Skip to main content

A prototype public docket site for the Connecticut Public Utilities Regulatory Authority

Utility Dockets and Filings

Interrogatory responses

Answers to questions 162, 165

ResponseFiled by Connecticut Light and Power Company dba Eversource Energy7 files
Part of docket 26-05-10Open
  • Electric
Application of The Connecticut Light and Power Company d/b/a Eversource Energy to Amend its Rate Schedules

Files7

Search terms highlighted
Eversource rate increase is on 12 pages across 3 files of the text below, highlighted. Go to the first matchClear highlighting
Words on different pages
Words on different pages
2 pages match

Text of RRU-163 Attachment 2.pdf

Extracted from the file · 7 pages · 46,127 characters

Text of RRU-163 Attachment 2.xlsx

Sheet names, column headings and text cells; numbers left out

7 pages match
  1. Page 65 of 129

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued October 23, 2026 RRU-163 Attachment 3 Page 65 of 129
  2. Page 66 of 129

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued October 23, 2026 RRU-163 Attachment 3 Page 66 of 129
  3. Page 67 of 129

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued October 23, 2026 RRU-163 Attachment 3 Page 67 of 129 Eversource Energy 2022 CT Management Audit Set FTI-01 Date Issued November 30, 2022 Q- FTI-195 Page 1 of 1 Date Filed: December 20, 2022 Witness: Marcucci, Nancy J, Teixeira, Lucy Request from: F T I Consulting Question: Please identify and describe the information systems used to facilitate workforce planning at each of the Connecticut utilities. Also, please describe any resource support provided by Eversource (i.e., technology, staffing, oversight) in workforce planning at the Connecticut utilities. Response: 1. The Connecticut Light & Power Company: Information Systems used to facilitate workforce planning are WorkDay and PowerBi. Eversource Human Resources provides the resource support in the workforce planning process. 2. Yankee Gas Services Company: YGS uses the same systems and support as CL&P above. 3. Aquarion Water Company of Connecticut: AQ currently utilizes SAP and SuccessFactors. Eversource does not provide any technical oversight to AQ, as AQ operates as a standalone company for workforce planning.
  4. Page 68 of 129

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued October 23, 2026 RRU-163 Attachment 3 Page 68 of 129 Eversource Energy 2022 CT Management Audit Set FTI-01 Date Issued November 30, 2022 Q- FTI-196 Page 1 of 1 Date Filed: January 04, 2023 Witness: Landry, Leanne M, Kirven, Debra, Driscoll, Daniel C, Desrosiers, Thomas C Request from: F T I Consulting Question: Please describe in detail how the Connecticut utilities monitor overtime. Please provide any written variance analyses performed for overtime expenses, identify who prepares these analyses, and to whom within the Connecticut utilities and Eversource the reports are sent. Response: 1. The Connecticut Light & Power Company: 2. Yankee Gas Services Company: The Investment Planning Team prepares bi-weekly and monthly overtime reports for CL&P and YGS, comparing budget and actual overtime for review by Operations leadership. On a monthly basis, overtime slides are presented to CL&P and YGS Operating Presidents and Eversource Energy Executive Vice Presidents and the Chief Operating Officer, comparing year-over-year capital and expense overtime and premiums paid, as well as a budget to actual comparison. In addition, various ad hoc analysis is done throughout the year as requested by CL&P and YGS leadership. Please refer to the response provided in FTI-167. 3. Aquarion Water Company of Connecticut: AQ’s payroll administrator prepares monthly overtime reports which compare actuals vs. budget for each department. The reports are sent to the managers of each department. For the monthly overtime reports, variance explanations of 10% below or above budget are required to be sent to the Controller and Accounting Manager. On a monthly basis, overtime slides are presented to AQ’s President and Eversource’s Vice President of Operations which compare expense vs. capital by AQ Vice President and top 10 earning codes compared to prior year. Please refer to reports provided in FTI-167, Attachment 1 (AQ).
  5. Page 69 of 129

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued October 23, 2026 RRU-163 Attachment 3 Page 69 of 129 Eversource Energy 2022 CT Management Audit Set FTI-01 Date Issued November 30, 2022 Q- FTI-197 Page 1 of 1 Date Filed: December 22, 2022 Witness: Landry, Leanne M, Desrosiers, Thomas C, Teixeira, Lucy, Driscoll, Daniel C Request from: F T I Consulting Question: Please provide the budgeted amounts for third-party contractor expenses from 2019-2022. Also, please provide any analysis reports that explain variances in budgeted and actual contractor expenses. Response: None of the CT Utilities budget at the individual contractor level. However, as noted in the response to FTI-033, the budgets are developed using major cost categories for both O&M and capital expenses. One of those categories is Outside Services. At a high level, this expense category captures the amount budgeted for third-party contractor costs. As actual costs are incurred, the costs are charged to the same major cost categories to support variance analyses. Contractor costs are also estimated as part of the capital project authorization process, but the specific contractor names is typically not known at the time of the approval.
  6. Page 70 of 129

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued October 23, 2026 RRU-163 Attachment 3 Page 70 of 129 Eversource Energy 2022 CT Management Audit Set FTI-01 Date Issued November 30, 2022 Q- FTI-199 Page 1 of 1 Date Filed: December 20, 2022 Witness: Teixeira, Lucy, Lazor, Sasha P Request from: F T I Consulting Question: Please provide, for the Connecticut utilities and Eversource Energy Service Company and for the years 2019 through 2022, tables showing management employee salary grades and step bands, with applicable salary ranges for each grade and step band. For each salary grade, please include the generic title typically used for jobs in the grade (e.g. supervisor, manager, project manager, director, senior director, vice president, etc.) Response: 1. The Connecticut Light & Power Company: 2. Yankee Gas Services Company: For CL&P and YGS, please refer to FTI-199, Attachment 1(ES) Confidential for salary grades and ranges from 2019-2022. 3. Aquarion Water Company of Connecticut: Please see FTI-199, Attachment 1 (AQ) Confidential showing tables for 2019-2022 management employee salary grades, step bands, and job titles.
  7. Page 71 of 129

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued October 23, 2026 RRU-163 Attachment 3 Page 71 of 129 Eversource Energy 2022 CT Management Audit Set FTI-02 Date Issued December 07, 2022 Q- FTI-296 Page 1 of 1 Date Filed: January 17, 2023 Witness: Munson, Danielle J Request from: F T I Consulting Question: What corporate functions such as HR, IT, regulatory, legal, accounting, etc. are allocated across the three CT Companies? How are they allocated and what is the process for allocation, and approval of allocation? Provide a description for the basis for the allocations, and provide documents agreed to and signed by the CT Utilities and any other companies/affiliates involved. Response: Please refer to the response to FTI-117 for the allocation process and FTI-300 for signed documents and contracts between the CT Utilities and other companies/affiliates.
  8. Page 72 of 129

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued October 23, 2026 RRU-163 Attachment 3 Page 72 of 129 Eversource Energy 2022 CT Management Audit Set FTI-02 Date Issued December 07, 2022 Q- FTI-297 Page 1 of 1 Date Filed: January 06, 2023 Witness: Driscoll, Daniel C Request from: F T I Consulting Question: Describe in detail the budgetary controls that Eversource has in place to ensure maximum efficiency and benefit for the CT Utilities related to shared services. Response: On a monthly basis, detailed O&M and Capital reports are generated for each functional organization in the Financial Performance System (FPS) dashboard application. These reports can be accessed by the owners of each functional organization, as well as subordinates and analysts that oversee cost control centers within the functional organization. The O&M detail reports provide actual, budget and variance information by cost category. The Capital detail reports provide actual, budget and variance information by project category. Budget analysts communicate regularly with the owners of each functional organization to assist in understanding their area financial results and the drivers of variances. In addition, budget analysts meet monthly with the VP and Director of FP&A to review the O&M and Capital detail reports by organization and discuss the major drivers of the variances. Please refer to FTI-033 for a comprehensive summary of the budget process and applicable procedures for all CT Utilities.
  9. Page 73 of 129

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued October 23, 2026 RRU-163 Attachment 3 Page 73 of 129 Eversource Energy 2022 CT Management Audit Set FTI-02 Date Issued December 07, 2022 Q- FTI-298 Page 1 of 1 Date Filed: January 06, 2023 Witness: Munson, Danielle J Request from: F T I Consulting Question: Describe the degree of control, if any, each of the three CT Utilities have over the volumes or prices of the shared services charged to them. Response: Please refer to the response to FTI-117, which addresses this Question.
  10. Page 74 of 129

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued October 23, 2026 RRU-163 Attachment 3 Page 74 of 129 Eversource Energy 2022 CT Management Audit Set FTI-02 Date Issued December 07, 2022 Q- FTI-299 Page 1 of 1 Date Filed: January 04, 2023 Witness: Akley, William J, Morrissey, Donald J, Sullivan, Stephen T Request from: F T I Consulting Question: Highlight any procedural or structural changes that have occurred as a result of COVID-19 for each of the three CT Utilities. Response: As a result of COVID-19, the following enterprise-wide procedural and structural changes have occurred throughout Eversource Energy, including CL&P, YGS and AQ: • Human Resource policies and procedures were established regarding hybrid and flexible work schedules. • A vaccination requirement and vaccination exemption process remains in place as a condition of employment. • Additional IT infrastructure and support has been implemented as a direct result of increased usage of collaboration tools (e.g., Microsoft Teams) driven by remote work arrangements. • Eversource’s Supply Chain model adapted from a ‘buy-to-forecast” model to increasing the volume of materials inventory to address shortages and longer purchase fulfillment cycles. This includes inventory of personal protective equipment supplies. • Global Supply Chain has been identified as a key risk in Eversource’s risk registry and will continue to be monitored and reassessed in the near future.

Text of RRU-165_Final.pdf

Extracted from the file · 1 page · 575 characters

Words on different pagesRead the text of RRU-165_Final.pdf

As listed on the current system

Question(s) Answered 162, 165 (Connecticut Light and Power Company dba Eversource Energy) Date Filed: 11/06/2026

This filing on the current system (opens in a new tab)