Interrogatory responses

Answers to questions 166, 169, 170, 173, 174

ResponseFiled by Connecticut Light and Power Company dba Eversource Energy11 files
Part of docket 26-05-10Open
  • Electric
Application of The Connecticut Light and Power Company d/b/a Eversource Energy to Amend its Rate Schedules

Files11

Search terms highlighted
Eversource rate increase is on 2 pages of the text below, highlighted. Go to the first matchClear highlighting
Words on different pages
2 pages match
  1. Page 58 of 297

    ACCOUNTING MANUAL Entity (blank)21 Company Cost Center NSTAR Electric -East - Distrib dba Eversource Energy E85 E88 E92 E97 E9M F48 H34 N44 N45 N51 N55 N60 P21 V08 V09 1M1 1MC 1PA 1PT 21V 2EM 38B 38G 38J 39B 468 46H 501 56E 5ER C41 C42 E1D E3R E3X E4U E5A E5C E5D E6D E6F E6S E6T E98 E99 The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued October 23, 2026 RRU-166 Attachment 1 Page 58 of 297 Description Distribution Engineering Metro West Dir Field Eng-Comm + Pwr Systems EMA UG Trans Lines Eng Small NCC Jobs Major Distribution Projects Facility- Capital - NSTAR Electric Tran Business + Quality MA E Veg Mgmt 21 TG MA E Veg Mgmt - Contractor Costs Dist Comm - NSTAR Bad Debt - Nstar Electric MA E Training - D Charges Transmission Construction-MA E Transportation capital - MA E D Transportation capital - MA E T MA EFO Central UG Maint Director MA Elec Central Operations Director Single Pole Administration EMA EMA Transmission Training + Procedures Electric Vehicle EMA Scheduling + Contract Controls-EMA MA-21-Wilmington Warehouse B MA-21-Readville Warehouse MA-21-60 Gerard St MA-21-Auburn Wilmington Warehouse - Bldg B Readville-Hyde Park Warehouse CG OMNI NSTAR E MA Electric Station Ops-MW South EMA Renewables Real Estate - Wilmington MA B Warehouse Real Estate-Readville-Hyde Park WH MA East Distributed Generation Goodwill EMA - 21 MA East XFMR CFI Elect M+C Central UG Maintenance Field Engineering South Field Communications South MA Elec Station Ops Director MA Electric Service Dispatch-South UG Troubleshooters North MA Electric Svc Dispatch-Southboro Mass Electric SVC-Sub-Transmission Grid Mod East Distribution and Resiliency Design Stds EMA
  2. Page 59 of 297

    ACCOUNTING MANUAL Entity (blank)21 22 2B Company Cost Center NSTAR Electric -East - Distrib dba Eversource Energy EDW W21 08G 08H 08I 1NF 38L 38M 39D 696 D31 D33 D50 D51 D52 D53 D60 D62 D63 D66 D70 D71 D78 D79 D80 E1A E1P E2A E2D E3J E9P K30 K31 T25 Select Energy Inc -disabled 02217 715 Hopkinton LNG Corp 196 330 H90 M11 M12 M13 M14 M15 M16 M17 The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued October 23, 2026 RRU-166 Attachment 1 Page 59 of 297 Description DG EMA MA E - WAM Work Order Clean-up D+T EMA Meter Lab EMA Meter Admin EMA Revenue Assurance NPA - EMA MA-21-Wareham Training Center MA-21-Rutherford Ave MA-21-Auburn Reel Storage Building MA-21-27 West St Charlestown Compet Trans - Siting+Project Svc 21 Transm Strategic Projects - NSTAR VP Transm Policy and Compliance Co 21 Trans Strategy and Economic Analysis for Co 21 T-Strategic Solutions Co 21 Reliability Compliance Co 21 VP Siting and Proj Svcs Co 21 Project Engagement for Co 21 Project Siting for Co 21 Strategic Projects Devl for Co 21 VP Performance and Controls Co 21 Proj Performance Co 21 VP Strategic Project Mgmt Co 21 VP Project Mgmt Co 21 Dir PM and Const Svcs UCMP Co 21 EMA Substation Civil P+C Special Projects EMA EMA Transmission Planning Substations Solutions EMA Trans MA-E Strategic Major Projects Dist MA-E Strategic Major Projects DistEng So Plymouth+NewBedford DistEng Central Somerville Trans Rates+Rev Req - NSTAR Corp Fin + Cash Mgmt - Select Claims + Insurance - Hopkinton Hopkinton LNG Corp Acushnet Lng 2B Ludlow LNG Easton LNG Marshfield LNG Brockton LPG Northampton LPG West Springfield LPG Lawrence LNG
  3. Page 60 of 297

    ACCOUNTING MANUAL Entity (blank)2B 2C 2G Company Hopkinton LNG Corp NSTAR Communications Inc Harbor Electric Energy Company 2T NSTAR Electric- East- Trans dba Eversource Energy 2Y NSTAR Gas Company dba Eversource Energy The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued October 23, 2026 RRU-166 Attachment 1 Page 60 of 297 Cost Center Description M18 197 198 340 076 318 656 039 04G 064 167 174 193 231 241 269 30G 393 412 461 476 486 52C 536 564 598 59N 638 655 710 B13 G1C G50 H02 H04 H06 H07 H09 H11 H13 H15 H16 H17 H18 H19 Lawrence LPG Claims + Insurance - NSTAR Comm Claims + Insurance - Harbor Elec Harbor Electric Energy Corporation Regulatory Financial - NSTAR Trans NSTAR Transmission Allocation Env Remediation - NSTAR Transmission Field Meter Work- NSTAR Gas Acctg - NSTAR Gas Billing- NSTAR Gas Rev Req - NSTAR Gas MA-2Y-New Bedford Gas Snow Claims + Insurance - NSTAR Gas Security Capital Projects- NSTAR Gas IT Capital Projects- NSTAR Gas EE-NSTAR Gas Projects HR-NSTAR Gas MA-2Y-Worcester Gas Snow EPO + Goodwill NSTAR Gas Inventory Management Admin-NSTAR Gas General Counsel 1 - NSTAR Gas NSTAR Gas Communications Telecom Eng-NSTAR Gas-Capital Cred Plan + Analysis Estrn MA Gas NSTAR Gas Corp Citizenship Take Stations - NSTAR Gas MA-2Y-Southborough Gas Snow Corp Doc Serv+Bill Print- NSTAR Gas Env Remediation - NSTAR Gas Corp Fin + Cash Mgmt - NSTAR Gas Real Estate- NSTAR Gas Corr Control-MA MA E Gas Charges NSTAR HHPP Service Revenues NSTART Exec Admin Damage Prevention - MA Worcester Operations Southboro Operations Somerville Operations Hyde Park Operations Plymouth Operations Sales Fulfillment MA New Bedford Operations Leak Mgmnt - MA ATM CFI
  4. Page 61 of 297

    ACCOUNTING MANUAL Entity (blank)2Y 41 Company NSTAR Gas Company dba Eversource Energy Cost Center H21 H22 H23 H24 H25 H27 H29 H31 H35 H37 H39 H40 H41 H42 H43 H44 H45 H50 H55 H87 H89 H91 H94 H95 N52 N57 V91 01K 01W 39C 48S 503 C15 H20 H26 H28 H3R HT1 1NC NSTAR Elect- West - Distribution dba Eversource Energy 01D 036 040 091 131 165 The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued October 23, 2026 RRU-166 Attachment 1 Page 61 of 297 Description Construction Hyde Park+Southboro Construction Somerville Facility- Capital - NSTAR Gas MA - Restoration Pressure Mgmt-MA Meter Test Lab-MA Gas Dispatch-MA Gas Meter CFI Worcester Meter + Service Southboro Meter + Serv Somerville Meter + Service NSTAR Gas sales Hyde Park Meter + Service Sales Operation MA Plymouth Meter + Service Work Prep MA New Bedford Meter + Service Gas Ops Direct Charges Fleet Services Admin MA E Gas Plan + Sched Acushnet Lng GIS NSTAR Gas Eut Compliance - MA Admin - MA East Gas Bad Debt - Nstar Gas Transportation capital - MA E GAS Facilities - NSTAR Gas - Shrewsbury Facilities-NSTAR Gas-Westborough MA-2Y-Auburn Gas Snow Strategy and Planning - NSTAR Gas CG OMNI NSTAR G T+D Rights + Survey - NSTAR Gas Construction New Bedford Construction Worcester Construction Plymouth Goodwill EMG - 2Y NSTAR Gas Field Training NPA - EMA Gas Utility Scale Solar - 41 MA W Training Charges Acctg - WMECO Dist EPO + Goodwill WMECO CG CFI WMECO Rev Req - WMECO Dist
  5. Page 62 of 297

    ACCOUNTING MANUAL Entity (blank)41 Company Cost Center NSTAR Elect- West - Distribution dba Eversource Energy 182 1AW 227 236 245 30W 325 344 350 353 356 358 3C4 3C7 3E2 3F2 3F7 3G2 3K2 473 4CS 500 505 507 50A 50B 50C 50E 50G 50H 50M 50T 50W 512 513 516 519 520 523 524 529 530 531 532 533 The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued October 23, 2026 RRU-166 Attachment 1 Page 62 of 297 Description Claims + Insurance - WMECO Dist 41-MA Electric Storms-Svc Co Security Capital Projects- WMECO IT Capital Projects- WMECO Distribution EE-WMECO Projects HR-WMECO Field Meter Work - WMECO Dist Comm - WMECO D Grid Mod Capital MA-W MA W Rubber Goods Dist Comm Svcs - NSTAR Equip - WMECO D Telecom Eng-WMECO D-Capital Telecom Eng-WMECO G-Capital AMI-WMA SS Eng + Design - WMECO D SS Eng + Design - WMECO G Dist Eng + Design - WMECO D Substation Tech Eng - MA D General Counsel 1 - WMECO Distr W MA Field Operations Craft School 41-MA Electric President Elect M+C West Director Dist FE Test MA W WMA GIS 41-VP Electric Field Ops MA West Distributed Generation Distribution Eng MA West PREV MAINT West Pr Line Crew MA W Safety Charges Elect Service West TS MA-W Misc Capitalization MDEC Garages MA W E Sprgfd Stores Had Grfd Stores Pittsfld Stores Substations West 41-Emergency Prep WMA Field Metering Credit Plan + Analysis - WMECO MA W Meter CFI Ops CTR West Capital Projects MA West 41-Transformer Credits
  6. Page 63 of 297

    ACCOUNTING MANUAL Entity (blank)41 Company Cost Center NSTAR Elect- West - Distribution dba Eversource Energy 534 53V 540 543 552 555 556 566 591 5DS 5SU 607 608 609 611 612 613 614 615 616 617 619 621 624 634 635 648 64M 64N 6AC 6AD 706 A83 C04 F45 V06 2RR 2WM 4FT 4PA 502 51R 51V 5DW 5GW The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued October 23, 2026 RRU-166 Attachment 1 Page 63 of 297 Description D Adm Sprngfld Voltage+Pole Inspections - MA West D Admhadley D Admpttsfld MA-41-Greenfield MA-41-Springfield MA-41-Pittsfield Meter Reading - WMECO Gen Constr West Dig Safe Mass West MA Solar 1 - 41 MA-41-Amherst MA-41-Easthampton MA-41-Cummington O Hl Sprngfld U Gl Sprngfld Admin - MA West O Hl Grenfld MA-41-Hadley New Svc Spfld O Hl Pttsfld New Svc Ptsfld O Hl Hadley New Svc Hadly Bad Debt - WMECO Corp Doc Serv+Bill Print-WMECO Dist Env Remediation - WMECO 41-Area Storms 41-MA Electric Storms-Non Svc Co D Mat Acq WMECO MA W Veg Mgmt - Contractor Costs Corp Fin + Cash Mgmt - WMECO Dist Real Estate- WMECO Distribution T+D Rights + Survey - WMECO Distribution Facility- Capital - WMECO Distribution Transportation capital - MA W D Reliability and Resiliency Planning - WMA Scheduling + Contract Controls-WMA WM Field Training Single Pole Administration WMA CG OMNI WMECO Goodwill WMA - 41 Electric Vehicle WMA DG WMECO Grid Mod West
  7. Page 64 of 297

    ACCOUNTING MANUAL Entity (blank)41 46 4T Company Cost Center NSTAR Elect- West - Distribution dba Eversource Energy 5WR W41 W9M WMA 08J 08W 1NE W9P The Rocky River Realty Company 199 23A 2YE 658 719 C06 N65 NSTAR Elec- West - Transmission dba Eversource Energy 041 075 183 1G4 348 35T 366 3CW 3F5 3G4 3K4 474 4TL 4TQ 4TY 55W 590 596 649 64G 64H 64K 707 A84 B18 B24 C05 F44 P4T V07 The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued October 23, 2026 RRU-166 Attachment 1 Page 64 of 297 Description WMA Renewables MA W - WAM Work Order Clean-up Distribution Major Projects- WMA Miscellaneous Capitalization WMA WMA Revenue Assurance WMA Meter Admin NPA - WMA Dist MA-W Strategic Major Projects Claims + Insurance - Rocky River Security Capital Projects-RRR Rocky River Windsor Rent Env Remediation - RRR Corp Fin + Cash Mgmt - RRR Real Estate- RRR Facility- Capital - RRR Acctg - WMECO Trans Regulatory Financial - WMECO Trans Claims + Insurance - WMECO Trans Svc Co GIS MA West T Dist Comm - WMECO T Equip - WMECO T IT Capital Projects- WMECO Transmission Trans Comm Svcs - NSTAR SS Eng + Design - WMECO T Dist Eng + Design - WMECO Substation Tech Eng - MA T General Counsel 1 - WMECO Trans Tran Ln + Civ Eng- WMECO Tg Prot + Cntrl- WMECO Interconnect- WMECO Misc Transmission- WMECO Trans C+M Wm T Mat Acq-WME Env Remediation - WMECO Transmission Tg S S Ct+M West Trans FE Test MA W TG MA W Veg Mgmt - Contractor Costs Corp Fin + Cash Mgmt - WMECO Trans Real Estate- WMECO Transmission Strat + Ops - WMECO Telecom Eng WMECO T Capital T+D Rights + Survey - WMECO Transmission Facility- Capital - WMECO Transmission Transmission Construction-MA W Transportation capital - MA T
  8. Page 65 of 297

    ACCOUNTING MANUAL Entity (blank)4T 61 Company Cost Center NSTAR Elec- West - Transmission dba Eversource Energy 623 40A 55J T23 Eversource Energy Service 001 002 004 008 010 012 017 018 01A 01B 01C 01F 01G 01H 01P 01Y 025 028 02C 02F 02I 02K 02M 02P 02S 02U 02Z 030 034 03B 03C 03D 03E 03S 03U 03V 03X 044 048 049 04D The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued October 23, 2026 RRU-166 Attachment 1 Page 65 of 297 Description Admin - MA West Trans MA-4T-Auburn Reel Storage Bldg Trans MA-W Strategic Major Projects Trans Rates+Rev Req - WMECO Trans CEO VP Transmission President CFO EVP IT Tech - Network Trans NH Projects EESBD EVP Sys Transportation Convex IT Bus Sol OPS - BSM Real Estate + Property Mgmt Director Real Estate - Svc Co Stations FE+Comm T+D 61 CT Electric Field Ops T+D 61 CT T+D Station Ops Mgmt 61 MA Facilities Management Convex IT Accounting - Svc Co Budgeting + Financial Analysis Procurement - Construction Services Procurement-Gas+Building Services Material Planning - Svc Co IT Gov - QA IT Gov - Supplier Mgmt Procurement-Professional Services Procurement-Core Electric Materials Svc Co Vehicle Support IT Bus Sol OPS - SCADA IAS - Audit EESCo Training IAS - Security Credit Call Center Accounting VP HR Operations + Service Delivery Benefits Strategy Compensation Credit + Collections Director Electric Supply- Svc Co Human Resources EVP CT-61-Berlin CT-61-Repro-Mail Services Stations +Trans Line Eng VP
  9. Page 66 of 297

    ACCOUNTING MANUAL Entity (blank)61 Company Eversource Energy Service The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued October 23, 2026 RRU-166 Attachment 1 Page 66 of 297 Cost Center Description 052 053 054 056 05B 05D 05E 05F 05I 05L 05R 05T 05W 05X 062 06E 06L 06S 071 07D 07F 07U 07V 07Z 081 085 086 089 08C 08D 08E 08F 08M 08R 08V 08X 08Y 08Z 090 093 096 09D 09M 09N 09Z Claims + Insurance - Svc Co MA Govt + Legislative Affairs External Communications General Counsel - 1- Svc Co Field Automation Comm Network Services Comm Wireless Services Corp Fin + Cash Mgmt - Svc Co Transmission Rates + Rev Req Svc Co Investor Relations VP Call Center Director Regulatory Financial Analysis Federal Legislative Affairs Strategy + Policy Taxes Employee + Labor Relations IT Customer- BSM Rates IT VP Environmental Remediation Fleet Services-Service Company Culture and Engagement Env Sustainability Vp Utility Svcs SVP Customer Ops+Dig-CCO Electric Service Support - EMA Electric Service Support - NH Meter Operations Leadership Telephone Strategy and Support Digital Strategy Customer Engagement + Communications Revenue Assurance Meter Engineering Energy Efficiency - CT TG Veg Mgmt - Employee Costs Electric Service Support - CT + WM Distributed Generation + Director Em Prep Sys Res Business Change Support Compliance Adv Eng Analytics T+D Rights + Survey - Svc Co Customer Operations VP General Counsel - 2 Customer Resolutions Group
  10. Page 67 of 297

    ACCOUNTING MANUAL Entity (blank)61 Company Eversource Energy Service The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued October 23, 2026 RRU-166 Attachment 1 Page 67 of 297 Cost Center Description 100 102 103 104 106 107 110 114 118 11B 11D 11F 11K 11P 11R 11V 11W 121 122 124 125 12B 12E 12H 12M 12N 12P 12Q 12T 12U 12X 12Y 130 133 136 13J 13L 13N 13P 13S 13U 143 145 146 14A Tran Ln + Civ Eng Environmental Field Response Svc Co Substa Eng + Des Call Center Workforce Planning Corporate Secretary + Legal GM Operational Tech Billing + Data Management Corporate Citizenship Director Billing Pay + Meter Srv Credit Planning and Analysis-Svc Co Billing + Data Management NHWMA Manchester Call Center Credit and Collection Operations IT S+C - Security + Compliance CT Veg Mgmt - Employee Costs Budgets + Invest Plan - CT MA Credit + Collect CT-61-Windsor Bldg Director Substation Engineering Work Management Reg+Strategic Financial Planning SVP Load + Settlement VP Safety+Training+Fleet Ops Org + Talent Development Corp Perf Mgmt Standards + Work Methods Director Gas Operations Technology System Planning Director Cost Controls Reliability Complnce Windsor Call Center Trans Interconnections Supply Chain + RE + Materials VP IT Corp - BSM CT-61-Facilities Ops Project Solutions Budgets + Invest Plan Telecom Eng SS Intelligent Design + Compliance Transmission Stations and Underground Dist Stds Financial Forecasting + Analysis Revenue Req CT - Svc Co Revenue Req MA - Svc Co Rev + Reg Accounting-Svc Co Corporate Relations EVP
Words on different pages
Words on different pages

Text of RRU-170_Final.pdf

Extracted from the file · 1 page · 1,010 characters

Words on different pagesRead the text of RRU-170_Final.pdf

Text of RRU-170 Attachment 1.pdf

Extracted from the file · 1 page · 2,022 characters

Text of RRU-170 Attachment 1.xlsx

Sheet names, column headings and text cells; numbers left out

Text of RRU-173_Final.pdf

Extracted from the file · 1 page · 1,296 characters

Words on different pagesRead the text of RRU-173_Final.pdf

Text of RRU-174_Final.pdf

Extracted from the file · 1 page · 755 characters

Words on different pagesRead the text of RRU-174_Final.pdf

Text of RRU-174 Attachment 1.pdf

Extracted from the file · 17 pages · 13,740 characters

Text of RRU-174 Attachment 1.xlsx

Sheet names, column headings and text cells; numbers left out

As listed on the current system