Skip to main content

A prototype public docket site for the Connecticut Public Utilities Regulatory Authority

Utility Dockets and Filings

Interrogatory responses

Answers to questions 27, 28, 31, 33, 34, 35, 37

ResponseFiled by Connecticut Light and Power Company dba Eversource Energy9 files
Part of docket 26-05-10Open
  • Electric
Application of The Connecticut Light and Power Company d/b/a Eversource Energy to Amend its Rate Schedules

Files9

Text of RRU-033_Final.pdf

Extracted from the file · 1 page · 647 characters

Text of RRU-033 Attachment 1.pdf

Extracted from the file · 24 pages · 298,577 characters

Text of RRU-033 Attachment 1.xlsx

Sheet names, column headings and text cells; numbers left out

Text of RRU-034_Final.pdf

Extracted from the file · 1 page · 834 characters

Text of RRU-035_Final.pdf

Extracted from the file · 1 page · 939 characters

  1. Page 1

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set PURA-05 Date Issued September 08, 2026 RRU-037 Page 1 of 1 Date Filed: September 21, 2026 Witness: Amparo Nieto Request from: Public Utilities Regulatory Authority Question: (MCOSS) Application, Ex. CLP-MCOS-2, p. 12. Explain the variance in the installed service costs (line 16) between Rates 1 & 7 and Rate 5. Provide the underlying cost support that demonstrates the variance between the rate classes. Response: The service cost analysis was based on a review of Company service drop installations for all customer classes, during the period 2021-2026. The analysis demonstrated a variance between Rates 1 & 7 and Rate 5 costs of installation, such that Rate 5 service drop installation cost was higher both for the Overhead and the Underground connections. The detailed calculation is included in OCC-365, Attachment 37.

As listed on the current system

Question(s) Answered 27, 28, 31, 33, 34, 35, 37 (Connecticut Light and Power Company dba Eversource Energy) Date Filed: 09/21/2026

This filing on the current system (opens in a new tab)