Skip to main content

A prototype public docket site for the Connecticut Public Utilities Regulatory Authority

Utility Dockets and Filings

Interrogatory responses

Answers to questions 51

Files7

Search terms highlighted
Eversource rate increase is on 3 pages of the text below, highlighted. Go to the first matchClear highlighting
3 pages match
Words on different pages

Text of RRU-051 Attachment 1 .xlsx

Sheet names, column headings and text cells; numbers left out

Words on different pages
No matches

The searchable text of a spreadsheet keeps the sheet names, column headings and text cells. Download the file for the figures.

  1. Part 1

    [Sheet: RRU-051 Attachment 2] EOE-123 | 28548987 Storms Prior to 2025 Service Co Work Orders, Not Related to Minor Events Misc Not included Total Labor and Non-Productive Overhead Cost for 2025 Minor Storms as of 12/31/2025 Labor and Non-Productive Overhead charges received in 2026, included in EOE-013-SP01 Other Payroll Overheads included in EOE-013-SP01 Contractual Meals, included in EOE-013-SP01 Non-Incremental Labor included in EOE-013-SP01 Total Per EOE-013-SP01 EOE-013-SP01 2025 Minor Storm Direct Labor EOE-013-SP01 2025 Minor Storm Payroll Overheads

Text of RRU-051 Attachment 3 .pdf

Extracted from the file · 1 page · 248 characters

Text of RRU-051 Attachment 3 .xlsx

Sheet names, column headings and text cells; numbers left out

As listed on the current system

Question(s) Answered 51 (The Connecticut Light and Power Company) Date Filed: 10/21/2026

This filing on the current system (opens in a new tab)