Skip to main content

A prototype public docket site for the Connecticut Public Utilities Regulatory Authority

Utility Dockets and Filings

Interrogatory responses

Answers to questions 48, 54

Files10

Search terms highlighted
Eversource rate increase is on 2 pages of the text below, highlighted. Go to the first matchClear highlighting
2 pages match
Words on different pages
Words on different pages

Text of RRU-054 Attachment 1.xlsx

Sheet names, column headings and text cells; numbers left out

Text of RRU-054 Attachment 2.pdf

Extracted from the file · 10 pages · 10,225 characters

Text of RRU-054 Attachment 2.xlsx

Sheet names, column headings and text cells; numbers left out

Words on different pages
  1. Page 1

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 25, 2026 RRU-054 Attachment 3 Page 1 of 2 Corporate Accounting Company 61 Allocation 2025 Rate Code M9C (Identical to M01) Basis: 2025 Service Company Budgeted Distributed Labor Labor Miscellaneous - 11, 1T, 21, 06, 6T, 41, 4T, 71, 2Y, 01, 46, 2B, GM 11, 1T, 21, 06, 6T, 41, 4T, 71, 2Y, 01, 46, 2B, GM Company CL+P - Distribution CL+P - Transmission NSTAR Electric -East - Distribution PSNH - Distribution PSNH - Transmission NSTAR Elect- West - Distribution NSTAR Elec- West - Transmission Yankee Gas Services Company NSTAR Gas Company Eversource Energy Parent The Rocky River Realty Company Hopkinton LNG Corp Eversource Gas Company of Massachusetts Eversource Investment Service Company Total Entity LOB Amount 11 1T 21 06 6T 41 4T 71 2Y 01 46 2B GM J4 11100 33100 11100 11100 33100 11100 33100 11100 11100 14100 14100 12705 11100 55100 94,897,490 84,424,699 138,821,168 33,506,303 23,150,687 16,456,885 22,357,671 41,896,062 38,949,499 643,614 520,107 2,303,244 33,836,051 0.1786 0.1588 0.2611 0.0630 0.0435 0.0309 0.0420 0.0788 0.0732 0.0012 0.0010 0.0043 0.0636 - 531,763,482 1.0000 Eversource Investment Service Company removed from all rates codes 10/2024 Rounding differences accepted by Entity 11, CL+P Operating Company - Distribution. Percentage
  2. Page 2

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 25, 2026 RRU-054 Attachment 3 Page 2 of 2 Corporate Accounting Company 61 Allocation 2025 Rate P11 Gross Plant Assets - 11, 1T, 21, 06, 6T, 41, 4T 11, 1T, 21, 06, 6T, 41, 4T Company CL+P - Distribution CL+P - Transmission NSTAR Electric -East - Distribution PSNH - Distribution PSNH - Transmission NSTAR Elect- West - Distribution NSTAR Elec- West - Transmission Entity 11 1T 21 06 6T 41 4T LOB 11100 33100 11100 11100 33100 11100 33100 Total Rounding differences accepted by Entity 11, CL&P -Distribution. Amount 8,395,375,440 6,931,992,316 12,624,444,793 2,921,470,568 2,817,096,460 1,543,940,504 1,940,920,706 Percent 0.2258 0.1865 0.3396 0.0786 0.0758 0.0415 0.0522 37,175,240,788 1.0000

Text of RRU-054 Attachment 3.xlsx

Sheet names, column headings and text cells; numbers left out

Text of RRU-054 Attachment 4.pdf

Extracted from the file · 1 page · 14,377 characters

Text of RRU-054 Attachment 4.xlsx

Sheet names, column headings and text cells; numbers left out

As listed on the current system

Question(s) Answered 48, 54 (The Connecticut Light and Power Company) Date Filed: 10/16/2026

This filing on the current system (opens in a new tab)