Skip to main content

A prototype public docket site for the Connecticut Public Utilities Regulatory Authority

Utility Dockets and Filings

Interrogatory responses

Answers to questions 162, 165

ResponseFiled by Connecticut Light and Power Company dba Eversource Energy7 files
Part of docket 26-05-10Open
  • Electric
Application of The Connecticut Light and Power Company d/b/a Eversource Energy to Amend its Rate Schedules

Files7

Search terms highlighted
Eversource rate increase is on 12 pages across 3 files of the text below, highlighted. Go to the first matchClear highlighting
Words on different pages
Words on different pages
2 pages match

Text of RRU-163 Attachment 2.pdf

Extracted from the file · 7 pages · 46,127 characters

Text of RRU-163 Attachment 2.xlsx

Sheet names, column headings and text cells; numbers left out

7 pages match
  1. Page 112 of 129

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued October 23, 2026 RRU-163 Attachment 3 Page 112 of 129 Eversource Energy 2022 CT Management Audit Set FTI-19 Date Issued April 24, 2023 Q- FTI-571 Page 3 of 3 and achievement of predetermined goals as determined by their supervisor is also factored into the amount of the variable compensation granted. The payment made to the employee is based 100 percent on the employee’s individual performance against pre-designated goals and objectives specifically related to the employee’s job position. For the performance goals applicable to the executives of each business unit, please refer to the organizational level scorecards in response to FTI-150. Individual executives may have additional goals related to specific projects with a performance year. For example, please refer to FTI-571, Attachment 6(ES) for the 2021 organizational goals by department for the Vice President of Distribution Rates. As demonstrated in the Attachment, these goals cascade down from the Vice President to the Directors of each Department, and so forth down to their managers and employees. It is important to note that the Vice President of Distribution Rates may have corporate performance goals included in FTI-571, Attachment 6(ES) that are monitored on the CFO’s scorecard as demonstrated in FTI-150, Attachment 6(ES). Please refer to FTI-150, Attachment 6(ES), specifically pages 179-180, for an example of Doug Horton’s 2021 goals that are reported on the CFO’s scorecard, providing the performance for March 2021. These same goals can be shown on FTI-571, Attachment 6(ES).
  2. Page 113 of 129

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued October 23, 2026 RRU-163 Attachment 3 Page 113 of 129 Eversource Energy 2022 CT Management Audit Set FTI-19 Date Issued April 24, 2023 Q- FTI-575 Page 1 of 2 Date Filed: May 15, 2023 Witness: Landry, Leanne M, Kirven, Debra, Driscoll, Daniel C, Desrosiers, Thomas C Request from: F T I Consulting Question: For each Connecticut utility company, please provide the monthly overtime slides provided to executive leadership, as discussed in the response to FTI-196, for the months of December 2022, 2021, 2020 and 2019. Response: 1. The Connecticut Light & Power Company: 2. Yankee Gas Services Company: The overtime reports described in response to FTI-196 are provided monthly as part of the Operations Briefing package that were provided in response to FTI-287. Specifically, the overtime and premium costs can be found at the following locations within those attachments: December 2019 – FTI-287, Attachment 2(ES) Confidential at pages 13,28,30,31 December 2020 – FTI-287, Attachment 3(ES) Redacted and Confidential at pages 711,43,57,68,110 December 2021 – FTI-287, Attachment 4(ES) Redacted and Confidential at pages 1216,40,52,63,143,144,147,148 December 2022 – FTI-575, Attachment 1(ES) Redacted and Confidential at pages 1520,47,73,83,160,161,166,170. In addition, managers through executives can review monthly financial results for their responsible organization through the Company’s Financial Performance System (FPS), which shows real time actual and budgeted expenditures by cost control center and cost element including overtime. Please note that December 2020 and December 2021 include both CT and MA Electric Operations information as it was a combined organization under one president. December 2022 is strictly CT Electric Operations as CT and MA Electric Operations were two separate organizations each with their own president in 2022. Overtime slides were not broken out at the president level in the December 2019 reports.
  3. Page 114 of 129

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued October 23, 2026 RRU-163 Attachment 3 Page 114 of 129 Eversource Energy 2022 CT Management Audit Set FTI-19 Date Issued April 24, 2023 Q- FTI-575 Page 2 of 2 3. Aquarion Water Company of Connecticut: Please refer to FTI-575, Attachment 1(AQ) for the Consolidated Aquarion (including MA and NH) overtime slides provided to executive leadership for the months of December 2022 and 2021 (includes comparison to 2020). Prior to March of 2021, Aquarion was not required to submit overtime slides to executive leadership. Please see FTI-167, Attachment 1(AQ) for AQ (CT only) internal overtime reports by department for the years ending December 2019, 2020 and 2021.
  4. Page 115 of 129

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued October 23, 2026 RRU-163 Attachment 3 Page 115 of 129 Eversource Energy 2022 CT Management Audit Set FTI-24 Date Issued June 02, 2023 Q- FTI-617 Page 1 of 1 Date Filed: June 16, 2023 Witness: Marcucci, Nancy J Request from: F T I Consulting Question: Please provide the workforce summary presentations at FTI-156 for the CL&P and YGS utility subsidiaries. Response: 1. The Connecticut Light & Power Company: Please see FTI-617, Attachment 1(CLP). 2. Yankee Gas Services Company: Please see FTI-617, Attachment 1(YGS). This summary is for all Gas Distribution. This summary is not separated by individual company or state.
  5. Page 116 of 129

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued October 23, 2026 RRU-163 Attachment 3 Page 116 of 129 Eversource Energy 2022 CT Management Audit Set FTI-24 Date Issued June 02, 2023 Q- FTI-618 Page 1 of 1 Date Filed: June 16, 2023 Witness: Teixeira, Lucy, Marcucci, Nancy J Request from: F T I Consulting Question: What was the actual employee attrition rate in 2022? What is currently projected for 2023? What does management believe has caused the recent reduction in attrition rates? Response: 1. The Connecticut Light & Power Company: The 2022 YE attrition rate is 9.94%. In 2023, a similar trend with voluntary non-retirements from 2022 is anticipated. Retirements are expected to be lower due to market conditions and projected a 9.7% attrition rate, coming in slightly lower than 2022. With lower than anticipated attrition, the projected annual attrition rate has been adjusted down to 8.3%. Some considerations to lower attrition: • Large Companies (Meta, Amazon, Salesforce, Microsoft, Goldman Sachs) are experiencing major lay-offs – employees starting to see instability in other industries. • The U.S. job market is showing signs of softening as rising interest rates and slowing economic growth begin to take their toll on hiring - high inflation, rising costs and possible recession. For the full 2022 Attrition Analysis please refer to FTI-618, Attachment 1(ES). 2. Yankee Gas Services Company: Same as above 3. Aquarion Water Company of Connecticut: The attrition rate for 2022 was 10.5% and the projected attrition rate for 2023 is expected to be in the 8-10% range. The attrition rate for Aquarion has been in this range since 2020 due to the higher retirements due to an aging workforce. AQ expects the attrition to continue in this range for the next few years.
  6. Page 117 of 129

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued October 23, 2026 RRU-163 Attachment 3 Page 117 of 129 Eversource Energy 2022 CT Management Audit Set FTI-24 Date Issued June 02, 2023 Q- FTI-619 Page 1 of 1 Date Filed: June 16, 2023 Witness: Marcucci, Nancy J Request from: F T I Consulting Question: The most recent CEWD workforce survey was dated 2021 (provided in FTI-166). Has the 2022 report been received? If so, please provide. Response: Eversource did not participate in the 2022 CEWD workforce survey. Eversource is participating in the 2023 survey which is currently underway.
  7. Page 118 of 129

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued October 23, 2026 RRU-163 Attachment 3 Page 118 of 129 Eversource Energy 2022 CT Management Audit Set FTI-24 Date Issued June 02, 2023 Q- FTI-620 Page 1 of 2 Date Filed: June 16, 2023 Witness: Kirven, Debra, Landry, Leanne M, Desrosiers, Thomas C Request from: F T I Consulting Question: "The YGS overtime amounts provided in the tables on the Company's response to FTI-167 are sustantially lower than the overtime amounts reported on the monthly operations briefing reports provided on FTI-575 and FTI-287. For example, on FTI-287, Att. 4 (ES), p. 12 & 13, Gas Operations overtime expense were $6,364.5K and $12,676K for O&M and Capital, respectively, while the table on FTI-167 shows 2021 YGS overtime expenses of $2,500K and $3,800K for O&M and Capital, respectively. Similar differences were observed in 2019 and 2020. 1. Are the amounts reported in the table on FTI-167 correct? 2. If these amounts are correct, where is the remaining gas operations overtime incurred? 3. Please provide updated amounts for O&M and Capital overtime at CL&P, YGS and AQ through 12/31/22." Response: 1. The Connecticut Light & Power Company: 2. Yankee Gas Services Company: The amounts reported in the table on FTI-167 are correct; however, those amounts represent only the overtime associated with the Yankee Gas Services Company. The overtime reports shown in the monthly Operations Financial Briefing provided in FTI-287 and FTI-575 represent the total overtime incurred for all of the gas companies within the Eversource family. Please see the chart below for the YGS specific overtime incurred through 12/31/22.
  8. Page 119 of 129

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued October 23, 2026 RRU-163 Attachment 3 Page 119 of 129 Eversource Energy 2022 CT Management Audit Set FTI-24 Date Issued June 02, 2023 Q- FTI-620 Page 2 of 2 Please refer to the chart below for the CL&P specific overtime incurred through 12/31/22. 3. Aquarion Water Company of Connecticut: Please refer to FTI-575, Attachment 1(AQ) for the O&M and Capital OT for the full year of 2022.
  9. Page 120 of 129

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued October 23, 2026 RRU-163 Attachment 3 Page 120 of 129 Eversource Energy 2022 CT Management Audit Set FTI-24 Date Issued June 02, 2023 Q- FTI-621 Page 1 of 1 Date Filed: June 16, 2023 Witness: Teixeira, Lucy, Marcucci, Nancy J Request from: F T I Consulting Question: Please provide executive summary reports on succession planning outcomes from 2019 through 2022 for nonexecutive positions. Also, please provide the most recent executive succesion planning documents provided to the Board of Trustees. Have there been any material changes to the executive succession planning process since 2019? Response: 1. The Connecticut Light & Power Company: 2. Yankee Gas Services Company: Please see FTI-621, Attachment 1(ES)Confidential through FTI-621, Attachment 3(ES)Confidential for the executive summaries from 2019 through 2022 that provide an overview of our process and results. This process occurs every 18 months, but did not occur in 2020 due to the COVID-19 pandemic. There have not been any material changes to our Talent Management/Succession Planning process since 2019. Eversource does not share Executive level succession planning documents with the Board of Trustees. 3. Aquarion Water Company of Connecticut: AQ does not prepare executive summary reports for succession planning as AQ does not have a formalized process for succession planning.
  10. Page 121 of 129

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued October 23, 2026 RRU-163 Attachment 3 Page 121 of 129 Eversource Energy 2022 CT Management Audit Set FTI-24 Date Issued June 02, 2023 Q- FTI-622 Page 1 of 1 Date Filed: June 16, 2023 Witness: Marcucci, Nancy J Request from: F T I Consulting Question: What positions has Eversource identifed to be critical skill roles? What positions have been added or removed from this designation since 2019? Response: For the list of positions that Eversource identified to be critical skill roles, please see FTI-622, Attachment 1(ES). No positions have been added or removed from this list since 2019.

Text of RRU-165_Final.pdf

Extracted from the file · 1 page · 575 characters

Words on different pagesRead the text of RRU-165_Final.pdf

As listed on the current system

Question(s) Answered 162, 165 (Connecticut Light and Power Company dba Eversource Energy) Date Filed: 11/06/2026

This filing on the current system (opens in a new tab)