Skip to main content

A prototype public docket site for the Connecticut Public Utilities Regulatory Authority

Utility Dockets and Filings

Interrogatory responses

Answers to questions 46, 47, 61

Files7

The searchable text of a spreadsheet keeps the sheet names, column headings and text cells. Download the file for the figures.

  1. Part 1

    [Sheet: Sheet1] PAYROLL EXPENSE INCREMENTAL FTE CALCULATION (Thousands of Dollars) Exhibit CLP-REVREQ-2, WP C-3.5, p. 3 of 3 As Filed July 14, 2026 (A) | (B) | (C) | (D) | (E) | (F) | (G) | (H) | (I) | (J) Employee Type | # of Employees | Salary | Total | Hiring Date | Rate Year | # of Months of Escalation | O& M Payroll | Reconcile to Attachment OCC-333 and OCC-327 | # of Employees per OCC-333 and OCC-327 Incremental CL&P Non-Union FTE (Vegetation) | Reduced by 8 FTEs Incremental CL&P Non-Union FTE (Vegetation) | No Change Incremental CL&P Non-Union FTE (Vegetation) Incremental ESC Non-Union FTE (Grid Mod) | New Positions Incremental ESC Non-Union FTE (Grid Mod) | No Change Incremental ESC Non-Union FTE (Grid Mod) Incremental ESC Non-Union FTE (Engineering Capital) Incremental ESC Non-Union FTE (Distribution Sytem Planning) | Reduced by 7 FTEs Incremental ESC Non-Union FTE (Distribution Sytem Planning) | No Change Incremental ESC Non-Union FTE (Distribution Sytem Planning) Incremental ESC Non-Union FTE (Asset Health) | No Change Incremental ESC Non-Union FTE (Field Engineering Labor) | Reduced to 5 Power Quality FTEs Grand Total

Text of RRU-047 Attachment 2.pdf

Extracted from the file · 1 page · 1,845 characters

Text of RRU-047 Attachment 2.xlsx

Sheet names, column headings and text cells; numbers left out

Text of RRU-061_Final.pdf

Extracted from the file · 2 pages · 2,957 characters

As listed on the current system

Question(s) Answered 46, 47, 61 (The Connecticut Light and Power Company) Date Filed: 10/16/2026

This filing on the current system (opens in a new tab)