Skip to main content

A prototype public docket site for the Connecticut Public Utilities Regulatory Authority

Utility Dockets and Filings

Interrogatory responses

Answers to questions 65

ResponseFiled by Connecticut Light and Power Company dba Eversource Energy15 files
Part of docket 26-05-10Open
  • Electric
Application of The Connecticut Light and Power Company d/b/a Eversource Energy to Amend its Rate Schedules

Files15

Search terms highlighted
Eversource rate increase is on 87 pages across 10 files of the text below, highlighted. Go to the first matchClear highlighting
Words on different pages
Words on different pages
12 pages match

Text of RRU-065 Attachment 03.pdf

Extracted from the file · 100 pages · 148,919 characters

Text of RRU-065 Attachment 04.pdf

Extracted from the file · 99 pages · 143,898 characters

Text of RRU-065 Attachment 05.pdf

Extracted from the file · 93 pages · 133,357 characters

Text of RRU-065 Attachment 06.pdf

Extracted from the file · 94 pages · 151,245 characters

4 pages match
  1. Page 11 of 56

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 25, 2026 RRU- 065 Attachment 7 Page 11 of 56 Eversource Energy Postretirement Welfare Plans 7 Actuarial certification This valuation has been conducted in accordance with generally accepted actuarial principles and practices. However, please note the information discussed below regarding this valuation. Reliances In preparing the results presented in this report, we have relied upon information regarding plan provisions, participants, assets, and sponsor accounting policies and methods provided by Eversource and other persons or organizations designated by Eversource. See the Sources of Data and Other Information section of Appendix A for further details. We have relied on all the data and information provided as complete and accurate. We have reviewed this information for overall reasonableness and consistency, but have neither audited nor independently verified this information. Based on discussions with and concurrence by the plan sponsor, assumptions or estimates may have been made if data were not available. We are not aware of any errors or omissions in the data that would have a significant effect on the results of our calculations. The results presented in this report are directly dependent upon the accuracy and completeness of the underlying data and information. Any material inaccuracy in the data, assets, plan provisions or other information provided to us may have produced results that are not suitable for the purposes of this report and such inaccuracies, as corrected by Eversource, may produce materially different results that could require that a revised report be issued. Measurement of benefit obligations, plan assets and balance sheet adjustments Census date/measurement date The measurement date is January 1, 2021. The benefit obligations were measured as of January 1, 2021 and are based on participant data as of the census date, January 1, 2021, which is displayed by Plan in Section 4. Plan assets and balance sheet adjustments Information about the fair value of plan assets was furnished to us by Eversource as of December 31, 2020. This data was reviewed for reasonableness and consistency, but no audit was performed. Accumulated other comprehensive (income)/loss amounts shown in the report are shown prior to adjustment for tax effects. Any tax effects in AOCI should be determined in consultation with Eversource’s tax advisors and auditors. November 2021
  2. Page 12 of 56Match

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 25, 2026 RRU- 065 Attachment 7 Page 12 of 56 8 Eversource Energy Postretirement Welfare Plans Assumptions and methods under U.S. GAAP As required by U.S. GAAP, the actuarial assumptions and methods employed in the development of the other postretirement benefit cost and other financial reporting have been selected by Eversource. Willis Towers Watson has concurred with these assumptions and methods, except for the expected rate of return on plan assets selected as of January 1, 2021. Evaluation of the expected return assumption was outside the scope of Willis Towers Watson’s assignment and would have required substantial additional work that we were not engaged to perform. U.S. GAAP requires that each significant assumption “individually represent the best estimate of a particular future event.” The results shown in this report have been developed based on actuarial assumptions that, to the extent evaluated by Willis Towers Watson, we consider to be reasonable. Other actuarial assumptions could also be considered to be reasonable. Thus, reasonable results differing from those presented in this report could have been developed by selecting different reasonable assumptions. A summary of the assumptions, methods and sources of data and other information used is provided in Appendix A. Note that any subsequent changes in methods or assumptions for the January 1, 2021 measurement date will change the results shown in this report. Certain models (as described in ASOP No. 56) were used in preparing the information presented herein. Further information on these models can be found in Appendix A. Nature of actuarial calculations The results shown in this report are estimates based on data that may be imperfect and on assumptions about future events that cannot be predicted with any certainty. The effects of certain plan provisions may be approximated, or determined to be insignificant and therefore not valued. Reasonable efforts were made in preparing this valuation to confirm that items that are significant in the context of the actuarial liabilities or costs are treated appropriately, and are not excluded or included inappropriately. Any rounding (or lack thereof) used for displaying numbers in this report is not intended to imply a degree of precision, which is not a characteristic of actuarial calculations. If overall future plan experience produces higher benefit payments or lower investment returns than assumed, the relative level of plan costs reported in this valuation will likely increase in future valuations (and vice versa). Future actuarial measurements may differ significantly from the current measurements presented in this report due to many factors, including: plan experience differing from that anticipated by the economic or demographic assumptions, changes in economic or demographic assumptions, increases or decreases expected as part of the natural operation of the methodology used for the measurements (such as the end of an amortization period), and changes in plan provisions or applicable law. Due to the limited scope of our assignment, we did not perform an analysis of the potential range of such future measurements. Retiree group benefits models necessarily rely on the use of approximations and estimates, and are sensitive to changes in these approximations and estimates. Small variations in these approximations and estimates may lead to significant changes in actuarial measurements. See Basis for Valuation in Section 1 above for a discussion of any material events that have occurred after the valuation date that are not reflected in this valuation. Willis Towers Watson Confidential
  3. Page 13 of 56

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 25, 2026 RRU- 065 Attachment 7 Page 13 of 56 Eversource Energy Postretirement Welfare Plans 9 Limitations on use This report is provided subject to the terms set out herein and in our engagement letter dated December 18, 2019 and any accompanying or referenced terms and conditions. The information contained in this report was prepared for the internal use of Eversource and its auditors in connection with our actuarial valuation of the other postretirement benefit plans as described in Purposes of Valuation above. It is not intended for and may not be used for other purposes, and we accept no responsibility or liability in this regard. Eversource may distribute this actuarial valuation report to the appropriate authorities who have the legal right to require Eversource to provide them this report, in which case Eversource will use best efforts to notify Willis Towers Watson in advance of this distribution. Further distribution to, or use by, other parties of all or part of this report is expressly prohibited without Willis Towers Watson’s prior written consent. Willis Towers Watson accepts no responsibility for any consequences arising from any other party relying on this report or any advice relating to its contents. Professional qualifications The undersigned consulting actuaries are members of the Society of Actuaries and meet the “Qualification Standards for Actuaries Issuing Statements of Actuarial Opinion in the United States” relating to other postretirement benefit plans. Our objectivity is not impaired by any relationship between the plan sponsor and our employer, Willis Towers Watson US LLC (“Willis Towers Watson”). Ron King, FSA, MAAA Senior Director, Retirement Gary S. Harper, ASA Director, Retirement November 2021 November 2021 Kathleen Brophy, ASA Senior Associate, Retirement
  4. Page 14 of 56

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 25, 2026 RRU- 065 Attachment 7 Page 14 of 56 10 Eversource Energy Postretirement Welfare Plans Willis Towers Watson Confidential
  5. Page 15 of 56

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 25, 2026 RRU- 065 Attachment 7 Page 15 of 56 Eversource Energy Postretirement Welfare Plans This page is intentionally left blank November 2021 11
  6. Page 16 of 56

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 25, 2026 RRU- 065 Attachment 7 Page 16 of 56 Eversource Energy Postretirement Welfare Plans 12 Section 2: Consolidated accounting exhibits for PBOP 2.1 Balance sheet asset/(liability) All monetary amounts shown in US Dollars Measurement Date 01/01/2021 01/01/2020 (916,849,142) (850,883,278) 2 Fair value of assets (FVA)1 976,024,094 911,456,817 3 Net balance sheet asset/(liability) 59,174,952 60,573,539 B Current and Noncurrent Allocation 1 Noncurrent asset 2 Current liability 3 Noncurrent liability 59,174,952 0 0 60,573,539 0 0 4 Net balance sheet asset/(liability) 59,174,952 60,573,539 C Accumulated Other Comprehensive (Income)/Loss 1 Net prior service cost/(credit) 2 Net loss/(gain) (150,856,856) 220,776,052 (172,560,629) 208,806,757 69,919,196 36,246,128 2.59%3 3.50% 3.26%4 3.50% N/A N/A N/A 01/01/2021 N/A N/A N/A 01/01/2020 A Development of Balance Sheet Asset/(Liability) 1 Accumulated postretirement benefit obligation (APBO) 3 Accumulated other comprehensive (income)/loss2 D Assumptions and Dates 1 Discount rate 2 Annual indexation on annual HRA credit (for certain grandfathered retirees) 3 Current health care cost trend rate 4 Ultimate health care cost trend rate 5 Year of ultimate trend rate 6 Census date 1 Excludes receivable contributions. Amount shown is pre-tax and should be adjusted by plan sponsor for tax effects. 3 Reflects single equivalent discount rate derived from the yield curve provided by Aon Hewitt in January 2021 and the plan’s total cash flows. 4 Reflects single equivalent discount rate derived from the yield curve provided by Aon Hewitt in January 2020 and the plan’s total cash flows. 2 Willis Towers Watson Confidential
  7. Page 17 of 56

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 25, 2026 RRU- 065 Attachment 7 Page 17 of 56 Eversource Energy Postretirement Welfare Plans 2.2 13 PBOP changes in net balance sheet asset/(liability) All monetary amounts shown in US Dollars Fiscal Year Beginning A 1/1/2021 1/1/2020 60,573,539 48,456,239 (10,089,934) (23,198,167) 71,962,601 0 (20,339,757) 0 (7,775,763) (30,897,311) 65,476,939 0 (22,991,014) 7,926,853 0 390,643 0 0 377,596 0 (27,479,941) 0 11 Adjustment to acquisition liability 12 Curtailments 13 Settlements (if settled using corporate cash) 14 Special/contractual termination benefits 7,355,968 0 0 0 0 0 0 0 15 Net balance sheet asset /(liability) at beginning of current period 59,174,952 60,573,539 Reconciliation of Net Balance Sheet Asset/(Liability) 1 Net balance sheet asset/(liability) at beginning of prior period 2 Employer service cost 3 Interest cost 4 Expected return on assets 5 Plan amendments 6 Actuarial gain/(loss) 7 Employer contributions 8 Medicare D contributions 8 Benefits paid directly by the company1 9 Administrative Expenses paid 10 Acquisitions/divestitures 1 Key employee payments November 2021
  8. Page 18 of 56

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 25, 2026 RRU- 065 Attachment 7 Page 18 of 56 Eversource Energy Postretirement Welfare Plans 14 2.3 PBOP changes in liabilities and assets All monetary amounts shown in US Dollars Fiscal Year Beginning A B 1/1/2021 1/1/2020 Change in Accumulated Postretirement Benefit Obligation (APBO) 1 APBO at beginning of prior period 2 Employer service cost 3 Interest cost 4 Actuarial loss/(gain) 5 Plan participants’ contributions 6 Benefits paid from plan assets1 7 Benefits paid from the Company 8 Administrative expenses paid 9 Plan change 850,883,278 10,089,934 23,198,167 61,336,950 516,758 (48,909,275) (390,643) 0 0 780,124,728 7,775,763 30,897,311 80,439,007 692,608 (48,668,543) (377,596) 0 0 10 Acquisitions/divestitures2 11 Adjustment to acquisition liability 12 Curtailments 13 Settlements 14 Special/contractual termination benefits 27,479,941 (7,355,968) 0 0 0 0 15 APBO at beginning of current period 916,849,142 850,883,278 Change in Plan Assets 1 Fair value of assets at beginning of prior period 2 Actual return on assets 3 Employer contributions 4 Plan participants’ contributions 911,456,817 112,959,794 0 516,758 828,580,967 122,924,932 7,926,853 692,608 (48,909,275) (48,668,543) 0 0 0 0 0 0 0 0 0 0 976,024,094 911,456,817 5 Benefits paid1 6 Administrative expenses paid 7 Transfer payments 8 Acquisitions/(divestitures) 9 Settlements 10 Special/contractual termination benefits 11 Fair value of assets at beginning of current period 0 0 0 1 Gross benefit payments, net of retiree contributions Reflects integration of Eversource Gas of Massachusetts (EGMA) during fiscal 2020 effective 10/9/2020 with no impact to AOCI at acquisition date. 2 Willis Towers Watson Confidential
  9. Page 19 of 56

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 25, 2026 RRU- 065 Attachment 7 Page 19 of 56 Eversource Energy Postretirement Welfare Plans 2.4 A. 15 PBOP development of assets for benefit cost 401(h) account All monetary amounts shown in US Dollars Fiscal Year Beginning Reconciliation of Assets 1 Plan assets at 12/31/2019 2 Investment return 3 Employer contributions 4 Plan participants’ contributions 5 Benefits paid 6 Administrative expenses paid Total 261,058,350 25,075,742 0 0 (24,271,576) 0 7 Plan assets at 12/31/2020 B. 261,862,516 Management / Non-Union VEBAs All monetary amounts shown in US Dollars Fiscal Year Beginning Reconciliation of Assets 1 Plan assets at 12/31/2019 2 Investment return 3 Employer contributions 4 Plan participants’ contributions 5 Benefits paid 6 Administrative expenses paid 7 Plan assets at 12/31/2020 September 2021 Non-Union Medical NSTAR Management Life Total 29,262,756 24,531,722 53,794,478 1,253,839 3,105,114 4,358,953 0 0 0 27,339 0 27,339 (778,049) (923,017) (1,701,066) 0 0 0 29,765,884 26,713,819 56,479,704
  10. Page 20 of 56

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 25, 2026 RRU- 065 Attachment 7 Page 20 of 56 Eversource Energy Postretirement Welfare Plans 16 2.4 C. PBOP development of assets for benefit cost (continued) Union VEBAs (includes Non-Union Life) All monetary amounts shown in US Dollars Fiscal Year Beginning Union Medical NUSCO Life (Union & Non-Union) NSTAR Union Life Total Reconciliation of Assets 1 Plan assets at 12/31/2019 2 Investment return 3 Employer contributions 4 Plan participants’ contributions 5 Benefits paid 6 Administrative expenses paid 539,411,557 77,036,584 0 35,032 (15,203,808) 0 34,625,750 3,781,491 0 454,387 (5,858,822) 0 22,566,682 2,705,024 0 0 (1,874,003) 0 596,603,989 83,525,100 0 489,419 (22,936,634) 0 7 Plan assets at 12/31/2020 601,281,365 33,002,807 23,397,703 657,681,874 Willis Towers Watson Confidential

Text of RRU-065 Attachment 08.pdf

Extracted from the file · 54 pages · 97,205 characters

Text of RRU-065 Attachment 09.pdf

Extracted from the file · 59 pages · 100,853 characters

Text of RRU-065 Attachment 10.pdf

Extracted from the file · 58 pages · 100,267 characters

Text of RRU-065 Attachment 11.pdf

Extracted from the file · 59 pages · 99,366 characters

Text of RRU-065 Attachment 12.pdf

Extracted from the file · 1 page · 710 characters

Text of RRU-065 Attachment 13.pdf

Extracted from the file · 1 page · 967 characters

Text of RRU-065 Attachment 13.xlsx

Sheet names, column headings and text cells; numbers left out

As listed on the current system

Question(s) Answered 65 (Connecticut Light and Power Company dba Eversource Energy) Date Filed: 10/09/2026

This filing on the current system (opens in a new tab)