ResponseFiled by Connecticut Light and Power Company dba Eversource Energy7 files
Part of docket 26-05-10Open
  • Electric
Application of The Connecticut Light and Power Company d/b/a Eversource Energy to Amend its Rate Schedules

Files7

Search terms highlighted
Eversource rate increase is on 12 pages across 3 files of the text below, highlighted. Go to the first matchClear highlighting
Words on different pages
Words on different pages
2 pages match

Text of RRU-163 Attachment 2.pdf

Extracted from the file · 7 pages · 46,127 characters

Text of RRU-163 Attachment 2.xlsx

Sheet names, column headings and text cells; numbers left out

7 pages match
  1. Page 61 of 129

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued October 23, 2026 RRU-163 Attachment 3 Page 61 of 129 Eversource Energy 2022 CT Management Audit Set FTI-01 Date Issued November 30, 2022 Q- FTI-180 Page 2 of 2 are held and Safety Briefing sheets are regularly distributed that identify the importance of proper testing, grounding, and insulate/isolate procedures to mitigate the hazards. Training has been provided to the Connecticut Distribution System Operators covering distributed generation, equipment upgrades (i.e. new reclosers or switches), and software/ program updates (i.e. Outage Management System and Energy Control System). Distributed generations (DG) topics covered where DG resources connect to the distribution system and their impact, back feed safety and operational concerns, and how the DG resources respond to outages. Equipment upgrades topics review new equipment being added to the system and how it interfaces with the distribution system and system operator controls. Software/ program update topics provide gap training based on changes in the tools used by the system operator. 2. Yankee Gas Services Company: Not applicable. 3. Aquarion Water Company of Connecticut: Not applicable.
  2. Page 62 of 129

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued October 23, 2026 RRU-163 Attachment 3 Page 62 of 129 Eversource Energy 2022 CT Management Audit Set FTI-01 Date Issued November 30, 2022 Q- FTI-181 Page 1 of 1 Date Filed: December 20, 2022 Witness: Teixeira, Lucy, Marcucci, Nancy J Request from: F T I Consulting Question: Please describe the succession planning process currently employed by Eversource, the Service Company and the Connecticut utilities. Please indicate how the succession planning process applies to the various levels of management and, more broadly, into the exempt workforce. Response: 1. The Connecticut Light & Power Company: 2. Yankee Gas Services Company: CL&P and YGS have an annual talent review process that identifies high potential talent and critical impact roles. Succession Planning is also conducted at the Director level and above with Human Resources and Business Leaders. Individual organizations also do their own succession planning process for their teams which include Supervisor and Above. This has been and will continue to be an enterprise-wide process. 3. Aquarion Water Company of Connecticut: High potential talent is reviewed annually during the annual performance assessment process. Critical positions have been identified - please refer to response to FTI-178. Succession planning for positions that are manager level and above are discussed with Human Resources on an annual basis, and the executive team during the quarterly review process.
  3. Page 63 of 129

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued October 23, 2026 RRU-163 Attachment 3 Page 63 of 129 Eversource Energy 2022 CT Management Audit Set FTI-01 Date Issued November 30, 2022 Q- FTI-192 Page 1 of 2 Date Filed: January 11, 2023 Witness: Kirven, Debra, Driscoll, Daniel C Request from: F T I Consulting Question: Please provide a detailed listing of 3rd party contract labor spend for 2020, 2021 and YTD 2022. The listing should include the vendor’s name, the specific program worked by the vendor, and the amount of spend for 2020, 2021 and YTD 2022. The listing by vendor should include the top ten vendors in each calendar year, with remaining costs lumped together to provide annual totals. The listing should also be broken out by Eversource, the Service Company and each of the Connecticut utilities. The listing should also be broken down by major business units and departments, as available. Response: 1. The Connecticut Light & Power Company: 2. Yankee Gas Services Company: Eversource Energy, CL&P and YGS consider “third-party contractor labor” services as representing the “third-party contractor spend.” The data provided in the attachments listed below were pulled from the Eversource Maximo (Accounts Payable Module) system. All costs are by vendor and not by program or major business units. To present the data regarding thirdparty contractor services accurately and in context, the following payments to third-party vendors are excluded: • • • • • • • Third party energy supplier purchases and contracts Property tax payments Electric and gas purchase power payments Storm costs Co-generation payments Capital lease payments Intercompany billings and transactions Please see FTI-192, Attachment 1 (CLP), FTI-192, Attachment 1 (YGS) and FTI-192, Attachment 1 (ES) for a summary of third-party contractor costs for 2019 through December 2022 for Eversource Energy, CL&P and YGS. The data presented in these attachments includes the top 15 vendors in each calendar year with remaining costs lumped together and a high-level description of the services provided by each vendor. Please note the attachments provide information for 2019 to be responsive to the information requested in FTI-168.
  4. Page 64 of 129

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued October 23, 2026 RRU-163 Attachment 3 Page 64 of 129 Eversource Energy 2022 CT Management Audit Set FTI-01 Date Issued November 30, 2022 Q- FTI-192 Page 2 of 2 3. Aquarion Water Company of Connecticut: AQ considers temporary help and professional services to constitute “third-party contractor labor.” All costs are tracked by G/L account and are not tracked by program. Please see FTI-192, Attachment 1(AQ) for a summary of third-party contractor labor costs for 2019 through November of 2022. Please note the attachments provide information for 2019 to be responsive to the information requested in FTI-168.
  5. Page 65 of 129

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued October 23, 2026 RRU-163 Attachment 3 Page 65 of 129
  6. Page 66 of 129

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued October 23, 2026 RRU-163 Attachment 3 Page 66 of 129
  7. Page 67 of 129

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued October 23, 2026 RRU-163 Attachment 3 Page 67 of 129 Eversource Energy 2022 CT Management Audit Set FTI-01 Date Issued November 30, 2022 Q- FTI-195 Page 1 of 1 Date Filed: December 20, 2022 Witness: Marcucci, Nancy J, Teixeira, Lucy Request from: F T I Consulting Question: Please identify and describe the information systems used to facilitate workforce planning at each of the Connecticut utilities. Also, please describe any resource support provided by Eversource (i.e., technology, staffing, oversight) in workforce planning at the Connecticut utilities. Response: 1. The Connecticut Light & Power Company: Information Systems used to facilitate workforce planning are WorkDay and PowerBi. Eversource Human Resources provides the resource support in the workforce planning process. 2. Yankee Gas Services Company: YGS uses the same systems and support as CL&P above. 3. Aquarion Water Company of Connecticut: AQ currently utilizes SAP and SuccessFactors. Eversource does not provide any technical oversight to AQ, as AQ operates as a standalone company for workforce planning.
  8. Page 68 of 129

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued October 23, 2026 RRU-163 Attachment 3 Page 68 of 129 Eversource Energy 2022 CT Management Audit Set FTI-01 Date Issued November 30, 2022 Q- FTI-196 Page 1 of 1 Date Filed: January 04, 2023 Witness: Landry, Leanne M, Kirven, Debra, Driscoll, Daniel C, Desrosiers, Thomas C Request from: F T I Consulting Question: Please describe in detail how the Connecticut utilities monitor overtime. Please provide any written variance analyses performed for overtime expenses, identify who prepares these analyses, and to whom within the Connecticut utilities and Eversource the reports are sent. Response: 1. The Connecticut Light & Power Company: 2. Yankee Gas Services Company: The Investment Planning Team prepares bi-weekly and monthly overtime reports for CL&P and YGS, comparing budget and actual overtime for review by Operations leadership. On a monthly basis, overtime slides are presented to CL&P and YGS Operating Presidents and Eversource Energy Executive Vice Presidents and the Chief Operating Officer, comparing year-over-year capital and expense overtime and premiums paid, as well as a budget to actual comparison. In addition, various ad hoc analysis is done throughout the year as requested by CL&P and YGS leadership. Please refer to the response provided in FTI-167. 3. Aquarion Water Company of Connecticut: AQ’s payroll administrator prepares monthly overtime reports which compare actuals vs. budget for each department. The reports are sent to the managers of each department. For the monthly overtime reports, variance explanations of 10% below or above budget are required to be sent to the Controller and Accounting Manager. On a monthly basis, overtime slides are presented to AQ’s President and Eversource’s Vice President of Operations which compare expense vs. capital by AQ Vice President and top 10 earning codes compared to prior year. Please refer to reports provided in FTI-167, Attachment 1 (AQ).
  9. Page 69 of 129

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued October 23, 2026 RRU-163 Attachment 3 Page 69 of 129 Eversource Energy 2022 CT Management Audit Set FTI-01 Date Issued November 30, 2022 Q- FTI-197 Page 1 of 1 Date Filed: December 22, 2022 Witness: Landry, Leanne M, Desrosiers, Thomas C, Teixeira, Lucy, Driscoll, Daniel C Request from: F T I Consulting Question: Please provide the budgeted amounts for third-party contractor expenses from 2019-2022. Also, please provide any analysis reports that explain variances in budgeted and actual contractor expenses. Response: None of the CT Utilities budget at the individual contractor level. However, as noted in the response to FTI-033, the budgets are developed using major cost categories for both O&M and capital expenses. One of those categories is Outside Services. At a high level, this expense category captures the amount budgeted for third-party contractor costs. As actual costs are incurred, the costs are charged to the same major cost categories to support variance analyses. Contractor costs are also estimated as part of the capital project authorization process, but the specific contractor names is typically not known at the time of the approval.
  10. Page 70 of 129

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued October 23, 2026 RRU-163 Attachment 3 Page 70 of 129 Eversource Energy 2022 CT Management Audit Set FTI-01 Date Issued November 30, 2022 Q- FTI-199 Page 1 of 1 Date Filed: December 20, 2022 Witness: Teixeira, Lucy, Lazor, Sasha P Request from: F T I Consulting Question: Please provide, for the Connecticut utilities and Eversource Energy Service Company and for the years 2019 through 2022, tables showing management employee salary grades and step bands, with applicable salary ranges for each grade and step band. For each salary grade, please include the generic title typically used for jobs in the grade (e.g. supervisor, manager, project manager, director, senior director, vice president, etc.) Response: 1. The Connecticut Light & Power Company: 2. Yankee Gas Services Company: For CL&P and YGS, please refer to FTI-199, Attachment 1(ES) Confidential for salary grades and ranges from 2019-2022. 3. Aquarion Water Company of Connecticut: Please see FTI-199, Attachment 1 (AQ) Confidential showing tables for 2019-2022 management employee salary grades, step bands, and job titles.

Text of RRU-165_Final.pdf

Extracted from the file · 1 page · 575 characters

Words on different pagesRead the text of RRU-165_Final.pdf

As listed on the current system

Question(s) Answered 162, 165 (Connecticut Light and Power Company dba Eversource Energy) Date Filed: 11/06/2026