Interrogatory responses

Answers to questions 202, 204, 205, 206, 209

Files19

Search terms highlighted
Eversource rate increase is on 3 pages across 2 files of the text below, highlighted. Go to the first matchClear highlighting
Words on different pages
Words on different pages
Words on different pages

Text of RRU-204_Final.pdf

Extracted from the file · 1 page · 1,941 characters

Words on different pagesRead the text of RRU-204_Final.pdf

Text of RRU-204 Attachment 1.pdf

Extracted from the file · 1 page · 2,533 characters

Text of RRU-204 Attachment 1.xlsx

Sheet names, column headings and text cells; numbers left out

Text of RRU-204 Attachment 2.pdf

Extracted from the file · 1 page · 612 characters

Text of RRU-204 Attachment 2.xlsx

Sheet names, column headings and text cells; numbers left out

Text of RRU-205_Final.pdf

Extracted from the file · 2 pages · 3,596 characters

Words on different pagesRead the text of RRU-205_Final.pdf

Text of RRU-206_Final.pdf

Extracted from the file · 2 pages · 3,558 characters

Text of RRU-206 Attachment 1.pdf

Extracted from the file · 16 pages · 39,870 characters

Text of RRU-206 Attachment 1.xlsx

Sheet names, column headings and text cells; numbers left out

Text of RRU-206 Attachment 2.pdf

Extracted from the file · 9 pages · 15,231 characters

Text of RRU-206 Attachment 2.xlsx

Sheet names, column headings and text cells; numbers left out

Text of RRU-206 Attachment 3.pdf

Extracted from the file · 4 pages · 7,846 characters

Text of RRU-206 Attachment 3.xlsx

Sheet names, column headings and text cells; numbers left out

2 pages match
  1. Page 1Match

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set PURA-18 Date Issued November 03, 2026 RRU-209 Page 1 of 2 Date Filed: November 23, 2026 Witness: Brendan J. O’Brien, Matthew J. Correia, Garrett J. Murray and Marisa B. Paruta Request from: Public Utilities Regulatory Authority Question: (WORKING CAPITAL) Ex. CLP-REVREQ-2, Sch. WP B-4.0, Sch. G-1.2, p. 1 and Sch, H-1.0, p. 66. Regarding the proposed material and supplies (M&S) balance for the Rate Year: a. Provide an unlocked Excel worksheet, with formulas intact, showing the calculation of the 4.726% escalation factor, including all supporting exhibits; b. Provide an unlocked Excel worksheet, with formulas intact, showing the calculation of the 1.641% escalation factor, including all supporting exhibits; c. Provide an exhibit listing all of the Company’s warehouses and showing for each facility the annual M&S inventory balances as of December 31, 2018, through December 31, 2025; d. Explain why Schedule WP B-4.0 reports an M&S balance of $151,831,000 as of December 31, 2025, while both Schedule G-1.2 and Schedule H-1.0 show the M&S distribution portion as $132,023,103 for the same period; and e. Explain why the distribution portion of $112,143,099 ($194,058,877 - $81,915,778) is labeled as “Assigned to – Construction.” Response: a. Please refer to OCC-893, Attachment 1, page 8 of 8 for the calculation of the 4.726% escalation factor. b. Please refer to OCC-893, Attachment 1, page 8 of 8 for the calculation of the 1.641% escalation factor. c. Please refer to RRU-209, Attachment 1, which provides a listing of all the Company’s warehousing inventory pulled from the Company’s Materials Management source system (Maximo), by location and year-end, as of December 31, 2018 through December 21, 2025. Since 2022, the inventory value has increased due to a combination of: • Inflationary pressures, including increased material costs and higher supplier labor costs associated with skilled-labor shortages and capacity constraints;
  2. Page 2Match

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set PURA-18 Date Issued November 03, 2026 RRU-209 Page 2 of 2 • Longer supplier lead times, particularly during and following the COVID-19 period, which required the Company to maintain additional inventory coverage; and, • A shift toward more technologically advanced and higher-value materials that support system reliability, grid modernization, and growing customer demand. The increase in inventory value is not solely attributable to an increase in material quantities and values. Extended lead times and supply chain constraints drove the Company to increase its inventory coverage of critical materials to support system operations, emergency response, reliability work, and infrastructure investment. d. The M&S distribution balance of $132,023,103 included in Schedule G-1.2 and Schedule H-1.0 reflect the balance reported in the 2025 FERC Form No. 1. However, as noted in footnote 4 of the Company’s testimony in Exhibit CLP-REVREQ-1, page 28, “the Company identified a reclassification of materials and supplies between the distribution and transmission business segment, which has been appropriately adjusted in the rate filing herein.” The $151,831,000 M&S balance included in Schedule WP B-4.0 reflects the reclassification. e. The $112,143,099 represents the portion of the CL&P Distribution materials and supplies balance as of December 31, 2025 that is estimated to be used to support capital construction projects in future periods. Based on CL&P Distribution’s usage of materials and supplies in 2025, a future-use estimate was calculated to determine the split between what would likely be used to support capital investments, as opposed to what would likely be used to support O&M work, for the materials and supplies balance as of December 31, 2025. This is disclosure only and does not impact the FERC Accounts’ recognition and measurement as of December 31, 2025 where all inventory continues to be accounted for in FERC Account 154 (not in FERC Account 101/106/107 or O&M) until such inventory is issued for construction or O&M.

Text of RRU-209 Attachment 1.pdf

Extracted from the file · 1 page · 3,035 characters

Text of RRU-209 Attachment 1.xlsx

Sheet names, column headings and text cells; numbers left out

As listed on the current system

Question(s) Answered 202, 204, 205, 206, 209 (Connecticut Light and Power Company dba Eversource) Date Filed: 11/23/2026