/REPLACE RECLOSER - UPPER UNIT-**YELLOW TAG** AP2-YWO Total Cost Variance Met - Variance :-30.3396 MIN.:-40 MAX.:40 DL; ESO 9A FAIRFIELD AVE; P#1736/REPLACE RECLOSER - UPPER UNIT-**YELLOW TAG** AP2-YWO Total Cost Variance Met - Variance :-30.3396 MIN.:-40 MAX.:40 RM- CDOT 135-307, Temp Relocate Poles Boston post Rd - DARIEN JE-YWO Variance Job Type Exclusion RM- CDOT 135-307, Temp Relocate Poles Boston post Rd - DARIEN JE-YWO Variance Job Type Exclusion RM- CDOT 135-307, Temp Relocate Poles Boston post Rd - DARIEN JE-YWO Variance Job Type Exclusion RM- CDOT 135-307, Temp Relocate Poles Boston post Rd - DARIEN JE-YWO Variance Job Type Exclusion PH; 0 Shadbush Ln/P#13752/Tree broke pole/Rep 25 kVa & cutout/See TT/Alex M. PH; 0 Shadbush Ln/P#13752/Tree broke pole/Rep 25 kVa & cutout/See TT/Alex M.
  3. Page 3 of 879

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued October 23, 2026 RRU-159 Attachment 5 Page 3 of 879 work_order_number description long_description cost_element_group ferc_account percent PH; 0 Shadbush Ln/P#13752/Tree broke pole/Rep 25 kVa & cutout/See TT/Alex M. 1S620343 PH; 0 Shadbush Ln/P#13752/Tree brok 1S620343 PH; 0 Shadbush Ln/P#13752/Tree brok 1S720189 DL; 425 FAIRFIELD AVE; CUSTOMER CON 1S720491 RL:205 Glenville Rd; Electric Servi 1S720520 DL; 2 SELLECK ST; NEW 3PH PRIMARY R 1S720569 RL:Ettl Ln: Replace poles 79977, 79 1S720569 RL:Ettl Ln: Replace poles 79977, 79 1S720569 RL:Ettl Ln: Replace poles 79977, 79 1S720569 RL:Ettl Ln: Replace poles 79977, 79 1S720980 20120901 20125202 20127301 20141402 20141402 20143516 20143516 22787472 CIR# 22M9 REHAB FROM CIRCUIT PATROL NORWALK 9S - ADD THREE 13.8 KV FEED WEST SIDE 7A - OLD SWITCHGEAR REMOV CANAL 15Q - ADD BULK TRANSFORMER & UNCASVILLE 1Q - BUS REHAB UNCASVILLE 1Q - BUS REHAB Transformer Metering Transformer Metering UCONN VEG MGMT RSRCH REL2 2C420241 (3 or more) - Salisbury-White Hollo 2C420241 (3 or more) - Salisbury-White Hollo 2C420241 (3 or more) - Salisbury-White Hollo 2C420241 (3 or more) - Salisbury-White Hollo Employee Expenses-EE0 107010 0.30447 Employee Expenses-EE0 108030 0.18056 Employee Expenses-EE0 107010 1 Employee Expenses-EE0 107010 1 Employee Expenses-EE0 107010 1 Employee Expenses-EE0 107010 0.52546 Employee Expenses-EE0 108030 0.14063 Employee Expenses-EE0 595000 0.03838 Employee Expenses-EE0 583000 0.29553 Employee Expenses-EE0 Employee Expenses-EE0 Employee Expenses-EE0 Employee Expenses-EE0 Employee Expenses-EE0 Employee Expenses-EE0 Employee Expenses-EE0 Employee Expenses-EE0 Employee Expenses-EE0 107010 107010 108030 107010 107010 108030 108030 107010 107010 1 1 1 1 0.8 0.2 0.04703564 0.95296436 1 Employee Expenses-EE0 583000 0.04949 Employee Expenses-EE0 108030 0.26345 Employee Expenses-EE0 107010 0.66256 Employee Expenses-EE0 595000 0.0198 Employee Expenses-EE0 587000 0.0047 Employee Expenses-EE0 595000 0.01651 Employee Expenses-EE0 107010 0.89876 Employee Expenses-EE0 583000 0.08473 Employee Expenses-EE0 593000 0.11874 Employee Expenses-EE0 107010 0.43712 Employee Expenses-EE0 583000 0.44414 Employee Expenses-EE0 593000 1 Employee Expenses-EE0 595000 0.02223 Employee Expenses-EE0 593000 0.2795 Employee Expenses-EE0 107010 0.62855 Employee Expenses-EE0 583000 0.06972 Employee Expenses-EE0 593000 0.03571 Employee Expenses-EE0 107010 0.64617 Employee Expenses-EE0 595000 0.00811 Employee Expenses-EE0 594000 0.001 Employee Expenses-EE0 108030 0.2599 Employee Expenses-EE0 583000 0.04911 Employee Expenses-EE0 583000 0.03844 Employee Expenses-EE0 595000 0.02192 Employee Expenses-EE0 584000 0.09788 Employee Expenses-EE0 107010 0.60251 Employee Expenses-EE0 108030 0.23925 Employee Expenses-EE0 593000 0.64103 Employee Expenses-EE0 107010 0.21964 Employee Expenses-EE0 108030 0.13933 Employee Expenses-EE0 107010 0.80555 Employee Expenses-EE0 108030 0.19445 Employee Expenses-EE0 108030 0.19445 Employee Expenses-EE0 107010 0.80555 Employee Expenses-EE0 595000 0.019 Employee Expenses-EE0 108030 0.13552 Employee Expenses-EE0 107010 0.73558 Employee Expenses-EE0 584000 0.1099 Employee Expenses-EE0 583000 0.01594 Employee Expenses-EE0 593000 0.00189 Employee Expenses-EE0 108030 0.30022 Employee Expenses-EE0 595000 0.0405 Employee Expenses-EE0 594000 0.08194 Employee Expenses-EE0 107010 0.53659 Employee Expenses-EE0 584000 0.02292 Employee Expenses-EE0 107010 1 Employee Expenses-EE0 584000 0.10506 Employee Expenses-EE0 108030 0.02228 Employee Expenses-EE0 595000 0.09216 Employee Expenses-EE0 107010 0.7805 Employee Expenses-EE0 593000 0.0935 Employee Expenses-EE0 107010 0.40417 Employee Expenses-EE0 108030 0.28021 Employee Expenses-EE0 595000 0.03721 Employee Expenses-EE0 583000 0.18491 Employee Expenses-EE0 583000 0.1084 Employee Expenses-EE0 107010 0.57965 Employee Expenses-EE0 594000 0.23998 Employee Expenses-EE0 595000 0.07197 Employee Expenses-EE0 108030 0.31060606 Employee Expenses-EE0 107010 0.68939394 Employee Expenses-EE0 594000 0.00641 Employee Expenses-EE0 107010 0.80752 Employee Expenses-EE0 108030 0.18607 Employee Expenses-EE0 108030 0.17018 Employee Expenses-EE0 593000 0.19696 Employee Expenses-EE0 595000 0.02509 Employee Expenses-EE0 107010 0.4349 Employee Expenses-EE0 583000 0.14384 Employee Expenses-EE0 594000 0.02903 Employee Expenses-EE0 108030 0.22696 Employee Expenses-EE0 593000 0.06169 Employee Expenses-EE0 583000 0.18904 Employee Expenses-EE0 107010 0.52231 Employee Expenses-EE0 108030 0.22651 Employee Expenses-EE0 107010 0.4698 Employee Expenses-EE0 593000 0.2262 Employee Expenses-EE0 595000 0.07749 Employee Expenses-EE0 593000 1 Employee Expenses-EE0 107010 0.42709 Employee Expenses-EE0 108030 0.21523 Employee Expenses-EE0 593000 0.35768 Employee Expenses-EE0 108030 0.22167 Employee Expenses-EE0 107010 0.77833 Employee Expenses-EE0 583000 0.15014 Employee Expenses-EE0 108030 0.27785 Employee Expenses-EE0 107010 0.54754 Employee Expenses-EE0 595000 0.02447 Employee Expenses-EE0 107010 1 Employee Expenses-EE0 593000 0.23406 Employee Expenses-EE0 107010 0.52116 Employee Expenses-EE0 108030 0.24478 PH; 0 Shadbush Ln/P#13752/Tree broke pole/Rep 25 kVa & cutout/See TT/Alex M. DL; 425 FAIRFIELD AVE; CUSTOMER CONNECTIONS IN NEW PAD XFMR & METER WORK AP1-YWO Total Cost Less Than 7K RL:205 Glenville Rd; Electric Service New Residential Overhead AP1-YWO Total Cost Less Than 7K DL; 2 SELLECK ST; NEW 3PH PRIMARY RISER TO NEW PAD XFMR - BLT NL-YWO Variance - NU Construction Labor RL:Ettl Ln: Replace poles 79977, 79976 Install 3 spans 1/0 tpx remove open wire AP2-YWO Total Cost Variance Met - Variance :21.7787 MIN.:-50 MAX.:50 RL:Ettl Ln: Replace poles 79977, 79976 Install 3 spans 1/0 tpx remove open wire AP2-YWO Total Cost Variance Met - Variance :21.7787 MIN.:-50 MAX.:50 RL:Ettl Ln: Replace poles 79977, 79976 Install 3 spans 1/0 tpx remove open wire AP2-YWO Total Cost Variance Met - Variance :21.7787 MIN.:-50 MAX.:50 RL:Ettl Ln: Replace poles 79977, 79976 Install 3 spans 1/0 tpx remove open wire AP2-YWO Total Cost Variance Met - Variance :21.7787 MIN.:-50 MAX.:50 CIR# 22M9 REHAB FROM CIRCUIT PATROL (CHARGE ANIMAL GUARDS TO 17XRELIN) AP2-YWO Total Cost Variance Met - Variance :2.5791 MIN.:-50 MAX.:50 POSITIONS BY EXTENDING THE EXISTING SWITCHGEAR A6/B6 BUS REPLACE THE WESTSIDE 7A SWITCHGEAR __________________________________________RJC ADD A SECOND BULK POWER TRANSFORMER & A SIX- BAY PCE TO PROVIDE FOUR NEW 23 KV FEEDER POSITIONS. A 60 MVA TRANSFORMER IS PROPOSED SINCE LOAD IN THIS AREA IS EXPECTED TO GROW. REPLACEMENT OF THE 1Q-2X1-4 HIGHSIDE TRANS- FORMER MOD ___________________________________________KA REPLACEMENT OF THE 1Q-2X1-4 HIGHSIDE TRANS- FORMER MOD ___________________________________________KA Bokum 15L - Install multifunction metering on bulk transformer positions in conjunction with Circuit Breaker Automation. Bokum 15L - Install multifunction metering on bulk transformer positions in conjunction with Circuit Breaker Automation. RELEASE 3 OF PO - UCONN selective hardening (3 or more) - Salisbury-White Hollow Rd-4L09 Rehab-Rec (10 poles,site del) KEEP (3 or more) - Salisbury-White Hollow Rd-4L09 Rehab-Rec (10 poles,site del) KEEP (3 or more) - Salisbury-White Hollow Rd-4L09 Rehab-Rec (10 poles,site del) KEEP (3 or more) - Salisbury-White Hollow Rd-4L09 Rehab-Rec (10 poles,site del) KEEP (3 or more) - Salisbury-White Hollow Rd-4L09 Rehab-Rec (10 poles,site del) KEEP 2C420241 (3 or more) - Salisbury-White Hollo 2C520200 Salisbury, 128 Rocky Ln -- ins pri Salisbury, 128 Rocky Ln -- ins pri ple line then db to pedestal Salisbury, 128 Rocky Ln -- ins pri ple line then db to pedestal 2C520200 Salisbury, 128 Rocky Ln -- ins pri 2C520200 Salisbury, 128 Rocky Ln -- ins pri Salisbury, 128 Rocky Ln -- ins pri ple line then db to pedestal 2L320454 Colebrook--Rockwell Rd. (81) 7510 2L320454 Colebrook--Rockwell Rd. (81) 7510 2L320454 Colebrook--Rockwell Rd. (81) 7510 2L420085 JD 452306 37J1 PHASE BALANCE PART 2 2L420383 DSEQ 19U1 INSTALL RR IN SUBSTATION- 2L420383 DSEQ 19U1 INSTALL RR IN SUBSTATION- 2L420383 DSEQ 19U1 INSTALL RR IN SUBSTATION- 2L420383 DSEQ 19U1 INSTALL RR IN SUBSTATION- 2L520052 New Htfd, Gillette Rd, - (3 or mor 2L520052 New Htfd, Gillette Rd, - (3 or mor 2L520052 New Htfd, Gillette Rd, - (3 or mor 2L520052 New Htfd, Gillette Rd, - (3 or mor 2L520052 New Htfd, Gillette Rd, - (3 or mor 2L520052 New Htfd, Gillette Rd, - (3 or mor 2L520353 BETHLEHEM,76 & 78 CRANE HOLLOW RD// 2L520353 BETHLEHEM,76 & 78 CRANE HOLLOW RD// 2L520353 BETHLEHEM,76 & 78 CRANE HOLLOW RD// 2L520353 BETHLEHEM,76 & 78 CRANE HOLLOW RD// 2L520353 BETHLEHEM,76 & 78 CRANE HOLLOW RD// 2L520390 PLYMOUTH,GREYSTONE RD/SHIFT RED TAG 2L520390 PLYMOUTH,GREYSTONE RD/SHIFT RED TAG Colebrook--Rockwell Rd. (81) 7510 Repl x-fmr, run span secd APPT: AP1-YWO Total Cost Less Than 7K Colebrook--Rockwell Rd. (81) 7510 Repl x-fmr, run span secd APPT: AP1-YWO Total Cost Less Than 7K Colebrook--Rockwell Rd. (81) 7510 Repl x-fmr, run span secd APPT: AP1-YWO Total Cost Less Than 7K JD 452306 37J1 PHASE BALANCE PART 2 OF 2- SEG 5 AP1-YWO Total Cost Less Than 7K DSEQ 19U1 INSTALL RR IN SUBSTATION- SEG 1 AP2-YWO Total Cost Variance Met - Variance :-26.4276 MIN.:-30 MAX.:30 DSEQ 19U1 INSTALL RR IN SUBSTATION- SEG 1 AP2-YWO Total Cost Variance Met - Variance :-26.4276 MIN.:-30 MAX.:30 DSEQ 19U1 INSTALL RR IN SUBSTATION- SEG 1 AP2-YWO Total Cost Variance Met - Variance :-26.4276 MIN.:-30 MAX.:30 DSEQ 19U1 INSTALL RR IN SUBSTATION- SEG 1 AP2-YWO Total Cost Variance Met - Variance :-26.4276 MIN.:-30 MAX.:30 New Htfd, Gillette Rd, - (3 or more) 5R1 - (CUST CPLT) See Skt.- Recond w/ TW New Htfd, Gillette Rd, - (3 or more) 5R1 - (CUST CPLT) See Skt.- Recond w/ TW New Htfd, Gillette Rd, - (3 or more) 5R1 - (CUST CPLT) See Skt.- Recond w/ TW New Htfd, Gillette Rd, - (3 or more) 5R1 - (CUST CPLT) See Skt.- Recond w/ TW New Htfd, Gillette Rd, - (3 or more) 5R1 - (CUST CPLT) See Skt.- Recond w/ TW New Htfd, Gillette Rd, - (3 or more) 5R1 - (CUST CPLT) See Skt.- Recond w/ TW BETHLEHEM,76 & 78 CRANE HOLLOW RD//EXISTING SVC CHANGES & UPGRADES// OH TO DB AP2-YWO Total Cost Variance Met - Variance :35.2001 MIN.:-50 MAX.:50 BETHLEHEM,76 & 78 CRANE HOLLOW RD//EXISTING SVC CHANGES & UPGRADES// OH TO DB AP2-YWO Total Cost Variance Met - Variance :35.2001 MIN.:-50 MAX.:50 BETHLEHEM,76 & 78 CRANE HOLLOW RD//EXISTING SVC CHANGES & UPGRADES// OH TO DB AP2-YWO Total Cost Variance Met - Variance :35.2001 MIN.:-50 MAX.:50 BETHLEHEM,76 & 78 CRANE HOLLOW RD//EXISTING SVC CHANGES & UPGRADES// OH TO DB AP2-YWO Total Cost Variance Met - Variance :35.2001 MIN.:-50 MAX.:50 BETHLEHEM,76 & 78 CRANE HOLLOW RD//EXISTING SVC CHANGES & UPGRADES// OH TO DB AP2-YWO Total Cost Variance Met - Variance :35.2001 MIN.:-50 MAX.:50 PLYMOUTH,GREYSTONE RD/SHIFT RED TAGGED PHONE POLES//P#322 & P#319//POLES ARE SET PLYMOUTH,GREYSTONE RD/SHIFT RED TAGGED PHONE POLES//P#322 & P#319//POLES ARE SET PLYMOUTH,GREYSTONE RD/SHIFT RED TAGGED PHONE POLES//P#322 & P#319//POLES ARE SET 2L520390 PLYMOUTH,GREYSTONE RD/SHIFT RED TAG 2L520432 WINCHESTER POLE 8172 70 MH PDL 435 WINCHESTER POLE 8172 70 MH PDL 435631 - COMPLETED 3/18/16 HAR WINCHESTER POLE 8172 70 MH PDL 435631 - COMPLETED 3/18/16 HAR 2L520432 WINCHESTER POLE 8172 70 MH PDL 435 2L520433 WINCHESTER POLE 8160 70 MH PDL 435 WINCHESTER POLE 8160 70 MH PDL 435631 - COMPLETED 3/18/16 HAR WINCHESTER POLE 8160 70 MH PDL 435631 - COMPLETED 3/18/16 HAR 2L520433 WINCHESTER POLE 8160 70 MH PDL 435 2L620302 cornwall, dibble hill rmv oh R.O. 2L620302 cornwall, dibble hill rmv oh R.O. 2L620302 cornwall, dibble hill rmv oh R.O. 2L620302 cornwall, dibble hill rmv oh R.O. 2L620485 WARREN,39 BLISS RD//REMOVE POLE LIN 2L620485 WARREN,39 BLISS RD//REMOVE POLE LIN 2L620485 WARREN,39 BLISS RD//REMOVE POLE LIN 2L620485 WARREN,39 BLISS RD//REMOVE POLE LIN 2L620485 WARREN,39 BLISS RD//REMOVE POLE LIN 2L620485 WARREN,39 BLISS RD//REMOVE POLE LIN 2L620485 WARREN,39 BLISS RD//REMOVE POLE LIN 2L620661 Replaced a new Kyle Recloser @ Pole 2L620873 LITCHFIELD,12 NORFOLK RD// INSTALL 2L620873 LITCHFIELD,12 NORFOLK RD// INSTALL 2L620873 LITCHFIELD,12 NORFOLK RD// INSTALL 2L620873 LITCHFIELD,12 NORFOLK RD// INSTALL 2L720400 New Hartford--Steele Rd. (120) 1189 2L720400 New Hartford--Steele Rd. (120) 1189 2L720400 New Hartford--Steele Rd. (120) 1189 2L720400 New Hartford--Steele Rd. (120) 1189 2L720400 New Hartford--Steele Rd. (120) 1189 2L720416 Canton--Collins Rd. (15) 2274 inst 2L720416 Canton--Collins Rd. (15) 2274 inst 2L720416 Canton--Collins Rd. (15) 2274 inst 2L720416 Canton--Collins Rd. (15) 2274 inst 2M220046 Jpt-Boardman St Brstl P4525 & P4526 2M220046 Jpt-Boardman St Brstl P4525 & P4526 2M220215 103626-01 W Main Street 3A New Bri 2M220215 103626-01 W Main Street 3A New Bri 2M220215 103626-01 W Main Street 3A New Bri 2M322576 Elec Proj Highway Relocation Reimbu 2M322576 Elec Proj Highway Relocation Reimbu 2M322576 Elec Proj Highway Relocation Reimbu 2M322576 Elec Proj Highway Relocation Reimbu 2M322576 Elec Proj Highway Relocation Reimbu 2M322576 Elec Proj Highway Relocation Reimbu 2M322577 CDOT 17-186 - RTE 6 Bristol Road Wi 2M322577 CDOT 17-186 - RTE 6 Bristol Road Wi 2M322577 CDOT 17-186 - RTE 6 Bristol Road Wi 2M322577 CDOT 17-186 - RTE 6 Bristol Road Wi 2M322578 CDOT 17-186 - RTE 6 Bristol Road Wi 2M322578 CDOT 17-186 - RTE 6 Bristol Road Wi 2M322578 CDOT 17-186 - RTE 6 Bristol Road Wi 2M322578 CDOT 17-186 - RTE 6 Bristol Road Wi 2M420571 Corrective Maintenance GOAB Operati 2M421934 Jpt-Granger Rd Brstl P7085 & P6746 2M421934 Jpt-Granger Rd Brstl P7085 & P6746 2M421934 Jpt-Granger Rd Brstl P7085 & P6746 2M423451 RTM-93 Cherry Hill Rd, Nwt. Remove cornwall, dibble hill rmv oh R.O.W ins db up driveway to upgraded svc AP2-YWO Total Cost Variance Met - Variance :23.2749 MIN.:-50 MAX.:50 cornwall, dibble hill rmv oh R.O.W ins db up driveway to upgraded svc AP2-YWO Total Cost Variance Met - Variance :23.2749 MIN.:-50 MAX.:50 cornwall, dibble hill rmv oh R.O.W ins db up driveway to upgraded svc AP2-YWO Total Cost Variance Met - Variance :23.2749 MIN.:-50 MAX.:50 cornwall, dibble hill rmv oh R.O.W ins db up driveway to upgraded svc AP2-YWO Total Cost Variance Met - Variance :23.2749 MIN.:-50 MAX.:50 WARREN,39 BLISS RD//REMOVE POLE LINE & INSTALL DB PRIMARY, PAD &SWITCH// AP2-YWO Total Cost Variance Met - Variance :-3.7348 MIN.:-50 MAX.:50 WARREN,39 BLISS RD//REMOVE POLE LINE & INSTALL DB PRIMARY, PAD &SWITCH// AP2-YWO Total Cost Variance Met - Variance :-3.7348 MIN.:-50 MAX.:50 WARREN,39 BLISS RD//REMOVE POLE LINE & INSTALL DB PRIMARY, PAD &SWITCH// AP2-YWO Total Cost Variance Met - Variance :-3.7348 MIN.:-50 MAX.:50 WARREN,39 BLISS RD//REMOVE POLE LINE & INSTALL DB PRIMARY, PAD &SWITCH// AP2-YWO Total Cost Variance Met - Variance :-3.7348 MIN.:-50 MAX.:50 WARREN,39 BLISS RD//REMOVE POLE LINE & INSTALL DB PRIMARY, PAD &SWITCH// AP2-YWO Total Cost Variance Met - Variance :-3.7348 MIN.:-50 MAX.:50 WARREN,39 BLISS RD//REMOVE POLE LINE & INSTALL DB PRIMARY, PAD &SWITCH// AP2-YWO Total Cost Variance Met - Variance :-3.7348 MIN.:-50 MAX.:50 WARREN,39 BLISS RD//REMOVE POLE LINE & INSTALL DB PRIMARY, PAD &SWITCH// AP2-YWO Total Cost Variance Met - Variance :-3.7348 MIN.:-50 MAX.:50 Replaced a new Kyle Recloser @ Pole 4676 / work complete AP3-YWO Resource Variance Met- Labor 12 <= 32 OR 28.17 <= 30 And Contractor $0 <= 2000 LITCHFIELD,12 NORFOLK RD// INSTALL NEW 300 KVA DB XFMRFOR NEW MUSIC CENTER// AP3-YWO Resource Variance Met- Labor 11 <= 32 OR 27.01 <= 30 And Contractor $0 <= 2000 LITCHFIELD,12 NORFOLK RD// INSTALL NEW 300 KVA DB XFMRFOR NEW MUSIC CENTER// AP3-YWO Resource Variance Met- Labor 11 <= 32 OR 27.01 <= 30 And Contractor $0 <= 2000 LITCHFIELD,12 NORFOLK RD// INSTALL NEW 300 KVA DB XFMRFOR NEW MUSIC CENTER// AP3-YWO Resource Variance Met- Labor 11 <= 32 OR 27.01 <= 30 And Contractor $0 <= 2000 LITCHFIELD,12 NORFOLK RD// INSTALL NEW 300 KVA DB XFMRFOR NEW MUSIC CENTER// AP3-YWO Resource Variance Met- Labor 11 <= 32 OR 27.01 <= 30 And Contractor $0 <= 2000 New Hartford--Steele Rd. (120) 1189 Repl pole & inst new oh/ug svc. Rem extg AP2-YWO Total Cost Variance Met - Variance :-13.9725 MIN.:-40 MAX.:40 New Hartford--Steele Rd. (120) 1189 Repl pole & inst new oh/ug svc. Rem extg AP2-YWO Total Cost Variance Met - Variance :-13.9725 MIN.:-40 MAX.:40 New Hartford--Steele Rd. (120) 1189 Repl pole & inst new oh/ug svc. Rem extg AP2-YWO Total Cost Variance Met - Variance :-13.9725 MIN.:-40 MAX.:40 New Hartford--Steele Rd. (120) 1189 Repl pole & inst new oh/ug svc. Rem extg AP2-YWO Total Cost Variance Met - Variance :-13.9725 MIN.:-40 MAX.:40 New Hartford--Steele Rd. (120) 1189 Repl pole & inst new oh/ug svc. Rem extg AP2-YWO Total Cost Variance Met - Variance :-13.9725 MIN.:-40 MAX.:40 Canton--Collins Rd. (15) 2274 inst 25kva xfmr, inst xover pole, secd riser & svc AP1-YWO Total Cost Less Than 7K Canton--Collins Rd. (15) 2274 inst 25kva xfmr, inst xover pole, secd riser & svc AP1-YWO Total Cost Less Than 7K Canton--Collins Rd. (15) 2274 inst 25kva xfmr, inst xover pole, secd riser & svc AP1-YWO Total Cost Less Than 7K Canton--Collins Rd. (15) 2274 inst 25kva xfmr, inst xover pole, secd riser & svc AP1-YWO Total Cost Less Than 7K Jpt-Boardman St Brstl P4525 & P4526 - Replace with 40Ftrs - Shift Facilities Jpt-Boardman St Brstl P4525 & P4526 - Replace with 40Ftrs - Shift Facilities 103626-01 W Main Street 3A New Britain Secondary Replacement CL-YWO Variance - Contractor Labor 103626-01 W Main Street 3A New Britain Secondary Replacement CL-YWO Variance - Contractor Labor 103626-01 W Main Street 3A New Britain Secondary Replacement CL-YWO Variance - Contractor Labor Elec Proj Highway Relocation Reimbursable Specific DESG (MIBPROJ) JE-YWO Variance Job Type Exclusion Elec Proj Highway Relocation Reimbursable Specific DESG (MIBPROJ) JE-YWO Variance Job Type Exclusion Elec Proj Highway Relocation Reimbursable Specific DESG (MIBPROJ) JE-YWO Variance Job Type Exclusion Elec Proj Highway Relocation Reimbursable Specific DESG (MIBPROJ) JE-YWO Variance Job Type Exclusion Elec Proj Highway Relocation Reimbursable Specific DESG (MIBPROJ) JE-YWO Variance Job Type Exclusion Elec Proj Highway Relocation Reimbursable Specific DESG (MIBPROJ) JE-YWO Variance Job Type Exclusion CDOT 17-186 - RTE 6 Bristol Road Widening - OH 3 of 6 - Poles 15691 to 15809(TR) JE-YWO Variance Job Type Exclusion CDOT 17-186 - RTE 6 Bristol Road Widening - OH 3 of 6 - Poles 15691 to 15809(TR) JE-YWO Variance Job Type Exclusion CDOT 17-186 - RTE 6 Bristol Road Widening - OH 3 of 6 - Poles 15691 to 15809(TR) JE-YWO Variance Job Type Exclusion CDOT 17-186 - RTE 6 Bristol Road Widening - OH 3 of 6 - Poles 15691 to 15809(TR) JE-YWO Variance Job Type Exclusion CDOT 17-186 - RTE 6 Bristol Road Widening - OH 4 of 6 - Poles 15827 to Camp St JE-YWO Variance Job Type Exclusion CDOT 17-186 - RTE 6 Bristol Road Widening - OH 4 of 6 - Poles 15827 to Camp St JE-YWO Variance Job Type Exclusion CDOT 17-186 - RTE 6 Bristol Road Widening - OH 4 of 6 - Poles 15827 to Camp St JE-YWO Variance Job Type Exclusion CDOT 17-186 - RTE 6 Bristol Road Widening - OH 4 of 6 - Poles 15827 to Camp St JE-YWO Variance Job Type Exclusion Corrective Maintenance GOAB Operational - See Comments :2932 Circuit#: 12F49 AP1-YWO Total Cost Less Than 7K Jpt-Granger Rd Brstl P7085 & P6746 - Rplc Poles Shift 1PH Primary Jpt-Granger Rd Brstl P7085 & P6746 - Rplc Poles Shift 1PH Primary Jpt-Granger Rd Brstl P7085 & P6746 - Rplc Poles Shift 1PH Primary RTM-93 Cherry Hill Rd, Nwt. Remove OH Ariel Trespass Over Driveway Feeding #99 RTM-93 Cherry Hill Rd, Nwt. Remove OH Ariel Trespass Over Driveway Feeding #99 2M423451 RTM-93 Cherry Hill Rd, Nwt. Remove 2M423467 CDOT 17-186 - RTE 6 Bristol Road Wi 2M423467 CDOT 17-186 - RTE 6 Bristol Road Wi 2M423467 CDOT 17-186 - RTE 6 Bristol Road Wi 2M423467 CDOT 17-186 - RTE 6 Bristol Road Wi 2M520173 Jpt-Steeplechase Dr SOG - Lighting 2M520845 CDOT 17-186 - RTE 6 Bristol Road Wi 2M520845 CDOT 17-186 - RTE 6 Bristol Road Wi 2M520845 CDOT 17-186 - RTE 6 Bristol Road Wi CDOT 17-186 - RTE 6 Bristol Road Widening - OH 2 of 6 - Pole 2299 to Pole 15691 JE-YWO Variance Job Type Exclusion CDOT 17-186 - RTE 6 Bristol Road Widening - OH 2 of 6 - Pole 2299 to Pole 15691 JE-YWO Variance Job Type Exclusion CDOT 17-186 - RTE 6 Bristol Road Widening - OH 2 of 6 - Pole 2299 to Pole 15691 JE-YWO Variance Job Type Exclusion CDOT 17-186 - RTE 6 Bristol Road Widening - OH 2 of 6 - Pole 2299 to Pole 15691 JE-YWO Variance Job Type Exclusion Jpt-Steeplechase Dr SOG - Lighting - Muni - Public Roadway - COMP 8-4 CCC AP2-YWO Total Cost Variance Met - Variance :38.665 MIN.:-50 MAX.:50 CDOT 17-186 - RTE 6 Bristol Road Widening - Additional Pole Relocations JE-YWO Variance Job Type Exclusion CDOT 17-186 - RTE 6 Bristol Road Widening - Additional Pole Relocations JE-YWO Variance Job Type Exclusion CDOT 17-186 - RTE 6 Bristol Road Widening - Additional Pole Relocations JE-YWO Variance Job Type Exclusion
  4. Page 4 of 879

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued October 23, 2026 RRU-159 Attachment 5 Page 4 of 879 work_order_number description 2M521161 CDOT 17-186 - CD00045 - Temporary L 2M521161 CDOT 17-186 - CD00045 - Temporary L 2M521161 2M521278 2M521278 2M521278 2M521278 2M521278 CDOT 17-186 - CD00045 - Temporary L *(50):(Asp) WC-136 Meriden Ave,Sog. *(50):(Asp) WC-136 Meriden Ave,Sog. *(50):(Asp) WC-136 Meriden Ave,Sog. *(50):(Asp) WC-136 Meriden Ave,Sog. *(50):(Asp) WC-136 Meriden Ave,Sog. 2M522454 CDOT 110-132 Allentown Rd reconstru 2M522454 CDOT 110-132 Allentown Rd reconstru 2M522454 CDOT 110-132 Allentown Rd reconstru 2M522895 CD00323-01 Elm St Secondary Recondu 2M522895 CD00323-01 Elm St Secondary Recondu 2M522896 CD00323-01 Chestnut St Secondary Re 2M522896 CD00323-01 Chestnut St Secondary Re 2M522896 CD00323-01 Chestnut St Secondary Re 2M620326 WC/JJH-49 Depaolo Dr, Southington. 2M620326 WC/JJH-49 Depaolo Dr, Southington. 2M620326 WC/JJH-49 Depaolo Dr, Southington. 2M620326 WC/JJH-49 Depaolo Dr, Southington. 2M620326 WC/JJH-49 Depaolo Dr, Southington. 2M620842 DM 1483 Cheshire St CHES Change ove 2M620842 DM 1483 Cheshire St CHES Change ove 2M620842 DM 1483 Cheshire St CHES Change ove 2M621361 PN 492601 13F63 CDOT 151-273- RELOC 2M621361 PN 492601 13F63 CDOT 151-273- RELOC 2M621361 PN 492601 13F63 CDOT 151-273- RELOC 2M621361 PN 492601 13F63 CDOT 151-273- RELOC 2M621550 RTM-Lot 930 Division St, Ber. New C 2M621550 RTM-Lot 930 Division St, Ber. New C 2M621550 RTM-Lot 930 Division St, Ber. New C 2M621645 WC-Norton St Sog 9A car vs pole 881 2M621645 WC-Norton St Sog 9A car vs pole 881 2M621645 WC-Norton St Sog 9A car vs pole 881 2M621699 (DF) FTR8658-35-40',(R/I)Spacer Sma 2M621699 (DF) FTR8658-35-40',(R/I)Spacer Sma 2M621699 (DF) FTR8658-35-40',(R/I)Spacer Sma 2M621871 REPLACE YELLOW TAGGED RECLOSER (Y-1 2M621871 REPLACE YELLOW TAGGED RECLOSER (Y-1 2M621872 EJC 721 Russell Rd Wethersfield P#3 2M621872 EJC 721 Russell Rd Wethersfield P#3 2M621872 EJC 721 Russell Rd Wethersfield P#3 2M621872 EJC 721 Russell Rd Wethersfield P#3 2M621899 (DF) Ple 9634-(R/I) 2 ph Tang w dn 2M621899 (DF) Ple 9634-(R/I) 2 ph Tang w dn 2M621899 (DF) Ple 9634-(R/I) 2 ph Tang w dn 2M621944 DM Four Rod Rd BER Install covering 2M622268 CDOT 17-186 - RTE 6 Bristol Road Wi 2M622446 JC/35 OLD FAIRWOOD RD. BETHANY/ REM 2M622446 JC/35 OLD FAIRWOOD RD. BETHANY/ REM 2M622446 JC/35 OLD FAIRWOOD RD. BETHANY/ REM 2M622490 AMM 172 SCOTT SWAMP RD,FARMINGTON. 2M622490 AMM 172 SCOTT SWAMP RD,FARMINGTON. 2M622617 EJC 1897 Stanley St, NB P#103 Ftr R 2M622617 EJC 1897 Stanley St, NB P#103 Ftr R 2M622617 EJC 1897 Stanley St, NB P#103 Ftr R 2M622771 JC/39 FENN RD MIDDLEBURY / POLE 174 2M622771 JC/39 FENN RD MIDDLEBURY / POLE 174 2M622771 JC/39 FENN RD MIDDLEBURY / POLE 174 2M623045 RTM-Meetinghouse Village Meriden 6 2M623045 RTM-Meetinghouse Village Meriden 6 2M623045 RTM-Meetinghouse Village Meriden 6 2M623119 EJC 489 Columbus Blvd, NB Install P 2M623119 EJC 489 Columbus Blvd, NB Install P 2M623119 EJC 489 Columbus Blvd, NB Install P 2M720275 WC-1/22 ESO/AWC 48 TODD RD WOLCOTT 2M720275 WC-1/22 ESO/AWC 48 TODD RD WOLCOTT 2M720275 WC-1/22 ESO/AWC 48 TODD RD WOLCOTT 2M720353 JC/Municipal Light Fault Locate and 2M720353 JC/Municipal Light Fault Locate and 2M720580 RTM-839 Murdock Ave, Mer. Existing 2M720580 RTM-839 Murdock Ave, Mer. Existing 2M720587 WC/1/14 - ESO 115 Windy Dr Wtby 9A 2M720587 WC/1/14 - ESO 115 Windy Dr Wtby 9A 2M720587 WC/1/14 - ESO 115 Windy Dr Wtby 9A 2M720604 (DF) WTRBRY - XX-11H62 REHAB - Vari 2M720625 DM 1145 CHESHIRE ST CHESHIRE 9A P#2 2M720625 DM 1145 CHESHIRE ST CHESHIRE 9A P#2 2M720625 DM 1145 CHESHIRE ST CHESHIRE 9A P#2 2M720747 WC-87 S Main St,Naugatuck. Car v Po 2M720747 WC-87 S Main St,Naugatuck. Car v Po 2M720747 WC-87 S Main St,Naugatuck. Car v Po 2M720798 WC-498 Pine St, Wtrbry. Ca v pole 2 2M720798 WC-498 Pine St, Wtrbry. Ca v pole 2 2M720798 WC-498 Pine St, Wtrbry. Ca v pole 2 2M720799 JPT Tomlinson Ave Plainville Shelte 2M720799 JPT Tomlinson Ave Plainville Shelte 2M720850 STRAITSVILLE RD, PROSPECT. POLES 42 2M720850 STRAITSVILLE RD, PROSPECT. POLES 42 2M720850 STRAITSVILLE RD, PROSPECT. POLES 42 2M720850 STRAITSVILLE RD, PROSPECT. POLES 42 2M720850 STRAITSVILLE RD, PROSPECT. POLES 42 2M720868 DM MILLER RD, BETHANY. POLE 1820 2M720868 DM MILLER RD, BETHANY. POLE 1820 2M720868 DM MILLER RD, BETHANY. POLE 1820 2M720868 DM MILLER RD, BETHANY. POLE 1820 2M721152 WC-2/25/17 ESO 221 DIANA RD SOUTHIN 2M721152 WC-2/25/17 ESO 221 DIANA RD SOUTHIN 2M721152 WC-2/25/17 ESO 221 DIANA RD SOUTHIN 2M721190 DM 811 Queen St SOG ALDI's INST 3PH 2M721190 DM 811 Queen St SOG ALDI's INST 3PH 2M721206 AMM 788 FARMINGTON AVE,FARMINGTON. 2M721206 AMM 788 FARMINGTON AVE,FARMINGTON. 2M721206 AMM 788 FARMINGTON AVE,FARMINGTON. 2M721206 AMM 788 FARMINGTON AVE,FARMINGTON. 2M721206 AMM 788 FARMINGTON AVE,FARMINGTON. 2M721388 PT Conv# 498791-MakeReadyNonReimb-F 2M721388 PT Conv# 498791-MakeReadyNonReimb-F 2M721388 PT Conv# 498791-MakeReadyNonReimb-F long_description CDOT 17-186 - CD00045 - Temporary Line Relocation, RTE 6 near Stafford Ave JE-YWO Variance Job Type Exclusion CDOT 17-186 - CD00045 - Temporary Line Relocation, RTE 6 near Stafford Ave JE-YWO Variance Job Type Exclusion CDOT 17-186 - CD00045 - Temporary Line Relocation, RTE 6 near Stafford Ave JE-YWO Variance Job Type Exclusion CDOT 110-132 Allentown Rd reconstruction, Plymouth AP2-YWO Total Cost Variance Met - Variance :-26.3616 MIN.:-50 MAX.:50 CDOT 110-132 Allentown Rd reconstruction, Plymouth AP2-YWO Total Cost Variance Met - Variance :-26.3616 MIN.:-50 MAX.:50 CDOT 110-132 Allentown Rd reconstruction, Plymouth AP2-YWO Total Cost Variance Met - Variance :-26.3616 MIN.:-50 MAX.:50 CD00323-01 Elm St Secondary Reconductoring AP2-YWO Total Cost Variance Met - Variance :13.8355 MIN.:-20 MAX.:20 CD00323-01 Elm St Secondary Reconductoring AP2-YWO Total Cost Variance Met - Variance :13.8355 MIN.:-20 MAX.:20 CD00323-01 Chestnut St Secondary Reconductoring CL-YWO Variance - Contractor Labor CD00323-01 Chestnut St Secondary Reconductoring CL-YWO Variance - Contractor Labor CD00323-01 Chestnut St Secondary Reconductoring CL-YWO Variance - Contractor Labor WC/JJH-49 Depaolo Dr, Southington. CO-GEN INTERCONNECT CI-YWO Variance - Contractor Invoice WC/JJH-49 Depaolo Dr, Southington. CO-GEN INTERCONNECT CI-YWO Variance - Contractor Invoice WC/JJH-49 Depaolo Dr, Southington. CO-GEN INTERCONNECT CI-YWO Variance - Contractor Invoice WC/JJH-49 Depaolo Dr, Southington. CO-GEN INTERCONNECT CI-YWO Variance - Contractor Invoice WC/JJH-49 Depaolo Dr, Southington. CO-GEN INTERCONNECT CI-YWO Variance - Contractor Invoice DM 1483 Cheshire St CHES Change over FTR P#3731 CONV#380812 AP1-YWO Total Cost Less Than 7K DM 1483 Cheshire St CHES Change over FTR P#3731 CONV#380812 AP1-YWO Total Cost Less Than 7K DM 1483 Cheshire St CHES Change over FTR P#3731 CONV#380812 AP1-YWO Total Cost Less Than 7K PN 492601 13F63 CDOT 151-273- RELOCATE TEMP OH LINE-SEG 4 - OOS#5 JE-YWO Variance Job Type Exclusion PN 492601 13F63 CDOT 151-273- RELOCATE TEMP OH LINE-SEG 4 - OOS#5 JE-YWO Variance Job Type Exclusion PN 492601 13F63 CDOT 151-273- RELOCATE TEMP OH LINE-SEG 4 - OOS#5 JE-YWO Variance Job Type Exclusion PN 492601 13F63 CDOT 151-273- RELOCATE TEMP OH LINE-SEG 4 - OOS#5 JE-YWO Variance Job Type Exclusion RTM-Lot 930 Division St, Ber. New Commercial 3PH OH Temp 200A 120/208 M/L-C AP1-YWO Total Cost Less Than 7K RTM-Lot 930 Division St, Ber. New Commercial 3PH OH Temp 200A 120/208 M/L-C AP1-YWO Total Cost Less Than 7K RTM-Lot 930 Division St, Ber. New Commercial 3PH OH Temp 200A 120/208 M/L-C AP1-YWO Total Cost Less Than 7K WC-Norton St Sog 9A car vs pole 88159 AP1-YWO Total Cost Less Than 7K WC-Norton St Sog 9A car vs pole 88159 AP1-YWO Total Cost Less Than 7K WC-Norton St Sog 9A car vs pole 88159 AP1-YWO Total Cost Less Than 7K (DF) FTR8658-35-40',(R/I)Spacer Small, Guy, Shift Wires- conv# 393950 AP1-YWO Total Cost Less Than 7K (DF) FTR8658-35-40',(R/I)Spacer Small, Guy, Shift Wires- conv# 393950 AP1-YWO Total Cost Less Than 7K (DF) FTR8658-35-40',(R/I)Spacer Small, Guy, Shift Wires- conv# 393950 AP1-YWO Total Cost Less Than 7K REPLACE YELLOW TAGGED RECLOSER (Y-17764-2016) 12B33-91T POLE C2225 AP2-YWO Total Cost Variance Met - Variance :21.4876 MIN.:-40 MAX.:40 REPLACE YELLOW TAGGED RECLOSER (Y-17764-2016) 12B33-91T POLE C2225 AP2-YWO Total Cost Variance Met - Variance :21.4876 MIN.:-40 MAX.:40 EJC 721 Russell Rd Wethersfield P#316 Ftr Replaced Pole, Shifted Facilities AP3-YWO Resource Variance Met- Labor 29 <= 32 OR 150.52 <= 30 And Contractor $0 <= 2000 EJC 721 Russell Rd Wethersfield P#316 Ftr Replaced Pole, Shifted Facilities AP3-YWO Resource Variance Met- Labor 29 <= 32 OR 150.52 <= 30 And Contractor $0 <= 2000 EJC 721 Russell Rd Wethersfield P#316 Ftr Replaced Pole, Shifted Facilities AP3-YWO Resource Variance Met- Labor 29 <= 32 OR 150.52 <= 30 And Contractor $0 <= 2000 EJC 721 Russell Rd Wethersfield P#316 Ftr Replaced Pole, Shifted Facilities AP3-YWO Resource Variance Met- Labor 29 <= 32 OR 150.52 <= 30 And Contractor $0 <= 2000 (DF) Ple 9634-(R/I) 2 ph Tang w dn guy- DESG (MIBPROJ) AP1-YWO Total Cost Less Than 7K (DF) Ple 9634-(R/I) 2 ph Tang w dn guy- DESG (MIBPROJ) AP1-YWO Total Cost Less Than 7K (DF) Ple 9634-(R/I) 2 ph Tang w dn guy- DESG (MIBPROJ) AP1-YWO Total Cost Less Than 7K DM Four Rod Rd BER Install covering on messanger cable various 7 locations. CL-YWO Variance - Contractor Labor CDOT 17-186 - RTE 6 Bristol Road Widening - Temp Pole for Traffic light JE-YWO Variance Job Type Exclusion JC/35 OLD FAIRWOOD RD. BETHANY/ REM BACK YARD SVC./SEC. MOVE TO ROAD NEW POLE AP1-YWO Total Cost Less Than 7K JC/35 OLD FAIRWOOD RD. BETHANY/ REM BACK YARD SVC./SEC. MOVE TO ROAD NEW POLE AP1-YWO Total Cost Less Than 7K JC/35 OLD FAIRWOOD RD. BETHANY/ REM BACK YARD SVC./SEC. MOVE TO ROAD NEW POLE AP1-YWO Total Cost Less Than 7K AMM 172 SCOTT SWAMP RD,FARMINGTON. INSTALL NEW OH SERVICE. AP2-YWO Total Cost Variance Met - Variance :-6.9374 MIN.:-50 MAX.:50 AMM 172 SCOTT SWAMP RD,FARMINGTON. INSTALL NEW OH SERVICE. AP2-YWO Total Cost Variance Met - Variance :-6.9374 MIN.:-50 MAX.:50 EJC 1897 Stanley St, NB P#103 Ftr Replaced Pole, Shifted Facilities, POST CONSTR AP1-YWO Total Cost Less Than 7K EJC 1897 Stanley St, NB P#103 Ftr Replaced Pole, Shifted Facilities, POST CONSTR AP1-YWO Total Cost Less Than 7K EJC 1897 Stanley St, NB P#103 Ftr Replaced Pole, Shifted Facilities, POST CONSTR AP1-YWO Total Cost Less Than 7K JC/39 FENN RD MIDDLEBURY / POLE 1747 SHIFT GUY ONLY( ALL OTHER WORK COMP) CI-YWO Variance - Contractor Invoice JC/39 FENN RD MIDDLEBURY / POLE 1747 SHIFT GUY ONLY( ALL OTHER WORK COMP) CI-YWO Variance - Contractor Invoice JC/39 FENN RD MIDDLEBURY / POLE 1747 SHIFT GUY ONLY( ALL OTHER WORK COMP) CI-YWO Variance - Contractor Invoice RTM-Meetinghouse Village Meriden 6 Locations - COMPLETED 1/19/17 CCC CL-YWO Variance - Contractor Labor RTM-Meetinghouse Village Meriden 6 Locations - COMPLETED 1/19/17 CCC CL-YWO Variance - Contractor Labor RTM-Meetinghouse Village Meriden 6 Locations - COMPLETED 1/19/17 CCC CL-YWO Variance - Contractor Labor EJC 489 Columbus Blvd, NB Install P#9576 1ph Riser, Pad, Svc to Bldg, M/L/C AP2-YWO Total Cost Variance Met - Variance :5.2071 MIN.:-50 MAX.:50 EJC 489 Columbus Blvd, NB Install P#9576 1ph Riser, Pad, Svc to Bldg, M/L/C AP2-YWO Total Cost Variance Met - Variance :5.2071 MIN.:-50 MAX.:50 EJC 489 Columbus Blvd, NB Install P#9576 1ph Riser, Pad, Svc to Bldg, M/L/C AP2-YWO Total Cost Variance Met - Variance :5.2071 MIN.:-50 MAX.:50 WC-1/22 ESO/AWC 48 TODD RD WOLCOTT Car vs pole # 1864 CASE# 2017-601 AP2-YWO Total Cost Variance Met - Variance :9.7651 MIN.:-30 MAX.:30 WC-1/22 ESO/AWC 48 TODD RD WOLCOTT Car vs pole # 1864 CASE# 2017-601 AP2-YWO Total Cost Variance Met - Variance :9.7651 MIN.:-30 MAX.:30 WC-1/22 ESO/AWC 48 TODD RD WOLCOTT Car vs pole # 1864 CASE# 2017-601 AP2-YWO Total Cost Variance Met - Variance :9.7651 MIN.:-30 MAX.:30 JC/Municipal Light Fault Locate and Repair@ POLE L1-P130 - COMP 4/3 CCC AP1-YWO Total Cost Less Than 7K JC/Municipal Light Fault Locate and Repair@ POLE L1-P130 - COMP 4/3 CCC AP1-YWO Total Cost Less Than 7K RTM-839 Murdock Ave, Mer. Existing Res Upgrade. Replace & Relocate OH Svc. M/L-C cost_element_group ferc_account percent Employee Expenses-EE0 593000 0.3687 Employee Expenses-EE0 107010 0.42011 Employee Expenses-EE0 Employee Expenses-EE0 Employee Expenses-EE0 Employee Expenses-EE0 Employee Expenses-EE0 Employee Expenses-EE0 108030 594030 593020 108030 596000 107010 0.21119 0.12571875 0.07463804 0.05638469 0.0374783 0.70578023 Employee Expenses-EE0 108030 0.13153 Employee Expenses-EE0 107010 0.83254 Employee Expenses-EE0 593000 0.03593 Employee Expenses-EE0 108030 0.09668 Employee Expenses-EE0 107010 0.90332 Employee Expenses-EE0 594000 0.02622 Employee Expenses-EE0 108030 0.19 Employee Expenses-EE0 107010 0.78378 Employee Expenses-EE0 593000 0.00747 Employee Expenses-EE0 108030 0.00489 Employee Expenses-EE0 107010 0.86535 Employee Expenses-EE0 595000 0.0089 Employee Expenses-EE0 597000 0.11339 Employee Expenses-EE0 107010 0.32992 Employee Expenses-EE0 595000 0.62942 Employee Expenses-EE0 108030 0.04066 Employee Expenses-EE0 108030 0.21294 Employee Expenses-EE0 593000 0.29091 Employee Expenses-EE0 107010 0.48041 Employee Expenses-EE0 595000 0.01574 Employee Expenses-EE0 593000 0.52839 Employee Expenses-EE0 107010 0.30752 Employee Expenses-EE0 108030 0.16409 Employee Expenses-EE0 587000 0.26074 Employee Expenses-EE0 107010 0.46302 Employee Expenses-EE0 108030 0.27624 Employee Expenses-EE0 108030 0.12363 Employee Expenses-EE0 593000 0.67355 Employee Expenses-EE0 107010 0.20282 Employee Expenses-EE0 107010 0.93848 Employee Expenses-EE0 108030 0.06152 Employee Expenses-EE0 108030 0.11562 Employee Expenses-EE0 107010 0.33678 Employee Expenses-EE0 595000 0.08083 Employee Expenses-EE0 583000 0.46677 Employee Expenses-EE0 108030 0.13416 Employee Expenses-EE0 107010 0.31831 Employee Expenses-EE0 593000 0.54753 Employee Expenses-EE0 107010 1 Employee Expenses-EE0 593000 1 Employee Expenses-EE0 593000 0.00008 Employee Expenses-EE0 107010 0.73201 Employee Expenses-EE0 108030 0.26791 Employee Expenses-EE0 107010 0.73224 Employee Expenses-EE0 593000 0.26776 Employee Expenses-EE0 107010 0.18625 Employee Expenses-EE0 108030 0.10295 Employee Expenses-EE0 593000 0.7108 Employee Expenses-EE0 593000 0.24522 Employee Expenses-EE0 107010 0.49435 Employee Expenses-EE0 108030 0.26043 Employee Expenses-EE0 108030 0.16925 Employee Expenses-EE0 107010 0.82522 Employee Expenses-EE0 594000 0.00553 Employee Expenses-EE0 584000 0.14884 Employee Expenses-EE0 107010 0.82542 Employee Expenses-EE0 595000 0.02574 Employee Expenses-EE0 107010 0.67515 Employee Expenses-EE0 108030 0.16567 Employee Expenses-EE0 593000 0.15918 Employee Expenses-EE0 107010 0.77676 Employee Expenses-EE0 108030 0.22324 Employee Expenses-EE0 108030 0.22167 Employee Expenses-EE0 107010 0.77833 Employee Expenses-EE0 593000 0.53862 Employee Expenses-EE0 108030 0.15001 Employee Expenses-EE0 107010 0.31137 Employee Expenses-EE0 107010 1 Employee Expenses-EE0 107010 0.7173 Employee Expenses-EE0 593000 0.13883 Employee Expenses-EE0 108030 0.14387 Employee Expenses-EE0 108030 0.08777 Employee Expenses-EE0 593000 0.79011 Employee Expenses-EE0 107010 0.12212 Employee Expenses-EE0 108030 0.18065 Employee Expenses-EE0 107010 0.35616 Employee Expenses-EE0 583000 0.46319 Employee Expenses-EE0 108030 0.24085 Employee Expenses-EE0 107010 0.75915 Employee Expenses-EE0 596000 0.04985 Employee Expenses-EE0 583000 0.17574 Employee Expenses-EE0 108030 0.14563 Employee Expenses-EE0 107010 0.47586 Employee Expenses-EE0 595000 0.15292 Employee Expenses-EE0 107010 0.30316 Employee Expenses-EE0 108030 0.13127 Employee Expenses-EE0 595000 0.11311 Employee Expenses-EE0 583000 0.45246 Employee Expenses-EE0 107010 0.29606 Employee Expenses-EE0 108030 0.14083 Employee Expenses-EE0 583000 0.56311 Employee Expenses-EE0 107010 0.95293 Employee Expenses-EE0 584000 0.04707 Employee Expenses-EE0 595000 0.4454 Employee Expenses-EE0 107010 0.44533 Employee Expenses-EE0 593000 0.00148 Employee Expenses-EE0 108030 0.02317 Employee Expenses-EE0 584000 0.08462 Employee Expenses-EE0 596000 0.24326 Employee Expenses-EE0 108030 0.25992 Employee Expenses-EE0 593000 0.26201 RTM-839 Murdock Ave, Mer. Existing Res Upgrade. Replace & Relocate OH Svc. M/L-C WC/1/14 - ESO 115 Windy Dr Wtby 9A CAR VS POLE # 9781 AP2-YWO Total Cost Variance Met - Variance :9.6092 MIN.:-50 MAX.:50 WC/1/14 - ESO 115 Windy Dr Wtby 9A CAR VS POLE # 9781 AP2-YWO Total Cost Variance Met - Variance :9.6092 MIN.:-50 MAX.:50 WC/1/14 - ESO 115 Windy Dr Wtby 9A CAR VS POLE # 9781 AP2-YWO Total Cost Variance Met - Variance :9.6092 MIN.:-50 MAX.:50 (DF) WTRBRY - XX-11H62 REHAB - Various Locations -EPORA - DESG (DR) CL-YWO Variance - Contractor Labor DM 1145 CHESHIRE ST CHESHIRE 9A P#2009 AP1-YWO Total Cost Less Than 7K DM 1145 CHESHIRE ST CHESHIRE 9A P#2009 AP1-YWO Total Cost Less Than 7K DM 1145 CHESHIRE ST CHESHIRE 9A P#2009 AP1-YWO Total Cost Less Than 7K WC-87 S Main St,Naugatuck. Car v Pole 1634 AP1-YWO Total Cost Less Than 7K WC-87 S Main St,Naugatuck. Car v Pole 1634 AP1-YWO Total Cost Less Than 7K WC-87 S Main St,Naugatuck. Car v Pole 1634 AP1-YWO Total Cost Less Than 7K WC-498 Pine St, Wtrbry. Ca v pole 29468 .Set new pole and new xfmr AP1-YWO Total Cost Less Than 7K WC-498 Pine St, Wtrbry. Ca v pole 29468 .Set new pole and new xfmr AP1-YWO Total Cost Less Than 7K WC-498 Pine St, Wtrbry. Ca v pole 29468 .Set new pole and new xfmr AP1-YWO Total Cost Less Than 7K JPT Tomlinson Ave Plainville Sheltered Ponds Cono'P#14682 needs replacement AP1-YWO Total Cost Less Than 7K JPT Tomlinson Ave Plainville Sheltered Ponds Cono'P#14682 needs replacement AP1-YWO Total Cost Less Than 7K STRAITSVILLE RD, PROSPECT. POLES 42 & 44 AP3-YWO Resource Variance Met- Labor 47 <= 32 OR -97.92 <= 30 And Contractor $0 <= 2000 STRAITSVILLE RD, PROSPECT. POLES 42 & 44 AP3-YWO Resource Variance Met- Labor 47 <= 32 OR -97.92 <= 30 And Contractor $0 <= 2000 STRAITSVILLE RD, PROSPECT. POLES 42 & 44 AP3-YWO Resource Variance Met- Labor 47 <= 32 OR -97.92 <= 30 And Contractor $0 <= 2000 STRAITSVILLE RD, PROSPECT. POLES 42 & 44 AP3-YWO Resource Variance Met- Labor 47 <= 32 OR -97.92 <= 30 And Contractor $0 <= 2000 STRAITSVILLE RD, PROSPECT. POLES 42 & 44 AP3-YWO Resource Variance Met- Labor 47 <= 32 OR -97.92 <= 30 And Contractor $0 <= 2000 DM MILLER RD, BETHANY. POLE 1820 AP1-YWO Total Cost Less Than 7K DM MILLER RD, BETHANY. POLE 1820 AP1-YWO Total Cost Less Than 7K DM MILLER RD, BETHANY. POLE 1820 AP1-YWO Total Cost Less Than 7K DM MILLER RD, BETHANY. POLE 1820 AP1-YWO Total Cost Less Than 7K WC-2/25/17 ESO 221 DIANA RD SOUTHINGTON CAR VS POLE # 2009 & 2010 AP2-YWO Total Cost Variance Met - Variance :7.5386 MIN.:-50 MAX.:50 WC-2/25/17 ESO 221 DIANA RD SOUTHINGTON CAR VS POLE # 2009 & 2010 AP2-YWO Total Cost Variance Met - Variance :7.5386 MIN.:-50 MAX.:50 WC-2/25/17 ESO 221 DIANA RD SOUTHINGTON CAR VS POLE # 2009 & 2010 AP2-YWO Total Cost Variance Met - Variance :7.5386 MIN.:-50 MAX.:50 DM 811 Queen St SOG ALDI's INST 3PH Primary & 300KVA XFMR 1000 AMP 120/208 SVC AP2-YWO Total Cost Variance Met - Variance :-6.1671 MIN.:-50 MAX.:50 DM 811 Queen St SOG ALDI's INST 3PH Primary & 300KVA XFMR 1000 AMP 120/208 SVC AP2-YWO Total Cost Variance Met - Variance :-6.1671 MIN.:-50 MAX.:50 AMM 788 FARMINGTON AVE,FARMINGTON. INSTALL NEW 3PH DB SERVICE. AP3-YWO Resource Variance Met- Labor 4 <= 32 OR 8.38 <= 30 And Contractor $0 <= 2000 AMM 788 FARMINGTON AVE,FARMINGTON. INSTALL NEW 3PH DB SERVICE. AP3-YWO Resource Variance Met- Labor 4 <= 32 OR 8.38 <= 30 And Contractor $0 <= 2000 AMM 788 FARMINGTON AVE,FARMINGTON. INSTALL NEW 3PH DB SERVICE. AP3-YWO Resource Variance Met- Labor 4 <= 32 OR 8.38 <= 30 And Contractor $0 <= 2000 AMM 788 FARMINGTON AVE,FARMINGTON. INSTALL NEW 3PH DB SERVICE. AP3-YWO Resource Variance Met- Labor 4 <= 32 OR 8.38 <= 30 And Contractor $0 <= 2000 AMM 788 FARMINGTON AVE,FARMINGTON. INSTALL NEW 3PH DB SERVICE. AP3-YWO Resource Variance Met- Labor 4 <= 32 OR 8.38 <= 30 And Contractor $0 <= 2000 PT Conv# 498791-MakeReadyNonReimb-Fibertech-ParentConv# 497106 AP2-YWO Total Cost Variance Met - Variance :-34.289 MIN.:-50 MAX.:50 PT Conv# 498791-MakeReadyNonReimb-Fibertech-ParentConv# 497106 AP2-YWO Total Cost Variance Met - Variance :-34.289 MIN.:-50 MAX.:50 PT Conv# 498791-MakeReadyNonReimb-Fibertech-ParentConv# 497106 AP2-YWO Total Cost Variance Met - Variance :-34.289 MIN.:-50 MAX.:50
  5. Page 5 of 879

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued October 23, 2026 RRU-159 Attachment 5 Page 5 of 879 work_order_number description 2M721388 PT Conv# 498791-MakeReadyNonReimb-F 2M721499 Jpt-Riverside Ave BRI P10581 - 9a - 2M721499 Jpt-Riverside Ave BRI P10581 - 9a - 2M721499 Jpt-Riverside Ave BRI P10581 - 9a - 2M721549 DM ESO 3/29/17 9A WOLF HILL RD WOL 2M721549 DM ESO 3/29/17 9A WOLF HILL RD WOL 2M721549 DM ESO 3/29/17 9A WOLF HILL RD WOL 2M721584 Jpt-5 Two Mile Rd Farm (Frnt)P38 - 2M721584 Jpt-5 Two Mile Rd Farm (Frnt)P38 - 2M721584 Jpt-5 Two Mile Rd Farm (Frnt)P38 - 2M721616 ESO 4/2/17 9A - 92 PARK RD WATERBUR 2M721616 ESO 4/2/17 9A - 92 PARK RD WATERBUR 2M721616 ESO 4/2/17 9A - 92 PARK RD WATERBUR 2M721712 WC-420 N Main ST,Sog. Upgrade svc t 2M721712 WC-420 N Main ST,Sog. Upgrade svc t 2M721712 WC-420 N Main ST,Sog. Upgrade svc t 2M721752 RTM-9 Glen Hills Rd, Mer. 9A-ESO-Ca 2M721752 RTM-9 Glen Hills Rd, Mer. 9A-ESO-Ca 2M721752 RTM-9 Glen Hills Rd, Mer. 9A-ESO-Ca 2M721758 DM 64 Wolcott RD WOLCOTT P#2211 out 2M721758 DM 64 Wolcott RD WOLCOTT P#2211 out 2M721811 WC-504 BURRITT ST, SOUTHINGTON - RE 2M721811 WC-504 BURRITT ST, SOUTHINGTON - RE 2M721811 WC-504 BURRITT ST, SOUTHINGTON - RE 2M721811 WC-504 BURRITT ST, SOUTHINGTON - RE 2M721811 WC-504 BURRITT ST, SOUTHINGTON - RE 2M722169 RTM-437 West Ln, Ber. 9A-ESO Car vs 2M722169 RTM-437 West Ln, Ber. 9A-ESO Car vs 2M722169 RTM-437 West Ln, Ber. 9A-ESO Car vs 2W421123 VT/CONFIRMING/UNKNOWN POLE NUMBER/c 2W421123 VT/CONFIRMING/UNKNOWN POLE NUMBER/c 2W421609 JAM CHANGE OUT SW GEAR AND CABLE FA 2W421609 JAM CHANGE OUT SW GEAR AND CABLE FA 2W421645 JD 492601 13F64 REMOVE/RELOCATE OH 2W421645 JD 492601 13F64 REMOVE/RELOCATE OH 2W421645 JD 492601 13F64 REMOVE/RELOCATE OH 2W520098 ROTTED FRNTR POLE #8951 INSTALLED R 2W520098 ROTTED FRNTR POLE #8951 INSTALLED R 2W520098 ROTTED FRNTR POLE #8951 INSTALLED R 2W521082 VT/RUN NEW OH SVC - TAKEN OUT BY S 2W521082 VT/RUN NEW OH SVC - TAKEN OUT BY S 2W521224 ESO 7/12 COOKE ST, WATERBURY - CAR 2W521224 ESO 7/12 COOKE ST, WATERBURY - CAR long_description PT Conv# 498791-MakeReadyNonReimb-Fibertech-ParentConv# 497106 AP2-YWO Total Cost Variance Met - Variance :-34.289 MIN.:-50 MAX.:50 Jpt-Riverside Ave BRI P10581 - 9a - Rplc'd 35Ft/C-2 Shifted Sec. & Svc AP1-YWO Total Cost Less Than 7K Jpt-Riverside Ave BRI P10581 - 9a - Rplc'd 35Ft/C-2 Shifted Sec. & Svc AP1-YWO Total Cost Less Than 7K Jpt-Riverside Ave BRI P10581 - 9a - Rplc'd 35Ft/C-2 Shifted Sec. & Svc AP1-YWO Total Cost Less Than 7K DM ESO 3/29/17 9A WOLF HILL RD WOLCOTT car vs frontier P# 4604 AP1-YWO Total Cost Less Than 7K DM ESO 3/29/17 9A WOLF HILL RD WOLCOTT car vs frontier P# 4604 AP1-YWO Total Cost Less Than 7K DM ESO 3/29/17 9A WOLF HILL RD WOLCOTT car vs frontier P# 4604 AP1-YWO Total Cost Less Than 7K Jpt-5 Two Mile Rd Farm (Frnt)P38 - Line Relocation Reimbursable AP3-YWO Resource Variance Met- Labor 15 <= 32 OR 38.61 <= 30 And Contractor $0 <= 2000 Jpt-5 Two Mile Rd Farm (Frnt)P38 - Line Relocation Reimbursable AP3-YWO Resource Variance Met- Labor 15 <= 32 OR 38.61 <= 30 And Contractor $0 <= 2000 Jpt-5 Two Mile Rd Farm (Frnt)P38 - Line Relocation Reimbursable AP3-YWO Resource Variance Met- Labor 15 <= 32 OR 38.61 <= 30 And Contractor $0 <= 2000 ESO 4/2/17 9A - 92 PARK RD WATERBURY CAR VS POLE # 1453 CASE# 17-27626 AP2-YWO Total Cost Variance Met - Variance :-47.3901 MIN.:-50 MAX.:50 ESO 4/2/17 9A - 92 PARK RD WATERBURY CAR VS POLE # 1453 CASE# 17-27626 AP2-YWO Total Cost Variance Met - Variance :-47.3901 MIN.:-50 MAX.:50 ESO 4/2/17 9A - 92 PARK RD WATERBURY CAR VS POLE # 1453 CASE# 17-27626 AP2-YWO Total Cost Variance Met - Variance :-47.3901 MIN.:-50 MAX.:50 WC-420 N Main ST,Sog. Upgrade svc to 3ph 480/277. M/L coordinate AP2-YWO Total Cost Variance Met - Variance :43.8246 MIN.:-50 MAX.:50 WC-420 N Main ST,Sog. Upgrade svc to 3ph 480/277. M/L coordinate AP2-YWO Total Cost Variance Met - Variance :43.8246 MIN.:-50 MAX.:50 WC-420 N Main ST,Sog. Upgrade svc to 3ph 480/277. M/L coordinate AP2-YWO Total Cost Variance Met - Variance :43.8246 MIN.:-50 MAX.:50 RTM-9 Glen Hills Rd, Mer. 9A-ESO-Car vs P#100 CASE#17-2559 AP2-YWO Total Cost Variance Met - Variance :-17.6764 MIN.:-50 MAX.:50 RTM-9 Glen Hills Rd, Mer. 9A-ESO-Car vs P#100 CASE#17-2559 AP2-YWO Total Cost Variance Met - Variance :-17.6764 MIN.:-50 MAX.:50 RTM-9 Glen Hills Rd, Mer. 9A-ESO-Car vs P#100 CASE#17-2559 AP2-YWO Total Cost Variance Met - Variance :-17.6764 MIN.:-50 MAX.:50 DM 64 Wolcott RD WOLCOTT P#2211 outage to remove vines growing in livefront xfmr AP1-YWO Total Cost Less Than 7K DM 64 Wolcott RD WOLCOTT P#2211 outage to remove vines growing in livefront xfmr AP1-YWO Total Cost Less Than 7K WC-504 BURRITT ST, SOUTHINGTON - RELOCATE SVC RISER FROM P4350 TO P 5111 CI-YWO Variance - Contractor Invoice WC-504 BURRITT ST, SOUTHINGTON - RELOCATE SVC RISER FROM P4350 TO P 5111 CI-YWO Variance - Contractor Invoice WC-504 BURRITT ST, SOUTHINGTON - RELOCATE SVC RISER FROM P4350 TO P 5111 CI-YWO Variance - Contractor Invoice WC-504 BURRITT ST, SOUTHINGTON - RELOCATE SVC RISER FROM P4350 TO P 5111 CI-YWO Variance - Contractor Invoice WC-504 BURRITT ST, SOUTHINGTON - RELOCATE SVC RISER FROM P4350 TO P 5111 CI-YWO Variance - Contractor Invoice RTM-437 West Ln, Ber. 9A-ESO Car vs P#5485. Pole Replaced POST CONSTRUCTION AP2-YWO Total Cost Variance Met - Variance :12.5508 MIN.:-50 MAX.:50 RTM-437 West Ln, Ber. 9A-ESO Car vs P#5485. Pole Replaced POST CONSTRUCTION AP2-YWO Total Cost Variance Met - Variance :12.5508 MIN.:-50 MAX.:50 RTM-437 West Ln, Ber. 9A-ESO Car vs P#5485. Pole Replaced POST CONSTRUCTION AP2-YWO Total Cost Variance Met - Variance :12.5508 MIN.:-50 MAX.:50 VT/CONFIRMING/UNKNOWN POLE NUMBER/car vs pole cost_element_group ferc_account percent Employee Expenses-EE0 107010 0.23481 Employee Expenses-EE0 107010 0.31061 Employee Expenses-EE0 593000 0.32772 Employee Expenses-EE0 108030 0.36167 Employee Expenses-EE0 593000 0.34909 Employee Expenses-EE0 107010 0.4129 Employee Expenses-EE0 108030 0.23801 Employee Expenses-EE0 594000 0.10722 Employee Expenses-EE0 108030 0.07897 Employee Expenses-EE0 107010 0.81381 Employee Expenses-EE0 107010 0.42282 Employee Expenses-EE0 593000 0.47023 Employee Expenses-EE0 108030 0.10695 Employee Expenses-EE0 583000 0.26163 Employee Expenses-EE0 107010 0.55495 Employee Expenses-EE0 108030 0.18342 Employee Expenses-EE0 587000 0.30548 Employee Expenses-EE0 107010 0.42884 Employee Expenses-EE0 108030 0.26568 Employee Expenses-EE0 107010 0.74903 Employee Expenses-EE0 108030 0.25097 Employee Expenses-EE0 593000 0.09667 Employee Expenses-EE0 583000 0.15228 Employee Expenses-EE0 595000 0.02966 Employee Expenses-EE0 107010 0.34806 Employee Expenses-EE0 108030 0.37333 Employee Expenses-EE0 593000 0.07351 Employee Expenses-EE0 107010 0.55475 Employee Expenses-EE0 108030 0.37174 Employee Expenses-EE0 593000 0.03721858 Employee Expenses-EE0 107010 0.96278142 Employee Expenses-EE0 107010 0.57419 Employee Expenses-EE0 108030 0.42581 Employee Expenses-EE0 595000 0.05683 Employee Expenses-EE0 107010 0.80516 Employee Expenses-EE0 583000 0.13801 Employee Expenses-EE0 593000 0.44578 Employee Expenses-EE0 107010 0.35159 Employee Expenses-EE0 108030 0.20263 Employee Expenses-EE0 108030 0.20018 Employee Expenses-EE0 107010 0.79982 Employee Expenses-EE0 107010 0.45492 Employee Expenses-EE0 108030 0.23927 Employee Expenses-EE0 593000 0.30581 Employee Expenses-EE0 107010 1 Employee Expenses-EE0 107010 0.87969 Employee Expenses-EE0 108030 0.12031 Employee Expenses-EE0 593000 1 Employee Expenses-EE0 108030 0.10797 Employee Expenses-EE0 107010 0.23685 Employee Expenses-EE0 595000 0.06283 Employee Expenses-EE0 583000 0.59235 Employee Expenses-EE0 107010 0.31753 Employee Expenses-EE0 593000 0.611 Employee Expenses-EE0 108030 0.07147 Employee Expenses-EE0 593000 0.81678 Employee Expenses-EE0 107010 0.11258 Employee Expenses-EE0 108030 0.07064 Employee Expenses-EE0 595000 0.25593 Employee Expenses-EE0 583000 0.55253 Employee Expenses-EE0 107010 0.15469 Employee Expenses-EE0 108030 0.03685 Employee Expenses-EE0 107010 0.13538 Employee Expenses-EE0 108030 0.02394 Employee Expenses-EE0 583000 0.60686 Employee Expenses-EE0 595000 0.23382 Employee Expenses-EE0 596000 0.15 Employee Expenses-EE0 107010 0.73889 Employee Expenses-EE0 108030 0.11111 Employee Expenses-EE0 108030 0.18356 Employee Expenses-EE0 107010 0.30803 Employee Expenses-EE0 583000 0.44997 Employee Expenses-EE0 595000 0.05844 Employee Expenses-EE0 593000 1 Employee Expenses-EE0 593000 0.60244 Employee Expenses-EE0 107010 0.2742 Employee Expenses-EE0 108030 0.12336 Employee Expenses-EE0 584000 0.8527 Employee Expenses-EE0 Employee Expenses-EE0 593000 107010 0.1473 1 Employee Expenses-EE0 108030 0.01136 Employee Expenses-EE0 107010 0.98864 Employee Expenses-EE0 594000 0.42386 Employee Expenses-EE0 108030 0.57614 Employee Expenses-EE0 107010 0.4547 Employee Expenses-EE0 108030 0.27875 Employee Expenses-EE0 593000 0.26655 Employee Expenses-EE0 108030 0.4005 Employee Expenses-EE0 107010 0.5995 Employee Expenses-EE0 108030 1 Employee Expenses-EE0 107010 0.69055 Employee Expenses-EE0 108030 0.30945 Employee Expenses-EE0 107010 0.78723 Employee Expenses-EE0 108030 0.21277 Employee Expenses-EE0 108030 0.24351 Employee Expenses-EE0 107010 0.75649 Employee Expenses-EE0 593000 1 Employee Expenses-EE0 108030 0.26198 Employee Expenses-EE0 107010 0.73802 Employee Expenses-EE0 108030 0.05769 Employee Expenses-EE0 107010 0.94231 Employee Expenses-EE0 594000 1 Employee Expenses-EE0 583000 0.13414 Employee Expenses-EE0 595000 0.24388 Employee Expenses-EE0 107010 0.62198 Employee Expenses-EE0 107010 0.73802 Employee Expenses-EE0 108030 0.26198 VT/CONFIRMING/UNKNOWN POLE NUMBER/car vs pole JAM CHANGE OUT SW GEAR AND CABLE FAULT JAM CHANGE OUT SW GEAR AND CABLE FAULT JD 492601 13F64 REMOVE/RELOCATE OH LINE-CDOT 151-273 - SEG 2 JE-YWO Variance Job Type Exclusion JD 492601 13F64 REMOVE/RELOCATE OH LINE-CDOT 151-273 - SEG 2 JE-YWO Variance Job Type Exclusion JD 492601 13F64 REMOVE/RELOCATE OH LINE-CDOT 151-273 - SEG 2 JE-YWO Variance Job Type Exclusion ROTTED FRNTR POLE #8951 INSTALLED RIDGE PIN NEUTRAL CLAMP & SHIFTED ROTTED FRNTR POLE #8951 INSTALLED RIDGE PIN NEUTRAL CLAMP & SHIFTED ROTTED FRNTR POLE #8951 INSTALLED RIDGE PIN NEUTRAL CLAMP & SHIFTED VT/RUN NEW OH SVC - TAKEN OUT BY STORM - NEW MAST INSTALLED AP1-YWO Total Cost Less Than 7K VT/RUN NEW OH SVC - TAKEN OUT BY STORM - NEW MAST INSTALLED AP1-YWO Total Cost Less Than 7K ESO 7/12 COOKE ST, WATERBURY - CAR VS P# 14126 ESO 7/12 COOKE ST, WATERBURY - CAR VS P# 14126 ESO 7/12 COOKE ST, WATERBURY - CAR VS P# 14126 2W521224 ESO 7/12 COOKE ST, WATERBURY - CAR 2W521519 VT/INSTALL 120' 4/0 TPX FROM HANDHO VT/INSTALL 120' 4/0 TPX FROM HANDHOLE TO NEW HOUSE Lantern Park Dr., Naugatuck - Cable Replacement 2W521547 Lantern Park Dr., Naugatuck - Cable 2W521547 Lantern Park Dr., Naugatuck - Cable 2W521628 P.1114 CAR FIRE VS POLE RISER PIPE 2W522049 PHD Elec Maint Replace/Renewal/Obs 2W522049 PHD Elec Maint Replace/Renewal/Obs 2W522049 PHD Elec Maint Replace/Renewal/Obs 2W522049 PHD Elec Maint Replace/Renewal/Obs 2W522187 PHD Elec Maint Replace/Renewal/Ob 2W522187 PHD Elec Maint Replace/Renewal/Ob 2W522187 PHD Elec Maint Replace/Renewal/Ob 2W522237 PHD JAM Frontier reject poles nee 2W522237 PHD JAM Frontier reject poles nee 2W522237 PHD JAM Frontier reject poles nee 2W620099 PHD Elec Maint Replace/Renewal/Obs 2W620099 PHD Elec Maint Replace/Renewal/Obs 2W620099 PHD Elec Maint Replace/Renewal/Obs 2W620099 PHD Elec Maint Replace/Renewal/Obs 2W620198 PHD Elec Maint Replace/Renewal/Ob 2W620198 PHD Elec Maint Replace/Renewal/Ob 2W620198 PHD Elec Maint Replace/Renewal/Ob 2W620198 PHD Elec Maint Replace/Renewal/Ob 2W620324 VT/REMOVE EXISTING LIGHT...INSTALL 2W620324 VT/REMOVE EXISTING LIGHT...INSTALL Lantern Park Dr., Naugatuck - Cable Replacement P.1114 CAR FIRE VS POLE RISER PIPE MELTED NEEDS TO BE REPLACED AP1-YWO Total Cost Less Than 7K PHD Elec Maint Replace/Renewal/Obsol OH DESG (AROH) AP2-YWO Total Cost Variance Met - Variance :112.0869 MIN.:-50 MAX.:150 PHD Elec Maint Replace/Renewal/Obsol OH DESG (AROH) AP2-YWO Total Cost Variance Met - Variance :112.0869 MIN.:-50 MAX.:150 PHD Elec Maint Replace/Renewal/Obsol OH DESG (AROH) AP2-YWO Total Cost Variance Met - Variance :112.0869 MIN.:-50 MAX.:150 PHD Elec Maint Replace/Renewal/Obsol OH DESG (AROH) AP2-YWO Total Cost Variance Met - Variance :112.0869 MIN.:-50 MAX.:150 PHD Elec Maint Replace/Renewal/Obsol OH DESG (AROH) AP1-YWO Total Cost Less Than 7K PHD Elec Maint Replace/Renewal/Obsol OH DESG (AROH) AP1-YWO Total Cost Less Than 7K PHD Elec Maint Replace/Renewal/Obsol OH DESG (AROH) AP1-YWO Total Cost Less Than 7K PHD JAM Frontier reject poles need to be changed over AP1-YWO Total Cost Less Than 7K PHD JAM Frontier reject poles need to be changed over AP1-YWO Total Cost Less Than 7K PHD JAM Frontier reject poles need to be changed over AP1-YWO Total Cost Less Than 7K PHD Elec Maint Replace/Renewal/Obsol OH DESG (AROH) AP1-YWO Total Cost Less Than 7K PHD Elec Maint Replace/Renewal/Obsol OH DESG (AROH) AP1-YWO Total Cost Less Than 7K PHD Elec Maint Replace/Renewal/Obsol OH DESG (AROH) AP1-YWO Total Cost Less Than 7K PHD Elec Maint Replace/Renewal/Obsol OH DESG (AROH) AP1-YWO Total Cost Less Than 7K PHD Elec Maint Replace/Renewal/Obsol OH DESG (AROH) AP1-YWO Total Cost Less Than 7K PHD Elec Maint Replace/Renewal/Obsol OH DESG (AROH) AP1-YWO Total Cost Less Than 7K PHD Elec Maint Replace/Renewal/Obsol OH DESG (AROH) AP1-YWO Total Cost Less Than 7K PHD Elec Maint Replace/Renewal/Obsol OH DESG (AROH) AP1-YWO Total Cost Less Than 7K VT/REMOVE EXISTING LIGHT...INSTALL 100W LED COBRA HEAD ON 12' BRACKET VT/REMOVE EXISTING LIGHT...INSTALL 100W LED COBRA HEAD ON 12' BRACKET VT/REMOVE EXISTING LIGHT...INSTALL 100W LED COBRA HEAD ON 12' BRACKET 2W620324 VT/REMOVE EXISTING LIGHT...INSTALL 2W620715 CAR VS FRONTIER POLE #35 POLE IS CR 2W620715 CAR VS FRONTIER POLE #35 POLE IS CR 2W620715 CAR VS FRONTIER POLE #35 POLE IS CR 2W620715 CAR VS FRONTIER POLE #35 POLE IS CR 2W620798 DM 5/3 ESO CAR VS POLE WATERBURY RD 2W620862 VT/WC-27 Williams Dr, Prospect. SHI 2W620862 VT/WC-27 Williams Dr, Prospect. SHI 2W620862 VT/WC-27 Williams Dr, Prospect. SHI 2W620907 JS - 64 Garrigus Ct, Wlctt, Repl PA 2W620907 3H420289 JS - 64 Garrigus Ct, Wlctt, Repl PA JWL. RUN NEW OH SVC . RUN MID SPAN 3H422062 Prospect St EH / 10.2.14 / P527 / 9 3H422062 Prospect St EH / 10.2.14 / P527 / 9 3H521526 RF-758 Rainbow Rd,Windsor,Remove Pr 3H521526 RF-758 Rainbow Rd,Windsor,Remove Pr 3H522597 NJB AWC 12/04 HTFD BUCKINGHAM ST HT 3H522597 NJB AWC 12/04 HTFD BUCKINGHAM ST HT CAR VS FRONTIER POLE #35 POLE IS CRACKED & ROTTED SHOULD BE REPLACED AP2-YWO Total Cost Variance Met - Variance :66.1647 MIN.:-50 MAX.:150 CAR VS FRONTIER POLE #35 POLE IS CRACKED & ROTTED SHOULD BE REPLACED AP2-YWO Total Cost Variance Met - Variance :66.1647 MIN.:-50 MAX.:150 CAR VS FRONTIER POLE #35 POLE IS CRACKED & ROTTED SHOULD BE REPLACED AP2-YWO Total Cost Variance Met - Variance :66.1647 MIN.:-50 MAX.:150 CAR VS FRONTIER POLE #35 POLE IS CRACKED & ROTTED SHOULD BE REPLACED AP2-YWO Total Cost Variance Met - Variance :66.1647 MIN.:-50 MAX.:150 DM 5/3 ESO CAR VS POLE WATERBURY RD PRSPCT P#1366 CONV#393701 AP1-YWO Total Cost Less Than 7K VT/WC-27 Williams Dr, Prospect. SHIFT TO NEW FRONTIER POLE 1775 AP1-YWO Total Cost Less Than 7K VT/WC-27 Williams Dr, Prospect. SHIFT TO NEW FRONTIER POLE 1775 AP1-YWO Total Cost Less Than 7K VT/WC-27 Williams Dr, Prospect. SHIFT TO NEW FRONTIER POLE 1775 AP1-YWO Total Cost Less Than 7K JS - 64 Garrigus Ct, Wlctt, Repl PAD XFMR (30L26) AP1-YWO Total Cost Less Than 7K JS - 64 Garrigus Ct, Wlctt, Repl PAD XFMR (30L26) AP1-YWO Total Cost Less Than 7K JWL. RUN NEW OH SVC . RUN MID SPAN TO AVOID 2ND FLOOR. TOO CLOSE!!! AP1 -WO TOTAL COST LESS THAN 7K Prospect St EH / 10.2.14 / P527 / 9A AP2-YWO Total Cost Variance Met - Variance :-28.0599 MIN.:-40 MAX.:40 Prospect St EH / 10.2.14 / P527 / 9A AP2-YWO Total Cost Variance Met - Variance :-28.0599 MIN.:-40 MAX.:40 RF-758 Rainbow Rd,Windsor,Remove Primary SVC and Pad 3215 AP3-YWO Resource Variance Met- Labor 114 <= 32 OR -70.38 <= 30 And Contractor $0 <= 2000 RF-758 Rainbow Rd,Windsor,Remove Primary SVC and Pad 3215 AP3-YWO Resource Variance Met- Labor 114 <= 32 OR -70.38 <= 30 And Contractor $0 <= 2000 NJB AWC 12/04 HTFD BUCKINGHAM ST HTFD. REPLCAE P#2374 35/2 (Stlght UG Feed) NJB AWC 12/04 HTFD BUCKINGHAM ST HTFD. REPLCAE P#2374 35/2 (Stlght UG Feed) NJB AWC 12/04 HTFD BUCKINGHAM ST HTFD. REPLCAE P#2374 35/2 (Stlght UG Feed) 3H522597 NJB AWC 12/04 HTFD BUCKINGHAM ST HT 3H620015 WF-41 Zion St-Htfd-@ mh# 4908, rpl 3H620015 WF-41 Zion St-Htfd-@ mh# 4908, rpl 3H620101 394 Tolland Tpk.Manch. Disconn.3PH 3H620115 HARTFORD, FRANKLIN AVE @ STANDISH S 3H620115 HARTFORD, FRANKLIN AVE @ STANDISH S 3H620395 Hartford, Broad St - car vs pole 5 3H620395 Hartford, Broad St - car vs pole 5 3H620866 HARTFORD, SCARBOROUGH ST city to re 3H620866 HARTFORD, SCARBOROUGH ST city to re 3H621240 DKH - Tower Ave, Htfd - P# 8053 - P 3H621384 HOMESTEAD AVE, HARTFORD Replace CH8 3H621384 HOMESTEAD AVE, HARTFORD Replace CH8 3H621509 Bidwell St, Manchester - Need to re 3H621509 Bidwell St, Manchester - Need to re 3H621641 Hartford, Asylum Ave 300B-2 repl 4 3H621725 RF-1150 Elm St Ext.,RHl,Install 3PH 3H621725 RF-1150 Elm St Ext.,RHl,Install 3PH 3H621725 RF-1150 Elm St Ext.,RHl,Install 3PH 3H621940 85 WOODLAND- HTFD C6266 Replace 250 3H621940 85 WOODLAND- HTFD C6266 Replace 250 WF-41 Zion St-Htfd-@ mh# 4908, rpl ug svc. WF-41 Zion St-Htfd-@ mh# 4908, rpl ug svc. 394 Tolland Tpk.Manch. Disconn.3PH service from P-3954 AP1-YWO Total Cost Less Than 7K HARTFORD, FRANKLIN AVE @ STANDISH ST REBUILD HEX VLT 606 AP3-YWO Resource Variance Met- Labor 62 <= 32 OR -95.41 <= 30 And Contractor $0 <= 2000 HARTFORD, FRANKLIN AVE @ STANDISH ST REBUILD HEX VLT 606 AP3-YWO Resource Variance Met- Labor 62 <= 32 OR -95.41 <= 30 And Contractor $0 <= 2000 Hartford, Broad St - car vs pole 5138- need to replace 150 cobra head AP1-YWO Total Cost Less Than 7K Hartford, Broad St - car vs pole 5138- need to replace 150 cobra head AP1-YWO Total Cost Less Than 7K HARTFORD, SCARBOROUGH ST city to replace pole C9051 AP1-YWO Total Cost Less Than 7K HARTFORD, SCARBOROUGH ST city to replace pole C9051 AP1-YWO Total Cost Less Than 7K DKH - Tower Ave, Htfd - P# 8053 - Problem with 2N10-53z recloser AP1-YWO Total Cost Less Than 7K HOMESTEAD AVE, HARTFORD Replace CH8470 and 250w head AP1-YWO Total Cost Less Than 7K HOMESTEAD AVE, HARTFORD Replace CH8470 and 250w head AP1-YWO Total Cost Less Than 7K Bidwell St, Manchester - Need to replace bad arrester 02 - P-9099 8/11 - HAROH AP1-YWO Total Cost Less Than 7K Bidwell St, Manchester - Need to replace bad arrester 02 - P-9099 8/11 - HAROH AP1-YWO Total Cost Less Than 7K Hartford, Asylum Ave 300B-2 repl 4ways in Hex5856 all 3 phases AP1-YWO Total Cost Less Than 7K RF-1150 Elm St Ext.,RHl,Install 3PH XFMR Bank on pole4966 & install OH/UG SVC AP1-YWO Total Cost Less Than 7K RF-1150 Elm St Ext.,RHl,Install 3PH XFMR Bank on pole4966 & install OH/UG SVC AP1-YWO Total Cost Less Than 7K RF-1150 Elm St Ext.,RHl,Install 3PH XFMR Bank on pole4966 & install OH/UG SVC AP1-YWO Total Cost Less Than 7K 85 WOODLAND- HTFD C6266 Replace 250w head AP1-YWO Total Cost Less Than 7K 85 WOODLAND- HTFD C6266 Replace 250w head AP1-YWO Total Cost Less Than 7K
  6. Page 6 of 879

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued October 23, 2026 RRU-159 Attachment 5 Page 6 of 879 work_order_number description 3H622038 9/19 - ESO - MANCHESTER, LOVE LN, 9 3H622038 9/19 - ESO - MANCHESTER, LOVE LN, 9 3H622038 9/19 - ESO - MANCHESTER, LOVE LN, 9 3H622085 HTFD, Wyllys St, CH9366 replaced 1 3H622085 HTFD, Wyllys St, CH9366 replaced 1 3H622137 99 HENDERSON RD, MANCH - PT Conv# 4 3H622137 99 HENDERSON RD, MANCH - PT Conv# 4 3H622137 99 HENDERSON RD, MANCH - PT Conv# 4 3H622496 WF-40-44 Lawrence St-Htfd-@pole-300 3H622496 WF-40-44 Lawrence St-Htfd-@pole-300 3H622553 12/7 - RSO - HARTFORD, SEQUIN ST - 3H622553 12/7 - RSO - HARTFORD, SEQUIN ST - 3H622617 WF-424-426 New Britain Ave-Htfd-@ m 3H622617 WF-424-426 New Britain Ave-Htfd-@ m 3H720005 12/31 - HAROH - MANCHESTER, CENTE 3H720215 WEST HARTFORD S MAIN - 9A - EVERSOU 3H720215 WEST HARTFORD S MAIN - 9A - EVERSOU 3H720215 WEST HARTFORD S MAIN - 9A - EVERSOU 3H720397 HARTFORD, JEFFERSON ST - ST LT POLE 3H720409 Htfd, Gillet St Replace A mains 2 3H720409 Htfd, Gillet St Replace A mains 2 3H720573 RSO 2/27 WINDSOR, HANSOM HILL RD - 3H720573 RSO 2/27 WINDSOR, HANSOM HILL RD - 3H720590 RSO& AWC, 3/4, HARTFORD, VINE STREE 3H720590 RSO& AWC, 3/4, HARTFORD, VINE STREE 3H720840 603 Broad St-Htfd metered St light 3H720935 RF-970 Marshall Phelps Rd,Windsor, 3H720935 RF-970 Marshall Phelps Rd,Windsor, 3H720935 RF-970 Marshall Phelps Rd,Windsor, 3H721131 8/22 - HAROH - WINDSOR POQUONOCK AV 3H721131 8/22 - HAROH - WINDSOR POQUONOCK AV 3H721131 8/22 - HAROH - WINDSOR POQUONOCK AV 3H721259 Mountain St Htffd POLE 3435 Install 3H721259 Mountain St Htffd POLE 3435 Install 3H721333 5/24 RSO WIndsor Ravine Rd P 3195 3H721333 5/24 RSO WIndsor Ravine Rd P 3195 3H721333 5/24 RSO WIndsor Ravine Rd P 3195 3H721365 NJB 60P HICKSVILLE RD CROM INSTL 60 3L520898 HPS 100W PTT @ PID 79 - COMPLETED 1 3L520898 HPS 100W PTT @ PID 79 - COMPLETED 1 3L620313 Municipal Light Fault Locate and Re 3L620438 WESTPORT POLE 29551 100 MH PDL - CO 3L620438 WESTPORT POLE 29551 100 MH PDL - CO 3L620719 SOUTH WINDSOR POLE 2977 400 HPS COB 3L620719 SOUTH WINDSOR POLE 2977 400 HPS COB long_description 9/19 - ESO - MANCHESTER, LOVE LN, 9A CAR V POLE 2828 - Replace with 40/2 AP1-YWO Total Cost Less Than 7K 9/19 - ESO - MANCHESTER, LOVE LN, 9A CAR V POLE 2828 - Replace with 40/2 AP1-YWO Total Cost Less Than 7K 9/19 - ESO - MANCHESTER, LOVE LN, 9A CAR V POLE 2828 - Replace with 40/2 AP1-YWO Total Cost Less Than 7K HTFD, Wyllys St, CH9366 replaced 143w led head AP1-YWO Total Cost Less Than 7K HTFD, Wyllys St, CH9366 replaced 143w led head AP1-YWO Total Cost Less Than 7K 99 HENDERSON RD, MANCH - PT Conv# 448570-TPA-Fibertech-ParentConv# 447025 cost_element_group ferc_account percent Employee Expenses-EE0 108030 0.34813 Employee Expenses-EE0 593000 0.13862 Employee Expenses-EE0 107010 0.51325 Employee Expenses-EE0 108030 0.25959 Employee Expenses-EE0 107010 0.74041 Employee Expenses-EE0 107010 0.65652 Employee Expenses-EE0 108030 0.21005 Employee Expenses-EE0 587000 0.13343 Employee Expenses-EE0 107010 0.79167 Employee Expenses-EE0 108030 0.20833 Employee Expenses-EE0 108030 0.32432 Employee Expenses-EE0 107010 0.67568 Employee Expenses-EE0 107010 0.7281 Employee Expenses-EE0 108030 0.2719 Employee Expenses-EE0 108030 1 Employee Expenses-EE0 108030 0.44757 Employee Expenses-EE0 107010 0.41661 Employee Expenses-EE0 587000 0.13582 Employee Expenses-EE0 593000 1 Employee Expenses-EE0 107010 0.94511 Employee Expenses-EE0 108030 0.05489 Employee Expenses-EE0 107010 0.976 Employee Expenses-EE0 108030 0.024 Employee Expenses-EE0 107010 0.77112 Employee Expenses-EE0 108030 0.22888 Employee Expenses-EE0 107010 1 Employee Expenses-EE0 107010 0.71003 Employee Expenses-EE0 583000 0.10289 Employee Expenses-EE0 595000 0.18708 Employee Expenses-EE0 108030 0.10423 Employee Expenses-EE0 107010 0.88992 Employee Expenses-EE0 594000 0.00585 Employee Expenses-EE0 108030 0.1875 Employee Expenses-EE0 107010 0.8125 Employee Expenses-EE0 107010 0.65699 Employee Expenses-EE0 108030 0.24873 Employee Expenses-EE0 593000 0.09428 Employee Expenses-EE0 107010 1 Employee Expenses-EE0 107010 0.78723 Employee Expenses-EE0 108030 0.21277 Employee Expenses-EE0 596000 1 Employee Expenses-EE0 107010 0.80555 Employee Expenses-EE0 108030 0.19445 Employee Expenses-EE0 108030 0.2451 Employee Expenses-EE0 107010 0.7549 Employee Expenses-EE0 107010 0.78723 Employee Expenses-EE0 108030 0.21277 Employee Expenses-EE0 107010 0.78723 Employee Expenses-EE0 108030 0.21277 Employee Expenses-EE0 108030 0.23076 Employee Expenses-EE0 107010 0.76924 Employee Expenses-EE0 107010 0.78723 Employee Expenses-EE0 108030 0.21277 Employee Expenses-EE0 107010 0.78723 Employee Expenses-EE0 108030 0.21277 Employee Expenses-EE0 107010 0.78723 Employee Expenses-EE0 108030 0.21277 Employee Expenses-EE0 107010 0.7549 Employee Expenses-EE0 108030 0.2451 Employee Expenses-EE0 107010 0.78723 Employee Expenses-EE0 108030 0.21277 Employee Expenses-EE0 107010 0.78723 Employee Expenses-EE0 108030 0.21277 Employee Expenses-EE0 108030 0.21277 Employee Expenses-EE0 107010 0.78723 Employee Expenses-EE0 107010 0.78723 Employee Expenses-EE0 108030 0.21277 Employee Expenses-EE0 107010 0.78723 Employee Expenses-EE0 108030 0.21277 Employee Expenses-EE0 107010 0.23061 Employee Expenses-EE0 596000 0.76939 Employee Expenses-EE0 107010 0.78724 Employee Expenses-EE0 108030 0.21276 Employee Expenses-EE0 108030 0.21277 Employee Expenses-EE0 107010 0.78723 Employee Expenses-EE0 107010 0.83434 Employee Expenses-EE0 108030 0.16566 Employee Expenses-EE0 595000 0.02008 Employee Expenses-EE0 108030 0.31603 Employee Expenses-EE0 593000 0.05869 Employee Expenses-EE0 107010 0.48925 Employee Expenses-EE0 583000 0.11595 Employee Expenses-EE0 593000 0.25607 Employee Expenses-EE0 108030 0.12182 Employee Expenses-EE0 107010 0.62211 Employee Expenses-EE0 107010 0.78111 Employee Expenses-EE0 584000 0.13897 Employee Expenses-EE0 595000 0.0377 Employee Expenses-EE0 594000 0.02702 Employee Expenses-EE0 108030 0.0152 Employee Expenses-EE0 107010 0.77359 Employee Expenses-EE0 108030 0.16892 Employee Expenses-EE0 595000 0.02385 Employee Expenses-EE0 593000 0.03364 Employee Expenses-EE0 593000 0.36631 Employee Expenses-EE0 108030 0.00804 Employee Expenses-EE0 587000 0.09598 Employee Expenses-EE0 107010 0.52967 Employee Expenses-EE0 593000 1 Employee Expenses-EE0 587000 0.03397 Employee Expenses-EE0 108030 0.06372 Employee Expenses-EE0 107010 0.71774 Employee Expenses-EE0 596000 0.02785 Employee Expenses-EE0 593000 0.15672 Employee Expenses-EE0 107010 0.56734 Employee Expenses-EE0 108030 0.14213 99 HENDERSON RD, MANCH - PT Conv# 448570-TPA-Fibertech-ParentConv# 447025 99 HENDERSON RD, MANCH - PT Conv# 448570-TPA-Fibertech-ParentConv# 447025 WF-40-44 Lawrence St-Htfd-@pole-3002, rpl oh svc to building. WF-40-44 Lawrence St-Htfd-@pole-3002, rpl oh svc to building. 12/7 - RSO - HARTFORD, SEQUIN ST - 18' DB POLE 10816 BROKEN, MADE SAFE AP1-YWO Total Cost Less Than 7K 12/7 - RSO - HARTFORD, SEQUIN ST - 18' DB POLE 10816 BROKEN, MADE SAFE AP1-YWO Total Cost Less Than 7K WF-424-426 New Britain Ave-Htfd-@ mh-2828, rpl ug svc to building. AP2-YWO Total Cost Variance Met - Variance :36.9082 MIN.:-50 MAX.:150 WF-424-426 New Britain Ave-Htfd-@ mh-2828, rpl ug svc to building. AP2-YWO Total Cost Variance Met - Variance :36.9082 MIN.:-50 MAX.:150 12/31 - HAROH - MANCHESTER, CENTER ST, EVERSOURCE P-1500 set 35/2 AP1-YWO Total Cost Less Than 7K WEST HARTFORD S MAIN - 9A - EVERSOURCE P-3059 AP1-YWO Total Cost Less Than 7K WEST HARTFORD S MAIN - 9A - EVERSOURCE P-3059 AP1-YWO Total Cost Less Than 7K WEST HARTFORD S MAIN - 9A - EVERSOURCE P-3059 AP1-YWO Total Cost Less Than 7K HARTFORD, JEFFERSON ST - ST LT POLE 2444 TROUBLE CALL AP1-YWO Total Cost Less Than 7K Htfd, Gillet St Replace A mains 2 sections AP2-YWO Total Cost Variance Met - Variance :-33.7248 MIN.:-50 MAX.:50 Htfd, Gillet St Replace A mains 2 sections AP2-YWO Total Cost Variance Met - Variance :-33.7248 MIN.:-50 MAX.:50 RSO 2/27 WINDSOR, HANSOM HILL RD - DB FAULT REPLACED HANDHOLE 1232C AP1-YWO Total Cost Less Than 7K RSO 2/27 WINDSOR, HANSOM HILL RD - DB FAULT REPLACED HANDHOLE 1232C AP1-YWO Total Cost Less Than 7K RSO& AWC, 3/4, HARTFORD, VINE STREET, 9A REPLACED 4/0 TPX 3743 TO 3742 AP1-YWO Total Cost Less Than 7K RSO& AWC, 3/4, HARTFORD, VINE STREET, 9A REPLACED 4/0 TPX 3743 TO 3742 AP1-YWO Total Cost Less Than 7K 603 Broad St-Htfd metered St light service AP1-YWO Total Cost Less Than 7K RF-970 Marshall Phelps Rd,Windsor, Install new OH/UG Sec SVC AP2-YWO Total Cost Variance Met - Variance :-5.3741 MIN.:-50 MAX.:50 RF-970 Marshall Phelps Rd,Windsor, Install new OH/UG Sec SVC AP2-YWO Total Cost Variance Met - Variance :-5.3741 MIN.:-50 MAX.:50 RF-970 Marshall Phelps Rd,Windsor, Install new OH/UG Sec SVC AP2-YWO Total Cost Variance Met - Variance :-5.3741 MIN.:-50 MAX.:50 8/22 - HAROH - WINDSOR POQUONOCK AVE - REPLACED 2 OH/DB SERVICES P-5248 AP2-YWO Total Cost Variance Met - Variance :3.3243 MIN.:-50 MAX.:50 8/22 - HAROH - WINDSOR POQUONOCK AVE - REPLACED 2 OH/DB SERVICES P-5248 AP2-YWO Total Cost Variance Met - Variance :3.3243 MIN.:-50 MAX.:50 8/22 - HAROH - WINDSOR POQUONOCK AVE - REPLACED 2 OH/DB SERVICES P-5248 AP2-YWO Total Cost Variance Met - Variance :3.3243 MIN.:-50 MAX.:50 Mountain St Htffd POLE 3435 Installed 90' duplex AP1-YWO Total Cost Less Than 7K Mountain St Htffd POLE 3435 Installed 90' duplex AP1-YWO Total Cost Less Than 7K 5/24 RSO WIndsor Ravine Rd P 3195 Replace pole/crossarm AP2-YWO Total Cost Variance Met - Variance :22.2081 MIN.:-50 MAX.:50 5/24 RSO WIndsor Ravine Rd P 3195 Replace pole/crossarm AP2-YWO Total Cost Variance Met - Variance :22.2081 MIN.:-50 MAX.:50 5/24 RSO WIndsor Ravine Rd P 3195 Replace pole/crossarm AP2-YWO Total Cost Variance Met - Variance :22.2081 MIN.:-50 MAX.:50 NJB 60P HICKSVILLE RD CROM INSTL 60' #2 TPX FROM POLE#2024 TO CUST POLE SVC AP1-YWO Total Cost Less Than 7K HPS 100W PTT @ PID 79 - COMPLETED 11/6/15 HARES1 AP1-YWO Total Cost Less Than 7K HPS 100W PTT @ PID 79 - COMPLETED 11/6/15 HARES1 AP1-YWO Total Cost Less Than 7K Municipal Light Fault Locate and Repair @ PID 4569 NO FEED ON POLES AP1-YWO Total Cost Less Than 7K WESTPORT POLE 29551 100 MH PDL - COMPLETED 3/18/16 NTW WESTPORT POLE 29551 100 MH PDL - COMPLETED 3/18/16 NTW SOUTH WINDSOR POLE 2977 400 HPS COBRA - COMPLETED 3/18/16 TOL SOUTH WINDSOR POLE 2977 400 HPS COBRA - COMPLETED 3/18/16 TOL PROSPECT POLE 1597 70 HPS COBRA (SEMI TO FULL) - COMPLETED 3/18/16 WTB 3L620841 PROSPECT POLE 1597 70 HPS COBRA (SE 3L620841 PROSPECT POLE 1597 70 HPS COBRA (SE 3L620897 BETHEL POLE 29 70 HPS COBRA - COMPL 3L620897 BETHEL POLE 29 70 HPS COBRA - COMPL 3L620934 WATERBURY POLE G7635 400 HPS FLOOD 3L620934 WATERBURY POLE G7635 400 HPS FLOOD 3L620966 STAMFORD POLE 17 70 HPS PTT - COMP 3L620966 STAMFORD POLE 17 70 HPS PTT - COMP 3L620985 WINDSOR POLE 2987 70 HPS COBRA - CO 3L620985 WINDSOR POLE 2987 70 HPS COBRA - CO 3L620990 BEACON FALLS POLE 22721 250 HPS COB 3L620990 BEACON FALLS POLE 22721 250 HPS COB 3L620993 WATERBURY POLE 63621 400 HPS COBRA 3L620993 WATERBURY POLE 63621 400 HPS COBRA 3L620994 WATERTOWN POLE 6112 70 HPS COBRA - 3L620994 WATERTOWN POLE 6112 70 HPS COBRA - 3L620995 WINDSOR POLE 2652 70 HPS COBRA - CO 3L620995 WINDSOR POLE 2652 70 HPS COBRA - CO 3L620996 MANCHESTER POLE 7984 250 HPS COBRA 3L620996 MANCHESTER POLE 7984 250 HPS COBRA 3L620999 WATERBURY POLE 5141 100 HPS COBRA - PROSPECT POLE 1597 70 HPS COBRA (SEMI TO FULL) - COMPLETED 3/18/16 WTB BETHEL POLE 29 70 HPS COBRA - COMPLETED 3/9/16 NTW BETHEL POLE 29 70 HPS COBRA - COMPLETED 3/9/16 NTW WATERBURY POLE G7635 400 HPS FLOOD - COMPLETED 3/11/16 WTB AP1-YWO Total Cost Less Than 7K WATERBURY POLE G7635 400 HPS FLOOD - COMPLETED 3/11/16 WTB AP1-YWO Total Cost Less Than 7K STAMFORD POLE 17 70 HPS PTT - COMPLETED 3/18/16 NTW STAMFORD POLE 17 70 HPS PTT - COMPLETED 3/18/16 NTW WINDSOR POLE 2987 70 HPS COBRA - COMPLETED 3/18/16 TOL WINDSOR POLE 2987 70 HPS COBRA - COMPLETED 3/18/16 TOL BEACON FALLS POLE 22721 250 HPS COBRA - COMPLETED 3/18/16 WTB BEACON FALLS POLE 22721 250 HPS COBRA - COMPLETED 3/18/16 WTB WATERBURY POLE 63621 400 HPS COBRA - COMPLETED 3/18/16 WTB WATERBURY POLE 63621 400 HPS COBRA - COMPLETED 3/18/16 WTB WATERTOWN POLE 6112 70 HPS COBRA - COMPLETED 3/18/16 WTB WATERTOWN POLE 6112 70 HPS COBRA - COMPLETED 3/18/16 WTB WINDSOR POLE 2652 70 HPS COBRA - COMPLETED 3/18/16 TOL WINDSOR POLE 2652 70 HPS COBRA - COMPLETED 3/18/16 TOL MANCHESTER POLE 7984 250 HPS COBRA - COMPLETED 3/18/16 TOL MANCHESTER POLE 7984 250 HPS COBRA - COMPLETED 3/18/16 TOL WATERBURY POLE 5141 100 HPS COBRA - COMPLETED 3/18/16 HAR WATERBURY POLE 5141 100 HPS COBRA - COMPLETED 3/18/16 HAR 3L620999 WATERBURY POLE 5141 100 HPS COBRA - 3L621000 MERIDEN POLE 5569 70 HPS COBRA - CO MERIDEN POLE 5569 70 HPS COBRA - COMPLETED 3/18/16 SIM MERIDEN POLE 5569 70 HPS COBRA - COMPLETED 3/18/16 SIM 3L621000 MERIDEN POLE 5569 70 HPS COBRA - CO 3L622637 Municipal Light Fault Locate and Re 3L622637 Municipal Light Fault Locate and Re 3L623404 Municipal Light Fault Locate and Re 3L623404 Municipal Light Fault Locate and Re 3L721076 HARTFORD POLE 6156 150 HPS COBRA CO 3L721076 HARTFORD POLE 6156 150 HPS COBRA CO 3L721151 BLOOMFIELD, CHESTNUT HILL RD, P-54 3L721151 BLOOMFIELD, CHESTNUT HILL RD, P-54 3R420330 CD00283-02 Ashford, RT 44, Knowlto 3R420330 CD00283-02 Ashford, RT 44, Knowlto 3R420330 CD00283-02 Ashford, RT 44, Knowlto 3R420330 CD00283-02 Ashford, RT 44, Knowlto 3R420330 CD00283-02 Ashford, RT 44, Knowlto 3R520161 CD00389-01 Remove Autos & Convert 3R520161 CD00389-01 Remove Autos & Convert 3R520161 CD00389-01 Remove Autos & Convert 3R520167 CD00387-04 Replace Pad 312 Rt 1 3R520167 CD00387-04 Replace Pad 312 Rt 1 3R520167 CD00387-04 Replace Pad 312 Rt 1 3R520167 CD00387-04 Replace Pad 312 Rt 1 3R520167 CD00387-04 Replace Pad 312 Rt 1 3R520199 CD00390-02 - System Resiliency - St 3R520199 CD00390-02 - System Resiliency - St 3R520199 CD00390-02 - System Resiliency - St 3R520199 CD00390-02 - System Resiliency - St 3R620039 JL 2015 SR highway crossing Locatio 3R620039 JL 2015 SR highway crossing Locatio 3R620039 JL 2015 SR highway crossing Locatio 3R620039 JL 2015 SR highway crossing Locatio 3R620286 MK SR Highway Crossing, LocationID- 3R620320 BC-CD00630-02 SR Hwy Xng Upg;Obj ID 3R620320 BC-CD00630-02 SR Hwy Xng Upg;Obj ID 3R620320 BC-CD00630-02 SR Hwy Xng Upg;Obj ID 3R620320 BC-CD00630-02 SR Hwy Xng Upg;Obj ID 3R620320 BC-CD00630-02 SR Hwy Xng Upg;Obj ID 3R620361 SR Highway Crossing Upgrades CD0063 3R620361 SR Highway Crossing Upgrades CD0063 Municipal Light Fault Locate and Repair @ POLE 1210 NO POWER CL-YWO Variance - Contractor Labor Municipal Light Fault Locate and Repair @ POLE 1210 NO POWER CL-YWO Variance - Contractor Labor Municipal Light Fault Locate and Repair@ POLE C6404 NO POWER AP1-YWO Total Cost Less Than 7K Municipal Light Fault Locate and Repair@ POLE C6404 NO POWER AP1-YWO Total Cost Less Than 7K HARTFORD POLE 6156 150 HPS COBRA COMP 4/13 TOL AP1-YWO Total Cost Less Than 7K HARTFORD POLE 6156 150 HPS COBRA COMP 4/13 TOL AP1-YWO Total Cost Less Than 7K BLOOMFIELD, CHESTNUT HILL RD, P-5481 REMOVED 100W HPS PTT/NEED TO REPLACE AP1-YWO Total Cost Less Than 7K BLOOMFIELD, CHESTNUT HILL RD, P-5481 REMOVED 100W HPS PTT/NEED TO REPLACE AP1-YWO Total Cost Less Than 7K CD00283-02 Ashford, RT 44, Knowlton Hill Rd (pole 1089) to (pole 1120) CL-YWO Variance - Contractor Labor CD00283-02 Ashford, RT 44, Knowlton Hill Rd (pole 1089) to (pole 1120) CL-YWO Variance - Contractor Labor CD00283-02 Ashford, RT 44, Knowlton Hill Rd (pole 1089) to (pole 1120) CL-YWO Variance - Contractor Labor CD00283-02 Ashford, RT 44, Knowlton Hill Rd (pole 1089) to (pole 1120) CL-YWO Variance - Contractor Labor CD00283-02 Ashford, RT 44, Knowlton Hill Rd (pole 1089) to (pole 1120) CL-YWO Variance - Contractor Labor CD00389-01 Remove Autos & Convert Boston Post Rd, Guilford CI-YWO Variance - Contractor Invoice CD00389-01 Remove Autos & Convert Boston Post Rd, Guilford CI-YWO Variance - Contractor Invoice CD00389-01 Remove Autos & Convert Boston Post Rd, Guilford CI-YWO Variance - Contractor Invoice CD00387-04 Replace Pad 312 Rt 1 Guilford CI-YWO Variance - Contractor Invoice CD00387-04 Replace Pad 312 Rt 1 Guilford CI-YWO Variance - Contractor Invoice CD00387-04 Replace Pad 312 Rt 1 Guilford CI-YWO Variance - Contractor Invoice CD00387-04 Replace Pad 312 Rt 1 Guilford CI-YWO Variance - Contractor Invoice CD00387-04 Replace Pad 312 Rt 1 Guilford CI-YWO Variance - Contractor Invoice CD00390-02 - System Resiliency - Step Down XFMRs - Wildrose & Sam Hill CI-YWO Variance - Contractor Invoice CD00390-02 - System Resiliency - Step Down XFMRs - Wildrose & Sam Hill CI-YWO Variance - Contractor Invoice CD00390-02 - System Resiliency - Step Down XFMRs - Wildrose & Sam Hill CI-YWO Variance - Contractor Invoice CD00390-02 - System Resiliency - Step Down XFMRs - Wildrose & Sam Hill CI-YWO Variance - Contractor Invoice JL 2015 SR highway crossing Location ID 139937542 Pole 946 & 947 CL-YWO Variance - Contractor Labor JL 2015 SR highway crossing Location ID 139937542 Pole 946 & 947 CL-YWO Variance - Contractor Labor JL 2015 SR highway crossing Location ID 139937542 Pole 946 & 947 CL-YWO Variance - Contractor Labor JL 2015 SR highway crossing Location ID 139937542 Pole 946 & 947 CL-YWO Variance - Contractor Labor MK SR Highway Crossing, LocationID-46921324, Poles-4515,4514 CI-YWO Variance - Contractor Invoice BC-CD00630-02 SR Hwy Xng Upg;Obj ID(135331980&139930744), I-691@Lewis Ave 417412 AP2-YWO Total Cost Variance Met - Variance :-4.2222 MIN.:-30 MAX.:30 BC-CD00630-02 SR Hwy Xng Upg;Obj ID(135331980&139930744), I-691@Lewis Ave 417412 AP2-YWO Total Cost Variance Met - Variance :-4.2222 MIN.:-30 MAX.:30 BC-CD00630-02 SR Hwy Xng Upg;Obj ID(135331980&139930744), I-691@Lewis Ave 417412 AP2-YWO Total Cost Variance Met - Variance :-4.2222 MIN.:-30 MAX.:30 BC-CD00630-02 SR Hwy Xng Upg;Obj ID(135331980&139930744), I-691@Lewis Ave 417412 AP2-YWO Total Cost Variance Met - Variance :-4.2222 MIN.:-30 MAX.:30 BC-CD00630-02 SR Hwy Xng Upg;Obj ID(135331980&139930744), I-691@Lewis Ave 417412 AP2-YWO Total Cost Variance Met - Variance :-4.2222 MIN.:-30 MAX.:30 SR Highway Crossing Upgrades CD00631-02 Object ID (46795754) E. River Rd SR Highway Crossing Upgrades CD00631-02 Object ID (46795754) E. River Rd
  7. Page 7 of 879

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued October 23, 2026 RRU-159 Attachment 5 Page 7 of 879 work_order_number description long_description cost_element_group ferc_account percent SR Highway Crossing Upgrades CD00631-02 Object ID (46795754) E. River Rd 3R620361 SR Highway Crossing Upgrades CD0063 3R620361 SR Highway Crossing Upgrades CD0063 3R620361 SR Highway Crossing Upgrades CD0063 3R620362 CD00631 SR HIGWY XING UPGRADES OBJE 3R620362 CD00631 SR HIGWY XING UPGRADES OBJE 3R620362 CD00631 SR HIGWY XING UPGRADES OBJE 3R620362 CD00631 SR HIGWY XING UPGRADES OBJE 3R621025 CD00471-01 Elim. 23U Voluntown S/S 3R621025 CD00471-01 Elim. 23U Voluntown S/S 3R621025 CD00471-01 Elim. 23U Voluntown S/S 3R621025 CD00471-01 Elim. 23U Voluntown S/S 3R621025 CD00471-01 Elim. 23U Voluntown S/S 3R621028 CD00471-01 Elim. 23U Voluntown S/S 3R621028 CD00471-01 Elim. 23U Voluntown S/S 3R621028 CD00471-01 Elim. 23U Voluntown S/S 3R621028 CD00471-01 Elim. 23U Voluntown S/S 3R621028 CD00471-01 Elim. 23U Voluntown S/S 3R621028 CD00471-01 Elim. 23U Voluntown S/S 3R621031 CD00471-02 Conversion Work Install 3R621031 CD00471-02 Conversion Work Install 3R621031 CD00471-02 Conversion Work Install 3R621031 CD00471-02 Conversion Work Install 3R621031 CD00471-02 Conversion Work Install 3R621032 CD00471-03 Conversion Work Rte.49 S 3R621032 CD00471-03 Conversion Work Rte.49 S 3R621032 CD00471-03 Conversion Work Rte.49 S 3R621032 CD00471-03 Conversion Work Rte.49 S 3R621032 CD00471-03 Conversion Work Rte.49 S 3R621032 CD00471-03 Conversion Work Rte.49 S 3R621032 CD00471-03 Conversion Work Rte.49 S 3R621034 CD00471-04 Conversion Work Install 3R621034 CD00471-04 Conversion Work Install 3R621034 CD00471-04 Conversion Work Install 3R621034 CD00471-04 Conversion Work Install 3R621034 CD00471-04 Conversion Work Install 3R621036 CD00471-04 Conversion Work Install 3R621036 CD00471-04 Conversion Work Install 3R621036 CD00471-04 Conversion Work Install 3R621037 CD00471-05 Conversion Work Install 3R621037 CD00471-05 Conversion Work Install 3R621037 CD00471-05 Conversion Work Install 3R621037 CD00471-05 Conversion Work Install 3R621037 CD00471-05 Conversion Work Install 3R720059 CAL - CD00849-01 - Ckt 23K12 MBI In 3R720059 CAL - CD00849-01 - Ckt 23K12 MBI In 3R720059 CAL - CD00849-01 - Ckt 23K12 MBI In 3R720059 CAL - CD00849-01 - Ckt 23K12 MBI In 3S321466 CDOT 17-186 - RTE 6 Farmington Road 3S321466 CDOT 17-186 - RTE 6 Farmington Road 3S321466 CDOT 17-186 - RTE 6 Farmington Road 3S420666 Farmington Ave. Farm. @ UConn Heath 3S520060 Elec Svc Existing Com/Ind DESG (DN) 3S520060 Elec Svc Existing Com/Ind DESG (DN) 3S520060 Elec Svc Existing Com/Ind DESG (DN) 3S520060 Elec Svc Existing Com/Ind DESG (DN) 3S521081 DB LOOP URD AT DUNCASTER WOOD, GRAN 3S521081 DB LOOP URD AT DUNCASTER WOOD, GRAN 3S521505 16 BARNARD DR, SIMSBURY / REPLACE O 3S521505 16 BARNARD DR, SIMSBURY / REPLACE O 3S620038 W HTFD, South Main St., Replaced Ne 3S620038 W HTFD, South Main St., Replaced Ne 3S620038 W HTFD, South Main St., Replaced Ne 3S620064 43107607 43107626 43107627 43107628 43107630 43107631 43107632 43107634 43107635 43107637 43107638 43107640 43107642 43107643 43107644 43107645 43107646 43107649 43107651 43107652 43107662 43107663 43107664 43107665 43107667 43107668 43107669 43107672 SIMSBURY 995 HOPMEADOW WESTMINSTER 900MHZ RADIO SITE BUILD - GREENWICH CL&P MHZ RADIO PROJECT SOUTHINGTON 9 CL&P MHZ RADIO PROJECT WESTBROOK CT CL&P 900 MHZ RADIO PROJECT LAKEVIEW CL&P 900 MHZ RADIO PROJECT LITCHFIE CL&P 900 MHZ RADIO PROJECT MONROE CL&P 900 MHZ RADIO PROJECT RIDGEFIE CL&P 900 MHZ RADIO PROJECT OXFORD C CL&P 900 MHZ RADIO PROJECT SOUTHBUR CL&P 900 MHZ RADIO PROJECT WILTON C CL&P 900 MHZ PROJECT - BROOKLYN TOLLAND 900 MHZ RADIO SITE WORK 900 MHZ RADIO SITE WORK-GOOSE HILLCL&P 900 MHZ RADIO PROJECT UNION CL&P 900 MHZ RADIO PROJECT THOMPSON 900 MHZ RADIO SITE WORK-DISASTER RE CL&P 900 MHZ RADIO PROJECT - TALCOT CL&P 900 MHZ RADIO PROJECT - STONIN 900 MHZ RADIOS - HOLDING WORKORDER CL&P 900 MHZ RADIO PROJCT-WESTPORT CL&P 900 MHZ RADIO PROJCT-WEST PEAK CL&P 900 MHZ RADIO PROJCT-PROSPECT CL&P 900 MHZ RADIO PROJCT-SOUTH MOU CL&P 900 MHZ RADIO PROJCT-WOODBURY CL&P 900 MHZ RADIO PROJCT-COOPER ST CL&P 900 MHZ RADIO PROJCT-NEWINGTON CL&P 900 MHZ BALD HILL UNION 4D220696 TS- BRADLEY AVE. BRANFORD. P#37212. 4D421399 9/6,ESO,9A,car vp3036 trouble ticke 4D421399 9/6,ESO,9A,car vp3036 trouble ticke 4D421399 9/6,ESO,9A,car vp3036 trouble ticke 4D421399 9/6,ESO,9A,car vp3036 trouble ticke 4D520654 CD00423, seg01, 30R13/11J58 ROW rel 4D520654 CD00423, seg01, 30R13/11J58 ROW rel 4D520654 CD00423, seg01, 30R13/11J58 ROW rel 4D520695 NS- P 272 Cow Hill Rd, CL- Shift to 4D520695 NS- P 272 Cow Hill Rd, CL- Shift to 4D520695 NS- P 272 Cow Hill Rd, CL- Shift to 4D620226 Elec Maint Replace/Renewal/Obsol OH 4D620423 MV-MADISON CREWS REPLACED REJECT PO 4D620423 MV-MADISON CREWS REPLACED REJECT PO 4D620423 MV-MADISON CREWS REPLACED REJECT PO 4D620654 NS- P 692 Cow Hill Rd, KW- Shift to 4D620654 NS- P 692 Cow Hill Rd, KW- Shift to 4D620709 CB//GUILFORD, 95 HART RD//RELOCATE Employee Expenses-EE0 593000 0.15208 Employee Expenses-EE0 594000 0.00386 Employee Expenses-EE0 587000 0.13459 Employee Expenses-EE0 107010 0.65039 Employee Expenses-EE0 108030 0.08512 Employee Expenses-EE0 587000 0.03936 Employee Expenses-EE0 593000 0.22513 Employee Expenses-EE0 593000 0.00133 Employee Expenses-EE0 107010 0.60725 Employee Expenses-EE0 583000 0.11617 Employee Expenses-EE0 594000 0.01524 Employee Expenses-EE0 108030 0.26001 Employee Expenses-EE0 594000 0.09813 Employee Expenses-EE0 596000 0.0064 Employee Expenses-EE0 107010 0.75547 Employee Expenses-EE0 595000 0.00352 Employee Expenses-EE0 583000 0.00884 Employee Expenses-EE0 108030 0.12764 Employee Expenses-EE0 107010 0.69412 Employee Expenses-EE0 596000 0.00408 Employee Expenses-EE0 108030 0.25707 Employee Expenses-EE0 595000 0.00824 Employee Expenses-EE0 583000 0.03649 Employee Expenses-EE0 594000 0.00284 Employee Expenses-EE0 584000 0.02403 Employee Expenses-EE0 107010 0.76449 Employee Expenses-EE0 108030 0.13015 Employee Expenses-EE0 583000 0.05626 Employee Expenses-EE0 595000 0.01308 Employee Expenses-EE0 593000 0.00915 Employee Expenses-EE0 593000 0.01542 Employee Expenses-EE0 107010 0.66759 Employee Expenses-EE0 595000 0.01296 Employee Expenses-EE0 583000 0.09826 Employee Expenses-EE0 108030 0.20577 Employee Expenses-EE0 107010 0.83178 Employee Expenses-EE0 108030 0.14959 Employee Expenses-EE0 595000 0.01863 Employee Expenses-EE0 107010 0.8012 Employee Expenses-EE0 593000 0.01278 Employee Expenses-EE0 583000 0.02898 Employee Expenses-EE0 108030 0.14186 Employee Expenses-EE0 595000 0.01518 Employee Expenses-EE0 108030 0.14328 Employee Expenses-EE0 593000 0.17693 Employee Expenses-EE0 107010 0.48748 Employee Expenses-EE0 596000 0.19231 Employee Expenses-EE0 107010 0.5286 Employee Expenses-EE0 108030 0.30385 Employee Expenses-EE0 593000 0.16755 Employee Expenses-EE0 594000 1 Employee Expenses-EE0 584000 0.07393 Employee Expenses-EE0 593000 0.02863 Employee Expenses-EE0 107010 0.88466 Employee Expenses-EE0 595000 0.01278 Employee Expenses-EE0 107010 0.97734 Employee Expenses-EE0 108030 0.02266 Employee Expenses-EE0 108030 0.22168 Employee Expenses-EE0 107010 0.77832 Employee Expenses-EE0 108030 0.21996 Employee Expenses-EE0 595000 0.00565 Employee Expenses-EE0 107010 0.77439 Employee Expenses-EE0 Employee Expenses-EE0 Employee Expenses-EE0 Employee Expenses-EE0 Employee Expenses-EE0 Employee Expenses-EE0 Employee Expenses-EE0 Employee Expenses-EE0 Employee Expenses-EE0 Employee Expenses-EE0 Employee Expenses-EE0 Employee Expenses-EE0 Employee Expenses-EE0 Employee Expenses-EE0 Employee Expenses-EE0 Employee Expenses-EE0 Employee Expenses-EE0 Employee Expenses-EE0 Employee Expenses-EE0 Employee Expenses-EE0 Employee Expenses-EE0 Employee Expenses-EE0 Employee Expenses-EE0 Employee Expenses-EE0 Employee Expenses-EE0 Employee Expenses-EE0 Employee Expenses-EE0 Employee Expenses-EE0 Employee Expenses-EE0 108030 107010 107010 107010 107010 107010 107010 107010 107010 107010 107010 107010 107010 107010 107010 107010 107010 107010 107010 107010 107010 107010 107010 107010 107010 107010 107010 107010 107010 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 Employee Expenses-EE0 107010 1 Employee Expenses-EE0 108030 0.24365 Employee Expenses-EE0 107010 0.35267 Employee Expenses-EE0 593000 0.06464 Employee Expenses-EE0 594000 0.33904 Employee Expenses-EE0 107010 0.91457 Employee Expenses-EE0 584000 0.00153 Employee Expenses-EE0 594000 0.0839 Employee Expenses-EE0 107010 0.28481 Employee Expenses-EE0 108030 0.13768 Employee Expenses-EE0 593000 0.57751 Employee Expenses-EE0 593000 1 Employee Expenses-EE0 107010 0.45346 Employee Expenses-EE0 108030 0.29944 Employee Expenses-EE0 593000 0.2471 Employee Expenses-EE0 107010 0.84581 Employee Expenses-EE0 108030 0.15419 Employee Expenses-EE0 107010 0.77833 Employee Expenses-EE0 108030 0.22167 Employee Expenses-EE0 595000 0.24857 Employee Expenses-EE0 107010 0.33004 Employee Expenses-EE0 108030 0.13572 Employee Expenses-EE0 583000 0.28567 Employee Expenses-EE0 107010 1 Employee Expenses-EE0 107010 0.3857 Employee Expenses-EE0 108030 0.20886 Employee Expenses-EE0 593000 0.40544 Employee Expenses-EE0 108030 0.04081 Employee Expenses-EE0 595000 0.01009 SR Highway Crossing Upgrades CD00631-02 Object ID (46795754) E. River Rd SR Highway Crossing Upgrades CD00631-02 Object ID (46795754) E. River Rd CD00631 SR HIGWY XING UPGRADES OBJECT ID (46818750) HARTFORD RD CD00631 SR HIGWY XING UPGRADES OBJECT ID (46818750) HARTFORD RD CD00631 SR HIGWY XING UPGRADES OBJECT ID (46818750) HARTFORD RD CD00631 SR HIGWY XING UPGRADES OBJECT ID (46818750) HARTFORD RD CD00471-01 Elim. 23U Voluntown S/S - Convert Machine Shop w/XFbank AP3-YWO Resource Variance Met- Labor 4 <= 32 OR 300 <= 30 And Contractor $351.6 <= 2000 CD00471-01 Elim. 23U Voluntown S/S - Convert Machine Shop w/XFbank AP3-YWO Resource Variance Met- Labor 4 <= 32 OR 300 <= 30 And Contractor $351.6 <= 2000 CD00471-01 Elim. 23U Voluntown S/S - Convert Machine Shop w/XFbank AP3-YWO Resource Variance Met- Labor 4 <= 32 OR 300 <= 30 And Contractor $351.6 <= 2000 CD00471-01 Elim. 23U Voluntown S/S - Convert Machine Shop w/XFbank AP3-YWO Resource Variance Met- Labor 4 <= 32 OR 300 <= 30 And Contractor $351.6 <= 2000 CD00471-01 Elim. 23U Voluntown S/S - Convert Machine Shop w/XFbank AP3-YWO Resource Variance Met- Labor 4 <= 32 OR 300 <= 30 And Contractor $351.6 <= 2000 CD00471-01 Elim. 23U Voluntown S/S Convert School & Housing Authority Phase A AP2-YWO Total Cost Variance Met - Variance :-25.243 MIN.:-30 MAX.:30 CD00471-01 Elim. 23U Voluntown S/S Convert School & Housing Authority Phase A AP2-YWO Total Cost Variance Met - Variance :-25.243 MIN.:-30 MAX.:30 CD00471-01 Elim. 23U Voluntown S/S Convert School & Housing Authority Phase A AP2-YWO Total Cost Variance Met - Variance :-25.243 MIN.:-30 MAX.:30 CD00471-01 Elim. 23U Voluntown S/S Convert School & Housing Authority Phase A AP2-YWO Total Cost Variance Met - Variance :-25.243 MIN.:-30 MAX.:30 CD00471-01 Elim. 23U Voluntown S/S Convert School & Housing Authority Phase A AP2-YWO Total Cost Variance Met - Variance :-25.243 MIN.:-30 MAX.:30 CD00471-01 Elim. 23U Voluntown S/S Convert School & Housing Authority Phase A AP2-YWO Total Cost Variance Met - Variance :-25.243 MIN.:-30 MAX.:30 CD00471-02 Conversion Work Install Step Down XF Rte.165 - Place on Phase C AP2-YWO Total Cost Variance Met - Variance :-28.6336 MIN.:-40 MAX.:40 CD00471-02 Conversion Work Install Step Down XF Rte.165 - Place on Phase C AP2-YWO Total Cost Variance Met - Variance :-28.6336 MIN.:-40 MAX.:40 CD00471-02 Conversion Work Install Step Down XF Rte.165 - Place on Phase C AP2-YWO Total Cost Variance Met - Variance :-28.6336 MIN.:-40 MAX.:40 CD00471-02 Conversion Work Install Step Down XF Rte.165 - Place on Phase C AP2-YWO Total Cost Variance Met - Variance :-28.6336 MIN.:-40 MAX.:40 CD00471-02 Conversion Work Install Step Down XF Rte.165 - Place on Phase C AP2-YWO Total Cost Variance Met - Variance :-28.6336 MIN.:-40 MAX.:40 CD00471-03 Conversion Work Rte.49 South AP2-YWO Total Cost Variance Met - Variance :-25.124 MIN.:-30 MAX.:30 CD00471-03 Conversion Work Rte.49 South AP2-YWO Total Cost Variance Met - Variance :-25.124 MIN.:-30 MAX.:30 CD00471-03 Conversion Work Rte.49 South AP2-YWO Total Cost Variance Met - Variance :-25.124 MIN.:-30 MAX.:30 CD00471-03 Conversion Work Rte.49 South AP2-YWO Total Cost Variance Met - Variance :-25.124 MIN.:-30 MAX.:30 CD00471-03 Conversion Work Rte.49 South AP2-YWO Total Cost Variance Met - Variance :-25.124 MIN.:-30 MAX.:30 CD00471-03 Conversion Work Rte.49 South AP2-YWO Total Cost Variance Met - Variance :-25.124 MIN.:-30 MAX.:30 CD00471-03 Conversion Work Rte.49 South AP2-YWO Total Cost Variance Met - Variance :-25.124 MIN.:-30 MAX.:30 CD00471-04 Conversion Work Install Step Down XF Rte.49 North AP2-YWO Total Cost Variance Met - Variance :32.2343 MIN.:-40 MAX.:40 CD00471-04 Conversion Work Install Step Down XF Rte.49 North AP2-YWO Total Cost Variance Met - Variance :32.2343 MIN.:-40 MAX.:40 CD00471-04 Conversion Work Install Step Down XF Rte.49 North AP2-YWO Total Cost Variance Met - Variance :32.2343 MIN.:-40 MAX.:40 CD00471-04 Conversion Work Install Step Down XF Rte.49 North AP2-YWO Total Cost Variance Met - Variance :32.2343 MIN.:-40 MAX.:40 CD00471-04 Conversion Work Install Step Down XF Rte.49 North AP2-YWO Total Cost Variance Met - Variance :32.2343 MIN.:-40 MAX.:40 CD00471-04 Conversion Work Install Step Down XF Rte.49 North AP2-YWO Total Cost Variance Met - Variance :2.0975 MIN.:-40 MAX.:40 CD00471-04 Conversion Work Install Step Down XF Rte.49 North AP2-YWO Total Cost Variance Met - Variance :2.0975 MIN.:-40 MAX.:40 CD00471-04 Conversion Work Install Step Down XF Rte.49 North AP2-YWO Total Cost Variance Met - Variance :2.0975 MIN.:-40 MAX.:40 CD00471-05 Conversion Work Install Step Down XF Shetucket Tpke P#449 AP2-YWO Total Cost Variance Met - Variance :-30.923 MIN.:-40 MAX.:40 CD00471-05 Conversion Work Install Step Down XF Shetucket Tpke P#449 AP2-YWO Total Cost Variance Met - Variance :-30.923 MIN.:-40 MAX.:40 CD00471-05 Conversion Work Install Step Down XF Shetucket Tpke P#449 AP2-YWO Total Cost Variance Met - Variance :-30.923 MIN.:-40 MAX.:40 CD00471-05 Conversion Work Install Step Down XF Shetucket Tpke P#449 AP2-YWO Total Cost Variance Met - Variance :-30.923 MIN.:-40 MAX.:40 CD00471-05 Conversion Work Install Step Down XF Shetucket Tpke P#449 AP2-YWO Total Cost Variance Met - Variance :-30.923 MIN.:-40 MAX.:40 CAL - CD00849-01 - Ckt 23K12 MBI Initiative Design Work, Westport AP1-YWO Total Cost Less Than 7K CAL - CD00849-01 - Ckt 23K12 MBI Initiative Design Work, Westport AP1-YWO Total Cost Less Than 7K CAL - CD00849-01 - Ckt 23K12 MBI Initiative Design Work, Westport AP1-YWO Total Cost Less Than 7K CAL - CD00849-01 - Ckt 23K12 MBI Initiative Design Work, Westport AP1-YWO Total Cost Less Than 7K CDOT 17-186 - RTE 6 Farmington Road Widening - OH 6 of 6 - Scott Swamp Rd JE-YWO Variance Job Type Exclusion CDOT 17-186 - RTE 6 Farmington Road Widening - OH 6 of 6 - Scott Swamp Rd JE-YWO Variance Job Type Exclusion CDOT 17-186 - RTE 6 Farmington Road Widening - OH 6 of 6 - Scott Swamp Rd JE-YWO Variance Job Type Exclusion Farmington Ave. Farm. @ UConn Heath Center. Adjust MH covers @ 10 locations AP2-YWO Total Cost Variance Met - Variance :29.7392 MIN.:-40 MAX.:40 Elec Svc Existing Com/Ind DESG (DN) Elec Svc Existing Com/Ind DESG (DN) Elec Svc Existing Com/Ind DESG (DN) Elec Svc Existing Com/Ind DESG (DN) DB LOOP URD AT DUNCASTER WOOD, GRANBY JE-YWO Variance Job Type Exclusion DB LOOP URD AT DUNCASTER WOOD, GRANBY JE-YWO Variance Job Type Exclusion 16 BARNARD DR, SIMSBURY / REPLACE OH SVC W/ #2 TPX 16 BARNARD DR, SIMSBURY / REPLACE OH SVC W/ #2 TPX W HTFD, South Main St., Replaced Network Protector and transformer U-259 W HTFD, South Main St., Replaced Network Protector and transformer U-259 W HTFD, South Main St., Replaced Network Protector and transformer U-259 SIMSBURY 995 HOPMEADOW WESTMINSTER SCHOOL LINE RELO (PHASE 1) AP1-YWO Total Cost Less Than 7K 900MHZ RADIO SITE BUILD - GREENWICH CL&P MHZ RADIO PROJECT SOUTHINGTON CL&P MHZ RADIO PROJECT STONE RANCH CTSP CL&P MHZ RADIO PROJECT WESTBROOK CTSP CL&P 900 MHZ RADIO PROJECT LAKEVIEW SS CL&P 900 MHZ RADIO PROJECT LITCHFIELD CTSP CL&P 900 MHZ RADIO PROJECT MONROE CL&P 900 MHZ RADIO PROJECT RIDGEFIELD CL&P 900 MHZ RADIO PROJECT OXFORD CTSP CL&P 900 MHZ RADIO PROJECT SOUTHBURY CTSP CL&P 900 MHZ RADIO PROJECT WILTON CTSP CL&P 900 MHZ PROJECT - BROOKLY CROWN CASTLE 116 GRANT HILL ROAD TOLLAND 900 MHZ RADIO SITE WORK 900 MHZ RADIO SITE WORK-GOOSE HILL-SHELTER REQUESTOR - P. SCHUBERTH MANAGER-G. BLANCHARD CL&P 900 MHZ RADIO PROJECT UNION CL&P 900 MHZ RADIO PROJECT THOMPSON 900 MHZ RADIO SITE WORK-DISASTER RECOVERY EQUIPMENT REQUESTOR - P. SCHUBERTH MANAGER-G. BLANCHARD CL&P 900 MHZ RADIO PROJECT - TALCOTT MOUNTAIN CL&P 900 MHZ RADIO PROJECT - STONINGTON 900 MHZ RADIOS - HOLDING WORKORDER CL&P 900 MHZ RADIO PROJECT - WESTPORT CL&P 900 MHZ RADIO PROJECT - WEST PEAK BROOKLYN CT CL&P 900 MHZ RADIO PROJECT - PROSPECT CL&P 900 MHZ RADIO PROJECT - SOUTH MOUNTAIN BRISTOL CT CL&P 900 MHZ RADIO PROJECT - WOODBURY------ 202 GREAT HILL ROAD CL&P 900 MHZ RADIO PROJECT - COOPER STREET- 46 COOPER STREET, MERIDEN CT CONTACT: P.SCHUBERTH-MANAGER: G. BLANCHARD CL&P 900 MHZ RADIO PROJECT - NEWINGTON- 3333 BERLIN TURNPIKE, NEWINGTON CONTACT: P.SCHUBERTH-MANAGER: G. BLANCHARD CL&P 900 MHZ RADIO PROJECT - BALD HILL ROAD, UNION CT PURCHASE ANTENNA SYSTEM FOR DSCADA BASE AND CONTRACTOR LABOR TS- BRADLEY AVE. BRANFORD. P#37212. INST THREE 900A IN-LINE SWITCHES 9/6,ESO,9A,car vp3036 trouble ticket & timesheet in documents AP2-YWO Total Cost Variance Met - Variance :39.5828 MIN.:-50 MAX.:50 9/6,ESO,9A,car vp3036 trouble ticket & timesheet in documents AP2-YWO Total Cost Variance Met - Variance :39.5828 MIN.:-50 MAX.:50 9/6,ESO,9A,car vp3036 trouble ticket & timesheet in documents AP2-YWO Total Cost Variance Met - Variance :39.5828 MIN.:-50 MAX.:50 9/6,ESO,9A,car vp3036 trouble ticket & timesheet in documents AP2-YWO Total Cost Variance Met - Variance :39.5828 MIN.:-50 MAX.:50 CD00423, seg01, 30R13/11J58 ROW relocate, U.G., Guilford CL-YWO Variance - Contractor Labor CD00423, seg01, 30R13/11J58 ROW relocate, U.G., Guilford CL-YWO Variance - Contractor Labor CD00423, seg01, 30R13/11J58 ROW relocate, U.G., Guilford CL-YWO Variance - Contractor Labor NS- P 272 Cow Hill Rd, CL- Shift to Frontier Pole 272 NS- P 272 Cow Hill Rd, CL- Shift to Frontier Pole 272 NS- P 272 Cow Hill Rd, CL- Shift to Frontier Pole 272 Elec Maint Replace/Renewal/Obsol OH DESG (AROH) AP1-YWO Total Cost Less Than 7K MV-MADISON CREWS REPLACED REJECT POLE 1170 AP1-YWO Total Cost Less Than 7K MV-MADISON CREWS REPLACED REJECT POLE 1170 AP1-YWO Total Cost Less Than 7K MV-MADISON CREWS REPLACED REJECT POLE 1170 AP1-YWO Total Cost Less Than 7K NS- P 692 Cow Hill Rd, KW- Shift to New Pole, Rmv 600A Disconnects CL-YWO Variance - Contractor Labor NS- P 692 Cow Hill Rd, KW- Shift to New Pole, Rmv 600A Disconnects CL-YWO Variance - Contractor Labor CB//GUILFORD, 95 HART RD//RELOCATE OH SVC CB//GUILFORD, 95 HART RD//RELOCATE OH SVC 4D620709 CB//GUILFORD, 95 HART RD//RELOCATE 4D620878 ESO - 6/4 Stevenstown Rd. Westbrook 4D620878 ESO - 6/4 Stevenstown Rd. Westbrook 4D620878 ESO - 6/4 Stevenstown Rd. Westbrook 4D620878 ESO - 6/4 Stevenstown Rd. Westbrook 4D621073 NS- 215 Old Mail Trl, WB- Ins Oh Sv 4D621215 (DF) Ple 957 -(R/I) Pole & 1 Ph tpo 4D621215 (DF) Ple 957 -(R/I) Pole & 1 Ph tpo 4D621215 (DF) Ple 957 -(R/I) Pole & 1 Ph tpo 4D621244 PATROL REPAIRS, 30R8, MADISON 4D621244 PATROL REPAIRS, 30R8, MADISON ESO - 6/4 Stevenstown Rd. Westbrook CAR V POLE 651- FOLLOW UP WORK REQUIRED AP2-YWO Total Cost Variance Met - Variance :99.9865 MIN.:-50 MAX.:150 ESO - 6/4 Stevenstown Rd. Westbrook CAR V POLE 651- FOLLOW UP WORK REQUIRED AP2-YWO Total Cost Variance Met - Variance :99.9865 MIN.:-50 MAX.:150 ESO - 6/4 Stevenstown Rd. Westbrook CAR V POLE 651- FOLLOW UP WORK REQUIRED AP2-YWO Total Cost Variance Met - Variance :99.9865 MIN.:-50 MAX.:150 ESO - 6/4 Stevenstown Rd. Westbrook CAR V POLE 651- FOLLOW UP WORK REQUIRED AP2-YWO Total Cost Variance Met - Variance :99.9865 MIN.:-50 MAX.:150 NS- 215 Old Mail Trl, WB- Ins Oh Svc from P 1005 AP1-YWO Total Cost Less Than 7K (DF) Ple 957 -(R/I) Pole & 1 Ph tpo & 1 Ph tap ESO 9A AP2-YWO Total Cost Variance Met - Variance :94.7836 MIN.:-50 MAX.:150 (DF) Ple 957 -(R/I) Pole & 1 Ph tpo & 1 Ph tap ESO 9A AP2-YWO Total Cost Variance Met - Variance :94.7836 MIN.:-50 MAX.:150 (DF) Ple 957 -(R/I) Pole & 1 Ph tpo & 1 Ph tap ESO 9A AP2-YWO Total Cost Variance Met - Variance :94.7836 MIN.:-50 MAX.:150 PATROL REPAIRS, 30R8, MADISON CL-YWO Variance - Contractor Labor PATROL REPAIRS, 30R8, MADISON CL-YWO Variance - Contractor Labor
  8. Page 8 of 879

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued October 23, 2026 RRU-159 Attachment 5 Page 8 of 879 work_order_number description 4D621244 PATROL REPAIRS, 30R8, MADISON 4D621244 PATROL REPAIRS, 30R8, MADISON 4D621412 ESO- 9A Pole - P 2473- Hemlock Dr, 4D621412 ESO- 9A Pole - P 2473- Hemlock Dr, 4D621412 ESO- 9A Pole - P 2473- Hemlock Dr, 4D621438 (DF) PATROL REPAIRS, 30R9, WESTBROO 4D720127 CB//Guilford, Boston Post Rd @ Notc 4D720127 CB//Guilford, Boston Post Rd @ Notc 4D720127 CB//Guilford, Boston Post Rd @ Notc 4D720188 Bahr Rd, #3 Deep River/TL-INST (65' 4D720188 Bahr Rd, #3 Deep River/TL-INST (65' 4D720188 Bahr Rd, #3 Deep River/TL-INST (65' 4D720272 RSO 2/22 -- WESTBROOK, 798 HORSE HI 4D720272 RSO 2/22 -- WESTBROOK, 798 HORSE HI 4D720301 CB//GUILFORD, CHAFFINCH ISLAND RD// 4D720301 CB//GUILFORD, CHAFFINCH ISLAND RD// 4D720484 NS- 1 Sag Ter, WB- Ins 4/0 AL from 4D720484 NS- 1 Sag Ter, WB- Ins 4/0 AL from 4D720605 TS 7 FERRY LA 40778 EC RMV OH SVC I 4D720605 TS 7 FERRY LA 40778 EC RMV OH SVC I 4E420687 printed Elec Maint Trouble Call - P 4E420727 car vs pole 1561 6/30/14 4E420727 car vs pole 1561 6/30/14 4E420727 car vs pole 1561 6/30/14 4E420733 74 MIDDLE HADDAM RD E HMPTN AT NEW 4E420733 74 MIDDLE HADDAM RD E HMPTN AT NEW 4E420733 74 MIDDLE HADDAM RD E HMPTN AT NEW 4E420733 74 MIDDLE HADDAM RD E HMPTN AT NEW 4E420733 74 MIDDLE HADDAM RD E HMPTN AT NEW 4E520935 RA CDOT 163-203 RT 66, Bridge#0049 4E520935 RA CDOT 163-203 RT 66, Bridge#0049 4E520935 RA CDOT 163-203 RT 66, Bridge#0049 4E520935 RA CDOT 163-203 RT 66, Bridge#0049 4E520935 RA CDOT 163-203 RT 66, Bridge#0049 4E521445 INSTALL DB SVC TO NEW HOME .H.H. 50 4E521666 11/14/15- CUST TOOK DOWN SVC WIRE, 4E521666 11/14/15- CUST TOOK DOWN SVC WIRE, 4E521666 11/14/15- CUST TOOK DOWN SVC WIRE, 4E521680 TW Verizon antenna billable make re 4E521680 TW Verizon antenna billable make re 4E521680 TW Verizon antenna billable make re 4E521848 ESO/AWC GLAS, Roaring Brook Plaza-S 4E620254 JK>POLE 651--REPLACE POLE W/35', AN long_description PATROL REPAIRS, 30R8, MADISON CL-YWO Variance - Contractor Labor PATROL REPAIRS, 30R8, MADISON CL-YWO Variance - Contractor Labor ESO- 9A Pole - P 2473- Hemlock Dr, KW- FOLLOW UP WORK- Rplc Pole & Shift AP2-YWO Total Cost Variance Met - Variance :50.483 MIN.:-50 MAX.:150 ESO- 9A Pole - P 2473- Hemlock Dr, KW- FOLLOW UP WORK- Rplc Pole & Shift AP2-YWO Total Cost Variance Met - Variance :50.483 MIN.:-50 MAX.:150 ESO- 9A Pole - P 2473- Hemlock Dr, KW- FOLLOW UP WORK- Rplc Pole & Shift AP2-YWO Total Cost Variance Met - Variance :50.483 MIN.:-50 MAX.:150 (DF) PATROL REPAIRS, 30R9, WESTBROOK AP1-YWO Total Cost Less Than 7K CB//Guilford, Boston Post Rd @ Notch Hill Rd//9A follow up,Install lights,ins NL-YWO Variance - NU Construction Labor CB//Guilford, Boston Post Rd @ Notch Hill Rd//9A follow up,Install lights,ins NL-YWO Variance - NU Construction Labor CB//Guilford, Boston Post Rd @ Notch Hill Rd//9A follow up,Install lights,ins NL-YWO Variance - NU Construction Labor Bahr Rd, #3 Deep River/TL-INST (65',4/03CT) OH-DB SVC FROM P#423 ON W ELM ST AP1-YWO Total Cost Less Than 7K Bahr Rd, #3 Deep River/TL-INST (65',4/03CT) OH-DB SVC FROM P#423 ON W ELM ST AP1-YWO Total Cost Less Than 7K Bahr Rd, #3 Deep River/TL-INST (65',4/03CT) OH-DB SVC FROM P#423 ON W ELM ST AP1-YWO Total Cost Less Than 7K RSO 2/22 -- WESTBROOK, 798 HORSE HILL RD- POLE # 2211 - NEEDS 60' OF #2 SERVICE AP1-YWO Total Cost Less Than 7K RSO 2/22 -- WESTBROOK, 798 HORSE HILL RD- POLE # 2211 - NEEDS 60' OF #2 SERVICE AP1-YWO Total Cost Less Than 7K CB//GUILFORD, CHAFFINCH ISLAND RD//INSTALL CUTOUTS VARIOUS LOCATIONS (3ORMORE) AP1-YWO Total Cost Less Than 7K CB//GUILFORD, CHAFFINCH ISLAND RD//INSTALL CUTOUTS VARIOUS LOCATIONS (3ORMORE) AP1-YWO Total Cost Less Than 7K NS- 1 Sag Ter, WB- Ins 4/0 AL from New HH 831A, Rmv Oh Svc- P 831 AP1-YWO Total Cost Less Than 7K NS- 1 Sag Ter, WB- Ins 4/0 AL from New HH 831A, Rmv Oh Svc- P 831 AP1-YWO Total Cost Less Than 7K TS 7 FERRY LA 40778 EC RMV OH SVC INSTALL OH/DB SVC NOT SURE IF APPOINT REQUIRED AP1-YWO Total Cost Less Than 7K TS 7 FERRY LA 40778 EC RMV OH SVC INSTALL OH/DB SVC NOT SURE IF APPOINT REQUIRED AP1-YWO Total Cost Less Than 7K printed Elec Maint Trouble Call - Property Damage OH (INSOH) car vs pole 1561 6/30/14 AP1-YWO Total Cost Less Than 7K car vs pole 1561 6/30/14 AP1-YWO Total Cost Less Than 7K car vs pole 1561 6/30/14 AP1-YWO Total Cost Less Than 7K 74 MIDDLE HADDAM RD E HMPTN AT NEW P-40 INST PRI RISER, PAD XF, SVC AP3-YWO Resource Variance Met- Labor 12 <= 32 OR 29.54 <= 30 And Contractor $1020.59 <= 2000 74 MIDDLE HADDAM RD E HMPTN AT NEW P-40 INST PRI RISER, PAD XF, SVC AP3-YWO Resource Variance Met- Labor 12 <= 32 OR 29.54 <= 30 And Contractor $1020.59 <= 2000 74 MIDDLE HADDAM RD E HMPTN AT NEW P-40 INST PRI RISER, PAD XF, SVC AP3-YWO Resource Variance Met- Labor 12 <= 32 OR 29.54 <= 30 And Contractor $1020.59 <= 2000 74 MIDDLE HADDAM RD E HMPTN AT NEW P-40 INST PRI RISER, PAD XF, SVC AP3-YWO Resource Variance Met- Labor 12 <= 32 OR 29.54 <= 30 And Contractor $1020.59 <= 2000 74 MIDDLE HADDAM RD E HMPTN AT NEW P-40 INST PRI RISER, PAD XF, SVC AP3-YWO Resource Variance Met- Labor 12 <= 32 OR 29.54 <= 30 And Contractor $1020.59 <= 2000 RA CDOT 163-203 RT 66, Bridge#00490 over Natchaug River, Windham - stage 1 JE-YWO Variance Job Type Exclusion RA CDOT 163-203 RT 66, Bridge#00490 over Natchaug River, Windham - stage 1 JE-YWO Variance Job Type Exclusion RA CDOT 163-203 RT 66, Bridge#00490 over Natchaug River, Windham - stage 1 JE-YWO Variance Job Type Exclusion RA CDOT 163-203 RT 66, Bridge#00490 over Natchaug River, Windham - stage 1 JE-YWO Variance Job Type Exclusion RA CDOT 163-203 RT 66, Bridge#00490 over Natchaug River, Windham - stage 1 JE-YWO Variance Job Type Exclusion INSTALL DB SVC TO NEW HOME .H.H. 500 WORK W/2536773 AP1-YWO Total Cost Less Than 7K 11/14/15- CUST TOOK DOWN SVC WIRE, SEE ATTCHED T TICKET cost_element_group ferc_account percent Employee Expenses-EE0 107010 0.53601 Employee Expenses-EE0 593000 0.41309 Employee Expenses-EE0 107010 0.34355 Employee Expenses-EE0 108030 0.23121 Employee Expenses-EE0 593000 0.42524 Employee Expenses-EE0 107010 1 Employee Expenses-EE0 594000 0.18104 Employee Expenses-EE0 108030 0.26933 Employee Expenses-EE0 107010 0.54963 Employee Expenses-EE0 107010 0.90705 Employee Expenses-EE0 594000 0.00489 Employee Expenses-EE0 593000 0.08806 Employee Expenses-EE0 107010 0.74253 Employee Expenses-EE0 108030 0.25747 Employee Expenses-EE0 593000 0.03769 Employee Expenses-EE0 107010 0.96231 Employee Expenses-EE0 108030 0.61982 Employee Expenses-EE0 107010 0.38018 Employee Expenses-EE0 107010 0.83696 Employee Expenses-EE0 108030 0.16304 Employee Expenses-EE0 107010 1 Employee Expenses-EE0 108030 0.3687 Employee Expenses-EE0 107010 0.39317 Employee Expenses-EE0 593000 0.23813 Employee Expenses-EE0 583000 0.09978 Employee Expenses-EE0 598000 0.00002 Employee Expenses-EE0 107010 0.71936 Employee Expenses-EE0 584000 0.09356 Employee Expenses-EE0 595000 0.08728 Employee Expenses-EE0 595000 0.01133 Employee Expenses-EE0 583000 0.08727 Employee Expenses-EE0 108030 0.1758 Employee Expenses-EE0 593000 0.26643 Employee Expenses-EE0 107010 0.45917 Employee Expenses-EE0 107010 1 Employee Expenses-EE0 595000 0.09444 Employee Expenses-EE0 583000 0.74045 Employee Expenses-EE0 107010 0.16511 Employee Expenses-EE0 593000 0.43204 Employee Expenses-EE0 107010 0.35249 Employee Expenses-EE0 108030 0.21547 Employee Expenses-EE0 108030 1 Employee Expenses-EE0 107010 0.66506 Employee Expenses-EE0 108030 0.33494 Employee Expenses-EE0 108030 0.18261 Employee Expenses-EE0 107010 0.81739 Employee Expenses-EE0 107010 0.91304 Employee Expenses-EE0 593000 0.08696 Employee Expenses-EE0 593000 0.06969 Employee Expenses-EE0 583000 0.29269 Employee Expenses-EE0 107010 0.42397 Employee Expenses-EE0 108030 0.21365 Employee Expenses-EE0 107010 1 Employee Expenses-EE0 107010 1 Employee Expenses-EE0 107010 0.82 Employee Expenses-EE0 108030 0.18 Employee Expenses-EE0 107010 1 Employee Expenses-EE0 107010 1 Employee Expenses-EE0 107010 1 Employee Expenses-EE0 107010 1 Employee Expenses-EE0 108030 0.11182 Employee Expenses-EE0 107010 0.32907 Employee Expenses-EE0 595000 0.06426 Employee Expenses-EE0 583000 0.49485 Employee Expenses-EE0 584000 0.25623 Employee Expenses-EE0 108030 0.17602 Employee Expenses-EE0 595000 0.03321 Employee Expenses-EE0 107010 0.53454 Employee Expenses-EE0 108030 1 Employee Expenses-EE0 108030 0.20699 Employee Expenses-EE0 107010 0.79301 Employee Expenses-EE0 593000 0.11469 Employee Expenses-EE0 108030 0.21507 Employee Expenses-EE0 107010 0.67024 Employee Expenses-EE0 107010 0.53235 Employee Expenses-EE0 108030 0.27228 Employee Expenses-EE0 593000 0.19537 Employee Expenses-EE0 107010 0.74226 Employee Expenses-EE0 108030 0.25774 Employee Expenses-EE0 108030 0.02879 Employee Expenses-EE0 107010 0.58478 Employee Expenses-EE0 583000 0.24082 Employee Expenses-EE0 593000 0.0987 Employee Expenses-EE0 595000 0.04691 Employee Expenses-EE0 107010 0.65564 Employee Expenses-EE0 108030 0.34436 Employee Expenses-EE0 108030 0.35226 Employee Expenses-EE0 107010 0.54295 Employee Expenses-EE0 593000 0.10479 Employee Expenses-EE0 593000 1 Employee Expenses-EE0 594000 0.3572 Employee Expenses-EE0 107010 0.49388 Employee Expenses-EE0 108030 0.14892 Employee Expenses-EE0 593000 0.60919 Employee Expenses-EE0 107010 0.19403 Employee Expenses-EE0 108030 0.19678 Employee Expenses-EE0 107010 1 Employee Expenses-EE0 107010 1 Employee Expenses-EE0 107010 1 Employee Expenses-EE0 596000 1 Employee Expenses-EE0 107010 0.78724 Employee Expenses-EE0 108030 0.21276 Employee Expenses-EE0 593000 0.14399 Employee Expenses-EE0 107010 0.70128 Employee Expenses-EE0 108030 0.15473 Employee Expenses-EE0 108030 0.21277 11/14/15- CUST TOOK DOWN SVC WIRE, SEE ATTCHED T TICKET 11/14/15- CUST TOOK DOWN SVC WIRE, SEE ATTCHED T TICKET TW Verizon antenna billable make ready Conv 320155 AP1-YWO Total Cost Less Than 7K TW Verizon antenna billable make ready Conv 320155 AP1-YWO Total Cost Less Than 7K TW Verizon antenna billable make ready Conv 320155 AP1-YWO Total Cost Less Than 7K ESO/AWC GLAS, Roaring Brook Plaza-StructureFire- Pad#1886 - FD Case #8481500848 AP2-YWO Total Cost Variance Met - Variance :6.4019 MIN.:-50 MAX.:50 JK>POLE 651--REPLACE POLE W/35', ANCHOR, SECONDARY & SERVICE JK>POLE 651--REPLACE POLE W/35', ANCHOR, SECONDARY & SERVICE 4E620254 JK>POLE 651--REPLACE POLE W/35', AN 4E620345 Elec Maint Trouble Call - Repairs/O Elec Maint Trouble Call - Repairs/Obsolescence OH (AROH) Elec Maint Trouble Call - Repairs/Obsolescence OH (AROH) 4E620345 Elec Maint Trouble Call - Repairs/O 4E620656 36 ABBEY EH AT P-1249 INSTALL A ST 4E620656 36 ABBEY EH AT P-1249 INSTALL A ST 4E621047 (CH) EAST HADDAM_TO WRITE_ESO 7/10 4E621047 (CH) EAST HADDAM_TO WRITE_ESO 7/10 4E621047 (CH) EAST HADDAM_TO WRITE_ESO 7/10 4E621047 (CH) EAST HADDAM_TO WRITE_ESO 7/10 4E621235 PATROL REPAIRS, EAST HAMPTON, 0-100 4E621247 (CH) PATROL REPAIRS, MIDDLETOWN, 0- 4E621449 (CH) HH#385A: CHG LAWNBOX & TAG_HH# 4E621449 (CH) HH#385A: CHG LAWNBOX & TAG_HH# 4E621506 JK>HH533C--INSTALL 15' OF 4/0 DB CA 4E621507 JK>HH533C--INSTALL 35' OF 4/0 DB CA 4E621511 JK>HH533B--INSTALL 10' OF 4/0 DB CA 4E621512 JK>HH533B--INSTALL 35' OF 4/0 DB CA 4E720331 32 FERNWOOD DR COLCH AT P- 2298 FTR 4E720331 32 FERNWOOD DR COLCH AT P- 2298 FTR 4E720331 32 FERNWOOD DR COLCH AT P- 2298 FTR 4E720331 32 FERNWOOD DR COLCH AT P- 2298 FTR 4E720341 3/2 MIDDLETOWN, WESTLAKE RD, YELLOW 4E720341 3/2 MIDDLETOWN, WESTLAKE RD, YELLOW 4E720341 3/2 MIDDLETOWN, WESTLAKE RD, YELLOW 4E720341 3/2 MIDDLETOWN, WESTLAKE RD, YELLOW 4E720376 Buckley Rd, Salem/TL-TRANSFER EX OH 4E720394 RSO/AWC 3/15 PORTLAND, HIGH ST POLE 4E720394 RSO/AWC 3/15 PORTLAND, HIGH ST POLE 4E720401 MN LAKE DR E HMPTN AT P-244 REPLACE 4E720401 MN LAKE DR E HMPTN AT P-244 REPLACE 4E720401 MN LAKE DR E HMPTN AT P-244 REPLACE 4E720451 (CH) P#97: WORK COMP'D_RSO 3/30-3/3 4E720451 (CH) P#97: WORK COMP'D_RSO 3/30-3/3 4E720451 (CH) P#97: WORK COMP'D_RSO 3/30-3/3 4E720504 JV RSO 4/7 WINDHAM, BEACON RD - REP 4E720504 JV RSO 4/7 WINDHAM, BEACON RD - REP 4E720622 JV 60 LOVERS LN WINDHAM INST OH XFM 4E720622 JV 60 LOVERS LN WINDHAM INST OH XFM 4E720622 JV 60 LOVERS LN WINDHAM INST OH XFM 4E720622 JV 60 LOVERS LN WINDHAM INST OH XFM 4E720622 JV 60 LOVERS LN WINDHAM INST OH XFM 4E720707 JK>POLE 102--REPLACE POLE & SPAN OF 4E720707 JK>POLE 102--REPLACE POLE & SPAN OF 4E720849 RSO/EH - 5/26 MIDDLETOWN, WASHINGTO 4E720849 RSO/EH - 5/26 MIDDLETOWN, WASHINGTO 4E720849 RSO/EH - 5/26 MIDDLETOWN, WASHINGTO 4M020394 7 lots Subdiv-Partially Completed y 4M221036 pole 2067 prim de/3ph. riser pole s 36 ABBEY EH AT P-1249 INSTALL A STUB POLE & GUYING, ** Contractor to work *** AP1-YWO Total Cost Less Than 7K 36 ABBEY EH AT P-1249 INSTALL A STUB POLE & GUYING, ** Contractor to work *** AP1-YWO Total Cost Less Than 7K (CH) EAST HADDAM_TO WRITE_ESO 7/10 Mill rd East Haddam pole 2311 AP2-YWO Total Cost Variance Met - Variance :148.1196 MIN.:-50 MAX.:150 (CH) EAST HADDAM_TO WRITE_ESO 7/10 Mill rd East Haddam pole 2311 AP2-YWO Total Cost Variance Met - Variance :148.1196 MIN.:-50 MAX.:150 (CH) EAST HADDAM_TO WRITE_ESO 7/10 Mill rd East Haddam pole 2311 AP2-YWO Total Cost Variance Met - Variance :148.1196 MIN.:-50 MAX.:150 (CH) EAST HADDAM_TO WRITE_ESO 7/10 Mill rd East Haddam pole 2311 AP2-YWO Total Cost Variance Met - Variance :148.1196 MIN.:-50 MAX.:150 PATROL REPAIRS, EAST HAMPTON, 0-100 CIRCUITS AP2-YWO Total Cost Variance Met - Variance :39.2199 MIN.:-50 MAX.:50 (CH) PATROL REPAIRS, MIDDLETOWN, 0-100 CIRCUITS AP3-YWO Resource Variance Met- Labor 153 <= 32 OR -86.41 <= 30 And Contractor $0 <= 2000 (CH) HH#385A: CHG LAWNBOX & TAG_HH#385B: CHG POLYCRETE & TAG. AP2-YWO Total Cost Variance Met - Variance :-20.3294 MIN.:-50 MAX.:50 (CH) HH#385A: CHG LAWNBOX & TAG_HH#385B: CHG POLYCRETE & TAG. AP2-YWO Total Cost Variance Met - Variance :-20.3294 MIN.:-50 MAX.:50 JK>HH533C--INSTALL 15' OF 4/0 DB CABLE TO CONDO UNIT AP1-YWO Total Cost Less Than 7K JK>HH533C--INSTALL 35' OF 4/0 DB CABLE TO CONDO UNIT AP1-YWO Total Cost Less Than 7K JK>HH533B--INSTALL 10' OF 4/0 DB CABLE TO CONDO UNIT AP1-YWO Total Cost Less Than 7K JK>HH533B--INSTALL 35' OF 4/0 DB CABLE TO CONDO UNIT AP1-YWO Total Cost Less Than 7K 32 FERNWOOD DR COLCH AT P- 2298 FTR POLE IS SET, SHIFT FACILITIES. DBL POLES AP1-YWO Total Cost Less Than 7K 32 FERNWOOD DR COLCH AT P- 2298 FTR POLE IS SET, SHIFT FACILITIES. DBL POLES AP1-YWO Total Cost Less Than 7K 32 FERNWOOD DR COLCH AT P- 2298 FTR POLE IS SET, SHIFT FACILITIES. DBL POLES AP1-YWO Total Cost Less Than 7K 32 FERNWOOD DR COLCH AT P- 2298 FTR POLE IS SET, SHIFT FACILITIES. DBL POLES AP1-YWO Total Cost Less Than 7K 3/2 MIDDLETOWN, WESTLAKE RD, YELLOW TAG Y-18557-2017 ** 17B-2340 *** AP1-YWO Total Cost Less Than 7K 3/2 MIDDLETOWN, WESTLAKE RD, YELLOW TAG Y-18557-2017 ** 17B-2340 *** AP1-YWO Total Cost Less Than 7K 3/2 MIDDLETOWN, WESTLAKE RD, YELLOW TAG Y-18557-2017 ** 17B-2340 *** AP1-YWO Total Cost Less Than 7K 3/2 MIDDLETOWN, WESTLAKE RD, YELLOW TAG Y-18557-2017 ** 17B-2340 *** AP1-YWO Total Cost Less Than 7K Buckley Rd, Salem/TL-TRANSFER EX OH-DB SVC TO NEW 40/2 P#792 [36"HH INCLUDED] AP1-YWO Total Cost Less Than 7K RSO/AWC 3/15 PORTLAND, HIGH ST POLE 1082 SVC REPLACED AP1-YWO Total Cost Less Than 7K RSO/AWC 3/15 PORTLAND, HIGH ST POLE 1082 SVC REPLACED AP1-YWO Total Cost Less Than 7K MN LAKE DR E HMPTN AT P-244 REPLACE POLE, SHIFT FACILITIES. THIS IS A 9A. AP2-YWO Total Cost Variance Met - Variance :-10.9133 MIN.:-50 MAX.:50 MN LAKE DR E HMPTN AT P-244 REPLACE POLE, SHIFT FACILITIES. THIS IS A 9A. AP2-YWO Total Cost Variance Met - Variance :-10.9133 MIN.:-50 MAX.:50 MN LAKE DR E HMPTN AT P-244 REPLACE POLE, SHIFT FACILITIES. THIS IS A 9A. AP2-YWO Total Cost Variance Met - Variance :-10.9133 MIN.:-50 MAX.:50 (CH) P#97: WORK COMP'D_RSO 3/30-3/31_9A_FRNTR SET_WE SHFT'D AP1-YWO Total Cost Less Than 7K (CH) P#97: WORK COMP'D_RSO 3/30-3/31_9A_FRNTR SET_WE SHFT'D AP1-YWO Total Cost Less Than 7K (CH) P#97: WORK COMP'D_RSO 3/30-3/31_9A_FRNTR SET_WE SHFT'D AP1-YWO Total Cost Less Than 7K JV RSO 4/7 WINDHAM, BEACON RD - REPOLACED 200'AL SVC AP1-YWO Total Cost Less Than 7K JV RSO 4/7 WINDHAM, BEACON RD - REPOLACED 200'AL SVC AP1-YWO Total Cost Less Than 7K JV 60 LOVERS LN WINDHAM INST OH XFMR RPLC PL TOP SPCR INST OH SVC AP1-YWO Total Cost Less Than 7K JV 60 LOVERS LN WINDHAM INST OH XFMR RPLC PL TOP SPCR INST OH SVC AP1-YWO Total Cost Less Than 7K JV 60 LOVERS LN WINDHAM INST OH XFMR RPLC PL TOP SPCR INST OH SVC AP1-YWO Total Cost Less Than 7K JV 60 LOVERS LN WINDHAM INST OH XFMR RPLC PL TOP SPCR INST OH SVC AP1-YWO Total Cost Less Than 7K JV 60 LOVERS LN WINDHAM INST OH XFMR RPLC PL TOP SPCR INST OH SVC AP1-YWO Total Cost Less Than 7K JK>POLE 102--REPLACE POLE & SPAN OF SEC/SVC FOR OH TRESPASS AP1-YWO Total Cost Less Than 7K JK>POLE 102--REPLACE POLE & SPAN OF SEC/SVC FOR OH TRESPASS AP1-YWO Total Cost Less Than 7K RSO/EH - 5/26 MIDDLETOWN, WASHINGTON ST - 9A P3088 STROM / HOAR AP2-YWO Total Cost Variance Met - Variance :80.0182 MIN.:-50 MAX.:150 RSO/EH - 5/26 MIDDLETOWN, WASHINGTON ST - 9A P3088 STROM / HOAR AP2-YWO Total Cost Variance Met - Variance :80.0182 MIN.:-50 MAX.:150 RSO/EH - 5/26 MIDDLETOWN, WASHINGTON ST - 9A P3088 STROM / HOAR AP2-YWO Total Cost Variance Met - Variance :80.0182 MIN.:-50 MAX.:150 7 lots Subdiv-Partially Completed years ago-(Design for lots-3,4,5,6 ) AP1-YWO Total Cost Less Than 7K pole 2067 prim de/3ph. riser pole splitting. NEED to repl & shift now E. Cook pole 2067 prim de/3ph. riser pole splitting. NEED to repl & shift now E. Cook 4M221036 pole 2067 prim de/3ph. riser pole s 4M221036 pole 2067 prim de/3ph. riser pole s pole 2067 prim de/3ph. riser pole splitting. NEED to repl & shift now E. Cook 4M320057 Pole 1253 -40/3 pole has been set, 4M320057 Pole 1253 -40/3 pole has been set, 4M320057 Pole 1253 -40/3 pole has been set, 4N320633 Grassy Hill Rd, #88 Old Lyme/Elec S 4N420900 **CANCEL***SEE 2369539*** MV 250W 4N421040 **CANCEL** SEE 2376939** 07/03/14 P 4N421163 ELYM - FLR - WINSTON RD EAST LYME-P 4N421261 07/03/14 Pole 5013 replace mh 100 w 4N421261 07/03/14 Pole 5013 replace mh 100 w 4N520050 RA Project CDOT 113-107 - relocate 4N520050 RA Project CDOT 113-107 - relocate 4N520050 RA Project CDOT 113-107 - relocate 4N520390 STONINGTON COTTRELL ST - HPS 150W C Pole 1253 -40/3 pole has been set, (R/I) anc- Guy & Pole top, Shift wires &Light AP1-YWO Total Cost Less Than 7K Pole 1253 -40/3 pole has been set, (R/I) anc- Guy & Pole top, Shift wires &Light AP1-YWO Total Cost Less Than 7K Pole 1253 -40/3 pole has been set, (R/I) anc- Guy & Pole top, Shift wires &Light AP1-YWO Total Cost Less Than 7K Grassy Hill Rd, #88 Old Lyme/Elec Svc Existing Residential DESG (DN) AP1-YWO Total Cost Less Than 7K **CANCEL***SEE 2369539*** MV 250W **CANCEL** SEE 2376939** 07/03/14 Pole 5013 replace mh 100 w head ESO ELYM - FLR - WINSTON RD EAST LYME-PID 11618 70 HPS PTT-BAD CABLE FROM HH TO POLE AP1-YWO Total Cost Less Than 7K 07/03/14 Pole 5013 replace mh 100 w head ESO AP1-YWO Total Cost Less Than 7K 07/03/14 Pole 5013 replace mh 100 w head ESO AP1-YWO Total Cost Less Than 7K RA Project CDOT 113-107 - relocate facilities for bridge construction Stage 1 JE-YWO Variance Job Type Exclusion RA Project CDOT 113-107 - relocate facilities for bridge construction Stage 1 JE-YWO Variance Job Type Exclusion RA Project CDOT 113-107 - relocate facilities for bridge construction Stage 1 JE-YWO Variance Job Type Exclusion STONINGTON COTTRELL ST - HPS 150W COBRA @ PID 2401 AP1-YWO Total Cost Less Than 7K
  9. Page 9 of 879

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued October 23, 2026 RRU-159 Attachment 5 Page 9 of 879 work_order_number description 4N520390 STONINGTON COTTRELL ST - HPS 150W C 4N521143 08/15 ESO LAWRENCE CT PRESTON BROK 4N521143 08/15 ESO LAWRENCE CT PRESTON BROK 4N521143 08/15 ESO LAWRENCE CT PRESTON BROK 4N521143 08/15 ESO LAWRENCE CT PRESTON BROK 4N521430 9A 11/6/15-CAR VS POLE 1163- SEE AT 4N620016 PD-849 Pequot Ave NLD/Replace exist 4N620016 PD-849 Pequot Ave NLD/Replace exist 4N620016 PD-849 Pequot Ave NLD/Replace exist 4N620016 PD-849 Pequot Ave NLD/Replace exist 4N620201 MM JOSHUATOWN FUSESAVER RECLOSER PO 4N620201 MM JOSHUATOWN FUSESAVER RECLOSER PO 4N620201 MM JOSHUATOWN FUSESAVER RECLOSER PO 4N620334 GCC / INSTALL A NEW 50KVA XFMR W/CU 4N620334 GCC / INSTALL A NEW 50KVA XFMR W/CU 4N620334 GCC / INSTALL A NEW 50KVA XFMR W/CU 4N620334 GCC / INSTALL A NEW 50KVA XFMR W/CU 4N620359 ESO 1/28 OXOBOXO DAM RD MONTVILLE C 4N620359 ESO 1/28 OXOBOXO DAM RD MONTVILLE C 4N620359 ESO 1/28 OXOBOXO DAM RD MONTVILLE C 4N620614 PD-18 Bartlett Place WTFD/Install n 4N620614 PD-18 Bartlett Place WTFD/Install n 4N620614 PD-18 Bartlett Place WTFD/Install n 4N620766 GCC / REMOVE AND RELOCATE FACILITIE long_description STONINGTON COTTRELL ST - HPS 150W COBRA @ PID 2401 AP1-YWO Total Cost Less Than 7K 08/15 ESO LAWRENCE CT PRESTON BROKEN POLE 2469 AP1-YWO Total Cost Less Than 7K 08/15 ESO LAWRENCE CT PRESTON BROKEN POLE 2469 AP1-YWO Total Cost Less Than 7K 08/15 ESO LAWRENCE CT PRESTON BROKEN POLE 2469 AP1-YWO Total Cost Less Than 7K 08/15 ESO LAWRENCE CT PRESTON BROKEN POLE 2469 AP1-YWO Total Cost Less Than 7K 9A 11/6/15-CAR VS POLE 1163- SEE ATTACHED TT AP1-YWO Total Cost Less Than 7K PD-849 Pequot Ave NLD/Replace existing P# 10836/Replace ASAP pole is leaning. cost_element_group ferc_account percent Employee Expenses-EE0 107010 0.78723 Employee Expenses-EE0 107010 0.42185 Employee Expenses-EE0 108030 0.10904 Employee Expenses-EE0 595000 0.05392 Employee Expenses-EE0 583000 0.41519 Employee Expenses-EE0 593000 1 Employee Expenses-EE0 583000 0.41197 Employee Expenses-EE0 108030 0.15844 Employee Expenses-EE0 107010 0.37609 Employee Expenses-EE0 595000 0.0535 Employee Expenses-EE0 107010 0.9462 Employee Expenses-EE0 108030 0.03088 Employee Expenses-EE0 595000 0.02292 Employee Expenses-EE0 107010 0.58216 Employee Expenses-EE0 108030 0.09631 Employee Expenses-EE0 595000 0.05242 Employee Expenses-EE0 583000 0.26911 Employee Expenses-EE0 107010 0.57512 Employee Expenses-EE0 593000 0.06539 Employee Expenses-EE0 108030 0.35949 Employee Expenses-EE0 108030 0.45918 Employee Expenses-EE0 107010 0.37245 Employee Expenses-EE0 593000 0.16837 Employee Expenses-EE0 596000 0.02519 Employee Expenses-EE0 108030 0.66197 Employee Expenses-EE0 107010 0.16224 Employee Expenses-EE0 594000 0.1506 Employee Expenses-EE0 107010 0.47934 Employee Expenses-EE0 595000 0.0442 Employee Expenses-EE0 108030 0.22119 Employee Expenses-EE0 583000 0.25527 Employee Expenses-EE0 107010 0.5 Employee Expenses-EE0 108030 0.5 Employee Expenses-EE0 593000 1 Employee Expenses-EE0 107010 0.25378 Employee Expenses-EE0 583000 0.38853 Employee Expenses-EE0 595000 0.2792 Employee Expenses-EE0 108030 0.07849 Employee Expenses-EE0 598000 1 Employee Expenses-EE0 594000 0.00002 Employee Expenses-EE0 593000 0.00566 Employee Expenses-EE0 107010 0.99432 Employee Expenses-EE0 107010 1 Employee Expenses-EE0 108030 0.43479 Employee Expenses-EE0 107010 0.56521 Employee Expenses-EE0 107010 0.58824 Employee Expenses-EE0 108030 0.41176 Employee Expenses-EE0 107010 0.49798 Employee Expenses-EE0 108030 0.30552 Employee Expenses-EE0 593000 0.1965 Employee Expenses-EE0 108030 0.31425 Employee Expenses-EE0 593000 0.21634 Employee Expenses-EE0 107010 0.46941 Employee Expenses-EE0 107010 0.52547 Employee Expenses-EE0 108030 0.22032 Employee Expenses-EE0 593000 0.25421 Employee Expenses-EE0 595000 0.04373 Employee Expenses-EE0 108030 0.07209 Employee Expenses-EE0 107010 0.5475 Employee Expenses-EE0 583000 0.33668 Employee Expenses-EE0 107010 0.38995 Employee Expenses-EE0 593000 0.28231 Employee Expenses-EE0 108030 0.32774 Employee Expenses-EE0 598000 0.05946 Employee Expenses-EE0 594000 0.94054 Employee Expenses-EE0 108030 0.15906 Employee Expenses-EE0 593000 0.4841 Employee Expenses-EE0 107010 0.35684 Employee Expenses-EE0 583000 0.26204 Employee Expenses-EE0 107010 0.52473 Employee Expenses-EE0 108030 0.16786 Employee Expenses-EE0 595000 0.04537 Employee Expenses-EE0 107010 0.3982 Employee Expenses-EE0 587000 0.53077 Employee Expenses-EE0 108030 0.07103 Employee Expenses-EE0 107010 1 Employee Expenses-EE0 108030 0.08837 Employee Expenses-EE0 107010 0.91163 Employee Expenses-EE0 107010 0.88176 Employee Expenses-EE0 595000 0.00283 Employee Expenses-EE0 593000 0.0032 Employee Expenses-EE0 108030 0.0896 Employee Expenses-EE0 583000 0.02261 Employee Expenses-EE0 107010 1 Employee Expenses-EE0 107010 1 Employee Expenses-EE0 108030 0.20267 Employee Expenses-EE0 593000 0.44587 Employee Expenses-EE0 107010 0.35146 Employee Expenses-EE0 108030 0.06148 Employee Expenses-EE0 107010 0.93852 Employee Expenses-EE0 108030 0.15254 Employee Expenses-EE0 107010 0.84746 Employee Expenses-EE0 107010 0.52748 Employee Expenses-EE0 108030 0.18557 Employee Expenses-EE0 593000 0.28695 Employee Expenses-EE0 583000 0.36672 Employee Expenses-EE0 107010 0.38142 Employee Expenses-EE0 108030 0.16565 Employee Expenses-EE0 593000 0.08621 Employee Expenses-EE0 107010 0.76812 Employee Expenses-EE0 594000 0.02752 Employee Expenses-EE0 583000 0.04545 Employee Expenses-EE0 108030 0.1522 Employee Expenses-EE0 593000 0.00671 Employee Expenses-EE0 107010 0.84769 Employee Expenses-EE0 595000 0.01318 PD-849 Pequot Ave NLD/Replace existing P# 10836/Replace ASAP pole is leaning. PD-849 Pequot Ave NLD/Replace existing P# 10836/Replace ASAP pole is leaning. PD-849 Pequot Ave NLD/Replace existing P# 10836/Replace ASAP pole is leaning. MM JOSHUATOWN FUSESAVER RECLOSER POLE 481 NL-YWO Variance - NU Construction Labor MM JOSHUATOWN FUSESAVER RECLOSER POLE 481 NL-YWO Variance - NU Construction Labor MM JOSHUATOWN FUSESAVER RECLOSER POLE 481 NL-YWO Variance - NU Construction Labor GCC / INSTALL A NEW 50KVA XFMR W/CUT-OUT AND NEW 1/0 AL TPX OH SVC TO BUILDING GCC / INSTALL A NEW 50KVA XFMR W/CUT-OUT AND NEW 1/0 AL TPX OH SVC TO BUILDING GCC / INSTALL A NEW 50KVA XFMR W/CUT-OUT AND NEW 1/0 AL TPX OH SVC TO BUILDING GCC / INSTALL A NEW 50KVA XFMR W/CUT-OUT AND NEW 1/0 AL TPX OH SVC TO BUILDING ESO 1/28 OXOBOXO DAM RD MONTVILLE CARVSPOLE AP1-YWO Total Cost Less Than 7K ESO 1/28 OXOBOXO DAM RD MONTVILLE CARVSPOLE AP1-YWO Total Cost Less Than 7K ESO 1/28 OXOBOXO DAM RD MONTVILLE CARVSPOLE AP1-YWO Total Cost Less Than 7K PD-18 Bartlett Place WTFD/Install new pole due to woodpecker damage AP1-YWO Total Cost Less Than 7K PD-18 Bartlett Place WTFD/Install new pole due to woodpecker damage AP1-YWO Total Cost Less Than 7K PD-18 Bartlett Place WTFD/Install new pole due to woodpecker damage AP1-YWO Total Cost Less Than 7K GCC / REMOVE AND RELOCATE FACILITIES / STREET LITES GCC / REMOVE AND RELOCATE FACILITIES / STREET LITES 4N620766 GCC / REMOVE AND RELOCATE FACILITIE 4N620766 GCC / REMOVE AND RELOCATE FACILITIE 4N620766 GCC / REMOVE AND RELOCATE FACILITIE 4N620866 SM-1 LAMBERTS LN, STGN- EVRSRC RPLC 4N620866 SM-1 LAMBERTS LN, STGN- EVRSRC RPLC 4N620866 SM-1 LAMBERTS LN, STGN- EVRSRC RPLC 4N620866 SM-1 LAMBERTS LN, STGN- EVRSRC RPLC 4N620924 PD-Bayonet St P# 11494/Replace faul 4N620924 PD-Bayonet St P# 11494/Replace faul 4N621025 GCC / RMV OPEN WIRE SECONDARY AND I 4N621221 ESO 9/1/16-HAWKS NEST RD., OLD LYME 4N621221 ESO 9/1/16-HAWKS NEST RD., OLD LYME 4N621221 ESO 9/1/16-HAWKS NEST RD., OLD LYME 4N621221 ESO 9/1/16-HAWKS NEST RD., OLD LYME 4N621263 PD-P# 105S Ocean Ave Car vs Pole 4N621268 CDOT 137-159, RT27 Mystic, Civil, 4N621268 CDOT 137-159, RT27 Mystic, Civil, 4N621268 CDOT 137-159, RT27 Mystic, Civil, 4N621269 CDOT 137-159 Mysttic Ckt. 13K1 & 13 4N621398 ESO 9A 9/7/16-Cow Hill Rd., Groton/ 4N621398 ESO 9A 9/7/16-Cow Hill Rd., Groton/ 4N621419 MM POLE 2551 S. LEDYARD RD10/14/201 4N621419 MM POLE 2551 S. LEDYARD RD10/14/201 GCC / REMOVE AND RELOCATE FACILITIES / STREET LITES GCC / REMOVE AND RELOCATE FACILITIES / STREET LITES SM-1 LAMBERTS LN, STGN- EVRSRC RPLC 2 POLES INSTALL OH-DB SVC- APPNT REQ AP2-YWO Total Cost Variance Met - Variance :-6.923 MIN.:-50 MAX.:50 SM-1 LAMBERTS LN, STGN- EVRSRC RPLC 2 POLES INSTALL OH-DB SVC- APPNT REQ AP2-YWO Total Cost Variance Met - Variance :-6.923 MIN.:-50 MAX.:50 SM-1 LAMBERTS LN, STGN- EVRSRC RPLC 2 POLES INSTALL OH-DB SVC- APPNT REQ AP2-YWO Total Cost Variance Met - Variance :-6.923 MIN.:-50 MAX.:50 SM-1 LAMBERTS LN, STGN- EVRSRC RPLC 2 POLES INSTALL OH-DB SVC- APPNT REQ AP2-YWO Total Cost Variance Met - Variance :-6.923 MIN.:-50 MAX.:50 PD-Bayonet St P# 11494/Replace fault indicators PD-Bayonet St P# 11494/Replace fault indicators GCC / RMV OPEN WIRE SECONDARY AND INSTALL NEW 1/0 AL TPX SEC AND RESAG OH SVC AP2-YWO Total Cost Variance Met - Variance :146.9926 MIN.:-50 MAX.:150 ESO 9/1/16-HAWKS NEST RD., OLD LYME BACKHOE V POLE 761 AP1-YWO Total Cost Less Than 7K ESO 9/1/16-HAWKS NEST RD., OLD LYME BACKHOE V POLE 761 AP1-YWO Total Cost Less Than 7K ESO 9/1/16-HAWKS NEST RD., OLD LYME BACKHOE V POLE 761 AP1-YWO Total Cost Less Than 7K ESO 9/1/16-HAWKS NEST RD., OLD LYME BACKHOE V POLE 761 AP1-YWO Total Cost Less Than 7K PD-P# 105S Ocean Ave Car vs Pole AP1-YWO Total Cost Less Than 7K CDOT 137-159, RT27 Mystic, Civil, work @ I-95 /13K1 & 13K2 JE-YWO Variance Job Type Exclusion CDOT 137-159, RT27 Mystic, Civil, work @ I-95 /13K1 & 13K2 JE-YWO Variance Job Type Exclusion CDOT 137-159, RT27 Mystic, Civil, work @ I-95 /13K1 & 13K2 JE-YWO Variance Job Type Exclusion CDOT 137-159 Mysttic Ckt. 13K1 & 13K2 UG and Riser cables + splicing JE-YWO Variance Job Type Exclusion ESO 9A 9/7/16-Cow Hill Rd., Groton/Mystic /NEED TO RETURN & FIX PRIMARY RISER AP1-YWO Total Cost Less Than 7K ESO 9A 9/7/16-Cow Hill Rd., Groton/Mystic /NEED TO RETURN & FIX PRIMARY RISER AP1-YWO Total Cost Less Than 7K MM POLE 2551 S. LEDYARD RD10/14/2016 REPLACED INSULTATOR ALL WORK COMPLETE MM POLE 2551 S. LEDYARD RD10/14/2016 REPLACED INSULTATOR ALL WORK COMPLETE MM STUB POLE 2701S 9A ALL WORK COMPLETE DOT hit pole 2701 notify 491208 4N621464 MM STUB POLE 2701S 9A ALL WORK COM 4N621464 MM STUB POLE 2701S 9A ALL WORK COM 4N621464 MM STUB POLE 2701S 9A ALL WORK COM 4N621600 ESO 10/19 RAYMOND HILL RD, MONTVILL 4N621600 ESO 10/19 RAYMOND HILL RD, MONTVILL 4N621600 ESO 10/19 RAYMOND HILL RD, MONTVILL 4N621608 11/23/16 9A CAR V POLE - HARTFORD N 4N621608 11/23/16 9A CAR V POLE - HARTFORD N 4N621608 11/23/16 9A CAR V POLE - HARTFORD N 4N621635 GCC / FRONTIER I&R POLE / SHIFT FAC 4N621635 GCC / FRONTIER I&R POLE / SHIFT FAC 4N621635 GCC / FRONTIER I&R POLE / SHIFT FAC 4N621635 GCC / FRONTIER I&R POLE / SHIFT FAC 4N720015 RSO 1/2/, LIBERTY ST, STONINGTON - 4N720015 RSO 1/2/, LIBERTY ST, STONINGTON - 4N720015 RSO 1/2/, LIBERTY ST, STONINGTON - 4N720100 CD00526-07 FLANDERS CIVIL WORK 4N720100 CD00526-07 FLANDERS CIVIL WORK 4N720237 PD-Pequot Ct and West End Ave Niant 4N720237 PD-Pequot Ct and West End Ave Niant 4N720237 PD-Pequot Ct and West End Ave Niant 4N720247 SM-265 NW CRNR RD, N STGN- FRNT RPL 4N720247 SM-265 NW CRNR RD, N STGN- FRNT RPL 4N720247 SM-265 NW CRNR RD, N STGN- FRNT RPL 4N720247 SM-265 NW CRNR RD, N STGN- FRNT RPL 4N720369 SM-PURA DBL PLE P234- ELM ST, GRTN 4N720369 SM-PURA DBL PLE P234- ELM ST, GRTN 4N720369 SM-PURA DBL PLE P234- ELM ST, GRTN 4N720816 MM YELLOW TAG-Y-18666-2017 HALLS RD 5D221491 DG P#2411 RPLC 1 SECT NEUTRAL W/TPX 5D221491 DG P#2411 RPLC 1 SECT NEUTRAL W/TPX 5D420614 RA CD00086-04 1ph 1/0 to 3ph 336 T 5D420614 RA CD00086-04 1ph 1/0 to 3ph 336 T 5D420614 RA CD00086-04 1ph 1/0 to 3ph 336 T 5D420614 RA CD00086-04 1ph 1/0 to 3ph 336 T 5D420614 RA CD00086-04 1ph 1/0 to 3ph 336 T 5D520555 BC - CD00450-02 - 1PH, Re-cond. & C 5D520569 CD00450-01 New 3PH 556 TW Overbuild 5D521065 RA Power Survey 307373, Billable, D 5D521065 RA Power Survey 307373, Billable, D 5D521065 RA Power Survey 307373, Billable, D 5D620106 RA CD00078-02 JC B/B 12S1/21D3 co 5D620106 RA CD00078-02 JC B/B 12S1/21D3 co 5D620111 RA CD00078-06 JC B/B 12S1/21D3 : 5D620111 RA CD00078-06 JC B/B 12S1/21D3 : 5D620475 RD 2016 Def Pole Replacement - P179 MM STUB POLE 2701S 9A ALL WORK COMPLETE DOT hit pole 2701 notify 491208 MM STUB POLE 2701S 9A ALL WORK COMPLETE DOT hit pole 2701 notify 491208 ESO 10/19 RAYMOND HILL RD, MONTVILLE - CAR VS P#4492 MADE SAFE FOR NOW AP1-YWO Total Cost Less Than 7K ESO 10/19 RAYMOND HILL RD, MONTVILLE - CAR VS P#4492 MADE SAFE FOR NOW AP1-YWO Total Cost Less Than 7K ESO 10/19 RAYMOND HILL RD, MONTVILLE - CAR VS P#4492 MADE SAFE FOR NOW AP1-YWO Total Cost Less Than 7K 11/23/16 9A CAR V POLE - HARTFORD NEW LOND TPKE MNTVILE AP1-YWO Total Cost Less Than 7K 11/23/16 9A CAR V POLE - HARTFORD NEW LOND TPKE MNTVILE AP1-YWO Total Cost Less Than 7K 11/23/16 9A CAR V POLE - HARTFORD NEW LOND TPKE MNTVILE AP1-YWO Total Cost Less Than 7K GCC / FRONTIER I&R POLE / SHIFT FACILITES/INSTALL NEW SVC RISER TO DB SVC TO HOM AP1-YWO Total Cost Less Than 7K GCC / FRONTIER I&R POLE / SHIFT FACILITES/INSTALL NEW SVC RISER TO DB SVC TO HOM AP1-YWO Total Cost Less Than 7K GCC / FRONTIER I&R POLE / SHIFT FACILITES/INSTALL NEW SVC RISER TO DB SVC TO HOM AP1-YWO Total Cost Less Than 7K GCC / FRONTIER I&R POLE / SHIFT FACILITES/INSTALL NEW SVC RISER TO DB SVC TO HOM AP1-YWO Total Cost Less Than 7K RSO 1/2/, LIBERTY ST, STONINGTON - 9A - pole # 7004- needs to be replaced CI-YWO Variance - Contractor Invoice RSO 1/2/, LIBERTY ST, STONINGTON - 9A - pole # 7004- needs to be replaced CI-YWO Variance - Contractor Invoice RSO 1/2/, LIBERTY ST, STONINGTON - 9A - pole # 7004- needs to be replaced CI-YWO Variance - Contractor Invoice CD00526-07 FLANDERS CIVIL WORK CL-YWO Variance - Contractor Labor CD00526-07 FLANDERS CIVIL WORK CL-YWO Variance - Contractor Labor PD-Pequot Ct and West End Ave Niantic set new 45-2 & shifted facilities AP2-YWO Total Cost Variance Met - Variance :85.6706 MIN.:-50 MAX.:150 PD-Pequot Ct and West End Ave Niantic set new 45-2 & shifted facilities AP2-YWO Total Cost Variance Met - Variance :85.6706 MIN.:-50 MAX.:150 PD-Pequot Ct and West End Ave Niantic set new 45-2 & shifted facilities AP2-YWO Total Cost Variance Met - Variance :85.6706 MIN.:-50 MAX.:150 SM-265 NW CRNR RD, N STGN- FRNT RPLC PLE, OH XFMR, OH-DB SVC AP3-YWO Resource Variance Met- Labor 26 <= 32 OR 166.67 <= 30 And Contractor $571.4 <= 2000 SM-265 NW CRNR RD, N STGN- FRNT RPLC PLE, OH XFMR, OH-DB SVC AP3-YWO Resource Variance Met- Labor 26 <= 32 OR 166.67 <= 30 And Contractor $571.4 <= 2000 SM-265 NW CRNR RD, N STGN- FRNT RPLC PLE, OH XFMR, OH-DB SVC AP3-YWO Resource Variance Met- Labor 26 <= 32 OR 166.67 <= 30 And Contractor $571.4 <= 2000 SM-265 NW CRNR RD, N STGN- FRNT RPLC PLE, OH XFMR, OH-DB SVC AP3-YWO Resource Variance Met- Labor 26 <= 32 OR 166.67 <= 30 And Contractor $571.4 <= 2000 SM-PURA DBL PLE P234- ELM ST, GRTN AP1-YWO Total Cost Less Than 7K SM-PURA DBL PLE P234- ELM ST, GRTN AP1-YWO Total Cost Less Than 7K SM-PURA DBL PLE P234- ELM ST, GRTN AP1-YWO Total Cost Less Than 7K MM YELLOW TAG-Y-18666-2017 HALLS RD (RT 1) POLE 2309 REPLACE CAP BANK AP2-YWO Total Cost Variance Met - Variance :36.4507 MIN.:-50 MAX.:50 DG P#2411 RPLC 1 SECT NEUTRAL W/TPX, 1 SECT TPX XROAD, OH/DB SVC RSR DG P#2411 RPLC 1 SECT NEUTRAL W/TPX, 1 SECT TPX XROAD, OH/DB SVC RSR RA CD00086-04 1ph 1/0 to 3ph 336 TW reconductor RT 6 Chaplin AP2-YWO Total Cost Variance Met - Variance :9.3973 MIN.:-10 MAX.:10 RA CD00086-04 1ph 1/0 to 3ph 336 TW reconductor RT 6 Chaplin AP2-YWO Total Cost Variance Met - Variance :9.3973 MIN.:-10 MAX.:10 RA CD00086-04 1ph 1/0 to 3ph 336 TW reconductor RT 6 Chaplin AP2-YWO Total Cost Variance Met - Variance :9.3973 MIN.:-10 MAX.:10 RA CD00086-04 1ph 1/0 to 3ph 336 TW reconductor RT 6 Chaplin AP2-YWO Total Cost Variance Met - Variance :9.3973 MIN.:-10 MAX.:10 RA CD00086-04 1ph 1/0 to 3ph 336 TW reconductor RT 6 Chaplin AP2-YWO Total Cost Variance Met - Variance :9.3973 MIN.:-10 MAX.:10 BC - CD00450-02 - 1PH, Re-cond. & Convert (4.8 to 23)kV, Club House Rd (3 of 5) CL-YWO Variance - Contractor Labor CD00450-01 New 3PH 556 TW Overbuild, Paper Mill Rd, Town of Lisbon (Part 1 of 5) NO AWOCS-AWOCS REASON CODE AND DESCRIPTION NOT FOUND. RA Power Survey 307373, Billable, DAS pole 1754, Sterling RA Power Survey 307373, Billable, DAS pole 1754, Sterling RA Power Survey 307373, Billable, DAS pole 1754, Sterling RA CD00078-02 JC B/B 12S1/21D3 convert RT 138 p80 (600's) to p50 (600's) AP2-YWO Total Cost Variance Met - Variance :.8963 MIN.:-20 MAX.:20 RA CD00078-02 JC B/B 12S1/21D3 convert RT 138 p80 (600's) to p50 (600's) AP2-YWO Total Cost Variance Met - Variance :.8963 MIN.:-20 MAX.:20 RA CD00078-06 JC B/B 12S1/21D3 : install 3-333KVA S/D RT 164 Griswold AP2-YWO Total Cost Variance Met - Variance :-11.2133 MIN.:-20 MAX.:20 RA CD00078-06 JC B/B 12S1/21D3 : install 3-333KVA S/D RT 164 Griswold AP2-YWO Total Cost Variance Met - Variance :-11.2133 MIN.:-20 MAX.:20 RD 2016 Def Pole Replacement - P1790 - Brockway Rd RD 2016 Def Pole Replacement - P1790 - Brockway Rd 5D620475 RD 2016 Def Pole Replacement - P179 5D620475 RD 2016 Def Pole Replacement - P179 RD 2016 Def Pole Replacement - P1790 - Brockway Rd 1148 PLAINFIELD PIKE, STERLNG, POLE#218, INST NEW 1/0 QPX, 3-PH, 120/208 OH/SVC 5D620545 1148 PLAINFIELD PIKE, STERLNG, POL 5D620545 1148 PLAINFIELD PIKE, STERLNG, POL 1148 PLAINFIELD PIKE, STERLNG, POLE#218, INST NEW 1/0 QPX, 3-PH, 120/208 OH/SVC 1148 PLAINFIELD PIKE, STERLNG, POLE#218, INST NEW 1/0 QPX, 3-PH, 120/208 OH/SVC 5D620545 1148 PLAINFIELD PIKE, STERLNG, POL 5D620545 1148 PLAINFIELD PIKE, STERLNG, POL 5D620573 RA CD00078-02 JC B/B 12S1/21D3 : 5D620573 RA CD00078-02 JC B/B 12S1/21D3 : 5D620573 RA CD00078-02 JC B/B 12S1/21D3 : 5D620573 RA CD00078-02 JC B/B 12S1/21D3 : 5D620573 RA CD00078-02 JC B/B 12S1/21D3 : 5D620574 RA CD00078-02 JC B/B 12S1/21D3 : 5D620574 RA CD00078-02 JC B/B 12S1/21D3 : 1148 PLAINFIELD PIKE, STERLNG, POLE#218, INST NEW 1/0 QPX, 3-PH, 120/208 OH/SVC RA CD00078-02 JC B/B 12S1/21D3 : Pine Rd - Convert/Recon from RT 138 end AP2-YWO Total Cost Variance Met - Variance :-20.7484 MIN.:-30 MAX.:30 RA CD00078-02 JC B/B 12S1/21D3 : Pine Rd - Convert/Recon from RT 138 end AP2-YWO Total Cost Variance Met - Variance :-20.7484 MIN.:-30 MAX.:30 RA CD00078-02 JC B/B 12S1/21D3 : Pine Rd - Convert/Recon from RT 138 end AP2-YWO Total Cost Variance Met - Variance :-20.7484 MIN.:-30 MAX.:30 RA CD00078-02 JC B/B 12S1/21D3 : Pine Rd - Convert/Recon from RT 138 end AP2-YWO Total Cost Variance Met - Variance :-20.7484 MIN.:-30 MAX.:30 RA CD00078-02 JC B/B 12S1/21D3 : Pine Rd - Convert/Recon from RT 138 end AP2-YWO Total Cost Variance Met - Variance :-20.7484 MIN.:-30 MAX.:30 RA CD00078-02 JC B/B 12S1/21D3 : Pine Rd - fill gap - create N.O. tie point AP2-YWO Total Cost Variance Met - Variance :-33.7995 MIN.:-40 MAX.:40 RA CD00078-02 JC B/B 12S1/21D3 : Pine Rd - fill gap - create N.O. tie point AP2-YWO Total Cost Variance Met - Variance :-33.7995 MIN.:-40 MAX.:40
  10. Page 10 of 879

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued October 23, 2026 RRU-159 Attachment 5 Page 10 of 879 work_order_number description 5D620574 RA CD00078-02 JC B/B 12S1/21D3 : 5D620574 RA CD00078-02 JC B/B 12S1/21D3 : 5D620574 RA CD00078-02 JC B/B 12S1/21D3 : 5D620574 RA CD00078-02 JC B/B 12S1/21D3 : 5D620574 RA CD00078-02 JC B/B 12S1/21D3 : 5D620575 RA CD00078-02 JC B/B 12S1/21D3 : 5D620575 RA CD00078-02 JC B/B 12S1/21D3 : 5D620575 RA CD00078-02 JC B/B 12S1/21D3 : 5D620575 RA CD00078-02 JC B/B 12S1/21D3 : 5D620880 RA CD00078-02 JC B/B 12S1/21D3 pr 5D620880 RA CD00078-02 JC B/B 12S1/21D3 pr 5D620880 RA CD00078-02 JC B/B 12S1/21D3 pr 5D620880 RA CD00078-02 JC B/B 12S1/21D3 pr 5D620880 RA CD00078-02 JC B/B 12S1/21D3 pr 5D720504 POLE 286, RSO, 4/28, LISBON, NEWEN 5D720504 POLE 286, RSO, 4/28, LISBON, NEWEN 5D720504 POLE 286, RSO, 4/28, LISBON, NEWEN 5D720556 DG P#1348S ACADEMY HILL RD PLAINFIE 5D720556 DG P#1348S ACADEMY HILL RD PLAINFIE 5D720768 RSO/AWC, 6/10, THOMPSON, RIVERSIDE 5D720768 RSO/AWC, 6/10, THOMPSON, RIVERSIDE 5D720768 RSO/AWC, 6/10, THOMPSON, RIVERSIDE 5T520257 CDOT32-148 Mansfield/Cov Re-energiz 5T520257 CDOT32-148 Mansfield/Cov Re-energiz 5T520636 CB PN CD00462 - replace reject pole 5T520636 CB PN CD00462 - replace reject pole 5T520636 CB PN CD00462 - replace reject pole 5T521259 07/07 ESO BRIDGE ST E. WINDSOR CAR 5T521327 West Rd, Ellington. BBA P-32007 Ins 5T521327 West Rd, Ellington. BBA P-32007 Ins 5T521425 8/12 SPRINGFIELD RD,SOMERS-BBA 5T521425 8/12 SPRINGFIELD RD,SOMERS-BBA 5T521425 8/12 SPRINGFIELD RD,SOMERS-BBA 5T522069 AWC 12/1 S. MAIN ST, EW - DIG UP ES 5T522069 AWC 12/1 S. MAIN ST, EW - DIG UP ES 5T620092 1/15 RIVER RD,WILLINGTON 9A 5T620092 1/15 RIVER RD,WILLINGTON 9A 5T620092 1/15 RIVER RD,WILLINGTON 9A 5T620313 Highland Ave, Ellington - P#275, re 5T620313 Highland Ave, Ellington - P#275, re 5T620432 3/17 STOUGHTON RD, EW - TREE TOOK D long_description RA CD00078-02 JC B/B 12S1/21D3 : Pine Rd - fill gap - create N.O. tie point AP2-YWO Total Cost Variance Met - Variance :-33.7995 MIN.:-40 MAX.:40 RA CD00078-02 JC B/B 12S1/21D3 : Pine Rd - fill gap - create N.O. tie point AP2-YWO Total Cost Variance Met - Variance :-33.7995 MIN.:-40 MAX.:40 RA CD00078-02 JC B/B 12S1/21D3 : Pine Rd - fill gap - create N.O. tie point AP2-YWO Total Cost Variance Met - Variance :-33.7995 MIN.:-40 MAX.:40 RA CD00078-02 JC B/B 12S1/21D3 : Pine Rd - fill gap - create N.O. tie point AP2-YWO Total Cost Variance Met - Variance :-33.7995 MIN.:-40 MAX.:40 RA CD00078-02 JC B/B 12S1/21D3 : Pine Rd - fill gap - create N.O. tie point AP2-YWO Total Cost Variance Met - Variance :-33.7995 MIN.:-40 MAX.:40 RA CD00078-02 JC B/B 12S1/21D3 : Convert Goldstein Rd AP2-YWO Total Cost Variance Met - Variance :-47.7583 MIN.:-50 MAX.:50 RA CD00078-02 JC B/B 12S1/21D3 : Convert Goldstein Rd AP2-YWO Total Cost Variance Met - Variance :-47.7583 MIN.:-50 MAX.:50 RA CD00078-02 JC B/B 12S1/21D3 : Convert Goldstein Rd AP2-YWO Total Cost Variance Met - Variance :-47.7583 MIN.:-50 MAX.:50 RA CD00078-02 JC B/B 12S1/21D3 : Convert Goldstein Rd AP2-YWO Total Cost Variance Met - Variance :-47.7583 MIN.:-50 MAX.:50 RA CD00078-02 JC B/B 12S1/21D3 pre-build DB Slater Village Shopping Center AP2-YWO Total Cost Variance Met - Variance :-33.6523 MIN.:-50 MAX.:50 RA CD00078-02 JC B/B 12S1/21D3 pre-build DB Slater Village Shopping Center AP2-YWO Total Cost Variance Met - Variance :-33.6523 MIN.:-50 MAX.:50 RA CD00078-02 JC B/B 12S1/21D3 pre-build DB Slater Village Shopping Center AP2-YWO Total Cost Variance Met - Variance :-33.6523 MIN.:-50 MAX.:50 RA CD00078-02 JC B/B 12S1/21D3 pre-build DB Slater Village Shopping Center AP2-YWO Total Cost Variance Met - Variance :-33.6523 MIN.:-50 MAX.:50 RA CD00078-02 JC B/B 12S1/21D3 pre-build DB Slater Village Shopping Center AP2-YWO Total Cost Variance Met - Variance :-33.6523 MIN.:-50 MAX.:50 POLE 286, RSO, 4/28, LISBON, NEWENT RD, 9A, STILWELL AP2-YWO Total Cost Variance Met - Variance :10.474 MIN.:-50 MAX.:50 POLE 286, RSO, 4/28, LISBON, NEWENT RD, 9A, STILWELL AP2-YWO Total Cost Variance Met - Variance :10.474 MIN.:-50 MAX.:50 POLE 286, RSO, 4/28, LISBON, NEWENT RD, 9A, STILWELL AP2-YWO Total Cost Variance Met - Variance :10.474 MIN.:-50 MAX.:50 DG P#1348S ACADEMY HILL RD PLAINFIELD FRNTR POLE RPLC CLP TO SHIFT AP1-YWO Total Cost Less Than 7K DG P#1348S ACADEMY HILL RD PLAINFIELD FRNTR POLE RPLC CLP TO SHIFT AP1-YWO Total Cost Less Than 7K RSO/AWC, 6/10, THOMPSON, RIVERSIDE DRIVE, 9A AP1-YWO Total Cost Less Than 7K RSO/AWC, 6/10, THOMPSON, RIVERSIDE DRIVE, 9A AP1-YWO Total Cost Less Than 7K RSO/AWC, 6/10, THOMPSON, RIVERSIDE DRIVE, 9A AP1-YWO Total Cost Less Than 7K CDOT32-148 Mansfield/Cov Re-energize primary over Rte 275 bridge 1of 2 50% reimb JE-YWO Variance Job Type Exclusion CDOT32-148 Mansfield/Cov Re-energize primary over Rte 275 bridge 1of 2 50% reimb JE-YWO Variance Job Type Exclusion CB PN CD00462 - replace reject pole #7883 Colburn Rd. Stafford 40'/2 CI-YWO Variance - Contractor Invoice CB PN CD00462 - replace reject pole #7883 Colburn Rd. Stafford 40'/2 CI-YWO Variance - Contractor Invoice CB PN CD00462 - replace reject pole #7883 Colburn Rd. Stafford 40'/2 CI-YWO Variance - Contractor Invoice 07/07 ESO BRIDGE ST E. WINDSOR CAR VS POLE 15 cost_element_group ferc_account percent Employee Expenses-EE0 108030 0.07592 Employee Expenses-EE0 593000 0.00949 Employee Expenses-EE0 594000 0.02772 Employee Expenses-EE0 583000 0.01951 Employee Expenses-EE0 596000 0.00649 Employee Expenses-EE0 595000 0.00702 Employee Expenses-EE0 108030 0.14208 Employee Expenses-EE0 107010 0.7968 Employee Expenses-EE0 583000 0.0541 Employee Expenses-EE0 594000 0.50138 Employee Expenses-EE0 107010 0.29556 Employee Expenses-EE0 595000 0.0257 Employee Expenses-EE0 108030 0.10051 Employee Expenses-EE0 584000 0.07685 Employee Expenses-EE0 107010 0.45345 Employee Expenses-EE0 108030 0.18832 Employee Expenses-EE0 593000 0.35823 Employee Expenses-EE0 107010 0.59428 Employee Expenses-EE0 108030 0.40572 Employee Expenses-EE0 107010 0.29779 Employee Expenses-EE0 583000 0.53677 Employee Expenses-EE0 108030 0.16544 Employee Expenses-EE0 108030 0.05961 Employee Expenses-EE0 593000 0.94039 Employee Expenses-EE0 107010 0.27729 Employee Expenses-EE0 583000 0.53261 Employee Expenses-EE0 108030 0.1901 Employee Expenses-EE0 593000 1 Employee Expenses-EE0 108030 0.32418 Employee Expenses-EE0 107010 0.67582 Employee Expenses-EE0 593000 0.23306 Employee Expenses-EE0 108030 0.31378 Employee Expenses-EE0 107010 0.45316 Employee Expenses-EE0 107010 0.96463 Employee Expenses-EE0 594000 0.03537 Employee Expenses-EE0 107010 0.47799 Employee Expenses-EE0 593000 0.24456 Employee Expenses-EE0 108030 0.27745 Employee Expenses-EE0 107010 0.5 Employee Expenses-EE0 108030 0.5 Employee Expenses-EE0 583000 0.50786 Employee Expenses-EE0 107010 0.31371 Employee Expenses-EE0 108030 0.0795 Employee Expenses-EE0 595000 0.09893 Employee Expenses-EE0 594000 0.00153 Employee Expenses-EE0 584000 0.04088 Employee Expenses-EE0 107010 0.95759 Employee Expenses-EE0 107010 0.43552 Employee Expenses-EE0 593000 0.21539 Employee Expenses-EE0 108030 0.34909 Employee Expenses-EE0 107010 0.51604 Employee Expenses-EE0 593000 0.13903 Employee Expenses-EE0 108030 0.34493 Employee Expenses-EE0 108030 0.33891 Employee Expenses-EE0 107010 0.66109 Employee Expenses-EE0 107010 1 Employee Expenses-EE0 107010 1 Employee Expenses-EE0 107010 0.97091 Employee Expenses-EE0 108030 0.02909 Employee Expenses-EE0 107010 0.84649 Employee Expenses-EE0 108030 0.11389 Employee Expenses-EE0 593000 0.03962 Employee Expenses-EE0 593000 0.22201 Employee Expenses-EE0 107010 0.49566 Employee Expenses-EE0 108030 0.28233 Employee Expenses-EE0 583000 0.46859 Employee Expenses-EE0 108030 0.13192 Employee Expenses-EE0 595000 0.06086 Employee Expenses-EE0 107010 0.33863 Employee Expenses-EE0 587000 0.01262 Employee Expenses-EE0 108030 0.33251 Employee Expenses-EE0 107010 0.65487 Employee Expenses-EE0 107010 0.56705 Employee Expenses-EE0 593000 0.275 Employee Expenses-EE0 108030 0.15795 Employee Expenses-EE0 108030 0.54023 Employee Expenses-EE0 593000 0.19157 Employee Expenses-EE0 107010 0.2682 Employee Expenses-EE0 594000 0.39111 Employee Expenses-EE0 108030 0.17037 Employee Expenses-EE0 107010 0.43852 Employee Expenses-EE0 108030 0.27529 Employee Expenses-EE0 107010 0.5619 Employee Expenses-EE0 583000 0.16281 Employee Expenses-EE0 594000 0.06803 Employee Expenses-EE0 593000 0.01821 Employee Expenses-EE0 108030 0.21078 Employee Expenses-EE0 Employee Expenses-EE0 107010 593000 0.70298 1 Employee Expenses-EE0 107010 1 Employee Expenses-EE0 108030 0.45603 Employee Expenses-EE0 596000 0.06852 Employee Expenses-EE0 107010 0.47545 Employee Expenses-EE0 107010 0.4797 Employee Expenses-EE0 583000 0.25049 Employee Expenses-EE0 108030 0.23755 Employee Expenses-EE0 593000 0.01661 Employee Expenses-EE0 595000 0.01565 Employee Expenses-EE0 107010 0.34728 Employee Expenses-EE0 108030 0.18235 Employee Expenses-EE0 Employee Expenses-EE0 Employee Expenses-EE0 Employee Expenses-EE0 Employee Expenses-EE0 Employee Expenses-EE0 Employee Expenses-EE0 Employee Expenses-EE0 Employee Expenses-EE0 593000 588360 232CA0 23401X 107010 107010 107010 107010 592140 0.47037 1 1 1 1 1 1 1 1 Employee Expenses-EE0 Employee Expenses-EE0 Employee Expenses-EE0 583275 228450 107010 1 1 1 West Rd, Ellington. BBA P-32007 Install 45-2 replaced primary riser. West Rd, Ellington. BBA P-32007 Install 45-2 replaced primary riser. 8/12 SPRINGFIELD RD,SOMERS-BBA 8/12 SPRINGFIELD RD,SOMERS-BBA 8/12 SPRINGFIELD RD,SOMERS-BBA AWC 12/1 S. MAIN ST, EW - DIG UP ESI HIT CABLE AP2-YWO Total Cost Variance Met - Variance :-1.3831 MIN.:-40 MAX.:40 AWC 12/1 S. MAIN ST, EW - DIG UP ESI HIT CABLE AP2-YWO Total Cost Variance Met - Variance :-1.3831 MIN.:-40 MAX.:40 1/15 RIVER RD,WILLINGTON 9A AP2-YWO Total Cost Variance Met - Variance :38.8667 MIN.:-50 MAX.:50 1/15 RIVER RD,WILLINGTON 9A AP2-YWO Total Cost Variance Met - Variance :38.8667 MIN.:-50 MAX.:50 1/15 RIVER RD,WILLINGTON 9A AP2-YWO Total Cost Variance Met - Variance :38.8667 MIN.:-50 MAX.:50 Highland Ave, Ellington - P#275, replace 2 missing Fault Indicators Highland Ave, Ellington - P#275, replace 2 missing Fault Indicators 3/17 STOUGHTON RD, EW - TREE TOOK DOWN 2 POLES 1964 & 2310 40/2'S 3/17 STOUGHTON RD, EW - TREE TOOK DOWN 2 POLES 1964 & 2310 40/2'S 5T620432 3/17 STOUGHTON RD, EW - TREE TOOK D 5T620432 3/17 STOUGHTON RD, EW - TREE TOOK D 3/17 STOUGHTON RD, EW - TREE TOOK DOWN 2 POLES 1964 & 2310 40/2'S 3/17 STOUGHTON RD, EW - TREE TOOK DOWN 2 POLES 1964 & 2310 40/2'S 5T620432 3/17 STOUGHTON RD, EW - TREE TOOK D 5T620622 DG P#1653 GURLEYVILLE RD MANSFIELD 5T620622 DG P#1653 GURLEYVILLE RD MANSFIELD 5T620622 DG P#1653 GURLEYVILLE RD MANSFIELD 5T620824 RA CDOT 32-130 Main St., Coventry 5T620824 RA CDOT 32-130 Main St., Coventry 5T620824 RA CDOT 32-130 Main St., Coventry 5T620828 RA CDOT 32-130 Main St., Coventry 5T620828 RA CDOT 32-130 Main St., Coventry 5T620828 RA CDOT 32-130 Main St., Coventry 5T621453 8/7, 9A 196 FrazerFir Rd, SOUTH Win 5T621453 8/7, 9A 196 FrazerFir Rd, SOUTH Win 5T621800 RSO 11/14 HAZARD AVE ENFIELD - 2ND 5T621973 80 Hayes Rd, SW / 2775 / INS NEW CV 5T720247 SW, RUGBY LN - INSTALLED MED HH @ P 5T720247 SW, RUGBY LN - INSTALLED MED HH @ P 5T720350 Lathrop Rd, Covemtry - Extend prima 5T720350 Lathrop Rd, Covemtry - Extend prima 5T720350 Lathrop Rd, Covemtry - Extend prima 5T720375 AWC-OH, 2/25, ENFIELD, TILL STREET, 5T720375 AWC-OH, 2/25, ENFIELD, TILL STREET, 5T720375 AWC-OH, 2/25, ENFIELD, TILL STREET, 5T720517 3/8 - AWC - LONG HILL RD,ANDOVER - 5T720517 3/8 - AWC - LONG HILL RD,ANDOVER - 5T720517 3/8 - AWC - LONG HILL RD,ANDOVER - 5T720517 3/8 - AWC - LONG HILL RD,ANDOVER - 5T720571 Fletcher Rd, Enfield - Relocate fac 5T720571 Fletcher Rd, Enfield - Relocate fac 5T720571 Fletcher Rd, Enfield - Relocate fac 5T720579 WILLINGTON, RIVER RD 9A POLE 220 po 5T720579 WILLINGTON, RIVER RD 9A POLE 220 po 5T720579 WILLINGTON, RIVER RD 9A POLE 220 po 5T720704 JV COVENTRY, SOUTH ST - SHIFT FRONT 5T720704 JV COVENTRY, SOUTH ST - SHIFT FRONT 5T720704 JV COVENTRY, SOUTH ST - SHIFT FRONT 5T720747 West Main St 45, Vernon. Install Ra 5T720747 West Main St 45, Vernon. Install Ra 5T720747 West Main St 45, Vernon. Install Ra 5T720857 STAFFORD LAMB RD - PRIORITY REJECT 5T720857 STAFFORD LAMB RD - PRIORITY REJECT 5T720857 STAFFORD LAMB RD - PRIORITY REJECT 5T721048 Mullen Rd, Enfield - Part 3 of 4 - 5T721048 Mullen Rd, Enfield - Part 3 of 4 - 5T721048 Mullen Rd, Enfield - Part 3 of 4 - 5T721048 5W120423 Mullen Rd, Enfield - Part 3 of 4 ELEC PROJ RELIABILITY ANNUAL DESG ( 5W220938 RA CDOT 32-130 Main St., Coventry 5W420455 JV Crystal Ln Mansfield replace 3 w 5W420455 JV Crystal Ln Mansfield replace 3 w 5W420455 JV Crystal Ln Mansfield replace 3 w 5W613498 RA CDOT 32-130 Main St. Coventry - 5W613498 RA CDOT 32-130 Main St. Coventry - 5W613498 RA CDOT 32-130 Main St. Coventry - 5W613498 RA CDOT 32-130 Main St. Coventry - 5W613498 RA CDOT 32-130 Main St. Coventry - 5W720003 RA CDOT 32-130 Main St. Coventry - 5W720003 RA CDOT 32-130 Main St. Coventry - 5W720003 AIRS0011 APCAA211 APYA2011 AVTHFD11 AVTNLD11 AVTNWT11 AVTWDS11 B3H25388 RA CDOT 32-130 Main St. Coventry Asset Investment AP Contract Admin YA Decomm Costs AVTEC CL&P Hartford SOC Consoles AVTEC CL&P NEW LNDN SOC CONSOLES AVTEC CL&P NEWTOWN EOC CONSOLES AVTEC purch/install telecomm windsr 1A-5XLTCTRANSFORMERANNUAL DISTRIBUT BATREP11 BCAMSET1 BDCON107 Recloser Battery Replacements SITE #63 - BERLIN CAMPUS PCB SITE 1 STAMFORD CONSOLIDATION PROJECT DG P#1653 GURLEYVILLE RD MANSFIELD CLP 2 POLE/ANC SET, 2 SECT OH 3PH PRI & RSR AP2-YWO Total Cost Variance Met - Variance :-13.4141 MIN.:-30 MAX.:30 DG P#1653 GURLEYVILLE RD MANSFIELD CLP 2 POLE/ANC SET, 2 SECT OH 3PH PRI & RSR AP2-YWO Total Cost Variance Met - Variance :-13.4141 MIN.:-30 MAX.:30 DG P#1653 GURLEYVILLE RD MANSFIELD CLP 2 POLE/ANC SET, 2 SECT OH 3PH PRI & RSR AP2-YWO Total Cost Variance Met - Variance :-13.4141 MIN.:-30 MAX.:30 RA CDOT 32-130 Main St., Coventry - STA 23+50 relocate 26S JE-YWO Variance Job Type Exclusion RA CDOT 32-130 Main St., Coventry - STA 23+50 relocate 26S JE-YWO Variance Job Type Exclusion RA CDOT 32-130 Main St., Coventry - STA 23+50 relocate 26S JE-YWO Variance Job Type Exclusion RA CDOT 32-130 Main St., Coventry - STA 21+40 relocate 28s JE-YWO Variance Job Type Exclusion RA CDOT 32-130 Main St., Coventry - STA 21+40 relocate 28s JE-YWO Variance Job Type Exclusion RA CDOT 32-130 Main St., Coventry - STA 21+40 relocate 28s JE-YWO Variance Job Type Exclusion 8/7, 9A 196 FrazerFir Rd, SOUTH Windsor, pole 305 AP1-YWO Total Cost Less Than 7K 8/7, 9A 196 FrazerFir Rd, SOUTH Windsor, pole 305 AP1-YWO Total Cost Less Than 7K RSO 11/14 HAZARD AVE ENFIELD - 2ND TIME DIG UP AP2-YWO Total Cost Variance Met - Variance :25.4823 MIN.:-50 MAX.:50 80 Hayes Rd, SW / 2775 / INS NEW CV SVC SW, RUGBY LN - INSTALLED MED HH @ POLE 1 - COMP 6/2/17 CCC AP1-YWO Total Cost Less Than 7K SW, RUGBY LN - INSTALLED MED HH @ POLE 1 - COMP 6/2/17 CCC AP1-YWO Total Cost Less Than 7K Lathrop Rd, Covemtry - Extend primary two sections, plz see sketch AP2-YWO Total Cost Variance Met - Variance :20.6548 MIN.:-50 MAX.:50 Lathrop Rd, Covemtry - Extend primary two sections, plz see sketch AP2-YWO Total Cost Variance Met - Variance :20.6548 MIN.:-50 MAX.:50 Lathrop Rd, Covemtry - Extend primary two sections, plz see sketch AP2-YWO Total Cost Variance Met - Variance :20.6548 MIN.:-50 MAX.:50 AWC-OH, 2/25, ENFIELD, TILL STREET, CAR VS POLE 15009 9A AP2-YWO Total Cost Variance Met - Variance :32.6392 MIN.:-50 MAX.:150 AWC-OH, 2/25, ENFIELD, TILL STREET, CAR VS POLE 15009 9A AP2-YWO Total Cost Variance Met - Variance :32.6392 MIN.:-50 MAX.:150 AWC-OH, 2/25, ENFIELD, TILL STREET, CAR VS POLE 15009 9A AP2-YWO Total Cost Variance Met - Variance :32.6392 MIN.:-50 MAX.:150 3/8 - AWC - LONG HILL RD,ANDOVER - 9A - POLE 337 BROKEN - REPLACED XFMR AP2-YWO Total Cost Variance Met - Variance :-18.835 MIN.:-50 MAX.:50 3/8 - AWC - LONG HILL RD,ANDOVER - 9A - POLE 337 BROKEN - REPLACED XFMR AP2-YWO Total Cost Variance Met - Variance :-18.835 MIN.:-50 MAX.:50 3/8 - AWC - LONG HILL RD,ANDOVER - 9A - POLE 337 BROKEN - REPLACED XFMR AP2-YWO Total Cost Variance Met - Variance :-18.835 MIN.:-50 MAX.:50 3/8 - AWC - LONG HILL RD,ANDOVER - 9A - POLE 337 BROKEN - REPLACED XFMR AP2-YWO Total Cost Variance Met - Variance :-18.835 MIN.:-50 MAX.:50 Fletcher Rd, Enfield - Relocate facilities for the Town of Enfield AP2-YWO Total Cost Variance Met - Variance :-10.4774 MIN.:-50 MAX.:50 Fletcher Rd, Enfield - Relocate facilities for the Town of Enfield AP2-YWO Total Cost Variance Met - Variance :-10.4774 MIN.:-50 MAX.:50 Fletcher Rd, Enfield - Relocate facilities for the Town of Enfield AP2-YWO Total Cost Variance Met - Variance :-10.4774 MIN.:-50 MAX.:50 WILLINGTON, RIVER RD 9A POLE 220 pole replaced by Frontier 3/16 AP2-YWO Total Cost Variance Met - Variance :76.8228 MIN.:-50 MAX.:150 WILLINGTON, RIVER RD 9A POLE 220 pole replaced by Frontier 3/16 AP2-YWO Total Cost Variance Met - Variance :76.8228 MIN.:-50 MAX.:150 WILLINGTON, RIVER RD 9A POLE 220 pole replaced by Frontier 3/16 AP2-YWO Total Cost Variance Met - Variance :76.8228 MIN.:-50 MAX.:150 JV COVENTRY, SOUTH ST - SHIFT FRONTIER POLE 137 AP1-YWO Total Cost Less Than 7K JV COVENTRY, SOUTH ST - SHIFT FRONTIER POLE 137 AP1-YWO Total Cost Less Than 7K JV COVENTRY, SOUTH ST - SHIFT FRONTIER POLE 137 AP1-YWO Total Cost Less Than 7K West Main St 45, Vernon. Install Rayflate kits on 8 location. 2 SETS 4 CONDUITS AP1-YWO Total Cost Less Than 7K West Main St 45, Vernon. Install Rayflate kits on 8 location. 2 SETS 4 CONDUITS AP1-YWO Total Cost Less Than 7K West Main St 45, Vernon. Install Rayflate kits on 8 location. 2 SETS 4 CONDUITS AP1-YWO Total Cost Less Than 7K STAFFORD LAMB RD - PRIORITY REJECT POLE 7651 AP1-YWO Total Cost Less Than 7K STAFFORD LAMB RD - PRIORITY REJECT POLE 7651 AP1-YWO Total Cost Less Than 7K STAFFORD LAMB RD - PRIORITY REJECT POLE 7651 AP1-YWO Total Cost Less Than 7K Mullen Rd, Enfield - Part 3 of 4 - Relocate poles per Town of Enfield AP2-YWO Total Cost Variance Met - Variance :4.5336 MIN.:-40 MAX.:40 Mullen Rd, Enfield - Part 3 of 4 - Relocate poles per Town of Enfield AP2-YWO Total Cost Variance Met - Variance :4.5336 MIN.:-40 MAX.:40 Mullen Rd, Enfield - Part 3 of 4 - Relocate poles per Town of Enfield AP2-YWO Total Cost Variance Met - Variance :4.5336 MIN.:-40 MAX.:40 Mullen Rd, Enfield - Part 3 of 4 - Relocate poles per Town of Enfield AP2-YWO Total Cost Variance Met - Variance :4.5336 MIN.:-40 MAX.:40 JV P495 TREE GUY BROKE IN STORM, NEED ATT STU OR AP1 -WO TOTAL COST LESS THAN 7K RA CDOT 32-130 Main St., Coventry - STA 16+00 to 22+50 (pole 32 to pole 27) JE-YWO Variance Job Type Exclusion JV Crystal Ln Mansfield replace 3 wood SL poles rotted. UG complex AP2-YWO Total Cost Variance Met - Variance :17.4631 MIN.:-50 MAX.:50 JV Crystal Ln Mansfield replace 3 wood SL poles rotted. UG complex AP2-YWO Total Cost Variance Met - Variance :17.4631 MIN.:-50 MAX.:50 JV Crystal Ln Mansfield replace 3 wood SL poles rotted. UG complex AP2-YWO Total Cost Variance Met - Variance :17.4631 MIN.:-50 MAX.:50 RA CDOT 32-130 Main St. Coventry - STA 24+00 to 31+50 (pole 25 to 20) JE-YWO Variance Job Type Exclusion RA CDOT 32-130 Main St. Coventry - STA 24+00 to 31+50 (pole 25 to 20) JE-YWO Variance Job Type Exclusion RA CDOT 32-130 Main St. Coventry - STA 24+00 to 31+50 (pole 25 to 20) JE-YWO Variance Job Type Exclusion RA CDOT 32-130 Main St. Coventry - STA 24+00 to 31+50 (pole 25 to 20) JE-YWO Variance Job Type Exclusion RA CDOT 32-130 Main St. Coventry - STA 24+00 to 31+50 (pole 25 to 20) JE-YWO Variance Job Type Exclusion RA CDOT 32-130 Main St. Coventry - STA 23+00 to 24+00 (pole 26) JE-YWO Variance Job Type Exclusion RA CDOT 32-130 Main St. Coventry - STA 23+00 to 24+00 (pole 26) JE-YWO Variance Job Type Exclusion RA CDOT 32-130 Main St. Coventry - STA 23+00 to 24+00 (pole 26) JE-YWO Variance Job Type Exclusion Asset investment AP Contract Admin YA Decomm Costs-Morawsky Add four Avtec Scout dispatch consoles @ 410 Sheldon Street, Hartford AWC for EOC RMT operations. Part of the AVTEC upgrade project Add four Avtec Scout dispatch consoles New London AWC for EOC RMT operations. Part of the AVTEC upgrade project Add four Avtec Scout dispatch consoles to Newtown AWC for EOC RMT operations. Part of the AVTEC upgrade project Order and install various telecom epuipment at 1985 Blue Hills Ave Ext, Windsor related to the Avtec upgrade project CASCADE WORK ORDER-1A-5XLTCTRANSFORMERANNUAL DISTRIBUTION L TC ENERGIZED INSPECTION-(NUMM) The recloser control unit and the radio both use the batteries in the recloser so there is an effort is to get the batteries replaced ahead of failures. Each battery is approximately $25. There are 4000 reclosers in CT and 4 batteries in each. Estimated cost to replace the batteries in each recloser is $250. SITE #63 - BERLIN CAMPUS PCB SITE 1D CONSTRUCTION SERVICES FOR CONSOLIDATION OF GREENWICH INTO STAMFORD - LINEMEN'S ROOM, ELECTRICAL MAINTENANCE ROOM, AND SHOP AREA JOE MONGILLO

Text of RRU-159 Attachment 04.xlsx

Sheet names, column headings and text cells; numbers left out

Text of RRU-159 Attachment 04.pdf

Extracted from the file · 5 pages · 20,994 characters

Text of RRU-159 Attachment 03.xlsx

Sheet names, column headings and text cells; numbers left out · first 300,000 characters

Text of RRU-159 Attachment 03.pdf

Extracted from the file · 840 pages · 14,413,580 characters

Text of RRU-159 Attachment 02.xlsx

Sheet names, column headings and text cells; numbers left out · first 300,000 characters

Text of RRU-159 Attachment 02.pdf

Extracted from the file · 1,137 pages · 16,605,462 characters

Text of RRU-159 Attachment 01.xlsx

Sheet names, column headings and text cells; numbers left out

Text of RRU-159 Attachment 01.pdf

Extracted from the file · 1 page · 1,403 characters

As listed on the current system

Question(s) Answered 159 (Connecticut Light and Power Company dba Eversource Energy) Date Filed: 11/06/2026

This filing on the current system (opens in a new tab)