Skip to main content

A prototype public docket site for the Connecticut Public Utilities Regulatory Authority

Utility Dockets and Filings

Interrogatory responses

Answers to questions 161, 168, 172, 175, 176

Files24

Search terms highlighted
Eversource rate increase is on 1 page of the text below, highlighted. Go to the first matchClear highlighting
1 page match
Words on different pages
Words on different pages

Text of RRU-161 Attachment 2.pdf

Extracted from the file · 1 page · 11,196 characters

Text of RRU-161 Attachment 2.xlsx

Sheet names, column headings and text cells; numbers left out

Text of RRU-168_Final.pdf

Extracted from the file · 1 page · 1,487 characters

Words on different pagesRead the text of RRU-168_Final.pdf

Text of RRU-168 Attachment 1.pdf

Extracted from the file · 2 pages · 9,610 characters

Text of RRU-168 Attachment 1.xlsx

Sheet names, column headings and text cells; numbers left out

Words on different pages
  1. Page 1

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set PURA-15 Date Issued October 23, 2026 RRU-172 Page 1 of 2 Date Filed: November 12, 2026 Witness: Brendan J. O’Brien and Garrett J. Murray Request from: Public Utilities Regulatory Authority Question: (FIELD OPERATIONS DETAIL) Audit Plan No. 8 (Onsite follow up). Regarding the Schedule C-3.16 and C-3.17 selections identified in the PURA Audit-in-Person-8: a. Provide the Field Ops Overhead Selection Detail and Field Ops Underground Selection Detail files provided in the PURA Audit-in-Person-8 folder, the Company’s explanation of the transactions recorded without a supporting invoice or journal entry, and the basis for reporting a transaction in PURA-SUPP-001 rather than in the files referenced. b. Provide the documentation for items 1744369602 and 1744369604 in the Field Ops Overhead Selection Detail file. Response: a. Please refer to RRU-172, Attachment 1, for the Field Ops Overhead Selection Detail and RRU-172, Attachment 2, for the Field Ops Underground Selection Detail. Both attachments provide a detailed breakout of the lines referenced in the question. The initial data provided to PURA for sample selections provided all line items (as requested) regardless of whether or not they had associated invoices or journal entries in the Company’s test year. For those items which did not have a supporting invoice or journal entry the Company provided the detailed breakout by line item in the Excel files noted above. For example, line 6 from PURA-SUPP-01, Schedule 3.16 was provided in the “Field Ops Overhead Selection Detail” Excel file and consists of 29,916 individual general ledger transactions. Similarly, line 12 provided 23,722 individual general ledger transactions. The Company broke out each transaction with an associated invoice or journal entry in PURA-SUPP-001, while those transactions without an associated invoice or journal entry had the summarized line items broken out by each detailed line item. Examples of items without invoices or journal entries are items from WorkDay/WorkForce such as employee mileage and meals. Those transactions are approved in the Company’s systems through time reporting and therefore would not have an invoice or journal entry associated with them. Those items follow the Company’s time and expense reporting and are input by each employee and reviewed and approved by each employee’s supervisor. b. Items 1744369602 and 1744369604 included in the Field Ops Overhead Selection Detail file, and RRU-172, Attachment 1, are both general ledger system driven transactions
  2. Page 2

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set PURA-15 Date Issued October 23, 2026 RRU-172 Page 2 of 2 classified as Derivation True Ups. A Derivation True Up occurs when there is a change in estimate on a capital work order, typically when the work in the field is finalized. The FERC split between capital and operation and maintenance is reallocated based on the updated estimate. Invoice details are recorded to the original estimate, not the Derivation True Up general ledger entry. Please note in RRU-172, Attachment 1, item 1744369604 nets to zero based on the transaction item 1744369603. Please refer to RRU-172, Attachment 3, showing the derivation true-up for this work order moving dollars out from capital that would have been in rate base, and moving the dollars into O&M. Derivation true-ups are an accounting transaction that function as a net/net zero sum.

Text of RRU-172 Attachment 1.xlsx

Sheet names, column headings and text cells; numbers left out

Text of RRU-172 Attachment 2 .xlsx

Sheet names, column headings and text cells; numbers left out

Text of RRU-172 Attachment 3.pdf

Extracted from the file · 1 page · 632 characters

Text of RRU-172 Attachment 3.xlsx

Sheet names, column headings and text cells; numbers left out

Text of RRU-175_Final.pdf

Extracted from the file · 1 page · 654 characters

Words on different pagesRead the text of RRU-175_Final.pdf

Text of RRU-175 Attachment 1.xlsx

Sheet names, column headings and text cells; numbers left out · first 300,000 characters

Text of RRU-176_Final.pdf

Extracted from the file · 3 pages · 8,104 characters

Words on different pagesRead the text of RRU-176_Final.pdf

Text of RRU-176 Attachment 1.pdf

Extracted from the file · 1 page · 1,534 characters

Text of RRU-176 Attachment 1.xlsx

Sheet names, column headings and text cells; numbers left out

Text of RRU-175 Attachment 1.xlsx

Sheet names, column headings and text cells; numbers left out · first 300,000 characters

Text of RRU-175 Attachment 1.pdf

Extracted from the file · 4,088 pages · 14,632,083 characters

Text of RRU-172 Attachment 2 .xlsx

Sheet names, column headings and text cells; numbers left out

Text of RRU-172 Attachment 2 .pdf

Extracted from the file · 718 pages · 3,100,170 characters

Text of RRU-172 Attachment 1.xlsx

Sheet names, column headings and text cells; numbers left out

Text of RRU-172 Attachment 1.pdf

Extracted from the file · 2,855 pages · 12,561,209 characters

As listed on the current system

Question(s) Answered 161, 168, 172, 175, 176 (Connecticut Light and Power Company dba Eversource) Date Filed: 11/12/2026

This filing on the current system (opens in a new tab)